HomeMy WebLinkAbout1000-117.-8-18 (2)Trustees
Town of Southold
The New Suffolk Civic AsSOoetion wants to convey its concerns about the I;,'oposed expansion of the
existing madna being p~oposed by the Love Lane Acquisition Corporation eqt~ New Suffolk watedront.
As proposed, it W~ll have a ~ofound effect on this hamlet and the surroundin~ ~nanne communities.
Much of this propecty has been used commeroally for over a century: as a submarine base, for
shipbuilding, as a manna and shipyard, and for many decades as the location of a fuel business (coal, home
heating oil. automctive oil, diesel fuel). The result of this activity has been in.eased contamination of the
bay bottom, the harmful effects of which will be aggravated by the proposed dredging.
We have been advised by the Peconic Baykeeper of the roi!owing points:
a Dredging this area will re-suspend and disperse heavy me{als and other pollutants
throughout the area.
b. Eh-edging of this magnitude will remove all of the benthic organisms that may be p~esent in
the bottom and become a Iow-oxygenated pollutant sink.
C. The proposed wave baffle will have an effect on the along-shore currents in the area and
may have an adverse effect on the stability of adjacent shorelines.
d. Enlarging the existing madna from approximately 30 to 70 slips will impact water quality as
a result of more boats and accidental fuel and oil spillages.
We believe that a project of this magnitude deady requires a positive declaration pursuant to the State
Environmental Quality Review Act. It is therefore essential that the developer be required to prepare and
submit a new Draft EIS/EIR. The future of our hamlet is at stake.
Copies to: Charles T. Hamilton
New York State DEC
Building 40
SUNY
Stony Brook, NY 11790
ALSO: Assembtywoman Pab'ida Acompora
State Senator Kenneth T. LaValle
Southold Town Board
Southo~d Town Planning Board
July 9, 2002
Southold Town Board of Trustees
Southold Town Hall
PO Box 1179 - 53095 Main Road
Southold, NY 11971
Re: Cove View Marina - $CTNI#'I 17-8-18
The New Suffolk Civic Association wants to convey its concerns about the proposed expansion of the
existing marina being proposed by the Love Lane Acquisition Corporation on the New Suffolk waterfront.
As proposed, it will have a profound effect on this hamlet and the surrounding marine communities.
Much of this property has been used commercially for over a century:
· As a submarine base, for shipbuilding,
· As a marina and shipyard,
· And for many decades as the location of a fuel business (coal, home heating oil, automotive oil,
diesel fuel).
The result of this activity has been increased contamination of the bay bottom, the harmful effects of which
will be aggravated by the proposed dredging.
We have been advised by the Peconic Bay keeper on the following points:
1. Dredging this area will re-suspend and disperse heavy metals and other pollutants throughout the
area.
2. Dredging of this magnitude will remove all of the benthic organisms that may be present in the
bottom and become a Iow-oxygenated pollutant sink.
3. The proposed wave baffle will have an effect on the along-shore currents in the area and may have
an adverse effect on the stability of adjacent shorelines.
4. Enlarging the existing marina from approximately 30 to 70 slips will impact water quality as a
result of more boats and accidental fuel and oil spillages.
We believe that a project of this magnitude clearly requires a positive declaration pursuant to the State
Environmental Quality Review Act. It is, therefore, essential that the developer be required to prepare and
submit a new Draft EIS/EIR.
The future of our hamlet is at stake.
Sincerely,- ~i~ _. .~
Lauren Grant, President
New Suffolk Civic Association
Cc~
Charles T. Hamilton-NY State DEC
Senator Kenneth T. La Valle
NY State Assemblywoman Patricia Acampora
Southold Town Supervisor Josh Horton and the Southold Town Board
~,Southold Town Planning Board Chairman Bennett Orlowski and the Town Planning Board
Southold Town
Planning Board
NEW sUFFOLK, NY 119:56
NEW SUFFOLK CIVIC ASSOCIATION, INC. POST OFFICE BOX 642
July 9*, 2002
Charles T. Hamilton
Regulatory Approvals
New York State Dept. of Environmental Controls
SUNY Bldg. 40
Stony Brook, NY 11790
Dear Mr. Hamilton:
As Chief Administrator oftbe permitting process relating to the Cove View Marina Project
(Love Lane Acquisition Corp.) in New Suffolk, we are writing as concerned residents and
active members of the New Suffolk Civic Association regarding the proposed Cove View
Marina Project to express our concerns.
