HomeMy WebLinkAbout2008
~\llFfQli'~
~f
RESOLUTION 2007-526
ADOPTED
DOC ID: 2944
THIS IS TO CERTIFY THAT THE FOLLOWING RESOUJTION NO. 2007-526 WAS
ADOPTED AT THE REGULAR MEETING OF THE SOUTHOLD TOWN BOARD ON
JUNE 5, 2007:
RESOLVED that the Town Board of the Town of Southold hereby authorizes and directs
Supervisor Scott A. Russell to execute the Annual Certification Form between tbe NYS
Department of Environmental Conservation and the Town of South old for the POTW
Desil!:n, Planninl!: and Flow Manal!:ement of the Fishers Island Wastewater Treatment
Facilitv, subject to the approval of the Town Attorney.
(T~Q~H~'
Elizabeth A. Neville
Southold Town Clerk
RESULT: ADOPTED [UNANIMOUS]
MOVER: Daniel C. Ross, Councilman
SECONDER: William P. Edwards, Councilman
A YES: Krupski Jr., Edwards, Ross, Wickham, Russell
ABSENT: Louisa P. Evans
ELIZABETH A. NEVILLE
TOWN CLERK
REGISTRAR OF VITAL STATISTICS
MARRIAGE OFFICER
RECORDS MANAGEMENT OFFICER
FREEDOM OF INFORMATION OFFICER
Town Hall. 53095 Main Road
P.O. Box II 79
South old, New York II97I
Fax (63!) 765-6145
Telephone (631) 765-1800
southoldtown. northfork. net
OFFICE OF THE TOWN CLERK
TOWN OF SOUTHOLD
February 29, 2008
Re: POTW Design, Planning & Flow Management
Annual Certification Form
FISHERS ISLAND WWTF, NYOl99214
New York State Department of Environmental Conservation
Division of Water
Bureau of Water Compliance, 4th Floor
625 Broadway
Albany, New York 12233-3506
Dear Sirs:
Enclosed please find the fully executed annual certification for the Fishers Island Sewer
District in accordance with your instructions in your letter of January 29, 2008.
Please contact me at 631 765-1800 ex!. 228, if you should have any questions.
Very truly yours,
~O (1<1//"/
Elizabeth A Neville
Southold Town Clerk
Enclosure
cc: Town Attorney
Town Comptroller
Justice Louisa Evans
ENGINEERED
SOL UTI 0 N S
February 21, 2008
Ms. Elizabeth A. Neville
Town Clerk - Town of South old
Town Hall, 53095 Main Road
P.O. Box 1179
Southold, New York 11971-0959
RE: Fishers Island WWTF
Dear Ms. Neville:
STRUCTURES
REC.....'-"
J..:tvcu
C,' .' ! ! T CI'
)OUli,,,,d. H;wn er~
A completed copy of the Annual Certification Form is enclosed per your request.
The form is ready for Supervisor Scott A. Russell's signature and transmittal.
Respectfully,
DIVERSIFIED TECHNOLOGY CONSULTANTS
C~uu.L{? ~
Michael A. Home, P.E.
Associate
Enclosure
cc: Town Attorney
Town Comptroller
Justice Louisa Evans
5:\2007\07] 17 Fishers Island\I~eners\02-21.()H Neville Annual ('erlilication FOffil.dlK:
DIVERSIFIED TECHNDLDGY CDNSULTANTS
556 WASHINGTON AVENUE NORTH HAVEN CT 06473
203 239 4200
203 234 7376 FAX
NEW YORK STATE DEPARTMENT OF ENVlRONMENTALCONSERV ATION
WASTEWATER TREATMENT FACILITY
. DESIGN, PLANNING AND FLOW MANAGEMENT
2007 ANNUAL CERTIFICATION FORM
WASTEWATER TREATMENT FACILITY NYSDEC SPDES DESIGN
PERMITTEE NAME REGION PERMIT NUMBER FLOW. MGD
FISHERS ISLAND WWTF 01 NY0199214
1. Flow: Compare the annual averal!:e flow to the flow limit in the permit:
All flow calculations must be made based on total flow during calendar year 2007. For wastewater treatment facilities (WWTFs) with
seasonal flow limits, calculate the average flow for each of the seasonal flow limits based on the data collected during calendar year 2007.
