Loading...
HomeMy WebLinkAboutTransportation Plan - Rail Transportation Inventory - 1984 I I I I I I I I I I I I I - A COMPREHENSIVE TRANSPORTATION PLAN FOR SUFFOLK COUNTY RAIL TRANSPORTATION INVENTORY 1984 PETER F. COHALAN COUNTY EXECUTIVE LEE E.' KOPPELMAN DIRECTOR OF PLANNING GERALD V. CRONIN DIRECTOR OF TRANSPORTATION OPERATIONS The preparation of this report has been financed in part through funds from the U.S. Department of Transportation, Federal Highway Administration under the Federal Highway Act of 1956, as amended, and the Urban Mass Transportation Administration, under the Urban Mass Transportation Act of 1964, as amended. This document is disseminated under the sponsorship of the Department of Transportation in the interest of information exchange. The contents of this report reflect the views of the author who is responsible for the facts and the accuracy of the data presented herein. The contents do not necessarily reflect the official views or poliCies of the Urban Mass Transportation Administration, the Federal Highway Administration or the State of New York. This report does not constitute a standard. specification. or regulation. -;- I I I I I I I I I I I I I PREFACE The Comprehensive Transportation Plan for Suffolk County was completed in 1978 and consisted of two volumes: Volume I, 1975 Inventory and Analysis, and Volume II, 1978-1995 Improvement Program. The plan was prepared by the Suffolk County Department of Transportation under an agreement with the Tri-State Regional Planning Commission. Since the release of the plan, Tri-State has been dissolved and the New York Metropolitan Transportation Council has been formed and is now the Metropolitan Planning Organization (MPO) for the New York City metropolitan area which includes Suffolk County. The Suffolk County Department of Transportation was also abolished and its duties were divided between the Suffolk County Department of Planning and the Suffolk County Department of Public Works. This update of the 1975 Inventory and Analysis Plan has been prepared by the Transportation Division of the Suffolk County Department of Planning. The 1984 update consists of highway, rail, air and marine transportation elements. An update of the transit element and the completion of Phase II of the transit system development plan proposed in the 1978-1995 Improvement Program was accomplished under a contract with ATE Management and Service Company, Inc. * * * * * * * * * * * * .. .. This report was prepared and written by John Murray, with inventory update coordination and editing by Charles F. Nauss, graphics by John T. Wolfe and typing by Tsiporah Roter and Diane Hummel. We wish to thank the Suffolk County Departments of Planning, Planning Division, and Public Works, Traffic Control and Engineering Division, for their cooperation and assistance in the preparation of this report. -ii- I I I I I I I I I I I I I I I I I I I TABLE OF CONTENTS Page INTRODUCTION.... .. .. .. .. .. .... .. .. .. .. .... .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .... .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. 1 OVERVIEW.. .. .. .. .. .. .. .. .. .. .. .. .. .. .... .... .. .... .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .... .. .. .. .. .. .. .. .. .. .. 2 RAI LROAD ROUTES.............................................. 3 PHYSICAL PLANT & EQUIPMENT................................... 5 RAILROAD PARKING LOT PROJECTS................................ 6 PASSENGER OPERATIONS AND SERVICE LEVELS...................... 7 RIDERSHIP GROWTH......................................................................................... 12 PASSENGER FARE STRUCTURE..................................... 15 REVENUES, CAPITAL AND OPERATING COSTS........................ 17 FREIGHT OPERATIONS........................................... 17 HISTORY OF FREIGHT ACCESS.................................... 20 FINANCING AND FUNDING........................................ 25 DEMOGRAPHIC TRENDS........................................... 28 -iii- I I I I I I I I I I I I I I I I I I I LIST OF FIGURES Figure Page 1 Suffolk's Portion of the LIRR Branch Rail Miles........... 4 2 Tota 1 Yearly Passenger Counts............................. 7 3 A Comparison of Ridership to Type of LIRR Service......... 8- 4 LIRR Zone Schedul i ng...................................... 12 5 Rail Ridership/Population & Labor Force Growth............ 14 6 LIRR Fares and Zones...................................... 16 7 NYSOOT Full Freight Access Program........................ 21 8 LIRR Freight - 1965 to 1982............................... 23 9 LIRR Freight Revenue...................................... 24 10 LIRR Freight Volume by Carloads........................... 24 LIST OF TABLES Table Page 1 LIRR Station Parking Lot Improvement Projects............. 6 2 LIRR Level of Service - Suffolk County.................... 9 3 Distribution of LIRR Freight Traffic - 1980............... 19 LIST OF MAPS 1 Long Island Railroad Operations..................Following 8 APPENDIX A Westbound Peak AM Ridership......................Following 30 - iv - I I I I I I I I I I I I I I I I I I i RAIL TRANSPORTATION Introduction As part of this update of the 1975 Suffolk County Comprehensive Transportation Plan - Inventory and Analysis, the passenger and freight operations of the Long Island Rail Road have been examined to determine trends and revisions in service since 1975. While Long Island, and especially Suffolk County, continues to increasingly rely on the automobile as the primary mode of transportation, Nassau-Suffolk Long Island Rail Road ridership has increased 26 percent since 1974. The bicounty labor force grew by 24% from 1970 to 1980, and the number of New York City-bound commuters increased from 231,182 to 257,413, a gain of 26,231 or 11.3%. Passenger operations continue to be oriented to the New York City hub since approximately 80 percent