HomeMy WebLinkAbout32074-Z
FORM NO. 4
TOWN OF SOUTHOLD
BUILDING DEPARTMENT
Office of the Building Inspector
Town Hall
Southold, N.Y.
CERTIFICATE OF OCCUPANCY
No: Z-32687
Date: 10/22/07
THIS CERTIFIES that the building WIRELESS TELECOMM.
Location of Property: 23300 MAIN RD
(HOUSE NO.)
County Tax Map No. 473889 Section 18
(STREET)
Block 5
ORIENT
(HAMLET)
Lot 13.8
Subdivision
Filed Map No.
Lot No.
conforms substantially to the Application for Building Permit heretofore
filed in this office dated
MAY 18, 2006 pursuant to which
Building Permit No. 32074-Z
dated
JUNE 2, 2006
was issued, and conforms to all of the requirements of the applicable
provisions of the law. The occupancy for which this certificate is issued
is CO-LOCATION & WIRELESS COMMUNICATION FACILITY AS APPLIED FOR & AS
PER CONDITIONS OF ZBA #5805 DATED 4/13/06.
The certificate is issued to ORIENT FIRE DISTRICT
(OWNER)
of the aforesaid building.
SUFFOLK COIlllTY DEPARTMENT OF HEALTH APPROVAL
N/A
ELECTRICAL CERTIFICATE NO.
3020318
01/U/07
PLUMBERS CERTIFICATION DATED
N/A
Rev. 1/81
03/21/2007 12:17
00000000
PAGE 02/02
Form No.6
TOWN OF SOUTIIOLD
BUILDING DEPARTMENT
TOWN HALL
765-1802
APPLICATION FOR CERTIFICATE OF OCCUPANCY
This application must be filled in by typewriter or ink and submitted to the Building Department with the following:
A. For new building or new use:
I. Final survey of property with accurate location of all buildings, property lines, streets, and unusual natural Or
topographic features.
2. Final Approval from Health Dept. of water supply and sewerage-disposal (S-9 fonn).
3. Approval of electrical installation from Board of Fire Underwriters.
4. Sworn statement from plumber certifying that the solder used in system conlains less than 2/10 of I % lead.
5. Commercial building, industrial building, multiple residences and similar buildings and installations, a certificate
of Code Compliance from architect or engineer responsible for the building.
6. Submit Planning Board Approval of completed site plan requirements.
B. For existing buildings (prior to April 9, 1957) non-conforming uses, or buildings and "pre-existing" land uses:
I. Accurate survey of property showing all property lines, streets, building and unusual natural or topographic
features.
2. A properly completed application and consent to inspect signed by the applicant. If a Certificate of Occupancy is
denied, the Building Inspector shall Slate the reasons therefor in wliting ttl the applicant.
c. Fees
I. Certificate of Occupancy - New dwelling $25.00, Additions to dwelling $25.00, Alterations to dwelling $25.00,
Swimming pool $25.00, Accessory building $25.00, Additions to accessory building $25.00, Businesses $50.00.
2. Certificate of Occupancy on Pre-existing Building. $100.00
3. Copy of Certificate ofOccupancl' - $.25
4. Updated Celtificate of Occupancy - $5000
5. Temporary Certificate of Occupancy - Residentia] $15.00, Commercial $15.00
/tl //f" /P ?
Date.
New Construction: Ie:: '5 Old or Pre-existing Building:
Location ofProperty; ;?~ 500 MAIN,Pc/. OR/IE 11/7".),
House No. Street
(check one)
/l/ .7 // "1'5' 7
.
Hamlet
Owner or Owners of Property: ~I(/N ""r c:?A/E/IJ T
Suffolk County Tax Map No 1000, Section 17 2...il.QL__ Block. _:::.OC7'-
Subdivision /1/ /"A-- '__ Flied Mop.
/
Permit No. 3 Z~ ? ~ Date of pennit.1'/~~ L Applicant:
Health Depe Approval: V' ._ Underwriters Approval:
Planning Board Approval: /. .
Request for: Temporary Cerlifi::-'--- - Pi:Ccrlificate: __. /" _ (check one)
FeeSubmitted:$ 6~.o~__
Lot ~ /:5 ' ()Cl ,y'
Lot:
#C?xreL
r1 77,d C' ~~D
~.I)J~{)
Co-'C:31.&8'7
FORM NO. 3
TOWN OF SOUTHOLD
BUILDING DEPARTMENT
Town Hall
Southold, N.Y.
BUILDING PERMIT
(THIS PERMIT MUST BE KEPT ON THE PREMISES UNTIL FULL
COMPLETION OF THE WORK AUTHORIZED)
PERMIT NO.
32074 Z
Date JUNE
2, 2006
permission is hereby granted to:
NEXTEL
23300 MAIN ROAD
ORIENT,NY 11957
for :
CO-LOCATION & WIRELESS COMMUNICATION FACILITY PER ZBA #5805 AND
PLANNING AS APPLIED FOR; CERTIFICATION OF INSTALLATION REQUIRED
at premises located at
23300 MAIN RD
ORIENT
County Tax Map No. 473889 Section 018
Block 0005
Lot No. 013.008
pursuant to application dated MAY 18, 2006 and approved by the
Building Inspector to expire on DECEMBER 2, 2007.