If the design flow for the treatment facility is unknown, the design flow should he estimated using the ''Recommended Standards for
Wastewater Facilities, 2004 Edition" (Ten States Standards) which can be ordered from this web site: httu;//www.hes.onv.
For WWTFs monitoring monthly average flow, calculate the average annual flow by averaging the 12 monthly average flows for 2007.
For WWTFs monitoring quarterly average flow, calculate the average annual flow by averaging the 4 quarterly flows for 2007.
For WWTFs monitoring semiannual flow, calculate the average annual flow by averaging the 2 semiannual measurements for 2007.
For WWTFs monitoring annual average flow or 12 month rolling average flow, use the annual average flow calculated for 2007.
*System is a large septic system which removes
high percentage of solids.
Season I
Season 2
(if applicable)
5/1/07-10/1/07
Est.
0.0167 MOD
0.019 MOD
Indicate dates that seasonal limits apply:
10/1/06-5/1/07
. Est.
0.007688
a. What was the actual annual average flow, using the appropriate method above?
b. What is the design flow of the treatment WWTF, multiplied by 95% (0.95)7
0.019
c. Did the annual average flow exceed 95 % of the design flow?
DYes 0 No
If the answer to c. above is m, a Flow Management Plan must be prepared in accordance mth 6 NYCRR Part 750-2.9(c)(I) and
be submltted to the Regional Water Manager no later than Aurust I. 2008 .
d. Has a Flow Management Plan been submitted to the Department? Dyes 0 No
Date submitted:
2. Loadinl!:s: Compare the desil!:n BOD and TSS influent loadinl!:s to the actual BOD and TSS loadinl!:s:
All calculations for Biochemical Oxygen Demand (BOD), or Carbonaceous Biochemical OxygenDemand (CHOD) ifapplicable, and Total
Suspended Solids (TSS) must be made based on total loadings during calendar year 2007. For WWTFs mth seasonal limits, calculate
the average loading for each of the seasonal limits based on the data collected during calendar year 2007. If the design influent loading
for the treatment facility is unknown, the design loading should be estimated using the ''Recommended Standards for Wastewater Facilities,
2().o4 Edition" (Ten States Standards).
For WWTFs monitoring monthly average loadings, use the actual loadings as reported on your DMRs during calendar year 2007.
For WWTFs monitoring quarterly, semiannual, or annual loadings, calculate the actual loadings by averaging the loadings as reported
during calendar year 2007.
For WWTFs that have sand filter systems or other systems with no DMR requirements, check this box;
Septic System
D
Season I
a. The Design influent loading for BOD (or CBOD if applicable) is
b. The Design influent loading for Total Suspended Solids is
n/a
n/a
Season 2
(if applicable)
n/a
n/a
Ibs/d
lbs/d
- CONTINUED ON OTHER SIDE OF FORM-
NEW YORK STATE DEPARTMENT OF ENVIRONMENTALCONSERV ATION
WWTF DESIGN, PLANNING AND FLOW MANAGEMENT
2007 ANNUAL CERTIFICATION FORM
Page2of2
2. Loadin!!s continued:
For WWfFs monitoring monthlv avera!!e loadings:
c. Did the actual influent loading for either BOD (or CBOD) or TSS, as determined from WWTF operational data as submitted on
the DMRs exceed the monthly average design influent loading for any eight calendar months during 20077 DYes [J No
n/a
For WWfFs monitoring Quarterlv loadings:
c. Did the actual influent loading for either BOD (or CBOD) or TSS, as determined from WWTF operational data as submitted on
the DMRs exceed the quarterly average design influent loading for any three quarters during 20077 nl a DYes D No
For WWfFs monitoring semiannnalloadings:
c. Oid the actual influent loading for either BOD (or CBOD) or TSS, as determined from WWTF opcrational data as submitted on
the DMRs exceed the design influent loading for both readings during 2007? n I a DYes D No
For WWfFs monitoring !!!!!y!! loadings:
c. Did the actual influent loading for either BOD (or CBOD) or TSS, as determined from WWTF operational data as submitted on
the DMRs exceed the annnal infIuentloading for 20077 nl a Dyes D No
H the answer to 2.c. ism, a Plan for Future Growth must be. submitted to the Regional Water Manager in accordance with 6
NYCRR Part 750-2.9(c)(2) no later than AUl!ust 1. 2008.