of all boardings occur during the peak hours and virtually all are journeys to work in New York City. Between 1972 and 1982 the Main Line in Suffolk County had the highest rate of ridership growth followed by the Port Jefferson branch. Both have been selected for electrification by the Metropolitan Transportation Authority (MTA). The Montauk branch has had the lowest rate of ridership increase and therefore, has not been chosen at this time for electrification extension. The different analysis periods shown on page fourteen result from the fact that two different government agencies' statistics have been utilized and more recent labor force data is not available. - 1 - I I I I I I I I I I I I I I I I I i Freight traffic has declined primarily due to high interest rates and a concomitant lull in construction and the materials shipment required by construction. Also, because of inflation, more industries utilize computerized inventory control, resulting in decreased material storage. This in turn demands timely freight delivery which, at the present time, is betten served by the truck industry. Overview The Long Island Rail Road (LIRR), a subsidiary of the Metropolitan Transportation Authority (MTA), is the largest commuter railroad in the nation in terms of passenger volume. During 1983, ridership exceeded 73 million passengers. The LIRR carries more than 270,000 passengers on an average weekday. Regionally, 1982 LIRR ridership is 50% greater than Metro-North, which serves suburbs north of New York City. In addition to providing the only passenger rail service to Suffolk County, the LIRR also provides freight service to the county. In 1980, the Long Island Rail Road carried 37,036 carloads of freight, a decrease of 39% since 1974. Rail freight traffic was inbound and terminating, and consisted primarily of building materials, foodstuffs, and paper products. During 1982, rail freight shipments to and from Suffolk accounted for 8% of the total freight movement in the county. The combined passenger and freight operations in 1982 produced $217 million in revenues, but operating costs were more than double that amount, which resulted in a deficit of $241 million. Extensive improvements, costing hundreds of millions of dollars, will be made to the physical plant and equipment of the railroad during the MTA Five Year Capital Program. So, while ridership has increased, freight volumes have continued to decline and operating deficits have increased significantly. - 2 - ... . I I I I I I I I I I I I I I I I I I I The increase in passengers can be attributed primarily to one factor: the substantial increase (11.3%) in the number of New York City bound commuters. Intra-county passenger operations however still do not account for a significant portion of the ridership, principally because of the New York City-oriented service that results from zone scheduling which, in effect, leapfrogs stations in one or more zones further down the line. Suffolk County residents accounted for nearly 26% of the total daily peak hour ridership, and 48% (1984) of these riders utilize the electrified branch lines which extend a total of 9 miles into Suffolk County. The significance of the LIRR as a mass transit facility within the county cannot be underestimated. Its routes traverse the major east-west travel corridors of the county. However, its orientation toward the New York City-bound commuter, coupled with generally low service levels throughout most of the county, and unattractive intra-county fares severely limit its ability to function as a local mass transit facility. A reevaluation of present operating policies is necessary to achieve the objective of integrating the railroad to the overall county transportation network. Railroad Routes Suffolk County is the eastern terminus for three major LIRR services: the Main Line, the Port Jefferson Branch and the Montauk Branch. A minor branch, the Central, connects Babylon to Bethpage and is used to route peak period diesel trains. The Main Line traverses the central corridor of Suffolk County to Riverhead and continues along the North Fork to Greenport. The Port Jefferson Branch originates from the Main Line at Hicksville and, in general, traverses the northern corridor of the county to Port Jefferson. The Montauk Branch follows the southern corridor of the county to Montauk. - 3 - I I I I I I I I I I I I I I I I I I I L1RR ROUTES IN SUFFOLK PORT JEFFERSON BRANCH V"" MONTAUK BRANCH BRANCH The LIRR System is comprised of 322 route miles, of which approximately 122 are electrified, with 28 more miles to be electrified by 1987. Approximately. 180 route miles are within Suffolk County (54%), but only 9 miles are electrified. These are on the Montauk Branch as far as Babylon and on the Port Jefferson Branch as far as Huntington (Figure 1). The planned additional 28 miles of electrification are mostly within Suffolk County. - 4 - I I I I I I I I I I I I I I I I Physical Plant and Equipment In 1980 the MTA embarked on a new modernization program to improve the rail system, including rolling stock, signals, track, and roadbed. During 1982, the M-1 Car Overhaul Program completed a total of 100 cars. Since 1980, M-1 cars have been overhauled at the rate of. 180 per year. Of the LIRR's fleet of 236 diesel-hauled coaches, 103 or 44% have been rebuilt since 1980. Other highlights include: - Parking lot improvements at Port Jefferson, Brentwood, Huntington, Kings Park, Sayville, Smithtown, Mastic-Shirley, Wyandanch, and Deer Park. (See Table 1). Completion of a Massapequa Park grade crossing el imilnation project in 1981 at Sunrise Highway near the Sunrise Mall, thus increasing service 1 evel s for passengers boardi ng at Ami tyvi lIe, Copi ague, Lindenhurst, and Babylon. - Installation of second electrified track from Syosset to Huntington. - Purchase of 174 M-3 cars for use on electrified lines. - Purchase of 20 new