Our Civic Association is closely reviewing developments in the permit process and we
would greatly appreciate being kept informed by you. As residents, we have environmental
concerns as well as health and sanitary issues connected with the proposed marina
development.
Thank ~ou.
Wifliam J. S~fllivan
945 Fanning Road Box 317
New Suffolk, NY 119560317
5o' ;thold Town
P nning Boat'd
cc Planning Board J ~
Town Trustees
Committee
Submissio~t Withou! a Cover Letter
Seltder:
Subject:
SCT~I#: 1000-
Dale:
Southold Town
March 15, 2002"
Southold Town Board of Trustees
Town Hall
Soutbold, New York
Re:
COVE VIEW MARINA
SCTM# 117-8-18
Dear Members of the Board,
The New Suffolk Civic Association organized a public meeting at the School in New
Suffolk last fall for the purpose of discussing the above referenced project, and
approximately sixty people from the community attended. The sponsors of the project,
Henry and Mike Raynor, were kind enough to present drawings and answer questions
from those in attendance. Since that time there have been many discussions about the
project in New Suffolk, and there remains serious interest. Other projects have been
proposed for this site in the past, mad the residents question if this, finally, is the right
project for the community. The Civic Association has offered to conununicate their
concerns to 'the relevant regulatory agencies, such as the Board of Trustees. In addition,
you can expect to hear from many New Suffolk residents in person.
Although significantly scaled back from the Marina Bay Club application of fifteen years
ago, and the condo project before that, many of the environmental issues are the same.
Them is concern that the proposed construction, which extends far out into the Bay, will
affect the local ecology, particularly the natural movement of water and sand. The site is
at the edge of the North Race, a narrow strait between Robins Island and the New
Suffolk. Strong tidal currents nmve through the Race, and move significant amounts of
sand along with them. Residents with long experience on the Bay have noted long term
changes in the local sand bars. Of particular concern is a shoal located a few hundred
yards off the point of New Suffolk, which has seemed to grow in recent years, and
become shallower. How would the proposed project affect this condition and the
navigable waters in the immediate vicinity?
There has also been much discussion about how the project will affect the "littoral drift"
of sand along the shoreline. Sand appears to move from west to east, from the shore of
Great Peconic Bay to that of Cutchogue Harbor, past the project site. There is already a
deficit of sand along the eastern beaches of New Suffolk, from the end of Orchard Street,
to well past th~ Old Cove Yacht Club at Old Harbor Road. Beaches along this shore have
· eroded, in part because sand is trapped by the current breakwaters on the project site.
Would not a larger breakwater, projecting further out into the Bay, block more
sand from nourishing this beach? Could worse erosion occur?
NEW SUFFOLK CIVIC ASSOCIATION, ING, POST OFFICE BOX 64~ NEW SUFFOLK, NY 11956
The construction process itself raises some concerns. What will the effect b/: of dredging
potentially contaminated material from the bottom of the existing boat basin? Similarly,
the upland soil has been suspected of contamination for many years. Will samples of
both the basin bottom aud the uplaad soil be collected and tested as part of your
review? If contamlnation is fouud, what level of cleau-up will be a condition ofyour
approval?
Several people have expressed tbe conceru that adequate steps be taken to prevent new
contamination of the Bay and groundwater from the operation of the marina. The facility
may end up functioning as a "dock-ominimn", (live aboard yachts), which will lead to a
greater concentration of impacts. We know there are stringent regulations governing fuel
storage and sanitary waste collection and disposal. Will you be diligeut in your review
of the design .and.operatiag regulatioas of these facilities?
Since a large part of the project involves construction ou underwater land, we
wonder if sufficieut doculueatation of coutinuing title to that land (1838 grant) will
be required?
Many people have expressed the opinion that the new office building aud chandlery, as
proposed, will be in the wrong spot. The fact that it will block the view of the Bay from
Main Street may not be one of your cbief concerns. However, is it not an issue that the
buildiag is far closer to the wetland edge than the typically required 75 feet?