For aU permittees:
d Has a Plan for Future Growth been submitted to the Department? DYes [!] No If yes, date submitted:
e. Has the WWTF discharge exceeded a SPDES permit effluent limit for BOD, CBOD, Ultimate Oxygen Demand or Total
Suspended Solids for any four or more months during two consecutive calendar quarters, or (for facilities with quarterly
monitoring) for two consecutive quarters? n/a Dyes DNo
3. Implementation of Plan for Future Growth and Sewer Moratorium:
H the answers to BOTH 2.0. and 2.e are Ill!. the permittee must begin implementation of the Plan for Future Growth and
immediately cease the approval of further sewer connections to the WWTF in accordaoce with 6 NYCRR 750-2.9(C)(3).
4. Additional Information:
a. Is the facility currently under Order on Consent to address flow and/or loading concerns?
b: Ale additional cormn<,nls and explanations attached to this form?
DYes ~ No
DYes GJ No
Certification Statement
"1 certify under penalty of law that this document and all attachments were prepared under my direction or supervision in
accordance with a system designed to assure that qualified personnel properly gathered and eValuated the information submitted.
Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the
infonnation, the infonnation submitted is, to the best of my knowledge and belief, true, accurate, and complete. 1 am aware that
there are significant penalties for submitting false information, including the possibility of fine and imprisonment for knowing
violations. n
Signature:
,~" ;z
. ~~4
Title:
Supervisor, Town of Southold
Print Name:
Date:
7/7~/OR
This form must be signed by the chief fiscal officer of the permittee
TOWN CLERK COpy
ELIZABETH A. NEVILLE
TOWN CLERK
REGISTRAR OF VITAL STATISTICS
MARRIAGE OFFICER
RECORDS MANAGEMENT OFFICER
FREEDOM OF INFORMATION OFFICER
Town HaU, 53095 Main Road
P.O. Box II 79
Southold, New York II971
Fax (631) 765-6145
Telephone (631) 765-1800
southoldtown .northfork. net
OFFICE OF THE TOWN CLERK
TOWN OF SOUTHOLD
February 8,2008
Fishers Island WWTF
SPEDES Permit # NYO 199214
Michael A. Horne, M.S., P.E.
Diversified Technology Consultants
556 Washington Avenue
North Haven, Connecticut 06473
Dear Horne,
I received the enclosed request from the NYS DEC regarding the Town of Southold annual
certification requirement. Would you please complete this form and return it for the
Supervisor's signature. This form must be completed, signed, and returned to them by March
28, 2008.
Please contact me at 631 765-1800 if should you have any questions, or if I may be of assistance
to you in any way,. Thank you.
Very truly yours,
&~~~~a.YW
Elizabeth A. Neville
Southold Town Clerk
cc: Town Attorney
Town Comptroller
Justice Louisa Evans
~
-...
New York State Department of Environmental Conservation ~
Division of Water Alexander B. Grannis
Bureau of Water Compliance, 4th Floor Commissioner
625 Broadway, Albany, New York 12233-3506
Phone; (518) 402-8177 . FAX: (518) 402-8082
Website: www.dec.state.ny.us
January 29, 2008
SOUTHOLD (T)
POBOX 1179
SOUTHOLD, NY 11971
Re: POTW Design, Planning and Flow Management
Annual Certification Form
FISHERS ISLAND WWTF, NY0199214
Dear Permittee:
The Chief Fiscal Officer of your municipality is required to certifY, in writing to the New
York State Department of Environmental Conservation (the Department), that the municipality is
complying with the provisions of 6 NYCRR Part 750-2.9(c). This certification requirement must
be met by the permittee on an annual basis. The deadline to submit the required certification
form, for calendar year 2007, is March 28, 2008.