diesel locomotives for use on non-electrified service Within Suffolk County, these improvements have been concentrated in the western sector on the Montauk and Port Jefferson branches. The LIRR has improved much of the roadbed on the majority of the track mileage in the county and has improved track on the Main and Montauk routes, including the installation of welded rails. In spite of these improvements, 95% of the route miles in Suffolk County are still served by diesel locomotives and by rolling stock which was retired from electrified service as the M-1 cars were introduced. - - - - - 5 - I I I I I I I I I I I I I I I . - - Plans for extending electrification between Hicksville and Ronkonkoma on the Main Line and between Huntington and Port Jefferson_ on the Port Jefferson branch are in the process of being implemented concurrent with improvements in the commuter parking at the affected railroad stations. TABLE 1 LIRR Station Parking Lot Improvement Projects Station Additional Spaces Needed 1990 760 700* 980 777 66 65 618 325 5751 500 Replacement of Existing Spaces Brentwood Wyandanch Deer Park Huntington Kings Park Smithtown SUNY Parking Lot Acquisition Port Jefferson Sayv i 11 e Mastic-Shirley Non-TIP Post 1990 Parking Lot Construction Station Additional Spaces Needed - 1990 1,170 790 Ronkonkoma Central Islip 1 - Replacement of Deer Park and Pine Aire spaces lost. 390 spaces are to be replaced at new station in Deer Park, 110 are to be replaced at Wyandanch. Source: MTA/LIRR 5-Year Capital Program Line Improvements, March 83, LIRR Planning Department - Market Analysis & Pricing Group Source: * Suffolk County Planning Department - 6 - I I I I I I I I I I I I I I Passenger Operations and Service Levels The LIRR operates over 700 trains per day to serve its 270,000 daily passengers. Nearly one-half, or 327 of these trains, serve the Suffolk County passengers. During the period 1970-1974, overall ridership averaged 63,000,000 per year. However, this average increased to 67,000,000 during the 1975-1982 period. 90 80 70 60 50 '" z 40 0 :J ..J i 30 20 10 0 CD ... ., CI> 0 - N CD CD CD CD ... ... ... CI> CI> CI> CI> CI> CI> CI> - - - I TOTAL YEARLY PASSENGER COUNTS 1966-1983 ~ v ~ ~ ~ ~ ~ 0 - N ~ ~ ~ ~ ~ ~ ~ ~ ~ m ~ m m m m m m m m m m m m 'CDE~ 19-;2--JA; 19;3 ~IRR STRIKE FI GURE 2 As can be seen in Figure 2, the ridership decline of 1966-73 was reversed and ridership increased steadily from the mid year of 1974 through i 1983 by 26%. -7- I I I I I I I I I I I I I Because higher service levels are found on the portions of routes in the western sector of the county, 97% of the LIRR riders utilize only 70 miles or 38% of the total route miles within the county. (see Fi gure 3). 100 90 80 70 60 % 50 40 30 20 10 0 - - A COMPARISON OF RIDERSHIP TO TYPE OF L1RR SERVICE IN SUFFOLK COUNTY . o % SUFFOLK RIDERS OF LIRR % LIRR BRANCH RAIL MILES IN SUFFOLK COUNTY ELECTRIFIED PORTION OF LIRR REGULAR. DIESEL SERVICE LINES INFREOUENh* DIESEL SERVICE LINES * HEADWAYS UNDER 90 MINUTES (SEE MAP) .. HEADWAYS OVER 120 MINUTES (SEE MAP) FIGURE 3 Typically, service on the electrified portions of all routes receive the highest levels of service; an average of one train in each direction is provided at 30 minute intervals between 5:00 A.M. and midnight (See Map 1). Although more than 300 trains operate daily in the county, 211 of these operate exclusively on the nine miles of the electrified routes - 8 - -...,' .., I I I I I I I I I I I I I I I I [> ~ I I . Zone 10 Zone II Zone 9 PORT JEFFERSON BRANCH Total length :: In Suffolk 32.6 miles 25.2 miles Service levels: Between Average headways Hlcksville and Huntington :: under 30 minutes under 60 minutes " ." " , I I I / " " . " ." ,< , I I I I Zone 12 LONG ISLAND " " SOUND " 'j.\~'" , .' Zone 13 Zone 14 ~~6"'~<' ~,,~\ '.' MAIN LINE Total length In Suffolk 92.5 miles 63.5 miles Service levels: Between Average headways Hicksville and Ronkonkoma :: under 60 minutes Ronkonkoma and Greenport :: over 120 minutes ~ , ~ -+-----~~ ~ : --------------- \ \ \ Q' " .' " , RIVERHEAD ~\\ ~ --,- -- :, I '( I', I I I I _______ ,,~o" " " \ 'f\\!~ MONTAUK.\ , BRANCH " <;~~.... t~". " O~ qi ~~~ i"~.' ,U\.\,.. \ "'[,0 " " " " ,0 , $ ------------ " " " " " . ~V , , , , MONTAUK BRANCH Total length In Suffolk 115.8 miles 84.0 miles ATLANTIC , , , Service levels: Between Average headways New York City and Babylon :: under 30 minutes OCEAN Babylon and Patchogue :: under 90 minutes Patchogue and Montauk over 120 minutes , , , v " ~J I j ~ MilES 0 ~'l.-O"'ErE~s~ = :l , '1 I 1 I .I d i 1 1 .1 1 j LEGEND 1 1 '~ 'j 1 I , , I I I I I I " ,,/, '---~~ ........ / / ~4----~ ~~' STATION Iff-" _ f ELECTRIFIED SERVICE f I I I DIESEL SERVICE DAILY PASSENGER COUNTS BY STATION (APPROX) A , ~OG::-aooc 'j i ;l , , , "':00-2200 150-750 $ 1 j NOTE; STATIONS WHICH HAO LESS THAN 150 PASSENGERS WERE NOT CIRCLEO, II,s......; , , MAP NO. I A 4 - 84 UPDA:"E NO. DATE DESCRIPTION REVISIONS iK (..- U r PLANNING OEPT: 7/RANSPD,/1Y!;'9,JlON TIT LI RR OPERATIONS OR . 4-84 3-Q10l I ( I . I I I I I I I I I I I I I I I I I (Table 2). Consequently, service between Huntington and Port Jefferson, between Hicksville and Ronkonkoma, and between Babylon and Patchogue is less frequent, having average headways of between 60 to 90 minutes. Beyond both Ronkonkoma and Patchogue service is extremely limited, averaging 2-3 trains per day. TABLE 2 LIRR Level of Service - Suffolk County No. of Peak Hour Passengers Arriving No. of w/b Trains Arriving at NYC Terminals Trains per NYC Terminals Section 6 A.M. - 10 A.M. 24 hr. day (6 A.M.