The site ha~ been'an active port, shipyard, submarine base, commercial center, and
marina for over a hundred and filly years. It bas played a central role in the history of
New Suffolk. The ravages of time have brought serious deterioration to the site. Most
people in the community who bare spoken with us are in support of improvements,
however, everyone agrees that the "improvements" must not cause un-intended
environmental, social, or economic consequences, which will be regretted long into the
future. In your thorough evaluatlou of this applicatloa, please seek answers to these
important questions, and remain open to iuput from the community.
Respectfully,
Thomas C. Samuels
President, New Suffolk Civic Association
Cc: Henry Raynor
Town Trustees of the Town of Southol~
Southol~ Town }{all
Main Rsad
Southold, ~ew York
Dear Trustees:
~lar c h~O, 2002
Pnbli~ lie aring
~larch 20, 20~2
Love Lane Acquisition Co~.
11'!.-8-18
I wish to outline a num~e~ of concerns a~out the l{aynors' proposal
to expan~ their marina. As you knew, we in Mew Su~f£olk have trawele~
tills route before. ~an~v of my concerns are the ssme as those ex-
pressed in 1986-87 in regar~ to the then-proposed Marina ~ay Club --
questions equally wall~ to~ay.
1)
What will be the ei'iect s£ t~e bmlkhea~ing and ~oek extensions
on the stability of t~e remainder of the ~ew Sari'elk shoreline
to t~e north, south, and west?
Since all construction would be within a ~esignated floo~ plain,
what would be ti~e impact, of ~ite elevation on storm run-off into
~he Bay an4 onto t~e surrounding upland areas?
3) Prior use of the uplan~ an~ underwater properties as a marina
and submarine base is ~eliewe~ to have resulte~ in contamination
of Doth. What will ~e the effect on marine life of the ~ispersion
of toxic metals in the water ~uring ~re~ging operations an~ ~uring
uplan~ construction? New soil tests are neede~ for the presence
on t~e marine bottom and upland of heavy metals an4 pesticide
residues. To my knowledge t~ere has ~een no environmental elean-
up of the properties.
4) Are any under~%roun~ fuel storage tsl~s propose~? If so, what are
the hazards in a tidal flood plain? What are the plans to handle
possible accidental fuel spills at the decks an~ within the boat
storage building?
5) What is the propcse~ sewage treatment system? Site-specific con-
4itions include tidal influence, a high water table, au4 prier
landfill, if leaching pools are planne~, what amomnt of rainfall
is the system designed to handle? What will prevent exsess storm-
water overflow into the Bay? What ~0W_l~be the effect of wide
seasonal variations in the waste stream flow? Haws there been
percolation test8 and soil ~orings taken on site to ~.etermine
what lea4 t~e ground w~ml~ ~e able to handle? What would be the
el'fect on groundwater flows in t~e area?
6) How much light spillower woul~ there ~e onto the surrounding
hamlet, t~e Bay, and t~e e.pposite residential shore?
What would be the noise is@act ef operational mechanical systems?..
Does the projecte~ operation inclmde safeguards against regular
or continuous live-aboard residence on ~oats, i.e., floating
~ondos?
9) ]~ow could our narrow streets an~ limite~ parking absor~ more than
double the traffic?
Town Trustees page 2 ~,.lareh 20, 2002
Finally, with regard to underwater ownership, does the upland owner ~
in l'act own t~e entire underwater grant area? W~ile the 1838 grant
by J,~ew Yor~ State to.the uplan~ owners appears to be valid, it ~oes
include a condition: unless "all and every part" of the premises
were applied "to'the purposes o£ ¢om~,~eree, by erecting Do~ks an~
' "the grant of the unused
W~arves thereon, and filling in the same,
portion would ~e c~cele~, is it possible that !ess thsuu half the
l'~ew York State grant area has over', the years been utilized by the
uplan~ owners?
In view o~' all taese concerns, surely a new En-~ironmental Impact
Statement must be a requirement.
If some. of these issues fall within the jurisdiction of other
Boards or agencies, I submit t~zat the overriding concern for the
ell'est on ttze hamlet and on t~e Bay shoul~ be a factor .in your
considerations ·
I [zope the Rsynors' marina an~ l~ew Sufi'olk can successfully ~o-
exist, i submit this would have to mean fewer boat slips an~ boats,
J'ewer ears and parking spaces, and an office building that does not
block the foot o~' the main street in the hamlet with its direct
view oi' t~ze Bay. I woul~ hope t~at some consideration could be
given to puulic access.