The enclosed form and instructions have been developed to assist you in completing the
certification form. The completed form with the authorized signature should be submitted to the
address listed above in the letterhead with a copy to your Regional Office.
Please be advised that failure to submit the required certification form is a violation of
Article 17 of the Environmental Conservation Law of the State of New York and the respective
regulatory provisions found at 6 NYCRR Part 750:-2.9(c). Non-compliance with the certification
requirement may subject your facility to formal enforcement action.
Please contact your Regional Office with any questions that you have regarding this
requirement.
F,.,
r-,-{
~L
Q "o"n
l; L J(j
Si"'~
Koon S. Ta , P; -
Bureau of Water Compliance
Division of Water, NYSDEC
"rr-r.. ""'\
I\t\.....:.. ~ '-U
SOI.~1 -" ,.. -- ,., I..
,,"', ,....... I..,.'~. \..Jr.
NEW YORK STATE DEPARTMENT OF ENVIRONMENTAL CONSERV AnON
WASTEWATER TREATMENT FACILITY
DESIGN, PLANNING AND FLOW MANAGEMENT
2007 ANNUAL CERTIFICATION FORM
WASTEWATER TREATMENT FACILITY NYSDEC SPDES DESIGN
PERMITTEE NAME REGION PERMIT NUMBER FLOW, MGD
FISHERS ISLAND WWTF 01 NY0199214
I. Flow: Compare the annual averal!e flow to the flow limit in the permit:
All flow calculations must be made based on total flow during calendar year 2007. For wastewater treatment facilities (WWTFs) with
seasonal flow limits, calculate the average flow for each of the seasonal flow limits based on the data collected during calendar year 2007.
If the design flow for the treatment facility is unknown, the design flow should be estimated using the "Recommended Standards for
Wastewater Facilities, 2004 Edition" (Ten States Standards) which can be ordered from this web site: http://www.hes.org/.
For WWTFs monitoring monthly average flow, calculate the average annual flow by averaging the 12 monthly average flows for 2007.
For WWTFs monitoring quarterly average flow, calculate the average annual flow by averaging the 4 quarterly flows for 2007.
For WWTFs monitoring semiannual flow, calculate the average annual flow by averaging the 2 semiannual measurements for 2007.
For WWTFs monitoring annual average flow or 12 month rolling average flow, use the annual average flow calculated for 2007.
Season I
Season 2
(if applicable)
Indicate dates that seasonal limits apply:
a. What was the actual annual average flow, using the appropriate method above?
MGD
b. What is the design flow of the treatment WWTF, multiplied by 95% (0.95)?
DYes D No
MGD
c. Did the annual average flow exceed 95 % of the design flow?
If the answer to c. above is m, a Flow Management Plan must be prepared in accordance with 6 NYCRR Part 750-2.9(c)(l) and
be submitted to the Regional Water Manager no later than Au!!ust 1. 2008 .
d. Has a Flow Management Plan been submitted to the Department? DYes D No
Date submitted:
2. Loadinl!s: Compare the desil!n BOD and TSS influent loadinl!s to the actual BOD and TSS loadinl!s:
All calculations for Biochemical Oxygen Demand (BOD), or Carbonaceous Biochemical Oxygen Demand (CBOD) if applicable, and Total
Suspended Solids (TSS) must be made based on total loadings during calendar year 2007. For WWTFs with seasonal limits, calculate
the average loading for each of the seasonal limits based on the data collected during calendar year 2007. If the design influent loading
for the treatment facility is unknown, the design loading should be estimated using the "Recommended Standards for Wastewater Facilities,
2004 Edition" (Ten States Standards).
For WWTFs monitoring monthly average loadings, use the actual loadings as reported on your DMRs during calendar year 2007.
For WWTFs monitoring quarterly, semiannual, or annual loadings, calculate the actual loadings by averaging the loadings as reported
during calendar year 2007.