- 10 A.M.) 1973 1984 1973 1984 1973 1984 Port Jefferson to Huntington 4900 5700*** 15 18 6 7 *Huntington to New York City 4000 6300 31 39 13 13 **Ronkonkoma to New York City 3200 5700 15 20 6 7 **p a tchogue to Babylon 2600 3800*** 17 19 5 6 *Babylon to New York City 5500 8000 59 66 26 20 * Electrified M-l Trains ** Some are shuttle service from Ronkonkoma to Hicksville or from Patchogue to Babylon, others go into Jamaica Railroad Station Source: MTA 5 Year Capital Program *** LIRR Survey of 19BO-81 - 9 - I . I I I I I I I I I I I I I . I I I Because of its New York City commuter orientation, the LIRR Suffolk County service peaks are westbound during the period 6:00 A.M. to 10:00 A.M. (New York arrivals) and eastbound between 4:00 P.M. to 8:00 P.M. (New York departures). Railroad statistics reveal that 88% of the daily passengers travel during these two peak periods. The most active stations within the County are those at Babylon and Huntington, where between 4,000 to 5,000 passenger trips originate at each station each weekday. Passenger concentrations occur at those stations located on the 40% of the route miles which have regular service throughout the day. Map 1 depicts station trip origins which exceed 150 passengers per day. As can be noted from the map, nearly one-half of the stations within the County (20 stations out of a total of fifty) generate fewer than 150 trip origins per day. The LIRR could be a significant mass transit facility for work trips within Nassau and Suffolk. Its routes traverse the major east-west travel corridors and serve most of the industrial and major business districts of western Suffolk. However, because of the New York City hub-bound commuter orientation of the railroad, no eastbound trains can travel through central Nassau County on the Main Line for one hour and a half (between 6:30 A.M. and 8:00 A.M.) because both tracks are used for westbound commuter traffic. In addition, the railroad's zone service pattern means that trains originating in Suffolk make fewer or no stops in Nassau. Therefore, local rush hour service will be extremely limited until capacity improvements are undertaken between Floral Park and Hicksville. As Table 2 indicates, service levels have improved on all sections of the railroad since 1973 except Babylon and Huntington to New York during peak hour. As a result, daily peak westbound ridership in - 10 - I I I I I I I I I I I I I I I I I I I Suffolk County reached 30,000 in 1984. According to the Regional Plan Association, between 1971 and 1981, the number of daily Long Island passengers entering Penn Station increased by 37%. This was due largely to a 24% increase in the resident labor force during the decade (Figure 5). A new intra-county fare policy was initiated in 1980 to encourage local ridership by providing a reduced fare of 95~ to commuters traveling within the same or to adjacent fare zones in either Nassau or Suffolk Counties. Since July 1981, all intra-county trips pay the same fare. This fare is now $1.15. From 1980 to 1981, local ridership within Nassau and Suffolk Counties increased 22% but this increase was not significant in relation to total daily ridership. Elimination of the grade crossing in Massapequa Park was completed in 1981, making the Babylon branch elevated for its entire length, improving safety and service operating speeds. For example, the 7:21 A.M. Babylon Express now travels non-stop to Penn Station in 57 minutes. The LIRR also runs express service originating in Huntington at 7:08 A.M. (with two stops - Cold Spring Harbor and Syosset), that reaches Penn Station at 8:01 A.M. for a trip time of 53 minutes. (The additional 1.9 mile trip length from Babylon to Penn Station vs. Huntington would seem to account for the additional 4 minutes in travel time.) The express trains and'other additional peak hour services were made possible by the implementation of a major service (operational) change on the LIRR that schedules trains by zone1. Instead of originating all trains from the eastern terminus of each branch of the railroad and then 1. Eisele, Donald 0., Zone Theory of Suburban Rail Transit Operations: Revisited. Urban Transportation perspectives and prospects (Eno Foundation, 1982). - 11 - I I I I I I I I I I I I I I I I I I I skipping some stops, the zone scheduling of trains starts one train from the zone furthest from the business district (destination) and makes all stops within that zone. The next train starts from the next zone and so on. A direct result is reduced equipment requirements that allow the additional peak hour service and a dramatic decrease in travel time for zone 9 commuters in Babylon and zone 9 commuters in Huntington, (Figure 4). LIRR Zone Scheduling BABYLON BRANCH ZONE SCHEDULING DURING AM WEEKDAY PEAK HOURS z ~ " o o a: CD "- " a: o >- ill '" z o I- ZONE 3 ZONE 4 ZONE 7 ZONE 9 TRAIN (JAMAICA) TYPE/TIME ~ EXPRESS 7:21 AM - 7:29 - EX PRESS 7:31 ~ 7:40 - 7:45 ~ ~ 7:46 FIGURE 4 Ridership Growth Between 1970 and 1980 population growth slowed to 1.9 percent in the Nassau-Suffolk Region.2 2. LILCO, Population Surveys, 1970-1980. - 12 - I . I I I I I I I I I I I I I I I I I Population growth was not distributed evenly throughout the bicounty region. While Nassau County lost 7.5% of its population, Suffolk gained by 13.9%~ Seventy eight (78) percent of Suffolk County's' population increase (157,201) occurred in Brookhaven Town (122,586).4 While Brookhaven Town population grew 49% from 1970 to 1980, LIRR ridership grew 30% on the Main Line in Suffolk County, mainly attributable to increased boardings at Ronkonkoma, Deer Park and Central Islip. The period of rapid population growth in Suffolk County ended in 1973. Since that time, with the exception of Brookhaven Town, Suffolk County population has alternated between stabilization and slow growth. From 1973 to 1984 Long Island railroad ridership has increased 46 percent in Suffolk County.5 During the same period Brookhaven Town population increased 31 percent. While the Main Line, according to the LIRR, experienced an 81% increase from 1973 to 1984, this high percentage reflects an increase of only 2,560 in absolute numbers6. (Figure 5). The MTA 5 Year Capital Program provides for continued ridership growth on the Main Line through electrification. The increased service levels and travel speeds will encourage increased use of the railroad during the off-peak period as well as reverse commuting. The largest market sector with growth potential is the increased resident labor force in Suffolk County that commutes to Nassau County. Nassau County's labor force will experience a slight decline. This will produce a job surplus in Nassau County; 3. Long Island Regional Planning Board, Labor Force and Jobs Analysis-1983 4. Long Island Lighting Company, Population Survey, 1981. 