Loading...
HomeMy WebLinkAboutCross Sound Ferry-Parking Lot Expansion- Appendix AfiIPENDIX TO TRAFFIC IMPACT STUDY FOR PROPOSED CROSS SOUND FERRY PARKING LOT EXPANSION SOUTHOLD, NEW YORK Prepared for: CROSS SOUND FERRY,INC. Prllpllred by: DUNN ENGINEERING ASSOCIATES Planning Board Office Town of South old 53095 Main Rd. Southold, NY 1197 i , SEI'TEM8ER 1997 I I I I I I I I I I I I I I I I I I I PROPERTY OF PLANNING OFFice" TOWN OF SOUTHOLD' I . T able of Contents .1 OCT I 5 1997 i:i; f 'd"d, ! J 1 L. , TRAFFIC VOLUME COUNTS New York State Traffic Volume Counts 1996 Dunn Engineering Traffic Volume Counts Route 25 East of Main Street, Greenport: Friday, August 16, 1996 to Friday, August 23, 1996 Route 25 West of Tabor Road, Orient: Friday, August 16, 1996 to Friday, August 23, 1996 Route 25 East of Narrow River Road, Orient: Friday, August 16, 1996 to Friday, August 23, 1996 Route 25 West of Cross Sound Ferry Terminal, Orient: Friday, August 16, 1996 to Friday, August 23, 1996 Route 25 East of C.R. 48, Greenport: Friday, August 8, 1 997 to Thursday, August 21,1997 Route 25 West of Ferry Entrance, Orient: Friday, August 1, 1997 to Thursday, August 14, 1997 ~ \'~'---"'"",,", ACCIDENT DATA 1991 to June 1995: State Accident Surveillance System Accident Summaries 1996 Reportable Accident Descriptions CAPACITY ANALYSIS Traffic Volumes Used in Capacity Analysis Route 25, Main Street to East Marion Orient Park, Existing Capacity Analysis Route 25, Main Street to East Marion Orient Park, 2002 Capacity Analysis (No-Build) Route 25, Main Street to East Marion Orient Park, 2002 Capacity Analysis (Build) Route 25, Mein Street to East Marion Orient Park, 2007 Capacity Analysis (No Build) Route 25, Main Street to East Marion Orient Park, 2007 Capacity Analysis (Build) Route 25, East Marion/Orient Park to Narrow River Road, Existing Capacity Analysis Route 25, East Marion/Orient Park to Narrow River Road, 2002 Capacity Analysis (No-Build) Route 25, East Marion/Orient Park to Narrow River Road, 2002 Capacity Analysis (Build) Route 25, East Marion/Orient Park to Narrow River Road, 2007 Capacity Analysis (No-Build) Route 25, East Marion/Orient Park to Narrow River Road, 2007 Capacity Analysis (Build) Route 25, Narrow River Road to Eastern Terminus, Existing Capacity Analysis Route 25, Narrow River Road to Eastern Terminus, 2002 Capacity Analysis (No-Build) Route 25, Narrow River Road to Eastern Terminus, 2002 Capacity Analysis (No-Build) Route 25, Narrow River Road to Eastern Terminus, 2002 Capacity Analysis (Build) Route 25, Narrow River Road to Eastern Terminus, 2007 Capacity Analysis (No-Build) Route 25, Narrow River Road to Eastern Terminus, 2007 Capacity Analysis (Build) ROUTE 25. NON-MOTORIZED COUNT SUMMARY Disk #390. Cross Sound Ferry File: Traffic:\Cover i I I I I I I I I I I I I I I '. I I Traffic Volume Counts Disk #390, Cross Sound Ferry File: Dividers I I I I I I I I I I I I I I I I I I I New York State Traffic Volume Counts Disk #390. Cross Sound Ferry File: Dividers I I I I I I I I I I I I I I I I I I I NEW YORK STATE DEPT OF TRANSPORTATION AVERAGE WEEKDAY HOURLY REPORT AM 12-1 1-2 2-3 3-4 4-5 5-6 6-7 7-8 8-9 9-10 10-11 11-12 PM 12-1 1-2 2-3 3-4 4-5 5-6 6-7 7-8 8-9 9-10 10-11 11-12 TOTALS EASTBOUND 2 2 1 2 2 11 85 114 140 .. 73 130 74 88 63 107 68 86 42 41 20 28 14 15 5 1,213 WESTBOUND 4 4 o 4 1 5 27 55 91 60 75 72 98 60 137 89 161 .. 40 70 51 43 33 9 14 1,203 ROUTE 25 NARROW RIVER RD TO ORIENT POINT OCTOBER 1995 FILE NAME RT25 072951095 DAILY TOTAL 2,416 EST. AADT 2,700 .. DENOTES PEAK HOUR I I I I I I I I I I I I I I I I I I I NEW YORK STATE DEFT OF TRANSPORTATION AVERAGE WEEKDAY HOURLY REPORT AM 12-1 1-2 2-3 3-4 4-5 5-6 6-7 7-8 8-9 9-10 10-11 11-12 PM 12-1 1-2 2-3 3-4 4-5 5-6 6-7 7-8 8-9 9-10 10-11 11-12 TOTALS EASTBOUND 5 3 3 2 6 19 98 161 181 ** 118 168 117 140 141 168 138 144 96 76 49 43 28 26 12 1,942 WESTBOUND 3 2 o 4 3 15 56 94 150 115 115 108 159 109 224 ** 158 178 96 90 59 45 36 12 14 1,845 ROUTE 25 CR 48 MIDDLE ROAD TO NARROW RIVER ROAD OCTOBER 1995 FILE NAME RT25 072961095 DAILY TOTAL 3,787 EST. AADT 4,200 ** DENOTES PEAK HOUR I I I I I I I I I I I I I I I I I I I 1996 Dunn Engineering Traffic Volume Counts Disk #390, Cross Sound Ferry File: Dividers I I I I I I I I I I I I I I I I I I I Route 25 East of Main Street Greenport Friday, August 16, 1996 to Friday, August 23,1996 Disk #390, Cross Sound Ferry File: Dividers lO/07/97 9:38:10 I DUNN ENGINEERING ASSOCIATES 66 MAIN STREET WESTHAMPTON BEACH, N.Y. 11978 Page: 1 BASIC COUNT DATA PRINT lite ID : Info 1: I Info 2: actor RT.25 E/O MAIN ROAD EB WB Start Time: Start Date: End Time End Date 13:00 Aug 16, 21:00 Aug 23, 1996 Fri 1996 Fri 1.000 1****************************************************************************** ane #1 Info : EB Lane Mode : Subtraction fensor Used : Axle ****************************************************************************** Date Time :00 :15 :30 :45 Total 1-------------------------------------------- 8/16/96 13:00 105 84 110 115 414 14:00 110 150 104 91 455 15:00 103 103 111 114 431 16:00 145 107 115 130 497 17:00 122 120 119 106 467 18:00 115 114 102 90 421 19:00 82 77 70 74 303 20:00 59 87 75 68 289 21:00 72 76 70 42 260 22:00 65 40 41 39 185 23:00 37 34 26 31 128 I I I EilY Total : Total : M Total : .leak AM Hour: leak PM Hour: 3850 o 3850 ( 0.0%) (100.0%) 497 ( 12.9%) Average period: 85.6 Average Hour 350.0 16:00= Peak AM Factor: Peak PM Factor: 0.857 I I I I I I I I, 0/07/97 -09:38:10 I DUNN ENGINEERING ASSOCIATES 66 MAIN STREET WESTHAMPTON BEACH, N.Y. 11978 Page: 2 ~****************************************************************************** ane #1 Info : EB ane Mode : Subtraction .tensor Used : Axle Ir****************************************************************************** Date Time :00 :15 :30 :45 Total ~-------------------------------------------- ~8/17/96 00:00 17 28 10 15 70 01:00 11 15 5 7 38 02:00 4 10 7 8 29 03:00 6 1 2 6 15 04:00 1 6 6 4 17 05:00 10 10 16 29 65 06:00 46 57 73 43 219 07:00 66 85 62 58 271 08:00 82 122 84 80 368 09:00 121 148 117 116 502 10:00 147 150 150 154 601 11:00 157 175 163 146 641 12:00 173 170 168 172 683 13:00 139 136 164 112 551 14:00 148 155 139 141 583 15:00 127 139 103 121 490 16:00 128 134 108 139 509 17:00 106 111 101 108 426 18:00 113 103 112 82 410 19:00 80 91 83 80 334 20:00 77 88 80 70 315 21:00 54 65 47 42 208 22:00 48 36 39 37 160 23:00 34 29 23 32 118 I I I I I I I Daily Total ~ Total "M Total Peak AM Hour: ,eak PM Hour: I I I I I 7623 2836 4787 10:45= 12:00= Average period: 78.6 Average Hour 317.6 37.2%) 62.7%) 649 ( 683 ( 8.5%) 8.9%) Peak AM Factor: 0.927 Peak PM Factor: 0.987 10/07/97 -e9:38:10 I DUNN ENGINEERING ASSOCIATES 66 MAIN STREET WESTHAMPTON BEACH, N.Y. 11978 Page: 3 '****************************************************************************** ane #1 Info : EB ane Mode : Subtraction liensor Used : Axle 1****************************************************************************** Date Time :00 :15 :30 :45 Total 1-------------------------------------------- 8/18/96 00:00 28 29 15 19 91 01:00 18 16 10 11 55 I 02:00 8 9 8 5 30 03:00 7 5 6 2 20 04:00 2 3 3 7 15 05:00 10 11 7 13 41 I 06:00 42 60 66 51 219 07:00 44 55 72 71 242 08:00 71 88 83 102 344 I 09:00 112 110 111 116 449 10:00 121 141 151 137 550 11:00 161 179 184 178 702 I 12:00 181 169 157 142 649 13:00 152 141 133 152 578 14:00 150 155 161 123 589 15:00 148 107 119 132 506 I 16:00 112 166 109 108 495 17:00 115 120 95 81 411 18:00 90 104 80 82 356 I 19:00 72 79 63 66 280 20:00 58 59 67 47 231 21:00 48 66 42 28 184 I 22:00 19 25 25 13 82 23:00 17 12 17 19 65 Daily Total 7184 Average period: 74.1 ~ Total 2758 38.3%) Average Hour 299.3 M Total 4426 61. 6%) Peak AM Hour: 11:00= 702 ( 9.7%) Peak AM Factor: 0.954 ,eak PM Hour: 12:00= 649 ( 9.0%) Peak PM Factor: 0.896 I I I I I 110/07/97 09:38:10 I DUNN ENGINEERIN~ ASSOCIATES 66 MAIN STREET WESTHAMPTON BEACH, N.Y. 11978 Page: 4 ~****************************************************************************** ane #1 Info : EB ane Mode : Subtraction .eensor Used : Axle Ift****************************************************************************** Date Time :00 :15 :30 :45 Total .--------------------------------------------- 1P8/19/96 00:00 12 15 6 4 37 01:00 6 4 3 1 14 02:00 2 2 5 1 10 03:00 1 2 0 2 5 04:00 4 3 2 2 11 05:00 5 8 10 23 46 06:00 32 57 72 53 214 07:00 50 80 89 66 285 08:00 65 83 76 82 306 09:00 87 95 93 82 357 10:00 87 111 102 112 412 11:00 108 99 128 102 437 12:00 119 133 109 89 450 13:00 101 101 113 86 401 14:00 100 102 103 75 380 15:00 87 82 81 92 342 16:00 88 104 98 93 383 17:00 85 92 90 85 352 18:00 78 82 74 65 299 19:00 54 72 54 52 232 20:00 52 52 37 33 174 21:00 27 45 29 17 118 22:00 18 22 21 21 82 23:00 19 11 14 6 50 I I I I I I I Daily Total P Total "M Total Peak AM Hour: feak PM Hour: I I I I I 5397 2134 3263 10:45= 12:00= Average Period: Average Hour 55.6 224.9 39.5%) 60.4%) 447 ( 450 ( 8.2%) 8.3%) Peak AM Factor: 0.873 Peak PM Factor: 0.846 .0/07/97 ~9:38:10 I DUNN ENGINEERING ASSOCIATES 66 MAIN STREET WESTHAMPTON BEACH, N.Y. 11978 Page: 5 -****************************************************************************** ane #1 Info : EB ane Mode : Subtraction ilensor Used : Axle 11****************************************************************************** Date Time : 00 :15 :30 :45 Total 1-------------------------------------------- 8/20/96 00:00 10 7 5 7 29 01:00 9 5 4 1 19 02:00 3 1 2 1 7 03:00 3 2 1 1 7 04:00 2 1 6 1 10 05:00 4 11 7 15 37 06:00 18 56 51 51 176 07:00 55 94 100 83 332 08:00 62 80 60 69 271 09:00 83 95 88 84 350 10:00 96 101 84 77 358 11:00 86 118 97 80 381 12:00 116 95 91 94 396 13:00 92 87 89 72 340 14:00 89 85 84 92 350 15:00 96 86 95 91 368 16:00 80 104 97 95 376 17:00 82 78 93 82 335 18:00 91 71 81 51 294 19:00 52 59 29 32 172 20:00 40 47 38 38 163 21:00 34 39 32 26 131 22:00 21 16 36 14 87 23:00 11 8 12 14 45 I I I I I I I Daily Total p Total "M Total Peak AM Hour: feak PM Hour: I I I I I 5034 1977 3057 11:00% 12:00% Average Period: 51.9 Average Hour 209.8 39.2%) 60.7%) 381 ( 396 ( 7.5%) 7.8%) Peak AM Factor: 0.807 Peak PM Factor: 0.853 .0/07/97 1t9:38:10 I DUNN ENGINEERING ASSOCIATES 66 MAIN STREET WESTHAMPTON BEACH, N.Y. 11978 Page: 6 ~****************************************************************************** ane #1 Info : EB ane Mode : Subtraction .rensor used : Axle Jr****************************************************************************** Date Time :00 :15 :30 :45 Total 1-------------------------------------------- 8/21/96 00:00 14 6 6 9 35 01:00 4 6 3 2 15 I 02:00 3 2 3 1 9 03:00 0 2 1 4 7 04:00 0 2 2 0 4 05:00 4 5 8 10 27 I 06:00 27 47 40 38 152 07:00 47 79 78 88 292 08:00 81 82 80 53 296 I 09:00 83 87 91 78 339 10:00 87 88 89 64 328 11:00 89 98 120 102 409 I 12:00 76 114 93 105 388 13: 00 90 76 89 82 337 14:00 90 83 93 112 378 15:00 89 92 81 94 356 I 16:00 94 96 66 88 344 17:00 95 110 92 90 387 18:00 77 58 65 53 253 I 19:00 52 55 47 43 197 20:00 30 42 32 32 136 21:00 32 43 54 28 157 I 22:00 22 30 23 23 98 23:00 21 17 14 15 67 Daily Total 5011 Average period: 51. 7 ~ Total 1913 38.1%) Average Hour 208.8 M Total 3098 61. 8%) Peak AM Hour: 11:00= 409 ( 8.1%) Peak AM Factor: 0.852 reak PM Hour: 12:15= 402 ( 8.0%) Peak PM Factor: 0.882 I I I I I 110/07/97 09:38:10 I DUNN ENGINEERING ASSOCIATES 66 MAIN STREET WESTHAMPTON BEACH, N.Y. 11978 Page: 7 It****************************************************************************** ane #1 Info : EB ane Mode : Subtraction .tensor Used : Axle I~****************************************************************************** Date Time :00 :15 :30 :45 Total 1--------------------------------------------- 08/22/96 00:00 15 7 10 4 36 01:00 4 8 4 4 20 02:00 3 3 0 6 12 03:00 2 4 2 1 9 04:00 1 3 4 3 11 05:00 5 8 8 14 35 06:00 22 51 66 36 175 07:00 53 80 77 70 280 08:00 69 65 79 73 286 09:00 95 116 105 77 393 10:00 101 97 77 97 372 11:00 100 114 87 108 409 12:00 106 117 109 94 426 13:00 77 95 91 101 364 14:00 75 83 82 95 335 15:00 85 94 102 101 382 16:00 118 96 83 92 389 17:00 100 105 76 75 356 18:00 89 102 76 63 330 19:00 56 76 52 57 241 20:00 43 41 40 39 163 21:00 54 51 32 29 166 22:00 31 30 19 17 97 23:00 16 11 16 15 58 I I I I I I I Daily Total P Total -=,M Total Peak AM Hour: teak PM Hour: I I I I I 5345 2038 3307 11:00= 12:00= Average period: Average Hour 55.1 222.7 38.1%) 61. 8%) 409 ( 426 ( 7.6%) 7.9%) Peak AM Factor: 0.897 Peak PM Factor: 0.910 .0/07/97 -09:38:10 I DUNN ENGINEERING ASSOCIATES 66 MAIN STREET WESTHAMPTON BEACH, N.Y. 11978 Page: 8 -****************************************************************************** ane #1 Info : EB ane Mode : Subtraction .tensor Used : Axle If****************************************************************************** I I I I I I Date Time :00 :15 :30 :45 Total 1-------------------------------------------- 8/23/96 00:00 15 7 3 2 27 01:00 10 3 4 6 23 02:00 6 5 3 5 19 03:00 2 2 1 1 6 04:00 2 1 3 4 10 05:00 5 8 10 15 38 06:00 29 55 61 45 190 07:00 62 89 69 82 302 08:00 70 81 77 79 307 09:00 81 102 107 84 374 10:00 115 104 109 95 423 11:00 102 105 124 102 433 12:00 119 133 128 135 515 13:00 112 114 96 110 432 14:00 89 126 111 97 423 15:00 92 107 97 102 398 16:00 115 128 111 103 457 17:00 134 118 126 100 478 18:00 101 106 86 92 385 19:00 88 92 86 71 337 20:00 71 90 78 62 301 21:00 93 93 ~aily Total : aM Total : PM Total leak AM Hour: eak PM Hour: 5971 2152 3819 11:00= 12:00= 36.0%) 63.9%) 433 ( 515 ( Average Period: 70.2 Average Hour 271.4 7.2%) 8.6%) Peak AM Factor: 0.873 Peak PM Factor: 0.954 I I I I I I 110/07/97 09:38:10 I DUNN ENGINEERING ASSOCIATES 66 MAIN STREET WESTHAMPTON BEACH, N.Y. 11978 Page: 9 It******************************************************************************* ane #2 Info : WB ane Mode : Subtraction Sensor Used : Axle It****************************************************************************** Date Time :00 :15 :30 :45 Total .--------------------------------------------- 1P8/16/96 13:00 76 113 90 82 361 14:00 133 89 75 194 491 15:00 109 105 119 126 459 16:00 85 75 102 156 418 17:00 144 112 63 74 393 18:00 142 107 85 175 509 19:00 57 61 90 109 317 20:00 125 105 55 142 427 21:00 50 50 60 41 201 22:00 92 42 144 28 306 23:00 30 64 23 14 131 I I I EilY Total : Total : M Total : . Peak AM Hour: reak PM Hour: 4013 o 4013 ( 0.0%) (100.0%) 527 ( 13.1%) Average period: Average Hour 89.2 364.8 14:45= Peak AM Factor: Peak PM Factor: 0.679 I I I I I I I I I 110/07/97 09:38:10 I DUNN ENGINEERING ASSOCIATES 66 MAIN STREET WESTHAMPTON BEACH, N.Y. 11978 Page: 10 ~******************************************************************************* ane #2 Info : WB ane Mode : Subtraction Sensor used : Axle It****************************************************************************** Date Time :00 :15 :30 :45 Total .--------------------------------------------- 1P8/17/96 00:00 13 2 9 5 29 01:00 5 1 2 1 9 02:00 7 3 4 6 20 03:00 1 0 3 6 10 04:00 4 0 4 8 16 05:00 6 5 11 7 29 06:00 9 14 22 20 65 07:00 24 43 33 78 178 08:00 42 63 75 153 333 09:00 110 95 92 110 407 10:00 125 129 110 236 600 11:00 130 110 157 125 522 12:00 125 95 102 127 449 13:00 178 128 111 110 527 14:00 151 103 106 142 502 15:00 211 134 151 186 682 16:00 149 136 120 154 559 17:00 216 155 111 110 592 18:00 192 96 95 148 531 19:00 134 100 124 92 450 20:00 155 100 59 154 468 21:00 72 59 47 58 236 22:00 104 41 94 52 291 23:00 52 29 23 21 125 I I I I I I I Daily Total ~ Total : M Total : eak AM Hour: leak PM Hour: I I I I I 7630 2218 5412 10:45= 15:00= Average Period: 78.7 Average Hour 317.9 29.0%) 70.9%) 633 ( 682 ( 8.2%) 8.9%) Peak AM Factor: 0.671 Peak PM Factor: 0.808 110/07/97 09:38:10 1 DUNN ENGINEERING ASSOCIATES 66 MAIN STREET WESTHAMPTON BEACH, N.Y. 11978 Page: 11 If******************************************************************************* ane #2 Info : WB ane Mode : Subtraction .tensor Used : Axle I~****************************************************************************** Date Time :00 :15 :30 :45 Total .--------------------------------------------- 1P8/18/96 00:00 15 6 7 10 38 01:00 9 5 5 4 23 02:00 3 4 4 4 15 03:00 3 3 2 1 9 04:00 0 5 4 4 13 05:00 7 8 4 6 25 06:00 11 5 23 36 75 07:00 39 27 30 89 185 08:00 56 52 49 61 218 09:00 99 120 91 117 427 10:00 105 93 150 159 507 11:00 127 125 118 148 518 12:00 114 119 96 156 485 13:00 204 110 119 133 566 14:00 112 171 103 212 598 15:00 166 140 197 139 642 16:00 145 125 138 121 529 17:00 234 205 141 136 716 18:00 196 156 108 217 677 19:00 143 107 162 108 520 20:00 154 153 84 136 527 21:00 104 81 47 51 283 22:00 127 27 119 44 317 23:00 25 50 25 10 110 1 1 1 1 1 I I Daily Total IfM Total : .,M Total : Peak AM Hour: ,eak PM Hour: I I I I I 8023 2053 5970 10:30= 17:00= Average Period: Average Hour 82.7 334.3 25.5%} 74.4%) 561 ( 716 ( 6.9%) 8.9%) Peak AM Factor: 0.882 Peak PM Factor: 0.765 110/07/97 09:38:10 1 DUNN ENGINEERING ASSOCIATES 66 MAIN STREET WESTHAMPTON BEACH, N.Y. 11978 Page: 12 ~****************************************************************************** ane #2 Info : WB ane Mode : Subtraction .tensor Used : Axle I~****************************************************************************** Date Time :00 :15 :30 :45 Total ~-------------------------------------------- ~8/19/96 00:00 5 6 6 5 22 01:00 4 2 8 3 17 02:00 1 1 2 2 6 03:00 4 1 3 2 10 04:00 3 11 8 6 28 05:00 6 11 22 17 56 06:00 21 24 30 34 109 07:00 29 48 44 69 190 08:00 68 61 46 136 311 09:00 64 83 64 84 295 10:00 93 94 92 156 435 11:00 96 99 90 123 408 12:00 105 90 85 149 429 13:00 132 103 81 91 407 14:00 123 87 80 165 455 15:00 90 85 140 105 420 16:00 98 72 67 101 338 17:00 188 106 65 63 422 18:00 151 90 68 166 475 19:00 60 58 115 49 282 20:00 133 85 37 91 346 21:00 66 27 27 22 142 22:00 81 13 30 55 179 23:00 16 19 7 12 54 1 1 1 1 1 1 1 Daily Total r Total : .='M Total : Peak AM Hour: teak PM Hour: 1 I I I 1 5836 1887 3949 10:30= 14:45= Average Period: 60.2 Average Hour 243.2 32.3%) 67.6%) 443 ( 480 ( 7.5%) 8.2%) Peak AM Factor: 0.710 Peak PM Factor: 0.727 110/07/97 09:38:10 I DUNN ENGINEERING ASSOCIATES 66 MAIN STREET WESTHAMPTON BEACH, N.Y. 11978 Page: 13 If******************************************************************************* ane #2 Info : WB ane Mode : Subtraction Sensor used : Axle It****************************************************************************** Date Time :00 :15 :30 :45 Total It-------------------------------------------- 1P8/20/96 00:00 7 6 4 6 23 01:00 2 3 0 2 7 02:00 0 5 3 3 11 03:00 1 2 3 0 6 04:00 2 5 5 3 15 05:00 3 5 10 12 30 06:00 12 25 31 27 95 07:00 25 42 47 78 192 08:00 53 48 66 106 273 09:00 64 56 71 71 262 10:00 80 82 97 113 372 11:00 62 75 110 78 325 12:00 91 82 78 134 385 13:00 105 76 92 96 369 14:00 99 77 107 164 447 15:00 89 87 117 116 409 16:00 76 80 86 90 332 17:00 182 85 77 69 413 18:00 159 112 49 151 471 19:00 46 60 97 53 256 20:00 103 110 30 76 319 21:00 25 26 19 27 97 22:00 88 16 24 33 161 23:00 17 25 6 11 59 1 I 1 I 1 1 1 Daily Total ~ Total : M Total : eak AM Hour: leak PM Hour: 1 1 I 1 1 5329 1611 3718 10:00= 18:00= Average period: 54.9 Average Hour 222.0 30.2%) 69.7%) 372 ( 471 ( 6.9%) 8.8%) Peak AM Factor: 0.823 Peak PM Factor: 0.741 I, 0/07/97 -09:38:10 I DUNN ENGINEERING ASSOCIATES 66 MAIN STREET WESTHAMPTON BEACH, N.Y. 11978 Page: 14 ~****************************************************************************** ane #2 Info : WB ane Mode : Subtraction .censor Used : Axle 1[****************************************************************************** Date Time :00 :15 :30 :45 Total 1-------------------------------------------- 8/21/96 00:00 9 5 7 2 23 01:00 4 6 2 1 13 02:00 3 5 3 4 15 03:00 2 1 1 4 8 04:00 1 6 3 6 16 05:00 6 3 6 11 26 06:00 14 30 24 26 94 07:00 33 46 45 64 188 08:00 49 57 50 108 264 09:00 72 60 69 82 283 10:00 79 65 70 124 338 11:00 62 84 99 92 337 12:00 88 86 77 112 363 13:00 76 102 90 82 350 14:00 108 88 70 169 435 15:00 76 79 122 104 381 16:00 86 90 69 167 412 17:00 120 73 69 61 323 18:00 176 76 67 138 457 19:00 46 52 100 56 254 20:00 80 110 34 82 306 21:00 58 17 19 21 115 22:00 62 18 51 13 144 23:00 21 33 11 22 87 I I I I I I I Daily Total ~ Total : M Total : eak AM Hour: ,eak PM Hour: I I I I I 5232 1605 3627 10:45= 18:00= Average Period: 53.9 Average Hour 218.0 30.6%) 69.3%) 369 ( 457 ( 7.0%) 8.7%) Peak AM Factor: 0.744 Peak PM Factor: 0.649 110/07/97 09:38:10 DUNN ENGINEERING ASSOCIATES 66 MAIN STREET WESTHAMPTON BEACH, N.Y. 11978 Page: 15 1 1[****************************************************************************** ....ane #2 Info : WB Lane Mode : Subtraction .eensor Used : Axle 1******************************************************************************* Date Time :00 :15 :30 :45 Total .--------------------------------------------- ~8/22/96 00:00 10 4 8 5 27 01:00 4 2 1 1 8 1 02:00 1 3 2 2 8 03:00 2 2 1 4 9 04:00 3 3 4 6 16 05:00 6 3 6 7 22 1 06:00 17 25 27 30 99 07:00 32 37 43 69 181 08:00 65 49 41 98 253 1 09:00 61 70 49 69 249 10:00 106 74 111 90 381 11:00 74 69 92 95 330 1 12:00 99 90 88 80 357 13:00 125 86 83 91 385 14:00 97 96 94 183 470 15:00 109 84 86 141 420 1 16:00 97 83 82 74 336 17:00 180 99 81 74 434 18:00 132 121 59 172 484 1 19:00 66 49 115 53 283 20:00 77 145 38 119 379 21:00 31 29 37 28 125 1 22:00 91 19 77 24 211 23:00 15 34 7 12 68 Daily Total 5535 Average Period: 57.1 I: Total 1583 28.5%) Average Hour 230.6 M Total 3952 71.4%) Peak AM Hour: 10:00= 381 ( 6.8%) Peak AM Factor: 0.858 reak PM Hour: 18:00= 484 ( 8.7%) Peak PM Factor: 0.703 1 I 1 1 1 10/07/97 09:38:10 DUNN ENGINEERING ASSOCIATES 66 MAIN STREET WESTHAMPTON BEACH, N.Y. 11978 Page: 16 I ~****************************************************************************** ane #2 Info : WB ane Mode : Subtraction .tensor Used : Axle 1[****************************************************************************** Date Time :00 :15 :30 :45 Total ~-------------------------------------------- ~8/23/96 00:00 13 5 3 6 27 01:00 5 6 2 3 16 , 02:00 4 4 4 1 13 03:00 3 5 1 1 10 04:00 1 3 9 4 17 05:00 6 6 3 7 22 I 06:00 16 31 23 30 100 07:00 29 53 41 68 191 08:00 54 55 68 73 250 I 09:00 101 73 59 82 315 10:00 124 99 82 161 466 11:00 103 84 99 146 432 I 12:00 95 85 69 153 402 13 :00 109 118 79 98 404 14:00 110 89 142 121 462 15:00 96 81 109 93 379 - 16:00 104 103 86 160 453 17:00 139 100 57 93 389 18:00 152 102 142 123 519 , 19:00 73 61 126 55 315 20:00 111 114 44 92 361 21:00 59 59 ~ilY Total : 5602 Average period: 65.9 Total : 1859 33.1%) Average Hour 254.6 PM Total 3743 66.8%) Jeak AM Hour: 10:00= 466 ( 8.3%) Peak AM Factor: 0.724 eak PM Hour: 18:00= 519 ( 9.2%) Peak PM Factor: 0.854 I I I I I I lO/07/97 9:38:10 DUNN ENGINEERING ASSOCIATES 66 MAIN STREET WESTHAMPTON BEACH, N.Y. 11978 Page: 17 I r============================================================================== GRAND TOTALS =============================================================================== It**************************** LANES #1, & #2 FINAL **************************** Total Lane 1 45415 I Lane 2 47200 ------- TOTAL 92615 . Days Lane 1 7.42 Lane 2 7.42 ------- I HIGHEST 7.42 AM Total Lane 1 15808 ( 34.8%) I Lane 2 12816 ( 27.1%) ---------------- TOTAL 28624 30.9%) 1M Total Lane 1 29607 65.1%) Lane 2 34384 72 .8%) ---------------- I TOTAL 63991 69.0%) Peak AM Lane 1 11:00= 702 (08/18/96) I Lane 2 10:45= 633 (08/17/96) ------------------------ FINAL 11:00= 702 (08/18/96) leak PM Lane 1 12:00= 683 (08/17/96) Lane 2 17:00= 716 (08/18/96) ------------------------ I I I I I I I FINAL: 17:00= 716 (08/18/96) Avg Period Lane 1 63.8 Lane 2 66.3 ------- AVERAGE 65.0 ADT Lane 1 6123 Lane 2 6364 ------- ADT 12487 Avg Hour Lane 1 256.6 Lane 2 266.7 ------- AVERAGE 523.2 AM Factor Lane 1 0.954 Lane 2 0.671 ----- FINAL 0.954 PM Factor Lane 1 0.987 Lane 2 0.765 ----- FINAL 0.765 I I I I I I I I I I I I I I I I I I I Route 25 West of Tabor Road Orient Friday, August 16, 1996 to Friday, August 23, 1996 Disk #390, Cross Sound Ferry File: Dividers 1 08/23/96 DUNN ENGINEERING 15:17:37 66 Main Street Westhampton Beach, NY 11978 I (516) 288-2480 BASIC COUNT DATA PRINT 1 Site ID ; MAIN ROAD W/O TABOR ROAD Info 1: WE Info 2; EB I Factor 1. 000 Start Time: Start Date; End Time End Date 13 :00 Aug 16, 23:00 Aug 18, Page; 1 1996 Fri 1996 Sun I ******************************************************************************* Lane #1 Info : WB Lane Mode : Subtraction Sensor Used : Axle 1******************************************************************************* Average Period: 57.0 Average Hour 228.1 Date Time ;00 :15 ;30 ;45 Total 1--------------------------------------------- 08/16/96 13;00 73 35 63 171 14;00 62 41 74 138 315 15:00 58 60 102 59 279 16:00 34 52 46 173 305 17;00 75 42 38 61 216 18;00 122 34 122 43 321 19:00 30 25 91 24 170 20:00 124 34 54 107 319 21;00 21 35 20 73 149 22;00 24 44 106 12 186 23:00 57 5 5 11 78 I I I EilY Total ; Total ; M Total : Peak AM Hour: leak PM Hour: 2509 o 2509 ( 0.0%) (100.0%) 358 ( 14.2%) Peak AM Factor: Peak PM Factor; 0.649 14;45= I I I I I I I I I 08/23/96 15:17:37 DUNN ENGINEERING 66 Main Street Westhampton Beach, NY 11978 (516) 288-2480 Page: 2 I I 1 I I I I Daily Total f Total : M Total : eak AM Hour: leak PM Hour: I I I I 1 ******************************************************************************* 1 Lane #1 Info : WB Lane Mode : Subtraction Sensor Used : Axle I ******************************************************************************* Date Time :00 :15 :30 :45 Total 1--------------------------------------------- 08/17/96 00:00 8 2 3 3 16 01:00 0 0 2 1 3 02:00 2 1 2 2 7 03:00 0 1 3 3 7 04:00 1 0 4 0 5 05:00 4 3 5 1 13 06:00 5 4 8 16 33 07:00 21 19 40 42 122 08:00 24 45 58 99 226 09:00 58 44 39 71 212 10:00 53 51 139 89 332 11:00 55 52 110 67 284 12:00 49 64 61 148 322 13:00 88 88 76 100 352 14:00 91 84 62 189 426 15:00 98 88 158 105 449 16:00 67 89 91 171 418 17:00 83 104 52 81 320 18:00 109 42 42 148 341 19:00 38 58 89 51 236 20:00 98 28 51 85 262 21:00 19 23 13 53 108 22:00 55 9 80 8 152 23:00 34 13 10 7 64 4710 Average Period: 48.6 1260 26.7%) Average Hour 196.3 3450 73.2%-) 10:30= 335 ( 7.1%-) Peak AM Factor: 0.603 14:45= 533 ( 11.3%-) Peak PM Factor: 0.705 I 08/23/96 15:17:37 I DUNN ENGINEERING 66 Main Street Westhampton Beach, NY 11978 (516) 288-2480 Page: 3 I ******************************************************************************* Lane #1 Info : WB Lane Mode : Subtraction Sensor Used : Axle II ******************************************************************************* Date Time :00 :15 :30 :45 Total II --------------------------------------------- 08/18/96 00:00 6 4 2 4 16 01:00 5 0 5 1 11 II 02:00 0 2 0 1 3 03:00 3 1 0 0 4 04:00 0 6 1 0 7 II 05:00 2 5 2 8 17 06:00 7 4 11 17 39 07:00 12 15 27 49 .103 08:00 24 17 27 40 108 II 09:00 45 39 24 67 175 10:00 42 40 108 60 250 11:00 61 56 79 67 263 II 12:00 73 62 54 157 346 13:00 87 65 66 72 290 14:00 121 71 135 148 475 15:00 87 96 141 81 405 I 16:00 83 82 66 111 342 17:00 196 109 95 70 470 18:00 196 73 96 133 498 II 19:00 56 50 118 45 269 20:00 152 35 17 104 308 21:00 49 26 17 79 171 II 22:00 51 10 120 10 191 23:00 7 7 Daily Total 4768 Average Period: 50.7 ~ Total 996 20.8%-) Average Hour 198.7 M Total 3772 79.1%-) Peak AM Hour: 10:30= 285 ( 5.9%-) Peak AM Factor: 0.660 ,eak PM Hour: 16:45= 511 ( 10.7%-) Peak PM Factor: 0.652 II II I II I I I 08/23/96 15:17:37 DUNN ENGINEERING 66 Main Street Westhampton Beach, NY 11978" (516) 288-2480 Page: 4 I ******************************************************************************* Lane #2 Info : EB Lane Mode : Subtraction Sensor Used : Axle " I ******************************************************************************* Date Time :00 :15 :30 :45 Total I --------------------------------------------- 08/16/96 13:00 57 58 63 178 14:00 68 92 85 47 292 15:00 63 62 60 73 258 16:00 77 80 76 71 304 17:00 61 78 80 75 294 18:00 63 66 47 53 229 19:00 61 48 44 42 195 20:00 36 46 50 35 167 21:00 37 40 31 25 133 22:00 18 28 25 14 85 23:00 18 10 11 16 55 I I I .~~ily Total : ~~ Total : PM Total : Peak AM Hour: reak PM Hour: 2190 o 2190 ( 0.0%) (100.0%) 308 ( 14.0%) Average Period: 49.8 Average Hour 199.1 13:45= Peak AM Factor: Peak PM Factor: 0.837 I I I I I I I I I I ; I I I I 08/17/96 I I I I I I I . Da~ly Total E Total : M Total : eak AM Hour: Peak PM Hour: I I I I I I 08/23/96 15:17:37 DUNN ENGINEERING 66 Main Street Westhampton Beach, NY 11978 (516) 288-2480 Page: 5 ******************************************************************************* Lane #2 Info EB Lane Mode : Subtraction Sensor Used : Axle ******************************************************************************* Date Time --------------------------------------------- 00:00 01:00 02:00 03:00 04:00 05:00 06:00 07:00 08:00 09:00 10:00 11:00 12:00 13:00 14:00 15:00 16:00 17:00 18:00 19:00 20:00 21:00 22:00 23:00 :00 :15 :30 :45 Total 10 8 4 4 26 4 7 1 0 12 1 4 2 1 8 1 0 1 3 5 1 4 5 5 15 2 6 10 13 31 30 58 66 33 187 41 51 60 37 189 67 94 70 64 295 83 89 88 76 336 114 102 104 96 416 96 124 117 100 437 116 116 113 108 453 91 85 106 90 372 109 136 110 97 452 103 87 61 68 319 85 84 70 62 301 67 63 52 60 242 69 52 50 43 214 35 51 38 44 168 34 45 39 32 150 23 29 25 23 100 18 20 19 13 70 12 5 11 5 33 4831 Average Period: 49.8 1957 40.5%-) Average Hour 201. 3 2874 59.4%-) 11:00= 437 ( 9.0%-) Peak AM Factor: 0.881 12:00= 453 ( 9.3%-) Peak PM Factor: 0.976 I 08/23/96 15:17:37 I DUNN ENGINEERING 66 Main Street Westhampton BeaCh, NY 11978 (516) 288-2480 Page: 6 I ******************************************************************************* Lane #2 Info : EB Lane Mode : Subtraction Sensor Used : Axle I ******************************************************************************* Date Time :00 :15 :30 :45 Total 1--------------------------------------------- 08/18/96 00:00 9 13 8 4 34 01:00 7 8 5 1 21 1 02:00 5 3 4 2 14 03:00 1 4 3 0 8 04:00 0 1 3 3 7 I 05:00 5 7 3 7 22 06:00 27 49 58 36 170 07:00 27 52 49 41 .169 08:00 54 57 52 55 218 1 09:00 75 67 69 64 275 10:00 79 85 100 89 353 11:00 92 117 132 132 473 I 12:00 97 113 102 98 410 13:00 113 139 88 112 452 14:00 94 126 149 85 454 15:00 91 85 90 99 365 I 16:00 91 110 73 78 352 17:00 77 90 79 52 298 18:00 56 64 65 52 237 I 19:00 50 60 43 43 196 20:00 43 51 49 29 172 21:00 32 29 15 14 90 I 22:00 6 9 12 10 37 23:00 10 10 Daily Total : 4837 Average Period: 51. 5 ~ Total : 1764 36.4%) Average Hour 201. 5 M Total : 3073 63.5%) Peak AM Hour: 11:00= 473 ( 9.7%) Peak AM Factor: 0.896 ,eak PM Hour: 13 :45= 481 ( 9.9%) Peak PM Factor: 0.807 I I 1 I I 1 08/23/96 15:17:37 1 DUNN ENGINEERING 66 Main Street Westhampton Beach, NY 11978 (516) 288-2480 Page: 7 1 =============================================================================== GRAND TOTALS =============================================================================== Total Lane 1 I Lane 2 TOTAL 1# Days Lane 1 Lane 2 1 HIGHEST AM Total Lane 1 1 Lane 2 TOTAL IPM Total Lane 1 Lane 2 1 TOTAL Peak AM Lane 1 1 Lane 2 FINAL teak PM Lane 1 Lane 2 1 I I 'I I I I 23845 2.45 2.45 2.45 2256 ( 18.8%) 3721 ( 31.3%) ---------------- 5977 25.0%) 9731 81.H} 8137 68.6%} 17868 ---------------- 10:30= 11:00= 74.9%} 335 (08/17/96) 473 (08/18/96) 11:00= ------------------------ 14:45= 13:45= 473 (08/18/96) 533 (08/17/96) 481 (08/18/96) FINAL: 14:45= ------------------------ 533 (08/17/96) Avg Period Lane 1 51. 0 Lane 2 50.5 ------- AVERAGE 50.7 ADT Lane 1 4897 Lane 2 4844 ------- ADT 9741 Avg Hour Lane 1 203.2 Lane 2 201.0 ------- AVERAGE 404.2 AM Factor Lane 1 0.603 Lane 2 0.896 ----- FINAL 0.896 PM Factor Lane 1 0.705 Lane 2 0.807 ----- FINAL 0.705 1 08/23/96 15:23:47 1 1 Site ID : Info 1: 1 Info 2: Factor DUNN ENGINEERING 66 Main Street Westhampton Beach, NY 11978 (516) 288-2480 Page: 1 BASIC COUNT DATA PRINT MAIN ROAD W/O TABOR ROAD WB EB Start Time: Start Date: End Time End Date 14:30 Aug 2 0 , 11:15 Aug 23, 1996 Tue 1996 Fri 1.000 1******************************************************************************* Lane #1 Info : WB Lane Mode : Subtraction 1 Sensor Used : Axle. ******************************************************************************* Date Time :00 :15 :30 :45 Total 1--------------------------------------------- 08/20/96 14:00 93 72 165 15:00 49 84 60 78 271 16:00 42 43 40 170 295 17:00 59 46 37 37 179 18:00 148 36 73 90 347 19:00 27 22 72 29 150 20:00 141 19 10 58 228 21:00 14 13 13 53 93 22:00 35 7 30 9 81 23:00 25 4 0 13 42 1 1 1 Daily Total ~ Total : M Total : eak AM Hour: leak PM Hour: 1 1 1 1 I I I 1851 o 1851 Average Period: 47.5 Average Hour 185.1 ( o. 0%-) (100.0%-) 347 ( 18.7%-) Peak AM Factor: Peak PM Factor: 0.586 18:00= DUNN ENGINEERING 66 Main Street Westhampton Beach, NY 11978 (516) 288-2480 1 08/23/96 15:23:47 1 Page: 2 1 ******************************************************************************* Lane #1 Info : WB Lane Mode : Subtraction Sensor Used : Axle 1******************************************************************************* Date Time :00 :15 :30 :45 Total 1--------------------------------------------- 08/21/96 00:00 4 2 1 1 8 01:00 2 2 0 1 5 I 02:00 1 3 1 0 5 03:00 0 0 1 1 2 04:00 0 3 0 2 5 05:00 3 1 5 8 17 I 06:00 6 8 17 13 44 07:00 12 26 29 34 101 08:00 32 24 34 71 161 I 09:00 24 29 41 49 143 10:00 37 28 68 31 164 11:00 39 40 ""84 41 204 I 12:00 54 38 74 56 222 13:00 52 45 48 68 213 14:00 57 51 100 88 296 15:00 43 30 94 81 248 I 16:00 45 32 46 159 282 17:00 49 40 30 54 173 18:00 140 25 126 16 307 1 19:00 27 30 65 14 136 20:00 117 22 10 86 235 21:00 11 7 16 51 85 I 22:00 10 3 32 5 50 23:00 23 4 4 12 43 Daily Total 3149 Average Period: 32.5 I: Total 859 27.2%) Average Hour 131. 2 M Total 2290 72.7%) Peak AM Hour: 11:00= 204 ( 6.4%) Peak AM Factor: 0.607 ,eak PM Hour: 17:45= 345 ( 10.9%) Peak PM Factor: 0.616 I I I I I 108/23/96 15:23:47 DUNN ENGINEERING 66 Main Street Westhampton Beach, NY 11978 (516) 288-2480 Page: 3 1 1******************************************************************************* Lane #1 Info : WB Lane Mode : Subtraction 1 Sensor Used : Axle ******************************************************************************* Date Time ;00 ;15 ;30 :45 Total 1--------------------------------------------- 08/22/96 00:00 4 3 2 1 10 01:00 2 2 0 1 5 1 02:00 1 1 1 0 3 03:00 1 0 0 0 1 04;00 0 1 3 4 8 1 05:00 1 1 4 7 13 06;00 9 5 15 15 44 07:00 13 15 33 41 102 08;00 22 17 26 54 119 1 09:00 37 25 27 55 144 10:00 50 40 68 37 195 11;00 30 35 73 43 181 1 12:00 63 52 42 48 205 13;00 114 48 42 67 271 14:00 48 43 147 73 311 1 15;00 50 45 73 85 253 16:00 52 43 53 84 232 17:00 125 43 39 54 261 18;00 112 44 96 83 335 1 19:00 23 34 81 33 171 20:00 107 64 46 67 284 21:00 17 9 10 58 94 1 22;00 31 8 80 11 130 23:00 3 28 6 10 47 ~ilY Total : 3419 Average Period: 35.2 Total : 825 24.1'1;) Average Hour 142.5 M Total : 2594 75.8%) Peak AM Hour: 09:45= 213 ( 6.2%) Peak AM Factor: 0.783 leak PM Hour; 18:00= 335 ( 9.7%) Peak PM Factor: 0.748 I I I I I I 08/23/96 15:23:47 I ******************************************************************************* I Lane #1 Info WE Lane Mode : Subtraction Sensor Used : Axle I ******************************************************************************* Date Time :00 :15 :30 :45 Total I;~/;;/~~-;;~;;-----;-----;-----~-----;------; 01:00 0 1 3 2 6 02:00 1 1 0 1 3 03:00 1 2 0 0 3 04:00 0 0 1 2 3 05:00 0 5 2 10 17 06:00 11 13 11 13 48 07:00 15 25 23 23 86 08:00 25 29 27 66 147 09:00 39 35 31 55 160 10:00 60 33 36 134 263 11:00 40 35 75 DUNN ENGINEERING 66 Main Street Westhampton Beach, NY 11978 (516) 288-2480 Page: 4 I I I IDailY Total : AM Total : PM Total IPeak AM Hour: Peak PM Hour: 818 818 o 10:00= (100.0%) ( 0.0%) 263 ( 32.1%) Average Period: Average Hour 17.8 68.2 Peak AM Factor: 0.491 Peak PM Factor: I I I I I I I I I I I I I 08/23/96 15:23:47 DUNN ENGINEERING 66 Main Street Westhampton Beach, NY 11978 (516) 288-2480 Page: 5 ******************************************************************************* Lane #2 Info EB Lane Mode : Subtraction Sensor Used : Axle ******************************************************************************* Date Time : 00 : 15 : 30 : 45 Total I --------------------------------------------- 08/20/96 14:00 56 62 118 15:00 74 66 65 49 254 16:00 53 62 40 64 219 17:00 53 47 62 40 202 18:00 53 50 44 32 179 19:00 26 33 23 21 103 20:00 25 21 22 19 87 21:00 17 22 17 14 70 22:00 9 9 11 8 37 23:00 4 2 5 8 19 I I I . Da~ly Total lAM Total : PM Total : Peak AM Hour: Peak PM Hour: I I I I I I I I I I 1288 Average Period: 33.0 0 ( O.O%-) Average Hour 128.8 1288 (100.0%-) Peak AM Factor: 14:45= 267 ( 20.7%-) Peak PM Factor :. 0.902 I 08/23/96 15:23:47 I ******************************************************************************* I Lane #2 Info EB Lane Mode : Subtraction Sensor Used : Axle I ******************************************************************************* Date Time :00 :15 :30 :45 Total I ~~;;~;;~-~~~~~-----~-----~-----~-----;-----~~ 01:00 3 0 1 0 4 02:00 4 1 1 0 6 03:00 0 2 2 3 7 04:00 0 0 0 2 2 05:00 3 3 7 9 22 06:00 14 43 44 33 134 07:00 39 74 62 60 235 08:00 39 67 62 38 206 09:00 39 87 62 54 242 10:00 55 66 53 51 225 11:00 61 76 87 49 273 12:00 49 59 54 74 236 13:00 45 55 68 57 225 14:00 53 62 50 63 228 15:00 49 60 55 56 220 16:00 59 59 48 45 211 17:00 48 64 63 42 217 18:00 37 32 36 27 132 19:00 31 30 27 18 106 20:00 12 26 17 20 75 21:00 11 21 19 17 68 22:00 10 12 11 4 37 23:00 14 5 6 6 31 DUNN ENGINEERING 66 Main Street Westhampton Beach, NY 11978 (516) 288-2480 Page: 6 I I I I I I I Daily Total p Total "M Total Peak AM Hour: teak PM Hour: 3160 1374 1786 10:45= 12:45= 43.4%) 56.5%-) 275 ( 242 ( Average Period: Average Hour 32.6 131.7 8.7%-) 7.6%-) Peak AM Factor: 0.790 Peak PM Factor: 0.818 I I I I I 1 08/23/96 15:23:47 DUNN ENGINEERING 66 Main Street Westhampton Beach, NY 11978 (516) 288-2480 Page: 7 1 1 ******************************************************************************* Lane #2 Info : EB Lane Mode : Subtraction 1 Sensor Used : Axle . ******************************************************************************* Date Time :00 :15 :30 :45 Total 1--------------------------------------------- 08/22/96 00:00 6 1 1 1 9 01:00 0 4 2 0 6 1 02:00 3 0 0 0 3 03:00 0 2 1 0 3 04:00 1 2 2 5 10 1 05:00 2 2 8 13 25 06:00 21 37 59 37 154 07:00 37 65 57 54 213 08:00 41 56 47 50 194 1 09:00 65 88 82 63 298 10:00 62 74 56 50 242 11:00 69 71 67 70 277 1 12:00 65 85 61 56 267 13 :00 49 61 52 58 220 14:00 63 61 61 54 239 1 15:00 52 61 64 70 247 16:00 77 61 48 53 239 17:00 55 65 44 40 204 18:00 46 56 45 34 181 1 19:00 27 42 43 31 143 20:00 26 23 17 15 81 21:00 21 17 13 14 65 1 22:00 16 12 14 11 53 23:00 5 4 8 7 24 eilY Total : 3397 Average Period: 35.0 Total : 1434 42.2%) Average Hour 141. 5 M Total : 1963 57.7%) Peak AM Hour: 09:00= 298 ( 8.7%) Peak AM Factor: 0.847 reak PM Hour: 15:15= 272 ( 8.0%) Peak PM Factor: 0.883 1 1 I I I I 08/23/96 15:23:47 I DUNN ENGINEERING 66 Main Street Westhampton Beach, NY 11978 (516) 288-2480 Page: 8 I ******************************************************************************* Lane #2 Info : EB Lane Mode : Subtraction Sensor Used : Axle . I ******************************************************************************* Date Time :00 :15 :30 :45 Total 1~~/;3/~~-~~~~~-----~-----~-----~-----;-----~~ 01:00 02:00 03:00 04:00 05:00 06:00 07:00 08:00 09:00 10:00 11:00 IDailY Total : AM Total : PM Total teak AM Hour: eak PM Hour: I I I I I I I I I I I I 2 2 1 2 2 2 1 1 0 2 0 0 3 5 8 24 55 50 44 75 58 34 50 64 55 70 74 74 71 71 74 81 1352 1352 (100.0%) 0 ( 0.0%) 10:30= 283 ( 20.9%) 2 2 o 2 11 29 65 60 58 57 7 8 2 4 27 158 242 208 257 273 155 Average Period: Average Hour 29.4 112.7 Peak AM Factor: 0.873 Peak PM Factor: 108/23/96 15:23:47 DUNN ENGINEERING 66 Main St.reet. West.hampt.on Beach, NY 11978 (516) 288-2480 Page: 9 I I==================================~~=;~;~~================================= =============================================================================== 1***************************** LANES #1, & #2 ITot.al Lane 1 Lane 2 L TOTAL Days Lane 1 Lane 2 I HIGHEST ~ Tot.al Lane 1 Lane 2 TOTAL LM Tot.al Lane 1 Lane 2 1 TOTAL leak AM Lane 1 Lane 2 FINAL leak PM Lane 1 Lane 2 1 I I I 1 I I 9237 9197 18434 2.91 2.91 2.91 2502 ( 27.0%) 4160 ( 45.2%) 6662 36.1%) 6735 ( 72.9%) 5037 ( 54.7%) 11772 63.8%) 263 (08/23/96) 298 (08/22/96) 10:00= 09:00= 09:00= 298 (08/22/96) 347 (08/20/96) 272 (08/22/96) 18:00= 15:15= FINAL: 18:00= 347 (08/20/96) FINAL **************************** Avg Period Lane 1 33.1 Lane 2 33.0 ------- AVERAGE 33.0 ADT Lane 1 3178 Lane 2 3165 ------- ADT 6343 Avg Hour Lane 1 132.0 Lane 2 131.4 ------- AVERAGE 263.3 AM Fact.or Lane 1 0.491 Lane 2 0.847 ----- FINAL 0.847 PM Fact.or Lane 1 0.586 Lane 2 0.883 ----- FINAL 0.586 I I I I I I I I I I I I I I I I I I I Route 25 East of Narrow River Road Orient Friday, August 16, 1996 to Friday, August 23, 1996 Disk #390. Cross Sound Ferry File: Dividers 108/23/96 15:43:04 DUNN ENGINEERING 66 Main Street Westhampton Beach, NY 11978 (516) 288-2480 Page: 1 I ISite ID : Info 1: Info 2: BASIC COUNT DATA PRINT I Factor MAIN EB WB ROAD E/O NARROW RIVER RD. Start Time: Start Date: End Time End Date 13:30 Aug 16, 11:30 Aug 23, 1996 Fri 1.000 1996 Fri 11******************************************************************************* Lane #1 Info : EB Lane Mode : Subtraction Isensor Used : Axle ******************************************************************************* I Date Time : 00 : 15 : 30 : 45 Total . -----------------------------------------~--- 08/16/96 13:00 45 46 91 14:00 59 68 69 32 228 15:00 36 53 45 51 185 16:00 58 51 62 47 218 17:00 30 43 51 56 180 18:00 42 58 32 32 164 19:00 36 36 36 34 142 20:00 21 22 38 27 108 21:00 19 32 19 9 79 22:00 7 11 14 5 37 23:00 7 5 2 3 17 I I I ~aily Total : ~ Total : PM Total "eak AM Hour: "eak PM Hour: 1449 o 1449 ( 0.0%) (100.0%) 242 ( 16.7%) Average period: Average Hour 33.7 131. 7 13 : 45= Peak AM Factor: Peak PM Factor: 0.877 I I I I I I I 108/23/96 15:43:04 I DUNN ENGINEERING 66 Main Street Westhampton Beach, NY 11978 (516) 288-2480 Page: 2 1******************************************************************************* Lane #1 Info : EB Lane Mode : Subtraction Isensor Used : Axle ******************************************************************************* Date Time :00 :15 :30 :45 Total 1--------------------------------------------- 08/17/96 00:00 4 4 3 0 11 01:00 3 1 1 0 5 I 02:00 0 2 1 1 4 03:00 1 0 0 1 2 04:00 0 3 5 4 12 I 05:00 1 5 10 9 25 06:00 24 47 67 37 175 07:00 36 36 55 29 156 08:00 42 52 65 45 204 I 09:00 53 55 71 46 225 10:00 66 77 60 55 258 11:00 55 72 59 63 249 I 12:00 67 72 79 64 282 13:00 57 60 64 56 237 14:00 61 94 70 83 308 I 15:00 65 51 57 42 215 16:00 41 64 59 40 204 17:00 39 52 41 35 167 18:00 40 37 46 26 149 I 19:00 23 29 34 30 116 20:00 18 34 25 23 100 21:00 14 20 19 11 64 I 22:00 7 8 6 8 29 23:00 3 4 7 2 16 lSilY Total : 3213 Average Period: 33.1 Total : 1326 41. 2%) Average Hour 133.9 M Total : 1887 58.7%) Peak AM Hour: 09:30= 260 ( 8.0%) Peak AM Factor: 0.844 leak PM Hour: 14:15= 312 ( 9.7%) Peak PM Factor: 0.830 I I I I I 108/23/96 15:43:04 DUNN ENGINEERING 66 Main Street Westhampton Beach, NY 11978 (516) 288-2480 Page: 3 I 11.***************************************************.