For WWTFs that have sand filter systems or other systems with no DMR requirements, check this box: D
Season 1 Season 2
(if applicable)
a. The Design influent loading for BOD (or CBOD if applicable) is Ibs/d
b. The Design influent loading for Total Suspended Solids is Ibs/d
- CONTINUED ON OTHER SIDE OF FORM-
NEW YORK STATE DEPARTMENT OF ENVIRONMENTAL CONSER V A TION
WWTF DESIGN, PLANNING AND FLOW MANAGEMENT
2007 ANNUAL CERTIFICATION FORM
Pa~e2of2
2. Loadinl!s continued:
For WWTFs monitoring monthlv averal!e loadings:
c. Did \he actual influent loadiug for either BOD (or CBOD) or TSS, as determiued from WWTF operatioual data as submitted au
Ihe DMRs exceed the mou\hly average desigu influent loading for any eight calendar months during 2007? D Yes D No
For WWTFs monitoring Quarterlv loadings:
c. Did the actual influent loading for either BOD (or CBOD) or TSS, as determined from WWTF operational data as submitted on
the DMRs exceed the quarterly average design influent loading for any three quarters during 2007? DYes D No
For WWTFs monitoring semiannual loadings:
c. Did the actual influent loading for either BOD (or CBOD) or TSS, as determined from WWTF operational data as submitted on
the DMRs exceed the design influent loading for both readings during 20077 DYes D No
For WWTFs monitoring annual loadings:
c. Did the actual influent loading for either BOD (or CBOD) or TSS, as determined from WWTF operational data as submitted on
the DMRs exceed the annual influent loading for 20077 D Yes D No
If the answer to 2.c. is m, a Plan for Future Growth must be submitted to the Regional Water Manager in accordance with 6
NYCRR Part 750-2.9(c)(2) no later than Au!!ust L 2008.
For all permittees:
d. Has a Plan for Future Growth been submitted to the Department? D Yos D No
e. Has the WWTF discharge exceeded a SPDES permit effluent limit for BOD, CBOD, Ultimate Oxygen Demand or Total
Suspended Solids for any four or more months during two consecutive calendar quarters, or (for facilities with quarterly
monitoring) for two consecutive quarters? DYes D No
If yes, date submitted:
3. Implementation of Plan for Future Growth and Sewer Moratorium:
If the answers to BOTH 2.c. and 2.e are m, the permittee must begin implementation of the Plan for Future Growth and
immediately cease \he approval of further sewer connections to the WWTF in accordance with 6 NYCRR 7S0-2.9(C)(3).
4, Additional Information:
DYes D No
DYes D No
a. Is the facility currently under Order on Consent to address flow and/or loading concerns?
b. Are additional comments and explanations attached to this form?
Certification Statement
"1 certify under penalty of law that this document and all attachments "vere prepared under my direction or supervision in
accordance with a system designed to assure that qualified personnel properly gathered and evaluated the information submitted.
Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the
infonnation, the infonnation submitted is, to the best of my knowledge and belief true, accurote, and complete. 1 am aware that
there are significant penalties for submitting false information, including the possibility offine and imprisonment for knowing
violations. "
Print Name:
Title:
Signature:
Date:
This form must be signed by the chief fiscal officer of \he permittee
NEW YORK STATE DEPARTMENT OF ENVIRONMENTALCONSERV ATlON
POTW DESIGN, PLANNING AND FLOW MANAGEMENT
ANNUAL CERTIFICATION FORM
INSTRUCTIONS
Please complete the attached form in accordance with the instructions below. If you have any questions regarding the information to
be submitted or the calculations required for this form, please contact the Regional Water Engineer at the address and phone number
hsted on the RECORDING, REPORTING AND MONITORING page of your SPDES Permit.
1. Flow: Comoare the annual avera1!e flow to the flow limit in the oermit:
All flow calculations must be made based on total flow. For WWTFs with one monthly average flow limit, calculate the averagc
annual now by averaging the 12 monthly average flows reported on the monthly DMRs for calendar year 2007. For WWTFs
monitoring quarterly average flow, calculate the average annual flow by averaging the 4 quarterly flows for 2007. For WVv'TFs
monitoring semiannual flow, calculate the average aIUluaI flow by averaging the 2 semiannual measurements for 2007. For W\,\.-'TFs
monitoring annual average flow or 12 month rolling average flow, use the annual average flow calculated for 2007.