2002 is not 1~8'f. liowewer, some things remain the same. I quote
a neighbor £rom that time:
"In some measure J~ew Suffolk could be said to have extremely
low threshold levels which would to its inhabitants signal
a perception oI' pollution an~ d~erioration."
Our hamlet is very precious to us s~8 we wish to protect it.
Tt~a~fl~ you for yt~ur attention.
Very truly yours,
jo/~ Robbins
16~W5 12sin Street
Rew Su~'lolk, i{ew York 11956-0147
Town of $outhold Draft Local Waterfront Revitalitxttlon I'ro~ram
years.
North of Meadow Beach spit, a short inlet serves as the mouth for three creeks, East Creek, MUd
Creek, and the Haywater/Broadwaters Coves. This inlet was first dredged in 1966 (434,000 cubic
yards) and now is maintenance-dredged every one to twO"years. -The beach'un-the west side of the
inlet entrance lengthens to the east and into the channel, requiring dredging. The channel used to run
in front of Fishermans Beach, but it now runs straight out from the inlet. A large shoal, not attached
to the shoreline, has formed on the west side of the channel, and a smaller shoal, attached to
Fishermans Beach, is forming. Beaches on either side of the inlet are regularly overwashed during
storms, thereby flooding the houses behind the beach. Observation over time suggests the beaches
have eroded back about 20 feet in the past 20 years.
Further to the west, the Fleets Neck shoreline is exposed to waves traveling west/northwest .from Little
Peconlc Bay across Cutchogue Harbor. The shoreline here is bulkbeaded, and the beach is primarily
fashioned from placement of dredged materials. Bluffs behind the beach rise to about 50 feet.
Wickham Creek was first dredged in 1966 (48,300 cubic yards) and is now dredged regularly.
Between Wickham Creek and Schoolhouse Creek, the shoreline is partially bulkhesded with the
incidence of bulkheadiog decreasing as one moves towards Wickham Creek. This shoreline is open to
waves coming from the east across Cutcboque Harbor. Schoolhouse Creek is privately dredged as
needed. Sand accretes in the vicinity of New Suffolk Marina and the Robins Island ferry slip, which is
dredged yearly by the owner of the island. The entrance to the private ferry slip was recently
reinforced with rocks and the beach areas were stablized with native beach vegetation.
The Town Beach at the foot of 1" Street is open to waves from the south coming across the North Race
from Great Peconic Bay, a distance of about 37,000 feet. According to local residents, however, while
the beach is exposed, it is stable and has not eroded. The shoreline west of the Town beach is backed
by a Iow bluff. Based on observations of the spit at'Kimogener Point (at rite entrance to West Creek),
littoral drift in this section of the Reach is generally from east to west. Wesi Creek was dredged in
1966 (92,500 cubic yards) and continues to bo dredged regularly. At least shice the 1950's, the
shoreline from West Creek to Downs Creek has been eroding except when dredged materials have been
placed on it. Several deteriorating groins are located along this beach.
B. SUblMARY AND CONCLUSIONS
1. Opportunities for land use changes
As a result of the comprehensive Invent6ry and Analysis of Reach 8. three distinct land use situations
were identified within the Reach
areas of existing stable uses
areas subject to development pressure
underutilized sites
The location of these areas and sites ~.e described below and identified on Map ??.
R8-27
Town of $outhold Draft Local Waterfront Re~itallt. atlon Program
Reach 8
ti) Areas of existing stable uses
Most of the southern portion of Reach 8 near the shoreline has been developed as low to medium
density residential uses. These areas are considered to be existing stable uses. Changes within these
'a~s~prob'ab~f"~'~'~-~-i'~ite~ix~af'd'l~"re~~-remaining .-lots and 'renovation-~r---
expansion of existing homes, particularly those located on waterfront property. There is continuing
potential for abuse as waterfront lot owners attempt to obtain area variances for slightly undersized lots
under the guise of setting up "family compounds" or in response to the "spectre" of severe financial
hardship. The wetland areas distributed thrnugbout this reach are also identified as areas of existing
stable uses and they will be protected as natural areas.
(ii) Areas subject to development pressure
Most of the northern part of Reach 8 is subject to development pressure. The remainirlg large lots
located just south of SR 25 in the southern part of Reach 8 also are subject to developme~i pressure.