Fee $
200.00
/!;t~~ C~
I Authorized Signature
ORIGINAL
Rev. 5/8/02
B2!13!2BB7 12:B8
531-537-945B
THU~1A:; bULU 1 t.Lt.L I "L
r-i-ll1t. U.L
~ ~~~ ~~
@l
~
~
~
~
I
~
~
~
~
~
~
I
~
~
~
~
~
~
~
~
~
~
I
~
~
~
~
W
~
~
~
~
~
~
~
~
;
~
~
~
[01
BY THIS CERTIFICATE OF COMPLIANCE THE
NEW YORK BOARD OF FIRE UNDERWRITERS
BUREAU OF ELECTRICITY
40 FULTON STREET - NEW YORK, NY 10038
CERTIFIES THAT
Upon the appl icatlon of
upon premises OWl1fO by
THOMAS J. GULDI ELEC. INC
PO BOX 3022
BRIDGEHAMPTON, NY 11932,
ORIENT FIRE OFPT
23300 MAIN RD.
ORIENT, NY 11957
Located at
23300 MAIN RD. ORIENT, NY 11957
302031B
Certificate Number:
3020318
Application Number:
Section:
Block:
Lot
Budding Permit 32006
BDC ns11
Commerri~ .
Described as a occupancy. wherein the prelTllses electrl~..ll 5ystelll consistIng of
electrical devices and wiring, described below, located inion the premises at:
First Floor, Outside,
A visual inspection of the premises electrical system, limited to electrical oev'ces and WlrI"!; to the extent detailed
herein, was conducted in accordance wIth the requirements of the applicable 1~1)11e and/or standard
promulgated by the State of New York. Department of State Code Enforcement and /\I~mlnlstrdtion, or otlier
autho"ty having )u"sd1ctlon, and found to be In compliance therewith on the] lth Day of .1:mu",)',2007.
l'hum; QIT Rate Ratin.e. Clrcui\ ~ Ar\1l)llnt
!\Iiscenaneous
feeders from meter
to pre-faD building OIl]Y
ServiC'e
I phase 3 W Service Rating 200 Amperes
Service Disconnect:
Mdcrs: 1
$133.00
200
cb
In\'oict: Total
$]3300
seal
] of
ThIS certificate may not bf:: altered in any way and IS valIdated only by the presence of a raised seal at th,. 111Cr:1tlon mdlc,::ttf=:d
~~~
~.
$000
$0.00
~
I
~
I
~
~
~
i
I
~
I
i
w
I
I
I
~
~
lfu
~
~
I
I
I
. <.
,
.
APPEALS BOARD MEMBERS
Ruth D. Oliva, Chairwoman
Gerard P. Goehringer
James Dinizio, Jr.
Michael A. Simon
Leslie Kanes Weisman
http://southoldtown.northfork.net
,.-
\--:
\,
ZONING BOARD OF APPEALS
TOWN OF SOUTH OLD
Tel. (631) 765-1809 . Fax (631) 765-9064
\ '0 .
\!I\X\
Mailing Address:
Southold Town Hall
53095 Main Road. P.O. Box 1179
Southold. NY 11971-0959
Office Location:
Town Annex /First Floor, North Fork Bank
54375 Main Road ( at Youngs Avenue)
Southold, NY 11971
\\ .......
..r..
..-.--" .'
FINDINGS, DELIBERATIONS AND DETERMINATION
MEETING OF APRIL 13, ;1006
Appl. No. 5805 - CINGULAR WIRELESS; NEXTEL; VERIZON WIRELESS (Co-Applicants)
Zone District: R-80 Residential
Property Location: 23300 Main Road (State Route 25) and T~hM Road, East Ma. ;u,"
CTM 1000-18-5-13.8 OYi~
SEQRA DETERMINATION: The Zoning Board of Appeals has visited the property under
consideration in this application and determines that this review falls under the Type II
category of the State's List of Actions, without an adverse effect on the environment if the
project is implemented as planned.
PROPERTY FACTS/DESCRIPTION: The applicant's property consists of 4.355 acres,
situated on the south side of the Main Road (NYS Route 25) and the east side of Tabor
Road in East Marion. The property is improved with the following buildings and
structures: (a) fire station with an existing antenna facility and (b) detached metal
building.
BASIS OF APPLICATION: Zoning Code Section 100-162A, and the Building Department's, /,
March 14. 2006 Notice of Disapproval, which states the applicants' proposal requires a
Special Exception from the Southold Town Zoning Board of Appeals (and site approval
from the South old Town Planning Board).
CODE PROVISIONS:
TELECOMMUNICATION TOWER -- A telecommunication tower is a type of wireless
communication facility designed and constructed specifically to support an antenna array,
and may include a monopole, self-supporting tower, guy-wire support tower and other
similar structures. A wireless communication facility attached to an existing building or
structure shall be excluded from this definition. [Added 11-12-1997 by L.L. No. 26-1997)
WIRELESS COMMUNICATION FACILITY -- Any unstaffed facility for the transmission
and/or reception of wireless telecommunications services or other radio transmission
and/or receiving service or use usually consisting of a wireless communication facility
array, connection cables, an equipment facility and a support structure to obtain the
necessary elevation. The support structure is either a building, telecommunication or
radio antenna or tower or other approved structure. [Added 11-12-1997 by L.L. No. 26-
1997; amended 2-2-1999 by L.L. No. 3-1999)
,.
.