************************** ~ane #1 Info : EB Lane Mode : Subtraction Isensor Used : Axle ******************************************************************************* I Date Time :00 :15 :30 :45 Total --------------------------------------------- 08/18/96 00:00 6 2 5 2 15 01:00 2 2 2 0 6 I 02:00 1 4 1 1 7 03:00 0 3 1 0 4 04: 00 0 0 2 1 3 I 05:00 3 9 4 7 23 06:00 25 38 54 42 159 07:00 29 41 54 30 154 I 08:00 33 54 52 51 190 09:00 46 57 60 53 216 10:00 50 73 64 77 264 11:00 67 94 105 106 372 I 12:00 75 97 87 65 324 13:00 70 76 90 82 318 14:00 70 88 115 99 372 I 15:00 74 60 85 73 292 16:00 95 85 73 59 312 17:00 49 65 78 39 231 I 18:00 48 51 50 35 184 19:00 29 49 43 26 147 20:00 25 35 35 29 124 21:00 20 18 15 5 58 I 22:00 2 3 11 5 21 23:00 6 2 3 0 11 EilY Total : 3807 Average period: 39.2 Total : 1413 37.1%-) Average Hour 158.6 . M Total : 2394 62.8%-) Peak AM Hour: 11:00= 372 ( 9.n) Peak AM Factor: 0.877 leak PM Hour: 14:15= 376 ( 9.8%-) Peak PM Factor: 0.817 I I I I I I 08/23/96 115:43:04 DUNN ENGINEERING 66 Main Street Westhampton Beach, NY 11978 (516) 288-2480 Page: 4 11******************************************************************************* Lane #1 Info EB ILane Mode : Subtraction Sensor Used : Axle ******************************************************************************* I Date Time :00 :15 :30 : 45 Total --------------------------------------------- 108/19/96 00:00 4 1 1 0 6 01:00 1 1 1 0 3 02:00 0 0 0 0 0 03:00 0 1 3 1 5 I 04:00 0 1 1 2 4 05:00 1 4 7 5 17 06:00 23 46 58 49 176 I 07:00 32 47 81 46 206 08:00 23 41 55 45 164 09:00 57 62 63 49 231 I 10:00 39 64 56 62 221 11:00 52 58 58 55 223 12:00 42 75 59 36 212 13:00 52 54 38 38 182 I 14:00 67 49 46 39 201 15:00 49 37 38 26 150 16:00 31 69 38 43 181 I 17:00 33 41 41 21 136 18:00 25 36 52 28 141 19:00 15 34 23 17 89 20:00 10 23 14 3 50 I 21:00 10 7 8 4 29 22:00 4 5 8 9 26 23:00 5 0 2 0 7 ~ailY Total : 2660 Average Period: 27.4 AM Total : 1256 47.2%-) Average Hour 110.8 1M Total : 1404 52.7%) eak AM Hour: 10:15= 234 ( 8.7%) Peak AM Factor: 0.914 eak PM Hour: 12:15= 222 ( 8.3%) Peak PM Factor: 0.740 I I I I I I 08/23/96 115:43:04 DUNN ENGINEERING 66 Main Street Westhampton Beach, NY 11978 (516) 288-2480 Page: 5 II ******************************************************************************* Lane #1 Info EB I Lane Mode : Subtraction Sensor Used : Axle ******************************************************************************* I Date Time :00 :15 :30 :45 Total --------------------------------------------- 08/20/96 00:00 1 2 0 0 3 I 01:00 3 1 0 0 4 02:00 0 0 0 0 0 03:00 0 0 1 0 1 I 04:00 1 1 1 1 4 05:00 1 3 5 5 14 06:00 14 41 46 38 139 I 07:00 27 66 78 59 230 08:00 26 56 40 32 154 09:00 52 59 68 47 226 10:00 48 70 65 25 208 I 11:00 40 67 50 49 206 12:00 30 59 34 52 175 13:00 32 36 39 30 137 I 14:00 34 41 37 48 160 15:00 46 42 40 43 171 16:00 37 39 31 38 145 17:00 28 26 48 33 135 I 18:00 18 33 30 26 107 19:00 19 21 26 18 84 20:00 23 10 14 15 62 I 21:00 8 12 5 8 33 22:00 5 3 9 3 20 23:00 2 1 2 4 9 tailY Total : 2427 Average Period: 25.0 ~ Total : 1189 48.9%) Average Hour 101.1 PM Total 1238 51. 0%) teak AM Hour: 09:30= 233 ( 9.6%) Peak AM Factor: 0.832 eak PM Hour: 12:15= 177 ( 7.2%) Peak PM Factor: 0.750 II I II I I II 08/23/96 115:43:04 DUNN ENGINEERING 66 Main Street Westhampton Beach, NY 11978 (516) 288-2480 Page: 6 11******************************************************************************* Lane #1 Info EB ILane Mode : Subtraction Sensor Used : Axle ******************************************************************************* I Date Time :00 :15 :30 :45 Total --------------------------------------------- 108/21/96 00:00 1 1 2 2 6 01:00 3 0 0 0 3 02:00 2 1 0 0 3 03:00 0 1 1 0 2 I 04:00 1 0 0 1 2 05:00 2 5 5 7 19 06:00 15 36 45 37 133 II 07:00 29 53 69 59 210 08:00 21 49 50 28 148 09:00 29 63 74 31 197 10:00 35 48 47 30 160 I 11:00 49 60 50 51 210 12:00 34 42 48 43 167 13:00 42 36 42 42 162 1 14:00 38 45 41 35 159 15:00 30 39 40 26 135 16:00 39 46 34 20 139 II 17:00 26 51 50 35 162 18:00 20 22 16 19 77 19:00 17 25 21 4 67 20:00 6 11 14 9 40 I 21:00 8 12 8 6 34 22:00 3 12 10 1 26 23:00 5 3 3 2 13 ~ilY Total : 2274 Average Period: 23.4 Total : 1093 48.0%) Average Hour 94.8 1M Total : 1181 51.9%) eak AM Hour: 07:00= 210 ( 9.2%) Peak AM Factor: 0.761 eak PM Hour: 12:15= 175 ( 7.6%) Peak PM Factor: 0.911 I I I I I 108/23/96 115:43:04 DUNN ENGINEERING 66 Main Street Westhampton Beach, NY 11978 (516) 288-2480 Page: 7 11******************************************************************************* Lane #1 Info EB I Lane Mode : Subtraction Sensor Used : Axle ******************************************************************************* I Date Time :00 :15 :30 :45 Total . --------------------------------------------- 08/22/96 00:00 3 1 0 1 5 I 01:00 0 0 1 0 1 02:00 1 0 0 0 1 03:00 0 1 0 0 1 I 04:00 1 2 2 2 7 05:00 2 2 6 9 19 06:00 21 35 58 37 151 I 07:00 28 63 59 42 192 08:00 22 44 52 36 154 09:00 38 67 71 42 218 10:00 53 60 44 33 190 I 11:00 42 46 59 44 191 12:00 54 62 44 34 194 13:00 37 37 40 39 153 I 14:00 49 43 46 45 183 15:00 36 36 39 46 157 16:00 54 53 35 28 170 17:00 19 43 30 29 121 I 18:00 29 39 25 28 121 19:00 14 32 31 27 104 20:00 20 15 13 9 57 I 21:00 10 6 9 7 32 22:00 4 8 9 2 23 23:00 2 1 4 2 9 ~ilY Total : 2454 Average Period: 25.3 Total : 1130 46.0%) Average Hour 102.3 PM Total 1324 53.9%) teak AM Hour: 09:15= 233 ( 9.4%) Peak AM Factor: 0.820 eak PM Hour: 12:00= 194 ( 7.9%) Peak PM Factor: 0.782 I I II I I DUNN ENGINEERING 66 Main Street Westhampton Beach, NY 11978 (516) 288-2480 I I 08/23/96 15:43:04 Page: 8 I ******************************************************************************* Lane #1 Info EB I Lane Mode : Subtraction Sensor Used : Axle ******************************************************************************* I Time Date :00 :15 :30 : 45 Total --------------------------------------------- 08/23/96 00:00 2 0 0 1 I 01:00 2 0 0 1 02:00 1 2 2 0 03:00 1 1 0 0 I 04:00 2 0 0 0 05:00 3 4 7 9 06:00 19 42 58 35 I 07:00 45 61 67 51 08:00 36 33 53 42 09:00 42 62 58 45 10:00 55 59 53 41 I 11:00 38 70 55 Daily Total lAM Total : PM Total : Peak AM Hour: I Peak PM Hour: 1158 1158 o 07:00= (100.0%) ( 0.0%) 224 ( 19.3%) I I I I I I I I 3 3 5 2 2 23 154 224 164 207 208 163 Average Period: Average Hour 24.6 96.5 Peak AM Factor: 0.836 Peak PM Factor: 1 08/23/96 115:43:04 I DUNN ENGINEERING 66 Main Street Westhampton Beach, NY 11978 (516) 288-2480 Page: 9 ******************************************************************************* Lane #2 Info WB I Lane Mode : Subtraction Sensor Used : Axle ******************************************************************************* I__~:::_--~~~:_---~~~---~::_--~~~---~~:_-~~::: 08/16/96 13:00 25 57 82 I 14:00 38 25 99 90 252 15:00 33 39 91 43 206 16:00 30 26 46 148 250 I 17:00 46 24 21 65 156 18:00 74 9 122 26 231 19:00 20 30 69 30 149 20:00 100 21 103 34258 I 21:00 8 32 10 80 130 22:00 17 73 65 8 163 23:00 53 1 9 7 70 IDailY Total : AM Total .~M Total : Eeak AM Hour: Peak PM Hour: 1947 o 1947 ( 0.0%) (100.0%) 270 ( 13.8%) Average Period: 45.3 Average Hour 177.0 17:45= Peak AM Factor: Peak PM Factor: 0.553 I I I I I I I I I I 08/23/96 115:43:04 I DUNN ENGINEERING 66 Main Street Westhampton Beach, NY 11978 (516) 288-2480 Page: 10 ******************************************************************************* Lane #2 Info WE I Lane Mode : Subtraction Sensor Used : Axle ******************************************************************************* I Date Time : 00 : 15 : 30 : 45 Total --------------------------------------------- 08/17/96 00:00 3 1 1 2 7 I 01:00 0 1 1 1 3 02:00 2 1 1 2 6 03:00 0 0 1 1 2 I 04:00 0 0 2 0 2 05:00 0 1 1 2 4 06:00 2 1 11 8 22 I 07:00 10 12 37 18 77 08:00 12 16 70 56 154 09:00 40 16 32 41 129 10:00 38 29 137 56 260 I 11:00 21 62 64 48 195 12:00 33 29 44 128 234 13 :00 61 54 44 78 237 I 14:00 52 49 39 161 301 15:00 60 69 112 52 293 16:00 38 46 63 142 289 I 17:00 63 47 40 90 240 18:00 58 34 39 126 257 19:00 23 32 82 64 201 20:00 71 14 74 47 206 I 21:00 18 9 6 67 100 22:00 33 23:00 27 12 10 6 55 IDailY Total : AM Total : PM Total Ipeak AM Hour: Peak PM Hour: 3397 861 2536 10:30= 14:45= 25.3%) 74.6%) 276 ( 8.1%) 402 ( 11.8%) Average Period: 35.0 Average Hour 141.5 Peak AM Factor: 0.504 Peak PM Factor: 0.624 I I I I II I 1 08/23/96 115:43:04 DUNN ENGINEERING 66 Main Street Westhampton Beach, NY 11978 (516) 288-2480 Page: 11 1******************************************************************************* Lane #2 Info WB I Lane Mode : Subtraction Sensor Used : Axle ******************************************************************************* I Date Time :00 :15 : 30 :45 Total --------------------------------------------- 108/18/96 00:00 5 3 2 1 11 01:00 2 1 4 0 7 02:00 0 1 0 1 2 03:00 1 0 0 0 1 I 04:00 2 4 0 0 6 05:00 5 2 0 3 10 06:00 3 3 7 16 29 I 07:00 9 5 17 35 66 08:00 14 11 17 32 74 09:00 27 25 36 43 131 10:00 14 46 69 31 160 I 11:00 41 39 68 39 187 12:00 48 41 53 138 280 13:00 88 67 48 56 259 I 14:00 97 44 137 116 394 15:00 64 115 88 69 336 16:00 59 55 43 118 275 I 17:00 164 82 66 97 409 18:00 136 42 100 99 377 19:00 43 50 89 45 227 20:00 126 25 8 109 268 I 21:00 42 15 5 99 161 22:00 16 46 76 8 146 23:00 6 50 6 6 68 IDailY Total : 3884 Average period: 40.0 AM Total : 684 17.6%) Average Hour 161.8 PM Total : 3200 82.3%) I Peak AM Hour: 10:15= 187 ( 4.8%) Peak AM Factor: 0.678 Peak PM Hour: 14:30= 432 ( 11.1%) Peak PM Factor: 0.788 1 I I I I , 08/23/96 115:43:04 DUNN ENGINEERING 66 Main Street Westhampton Beach, NY 11978 (516) 288-2480 Page: 12 , ******************************************************************************* Lane #2 Info WB 'Lane Mode : Subtraction Sensor Used : Axle ******************************************************************************* 1 Date Time :00 :15 :30 :45 Total --------------------------------------------- 108/19/96 00:00 0 0 1 0 1 01:00 2 0 0 1 3 02:00 0 0 0 0 0 03:00 0 0 2 0 2 , 04:00 0 2 0 1 3 05:00 0 2 0 4 6 06:00 7 8 8 9 32 1 07:00 15 10 19 28 n 08:00 22 10 52 39 123 09:00 27 18 11 36 92 I 10:00 24 15 79 32 150 11:00 22 18 84 38 162 12:00 39 20 33 114 206 13:00 40 37 32 70 179 , 14:00 43 43 134 35 255 15:00 25 63 63 58 209 16:00 28 24 39 149 240 I 17:00 54 32 26 70 182 18:00 92 19 69 85 265 19:00 16 60 29 35 140 I 20:00 109 14 10 97 230 21:00 4 6 8 53 71 22:00 18 4 55 4 81 23:00 16 3 2 12 33 I Daily Total : 2737 Average Period: 28.2 AM Total 646 23.6%) Average Hour 114.0 1 PM Total : 2091 76.3%) Peak AM Hour: 11:00= 162 ( 5.9%) Peak AM Factor: 0.482 Peak PM Hour: 13:45= 290 ( 10.5%) Peak PM Factor: 0.541 , 1 I I I 1 08/23/96 115:43:04 DUNN ENGINEERING 66 Main Street Westhampton Beach, NY 11978 (516) 288-2480 Page: 13 1******************************************************************************* Lane #2 Info WB ILane Mode : Subtraction Sensor Used : Axle ******************************************************************************* I Date Time :00 :15 :30 :45 Total --------------------------------------------- 108/20/96 00:00 0 2 0 0 2 01:00 1 1 1 0 3 02:00 0 0 0 0 0 03:00 0 1 0 0 1 1 04:00 0 1 0 0 1 05:00 1 1 1 3 6 06:00 2 7 9 6 24 1 07:00 11 12 21 22 66 08:00 14 11 44 25 94 09:00 8 20 14 36 78 10:00 19 23 63 20 125 1 11:00 21 56 35 22 134 12:00 30 32 53 61 176 13: 00 26 33 28 54 141 1 14: 00 37 27 119 39 222 15:00 35 80 34 54 203 16:00 30 30 40 162 262 1 17:00 37 24 20 49 130 18:00 130 21 89 52 292 19:00 12 31 56 41 140 20:00 130 11 3 56 200 I 21:00 10 7 5 67 89 22:00 16 4 31 7 58 23:00 18 3 0 12 33 IDailY Total : 2480 Average Period: 25.6 AM Total : 534 21. 5%) Average Hour 103.3 PM Total : 1946 78.4%) Ipeak AM Hour: 10:30= 160 ( 6.4%) Peak AM Factor: 0.635 Peak PM Hour: 18:00= 292 ( 11.7%) Peak PM Factor: 0.562 1 1 I 1 I I I I I I I I I I I I I 08/23/96 15:43:04 DUNN ENGINEERING 66 Main Street Westhampton Beach, NY 11978 (516) 288-2480 Page: 14 ******************************************************************************* Lane #2 Info WB Lane Mode : Subtraction Sensor Used : Axle ******************************************************************************* Date Time --------------------------------------------- 08/21/96 00:00 01:00 02:00 03:00 04:00 05:00 06:00 07:00 08:00 09:00 10:00 11:00 12:00 13:00 14:00 15:00 16:00 17:00 18:00 19:00 20:00 21:00 22:00 23:00 I Daily Total : AM Total : PM Total I Peak AM Hour: Peak PM Hour: I I I I '. :00 :15 :30 :45 Total 2 1 1 0 4 2 1 0 1 4 0 2 1 0 3 0 0 0 1 1 2 1 0 0 3 0 0 2 5 7 2 6 7 14 29 8 14 15 21 58 20 9 19 54 102 9 17 35 29 90 18 15 44 26 103 22 26 67 30 145 33 32 72 43 180 30 18 24 66 138 40 32 109 52 233 24 36 73 55 188 24 16 76 104 220 18 20 14 81 133 94 19 122 14 249 12 54 27 6 99 113 14 5 78 210 7 6 10 54 77 8 8 21 4 41 22 6 5 11 44 2361 Average Period: 24.3 549 23.2%-) Average Hour 98.4 1812 76.7%-) 11:00= 145 ( 6.1%-) Peak AM Factor: 0.541 17:45= 316 ( 13.3%-) Peak PM Factor: 0.648 I . 08/23/96 115:43:04 DUNN ENGINEERING 66 Mairt Street Westhampton Beach, NY 11978 (516) 288-2480 Page: 15 1******************************************************************************* Lane #2 Info WB ILane Mode : Subtraction Sensor Used : Axle ******************************************************************************* 1 Date Time :00 :15 :30 :45 Total --------------------------------------------- 08/22/96 00:00 5 1 01: 00 2 02:00 0 03:00 1 1 04:00 0 05:00 1 06:00 1 I 07:00 13 08:00 12 09:00 14 10:00 20 1 11:00 15 12:00 34 13:00 73 1 14:00 32 15:00 40 16:00 30 I 17:00 70 18:00 96 19:00 10 20:00 128 I 21:00 9 22:00 16 23:00 4 Ihaily Total: 2506 ~ Total : 486 PM Total L Peak AM Hour: eak PM Hour: 17:45= I 1 1 1 I 2 3 0 10 1 0 1 4 0 0 0 0 0 0 0 1 0 1 1 2 1 1 2 5 4 11 11 27 6 16 21 56 10 16 39 77 10 9 49 82 13 50 15 98 33 54 22 124 43 10 62 149 31 24 64 192 28 143 29 232 36 68 62 206 35 27 104 196 17 33 50 170 23 122 26 267 41 46 16 113 29 69 28 254 11 7 73 100 4 73 7 100 24 4 9 41 Average period: 25.8 ( 19.3%) Average Hour 104.4 09:45= 132 5.2%) Peak AM Factor: 0.660 291 ( 11.6%) Peak PM Factor: 0.596 DUNN ENGINEERING 66 Main Street Westhampton Beach, NY 11978 (516) 288-2480 Page: 16 Lane #2 Info WB Lane Mode : Subtraction Sensor Used : Axle ******************************************************************************* 08/23/96 00:00 01:00 02:00 03:00 04:00 05:00 06:00 07:00 08:00 09:00 10:00 11:00 I I I I I I I II 2 2 1 2 7 0 1 2 1 4 1 0 0 2 3 2 0 0 0 2 0 0 0 0 0 1 3 0 5 9 3 5 8 9 25 10 12 21 16 59 20 11 10 48 89 16 12 11 55 94 26 12 39 101 178 21 22 76 119 589 Average Period: 12.5 589 (100.0%) Average Hour 49.1 0 ( 0.0%) 10:45= 220 ( 37.3%) Peak AM Factor: 0.545 Peak PM Factor: I I I I I I I I I I I I I I I I I I I 08/23/96 15:43:04 DUNN ENGINEERING 66 Main Street Westhampton Beach, NY 11978 (516) 288-2480 Page: 17 =============================================================================== GRAND TOTALS =============================================================================== ***************************** LANES #1, & #2 FINAL **************************** Total Lane 1 Lane 2 TOTAL # Days Lane 1 Lane 2 HIGHEST AM Total Lane 1 Lane 2 TOTAL PM Total Lane 1 Lane 2 TOTAL Peak AM Lane 1 Lane 2 FINAL Peak PM Lane 1 Lane 2 19442 19901 39343 7 7 Avg Period Lane 1 28.9 Lane 2 29.6 ------- AVERAGE 29.3 ADT Lane 1 2777 Lane 2 2843 ------- ADT 5620 Avg Hour Lane 1 116.4 Lane 2 119.2 ------- AVERAGE 235.6 7 8565 ( 44.0%) 4349 ( 21. 8%) 12914 10877 15552 26429 11:00= 10:30= 11:00= 14:15= 14:30= FINAL: 14:30= 32.8%) 55.9%) 78.1%) 67.1%) 372 (08/18/96) 276 (08/17/96) AM Factor Lane 1 0.877 Lane 2 0.504 ----- FINAL 0.877 PM Factor Lane 1 0.817 Lane 2 0.788 ----- FINAL 0.788 372 (08/18/96) 376 (08/18/96) 432 (08/18/96) 432 (08/18/96) I I I I I I I I I I I I I I I I I I I Route 25 West of Cross Sound Ferry Terminal Orient Friday, August 16, 1996 to Friday, August 23, 1996 Disk #390. Cross Sound Ferry File: Dividers I I I I I I I I I I 08/23/96 15:34:32 DUNN ENGINEERING 66 Main Street Westhampton Beach, NY 11978 (516) 288-2480 Page: 1 l BASIC COUNT DATA PRINT Site ID : MAIN ROAD W/O FERRY ENT. Start Time: 14:00 Info 1 : WB Start Date: Aug 16, 1996 Fri Info 2 : EB End Time 11:30 End Date Aug 23, 1996 Fri Factor 1.000 *********'~********************************************************************* Lane #1 Info WB Lane Mode : Subtraction Sensor Used : Axle *********~'********************************************************************* Date Time --------------------------------------------- 08/16/96 14:00 15:00 16:00 17:00 18:00 19:00 20:00 21:00 2.2:00 23:00 I Daily Total : AM Total : PM Total : Peak AM Hour: I Peak PM Hour: I I I I I I II :00 :15 :30 :45 Total 17 11 138 22 188 9 29 60 12 110 17 6 59 66 148 31 8 8 64 III 61 6 119 10 196 10 30 46 66 152 52 7 107 12 178 1 29 4 81 115 7 112 15 6 140 52 4 1 1 58 1396 Average Period: 34.0 0 ( O.O%-) Average Hour 139.6 1396 (100.0%-) Peak AM Factor: 17:45= 250 ( 17.9%-) Peak PM Factor: 0.525 DUNN ENGINEERING 66 Main Street Westhampton Beach, NY 11978 (516) 288-2480 Page: 2 Lane #1 Info WB Lane Mode : Subtraction Sensor Used : Axle ******************************************************************************* Date Time :00 :15 :30 :45 Total --------------------------------------------- 1 0 0 0 1 0 0 1 1 2 0 1 1 0 2 0 0 0 0 0 0 0 0 1 1 0 0 4 1 5 1 6 1 4 12 5 5 28 6 44 3 3 82 11 99 20 6 29 21 76 22 6 127 12 167 12 67 24 26 129 20 16 16 127 179 34 21 21 56 132 35 22 70 91 218 28 49 63 25 165 22 24 24 115 185 33 24 17 96 170 27 16 64 72 179 17 43 33 70 163 30 5 91 17 143 3 4 11 67 85 16 55 25 16 112 11 7 1 2 21 2290 Average Period: 23.6 538 23.4%) Average Hour 95.4 1752 76.5%) 10:30= 218 ( 9.5%) Peak AM Factor: 0.429 14:30= 238 ( 10.3%) Peak PM Factor: 0.654 I I I I I I, I 08/23/96 15:34:32 DUNN ENGINEERING 66 Main Street Westhampton Beach, NY 11978 (516) 288-2480 Page: 3 I **********",******************************************************************** Lane #1 Info WB I Lane Mode : Subtraction Sensor Used : Axle **********i'******************************************************************** I Date Ti.me :00 :15 :30 :45 Total --------------------------------------------- I 08/18/96 00:00 3 0 2 0 5 01:00 0 1 1 0 2 02:00 0 0 0 0 0 03:00 0 1 0 0 1 I 04:00 2 0 0 0 2 05:00 0 0 0 1 1 06:00 0 2 5 5 12 I 07:00 5 0 27 12 44 08:00 6 3 2 28 39 09:00 12 8 31 24 75 I 10:00 10 60 29 11 110 11:00 17 31 36 14 98 12:00 27 12 57 104 200 13: 00 42 52 37 42 173 I 14:00 68 24 153 72 317 15:00 44 77 37 36 194 16:00 20 13 6 120 159 I 17:00 102 47 24 104 277 18:00 73 12 117 36 238 19:00 14 61 33 66 174 I 20:00 66 4 40 64 174 21:00 29 9 4 98 140 22:00 6 89 30 6 131 23:00 23 33 2 0 58 IDailY Total : 2624 Average Period: 27.1 AM Total 389 14.8%) Average Hour 109.3 IPM Total : 2235 85.1%) Peak AM Hour: 09:30= 125 ( 4.7%) Peak AM Factor: 0.521 Peak PM Hour: 14:30= 346 ( 13.1%) Peak PM Factor: 0.565 I I I I II I. 08/23/96 115 :34 :32 I ******************************************************************************* DUNN ENGINEERING 66 Main Street Westhampton Beach, NY 11978 (516) 288-2480 Page: 4 Lane #1 Info WB I Lane Mode : Subtraction Sensor Used : Axle **********~,******************************************************************** I Date Time :00 :15 :30 :45 Total --------------------------------------------- I 08/19/96 00:00 0 0 0 0 0 01:00 1 0 0 0 1 02:00 1 0 0 0 1 03:00 0 0 1 1 2 I 04:00 0 0 0 0 0 05:00 0 0 0 2 2 06:00 0 2 4 6 12 I 07:00 6 2 13 9 30 08:00 4 3 S4 11 72 09:00 13 6 5 30 54 10:00 7 8 68 19 102 I 11:00 14 10 63 24 111 12:00 19 13 71 60 163 13 :00 27 12 20 50 109 I 14:00 18 18 127 21 184 15:00 19 67 22 11 119 16:00 6 10 13 104 133 I 17:00 36 7 9 85 137 18:00 51 9 88 41 189 19:00 14 58 9 63 144 20:00 63 2 33 62 160 I 21:00 5 0 1 63 69 22:00 5 1 57 2 65 23:00 19 3 0 0 22 IDaily Total : 1881 Average Period: 19.4 AM Total : 387 20.5%) Average Hour 78.4 PM Total : 1494 79.4%) Ipeak AM Hour: 09:45= 113 ( 6.0%) Peak AM Factor: 0.415 Peak PM Hour: 14:30= 234 ( 12.4%) Peak PM Factor: 0.461 I I I I I I OB/23/96 115:34:32 DUNN ENGINEERING 66 Main Street Westhampton Beach, NY 1197B (516) 2BB-24BO Page: 5 1***********.******************************************************************** Lane #1 Info WB ILane Mode : Subtraction Sensor Used : Axle **********~,******************************************************************** I Date Time :00 :15 :30 :45 Total --------------------------------------------- IOB/2O/96 00:00 0 0 0 0 0 01:00 0 2 2 0 4 02:00 0 0 0 0 0 03:00 0 0 0 0 0 I 04:00 0 2 0 0 2 05:00 0 0 1 1 2 06:00 2 2 1 2 7 I 07:00 4 2 0 6 12 OB:OO 5 4 44 6 59 09:00 2 B 5 22 37 10:00 12 7 S6 B 83 I 11:00 6 47 15 10 7B 12:00 19 10 75 1B 122 13: 00 17 13 25 35 90 I 14:00 12 1B 100 21 151 15:00 17 65 16 15 113 16:00 15 12 1B 107 152 I 17:00 13 15 B 92 12B 1B:00 67 8 11.2 12 199 19:00 4 52 11 33 100 20:00 101 4 30 23 15B I 21:00 5 3 1 73 B2 22:00 5 2 33 0 40 23:00 16 2 2 1 21 ~ilY Total : 1640 Average Period: 16.9 Total : 2B4 17.3%-) Average Hour 6B.3 1M Total : 1356 B2.6%-) eak AM Hour: 10:30= 117 ( 7.1%-) Peak AM Factor: 0.522 eak PM Hour: 17:45= 279 ( 17.0%-) Peak PM Factor: 0.623 I I I I I 1 08/23/96 115:34:32 DUNN ENGINEERING 66 Main Street Westhampton Beach, NY 11978 (516) 288-2480 Page: 6 1**********,,******************************************************************** Lane #1 Info WB ILane Mode : Subtraction Sensor Used : Axle **********,r******************************************************************** 1 Date Time :00 :15 :30 :45 Total --------------------------------------------- 108/21/96 00:00 1 1 1 0 3 01:00 2 0 0 0 2 02:00 0 1 1 0 2 03:00 0 0 1 1 2 1 O~i: 00 0 0 0 0 0 0:;: 00 0 0 0 0 0 06:00 3 3 1 3 10 I 07:00 4 4 4 7 19 OB:OO 3 2 40 9 54 09:00 6 6 23 17 52 I 10:00 7 4 42 14 67 11:00 12 49 27 19 107 12:00 15 11 69 20 115 13 :00 18 8 18 56 100 I 14:00 20 17 104 21 162 15:00 8 53 26 13 100 16:00 12 12 92 16 132 I 17:00 9 13 7 121 150 18:00 38 10 116 6 170 19:00 4 53 14 31 102 20:00 90 1 34 42 167 1 21:00 2 5 4 46 57 22:00 4 27 4 5 40 23:00 23 5 0 0 28 IDaily Total : 1641 Average period: 16.9 AM Total : 318 19.3%) Average Hour 68.4 PM Total : 1323 80.6%) Ipeak AM Hour: 10:30= 117 ( 7.1%) Peak AM Factor: 0.597 Peak PM Hour: 17:45= 285 ( 17.3%) Peak PM Factor: 0.589 I 1 I I 1 1 08/23/96 115:34:32 DUNN ENGINEERING 66 Main Street Westhampton Beach, NY 11978 (516) 288-2480 Page: 7 1**********,,******************************************************************** Lane #1 Info WE ILane Mode : Subtraction . Sensor Used : Axle ******************************************************************************* 1 Date Time :00 :15 :30 :45 Total --------------------------------------------- 108/22/96 00:00 0 0 0 0 0 01:00 0 0 0 1 1 02:00 0 0 0 0 0 03:00 0 0 0 0 0 I 04:00 0 0 0 1 1 05:00 1 0 0 1 2 06:00 2 1 2 5 10 1 07:00 0 1 5 4 10 08:00 2 3 34 5 44 09:00 8 0 4 40 52 I 10:00 7 30 16 7 60 11:00 7 49 20 15 91 12:00 21 17 9 80 127 13:00 27 17 20 47 111 I 14:00 18 12 132 10 172 15:00 22 10 64 12 108 16:00 13 14 10 92 129 I 17:00 16 11 12 70 109 18:00 62 10 119 8 199 19:00 4 56 9 9 78 20:00 124 12 92 2 230 1 21:00 1 2 1 69 73 22:00 5 35 43 3 86 23:00 14 14 3 1 32 IDailY Total 1725 Average Period: 17.8 AM Total 271 15.7%) Average Hour 71.9 PM Total : 1454 84.2%-) I Peak AM Hour: 09:45= 93 ( 5.3%) Peak AM Factor: 0.581 Peak PM Hour: 17:45= 261 ( 15.1%-) Peak PM Factor: 0.548 1 I I I I I 08/23/96 115:34:32 DUNN ENGINEERING 66 Main Street Westhampton Beach, NY 11978 (516) 288-2480 Page: 8 11**********,,******************************************************************** Lane #1 Info WB ILane Mode : Subtraction Sensor Used : Axle **********~r******************************************************************** I Date Ti.me :00 :15 :.30 :45 Total --------------------------------------------- 108/23/96 00:00 0 1 0 0 01:00 0 1 1 1 0;::: 00 0 0 0 1 03:00 2 0 0 0 I 04:00 0 0 0 0 05:00 0 3 0 2 06:00 4 1 2 4 I 07:00 3 9 13 3 08:00 8 6 4 42 09:00 12 5 7 43 I 10:00 10 3 71 46 11:00 8 13 63 Daily Total lAM Total PM Total Peak AM Hour: IPeak PM Hour: 392 392 o 10:30= (100.0%) ( 0.0%) 138 ( 35.2%) I I I I 1 I I I 1 3 1 2 o 5 11 28 60 67 130 84 Average Period: Average Hour 8.3 32.7 Peak AM Factor: 0.486 Peak PM Factor: I 08/23/96 I 15:34:32 I DUNN ENGINEERING 66 Main Street Westhampton Beach, NY 11978 (516) 288-2480 Page: 9 ******************************************************************************* Lane #2 Info EB I Lane Mode : Subtraction Sensor Used : Axle ******************************************************************************* I Date Time --------------------------------------------- 108/16/96 14:00 lS:00 16:00 17:00 113:00 19:00 20:00 21:00 22:00 23:00 IDailY Total : AM Total : PM Total I Peak AM Hour: Peak PM Hour: I I I I I I I I I 'I II :00 :15 :30 39 54 54 21 47 29 35 38 40 31 22 36 30 44 24 22 32 29 19 20 22 13 24 12 4 7 4 5 3 0 950 0 ( 0.0%) 950 (100.0%) 14:00= 170 ( 17. B%) :45 Total 23 29 36 28 22 24 20 4 3 1 170 126 149 117 120 107 81 53 18 9 Average Period: Average Hour 23.2 95.0 Peak AM Factor: Peak PM Factor: 0.787 1 08/23/96 115:34:32 DUNN ENGINEERING 66 Main Street Westhampton Beach, NY 11978 (516) 288-2480 Page: 10 11**********,,******************************************************************** Lane #2 Info EB ILane Mode : Subtraction Sensor Used : Axle **********;r******************************************************************** I Date Ti.me :00 :15 :30 --------------------------------------------- :45 Total 108/17/96 00:00 0 0 0 01:00 0 1 1 02:00 0 1 1 03:00 0 0 0 I 04:00 0 0 0 05,: 00 0 3 8 06:00 15 48 40 I 07:00 24 30 45 08:00 28 43 57 09:00 28 63 60 I 10:00 45 53 47 11:00 38 50 48 12:00 43 53 54 13:00 35 32 47 I 14:00 45 56 67 15:00 37 53 44 16:00 26 37 36 I 17:00 25 32 29 18:00 31 28 38 19:00 19 17 22 20:00 13 26 25 I 21:00 13 9 10 22:00 2 2 2 23:00 2 2 4 JailY Total : 2241 AM Total 1M Total : 1289 ( 57.5%) eak AM Hour: 09:15= 196 ( 8.7%) eak PM Hour: 14:00= 225 ( 10.0%) I I I I I I o 0 o 2 o 2 o 0 3 3 5 16 22 125 21 120 33 161 28 179 24 169 39 175 39 189 27 141 57 225 22 156 33 132 26 112 18 115 20 78 18 82 7 39 4 10 2 10 952 ( 42.4%) Average Hour Peak AM Factor: 0.778 Peak PM Factor: 0.840 I 08/23/96 115: 34: 32 DUNN ENGINEERING 66 Main Street Westhampton Beach, NY 11978 (516) 288-2480 Page: 11 11**********,,******************************************************************** Lane #2 Info EB ILane Mode : Subtraction Sensor Used : Axle **********i~******************************************************************** I Date Time :00 :15 :30 :45 Total --------------------------------------------- 108/18/96 00:00 1 0 0 0 1 01.:00 0 1 1 0 2 02:00 0 0 0 1 1 03:00 0 0 0 0 0 I 04: 00 0 0 1 0 1 05,: 00 0 3 3 1 7 06:00 24 30 51 29 134 I 07:00 21 24 49 23 117 08:00 22 45 40 43 150 09:00 34 42 49 45 170 10:00 35 52 51 44 182 I 11:00 44 67 99 98 308 12:00 44 76 55 47 222 13:00 56 44 58 51 209 I 14:00 53 59 99 81 292 15:00 63 41 74 68 246 16:00 93 93 95 47 328 I 17:00 36 57 70 39 202 18:00 42 50 32 41 165 19:00 27 36 51 17 131 20:00 22 22 35 26 105 I 21:00 14 16 12 5 47 22:00 1 1 4 4 10 23:00 1 4 0 0 5 lailY Total : 3035 Average Period: 31. 3 AM Total : 1073 35.3%) Average Hour 126.5 EM Total : 1962 64.6%) eak AM Hour: 11:00= 308 ( 10.1%) Peak AM Factor: 0.778 eak PM Hour: 15:45= 349 ( 11.4%) Peak PM Factor: 0.918 I I I I I I I I I. 08/23/96 115:34:32 DUNN ENGINEERING 66 Main Street Westhampton Beach, NY 11978 (516) 288-2480 Page: 12 11**********0'******************************************************************** Lane #2 Info EB ILane Mode : Subtraction Sensor Used : Axle **********~,******************************************************************** I Date Time :00 :15 :30 :45 Total --------------------------------------------- 108/19/96 00:00 1 0 2 0 3 01:00 0 0 0 0 0 02:00 0 0 0 0 0 03:00 0 1 0 1 2 I 04:00 0 0 1 2 3 05:00 1 3 3 3 10 06:00 18 42 41 29 130 I 07:00 24 36 59 24 143 08:00 20 32 48 29 129 09:00 35 51 56 38 180 I 10:00 27 52 43 42 164 11:00 32 41 45 32 150 12:00 38 54 45 27 164 13:00 34 27 32 30 123 I 14:00 36 38 46 30 150 15:00 26 35 24 18 103 16:00 24 47 27 17 115 I 17:00 20 20 30 18 88 18:00 15 21 38 16 90 19:00 25 21 22 11 79 I 20:00 6 12 14 3 35 21:00 7 3 8 1 19 22:00 1 1 2 2 6 23:00 5 1 0 0 6 IDailY Total : 1892 Average period: 19.5 AM Total 914 48.3%) Average Hour 78.8 ,PM Total : 978 51.6%) Peak AM Hour: 09:00= 180 ( 9.5%) Peak AM Factor: 0.804 Peak PM Hour: 1 1 I , I I I 115:34:32 08/23/96 DUNN ENGINEERING 66 Main Street Westhampton Beach, NY 11978 (516) 288-2480 11******************************************************************************* Lane #2 Info EB ILane Mode : Subtraction Sensor Used : Axle ******************************************************************************* II Date Time :00 :15 :30 :45 Total --------------------------------------------- 108/20/96 00:00 0 0 0 0 0 01:00 1 1 0 0 2 02:00 0 0 1 0 1 03:00 0 0 0 0 0 I 04:00 0 0 0 2 2 05:00 0 1 5 2 8 06:00 10 30 29 18 87 I 07:00 19 54 67 24 164 08:00 23 36 37 25 121 09:00 32 56 Sl 44 183 I 10:00 25 45 50 23 143 11:00 19 44 44 36 143 12:00 25 38 27 24 114 13:00 20 24 21 19 84 II 14:00 23 43 28 30 124 15:00 31 31 27 27 116 16:00 27 18 27 24 96 I 17:00 15 23 28 24 90 18:00 10 19 24 17 70 19:00 6 15 17 11 49 20:00 6 7 8 8 29 I 21:00 4 8 3 4 19 22:00 1 1 2 0 4 23:00 2 0 0 2 4 loailY Total : 1653 Average Period: 17.0 AM Total : 854 51.6%) Average Hour 68.9 PM Total : 799 48.3%) teak AM Hour: 09:00~ 183 ( 11.0%) Peak AM Factor: 0.817 eak PM Hour: 14:15~ 132 ( 7.9%) Peak PM Factor: 0.767 II I 1 I I 1 08/23/96 115:34:32 DUNN ENGINEERING 66 Main Street Westhampton Beach, NY 11978 (516) 288-2480 Page: 14 11**********..******************************************************************** Lane #2 Info EB ILane Mode : Subtraction Sensor Used : Axle ******************************************************************************* I Date Time :00 :15 :30 :45 Total --------------------------------------------- 108/21/96 00:00 0 0 0 0 0 01:00 2 1 0 0 3 02:00 1 0 1 0 2 03:00 0 0 1 1 2 I 04:00 0 0 0 1 1 05:00 0 1 4 9 14 06:00 9 24 25 15 73 I 07:00 23 37 53 34 147 08:00 15 43 33 28 119 09:00 21 51 61 26 159 10:00 27 39 30 25 121 I 11:00 38 47 50 31 166 12:00 22 27 39 32 120 13 :00 19 22 30 28 99 I 14:00 35 34 38 22 129 15:00 16 29 26 19 90 16:00 19 30 31 18 98 I 17:00 16 25 31 17 89 18:00 17 15 15 14 61 19:00 9 22 18 6 55 20:00 4 5 12 4 25 I 21:00 6 8 2 3 19 22:00 1 1 2 3 7 23:00 3 1 0 0 4 IDailY Total : 1603 Average period: 16.5 AM Total : 807 50.3%) Average Hour 66.8 PM Total : 796 49.6%) Ipeak AM Hour: 11:00= 166 ( 10.3%) Peak AM Factor: 0.830 Peak PM Hour: 13:45= 135 ( 8.4%) Peak PM Factor: 0.888 I I I I I I 08/23/96 115:34:32 DUNN ENGINEERING 66 Main Street Westhampton Beach, NY 11978 (516) 288-2480 Page: 15 Il***********.t******************************************************************* Lane #2 Info EB ILane Mode : Subtraction Sensor Used : Axle ******************************************************************************* I Date Time :00 :15 :30 :45 Total --------------------------------------------- 108/22/96 00:00 1 0 0 0 1 01:00 0 0 0 0 0 02:00 1 0 0 0 1 03:00 0 0 0 0 0 I 04:00 0 0 1 1 2 05:00 1 2 5 4 12 06:00 D 2l 45 21 100 I 07:00 16 47 39 25 127 08:00 19 36 48 D 116 09:00 37 57 65 28 187 I 10:00 34 32 55 20 141 11:00 24 33 53 26 D6 12:00 32 42 34 22 DO 13:00 24 25 42 19 110 I 14:00 39 30 40 24 D3 15:00 26 20 30 30 106 16:00 30 34 32 20 116 I 17:00 15 23 21 19 78 18:00 9 19 20 20 68 19:00 8 17 16 25 66 20:00 8 9 7 3 27 I 21:00 6 2 7 3 18 22:00 0 4 1 2 7 23:00 0 0 0 0 0 loailY Total : 1682 Average period: 17.3 AM Total : 823 48.9%) Average Hour 70.1 PM Total : 859 51.0%) teak AM Hour: 09:00= 187 ( 11.1%) Peak AM Factor: 0.719 Peak PM Hour: 14:00= D3 ( 7.9%) Peak PM Factor: O. I I I I I 1- 08/23/96 115:34:32 66 Main Street Westhampton Beach, NY 11978 (516) 288-2480 1***********,,******************************************************************* Lane #2 Info EB II Lane Mode : Subtraction Sensor Used : Axle ***********~~******************************************************************* 1 Date :00 :15 :30 --------------------------------------------- :45 Total Time 108/23/96 00:00 1 0 0 01:00 0 1 0 02:00 0 0 2 03:00 1 0 0 I 04:00 0 0 0 05:00 3 1 6 06:00 17 26 44 I 07:00 27 54 47 08:00 24 35 42 09:00 34 42 56 I 10:00 39 51 42 11:00 30 59 43 Daily Total : lAM Total : PM Total : Peak AM Hou:r-: I Peak PM Hour: 888 888 o 09:30= (100.0%) ( 0.0%) 188 ( 21.1%) II I I II I 1 1 I o 1 1 2 1 3 o 1 o 0 7 17 22 109 33 161 37 138 42 174 18 150 132 Average Period: Average Hour 18.9 74.0 Peak AM Factor: 0.839 Peak PM Factor: , 08/23/96 115:34:32 DUNN ENGINEERING 66 Main Street Westhampton Beach, NY 11978 (516) 288-2480 Page: 17 ~==========---===========-======-===================-==========--=====--===-==== GRAND TOTALS 1==---=====---===========---========================-===-================-====== **********i'****************** LANES #1, & #2 FINAL **************************** 'Total Lane 1 Lane 2 ~ TOTAL # Days Lane 1 I Lane 2 HIGHEST ~ Total Lane 1 Lane 2 I TOTAL PM Total Lane 1 I Lane 2 TOTAL teak AM Lane 1 Lane 2 I Peak I I , I , I I FINAL PM Lane 1 Lane 2 13589 13944 27533 6.98 6.98 6.98 Avg Period Lane 1 Lane 2 20.3 20.8 AVERAGE 20.5 32.2%) 81. 0%) 54.7%) ADT Lane 1 1947 Lane 2 1998 ------- ADT 3945 Avg Hour Lane 1 81. 9 Lane 2 84.0 ------- AVERAGE 165.9 2579 ( 18.9%) 6311 ( 45.2%) 8890 11010 7633 10:30= 11:00= 11:00= 14:30- 15:45- FINAL: 15:45- 218 (08/17/96) 308 (08/18/96) AM Factor Lane 1 0.429 Lane 2 0.778 ----- FINAL 0.778 PM Factor Lane 1 0.565 Lane 2 0.918 ----- FINAL 0.918 308 (08/18/96) 346 (08/18/96) 349 (08/18/96) 349 (08/18/96) I I I I I I I I I I I I I I I I I I I Route 25 East of C.R. 48 Greenport Friday, August 8, 1997 to Thursday, August 21, 1997 Disk #3'90, Cross Sound Ferry File: Dividers 109/15/97 15:14:45 I 1 ******************************************************************************** DUNN ENGINEERING ASSOCIATES 66 MAIN STREET WESTHAMPTON,BEACH NY (516) 288-2480 Page: 1 *** Hourly Multi-Channel Horizontal *** I II I 10 1 ISite ID : RT.25 E/O C.R.48 GREENPORT Start Time 13:30 Info 1 : EB Start Date : Aug 8, 1997 Fri Info 2 : WB End Time : 11:00 Factor : 1.000% End Date : Aug 21, 1997 Thu 1******************************************************************************** Lane #1 Info : EB Sensor Used : Axle Lane Mode : Subtraction Divide By 2 : Yes 1******************************************************************************** Lane #2 Info : WB Sensor Used : Axle Lane Mode : Subtraction Divide By 2 : Yes 11**********************::::**::::************************************************ Date Day' Time #1 #2 Avg. Total I ~ ~ i ~ ~ i ~; - ;~ ~ - ~ ~ ~ ~ ~ - - - - ~ ~ ~ - - - ~ ~~. - - - - ~;; - - - - - - ~ ~ ~ - 15:00 453 520 486 973 16:00 457 450 453 907 17:00 465 495 480 960 18:00 462 369 415 831 19:00 406 517 461 923 20:00 338 341 339 679 21:00 287 406 346 693 22:00 264 240 252 504 23:00 203 270 236 473 HOUR TOTAL PERCENTS 3776 48% 4013 52% 3894 7789 AM AM PM PM Peak Peak Peak Peak Peak Peak Lane Total Avg. Total Avg. AM Total Percent PM Total Percent I-;~------------------;;;~--;;;~~----------------------~;~~~----~~~--~;~;;- #2 4013 401.3 15:00 520 13.0% IIcoMB.------ ------ --;;~~ -;~~~~ ----- ------ ------ ~~~~~ ---~;; -~;~~; 1 I II I 109/15/97 15:14:45 II DUNN ENGINEERING ASSOCIATES 66 MAIN STREET WESTHAMPTON,BEACH NY (516) 288-2480 Page: 2 *** Hourly Multi-Channel Horizontal *** 1******************************************************************************** Site ID : RT.25 E/O C.R.48 GREEN PORT Date of Data: Aug 9, 1997 Sat II Info 1 : EB Adj. Factor : 1.00 Info 2 : WB # Of Lanes : 2 ******************************************************************************** II Lane Lane Date Day Time #1 #2 Avg. Total t-~i~;i;;-~~~-~~~~~----~;;---~~~:----~;~------;~~- 01:00 64 47 55 111 02:00 40 21. 30 61. II 03:00 29 10 19 39 04:00 10 17 13 27 05:00 13 5' 11 22 II 06:00 48 33 40 81 07:00 244 77 160 321 08:00 300 166 233 466 II 09:00 375 365 370 740 10:00 478 430 454 908 11:00 575 593 584 1168 12:00 682 560 621 1242 II 13: 00 634 551 592 1185 14:00 576 565 570 1141 15:00 509 541 525 1050 II 16:00 485 543 514 1028 17:00 464 511 487 975 18:00 425 497 461 922 19:00 368 566 467 934 II 20:00 335 423 379 758 21:00 58 198 128 256 22:00 0 0 0 0 1 23:00 0 0 0 0 ----- ----- ----- ------- 24 HOUR TOTAL 6845 6840 6842 13685 II PERCENTS 50% 50% AM AM PM PM Peak Peak Peak Peak Peak Peak Lane Total Avg. Total Avg. AM Total Percent PM Total Percent 11-------------------------------------------------------------------------- #1 2309 192.4 4536 378.0 11:00 575 8.4% 12:00 682 10.0% #2 1885 157.1 4955 412.9 11:00 593 8.7% 19:00 566 8.3% 10MB. ------ ------ ------ ------ ----- ------ ------ ----- ------ ------ 4194 174.8 9491 395.5 11:00 1168 8.5% 12:00 1242 9.1% II II II DUNN ENGINEERING ASSOCIATES 66 MAIN STREET WESTHAMPTON,BEACH NY (516) 288-2480 Page: 3 Site ID RT.25 E/O C.R.48 GREENPORT Date of Data: Aug la, 1997 Sun Info 1 : EB Adj. Factor : 1.00 Info 2 : \<18 # Of Lanes : 2 **********~'********************************************************************* Date Day Time 00:00 01:00 02:00 03:00 04:00 05:00 06:00 07:00 08:00 09:00 10:00 11:00 12: 00 13:00 14:00 15:00 16:00 17:00 18:00 19:00 20:00 21:00 22:00 23:00 Lane #1 Lane #2 Avg. Total 0 I) 0 0 0 :2 1 2 0 I) 0 0 0 () 0 0 0 () 0 0 0 () 0 0 0 () 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 0 1 0 1. 0 1 0 -, 1 2 <, 0 4 2 4 0 3 1 3 0 1 0 1 0 1 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ----- ----- ----- ------- 0 15 7 15 0% 100% AM AM PM PM Peak Peak Peak Peak Peak Peak Lane Total Avg. Total Avg. AM Total Percent PM Total Percent ~-;i-------~----~~~------~----~~~--~~~~~------~---~~~;-i;~~~------~---~~~;- #2 4 0.3 11 0.9 01:00 2 13.3% 13:00 4 26.7% ICOMB.-----~ ---~~; ----ii ---~~~ ~i~~~ -----; -i;~;; i;~~~ -----~ -;~~;; I I I II 09/15/97 15:14:45 II DUNN ENGINEERING ASSOCIATES 66 MAIN STREET WESTHAMPTON,BEACH NY (516) 288-2480 Page: 4 *** Hourly Multi-Channel Horizontal *** 11******************************************************************************** Site ID : RT.25 E/O C.R.48 GREENPORT Date of Data Aug 11, 1997 Mon II Info 1 : EB Adj. Factor : 1.00 Info 2 : WB # Of Lanes : 2 ******************************************************************************** II Lane Lane Date Day Time #1 #2 Avg. Total I;~i~~i~;-~~~-g~~gg------g-----~:------g--------g- II II II II II II II 24 II 02:00 0 (I 0 0 03:00 0 (I 0 0 04:00 0 (I 0 0 05:00 0 (I 0 0 06:00 0 (I 0 0 07:00 0 0 0 0 08:00 0 1 0 1 09:00 0 0 0 0 10:00 0 0 0 0 11:00 0 0 0 0 12:00 89 45 67 134 13:00 398 442 420 840 14:00 279 411 345 690 15:00 86 430 258 516 16:00 0 404 202 404 17:00 0 400 200 400 18:00 0 430 215 430 19:00 0 439 219 439 20:00 0 324 162 324 21:00 0 347 173 347 22:00 0 133 66 133 23:00 0 137 68 137 ----- ----- ----- ------- HOUR TOTAL 852 3943 2397 4795 PERCENTS 18% 82% AM AM PM PM Peak Peak Peak Peak Peak Peak Lane Total Avg. Total Avg. AM Total Percent PM Total Percent It#~-------;----;~;----~~;---;~~;--;;~;;------;---;~;%-~;~;;----;;~--~~~;%- #2 1 0.1 3942 328.5 08:00 1 0.0% 13:00 442 11.2% 10MB. -----~ ---;~; --~;;~ -~;~~~ ;~~;; ___h~ h;~;% ~;~;; ---~~; -~;~~% II II II I 09/15/97 15:14:45 I DUNN ENGINEERING ASSOCIATES 66 MAIN STREET WESTHAMPTON,BEACH NY (516) 288-2480 Page: 5 I *** Hourly Multi-Channel Horizontal *** ******************************************************************************** Site ID : RT.25 E/O C.R.48 GREENPORT Date of Data: Aug 12, 1997 Tue I Info 1 : BB Adj. Factor : 1.00 Info 2 : WB # Of Lanes : 2 ******************************************************************************** I Date Day Time Lane #1 Lane #2 Avg. Total I I I I I I 21 I I~~/~;/~;-;~~-~~~~~------~----~~:-----~~-------~~- 02:00 0 1S 7 15 03:00 0 6 3 6 04:00 0 6 3 6 05:00 0 14 7 14 06:00 0 41 20 41 07:00 0 108 54 108 08:00 0 192 96 192 09:00 0 273 136 273 10:00 0 314 157 314 11:00 0 373 186 373 12:00 0 350 175 350 16:00 255 536 395 791 17:00 337 327 332 664 18:00 293 443 368 736 19:00 178 272 225 450 20:00 147 308 227 455 21:00 117 135 126 252 22:00 84 119 101 203 23:00 42 61 51 103 HOUR TOTAL PERCENTS 1453 27% 3969 73% 2711 5422 AM AM PM PM Peak Peak Peak Peak Peak Peak I~;~= - - =~=~~ - - - ~;~ ~ - - =~~~; - - ~~~~.~ - - ~~ ~~ - - =~=~~ - ~=;~;:= ~; ~~~ - - =~~;~ - ~;;~;:= #2 1418 118.2 2551 283.4 11:00 373 9.4% 16:00 536 13.5% ICOMB. --~~~~ --~~~~ --~~~~ -;;;~.~ ~~~~~ ---;;; --~~~; ~~~~~ ---;~~ -~~~~; I I I I 109/15/97 15:14:45 I DUNN ENGINEERING ASSOCIATES 66 MAIN STREET WESTHAMPTON,BEACH NY (516) 288-2480 Page: 6 ... Hourly Multi-Channel Horizontal... 1******************.**.*************.******************************************** Site ID : RT.25 E/O C.R.48 GREENPORT Date of Data: Aug 13, 1997 Wed 1 Info 1 : EB Adj. Factor : 1.00 Info 2 : WB # Of Lanes : 2 ******************************************************************************** I Lane Lane Date Day Time #1 #2 Avg. Total I;;;i;;;;-;;~-;;~;;-----;i----;;-----;~-------;;- 01:00 18 18 18 36 02:00 4 7 5 11 03:00 7 8 7 15 04:00 8 5' 8 17 05:00 40 37 38 77 06:00 170 101 135 271 07:00 308 198 253 506 08:00 272 267 269 539 09:00 357 283 320 640 10:00 307 344 325 651 11: 00 345 363 354 708 12: 00 316 418 367 734 13:00 5 404 204 409 14:00 0 354 177 354 15:00 4 4 4 8 16:00 0 56 28 56 17:00 0 51 25 51 18:00 0 42 21 42 19:00 0 11 5 11 20:00 1 4 2 5 21:00 0 0 0 0 22:00 0 1 0 1 23:00 0 0 0 0 ----- ----- ----- ------- HOUR TOTAL 2203 3012 2607 5215 PERCEN'I'S 42% 58% I I I 1 1 1 1 24 I AM AM PM PM Peak Peak Peak Peak Peak Peak Lane Total Avg. Total Avg. AM Total Percent PM Total Percent lI#i----i~;;--i~~~~----;;~---;;~:;--;;~;;----;~;--i~~;%-i;~;;----;i~--i~~;%- #2 1667 138.9 1345 112.1 11:00 363 12.1% 12:00 418 13.9% IJOMB.--;~~~ -i~;~; --i~;i --~;~I~ ii~;; ---;;~ -i;~~% i;~;; ---;;~ -i~~i% I I I I I I 1 1 I 1 I I 1 1 I 09/15/97 15:14:45 DUNN ENGINEERING ASSOCIATES 66 MAIN STREET WESTHAMPTON,BEACH NY (516) 288-2480 Page: 7 *** Hourly Multi-Channel Horizontal *** **********~~********************************************************************* Site ID RT.25 E/O C.R.48 GREENPORT Date of Data: Aug 14, 1997 Thu Info 1 : EB Adj. Factor : 1.00 Info 2 : WB # Of Lanes : 2 ******************************'t************************************************* Date Day Time Lane #1 Lane #2 Avg. Total 08/14/97 Thu ------------------------------------------------ 124 I HOUR TOTAL PERCENTS 00:00 0 1 0 1 01:00 0 0 0 0 02:00 0 0 0 0 03:00 0 0 0 0 04:00 0 0 0 0 05:00 1 0 0 1 06:00 0 ", 1 2 <. 07:00 2 CI 1 2 08:00 3 CI 1 3 09:00 6 CI 3 6 10:00 9 1 5 10 11:00 7 3 5 10 12:00 11 4 7 15 13:00 15 2 8 17 14:00 25 5 15 30 15:00 12 6 9 18 16:00 29 7 18 36 17:00 12 0 6 12 18:00 18 4 11 22 19:00 1 1 1 2 20:00 1 0 0 1 21:00 1 0 0 1 22:00 0 0 0 0 23:00 1 0 0 1 ----- ----- ----- ------- 154 36 95 190 81% 19% AM AM PM PM Peak Peak Peak Peak Peak Peak Lane Total Avg. Total Avg. AM Total Percent PM Total Percent I-;~------;~----;~;----~;~---i;~~--~;~;;------;---~~~;-i~~;;-----;;--~~~~;- #2 7 0.6 29 2.4 11:00 3 8.3% 16:00 7 19.4% ICOMB.