Some of these lots are still in agricultural production. However, as public water mains continue to be
extended, these areas probably will experienced heightened development pressure due to their close
proximity to very desirable neighborhoods and the availability of potable water.
In the New Suffolk area, in general, there are few vacant infill lots left. However, existing homes,
some seasonal, are being renovated and expanded to the maximum allowed lot coverage. The lack of
public water probably has been the biggest deterrent to increased development pressure in New
Suffolk. The waterfront in the eastern portion of the hamlet has been of great interest to developers,
but the lack 9f public water and the difficulty of disposing of large volumes of wastewater have posed
hitherto insurmountable obstacles.
(iii) Underutilized sites
The Town of Southold has identified underntilized sites within Reach 8. One privately-owned parcel in
particular, the Anchor Inn (formerly known as the Marina Bay Club site), is considered underutilized
and in need of revitalization. This 3.5-acre site once housed the Holland Torpedo Company, which
designed and built some of the first submarines ever built in the United State~. Previous
redevelopment proposals have been dropped due to potential environmental problems and constraints
on the site. Rndevelopment action in this area should seek to maintain the marine-related character of
the New Suffolk waterfront and the continuance of water-dependent u~es, but at a scale appropriate to
the coinmunity. Future development also should be consistent with the property's Marine II zoning
desigt~tion. ToWards that end, the New Suffolk Civic Association has drawn up preliminary land use
plans to be used ns a guide for interested developers. The plans call for a mix of public and private
uses, which would permit shorefront access but also help to maintain the tax base within the school
district. The plan calls for rebuilding the post office and general store in their forraer location near the
intersection of New Suffolk Avenue and 1' Street. This Plan also suggests land uses that will not
cause excessive amounts of automobile traffic or other adverse environmental Impacts
Total public or public-private acquisition of the 3.5-acre property are two options that could lead to the
revitalization of this waterfront. A third option is for the Town to accept a donatio~l of all or part of
the site from the owner. In all cases, ownership of some or all of the property will facilitate obtaining
Brownfields grants to pay for environmental clean-up of the site prior to redevelopment.
R8-28
Town of $outhold DraJ~ Local Waterfront Rev;tnt;v_ntion progrotn
Reach 8
(iv) Areas of Special Concern
The Town of Southold has identified several areas of special concern within Reach 8. These are
geographic areas which may feature natural or cultural resources in need of protection or where key
dey.e!opm¢.n.!,~(gy~r.e~l, e._v~!pp.ment), strategles would revitalize the surrounding neighborhood. These..are~
examined in more detail below and in Sections III and IV.
The Creeks
The primary issues of concern here involve preservation of water quality (so as to maintain the
shellfish resource), harbor management (so as to reduce boater conflicts within the creeks), the
preservation of scenic resources (in the face of inflll development and revitalization efforts) and
the over-intensification of waterfront development Each of these issues affects the creeks to
varying degrees.
..
The Significant Coastal Fish and Wddlife Habitat areas'
Due to the close proximity of residential development to these sensitive habitats, and the
importance of these habitats to the health of the Peconie Estuary as well as to the resident flora
and fauna, the Town must find ways to ensure that these habitats are not further impacted by
human activity. Given the potential for increased septic flows as water front homes are built
or expanded, the location of septic systems should be the focus of greater scrutiny. Finally,
public education as to the negative impacts of the deposition of dog wastes on the beaches and
road ends will assume greater importance as the year-round population increases.
Cutchogue Harbor
Lack of a policy or regulations on bay moorings is of growing concern, particularly as marinas
seek to expand their customer base by offering access to moorings. The potential issues facing
the Town include complaints from waterfront owners on the bay about concentrations of
moorings in front of their properties, the impact on the scenic vistas, traffic congestion within
the Harbor and conflicts with baymen and commercial fishermen with traps or nets in the
vicinity. Also of concern are the long-range impacts of unregulated moorings on the
sbelifishing resource.
Entrance to East and Mud Creeks
The potential loss of public access and scenic vistas due to development of the beach from is of
ongoing concern to the immediate neighborhood, which has long fought the proposed
development of the beach adjacem to Trustee-owned land.
New SVffolk waterfront
The revitalization of this small and unique waterfront is of utmost concern to the r~ldents for
a number of reasons, ranging from improving the tax base to maintaining a cohesive sense of
community. The lack of public water and the environmental sensitivity, not to mention the
historic character, of New Suffolk highlight the need for careful and limited redevelopment.
