Loading...
HomeMy WebLinkAboutCore Watershed Protection Area Phase II Sep-88 REPORT of the CORE WATERSHED PROTECTION AREA PHASE II By Robert A. Villa Mark S. McDonald September 27, 1988 , / Recommendations WPA (Sub 4 acre parcels) WPZ (+4 acre parcels) R 80C (Cluster) Conservation, Summary INDEX Open Space, Sumps, Public Lands Page I Page 3 Page 11 Page 13 Page 15 Page 16 Page 1 RECOMMENDATIONS Designate the area outlined on the accompanying map, The Core Water- shed Protection Area. Creat three new zoning districts: the Water Protection Zone (WPZ), the Clustering Zone (R 80C), and the Transfer of Development Rights Receiving Zone (R 80R). WPZ: The WPZ should have a yield of one unit for every town acres (87,120 sq. ft.) but a denisity of no more than one unit for every ten acres. The remainder of the yield left after the owner has used as much of the one unit per ten acres as they wish will be credited toward Transfer of Development Rights to be utilized within the R 80R zone. Yield is to be determined by obtaining the acreage of the of the parcel from a current survey and dividing by two. No yield map is needed. Further controls are listed under the heading Core Watershed Protection Area Regulations. All parcels to be included in the WPZ are listed in the sheets titled WPZ. R 80C: R 80R: The R 80C designation indicates those parcels on the sheet titled R80C are to have manditory clustering outside of the Core Watershed Protection Area. Further controls are listed under the heading Core Watershed Protection Area Regulations. in other respects R80C should be treated as R 80. R 80R is the receiving area for the Transfer of Development Rights generated in WPZ. Those Development Rights can only be used within R 80R and in the following manner. A parcel in R 80R must calculate its normal yield based on R 80 zoning with a yield map. Once such a yield has been determined the final density of the parcel can be increased by up to 50% of the determinded R 80 yield with the use of Transfer of Development Rights from the WPZ. One Page 2 TDR is needed for each one unit of increase up to the +50% figure. In other respects, R 80R should be treated as R 80. CORE WATERSHED PROTECTION AREA REGULATIONS Only above ground storage of petrochemicals and other hazardous materials as described by Article 7 SCDHS will be allowed. No bulk storage of pesticides or fertilizer as per Article 7 SCDHS, The following actions would require a permit. A permit for these actions should only be issued in cases where need is demonstrated and the action does not run counter to the intent of the Core Watershed Protection Area's goals, Any exposure of the water