Page 2 - April 13, 2006
Appl. No. 5805 - Cingular, Nextel, Verizon
18.-5-13.8 at Orient
FINDINGS OF FACT
The Zoning Board of Appeals held a public hearing on this application on March 2, 2006
and March 30, 2006, at which time written and oral evidence were presented. Based upon
all testimony, documentation, personal inspection of the property, and other evidence, the
Zoning Board finds the following facts to be true and relevant:
APPLICANTS' REQUEST: The Applicants are seeking to install a public utility wireless
telecommunications facility at the premises by affixing wireless telecommunications
antennas within an approved pole to be built, and to install related equipment as required
to be functional.
RELATED INFORMATION: The owner of the property, the Orient Fire District (OFD), has a
current building permit (the first having been issued June 22, 2005 under No. 31215), by
the Southold Town Building Inspector for a 90 ft. high telecommunications tower facility.
The OFD has an existing antenna facility at the Orient Fire Station, also used by the Town
Police Department to transmit and receive messages to and from its various mobile units,
marine units and personnel patrolling the areas and adjacent waters. The purpose of the
requested wireless communications tower to provide improved emergency
communication services for the entire area lying east of the East Marion causeway.
Following approvals by the town agencies (but prior to the start of actual construction),
the Commissioners of the OFD retraced their efforts to assure the most unobtrusive
location for the crucially needed tower, and have, with recommendations for local
authorities and members of the Orient community, determined that a location directly
south of the existing main firehouse building would better suit the needs of the District
and the interests of the community. This location is fairly close to where an existing radio
transmission facility is located, which tower will be removed once the new public safety
communications system becomes fully operational.
RELATED FACTS:
The property is 4.35 acres in size, with 341 linear feet along Tabor Road, a side street, 226
linear feet along the Main Road (State Route 25), 570.70 linear feet along the most
southerly property line, and variables along the easterly property line of 169.30 and 287.60
linear feet. The fire house is closest to the Main Road, and the tower is proposed behind
the OFD building. The Orient Fire District has an existing antenna facility at the Orient Fire
Station, also used by the Town Police Department to transmit and receive messages to
and from its various mobile units, marine units and personnel patrolling the areas and
adjacent waters. The purpose of the requested wireless communications tower facility is
to provide Improved emergency communication services for the entire area lying east of
the East Marlon causeway.
The new wireless telecommunications tower is in the process of being constructed at the
rear of the fire house, behind the metal building, on this 4.35-acre parcel. The tower Is
Page 3 - April 13, 2006
Appl. No. 5805 - Clngular, Nextel, Verlzon
18.-5-13.8 at Orient
proposed to be located south of the fire department's metal building located in the rear
yard, distant 145+- feet from the northerly property line at its closest point, 140+- feet from
the easterly property line, 135+- feet from the southerly property line, and at least 315 feet
from Tabor Road to the west.
The telecommunications use requested herein on the same telecommunications tower that
was approved under ZBA Appeal No. 5408 and Building Permit issued June 22, 2005 under
Permit No. 31215-Z to the OFD (special district under Section 100-162A), except that it has
been moved closer to the buildings on the same parcel, and the co-applicants, as public
utilities, wish to co-locate with the consent of the owner/special district (OFD).
RELATED INFORMATION:
By application dated 6/27/03, the OFD stated that an antenna height of at least 90 feet is
mandated, to provide the coverage necessary to reach the furthest extent of the mainland
Southold, on physical sciences governing public service radio communications. The OFD
and Town Policy Public Safety indicate a height at 90 ft. AGL is required, with 'low band'
vertical whip antenna and future carrier antennas (see plans prepared by Michael Walker
Design/Builder dated 10/5/04). At the top of the OFD's tower is a 9'6" dipole array to be
externally mounted, 2.5" in diameter.
During the hearings, concerns were expressed and disputed by residents as to whether or
not the public utility is eligible to place its antenna facility and use on the site, since the
new tower is not existing, although the tower has a valid and current building permit in
effect for its construction.
OTHER CONSIDERATIONS:
In addition to the matters to be considered in Article XXVI of this Code, the Zoning Board
of Appeals has given consideration to the following in issuing a special approval for
wireless communication facilities:
(1) The height of the proposed tower is the minimum necessary to render adequate
service.
(2) The wireless communication facility has been situated to minimize its proximity and
visibility to residential structures, residential district boundaries and landmarks
designated by town, federal or state agencies.
(3) The wireless communication facility is designed and situated to be compatible with the
nature of uses on adjacent and nearby property.
(4) The wireless communication facility has been designed to use the surrounding
topography to minimize its visual Impacts.
, .
Page 4 - April 13, 2006
Appl. No. 5805 - Clngular, Nexlel, Verizon
18.-5-13.8 alOrienl
(5) The wireless communication facility has been designed to use the surrounding tree,
building or foliage coverage to minimize its visual impacts.
(6) The wireless communication facility maximizes design characteristics to reduce or
eliminate visual impacts or obtrusiveness.
(7) Other adequate conditions have been placed on the wireless communication facility
which will minimize any adverse impacts of the facility on adjoining properties.
REASONS FOR BOARD ACTION: On the basis of testimony presented, materials
submitted and personal inspections, the Board makes the following findings:
The new wireless communications tower will be co-located on a new telecommunications
tower, to be constructed in place of the existing OFD telecommunications tower facility,
and will meet the height and restrictions placed by the ZBA under Decision No. 5408.