For Vv'\VTFs with seasonal flow limits, calculate the average flow for each of the seasonal flow limits based on the data collected
durmg calendar year 2007. For example, if the facility has seasonal limits that apply from May through October, Season 1 would be
the average flow from May through October, while Season 2 would be the average flow from January through April and November
through December. The dates used for the seasonal flow rate calculations should be included on the form in the space provided. If
either of the seasonal calculations exceed 95% of the design flow, the "Yes" box must be checked and a Flow Management Plan must
be prepared in accordance with 6 NYCRR Part 750-2.9(c)(I) and submttted to the Regtonal Water Engineer no later than August 1,
200B.
If a Flow Management Plan has been previously submitted to the Department, indicate the date of submission on the line in Item l.d.
The design flow of the treatment facility shall be in accordance with that listed in the most recent design documents or treatment plant
ratmg submitted to and approved by this Department. If the design flow for the treatment facility is unknown, the design flow should
be estimated using the "Recommended Standards for Wastewater Facilities, 2004 Edition" (Ten States Standards), which can be
ordered from this website: htto://\vww.hes.org .
'l"he requirements for the flow management plan contained in 6 NYCRR Part 750-2.9(c)( I) are attached for reference.
2. Loadings: Compare the design BOD and TSS influent loadin2s to the actual BOD and TSS loadin2s:
The design influent loadings are not included on the preprinted DMR. These numbers may be found in the facility's engineering
design documents, O&M plans, or in more recent engineering reports if the treatment facility has had a recent upgrade. Use the most
recent design loadings data available for purposes of this calculation. If you cannot locate the facility's design influent loadings
enleria, please conlaclthe plant engineer. If the design loadings for the treatment facility are unknown, the loadings should be
estimated using the "Recommended Standards for Wastewater Facilities, 2004 Edition" (Ten States Standards), which can be ordered
from this website: htto://www.hes.orl! .
If the wastewater treatment facility uses Biochemical Oxygen Demand (BOD) as a measure of treatment system performance, use BOD
loudings in these calculations. If the facility uses CBOD as a measure of treatment system performance, use CBOD loadings in these
calculations.
Facilities with sand filters systems or other systems with no DMR requirements should check the box in Item 2.
To calculate the actual influent loadings in lbs/day, facilities that perform daily sampling should multiply the average monthly
concentration on the DMR (10 mg/I) by the average monthly flow (in MGD) and a conversion factor of8.34. For facilitIes With less
than daily sampling, i.e., monthly, weekly, etc., the daily flow from the POTW on the date that the sample was collected shall be used
to determine the loadings. These individual daily loadings should be averaged for the monthly actual influent loading. For WWTFs
monitoring quarterly, semiannual, or annual loadings, calculate the actual loadings by averaging the loadings as reported during
calendar year 2007.
I f either of the seasonal calculations exceed the design loading, the "Yes" box must be checked. Should the actual influent loading for
either BOD (or CBOD) or TSS exceed the design influent loading, you may include an explanation for these exceedances. Check the
"Yes" box in Item 4.b. if a written explanation is attached. If the facility has previously submitted a Plan for Future Growth. indlcate
the date that the plan was submitted in Item 3.d.
The requirements for the plan for future growth contamed in 6 NYCRH. Part 750-2.9(c)(2) are attached for reference.
3. Implementation of Plan for Future Growth and Sewer Moratorium:
Review the facility's DMRs 10 determine whether the discharge from the 'POTW has exceeded a SPDES permit effluent limit for BOD,
CBOD, Ultimate Oxygen Demand (including 28 day BOD), or Total Suspended Solids for any four or more months during two
consecutive calendar quarters during 2007. If the answer to this question is "Yes", an immediate moratorium on additional sewer
connections shall be imposed and the approval of sewer connections to the POTW must cease immediately. The requirements for the
sewer connection moratorium contained in 6 NYCRR Part 750-2.9(c)(3) are attached for reference.
4. Additional Information:
If the facility is currently under an Order on Consent with the Department that addresses flow and/or loadings concerns, check the
"Yes" box in Item 4.8.