5. Appendix A 6. Ibid - 13 - I I I I I . I ... CD ~ I I '" .... .. :z: I ... ~ 0 II: '" I ..e 0 I I I I I I I I I Rail Ridership/Population & Labor Force Growth 80 - 70 - 60 - 50 - 40 - 30 - 20 - 10 f- o NASSAU- SUFFOLK LABOR FORCE WORKING IN NYC (1970-1980) NASSAU- SUFFOLK R R RIDERSHIP SUFFOLK COUNTY POPULATION FIGURE 5 -14- BROOKHAVEN TOWN POPULATION MAIN LINE RIDERS RONKONKOMA BRANCH . I I I I I I I . I I I I I I I I I . Passenger Fare Structure The LIRR has divided its area of operation into ten separate zones (Map 1). Suffolk County stations are located in zones 9 through 14 inclusive. The fare structure is based on an initial charge incremented by the number of zones traveled. Figure 6 gives an example of 1984 fares for zones 1 through 14. The LIRR's fare structure favors the long distance traveler. For shorter distances, other modes of transportation are cheaper. Based upon the LIRR's regular one-way fare, the average passenger will pay 25~ per mile for a trip of 20 miles but less than 14~ per mile for a trip of over 60 miles. As you move further east from the Manhattan central business district the fare cost per mile gradually decreases. For example,in zone 9 the cost per mile for a Huntington trip to Manhattan is 16.3~, in zone 10 a Ronkonkoma trip costs 13.7~ per mile, and a Port Jefferson trip in zone 11 costs 12.9~ per mile. For intra-county trips under 20 miles it is cheaper to take the bus. A train ticket between Patchogue and Babylon, a distance of approximately 20 miles (17.4), costs $1.8~. The fare for the same trip by Suffolk Transit bus route (S-40) is 75~. Since 1975, commuter passenger fares on the LIRR in Suffolk County have increased 75%. As of January I, 1984 fares were raised 20% in each zone in Suffolk County. However, when the fare increase went into effect on July 15, 1981 it was at a decreasing rate as the commuting distance increased from Manhattan. That fare increase averaged almost 59% but ranged from 47% in zone 12 to 75% in zone 8. - 15 - .. ." ~. ...... IC c: en .... CD en ~ "" VI 0 ..... ...... ....... ...... ....... (Xl ~ ~ .. - - - .. .. - .. - - - - - - - - .. - " ~l~ I ~ ::I ~ 4 7 9 10 11 12 13 14 '- ".W'<<dIIl ~~ \I:~ ,..._ '_A 1 Monthly . 97.00 '109.00 "23.00 "35.00 "45.00 U 60.00 '168.00 0168.00 P.-." Il_~ I..... ...._ Weekly 30.00 33.76 38.25 41.75 45.00 49.50 52.00 52.00 UlOOKLV.... =-::::... One-Way -4.45 -5.00 -6.00 -6.90 -7.70 -S.65 .'0.00 -11.10 '................1 fIl0ctwn0nd.....~ .....~A.. (_.....,........... '\.\/ '- ,...~~ ..un..,.... - 3 Monthly 72.00 84.00 101.00 119.00 129.00 144.00 150.00 168.00 lCUII...... ~ ........ A......... Weekly 22.25 26.00 31.25 37.00 40.00 44.75 46.50 52.00 - One-Way -3.00 -3.56 ...65 -5.45 -8.25 -7.20 -8.65 -10.25 .......~ - "-UIe ~ A.... n_.... L__ - ..... -- ~ I~~ ,....." G..- _ -- - -... Monthly 36.00 36.00 67.50 90.00 94.00 103.25 112.50 150.00 _. 4 C""""'II -.. - Weekly 11.25 11.25 21.00 2800 28.25 32.00 35.00 46.50 -- '-- A" One-Way 1.15 1.15 2.30 "3.00 "3.80 '420 -5.85 -7.50 --- lffl' .... <-. ......... I"or1W........... Fat fIl__.. ""' .... ,...'" ~-h"~ -~ 'W ,-- ~~ ....- a-..- c.... PlK. -- 'r....-nW-1tuIy ~ .......... Merrell ~... 7 Monthly 36.00 38.00 36.00 63.00 75.00 94.00 105.00 142.50 L.......tc:.. ........ HO..... G." HM4 W..kly 11.25 11.25 11.25 19.50 23.25 2925 32.50 44.25 w....... ... CI.ft One-Way 1.15 1.15 1.15 2.10 '3.00 "380 '5.30 -7.15 -- 6<_ ~...... G....c_ --~ ...- $yMMI lac....IV..... M...........IJ8It Fe!' ........ O~.." V - , c....s.r.,..t* 36.00 36.00 56.50 75.00 90.00 120.00 - .- 9 Monthly 67.50 38.00 -- -- Nunc....."" Weekly 21.00 11.25 11.25 1\.25 17.50 23.25 28.00 37.25 -.... 6<_ One-Way 2.30 1.15 1.15 1.15 1.85 '3.00 '4.50 '6.00 - P,_.AHe -- ....5hor. .....-- Monthly 90.00 63.00 36.00 36.00 36.00 67.50 84.25 105.00 - .""......11. 10 Gr_f1_ Ceneral...... W..kly 28.00 19.50 11.25 11.25 11.25 21.00 26.00 32.50 - ~hI_ One-Way '3.00 2.10 1.15 1.15 1.15 2.30 '3.35 '5.30 5."".... --- - _.~ 11 Monthly 94.00 75.00 56.50 36.00 36.00 45.00 79.00 90.00 -.- Weekly 29.25 23.25 17.50 11.25 11.25 14.00 24.50 28.00 '- _.. -- One-Way -3.80 -3.00 1.85 1.15 1.15 -1.50 2.65 '4.50 - .-'* 12 Mon~IY 103.25 94.00 75.00 67.50 45.00 36.00 56.50 84.25 _.- W.. y 32.00 29.25 23.25 21.00 14.00 11.25 17.50 26.00 c..-__ - c.~Ofl One-WIY -4.20 '3.80 '3.00 2.30 -1.50 1.15 .'.85 3.35 ~.... 13 Monthly 112.50 105.00 90.00 84.25 19.00 56.50 36.00 5650 - J.......... Weekly 35.00 32.50 28.00 26.00 24.50 17.50 11.25 17.50 sOUln.:"~":: MC-:"-::~_ One.Way '5.65 '5.30 "4.50 "3.35 12.65 -'.85 1.15 '185 '- _o,"'*", ......'- ....- Monthly 150.00 142.50 120.00 105.00 90.00 84.25 56.50 38.00 ....