1. The proposed Communications Facilities consist of the installation of three (3) sets of
panel antennas, each set representing one wireless carrier, internally mounted within a
recently approved 90' high monopole. The monopole will be situated immediately behind
the south end of the OFD firehouse, and associated equipment cabinetry for each carrier
mounted alongside the monopole within a fenced and screen compound. The co-
applicants' proposal represents the least obtrusive means for three (3) FCC licensed
telecommunications carriers to provide service in the vicinity of emergency, fire, police,
ambulance companies and departments need wireless mutual aid communication
systems. The mutual aid and Individual (private) ambulance, radio and other aid
companies are involved with the mutual aid system. There are existing dispatch
problems, problems in scene management, fire safety issues, and fire ground operation
Issues. The fire departments and other companies join together to assist as needed, with
fundamental resources (low-band paging and radios). These systems clearly need to be
improved and expanded and to provide for more effective long-range communications and
senior managing during multiple fire ground and other emergencies. Because safety of
citizens and fire personnel is of primary concern, an improved wireless communications
facility is necessary and desirable.
2. Other experts, including that of members of the Orient community, gave unrebutted
testimony that effective coverage of the subject area can be provided by a
communications tower of 90 feet or less.
3. While safety is the primary concern, other values, such as aesthetic considerations,
character of the neighborhood, and preservation of the scenic nature of the State-
designed Scenic Byways Corridor must be heeded to the extent that they do not
compromise the tower's effectiveness In the locale it is designed to serve. In addressing
visual concerns, the applicant has offered: a) a neutral color and flagpole design, and b)
to locate the structure behind the existing OFD buildings as far south from the Main Road
as feasibly possible. These measures do not satisfy the concerns about visibility, since
!
.
'.
I
pag. s ~ April 13, 2000 :
. App/. No. 6806 ~ Cllt1lulilr, Nextel, Vtllzon
18........0 atOMnt
the tower will be visible particularly at the top half portion of the tower where the llntennas
are Visible over the existing bUildings and tree lines and not screened from view. A tower
structure at 120 feet in height compromises the scenic and historic surroundings along
the state designatied Scenic Highway Corr.idor and is: not consl$lent with tM surrounding
rural ch.racter of this area, with clear Visibility from various segments of the lands
surrounding the Itower site. The installation of these antennas and public utility
telecommunications facility, on a telACommunications tower approved under appeal No.
5408 Ilnd Building[.Permlt #31215..2: Issued June 22, 2005 will be a reasonable alternative to
placing a new tower facility on another site to serve within ths gap of llarvice for this
oommunlty, and will meet th.lltriCt requirement of the zoning Code Section 100.162.4-
4. It Is the Zoninul'Board's determination that the oo-loOlltlon of the three antennas onto a
new 90 fl wirel..S$ communications/telecommunications tower, to be built at this site of
the OFD, 1$ allolNed in the R-80 Residential Low-Density Zone District by Special
exception. '
,
RESOLUTION OF ITHE BOARD: In conslclering all of the .bove factors and applying the
balancing test under New York Town Law 267-6, motion was offered by Member
Goehrlnger, seconded by Member Simon, and duly carried, to
GRANT %.onlng approval under Section 100-162A, for public utility antennas and
telecommitnications use, as applied and sl10wn on the site and pole elevation
maps prepared by Michael Walker signed 3/6/2006 (with ZBA date stamp of March
8, 2008), ~UBJECT TO THE FOLLOWING eONOmON: Applicant shall post a bond,
In the fav.;.r of the Town for the purpose of guaranteeing to the Town that In the
event thti use of tne proposed Tower is dh:continued and not used for
telecommunication purposes. the applicant herein will faithfully cause the tower to
be decommissioned, deconstructed, demolished or otherwise removed from the
site, with the site restored to Its original condition. Basad upon the submission lit
the applu..ant and reviews by the Town Engineering Ins~ctor, the recommended
amount of suC'h bond Shall be not less than $10,000, subject to the approval and
acceptan~ by the Town Board and In a form acceptable to the Town Attorney.
,
,
Vote of the Board: Altes: Members Oliva (Chairwoman
Weisman. This re!solution was duly adopted (5.0).
Getilrd p. Goehringer
~/"Approved for Piling
.
PLANNING BOARD MEMBERS
JERILYN B. WOODHOUSE
Chair
KENNETH L. EDWARDS
MARTIN H. SIDOR
GEORGE D. SOLOMON
JOSEPH L. TOWNSEND
.
MAIUNG ADDRESS:
P.O. Box 1179
Southold, NY 11971
March 30, 2007
OFFICE WCATION:
Town Hall Annex
54375 State Route 25
(cor. Main Rd. & Youngs Ave.)