----;~ ---~~~ ---~~~ ---~~~ ~;~;; ----~; --~~;; ~~~;; ----;~ -~~~;; 1 1 1 109/15/97 15:14:45 DUNN ENGINEERING ASSOCIATES 66 MAIN STREET WESTHAMPTON,BEACH NY (516) 288-2480 Page: 8 I *** Hourly Multi-Channel Horizontal *** 1******************************************************************************** Site ID RT.25 Elo C.R.48 GREENPORT Date of Data: Aug 15, 1997 Fri 1 Info 1 : EB Adj. Factor : 1.00 Info 2 : WB # Of Lanes : 2 ******************************************************************************** 1 Date Day Time Lane #1 Lane #2 Avg. Total 108/15/97 Fri ------------------------------------------------ I I 1 I I I _4 I HOUR TOTAL PERCEN'l~S 00:00 0 (I 0 0 01:00 0 (I 0 0 02:00 0 (I 0 0 03:00 0 (I 0 0 04:00 0 0 0 0 05:00 0 0 0 0 06:00 0 0 0 0 07:00 2 1 1 3 08:00 4 0 2 4 09:00 1 0 0 1 10:00 8 5 6 13 11:00 17 29 23 46 12:00 554 400 477 954 13: 00 474 355 414 829 14:00 565 474 519 1039 15:00 503 384 443 887 16:00 548 417 482 965 17:00 642 269 455 911 18:00 532 366 449 898 19:00 440 277 358 717 20:00 430 299 364 729 21:00 385 239 312 624 22:00 314 175 244 489 23:00 216 59 137 275 ----- ----- ----- ------- 5635 3749 4692 9384 60% 40% AM AM PM PM Peak Peak Peak Peak Peak Peak Lane Total Avg. Total Avg. AM Total Percent PM Total Percent II#~------;;----;~;---~~~;--~~~~~--~~~~~-----~;---~~;%-~;~~~----~~;--~~~~%- #2 35 2.9 3714 309.5 11:00 29 0.8% 14:00 474 12.6% ------ ------ ------ ------ ----- ------ ------ ----- ------ ------ 10MB. 67 2.8 9317 388.:2 11:00 46 0.5% 14:00 1039 11.1% I I I I 09/15/97 15:14:45 I I *** Hourly Multi-Channel Horizontal *** ******************************************************************************** Site ID RT.25 E/O C.R.48 GREEN PORT Date of Data Aug 16, 1997 Sat I Info 1 : EB Adj. Factor : 1.00 Info 2 : WB # Of Lanes : 2 ******************************************************************************** I DUNN ENGINEERING ASSOCIATES 66 MAIN STREET WESTHAMPTON,BEACH NY (516) 288-2480 Page: 9 Lane Lane Date Day Time #1 #2 Avg. Total I ~~i~~i~;-~~~-~~~~~-----;;----;~;-----~;------~~~- 01:00 63 11 37 74 I I I I I I I 24 I 02:00 03:00 04:00 05:00 06:00 07:00 08:00 09:00 10:00 11:00 12: 00 13:00 14: 00 15:00 16:00 17:00 18:00 19:00 20:00 21:00 22:00 23:00 HOUR TOTAL PERCENTS 44 18 17 63 282 382 405 537 616 740 715 572 523 471 421 420 324 315 214 223 193 152 7802 51% II 9 HI 23 51 146 363 441 501 462 433 420 531 595 571 558 681 457 493 263 285 97 7434 49% 27 13 13 43 166 264 384 489 558 601 574 496 527 533 496 489 502 386 353 243 239 124 7618 55 27 27 86 333 528 768 978 lll7 1202 ll48 992 1054 1066 992 978 1005 772 707 486 478 249 15236 AM AM PM PM Peak Peak Peak Peak Peak Peak Lane Total Avg. Total Avg. AM Total Percent PM Total Percent I-;~----;;~;--;;~~~---~~~;--;;~~~--~~~~~----;~~---;~~~-~;~~~----;~~---;~;~- #2 2050 170.8 5384 448.7 10:00 501 6.7% 18:00 681 9.2% ICOMB. --~;~; -;;~~; --;~;; -~~;~,~ ~~~~~ --~;~; --;~;~ ~;~~~ h~~~~ --;~~~ I I I 109/15/97 15:14:45 1 DUNN ENGINEERING ASSOCIATES 66 MAIN STREET WESTHAMPTON,BEACH NY (516) 288-2480 Page: 10 *** Hourly Multi-Channel Horizontal *** 1******************************************************************************** Site ID : RT.25 E/O C.R.48 GREENPORT Date of Data: Aug 17, 1997 Sun 1 Info 1 : EB Adj. Factor : 1.00 Info 2 : WB # Of Lanes : 2 ******************************************************************************** 1 Lane Lane Date Day Time #1 #2 Avg. Total I~~i~;i;;-~~~-~~~~~-----;~----~~;-----;~------~~;- 01:00 57 22 39 79 02:00 31 13 22 44 1 03:00 15 6 10 21 04:00 19 4 11 23 05:00 39 22 30 61 1 06:00 198 70 134 268 07:00 326 163 244 489 08:00 381 219 300 600 1 09:00 511 334 422 845 10:00 602 451 526 1053 11:00 698 426 562 1124 12: 00 667 459 563 1126 1 13:00 653 514 583 1167 14:00 709 385 547 1094 15:00 683 372 527 1055 1 16:00 628 330 479 958 17:00 596 460 528 1056 18:00 564 476 520 1040 19:00 394 289 341 683 1 20:00 397 307 352 704 21:00 282 169 225 451 22:00 169 152 160 321 124 23:00 81 44 62 125 ----- ----- ----- ------- HOUR TOTAL 8794 5746 7270 14540 1 PERCEN'l~S 60% 40% AM AM PM PM Peak Peak Peak Peak Peak Peak Lane Total Avg. Total Avg. AM Total Percent PM Total Percent It-----------.-------------------------------------------------------------- #1 2971 247.6 5823 485.3 11:00 698 7.9% 14:00 709 8.1% #2 1789 149.1 3957 329.8 10:00 451 7.8% 13: 00 514 8.9% JOMB. ------ ------ ------ ------ ----- ------ ------ ----- ------ ------ 4760 198.3 9780 407.5 11:00 1124 7.7% 13:00 1167 8.0% 1 1 I I 09/15/97 15:14:45 I DUNN ENGINEERING ASSOCIATES 66 MAIN STREET WESTHAMPTON,BEACH NY (516) 288-2480 Page: 11 I *** Hourly Multi-Channel Horizontal *** ******************************************************************************** Site ID : RT.25 E/O C.R.48 GREENPORT Date of Data Aug 18, 1997 Mon I Info 1 : EB Adj. Factor : 1.00 Info 2 : WB # Of Lanes : 2 ******************************************************************************** I Lane Lane Date Day Time #1 #2 Avg. Total I~~i~~i;;-~~~-~~~~~-----~~----~~;-----;~-------~~- 01:00 19 8 13 27 I I I I I I I 24 I 02:00 03:00 04:00 05:00 06:00 07:00 08:00 09:00 10:00 11:00 12:00 13:00 14:00 15:00 16:00 17:00 18:00 19:00 20:00 21:00 22:00 23:00 HOUR TOTAL PERCENTS 11 14 18 58 241 365 387 438 437 511 550 489 533 529 592 667 671 402 453 235 210 105 7983 72% 7 9 39 61 153 194 214 308 287 215 253 267 315 188 188 105 67 61 43 37 29 3064 28% 4 7 10 13 48 151 259 290 326 372 399 382 371 400 422 390 427 388 234 257 139 123 67 15 21 27 97 302 518 581 652 745 798 765 742 800 844 780 855 776 469 514 278 247 134 5523 11047 AM AM PM PM Peak Peak Peak Peak Peak Peak Lane Total Avg. Total Avg. AM Total Percent PM Total Percent I-#~----;~~;"-;~;~;---~~;~--~~;~~--~~~~~----~~~---~~~~-~~~~~----~;~---~~~~- #2 1296 108.0 1768 147.3 10:00 308 10.1% 15:00 315 10.3% ~OMB.--;~~; -~~~~~ --;;~~ -;~~~; ~~~~~ ---;;~ --;~;% ~;~~~ ---~~~ --;~;% I I I 109/15/97 15:14:45 I DUNN ENGINEERING ASSOCIATES 66 MAIN STREET WESTHAMPTON,BEACH NY (516) 288-2480 Page: 12 I *** Hourly Multi-Channel Horizontal *** ******************************************************************************** ISite ID : RT.25 E/O C.R.48 GREENPORT Date of Data: Aug 19, 1997 Tue Info 1 : EB Adj. Factor : 1.00 Info 2 : WB # Of Lanes : 2 ******************************************************************************** I Lane Lane Date Day Time #1 #2 Avg. Total I~~;i;;;;-~~;-~~:~~-----i;-----~-----;;-------;;- 01:00 25 5 15 30 02:00 18 1 10 21 I -' 03:00 16 4 10 20 04:00 26 3 14 29 05:00 67 14 40 81 I 06:00 264 36 150 300 07:00 463 58 260 521 08:00 456 80 268 536 I 09:00 602 89 345 691 10:00 635 117 376 752 11:00 645 161 403 806 12:00 607 159 383 766 I 13:00 588 150 369 738 14: 00 607 205 406 812 15:00 587 190 388 777 I 16:00 585 162 373 747 17:00 613 169 391 782 18:00 589 214 401 803 I 19:00 378 96 237 474 20:00 424 147 285 571 21:00 237 48 142 285 22:00 188 47 117 235 I 23:00 87 11 49 98 ----- ----- ----- ------- 24 HOUR TOTAL 8746 2173 5459 10919 I PERCENTS 80% 20% AM AM PM PM Peak Peak Peak Peak Peak Peak Lane Total Avg. Total Avg. AM Total Percent PM Total Percent I-;i----i;~~--;;i~i---~;;~--;~;~~--ii:~~----~;~---;~;;-i;:~~----~ii---;~~;- #2 575 47.9 1598 133.:2 11: 00 161 7.4% 18:00 214 9.8% ICOMB. ------ ------ ------ ------ ----- ------ ------ ----- ------ ------ 3831 159.6 7088 295.3 11:00 806 7.4% 14:00 812 7.4% I I I I 09/15/97 15:14:45 I DUNN ENGINEERING ASSOCIATES 66 MAIN STREET WESTHAMPTON,BEACH NY (516) 288-2480 Page: 13 I *** Hourly Multi-Channel Horizontal *** ******************************************************************************** Site ID : RT.25 E/O C.R.48 GREEN PORT Date of Data: Aug 20, 1997 Wed I Info 1 : EB Adj. Factor : 1.00 Info 2 : WB # Of Lanes : 2 ******************************************************************************** I Lane Lane Date Day Time #1 #2 Avg. Total I~~i;~i;;-~~~-~~~~~-----~;-----:;-----;~-------~;- 01:00 33 2 17 35 I I I I I I I 24 I 02:00 03:00 04:00 05:00 06:00 07:00 08:00 09:00 10:00 11:00 12:00 13: 00 14:00 15:00 16:00 17:00 18:00 19:00 20:00 21:00 22:00 23:00 HOUR TOTAL PERCENTS 5 10 13 64 252 454 434 570 575 605 642 561 588 605 625 543 535 345 359 228 170 98 8376 80% 11 37 66 109 109 129 145 141 155 180 179 134 163 182 90 113 44 44 17 2063 20% 1 3 6 7 37 144 260 271 339 352 375 391 358 384 392 379 353 358 217 236 136 107 57 6 13 15 75 289 520 543 679 704 750 783 716 768 784 759 706 717 435 472 272 214 115 AM AM PM PM Peak Peak Peak Peak Peak Peak Lane Total Avg. Total Avg. AM Total Percent PM Total Percent It#~----;~;;---;~~~~---~;;;--~~~~~--~~~~~----~~~---;~;;-~;~~~----~~;---;~;;- #2 621 51.8 1442 120.2 11:00 145 7.0% 18:00 182 8.8% ~OMB.--;~;~ -~~~~~ --~;~~ -;~~~~ ~~~~~ ---;~~ --;~;% ~~~~~ ---;~~ --;~~% I I I :3 ;:: 5219 10439 109/15/97 15:14:45 I DUNN ENGINEERING ASSOCIATES 66 MAIN STREET WESTHAMPTON,BEACH NY (516) 288-2480 Page: 14 *** Hourly Multi-Channel Horizontal *** 1******************************************************************************** Site ID : RT.25 E/O C.R.48 GREEN PORT Date of Data: Aug 21, 1997 Thu I Info 1 : EB Adj. Factor : 1.00 Info 2 : WB # Of Lanes : 2 ******************************************************************************** I Lane Lane Date Day Time #1 #2 Avg. Total I;~i;~i~;-;~~-~~:~~-----~~-----j:-----~~-------~~- 02:00 14 2 8 16 03:00 11 1 6 12 04:00 15 3 9 18 05:00 45 13 29 58 06:00 212 26 119 238 07:00 363 48 205 411 08:00 411 23 217 434 09:00 571 40 305 611 10:00 512 13 262 525 I I I 11 I HOUR TOTAL PERCENTS 2219 93% 175 7% 1197 2394 AM AM PM PM Peak Peak Peak Peak Peak Peak ~~~:_-~~=~=---~~~~--~~=~=---~~~~----~---~~=~=-~:=~:~=--~~---~~=~=-~:=~:~= #1 2219 201.7 09:00 571 25.7% #2 175 15.9 07:00 48 27.4% IbOMB.--;;~~ -~;~~~ ------ ------ ;~~;; ---~~~ -;~~~% ----- ------ ------ I I I I I I I 109/15/97 15:14:45 I DUNN ENGINEERING ASSOCIATES 66 MAIN STREET WESTHAMPTON,BEACH NY (516) 288-2480 Page: 15 1================================================================================ GRAND TOTALS FOR HOURLY MULTI-CHANNEL HORIZONTAL ================================================================================ 1******************************************************************************** Site ID : RT.25 E/O C.R.48 GREEN PORT Start Time : 13:30 Info 1 EB Start Date : Aug 8, 1997 Fri I Info 2 : WB End Time : 11:00 Factor : 1.000% End Date : Aug 21, 1997 Thu ******************************************************************************** I Date Day Time Lane #1 Lane #2 Avg. Total ------------------------------------------------ 108/08/97 Fri 00:00 549 303 426 852 01:00 304 149 226 453 02:00 167 77 122 244 I 03:00 120 54 87 174 04:00 126 6"' 94 189 -' 05:00 390 182 286 572 I 06:00 1667 458 1062 2125 07:00 2909 1 Ole: 1963 3927 08:00 3053 1614 2333 4667 09:00 3968 2148 3058 6116 I 10:00 4179 2614 3396 6793 11:00 4143 2843 3493 6986 12:00 4833 3186 4009 8019 I 13:00 4389 3250 3819 7639 14:00 4846 3785 4315 8631 15:00 4442 3537 3989 7979 I 16:00 4625 3799 4212 8424 17:00 4759 3591 4175 8350 18:00 4413 3809 4111 8222 19:00 3227 3082 3154 6309 I 20:00 3099 2820 2959 5919 21:00 2053 1892 1972 3945 22:00 1592 1233 1412 2825 (8/21/97 Thu 23:00 985 725 855 1710 ----- ----- ----- ------- 06 HOUR TOTAL 64838 46232 55535 111070 PERCENTS 58% 42% I AM AM PM PM Peak Peak Peak Peak Peak Peak Lane Total Avg. Total Avg. AM Total Percent PM Total Percent ADT It------------------------------------------------------------------------------- #1 21575 139.2 43263 286.5 10:00 4179 6.4% 14:00 4846 7.5% 5085 #2 11523 74.3 34709 229.9 11:00 2843 6.1% 18:00 3809 8.2% 3626 ------ ------ ------ ------ ----- ------ ------ ----- ------ ------ ------ tOMB. 33098 106.8 77972 258.2 11:00 6986 6.3% 14: 00 8631 7.8% 8711 1 I I I I I I I I I I I I I I I I I I I I Route 25 West of Ferry Entrance Orient Friday, August 1, 1997 to Thursday, August 14, 1997 Disk #3HO, Cross Sound Ferry File: Dividers 1 08/22/97 10:43:21 1 <<Your Name>> <<Your Address Line 1>> <<Your Address Line 2>> <<Your Phone Number>> Page: 1 ... Hourly Multi-Channel Horizontal... 1***.**************************************************************************** Site ID 25 W/O FERRY Start Time 12:45 1 Info 1 : EB Start Date Aug 1, 1997 Fri Info 2 : WB End Time 10: 15 Factor : 1.000% End Date Aug 14, 1997 Thu 1******************************************************************************** Lane #1 Info : EB Sensor Used : Axle Lane Mode : Subtraction Divide By 2 : Yes ******************************************************************************** ILane #2 Info : WB Sensor Used : Axle Lane Mode : Subtraction Divide By 2 : Yes ******************************************************************************** 1 1 I I 11 I Lane Lane Date Day Time #1 #2 Avg. Total I~~i~~i;;-;;i-~;~~~----~;~----;~----~~~------;~~- 14:00 189 191 190 380 15:00 112 120 116 232 16:00 153 161 157 314 17:00 140 179 159 319 18:00 128 179 153 307 19:00 134 182 158 316 20:00 83 128 105 211 21:00 51 139 95 190 22:00 13 150 81 163 23:00 5 22 13 27 HOUR TOTAL PERCENTS 1129 42% 1541 58% 1335 2670 AM AM PM PM Peak Peak Peak Peak Peak Peak It:~~--~~::=._--~~~~--~~::=---~~~~----~---~~::=-~~==~~:--~~---~~::=-~~==~~: #1 1129 102.6 14:00 189 16.7% #2 1541 140.1 14:00 191 12.4% IbOMB.------ ------ --;~;~ -~;~~~ ----- ------ ------ ~~~~~ ---;~~ -~~~;~ 1 I 1 I. 1 108/22/97 10:43:21 I <<Your Name>> <<Your Address Line 1>> <<Your Address Line 2>> <<Your Phone Number>> Page: 2 I *** Hourly Multi-Channel Horizontal *** ******************************************************************************** Site ID : 25 w/o FERRY Date of Data: Aug 2, 1997 Sat 1 Info 1 : EB Adj. Factor : 1.00 Info 2 : WB # Of Lanes : 2 ******************************i'************************************************* I Lane Lane Date Da'y Time #1 #2 Avg. Total 1~;7~;7;;-;;~-~~:~~------i-----i------;--------;- 01:00 1 2 1 3 02:00 1 0 0 1 I 03:00 0 0 0 0 04:00 1 0 0 1 05:00 18 12 15 30 I 06:00 139 14 76 153 07:00 162 56 109 218 08:00 156 104 130 260 I 09:00 192 103 147 295 10:00 165 152 158 317 11:00 178 134 156 312 12:00 186 226 206 412 1 13: 00 163 127 145 290 14:00 186 210 198 396 15:00 160 162 161 322 I 16:00 150 187 168 337 17:00 123 210 166 333 18:00 94 161 127 255 19:00 100 207 153 307 1 20:00 68 113 90 181 21:00 57 107 82 164 22:00 21 90 55 111 124 23:00 4 13 8 17 ----- ----- ----- ------- HOUR TOTAL 2328 2391 2359 4719 1 PERCENTS 49% 51% AM AM PM PM Peak Peak Peak Peak Peak Peak Lane Total Avg. Total Avg. AM Total Percent PM Total Percent 1-----------.--------------------------------------------------------------- #1 1016 84.7 1312 109.3 09:00 192 8.2% 12:00 186 8.0% #2 578 48.2 1813 151.1 10:00 152 6.4% 12:00 226 9.5% JaMB. ------ ------ ------ ------ ----- ------ ------ ----- ------ ------ 1594 66.4 3125 130.2 10:00 317 6.7% 12:00 412 8.7% I I I 108/22/97 10:43:21 I <<Your Name>> <<Your Address Line 1>> <<Your Address Line 2>> <<Your Phone Number>> Page: 3 I *** Hourly Multi-Channel Horizontal *** ******************************************************************************** 'Site ID : 25 w/o FERRY Date of Data : Aug 3, 1997 Sun Info 1 : EB Adj. Factor : 1.00 Info 2 : WB # Of Lanes : 2 ******************************~.************************************************* I Lane Lane Date Da'y Time #1 #2 Avg. Total I~;~~;~;;-~~~-~~:~~------~-----;------;--------;- 01:00 11 2 6 13 I I I I I I I 24 I 02:00 03:00 04:00 05:00 06:00 07:00 08:00 09:00 10:00 11:00 12:00 13:00 14:00 15:00 16:00 17:00 18:00 19:00 20:00 21:00 22:00 23:00 HOUR TOTAL PERCENTS 3 o 2 18 112 166 153 203 166 258 211 178 230 235 231 161 235 128 102 39 5 7 2859 51% 1 o 2 2 12 56 53 80 177 170 237 189 230 210 284 239 127 223 128 140 153 7 2724 49% 2 o 2 10 62 111 103 141 171 214 224 183 230 222 257 200 181 175 115 89 79 7 4 o 4 20 124 222 206 283 343 428 448 367 460 445 515 400 362 351 230 179 158 14 2791 5583 AM AM PM PM Peak Peak Peak Peak Peak Peak Lane Total Avg. Total Avg. AM Total Percent PM Total Percent I-#~----~~;;'---;~~~---~;~;--~~~~;--~~:~~----;~;---;~~~-~~:~~----;;~---;~;~- #2 557 46.4 2167 180.6 10:00 177 6.5% 16:00 284 10.4% ~OMB.--~~~~ --~;~; --;;;; -~~;~; ~~:~~ ---~;; --;~;~ ~~:~~ ---~~~ --;~;~ I I I 108/22/97 10:43:21 I <<Your Name>> <<Your Address Line 1>> <<Your Address Line 2>> <<Your Phone Number>> Page: 4 1 *** Hourly Multi-Channel Horizontal *** ******************************************************************************** ISite ID : 25 wlo FERRY Date of Data: Aug 4, 1997 Mon Info 1 : EB Adj. Factor : 1.00 Info 2 : WB # Of Lanes : 2 ******************************~.************************************************* 1 Lane Lane Date Day Time #1 #2 Avg. Total I~~i~~i~;-~~~-~~~~~------~-----;,------~--------;- 01:00 0 0 0 0 1 1 I I 1 I 1 24 1 02:00 03:00 04:00 05:00 06:00 07:00 08:00 09:00 10:00 11:00 12: 00 13:00 14:00 15:00 16:00 17:00 18:00 19:00 20:00 21:00 22:00 23:00 HOUR TOTAL PERCENTS 1 o 2 21 136 159 143 190 138 145 166 112 152 93 131 92 89 62 37 31 7 1 1909 50% 1 o o 2 10 39 65 84 136 127 163 95 181 102 154 189 147 149 116 96 45 5 1908 50% 1 o 1 11 73 99 104 137 137 136 164 103 166 97 142 140 118 105 76 63 26 3 2 o 2 23 146 198 208 274 274 272 329 207 333 195 285 281 236 211 153 127 52 6 1908 3817 AM AM PM PM Peak Peak Peak Peak Peak Peak Lane Total Avg. Total Avg. AM Total Percent PM Total Percent I-#~-----~;~.._-;~~;----~;;---~~~~--~~~~~----~~~--~~~~%-~;~;~----~~~---~~;%- #2 466 38.8 1442 120.2 10:00 136 7.1% 17:00 189 9.9% ~OMB.--~~;; --~~~~ --;~~~ -~;;~~ ;~~;; ---;;~ --;~;% ~~~;; ---;;; --~~;% I I I 1 08/22/97 10:43:21 1 <<Your Name>> <<Your Address Line 1>> <<Your Address Line 2>> <<Your Phone Number>> Page: 5 *** Hourly Multi-Channel Horizontal *** 1******************************************************************************** Site ID : 25 W/O FERRY Date of Data : Aug 5, 1997 Tue I Info 1 : EB Adj. Factor : 1.00 Info 2 : WB # Of Lanes : 2 ******************************************************************************** II Date Day Time Lane #1 Lane #2 Avg. Total 1~~i~~i~;-;~~-~~~~~------21------00-------0~--------21-- 01:00 02:00 1 5 3 6 03:00 3 1 2 4 04:00 1 0 0 1 05:00 17 4 10 21 06:00 95 14 54 109 07:00 152 22 87 174 08:00 112 47 79 159 09:00 165 32 98 197 10:00 128 107 117 235 11:00 130 90 110 220 12:00 100 130 115 230 13:00 95 91 93 186 14:00 103 147 125 250 15:00 82 101 91 183 16:00 92 117 104 209 17:00 68 158 113 226 18:00 56 140 98 196 19:00 48 172 110 220 20:00 41 63 52 104 21:00 17 84 50 101 22:00 5 61 33 66 23:00 2 5 3 7 II II 1 II II 1 124 II HOUR TOTAL PERCENTS 1516 49% 1591 51% 1553 3107 AM AM PM PM Peak Peak Peak Peak Peak Peak Lane Total Avg. Total Avg. AM Total Percent PM Total Percent I-#~-----~~;---~;~;----;~;---~;~~--~~~~~----~~~--~~~~;-~~~~~----~~;---~~~;- #2 322 26.8 1269 105.8 10:00 107 6.7% 19:00 172 10.8% ICOMB.--~~;~ --~;~~ --~~;~ --~;~~ ~~~~~ ---;;~ --;~~; ~~~~~ ---;~~ --~~~; II II 1 108/22/97 10:43:21 <<Your Name>> <<Your Address Line 1>> <<Your Address Line 2>> <<Your Phone Number>> Page: 6 I *** Hourly Multi-Channel Horizontal *** 1******************************************************************************** Site ID : 25 W/O FERRY Date of Data Aug 6, 1997 Wed 1 Info 1 : EB Adj. Factor : 1.00 Info 2 : WB # Of Lanes : 2 ******************************************************************************** 1 Date Day Time Lane #1 Lane #2 Avg. Total ------------------------------------------------ 108/06/97 Wed 00:00 3 1 2 4 01:00 1 2: 1 3 02:00 0 0 0 0 1 03:00 1 1 1 2 04:00 2 0 1 2 05:00 13 4 8 17 1 06:00 71 7 39 78 07:00 162 22 92 184 08:00 130 64 97 194 09:00 203 74 138 277 I 10:00 139 88 113 227 11:00 134 102 118 236 12:00 118 105 111 223 I 13: 00 99 73 86 172 14:00 98 159 128 257 15:00 77 77 77 154 I 16:00 93 125 109 218 17:00 69 155 112 224 18:00 60 145 102 205 19:00 46 174 110 220 1 20:00 25 104 64 129 21:00 23 88 55 111 22:00 9 50 29 59 _4 23:00 4 9 6 13 ----- ----- ----- ------- HOUR TOTAL 1580 1629 1604 3209 PERCENTS 49% 51% I AM AM PM PM Peak Peak Peak Peak Peak Peak Lane Total Avg. Total Avg. AM Total Percent PM Total Percent It-------------------------------------------------------------------------- #1 859 71.6 721 60.1 09:00 203 12.8% 12:00 118 7.5% #2 365 30.4 1264 105.3 11:00 102 6.3% 19:00 174 10.7% tOMB. ------ ------ ------ ------ ----- ------ ------ ----- ------ ------ 1224 51.0 1985 82.7 09:00 277 8.6% 14:00 257 8.0% I 1 I I 08/22/97 10:43:21 I <<Your Name>> <<Your Address Line 1>> <<Your Address Line 2>> <<Your Phone Number>> Page: 7 1 *** Hourly Multi-Channel Horizontal *** ******************************'t************************************************* Site ID : 25 w/o FERRY Date of Data: Aug 7, 1997 Thu 1 Info 1 : EB Adj. Factor : 1.00 Info 2 : WB # Of Lanes : 2 ******************************************************************************** 1 Lane Lane Date Day Time #1 #2 Avg. Total 1~;7~;7;;-i~~-~~:~~------~-----~------~--------~- 01:00 0 0 0 0 1 1 I I I 1 02:00 0 0 0 0 03:00 2 1 1 3 04:00 3 1 2 4 05:00 12 ') 7 14 .. 06:00 115 8 61 123 07:00 181 19 100 200 08:00 120 54 87 174 09:00 190 46 118 236 10:00 148 105 126 253 11:00 151 101 126 252 12:00 153 141 147 294 13: 00 101 7-' 86 173 ", 14:00 144 188 166 332 15:00 106 102 104 208 16:00 123 146 134 269 17:00 97 67 82 164 18:00 85 274 179 359 19:00 77 78 77 155 20:00 38 234 136 272 21:00 27 47 37 74 22:00 16 185 100 201 23:00 2 8 5 10 ----- ----- ----- ------- HOUR TOTAL 1891 1879 1885 3770 PERCENTS 50% 50% 124 1 AM AM PM PM Peak Peak Peak Peak Peak Peak Lane Total Avg. Total Avg. AM Total Percent PM Total Percent I-#~-----;;;---;~~;----;~;---~~~;--~;:~~----~;~--~~~~%-~;:~~----~~;---;~~%- #2 337 28.1 1542 128.5 10:00 105 5.6% 18:00 274 14.6% ICOMB.--~;~; --~;~~ --;~~~ -~~~~~ ~~:~~ ---;~; --~~;% ~;:~~ ---;~; --;~~% 1 1 1 108/22/97 10:43:21 I I ******************************************************************************** <<Your Name>> <<Your Address Line 1>> <<Your Address Line 2>> <<Your Phone Number>> Page: 8 *** Hourly Multi-Channel Horizontal *** rite ID : 2.5 w/o FERRY Date of Data : Aug 8, 1997 Fri Info 1 : EB Adj. Factor : 1.00 Info 2 : WB # Of Lanes : 2 ******************************************************************************** I I I I I I I I 24 I Lane Lane Date Day Time #1 #2 Avg. Total 1;;7;;7;;-;;~-;;;;;------;-----~------i--------;- 01:00 1 1 1 2 02:00 1 1 1 2 03:00 1 1 1 2 04:00 3 1 2 4 05:00 19 3 11 22 06:00 115 13 64 128 07:00 155 23 89 178 08:00 133 99 116 232 09:00 161 55 108 216 10:00 148 159 153 307 11:00 182 11~; 148 297 12:00 143 152 147 295 13:00 117 136 126 253 14:00 153 175 164 328 15:00 122 138 130 260 16:00 130 164 147 294 17:00 168 138 153 306 18:00 128 173 150 301 19:00 111 197 154 308 20:00 105 206 155 311 21:00 57 138 97 195 22:00 13 131 72 144 23:00 7 54 30 61 HOUR TOTAL PERCENTS 2176 49% 2273 51% 2224 4449 AM AM PM PM Peak Peak Peak Peak Peak Peak I~;~:_-=~;;~---~~~~--=~;~~--i~~~~--ii~;--=~~~~-~:~~~;=i;~~;--=~~~~-~:;~;;= #2 471 39.3 1802 150.2 10:00 159 7.0% 20:00 206 9.1% ICOMB.--i;;; --~~~; --;;~~ -i;;~; i;;;; ---;;; --~~;% i~;;; ---;;~ --;~~% I I I 1 08/22/97 10:43:21 1 <<Your Name>> <<Your Address Line 1>> <<Your Address Line 2>> <<Your Phone Number>> Page: 9 1 *** Hourly Multi-Channel Horizontal *** ******************************************************************************** Site ID : 25 W/O FERRY Date of Data : Aug 9, 1997 Sat 1 Info 1 : EB Adj. Factor : 1.00 Info 2 : WB # Of Lanes : 2 ******************************************************************************** 1 Lane Lane Date Day Time #1 #2 Avg. Total I;~i;~i~;-~~~-;;~;;------~-----~------;--------~- 01:00 1 1. 1 2 1 1 1 1 1 1 02:00 4 4 4 8 03:00 1 0 0 1 04:00 2 3 2 5 05:00 24 ,. 14 29 ., 06:00 139 1-' 75 151 .. 07:00 174 48 111 222 08:00 152 110 131 262 09:00 176 10.2 139 278 10:00 165 160 162 325 11:00 189 181 185 370 12:00 158 154 156 312 13: 00 142 126 134 268 14:00 183 209 196 392 15:00 166 117 141 283 16:00 133 172 152 305 17:00 135 180 157 315 18:00 114 146 130 260 19:00 116 156 136 272 20:00 87 81 84 168 21:00 71 95 83 166 22:00 15 99 57 114 23:00 10 14 12 24 ----- ----- ----- ------- HOUR TOTAL 2358 2179 2268 4537 PERCENTS 52% 48% 124 1 AM AM PM PM Peak Peak Peak Peak Peak Peak Lane Total Avg. Total Avg. AM Total Percent PM Total Percent It#~----~;;~---~~~;---~;;;--~~;~~--~~~;;----~~~---~~;%-~~~;;----~~;---;~~%- #2 630 52.5 1549 129.1 11:00 181 8.3% 14:00 209 9.6% ~OMB.--~~~~ --~~~~ --;~;~ -~;;~; ~~~;; ---;;; --~~;% ~~~;; ---;~; --~~~% 1 I 1 1 08/22/97 10:43:21 <<Your Name>> <<Your Address Line 1>> <<Your Address Line 2>> <<Your Phone Number>> Page: 10 1 *** Hourly Multi-Channel Horizontal *** 1 ******************************************************************************** Site ID : 25 w/o FERRY Date of Data : Aug 10, 1997 Sun I Info 1 : EB Adj. Factor : 1.00 Info 2 : WB # Of Lanes : 2 ******************************************************************************** 1 Date Day Time Lane #1 Lane #2 Avg. Total 1~~i~~i~;-~~~-~~~~~------~-----~------3;-------~46-- 01:00 5 1 02:00 2 5 3 7 03:00 2 3 2 5 04:00 2 1 1 3 05:00 17 5 11 22 06:00 120 11 65 131 07:00 149 50 99 199 08:00 162 50 106 212 09:00 173 75 124 248 10:00 176 157 166 333 11:00 316 125 220 441 12:00 297 142 219 439 13:00 268 118 193 386 14:00 258 194 226 452 15:00 233 153 193 386 16:00 294 202 248 496 17:00 255 236 245 491 18:00 239 102 170 341 19:00 212 97 154 309 20:00 176 81 128 257 21:00 120 41 80 161 22:00 110 56 83 166 23:00 14 2 8 16 1 1 1 I 1 1 124 HOUR TOTAL PERCENTS 3609 65% 1912 35% 2760 5521 1 AM AM PM PM Peak Peak Peak Peak Peak Peak Lane Total Avg. Total Avg. AM Total Percent PM Total Percent I-#~----~~;;---~~~~---;~;~--;~~~;--~~~~~----;~~---~~~%-~;~~~----;~;---~~;%- #2 488 40.7 1424 118.7 10:00 157 8.2% 17:00 236 12.3% ------ ------ ------ ------ ----- ------ ------ ----- ------ ------ ICOMB. 1621 67.5 3900 162.5 11:00 441 8.0% 16:00 496 9.0% I I I 1 08/22/97 10:43:21 1 1 <<Your Name>> <<Your Address Line 1>> <<Your Address Line 2>> <<Your Phone Number>> Page: 11 *** Hourly Multi-Channel Horizontal *** ******************************************************************************** Site ID : 25 W/O FERRY Date of Data : Aug 11, 1997 Mon 1 Info 1 : EB Adj. Factor : 1.00 Info 2 : WB # Of Lanes : 2 ******************************************************************************** 1 Lane Lane Date Day Time #1 #2 Avg. Total I~~i~~i~;-~~~-~~~~~------~-----i~------~--------~- 02:00 1 lL 1 2 1 03:00 1 () 0 1 04:00 1 () 0 1 05:00 19 1 10 20 1 06:00 132 6 69 138 07:00 206 2-' 114 228 ... 08:00 148 60 104 208 1 09:00 198 48 123 246 10:00 154 109 131 263 11:00 159 81 120 240 12:00 178 89 133 267 1 13: 00 159 60 109 219 14: 00 109 137 123 246 15:00 141 86 113 227 I 16:00 180 86 133 266 17:00 171 146 158 317 18:00 128 118 123 246 19:00 120 118 119 238 1 20:00 86 61 73 147 21:00 47 62 54 109 22:00 45 67 56 112 124 23:00 4 0 2 4 ----- ----- ----- ------- HOUR TOTAL 2396 1358 1877 3754 1 PERCENTS 64% 36% AM AM PM PM Peak Peak Peak Peak Peak Peak Lane Total Avg. Total Avg. AM Total Percent PM Total Percent 1-------------------------------------------------------------------------- #1 1028 85.7 1368 114.0 07:00 206 8.6% 16:00 180 7.5% #2 328 27.3 1030 85.8 10:00 109 8.0% 17:00 146 10.8% ICOMB. ------ ------ ------ ------ ----- ------ ------ ----- ------ ------ 1356 56.5 2398 99.9 10:00 263 7.0% 17:00 317 8.4% 1 I I 1 08/22/97 10:43:21 1 I I 1 <<Your Name>> <<Your Address Line 1>> <<Your Address Line 2>> <<Your Phone Number>> Page: 12 *** Hourly Multi-Channel Horizontal *** **********~~********************************************************************* Site ID 25 w/a FERRY Date of Data: Aug 12, 1997 Tue Info 1 : EB Adj. Factor : 1.00 Info 2 : WB # Of Lanes : 2 ******************************************************************************** Date Day Time Lane #1 Lane #2 Avg. Total I ~~i~;i~;-~~~-~~~~~------2 2------11;)------11---------;- 01:00 2 02:00 0 0 0 0 03:00 0 0 0 0 04:00 3 0 1 3 05:00 16 0 8 16 06:00 104 6 55 110 07:00 187 22 104 209 08:00 147 47 97 194 09:00 178 41 109 219 10:00 161 75 118 236 11:00 155 68 111 223 12:00 194 61 127 255 13:00 131 59 95 190 14:00 176 91 133 267 15:00 154 47 100 201 16:00 180 53 116 233 17:00 169 66 117 235 18:00 160 54 107 214 19:00 162 79 120 241 20:00 114 33 73 147 21:00 73 36 54 109 22:00 49 23 36 72 23:00 3 3 3 6 I I 1 I I I 124 I HOUR TOTAL PERCENTS 2520 74% 864 26% 1692 3384 AM AM PM PM Peak Peak Peak Peak Peak Peak Lane Total Avg. Total Avg. AM Total Percent PM Total Percent I-#~-----~~~---;~~~---~~~~--~;~~~--~;~~~----~~;---;~~;-~;~~~----~~~---;~;%- #2 259 21.6 605 50.4 10:00 75 8.7% 14:00 91 10.5% ICOMB.--~;~~ --~~~~ --;~;~ --~~~~ ~~~~~ ---;;~ --;~~% ~~~~~ ---;~; --;~;; I I I 108/22/97 10:43:21 1 <<Your Name>> <<Your Address Line 1>> <<Your Address Line 2>> <<Your Phone Number>> Page: 13 *** Hourly Multi-Channel Horizontal *** 1***********,,******************************************************************** Site ID : 2~, W/O FERRY Date of Data : Aug 13, 1997 Wed 1 Info 1 : EB Adj. Factor : 1.00 Info 2 : WB # Of Lanes : 2 ***********,~******************************************************************** 1 Lane Lane Date Day Time #1 #2 Avg. Total t~i~; i~; - ;~;i - ~~ ~ ~~ - - - - - - ~ - - - - - ~ - - - - - - ~ - - - - - - - - ~- 02:00 0 0 0 0 1 03:00 1 0 0 1 04:00 1 0 0 1 05:00 10 0 5 10 1 06:00 82 9 45 91 07:00 194 15 104 209 08:00 131 45 88 176 1 09:00 215 43 129 258 10:00 174 67 120 241 11:00 163 58 110 221 12:00 159 93 126 252 1 13:00 116 37 76 153 14:00 203 79 141 282 15:00 118 49 83 167 1 16:00 144 93 118 237 17:00 191 56 123 247 18:00 157 48 102 205 19:00 195 38 116 233 1 20:00 106 26 66 132 21:00 75 33 54 108 22:00 24 38 31 62 124 23:00 6 0 3 6 ----- ----- ----- ------- HOUR TOTAL 2474 828 1651 3302 I PERCENTS 75% 25% AM AM PM PM Peak Peak Peak Peak Peak Peak Lane Total Avg. Total Avg. AM Total Percent PM Total Percent It------------------------------------------------------------------------- #1 980 81.7 1494 124.5 09:00 215 8.7% 14:00 203 8.2% #2 238 19.8 590 49.2 10:00 67 8.1% 12:00 93 11.2% JaMB. ------ ------ ------ ------ ----- ------ ------ ----- ------ ------ 1218 50.8 2084 86.8 09:00 258 7.8% 14:00 282 8.5% 1 I 1 108/22/97 10:43:21 I ""Your Name>> ""Your Address Line 1>> ""Your Address Line 2>> ""Your Phone Number>> Page: 14 I *** Hourly Multi-Channel Horizontal *** ***********,~******************************************************************** Site ID : 2!; W/O FERRY Date of Data Aug 14. 1997 Thu I Info 1 : EB Adj. Factor : 1.00 Info 2 : WB # Of Lanes : 2 ***********,~******************************************************************** I Lane Lane Date Day Time #1 #2 Avg. Total I ~ ~ i ~ ~ i ~; - ~h;~ - ~ ~ ~ ~ ~ - - - - - - ; - - - - - ~ - - - - - - ~ - - - - - - - - ; - 01:00 1 0 0 1 02:00 1 1 1 2 03:00 1 1 1 2 04:00 1 0 0 1 05:00 15 2 8 17 06:00 88 9 48 97 07:00 111 45 78 156 08:00 107 76 91 183 09:00 106 102 104 208 I I 110 HOUR TOTAL PERCENTS 433 65% 236 35% 334 669 I AM AM PM PM Peak Peak Peak Peak Peak Peak Lane Total Avg. Total Avg. AM Total Percent PM Total Percent I-#~-----~;;._--~;~;----------------~;~~~----~~~--;~~~%--------------------- #2 236 23.6 09:00 102 43.2% tOMB. ------ ------ ------ ------ ----- ------ ------ ----- ------ ------ 669 33.5 09:00 208 31.1% I I I I I I I 108/22/97 10:43:21 <<Your Name>> <<Your Address Line 1>> <<Your Address Line 2>> <<Your Phone Number>> Page: 15 1 --=-----==_._-=...---=....--===----------=....-==.....---....---=....=--==..----=-----=----= 1 ~~_~~~~~__~::~___ ~~~~~~:~~~~~~~~~~~Y..~~:I==~~~~~~:~O..- ~~~~~_~~~~~_~~~~_ -----------.---------------------------- ----- -------------- ------------------- I***********,r******************************************************************** Site ID : 25 W/O FERRY Start Time : 12:45 Info 1 EB Start Date : Aug I, 1997 Fri 1 Info 2 : WB End Time : 10: 15 Factor : 1..000% End Date : Aug 14, 1997 Thu ***********,r******************************************************************** 1 Date Da~r Time Lane #1 Lane #2 Avg. Total ------------------------------------------------ 108/01/97 Fri. 00:00 42 16 29 58 01:00 31 9 20 40 02:00 15 19 17 34 1 03:00 13 8 10 21 04:00 24 8 16 32 05:00 219 42 130 261 06:00 1448 131 789 1579 1 07:00 2158 439 1298 2597 08:00 1794 874 1334 2668 09:00 2350 885 1617 3235 1 10:00 1862 1492 1677 3354 11:00 2160 1352 1756 3512 12:00 2063 1693 1878 3756 1 13:00 1802 1273 1537 3075 14:00 2184 2191 2187 4375 15:00 1799 1464 1631 3263 16:00 2034 1944 1989 3978 I 17:00 1839 2019 1929 3858 18:00 1673 1814 1743 3487 19:00 1511 1870 1690 3381 1 20:00 1068 1374 1221 2442 21:00 688 1106 897 1794 22:00 332 1148 740 1480 _8/14/97 Thu 23:00 69 142 105 211 ----- ----- ----- ------- 09 HOUR TOTAL 29178 23313 26245 52491 PERCEN'l'S 56% 44% 1 AM AM PM PM Peak Peak Peak Peak Peak Peak Lane Total Avg. Total Avg. AM Total Percent PM Total Percent ADT 11------------------------------------------------------------------------------- #1 12116 78.7 17062 110.1 09:00 2350 8.1% 14:00 2184 7.5% 2266 #2 5275 34.3 18038 116.4 10:00 1492 6.4% 14:00 2191 9.4% 1811 10MB. 17391 ------ ------ ------ ------ ----- ------ ------ ----- ------ ------ ------ 56.5 35100 113.2 11:00 3512 6.7% 14:00 4375 8.3% 4077 I I I I I I I I I I I I I I I I I I I I I Accident Data Disk #:390. Cross Sound Ferry File: Dividers I I I I I I I I I I I I I I I I I I I 1991 to June 1995 State Accident Surveillance System Accident Summaries Disk #3HO, Cross Sound Ferry File: Dividers - - - - .. - - - - - - - - ,- - - - - - NY$ DEPARTMENT OF TRANSPORTATION USER, TRAFFIC & SAFETY SlATE ACCIDENT SURVEILLANCE SYSTEM RUN DATE 8/11/92 INTERIM ACC !DENT SUMMARY REGION-COUNTY 07 FOR 1/01/91 THRU 12/31/91 N U M B E R o F A C C I 0 E N T 5 - ROUTE REF. MARKER INTERSEC DESCRIPTION TOTAL FATAL IN.) POO N/R S!DE WET FIXED PEO & TRUCK lIGHT CONDITION NO, . ROAD ROAD OB,", BIKE ... DAY NIGHT DAWN/DUSK .. .. .. .. .. .. .. 25 25 07041626 1 0 0 0 1 0 0 0 0 0 0 0 0 25 25 07041629 I 0 1 0 0 0 0 0 0 0 0 1 0 25 25 07041634 I 0 I 0 0 0 0 0 0 0 I 0 0 25 25 07041636 2 1 I 0 0 0 0 2 0 0 1 I 0 25 25 07041638 1 0 0 0 1 0 0 0 0 0 0 0 0 25 25 07041641 49 KERWIN BLVO 2 0 1 0 1 0 0 0 0 0 1 0 0 25 25 07041643 95 CHAPEL LANE 1 0 1 0 0 0 0 0 0 0 1 0 0 25 25 07041645 2 0 2 0 0 0 1 0 0 0 1 1 0 25 25 07041647 1 0 0 0 1 0 0 0 0 0 0 0 0 25 25 07041650 1 0 0 0 1 0 0 0 0 0 0 0 0 25 25 07041652 I 0 0 0 1 0 0 0 0 0 0 0 0 25 25 07041654 3 0 0 0 3 0 0 0 0 0 0 0 0 25 25 07041655 2 0 0 1 1 0 0 0 0 0 0 1 0 25 25 07041656 I 0 I 0 0 0 0 0 0 0 0 0 0 25 25 07041656 75 MOORES LANE 5 0 4 0 1 0 2 0 0 0 2 0 1 25 25 07041657 OB EIGHTH ST 1 0 1 0 0 0 0 1 0 0 0 1 0 25 25 07041658 09 SEVENTH ST 1 0 1 0 0 0 0 0 0 0 1 0 0 25 25 07041658 10 SIXTH ST 2 0 1 0 1 0 1 0 0 0 1 0 0 25 25 07041658 39 FIFTH AVE 1 0 0 0 1 0 0 0 0 0 0 0 0 25 25 07041659 12 F lFTH Sf 1 0 0 0 1 0 0 0 0 0 0 0 0 25 25 07041660 I 0 1 0 0 0 0 0 0 0 1 0 0 25 25 07041661 3 0 0 0 3 0 0 0 0 0 0 0 0 25 25 07041661 16 THIRD ST 7 0 3 0 4 0 2 0 0 0 3 0 0 25 25 07041662 2 0 2 0 0 0 0 0 0 0 2 0 0 25 25 07041662 18 FIRST ST 6 0 1 0 5 0 0 0 0 0 1 0 0 25 25 07041663 1 0 0 1 0 0 0 0 0 0 0 0 0 25 25 07041663 19 MAIN ST. 3 0 1 0 2 0 0 0 0 0 I 0 0 25 25 07041665 24 CENTRAL AVE 1 0 0 1 0 0 1 0 0 0 1 0 0 25 25 07041665 25 CENTER ST -PARK ST 1 0 1 0 0 0 0 0 0 0 0 1 0 25 25 07041668 30 FIRST ANO WEBB STS 1 0 0 0 1 0 0 0 0 0 0 0 0 25 25 07041668 31 MANOR Pl 3 0 2 0 1 0 2 0 0 0 2 0 0 25 25 07041672 38 NORTH RD-CO RO 27 3 0 3 0 0 0 1 0 0 0 1 1 1 25 25 07041672 39 SOUNO RO 1 0 0 0 1 0 0 0 0 0 0 0 0 25 25 07041673 40 BAILEY AVE 1 0 0 0 1 0 0 0 0 0 0 0 0 25 25 07041674 1 0 0 0 1 0 0 0 0 0 0 0 0 25 25 07041676 1 0 0 0 1 0 0 0 0 0 0 0 0 25 25 07041678 1 0 1 0 0 0 0 0 0 0 0 0 0 25 25 07041681 I 0 1 0 0 0 0 0 0 0 1 0 0 25 25 07041683 1 0 0 0 1 0 0 0 0 0 0 0 0 25 25 07041685 1 0 0 0 I 0 0 0 0 0 0 0 0 25 25 07041685 48 ROCK PT RO 1 0 1 0 0 0 0 0 0 0 1 0 0 25 25 07041688 1 0 0 0 I 0 0 0 0 0 0 0 0 25 25 07041689 1 0 0 0 t 0 0 0 0 0 0 0 0 25 25 07041689 54 OLD ORCHARD LANE I 0 0 I 0 0 0 0 0 0 1 0 0 25 25 07041692 00 UNKOWN INTERSECTION 1 0 0 1 0 0 0 0 0 1 I 0 0 25 25 07041694 1 0 0 0 1 0 0 0 0 0 0 0 0 25 25 07041700 t 0 0 1 0 0 0 0 0 0 0 1 0 25 25 07041705 I 0 I 0 0 0 0 0 0 0 1 0 0 25 25 07041709 1 0 0 0 1 0 0 0 0 0 0 0 0 25 25 0704 n 13 I 0 0 0 1 0 0 0 0 0 0 0 0 SIDE-ROAD & NON-REPORTABLES I NCLUDEO .. EXCLUDES NON-REPORTABLES ...* EXCLUDES PICKUP & VANS REGION-COUNTY 07 PAGE 16 76 - - - - - - - - - - - - - - - ~ - - - NYS DEPARTMENT Of TRANSPORTATION USER: TRAFFIC & SAFETY STATE ACCIDENT SURVEILLANCE SYSTEM RUN DATE 8/11/92 INTERIM ACCIDENT SUMMARY REGION-COUNTY 07 fOR 1/01/91 THRU 12/31/91 N U M 8 E R o f A C C I 0 E N T S - ROUTE REF. MARKER INTERSEC DESCRIPTION TOTAL FATAL INJ POD N/R SIDE WET FIXED PEO & TRUCK LIGHT CONDITION NO. ROAD ROAD OBJ 81KE ... DAY NIGHT DAWN/DUSK .. .. .. .. .. .. .. 25 25 07041718 3 0 1 0 2 0 I 0 0 0 0 1 0 25 25 07041728 t 1 0 0 I 0 0 0 0 0 0 0 1 0 25 25 07041744 1 0 0 0 1 0 0 0 0 0 0 0 0 25 25 07041771 1 0 0 1 0 0 0 0 0 0 0 1 0 25 25 07041992 I 0 1 0 0 0 1 0 0 0 1 0 0 25 25 07041999 118 0 18 34 66 0 10 10 0 2 4 2 1 25 25 07041999 00 UNKOWN INTERSECTION 13 0 3 4 6 0 3 0 0 0 2 1 0 25 ..... ROUTE TOTAL W/999 RM'S.. 3519 15 1296 693 1515 1 541 107 77 57 1078 449 66 25. 25A07031185 39 UNKOWN INTERSECTION 1 0 1 0 0 0 0 0 0 0 1 0 0 25. ..to.. ROUTE TOTAL W/999 RM'S.. 1 0 1 0 0 0 0 0 0 0 1 0 0 25A 25A07031ooo 2 0 0 1 I 0 0 0 0 0 0 1 0 25A 25A07031001 2 0 0 1 1 0 0 0 0 0 0 0 0 25A 25A0703100 i 31 JeT NY 108 7 0 ^ 6 0 0 0 0 0 0 0 0 v 25A 25A07031006 2 0 0 0 2 0 0 0 0 0 0 0 0 25A 25A07031006 32 TERRACE PLACE 1 0 1 0 0 0 1 0 0 0 1 0 O. 25A 25407031008 2 0 0 1 1 0 0 0 0 0 0 0 0 25A 25A07031008 33 FLORA Sf 1 0 1 0 0 0 0 1 0 0 0 I 0 25A 25A07031008 34 PORTLAND ST 2 0 0 0 2 0 0 0 0 0 0 0 0 25A 25A07031009 6 0 2 0 4 0 0 0 0 0 1 0 0 25A 25A07031009 35 ELM PL 2 0 0 1 I 0 0 0 0 0 0 0 0 25A 25A07031009 85 SHORE RD-SNAKE HILL 3 0 0 1 2 0 0 0 0 0 0 0 0 25A 25A07031010 1 0 1 0 0 0 1 0 0 0 1 0 0 25A 25A07031012 1 0 0 0 1 0 0 0 0 0 0 0 0 25A 25A07031O 12 36 POPLAR PL 2 0 1 1 0 0 0 0 0 0 1 1 0 25A 25A07031013 1 0 0 1 0 0 I I 0 0 0 0 0 25A 25A07031O I 3 06 UNKOWN INTERSECTION 1 0 0 1 0 0 0 0 0 0 1 0 0 25A 25A07031015 2 0 0 0 2 0 0 0 0 0 0 0 0 25A 25A07031015 39 GOOSE HILL RD 5 0 0 2 3 0 I 0 0 0 2 0 0 25A 25A07031016 2 0 2 0 0 0 1 2 0 0 2 0 0 25A 25A070310 17 1 0 0 0 1 0 0 0 0 0 0 0 0 25A 25A07031017 40 GLEN WAY 1 0 1 0 0 0 0 I 0 0 1 0 0 25A 25A07D31018 1 0 1 0 0 0 0 1 0 0 1 0 0 25A 25A07031020 I 0 1 0 0 0 1 0 0 0 1 0 0 25A 25A07031020 42 MIDLAND S1 2 0 1 0 1 0 0 0 0 0 0 1 0 25A 25A07031021 1 0 0 0 1 0 0 0 0 0 0 0 0 25A 25A07031021 45 CROSSMAN P 1 0 0 0 1 0 0 0 0 0 0 0 0 25A 25A07031022 2 0 0 1 1 0 0 0 0 0 0 0 0 25A 25A01031022 46 WOOLSEY 51 CARLEY 1 0 1 0 0 0 0 0 1 0 1 0 0 25A 25A07031023 48 NATHAN HALE DR 1 0 1 0 0 0 1 0 0 0 0 1 0 25A 25A07031025 1 0 0 1 0 0 0 0 0 0 0 0 0 25A 25A07031025 89 SCUDDER PLACE 7 0 4 2 1 0 3 1 0 1 3 2 0 25A 25A07031026 5 0 1 2 2 0 I I 0 0 0 0 0 25A 25A07031026 52 ANDERSON PL 2 0 I 0 1 0 0 0 0 0 1 0 0 25A 25A07031026 54 WOOOBURY-WESTNECK 16 0 3 3 10 0 1 0 0 1 2 1 0 25A 25407031027 3 0 0 0 3 0 0 0 0 0 0 0 0 25A 25A07031027 55 PROSPECT ST I 0 0 0 1 0 0 0 0 0 0 0 0 25A 25A07031028 5 0 0 2 3 0 I 0 0 0 2 0 0 25A 25A07031028 40 UNKOWN INTERSECTION 1 0 1 0 0 0 0 0 0 0 0 0 0 25A 25AD7031028 56 GREEN ST/CLINTON ST 6 0 1 0 5 0 1 0 0 0 I 0 0 25A 25A07031028 90 WALL ST/NEW ST 17 0 3 3 11 0 1 0 3 0 3 2 0 ... SIDE-ROAD & NON-REPORT ABLES INCLUOED .. EXCLUDES NON-REPORTA8LES .~. EXCLUDES PICKUP & VANS REGION-COUNTV 07 PAGE 17 - - - - - - - - - - - - - - - - - - - NYS DEPARTMENT OF TRANSPORTATION USER: TRAFFIC & SAFETY ST A TE ACCIDENT SURVEILLANCE SYSTEM RUN DATE 7/27/93 INTERIM ACCIDENT SUMMARY REGION-COUNTY 07 FOR 1/01/92 THRU 12/31/92 N 'U 'I B E R o F A C C I D E N T S - ROUTE REF. MARKER INTERSEC OESCRIPTION TOTAL FATAL INJ POO N/R SIDE WET FIXED PED & TRUCK LIGHT CONOITION NO. . ROAO ROAO OBJ BIKE ... OAY NIGHT OAWN/OUSK .. .. .. .. .. 25 25 0704165B 39 FIFTH AVE 1 0 0 0 1 0 0 0 0 0 0 0 0 25 25 07041659 12 FIFTH ST 2 0 2 0 0 0 2 0 0 0 1 1 0 25 25 07041660 1 0 0 0 1 0 0 0 0 0 0 0 0 25 25 07041660 13 FOURTH AVE 2 0 2 0 0 0 0 0 0 0 0 0 0 25 25 07041660 14 FOURTH ST 1 0 0 0 1 0 0 0 0 0 0 0 0 25 25 07041661 4 0 1 1 2 0 1 0 0 0 2 0 0 25 25 07041661 16 THIRD ST 4 0 1 0 3 0 0 0 0 0 0 1 0 25 25 07041662 4 0 1 0 3 0 0 0 1 0 1 0 0 25 25 07041662 1B FIRST ST 1 0 1 0 0 0 1 0 0 0 1 0 0 25 25 07041663 1 0 1 0 0 0 0 0 0 0 1 0 0 25 25 07041663 19 MAIN ST. 6 0 2 0 4 0 0 0 0 0 2 0 0 25 25 07041663 21 ADAMS ST 1 0 0 0 1 0 0 0 0 0 0 0 0 25 25 07041664 1 0 0 0 1 0 0 0 0 0 0 0 0 25 25 07041665 2 0 1 0 1 0 0 0 0 0 1 0 0 25 25 07041665 24 CENTRAL AVE 1 0 0 0 1 0 0 0 0 0 0 0 0 25 25 07041665 25 CENTER 5T-PARK 5T 2 0 0 0 2 0 0 0 0 0 0 0 0 25 25 07041667 1 0 0 0 1 0 0 0 0 0 0 0 0 25 25 0704166B 30 FIRST ANa WEBB STS 2 0 0 0 2 0 0 0 0 0 0 0 0 25 25 07041668 31 MANDR PL 2 0 2 0 0 0 2 0 1 0 0 2 0 25 25 07041670 36 CHAMPLIN-WILMARTH A 1 0 1 0 0 0 0 0 0 0 1 0 0 25 25 07041671 37 KNAPP PL 2 0 1 0 1 0 0 0 1 0 0 1 0 25 25 07041672 38 NDRTH RD-CO RO 27 J- 3 0 2 0 1 0 0 0 0 0 2 0 0 25 25 07041672 39 SaUNa RO 1 0 1 0 0 0 0 0 0 0 1 0 0 25 25 07041675 41 MANHASSET RO 1 0 1 0 0 0 0 0 0 0 1 0 0 25 25 07041681 1 0 0 0 1 0 0 0 0 0 0 0 0 25 25 07041684 1 0 0 0 1 0 0 0 0 0 0 0 0 25 25 070416B5 4B ROCK PT RO 1 0 0 0 1 O. 0 0 0 .0 0 0 0 25 25 07041688 2 0 0 0 2 0 0 0 0 0 0 0 0 25 25 07041690 B2 STARS RO 1 0 1 0 0 0 1 1 0 0 1 0 0 25 25 07041691 1 0 1 0 0 0 0 0 0 0 1 0 0 25 25 07041695 2 0 0 0 2 0 0 0 0 0 0 0 0 25 25 07041700 1 0 1 0 0 0 0 0 0 0 1 0 0 25 25 0704170B t 0 0 0 1 0 0 0 0 0 0 0 0 25 25 07041710 1 0 0 0 1 0 0 0 0 0 0 0 0 25 25 07041714 65 TABOR RO 1 0 0 1 0 0 1 0 0 0 1 0 0 25 25 07041717 66 PLATT RO 2 0 1 0 1 0 0 0 0 0 1 0 0 25 25 07041718 1 0 0 0 1 0 0 0 0 0 0 0 0 25 25 0704 1720 00 UNKQWN INTERSECTION 1 0 0 0 1 0 0 0 0 0 0 0 0 25 25 07041732 t 2 0 0 0 2 0 0 0 0 0 0 0 0 25 25 07041743 1 0 0 0 1 0 0 0 0 0 0 0 0 25 25 07041905 1 0 1 0 0 0 0 0 0 0 1 0 0 25 25 07041999 153 0 31 34 88 0 17 2 0 2 3 0 0 25 25 07041999 00 UNKQWN INTERSECTION 21 0 B 1 12 0 1 0 1 0 2 0 0 25 ..... ROUTE TOTAL W/999 RM'S.. 2960 13 1280 565 1102 0 476 91 69 45 728 338 52 25A 25 07041135 40 UNKQWN INTERSECTION 3 0 2 0 1 0 0 0 0 0 1 0 0 25A 25 01041149 03 UNKQWN INTERSECTION 1 0 0 1 0 0 0 0 0 0 1 0 0 25A 25 07041368 35 UNKQWN INTERSECTION 1 0 0 0 1 0 Cl 0 0 0 0 0 0 25A 25A070310oo 1 0 1 0 0 0 0 1 0 0 0 1 0 25A 25A07031001 2 0 1 0 1 0 1 0 0 0 1 0 0 25A 25A07031001 31 JeT NY 108 8 0 4 3 1 0 5 0 0 0 0 2 0 . SIDE-ROAD & NQN-REPORTABLES INCLUDED .. EXCLUOES NON-REPORT ABLES ... EXCLUDES PICKUP & VANS REGION-COUNTY 07 PAGE 16 76 - - - - - - ,- - - - - - - - - - - - - NYS DEPARTMENT OF TRANSPORT A T ION USER: TRAFFIC & SAFETY STATE ACCIDENT SURVEILLANCE SYSTEM RUN DATE 10/12/94 INTERIM ACCIDENT SUMMARY REGION-COUNTY 01 FOR '/01/93 THRU 12/31/93 N U ~ g " n n 0 A C C I 0 E !'oJ T S. - . " u . ROUTE REF. MARKER INTERSEC DESCR I PT ION TOTAL FATAL INJ POD N/R SIDE WET FIXED PED & TRUCK LIGHT CONDITION NO. . ROAD ROAD OBJ BIKE ... DAY NIGHT DAWN/OUSK .. .. .. .. .. .. .. 25 25 0704 17 20 , 0 0 0 , 0 0 0 0 0 0 0 0 25 25 07041724 1 0 0 0 1 0 0 0 0 0 0 0 0 25 25 07041727 1 0 0 0 1 0 0 0 0 0 0 0 0 25 25 07041736 1 0 0 0 1 0 0 0 0 0 0 0 0 25 25 07041738 1 0 0 0 1 0 0 0 0 0 0 0 0 25 25 07041739 1 0 0 0 , 0 0 0 0 0 0 0 0 25 25 07041744 1 0 0 0 1 0 0 0 0 0 0 0 0 25 25 07041745 1 0 0 0 1 0 0 0 0 0 0 0 0 25 25 07041747 1 0 0 0 1 0 0 0 0 0 0 0 0 25 25 07041747 09 PLUM ISLAND LA 1 0 0 0 1 0 0 0 0 0 0 0 0 0 41 1 0 0 0 1 0 0 0 0 0 0 0 0 25 25 07041971 1 0 0 1 0 0 1 0 0 0 0 1 0 25 25 07041979 1 0 0 1 0 0 1 0 0 0 0 0 0 25 25 07041999 "4 0 16 31 67 0 8 3 1 1 4 1 0 25 25 07041999 00 UNKOWN INTERSECTION 14 0 5 5 4 0 1 0 1 0 3 0 0 25 25 07041999 01 UNKDWN INTERSECTiON 1 0 0 0 1 0 0 0 0 0 0 0 0 25 25 07041999 58 UNKOWN INTERSECTION 1 0 1 0 0 0 0 0 0 0 0 0 1 25 25 07041999 99 UNKOWN INTERSECTION 1 0 0 0 1 0 0 0 0 0 0 0 0 25 ..... ROUTE TOTAL W/999 RM'S+4< 3331 8 1370 519 1434 2 403 102 83 65 1118 372 63 25A 25A07031oo1 5 0 1 1 3 0 2 1 0 0 1 0 0 25A 25A07031oo1 31 JCT NY 108 9 0 2 2 5 0 2 1 0 0 1 1 0 25A 25A07031002 1 0 0 1 0 0 0 0 0 0 1 0 0 25A 25A07031005 2 0 1 0 1 0 1 1 0 0 0 1 0 25A 25A07031oo6 1 0 0 0 1 0 0 0 0 0 0 0 0 25A 25A07031oo8 1 0 0 1 0 0 0 1 0 0 0 0 0 25A 25A07031oo8 34 PORTLANO ST 2 0 1 0 1 0 0 1 0 0 0 1 0 25A 25A07031oo9 6 0 1 0 5 0 1 0 0 0 0 1 0 25A 25A07031oo9 35 ELM PL 2 0 1 0 1 0 0 0 0 0 1 0 0 25A 25A07031009 85 SHORE RD-SNAKE HILL 4 0 2 1 1 0 0 0 0 0 3 0 0 25A 25A07031oo9 88 UNKOWN INTERSECTION 1 0 1 0 0 0 0 0 1 0 1 0 0 25A 25A0103101O 2 0 t 0 1 0 0 0 0 0 1 0 0 25A 25A070310 11 1 0 1 0 0 0 0 0 0 0 0 1 0 25A 25A01031O 12 2 0 0 1 1 0 0 0 0 0 0 0 0 25A 25A07031012 36 POPLAR PL 2 0 2 0 0 0 0 1 0 0 0 2 0 25A 25A01031013 37 TURKEY RO 2 0 0 0 2 0 0 0 0 0 0 0 0 25A 25A0103'014 1 0 1 0 0 0 1 1 0 0 0 1 0 .' 25A 25A070310'5 2 0 0 0 2 0 0 0 0 0 0 0 0 25A 25A07031015 39 GOOSE HILL RO 3 0 0 1 2 0 0 0 0 0 0 t 0 25A 25A07031017 5 0 1 0 4 0 0 0 0 0 1 0 0 25A 25A07031018 1 0 0 0 1 0 0 0 0 0 0 0 0 25A 2~A01031018 4 , CARNNEGE AVE 1 0 0 1 0 0 I 0 0 0 , 0 0 25A 2~A07031020 1 0 1 0 0 0 0 1 0 0 0 1 0 25A .25A07031020 42 MIOLANO ST 1 0 1 0 0 0 I 0 0 0 0 1 0 25A 25A07031021 2 0 1 0 1 0 0 0 1 0 0 0 1 25A 25AQ7031021 .. QUAKER PATH 3 0 1 1 1 0 2 0 0 0 2 0 0 25A 25A07Q31Q22 2 0 1 0 1 0 0 0 0 0 1 0 0 25A 25A01031022 46 WOOLSEY ST CARLEY 2 0 1 0 1 0 1 0 0 0 1 0 0 25A 25A07031023 48 NATHAN HALE OR 5 0 2 0 3 0 1 0 0 0 1 1 0 25A 25A0703'024 1 0 1 0 0 0 0 0 0 0 1 0 0 25A 25AQ7031Q24 03 UNKOWN INTERSECTION 1 0 0 1 0 0 0 0 0 0 0 0 0 . SIDE-ROAD & NON-REPORTABLES INCLUDED .. EXCLUOES NON-REPORIABLES ... EXCLUDES PICKUP & VANS REGION-COUNTY 07 PAGE 17 .