- 14 Weekly 46.50 44.25 37.25 32.50 28.00 26.00 17.50 11.25 - -- One-Way '7.50 -7.15 -6.00 "5.30 "4.50 3.35 -1.85 1.15 -Lower rates for Off Peak (non-rush hour} travel ....e available. Ask your ticket agent for the leasl expensive ticket available for the time and day on which you plan to travel. SENIOR CITIZEN/HANDICAPPED 'ares are equal to 1/2 the regular one.way lare. MONTHLY SCHOOL fares, for elementary and high school studenls under 21 are equalta 2/3 the regular monthly fare. All fares direct route only. I I I I I I I I I I I I I I I I I I I Revenues, Capital and Operating Costs Combined freight and passenger revenues from the LIRR operations account for approximately one-half of the operating costs. Despite freight rate and passenger fare increases, deficits have continued to increase, especially during the past twelve years. Total passenger revenue in calendar year 1982 was $204.22 million. Total passenger operating expenses in 1982 were $437.5 million, yielding a net passenger operating deficit of $233 million. One of the best performance indicators for mass transportation is the farebox recovery ratio. Farebox recovery ratio is passenger fare revenue divided by total passenger operating expenses. In 1982 the LIRR had a farebox recovery ratio of 45.5%, which is typical of large urban areas and approaches the ratio of central city transit systems. Total freight revenue in 1982 was $13.02 million but total freight operating costs for the year were $21.20 million. Combined passenger and freight revenue in 1982 amounted to $217.24 million but combined operating costs were $458.7 million resulting in a deficit of $241.46 million. Freight Operations In 1980, the Long Island Rail Road carried 37,036 carloads of freight, most of which were inbound and consumption-oriented, since few of Long Island's industries are export-oriented. Ninety percent of total tonnage in 1976 and 95% of total tonnage in 1980 was inbound and terminating. - 17 - I I I I I I I I I I I I I . I I I ,- I Long Island Rail Road freight traffic is unevenly di~tributed, as shown in Table 3, since 80% of the carloads and 78% of the revenues involve 12 of the 52 freight stations. Also, freight volume, measured in carloads, is decreasing at an annual average rate of 6%. Between the base year, 1969, and 1975, the LIRR's annual freight volume declined by approximately 43%, or double the 21% decline in industrywide adjusted carloadings7. From 1976 to 1980, the LIRR experienced a 22% freight decline in tons and declined 29% in number of carloads. The most significant reasons for this extreme decline in freight volume over the past 15 years are: ~ While highway access to Long Island improved via the Throgs Neck Bridge, the Verrazano Bridge and Long Island Expressway completion, the Long Island Rail Road started phasing out marine carfloat services in the New York harbor in 1971. ~ During the same period, the LIRR's connecting line-haul carriers, the Erie-Lackawanna, Lehigh Valley and Jersey Central Railroads returned to marine carfloat services, thus requiring the railroad to rely on all land-routing via Hellgate Bridge and Selkirk. ~ Regional Rail Reorganization Act of 1973 reorganized all of the LIRR's direct connection line-haul carriers into Conrail on April I, 1976. The end result has been a fundamental access problem due to bridge clearance restraints on all land routings via Selkirk (near Albany) restricting TOFC/COFC (Trailer-on-flatcar/Container-on-flatcar) traffic to Long Island. 7 NYSDOT, LIRR Freight Study, Part III-Cost Study, Nov. 1981, p. 9. - 18 - I I I I I I I I I I I , I . I I I I I TABLE 3 Distribution of Long Island Rail Road Freight Traffic - 1980 Carloads Revenues Long Island City Nichols Siding (Maspeth) Farmingdale Deer Park Bushwick Jamaica Central Islip Mineola/Garden City Huntington He ltsvill e Fresh Pond Hicksville 40 other stations, each less than 1,000 cars per year Total 5,267 4,960 3,868 2,575 2,458 2,243 2,109 1,942 1,605 1,519 1,191 1,083 $ 3,153,000 3,206,000 2,349,000 1,410,000 1,225,000 1,157,000 1,133,000 1,120,000 1,023,000 243,000 465,000 776,000 4,870,000 $22,130,000 7,616 38,436 Source: NYSDOT, Freight Cost Study, 1981 In January, 1985 the Long Island Railroad negotiated new rates with connecting freight railroads and the New York Cross-Harbor Terminal Railroad Company to reinstitute marine carfloat services that were eliminated during the last decade, as mentioned above. Currently this operation carries only paper and pulpboard products but negotiations are underway to extend this service to other commodities. - 19 - I I I I I I I I I , I I I I I I I I I History of Freight Access Even though it was one of the rationales for the creation of the Port Authority of New York and New Jersey, the construction of a rail freight tunnel from New Jersey to Long Island never started. Instead, freight was shipped by barge across the Hudson River. Since the LIRR switched to all land routings from the mainland via He11gate Bridge and Selkirk. (established by Penn Central in 1971), all TOFC traffic was excluded because of height restrictions. All height restrictions have since been improved between the Selkirk Yard and Highbridge in the Bronx by the end of 1982. Construction started in early 1983 on the South Bronx-Oak Point Link Project,(Figure 7), which is now being advanced under the 1979 Rail Bond Issue to remove restrictions from Highbridge south to Oak Point in the South Bronx. The next phase will be from Oak Point to Fresh Pond Junction in Queensand then from Fresh Pond eastward as far as Hicksvi11e on the main line. Four Nassau County LIRR bridges are scheduled for reconstruction and are located in Carle Place, Ellison Avenue in Westbury, Mineo1a Boulevard in Mineo1a, and Grand Boulevard in New Cassell-Westbury. In addition the LIRR tracks will be elevated over six Mineo1a intersections on one structure estimated to cost $70 million to be funded by regular state budget appropriations (100% state funding). -20- ----~~--~---------- @ @ @ I N .... I @ CD CD NYSDOT FULL FREIGHT ACCESS PROGRAM** 17'-6" MINIMUM CLEARANCE PROGRAM Selkirk - Hi~hbridge Modify 18 Br dges south of Irvington to obtain clearance - Complete Highbridge - Oak Point Construct New Rail Link - Location and Design Study - Completed. Design/Environmental Impact Statement Phase - Complete. Final Design Underway. Oak Point - Fresh Pond Minor obstructions. Fresh Pond - Hicksville Modi fy structure or lower track for 7 bridges between Fresh Pond and Hicksville. Final Design 8ay Ri dge Li ne Track lowering under 24 structures Final Design West Side Line No obstructions. . Terminal