Southold, NY
Telephone: 631 765-1988
Fax: 631 765-3186
Lawrence C. Re
Munley, Meade, N"lelsen & Re
36 North New YOlK Avenue
Huntington, NY 11743
Re: Proposed Amended Site Plan for Orient PO Telecom
Located on the s/ s/ 0 Main Road at the s/ e intersection of Main Road and Tabor Road in
Orient. SCIM# 1000-18-5-13.8 Zoning District: R-80
PLANNING BOARD OFFICE
TOWN OF SOUTHOLD
Dear Mr. Re:
At the Written request of Edward J. Boyd requesting final site plan inspection, Planning Department
staff performed a site visit on January 4, 2007. In reference to the above, the Planning Board held a
work session on March 19,2007 to discuss the submitted materials, the approved site plan and
resolution dated June 13,2006, the final survey dated December 27, 2006 and the letter from
Vmcent Cannuscio for Michael Walker dated February 7, 2007 detailing the changes from the
approved site plan. Please be aware the Planning Board has accepted the "Final Survey Tower Site
Orient F.D." prepared by PJM Land Surveying, PILe dated December 27, 2006 for the file.
The Planning Board accepts the letter from Vincent Cannuscio for Michael Walker dated February
7, 2007 detailing the changes from the approved site plan. This is to inform you that the site plan
requirements have been satisfied and include the following items:
· The Planning Board approves the installation of all landscaping, including seeding, in the
Spring of 2007. The Planning Board recognizes that, due to weather constraints, this will be
completed no later than June 30, 2007. If the landscaping is not installed by June 30, 2007,
the applicant must request an extension from the Planning Board, in writing, detailing the
expected time of completion.
· As per the landscape survivability guarantee, the applicant agrees to replace any of the
landscaping which fails to survive within three (3) years of planting.
· All outdoor lighting shall be shielded so that the light source is not visible from adjacent
properties and roadways. Lighting fiXtUres shall focus and direct the light in such a manner
as to contain the light and glare within property boundaries. The lighting must meet the
Town Code requirements.
· The Planning Board approves the fencing and relocation of the gates around the equipment
compound as detailed in the letter from Vincent Cannusio for Michael Walker dated
February 7, 2007.
· The applicant agrees to complete the remaining asphalt work no later than June 30, 2007. If
this work is not completed by June 30, 2007, the applicant must request an extension from
the Planning Board, in writing, detailing the expected time of completion.
· The Planning Board acknowledges and approves the revised driveway layout.
.
.
Orient PO Telecom
Page Two
March 30, 2007
lbis letter does not condone any other changes from the approved site plan or approvals from other
agencies if required.
Sincerely,
~.e!fw~
tferi1yn B.'woodhouse
Otairperson
Cc: File
Building Department"
Town Engineer""
Edward J. Boyd, Esq. *
Ene: Letter from Vincent Cannuscio for Michael Walker dated Febnwy7, 2007*
\ -~.__.~.-
\ ...
~ ,/_?-- ,/ > I _. _.... I I ___.,.."
,,'t' k" I / ,\ I I")' " I J
\ '-" ,-, ...-{"d',j ,/",C\jIG'''-,-
('-(:;~--; t""')\(~jJ f t--- )1-- r - -"0
'--' '-_/'
;:;r") :.-:;' -) I ') -)4
_:../\ ...-/"''''''
TOWN OF SOUTH OLD BUILDING DEPT.
765.1802
INSPECTION
[ ] FOUNDATION 1 ST ] ROUGH PLBG.
[ ] FOUNDATION 2ND [] INSULATION
[ ] FRAMING I STRAPPING [ ] FINAL
, .
[ ] FIREPLACE & CHIMNEY Yl!IRE SAFETY INSPECTION
REMAR~:
t' '
2 n~
.<
~ .
El ~i f:;~ ' L ,..,-:;;, 'i"/ rJ vve'r2-t."
-=rl \2{ -~,~.:{lOi;.,.J (-1\ sS.E]:)
,
,',7/ f
,,/ '-t711 -
INSPECTOR/\' , I,> fJ-t:.:: ~
DATE 1- I! - 0 .,
I
3;-0 ?'f~
TOWN OF SOUTHOLD BUILDING DEPT.
765.1802
INSPECTION
[~NDATION 1ST [
[ ] FOUNDATION 2ND [
[ ] FRAMING I STRAPPING [
[ ] FIREPLACE & CHIMNEY [
V
] ROUGH PLBG.
] INSULATION
] FINAL
] FIRE SAFETY INSPECTION
<-
,
-.
DATE (0 j5-;;~
! !
INSPECTOR /
?:> v:/H ~
TOWN OF SOUTH OLD BUILDING DEPT.
765.1802
INSPECTION
[~NDATION 1ST [
[ ] FOUNDATION 2ND [
[ ] FRAMING I STRAPPING [
[ ] FIREPLACE & CHIMNEY [
f3w
REMARKS:
~f:{-UJU. ,
] ROUGH PLBG.
] INSULATION
] FINAL
] FIRE SAFETY INSPECTION
vi
iof~fo.rL
INSPECTOR
DATE
10 /~ /Db
I f
I
(
FIELD INSPECTION-REPORT
FOUNDATION (1ST)
FOUNDATION (2ND)
.
ROUGH FRAMING &
PLUMBING
,
INSULATION PER N. Y.
STATE ENERGY CODE
.
FINAL
COMMENTS
\}J
la/a V" (/)~,":. .. or l' ~ ~: .. ,-7:._ 9i ~
1 I I"" -C1-4 '1*"" . r. ,I " ~) ."2L AZ -,?, 0, ~
I' /:;...,- , <V-- "A.'. ,d,.. 7JtJ:/L _ ~L--. -L 7/1 i ~
, V' i ' 7f " "1 ]--v'
1/0..1 /- -/.' J cJ1f'~ /.... AT (kJH
/ I 1~Jr'.H d' /L-I..1/ ~
.... t/ ~ ~
..