~ - - - - - - - - - - - - - - - - - - NYS DEPARTMENT OF TRANSPORTATION USER, TRAFFIC & SAFETY STATE ACCIDENT SURVEILLANCE SYSTEM RUN DATE 10/12/94 INTERIM ACCIDENT SUMMARY REGION-COUNTY 07 FOR 1/01/93 THRU 12/31/93 N U M B E R o F A C C I 0 E N T S - ROUTE REF. MARKER INTERSEC DESCRIPTION TOTAL FATAL INJ POO N/R SlOE WET FI XED PED & TRUCK LIGHT CONDITION NO. . ROAD ROAD DB.... BIKE ... DAY NIGHT DAWN/DUSK .. .. .. .. .. .. .. 25 25 07041634 2. 0 2 0 0 0 1 2 0 0 0 2 0 25 25 07041636 2 0 1 0 1 0 0 1 0 0 0 1 0 25 25 07041637 1 0 0 0 1 0 0 0 0 0 0 0 0 25 25 07041637 90 SAGE BLVD 1 0 0 0 1 0 0 0 0 0 0 0 0 25 25 07041640 1 0 0 1 0 0 0 0 0 0 1 0 0 25 25 07041640 94 PIPES NECK 1 0 0 0 1 0 0 0 0 0 0 0 0 25 25 07041641 1 0 0 0 1 0 0 0 0 0 0 0 0 25 25 07041643 95 CHAPEL LANE 1 0 1 0 0 0 1 0 0 0 1 0 0 25 25 07041644 1 0 1 0 0 0 1 1 0 0 1 0 0 25 25 07041645 1 0 1 0 0 0 1 1 0 0 0 1 0 25 25 07041648 1 0 0 0 1 0 0 0 0 0 0 0 0 25 25 07041649 1 0 0 0 1 0 0 0 0 0 0 .0 0 25 25 07041652 1 0 0 0 1 0 0 0 0 0 0 0 0 25 25 07041653 2 0 I 0 1 0 1 0 0 0 1 0 0 25 25 07041656 07 NINTH ST I 0 0 0 I 0 0 0 0 0 0 0 0 25 25 07041656 75 MOORES LANE 1 0 1 0 0 0 0 0 0 0 I 0 0 25 25 07041657 08 EIGHTH ST . I 0 0 0 1 0 0 0 0 0 0 0 0 25 25 07041658 1 0 1 0 0 0 0 0 0 0 1 0 0 25 25 07041659 1 0 0 1 0 0 0 0 0 0 0 0 0 25 25 07041659 12 FIFTH ST 2 0 1 0 1 0 0 0 0 0 1 0 0 25 25 0704 1660 . 2 0 2 0 0 0 0 0 1 1 1 0 1 25 25 07041660 13 FOURTH AVE I 0 1 0 0 0 0 0 1 0 1 0 0 25 25 07041661 I 0 0 0 1 0 0 0 0 0 0 0 0 25 25 07041661 16 THIRD ST 1 0 0 0 1 0 0 0 0 0 0 0 0 25 25 07041662 1 0 0 0 I 0 0 0 0 0 0 0 0 25 25 07041662 18 FIRST ST 3 0 1 0 2 0 0 0 0 0 1 0 0 25 25 07041663 3 0 0 1 2 0 0 1 0 0 0 0 0 25 25 07041663 19 MAIN ST. 4 0 I 1 2 0 0 0 0 0 I 0 0 25. 25 07041663 2 I AOAMS ST 1 0 0 0 1 0 0 0 0 0 0 0 0 25 25 07041665 4 0 0 I 3 0 0 0 0 0 1 0 0 25 25 07041665 24 CENTRAL AVE 1 0 0 0 I 0 0 0 0 0 0 0 0 25 25 07041672 t- I 0 1 0 0 0 0 0 0 0 I 0 0 25 25 07041672 38 NORTH RD-CO RD 27 3 0 0 0 3 0 0 0 0 0 0 0 0 25 25 07041672 92 UNKOWN INTERSECTION I 0 0 0 1 0 0 0 0 0 0 0 0 25 25 07041674 1 0 0 0 1 0 0 0 0 0 0 0 0 25 25 07041675 1 I 0 0 0 0 0 0 0 0 I 0 0 25 25 07041675 41 MANHASSET RD 3 0 0 0 3 0 0 0 0 0 0 0 0 25 25 07041677 1 0 1 0 0 0 0 1 0 0 1 0 0 25 25 07041681 I 0 1 0 0 0 0 0 0 0 0 I 0 25 25 07041682 2 0 I 0 I 0 0 1 0 0 I 0 0 25 25 07041683 I 0 0 0 I 0 0 0 0 0 0 0 0 25 25 07041685 48 ROCK PT RD 2 0 I 0 1 0 0 0 0 0 I 0 0 25 25.07041688 1 0 0 0 I 0 0 0 0 0 0 0 0 25 25;07041689 54 OLD ORCHARD LANE 1 0 0 0 1 0 0 0 0 0 0 0 0 25 25.07041&90 82 STARS RD 1 0 1 0 0 0 0 1 0 0 0 0 1 25 - 2-5 0704 1695 1 0 0 0 1 0 0 0 0 0 0 0 0 25 25 0704 1705 1 0 0 0 1 0 0 0 0 0 0 0 0 25 25 07041706 1. 0 0 0 1 0 0 0 0 0 0 0 0 25 25 07041714 65 TABOR RD 2 0 0 0 2 0 0 0 0 0 0 0 0 25 25 07041717 1 0 0 0 1 0 0 0 0 0 0 0 0 . SIDE-ROAD & NON-REPDRTABLES INCLUDED .. EXCLUDES NON-REPORT ABLES "'.. EXCLUDES PICKUP & VANS REGION-COUNTY 07 PAGE 16 76 - - - - - - - - - - - - - - - - - - - NVS DEPARTM""T OF TRANSPORTATION USER: TRAFFIC & SAFETY STATE ACCIDENT SURVEILLANCE SYSTEM RUN DATE 9/27/95 INTERIM ACCIDENT SUMMARV REGIDN-COUNTV 07 FOR 1/01/94 THRU 12/31/94 N U M B E R o F A C C I 0 E N T S - ROUTE REF . MARKER INTERSEC DESCRIPTION TOTAL FATAL INJ POD N/R SIDE WET FIXED PEO & TRUCK LI GHT CONDITION NO~ . ROAD ROAD OBJ BIKE ... DAY NIGHT DAWN/DUSK .. .. .. .. .. .. .. 25 25 07041612 69 WELLS AVE 3 0 2 0 1 0 0 0 1 0 1 1 0 25 25 07041613 1 0 1 0 0 0 0 0 0 0 1 0 0 25 25 07041614 3 0 0 2 1 0 1 0 0 0 1 1 0 25 25 07041614 56 YOUNGS AVE. 4 0 1 1 2 0 0 0 0 0 2 0 0 25 25 07041615 2 0 1 1 0 0 0 0 1 0 1 0 0 25 25 07041616 76 HOBART RO-BOSSEAI 1 0 1 0 0 0 0 0 0 0 1 0 0 25 25 07041617 1 0 0 0 1 0 0 0 0 0 0 0 0 25 25 07041617 79 LOCUST LANE 1 0 1 0 0 0 0 0 0 0 1 0 0 25 25 07041618 3 0 0 0 3 0 0 0 0 0 0 0 0 25 25 07041619 1 0 0 0 1 0 0 0 0 0 0 0 0 25 25 07041621 3 0 0 1 2 0 0 0 0 0 0 0 0 25 25 07041622 1 0 1 0 0 0 0 0 0 0 1 0 0 25 25 07041629 1 0 1 0 0 0 0 0 0 0 1 0 0 25 25 07041632 1 0 0 0 1 0 0 0 0 0 0 0 0 25 25 07041635 2 0 1 1 0 0 0 1 0 0 , , 0 25 25 07041637 1 0 1 0 0 0 0 0 0 0 1 0 0 25 25 07041640 , 0 1 0 0 0 0 0 0 0 0 1 0 25 25 07041640 94 PIPES NECK 1 0 0 0 1 0 0 0 0 0 0 0 0 25 25 0704164' 2 0 0 0 2 0 0 0 0 0 0 0 0 25 25 07041643 95 CHAPEL LANE 3 0 0 0 3 0 0 0 0 0 0 0 0 25 25 01041644 1 0 0 0 1 0 0 0 0 0 0 0 0 25 25 07041645 1 0 0 0 1 0 0 0 0 0 0 0 0 25 25 07041648 1 0 0 0 1 0 0 0 0 0 0 0 0 25 25 07041649 1 0 0 0 1 0 0 0 0 0 0 0 0 25 25 07041651 1 1 0 0 0 0 0 0 0 0 1 0 0 25 25 07041653 1 0 1 0 0 0 0 0 0 0 1 0 0 25 25 07041655 1 0 0 0 1 0 0 0 0 0 0 0 0 25 25 07041656 2 0 1 0 1 0 1 0 0 0 1 0 0 25 25 07041656 07 NINTH ST 2 0 2 0 0 0 1 0 0 0 1 1 0 25 25 07041656 75 MOORES LANE 1 0 0 0 1 0 0 0 0 0 0 0 0 25 25 07041658 39 FIFTH AVE 1 0 0 0 1 0 0 0 0 0 0" 0 0 25 25 07041659 12 FIFTH ST 1 0 1 0 0 0 0 0 0 0 0 1 0 25 25 07041660 14 FOURTH ST 1 0 0 1 0 0 0 1 0 0 0 0 0 25 25 07041661 1 0 0 0 1 0 0 0 0 0 0 0 0 25 25 07041661 16 THIRD ST 4 0 0 0 4 0 0 0 0 0 0 0 0 25 25 07041662 18 FIRST ST 3 0 0 0 3 0 0 0 0 0 0 0 0 25 25 07041663 2 0 0 0 2 0 0 0 0 0 0 0 0 25 25 07041663 19 MAIN ST. 1 0 0 1 0 0 0 0 0 0 0 1 0 25 25 07041663 21 ADAMS ST 3 0 0 0 3 0 0 0 0 0 0 0 0 25 25 07041664 1 0 0 0 1 0 0 0 0 0 0 0 0 25 25 07041664 00 UNKOWN INTERSECTION 1 0 0 0 1 0 0 0 0 0 0 0 0 25 25 07041665 24 CENTRAL AVE 1 0 0 0 1 0 0 0 0 0 0 0 0 25 25 07041666 2 0 0 1 1 0 0 0 0 0 1 0 0 25 25 07041667 1 0 1 0 0 0 1 1 0 0 0 1 0 25 25 07041668 31 MANOR PL 3 0 I" 2 0 0 2 0 0 0 2 1 0 25 25 07041669 1 0 1 0 0 0 1 1 0 0 1 0 0 25 25 07041672 38 NORTH RD-CO RD 27 J, 1 0 0 1 0 0 0 0 0 0 0 0 0 25 25 07041672 39 SOUND RD 1 0 0 0 1 0 0 0 0 0 0 0 0 25 25 07041673 40 BAILEY AVE 1 0 0 0 1 0 0 0 0 0 0 0 0 25 25 07041676 1 0 0 0 1. 0 0 0 0 0 0 0 0 . SIDF-RDAD & NON-REPORTABLES INCLUDED .. EXCLUDES NDN-REPORTABUS ... EXCLUDES PICKUP & VANS REGION-COUNTY 07 PAGE 16 76 - - - - - - - - - - - - - - - - - - - NYS DEPARTMENT OF TRANSPORTATION USER: TRAFFIC & SAFETY STATE ACCIDENT SURVEILLANCE SYSTEM RUN OA TE 9/27/95 INTERIM ACC !DENT SUMMARY REGION-COUNTY 07 FOR 1/01/94 THRU 12/31/94 N U M B E R o F A C C I 0 ENT$- ROUTE REF. MARKER INTERSEC OESCR IPT ION TOTAL FATAL IN~ POD N/R S!DE WET FIXED PEO & TRUCK LIGHT CONDITION NO. . ROAD ROAD OB~ BIKE ... DAY NIGHT DAWN/DUSK .. .. .. .. .. .. .. 25 25 07041677 2 0 1 0 1 0 0 0 0 0 1 0 0 25 25 07041679 2 0 0 0 2 0 0 0 0 0 0 0 0 25 25 070416BO 44 MAPLE LN 1 0 1 0 0 0 0 0 0 0 1 0 0 25 25 070416Bl 3 0 1 0 2 0 0 1 0 0 1 0 0 25 25 07041682 1 0 0 0 1 0 0 0 0 0 0 0 0 25 25 07041683 1 0 0 0 1 0 0 ,0 0 0 0 0 0 25 25 07041685 1 0 0 0 1 0 0 0 0 0 0 0 0 25 25 07041685 4B ROCK PT RO 1 0 0 0 1 0 0 0 0 0 0 0 0 25 25 070416BB 1 0 0 0 1 0 0 0 0 0 0 0 0 25 25 070416B9 4 0 3 0 1 0 1 0 1 0 3 0 0 25 25 07041691 1 0 0 1 0 0 0 0 0 0 1 0 0 25 25 07041692 1 0 0 0 1 0 0 0 0 0 0 0 0 25 25 07041699 3 0 2 0 1 0 0 0 0 0 0 2 0 25 25 07041702 1 0 0 0 1 0 0 0 0 0 0 0 0 25 25 0704 1704 1 0 1 0 0 0 0 0 0 0 1 0 0 25 25 07041709 1 0 0 0 1 0 0 0 0 0 0 0 0 25 25 07041710 1 0 0 0 1 0 0 0 0 0 0 0 0 25 25 07041711 1 0 0 0 1 0 0 0 0 0 0 0 0 25 25 07041712 1 0 1 0 0 0 0 0 0 0 1 0 0 25 25 07041712 63 OYSTER POND RO 1 0 0 0 1 0 0 0 0 0 0 0 0 25 25 07041714 2 0 1 0 1 0 0 0 0 0 1 0 0 25 25 07041714 65 TABOR RO 1 0 0 0 1 0 0 0 0 0 0 0 0 25 25 07041715 1 0 0 0 1 0 0 0 0 0 0 0 0 25 25 07041716 1 0 0 0 1 0 0 0 0 0 0 0 0 25 25 07041718 1 0 0 0 1 0 0 0 0 0 0 0 0 25 25 07041720 1 0 0 0 1 0 0 0 0 0 0 0 0 25 25 07041724 00 UNKOWN INTERSECTION 1 O. 1 0 0 0 0 0 1 0 1 0 0 25 25 07041728 1 0 0 1 0 0 0 0 0 0 0 1 0 25 25 0704 1729 l' 1 0 0 0 1 0 0 0 0 0 0 0 0 25 25 07041736 00 UNKOWN INTERSECTION 1 0 1 0 0 0 0 0 0 0 0 1 0 25 25 07041802 1 0 0 1 0 0 0 0 0 0 1 0 0 25 25 07041815 1 0 0 0 1 0 0 0 0 0 0 0 0 25 25 07041941 2 0 2 0 0 0 0 0 0 0 1 1 0 25 25 07041964 1 0 0 1 0 0 1 0 0 0 1 0 0 25 25 07041968 1 0 1 0 0 0 0 0 0 0 1 0 0 25 25 07041999 116 0 23 34 59 0 10 7 0 0 5 2 0 25 25 07041999 00 UNKOWN INTERSECTION 12 0 2 3 7 0 0 0 0 0 1 1 0 25 25 07041999 58 UNKQWN INTERSECTION 1 0 0 0 1 0 0 0 0 0 0 0 0 25 25 07041999 99 UNKOWN INTERSECTION 2 0 0 1 1 0 0 1 0 0 0 0 1 25 ..... ROUTE TOTAL W/999 RM'S.. 3282 12 1280 512 1478 3 392 103 54 61 1013 398 62 25A 25A07031001 5 0 3 2 0 0 3 I 0 0 1 1 0 25A 25A07031oo1 31 vCT NY 108 1 0 0 0 1 0 0 0 0 0 0 0 0 25A 25A07031004 1 0 0 1 0 0 I 0 0 0 0 1 0 25A 25A07031005 1 0 0 0 1 0 0 0 0 0 0 0 0 25A 25A07031oo6 2 0 1 1 0 0 I 1 0 0 2 0 0 25A 25AQ703100G 32 TERRACE PLACE 1 0 1 0 0 0 0 0 0 0 0 1 0 25A 25A07031oo7 2 0 1 1 0 0 0 0 0 1 2 0 0 25A 25A07031oo8 34 PORTLAND ST 2 0 2 0 0 0 2 2 0 0 1 1 0 25A 25A07031oo9 7 0 1 2 4 0 1 0 0 0 2 1 0 25A 25A07031009 85 SHORE RO-SNAKE HILL 2 0 0 1 t 0 0 0 0 1 0 0 1 . SIDE-ROAD & NON-REPORT ABLES INCLUOEO .. EXCLUDES NON-REPORTABLES ... EXCLUDES PICKUP & VANS REGION-COUNTY 07 PAGE 17 - - - - - - - - - - - - - - - - - - - NYS DEPARTMENT OF TRANSPORTATION USER: TRAfFIC & SAFETY STATE ACCIDENT SURVEILLANCE SYSTEM RUN DATE 3/ 1/96 INTERIM ACCIDENT SUMMARY REGION-COUNTY 07 FOR 1/01/95 THRU 6/30/95 N U M B E R 0 F A C C ! 0 E N T S - ROUTE REF . MARKER JNTERSEC OESCRIPTION TOTAL FATAL INJ POO N/R SlOE wET FIXED PEO & TRUCK LIGHT CONDITION NO. . ROAD ROAD OBJ BIKE ... DAY NIGHT DAWN/DUSK .. .. .. .. .. .. .. 25 25 01041565 84 NEW SUFFOLK-NORTH 2 0 1 1 0 0 1 0 0 I 2 0 0 25 25 07041566 85 DEPOT LANE 2 0 I 0 I 0 I 0 0 0 0 1 0 25 25 01041568 00 UNKOWN INTERSECTION 1 0 1 0 0 0 1 1 0 0 1 0 0 25 25 01041513 3 0 3 0 0 0 2 0 I 0 2 1 0 25 25 01041513 90 EUGENE ROAO 1 0 0 0 1 0 0 0 0 0 0 0 0 25 25 01041514 1 0 0 0 1 0 0 0 0 0 0 0 0 25 25 01041519 2 0 2 0 0 0 0 0 0 0 2 0 0 25 25 0104'586 1 0 0 0 1 0 0 0 0 0 0 0 0 25 25 01041588 I 0 0 0 1 0 0 0 0 0 0 0 0 25 25 01041588 94 INDIAN NECK LANE 1 0 0 0 1 0 0 0 0 0 0 0 0 25 25 07041593 1 0 0 0 1 0 0 0 0 0 0 0 0 25 25 01041594 1 0 1 0 0 0 0 0 0 0 1 0 0 25 25 01041591 0 0 0 0 0 0 0 ^ ^ ^ 0 v v v 25 25 07041600 62 SOUTH HARBOR ROAD 1 0 1 0 0 0 0 1 0 0 1 0 0 25 25 07041604 I 0 0 0 1 0 0 0 0 0 0 0 0 25 25 07041609 1 0 0 0 1 0 0 0 0 0 0 .0 0 25 25 01041609 65 TUCKERS LANE 2 0 1 0 1 0 0 0 0 1 I 0 0 25 25 01041612 1 0 0 1 1) 0 1 0 0 0 1 0 0 25 25 01041613 13 BECKWITtl AVE 1 0 0 1 0 0 0 0 0 1 1 0 0 25 25 01041614 4 0 2 1 1 0 0 0 0 0 2 0 0 25 25 07041614 56 YOUNGS AVE. 2 0 0 1 1 0 0 0 0 0 1 0 0 25 25 01041615 1 0 I 0 0 0 0 0 0 0 1 0 0 25 25 01041616 3 0 2 0 1 0 0 0 2 0 1 1 0 25 25 01041611 79 LOCUST LANE 1 0 1 0 0 0 1 0 0 0 I 0 0 25 25 01041618 80 TOWN HARBOR LANE 1 0 0 0 1 0 0 0 0 0 0 0 0 25 25 01041620 1 0 I 0 0 0 1 0 0 0 . 0 0 25 25 07041623 1 0 0 0 1 0 0 0 0 0 0 0 0 25 25 07041635 1 0 0 0 1 0 0 0 0 0 0 0 0 25 25 01041641 49 KERWIN BLVO 1 0 0 0 1 0 0 0 0 0 0 0 0 25 25 01041646 1 0 0 0 1 0 0 0 0 0 0 0 0 25 25 01041649 1 0 0 0 1 0 0 0 0 0 0 0 0 25 25 07041653 1 0 0 0 1 0 0 0 0 0 0 0 0 25 25 01041656 01 NINTH ST 2 0 0 1 1 0 1 0 0 0 1 0 0 25 25 01041656 15 MOORES LANE 2 0 1 1 0 0 0 0 0 1 2 0 0 25 25 01041658 10 SIXTH ST 1 0 1 0 0 0 0 0 0 0 1 0 0 25 25 01041659 12 FIFTH ST 1 0 1 0 0 0 0 0 0 0 1 0 0 25 25 07041660 1 0 0 0 1 0 0 0 0 0 0 0 0 25 25 07041660 14 FOURTH ST 1 0 0 0 1 0 0 0 0 0 0 0 0 25 25 07041661 2 0 0 0 2 0 0 0 0 0 0 0 0 25 25 01041663 1 0 0 0 1 0 0 0 0 0 0 0 0 25 25 01041665 1 0 0 1 0 0 0 0 0 0 1 0 0 25 25 01041669 32 MONSELL PL 1 0 1 0 0 0 0 0 0 0 ,I 0 0 25 25 01041610 36 CHAMPLIN-WILMARTH A 1 0 1 0 0 0 0 0 0 0 1 0 0 25 25 01041612 t 1 0 0 1 0 0 0 0 0 0 1 0 0 25 25 07041682 1 0 0 0 1 0 0 0 0 0 0 0 0 25 25 070416B2 45 SHIPYARO LN 1 0 0 0 1 0 0 0 0 0 0 0 0 25 25 010416B3 1 0 1 0 0 0 0 0 0 0 I 0 0 25 25 01041683 00 UNKOWN INTERSECTION 1 0 0 0 1 0 0 0 0 0 0 0 0 25 25 01041684 1 0 0 0 1 0 0 0 0 0 0 0 0 25 25 0104.688 1 0 1 0 0 0 0 1 0 0 t 0 0 . SIOE-ROAO & NON-REPORTABLES INCLUOEO .. EXCLUOES NON-REPORTABLES .... EXCLUDES PICKUP & VANS REGION-COUNTV 07 PAGE 11 - - - - - - - - - - - - - - - - - - - NYS DEPARTMENT OF TRANSPORTATION USER: TRAFFIC & SAFETY STATE ACCIDENT SURVEILLANCE SYSTEM RUN DATE 3/ 1/96 INTERIM ACCIDENT SUMMARY REGION-COUNTY 07 FOR 1/01/95 THRU 6/30/95 N U M B E R o F A C C I 0 E N T S - ROUTE REF. MARKER INTERSEC DESCRIPTION TOTAL FATAL INJ PDO N/R SlOE WET FIXED PED & TRUCK LIGHT CONDIT ION NO. . ROAD ROAD OBJ BIKE ... DAY NIGHT DAWN/DUSK .. .. .. .. .. .. .. 25 25 07041690 1 0 0 0 1 0 0 0 0 0 0 0 0 25 25 07041710 1 0 0 1 0 0 0 0 0 0 0 0 0 25 25 07041732 1 0 0 0 1 0 0 0 0 0 0 0 0 25 25 07041740 1 0 0 0 1 0 0 0 0 0 0 0 0 25 25 07041749 1 0 0 0 1 0 0 0 0 0 0 0 0 2 25 07041861 1 0 1 0 0 0 0 0 0 0 0 0 1 25 25 07041999 38 0 3 16 19 0 2 2 0 0 0 1 0 25 25 07041999 00 UNKDWN INTERSECTION 6 0 4 0 2 0 3 0 1 0 3 1 0 25 25 07041999 99 UNKOWN INTERSECTION 1 0 0 0 1 0 0 0 0 0 0 0 0 25 ..... ROUTE TOTAL W/999 RM'S.. 1479 7 546 265 661 0 219 41 26 31 487 145 38 25A 25A07031001 31 JCT NY 108 1 0 1 0 0 0 1 0 0 0 1 0 0 25A 25A07031003 1 0 0 0 1 0 0 0 0 0 0 0 0 25A 25A07031006 1 0 1 0 0 0 0 0 0 0 1 0 0 25A 25A07031008 1 0 0 0 1 0 0 0 0 0 0 0 0 25A 25A07031008 33 FLORA 5T 1 0 1 0 0 0 0 1 0 0 0 0 I 25A 25A07031008 34 PORTLAND ST 2 0 2 0 0 0 1 2 0 0 1 1 0 25A 25A07031009 2 0 2 0 0 0 2 0 0 0 0 2 0 25A 25A07031009 35 ELM PL 1 0 0 0 1 0 0 0 0 0 0 0 0 254 25407031010 2 0 1 0 1 0 0 0 0 0 1 0 0 254 25407031011 1 0 0 0 1 0 0 0 0 0 0 0 0 254 25A07031012 36 POPLAR PL 1 0 1 0 0 0 1 0 0 0 1 0 0 254 25401031013 31 TURKEY RO 1 0 0 1 0 0 0 0 0 0 0 0 0 254 25401031014 1 0 1 0 0 0 0 0 0 0 0 1 0 25A 25401031015 39 GOOSE HIll RD 2 0 1 1 0 0 1 0 1 0 2 0 0 25A 25401031016 1 0 1 0 0 0 0 1 0 0 0 1 0 25A 25401031011 40 GLEN W4 Y 1 0 1 0 0 0 1 0 0 0 1 0 0 254 25401031019 3 0 1 0 2 0 0 1 0 0 1 0 0 254 25A01031020 2 0 2 0 0 0 2 1 0 1 2 0 0 254 25407031020 42 MIOL4ND ST 1 0 1 0 0 0 0 0 0 0 1 0 0 254 25401031021 44 QU4KER P4TH 1 0 0 0 1 0 0 0 0 0 0 0 0 254 25A01031022 46 WOOLSEY ST C4RLEY 1 0 0 1 0 0 1 0 0 0 O. 0 0 254 25401031023 48 N4TH4N HALE OR 2 0 1 0 1 0 1 0 0 0 1 0 0 25A 25401031025 2 0 0 0 2 0 0 0 0 0 0 0 0 25A 25401031026 1 0 1 0 0 0 0 0 1 0 1 0 0 254 25401031026 54 WOODBURY-WESTNECK 5 0 2 2 1 0 1 0 0 0 1 2 0 254 25A07031027 2 0 0 0 2 0 0 0 0 0 0 0 0 254 25401031028 1 0 0 1 0 0 0 1 0 0 0 0 0 254 25401031028 56 GREEN ST/CLINTON ST 3 0 1 1 1 0 1 0 0 0 2 0 0 254 25A07031028 90 WALL ST/NEW ST 6 0 0 2 4 0 0 0 0 0 0 0 0 254 25401031029 1 0 0 0 1 0 0 0 0 0 0 0 0 254 25401031029 58 JeT NY 110- NY AVE 10 0 3 1 6 0 1 0 0 0 4 0 0 254 25401031030 2 0 1 0 1 0 0 0 0 0 1 0 0 254 25407031031 62 GIBSON 2 0 0 1 1 0 0 0 0 0 1 0 0 254 25407031032 4 0 2 1 1 0 2 1 0 0 p 0 1 25A 25401031032 63 SPRING RO-PRIME 4VE 6 0 3 2 1 0 1 0 0 0 1 2 0 254 25407031033 1 0 0 0 1 0 0 0 0 0 0 0 0 25A 25407031033 65 IRWIN PL 1 0 0 0 1 0 0 0 0 0 0 0 0 254 25401031034 1 0 0 1 0 0 0 0 0 0 1 0 0 254 25407031034 31 S4BBATH PATH 3 0 1 0 2 0 0 0 0 0 1 0 0 25A 25A07031034 66 JACKSON 5 0 2 2 1 0 1 0 0 0 1 3 0 . SIOE-Q04D & NON-REPORTABLES INCLUDED .. EXCLUDES NON-REPORTABLES ... EXCLUDES PICKUP & V4NS REGION-COUNTY 07 P4GE 12 58 I I I I I I I I I I I I I I I I I I I 1996 Reportable Accident Descriptions Disk #a90, Cross Sound Ferry File: Di....iders ------------------- LOCATION CODE: 025- 0704 1674 CASE NUMBER: 6-434108 ACCIDENT DATE: 07/05/96 POLICE AGENCY: 05155 RIVERHEAD TOWN POLICE DEPARTMENT COUNTY/MUNI: SUFFOLK COUNTY, TOWN OF SOUTHOLD TIME: 16: PRECINCT: FIRST EVENT: COLLISION WITH PEDESTRIAN LOCATION FIRST EVENT: ON ROADWAY ACCIDENT CLASS: INJURY AND P.D. TRAFFIC CONTROL: NONE LIGHT CONDITION: DAYLIGHT WEATHER: CLEAR ROAD CHARACTER: STRAIGHT AND LEVEL MANNER OF COLLISION: OTHER TYPE OF ROAD SYSTEM: STATE PED./BIKER LOCATION: NOT AT INTERSECTION PED./BIKER ACTION: CROSSING - NO SIGNAL OR CROSSWALK REFERENCE MARKER: 025-07041674 REGISTRATION TYPE: 76 COMMERCIAL SCHOOL BUS, NO VEHICLE YEAR: 92 wEIGHT/PASSENGERS: 005450 APPARENT APPARENT FACTOR 2: NOT-ENTERED - N/A SEX ***, M SECONO EVENT: NOT-ENTERED - N/A EXTENT OF DAMAGE: UNAVAILBLE DIRECTION OF TRAVEL: EAST DRIVEll-STATE-CODE: NEW YORK HAZARDOUS MATERIAL: NO HAZARDOUS BODY TYPE: 63 PICK UP TRUCK BUS/TRUCK CODES: NO VEHICLE MAKE: FORD VEIiICLE ID NUMBER: IFTDF15Y2NNA84773 FACTOR 1: N/A PRE-ACCIDENT ACTION: GOING STRAIGHT AHEAD AREA OF IMPACT: NOT AVAILABLE NUMBER OF OCCUPANTS: 01 MATERIAL INDICATED AGE ***: 38 REGISTRATION TYPE: NO REGISTRATION TYPE BODY TYPE: 36 PEDESTRIAN BUS/TRUCK CODES: NO SCHOOL BUS, NO VEHICLE YEAR: VEHICLE MAKE: VEIiICLE ID NUMBER: wEIGHT/PASSENGERS. APPARENT FACTOR 1. PED'S/BIKE'S ERROR/CDNFUSION ~PPARENT FACTOR 2: NOT-ENTERED - N/A PRE-ACCIDENT ACTION: N/A AGE ***: 40 SEX ***. M SECOND EVENT: NOT-ENTERED - N/A AREA OF IMPACT: NOT AVAILABLE eXTENT OF DAMAGE: UNAVAILBLE DIRECTION OF TRAVEL: N/A NUMBER OF OCCUPANTS: DRIVER-STATE-CODE: NEW YORK HAZARDOUS MATERIAL: NO HAZARDOUS MATERIAL INDICATED ** OCCUPANT VEHICLE OCCUPIED: 01 SAFETY EQUIPMENT USED: LAP BELT&HARNESS ** INJURY VEHICLE DCCUPIED: 02P SAFETY EQUIPMENT USED: N/A LOCATION OF PHYSICAL COMPLAINT: KNEE TO FOOT iICTIM STATUS: CONSCIOUS TAKEN TO: AGE: 36 SEX: MALE POSITION IN VEHICLE: DRIVER EJECTION FROM VEHICLE: NOT EJECTE! AGE: 40 SEX: MALE POSITION IN VEHICLE: N/A EJECTION FROM VEHICLE: N/A TYPE OF PHYSICAL COMPLAINT: FRACTURE-DISLCTN TAKEN BY: 9997 ------------------- OCATION CODE: 025- 0704 1675 41 ASE NUMBER: 6-528957 ACCIDENT DATE: 08/31/96 POLICE AGENCY: 05159 SOUTHOLD TOWN POLICE DEPARTMENT OUNTY/MUNI: SUFFOLK COUNTY, TOWN OF SOUTHOLD TIME: 08: PRECINCT: IRST EVENT: COLL W LIGHT SUPPORT/UTILITY POLE LOCATION FIRST EVENT: ON ROADWAY ACCIDENT CLASS. INJURY RAFFIC CONTROL: NONE LIGHT CONDITION: DAYLIGHT WEATHER: CLEAR UAD CHARACTER: STRAIGHT AND LEVEL MANNER OF COLLISION: OTHER TYPE OF ROAD SYSTEM: STATE ED./8IKER LOCATION: NO PED. INVOLVEMENT PED./BIKER ACTION: NOT AVAILABLE (NO PEDESTRIAN INVOLVEMENT) EFERENCE MARKER, 025-0704167541 EGISTRATION TYPE: NO REGISTRATION TYPE BODY TYPE: 14 2 DOOR SEDAN BUS/TRUCK CODES: NO CHOUL BUS: NO VEHICLE YEAR: VEHICLE MAKE: VEHICLE ID NUMBER: EIGIIT /PASSENGERS: APPARENT FACTOR 1: FELL ASLEEP PPARENT FACTOR 2: N/A PRE-ACCIDENT ACTION: GOING STRAIGHT AHEAD AGE ***: 23 EX ***, M SECOND EVENT: COLLISION WITH OTHER MOTOR VEHICLE AREA OF IMPACT: NOT AVAILABLE XTENT OF DAMAGE, UNAVAILBLE DIRECTION OF TRAVEL: EAST NUMBER OF OCCUPANTS: 01 RIVER-STATE-CODE: NEW YORK HAZARDOUS MATERIAL: NO HAZARDOUS MATERIAL INDICATED EGISTRATION TYPE: 16 PASSENGER OR SUBURBAN BODY TYPE: 11 SEDAN BUS/TRUCK CODES: NO CIIOOL BUS: NO VEHICLE YEAR: 94 VEIHCLE MAKE: JEEP VEHICLE 10 NUMBER: IJ4GZ58SXRC141669 EIGHT/PASSENGERS: 003552 APPARENT FACTOR 1: N/A PPARENT FACTOR 2: N/A PRE-ACCIDENT ACTION: GOING STRAIGHT AHEAD AGE ***, 27 EX ***: F SECOND EVENT: NOT-ENTERED - N/A AREA OF IMPACT: NOT AVAILABLE XTENT OF DAMAGE: UNAVAILBLE DIRECTION OF TRAVEL: WEST NUMBER OF OCCUPANTS: 01 RIVER-STATE-CODE, NEW YORK HAZARDOUS MATERIAL: NO HAZARDOUS MATERIAL INDICATED ** INJURY VEHICLE OCCUPIED: 01 AFETY EQUIPMENT USED: LAP BELT&HARNESS OCATIotl OF PIIYSICAL COMPLAINT: FACE ICTIM STATUS: CONSCIOUS TAKEN TO: ** INJURY VEHICLE OCCUPIED: 02 AFETY EQUIPMENT USED: AIRB DPLOYD/LAPB/HARNSS OCATION OF PHYSICAL COMPLAINT: KNEE TO FOOT ICTIM STATUS: CONSCIOUS TAKEN TO: AGE: 23 SEX: MALE POSITION IN VEHICLE: DRIVER EJECTION FROM VEHICLE: NOT EJECTED TYPE OF PHYSICAL COMPLAINT: MINOR BLEEDING TAKEN BY: 9997 AGE: 27 SEX: FEMALE POSITION IN VEHICLE: DRIVER EJECTION FROM VEHICLE: NOT EJECTED TYPE OF PHYSICAL COMPLAINT: COMPLAINT OF PAIN TAKEN BY: 9997 ------------------- .OCATION CODE: 025- 0704 1683 ;ASE NUMBER, 6-609642 ACCIDENT DATE: 10/16/96 ;OUNTY/MUNI, SUFFOLK COUNTY, TOWN OF SOUTH OLD 'IRST EVENT, COLLISION WITH BICYCLIST "RAFFIC CONTROL. NO PASSING ZONE lOAD CHARACTER, STRAIGHT AND LEVEL 'ED./BIKER LOCATION: NOT AT INTERSECTION tEFERENCE MARKER. 025-07041683 POLICE AGENCY:. 05159 SOUTHOLD TOWN POLICE DEPARTMENT TIME, 15: PRECINCT: LOCATION FIRST EVENT: ON ROADWAY ACCIDENT CLASS: INJURY LIGHT CONDITION, DAYLIGHT WEATHER: CLEAR MANNER OF COLLISION: OTHER TYPE OF ROAD SYSTEM: STATE PED./BIKER ACTION: WALKING/RIDING ALONG HIGHWAY WITH TRAFFIC IEGISTRATION TYPE: 76 COMMERCIAL BODY TYPE: 68 VAN TRUCK BUS/TRUCK CODES: NO ;CHOOL BUS: NO VEHICLE YEAR: 94 VEHICLE MAKE: DODGE VEHICLE ID NUMBER, 2B7HB21Y4RK537026 lEIGHT/PASSENGERS: 004934 APPARENT FACTOR 1: N/A IPPARENT FACTOR 2: N/A PRE-ACCIDENT ACTION, GOING STRAIGHT AHEAD AGE ..., 59 ;EX ..., M SECOND EVENT: NOT-ENTERED - N/A AREA OF IMPACT: NOT AVAILABLE ,XTENT OF DAMAGE: UNAVAILBLE DIRECTION OF TRAVEL, WEST NUMBER OF OCCUPANTS, 01 IRIVER-STATE-CODE: NEW YORK HAZARDOUS MATERIAL: NO HAZARDOUS MATERIAL INDICATED IEGISTRATION TYPE: NO REGISTRATION TYPE BODY TYPE: 35 BICYCLE BUS/TRUCK CODES: NO ;CHOOL BUS: NO VEHICLE YEAR: VEHICLE MAKE: VEHICLE ID NUMBER: lEIGHT/PASSENGERS, APPARENT FACTOR 1: FAILURE TO YIELD ROW ,PPARENT FACTOR 2: N/A PRE-ACCIDENT ACTION, MAKING LEFT TURN AGE ...: 65 ;EX ...: F SECOND EVENT, NOT-ENTERED - N/A AREA OF IMPACT: NOT AVAILABLE :XTENT OF DAMAGE: UNAVAILBLE DIRECTION OF TRAVEL: WEST NUMBER OF OCCUPANTS: 'RIVER-STATE-CODE: NEW YORK HAZARDOUS MATERIAL: NO HAZARDOUS MATERIAL INDICATED .. OCCUPANT VEHICLE OCCUPIED: 01 AGE, 59 SEX: MALE .AFETY EQUIPMENT USED: LAP BELT&HARNESS POSITION IN VEHICLE, DRIVER EJECTION FROM VEHICLE, NOT EJECTED .. INJURY VEHICLE OCCUPIED: 02B AGE: 65 SEX: FEMALE ,AFETY EQUIPMENT USED: N/A POSITION IN VEHICLE, N/A EJECTION FROM VEHICLE: N/A .OCATION OF PHYSICAL COMPLAINT: HEAD TYPE OF PHYSICAL COMPLAINT, CONCUSSION 'ICT!M STATUS: SHOCK TAKEN TO, TAKEN BY: 9997 ------------------- 994-1996 7-029 OCATION CODE: 025- 0704 1693 "ASE NUMBER: 6-383681 ACCIDENT DATE: 06/08/96 OllNTY /MUNl: SUFFOLK COUNTY, TOWN OF SOUTlIOLD IRST EVENT: COLLISION WITH ANIMAL WAFFIC CUNTROl: NONE IIAo CIlARACTER: CURVE AND LEVEL fn./BIKER LnCATION: NO PED. INVOLVEMENT FFERE/ICE MARKER: 025-07041693 POLICE AGENCY; 05159 SOUTliOLD TOWN POLICE DEPARTMENT TIME: 12: PRECINCT: LOCATION FIRST EVENT: ON ROADWAY ACCIDENT CLASS: PROPERTY DAMAGE LIGllT CONDITION: DARK-RD NOT LIT WEATHER: CLEAR MANNER OF COLLISION: OTHER TYPE OF ROAD SYSTEM: STATE PEO./BIKER ACTION: NOT AVAILABLE (NO PEDESTRIAN INVOLVEMENT) U3ISTRATICN TYPE: 16 PASSENGER OR SUBURBAN BODY TYPE: 14 2 DOOR SEDAN BUS/TRUCK CODES: NO .CHOOl BUS: NO VEHICLE YEAR: 94 VEHICLE MAKE: FORD VEllIClE 10 NUMBER: IFALP4042RF234191 ~IUHT/PASSENGERS: 003050 APPARENT FACTOR 1: ANIMAL'S ACTION ,rPARENf FACIOR 2: NOT-ENTERED - N/A PRE-ACCIDENT ACTION: GOING STRAIGHT AHEAD AGE **.: 18 "X ...: M SECOND EVENT: NOT-ENTERED - NIA AREA OF IMPACT: NOT AVAILABLE XfENT OF DAMAGE: UNAVAIlBlE DIREcrIDN OF TRAVEL: EAST NUMBER OF OCCUPANTS: 01 'ilVEI/-STAIE-CODE: NEW YORK HAZARDOUS MATERIAL: NO HAZARDOUS MATERIAL INDICATED H OCCUPANT VEHICLE OCCUPIED: 01 AGE: 16 SEX: MALE OSITION IN VEHICLE: DRIVER EJECTION FROM VEHICLE: NOT EJECTED SAFETY EQUIPMENT USED: AIRBAG/LAPB/HARNES ------------------- 94-1996 7-029 CATION CODE: 025- 0704 1698 SE NUMBER: 6-102568 ACCIDEHT DATE: 01/02/96 POLICE AGENCY; 05159 SOUTHOLD TOWN POLICE DEPARTMENT UNTY/MUNI: SUFFOLK COUNTY, TOWN OF SOUTHOLD TIME: 17: PRECINCT: RST EVENT: COLl J SION WIlli OTHER FIXED OBJECT LOCATION FIRST EVENT: OFF ROADWAY ACCIDENT CLASS: INJURY AND P. D. AFFIC CONTROL: NO PASSING ZUNE LIGIIT CONDITION: DARK-RD LIGIITED WEATIIER: SNOW AD CIIARACTER: CURVE AND LEVEL MANNER OF COLLISION: UTIIER TYPE OF ROAD SYSTEM: STATE _U./BIKER LOCATION: NU PED. INVOLVEMENT PED./BIKER ACTIUN: NOT AVAILABLE (NO PEDESTRIAN INVOLVEMENT) FERENCE MARKER: U25-U7U41698 GISTRATION TYPE: 16 PASSENGER OR SUBURBAN BODY TYPE: 14 2 DOOR SEDAN BUS/TRUCK CODES: NO HOOL BUS: NO VEIIJCLE YEAR: 9', VEHICLE MAKE: FORD VEIIICLE ID NUMBER: 1FALP4042RF234191 IOIIT/PASSENGERS: UU30~0 APPARENT FACTOR 1: PAVEMENT SLIPPERY PARENT FACTOR 2: N/A PRE-ACCIDENT ACTION: GOING STRAIGHT AHEAD AGE ***: 17 -X "': M SECUND EVENT: NOT-ENTERED - N/A AREA OF IMPACT: NOT AVAILABLE TENT UF DAMAGE: UNAVAIlBLE UIRECTION OF TRAVEL: WEST NUMOER OF OCCUPANTS, 01 IVER-STATE-CODE: NEW YORK IIAZAROOUS MATERIAL: NO FIAZARDOUS MATERIAL INDICATED H INJURY VEHICLE OCCUPIED: 01 AGE: 17 SEX, MALE SITION IN VEIIICLE: DRIVER EJECTION FROM VEHICLE: NOT EJECTED PE ur PIIYSICAL COMPLAINT: N/A VICTIM STATUS: C INJURY SAFETY EQUIPMENT USED: LAP BELT&HARNESS LOCATION OF PHYSICAL COMPLAINT: N/A TAKEN TD: TAKEN BY, -------- ---------- 94-1996 7-029 CATION CODE: 025- 0704 1704 SE NUMBER: 6-288007 ACCIDENT DATE: 04/14/96 POLICE AGENCY: 05159 SOUTHOlD TOWN POLICE DEPARTMENT UNTY/MUNI: SUFFOLK COUNTY, TOWN OF SOUTHOLD TIME: 01: PRECINCT: RST EVENT: COLL W LIGHT SUPPORT/UTILITY POLE LOCATION FIRST EVENT. OFF ROADWAY ACCIDENT CLASS. INJURY AFFIC COIHROL: NO PASSIIm ZONE LIGHT CONDITION. DARK-RD LIGHTED WEATHER, CLOUDY AD CHA~ACTER. SrRAIGIIT AND LFVEL MANNER OF COLLISION, OIHER TYPE OF ROAD SYSTEM, STATE :0. /UIKElI LOCATION, NO PEO. INVOLVEMENT PED .IBIKER ACTION, NOT AVAILABLE (NO PEDESTRIAN INVOLVEMENT> ~FEREIICE MARKER: 025-070~1704 GISTRATION TYPE, 16 PASSENGER OR SUBURBAN BODY TYPE. 63 PICK UP TRUCK BUS/TRUCK CODES. NO ;HOOL BUS. NO VEHICLE YEAR. 88 VEHICLE MAKE, NITSU VEHICLE 10 NUMBER, JA7FM54E9JP029312 :lGIIT/PASSENGERS, 0037~0 APPARENT FACTOR I, FELL ASLEEP PARENI FACTOR Z: NOT-ENTERED - II/A PRE-ACCIDENT ACTION: GOING STRAIGHT AHEAD AGE '''''': 28 :x ...: F SECOND [VENT, NON-COLLISION - OVERTURNEO AREA OF IMPACT, NOT AVAILABLE TENT OF DAMAGE. UNAVAILULE DIRECTION OF fRAVEl. EAST NUMBER OF OCCUPANTS, 01 IIVER-STArE-CODE. NEW YORK HAlARDOUS MATERIAL. NO HAlARDOUS MATERIAL INDICATED .. INJURY VEHICLE OCCUPIED, 01 SITION IN VEHICLE: DRIVFR EJECTION PE OF PIIYSICAL COMPLAINI, MINOR BLEEDING AGE: 26 FROM VEHICLE, NOT VICTIM STATUS, SEX, FEMALE EJECTEO CONSCIOUS SAFETY EQUIPMENT USED, lAP BElT&HARNESS lOCATION OF PHYSICAL COMPLAINT, ELBOW TO HAND TAKEN TO, TAKEN BY, - - - - - - - -..... ---------- 994-1996 7-029 OCATION CODE, 025- 0704 1726 67 ASE NUMBER: 6-296285 ACCIDENT DATE: 04/21/96 POLICE AGENCY: 05159 SOUTHOLD TOWN POLICE DEPARTMENT OUNTV/MUNI, SUFFOLK COUNTY, TOWN OF SOU1HOLO TIME: 12: PRECINCT: IRST EVENT: COLLISION WITH OTHER MOTOR VEHICLE LOCATION FIRST EVENT: ON ROADWAV ACCIDENT CLASS: INJURV AND P.D. tRAFFIC CONTROL: NO PASSING ZONE LimiT CONDITION, DAVLIGHT WEATHER: CLEAR OAO CHARACTER: CURVE AND LEVEL MANNER OF COLLISION: UNKNOWN TVPE OF ROAD SYSTEM, STATE ED./BIKER LOCATION: NO PED. INVOLVEMENT PED./BIKER ACTION: NOT AVAILABLE (NO PEDESTRIAN INVOLVEMENT) EFERENCE MARKER: 025-070"172667 EGISTRATlON TYPE: NO REGISTRATION TVPE BODY TYPE: 13 4 DOOR SEDAN BUS/TRUCK CODES, NO ClmOL IlUS: NO VEHICLE YEAR, VEHICLE MAKE, VEHICLE III NUMBER: EIGIIT /PASSENGERS, APPARENT FACTOR I: N/A PPAREIH FACTOR 2: NOT-ENTERED - N/A PRE-ACCIDENT ACTION, GOING STRAIGHT AHEAD AGE ""*: 27 'EX ***: F SECOND EVENr, NIlT-ENTERED - N/A AREA OF IMPACT: NOT AVAILABLE "XTEln OF IlAMAGE: UNAVA [LIlLe IlIRECTION OF TRAVEL: EAST NUMBER OF OCCUPANTS: 02 RIVEIl-STATE-CODE: MASSI\CIIUSETTS HAZARDOUS MATERIAL: NO HAZAROOUS MA TeRIAL INDICATED leGISTRATION TVPE: 16 PASSENGER OR SUBURBAN BODY TYPE: 12 SUBURBAN BUS/TRUCK CODES: NO CHOOL BUS, NO VelHCLE YEAR: 84 VEIHCLE MAKE: SUBAR VEHICLE ID NUMBER: JF2AM52B3ED409230 EIGIIT /I'ASSENGERS: 002365 APPARENT FACTOR I: DRIVER INATTENTION d'PAREIH FACTOR 2: FAILURE TO YIELD ROW PRE-ACCIDENT ACTION: GOING STRAIGHT AHEAD AGE ""*: 50 EX ***: F SECIlNO EVENT, NOT-ENTERED - N/A AReA OF IMPACT: NOT AVAILABLE XTENT OF DAMAGE: UNAVAlLBLE DIRECTION OF TRAVEL: SOUTH NUMIlER OF OCCUPANTS: 05 RIVeR-STATE-CODE: NEW YORK HAZARDOUS MATERIAL: NO HAZARDOUS MATERIAL INDICATED "" INJURY VEIIlCLE OCCUPIED: 01 AGE, 07 SEX: FEMALE OSITION IN VEHICLE, RIGHT FRONT EJECTION FROM VEHICLE: NOT EJECTED rVPE OF PHYSICAL COMPLAINT, COMPLAINT OF PAIN VICTIM STATUS: CONSCIOUS "* INJURY VEHICLE OCCUPIED, 01 AGE: 27 SEX, FEMALE OSITION IN VEHICLE: DRIVER EJECTION FROM VEHICLE: NOT EJECTED rvpE OF plNSICAL COMPLAINT: N/A VICTIM STATUS: B INJURY H INJURY VEHICLE OCCUPIED: 02 AGE: 50 SEX: FEMALE OSITION IN VEHICLE: DRIVER EJECTION FROM VEIHCLE: NOT EJECTED rVPE IlF PHYSICAL COMPLAINT: COMPLAINT OF PAIN VICTIM STATUS: CONSCIOUS "* INJURV VEIHCl E OCCUPIED, 02 AGE: 17 SEX: MALE 'OSITION IN VEHICLE: RIGHT FRONT EJECTION FROM VEHICLE: NOT EJECTED rVPE OF plNSICAL COMPLAINT: COMPLAINT OF PAIN VICTIM STATUS: CONSCIOUS n INJURV VEHICLE IlCCUpIED: 02 AGE: 14 SEX: MALE . OSITION IN VEHICLE: MIDDLE BACK EJECTION FROM VEHICLE: Nor EJECTED rVpE OF PHYSICAL CUMPLAINT: FRACTURE-DISLCTN VICTIM STATUS: CONSCIOUS ** INJURV VEHICLE OCCUPIED: 02 AGE: 51 SEX: FEMALE POSITION IN VEHICLE: RIGHT BACK EJECTION FROM VEHICLE: NOT EJECTED TVpE OF PHYSICAL COMPLAINT: FRACTURE-DISLCTN VICTIM STATUS, CONSCIOUS H INJURV VEIIlCLE OCCUPIED: 02 AGE: 51 SEX: FEMALE POSITION IN VEHICLE: LEFT BACK EJECTION FROM VEHICLE: NOT EJECTED TVpE or PHYSICAL COMPLAINT: COMPLAINT OF PAIN VICTIM STATUS: CONSCIOUS SAFETY EQUIPMENT USED: CHILD RESTRAINT LOCATION OF PHYSICAL COMPLAINT: ABDOMEN-PELVIS TAKEN TO: TAKEN BY: 9997 SAFETY EQUIPMENT USED: LAP BELT&HARNESS LOCATION OF PHYSICAL COMPLAINT: N/A TAKEN TO: TAKEN BY: SAFETY EQUIPMENT USED: LAP BELT&HARNESS LOCATION OF PHYSICAL COMPLAINT: NECK TAKEN TO: TAKEN BY: 9997 SAFETY EQUIPMENT USED: LAP BELT&HARNESS LOCATION OF PHYSICAL COMPLAINT: CHEST TAKEN TO: TAKEN BY: 9997 SAFETY EQUIPMENT USED: NONE LOCATION OF PHYSICAL COMPLAINT: SHLDR-UppER AR~ TAKEN TO: TAKEN BY: 9997 SAFETY EQUIPMENT USED: NONE LOCATION OF PHYSICAL COMPLAINT: CHEST TAKEN TO: TAKEN BY: 9997 SAFETY EQUIPMENT USED: NONE LOCATION OF PHYSICAL COMPLAINT: CHEST TAKEN TO: TAKEN BY: 9997 ------- ---------- 94-1996 7-029 CATION COOE, 025- 0704 1747 .SE HUMBER: 6-283371 ACCIDENT DATE: 04/11/96 JIJNTY/MIJNI, SUFFOLK COUNTY, TOWN OF SOUTIIOLD IRST EVENT, COLLISION WITII SIGN POST I.\FFlC COtHROL, NO PASSING ZONE JAO CIIARACTER, STRAIGHT AND LEVEL 'u./UIKER LOCATION, N/A fEREHCE MARKER, U25-07041747 POLICE AGENCY: 05159 SOUTHOLD TOWN POLICE DEPARTMENT TIME, 06, PRECINCT: LOCATION FIRST EVENT: OFF ROADWAY ACCIDENT CLASS, INJURY LIGHT CONDITION: DAWN WEAlHER: CLOUDY MANNER OF COLLISION, OTHER TYPE OF ROAD SYSTEM: STATE PED./UIKER ACTION, N/A :GISTRATION TYPE, ND REGISTRATION TYPE UODY TYPE: I3 4 DOOR SEOAN BUS/TRUCK CODES, NO ;ItOOL BUS, NO VEIIICLE YEAR, VEHICLE MAKE: VEHICLE 10 NUMBER: ~ [GilT /PASSENGERS, APPARENT FACTOR 1, FEll ASLEEP 'I'AIIHIT FACTOR 2, N/A PRE-ACCIDENT ACTION, GOING STRAIGHT AHEAD AGE '''''', 64 'X H*, M SECOND EVENT, NON-COUISION - OVERTURNED AREA OF IMPACT, NOT AVAILABLE rEHT OF DAMAGE, UNAVAIlDlE DIRECTION OF TRAVEL, EASl NUMDER OF OCCUPANTS: 01 aVfR-S TATE-CODE, VIRGINIA HAZARDOUS MATERIAL, NO HAZARDOUS MATERIAL INDICATED ** IIlJURY VEHICLE OCCUPIED, 01 0511ION IN VEHICLE, DRIVER EJECTION I'E OF PHYSICAL COMPLAINT, COMPLAINT OF PAIIl AGE: 8f, FROM VEHICLE, NOT VICTIM STATUS, SEX, MALE EJECTED CONSCIOUS SAFETY EQUIPMENT USED, LAP BELT&HARNESS LOCATION OF PHYSICAL COMPLAINT: CHEST TAKEN TO: TAKEN BY: 9997 I I . I . . . . I . . . I I I I I I I Capacity Analysis Disk #3:90. Cross Sound Ferry File: Dividers I I I I I I . . . . . I I I I I I I I Traffic Volumes Used In Capacity Analysis Disk #390. Cross Sound Ferry File: Dividers . . . . . . I I I I . I I I I I I I I This section presents the results of a detailed Highway Capacity Software analysis of existing and future, 2002 and 2007, NYS Route 25 traffic operations. Specifically, this section contains the traffic volumes used in estimating level of service and the level of service calculations for the following three sections of Route 25 between the intersection of Route 25 and Main Street (Greenport) and the eastern terminus of Route 25: Main Street to East Marion Orient Park, East Marion Orient Park to Narrow River Road, and Narrow River Road to the eastern terminus of Route 25. The analysis was completed for three one-hour time periods within a typical weekday, Saturday, and Sunday: I] :00 A.M. to ]2:00 Noon, 5:00 P.M. to 6:00 P.M., and 9:00 P.M. to 10:00 P.M. Disk #390-Cross Sound Ferry File: Se,ftware analysis.wpd . . . . . . . . . . . J I I I I I I I Route 25 Main Street to East MarianI Orient Park Existing Capacity Analysis Disk #3:90, Cross Sound Ferry File: Dividers . . . . . . . . I I . ~ I I I I I I I 1985 HCM:TWO-LANE HIGHWAYS **************************************************************** FACILITY LOCATION.... NYS Route 25 ANALyST.............. DEA/SPL TIME OF ANALySIS..... DATE OF ANALySIS..... 10-03-1997 OTHER INFORMATION.... East of Main st. (Greenport); 11-12 NOO N, weekday; Existing A) ADJUSTMENT FACTORS PERCENTAGE OF TRUCKS........................ PERCENTAGE OF BUSES......................... PERCENTAGE OF RECREATIONAL VEHICLES......... DESIGN SPEED (MPH).......................... PEAK HOUR FACTOR............................ DIRECTIONAL DISTRIBUTION (UP/DOWN).......... IANE WIDTH (FT)............................. USABLE SHOULDER WIDTH (AVG. WIDTH IN FT.)... PERCENT NO PASSING ZONES.................... B) CORRECTION FACTORS 2 2 5 50 .89 54 / 46 10 7 57 LEVEL TERRAIN E E E f f f LOS T B R w d HV ----- ---.-- ----- ----- ----- ----- A 2 1.8 2.2 .84 .98 .91 B 2.2 :2 2.5 .84 .98 .89 C 2.2 :2 2.5 .84 .98 .89 0 2 1.6 1.6 .84 .98 .94 E 2 1.6 1.6 .87 .98 .94 C) LEVEL OF SERVICE RESULTS ------------------.------------------------------------------- INPUT VOLUME(vph): 607 ACTUAL FLOW RATE: 682 SERVICE LOS FLOW RATE V/C --------- .----- A 147 .07 B 390 .19 C 697 .34 0 1275 .59 E 2239 1 LOS FOR GIVEN CONDITIONS: C . . . . . . . . . . . ,I I I I I I I I 1985 HCM:TWO-LANE HIGHWAYS **************************************************************** FACILITY LOCATION.... NYS Route 25 ANALyST.............. DEA/SPL TIME OF ANALySIS..... DATE OF ANALySIS..... 10-03-1997 OTHER INFORMATION.... East of Main st. (Greenport); 5-6 PM, w eekday; Existing A) ADJUSTMENT FACTORS PERCENTAGE OF TRUCKS.............................................. PERCENTAGE OF BUSES......................... PERCENTAGE OF RECREATIONAL VEHICLES......... DESIGN SPEED (MPH).......................... PEAK HOUR FACTOR... '................................................... DIRECTIONAL DISTRIBUTION (UP/DOWN).......... LANE WIDTH (FT)............................. USABLE SHOULDER WIDTH (AVG. WIDTH IN FT.)... PERCENT NO PASSING ZONES.................... B) CORRECTION FACTORS LEVEL TERRAIN E E E f f f LOS T B R w d HV ----- ----- ----- ----- ----- ----- A 2 1.8 2.2 .84 .99 .91 B 2.2 2 2.5 .84 .99 .89 C 2.2 2 2.5 .84 .99 .89 D 2 1.6 1.6 .84 .99 .94 E 2 1.6 1.6 .87 .99 .94 C) LEVEL OF SERVICE RESULTS INPUT VOLUME(vph): 776 ACTUAL FLOW RATE: 1035 SERVICE LOS FLOW RATE V/C --------- .----- A 149 .07 B 397 .19 C 710 .34 D 1299 .59 E 2280 1 LOS FOR GIVEN CONDITIONS: D 2 2 5 50 .75 49 / 51 10 7 57 I I I . . . . . . . I I I I I I I I I 1985 HCM:TWO-LANE HIGHWAYS *~,************************************************************** FACILITY LOCATION.... NYS Route 25 ANALyST.............. DEA/SPL TIME OF ANALySIS..... DATE OF ANALySIS..... 10-03-1997 OTHER INFORMATION.... East of Main st. (Greenport); 9-10 PM, weekday; Existing A) ADJUSTMENT FACTORS PERCENTAGE OF TRUCKS........................ PERCENTAGE OF BUSES......................... PERCENTAGE OF RECREATIONAL VEHICLES......... DESIGN SPEED (MPH).................................................... PEAK HOUR FACTOR....................................................... DIRECTIONAL DISTRIBUTION (UP/DOWN).......... LANE WIDTH (FT).......................................................... USABLE SHOULDER WIDTH (AVG. WIDTH IN FT.)... PERCENT NO PASSING ZONES.................... B) CORRECTION FACTORS LEVEL TERRAIN E E E f f f LOS T B R w d HV ----- --_._- ----- ----- ----- ----- A 2 1.B 2.2 .84 .97 .91 B 2.2 2 2.5 .84 .97 .89 C 2.2 2 2.5 .84 .97 .89 0 2 1.6 1.6 .84 .97 .94 E 2 1.6 1.6 .87 .97 .94 C) LEVEL OF SERVICE RESULTS INPUT VOLUME (vph) : 302 ACTUAL FLOW RATE: 378 SERVICE LOS FLOW RATE V/C --------- ----- A 146 .07 B 387 .19 C 693 .34 0 1267 .59 E 2225 1 LOS FOR GIVEN CONDITIONS: B 2 2 5 50 .8 55 / 45 10 7 57 . . . . . . . . . . . I I I I I I I I 1985 HCM:TWO-LANE HIGHWAYS *~.************************************************************** FACILITY LOCATION.... NYS Route 25 ANALyST.............. DEA/SPL TIME OF ANALySIS..... DATE OF ANALySIS..... 10-03-1997 OTHER INFORMATION.... East of Main st. (Greenport); 11-12 NOO N, Sat.; Existing A) ADJUSTMENT FACTORS PERCENTAGE OF TRUCKS........................ PERCENTAGE OF BUSES......................... PERCENTAGE OF RECREATIONAL VEHICLES......... DESIGN SPEED (MPH).......................... PEAK HOUR FACTOR....................................................... DIRECTIONAL DISTRIBUTION (UP/DOWN).......... IANE WIDTH (FT).......................................................... USABLE SHOULDER WIDTH (AVG. WIDTH IN FT.)... PERCENT NO PASSING ZONES.................... B) CORRECTION FACTORS LEVEL TERRAIN E E E f f f LOS T B R w d HV ----- ---~..- ----- ----- ----- ----- A 2 1.8 2.2 .84 .97 .91 B 2.2 :~ 2.5 .84 .97 .89 C 2.2 2 2.5 .84 .97 .89 D 2 1.6 1.6 .84 .97 .94 E 2 1.6 1.6 .87 .97 .94 C) LEVEL OF SERVICE RESULTS INPUT VOLUME(vph): 1163 ACTUAL FLOW RATE: 1278 SERVICE LOS FLOW RATE V/C --------- ----- A 146 .07 B 387 .19 C 693 .34 D 1267 .59 E 2225 1 LOS FOR GIVEN CONDITIONS: E 2 2 5 50 .91 55 / 45 10 7 57 . . . . . . . . I I , 1985 HCM:TWO-LANE HIGHWAYS **************************************************************** FACILITY LOCATION..,.. NYS Route 25 ANALyST.............. DEA/SPL TIME OF ANALySIS..... DATE OF ANALySIS..... 10-03-1997 OTHER INFORMATION.... East of Main st. (Greenport); 5-6 PM, S at. Existing A) ADJUSTMENT FACTORS PERCENTAGE OF TRUCKS........................ PERCENTAGE OF BUSES......................... PERCENTAGE OF RECREATIONAL VEHICLES......... DESIGN SPEED (MPH).......................... PEAK HOUR FACTOR....................................................... DIRECTIONAL DISTRIBUTION (UP/DOWN).......... LANE WIDTH (FT)............................. USABLE SHOULDER WIDTH (AVG. WIDTH IN FT.)... PERCENT NO PASSING ZONES.................... B) CORRECTION FACTORS LEVEL TERRAIN E E E f f f LOS T B R w d HV ----- ---.-- ----- ----- ----- ----- A 2 1.8 2.2 .84 .95 .91 B 2.2 2 2.5 .84 .95 .89 C 2.2 2 2.5 .84 .95 .89 D 2 1.6 1.6 .84 .95 .94 E 2 1.6 1.6 .87 .95 .94 C) LEVEL OF SERVICE RESULTS ~ I I I I I I I INPUT VOLUME(vph): 1018 ACTUAL FLOW RATE: 1289 SERVICE LOS FLOW RATE V/C --------- ----- A 143 .07 B 380 .19 C 680 .34 D 1244 .59 E 2184 1 LOS FOR GIVEN CONDITIONS: E 2 2 5 50 .79 42 / 58 10 7 57 I I I I I I I I I I I I I I I I I I I 1985 HCM:TWO-LANE HIGHWAYS **************************************************************** FACILITY LOCATION.... NYS Route 25 ANALyST.............. DEA/SPL TIME OF ANALySIS...... DATE OF ANALySIS..... 10-03-1997 OTHER INFORMATION.... East of Main st. (Greenport); 9-10 PM, Sat.; Existing A) ADJUSTMENT FACTORS PERCENTAGE OF TRUCKS........................ PERCENTAGE OF BUSES......................... PERCENTAGE OF RECREATIONAL VEHICLES......... DESIGN SPEED (MPH).......................... l?~1\l{ }{()tJ~ ~J\C=~()il... ~ .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. DIRECTIONAL DISTRIBUTION (UP/DOWN).......... I..aANE WIDTH (FT)......".................................................. USABLE SHOULDER WIDTH (AVG. WIDTH IN FT.)... PERCENT NO PASSING ZONES.................... B) CORRECTION FACTORS LEVEL TERRAIN E E E f f f LOS T B R w d HV ----- ----- ----- ----- ----- ----- A 2 1.8 2.2 .84 .98 .91 B 2.2 2 2.5 .84 .98 .89 C 2.2 2 2.5 .84 .98 .89 D 2 1.6 1.6 .84 .98 .94 E 2 1.6 1.6 .87 .98 .94 C) LEVEL OF SERVICE RESULTS INPUT VOLUME (vph) : 444 ACTUAL FLOW RATE: 505 SERVICE LOS FLOW RATE V/C --------- ----- A 148 .07 B 392 .19 C 702 .34 D 1283 .59 E 2252 1 LOS FOR GIVEN CONDITIONS: C 2 2 5 50 .88 47 / 53 10 7 57 I I I I I I I I I I I I I I I I I I I 1985 HCM:TWO-LANE HIGHWAYS *~,************************************************************** FACILITY LOCATION.... NYS Route 25 ANALyST.............. DEA/SPL TIME OF ANALySIS..... DATE OF ANALySIS..... 10-03-1997 OTHER INFORMATION.... East of Main st. (Greenport); 11-12 NOO N, Sun.; Existing A) ADJUSTMENT FACTORS PERCENTAGE OF TRUCKS........................ PERCENTAGE OF BUSES......................... PERCENTAGE OF RECREATIONAL VEHICLES......... DESIGN SPEED (MPH) '. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. PEAK HOUR FACTOR....................................................... DIRECTIONAL DISTRIBUTION (UP/DOWN).......... IANE WIDTH (FT).......................................................... USABLE SHOULDER WIDTH (AVG. WIDTH IN FT.)... PERCENT NO PASSING ZONES.................... B) CORRECTION FACTORS 2 2 5 50 .94 58 / 42 10 7 57 LEVEL TERRAIN E E E f f f LOS T B R w d HV ----- ----- ----- ----- ----- ----- A 2 1.8 2.2 .84 .95 .91 B 2.2 :2 2.5 .84 .95 .89 C 2.2 :2 2.5 .84 .95 .89 D 2 1.6 1.6 .84 .95 .94 E 2 1.6 1.6 .87 .95 .94 C) LEVEL OF SERVICE RESULTS ------------------------------------------------------------- INPUT VOLUME(vph): 1220 ACTUAL FLOW RATE: 1298 SERVICE LOS FLOW RATE V/C --------- ----- A 143 .07 B 380 .19 C 680 .34 D 1244 .59 E 2184 1 LOS FOR GIVEN CONDITIONS: E I I I I I I I I I I I I I I I I I I I 1985 HCM:TWO-LANE HIGHWAYS **************************************************************** FACILITY LOCATION.... NYS Route 25 ANALyST.............. DEA/SPL TIME OF ANALySIS..... DATE OF ANALYSIS...... 10-03-1997 OTHER INFORMATION.... East of Main st. (Greenport); 5-6 PM, S un.; Existing A) ADJUSTMENT FACTORS PERCENTAGE OF TRUCKS........................ PERCENTAGE OF BUSES......................... PERCENTAGE OF RECREATIONAL VEHICLES......... DESIGN SPEED (MPH).......................... PEAK HOUR FACTOR............................ DIRECTIONAL DISTRIBUTION (UP/DOWN).......... lANE WIDTH (FT)............................. USABLE SHOULDER WIDTH (AVG. WIDTH IN FT.)... PERCENT NO PASSING ZONES.................... B) CORRECTION FACTORS 2 2 5 50 .81 36 / 64 10 7 57 LEVEL TERRAIN E E E f f f LOS T B R w d HV ----- ----- ----- ----- ----- ----- A 2 1.8 2.2 .84 .92 .91 B 2.2 2 2.5 .84 .92 .89 C 2.2 2 2.5 .84 .92 .89 0 2 1.6 1.6 .84 .92 .94 E 2 1.6 1.6 .87 .92 .94 C) LEVEL OF SERVICE RESULTS ------------------------------------------------------------- INPUT VOLUME(vph): 1127 ACTUAL FLOW RATE: 1391 SERVICE LOS FLOW RATE V/C --------- ----- A 138 .07 B 367 .19 C 657 .34 D 1202 .59 E 2110 1 LOS FOR GIVEN CONDITIONS: E I I I I I I I I I I I I I I I I I I I 1985 HCM:TWO-LANE HIGHWAYS **************************************************************** FACILITY LOCATION.... NYS Route 25 ANALyST.............. DEA/SPL TIME OF ANALySIS..... DATE OF ANALySIS..... 10-03-1997 OTHER INFORMATION.... East of Main st. (Greenport); 9-10 PM, Sun.; Existing A) ADJUSTMENT FACTORS PERCENTAGE OF TRUCKS........................ PERCENTAGE OF BUSES......................... PERCENTAGE OF RECREATIONAL VEHICLES......... DESIGN SPEED (HPH) ~ . . . . . . . . . . . . . . . . . . . . . . . . . PEAK HOUR FACTOR............................ DIRECTIONAL DISTRIBUTION (UP/DOWN).......... LANE WIDTH (FT)............................. USABLE SHOULDER WIDTH (AVG. WIDTH IN FT.)... PERCENT NO PASSING ZONES.................... B) CORRECTION FACTORS 2 2 5 50 .77 39 / 61 10 7 57 LEVEL TERRAIN E E E f f f LOS T B R w d HV ----- ------ ----- ----- ----- ----- A 2 1.8 2.2 .84 .94 .91 B 2.2 2 2.5 .84 .94 .89 C 2.2 2 2.5 .84 .94 .89 D 2 1.6 1.6 .84 .94 .94 E 2 1.6 1.6 .87 .94 .94 C) LEVEL OF SERVICE RESULTS ------------------------------------------------------------- INPUT VOLUME(vph): 467 ACTUAL FLOW RATE: 606 SERVICE LOS FLOW RATE V/C --------- ----- A 140 .07 B 373 .19 C 668 .34 D 1222 .59 E 2145 1 LOS FOR GIVEN CONDITIONS: C I I I I I I I I I I I I I I I I I I I Route 25 Main Street to East Marionl Orient Park 2002 Capacity Analysis (No-Build) Disk #:::90. Cross Sound Ferry File: Dividers I I I I I I I I I I I I I I I I I I I 1985 HCM:TWO-LANE HIGHWAYS **************************************************************** FACILITY LOCATION.... NYS Route 25 ANALyST.............. DEA/SPL TIME OF ANALySIS..... DATE OF ANALySIS..... 