Location @ Intermodal Terminal * Interim Terminal - Final Terminal locations are being evaluated. ** Extracted from Oak Point Link Figure 7 o I I I I t I I l , , I I I I I I I I I In the fall of 1982, the New York State Department of Transportation worked with Conrail and the Bimodal Corporation to commence a new form of TOFC service between Buffalo and New York City (Highbridge) since the height restrictions' elimination. The service will use the new Roadrailer equipment supplied by private investment. A Roadrailer consists of a truck trailer equipped with rail wheels so that the trailers can be made up in a train without having to be placed on flat cars, as in normal TOFC operations. This service, called the Empire Express was abandoned on July 31, 1984. TOFC service on Long Island requires completion of the Harlem River yard and removal of clearance restrictions at six overpasses. Also, a Nassau-Suffolk TOFC yard site must be found. The service would use Penn Station passenger tunnels at night for southbound freight8. As previously mentioned the historical trends of freight traffic volume are of a steady declining rate. Volume, measured in carloads, have decreased at an average annual rate of 6%. Revenues are increasing at a rate reflective of inflation. Labor costs are being controlled by force reductions averaging nearly 8% per year9 but work force reductions are not an inexhaustible relief from declining freight traffic volume. The freight trends as measured in tons and in revenue, are shown in Figures 8 and 9. Figure 10 shows the freight volume trend of the last 10 years, including the slight increase in the number of carloads during 1984. 8 The Regional Plan Association, Long Island Rail Issues - Summary and Recommendations, March, 1983. 9 NYSDOT, Freight Cost Study, 1981, p. 11 - 22 - I t I I t II , I I I t I I t I I I I . The New York State Department of Transportation cost study explored two future restructuring alternatives for LIRR freight service: A short line railroad and a terminal switching company. The short line railroad alternative was dependent upon new sources of traffic revenue so that the operation would be profitable. The NYSDOT marketing study concluded that opportunities to increase revenue by capturing new sources of profitable traffic are few and therefore, the only viable alternative seems to be to separate freight service from passenger operations and to run it as a bare-bones terminal switching company. LIRR Freight - 1965 to 1982 5 4 "' ~ 3 ..J ..J i 2 "' z ~ o 1965 1970 1975 19BO FIGURE 8 -23- t , I I , . , t , I , I I I I I I I . '" z 0 ...l 10 ...l i '" II: C ...l ...l 0 5 0 60 50 '" o 40 z c '" :;) ~ 30 .... '" o 20 c o ...l II: C tJ 10 o LIRR Freight Revenue 20 15 o 1972 1973 1974 1975 1976 1977 1978 1979 1980 FIGURE 9 LIRR Freight Volume. By Carloads 1974 1975 1976 1977 1978 1979 1980 1981 1982 1983 1984 FIGURE 10 -24- I I I I , I t t I t , I I I I I t I . Financing and Funding Station Maintenance The New York State Legislature requested (in the 1982-83 Fiscal Budget) that.the M.T.A. develop, in cooperation with affected counties~ a voluntary program for county assumption of certain aspects of operation and maintenance of commuter railroad stations. Suffolk County has indicated an interest in participating in such a program since station maintenance costs rose from $5.8 million to $7 million in one year (from 1981 to 1982), an increase of $1.2 million or nearly 20%. Since 1975, total operation and maintenance payments from Suffolk County to the Metropolitan Transportation Authority have increased 160%. Payments in 1975 totaled $2,695,719 but by 1983 the total charges for operation and maintenance have reached $7,028,172. Station Maintenance and Operating Costs - 1975 and. 1983 Total Maintenance and Use Total Operation Total Operation and Maintenance lill. $1,145,609 1,550;110 $2,695,719 ~ $2,870,633 4,157,539 $7,028,172 - 25 - I , I I , I , I t ,t t I f I, I I t I I MTA Capital Financing Plan LIRR/Metro North (As of June 1, 1982) Expected Funding Source Federal State T8TA Bonds ASC Bonds (Annual State Service Contract) Revenue Bonds Lessor Equity Total (Mi 11 ions) $ 169 144 425 198 385 100 $1,367 MTA Five Year Capital Program (LIRR) (Mill ions) 1981 Program 1982 Program Change Rolling Stock $252.5 196.0 $-56.5 Passenger Stations 31.2 31.2 Track 75.9 48.5 -27.4 Li ne Structures 67.2 67.2 Signals 28.5 28.5 Shops/Yards 159.0 161.1 + 2.1 Electrification/Extension 35.7 63.1 +27.4 Emergency/Mi sc. 29.9 61.8 +33.9 Securi ty 3.1 3.1 Total $683.0 $660.5 $-22.5 Note: Line Improvements on the Port Jefferson Branch originally were $111.6 million in the 1981 MTA Five Year Capital Program. It appears that $48.5 million (2nd track) was moved to the Ronkonkoma electrification project (single track). - 26 - I I I I t I t I t t I I I t I I , I . Surface Transportation Assistance (STAA) Act of 1982 The federal 9asoline tax was raised from 4t to 9t per gallon on April 1, 1983, the first federal gas tax increase since 1959. The STAA provides a multi-year funding source for fiscal years 1983-1986. Of the 5 cent per gallon federal tax on gasoline, 1 cent or 20% is allocated to go to the Mass Transit Trust Fund. The Section 3 rail replaces the former Section 3 modernization grants (except rail) and Section 5 Tier IV bus funds in succeeded by a new Section 9 Block Grant for mass transit capital projects. New York State Transportation Infrastructure Bond Issue of 1.25 billion dollars was approved by the voters in the Fall of 1983. This bond issue will pay 100% of the cost of the Freight Access Program of the NY State Department of Transportation. New York State Operating Assistance Operating Assistance to the LIRR has been provided by New York State under the Mass Transportation Operating Assistance Program (MTOA) since 1974, with a matching requirement by the Counties in which the rail line operates. From