DATE
J l~lXT
/ '1 .h 'f ~~r C/? /1 ?
/ / .4~.';' /...1:. '/?J~../
// 'l ~ ' / - fa *,J.// --A_l~_ ,
y~ ' "/ ~ /// '/
+ ~A" +. 1 Arf A.I "r';-k>.f<; v
. ADDITIONAL COMMENTS
i (1- 07
~~ . '-::z=,'f'~-,~tJ ~/,ASs.:<-;~
, I
..:n J
"-,
,
4
,-
~e
-en
x~
([
f
jz
9
c
:0~
(jJg;
,t"l
U--'..,
8
. ~
r .
)
rGJ~
-t'"
l'"
..,
(')
~
~
r
rc Z
(II (II
,l
.' (<
II ~N
r m 1(\1
rT1 ;tl r
U'
l~
-\
.
~
~ ~
. ""
Q../-
, ~
0, ::l
'-.Jo
z
<-;;
"--, ~
j)~
o
i"l
."
"
TOWN OF SOUTHOLD
BUILDING DEPARTMENT
TOWN HALL
SOUTHOLD, NY 11971
TEL: (631) 765-1802
FAX: (631) 765-9502
www.northfork.net/Southold/
r----
!"I
, ,
---.-
!
BUfLDINGPERMIT APPLICATION CHECKLIST
Do you have or need the following, before applying?
Board of Health
3 sets of Building Plans
,Planning Board approval
, , I Survey
---',_J Check
Septic F onn
N.Y.S.D.E.C.
Trustees
Contact: Lawrence C. Re'
Mail to: Munley, Meade, Nielsen &Re'
36 N. New YorK Avenue
Huntington. NY 11743
Phone: 631-425-4100
Fax: 631-4Z~-41U4
n
{
,
r
~...-....... -...."-
PERMIT NO.
5 .HJ J <f b
C.(;-'20~
2.-,20-d-
Examined
Approved
Disapproved alc
Expiration
I ~/ )_. 20-'!.1
. /
I~
, Building Inspector
APPLlCA nON FOR BUILDING PERMIT
Date
March 6
2006
'-
INSTRUCTIONS
a. This application MUST be completely filled in by typewriter or in ink and submitted to the Building Inspector with 3
sets of plans, accurate plot plan to scale. Fee according to schedule.
b. Plot plan showing location of lot and of buildings on premises, relationship to adjoining premises or public streets or
areas, and waterways.
c. The work covered by this application may not be commenced before issuance of Building Permit.
d. Upon approval of this application, the Building Inspector will issue a Building Permit to the applicant. Such a permit
shall be kept on the premises available for inspection throughout the work.
e. No building shall be occupied or used in whole or in part for any purpose what so ever until the Building Inspector
issues a Certificate of Occupancy.
f. Every building permit shall expire if the work authorized has not commenced within 12 months after the date of
issuance or has not been completed within 18 months from such date. If no zoning amendments or other regulations affecting the
property have been enacted in the interim, the Building Inspector may authorize, in writing, the extension of the permit for an
addition six months. Thereafter, a new permit shall be required.
APPLICATION IS HEREBY MADE to the Building Department for the issuance of a Building Permit pursuant to the
Building Zone Ordinance of the Town of South old, Suffolk County, New York, and other applicable Laws, Ordinances or
Regulations, for the construction of buildings, additions, or alterations or for removal or demolition as herein described. The
applicant agrees to comply with all applicable laws, ordinances, building code, housing code, and regulations, and to admit
authorized inspectors on premises and in building for necessary inspections.
NEXTEL OF NEW YORK, INC.
(Signature of applicant or name, if a corporation)
One North Broadway, White Plains, NY 10601
(Mailing address of applicant)
State whether applicant is owner, lessee, agent, architect, engineer, general contractor, electrician, plumber or builder
Lessee
Name of owner of premises Orient Fire District
(As on the tax roll or latest deed)
If applicant i a corporation signature of duly authorized officer
Bv: p
<N:ame and title of corpora officer)
Glp.nn Ciottone, Project Manager
Builders License No.
Plumbers License No.
Electricians License No.
Jther Trade's License No.
I. Location ofland on which proposed work will be done:
23300 Main Road
House Number Street
Orient
Hamlet
County Tax Map No. 1000 Section
Subdivision
18.00
Block 05.00
Filed Map No.
Lot 013.00A
Lot '
(Name)
2. State existing use and occupancy of premises and intended use and occupancy of proposed construction:
a. Existing use and occupancy Fi rehouse and Pub 1 i c Safety
b. Intended use and occupancy Public Utility Wireless Telecommunications Facility
3. Nature of work (check which applicable): New Building
Repair Removal Demolition
Addition Alteration
OtherWorkTu9~'cn\lnl' l.1t"YtWireltss','t
e co Ir"(' ,nnc::. rlrl 1 y
(Description)
4. Estimated Cost
$60.000.00
Fee
5. If dwelling, number of dwelling units N/ A
If garage, number of cars N/ A
(To be paid on filing this application)
Number of dwelling units on each floor N/ A
6. Ifbusiness, commercial or mixed occupancy, specifY nature and extent of each type of use.
(FH:Firehou.se; A:Accessory B\lilding)
7. DimenSIOns ot eXIsting structures, it any: Front FH:80' A:40' Rear FH:43'; A:40'
Height FH:30 ': A:25' Number of Stories FH:1; A:l
N/A
Depth FH:llO' ; A:80'
Dimensions of same structure with alterations or additions: Front Unchanqed RearUnchanged
Depth Unchanged Height Unchanged Number of Stories Unchanged
8. Dimensions of entire new construction: Front
Height Number of Stories
Rear
Depth
9. Size oflot: Front 226':t
Rear
570':t
Depth 458':t Irregular shaped lot.