10-03-1997 OTHER INFORMATION.... East of Main st. (Greenport); 11-12 NOO N, weekday; 5 year, no-build A) ADJUSTMENT FACTORS PERCENTAGE OF TRUCKS........................ PERCENTAGE OF BUSES......................... PERCENTAGE OF RECREATIONAL VEHICLES......... DESIGN SPEED (MPH).......................... PEAK HOUR FACTOR............................ DIRECTIONAL DISTRIBUTION (UP/DOWN).......... LANE WIDTH (FT).......................................................... USABLE SHOULDER WIDTH (AVG. WIDTH IN FT.)... PERCENT NO PASSING ZONES.................... B) CORRECTION FACTORS LEVEL TERRAIN E E E f f f LOS T B R w d HV ----- ----- ----- ----- ----- ----- A 2 1.8 2.2 .84 .98 .91 B 2.2 2 2.5 .84 .98 .89 C 2.2 2 2.5 .84 .98 .89 D 2 1.6 1.6 .84 .98 .94 E 2 1.6 1.6 .87 .98 .94 C) LEVEL OF SERVICE RESULTS INPUT VOLUME(vph): 699 ACTUAL FLOW RATE: 785 SERVICE LOS FLOW RATE V/C --------- .----- A 148 .07 B 392 .19 C 702 .34 0 1283 .59 E 2252 1 LOS FOR GIVEN CONDITIONS: D 2 2 5 50 .89 53 / 47 10 7 57 I I I I I I I I I I I I I I I I I I I 1985 HCM:TWO-LANE HIGHWAYS **************************************************************** FACILITY LOCATION.... NYS Route 25 ANALYST..............DEA/SPL TIME OF ANALySIS..... DATE OF ANALySIS..... 10-03-1997 OTHER INFORMATION.... East of Main st. (Greenport); 5-6 PM, W eekday; 5 Year, no-build A) ADJUSTMENT FACTORS ------------------------------------------------------------- PERCENTAGE OF TRUCKS........................ PERCENTAGE OF BUSES......................... PERCENTAGE OF RECREATIONAL VEHICLES......... DESIGN SPEED (MPH).......................... PEAK HOUR FACTOR.....,........................ DIRECTIONAL DISTRIBUTION (UP/DOWN).......... lANE WIDTH (FT)................................".... USABLE SHOULDER WIDTH (AVG. WIDTH IN FT.)... PERCENT NO PASSING ZONES.................... B) CORRECTION FACTORS LEVEL TERRAIN E E E f f f LOS T B R w d HV ----- ----- ----- ----- ----- ----- A 2 1.8 2.2 .84 .99 .91 B 2.2 2 2.5 .84 .99 .89 C 2.2 2 2.5 .84 .99 .89 0 2 1.6 1.6 .84 .99 .94 E 2 1.6 1.6 .87 .99 .94 C) LEVEL OF SERVICE RESULTS INPUT VOLUME(vph): 886 ACTUAL FLOW RATE: 1181 SERVICE LOS FLOW RATE V/C --------- -.---- A 149 .07 B 397 .19 C 710 .34 D 1299 .59 E 2280 1 LOS FOR GIVEN CONDITIONS: 0 2 2 5 50 .75 49 / 51 10 7 57 I I I I I I I I I I I I I I I I I I I 1985 HCM:TWO-LANE HIGHWAYS **************************************************************** FACILITY LOCATION.... NYS Route 25 ANALyST.............. DEA/SPL TIME OF ANALySIS..... DATE OF ANALySIS..... 10-03-1997 OTHER INFORMATION.... East of Main st. (Greenport); 9-10 PM, weekday; 5 Year, no-build A) ADJUSTMENT FACTORS ------------------------------------------------------------- PERCENTAGE OF TRUCKS......... .......... ..... PERCENTAGE OF BUSES......................... PERCENTAGE OF RECREATIONAL VEHICLES......... DESIGN SPEED (MPH).......................... l?~~l{ li()1J~ ~~<:~()~............................ DIRECTIONAL DISTRIBUTION (UP/DOWN).......... LANE WIDTH (FT)............................. USABLE SHOULDER WIDTH (AVG. WIDTH IN FT.)... PERCENT NO PASSING ZONES.................... B) CORRECTION FACTORS LEVEL TERRAIN E E E f f f LOS T B R w d HV ----- ----- ----- ----- ----- ----- A 2 1.8 2.2 .84 .96 .91 B 2.2 2 2.5 .84 .96 .89 C 2.2 2 2.5 .84 .96 .89 D 2 1.6 1.6 .84 .96 .94 E 2 1.6 1.6 .87 .96 .94 C) LEVEL OF SERVICE RESULTS INPUT VOLUME(vph): 341 ACTUAL FLOW RATE: 426 SERVICE LOS FLOW RATE V/C --------- ----- A 145 .07 B 385 .19 C 689 .34 D 1260 .59 E 2211 1 LOS FOR GIVEN CONDITIONS: C 2 2 5 50 .8 56 / 44 10 7 57 I I I I I I I I I I I I I I I I I I I 1985 HCM:TWO-LANE HIGHWAYS **************************************************************** FACILITY LOCATION.... NYS Route 25 ANALyST.............. DEA/SPL TIME OF ANALySIS..... DATE OF ANALySIS..... 10-03-1997 OTHER INFORMATION.... East of Main St. (Greenport); 11-12 NOO N, Sat.; 5 Year, no-build A) ADJUSTMENT FACTORS ------------------------------------------------------------- PERCENTAGE OF TRUCKS........................ PERCENTAGE OF BUSES......................... PERCENTAGE OF RECREATIONAL VEHICLES......... DESIGN SPEED (MPH).......................... l?~1\J{ ff()tJ~ ~J\C:1r()~............................ DIRECTIONAL DISTRIBUTION (UP/DOWN).......... LANE WIDTH (FT).............................. USABLE SHOULDER WIDTH (AVG. WIDTH IN FT.)... PERCENT NO PASSING ZONES.................... B) CORRECTION FACTORS LEVEL TERRAIN E E E f f f LOS T B R w d HV ----- ----- ----- ----- ----- ----- A 2 1.8 2.2 .84 .97 .91 B 2.2 :2 2.5 .84 .97 .89 C 2.2 2: 2.5 .84 .97 .89 0 2 1.6 1.6 .84 .97 .94 E 2 1.6 1.6 .87 .97 .94 C) LEVEL OF SERVICE RESULTS INPUT VOLUME(vph): 1335 ACTUAL FLOW RATE: 1467 SERVICE LOS FLOW RATE V/C --------- ----- A 146 .07 B 387 .19 C 693 .34 D 1267 .59 E 2225 1 LOS FOR GIVEN CONDITIONS: E 2 2 5 50 .91 55 / 45 10 7 57 I I I I I I I I I I I I I I I I I I I 1985 HCM:TWO-LANE HIGHWAYS **************************************************************** FACILITY LOCATION.... NYS Route 25 ANALyST.............. DEA/SPL TIME OF ANALySIS..... DATE OF ANALySIS..... 10-03-1997 OTHER INFORMATION.... East of Main st. (Greenport); 5-6 PM, S at.; 5 Year, no-build A) ADJUSTMENT FACTORS PERCENTAGE OF TRUCKS........................ PERCENTAGE OF BUSES......................... PERCENTAGE OF RECREATIONAL VEHICLES......... DESIGN SPEED (MPH).......................... PEAK HOUR FACTOR............................. DIRECTIONAL DISTRIBUTION (UP/DOWN).......... LANE WIDTH (FT)............................. USABLE SHOULDER WIDTH (AVG. WIDTH IN FT.)... PERCENT NO PASSING ZONES.................... B) CORRECTION FACTORS LEVEL TERRAIN E E E f f f LOS T B R w d HV ----- ----- ----- ----- ----- ----- A 2 1.8 2.2 .84 .95 .91 B 2.2 2 2.5 .84 .95 .89 C 2.2 2 2.5 .84 .95 .89 D 2 1.6 1.6 .84 .95 .94 E 2 1.6 1.6 .87 .95 .94 C) LEVEL OF SERVICE RESULTS INPUT VOLUME(vph): 1169 ACTUAL FLOW RATE: 1480 SERVICE LOS FLOW RATE V/C --------- ----- A 143 .07 B 380 .19 C 680 .34 D 1244 .59 E 2184 1 LOS FOR GIVEN CONDITIONS: E 2 2 5 50 .79 42 / 58 10 7 57 I I I I I I I I I I I I I I I I I I I 1985 HCM:TWO-LANE HIGHWAYS **************************************************************** FACILITY LOCATION.... NYS Route 25 ANALyST.............. DEA/SPL TIME OF ANALySIS..... DATE OF ANALySIS..... 10-03-1997 OTHER INFORMATION.... East of Main st. (Greenport); 9-10 PM, Sat.; 5 Year, no-build A) ADJUSTMENT FACTORS ------------------------------------------------------------- PERCENTAGE OF TRUCKS........................ PERCENTAGE OF BUSES......................... PERCENTAGE OF RECREATIONAL VEHICLES......... DESIGN SPEED (MPH).......................... PEAK HOUR FACTOR............................ DIRECTIONAL DISTRIBUTION (UP/DOWN).......... IANE WIDTH (FT)............................. USABLE SHOULDER WIDTH (AVG. WIDTH IN FT.)... PERCENT NO PASSING ZONES.................... B) CORRECTION FACTORS 2 2 5 50 .88 48 / 52 10 7 57 -------------------.------------------------------------------ LEVEL TERRAIN E E E f f f LOS T B R w d HV ----- ----- ----- ----- ----- ----- A 2 1.8 2.2 .84 .99 .91 B 2.2 2 2.5 .84 .99 .89 C 2.2 2 2.5 .84 .99 .89 0 2 1.6 1.6 .84 .99 .94 E 2 1.6 1.6 .87 .99 .94 C) LEVEL OF SERVICE RESULTS ------------------------------------------------------------- INPUT VOLUME(vph): 505 ACTUAL FLOW RATE: 574 SERVICE LOS FLOW RATE V/C --------- ----- A 148 .07 B 395 .19 C 706 .34 0 1291 .59 E 2266 1 LOS FOR GIVEN CONDITIONS: C I I I I I I I I I I I I I I I I I I I 1985 HCM:TWO-LANE HIGHWAYS **************************************************************** FACILITY LOCATION.... NYS Route 25 ANALyST.............. DEA/SPL TIME OF ANALySIS..... DATE OF ANALySIS..... 10-03-1997 OTHER INFORMATION.... East of Main st. (Greenport); 11-12 NOO N, Sun.; 5 Year, no-build A) ADJUSTMENT FACTORS ------------------------------------------------------------- PERCENTAGE OF TRUCKS........................ PERCENTAGE OF BUSES......................... PERCENTAGE OF RECREATIONAL VEHICLES......... DESIGN SPEED (MPH).......................... PEAK HOUR FACTOR....................................................... DIRECTIONAL DISTRIBUTION (UP/DOWN).......... JANE WIDTH (FT).......................................................... USABLE SHOULDER WIDTH (AVG. WIDTH IN FT.)... PERCENT NO PASSING ZONES.................... B) CORRECTION FACTORS 2 2 5 50 .94 57 / 43 10 7 57 ------------------------------------------------------------- LEVEL TERRAIN E E E f f f LOS T B R w d HV ----- ----- ----- ----- ----- ----- A 2 1.8 2.2 .84 .96 .91 B 2.2 :2 2.5 .84 .96 .89 C 2.2 :2 2.5 .84 .96 .89 0 2 1.6 1.6 .84 .96 .94 E 2 1.6 1.6 .87 .96 .94 C) LEVEL OF SERVICE RESULTS ------------------------------------------------------------- INPUT VOLUME(vph): 1404 ACTUAL FLOW RATE: 1494 SERVICE LOS FLOW RATE V/C --------- ----- A 144 .07 B 383 .19 C 685 .34 D 1252 .59 E 2197 1 LOS FOR GIVEN CONDITIONS: E I I I I I I I I I I I I I I I I I I I 1985 HCM:TWO-LANE HIGHWAYS **************************************************************** FACILITY LOCATION.... NYS Route 25 ANALyST.............. DEA/SPL TIME OF ANALySIS..... DATE OF ANALySIS..... 10-03-1997 OTHER INFORMATION.... East of Main st. (Greenport); 5-6 PM, S un.; 5 Year, no-build A) ADJUSTMENT FACTORS ------------------------------------------------------------- PERCENTAGE OF TRUCKS........................ PERCENTAGE OF BUSES......................... PERCENTAGE OF RECREATIONAL VEHICLES......... DESIGN SPEED (MPH).......................... PEAK HOUR FACTOR............................ DIRECTIONAL DISTRIBUTION (UP/DOWN).......... I...ANE WIDTH (FT)............................. USABLE SHOULDER WIDTH (AVG. WIDTH IN FT.)... PERCENT NO PASSING ZONES.................... B) CORRECTION FACTORS 2 2 5 50 .81 37 / 63 10 7 57 ------------------------------------------------------------- LEVEL TERRAIN E E E f f f LOS T B R w d HV ----- ----- ----- ----- ----- ----- A 2 1.8 2.2 .84 .93 .91 B 2.2 2 2.5 .84 .93 .89 C 2.2 2 2.5 .84 .93 .89 D 2 1.6 1.6 .84 .93 .94 E 2 1.6 1.6 .87 .93 .94 C) LEVEL OF SERVICE RESULTS ------------------------------------------------------------- INPUT VOLUME(vph): 1288 ACTUAL FLOW RATE: 1590 SERVICE LOS FLOW RATE V/C --------- _._--- A 139 .07 B 369 .19 C 661 .34 D 1209 .59 E 2122 1 LOS FOR GIVEN CONDITIONS: E I I I I I I I I I I I I I I I I I I I 1985 HCM:TWO-LANE HIGHWAYS **************************************************************** FACILITY LOCATION.... NYS Route 25 ANALyST.............. DEA/SPL TIME OF ANALySIS..... DATE OF ANALySIS..... 10-03-1997 OTHER INFORMATION.... East of Main st. (Greenport); 9-10 PM, Sun.; 5 Year, no-build A) ADJUSTMENT FACTORS PERCENTAGE OF TRUCKS........................ PERCENTAGE OF BUSES......................... PERCENTAGE OF RECREATIONAL VEHICLES......... DESIGN SPEED (MPH).......................... PEAK HOUR FACTOR............................ DIRECTIONAL DISTRIBUTION (UP/DOWN).......... LANE WIDTH (FT)............................. USABLE SHOULDER WIDTH (AVG. WIDTH IN FT.)... PERCENT NO PASSING ZONES.................... B) CORRECTION FACTORS LEVEL TERRAIN E E E f f f LOS T B R w d HV ----- ----- ----- ----- ----- ----- A 2 1.8 2.2 .84 .94 .91 B 2.2 2 2.5 .84 .94 .89 C 2.2 2 2.5 .84 .94 .89 0 2 1.6 1.6 .84 .94 .94 E 2 1.6 1.6 .87 .94 .94 C) LEVEL OF SERVICE RESULTS INPUT VOLUME(vph): 534 ACTUAL FLOW RATE: 694 SERVICE LOS FLOW RATE V/C --------- ----- A 141 .07 B 375 .19 C 672 .34 0 1228 .59 E 2156 1 LOS FOR GIVEN CONDITIONS: 0 2 2 5 50 .77 40 / 60 10 7 57 I I I I I I I I I I I I I I I I I I I Route 25 Main Street to East MarianI Orient Park 2002 Capacity Analysis (Build) Disk #390, Cross Sound Ferry File: Dividers I I I I I I I I I I I I I I I I I I I 1985 HCM:TWO-LANE HIGHWAYS **************************************************************** FACILITY LOCATION.... NYS Route 25 ANALyST.............. DEA/SPL TIME OF ANALySIS..... DATE OF ANALySIS..... 10-03-1997 OTHER INFORMATION.... East of Main st. (Greenport); 11-12 NOO N, weekday; 5 Year, build A) ADJUSTMENT FACTORS ------------------------------------------------------------- PERCENTAGE OF TRUCKS........................ PERCENTAGE OF BUSES......................... PERCENTAGE OF RECREATIONAL VEHICLES......... DESIGN SPEED (MPH).......................... PEAK HOUR FACTOR.. .......................... DIRECTIONAL DISTRIBUTION (UP/DOWN).......... LANE W.IDTH (FT)............................. USABLE SHOULDER WIDTH (AVG. WIDTH IN FT.)... PERCENT NO PASSING ZONES.................... B) CORRECTION FACTORS LEVEL TERRAIN E E E f f f LOS T B R w d HV ----- ----- ----- ----- ----- ----- A 2 1.8 2.2 .84 .95 .91 B 2.2 2 2.5 .84 .95 .89 C 2.2 2 2.5 .84 .95 .89 D 2 1.6 1.6 .84 .95 .94 E 2 1.6 1.6 .87 .95 .94 C) LEVEL OF SERVICE RESULTS INPUT VOLUME(vph): 739 ACTUAL FLOW RATE: 830 SERVICE LOS FLOW RATE V/C --------- ----- A 143 .07 B 380 .19 C 680 .34 D 1244 .59 E 2184 1 LOS FOR GIVEN CONDITIONS: D 2 2 5 50 .89 58 / 42 10 7 57 I I I I I I I I I I I I I I I I I I I 1985 HCM:TWO-LANE HIGHWAYS **************************************************************** FACILITY LOCATION.... NYS Route 25 ANALyST.............. DEA/SPL TIME OF ANALySIS..... DATE OF ANALySIS..... 10-03-1997 OTHER INFORMATION.... East of Main st. (Greenport); 5-6 PM, w eekday; 5 Year, build A) ADJUSTMENT FACTORS ------------------------------------------------------------- PERCENTAGE OF TRUCKS........................ PERCENTAGE OF BUSES......................... PERCENTAGE OF RECREATIONAL VEHICLES......... DESIGN SPEED (MPH).......................... PEAK HOUR FACTOR............................ DIRECTIONAL DISTRIBUTION (UP/DOWN).......... I...ANE WIDTH eFT)............................. USABLE SHOULDER WIDTH (AVG. WIDTH IN FT.)... PERCENT NO PASSING ZONES.................... B) CORRECTION FACTORS 2 2 5 50 .75 50 / 50 10 7 57 ------------------------------------------------------------- LEVEL TERRAIN E E E f f f LOS T B R w d HV ----- ----- ----- ----- ----- ----- A 2 1.8 2.2 .84 1 .91 B 2.2 2 2.5 .84 1 .89 C 2.2 2 2.5 .84 1 .89 D 2 1.6 1.6 .84 1 .94 E 2 1.6 1.6 .87 1 .94 C) LEVEL OF SERVICE RESULTS ------------------------------------------------------------- INPUT VOLUME(vph): 932 ACTUAL FLOW RATE: 1243 SERVICE LOS FLOW RATE V/C --------- ----- A 150 .07 B 399 .19 C 715 .34 D 1307 .59 E 2294 1 LOS FOR GIVEN CONDITIONS: D I I I I I I I I I I I I I I I I I I I 1985 HCM:TWO-LANE HIGHWAYS **************************************************************** FACILITY LOCATION.... NYS Route 25 ANALyST.............. DEA/SPL TIME OF ANALySIS..... DATE OF ANALySIS..... 10-03-1997 OTHER INFORMATION.... East of Main st. (Greenport); 9-10 PM, weekday; 5 Year. build A) ADJUSTMENT FACTORS ------------------------------------------------------------- PERCENTAGE OF TRUCKS........................ PERCENTAGE OF BUSES......................... PERCENTAGE OF RECREATIONAL VEHICLES......... DESIGN SPEED (MPH).......................... PEAK HOUR FACTOR............................ DIRECTIONAL DISTRIBUTION (UP/DOWN).......... IANE WIDTH (FT)............................. USABLE SHOULDER WIDTH (AVG. WIDTH IN FT.)... PERCENT NO PASSING ZONES.................... B) CORRECTION FACTORS 2 2 5 50 .8 45 / 55 10 7 57 ------------------------------------------------------------- LEVEL TERRAIN E E E f f f LOS T B R w d HV ----- ----.- ----- ----- ----- ----- A 2 1.8 2.2 .84 .97 .91 B 2.2 2 2.5 .84 .97 .89 C 2.2 2 2.5 .84 .97 .89 0 2 1.6 1.6 .84 .97 .94 E 2 1.6 1.6 .87 .97 .94 C) LEVEL OF SERVICE RESULTS ------------------------------------------------------------- INPUT VOLUME(vph): 384 ACTUAL FLOW RATE: 480 SERVICE LOS FLOW RATE V/C --------- -.---- A 146 .07 B 387 .19 C 693 .34 0 1267 .59 E 2225 1 LOS FOR GIVEN CONDITIONS: C I I I I I I I I I I I I I I I I I I I 1985 HCM:TWO-LANE HIGHWAYS *~,************************************************************** FACILITY LOCATION.... NYS Route 25 ANALyST.............. DEA/SPL TIME OF ANALySIS..... DATE OF ANALySIS..... 10-03-1997 OTHER INFORMATION.... East of Main st. (Greenport): 11-12 NOO N, Sat.: 5 Year, build A) ADJUSTMENT FACTORS ------------------------------------------------------------- PERCENTAGE OF TRUCKS........................ PERCENTAGE OF BUSES......................... PERCENTAGE OF RECREATIONAL VEHICLES......... DESIGN SPEED (MPH).......................... l?~J\l< If()tJ~ ~J\C:1r()~............................ DIRECTIONAL DISTRIBUTION (UP/DOWN).......... IANE WIDTH (FT)............................. USABLE SHOULDER WIDTH (AVG. WIDTH IN FT.)... PERCENT NO PASSING ZONES.................... B) CORRECTION FACTORS 2 2 5 50 .91 57 / 43 10 7 57 ------------------------------------------------------------- LEVEL TERRAIN E E E f f f LOS T B R w d HV ----- ---.-- ----- ----- ----- ----- A 2 1.8 2.2 .84 .96 .91 B 2.2 2 2.5 .84 .96 .89 C 2.2 2 2.5 .84 .96 .89 D 2 1.6 1.6 .84 .96 .94 E 2 1.6 1.6 .87 .96 .94 C) LEVEL OF SERVICE RESULTS ------------------------------------------------------------- INPUT VOLUME(vph): 1386 ACTUAL FLOW RATE: 1523 SERVICE LOS FLOW RATE V/C --------- ----- A 144 .07 B 383 .19 C 685 .34 0 1252 .59 E 2197 1 LOS FOR GIVEN CONDITIONS: E I I I I I I I I I I I I I I I I I I I 1985 HCM:TWO-LANE HIGHWAYS **************************************************************** FACILITY LOCATION.... NYS Route 25 ANALyST.............. DEA/SPL TIME OF ANALySIS..... DATE OF ANALySIS..... 10-03-1997 OTHER INFORMATION.... East of Main st. (Greenport); 5-6 PM, S at.; 5 Year, build A) ADJUSTMENT FACTORS ------------------------------------------------------------- PERCENTAGE OF TRUCKS........................ PERCENTAGE OF BUSES......................... PERCENTAGE OF RECREATIONAL VEHICLES......... DESIGN SPEED (MPH).......................... PEAK HOUR FACTOR............................ DIRECTIONAL DISTRIBUTION (UP/DOWN).......... IANE WIDTH (FT)............................. USABLE SHOULDER WIDTH (AVG. WIDTH IN FT.)... PERCENT NO PASSING ZONES.................... B) CORRECTION FACTORS 2 2 5 50 .79 42 / 58 10 7 57 -------------------,------------------------------------------ LEVEL TERRAIN E E E f f f LOS T B R w d HV ----- ----- ----- ----- ----- ----- A 2 1.8 2.2 .84 .95 .91 B 2.2 2 2.5 .84 .95 .89 C 2.2 2 2.5 .84 .95 .89 D 2 1.6 1.6 .84 .95 .94 E 2 1.6 1.6 .87 .95 .94 C) LEVEL OF SERVICE RESULTS ------------------------------------------------------------- INPUT VOLUME(vph): 1211 ACTUAL FLOW RATE: 1533 SERVICE LOS FLOW RATE V/C --------- ----- A 143 .07 B 380 .19 C 680 .34 0 1244 .59 E 2184 1 LOS FOR GIVEN CONDITIONS: E I I I I I I I I I I I I I I I I I I I 1985 HCM:TWO-LANE HIGHWAYS **************************************************************** FACILITY LOCATION.... NYS Route 25 ANALyST.............. DEA/SPL TIME OF ANALySIS..... DATE OF ANALySIS..... 10-03-1997 OTHER INFORMATION.... East of Main st. (Greenport); 9-10 PM, Sat.; 5 Year, build A) ADJUSTMENT FACTORS ------------------------------------------------------------- PERCENTAGE OF TRUCKS........................ PERCENTAGE OF BUSES......................... PERCENTAGE OF RECREATIONAL VEHICLES......... DESIGN SPEED (MPH).......................... PEAK HOUR FACTOR....................................................... DIRECTIONAL DISTRIBUTION (UP/DOWN).......... IANE WIDTH (FT).......................................................... USABLE SHOULDER WIDTH (AVG. WIDTH IN FT.)... PERCENT NO PASSING ZONES.................... B) CORRECTION FACTORS 2 2 5 50 .88 41 / 59 10 7 57 ------------------------------------------------------------- LEVEL TERRAIN E E E f f f LOS T B R w d HV ----- ----- ----- ----- ----- ----- A 2 1.8 2.2 .84 .95 .91 B 2.2 2 2.5 .84 .95 .89 C 2.2 2 2.5 .84 .95 .89 0 2 1.6 1.6 .84 .95 .94 E 2 1.6 1.6 .87 .95 .94 C) LEVEL OF SERVICE RESULTS ------------------------------------------------------------- INPUT VOLUME(vph): 545 ACTUAL FLOW RATE: 619 SERVICE LOS FLOW RATE V/C --------- ----- A 142 .07 B 378 .19 C 676 .34 0 1236 .59 E 2170 1 LOS FOR GIVEN CONDITIONS: C I I I I I I I I I I I I I I I I I I I 1985 HCM:TWO-LANE HIGHWAYS **************************************************************** FACILITY LOCATION.... NYS Route 25 ANALyST.............. DEA/SPL TIME OF ANALySIS..... DATE OF ANALySIS..... 10-03-1997 OTHER INFORMATION.... East of Main st. (Greenport); 11-12 NOO N, Sun.; 5 Year, build A) ADJUSTMENT FACTORS ------------------------------------------------------------- PERCENTAGE OF TRUCKS........................ PERCENTAGE OF BUSES......................... PERCENTAGE OF RECREATIONAL VEHICLES......... DESIGN SPEED (MPH).......................... PEAK HOUR FACTOR............................ DIRECTIONAL DISTRIBUTION (UP/DOWN).......... IANE WIDTH (FT)............................. USABLE SHOULDER WIDTH (AVG. WIDTH IN FT.)... PERCENT NO PASSING ZONES.................... B) CORRECTION FACTORS 2 2 5 50 .94 59 / 41 10 7 57 LEVEL TERRAIN E E E f f f LOS T B R w d HV ----- ----- ----- ----- ----- ----- A 2 1.8 2.2 .84 .95 .91 B 2.2 :2 2.5 .84 .95 .89 C 2.2 2 2.5 .84 .95 .89 D 2 1.6 1.6 .84 .95 .94 E 2 1.6 1.6 .87 .95 .94 C) LEVEL OF SERVICE RESULTS ------------------------------------------------------------- INPUT VOLUME(vph): 1451 ACTUAL FLOW RATE: 1544 SERVICE LOS FLOW RATE V/C --------- ----- A 142 .07 B 378 .19 C 676 .34 D 1236 .59 E 2170 1 LOS FOR GIVEN CONDITIONS: E I I I I I I I I I I I I I I I I I I I 1985 HCM:TWO-LANE HIGHWAYS **************************************************************** FACILITY LOCATION.... NYS Route 25 ANALyST.............. DEA/SPL TIME OF ANALySIS..... DATE OF ANALySIS..... 10-03-1997 OTHER INFORMATION.... East of Main st. (Greenport); 5-6 PM, S un.; 5 Year, build A) ADJUSTMENT FACTORS PERCENTAGE OF TRUCKS........................ PERCENTAGE OF BUSES......................... PERCENTAGE OF RECREATIONAL VEHICLES......... DESIGN SPEED (MPH)........................... PEAK HOUR FACTOR............................ DIRECTIONAL DISTRIBUTION (UP/DOWN).......... LANE WIDTH (FT)............................. USABLE SHOULDER WIDTH (AVG. WIDTH IN FT.)... PERCENT NO PASSING ZONES.................... B) CORRECTION FACTORS 2 2 5 50 .81 37 / 63 10 7 57 LEVEL TERRAIN E E E f f f LOS T B R w d HV ----- ----- ----- ----- ----- ----- A 2 1.8 2.2 .84 .93 .91 B 2.2 2 2.5 .84 .93 .89 C 2.2 2 2.5 .84 .93 .89 D 2 1.6 1.6 .84 .93 .94 E 2 1.6 1.6 .87 .93 .94 C) LEVEL OF SERVICE RESULTS ------------------------------------------------------------- INPUT VOLUME(vph): 1337 ACTUAL FLOW RATE: 1651 SERVICE LOS FLOW RATE V/C --------- ----- A 139 .07 B 369 .19 C 661 .34 D 1209 .59 E 2122 1 LOS FOR GIVEN CONDITIONS: E I I I I I I I I I I I I I I I I I I I 1985 HCM:TWO-LANE HIGHWAYS **************************************************************** FACILITY LOCATION.... NYS Route 25 ANALyST.............. DEA/SPL TIME OF ANALySIS..... DATE OF ANALySIS..... 10-03-1997 OTHER INFORMATION.... East of Main st. (Greenport): 9-10 PM, Sun.: 5 Year, build A) ADJUSTMENT FACTORS ------------------------------------------------------------- PERCENTAGE OF TRUCKS........................ PERCENTAGE OF BUSES......................... PERCENTAGE OF RECREATIONAL VEHICLES......... DESIGN SPEED (MPH).......................... PEAK HOUR FACTOR............................ DIRECTIONAL DISTRIBUTION (UP/DOWN).......... IANE WIDTH eFT)............................. USABLE SHOULDER WIDTH (AVG. WIDTH IN FT.)... PERCENT NO PASSING ZONES.................... B) CORRECTION FACTORS 2 2 5 50 .77 35 / 65 10 7 57 LEVEL TERRAIN E E E f f f LOS T B R w d HV ----- ----- ----- ----- ----- ----- A 2 1.8 2.2 .84 .92 .91 B 2.2 2 2.5 .84 .92 .89 C 2.2 2 2.5 .84 .92 .89 D 2 1.6 1.6 .84 .92 .94 E 2 1.6 1.6 .87 .92 .94 C) LEVEL OF SERVICE RESULTS ------------------------------------------------------------- INPUT VOLUME(vph): 575 ACTUAL FLOW RATE: 747 SERVICE LOS FLOW RATE V/C --------- ----- A 137 .07 B 365 .19 C 654 .34 D 1196 .59 E 2099 1 LOS FOR GIVEN CONDITIONS: D I I I I I I I I I I I I I I I I I I I Route 25 Main Street to East Marionl Orient Park 2007 Capacity Analysis (No Build) Disk #~190, Cross Sound Ferry File: Dividers I I I I I I I I I I I I I I I I I I I 1985 HCM:TWO-LANE HIGHWAYS **************************************************************** FACILITY LOCATION.... NYS Route 25 ANALyST.............. DEA/SPL TIME OF ANALySIS..... DATE OF ANALySIS..... 10-03-1997 OTHER INFORMATION.... East of Main st. (Greenport); 11-12 NOO N, weekday; 10 Year, no-build A) ADJUSTMENT FACTORS PERCENTAGE OF TRUCKS........................ PERCENTAGE OF BUSES......................... PERCENTAGE OF RECREATIONAL VEHICLES......... DESIGN SPEED (MPH).................................................... PEAK HOUR FACTOR....................................................... DIRECTIONAL DISTRIBUTION (UP/DOWN) .......... I.A.NE WIDTH (FT).......................................................... USABLE SHOULDER WIDTH (AVG. WIDTH IN FT.)... PERCENT NO PASSING ZONES.................... B) CORRECTION FACTORS 2 2 5 50 .89 53 / 47 10 7 57 LEVEL TERRAIN E E E f f f LOS T B R w d HV ----- ----- ----- ----- ----- ----- A 2 1.8 2.2 .84 .98 .91 B 2.2 2 2.5 .84 .98 .89 C 2.2 2 2.5 .84 .98 .89 D 2 1.6 1.6 .84 .98 .94 E 2 1.6 1.6 .87 .98 .94 C) LEVEL OF SERVICE RESULTS ------------------------------------------------------------- INPUT VOLUME(vph): 809 ACTUAL FLOW RATE: 909 SERVICE LOS FLOW RATE V/C --------- .----- A 148 .07 B 392 .19 C 702 .34 D 1283 .59 E 2252 1 LOS FOR GIVEN CONDITIONS: D I I I I I I I I I I I I I I I I I I I 1985 HCM:TWO-LANE HIGHWAYS **************************************************************** FACILITY LOCATION.... NYS Route 25 ANALyST............... DEA/SPL TIME OF ANALySIS..... DATE OF ANALySIS..... 10-03-1997 OTHER INFORMATION.... East of Main st. (Greenport); 5-6 PM, W eekday; 10 Year, no-build A) ADJUSTMENT FACTORS PERCENTAGE OF TRUCKS........................ 2 PERCENTAGE OF BUSES......................... 2 PERCENTAGE OF RECREATIONAL VEHICLES......... 5 DESIGN SPEED (MPH) It .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. 50 PEAK HOUR FACTOR....................................................... .. 75 DIRECTIONAL DISTRIBUTION (UP/DOWN).......... 50/50 LANE WIDTH (FT).......................................................... 10 USABLE SHOULDER WIDTH (AVG. WIDTH IN FT.)... 7 PERCENT NO PASSING ZONES.................... 57 B) CORRECTION FACTORS LEVEL TERRAIN E E E f f f LOS T B R W d HV ----- ----- ----- ----- ----- ----- A 2 1.8 2.2 .84 1 .91 B 2.2 2 2.5 .84 1 .89 C 2.2 2 2.5 .84 1 .89 D 2 1.6 1.6 .84 1 .94 E 2 1.6 1.6 .87 1 .94 C) LEVEL OF SERVICE RESULTS INPUT VOLUME(vph): 1017 ACTUAL FLOW RATE: 1356 SERVICE LOS FLOW RATE V/C --------- ----- A 150 .07 B 399 .19 C 715 .34 D 1307 .59 E 2294 1 LOS FOR GIVEN CONDITIONS: E I I I I I I I I I I I I I I I I I I I 1985 HCM:TWO-LANE HIGHWAYS **************************************************************** FACILITY LOCATION.... NYS Route 25 ANALyST.............. DEA/SPL TIME OF ANALySIS..... DATE OF ANALySIS..... 10-03-1997 OTHER INFORMATION.... East of Main st. (Greenport); 9-10 PM, weekday; 10 Year, no-build A) ADJUSTMENT FACTORS PERCENTAGE OF TRUCKS........................ PERCENTAGE OF BUSES......................... PERCENTAGE OF RECREATIONAL VEHICLES......... DESIGN SPEED (MPH).......................... PEAl< }{()lJR ~ACT()R............................ DIRECTIONAL DISTRIBUTION (UP/DOWN).......... LANE WIDTH (FT)............................. USABLE SHOULDER WIDTH (AVG. WIDTH IN FT.)... PERCENT NO PASSING ZONES.................... B) CORRECTION FACTORS 2 2 5 50 .8 58 / 42 10 7 57 LEVEL TERRAIN E E E f f f LOS T B R w d HV ----- ----- ----- ----- ----- ----- A 2 1.8 2.2 .84 .95 .91 B 2.2 2 2.5 .84 .95 .89 C 2.2 2 2.5 .84 .95 .89 0 2 1.6 1.6 .84 .95 .94 E 2 1.6 1.6 .87 .95 .94 C) LEVEL OF SERVICE RESULTS ------------------------------------------------------------- INPUT VOLUME (vph) : 389 ACTUAL FLOW RATE: 486 SERVICE LOS FLOW RATE V/C --------- ----- A 143 .07 B 380 .19 C 680 .34 0 1244 .59 E 2184 1 LOS FOR GIVEN CONDITIONS: C I I I I I I I I I I I I I I I I I I I 1985 HCM:TWO-LANE HIGHWAYS **************************************************************** FACILITY LOCATION.... NYS Route 25 ANALyST.............. DEA/SPL TIME OF ANALySIS..... DATE OF ANALySIS..... 10-03-1997 OTHER INFORMATION.... East of Main st. (Greenport); 11-12 NOO N, Sat.; 10 Year, no-build A) ADJUSTMENT FACTORS PERCENTAGE OF TRUCKS........................ PERCENTAGE OF BUSES......................... PERCENTAGE OF RECREATIONAL VEHICLES......... DESIGN SPEED (MPH)........................... PEAl< HOUR FACTOR............................ DIRECTIONAL DISTRIBUTION (UP/DOWN).......... lANE WIDTH (FT)............................. USABLE SHOULDER WIDTH (AVG. WIDTH IN FT.)... PERCENT NO PASSING ZONES.................... B) CORRECTION FACTORS 2 2 5 50 .91 54 / 46 10 7 57 LEVEL TERRAIN E E E f f f LOS T B R w d HV ----- ----- ----- ----- ----- ----- A 2 1.8 2.2 .84 .98 .91 B 2.2 2 2.5 .84 .98 .89 C 2.2 2 2.5 .84 .98 .89 D 2 1.6 1.6 .84 .98 .94 E 2 1.6 1.6 .87 .98 .94 C) LEVEL OF SERVICE RESULTS ------------------------------------------------------------- INPUT VOLUME(vph): 1535 ACTUAL FLOW RATE: 1687 SERVICE LOS FLOW RATE V/C --------- ----- A 147 .07 B 390 .19 C 697 .34 D 1275 .59 E 2239 1 LOS FOR GIVEN CONDITIONS: E I I I I I I I I I I I I I I I I I I I 1985 HCM:TWO-LANE HIGHWAYS **************************************************************** FACILITY LOCATION.... NYS Route 25 ANALyST.............. DEA/SPL TIME OF ANALySIS..... DATE OF ANALySIS..... 10-03-1997 OTHER INFORMATION.... East of Main st. (Greenport); 5-6 PM, S at.; 10 Year, no-build A) ADJUSTMENT FACTORS ------------------------------------------------------------- PERCENTAGE OF TRUCKS................................................ PERCENTAGE OF BUSES......................... PERCENTAGE OF RECREATIONAL VEHICLES......... DESIGN SPEED (MPH).......................... PEAK HOUR FACTOR....................................................... DIRECTIONAL DISTRIBUTION (UP/DOWN).......... IANE WIDTH (FT).......................................................... USABLE SHOULDER WIDTH (AVG. WIDTH IN FT.)... PERCENT NO PASSING ZONES.................... B) CORRECTION FACTORS LEVEL TERRAIN E E E f f f LOS T B R w d HV ----- ----- ----- ----- ----- ----- A 2 1.8 2.2 .84 .96 .91 B 2.2 2 2.5 .84 .96 .89 C 2.2 2 2.5 .84 .96 .89 D 2 1.6 1.6 .84 .96 .94 E 2 1.6 1.6 .87 .96 .94 C) LEVEL OF SERVICE RESULTS INPUT VOLUME(vph): 1345 ACTUAL FLOW RATE: 1703 SERVICE LOS FLOW RATE V/C --------- ----- A 144 .07 B 383 .19 C 685 .34 D 1252 .59 E 2197 1 LOS FOR GIVEN CONDITIONS: E 2 2 5 50 .79 43 / 57 10 7 57 1985 HCM:TWO-LANE HIGHWAYS **************************************************************** I I I I I I I I I I I I I I I I I I FACILITY LOCATION.... NYS Route 25 ANALyST.............. DEA/SPL TIME OF ANALySIS..... DATE OF ANALySIS..... 10-03-1997 OTHER INFORMATION.... East of Main st. (Greenport); 9-10 PM, Sat.; 10 Year, no-build A) ADJUSTMENT FACTORS ------------------------------------------------------------- PERCENTAGE OF TRUCKS........................ PERCENTAGE OF BUSES....................... ... PERCENTAGE OF RECREATIONAL VEHICLES......... DESIGN SPEED (MPH).................................................... PEAK HOUR FACTOR....................................................... DIRECTIONAL DISTRIBUTION (UP/DOWN).......... I..ANE WIDTH eFT).......................................................... USABLE SHOULDER WIDTH (AVG. WIDTH IN FT.)... PERCENT NO PASSING ZONES.................... B) CORRECTION FACTORS 2 2 5 50 .88 49 / 51 10 7 57 ------------------------------------------------------------- LEVEL TERRAIN E E E f f f LOS T B R w d HV ----- ----- ----- ----- ----- ----- A 2 1.8 2.2 .84 .99 .91 B 2.2 2 2.5 .84 .99 .89 C 2.2 2 2.5 .84 .99 .89 0 2 1.6 1.6 .84 .99 .94 E 2 1.6 1.6 .87 .99 .94 C) LEVEL OF SERVICE RESULTS ------------------------------------------------------------- INPUT VOLUME(vph): 576 ACTUAL FLOW RATE: 655 SERVICE LOS FLOW RATE V/C --------- ----- A 149 .07 B 397 .19 C 710 .34 0 1299 .59 E 2280 1 LOS FOR GIVEN CONDITIONS: C ~ -. . I I I I I I I I I I I I I I I I 1985 HCM:TWO-LANE HIGHWAYS **************************************************************** FACILITY LOCATION.... NYS Route 25 ANALyST.............. DEA/SPL TIME OF ANALySIS..... DATE OF ANALySIS..... 10-03-1997 OTHER INFORMATION.... East of Main st. (Greenport); 11-12 NOO N, Sun.; 10 Year, no-build A) ADJUSTMENT FACTORS PERCENTAGE OF TRUCKS........................ PERCENTAGE OF BUSES......................... PERCENTAGE OF RECREATIONAL VEHICLES......... DESIGN SPEED (MPH).......................... PEAK HOUR FACTOR............................ DIRECTIONAL DISTRIBUTION (UP/DOWN).......... lANE WIDTH (FT)............................. USABLE SHOULDER WIDTH (AVG. WIDTH IN FT.)... PERCENT NO PASSING ZONES.................... B) CORRECTION FACTORS LEVEL TERRAIN E E E f f f LOS T B R w d HV ----- ----- ----- ----- ----- ----- A 2 1.8 2.2 .84 .96 .91 B 2.2 2 2.5 .84 .96 .89 C 2.2 2 2.5 .84 .96 .89 D 2 1.6 1.6 .84 .96 .94 E 2 1.6 1.6 .87 .96 .94 C) LEVEL OF SERVICE RESULTS INPUT VOLUME(vph): 1608 ACTUAL FLOW RATE: 1711 SERVICE LOS FLOW RATE V/C --------- ----- A 144 .07 B 383 .19 C 685 .34 D 1252 .59 E 2197 1 LOS FOR GIVEN CONDITIONS: E 2 2 5 50 .94 57 / 43 10 7 57 1985 HCM:TWO-LANE HIGHWAYS **************************************************************** I I I I I I I I I I I I I I I I I I FACILITY LOCATION.... NYS Route 25 ANALyST.............. DEA/SPL TIME OF ANALySIS..... DATE OF ANALySIS..... 10-03-1997 OTHER INFORMATION.... East of Main st. (Greenport); 5-6 PM, S un.; 10 Year, no-build A) ADJUSTMENT FACTORS ------------------------------------------------------------- PERCENTAGE OF TRUCKS........................ PERCENTAGE OF BUSES......................... PERCENTAGE OF RECREATIONAL VEHICLES......... DESIGN SPEED (MPH).......................... PEAK HOUR FACTOR............................ DIRECTIONAL DISTRIBUTION (UP/DOWN).......... lANE WIDTH (FT)............................. USABLE SHOULDER WIDTH (AVG. WIDTH IN FT.)... PERCENT NO PASSING ZONES.................... 5) CORRECTION FACTORS 2 2 5 50 .81 37 / 63 10 7 57 LEVEL TERRAIN E E E f f f LOS T B R w d HV ----- ----- ----- ----- ----- ----- A 2 1.8 2.2 .84 .93 .91 5 2.2 2 2.5 .84 .93 .89 C 2.2 2 2.5 .84 .93 .89 D 2 1.6 1.6 .84 .93 .94 E 2 1.6 1.6 .87 .93 .94 C) LEVEL OF SERVICE RESULTS ------------------------------------------------------------- INPUT VOLUME(vph): 1476 ACTUAL FLOW RATE: 1822 SERVICE LOS FLOW RATE V/C --------- ----- A 139 .07 5 369 .19 C 661 .34 D 1209 .59 E 2122 1 LOS FOR GIVEN CONDITIONS: E I I I I I I I I I I I I I I I I I I I 1985 HCM:TWO-LANE HIGHWAYS **************************************************************** FACILITY LOCATION.... NYS Route 25 ANALyST.............. DEA/SPL TIME OF ANALySIS..... DATE OF ANALySIS..... 10-03-1997 OTHER INFORMATION.... East of Main st. (Greenport); 9-10 PM, Sun.; 10 Year, no-build A) ADJUSTMENT FACTORS ------------------------------------------------------------- PERCENTAGE OF TRUCKS........................ 2 PERCENTAGE OF BUSES......................... 2 PERCENTAGE OF RECREATIONAL VEHICLES......... 5 DESIGN SPEED (MPH).......................... 50 PEAK HOUR FACTOR............................ .77 DIRECTIONAL DISTRIBUTION (UP/DOWN).......... 40/60 I..A.NE WIDTH (FT)............................. 10 USABLE SHOULDER WIDTH (AVG. WIDTH IN FT.)... 7 PERCENT NO PASSING ZONES.................... 57 B) CORRECTION FACTORS ------------------------------------------------------------- LEVEL TERRAIN E E E f f f LOS T B R w d HV ----- ----- ----- ----- ----- ----- A 2 1.8 2.2 .84 .94 .91 B 2.2 2 2.5 .84 .94 .89 C 2.2 2 2.5 .84 .94 .89 0 2 1.6 1.6 .84 .94 .94 E 2 1.6 1.6 .87 .94 .94 C) LEVEL OF SERVICE RESULTS ------------------------------------------------------------- INPUT VOLUME(vph): 612 ACTUAL FLOW RATE: 795 SERVICE LOS FLOW RATE V/C --------- ----- A 141 .07 B 375 .19 C 672 .34 0 1228 .59 E 2156 1 LOS FOR GIVEN CONDITIONS: 0 I I I I I I I I I I I I I I I I I I I Route 25 Main Street to East MarianI Orient Park 2007 Capacity Analysis {Build} Disk #390, Cross Sound Ferry File: Dividers I I I I I I I I I I I I I I I I I I I 1985 HCM:TWO-LANE HIGHWAYS **************************************************************** FACILITY LOCATION.... NYS Route 25 ANALyST.............. DEA/SPL TIME OF ANALySIS..... DATE OF ANALySIS..... 10-03-1997 OTHER INFORMATION.... East of Main st. (Greenport); 11-12 NOO N, weekday; 10 Year, build A) ADJUSTMENT FACTORS PERCENTAGE OF TRUCKS........................ PERCENTAGE OF BUSES......................... PERCENTAGE OF RECREATIONAL VEHICLES......... DESIGN SPEED (MPH).......................... PEAK HOUR FACTOR............................ DIRECTIONAL DISTRIBUTION (UP/DOWN).......... IANE WIDTH eFT)............................................. USABLE SHOULDER WIDTH (AVG. WIDTH IN FT.)... PERCENT NO PASSING ZONES.................... B) CORRECTION FACTORS 2 2 5 50 .89 59 / 41 10 7 57 LEVEL TERRAIN E E E f f f LOS T B R w d HV ----- ----- ----- ----- ----- ----- A 2 1.8 2.2 .84 .95 .91 B 2.2 2 2.5 .84 .95 .89 C 2.2 2 2.5 .84 .95 .89 0 2 1.6 1.6 .84 .95 .94 E 2 1.6 1.6 .87 .95 .94 C) LEVEL OF SERVICE RESULTS ------------------------------------------------------------- INPUT VOLUME(vph): 900 ACTUAL FLOW RATE: 1011 SERVICE LOS FLOW RATE V/C --------- ----- A 142 .07 B 378 .19 C 676 .34 D 1236 .59 E 2170 1 LOS FOR GIVEN CONDITIONS: D I I I I I I I I I I I I I I I I I I I 1985 HCM:TWO-LANE HIGHWAYS **************************************************************** FACILITY LOCATION.... NYS Route 25 ANALyST.............. DEA/SPL TIME OF ANALySIS..... DATE OF ANALySIS..... 10-03-1997 OTHER INFORMATION.... East of Main st. (Greenport): 5-6 PM, w eekday: 10 Year, build A) ADJUSTMENT FACTORS PERCENTAGE OF TRUCKS........................ PERCENTAGE OF BUSES......................... PERCENTAGE OF RECREATIONAL VEHICLES......... DESIGN SPEED (MPH)........ . . . . . . . . . . . . . . . . . . PEAl{ }{()lJ~ FA<:TOR........... . . . . . . . . . . . . . . . . . DIRECTIONAL DISTRIBUTION (UP/DOWN).......... lANE WIDTH (FT).............................. USABLE SHOULDER WIDTH (AVG. WIDTH IN FT.)... PERCENT NO PASSING ZONES.................... B) CORRECTION FACTORS LEVEL TERRAIN E E E f f f LOS T B R w d HV ----- ----- ----- ----- ----- ----- A 2 1.8 2.2 .84 .99 .91 B 2.2 2 2.5 .84 .99 .89 C 2.2 2 2.5 .84 .99 .89 D 2 1.6 1.6 .84 .99 .94 E 2 1.6 1.6 .87 .99 .94 C) LEVEL OF SERVICE RESULTS INPUT VOLUME(vph): 1113 ACTUAL FLOW RATE: 1484 SERVICE LOS FLOW RATE V/C --------- ----- A 149 .07 B 397 .19 C 710 .34 D 1299 .59 E 2280 1 LOS FOR GIVEN CONDITIONS: E 2 2 5 50 .75 49 / 51 10 7 57 I I I I I I I I I I I I I I I I I I I 1985 HCM:TWO-LANE HIGHWAYS **************************************************************** FACILITY LOCATION.... NYS Route 25 ANALyST.............. DEA/SPL TIME OF ANALySIS..... DATE OF ANALySIS..... 10-03-1997 OTHER INFORMATION.... East of Main st. (Greenport); 9-10 PM, weekday; 10 Year, build A) ADJUSTMENT FACTORS ------------------------------------------------------------- PERCENTAGE OF TRUCKS........................ PERCENTAGE OF BUSES......................... PERCENTAGE OF RECREATIONAL VEHICLES......... DESIGN SPEED (MPH).......................... PEAK HOUR FACTOR............................ DIRECTIONAL DISTRIBUTION (UP/DOWN).......... LANE WIDTH (FT)............................. USABLE SHOULDER WIDTH (AVG. WIDTH IN FT.)... PERCENT NO PASSING ZONES.................... B) CORRECTION FACTORS 2 2 5 50 .8 43 / 57 10 7 57 ------------------------------------------------------------- LEVEL TERRAIN E E E f f f LOS T B R w d HV ----- ----- ----- ----- ----- ----- A 2 1.8 2.2 .84 .96 .91 B 2.2 2 2.5 .84 .96 .89 C 2.2 2 2.5 .84 .96 .89 D 2 1.6 1.6 .84 .96 .94 E 2 1.6 1.6 .87 .96 .94 C) LEVEL OF SERVICE RESULTS ------------------------------------------------------------- INPUT VOLUME(vph): 486 ACTUAL FLOW RATE: 608 SERVICE LOS FLOW RATE V/C --------- ----- A 144 .07 B 383 .19 C 685 .34 D 1252 .59 E 2197 1 LOS FOR GIVEN CONDITIONS: C I I I I I I I I I I I I I I I I I I I 1985 HCM:TWO-LANE HIGHWAYS **************************************************************** FACILITY LOCATION.... NYS Route 25 ANALyST.............. DEA/SPL TIME OF ANALySIS..... DATE OF ANALySIS..... 10-03-1997 OTHER INFORMATION.... East of Main st. (Greenport); 11-12 NOO N, Sat.: 10 Year, build A) ADJUSTMENT FACTORS PERCENTAGE OF TRUCKS........................ PERCENTAGE OF BUSES......................... PERCENTAGE OF RECREATIONAL VEHICLES......... DESIGN SPEED (MPH).......................... PEAK liOUR FACTOIi............................ DIRECTIONAL DISTRIBUTION (UP/DOWN).......... I..ANE WIDTH (FT)............................. USABLE SHOULDER WIDTH (AVG. WIDTH IN FT.)... PERCENT NO PASSING ZONES.................... B) CORRECTION FACTORS 2 2 5 50 .91 56 / 44 10 7 57 LEVEL TERRAIN E E E f f f LOS T B R w d HV ----- ----- ----- ----- ----- ----- A 2 1.8 2.2 .84 .96 .91 B 2.2 2 2.5 .84 .96 .89 C 2.2 2 2.5 .84 .96 .89 0 2 1.6 1.6 .84 .96 .94 E 2 1.6 1.6 .87 .96 .94 C) LEVEL OF SERVICE RESULTS ------------------------------------------------------------- INPUT VOLUME(vph): 1647 ACTUAL FLOW RATE: 1810 SERVICE LOS FLOW RATE V/C --------- ----- A 145 .07 B 385 .19 C 689 .34 0 1260 .59 E 2211 1 LOS FOR GIVEN CONDITIONS: E I I I I I I I I I I I I I I I I I I I 1985 HCM:TWO-LANE HIGHWAYS **************************************************************** FACILITY LOCATION.... NYS Route 25 ANALyST.............. DEA/SPL TIME OF ANALySIS..... DATE OF ANALySIS..... 10-03-1997 OTHER INFORMATION.... East of Main st. (Greenport); 5-6 PM, S at.; 10 Year, build A) ADJUSTMENT FACTORS ------------------------------------------------------------- PERCENTAGE OF TRUCKS........................ PERCENTAGE OF BUSES......................... PERCENTAGE OF RECREATIONAL VEHICLES......... DESIGN SPEED (MPH).......................... PEAK HOUR FACTOR....................................................... DIRECTIONAL DISTRIBUTION (UP/DOWN).......... LANE WIDTH (FT)............................. USABLE SHOULDER WIDTH (AVG. WIDTH IN FT.)... PERCENT NO PASSING ZONES.................... B) CORRECTION FACTORS 2 2 5 50 .79 43 / 57 10 7 57 ------------------------------------------------------------- LEVEL TERRAIN E E E f f f LOS T B R w d HV ----- ----- ----- ----- ----- ----- A 2 1.8 2.2 .84 .96 .91 B 2.2 2 2.5 .84 .96 .89 C 2.2 2 2.5 .84 .96 .89 D 2 1.6 1.6 .84 .96 .94 E 2 1.6 1.6 .87 .96 .94 C) LEVEL OF SERVICE RESULTS ------------------------------------------------------------- INPUT VOLUME(vph): 1439 ACTUAL FLOW RATE: 1822 SERVICE LOS FLOW RATE V/C --------- -,---- A 144 .07 B 383 .19 C 685 .34 D 1252 .59 E 2197 1 LOS FOR GIVEN CONDITIONS: E I I I I I I I I I I I I I I I I I I I 1985 HCM:TWO-LANE HIGHWAYS **************************************************************** FACILITY LOCATION.... NYS Route 25 ANALyST.............. DEA/SPL TIME OF ANALySIS..... DATE OF ANALySIS..... 10-03-1997 OTHER INFORMATION.... East of Main st. (Greenport); 9-10 PM, Sat.; 10 Year, build A) ADJUSTMENT FACTORS ------------------------------------------------------------- PERCENTAGE OF TRUCKS........................ PERCENTAGE OF BUSES......................... PERCENTAGE OF RECREATIONAL VEHICLES......... DESIGN SPEED (MPH).......................... PE~l< lIOlJR ~~C:T()R....................................................... DIRECTIONAL DISTRIBUTION (UP/DOWN).......... I..ANE WIDTH (F'r).......................................................... USABLE SHOULDER WIDTH (AVG. WIDTH IN FT.)