2. Key Issues
Following a review of the inventory and Analysis, the Town of Southold has Identified a number of
R8-29
Town of Soutbold Draft Local Waterfront Re~itah'zation Program
Reach 8
key issues in Reach 8 that should be examined in tbe LWRP. These issues are examined below.
Further detail about potential responses to these issues is provided in Sections ltl, IV and V, later in
this document.
(i) Agricultural protection .
The entire block of farmland within Reach 8 is crucial to the town and the agricultural industry. This
Reach contains the greatest concentration of vineyards due to the particular confluence of soils, average
days of sunlight, and air moisture. Loss of this land to continued residential iniill will deal a serious
blow to the town's goal of maintaining a core block of land for agricultural purposes. The threat is
greatest south of SR 25 due to the proximity of that farmland to desirable residential.neighborhoods
and the water. But, the threat to the land to the north should not be discounted. The chipping away of
smaller lots into minor subdivisions is taking place now, and is of ongoing concern. The seriousness of
the threat to this agricultural land is obvious from looking at the proposed acquisitions of such land in
the northern part of Reach 8, as shown on the Commmlity Prese. rvatio,~ Project Plan map.
(11) tlarbor management issues
The Harbor Management issues in Reach 8 have to do with two separate issues. One is striking a
balance between use of the creeks for boating and use for shellfishing. The extent of residential
development along most of the shoreline within this Reach precludes simple solutions. It probably will
be necessary to devise harbor management plans, particularly for the Broadwater/Haywater/Mud and
East creek complex and the New Suffolk harbor area. The second is the need for policy and
regulations on bay moorings. Given the lack of sufficient marina dockage to meet the demand from
within this Reach, mooring conflicts will inevitably rise. The spill-over into the bays outside existing
marina has begun to generate complaints and concerns about the environment, particularly where the
boats are used as iive-aboards or for over-night stays. A management plan for designating mooring
fields may have to be considered, along with regulations to ensure that easy access to pump-out
stations are provided.
0il) Public access and recreation
The public access and recreation within this reach is heavily used. Demand is expected to increase as
infill development of the remaining subdivision lots continues. The ultimate demand for public access
will d?end, in the end, on the amount of agricultural land that is converted into resid,ential use. The
limite~i'opportunltles for increasing public access suggests that the Town move aggressively to pursue
them. '
(iv) Protection of Imbltnta mad wetlands
Reach 8 features important wetlands and habitats around the creeks and within Cutcbogue Harbor.
They include the designated SCFWHs at Little Creek and Beach, Cutcbogue Harbor and Robins Island.
Protection of these habitats in the face of continuing residential development will require the initiation
of continuing public education programs about how to respect these habitats. The use of four-wheel
drive vehicles on the benches near nesting areas should be discouraged. Also, as is true elsewhere in
the reach, the walking of dogs on the beaches and at the road ends to relieve themselves is an ongoing
nuisance.
(v) Protection of water quality
The Town and the State need to coordinate efforts to filter stormwater runoff before it is discharged
R8-30
into creeks and coves. The Town has taken the lead in this area by successfully experimenting with
reed beds of various designs and composition. The' State has begun to follow suit, however, at a very
slow pace. To date, their efforts have not led to any construction of stormwater retention facilities
other than standard recharge basins alongside SR 25.
The detrimental impacts from poorly located or malfunctioning cesspools and leaching basins are of
great concern within this Reach. Given the degree of development that has already occurred, the
under-sized nature of many of these lots. and the potential for infill development, it is evident that the
Town will have to develop watershed management plans for individual creeks, particularly the
Brnadwaters-East Creek complex, which has the most intensively developed shoreline within Reach 8.
As summer cottages are expanded into larger, year-round homes, and septic systems are upgraded and
enlarged, the placement of these systems must not further endanger the water quality of the creeks.
ttowever, where if the Town is successful in preserving from development the remaining open space
around the other creeks within the Reach, it will not be necessary to develop watershed m,~nagement
plans for those creeks.
(vi) Flooding and erosion
Flooding within Reach 8 is of major concern in a few key areas: Fisherman's Beach and in the eastern
section of New Suffolk hamlet, along thc New Suffolk Avenue shoreline and near the bridges.