10. Date of Purchase November 14,1985 Name of Former Owner Barbara Dwi ght Schriever
II. Zone or use district in which premises are situated Res i denti a 1 R-80
12. Does proposed construction violate any zoning law, ordinance or regulation? YES x NO
- -
13. Will lot be re-graded? YES_NO ~ Will excess fill be removed from premises? YES_NO ~
Orient 23300 Main Road
Fir!' District Address Orient. NY
Wa 1 ker Address S. Dartmouth ,MA
Address
14. Names of Owner of premises
Name of Architect Mi chae 1
Name of Contractor
Phone No.
Phone No 508-287-4313
Phone No.
IS a. Is this property within 100 feet of a tidal wetland or a freshwater wetland? *YES _ NO ~
* IF YES, SOUTHOLD TOWN TRUSTEES & D.E.C. PERMITS MAY BE REQUIRED.
b. Is this property within 300 feet of a tidal wetland? * YES NO x
* IF YES, D.E.C. PERMITS MAY BE REQUIRED. --
16. Provide survey, to scale, with accurate foundation plan and distances to property lines.
17. If elevation at any point on property is at 10 feet or below, must provide topographical data on survey.
-:S~fS<>:'1
STATE OF NEW Y'eftK)
SS:
COUNTY OF ~~e 1'\ )
GLENN CIOTTONE being duly sworn, deposes and says thaI (s)he is Ihe applicant
(Name of individual signing contract) above named,
(S)He is the Project Manager, Nextel of New York, Inc.
(Contractor, Agent, Corporate Officer, etc.) Lessee - Authori zed Agent
of said owner or owners, and is duly authorized to perform or have performed the said work and to make and file this application'
that all statements contained in this application are true to the best of his knowledge and belief; and that the work will be '
performed in the manner set forth in the application filed therewith.
Sworn to before me this h
v""" dayof fY'."" '<:..v 20~
d,,,,,,j) Vv :=f~-0r'.o
Notary Public
By:Nex;;:::y: _
/ Signature of Ap!llicant
Glenn Ciottone, Project Manager
SAMUEL W. TRIPSAS
NOTARY PUBUC OF NEW JERSEY
My Commll8lan Expll'IllI Oct 25. 2009
/
PLANNING BOARD MEMBERS
JERILYN B. WOODHOUSE
Chair
KENNETH L. EDWARDS
MARTIN H. SIDOR
GEORGE D. SOLOMON
JOSEPH L. TOWNSEND
June 13, 2006
Lawrence C. Re
Munley, Meade, Nielsen & Re
36 North New York Avenue
Huntington, NY 11743
B\do,*-
MAIliNG ADDRESS:
P.O. Box 1179
Southold, NY 11971
OFFICE LOCATION:
Town Hall Annex
54375 State Route 25
(cor. Main Rd. & Youngs Ave.)
Southold, NY
Telephone: 631 765-1938
Fax: 631 765-3136
PLANNING BOARD OFFICE
TOWN OF SOUTH OLD
r~1 U 0i ff:r ~ Ir~1'.'I'
I. '" ..' r- -. "h.._ - . '.' ..'"
; "'< i ~., -, -"~ _ ,'~ j
in,! JUN 14~ S ,'.
I I,. I ,; .
I"""" .,
I
1
,
F '_.5'~~'~;~?T~'- -.",-_..1
TOWN OF SOUTHOLQ
Re: Proposed Site Plan for Orient FD Telecom
Located on the slslo Main Road at the sle intersection of Main Road and Tabor
Road in Orient.
SCTM#1000-18-5-13.8 Zoning District: R-80
Dear Mr. Re:
The South old Town Planning Board, at a meeting held on Monday, June12, 2006,
adopted the following resolutions:
The final public hearing was closed.
WHEREAS, the site plan is for the co-location of Nextel @ 85' height, Cingular @ 75'
height & Verizon @ 65' height on a proposed 90' communications flagpole tower with
firelpolice emergency communication mounted on a cross bar @ 90' height and
includes a 43'x46'x 6' high fenced enclosure on a 4.4-acre parcel in the R-80 Zone
located on the slslo Main Road at the sle intersection of Main Road and Tabor Road in
Orient. SCTM# 1000-18-5-13.8; and
WHEREAS, Orient Fire District is the owner of the property located on the slslo Main
Road at the sle intersection on Main Road and Tabor Road in Orient; and
WHEREAS, on March 31,2005, the Southold Town Zoning Board of Appeals granted a
Variance described under Appeal Number 5408 allowing the construction of a 90 ft.