the first year of the MTOA program funding levels have risen from $100 million (1974) to $650 million (1982). During the 1983-84 state fiscal year, under the MTOA program, the MTA received $24.03 million from the state general fund (Section 18-b), $44.15 million from Dedicated Taxes and $95.0 million from the Corporate Surcharge taxes for operating expenses of its commuter railroads. In addition, the MTA counties were required to match the 18-b portion of the state payments. While no precise - 27 - I I I I t I I I I , I I , I I I t I . figure is available, it is estimated that the LIRR received slightly over 50% of these state subsidies which, when including the required match, would have amounted to about $103 million during the 1983-84 year. Demographic Trends Because of the amount of developable, industrially zoned land available in Suffolk County, the existing network of roads and utility lines, as well as economic development financing policies favoring growth, the continuation of existing trends can be expected. The majority of workers will continue to travel to work by automobile. Analysis of 1980 census data revealed that 87.5% of the Suffolk County labor force commute by car, truck or van. Census data also show that 68% of Nassau-Suffolk residents, work in Nassau or Suffolk, a jump of nearly 4% in the last decade. The existing fare structure of the LIRR induces work trips within the County but not inter-county work trips between zones 4 and 14. Over the past two decades manufacturing has been moving increasingly from Nassau to Suffolk County. Suffolk gained 35,000 such jobs, while Nassau lost 16,000. But, at the same time, following national trends, Nassau has been shifting towards white-collar office work that is concentrated in the high growth areas of Garden City (including Roosevelt and Mitchell Fields), Jericho, and Lake Success, which are well served by highways but under-served by mass transit. White-collar jobs in finance and services accounted for 60% of the labor force growth in the bicounty region and virtually all of Nassau County's jOb growth. - 28 - I I I I I I , I t , I I I . I I t I . Women entering the labor force accounted for 57% of the labor force growth in Suffolk County and 92% of the increase in Nassau. Women's labor force participation rate is significant for transit planning. Census data has shown that women use public transportation twice as much as men. Although increasing numbers of women are becoming licensed drivers, they still comprise less than half (41%) of all U.S. drivers.lO The local labor force grew by 24% in the last decade (Nassau and Suffolk) and is expected to continue growing in Suffolk, but at a slower rate through the next decade (4% to 1990 and less thereafter). As a result of all the demographic factors cited above, (LIRR ridership will continue to grow but less than has occurred since the late 1970's. However, the census data and ridership analysis seems to justify support for triple-tracking in Nassau County between Floral Park and Hicksville and electrification in Suffolk County between Republic and Ronkonkoma and on the Port Jefferson branch to accommodate additional peak hour service and reverse commuter trips. Recent changes in labor force participation and suburban back office location should increase public transit ridership in Nassau and Suffolk Counties. Although the LIRR fare structure and off-peak service frequency do affect inter-county ridership, another major reason for low utilization of the railroad for worktrips to Nassau-Suffolk employment sites is that few of these sites are located near rail stations. While the LIRR serves most of the industrial and major business districts of Nassau 10 Fox, M.B. Working Women and Travel: The Access of Women to Work and Community Facilities. Journal of the American Planning Association 49, 2:156-170. - 29 - I I I I I I I I I , I I I I I I I I . County and western Suffolk, the growth trend for office complex location has 'been outside these areas. Suffolk County supports the current MTA capital plans that will provide mid-island residents with electrified service similar to that of the Huntington and Babylon branches, as well as extension of electrification on the Port Jefferson branch. At the same time, Suffolk County also remains committed to controlling payments to the Metropolitan Transportation Authority for the operation and maintenance of commuter railroad stations to amounts necessary to cover the actual expenses of operating and maintaining the stations in Suffolk. Other Suffolk County priorities include maintenance of existing freight service, completion of the freight access program, and a reevaluation of present operating policies to facilitate inter-county (Nassau and Suffolk) travel along with maintaining reasonable fare levels for commuters/residents. - 30 - I I I I I I I I I I I I I I I I I I I APPENDIX A Long Island Rail Road Westbound AM Peak Ridership* From Stations in Suffolk County (Port Jefferson Branch and Main Line) Station 1973 1984 % Change Cold Spring Harbor 640 1,150 79.69% Huntington 3,360 5,170 53.87% Greenlawn 570 580 1.75% Northport 1,880 1,230 -34.57% Kings Park 700 1,310 87.14% Smithtown 860 910 5.81% St. James 260 350 34.62% Stony Brook 270 490 81.48% Setauket 10 N/A N/A Port Jefferson 380 860 126.32% Branch Totals 8,930 12,050 34.94% Wyandanch 660 700 6.06% Deer Park 530 1,030 94.34% Pine-Aire 60 80 33.33% Brentwood 710 780 9.86% Central Islip 220 470 113.64% Ronkonkoma 980 2,660 171.43% Branch Totals 3,160 5,720 81.01% # Includes Holtsville-Yaphank Total 12,090 17,770 46.98% * Westbound AM Peak - Passengers on trains arriving at the three western terminals between 6:00 A.M. and 10:00 A.M. Sources: 1973 LIRR Passenger Loadings by Branch (P&D) LIRR Spring 1984 Ridership Base (August 1983 OlD Matrix weighted up to the LIRR Transportation Department's Spring 1984 ridership book) - 31 -