table or the creation of a pond. Clearing of land (woodland, brush, etc.). Topsoil stripping. If a permit to strip topsoil is issued, no topsoild is to be removed from its parcel of land. Lawn care services and landscaping operations are not permittted uses. All community water systems must have their wells within the Core Watershed Protection Area on approved sites. An oversight and review board should be created, or such duties relegated to an existing town agency, to monitor the Core Watershed Protection Area. Such a board should be empowered to review present regulations and propose new regulations to ensure the protection of the Core Water- shed Protection Area. Page 3 WPA (Sub 4 acre parcels) NOTE: Minus sign (-) denotes "less than" Tax Map No. Acreage 68-4-20 1.1 69-1-2 -1 3 -I 5 -1 69-2-1 2.7 2 -I 4 1.7 69-3-1 -1 2 2.1 3 1.1 8 2 69-4-1.1 1 1.2 1.3 1 1.4 2.1 1.2 2.2 -1 3 -1 4 3.6 5 3.4 6 -1 7 3.5 8.2 1 10.1 1.9 10.2 1.8 10.3 2.1 69-4-13 1.4 14 1.3 69-5-1 1.9 2 -1 74-1-9 -1 10 -I 11 -1 12 -1 1:~ -1 14 -1 74-I-15 16 17 18 19 20 21 22 23 37.2 40.2 41 74-2-10.2 10.3 10.4 10.5 11.1 14.1 17 21 23 24 25 26 27 28 29 3O 31 32 33 34 35 37.1 74-3-1.1 2.1 3.1 4.1 5 Page 4 -I -1 -1 -1 -1 -I -1 -1 I -1 1 -I 2 1.9 1.9 2 1 -I 2.3 -1 3.4 -1 -1 -1 -I -1 -1 -1 -1 -1 -1 -1 -1 -1 -1 1.1 1.6 -1 4 74-3-6 7 8 10 11 12 13 14 15 16 17 19.1 20 21 22 23 74-4-2.1 5 7.1 8 9 10 11 13 14.1 14.2 15 16 17 74-5-1 4.1 5 9.2 75-1-1.1 1.2 3 4 5 Page 5 2 2 2.7 3.7' 3.5 84-1-6.1 6.11 1.12 6.13 6.14 6.15 6.16 6.17 7.1 9 84-2-3.2 3.4 4.2 84-4-2 3 4 5 8.1 9 10.2 84-5-1.2 2 3.1 5 7.3 8.1 9 10 11 85-2-2 19 2O 21 95-4-17 18.1 18.2 18.3 18.4 Page 6 1.6 1.3 1.3 1.3 1.3 1.3 -1 -1 1.9 -1 2 -1 -1 -1 3.7 1.3 3.1 -1 -1 -1 -1 -1 -1 -1 1.5 1.6 1.1 1.1 1.4 -1 -1 -1 -1 -1 -1 -1 -1 -1 95-4-18.5 18.6 18.7 18.8 18.9 18.10 18.11 18.12 18.13 18.14 18.15 18.18 18.17 18.18 18.19 18.20 18.21 18.22 18.23 18.24 18.25 18.26 18.27 18.28 18.29 18.30 18.31 18.32 18.33 18.34 18.35 18.36 18.37 18.38 18.39 18.40 19 Page 1.1 I -I -I -1 -1 1.1 1.1 1 1.2 1.2 -1 -1 -1 -1 -1 -I -1 -1 -1 -1 -1 -1 -1 1.1 1.1 -1 -1 -1 -1 1 1.1 -1 -1 1 -1 2.1 Page 8 96-2-2 3 8 96-3-3.1 96-4-I 3 5 6 8.1 96-5-1.1 2 4.1 $ 6 7 8 9 10 11 100-4-9 10 11 101-1-9 10 11 12 13 15.1 15.2 16.2 17 18 20 21 101-2-2 3.2 11.1 12 3.1 2.2 -1 1.6 -1 -I 2.1 2.4 3.3 -1 -1 -1 -1 1.2 -1 2.2 -I 1.8 -1 1.3 1.3 1 -1 -1 -1 -1 -1 -1 -1 1.8 -1 -1 -1 -1 3 -1 -1 -1 Page 9 101-2-13 14 17 18.4 18.5 23 102-1-1.1 1.2 107-5-1.2 2 4 $ 108-1-3 108-2-1 2 3 108-3-2 108-4-19 2O 21 121-3-8 121-4-12.2 12.3 12.4 13 14 15 16 17 18 19 2O 21 22 23 24 25 -1 -I 1.5 -1 1.1 1.2 1.1 2.4 I 2.1 2.5 -1 1.2 2.7 1.7 2.4 3.9 -1 -1 -1 -1 1.4 -1 -1 -1 -1 -1 -1 -1 Page 10 