... PERCENT NO PASSING ZONES.................... B) CORRECTION FACTORS 2 2 5 50 .88 41 / 59 10 7 57 ------------------------------------------------------------- LEVEL TERRAIN E E E f f f LOS T B R w d HV ----- ----- ----- ----- ----- ----- A 2 1.8 2.2 .84 .95 .91 B 2.2 2 2.5 .84 .95 .89 C 2.2 2 2.5 .84 .95 .89 D 2 1.6 1.6 .84 .95 .94 E 2 1.6 1.6 .87 .95 .94 C) LEVEL OF SERVICE RESULTS ------------------------------------------------------------- INPUT VOLUME(vph): 666 ACTUAL FLOW RATE: 757 SERVICE LOS FLOW RATE V/C --------- ----- A 142 .07 B 378 .19 C 676 .34 D 1236 .59 E 2170 1 LOS FOR GIVEN CONDITIONS: D I I I I I I t I I I I I I I I I I I I 1985 HCM:TWO-LANE HIGHWAYS **************************************************************** FACILITY LOCATION.... NYS Route 25 ANALyST.............. DEA/SPL TIME OF ANALySIS..... DATE OF ANALySIS..... 10-03-1997 OTHER INFORMATION.... East of Main st. (Greenport); 11-12 NOO N, Sun.; 10 Year, build A) ADJUSTMENT FACTORS ------------------------------------------------------------- PERCENTAGE OF TRUCKS........................ PERCENTAGE OF BUSES......................... PERCENTAGE OF RECREATIONAL VEHICLES......... DESIGN SPEED (MPH).......................... PEAl< H()U~ FACT()~............................ DIRECTIONAL DISTRIBUTION (UP/DOWN).......... LANE WIDTH (FT)............................. USABLE SHOULDER WIDTH (AVG. WIDTH IN FT.)... PERCENT NO PASSING ZONES.................... B) CORRECTION FACTORS 2 2 5 50 .94 59 / 41 10 7 57 ------------------------------------------------------------- LEVEL TERRAIN E E E f f f LOS T B R w d HV ----- ----- ----- ----- ----- ----- A 2 1.8 2.2 .84 .95 .91 B 2.2 2 2.5 .84 .95 .89 C 2.2 2 2.5 .84 .95 .89 D 2 1.6 1.6 .84 .95 .94 E 2 1.6 1.6 .87 .95 .94 C) LEVEL OF SERVICE RESULTS ------------------------------------------------------------- INPUT VOLUME(vph): 1728 ACTUAL FLOW RATE: 1838 SERVICE LOS FLOW RATE V/C --------- ----- A 142 .07 B 378 .19 C 676 .34 D 1236 .59 E 2170 1 LOS FOR GIVEN CONDITIONS: E I I I I I I I I I I I I I I I I I I I 1985 HCM:TWO-LANE HIGHWAYS **************************************************************** FACILITY LOCATION.... NYS Route 25 ANALyST.............. DEA/SPL TIME OF ANALySIS..... DATE OF ANALySIS..... 10-03-1997 OTHER INFORMATION.... East of Main st. (Greenport); 5-6 PM, S un.; 10 Year, build A) ADJUSTMENT FACTORS ------------------------------------------------------------- PERCENTAGE OF TRUCKS........................ PERCENTAGE OF BUSES......................... PERCENTAGE OF RECREATIONAL VEHICLES......... DESIGN SPEED (MPH).......................... PEAl< flOUR FACTOR............................ DIRECTIONAL DISTRIBUTION (UP/DOWN).......... IANE WIDTH (FT)............................. USABLE SHOULDER WIDTH (AVG. WIDTH IN FT.)... PERCENT NO PASSING ZONES.................... B) CORRECTION FACTORS 2 2 5 50 .81 38 / 62 10 7 57 ------------------------------------------------------------- LEVEL TERRAIN E E E f f f LOS T B R w d HV ----- ----- ----- ----- ----- ----- A 2 1.8 2.2 .84 .93 .91 B 2.2 2 2.5 .84 .93 .89 C 2.2 2 2.5 .84 .93 .89 D 2 1.6 1.6 .84 .93 .94 E 2 1.6 1.6 .87 .93 .94 C) LEVEL OF SERVICE RESULTS ------------------------------------------------------------- INPUT VOLUME(vph): 1574 ACTUAL FLOW RATE: 1943 SERVICE LOS FLOW RATE V/C --------- ----- A 140 .07 B 371 .19 C 665 .34 D 1215 .59 E 2133 1 LOS FOR GIVEN CONDITIONS: E I I I I I I I I I I I I I I I I I I I 1985 HCM:TWO-LANE HIGHWAYS **************************************************************** FACILITY LOCATION.... NYS Route 25 ANALyST.............. DEA/SPL TIME OF ANALySIS..... DATE OF ANALySIS..... 10-03-1997 OTHER INFORMATION.... East of Main st. (Greenport); 9-10 PM, Sun.; 10 Year, build A) ADJUSTMENT FACTORS ------------------------------------------------------------- PERCENTAGE OF TRUCKS........................ PERCENTAGE OF BUSES......................... PERCENTAGE OF RECREATIONAL VEHICLES......... DESIGN SPEED (MPH).......................... PEAK HOUR FACTOR............................ DIRECTIONAL DISTRIBUTION (UP/DOWN).......... IANE WIDTH (FT).......................................................... USABLE SHOULDER WIDTH (AVG. WIDTH IN FT.)... PERCENT NO PASSING ZONES.................... B) CORRECTION FACTORS 2 2 5 50 .77 33 / 67 10 7 57 ------------------------------------------------------------- LEVEL TERRAIN E E E f f f LOS T B R w d HV ----- ----- ----- ----- ----- ----- A 2 1.8 2.2 .84 .91 .91 B 2.2 :2 2.5 .84 .91 .89 C 2.2 :2 2.5 .84 .91 .89 0 2 1.6 1.6 .84 .91 .94 E 2 1.6 1.6 .87 .91 .94 C) LEVEL OF SERVICE RESULTS ------------------------------------------------------------- INPUT VOLUME(vph): 706 ACTUAL FLOW RATE: 917 SERVICE LOS FLOW RATE V/C --------- ----- A 136 .07 B 361 .19 C 647 .34 0 1183 .59 E 2076 1 LOS FOR GIVEN CONDITIONS: 0 I I I I I I I I I I I I I I I I I I I Route 25 East Marion/Orient Park to Narrow River Road Existing Capacity Analysis Disk #390. Cross Sound Ferry File; Dividers I I I I I I I I I I I I I I I I I I I 1985 HCM:TWO-LANE HIGHWAYS **************************************************************** FACILITY LOCATION.... NYS Route 25 ANALyST.............. DEA/SPL TIME OF ANALySIS..... DATE OF ANALySIS..... 10-03-1997 OTHER INFORMATION.... West of Tabor Rd.; 11-12 NOON, weekday; Existing A) ADJUSTMENT FACTORS ------------------------------------------------------------- PERCENTAGE OF TRUCKS........................ PERCENTAGE OF BUSES......................... PERCENTAGE OF RECREATIONAL VEHICLES......... DESIGN SPEED (MPH).......................... PEAK HOUR FACTOR............................ DIRECTIONAL DISTRIBUTION (UP/DOWN).......... LANE WIDTH (FT)............................. USABLE SHOULDER WIDTH (AVG. WIDTH IN FT.)... PERCENT NO PASSING ZONES.................... B) CORRECTION FACTORS 2 2 5 50 .76 61 / 39 10 7 51 ------------------------------------------------------------- LEVEL TERRAIN E E E f f f LOS T B R w d HV ----- ----- ----- ----- ----- ----- A 2 1.8 2.2 .84 .94 .91 B 2.2 2 2.5 .84 .94 .89 C 2.2 2 2.5 .84 .94 .89 D 2 1.6 1.6 .84 .94 .94 E 2 1.6 1.6 .87 .94 .94 C) LEVEL OF SERVICE RESULTS ------------------------------------------------------------- INPUT VOLUME (vph) : 388 ACTUAL FLOW RATE: 511 SERVICE LOS FLOW RATE V/C --------- ----- A 140 .07 B 373 .19 C 668 .34 D 1222 .59 E 2145 1 LOS FOR GIVEN CONDITIONS: C I I I I I I I I I I I I I I I I I I I 1985 HCM:TWO-LANE HIGHWAYS **************************************************************** FACILITY LOCATION.... NYS Route 25 ANALyST.............. DEA/SPL TIME OF ANALySIS..... DATE OF ANALySIS..... 10-03-1997 OTHER INFORMATION.... West of Tabor Rd.; 5-6 PM, weekday; Exi sting A) ADJUSTMENT FACTORS PERCENTAGE OF TRUCKS........................ PERCENTAGE OF BUSES......................... PERCENTAGE OF RECREATIONAL VEHICLES......... DESIGN SPEED (MPH).......................... PEAK }fOUR FACTOR............................ DIRECTIONAL DISTRIBUTION (UP/DOWN).......... LA.NE WIDTH (FT)............................. USABLE SHOULDER WIDTH (AVG. WIDTH IN FT.)... PERCENT NO PASSING ZONES.................... B) CORRECTION FACTORS 2 2 5 50 .84 53 / 47 10 7 51 LEVEL TERRAIN E E E f f f LOS T B R w d HV ----- ----- ----- ----- ----- ----- A 2 1.8 2.2 .84 .98 .91 B 2.2 2 2.5 .84 .98 .89 C 2.2 2 2.5 .84 .98 .89 0 2 1.6 1.6 .84 .98 .94 E 2 1.6 1.6 .87 .98 .94 C) LEVEL OF SERVICE RESULTS ------------------------------------------------------------- INPUT VOLUME(vph): 436 ACTUAL FLOW RATE: 519 SERVICE LOS FLOW RATE V/C --------- ----- A 148 .07 B 392 .19 C 702 .34 0 1283 .59 E 2252 1 LOS FOR GIVEN CONDITIONS: C I I I I I I I I I I I I I I I I I I I 1985 HCM:TWO-LANE HIGHWAYS **************************************************************** FACILITY LOCATION.... NYS Route 25 ANALyST.............. DEA/SPL TIME OF ANALySIS..... DATE OF ANALySIS..... 10-03-1997 OTHER INFORMATION.... West of Tabor Rd.; 9-10 PM, weekday; Ex isting A) ADJUSTMENT FACTORS PERCENTAGE OF TRUCKS........................ PERCENTAGE OF BUSES......................... PERCENTAGE OF RECREATIONAL VEHICLES......... DESIGN SPEED (MPH).......................... PEAK HOUR FACTOR................................... DIRECTIONAL DISTRIBUTION (UP/DOWN).......... IANE WIDTH eFT)........................................... USABLE SHOULDER WIDTH (AVG. WIDTH IN FT.)... PERCENT NO PASSING ZONES.................... 2 2 5 50 .61 44 / 56 10 7 51 B) CORRECTION FACTORS ------------------------------------------------------------- LEVEL TERRAIN E E E f f f LOS T B R w d HV ----- ----- ----- ----- ----- ----- A 2 1.8 2.2 .84 .96 .91 B 2.2 2 2.5 .84 .96 .89 C 2.2 2 2.5 .84 .96 .89 D 2 1.6 1.6 .84 .96 .94 E 2 1.6 1.6 .87 .96 .94 C) LEVEL OF SERVICE RESULTS INPUT VOLUME(vph): 189 ACTUAL FLOW RATE: 310 SERVICE LOS FLOW RATE V/C --------- ----- A 145 .07 B 385 .19 C 689 .34 D 1260 .59 E 2211 1 LOS FOR GIVEN CONDITIONS: B I I I I I I I I I I I I I I I I I I I 1985 HCM:TWO-LANE HIGHWAYS **************************************************************** FACILITY LOCATION.... NYS Route 25 ANALyST.............. DEA/SPL TIME OF ANALySIS..... DATE OF ANALySIS..... 10-03-1997 OTHER INFORMATION.... West of Tabor Rd.; 11-12 NOON, Sat.; Ex isting A) ADJUSTMENT FACTORS ------------------------------------------------------------- PERCENTAGE OF TRUCKS........................ PERCENTAGE OF BUSES......................... PERCENTAGE OF RECREATIONAL VEHICLES......... DESIGN SPEED (MPH).......................... PEAK HOUR FACTOR............................ DIRECTIONAL DISTRIBUTION (UP/DOWN).......... LANE WIDTH .(FT)..................... IO....... USABLE SHOULDER WIDTH (AVG. WIDTH IN FT.)... PERCENT NO PASSING ZONES.................... B) CORRECTION FACTORS LEVEL TERRAIN E E E f f f LOS T B R w d HV ----- ---,-- ----- ----- ----- ----- A 2 1.8 2.2 .84 .94 .91 B 2.2 2 2.5 .84 .94 .89 C 2.2 2 2.5 .84 .94 .89 0 2 1.6 1.6 .84 .94 .94 E 2 1.6 1.6 .87 .94 .94 C) LEVEL OF SERVICE RESULTS INPUT VOLUME(vph): 721 ACTUAL FLOW RATE: 913 SERVICE LOS FLOW RATE V/C --------- ----- A 140 .07 B 373 .19 C 668 .34 0 1222 .59 E 2145 1 LOS FOR GIVEN CONDITIONS: 0 2 2 5 50 .79 61 / 39 10 7 51 I I I I I I I I I I I I I I I I I I I 1985 HCM:TWO-LANE HIGHWAYS **************************************************************** FACILITY LOCATION.... NYS Route 25 ANALyST.............. DEA/SPL TIME OF ANALySIS..... DATE OF ANALySIS..... 10-03-1997 OTHER INFORMATION.... West of Tabor Rd.; 5-6 PM, Sat.; Existi ng A) ADJUSTMENT FACTORS PERCENTAGE OF TRUCKS........................ PERCENTAGE OF BUSES......................... PERCENTAGE OF RECREATIONAL VEHICLES......... DESIGN SPEED (MPH).......................... l?~}\J{ 1i(){J~ ~}\c:~()~............................ DIRECTIONAL DISTRIBUTION (UP/DOWN).......... LANE WIDTH (FT)............................. USABLE SHOULDER WIDTH (AVG. WIDTH IN FT.)... PERCENT NO PASSING ZONES.................... B) CORRECTION FACTORS LEVEL TERRAIN E E E f f f LOS T B R w d HV ----- ----- ----- ----- ----- ----- A 2 1.8 2.2 .84 .96 .91 B 2.2 2 2.5 .84 .96 .89 C 2.2 2 2.5 .84 .96 .89 0 2 1.6 1.6 .84 .96 .94 E 2 1.6 1.6 .87 .96 .94 C) LEVEL OF SERVICE RESULTS INPUT VOLUME(vph): 562 ACTUAL FLOW RATE: 669 SERVICE LOS FLOW RATE V/C --------- ----- A 144 .07 B 383 .19 C 685 .34 0 1252 .59 E 2197 1 LOS FOR GIVEN CONDITIONS: C 2 2 5 50 .84 43 / 57 10 7 51 I I I I I I I I I I I I I I I I I I I 1985 HCM:TWO-LANE HIGHWAYS **************************************************************** FACILITY LOCATION.... NYS Route 25 ANALyST.............. DEA/SPL TIME OF ANALySIS..... DATE OF ANALySIS..... 10-03-1997 OTHER INFORMATION.... West of Tabor Rd.; 9-10 PM, Sat.; Exist ing A) ADJUSTMENT FACTORS ------------------------------------------------------------- PERCENTAGE OF TRUCKS........................ PERCENTAGE OF BUSES......................... PERCENTAGE OF RECREATIONAL VEHICLES......... DESIGN SPEED (MPH).......................... PEAK HOUR FACTOR............................ DIRECTIONAL DISTRIBUTION (UP/DOWN).......... lANE WIDTH (FT)............................. USABLE SHOULDER WIDTH (AVG. WIDTH IN FT.)... PERCENT NO PASSING ZONES.................... B) CORRECTION FACTORS 2 2 5 50 .68 48 / 52 10 7 51 ------------------------------------------------------------- LEVEL TERRAIN E E E f f f LOS T B R w d HV ----- ----- ----- ----- ----- ----- A 2 1.8 2.2 .84 .99 .91 B 2.2 2 2.5 .84 .99 .89 C 2.2 2 2.5 .84 .99 .89 D 2 1.6 1.6 .84 .99 .94 E 2 1.6 1.6 .87 .99 .94 C) LEVEL OF SERVICE RESULTS ------------------------------------------------------------- INPUT VOLUME(vph): 208 ACTUAL FLOW RATE: 306 SERVICE LOS FLOW RATE V/C --------- ----- A 148 .07 B 395 .19 C 706 .34 D 1291 .59 E 2266 1 LOS FOR GIVEN CONDITIONS: B I I I I I I I I I I I I I I I I I I I 1985 HCM:TWO-LANE HIGHWAYS **************************************************************** FACILITY LOCATION.... NYS Route 25 ANALYST. . . . . . . . . . .. .. DEA/SPL TIME OF ANALySIS..... DATE OF ANALySIS..... 10-03-1997 OTHER INFORMATION.... West of Tabor Rd.; 11-12 NOON, Sun.; Ex isting A) ADJUSTMENT FACTORS ------------------------------------------------------------- PERCENTAGE OF TRUCKS........................ PERCENTAGE OF BUSES......................... PERCENTAGE OF RECREATIONAL VEHICLES......... DESIGN SPEED (MPH).......................... PEAK HOUR FACTOR............................ DIRECTIONAL DISTRIBUTION (UP/DOWN).......... IA.NE WIDTH (FT)............................. USABLE SHOULDER WIDTH (AVG. WIDTH IN FT.)... PERCENT NO PASSING ZONES.................... B) CORRECTION FACTORS 2 2 5 50 .87 64 / 36 10 7 51 ------------------------------------------------------------- LEVEL TERRAIN E E E f f f LOS T B R w d HV ----- ----- ----- ----- ----- ----- A 2 1.8 2.2 .84 .92 .91 B 2.2 2 2.5 .84 .92 .89 C 2.2 2 2.5 .84 .92 .89 0 2 1.6 1.6 .84 .92 .94 E 2 1.6 1.6 .87 .92 .94 C) LEVEL OF SERVICE RESULTS ------------------------------------------------------------- INPUT VOLUME(vph): 736 ACTUAL FLOW RATE: 846 SERVICE LOS FLOW RATE V/C --------- ----- A 138 .07 B 367 .19 C 657 .34 0 1202 .59 E 2110 1 LOS FOR GIVEN CONDITIONS: 0 I I I I I I I I I I I I I I I I I I I 1985 HCM:TWO-LANE HIGHWAYS **************************************************************** FACILITY LOCATION.... NYS Route 25 ANALyST.............. DEA/SPL TIME OF ANALySIS..... DATE OF ANALySIS..... 10-03-1997 OTHER INFORMATION.... West of Tabor Rd.; 5-6 PM, Sun.; Existi ng A) ADJUSTMENT FACTORS ------------------------------------------------------------- PERCENTAGE OF TRUCKS........................ PERCENTAGE OF BUSES......................... PERCENTAGE OF RECREATIONAL VEHICLES......... DESIGN SPEED (MPH).......................... PEAl< IiOtJR Jr~C:T()R............................ DIRECTIONAL DISTRIBUTION (UP/DOWN).......... LANE WIDTH (FT)............................. USABLE SHOULDER WIDTH (AVG. WIDTH IN FT.)... PERCENT NO PASSING ZONES.................... B) CORRECTION FACTORS 2 2 5 50 .7 39 / 61 10 7 51 ------------------------------------------------------------- LEVEL TERRAIN E E E f f f LOS T B R w d HV ----- ----- ----- ----- ----- ----- A 2 1.8 2.2 .84 .94 .91 B 2.2 2 2.5 .84 .94 .89 C 2.2 2 2.5 .84 .94 .89 D 2 1.6 1.6 .84 .94 .94 E 2 1.6 1.6 .87 .94 .94 C) LEVEL OF SERVICE RESULTS ------------------------------------------------------------- INPUT VOLUME (vph) : 768 ACTUAL FLOW RATE: 1097 SERVICE LOS FLOW RATE V/C --------- ----- A 140 .07 B 373 .19 C 668 .34 D 1222 .59 E 2145 1 LOS FOR GIVEN CONDITIONS: D I I I I I I I I I I I I I I I I I I I 1985 HCM:TWO-LANE HIGHWAYS **************************************************************** FACILITY LOCATION.... NYS Route 25 ANALyST.............. DEA/SPL TIME OF ANALySIS..... DATE OF ANALySIS..... 10-03-1997 OTHER INFORMATION.... West of Tabor Rd.; 9-10 PM, Sun.; Exist ing A) ADJUSTMENT FACTORS ------------------------------------------------------------- PERCENTAGE OF TRUCKS........................ PERCENTAGE OF BUSES......................... PERCENTAGE OF RECREATIONAL VEHICLES......... DESIGN SPEED (MPH).......................... PEAK HOUR FACTOR....................................................... DIRECTIONAL DISTRIBUTION (UP/DOWN).......... IANE WIDTH (FT).......................................................... USABLE SHOULDER WIDTH (AVG. WIDTH IN FT.)... PERCENT NO PASSING ZONES.................... B) CORRECTION FACTORS 2 2 5 50 .7 34 / 66 10 7 51 ------------------------------------------------------------- LEVEL TERRAIN E E E f f f LOS T B R w d HV ----- ----- ----- ----- ----- ----- A 2 1.8 2.2 .84 .91 .91 B 2.2 2 2.5 .84 .91 .89 C 2.2 2 2.5 .84 .91 .89 D 2 1.6 1.6 .84 .91 .94 E 2 1.6 1.6 .87 .91 .94 C) LEVEL OF SERVICE RESULTS ------------------------------------------------------------- INPUT VOLUME(vph): 261 ACTUAL FLOW RATE: 373 SERVICE LOS FLOW RATE V/C --------- ----- A 137 .07 B 363 .19 C 650 .34 D 1189 .59 E 2087 1 LOS FOR GIVEN CONDITIONS: C I I I I I I I I I I I I I I I I I I I Route 25 East Marion/Orient Park to Narrow River Road 2002 Capacity Analysis (No-Build) Disk #390, Cross Sound Ferry File; Dividers I I I I I I I I I I I I I I I I I I I 1985 HCM:TWO-LANE HIGHWAYS **************************************************************** FACILITY LOCATION.... NYS Route 25 ANALyST.............. DEA/SPL TIME OF ANALySIS..... DATE OF ANALySIS..... 10-03-1997 OTHER INFORMATION.... West of Tabor Rd.; 11-12 NOON, weekday; 5 Year, no-build A) ADJUSTMENT FACTORS ------------------------------------------------------------- PERCENTAGE OF TRUCKS........................ PERCENTAGE OF BUSES......................... PERCENTAGE OF RECREATIONAL VEHICLES......... DESIGN SPEED (MPH).......................... PEAK HOUR FACTOR............................ DIRECTIONAL DISTRIBUTION (UP/DOWN).......... I..A.NE WIDTH (FT)........................................................ USABLE SHOULDER WIDTH (AVG. WIDTH IN FT.)... PERCENT NO PASSING ZONES.................... B) CORRECTION FACTORS 2 2 5 50 .76 59 / 41 10 7 51 ------------------------------------------------------------- LEVEL TERRAIN E E E f f f LOS T B R w d HV ----- ----- ----- ----- ----- ----- A 2 1.8 2.2 .84 .95 .91 B 2.2 2 2.5 .84 .95 .89 C 2.2 2 2.5 .84 .95 .89 D 2 1.6 1.6 .84 .95 .94 E 2 1.6 1.6 .87 .95 .94 C) LEVEL OF SERVICE RESULTS ------------------------------------------------------------- INPUT VOLUME(vph): 445 ACTUAL FLOW RATE: 586 SERVICE LOS FLOW RATE V/C --------- ----- A 142 .07 B 378 .19 C 676 .34 D 1236 .59 E 2170 1 LOS FOR GIVEN CONDITIONS: C I I I I I I I I I I I I I I I I I I I 1985 HCM:TWO-LANE HIGHWAYS **************************************************************** FACILITY LOCATION.... NYS Route 25 ANALyST.............. DEA/SPL TIME OF ANALySIS..... DATE OF ANALySIS..... 10-03-1997 OTHER INFORMATION.... West of Tabor Rd.; 5-6 PM, weekday; 5 Y ear, no-build A) ADJUSTMENT FACTORS ------------------------------------------------------------- PERCENTAGE OF TRUCKS........................ PERCENTAGE OF BUSES......................... PERCENTAGE OF RECREATIONAL VEHICLES......... DESIGN SPEED (MPH).......................... PEAK HOUR FACTOR............................ DIRECTIONAL DISTRIBUTION (UP/DOWN).......... LANE WIDTH (FT)............................. USABLE SHOULDER WIDTH (AVG. WIDTH IN FT.)... PERCENT NO PASSING ZONES.................... B) CORRECTION FACTORS 2 2 5 50 .84 54 / 46 10 7 51 LEVEL TERRAIN E E E f f f LOS T B R w d HV ----- ----- ----- ----- ----- ----- A 2 1.8 2.2 .84 .98 .91 B 2.2 2 2.5 .84 .98 .89 C 2.2 2 2.5 .84 .98 .89 D 2 1.6 1.6 .84 .98 .94 E 2 1.6 1.6 .87 .98 .94 C) LEVEL OF SERVICE RESULTS ------------------------------------------------------------- INPUT VOLUME(vph): 492 ACTUAL FLOW RATE: 586 SERVICE LOS FLOW RATE V/C --------- ----- A 147 .07 B 390 .19 C 697 .34 D 1275 .59 E 2239 1 LOS FOR GIVEN CONDITIONS: C I I I I I I I I I I I I I I I I I I I 1985 HCM:TWO-LANE HIGHWAYS **************************************************************** FACILITY LOCATION.... NYS Route 25 ANALyST.............. DEA/SPL TIME OF ANALySIS..... DATE OF ANALySIS..... 10-03-1997 OTHER INFORMATION.... West of Tabor Rd.; 9-10 PM, weekday; 5 Year, no-build A) ADJUSTMENT FACTORS ------------------------------------------------------------- PERCENTAGE OF TRUCKS........................ PERCENTAGE OF BUSES......................... PERCENTAGE OF RECREATIONAL VEHICLES......... DESIGN SPEED (NPH).......................... PEJ\l{ H()tJ~ ~J\C:~()~............................ DIRECTIONAL DISTRIBUTION (UP/DOWN).......... LANE WIDTH (FT)............................. USABLE SHOULDER WIDTH (AVG. WIDTH IN FT.)... PERCENT NO PASSING ZONES.................... B) CORRECTION FACTORS 2 2 5 50 .61 46 / 54 10 7 51 ------------------------------------------------------------- LEVEL TERRAIN E E E f f f LOS T B R w d HV ----- ----- ----- ----- ----- ----- A 2 1.8 2.2 .84 .98 .91 B 2.2 2 2.5 .84 .98 .89 C 2.2 2 2.5 .84 .98 .89 0 2 1.6 1.6 .84 .98 .94 E 2 1.6 1.6 .87 .98 .94 C) LEVEL OF SERVICE RESULTS ------------------------------------------------------------- INPUT VOLUME(vph): 211 ACTUAL FLOW RATE: 346 SERVICE LOS FLOW RATE V/C --------- ----- A 147 .07 B 390 .19 C 697 .34 D 1275 .59 E 2239 1 LOS FOR GIVEN CONDITIONS: B I I I I I I I I I I I I I I I I I I I 1985 HCM:TWO-LANE HIGHWAYS **************************************************************** FACILITY LOCATION.... NYS Route 25 ANALyST.............. DEA/SPL TIME OF ANALySIS..... DATE OF ANALySIS..... 10-03-1997 OTHER INFORMATION.... West of Tabor Rd.; 11-12 NOON, Sat.; 5 Year, no-build A) ADJUSTMENT FACTORS PERCENTAGE OF TRUCKS........................ PERCENTAGE OF BUSES......................... PERCENTAGE OF RECREATIONAL VEHICLES......... DESIGN SPEED (MPH).......................... PEAl< }lOUR ~ACT()R....................................................... DIRECTIONAL DISTRIBUTION (UP/DOWN).......... LANE WIDTH (FT)............................. USABLE SHOULDER WIDTH (AVG. WIDTH IN FT.)... PERCENT NO PASSING ZONES.................... B) CORRECTION FACTORS 2 2 5 50 .79 60 / 40 10 7 51 LEVEL TERRAIN E E E f f f LOS T B R w d HV ----- ----- ----- ----- ----- ----- A 2 1.8 2.2 .84 .94 .91 B 2.2 2 2.5 .84 .94 .89 C 2.2 2 2.5 .84 .94 .89 D 2 1.6 1.6 .84 .94 .94 E 2 1.6 1.6 .87 .94 .94 C) LEVEL OF SERVICE RESULTS ------------------------------------------------------------- INPUT VOLUME(vph): 823 ACTUAL FLOW RATE: 1042 SERVICE LOS FLOW RATE V/C --------- ----- A 141 .07 B 375 .19 C 672 .34 D 1228 .59 E 2156 1 LOS FOR GIVEN CONDITIONS: D I I I I I I I I I I I I I I I I I I I 1985 HCM:TWO-LANE HIGHWAYS **************************************************************** FACILITY LOCATION.... NYS Route 25 ANALyST.............. DEA/SPL TIME OF ANALySIS..... DATE OF ANALySIS..... 10-03-1997 OTHER INFORMATION.... West of Tabor Rd.; 5-6 PM, Sat.; 5 Year , no-build A) ADJUSTMENT FACTORS ------------------------------------------------------------- PERCENTAGE OF TRUCKS........................ PERCENTAGE OF BUSES......................... PERCENTAGE OF RECREATIONAL VEHICLES......... DESIGN SPEED (MPH).......................... PEAK HOUR FACTOR....................................................... DIRECTIONAL DISTRIBUTION (UP/DOWN).......... IANE WIDTH (FT).......................................................... USABLE SHOULDER WIDTH (AVG. WIDTH IN FT.)... PERCENT NO PASSING ZONES.................... B) CORRECTION FACTORS 2 2 5 50 .84 44 / 56 10 7 51 ------------------------------------------------------------- LEVEL TERRAIN E E E f f f LOS T B R w d HV ----- ----- ----- ----- ----- ----- A 2 1.8 2.2 .84 .96 .91 B 2.2 2 2.5 .84 .96 .89 C 2.2 2 2.5 .84 .96 .89 0 2 1.6 1.6 .84 .96 .94 E 2 1.6 1.6 .87 .96 .94 C) LEVEL OF SERVICE RESULTS ------------------------------------------------------------- INPUT VOLUME (vph) : 641 ACTUAL FLOW RATE: 763 SERVICE LOS FLOW RATE V/C --------- ----- A 145 .07 B 385 .19 C 689 .34 0 1260 .59 E 2211 1 LOS FOR GIVEN CONDITIONS: 0 I I I I I I I I I I I I I I I I I I I 1985 HCM:TWO-LANE HIGHWAYS **************************************************************** FACILITY LOCATION.... NYS Route 25 ANALyST.............. DEA/SPL TIME OF ANALySIS..... DATE OF ANALySIS..... 10-03-1997 OTHER INFORMATION.... West of Tabor Rd.; 9-10 PM, Sat.; 5 Yea r, no-build A) ADJUSTMENT FACTORS ------------------------------------------------------------- PERCENTAGE OF TRUCKS........................ PERCENTAGE OF BUSES......................... PERCENTAGE OF RECREATIONAL VEHICLES......... DESIGN SPEED (MPH).......................... l?~~l< li()lJFt lrJ\c;1r()~............................ DIRECTIONAL DISTRIBUTION (UP/DOWN).......... LANE WIDTH (FT)............................. USABLE SHOULDER WIDTH (AVG. WIDTH IN FT.)... PERCENT NO PASSING ZONES.................... B) CORRECTION FACTORS 2 2 5 50 .68 49 / 51 10 7 51 ------------------------------------------------------------- LEVEL TERRAIN E E E f f f LOS T B R w d HV ----- ----- ----- ----- ----- ----- A 2 1.8 2.2 .84 .99 .91 B 2.2 2 2.5 .84 .99 .89 C 2.2 -, 2.5 .84 .99 .89 .. D 2 1.6 1.6 .84 .99 .94 E 2 1.6 1.6 .87 .99 .94 C) LEVEL OF SERVICE RESULTS ------------------------------------------------------------- INPUT VOLUME(vph): 231 ACTUAL FLOW RATE: 340 SERVICE LOS FLOW RATE V/C --------- ----- A 149 .07 B 397 .19 C 710 .34 D 1299 .59 E 2280 1 LOS FOR GIVEN CONDITIONS: B I I I I I I I I I I I I I I I I I I II ! 1985 HCM:TWO-LANE HIGHWAYS **************************************************************** FACILITY LOCATION.... NYS Route 25 ANALyST.............. DEAISPL TIME OF ANALySIS..... DATE OF ANALySIS..... 10-03-1997 OTHER INFORMATION.... West of Tabor Rd.; 11-12 NOON, Sun.; 5 Year, no-build A) ADJUSTMENT FACTORS ------------------------------------------------------------- PERCENTAGE OF TRUCKS........................ PERCENTAGE OF BUSES......................... PERCENTAGE OF RECREATIONAL VEHICLES......... DESIGN SPEED (MPH).......................... PEAK HOUR FACTOR..................................................... DIRECTIONAL DISTRIBUTION (UP/DOWN).......... LANE WIDTH (FT)............................. USABLE SHOULDER WIDTH (AVG. WIDTH IN FT.)... PERCENT NO PASSING ZONES.................... B) CORRECTION FACTORS 2 2 5 50 .87 64 I 36 10 7 51 ------------------------------------------------------------- LEVEL TERRAIN E E E f f f LOS T B R w d HV ----- ----- ----- ----- ----- ----- A 2 1.8 2.2 .84 .92 .91 B 2.2 2 2.5 .84 .92 .89 C 2.2 2 2.5 .84 .92 .89 0 2 1.6 1.6 .84 .92 .94 E 2 1.6 1.6 .87 .92 .94 C) LEVEL OF SERVICE RESULTS ------------------------------------------------------------- INPUT VOLUME(vph): 843 ACTUAL FLOW RATE: 969 SERVICE LOS FLOW RATE VIC --------- ----- A 138 .07 B 367 .19 C 657 .34 D 1202 .59 E 2110 1 LOS FOR GIVEN CONDITIONS: 0 I I I I I I I I I I I I I I I I I I I 1985 HCM:TWO-LANE HIGHWAYS **************************************************************** FACILITY LOCATION.... NYS Route 25 ANALyST.............. DEA/SPL TIME OF ANALySIS..... DATE OF ANALySIS..... 10-03-1997 OTHER INFORMATION.... West of Tabor Rd.; 5-6 PM, Sun.; 5 Year , no-build A) ADJUSTMENT FACTORS ------------------------------------------------------------- PERCENTAGE OF TRUCKS........................ PERCENTAGE OF BUSES......................... PERCENTAGE OF RECREATIONAL VEHICLES......... DESIGN SPEED {MPH).......................... PEAK HOUR FACTOR....................................................... DIRECTIONAL DISTRIBUTION {UP/DOWN).......... lANE WIDTH eFT)......................................................... USABLE SHOULDER WIDTH (AVG. WIDTH IN FT.)... PERCENT NO PASSING ZONES.................... B) CORRECTION FACTORS 2 2 5 50 .7 39 / 61 10 7 51 ------------------------------------------------------------- LEVEL TERRAIN E E E f f f LOS T B R w d HV ----- ----- ----- ----- ----- ----- A 2 1.8 2.2 .84 .94 .91 B 2.2 :2 2.5 .84 .94 .89 C 2.2 :2 2.5 .84 .94 .89 D 2 1.6 1.6 .84 .94 .94 E 2 1.6 1.6 .87 .94 .94 C) LEVEL OF SERVICE RESULTS ------------------------------------------------------------- INPUT VOLUME{vph): 872 ACTUAL FLOW RATE: 1246 SERVICE LOS FLOW RATE V/C --------- ----- A 140 .07 B 373 .19 C 668 .34 D 1222 .59 E 2145 1 LOS FOR GIVEN CONDITIONS: E I I I I I I I I I I I I I I I I I I I 1985 HCM:TWO-LANE HIGHWAYS **************************************************************** FACILITY LOCATION.... NYS Route 25 ANALyST.............. DEA/SPL TIME OF ANALySIS..... DATE OF ANALySIS..... 10-03-1997 OTHER INFORMATION.... West of Tabor Rd.; 9-10 PM, Sun.; 5 Yea r, no-build A) ADJUSTMENT FACTORS ------------------------------------------------------------- PERCENTAGE OF TRUCKS........................ PERCENTAGE OF BUSES......................... PERCENTAGE OF RECREATIONAL VEHICLES......... DESIGN SPEED (MPH).......................... PEAl{ }fOUR ~ACT()~............................ DIRECTIONAL DISTRIBUTION (UP/DOWN).......... IANE WIDTH (FT)............................. USABLE SHOULDER WIDTH (AVG. WIDTH IN FT.)... PERCENT NO PASSING ZONES.................... B) CORRECTION FACTORS 2 2 5 50 .7 35 / 65 10 7 51 ------------------------------------------------------------- LEVEL TERRAIN E E E f f f LOS T B R w d HV ----- ----- ----- ----- ----- ----- A 2 1.8 2.2 .84 .92 .91 B 2.2 2 2.5 .84 .92 .89 C 2.2 2 2.5 .84 .92 .89 D 2 1.6 1.6 .84 .92 .94 E 2 1.6 1.6 .87 .92 .94 C) LEVEL OF SERVICE RESULTS ------------------------------------------------------------- INPUT VOLUME (vph) : 295 ACTUAL FLOW RATE: 421 SERVICE LOS FLOW RATE V/C --------- ----- A 137 .07 B 365 .19 C 654 .34 D 1196 .59 E 2099 1 LOS FOR GIVEN CONDITIONS: C I I I I I I I I I I I I I I I I I I I Route 25 East Marion/Orient Park to Narrow River Road 2002 Capacity Analysis (Build) Disk #390. Cross Sound Ferry File: Dividers I I I I I I I I I I I I I I I I I I 'I 1985 HCM:TWO-LANE HIGHWAYS **************************************************************** FACILITY LOCATION.... NYS Route 25 ANALyST.............. DEA/SPL TIME OF ANALySIS..... DATE OF ANALySIS..... 10-03-1997 OTHER INFORMATION.... West of Tabor Rd.; 11-12 NOON, weekday; 5 Year, build A) ADJUSTMENT FACTORS ------------------------------------------------------------- PERCENTAGE OF TRUCKS............... ......... PERCENTAGE OF BUSES......................... PERCENTAGE OF RECREATIONAL VEHICLES......... DESIGN SPEED (MPH).......................... PEAK HOUR FACTOR............................ DIRECTIONAL DISTRIBUTION (UP/DOWN).......... LANE WIDTH (FT)............................. USABLE SHOULDER WIDTH (AVG. WIDTH IN FT.)... PERCENT NO PASSING ZONES.................... B) CORRECTION FACTORS 2 2 5 50 .76 65 / 35 10 7 51 ------------------------------------------------------------- LEVEL TERRAIN E E E f f f LOS T B R w d HV ----- ----- ----- ----- ----- ----- A 2 1.8 2.2 .84 .92 .91 B 2.2 :2 2.5 .84 .92 .89 C 2.2 2 2.5 .84 .92 .89 0 2 1.6 1.6 .84 .92 .94 E 2 1.6 1.6 .87 .92 .94 C) LEVEL OF SERVICE RESULTS ------------------------------------------------------------- INPUT VOLUME(vph): 485 ACTUAL FLOW RATE: 638 SERVICE LOS FLOW RATE V/C --------- _._--- A 137 .07 B 365 .19 C 654 .34 0 1196 .59 E 2099 1 LOS FOR GIVEN CONDITIONS: C I I I I I I I I I I I I I I I I I I I 1985 HCM:TWO-LANE HIGHWAYS **************************************************************** FACILITY LOCATION.... NYS Route 25 ANALyST.............. DEA/SPL TIME OF ANALySIS..... DATE OF ANALYSIS..".. 10-03-1997 OTHER INFORMATION.... West of Tabor Rd.; 5-6 PM, weekday; 5 Y ear, build A) ADJUSTMENT FACTORS ------------------------------------------------------------- PERCENTAGE OF TRUCKS........................ PERCENTAGE OF BUSES......................... PERCENTAGE OF RECREATIONAL VEHICLES......... DESIGN SPEED (MPH).................................................... PEAK HOUR FACTOR................................................. DIRECTIONAL DISTRIBUTION (UP/DOWN).......... LANE WIDTH (FT)............................. USABLE SHOULDER WIDTH (AVG. WIDTH IN FT.)... PERCENT NO PASSING ZONES.................... B) CORRECTION FACTORS 2 2 5 50 .84 54 / 46 10 7 51 ------------------------------------------------------------- LEVEL TERRAIN E E E f f f LOS T B R w d HV ----- ----- ----- ----- ----- ----- A 2 1.8 2.2 .84 .98 .91 B 2.2 2 2.5 .84 .98 .89 C 2.2 2 2.5 .84 .98 .89 0 2 1.6 1.6 .84 .98 .94 E 2 1.6 1.6 .87 .98 .94 C) LEVEL OF SERVICE RESULTS ------------------------------------------------------------- INPUT VOLUME(vph): 538 ACTUAL FLOW RATE: 640 SERVICE LOS FLOW RATE V/C --------- ----- A 147 .07 B 390 .19 C 697 .34 0 1275 .59 E 2239 1 LOS FOR GIVEN CONDITIONS: C I I I I I I I I I I I I I I I I I I I 1985 HCM:TWO-LANE HIGHWAYS *~.************************************************************** FACILITY LOCATION.... NYS Route 25 ANALYST. . . . . . . . . . . . .. DEA/SPL TIME OF ANALySIS..... DATE OF ANALySIS..... 10-03-1997 OTHER INFORMATION.... West of Tabor Rd.; 9-10 PM, weekday; 5 Year, build A) ADJUSTMENT FACTORS ------------------------------------------------------------- PERCENTAGE OF TRUCKS........................ PERCENTAGE OF BUSES......................... PERCENTAGE OF RECREATIONAL VEHICLES......... DESIGN SPEED (MPH).......................... PEAK HOUR FACTOR............................ DIRECTIONAL DISTRIBUTION (UP/DOWN).......... lA.NE WIDTH (FT)............................. USABLE SHOULDER WIDTH (AVG. WIDTH IN FT.)... PERCENT NO PASSING ZONES.................... B) CORRECTION FACTORS 2 2 5 50 .61 33 / 67 10 7 51 ------------------------------------------------------------- LEVEL TERRAIN E E E f f f LOS T B R w d HV ----- ----- ----- ----- ----- ----- A 2 1.8 2.2 .84 .91 .91 B 2.2 2 2.5 .84 .91 .89 C 2.2 2 2.5 .84 .91 .89 D 2 1.6 1.6 .84 .91 .94 E 2 1.6 1.6 .87 .91 .94 C) LEVEL OF SERVICE RESULTS ------------------------------------------------------------- INPUT VOLUME(vph): 254 ACTUAL FLOW RATE: 416 SERVICE LOS FLOW RATE V/C --------- ----- A 136 .07 B 361 .19 C 647 .34 D 1183 .59 E 2076 1 LOS FOR GIVEN CONDITIONS: C I I I I I I I I I I I I I I I I I I I 1985 HCM:TWO-LANE HIGHWAYS *.~************************************************************** FACILITY LOCATION.... NYS Route 25 ANALyST.............. DEA/SPL TIME OF ANALySIS..... DATE OF ANALySIS..... 10-03-1997 OTHER INFORMATION.... West of Tabor Rd.; 11-12 NOON, Sat.; 5 Year, build A) ADJUSTMENT FACTORS ------------------------------------------------------------- PERCENTAGE OF TRUCKS........................ PERCENTAGE OF BUSES......................... PERCENTAGE OF RECREATIONAL VEHICLES......... DESIGN SPEED (MPH).......................... PEAK HOUR FACTOR............................ DIRECTIONAL DISTRIBUTION (UP/DOWN).......... LA.NE WIDTH (FT)............................. USABLE SHOULDER WIDTH (AVG. WIDTH IN FT.)... PERCENT NO PASSING ZONES.................... B) CORRECTION FACTORS 2 2 5 50 .79 63 / 37 10 7 51 ------------------------------------------------------------- LEVEL TERRAIN E E E f f f LOS T B R w d HV ----- ----- ----- ----- ----- ----- A 2 1.8 2.2 .84 .93 .91 B 2.2 2 2.5 .84 .93 .89 C 2.2 2 2.5 .84 .93 .89 D 2 1.6 1.6 .84 .93 .94 E 2 1.6 1.6 .87 .93 .94 C) LEVEL OF SERVICE RESULTS ------------------------------------------------------------- INPUT VOLUME(vph): 874 ACTUAL FLOW RATE: 1106 SERVICE LOS FLOW RATE V/C --------- .----- A 139 .07 B 369 .19 C 661 .34 D 1209 .59 E 2122 1 LOS FOR GIVEN CONDITIONS: D I I I I I I I I I I I I I I I I I I I 1985 HCM:TWO-LANE HIGHWAYS **************************************************************** FACILITY LOCATION.... NYS Route 25 ANALyST.............. DEA/SPL TIME OF ANALySIS..... DATE OF ANALySIS..... 10-03-1997 OTHER INFORMATION.... West of Tabor Rd.; 5-6 PM, Sat.; 5 Year , build A) ADJUSTMENT FACTORS ------------------------------------------------------------- PERCENTAGE OF TRUCKS........................ PERCENTAGE OF BUSES......................... PERCENTAGE OF RECREATIONAL VEHICLES......... DESIGN SPEED (MPH).................................................... PEAl{ flOUR FACTOR...................................................... DIRECTIONAL DISTRIBUTION (UP/DOWN).......... LANE WIDTH (FT)......................................................... USABLE SHOULDER WIDTH (AVG. WIDTH IN FT.)... PERCENT NO PASSING ZONES.................... B) CORRECTION FACTORS LEVEL TERRAIN E E E f f f LOS T B R w d HV ----- ----- ----- ----- ----- ----- A 2 1.8 2.2 .84 .96 .91 B 2.2 2 2.5 .84 .96 .89 C 2.2 2 2.5 .84 .96 .89 0 2 1.6 1.6 .84 .96 .94 E 2 1.6 1.6 .87 .96 .94 C) LEVEL OF SERVICE RESULTS INPUT VOLUME (vph) : 683 ACTUAL FLOW RATE: 813 SERVICE LOS FLOW RATE V/C --------- ----- A 145 .07 B 385 .19 C 689 .34 0 1260 .59 E 2211 1 LOS FOR GIVEN CONDITIONS: 0 2 2 5 50 .84 44 / 56 10 7 51 I I I I I I I I I I I I I I I I I I I 1985 HCM:TWO-LANE HIGHWAYS **************************************************************** FACILITY LOCATION.... NYS Route 25 ANALyST.............. DEA/SPL TIME OF ANALySIS..... DATE OF ANALySIS..... 10-03-1997 OTHER INFORMATION.... West of Tabor Rd.; 9-10 PM, Sat.; 5 Yea r, build A) ADJUSTMENT FACTORS ------------------------------------------------------.------- PERCENTAGE OF TRUCKS........................ PERCENTAGE OF BUSES......................... PERCENTAGE OF RECREATIONAL VEHICLES......... DESIGN SPEED (MPH).......................... PE~ H()~ FAC~()~............................ 2 2 5 50 .68 37 / 63 10 7 51 DIRECTIONAL DISTRIBUTION (UP/DOWN).......... I..ANE WIDTH eFT)............................. USABLE SHOULDER WIDTH (AVG. WIDTH IN FT.)... PERCENT NO PASSING ZONES.................... B) CORRECTION FACTORS ------------------------------------------------------------- LEVEL TERRAIN E E E f f f LOS T B R w d HV ----- ----- ----- ----- ----- ----- A 2 1.8 2.2 .84 .93 .91 B 2.2 2 2.5 .84 .93 .89 C 2.2 2 2.5 .84 .93 .89 D 2 1.6 1.6 .84 .93 .94 E 2 1.6 1.6 .87 .93 .94 C) LEVEL OF SERVICE RESULTS ------------------------------------------------------------- INPUT VOLUME(vph): 271 ACTUAL FLOW RATE: 399 SERVICE LOS FLOW RATE V/C --------- ----- A B C D E 139 369 661 1209 2122 .07 .19 .34 .59 1 LOS FOR GIVEN CONDITIONS: C I I I I I I I I I I I I I I I I I I I 1985 HCM:TWO-LANE HIGHWAYS **************************************************************** FACILITY LOCATION.... NYS Route 25 ANALyST.............. DEA/SPL TIME OF ANALySIS..... DATE OF ANALySIS..... 10-03-1997 OTHER INFORMATION.... West of Tabor Rd.; 11-12 NOON, Sun.; 5 Year, build A) ADJUSTMENT FACTORS ------------------------------------------------------------- PERCENTAGE OF TRlJClC!;........................ PERCENTAGE OF BlJSES......................... PERCENTAGE OF RECREATIONAL VEHICLES......... DESIGN SPEED (MPH).......................... PEAK HOUR FACTOR............................ DIRECTIONAL DISTRIBlJTION (lJP/DOWN).......... lANE WIDTH eFT)............................. lJSABLE SHOlJLDER WIDTH (AVG. WIDTH IN FT.)... PERCENT NO PASSING ZONES.................... 2 2 5 50 .87 66 I 34 10 7 51 B) CORRECTION FACTORS ------------------------------------------------------------- LEVEL TERRAIN E E E f f f LOS T B R w d HV ----- ----- ----- ----- ----- ----- A 2 1.8 2.2 .84 .91 .91 B 2.2 2 2.5 .84 .91 .89 C 2.2 2 2.5 .84 .91 .89 D 2 1.6 1.6 .84 .91 .94 E 2 1.6 1.6 .87 .91 .94 C) LEVEL OF SERVICE RESlJLTS ------------------------------------------------------------- INPlJT VOLlJME(vph): 890 ACTlJAL FLOW RATE: 1023 SERVICE LOS FLOW RATE V/C --------- ----- A 137 .07 B 363 .19 C 650 .34 D 1189 .59 E 2087 1 LOS FOR GIVEN CONDITIONS: D I I I I I I I I I I I I I I I I I I I 1985 HCM:TWO-LANE HIGHWAYS **************************************************************** FACILITY LOCATION.... NYS Route 25 ANALyST.............. DEA/SPL TIME OF ANALySIS..... DATE OF ANALySIS..... 10-03-1997 OTHER INFORMATION.... West of Tabor Rd.; 5-6 PM, Sun.; 5 Year , build A) ADJUSTMENT FACTORS ------------------------------------------------------------- PERCENTAGE OF TRUCKS........................ PERCENTAGE OF BUSES......................... PERCENTAGE OF RECREATIONAL VEHICLES......... DESIGN SPEED (MPH).......................... PEAle H()~ FA~()R............................ DIRECTIONAL DISTRIBUTION (UP/DOWN).......... lANE WIDTH eFT)............................. USABLE SHOULDER WIDTH (AVG. WIDTH IN FT.)... PERCENT NO PASSING ZONES.................... 2 2 5 50 .7 40 / 60 10 7 51 B) CORRECTION FACTORS ------------------------------------------------------------- LEVEL TERRAIN E E E f f f LOS T B R w d HV ----- ----- ----- ----- ----- ----- A 2 1.8 2.2 .84 .94 .91 B 2.2 2 2.5 .84 .94 .89 C 2.2 2 2.5 .84 .94 .89 D 2 1.6 1.6 .84 .94 .94 E 2 1.6 1.6 .87 .94 .94 C) LEVEL OF SERVICE RESULTS ------------------------------------------------------------- INPUT VOLUME (vph) : 921 ACTUAL FLOW RATE: 1316 SERVICE LOS FLOW RATE V/C --------- ----- A 141 .07 B 375 .19 C 672 .34 D 1228 .59 E 2156 1 LOS FOR GIVEN CONDITIONS: E I I I I I I I I I I I I I I I I I I I 1985 HCM:TWO-LANE HIGHWAYS **************************************************************** FACILITY LOCATION.... NYS Route 25 ANALyST.............. DEA/SPL TIME OF ANALySIS..... DATE OF ANALySIS..... 10-03-1997 OTHER INFORMATION.... West of Tabor Rd.; 9-10 PM, Sun.; 5 Yea r, build A) ADJUSTMENT FACTORS ------------------------------------------------------------- PERCENTAGE OF TRUCKS........................ PERCENTAGE OF BUSES......................... PERCENTAGE OF RECREATIONAL VEHICLES......... DESIGN SPEED (MPH).......................... 2 2 5 50 .7 28 / 72 10 7 51 l?~ Jf()~ ~~C:~()Il............................ DIRECTIONAL DISTRIBUTION (UP/DOWN).......... IA.NE WIDTH. eFT)............................. USABLE SHOULDER WIDTH (AVG. WIDTH IN FT.)... PERCENT NO PASSING ZONES.................... B) CORRECTION FACTORS ------------------------------------------------------------- LEVEL TERRAIN E E E f f f LOS T B R w d HV ----- ----- ----- ----- ----- ----- A 2 1.8 2.2 .84 .88 .91 B 2.2 2 2.5 .84 .88 .89 C 2.2 2 2.5 .84 .88 .89 D 2 1.6 1.6 .84 .88 .94 E 2 1.6 1.6 .87 .88 .94 C) LEVEL OF SERVICE RESULTS ------------------------------------------------------------- INPUT VOLUME (vph) : 336 ACTUAL FLOW RATE: 480 SERVICE LOS FLOW RATE V/C --------- ----- A 132 .07 B 351 .19 C 627 .34 D 1147 .59 E 2014 1 LOS FOR GIVEN CONDITIONS: C I I I I I I I I I I I I I I I I I I I Route 25 East Marion/Orient Park to Narrow River Road 2007 Capacity Analysis (No-Build) Disk #390, Cross Sound Ferry File: Dividers I I I I I I I I I I I I I I I I I I I 1985 HCM:TWO-LANE HIGHWAYS **************************************************************** FACILITY LOCATION.... NYS Route 25 ANALyST.............. DEA/SPL TIME OF ANALySIS..... DATE OF ANALySIS..... 10-03-1997 OTHER INFORMATION.... West of Tabor Rd.; 11-12 NOON, weekday; 10 Year, nO-build A) ADJUSTMENT FACTORS ------------------------------------------------------------- PERCENTAGE OF TRUCKS........................ PERCENTAGE OF BUSES......................... PERCENTAGE OF RECREATIONAL VEHICLES......... DESIGN SPEED (MPH).......................... PEAK HOUR FACTOR............................ DIRECTIONAL DISTRIBUTION (UP/DOWN).......... lANE WIDTH eFT)............................. USABLE SHOULDER WIDTH (AVG. WIDTH IN FT.)... PERCENT NO PASSING ZONES.................... 2 2 5 50 .76 58 / 42 10 7 51 B) CORRECTION FACTORS ------------------------------------------------------------- LEVEL TERRAIN E E E f f f LOS T B R w d HV ----- ----- ----- ----- ----- ----- A 2 1.8 2.2 .84 .95 .91 B 2.2 2 2.5 .84 .95 .89 C 2.2 2 2.5 .84 .95 .89 D 2 1.6 1.6 .84 .95 .94 E 2 1.6 1.6 .87 .95 .94 C) LEVEL OF SERVICE RESULTS ------------------------------------------------------------- INPUT VOLUME(vph): 515 ACTUAL FLOW RATE: 678 SERVICE LOS FLOW RATE V/C --------- ----- A 143 .07 B 380 .19 C 680 .34 D 1244 .59 E 2184 1 LOS FOR GIVEN CONDITIONS: C I I I I I I I I I I I I I I I I I I I 1985 HCM:TWO-LANE HIGHWAYS **************************************************************** FACILITY LOCATION.... NYS Route 25 ANALyST.............. DEA/SPL TIME OF ANALySIS..... DATE OF ANALySIS..... 