Loading...
HomeMy WebLinkAboutDesign Learned Inc Town of Southold- Letter Board Meeting of August 22, 2006 It®® RESOLUTION 2006-706 Item# 19 ADOPTED DOC ID: 2112 THIS IS TO CERTIFY THAT THE FOLLOWING RESOLUTION NO. 2006-706 WAS ADOPTED AT THE REGULAR MEETING OF THE SOUTHOLD TOWN BOARD ON AUGUST 22,2006: RESOLVED that the Town Board of the Town of Southold hereby authorizes and directs Supervisor Scott A. Russell to execute the amendment to the contract with the Town Of Southold dated February 11, 2005, proposed by Designed Learned, Inc. on August 18, 2006, with the proviso that Designed Learned, Inc. understands the Towns' goal of building an animal shelter at a cost not to exceed $2.1 million(not inclusive of contingencies and approximately $.5 million in site and other work not to be included in prospective bids). , Elizabeth A. Neville Southold Town Clerk RESULT: ADOPTED [S TO 1] MOVER: William P. Edwards, Councilman SECONDER: Daniel C. Ross, Councilman AYES: Edwards, Ross, Wickham, Evans, Russell NAYS:Albert Krupski Jr. Generated August 25, 2006 Page 24 PATRICIA A. FINNEGAN SCOTT A. RUSSELL TOWN ATTORNEY ��OF soalyoSupervisor patricia.fmnegan@ I town.southold.ny.us �� KIERAN M. CORCORAN �r Town Hall Annex, 54375 Route 25 P.O. Box 1179 ASSISTANT TOWN ATTORNEY G Q Southold, New York 11971-0959 kieran.corcoran(c'town.southold.ny.us • ,O LORI HULSE MONTEFUSCO Ol'Y�'OUI� Telephone (631) 765-1939 ASSISTANT TOWN ATTORNEY Facsimile (631) 765-6639 lori.montefusco(&town.southold.ny.us OFFICE OF THE TOWN ATTORNEY TOWN OF SOUTHOLD MEMORANDUM To: Ms. Elizabeth A. Neville, Town Clerk From: Lynne Krauza Secretary to the Town Attorney Date: September 18, 2006 Subject: Contract Addendum with Design Learned Inc. Animal Shelter For your records, I am enclosing an original fully executed Contract Addendum between the Town of Southold and Design Learned Inc. in connection with the referenced matter. Also attached is a copy of the resolution authorizing Scott to sign same. If you have any questions, please do not hesitate to call me. Thank you for your attention. /Ik Enclosures cc: Members of the Town Board (w/encls.) Patricia A. Finnegan, Esq., Town Attorney (w/encls.) Mr. Jamie Richter, Engineering Inspector (w/encls.) ~ 866.DLI.7078 INDOOR AIR QUALITY TOLLFREE HVAC NOISE CONTROL lestgn 860.889.7078T LIGHTING 860.204.0419 F ELECTRICAL earned 116 MAIN STREET PLUMBING Inc. NORWICH,CT 06360 FIRE PROTECTION Specialists in Aninwl Care FQCik Engineering W W W.DESIGNLEARNED.COM Contract Addendum Town of Southold,Town Hall, 53095 Route 25 Southold,New York 11971-0959 (631)765-1889(T) (631)765-1823 (F) Friday,August 18,2006 Reference: Southold Animal Shelter Design Contract dated February 11,2005 This document is an Addendum to our existing contract under Exhibit A Part 2 Section A2.01(A)(3)(additional services)for the purpose of redesigning the animal shelter to meet a smaller budget. I. Town Contact: We understand that we will now report directly to the Council. Mr.Russell and Mr. Wickham will act as liaisons to us for the purpose of communications and decisions. 2. Civil Engineering: Exhibit B (Owner's Responsibilities) Section B2.01(Q)of the original contract states that the Town of Southold will: `Perform or provide the following additional services: All civil engineering, surveying, environmental engineering, and soils engineering". We have assumed that this responsibility remains intact with the Town and that they will provide civil engineering services on the redesigned concept. We will provide: J A redesign for an approximately 6,000 to 8,000 square foot building I The associated changes in building type,building materials,&previous cost saving suggestions I The redesign of the architectural&structural work 4 The redesign of the mechanical,plumbing,electrical,noise control,&animal care equipment J One design meeting to review schematic design concepts approximately one month after approval 4 One meeting to review final construction documents approximately two months after fust meeting I One bid meeting to review the plans with the bidders&respond to questions We will provide the above services for a fixed fee of$80,860. This includes the fees for Design Learned, Inc., Studio a/b,and the structural engineer only. The previous low bid(inclusive of site work)came in at over $320/square foot. This is one of the highest costs we have seen in the nation and astonished us. It is notable that we have had similar cost issues in other New York projects(and only in New York). We will make every effort to bring the new concept in at the budget based on this cost per square foot,however we cannot guarantee that New York contractors will not further increase their costs. The Town understands: "k1d The construction administration portion of the original contract remains intact at$45,500 'k1d This funding is available to us in its entirety during construction 717{ The result of a smaller building will be a need for phasing additional kennel space in the future ')N4 This project will have reduced office space&fewer areas for get-acquainted rooms Observation areas &animal control officer areas will also be reduced or possibly shared 1* There is a risk of animals being caged in hallways and offices during peak periods Ir l SEP 1 8 2006 I MFMHER.S. AMERICAN BoARDLN'G KEmvFLS ASSOCIATION,HUMANE SOCIETYOF THE UNITED STATES - I i • 866.01-1.7078 INDOOR AIR QUALITY TOLLFREE HVAC NOISE CONTROL kes& n 860.889.7078 T LIGHTING 860.204.0419 F ELECTRICAL earned 116 MAIN STREET PLUMBING II1C. NORWICH,CT 06360 FIRE PROTECTION Specialists in Animal Inc. W W.DESIGNLEARNED.COM Care Facility Engineering The Town includes the following proviso: Design Learned,Inc.understands the Town's goal of building an animal shelter at a cost not to exceed $2.1 million(not inclusive of contingencies and approximately$.5 million in site and other work not to be included in prospective bids). For Desig ea� d,Inca For the To of Southold: C. Scott Aarned,Vr,President DLI Mr. Scott Russell, Supervisor MEMBERS: AMERICANBOARD/NGKENNEESASSOCIATION,HUMANESOCIE7YOFTVEUNIPEDSTATES