121-4-26 124-I-3. I 3.2 4 5 125-2-1.6 1.14 1.15 1.16 1.17 1.18 1.19 1.5 -1 -1 -1 -1 1.9 2.2 2.3 2.3 2.3 2.3 2.4 WPZ (+4 acre parcels) Tax Map No. 59-10-I 68-4-18 19 69-1-1.3 6 69-2-3 69-4-8.1 9 11 74-2-12.2 12.3 15 22.1 74-4-3.1 4 84-1-25 84-4-1 6.1 7.1 10.1 11 84-5-4 85-1-3 4 85-2-3 96-2-5 7 10 11 96-4-4.3 96-4-1.2 100-4-4 101-1-2.3 4.1 4.3 Page 11 ** denotes presently being subdivided Acreage 12 40 6 21.9 18.2 40.1 5.1 8.3 4 ** 9.3 5.3 5.2 7 9.6 52.2 16.8 ** 9.3 6.3 48.8 7.9 36.5 5.8 ** 4.3 8 12.6 9.5 22.8 34.9 28.5 9.3 15 5.2 50 20.9 14.5 8.4 ** 101-I-8.1 1/4.1 Iq.3 16.2 19 101-2-1 3.1 /4 5 6 7 8 18.3 19 22 107-5-1.1 6.1 107-10-9 '10.1 10.2 108-1-I 2 5.2 108-2-6 7 120-3-11.6 121-I-1 121-3-7 121-/4-8.1 8.2 8.3 8./4 9 10.1 121-5-1 12q-1-2.1 125-1-I 5 12'5-2-1.5 Page 12 32.2 13.3 12.3 10.8 20.0, 6.9 9.1 5.1 10./4 16.7 6 5.7 /4.6 7./4 7.1 18.6 23.3 27.7 10 12.1 7.6 /4.7 12.9 9 12.6 11.6 48.6 42 13.4 /4.7 /4.7 /4.7 50 8.2 13.2 28.5 38 10.6 /4.1 R 80C (Cluster) Tax Map No. 69-I-7.1 8 9 69-3-9.3 69-5-4.1 15.1 18 73-3-1.1 74-1-36 38 40.1 42 74-3-24.1 74-5-6 75-1-6 20 75-2-2 8 9 16 75-4-31 84-1-8 10 84-2-2 3.3 4.1 85-2-1.1 1.2 7 9.1 13 14 15 16 18 Page 13 Total Acreage 36.1 22.3 37.7 15.9 10 45 18.8 56.5 68.4 45.7 51.4 83.7 10.5 14 10.4 50.8 37.8 16.6 18.7 17.6 28 23.9 9.2 21.7 57 86 6.4 11.7 33.7 99 37.2 36.5 37.6 31.4 27.2 ** Denotes presently being subdivided Acreage in CWPA 18 11 19 8 4 15 6 8 28 23 17 25 5 7 5 16 8 5 5 6 14 11 4 11 17 30 4 4 6 15 6 5 6 5 5 86-I-3.2 95-3-3.3 95-4-4.1 11 12 13 96-3-4.1 5 96-5-12. I 97-1-12 100-4-2 3 5.1 8 101-1-5.2 102-1-4 102-2-23 108-3-1 6.1 7 108-4-1 7.1 109-1-10.1 11 13 115-2-2.1 3 6 9.1 10 120-3-11.6 121-3-1 2 121-5-5 125-1-2.25 2.9 14 125-2-2.2 1'27-1-1 Page 14 24.8 39.7 35 13.1 6.2 6.5 38.7 10.9 36.3 42.1 24.1 22.1 38.3 33.1 96.5 31.4 45.7 17.3 28.9 57.6 25.4 39.7 53 77.3 50.4 35.1 17 23.3 20.5 23.8 11.6 47.1 31.5 70.8 23.1 24.8 31.7 36.5 49.6 5 19 17 6.5 3 3 18 4 12 4 12 11 19 16 70 8 6 8 10 15 4 8 6 9 4 4 4 5 5 10 5.5 22 16 34 11 10 5 12 24 Page 15 CONSERVATION, Tax Map No. 59-9-28 69-3-4 71-1-35.57 39 74-2-16 75-2-15.1 76-1-37.3 84-I-7.3 7.4 84-5-1.3 3.2 85-1-2 85-2-17.1 96-2-1 96-3-6.4 97-1-11.2 101-1-1 7.2 101-2-2 9 16 18.6 21.3 OPEN SPACE, SUMPS, PUBLIC LANDS Acreage 23 5 22 2.6 20 12 14.3 6.9 5.6 6 3.6 5.8 7 1.8 21.8 3 1.7 6.9 12.6 20 Page 16 SUMMARY WPZ (Sub 4 acre parcels) WPZ (+ 4 acre TDRs) 359.9 acres (assuming one acre lot minimum) 1208.3 acres 164.1 presently being subdivided ~1044.2 Divided by 2 = 522 rights There are 75 TDR parcels if each has 1 building, then 522 rights minus 75 = 447 TDRs. R 80C (Cluster) 847 acres Conservation, Open Space, Sumps, Public Lands 213.6 acrea