10-03-1997 OTHER INFORMATION.... West of Tabor Rd.; 5-6 PM, weekday; 10 Year, nO-build .A) ADJUSTMENT FACTORS ------------------------------------------------------------- PERCENTAGE OF TRUCKS........................ PERCENTAGE OF BUSES......................... PERCENTAGE OF RECREATIONAL VEHICLES......... DESIGN SPEED (MPH).......................... PEJllC 11()~ FA~()R............................ DIRECTIONAL DISTRIBUTION (UP/DOWN).......... u.NE WIDTH eFT)............................. USABLE SHOULDER WIDTH (AVG. WIDTH IN FT.)... PERCENT NO PASSING ZONES.................... 2 2 5 50 .84 55 / 45 10 7 51 B) CORRECTION FACTORS ------------------------------------------------------------- LEVEL TERRAIN E E E f f f LOS T B R w d HV ----- ----- ----- ----- ----- ----- A 2 1.8 2.2 .84 .97 .91 B 2.2 2 2.5 .84 .97 .89 C 2.2 2 2.5 .84 .97 .89 D 2 1.6 1.6 .84 .97 .94 E 2 1.6 1.6 .87 .97 .94 C) LEVEL OF SERVICE RESULTS ------------------------------------------------------------- INPUT VOLUME (vph) : 559 ACTUAL FLOW RATE: 665 SERVICE LOS FLOW RATE V/C --------- ----- A 146 .07 B 387 .19 C 693 .34 D 1267 .59 E 2225 1 LOS FOR GIVEN CONDITIONS: C I I I I I I I I I I I I I I I I I I I 1985 HCM:TWO-LANE HIGHWAYS **************************************************************** FACILITY LOCATION.... NYS Route 25 ANALyST.............. DEA/SPL TIME OF ANALySIS..... DATE OF ANALySIS..... 10-03-1997 OTHER INFORMATION.... West of Tabor Rd.; 9-10 PM, weekday; 10 Year, nO-build A) ADJUSTMENT FACTORS ------------------------------------------------------------- PERCENTAGE OF TRUCKS........................ PERCENTAGE OF BUSES......................... PERCENTAGE OF RECREATIONAL VEHICLES......... DESIGN SPEED (MPH).......................... PEAK HOUR FACTOR............................ DIRECTIONAL DISTRIBUTION (UP/DOWN).......... lANE WIDTH eFT)............................. USABLE SHOULDER WIDTH (AVG. WIDTH IN FT.)... PERCENT NO PASSING ZONES.................... 2 2 5 50 .61 48 / 52 10 7 51 B) CORRECTION FACTORS ------------------------------------------------------------- LEVEL TERRAIN E E E f f f LOS T B R w d HV ----- ----- ----- ----- ----- ----- A 2 1.8 2.2 .84 .99 .91 B 2.2 2 2.5 .84 .99 .89 C 2.2 2 2.5 .84 .99 .89 D 2 1.6 1.6 .84 .99 .94 E 2 1.6 1.6 .87 .99 .94 C) LEVEL OF SERVICE RESULTS ------------------------------------------------------------- INPUT VOLUME(vph): 238 ACTUAL FLOW RATE: 390 SERVICE LOS FLOW RATE V/C --------- ----- A 148 .07 B 395 .19 C 706 .34 D 1291 .59 E 2266 1 LOS FOR GIVEN CONDITIONS: B I I I I I I I I I I I I I I I I I I I 1985 HCM:TWO-LANE HIGHWAYS **************************************************************** FACILITY LOCATION.... NYS Route 25 ANALyST.............. DEA/SPL TIME OF ANALySIS..... DATE OF ANALySIS..... 10-03-1997 OTHER INFORMATION.... West of Tabor Rd.; 11-12 NOON, Sat.; 10 Year, nO-build A) ADJUSTMENT FACTORS ------------------------------------------------------------- PERCENTAGE OF TRUCKS........................ PERCENTAGE OF BUSES......................... PERCENTAGE OF RECREATIONAL VEHICLES......... DESIGN SPEED (MPH).......................... PEAK HOUR FACTOR............................ DIRECTIONAL DISTRIBUTION (UP/DOWN).......... LANE WIDTH (FT)............................. USABLE SHOULDER WIDTH (AVG. WIDTH IN FT.)... PERCENT NO PASSING ZONES.................... 2 2 5 50 .79 59 / 41 10 7 51 B) CORRECTION FACTORS ------------------------------------------------------------- LEVEL TERRAIN E E E f f f LOS T B R w d HV ----- ----- ----- ----- ----- ----- A 2 1.8 2.2 .84 .95 .91 B 2.2 2 2.5 .84 .95 .89 C 2.2 2 2.5 .84 .95 .89 0 2 1.6 1.6 .84 .95 .94 E 2 1.6 1.6 .87 .95 .94 C) LEVEL OF SERVICE RESULTS ------------------------------------------------------------- INPUT VOLUME (vph) : 941 ACTUAL FLOW RATE: 1191 SERVICE LOS FLOW RATE V/C --------- ----- A 142 .07 B 378 .19 C 676 .34 0 1236 .59 E 2170 1 LOS FOR GIVEN CONDITIONS: 0 I I I I I I I I I I I I I I I I I I I 1985 HCM:TWO-LANE HIGHWAYS **************************************************************** FACILITY LOCATION.... NYS Route 25 ANALyST.............. DEA/SPL TIME OF ANALySIS..... DATE OF ANALySIS..... 10-03-1997 OTHER INFORMATION.... West of Tabor Rd.; 5-6 PM, Sat.; 10 Yea r, nO-build A) ADJUSTMENT FACTORS ------------------------------------------------------------- PERCENTAGE OF TRUCKS........................ PERCENTAGE OF BUSES......................... PERCENTAGE OF RECREATIONAL VEHICLES......... DESIGN SPEED (MPH).......................... PEAK HOUR FACTOR............................ 2 2 5 50 .84 45 / 55 10 7 51 DIRECTIONAL DISTRIBUTION (UP/DOWN).......... IANE WIDTH (FT)............................. USABLE SHOULDER WIDTH (AVG. WIDTH IN FT.)... PERCENT NO PASSING ZONES.................... B) CORRECTION FACTORS ------------------------------------------------------------- LEVEL TERRAIN E E E f f f LOS T B R w d HV ----- ----- ----- ----- ----- ----- A 2 1.8 2.2 .84 .97 .91 B 2.2 2 2.5 .84 .97 .89 C 2.2 2 2.5 .84 .97 .89 D 2 1.6 1.6 .84 .97 .94 E 2 1.6 1.6 .87 .97 .94 C) LEVEL OF SERVICE RESULTS ------------------------------------------------------------- INPUT VOLUME(vph): 720 ACTUAL FLOW RATE: 857 SERVICE LOS FLOW RATE V/C --------- ----- A 146 .07 B 387 .19 C 693 .34 D 1267 .59 E 2225 1 LOs FOR GIVEN CONDITIONS: D I I I I I I I I I I I I I I I I I I I 1985 HCM:TWO-LANE HIGHWAYS **************************************************************** FACILITY LOCATION.... NYS Route 25 ANALyST.............. DEA/SPL TIME OF ANALySIS..... DATE OF ANALySIS..... 10-03-1997 OTHER INFORMATION.... West of Tabor Rd.; 9-10 PM, Sat.; 10 Ye ar, nO-build A) ADJUSTMENT FACTORS ------------------------------------------------------------- PERCENTAGE OF TRUCKS........................ PERCENTAGE OF BUSES......................... PERCENTAGE OF RECREATIONAL VEHICLES......... DESIGN SPEED (MPH).......................... PEAl{ H()~ FAC~()Il............................ 2 2 5 50 .68 51 / 49 10 7 51 DIRECTIONAL DISTRIBUTION (UP/DOWN).......... IAN'E WIDTH eFT)............................. USABLE SHOULDER WIDTH (AVG. WIDTH IN FT.)... PERCENT NO PASSING ZONES.................... B) CORRECTION FACTORS ------------------------------------------------------------- LEVEL TERRAIN E E E f f f LOS T B R w d HV ----- ----- ----- ----- ----- ----- A 2 1.8 2.2 .84 .99 .91 B 2.2 2 2.5 .84 .99 .89 C 2.2 2 2.5 .84 .99 .89 D 2 1.6 1.6 .84 .99 .94 E 2 1.6 1.6 .87 .99 .94 C) LEVEL OF SERVICE RESULTS ------------------------------------------------------------- INPUT VOLUME(vph): 258 ACTUAL FLOW RATE: 379 SERVICE LOS FLOW RATE V/C --------- ----- A 149 .07 B 397 .19 C 710 .34 D 1299 .59 E 2280 1 LOS FOR GIVEN CONDITIONS: B I I I I I I I I I I I I I I I I I I I 1985 HCM:TWO-LANE HIGHWAYS **************************************************************** FACILITY LOCATION.... NYS Route 25 ANALyST.............. DEA/SPL TIME OF ANALySIS..... DATE OF ANALySIS..... 10-03-1997 OTHER INFORMATION.... West of Tabor Rd.; 11-12 NOON, Sun.; 10 Year, no-build A) ADJUSTMENT FACTORS ------------------------------------------------------------- PERCENTAGE OF TRUCKS........................ PERCENTAGE OF BUSES......................... PERCENTAGE OF RECREATIONAL VEHICLES......... DESIGN SPEED (MPH).......................... PEAK HOUR FACTOR............................ 2 2 5 50 .87 63 / 37 10 7 51 USABLE SHOULDER WIDTH (AVG. WIDTH IN FT.)... PERCENT NO PASSING ZONES.................... I..ANE WIDTH eFT)............................. DIRECTIONAL DISTRIBUTION (UP/DOWN).......... B) CORRECTION FACTORS ------------------------------------------------------------- LEVEL TERRAIN E E E f f f LOS T B R w d HV ----- ----- ----- ----- ----- ----- A 2 1.8 2.2 .84 .93 .91 B 2.2 2 2.5 .84 .93 .89 C 2.2 2 2.5 .84 .93 .89 D 2 1.6 1.6 .84 .93 .94 E 2 1.6 1.6 .87 .93 .94 C) LEVEL OF SERVICE RESULTS -----------------------------------~------------------------- INPUT VOLUME(vph): 945 ACTUAL FLOW RATE: 1086 SERVICE LOS FLOW RATE V/C --------- ----- A 139 .07 B 369 .19 C 661 .34 D 1209 .59 E 2122 1 LOS FOR GIVEN CONDITIONS: D I I I I I I I I I I I I I I I I I I I 1985 HCM:TWO-LANE HIGHWAYS **************************************************************** FACILITY LOCATION.... NYS Route 25 ANALyST.............. DEA/SPL TIME OF ANALySIS..... DATE OF ANALySIS..... 10-03-1997 OTHER INFORMATION.... West of Tabor Rd.; 5-6 PM, Sun.; 10 Yea r, no-build A) ADJUSTMENT FACTORS PERCENTAGE OF TRUCKS........................ PERCENTAGE OF BUSES......................... PERCENTAGE OF RECREATIONAL VEHICLES......... DESIGN SPEED (MPH).......................... P~lC }f()~ FA~()R............................ DIRECTIONAL DISTRIBUTION (UP/DOWN).......... IANE WIDTH eFT)............................. USABLE SHOULDER WIDTH (AVG. WIDTH IN FT.)... PERCENT NO PASSING ZONES.................... B) CORRECTION FACTORS LEVEL TERRAIN E E E f f f LOS T B R w d HV ----- ----- ----- ----- ----- ----- A 2 1.8 2.2 .84 .94 .91 B 2.2 2 2.5 .84 .94 .89 C 2.2 2 2.5 .84 .94 .89 D 2 1.6 1.6 .84 .94 .94 E 2 1.6 1.6 .87 .94 .94 C) LEVEL OF SERVICE RESULTS INPUT VOLUME (vph) : 994 ACTUAL FLOW RATE: 1420 SERVICE LOS FLOW RATE V/C --------- ----- A 140 .07 B 373 .19 C 668 .34 D 1222 .59 E 2145 1 LOS FOR GIVEN CONDITIONS: E 2 2 5 50 .7 39 / 61 10 7 51 I I I I I I I I I I I I I I I I I I I 1985 HCM:TWO-LANE HIGHWAYS **************************************************************** FACILITY LOCATION.... NYS Route 25 ANALyST.............. DEA/SPL TIME OF ANALySIS..... DATE OF ANALySIS..... 10-03-1997 OTHER INFORMATION.... West of Tabor Rd.; 9-10 PM, Sun.; 10 Ye ar, no-build A) ADJUSTMENT FACTORS ------------------------------------------------------------- PERCENTAGE OF TRUCKS........................ PERCENTAGE OF BUSES......................... PERCENTAGE OF RECREATIONAL VEHICLES......... DESIGN SPEED (MPH).......................... PEAK HOUR FACTOR............................ DIRECTIONAL DISTRIBUTION (UP/DOWN).......... IANE WIDTH CFT)............................. USABLE SHOULDER WIDTH (AVG. WIDTH IN FT.)... PERCENT NO PASSING ZONES.................... B) CORRECTION FACTORS 2 2 5 50 .7 36 / 64 10 7 51 ------------------------------------------------------------- LEVEL TERRAIN E E E f f f LOS T B R w d HV ----- ----- ----- ----- ----- ----- A 2 1.8 2.2 .84 .92 .91 B 2.2 2 2.5 .84 .92 .89 C 2.2 2 2.5 .84 .92 .89 D 2 1.6 1.6 .84 .92 .94 E 2 1.6 1.6 .87 .92 .94 C) LEVEL OF SERVICE RESULTS ------------------------------------------------------------- INPUT VOLUME(vph): 335 ACTUAL FLOW RATE: 479 SERVICE LOS FLOW RATE V/C --------- ----- A 138 .07 B 367 .19 C 657 .34 D 1202 .59 E 2110 1 LOS FOR GIVEN CONDITIONS: C I I I I I I I I I Route 25 East Marion/Orient Park to Narrow River Road 2007 Capacity Analysis (Build) i I I I I I I I I Disk #390, Cross Sound Ferry File: Dividers I I I I I I I I I 1985 HCM:TWO-LANE HIGHWAYS **************************************************************** FACILITY LOCATION.... NYS Route 25 ANALyST.............. DEA/SPL TIME OF ANALySIS..... DATE OF ANALySIS..... 10-03-1997 OTHER INFORMATION.... West of Tabor Rd.; 11-12 NOON, weekday; 10 Year, build AJ ADJUSTMENT FACTORS ------------------------------------------------------------- PERCENTAGE OF TRUCKS........................ 2 PERCENTAGE OF BUSES......................... 2 PERCENTAGE OF RECREATIONAL VEHICLES......... 5 DESIGN SPEED (MPH).......................... 50 PEAK HOUR FACTOR............................ .76 DIRECTIONAL DISTRIBUTION (UP/DOWN).......... 67/33 IANE WIDTH (FT)............................. 10 USABLE SHOULDER WIDTH (AVG. WIDTH IN FT.)... 7 PERCENT NO PASSING ZONES.................... 51 B) CORRECTION FACTORS ------------------------------------------------------------- I I I I I I I I I LEVEL TERRAIN E E E f f f LOS T B R w d HV ----- ----- ----- ----- ----- ----- A 2 1.8 2.2 .84 .91 .91 B 2.2 2 2.5 .84 .91 .89 C 2.2 2 2.5 .84 .91 .89 D 2 1.6 1.6 .84 .91 .94 E 2 1.6 1.6 .87 .91 .94 C) LEVEL OF SERVICE RESULTS INPUT VOLUME (vph) : 606 ACTUAL FLOW RATE: 797 SERVICE LOS FLOW RATE V/C --------- ----- A 136 .07 B 361 .19 C 647 .34 D 1183 .59 E 2076 1 LOS FOR GIVEN CONDITIONS: D I I I I I I I I I I I I I I I I I I I 1985 HCM:TWO-LANE HIGHWAYS *~,************************************************************** FACILITY LOCATION.... NYS Route 25 ANALYST. . . . . . . . . . .. .. DEA/SPL TIME OF ANALySIS..... DATE OF ANALySIS..... 10-03-1997 OTHER INFORMATION.... West of Tabor Rd.; 5-6 PM, weekday; 10 Year, build A) ADJUSTMENT FACTORS ------------------------------------------------------------- PERCENTAGE OF TRUCKS........................ PERCENTAGE OF BUSES......................... PERCENTAGE OF RECREATIONAL VEHICLES......... DESIGN SPEED (MPH).......................... PE~K fI()~ FA~()R............................ DIRECTIONAL DISTRIBUTION (UP/DOWN).......... IA.NE WIDTH eFT)............................. USABLE SHOULDER WIDTH (AVG. WIDTH IN FT.)... PERCENT NO PASSING ZONES.................... B) CORRECTION FACTORS 2 2 5 50 .84 53 / 47 10 7 51 ------------------------------------------------------------- LEVEL TERRAIN E E E f f f LOS T B R w d HV ----- ---.-- ----- ----- ----- ----- A 2 1.8 2.2 .84 .98 .91 B 2.2 2 2.5 .84 .98 .89 C 2.2 2 2.5 .84 .98 .89 D 2 1.6 1.6 .84 .98 .94 E 2 1.6 1.6 .87 .98 .94 C) LEVEL OF SERVICE RESULTS ------------------------------------------------------------- INPUT VOLUME (vph) : 657 ACTUAL FLOW RATE: 782 SERVICE LOS FLOW RATE V/C --------- ----- A 148 .07 B 392 .19 C 702 .34 D 1283 .59 E 2252 1 LOS FOR GIVEN CONDITIONS: D I I I I I I I I I I I I I I I I I I II 1985 HCM:TWO-LANE HIGHWAYS **************************************************************** FACILITY LOCATION.... NYS Route 25 ANALyST.............. DEA/SPL TIME OF ANALySIS..... DATE OF ANALySIS..... 10-03-1997 OTHER INFORMATION.... West of Tabor Rd.; 9-10 PM, weekday; 10 Year, build A) ADJUSTMENT FACTORS ------------------------------------------------------------- PERCENTAGE OF TRUCKS........................ PERCENTAGE OF BUSES......................... PERCENTAGE OF RECREATIONAL VEHICLES......... DESIGN SPEED (MPH).......................... PEAK fI()~ FA~()R............................ DIRECTIONAL DISTRIBUTION (UP/DOWN).......... lANE WIDTH eFT)............................. USABLE SHOULDER WIDTH (AVG. WIDTH IN FT.)... PERCENT NO PASSING ZONES.................... B) CORRECTION FACTORS 2 2 5 50 .61 31 I 69 10 7 51 ------------------------------------------------------------- LEVEL TERRAIN E E E f f f LOS T B R w d HV ----- ----- ----- ----- ----- ----- A 2 1.8 2.2 .84 .9 .91 B 2.2 2 2.5 .84 .9 .89 C 2.2 2 2.5 .84 .9 .89 D 2 1.6 1.6 .84 .9 .94 E 2 1.6 1.6 .87 .9 .94 e) LEVEL OF SERVICE RESULTS ------------------------------------------------------------- INPUT VOLUME(vph): 335 ACTUAL FLOW RATE: 549 SERVICE LOS FLOW RATE Vie --------- ----- A 134 .07 B 357 .19 e 640 .34 D 1169 .59 E 2053 1 LOS FOR GIVEN CONDITIONS: e 1985 HCM:TWO-LANE HIGHWAYS *~,*************************.************************************ I I I I I I I I I I I I I I I I I FACILITY LOCATION.... NYS Route 25 ANALyST.............. DEA/SPL TIME OF ANALySIS..... DATE OF ANALySIS..... 10-03-1997 OTHER INFORMATION.... West of Tabor Rd.; 11-12 NOON, Sat.; 10 Year, build A) ADJUSTMENT FACTORS ------------------------------------------------------------- PERCENTAGE OF TRUCKS........................ PERCENTAGE OF BUSES......................... PERCENTAGE OF RECREATIONAL VEHICLES......... DESIGN SPEED (MPH).......................... PEAl{ J{()tJli ~AC~R............................ DIRECTIONAL DISTRIBUTION (UP/DOWN).......... lANE WIDTH (FT)............................. USABLE SHOULDER WIDTH (AVG. WIDTH IN FT.)... PERCENT NO PASSING ZONES.................... B) CORRECTION FACTORS 2 2 5 50 .79 62 / 38 10 7 51 ------------------------------------------------------------- LEVEL TERRAIN E E E f f f LOS T B R w d HV ----- ----- ----- ----- ----- ----- A 2 1.8 2.2 .84 .93 .91 B 2.2 2 2.5 .84 .93 .89 C 2.2 2 2.5 .84 .93 .89 D 2 1.6 1.6 .84 .93 .94 E 2 1.6 1.6 .87 .93 .94 C) LEVEL OF SERVICE RESULTS ------------------------------------------------------------- INPUT VOLUME(vph): 1053 ACTUAL FLOW RATE: 1333 SERVICE LOS FLOW RATE V/C --------- ----- A 140 .07 B 371 .19 C 665 .34 D 1215 .59 E 2133 1 LOS FOR GIVEN CONDITIONS: E 1985 HCM:TWO-LANE HIGHWAYS **************************************************************** I I I I I I I I I I I I I I I I I FACILITY LOCATION.... NYS Route 25 ANALyST.............. DEA/SPL TIME OF ANALySIS..... DATE OF ANALySIS..... 10-03-1997 OTHER INFORMATION.... West of Tabor Rd.; 5-6 PM, Sat.; 10 Yea r, build A) ADJUSTMENT FACTORS ------------------------------------------------------------- PERCENTAGE OF TRUCKS........................ PERCENTAGE OF BUSES......................... PERCENTAGE OF RECREATIONAL VEHICLES......... DESIGN SPEED (MPH).......................... PEAK HOUR FACTOR............................ DIRECTIONAL DISTRIBUTION (UP/DOWN).......... LANE WIDTH eFT)............................. USABLE SHOULDER WIDTH (AVG. WIDTH IN FT.)... PERCENT NO PASSING ZONES.................... B) CORRECTION FACTORS 2 2 5 50 .84 45 / 55 10 7 51 ------------------------------------------------------------- LEVEL TERRAIN E E E f f f LOS T B R w d HV ----- ----- ----- ----- ----- ----- A 2 1.8 2.2 .84 .97 .91 B 2.2 2 2.5 .84 .97 .89 C 2.2 2 2.5 .84 .97 .89 D 2 1.6 1.6 .84 .97 .94 E 2 1.6 1.6 .87 .97 .94 C) LEVEL OF SERVICE RESULTS ------------------------------------------------------------- INPUT VOLUME(vph): 825 ACTUAL FLOW RATE: 982 SERVICE LOS FLOW RATE V/C --------- ----- A 146 .07 B 387 .19 C 693 .34 D 1267 .59 E 2225 1 LOS FOR GIVEN CONDITIONS: D I I I I I I I I I I I I I I I I I I I 1985 HCM:TWO-LANE HIGHWAYS **************************************************************** FACILITY LOCATION.... NYS Route 25 ANALyST.............. DEA/SPL TIME OF ANALySIS..... DATE OF ANALySIS..... 10-03-1997 OTHER INFORMATION.... West of Tabor Rd.; 9-10 PM, Sat.; 10 Ye ar, build A} ADJUSTMENT FACTORS ------------------------------------------------------------- PERCENTAGE OF TRUCKS........................ PERCENTAGE OF BUSES......................... PERCENTAGE OF RECREATIONAL VEHICLES......... DESIGN SPEED (MPH).......................... PEJllC fI()~ FA~()R............................ DIRECTIONAL DISTRIBUTION (UP/DOWN).......... IANE WIDTH (FT)............................. USABLE SHOULDER WIDTH (AVG. WIDTH IN FT.)... PERCENT NO PASSING ZONES.................... B) CORRECTION FACTORS 2 2 5 50 .68 35 / 65 10 7 51 ------------------------------------------------------------- LEVEL TERRAIN E E E f f f LOS T B R w d HV ----- ----- ----- ----- ----- ----- A 2 1.8 2.2 .84 .92 .91 B 2.2 2 2.5 .84 .92 .89 C 2.2 2 2.5 .84 .92 .89 D 2 1.6 1.6 .84 .92 .94 E 2 1.6 1.6 .87 .92 .94 C) LEVEL OF SERVICE RESULTS ------------------------------------------------------------- INPUT VOLUME (vph) : 348 ACTUAL FLOW RATE: 512 SERVICE LOS FLOW RATE V/C --------- ----- A 137 .07 B 365 .19 C 654 .34 D 1196 .59 E 2099 1 LOS FOR GIVEN CONDITIONS: C I I I I I I I I I I I I I I I I I I I 1985 HCM:TWO-LANE HIGHWAYS **************************************************************** FACILITY LOCATION.... NYS Route 25 ANALyST.............. DEA/SPL TIME OF ANALySIS..... DATE OF ANALySIS..... 10-03-1997 OTHER INFORMATION.... West of Tabor Rd.; 11-12 NOON, Sun.; 10 Year, build A) ADJUSTMENT FACTORS PERCENTAGE OF TRUCKS................................................ PERCENTAGE OF BUSES......................... PERCENTAGE OF RECREATIONAL VEHICLES......... DESIGN SPEED (MPH).................................................... PEAK HOUR FACTOR....................................................... DIRECTIONAL DISTRIBUTION (UP/DOWN).......... LANE WIDTH (FT)............................. USABLE SHOULDER WIDTH (AVG. WIDTH IN FT.)... PERCENT NO PASSING ZONES.................... B) CORRECTION FACTORS LEVEL TERRAIN E E E f f f LOS T B R w d HV ----- ----- ----- ----- ----- ----- A 2 1.8 2.2 .84 .91 .91 B 2.2 2 2.5 .84 .91 .89 C 2.2 2 2.5 .84 .91 .89 0 2 1.6 1.6 .84 .91 .94 E 2 1.6 1.6 .87 .91 .94 C) LEVEL OF SERVICE RESULTS INPUT VOLUME (vph) : 1077 ACTUAL FLOW RATE: 1238 SERVICE LOS FLOW RATE V/C --------- ----- A 137 .07 B 363 .19 C 650 .34 0 1189 .59 E 2087 1 LOS FOR GIVEN CONDITIONS: E 2 2 5 50 .87 66 / 34 10 7 51 I I I I I I I I I I I I I I I I I I I 1985 HCM:TWO-LANE HIGHWAYS *~~************************************************************** FACILITY LOCATION.... NYS Route 25 ANALyST.............. DEA/SPL TIME OF ANALySIS..... DATE OF ANALySIS..... 10-03-1997 OTHER INFORMATION.... West of Tabor Rd.; 5-6 PM, Sun.; 10 Yea r, build A) ADJUSTMENT FACTORS PERCENTAGE OF TRUCKS........................ PERCENTAGE OF BUSES......................... PERCENTAGE OF RECREATIONAL VEHICLES......... DESIGN SPEED (MPH).......................... PEAle H()~ ~A~()R............................ DIRECTIONAL DISTRIBUTION (UP/DOWN).......... IANE WIDTH (FT)............................. USABLE SHOULDER WIDTH (AVG. WIDTH IN FT.)... PERCENT NO PASSING ZONES.................... B) CORRECTION FACTORS 2 2 5 50 .7 40 / 60 10 7 51 ------------------------------------------------------------- LEVEL TERRAIN E E E f f f LOS T B R w d HV ----- ----- ----- ----- ----- ----- A 2 1.8 2.2 .84 .94 .91 B 2.2 2 2.5 .84 .94 .89 C 2.2 2 2.5 .84 .94 .89 D 2 1.6 1.6 .84 .94 .94 E 2 1.6 1.6 .87 .94 .94 C) LEVEL OF SERVICE RESULTS INPUT VOLUME(vph): 1092 ACTUAL FLOW RATE: 1560 SERVICE LOS FLOW RATE V/C --------- ----- A 141 .07 B 375 .19 C 672 .34 D 1228 .59 E 2156 1 LOS FOR GIVEN CONDITIONS: E I I I I I I I I I I I I I I I I I I I 1985 HCM:TWO-LANE HIGHWAYS **************************************************************** FACILITY LOCATION.... NYS Route 25 ANALyST.............. DEA/SPL TIME OF ANALySIS..... DATE OF ANALySIS..... 10-03-1997 OTHER INFORMATION.... West of Tabor Rd.; 9-10 PM, Sun.; 10 Ye ar, build A) ADJUSTMENT FACTORS ------------------------------------------------------------- PERCENTAGE OF TRUCKS........................ PERCENTAGE OF BUSES......................... PERCENTAGE OF RECREATIONAL VEHICLES......... DESIGN SPEED (MPH).......................... PEAK HOUR FACTOR............................ DIRECTIONAL DISTRIBUTION (UP/DOWN).......... IANE WIDTH (FT)............................. USABLE SHOULDER WIDTH (AVG. WIDTH IN FT.)... PERCENT NO PASSING ZONES.................... B) CORRECTION FACTORS 2 2 5 50 .7 26 / 74 10 7 51 ------------------------------------------------------------- LEVEL TERRAIN E E E f f f LOS T B R w d HV ----- ----- ----- ----- ----- ----- A 2 1.8 2.2 .84 .87 .91 B 2.2 2 2.5 .84 .87 .89 C 2.2 2 2.5 .84 .87 .89 D 2 1.6 1.6 .84 .87 .94 E 2 1.6 1.6 .87 .87 .94 C) LEVEL OF SERVICE RESULTS INPUT VOLUME(vph): 429 ACTUAL FLOW RATE: 613 SERVICE LOS FLOW RATE V/C --------- ----- A 130 .07 B 346 .19 C 619 .34 D 1132 .59 E 1986 1 LOS FOR GIVEN CONDITIONS: C I I I I I I I I I I I I I I I I I I I Route 25 Narrow River Road to Eastern Terminus Existing Capacity Analysis Disk #390, Cross Sound Ferry File: Dividers I I I I I I I I I I I I I I I I I I I 1985 HCM:TWO-LANE HIGHWAYS **************************************************************** FACILITY LOCATION.... NYS Route 25 ANALyST.............. DEA/SPL TIME OF ANALySIS..... DATE OF ANALySIS..... 10-03-1997 OTHER INFORMATION.... East of Narrow River Rd.; 11-12 NOON, w eekday; Existing A) ADJUSTMENT FACTORS ------------------------------------------------------------- PERCENTAGE OF TRUCKS........................ PERCENTAGE OF BUSES......................... PERCENTAGE OF RECREATIONAL VEHICLES......... DESIGN SPEED (MPH).......................... l?~l{ }f()~ ~~~~()~............................ DIRECTIONAL DISTRIBUTION (UP/DOWN).......... IANE WIDTH (FT)............................. USABLE SHOULDER WIDTH (AVG. WIDTH IN FT.)... PERCENT NO PASSING ZONES.................... B) CORRECTION FACTORS 2 2 5 50 .71 59 / 41 10 7 78 ------------------------------------------------------------- LEVEL TERRAIN E E E f f f LOS T B R w d HV ----- ----- ----- ----- ----- ----- A 2 1.8 2.2 .84 .95 .91 B 2.2 2 2.5 .84 .95 .89 C 2.2 2 2.5 .84 .95 .89 D 2 1.6 1.6 .84 .95 .94 E 2 1.6 1.6 .87 .95 .94 C) LEVEL OF SERVICE RESULTS INPUT VOLUME(vph): 336 ACTUAL FLOW RATE: 473 SERVICE LOS FLOW RATE V/C --------- ----- A 102 .05 B 338 .17 C 656 .33 D 1215 .58 E 2170 1 LOS FOR GIVEN CONDITIONS: C I I I I I I I I I I I I I I I I I I Ii. 1985 HCM:TWO-LANE HIGHWAYS **,************************************************************** FACILITY LOCATION.... NYS Route 25 ANALyST.............. DEA/SPL TIME OF ANALySIS..... DATE OF ANALySIS..... 10-03-1997 OTHER INFORMATION.... East of Narrow River Rd.: 5-6 PM, weekd ay, Existing A) ADJUSTMENT FACTORS PERCENTAGE OF TRUCKS........................ PERCENTAGE OF BUSES......................... PERCENTAGE OF RECREATIONAL VEHICLES......... DESIGN SPEED (MPH).......................... PEJlK }I()~ FAC~()R............................ DIRECTIONAL DISTRIBUTION (UP/DOWN).......... lANE WIDTH (FT)............................. USABLE SHOULDER WIDTH (AVG. WIDTH IN FT.)... PERCENT NO PASSING ZONES.................... B) CORRECTION FACTORS 2 2 5 50 .77 49 / 51 10 7 78 ------------------------------------------------------------- LEVEL TERRAIN E E E f f f LOS T B R w d HV ----- ----- ----- ----- ----- ----- A 2 1.8 2.2 .84 .99 .91 B 2.2 2 2.5 .84 .99 .89 C 2.2 2 2.5 .84 .99 .89 D 2 1.6 1.6 .84 .99 .94 E 2 1.6 1.6 .87 .99 .94 C) LEVEL OF SERVICE RESULTS ------------------------------------------------------------- INPUT VOLUME (vph) : 301 ACTUAL FLOW RATE: 391 SERVICE LOS FLOW RATE V/C --------- ----- A 107 .05 B 355 .17 C 689 .33 D 1277 .58 E 2280 1 LOS FOR GIVEN CONDITIONS: C I I I I I I I I I I I I I I I I I I I 1985 HCM:TWO-LANE HIGHWAYS **************************************************************** FACILITY LOCATION.... NYS Route 25 ANALyST.............. DEA/SPL TIME OF ANALySIS..... DATE OF ANALySIS..... 10-03-1997 OTHER INFORMATION.... East of Narrow River Rd.; 9-10 PM, week day; Existing A) ADJUSTMENT FACTORS ------------------------------------------------------------- PERCENTAGE OF TRUCKS........................ PERCENTAGE OF BUSES......................... PERCENTAGE OF RECREATIONAL VEHICLES......... DESIGN SPEED (MPH).......................... J?~~J{ FI()~ ~1\~()~............................ DIRECTIONAL DISTRIBUTION (UP/DOWN).......... IA.NE WIDTH (FT)............................. USABLE SHOULDER WIDTH (AVG. WIDTH IN FT.)... PERCENT NO PASSING ZONES.................... B) CORRECTION FACTORS 2 2 5 50 .5 31 / 69 10 7 78 ------------------------------------------------------------- LEVEL TERRAIN E E E f f f LOS T B R w d HV ----- ----- ----- ----- ----- ----- A 2 1.8 2.2 .84 .9 .91 B 2.2 2 2.5 .84 .9 .89 C 2.2 2 2.5 .84 .9 .89 D 2 1.6 1.6 .84 .9 .94 E 2 1.6 1.6 .87 .9 .94 C) LEVEL OF SERVICE RESULTS ------------------------------------------------------------- INPUT VOLUME(vph): 134 ACTUAL FLOW RATE: 268 SERVICE LOS FLOW RATE V/C --------- ----- A 96 .05 B 320 .17 C 621 .33 D 1150 .58 E 2053 1 LOS FOR GIVEN CONDITIONS: B I I I I I I I I I I I I I I I I I I I 1985 HCM:TWO-LANE HIGHWAYS **************************************************************** FACILITY LOCATION.... NYS Route 25 ANALyST.............. DEA/SPL TIME OF ANALySIS..... DATE OF ANALySIS..... 10-03-1997 OTHER INFORMATION.... East of Narrow River Rd.; 11-12 NOON, S at.; Existing A) ADJUSTMENT FACTORS ------------------------------------------------------------- PERCENTAGE OF TRUCKS........................ PERCENTAGE OF BUSES......................... PERCENTAGE OF RECREATIONAL VEHICLES......... DESIGN SPEED (MPH).......................... J?E~J{ fI()~ FA~()R............................ DIRECTIONAL DISTRIBUTION (UP/DOWN).......... IA.NE WIDTH (FT)............................. USABLE SHOULDER WIDTH (AVG. WIDTH IN FT.)... PERCENT NO PASSING ZONES.................... B) CORRECTION FACTORS 2 2 5 50 .83 56 / 44 10 7 78 ------------------------------------------------------------- LEVEL TERRAIN E E E f f f LOS T B R w d HV ----- ----- ----- ----- ----- ----- A 2 1.8 2.2 .84 .96 .91 B 2.2 2 2.5 .84 .96 .89 C 2.2 2 2.5 .84 .96 .89 D 2 1.6 1.6 .84 .96 .94 E 2 1.6 1.6 .87 .96 .94 C) LEVEL OF SERVICE RESULTS ------------------------------------------------------------- INPUT VOLUME (vph) : 444 ACTUAL FLOW RATE: 535 SERVICE LOS FLOW RATE V/C --------- ----- A 103 .05 B 344 .17 C 669 .33 0 1238 .58 E 2211 1 LOS FOR GIVEN CONDITIONS: C I I I I I I I I I I I I I I I I I I I 1985 HCM:TWO-LANE HIGHWAYS **************************************************************** FACILITY LOCATION.... NYS Route 25 ANALyST.............. DEA/SPL TIME OF ANALySIS..... DATE OF ANALySIS..... 10-03-1997 OTHER INFORMATION.... East of Narrow River Rd.; 5-6 PM, Sat.; Existing A) ADJUSTMENT FACTORS ------------------------------------------------------------- PERCENTAGE OF TRUCKS........................ PERCENTAGE OF BUSES......................... PERCENTAGE OF RECREATIONAL VEHICLES......... DESIGN SPEED (MPH).......................... PEAl{ }f()~ FA~()R............................ DIRECTIONAL DISTRIBUTION (UP/DOWN).......... IA.NE WIDTH (FT)............................. USABLE SHOULDER WIDTH (AVG. WIDTH IN FT.)... PERCENT NO PASSING ZONES.................... B) CORRECTION FACTORS 2 2 5 50 .81 41 / 59 10 7 78 ------------------------------------------------------------- LEVEL TERRAIN E E E f f f LOS T B R w d HV ----- ----- ----- ----- ----- ----- A 2 1.8 2.2 .84 .95 .91 B 2.2 2 2.5 .84 .95 .89 C 2.2 2 2.5 .84 .95 .89 D 2 1.6 1.6 .84 .95 .94 E 2 1.6 1.6 .87 .95 .94 C) LEVEL OF SERVICE RESULTS ------------------------------------------------------------- INPUT VOLUME (vph) : 407 ACTUAL FLOW RATE: 502 SERVICE LOS FLOW RATE V/C --------- .----- A 102 .05 B 338 .17 C 656 .33 D 1215 .58 E 2170 1 LOS FOR GIVEN CONDITIONS: C I I I I I I I I I I I I I I I I I I I 1985 HCM:TWO-LANE HIGHWAYS **************************************************************** FACILITY LOCATION.... NYS Route 25 ANALyST.............. DEA/SPL TIME OF ANALySIS..... DATE OF ANALySIS..... 10-03-1997 OTHER INFORMATION.... East of Narrow River Rd.; 9-10 PM, Sat. ; Existing A) ADJUSTMENT FACTORS PERCENTAGE OF TRUCKS........................ PERCENTAGE OF BUSES......................... PERCENTAGE OF RECREATIONAL VEHICLES......... DESIGN SPEED (MPH).......................... PEAK HOUR FACTOR............................ DIRECTIONAL DISTRIBUTION (UP/DOWN).......... LANE WIDTH (FT)............................. USABLE SHOULDER WIDTH (AVG. WIDTH IN FT.)... PERCENT NO PASSING ZONES.................... B) CORRECTION FACTORS 2 2 5 50 .53 39 / 61 10 7 78 ------------------------------------------------------------- LEVEL TERRAIN E E E f f f LOS T B R w d HV ----- ----- ----- ----- ----- ----- A 2 1.8 2.2 .84 .94 .91 B 2.2 2 2.5 .84 .94 .89 C 2.2 2 2.5 .84 .94 .89 0 2 1.6 1.6 .84 .94 .94 E 2 1.6 1.6 .87 .94 .94 C) LEVEL OF SERVICE RESULTS INPUT VOLUME(vph): 164 ACTUAL FLOW RATE: 309 SERVICE LOS FLOW RATE V/C --------- ----- A 100 .05 B 334 .17 C 649 .33 0 1201 .58 E 2145 1 LOS FOR GIVEN CONDITIONS: B I I I I I I I I I I I I I I I I I I I 1985 HCM:TWO-LANE HIGHWAYS **************************************************************** FACILITY LOCATION.... NYS Route 25 ANALyST.............. DEA/SPL TIME OF ANALySIS..... DATE OF ANALySIS..... 10-03-1997 OTHER INFORMATION.... East of Narrow River Rd.; 11-12 NOON, S un.; Existing A) ADJUSTMENT FACTORS ------------------------------------------------------------- PERCENTAGE OF TRUCKS........................ PERCENTAGE OF BUSES......................... PERCENTAGE OF RECREATIONAL VEHICLES......... DESIGN SPEED (MPH).......................... PEAle HOtJli ~AC~()R............................ DIRECTIONAL DISTRIBUTION (UP/DOWN).......... IANE WIDTH eFT)............................. USABLE SHOULDER WIDTH (AVG. WIDTH IN FT.)... PERCENT NO PASSING ZONES.................... B) CORRECTION FACTORS 2 2 5 50 .81 67 / 33 10 7 78 ------------------------------------------------------------- LEVEL TERRAIN E E E f f f LOS T B R w d HV ----- ----- ----- ----- ----- ----- A 2 1.8 2.2 .84 .91 .91 B 2.2 2 2.5 .84 .91 .89 C 2.2 2 2.5 .84 .91 .89 D 2 1.6 1.6 .84 .91 .94 E 2 1.6 1.6 .87 .91 .94 C) LEVEL OF SERVICE RESULTS ------------------------------------------------------------- INPUT VOLUME(vph): 559 ACTUAL FLOW RATE: 690 SERVICE LOS FLOW RATE V/C --------- ----- A 97 .05 B 323 .17 C 628 .33 D 1162 .58 E 2076 1 LOS FOR GIVEN CONDITIONS: D . . . -. . . . . . . . . . I I I I I I 1985 HCM:TWO-LANE HIGHWAYS *****************************************************.********** FACILITY LOCATION.... NYS Route 25 ANALyST.............. DEA/SPL TIME OF ANALySIS..... DATE OF ANALySIS..... 10-03-1997 OTHER INFORMATION.... East of Narrow River Rd.; 5-6 PM, Sun; Existing A) ADJUSTMENT FACTORS ------------------------------------------------------------- PERCENTAGE OF TRUCKS........................ PERCENTAGE OF BUSES......................... PERCENTAGE OF RECREATIONAL VEHICLES......... DESIGN SPEED (MPH).......................... P~K If()~ FA<=~()It............................ DIRECTIONAL DISTRIBUTION (UP/DOWN).......... IA.NE WIDTH (FT)............................. USABLE SHOULDER WIDTH (AVG. WIDTH IN FT.)... PERCENT NO PASSING ZONES.................... B) CORRECTION FACTORS 2 2 5 50 .75 36 / 64 10 7 78 ------------------------------------------------------------- LEVEL TERRAIN E E E f f f LOS T B R w d HV ----- ----- ----- ----- ----- ----- A 2 1.8 2.2 .84 .92 .91 B 2.2 2 2.5 .84 .92 .89 C 2.2 2 2.5 .84 .92 .89 D 2 1.6 1.6 .84 .92 .94 E 2 1.6 1.6 .87 .92 .94 C) LEVEL OF SERVICE RESULTS ------------------------------------------------------------- INPUT VOLUME(vph): 640 ACTUAL FLOW RATE: 853 SERVICE LOS FLOW RATE V/C --------- ----- A 99 .05 B 329 .17 C 638 .33 D 1182 .58 E 2110 1 LOS FOR GIVEN CONDITIONS: D I I I I I I I I I I I I I I I I I I I 1985 HCM:TWO-LANE HIGHWAYS **************************************************************** FACILITY LOCATION.... NYS Route 25 ANALyST.............. DEA/SPL TIME OF ANALySIS..... DATE OF ANALySIS..... 10-03-1997 OTHER INFORMATION.... East of Narrow River Rd.; 9-10 PM, Sun. ; Existing A) ADJUSTMENT FACTORS ------------------------------------------------------------- PERCENTAGE OF TRUCKS........................ PERCENTAGE OF BUSES......................... PERCENTAGE OF RECREATIONAL VEHICLES......... DESIGN SPEED (MPH)................................................... PE~lC fI()~ Jr~<=~()li....................................................... DIRECTIONAL DISTRIBUTION (UP/DOWN).......... IANE WIDTH (FT)......................................................... USABLE SHOULDER WIDTH (AVG. WIDTH IN FT.)... PERCENT NO PASSING ZONES.................... B) CORRECTION FACTORS LEVEL TERRAIN E E E f f f LOS T B R w d HV ----- ----- ----- ----- ----- ----- A 2 1.8 2.2 .84 .87 .91 B 2.2 2 2.5 .84 .87 .89 C 2.2 2 2.5 .84 .87 .89 D 2 1.6 1.6 .84 .87 .94 E 2 1.6 1.6 .87 .87 .94 C) LEVEL OF SERVICE RESULTS 2 2 5 50 .53 26 / 74 10 7 78 ------------------------------------------------------------- INPUT VOLUME(vph): 219 ACTUAL FLOW RATE: 413 SERVICE LOS FLOW RATE V/C --------- ----- A 93 .05 B 309 .17 C 601 .33 D 1112 .58 E 1986 1 LOS FOR GIVEN CONDITIONS: C I I I I I I I I I I I I I I I I I I I Route 25 Narrow River Road to Eastern Terminus 2002 Capacity Analysis (No-Build) Disk #390, Cross Sound Ferry File: Dividers I I I I I I I I I I I I I I I I I I I 1985 HCM:TWO-LANE HIGHWAYS **************************************************************** FACILITY LOCATION.... NYS Route 25 ANALyST.............. DEA/SPL TIME OF ANALySIS..... DATE OF ANALySIS..... 10-03-1997 OTHER INFORMATION.... East of Narrow River Rd.: 11-12 NOON, w eekday: 5 Year, no-build A) ADJUSTMENT FACTORS PERCENTAGE OF TRUCKS........................ PERCENTAGE OF BUSES......................... PERCENTAGE OF RECREATIONAL VEHICLES......... DESIGN SPEED (MPH}.......................... PE~!C H()~ Jr~~()ll............................ DIRECTIONAL DISTRIBUTION (UP/DOWN).......... LANE WIDTH (FT)............................. USABLE SHOULDER WIDTH (AVG. WIDTH IN FT.)... PERCENT NO PASSING ZONES.................... B) CORRECTION FACTORS LEVEL TERRAIN E E E f f f LOS T B R w d HV ----- ----- ----- ----- ----- ----- A 2 1.8 2.2 .84 .95 .91 B 2.2 2 2.5 .84 .95 .89 C 2.2 2 2.5 .84 .95 .89 D 2 1.6 1.6 .84 .95 .94 E 2 1.6 1.6 .87 .95 .94 C) LEVEL OF SERVICE RESULTS INPUT VOLUME (vph) : 386 ACTUAL FLOW RATE: 544 SERVICE LOS FLOW RATE V/C --------- ----- A 102 .05 B 340 .17 C 660 .33 D 1223 .58 E 2184 1 LOS FOR GIVEN CONDITIONS: C 2 2 5 50 .71 58 / 42 10 7 78 I I I I I I I I I I I I I I I I I I I 1985 HCM:TWO-LANE HIGHWAYS **************************************************************** FACILITY LOCATION.... NYS Route 25 ANALyST.............. DEA/SPL TIME OF ANALySIS..... DATE OF ANALySIS..... 10-03-1997 OTHER INFORMATION.... East of Narrow River Rd.; 5-6 PM, weekd ay; 5 Year, no-build A) ADJUSTMENT FACTORS PERCENTAGE OF TRUCKS........................ PERCENTAGE OF BUSES......................... PERCENTAGE OF RECREATIONAL VEHICLES......... DESIGN SPEED (MPH).......................... PEAK HOUR FACTOR............................ DIRECTIONAL DISTRIBUTION (UP/DOWN).......... IA.NE WIDTH eFT)............................. USABLE SHOULDER WIDTH (AVG. WIDTH IN FT.)... PERCENT NO PASSING ZONES.................... B) CORRECTION FACTORS LEVEL TERRAIN E E E f f f LOS T B R w d HV ----- ----- ----- ----- ----- ----- A 2 1.8 2.2 .84 .96 .91 B 2.2 2 2.5 .84 .96 .89 C 2.2 2 2.5 .84 .96 .89 0 2 1.6 1.6 .84 .96 .94 E 2 1.6 1.6 .87 .96 .94 C) LEVEL OF SERVICE RESULTS INPUT VOLUME (vph) : 336 ACTUAL FLOW RATE: 436 SERVICE LOS FLOW RATE V/C --------- .----- A 103 .05 B 342 .17 C 664 .33 0 1231 .58 E 2197 1 LOS FOR GIVEN CONDITIONS: C 2 2 5 50 .77 57 / 43 10 7 78 I I I I I I I I I I I I I I I I I I I 1985 HCM:TWO-LANE HIGHWAYS **************************************************************** FACILITY LOCATION.... NYS Route 25 ANALyST.............. DEA/SPL TIME OF ANALySIS..... DATE OF ANALySIS..... 10-03-1997 OTHER INFORMATION.... East of Narrow River Rd.; 9-10 PM, week day; 5 Year, no-build A) ADJUSTMENT FACTORS ------------------------------------------------------------- PERCENTAGE OF TRUCKS........................ PERCENTAGE OF BUSES......................... PERCENTAGE OF RECREATIONAL VEHICLES......... DESIGN SPEED (MPH).......................... PEAK HOUR FACTOR............................ DIRECTIONAL DISTRIBUTION (UP/DOWN).......... lANE WIDTH eFT)............................. USABLE SHOULDER WIDTH (AVG. WIDTH IN FT.)... PERCENT NO PASSING ZONES.................... B) CORRECTION FACTORS 2 2 5 50 .5 32 / 68 10 7 78 ------------------------------------------------------------- LEVEL TERRAIN E E E f f f LOS T B R w d HV ----- ----- ----- ----- ----- ----- A 2 1.8 2.2 .84 .9 .91 B 2.2 2 2.5 .84 .9 .89 C 2.2 2 2.5 .84 .9 .89 D 2 1.6 1.6 .84 .9 .94 E 2 1.6 1.6 .87 .9 .94 C) LEVEL OF SERVICE RESULTS ------------------------------------------------------------- INPUT VOLUME(vph): 148 ACTUAL FLOW RATE: 296 SERVICE LOS FLOW RATE V/C --------- ----- A 97 .05 B 322 .17 C 624 .33 D 1156 .58 E 2064 1 LOS FOR GIVEN CONDITIONS: B I I I I I I I I I I I I I I I I I I I 1985 HCM:TWO-LANE HIGHWAYS **************************************************************** FACILITY LOCATION.... NYS Route 25 ANALyST.............. DEA/SPL TIME OF ANALySIS..... DATE OF ANALySIS..... 10-03-1997 OTHER INFORMATION.... East of Narrow River Rd.; 11-12 NOON, S at.; 5 Year, no-build A) ADJUSTMENT FACTORS PERCENTAGE OF TRUCKS........................ PERCENTAGE OF BUSES......................... PERCENTAGE OF RECREATIONAL VEHICLES......... DESIGN SPEED (MPH).......................... l?~Jll< 1iC>t1li JrJl~()~............................ DIRECTIONAL DISTRIBUTION (UP/DOWN).......... IANE WIDTH eFT)............................. USABLE SHOULDER WIDTH (AVG. WIDTH IN FT.)... PERCENT NO PASSING ZONES.................... B) CORRECTION FACTORS LEVEL TERRAIN E E E f f f LOS T B R w d HV ----- ----- ----- ----- ----- ----- A 2 1.8 2.2 .84 .97 .91 B 2.2 2 2.5 .84 .97 .89 C 2.2 2 2.5 .84 .97 .89 D 2 1.6 1.6 .84 .97 .94 E 2 1.6 1.6 .87 .97 .94 C) LEVEL OF SERVICE RESULTS INPUT VOLUME(vph): 502 ACTUAL FLOW RATE: 605 SERVICE LOS FLOW RATE V/C --------- ----- A 104 .05 B 347 .17 C 673 .33 D 1246 .58 E 2225 1 LOS FOR GIVEN CONDITIONS: C 2 2 5 50 .83 55 / 45 10 7 78 I I I I I I I I I I I I I I I I I I I 1985 HCM:TWO-LANE HIGHWAYS ****************************************************.*********** FACILITY LOCATION.... NYS Route 25 ANALyST.............. DEA/SPL TIME OF ANALySIS..... DATE OF ANALySIS..... 10-03-1997 OTHER INFORMATION.... East of Narrow River Rd.; 5-6 PM, Sat.; 5 Year, no-build A) ADJUSTMENT FACTORS PERCENTAGE OF TRUCKS........................ PERCENTAGE OF BUSES.................................................. PERCENTAGE OF RECREATIONAL VEHICLES......... DESIGN SPEED (MPH).......................... PEAl{ If()~ FAC~()R....................................................... DIRECTIONAL DISTRIBUTION (UP/DOWN).......... IANE WIDTH (FT).......................................................... USABLE SHOULDER WIDTH (AVG. WIDTH IN FT.)... PERCENT NO PASSING ZONES.................... B) CORRECTION FACTORS LEVEL TERRAIN E E E f f f LOS T B R w d HV ----- ----- ----- ----- ----- ----- A 2 1.8 2.2 .84 .95 .91 B 2.2 2 2.5 .84 .95 .89 C 2.2 2 2.5 .84 .95 .89 D 2 1.6 1.6 .84 .95 .94 E 2 1.6 1.6 .87 .95 .94 C) LEVEL OF SERVICE RESULTS INPUT VOLUME(vph): 461 ACTUAL FLOW RATE: 569 SERVICE LOS FLOW RATE V/C --------- ----- A 102 .05 B 340 .17 C 660 .33 D 1223 .58 E 2184 1 LOS FOR GIVEN CONDITIONS: C 2 2 5 50 .81 42 / 58 10 7 78 I I I I I I I I I I I I I I I I I I I 1985 HCM:TWO-LANE HIGHWAYS **************************************************************** FACILITY LOCATION.... NYS Route 25 ANALyST.............. DEA/SPL TIME OF ANALySIS..... DATE OF ANALySIS..... 10-03-1997 OTHER INFORMATION.... East of Narrow River Rd.; 9-10 PM, Sat. ; 5 Year, no-build A) ADJUSTMENT FACTORS PERCENTAGE OF TRUCKS........................ PERCENTAGE OF BUSES......................... PERCENTAGE OF RECREATIONAL VEHICLES......... DESIGN SPEED (MPS).......................... PEAl( I{()~ FA~()R............................ DIRECTIONAL DISTRIBUTION (UP/DOWN).......... LANE WIDTH (FT)............................. USABLE SHOULDER WIDTH (AVG. WIDTH IN FT.)... PERCENT NO PASSING ZONES.................... B) CORRECTION FACTORS LEVEL TERRAIN E E E f f f LOS T B R w d HV ----- ----- ----- ----- ----- ----- A 2 1.8 2.2 .84 .93 .91 B 2.2 2 2.5 .84 .93 .89 C 2.2 2 2.5 .84 .93 .89 D 2 1.6 1.6 .84 .93 .94 E 2 1.6 1.6 .87 .93 .94 C) LEVEL OF SERVICE RESULTS INPUT VOLUME(vph): 181 ACTUAL FLOW RATE: 342 SERVICE LOS FLOW RATE V/C --------- ----- A 100 .05 B 332 .17 C 645 .33 D 1195 .58 E 2133 1 LOS FOR GIVEN CONDITIONS: C 2 2 5 50 .53 38 / 62 10 7 78 I I I I I I I I I I I I I I I I I I I 1985 HCM:TWO-LANE HIGHWAYS **************************************************************** FACILITY LOCATION.... NYS Route 25 ANALyST.............. DEA/SPL TIME OF ANALySIS..... DATE OF ANALySIS..... 10-03-1997 OTHER INFORMATION.... East of Narrow River Rd.; 11-12 NOON, S un.; 5 Year, no-build A) ADJUSTMENT FACTORS PERCENTAGE OF TRUCKS........................ PERCENTAGE OF BUSES......................... PERCENTAGE OF RECREATIONAL VEHICLES......... DESIGN SPEED (MPH).......................... PEAK HOUR FACTOR............................ DIRECTIONAL DISTRIBUTION (UP/DOWN).......... I.aA.NE WIDTH (FT)............................. USABLE SHOULDER WIDTH (AVG. WIDTH IN FT.)