wireless communications flagpole and related equipment enclosure; and
WHEREAS, on November 9, 2005, the agent, Lawrence C. Re, working for New
Cingular Wireless PCS, LLC, submitted an amended formal site plan for approval; and
WHEREAS, on November 18, 2005, the New York State Department of Transportation
responded after review and determined a permit would not be necessary as long as all
work is out of the State ROW; and
/
Orient FD Telecom Project
Page Two
June 13, 2006
WHEREAS, on November 21, 2005, the Orient Fire District responded that no additional
requirements and/or recommendations for fire access are necessary; and
WHEREAS, on November 28, 2005, the Suffolk County Departm,ent of Planning
responded after review and determined this matter is for "local determination as there
appears to be no significant county-wide or inter-community impact(s)" and the Planning
Board accepts this pursuant to 239L & M General Municipal Law; and
WHEREAS, on December 1, 2005, the Architectural Review Committee reviewed the
architectural drawings and associated site plan materials and tabled the application
pending the receipt of further information; and
WHEREAS, on January 12, 2006, the Architectural Review Committee reviewed the
architectural drawings and associated site plan materials and made recommendations;
and
WHEREAS, on April 13, 2006, the Southold Town Zoning Board of Appeals, under
previous Appeal number 5408, granted a Variance described under Appeal Number
5863 allowing the relocation of the communications flagpole and related equipment
enclosure; and
WHEREAS, on April 13, 2006, the Southold Town Zoning Board of Appeals granted a
Variance described under Appeal Number 5805 for public utility antennas and
telecommunications use; and
WHEREAS, on May 30,2006, the Southold Town Building Inspector reviewed and
certified the amended site plan for a "Wireless Communication Facility on an Existing
Telecommunications Tower" use; and
WHEREAS, on May 31,2006, the Southold Town Engineer reviewed the amended site
plan materials regarding the relocation of the wireless communications tower and
related equipment enclosures and requested further information; and
WHEREAS, on June 1, 2006, the Architectural Review Committee reviewed the revised
architectural drawings and associated site plan materials and approved the application
subject to conditions, and, subject to their approval, the Planning Board incorporates
this recommendation in the site plan; and
WHEREAS, on June 12, 2006, the Southold Town Engineer reviewed the amended site
plan materials and approved the drainage of existing conditions along with the proposed
construction subject to comments/conditions and the South old Town Planning Board
incorporates such comments /conditions as requirements in this approval; and
WHEREAS, the Southold Town Planning Board, pursuant to Chapter 58, Notice of
Public Hearing, has received affidavits that the applicant has complied with the
notification provisions; and
I
/
Orient FD Telecom Project
Page Three
June 13, 2006
WHEREAS, the following items shall be required:
1. All outdoor lighting shall be shielded so that the Ii,ght source is not visible from
adjacent properties and roadways. Lighting fixtures shall focus and direct the
light in such a manner as to contain the light and glare within property
boundaries. The lighting must meet town code requirements.
2. All signs shall meet Southold Town Zoning Codes and shall be subject to
approval of the Southold Town Building Inspector.
3. As per the landscape survivability guarantee, the applicant agrees to replace any
of the landscaping which dies within three (3) years of planting; be it therefore
RESOLVED that, on June 12, 2006, the Southold Town Planning Board, acting under
the State Environmental Quality Review Act (6 NYCRR), Part 617.5 c (11&13), makes a
determination that the proposed action is a Type II and not subject to review; and be it
further
RESOLVED, that the Southold Town Planning Board has reviewed the proposed action
under the policies of the Town of Southold Local Waterfront Revitalization Program and
has determined that the action is consistent provided that the best management
practices outlined in the December 23, 2005 memo prepared by the LWRP Coordinator
are implemented; and be it further
RESOLVED, that pursuant to Southold Town Code 100-254 Part I, the applicant agrees
to incorporate all the requirements, comments, and recommendations of each reviewing
agency as referenced above and as indicated on the site plan and corresponding
attachments; and be it further
RESOLVED, that the Southold Town Planning Board grant approval on the site plan
drawings T-1, A-1 & A-2 prepared by Michael Walker Design/Builder, LLC and certified
by Michael Walker, Architect dated December 6, 2004 and last revised March 6, 2006
and authorize the Chairperson to endorse the site plans with the following conditions:
1. The site plan approval requires that all work proposed on the site plan shall be
completed within three (3) years from the date of this resolution.
2. Prior to the request for the Certificate of Occupancy, the owner or authorized
agent must request the said Building Inspector and the Planning Board to
perform an on-site inspection to find the site improvements are in conformity with
the approved amended site plan.
3. If the as-built site improvements vary from the approved amended site plan, the
Planning Board reserves the right to request a certified as-built site plan detailing
all the changes.
I
;'
I
/
. .
Orient FD Telecom Project
Page Four
June 13, 2006
4. Any changes from the approved amended site plan shall require Planning Board
approval, and any such changes without Planning Board approval will be subject
to referral to the Town Attorney's Office for possible legal action.
The Planning Board will issue a final site plan approval in the form of a letter following a
site inspection and at the time the site improvements are found to be in conformance
with the approved site plan.
A copy of the approved amended site plan is enclosed for your records. As per the
Town Code, one copy each will be distributed to the Building Department, Zoning Board
of Appeals and Town Engineer/Highway Department.
If you have any questions regarding the above, please contact this office.
Very truly yours,
t::=
Chairperson
Enc.
cc: Southold Town Zoning Board of Appeals
Southold Town Building Department
Southold Town Engineer
Suffolk County Planning Department
New York State Department of Transportation
File