Although Fisherman's Beach road is privately owned and maintained at this time, as the seasonal
dwellings are converted to year-round dwellings, the pressure to improve emergency services to this
area will most likely increase. Within New Suffolk proper, the Iow shoreline elevation and that
shoreline's vulnerability to storm-drlvcn waves from the east can only be countered by either elevating
all strncmres to 10 feet above sea-level or retreating from the shoreline. The shallow lot depths on
New Suffolk's eastern shore preclude the latter option. However, as strncmres are elevated to meet
FEMA requirements, the Town will have to devote more resources and energies into devising safe
emergency evacuation procedures and routes for the waterfront. The same holds true for the shoreline
south of New Suffolk Avenue. During storms, parilcularly those hitting the beach during high tides,
flood waters typically flow across the Avenue into the creeks, effectively cutting off usc of this street.
Erosion is a problem along the Little Hog Neck shoreline, particularly the east side. The extensive
bulkheading and groins that line this shoreline act to prevent the addition of sand to the shoreline drift.
These defense structures may be aggravating the problem rather than mitigating it. Unfortunately,
residential construction continues to take place at the bluff face, sometimes resulting in the destruction
of stabilizing vegetation. Once these bluffs start eroding, it is difficult to reverse the process. Given
the desirablity of the Little Hog Neck (Nassau Point) for upseale residences, it is highly likely that this
shoreline will continue to be m-bulkheaded and re-fortified as time goes on.
(vii) Protection of scenic resources
The scenic resources of Reach 8 are found along SR 25, CR 48, and the local, creek-side roads.
Protection of those resources depends on preserving the agricultural land and the industry from further
intrusions from residemial development. Although some of the creek-side views that are visible from
the roads are in public ownership, a great deal of it is not. The Community Preservation Project Plan
deooted waterfront sites worthy of acquisition. Most of the sites are located in the western part of the
Reach where the most undeveloped land is available. Finally, as mentioned earlier, most of the
agricultural land in the northern part of Reach 8, alongside CR 48, is slated for preservation.
R8-31
Town of $outhold DraJ? Local Waterfront Revitalization Program Reach
(viii) Protection of historic resources
Tile historic resources of Reach 8iare highly significant, reaching back to the earliest days of tile native
American community as well as the English settlers: Fort Corchaug and The Old House at the Village
~'~'~,~r~'~s,,~c.~.s~are included in the National
Extensive planning efforts are being made to improve access to this site without destroying the value of
the site for archeological purposes.
(ix) Transportation management
Traffic congestion within Reach 8 is of considerable concern now. if residential development
contianes, it is likely that congestion problems will worsen. Presently, the State DOT is planning to
expand the capacity of the SR 25 roadway by adding turning lanes, widening the travel lanes and
shoulders, and otherwise facilitating movement of cars through the hamlet of Cutchogue. There is
considerable concern within the business and residential community about these proposed ~hanges for
2001-2003 because of their potential to change the character of the business district into more of a
suburban strip corridor, not to mention the potentially significant loss of small-town character.
R8-32
So
~ 0CT-23-~001 12:38 'IONAL LAND TENURE
TOTAL P,84
SublltLs. ston Wilhou! a Cover Letter
FEB 1 z zuuz
SouthoId Town
Planning Board
MAIN STREET
MAP OF PROPERTY
SITUATE AT
NEW SUFFOLK, TOWN OF SOUTHOLD
SUFFOLK COUNTY, NEW YORK
LOVE LANE ACQUISION CORP.
SC'I'M: 1000-117-8-18
SCAL~: 1"~60~
DINO0~,3
NEW BOAT STORAGE BUILDING
NEW BOATYARD OFFICE
NEW POOL HOUSE & TOOL STORAGE SHED
FRONT ELEVA~ON
MAP OF PROPERTY
SITUATE AT
N~W SUFFOLI~ TOWN OF SOUTHOLD
SUFFOLK COUNTY, NEW YORK
LOVE LANE ACQUISION CORP.
~ 1000-117-8-18
STREET
f
KING STREET
SCTM: 1000-117-8-18
SCALE: 1"=40'
N/O/F
NEW SUFFOLK FISHING STATION
-12
N/OfF
LOT COYERAGE CRITERI^: 784-2001
PARKING CALCULATIONS.
1" = 40'
SITE PLAN
lofl