... PERCENT NO PASSING ZONES.................... B) CORRECTION FACTORS LEVEL TERRAIN E E E f f f LOS T B R w d HV ----- ----- ----- ----- ----- ----- A 2 1.8 2.2 .84 .91 .91 B 2.2 2 2.5 .84 .91 .89 C 2.2 2 2.5 .84 .91 .89 D 2 1.6 1.6 .84 .91 .94 E 2 1.6 1.6 .87 .91 .94 C) LEVEL OF SERVICE RESULTS INPUT VOLUME (vph) : 637 ACTUAL FLOW RATE: 786 SERVICE LOS FLOW RATE V/C --------- ----- A 98 .05 B 325 .17 C 631 .33 D 1169 .58 E 2087 1 LOS FOR GIVEN CONDITIONS: D 2 2 5 50 .81 66 / 34 10 7 78 I I I I I I I I I I I I I I I I I I I 1985 HCM:TWO-LANE HIGHWAYS **************************************************************** FACILITY LOCATION.... NYS Route 25 ANALyST.............. DEA/SPL TIME OF ANALySIS..... DATE OF ANALySIS..... 10-03-1997 OTHER INFORMATION.... East of Narrow River Rd.; 5-6 PM, Sun.; 5 Year, no-build A) ADJUSTMENT FACTORS ------------------------------------------------------------- PERCENTAGE OF TRUCKS........................ PERCENTAGE OF BUSES......................... PERCENTAGE OF RECREATIONAL VEHICLES......... DESIGN SPEED (MPH).......................... PEAK Ii()~ FAC~()R............................ DIRECTIONAL DISTRIBUTION (UP/DOWN).......... IANE WIDTH (FT)............................. USABLE SHOULDER WIDTH (AVG. WIDTH IN FT.)... PERCENT NO PASSING ZONES.................... B) CORRECTION FACTORS 2 2 5 50 .75 36 / 64 10 7 78 ------------------------------------------------------------- LEVEL TERRAIN E E E f f f LOS T B R w d HV ----- ----- ----- ----- ----- ----- A 2 1.8 2.2 .84 .92 .91 B 2.2 2 2.5 .84 .92 .89 C 2.2 2 2.5 .84 .92 .89 0 2 1.6 1.6 .84 .92 .94 E 2 1.6 1.6 .87 .92 .94 C) LEVEL OF SERVICE RESULTS ------------------------------------------------------------- INPUT VOLUME (vph) : 723 ACTUAL FLOW RATE: 964 SERVICE LOS FLOW RATE v/e --------- ----- A 99 .05 B 329 .17 C 638 .33 0 1182 .58 E 2110 1 LOS FOR GIVEN CONDITIONS: 0 I I I I I I I I I I I I I I I I I I I 1985 HCM:TWO-LANE HIGHWAYS **************************************************************** FACILITY LOCATION.... NYS Route 25 ANALyST.............. DEA/SPL TIME OF ANALySIS..... DATE OF ANALySIS..... 10-03-1997 OTHER INFORMATION.... East of Narrow River Rd.; 9-10 PM, Sun. ; 5 Year, no-build A) ADJUSTMENT FACTORS PERCENTAGE OF TRUCKS........................ PERCENTAGE OF BUSES......................... PERCENTAGE OF RECREATIONAL VEHICLES......... DESIGN SPEED (MPH).......................... PEAl{ HOUR FACTOR............................ DIRECTIONAL DISTRIBUTION (UP/DOWN).......... IA.NE WIDTH eFT)............................. USABLE SHOULDER WIDTH (AVG. WIDTH IN FT.)... PERCENT NO PASSING ZONES.................... B) CORRECTION FACTORS LEVEL TERRAIN E E E f f f LOS T B R w d HV ----- ----- ----- ----- ----- ----- A 2 1.8 2.2 .84 .87 .91 B 2.2 2 2.5 .84 .87 .89 C 2.2 2 2.5 .84 .87 .89 D 2 1.6 1.6 .84 .87 .94 E 2 1.6 1.6 .87 .87 .94 C) LEVEL OF SERVICE RESULTS INPUT VOLUME(vph): 247 ACTUAL FLOW RATE: 466 SERVICE LOS FLOW RATE V/C --------- ----- A 93 .05 B 309 .17 C 601 .33 D 1112 .58 E 1986 1 LOS FOR GIVEN CONDITIONS: C 2 2 5 50 .53 26 / 74 10 7 78 I I I I I I I I I I I I I I I I I I I Route 25 Narrow River Road to Eastern Terminus 2002 Capacity Analysis (Build) Disk #390. Cross Sound Ferry File: Dividers I I I I I I I I I I I I I I I I I I I 1985 HCM:TWO-LANE HIGHWAYS **************************************************************** FACILITY LOCATION.... NYS Route 25 ANALyST.............. DEA/SPL TIME OF ANALySIS..... DATE OF ANALySIS..... 10-03-1997 OTHER INFORMATION.... East of Narrow River Rd.; 11-12 NOON, w eekday; 5 Year, build A) ADJUSTMENT FACTORS ------------------------------------------------------------- PERCENTAGE OF TRUCKS........................ PERCENTAGE OF BUSES......................... PERCENTAGE OF RECREATIONAL VEHICLES......... DESIGN SPEED (MPH).......................... P~JC H()~ FAC~()R............................ DIRECTIONAL DISTRIBUTION (UP/DOWN).......... IA.NE WIDTH CFT)............................. USABLE SHOULDER WIDTH (AVG. WIDTH IN FT.)... PERCENT NO PASSING ZONES.................... B) CORRECTION FACTORS 2 2 5 50 .71 65 / 35 10 7 78 ------------------------------------------------------------- LEVEL TERRAIN E E E f f f LOS T B R w d HV ----- ----- ----- ----- ----- ----- A 2 1.8 2.2 .84 .92 .91 B 2.2 2 2.5 .84 .92 .89 C 2.2 2 2.5 .84 .92 .89 D 2 1.6 1.6 .84 .92 .94 E 2 1.6 1.6 .87 .92 .94 C) LEVEL OF SERVICE RESULTS ------------------------------------------------------------- INPUT VOLUME(vph): 426 ACTUAL FLOW RATE: 600 SERVICE LOS FLOW RATE V/C --------- ----- A 98 .05 B 327 .17 C 635 .33 D 1175 .58 E 2099 1 LOS FOR GIVEN CONDITIONS: C I I I I I I I I I I I I I I I I I I I 1985 HCM:TWO-LANE HIGHWAYS **************************************************************** FACILITY LOCATION.... NYS Route 25 ANALyST.............. DEA/SPL TIME OF ANALySIS..... DATE OF ANALySIS..... 10-03-1997 OTHER INFORMATION.... East of Narrow River Rd., 5-6 PM, weekd ay, 5 Year, build A) ADJUSTMENT FACTORS ------------------------------------------------------------- PERCENTAGE OF TRUCKS........................ PERCENTAGE OF BUSES......................... PERCENTAGE OF RECREATIONAL VEHICLES......... DESIGN SPEED (MPH).......................... PEAK HOUR FACTOR............................ DIRECTIONAL DISTRIBUTION (UP/DOWN).......... IAN'E WIDTH (FT)............................. USABLE SHOULDER WIDTH (AVG. WIDTH IN FT.)... PERCENT NO PASSING ZONES.................... B) CORRECTION FACTORS 2 2 5 50 .77 57 / 43 10 7 78 ------------------------------------------------------------- LEVEL TERRAIN E E E f f f LOS T B R w d HV ----- ----- ----- ----- ----- ----- A 2 1.8 2.2 .84 .96 .91 B 2.2 2 2.5 .84 .96 .89 C 2.2 2 2.5 .84 .96 .89 D 2 1.6 1.6 .84 .96 .94 E 2 1.6 1.6 .87 .96 .94 C) LEVEL OF SERVICE RESULTS ------------------------------------------------------------- INPUT VOLUME (vph) : 382 ACTUAL FLOW RATE: 496 SERVICE LOS FLOW RATE V/C --------- ----- A 103 .05 B 342 .17 C 664 .33 D 1231 .58 E 2197 1 LOS FOR GIVEN CONDITIONS: C I I I I I I I I I I I I I I I I I I I 1985 HCM:TWO-LANE HIGHWAYS **************************************************************** FACILITY LOCATION.... NYS Route 25 ANALyST.............. DEA/SPL TIME OF ANALySIS..... DATE OF ANALySIS..... 10-03-1997 OTHER INFORMATION.... East of Narrow River Rd.; 9-10 PM, week day; 5 Year, build A) ADJUSTMENT FACTORS PERCENTAGE OF TRUCKS........................ PERCENTAGE OF BUSES......................... PERCENTAGE OF RECREATIONAL VEHICLES......... DESIGN SPEED (MPH).......................... PEAl{ HOUR FACTOR............................ DIRECTIONAL DISTRIBUTION (UP/DOWN).......... LANE WIDTH (FT)............................. USABLE SHOULDER WIDTH (AVG. WIDTH IN FT.)... PERCENT NO PASSING ZONES.................... B) CORRECTION FACTORS 2 2 5 50 .5 21 / 79 10 7 78 ------------------------------------------------------------- LEVEL TERRAIN E E E f f f LOS T B R w d HV ----- ----- ----- ----- ----- ----- A 2 1.8 2.2 .84 .84 .91 B 2.2 2 2.5 .84 .84 .89 C 2.2 2 2.5 .84 .84 .89 D 2 1.6 1.6 .84 .84 .94 E 2 1.6 1.6 .87 .84 .94 C) LEVEL OF SERVICE RESULTS ------------------------------------------------------------- INPUT VOLUME (vph) : 191 ACTUAL FLOW RATE: 382 SERVICE LOS FLOW RATE VIC --------- ----- A 90 .05 B 299 .17 C 580 .33 0 1074 .58 E 1918 1 LOS FOR GIVEN CONDITIONS: C I I I I I I I I I I I I I I I I I I I 1985 HCM:TWO-LANE HIGHWAYS **************************************************************** FACILITY LOCATION.... NYS Route 25 ANALyST.............. DEA/SPL TIME OF ANALySIS..... DATE OF ANALySIS..... 10-03-1997 OTHER INFORMATION.... East of Narrow River Rd.; 11-12 NOON, S at.; 5 Year, build A) ADJUSTMENT FACTORS ------------------------------------------------------------- PERCENTAGE OF TRUCKS........................ PERCENTAGE OF BUSES......................... PERCENTAGE OF RECREATIONAL VEHICLES......... DESIGN SPEED (MPH).......................... l?~~l{ I{()~ ~~c=~()~............................ DIRECTIONAL DISTRIBUTION (UP/DOWN).......... LANE WIDTH (FT)............................. USABLE SHOULDER WIDTH (AVG. WIDTH IN FT.)... PERCENT NO PASSING ZONES.................... B) CORRECTION FACTORS 2 2 5 50 .83 61 / 39 10 7 78 ------------------------------------------------------------- LEVEL TERRAIN E E E f f f LOS T B R w d HV ----- ----.- ----- ----- ----- ----- A 2 1.8 2.2 .84 .94 .91 B 2.2 2 2.5 .84 .94 .89 C 2.2 2 2.5 .84 .94 .89 D 2 1.6 1.6 .84 .94 .94 E 2 1.6 1.6 .87 .94 .94 C) LEVEL OF SERVICE RESULTS ------------------------------------------------------------- INPUT VOLUME (vph) : 553 ACTUAL FLOW RATE: 666 SERVICE LOS FLOW RATE V/C --------- ----- A 100 .05 B 334 .17 C 649 .33 D 1201 .58 E 2145 1 LOS FOR GIVEN CONDITIONS: D I I I I I I I I I I I I I I I I I I I 1985 HCM:TWO-LANE HIGHWAYS **************************************************************** FACILITY LOCATION.... NYS Route 25 ANALyST.............. DEA/SPL TIME OF ANALySIS..... DATE OF ANALySIS..... 10-03-1997 OTHER INFORMATION.... East of Narrow River Rd.; 5-6 PM, Sat.; 5 Year, build A) ADJUSTMENT FACTORS ------------------------------------------------------------- PERCENTAGE OF TRUCKS........................ PERCENTAGE OF BUSES......................... PERCENTAGE OF RECREATIONAL VEHICLES......... DESIGN SPEED (MPH).......................... PEAK HOUR FACTOR............................ DIRECTIONAL DISTRIBUTION (UP/DOWN).......... LANE WIDTH (FT)............................. USABLE SHOULDER WIDTH (AVG. WIDTH IN FT.)... PERCENT NO PASSING ZONES.................... 2 2 5 50 .81 42 / 58 10 7 78 B) CORRECTION FACTORS ------------------------------------------------------------- LEVEL TERRAIN E E E f f f LOS T B R w d HV ----- ----- ----- ----- ----- ----- A 2 1.8 2.2 .84 .95 .91 B 2.2 2 2.5 .84 .95 .89 C 2.2 2 2.5 .84 .95 .89 D 2 1.6 1.6 .84 .95 .94 E 2 1.6 1.6 .87 .95 .94 C) LEVEL OF SERVICE RESULTS ------------------------------------------------------------- INPUT VOLUME (vph) : 503 ACTUAL FLOW RATE: 621 SERVICE LOS FLOW RATE V/C --------- ----- A 102 .05 B 340 .17 C 660 .33 D 1223 .58 E 2184 1 LOS FOR GIVEN CONDITIONS: C I I I I I I I I I I I I I I I I I I I 1985 HCM:TWO-LANE HIGHWAYS ***************************************************************. FACILITY LOCATION.... NYS Route 25 ANALyST.............. DEA/SPL TIME OF ANALySIS..... DATE OF ANALySIS..... 10-03-1997 OTHER INFORMATION.... East of Narrow River Rd.: 9-10 PM, Sat. : 5 Year, build A) ADJUSTMENT FACTORS ------------------------------------------------------------- PERCENTAGE OF TRUCKS........................ PERCENTAGE OF BUSES.................................................. PERCENTAGE OF RECREATIONAL VEHICLES......... DESIGN SPEED (MPH).......................... PEAle Ii()~ ~AC~()~....................................................... DIRECTIONAL DISTRIBUTION (UP/DOWN).......... LANE WIDTH (FT).......................................................... USABLE SHOULDER WIDTH (AVG. WIDTH IN FT.)... PERCENT NO PASSING ZONES.................... 2 2 5 50 .53 27 / 73 10 7 78 B) CORRECTION FACTORS ------------------------------------------------------------- LEVEL TERRAIN E E E f f f LOS T B R w d HV ----- ----- ----- ----- ----- ----- A 2 1.8 2.2 .84 .87 .91 B 2.2 2 2.5 .84 .87 .89 C 2.2 2 2.5 .84 .87 .89 D 2 1.6 1.6 .84 .87 .94 E 2 1.6 1.6 .87 .87 .94 C) LEVEL OF SERVICE RESULTS ------------------------------------------------------------- INPUT VOLUME (vph) : 227 ACTUAL FLOW RATE: 428 SERVICE LOS FLOW RATE V/C --------- ----- A 94 .05 B 312 .17 C 605 .33 D 1120 .58 E 2000 1 LOS FOR GIVEN CONDITIONS: C I I I I I I I I I I I I I I I I I il II 1985 HCM:TWO-LANE HIGHWAYS *.'************************************************************** FACILITY LOCATION.... NYS Route 25 ANALyST.............. DEA/SPL TIME OF ANALySIS..... DATE OF ANALySIS..... 10-03-1997 OTHER INFORMATION.... East of Narrow River Rd.; 11-12 NOON, S un.; 5 Year, build A) ADJUSTMENT FACTORS PERCENTAGE OF TRUCKS........................ PERCENTAGE OF BUSES......................... PERCENTAGE OF RECREATIONAL VEHICLES......... DESIGN SPEED (MPH).......................... PEJlIC H()tJ~ ~J\~()~............................ DIRECTIONAL DISTRIBUTION (UP/DOWN).......... LANE WIDTH (FT)............................. USABLE SHOULDER WIDTH (AVG. WIDTH IN FT.)... PERCENT NO PASSING ZONES.................... B) CORRECTION FACTORS LEVEL TERRAIN E E E f f f LOS T B R w d HV ----- ----- ----- ----- ----- ----- A 2 1.8 2.2 .84 .9 .91 B 2.2 2 2.5 .84 .9 .89 C 2.2 2 2.5 .84 .9 .89 D 2 1.6 1.6 .84 .9 .94 E 2 1.6 1.6 .87 .9 .94 C) LEVEL OF SERVICE RESULTS INPUT VOLUME(vph): 685 ACTUAL FLOW RATE: 846 SERVICE LOS FLOW RATE V/C --------- ----- A 96 .05 B 320 .17 C 621 .33 D 1150 .58 E 2053 1 LOS FOR GIVEN CONDITIONS: D 2 2 5 50 .81 69 / 31 10 7 78 I I I I I I I I I I I I I I I I I I I 1985 HCM:TWO-LANE HIGHWAYS **~t************************************************************* FACILITY LOCATION.... NYS Route 25 ANALyST.............. DEA/SPL TIME OF ANALySIS..... DATE OF ANALySIS..... 10-03-1997 OTHER INFORMATION.... East of Narrow River Rd.; 5-6 PM, Sun.; 5 Year, build A) ADJUSTMENT FACTORS ------------------------------------------------------------- PERCENTAGE OF TRUCKS........................ PERCENTAGE OF BUSES......................... PERCENTAGE OF RECREATIONAL VEHICLES......... DESIGN SPEED (MPH).......................... PEAK HOUR FACTOR............................ DIRECTIONAL DISTRIBUTION (UP/DOWN).......... LANE WIDTH (FT)............................. USABLE SHOULDER WIDTH (AVG. WIDTH IN FT.)... PERCENT NO PASSING ZONES.................... B) CORRECTION FACTORS 2 2 5 50 .75 37 / 63 10 7 78 ------------------------------------------------------------- LEVEL TERRAIN E E E f f f LOS T B R w d HV ----- ----- ----- ----- ----- ----- A 2 1.8 2.2 .84 .93 .91 B 2.2 :2 2.5 .84 .93 .89 C 2.2 2 2.5 .84 .93 .89 D 2 1.6 1.6 .84 .93 .94 E 2 1.6 1.6 .87 .93 .94 C) LEVEL OF SERVICE RESULTS INPUT VOLUME (vph) : 772 ACTUAL FLOW RATE: 1029 SERVICE LOS FLOW RATE V/C --------- ----- A 99 .05 B 331 .17 C 642 .33 D 1188 .58 E 2122 1 LOS FOR GIVEN CONDITIONS: D I I I I I I I I I I I I I I I I I I I 1985 HCM:TWO-LANE HIGHWAYS **.~************************************************************* FACILITY LOCATION.... NYS Route 25 ANALyST.............. DEA/SPL TIME OF ANALySIS..... DATE OF ANALySIS..... 10-03-1997 OTHER INFORMATION.... East of Narrow River Rd.; 9-10 PM, Sun. ; 5 Year, build A) ADJUSTMENT FACTORS PERCENTAGE OF TRUCKS........................ PERCENTAGE OF BUSES......................... PERCENTAGE OF RECREATIONAL VEHICLES......... DESIGN SPEED (MPH).......................... PEAl< fI()~ ~A~()~............................ DIRECTIONAL DISTRIBUTION (UP/DOWN).......... IANE WIDTH (FT)............................. USABLE SHOULDER WIDTH (AVG. WIDTH IN FT.)... PERCENT NO PASSING ZONES.................... B) CORRECTION FACTORS 2 2 5 50 .53 20 / 80 10 7 78 ------------------------------------------------------------- LEVEL TERRAIN E E E f f f LOS T B R w d HV ----- ----- ----- ----- ----- ----- A 2 1.8 2.2 .84 .83 .91 B 2.2 2 2.5 .84 .83 .89 C 2.2 2 2.5 .84 .83 .89 D 2 1.6 1.6 .84 .83 .94 E 2 1.6 1.6 .87 .83 .94 C) LEVEL OF SERVICE RESULTS INPUT VOLUME (vph) : 288 ACTUAL FLOW RATE: 543 SERVICE LOS FLOW RATE v/e --------- ----- A 89 .05 B 297 .17 C 576 .33 D 1066 .58 E 1904 1 LOS FOR GIVEN CONDITIONS: C I I I I I I I I I I I I I I I I I I I Route 25 Narrow River Road to Eastern Terminus 2007 Capacity Analysis (No-Build) Disk #3!W. Cross Sound Ferry File: Dividers I I I I I I I I I I I I I I I I I I I 1985 HCM:TWO-LANE HIGHWAYS **************************************************************** FACILITY LOCATION.... NYS Route 25 ANALyST.............. DEA/SPL TIME OF ANALySIS..... DATE OF ANALySIS..... 10-03-1997 OTHER INFORMATION.... East of Narrow River Rd.; 11-12 NOON, w eekday, 10 Year, no-build A) ADJUSTMENT FACTORS PERCENTAGE OF TRUCKS........................ PERCENTAGE OF BUSES......................... PERCENTAGE OF RECREATIONAL VEHICLES......... DESIGN SPEED (MPH).......................... PEAl< HOUR FACTOR............................ DIRECTIONAL DISTRIBUTION (UP/DOWN).......... lANE WIDTH (FT)............................. USABLE SHOULDER WIDTH (AVG. WIDTH IN FT.)... PERCENT NO PASSING ZONES.................... B) CORRECTION FACTORS 2 2 5 50 .71 57 / 43 10 7 78 ------------------------------------------------------------- LEVEL TERRAIN E E E f f f LOS T B R w d HV ----- ----- ----- ----- ----- ----- A 2 1.8 2.2 .84 .96 .91 B 2.2 2 2.5 .84 .96 .89 C 2.2 2 2.5 .84 .96 .89 D 2 1.6 1.6 .84 .96 .94 E 2 1.6 1.6 .87 .96 .94 C) LEVEL OF SERVICE RESULTS ------------------------------------------------------------- INPUT VOLUME (vph) : 445 ACTUAL FLOW RATE: 627 SERVICE LOS FLOW RATE V/C --------- ----- A 103 .05 B 342 .17 C 664 .33 D 1231 .58 E 2197 1 LOS FOR GIVEN CONDITIONS: C I I I I I I I I I I I I I I I I I I I 1985 HCM:TWO-LANE HIGHWAYS **************************************************************** FACILITY LOCATION.... NYS Route 25 ANALyST.............. DEA/SPL TIME OF ANALySIS..... DATE OF ANALySIS..... 10-03-1997 OTHER INFORMATION.... East of Narrow River Rd.; 5-6 PM, weekd ay; 10 Year, no-build A) ADJUSTMENT FACTORS ------------------------------------------------------------- PERCENTAGE OF TRUCKS........................ PERCENTAGE OF BUSES......................... PERCENTAGE OF RECREATIONAL VEHICLES......... DESIGN SPEED (MPH).......................... PEAl{ HOUR FACTOR............................ DIRECTIONAL DISTRIBUTION (UP/DOWN).......... LANE WIDTH (FT)............................. USABLE SHOULDER WIDTH (AVG. WIDTH IN FT.)... PERCENT NO PASSING ZONES.................... B) CORRECTION FACTORS 2 2 5 50 .77 48 / 52 10 7 78 ------------------------------------------------------------- LEVEL TERRAIN E E E f f f LOS T B R w d HV ----- ----- ----- ----- ----- ----- A 2 1.8 2.2 .84 .99 .91 B 2.2 2 2.5 .84 .99 .89 C 2.2 2 2.5 .84 .99 .89 D 2 1.6 1.6 .84 .99 .94 E 2 1.6 1.6 .87 .99 .94 C) LEVEL OF SERVICE RESULTS ------------------------------------------------------------- INPUT VOLUME (vph) : 377 ACTUAL FLOW RATE: 490 SERVICE LOS FLOW RATE V/C --------- ----- A 106 .05 B 353 .17 C 685 .33 D 1269 .58 E 2266 1 LOS FOR GIVEN CONDITIONS: C I I I I I I I I I I I I I I I I I I I 1985 HCM:TWO-LANE HIGHWAYS **************************************************************** FACILITY LOCATION.... NYS Route 25 ANALyST.............. DEA/SPL TIME OF ANALySIS..... DATE OF ANALySIS..... 10-03-1997 OTHER INFORMATION.... East of Narrow River Rd.; 9-10 PM, week day; 10 Year, no-build A) ADJUSTMENT FACTORS PERCENTAGE OF TRUCKS........................ PERCENTAGE OF BUSES......................... PERCENTAGE OF RECREATIONAL VEHICLES......... DESIGN SPEED (MPH).......................... PEAK HOUR FACTOR............................ DIRECTIONAL DISTRIBUTION (UP/DOWN).......... IANE WIDTH CFT)............................. USABLE SHOULDER WIDTH (AVG. WIDTH IN FT.)... PERCENT NO PASSING ZONES.................... B) CORRECTION FACTORS LEVEL TERRAIN E E E f f f LOS T B R w d HV ----- ----- ----- ----- ----- ----- A 2 1.8 2.2 .84 .92 .91 B 2.2 2 2.5 .84 .92 .89 C 2.2 2 2.5 .84 .92 .89 0 2 1.6 1.6 .84 .92 .94 E 2 1.6 1.6 .87 .92 .94 C) LEVEL OF SERVICE RESULTS INPUT VOLUME (vph) : 163 ACTUAL FLOW RATE: 326 SERVICE LOS FLOW RATE V/C --------- ----- A 98 .05 B 327 .17 C 635 .33 0 1175 .58 E 2099 1 LOS FOR GIVEN CONDITIONS: B 2 2 5 50 .5 35 / 65 10 7 78 I I I I I I I I I I I I I I I I I I , II I ..... 1985 HCM:TWO-LANE HIGHWAYS **~t************************************************************* FACILITY LOCATION.... NYS Route 25 ANALyST.............. DEAISPL TIME OF ANALySIS..... DATE OF ANALySIS..... 10-03-1997 OTHER INFORMATION.... East of Narrow River Rd.; 11-12 NOON, S at,; 10 Year, no-build A) ADJUSTMENT FACTORS PERCENTAGE OF TRUCKS........................ PERCENTAGE OF BUSES......................... PERCENTAGE OF RECREATIONAL VEHICLES......... DESIGN SPEED (MPH).......................... PEAK HOUR FACTOR............................ DIRECTIONAL DISTRIBUTION (UP/DOWN).......... LANE WIDTH (FT)............................. USABLE SHOULDER WIDTH (AVG. WIDTH IN FT.)... PERCENT NO PASSING ZONES.................... B) CORRECTION FACTORS LEVEL TERRAIN E E E f f f LOS T B R w d HV ----- ----- ----- ----- ----- ----- A 2 1.8 2.2 .84 .98 .91 B 2.2 2 2.5 .84 .98 .89 C 2.2 2 2.5 .84 .98 .89 D 2 1.6 1.6 .84 .98 .94 E 2 1.6 1.6 .87 .98 .94 C) LEVEL OF SERVICE RESULTS INPUT VOLUME (vph) : 569 ACTUAL FLOW RATE: 686 SERVICE LOS FLOW RATE VIC --------- ----- A 105 .05 B 351 .17 C 681 .33 D 1261 .58 E 2252 1 LOS FOR GIVEN CONDITIONS: D 2 2 5 50 .83 53 I 47 10 7 78 I I I I I I I I I I I I I I I I I I I 1985 HCM:TWO-LANE HIGHWAYS **************************************************************** FACILITY LOCATION.... NYS Route 25 ANALyST.............. DEA/SPL TIME OF ANALySIS..... DATE OF ANALySIS..... 10-03-1997 OTHER INFORMATION.... East of Narrow River Rd.; 5-6 PM, Sat.; 10 Year, no-build A) ADJUSTMENT FACTORS PERCENTAGE OF TRUCKS........................ PERCENTAGE OF BUSES......................... PERCENTAGE OF RECREATIONAL VEHICLES......... DESIGN SPEED (MPH).......................... l?~J\l{ 1i()t1it ~~C=~()il............................ DIRECTIONAL DISTRIBUTION (UP/DOWN).......... IANE WIDTH (FT)............................. USABLE SHOULDER WIDTH (AVG. WIDTH IN FT.)... PERCENT NO PASSING ZONES.................... B) CORRECTION FACTORS LEVEL TERRAIN E E E f f f LOS T B R w d HV ----- ----- ----- ----- ----- ----- A 2 1.8 2.2 .84 .96 .91 B 2.2 2 2.5 .84 .96 .89 C 2.2 2 2.5 .84 .96 .89 D 2 1.6 1.6 .84 .96 .94 E 2 1.6 1.6 .87 .96 .94 C) LEVEL OF SERVICE RESULTS INPUT VOLUME (vph) : 523 ACTUAL FLOW RATE: 646 SERVICE LOS FLOW RATE V/C --------- ----- A 103 .05 B 342 .17 C 664 .33 D 1231 .58 E 2197 1 LOS FOR GIVEN CONDITIONS: C 2 2 5 50 .81 43 / 57 10 7 78 I I I I I I I I I I I I I I I I I I I 1985 HCM:TWO-LANE HIGHWAYS **************************************************************** FACILITY LOCATION.... NYS Route 25 ANALyST.............. DEA/SPL TIME OF ANALySIS..... DATE OF ANALySIS..... 10-03-1997 OTHER INFORMATION.... East of Narrow River Rd.; 9-10 PM, Sat. ; 10 Year, no-build A) ADJUSTMENT FACTORS PERCENTAGE OF TRUCKS........................ PERCENTAGE OF BUSES......................... PERCENTAGE OF RECREATIONAL VEHICLES......... DESIGN SPEED (MPH).......................... l?~~J{ Ii()~ ~~c:~()~............................ DIRECTIONAL DISTRIBUTION (UP/DOWN).......... IANE WIDTH (FT)............................. USABLE SHOULDER WIDTH (AVG. WIDTH IN FT.)... PERCENT NO PASSING ZONES.................... 2 2 5 50 .53 40 / 60 10 7 78 B) CORRECTION FACTORS ------------------------------------------------------------- LEVEL TERRAIN E E E f f f LOS T B R w d HV ----- ----- ----- ----- ----- ----- A 2 1.8 2.2 .84 .94 .91 B 2.2 2 2.5 .84 .94 .89 C 2.2 2 2.5 .84 .94 .89 D 2 1.6 1.6 .84 .94 .94 E 2 1.6 1.6 .87 .94 .94 C) LEVEL OF SERVICE RESULTS INPUT VOLUME (vph) : 201 ACTUAL FLOW RATE: 379 SERVICE LOS FLOW RATE V/C --------- ----- A 101 .05 B 336 .17 C 652 .33 D 1207 .58 E 2156 1 LOS FOR GIVEN CONDITIONS: C I I I I I I I I I I I I I I I I I I I 1985 HCM:TWO-LANE HIGHWAYS **************************************************************** FACILITY LOCATION.... NYS Route 25 ANALyST.............. DEA/SPL TIME OF ANALySIS..... DATE OF ANALySIS..... 10-03-1997 OTHER INFORMATION.... East of Narrow River Rd.; 11-12 NOON, S un.; 10 Year, no-build A) ADJUSTMENT FACTORS PERCENTAGE OF TRUCKS........................ PERCENTAGE OF BUSES......................... PERCENTAGE OF RECREATIONAL VEHICLES......... DESIGN SPEED (MPH).......................... PEAK HOUR FACTOR............................ DIRECTIONAL DISTRIBUTION (UP/DOWN).......... LANE WIDTH (FT)............................. USABLE SHOULDER WIDTH (AVG. WIDTH IN FT.)... PERCENT NO PASSING ZONES.................... B) CORRECTION FACTORS LEVEL TERRAIN E E E f f f LOS T B R w d HV ----- ----- ----- ----- ----- ----- A 2 1.8 2.2 .84 .92 .91 B 2.2 2 2.5 .84 .92 .89 C 2.2 2 2.5 .84 .92 .89 D 2 1.6 1.6 .84 .92 .94 E 2 1.6 1.6 .87 .92 .94 C) LEVEL OF SERVICE RESULTS INPUT VOLUME(vph): 732 ACTUAL FLOW RATE: 904 SERVICE LOS FLOW RATE V/C --------- ----- A 98 .05 B 327 .17 C 635 .33 D 1175 .58 E 2099 1 LOS FOR GIVEN CONDITIONS: D 2 2 5 50 .81 65 / 35 10 7 78 I I I I I I I I I I I I I I I I I I I 1985 HCM:TWO-LANE HIGHWAYS **************************************************************** FACILITY LOCATION.... NYS Route 25 ANALyST.............. DEA/SPL TIME OF ANALySIS..... DATE OF ANALySIS..... 10-03-1997 OTHER INFORMATION.... East of Narrow River Rd.; 5-6 PM, Sun.; 10 Year, no-build A) ADJUSTMENT FACTORS PERCENTAGE OF TRUCKS........................ PERCENTAGE OF BUSES......................... PERCENTAGE OF RECREATIONAL VEHICLES......... DESIGN SPEED (MPH).......................... l?~~lC FI()~ ~~c:~()~............................ DIRECTIONAL DISTRIBUTION (UP/DOWN).......... IANE WIDTH (FT)............................. USABLE SHOULDER WIDTH (AVG. WIDTH IN FT.)... PERCENT NO PASSING ZONES.................... 2 2 5 50 .75 37 I 63 10 7 78 B) CORRECTION FACTORS ------------------------------------------------------------- LEVEL TERRAIN E E E f f f LOS T B R w d HV ----- ----- ----- ----- ----- ----- A 2 1.8 2.2 .84 .93 .91 B 2.2 2 2.5 .84 .93 .89 C 2.2 2 2.5 .84 .93 .89 D 2 1.6 1.6 .84 .93 .94 E 2 1.6 1.6 .87 .93 .94 C) LEVEL OF SERVICE RESULTS INPUT VOLUME (vph) : 821 ACTUAL FLOW RATE: 1095 SERVICE LOS FLOW RATE VIC --------- ----- A 100 .05 B 332 .17 C 645 .33 D 1195 .58 E 2133 1 LOS FOR GIVEN CONDITIONS: D I I I I I I I I I I I I I I I I I I I 1985 HCM:TWO-LANE HIGHWAYS **************************************************************** FACILITY LOCATION.... NYS Route 25 ANALyST.............. DEA/SPL TIME OF ANALySIS..... DATE OF ANALySIS..... 10-03-1997 OTHER INFORMATION.... East of Narrow River Rd.; 9-10 PM, Sun. ; 10 Year, no-build A) ADJUSTMENT FACTORS ------------------------------------------------------------- PERCENTAGE OF TRUCKS........................ PERCENTAGE OF BUSES......................... PERCENTAGE OF RECREATIONAL VEHICLES......... DESIGN SPEED (MPH).......................... PEAK HOUR FACTOR............................ DIRECTIONAL DISTRIBUTION (UP/DOWN).......... LANE WIDTH (FT)............................. USABLE SHOULDER WIDTH (AVG. WIDTH IN FT.)... PERCENT NO PASSING ZONES.................... 2 2 5 50 .53 27 / 73 10 7 78 B) CORRECTION FACTORS ------------------------------------------------------------- LEVEL TERRAIN E E E f f f LOS T B R w d HV ----- ----- ----- ----- ----- ----- A 2 1.8 2.2 .84 .87 .91 B 2.2 2 2.5 .84 .87 .89 C 2.2 2 2.5 .84 .87 .89 0 2 1.6 1.6 .84 .87 .94 E 2 1.6 1.6 .87 .87 .94 C) LEVEL OF SERVICE RESULTS ------------------------------------------------------------- INPUT VOLUME (vph) : 279 ACTUAL FLOW RATE: 526 SERVICE LOS FLOW RATE V/C --------- ----- A 94 .05 B 312 .17 C 605 .33 0 1120 .58 E 2000 1 LOS FOR GIVEN CONDITIONS: C I I I I I I I I I I I I I I I I I I I Route 25 Narrow River Road to Eastern Terminus 2007 Capacity Analysis (Build) Disk #390. Cross Sound Ferry File: Dividers I, I , I I I I I I I I I I I I I I I I , 1985 HCM:TWO-LANE HIGHWAYS **~,************************************************************* FACILITY LOCATION.... NYS Route 25 ANALyST.............. DEA/SPL TIME OF ANALySIS..... DATE OF ANALySIS..... 10-03-1997 OTHER INFORMATION.... East of Narrow River Rd.; 11-12 NOON, w eekday; 10 Year, build A) ADJUSTMENT FACTORS ------------------------------------------------------------- PERCENTAGE OF TRUCKS........................ PERCENTAGE OF BUSES......................... PERCENTAGE OF RECREATIONAL VEHICLES......... DESIGN SPEED (MPH).......................... PEAK HOUR FACTOR............................ DIRECTIONAL DISTRIBUTION (UP/DOWN).......... LANE WIDTH (FT).......................................................... USABLE SHOULDER WIDTH (AVG. WIDTH IN FT.)... PERCENT NO PASSING ZONES.................... B) CORRECTION FACTORS 2 2 5 50 .71 67 / 33 10 7 78 ------------------------------------------------------------- LEVEL TERRAIN E E E f f f LOS T B R w d HV ----- ----- ----- ----- ----- ----- A 2 1.8 2.2 .84 .91 .91 B 2.2 2 2.5 .84 .91 .89 C 2.2 2 2.5 .84 .91 .89 D 2 1.6 1.6 .84 .91 .94 E 2 1.6 1.6 .87 .91 .94 C) LEVEL OF SERVICE RESULTS ------------------------------------------------------------- INPUT VOLUME(vph): 536 ACTUAL FLOW RATE: 755 SERVICE LOS FLOW RATE V/C --------- ----- A 97 .05 B 323 .17 C 628 .33 D 1162 .58 E 2076 1 LOS FOR GIVEN CONDITIONS: D I I I I I I I I I I I I I I I I I I I 1985 HCM:TWO-LANE HIGHWAYS **************************************************************** FACILITY LOCATION.... NYS Route 25 ANALyST.............. DEA/SPL TIME OF ANALySIS..... DATE OF ANALySIS..... 10-03-1997 OTHER INFORMATION.... East of Narrow River Rd.; 5-6 PM, weekd ay; 10 Year, build A) ADJUSTMENT FACTORS ------------------------------------------------------------- PERCENTAGE OF TRUCKS........................ PERCENTAGE OF BUSES......................... PERCENTAGE OF RECREATIONAL VEHICLES......... DESIGN SPEED (MPH).......................... PEAK HOUR FACTOR............................ DIRECTIONAL DISTRIBUTION (UP/DOWN).......... LANE WIDTH (FT)............................. USABLE SHOULDER WIDTH (AVG. WIDTH IN FT.)... PERCENT NO PASSING ZONES.................... B) CORRECTION FACTORS LEVEL TERRAIN E E E f f f LOS T B R w d HV ----- ----- ----- ----- ----- ----- A 2 1.8 2.2 .84 .98 .91 B 2.2 2 2.5 .84 .98 .89 C 2.2 2 2.5 .84 .98 .89 D 2 1.6 1.6 .84 .98 .94 E 2 1.6 1.6 .87 .98 .94 C) LEVEL OF SERVICE RESULTS 2 2 5 50 .77 46 / 54 10 7 78 ------------------------------------------------------------- INPUT VOLUME (vph) : 475 ACTUAL FLOW RATE: 617 SERVICE LOS FLOW RATE V/C --------- ----- A 105 .05 B 349 .17 C 677 .33 D 1254 .58 E 2239 1 LOS FOR GIVEN CONDITIONS: C I I I I I I I I I I I I I I I I I I I 1985 HCM:TWO-LANE HIGHWAYS **.t************************************************************* FACILITY LOCATION.... NYS Route 25 ANALyST.............. DEA/SPL TIME OF ANALySIS..... DATE OF ANALySIS..... 10-03-1997 OTHER INFORMATION.... East of Narrow River Road.; 9-10 PM, we ekday; 10 Year, build A) ADJUSTMENT FACTORS PERCENTAGE OF TRUCKS........................ PERCENTAGE OF BUSES......................... PERCENTAGE OF RECREATIONAL VEHICLES......... DESIGN SPEED (MPH).......................... PEAK HOUR FACTOR............................ DIRECTIONAL DISTRIBUTION (UP/DOWN).......... IANE WIDTH (FT)............................. USABLE SHOULDER WIDTH (AVG. WIDTH IN FT.)... PERCENT NO PASSING ZONES.................... B) CORRECTION FACTORS LEVEL TERRAIN E E E f f f LOS T B R w d HV ----- ----- ----- ----- ----- ----- A 2 1.8 2.2 .84 .83 .91 B 2.2 2 2.5 .84 .83 .89 C 2.2 2 2.5 .84 .83 .89 D 2 1.6 1.6 .84 .83 .94 E 2 1.6 1.6 .87 .83 .94 C) LEVEL OF SERVICE RESULTS 2 2 5 50 .5 20 / 80 10 7 78 ------------------------------------------------------------- INPUT VOLUME(vph): 260 ACTUAL FLOW RATE: 520 SERVICE LOS FLOW RATE V/C --------- ----- A 89 .05 B 297 .17 C 576 .33 D 1066 .58 E 1904 1 LOS FOR GIVEN CONDITIONS: C I I I I I I I I I I I I I I I I I I I 1985 HCM:TWO-LANE HIGHWAYS **************************************************************** FACILITY LOCATION.... NYS Route 25 ANALyST.............. DEA/SPL TIME OF ANALySIS..... DATE OF ANALySIS..... 10-03-1997 OTHER INFORMATION.... East of Narrow River Rd.; 11-12 NOON, S at.; 10 Year, build A) ADJUSTMENT FACTORS PERCENTAGE OF TRUCKS........................ PERCENTAGE OF BUSES......................... PERCENTAGE OF RECREATIONAL VEHICLES......... DESIGN SPEED (MPH).......................... PEAK HOUR FACTOR............................ DIRECTIONAL DISTRIBUTION (UP/DOWN).......... LANE WIDTH (FT)............................. USABLE SHOULDER WIDTH (AVG. WIDTH IN FT.)... PERCENT NO PASSING ZONES.................... B) CORRECTION FACTORS LEVEL TERRAIN E E E f f f LOS T B R w d HV ----- ----- ----- ----- ----- ----- A 2 1.8 2.2 .84 .95 .91 B 2.2 2 2.5 .84 .95 .89 C 2.2 2 2.5 .84 .95 .89 D 2 1.6 1.6 .84 .95 .94 E 2 1.6 1.6 .87 .95 .94 C) LEVEL OF SERVICE RESULTS INPUT VOLUME (vph) : 681 ACTUAL FLOW RATE: 820 SERVICE LOS FLOW RATE V/C --------- ----- A 102 .05 B 338 .17 C 656 .33 D 1215 .58 E 2170 1 LOS FOR GIVEN CONDITIONS: D 2 2 5 50 .83 59 / 41 10 7 78 I I I I I I I I I I I I I I I I I I II 1985 HCM:TWO-LANE HIGHWAYS **.t************************************************************* FACILITY LOCATION.... NYS Route 25 ANALyST.............. DEA/SPL TIME OF ANALySIS..... DATE OF ANALySIS..... 10-03-1997 OTHER INFORMATION.... East of Narrow River Rd.; 5-6 PM, Sat.; 10 Year, build A) ADJUSTMENT FACTORS PERCENTAGE OF TRUCKS........................ PERCENTAGE OF BUSES......................... PERCENTAGE OF RECREATIONAL VEHICLES......... DESIGN SPEED (MPH).......................... PEAK HOUR FACTOR............................ DIRECTIONAL DISTRIBUTION (UP/DOWN).......... LANE WIDTH (FT)............................. USABLE SHOULDER WIDTH (AVG. WIDTH IN FT.)... PERCENT NO PASSING ZONES.................... B) CORRECTION FACTORS LEVEL TERRAIN E E E f f f LOS T B R w d HV ----- ----- ----- ----- ----- ----- A 2 1.8 2.2 .84 .96 .91 B 2.2 2 2.5 .84 .96 .89 C 2.2 2 2.5 .84 .96 .89 D 2 1.6 1.6 .84 .96 .94 E 2 1.6 1.6 .87 .96 .94 C) LEVEL OF SERVICE RESULTS 2 2 5 50 .81 43 / 57 10 7 78 ------------------------------------------------------------- INPUT VOLUME (vph) : 617 ACTUAL FLOW RATE: 762 SERVICE LOS FLOW RATE V/C --------- ----- A 103 .05 B 342 .17 C 664 .33 D 1231 .58 E 2197 1 LOS FOR GIVEN CONDITIONS: D I I I I I I I I I I I I I I I I I I I 1985 HCM:TWO-LANE HIGHWAYS **************************************************************** FACILITY LOCATION.... NYS Route 25 ANALyST.............. DEA/SPL TIME OF ANALySIS..... DATE OF ANALySIS..... 10-03-1997 OTHER INFORMATION.... East of Narrow River Rd.; 9-10 PM, Sat. ; 10 Year, build A) ADJUSTMENT FACTORS ------------------------------------------------------------- PERCENTAGE OF TRUCKS........................ PERCENTAGE OF BUSES......................... PERCENTAGE OF RECREATIONAL VEHICLES......... DESIGN SPEED (MPH).......................... PEAK HOUR FACTOR............................ DIRECTIONAL DISTRIBUTION (UP/DOWN).......... IANE WIDTH (FT)............................. USABLE SHOULDER WIDTH (AVG. WIDTH IN FT.)... PERCENT NO PASSING ZONES.................... B) CORRECTION FACTORS 2 2 5 50 .53 26 / 74 10 7 78 ------------------------------------------------------------- LEVEL TERRAIN E E E f f f LOS T B R w d HV ----- ----- ----- ----- ----- ----- A 2 1.8 2.2 .84 .87 .91 B 2.2 2 2.5 .84 .87 .89 C 2.2 2 2.5 .84 .87 .89 D 2 1.6 1.6 .84 .87 .94 E 2 1.6 1.6 .87 .87 .94 C) LEVEL OF SERVICE RESULTS ------------------------------------------------------------- INPUT VOLUME(vph): 297 ACTUAL FLOW RATE: 560 SERVICE LOS FLOW RATE V/C --------- ----- A 93 .05 B 309 .17 C 601 .33 D 1112 .58 E 1986 1 LOS FOR GIVEN CONDITIONS: C I I I I I I I I I I I I I I I I I I I 1985 HCM:TWO-LANE HIGHWAYS **~t************************************************************* FACILITY LOCATION.... NYS Route 25 ANALyST.............. DEA/SPL TIME OF ANALySIS..... DATE OF ANALySIS..... 10-03-1997 OTHER INFORMATION.... East of Narrow River Rd.; 11-12 NOON, S un.; 10 Year, Build A) ADJUSTMENT FACTORS PERCENTAGE OF TRUCKS........................ PERCENTAGE OF BUSES......................... PERCENTAGE OF RECREATIONAL VEHICLES......... DESIGN SPEED (MPH).......................... PEAK HOUR FACTOR............................ DIRECTIONAL DISTRIBUTION (UP/DOWN).......... IANE WIDTH eFT).......................................................... USABLE SHOULDER WIDTH (AVG. WIDTH IN FT.)... PERCENT NO PASSING ZONES.................... 2 2 5 50 .81 69 / 31 10 7 78 B) CORRECTION FACTORS ------------------------------------------------------------- LEVEL TERRAIN E E E f f f LOS T B R w d HV ----- ----- ----- ----- ----- ----- A 2 1.8 2.2 .84 .9 .91 B 2.2 2 2.5 .84 .9 .89 C 2.2 2 2.5 .84 .9 .89 0 2 1.6 1.6 .84 .9 .94 E 2 1.6 1.6 .87 .9 .94 C) LEVEL OF SERVICE RESULTS ------------------------------------------------------------- INPUT VOLUME (vph) : 840 ACTUAL FLOW RATE: 1037 SERVICE LOS FLOW RATE V/C --------- ----- A 96 .05 B 320 .17 C 621 .33 0 1150 .58 E 2053 1 LOS FOR GIVEN CONDITIONS: 0 I I I I I I I I I I I I I I I I I I I 1985 HCM:TWO-LANE HIGHWAYS **************************************************************** FACILITY LOCATION.... NYS Route 25 ANALyST.............. DEA/SPL TIME OF ANALySIS..... DATE OF ANALySIS..... 10-03-1997 OTHER INFORMATION.... East of Narrow River Rd.; 9-10 PM, Sun. ; 10 Year, build A) ADJUSTMENT FACTORS ------------------------------------------------------------- PERCENTAGE OF TRUCKS........................ PERCENTAGE OF BUSES......................... PERCENTAGE OF RECREATIONAL VEHICLES......... DESIGN SPEED (MPH).......................... PEAK HOUR FACTOR............................ DIRECTIONAL DISTRIBUTION (UP/DOWN).......... LANE WIDTH (FT)............................. USABLE SHOULDER WIDTH (AVG. WIDTH IN FT.)... PERCENT NO PASSING ZONES.................... 2 2 5 50 .53 19 / 81 10 7 78 B) CORRECTION FACTORS ------------------------------------------------------------- LEVEL TERRAIN E E E f f f LOS T B R w d HV ----- ----- ----- ----- ----- ----- A 2 1.8 2.2 .84 .82 .91 B 2.2 2 2.5 .84 .82 .89 C 2.2 2 2.5 .84 .82 .89 D 2 1.6 1.6 .84 .82 .94 E 2 1.6 1.6 .87 .82 .94 C) LEVEL OF SERVICE RESULTS ------------------------------------------------------------- INPUT VOLUME (vph) : 373 ACTUAL FLOW RATE: 704 SERVICE LOS FLOW RATE V/C --------- ----- A 88 .05 B 294 .17 C 570 .33 D 1056 .58 E 1885 1 LOS FOR GIVEN CONDITIONS: D I I I I I I I I I I I I I I I I I I I 1985 HCM:TWO-LANE HIGHWAYS **************************************************************** FACILITY LOCATION.... NYS Route 25 ANALyST.............. DEA/SPL TIME OF ANALySIS..... DATE OF ANALySIS..... 10-03-1997 OTHER INFORMATION.... East of Narrow River Rd.; 5-6 PM, Sun.; 10 Year, build A) ADJUSTMENT FACTORS ------------------------------------------------------------- PERCENTAGE OF TRUCKS........................ PERCENTAGE OF BUSES......................... PERCENTAGE OF RECREATIONAL VEHICLES......... DESIGN SPEED (MPH).......................... PEAK HOUR FACTOR....................................................... DIRECTIONAL DISTRIBUTION (UP/DOWN).......... lANE WIDTH (FT).......................................................... USABLE SHOULDER WIDTH (AVG. WIDTH IN FT.)... PERCENT NO PASSING ZONES.................... 2 2 5 50 .75 38 / 62 10 7 78 B) CORRECTION FACTORS ------------------------------------------------------------- LEVEL TERRAIN E E E f f f LOS T B R w d HV ----- ----- ----- ----- ----- ----- A 2 1.8 2.2 .84 .93 .91 B 2.2 2 2.5 .84 .93 .89 C 2.2 2 2.5 .84 .93 .89 0 2 1.6 1.6 .84 .93 .94 E 2 1.6 1.6 .87 .93 .94 C) LEVEL OF SERVICE RESULTS ------------------------------------------------------------- INPUT VOLUME(vph): 919 ACTUAL FLOW RATE: 1225 SERVICE LOS FLOW RATE V/C --------- ----- A 100 .05 B 332 .17 C 645 .33 0 1195 .58 E 2133 1 LOS FOR GIVEN CONDITIONS: E I I I I I I I I I I I I I I I I I I I Route 25 Non-Motorized Count Summary Disk #380, Cross Sound Ferry File: Dividers I I I I I I I I I I I I I I I I I I I Long Island Transportation Plan Non-Motorized Count Summary Route 25, Southold Saturday August 2, 1997 Weather: sunny,warm Eastbound Time Peds Bikes Skaters 10:00 AM 1 2 0 10:15AM 1 2 0 10:30 AM 4 4 0 10:45 AM 1 2 0 HR Total 7 10 0 11:00AM 5 3 1 11:15AM 4 9 0 11:30AM 6 11 0 11:45AM 8 6 0 HR Total 23 29 1 12:00 PM 6 5 0 12:15PM 2 2 0 12:30 PM 3 11 0 12:45 PM 1 2 0 HR Total 12 20 0 1:00PM 1 3 0 1:15PM 2 5 2 1:30 PM 0 1 0 1:45PM 3 2 0 HR Total 6 11 2 2:00 PM 0 1 0 2:15PM 1 3 0 2:30 PM 2 0 0 2:45 PM 2 4 0 HR Total 5 8 0 3:00 PM 1 5 0 3:15PM 0 3 2 3:30 PM 2 1 0 3:45 PM 1 2 0 HR Total 4 11 2 Dav Total 57 89 5 Westbound Time Peds Bikes Skaters 10:00 AM 4 1 0 10:15AM 2 4 1 10:30 AM 2 6 0 10:45 AM 2 1 1 HR Total 10 12 2 11:00AM 2 2 0 11:15AM 3 1 1 11:30AM 7 1 0 11:45AM 7 11 0 HR Total 19 15 1 12:00 PM 3 5 0 12:15PM 5 3 0 12:30 PM 7 2 0 12:45 PM 11 1 0 HR Total 26 11 0 1:00PM 2 7 2 1:15PM 5 5 0 1:30 PM 0 0 1 1:45PM 3 1 0 HR Total 10 13 3 2:00 PM 1 2 0 2:15PM 3 1 0 2:30 PM 2 5 0 2:45 PM 1 3 0 HR Total 7 11 0 3:00 PM 5 2 0 3:15PM 1 6 1 3:30 PM 7 1 0 3:45 PM 3 5 0 HR Total 16 14 1 Dav Total 88 76 7 Page 1 of4 I I I I I I I I I I I I I I I I I I I Long Island Transportation Plan Non-Motorized Count Summary Route 25, Southold Saturday August 9,1997 Weather: sunny,warm Eastbound Time Peds Bikes Skaters 10:00 AM 1 2 0 10:15AM 2 0 0 10:30 AM 4 2 0 10:45 AM 1 0 0 HR Total 8 4 0 11:00AM 1 0 0 11:15AM 2 2 0 11:30AM 0 4 0 11:45AM 0 1 0 HR Total 3 7 0 12:00 PM 5 1 0 12:15PM 3 2 0 12:30 PM 4 5 0 12:45 PM 6 0 0 HR Total 18 8 0 1:00 PM 4 1 0 1:15PM 0 3 1 1:30PM 1 2 0 1:45PM 2 0 0 HR Total 7 6 1 2:00 PM 2 1 0 2:15PM 1 4 0 2:30 PM 0 3 2 2:45 PM 0 0 0 HR Total 3 8 2 3:00 PM 0 4 0 3:15 PM 1 0 1 3:30 PM 2 1 0 3:45 PM 1 2 0 HR Total 4 7 1 Dav Total 43 40 4 Westbound Time Peds Bikes Skaters 10:00 AM 2 4 0 10:15AM 1 0 2 10:30 AM 3 1 1 10:45 AM 1 2 0 HR Total 7 7 3 11:00AM 5 4 0 11:15AM 3 5 0 11:30AM 1 1 0 11:45AM 2 3 0 HR Total 11 13 0 12:00 PM 1 0 1 12:15 PM 5 2 0 12:30 PM 3 1 0 12:45 PM 0 2 0 HR Total 9 5 1 1:00PM 3 4 0 1:15PM 2 5 0 1:30PM 5 0 0 1:45PM 0 2 0 HR Total 10 11 0 2:00 PM 0 0 1 2:15PM 2 3 0 2:30 PM 1 1 0 2:45 PM 2 2 0 HR Total 5 6 1 3:00 PM 3 0 0 3:15PM 4 1 0 3:30 PM 1 2 0 3:45 PM 2 3 0 HR Total 10 6 0 Dav Total 52 48 5 Page 2 of4 I I I I I I I I I I I I I I I I I I I Long Island Transportation Plan Non-Motorized Count Summary Route 25, Southold Saturday,August 16,1997 Weather: sunny,hot Eastbound Westbound Time Peds Bikes Skaters 10:00 AM 5 3 1 10:15AM 3 2 0 10:30 AM 1 4 4 10:45 AM 2 3 0 HR Total 11 12 5 11:00AM 4 7 2 11:15AM 3 3 1 11:30AM 5 2 0 11:45AM 1 5 0 HR Total 13 17 3 12:00 PM 3 1 0 12:15PM 5 6 1 12:30 PM 0 3 0 12:45 PM 2 2 2 HR Total 10 12 3 1:00PM 5 4 0 1:15PM 3 3 1 1:30PM 3 0 0 1:45 PM 0 3 0 HR Total 11 10 1 2:00 PM 6 3 0 2:15PM 2 5 1 2:30 PM 1 2 2 2:45 PM 2 1 0 HR Total 11 11 3 3:00 PM 3 6 0 3:15PM 1 7 2 3:30 PM 2 3 3 3:45 PM 4 0 0 HR Total 10 16 5 Dav Total 66 78 20 Time Peds Bikes Skaters 10:00 AM 4 0 0 10:15AM 5 3 2 10:30 AM 1 4 1 10:45 AM 3 1 0 HR Total 13 8 3 11:00AM 6 3 0 11:15AM 5 2 1 11:30AM 3 5 3 11:45AM 1 3 0 HR Total 15 13 4 12:00 PM 5 6 1 12:15PM 6 9 2 12:30 PM 3 1 0 12:45 PM 1 2 0 HR Total 15 18 3 1:00PM 2 7 0 1:15 PM 5 2 0 1:30PM 3 1 0 1:45 PM 4 3 0 HR Total 14 13 0 2:00 PM 0 6 1 2:15PM 2 0 1 2:30 PM 3 1 0 2:45 PM 1 3 0 HR Total 6 10 2 3:00 PM 4 5 0 3:15PM 1 3 1 3:30 PM 2 1 0 3:45 PM 0 0 0 HR Total 7 9 1 Dav Total 70 71 13 Page 3 of 4 I I I I I I I I I I I I I I I I I I I Long Island Transportation Plan Non-Motorized Count Summary Route 25, Southold Saturday August 23,1997 Weather: sunny,warm Eastbound Time Peds Bikes Skaters 10:00 AM 1 4 0 10:15 AM 0 3 0 10:30 AM 3 0 0 10:45 AM 1 2 0 HR Total 5 9 0 11:00AM 0 1 1 11:15AM 4 5 0 11:30AM 3 9 0 11:45AM 1 6 2 HR Total 8 21 3 12:00 PM 2 7 0 12:15PM 5 3 1 12:30 PM 6 4 2 12:45 PM 1 1 1 HR Total 14 15 4 1:00PM 3 2 1 1:15PM 7 0 0 1:30PM 1 8 2 1:45PM 4 9 0 HR Total 15 19 3 2:00 PM 2 0 0 2:15PM 5 2 0 2:30 PM 0 3 0 2:45 PM 1 5 0 HR Total 8 10 0 3:00 PM 4 9 0 3:15PM 6 3 1 3:30 PM 1 2 0 3:45 PM 5 1 1 HR Total 16 15 2 DavTotal 66 89 12 Westbound Time Peds Bikes Skaters 10:00 AM 4 12 1 10:15 AM 3 3 0 10:30 AM 0 9 0 10:45 AM 1 1 2 HR Total 8 25 3 11:00AM 5 0 1 11:15AM 1 6 1 11:30AM 6 3 0 11:45AM 9 5 0 HR Total 21 14 2 12:00 PM 1 1 3 12:15 PM 2 3 4 12:30 PM 4 7 1 12:45 PM 0 6 0 HR Total 7 17 8 1 :00 PM 9 1 0 1:15PM 1 2 2 1:30PM 6 2 1 1 :45 PM 3 6 0 HR Total 19 11 3 2:00 PM 2 2 1 2:15PM 1 3 3 2:30 PM 1 7 0 2:45 PM 4 1 0 HR Total 8 13 4 3:00 PM 1 5 0 3:15PM 2 3 0 3:30 PM 4 1 2 3:45 PM 0 0 0 HR Total 7 9 2 Day Total 70 89 22 Page 4 of 4