If you have attached additional comments or explanations, check the "Yes" box in Item 4.b.
CERTIFICATION STATEMENT:
This form must be signed by the municipality's chief fiscal officer, such as the mayor, comptroller, treasurer, city manager or chief
financial officer. This person may differ from the person who signs the facility's DMR.
SUBMITTAL INSTRUCTIONS:
Please submit copies of this form by March 28,2008 to the NYSDEC Bureau of Water Compliance, 625 Broadway, Albany NY
12233-3506 and the Regional Water Engineer at the address and phone number listed on the RECORDING, REPORTING AND
MONITORING page of your SPDESPermil.
REGIONAL WATER ENGINEER CONTACT INFORMA nON
Regional Water
Mailing Address: Mail Form to "Regional Water Engineer" Engineer
Telephone
NYSDEC REGION I, SUNY Stony Brook, 50 Circle Road, Stony Brook, NY 11790-3409 (631) 444-0405
NYSDEC REGION 2, One Hunters Point Plaza, 47-40 21st St, Long Island City, NY (718) 482-4933
NYSDEC REGION 3, 21 South Putt Corners, NewPaltz, NY 12561 (845) 256-3000
NYSDEC REGION 3 Sub-Office 100 Hillside Ave. Suite IW White Plains, NY 10603 (914) 428-2505
NYSDEC REGION 4, 1130 North Westcott Road., Schenectady, NY 12306-2014 (518) 357-2045
NYSDEC REGION 5, PO Box 296, 1115 State Route 86, Ray Brook. NY 12977-0296 (518) 897-1241
NYSDEC REGION 5 SUB-OFFICE, PO Box 220, 232 Golf Course Road, Warrensburg, (518) 623-3671
NYSDEC REGION 6, State Office Bldg.,317 Washington St., Watertown, NY 13601-2245 (315) 785-2513
NYSDEC REGION 6 SUB-OFFICE, State Office Building., 207 Genesee St., Utica NY (315) 793-2554
NYSDEC REGION 7, 615 Erie Boulevard West, Syracuse, NY 13204-2400 (315) 426-7500
NYSDEC REGION 8, 6274 East Avon-Lima Rd., Avon, NY 14414-9519 (585) 226-2466
NYSDEC REGION 9,270 Michigan Ave., Buffalo, NY 14203-2999 (716) 851-7070
Part 750 -2.9
(cj POTW DESIGN, PLANNING AND FLOW MANAGEMENT
(I) Flow Management Plan
(i) Within 120 days of when the permittee determines in accordance with paragraph 4 of this subdivision that the annual average flow value
for a calendar year to a POTW has reached or exceeded 95 percent afthat POTW's design flow, the pennittee shall submit to the RcglOnal
\Vatel" Engineer a flow management plan to identify and implement reductions in hydraulic loading to the POTW treatment plant or failing
that, approvable engineering reports, plans and specifications and/or capital improvements as necessary to stabilize annual average flows
belov..' the POTW treatment plant design flow. This plan shall be certified by a professional engineer licensed to practice in the State of
Nev-,' York and endorsed by the chief fiscal officer of the municipality. The provisions of the plan may reflect new efforts or may refer to
existing, ongoll1g efforts, The flow management plan shall, at a minimum, include provisions for:
(a) A statement to the effect that the permittee has the authority in all parts of the POTW service area to implement or cause to
be implemented the provisions of this subdivision or, if the permittee does not have such authority, a proposed schedule, not to
exceed three years, to obtain such authority or a statement from the permittee's designated legal representative that existing law
precludes the permittee from obtaining such authority;
(b) An inventory of all known facilities/projects that have applied to connect to the sewer system and a determination if there is
capacity for connection;
(c) A schedule of implementation for all flow reduction measures identified herein;
(d) A map delineating the service area as defined; and
(e) A description of information that will be reported during implementation of the plan to the Regional Water Engineer and a
schedule for such reporting.
(ii) The l1C1\V management plan required by subparagraph (i) of this paragraph shall also include provisions for implementation of any or
all of the following that are necessary to stabilize influent flows below design flows:
(a) Water conservation measures to reduce customer usage by measures including but not limited to customer metering, meter
calibration, retrofitting existing plumbing fixtures with water conservation fixtures and revision of water rate structures;
(b) Reduction of infiltration and inflow through continuous measures including but not limited to sewer system metering,
evaluation and rehabilitation, removal of roofleaders and footing drains from separate sanitary sewers and installation of separate
storm sewers;
(c) Prevention of future sources of infiltration and inflow where feasible through measures including but not limited to
implementation of standards for sewer installation and requirements to provide for adequate drainage from roofleaders and footing
drains in new construction;
(d) Measures to maximize sewer system and sewage treatment works capacity at a minimum cost; and/or
(e) Approvable engineering reports and/or plans and specifications to assure annual average flows do not exceed 95 percent of
the POTW treatment plant design flow.
(I) Capital improvements necessary to assure annual average flows do not exceed 95 percent of the POT\V treatment plant design
now.
(iii) W ithm 90 days of submittal to the Regional Water Engineer of the plan required under subparagraphs (i) and (ii) of this paragraph.
the peffi1ittee shall begin to implement the provisions of said program in accordance with the proposed schedule or cause the provisions
of said program to be implemented by another party.
(iv) The RegIOnal \Valer Engineer may object to the plan, or implementation of the plan, submitted in accordance with subparagraph (i)
and (ii) of this paragraph if the plan does not provide for substantive and effective measures to reduce hydraulic loading to the POT\V.
\\/11h111 90 days of receIpt of written notification from the Regional Water Engineer documenting the aspects of the plan that must be
revIsed, the pert11ltlee shall submit a revised plan that addresses the department's objection(s).
Part 750 -2.9
(c) POTW DESIGN, PLANNING AND FLOW MANAGEMENT
(2) Planning
(i) Within 120 days of when the permittee determines that the actual influent mass loading of Biochemical Oxygen Demand or Total
Suspended Solids to a POTW has reached or exceeded the design influent loading for those parameters for any eight calendar months
dunng a calendar year, the permittee shall submit a plan for future growth at the POTW. The plan shall include:
(a) Provisions for obtaining any necessary funding; and Part 750 - 2, Page 61 Effective May 11, 2003
(b) Provisions for preparation and submission to the Regional Water Engineer of approvable engineering reports and/or plans and
specifications to provide for growth of discharges in the POTW service area.
(c) A demonstration of the permittee"s ability to impose a connection moratorium in any and all parts of the service area or, if the
penllittee does not have such authority, a proposed schedule, not to exceed three years, to obtain such authority or a statement
from the permittee's designated legal representative that existing law precludes the permittee from obtaining such authority.
(ii) The Regional Water Engineer may object to the plan, nr implementation of the plan, submitted in accordance with subparagraph (i)
of this paragraph if the plan does not provide for substantive and effective measures to accommodate future grov.rth of discharges from the
POTW service area. Within 90 days of receipt of written notification from the Regional Water Engineer documenting the aspects of the
plan that must he revised, the permittee shall submit an approvable, revised plan that addresses the department's objection(s).
(iii) Within 90 days of submittal to the Regional Water Engineer of the plan required under subparagraph (i) ofthis paragraph, the pen11lttee
shall begin to implement the plan to obtain the authority required under clause '(c)' of subparagraph (i) of this paragraph.
(3) Plan Implementation and Sewer Connection Moratorium
For POTWs that have exceeded the design influent loading criteria set forth in paragraph (2) of this subdivision, within 90 days of when
the permittee determines that, in accordance with the annual review required by paragraph (4) of this subdivision, that the effluent discharge
from a publicly owned treatment works has exceeded a SPDES permit limit for Biochemical Oxygen Demand or Ultimate Oxygen Demand
for any four or more months during two consecutive calendar quarters, or a SPDES permit limit for Total Suspended Solids for any four
or more months during two
consecutive calendar quarters, the permittee shall:
(i) Begin to implement the plan developed in accordance with paragraph (2) of this subdivision or in accordance with
subparagraph (i) of that paragraph; and
(ii) Cease the further approval of sewer connections to the POTW.