THIS IS TO CERTIFY THAT THE FOLLOWING RESOLUTION NO. 226 OF 2004
WAS ADOPTED AT THE REGULAR MEETING OF THE SOUTHOLD TOWN BOARD
ON MARCH 23, 2004:
RESOLVED that the Town Board of the Town of Southold herebv authorizes the release of
the remain in I!: $132.000.00 oerformance bond I!:uarantee for imorovements in Peconic
LandinI!: at South old. Inc.. located at north side Main Road, east of Sound Road at Greenport,
New York all in accordance with the recommendation of the Planning Board and approval of the
Town Engineer.
Pl~..' f'.IQ.~../lh.
Elizabeth A. Neville
Southold Town Clerk
SUFFOLK COUNTY
NATIONAL BANK
Dan A. Cicale
Senior Vice President &
Trust Officer
April 26, 2004
Ms. Holly Stevens
Retirement Living Services, LLC
100 Allyn Street
Hartford, CT 06103
RECEIVED
APR 2 7 2004
Re: Peconic Landing at Southold, Inc. Escrow Custodial
Account No. 60-00-6971-32-3
~ulhol. TOWI Oerl
Dear Holly:
This will confirm that $132,000.00, plus interest of $2,690.49 was wired to:
The Bank of New York
ABA #021000018
GLA #111-565
Acct. #648111
Acct. Name: Peconic Landing Construction Fund
Attn: Miriam Moraca
We released the $132,000.00, under Resolution #226 of 2004, adopted at the regular
meeting of the Southold Town Board on March 23, 2004, and the interest under letter dated, July
31,2001, from William G. Thompson, President.
This wire represents final principal payment. Their will be a small interest amount credited
to the account in the first week of May, representing interest for April, which will be wired to The
Bank of New York.
Should you have any questions, please do not hesitate to call.
Very truly yours,
/'iF)
~icale
Cc: Charles Cuddy, Esq.
William G. Thompson, President
Elizabeth A. Neville, Southold Town Clerk
Bennett Orlowski, Jr., Planning Board Chairman
~
Trust & Financial Services Group
3880 Veterans J'vlcrnorial Highway, Bohemia. NY 117] 6 ~ 631-285-(,600 -Fax 631-285-
6610
ELIZABETH A. NEVILLE
TOWN CLERK
REGISTRAR OF VITAL STATISTICS
MARRIAGE OFFICER
RECORDS MANAGEMENT OFFICER
FREEDOM OF INFORMATION OFFICER
Town Hall, 53095 Main Road
P.O. Box 1179
Southold, New York 11971
Fax (631) 765-6145
Telephone (631) 765-1800
southoldtown.northfork.net
OFFICE OF THE TOWN CLERK
TOWN OF SOUTH OLD
April 2, 2004
Mr. Dennis M. Wilhelm
Sr. Vice President
Retirement Living Services
100 Allyn Street
Hartford, CT 06103
Dear Mr. Wilhelm:
The Southold Town Board, at its regular meeting of March 23, 2004, has authorized the
release of the remaining $132,000.00 performance bond guarantee for improvements in Peconic
Landing at Southold. A certified copy of the resolution is enclosed.
Very truly yours,
~~
Elizabeth A. Neville
Ene.
04/02/2004 15:34
5313599080
PAGE 01/03
CHARLES R. CUDDY
Attorney at Law
445 Griffing Avenue
Riverhead, NY 11901
Mailing Address;
PO Bo~ 1547
Rivctbead, NY 1190 I
1'01: (631) 369-8200
p'l\l<: (63 J) 369-9080
e:"lnail; charles.cudd\'(iJ)verizon,n,et
April 2, 2004
VIA FA.CSIMILE - 765-6145
Elizabeth A. Neville
Southold Town Cleric:
PO Box 1179
Southold, NY 11971
Re: Performance Bond - Peconic Landing
Dear Ms. Neville:
On February 13, 2004, I forwarded a resolution from the PlaMing Board recommending release of
the remaining Performance Bond for Peconic Landing. A copy of my prior communication is
attached. To date, J have not heard further. Please confirm ifthis matter has been taken care of and
forward a copy of the Town Board resolution.
Very truly yours,
~4?~
Charles R. Cuddy
CRC:ms
Enclosure
04/02/2004 15:34
53135'3'3080
PAGE 02/03
CHARLES R. CUDDY
Attorney at Law
445 Griffing Avenue
Riverhead, NY 11901
Mailing Addre..:
PO Box 1547
R;vemClld, NY 1190 I
Tol: (631) 369-8200
Fo.: (631) 369-9080
....mail: charles.cudt.trlii.Neti7..on.nol
February J3, 2004
VIA FACSIMILE. 765.6145
Elizabeth A. Neville
Southold Town Clerk
POBox IJ79
Southold, NY 11971
Re: Performance Bond. Peconic Landing
Dear Ms. Neville:
I note that by the attached resolution, the Planning Board has recommended the release of the
remaining Performance Bond for peconic Landing. Please note that, in fact, this is not a performance
Bond but a bank account obligation maintained by the Suffolk County National Bank in conjunction
with the Town of Southold and peconic Landing to insure performance of development obligations
by Peconic Landing. In the Town Board resolution will you please indicated that the performance
obligation ofpeconic Landil1g in the form of a bank escrow custodial account is released.
Very truly yours,
OhadNl?~
Charles R. Cuddy
CRC:ms
Enclosure
)
') [iJ/3F
~
JAMES A. RICHTER, RX
ENGINEER
TOWN OF SOUTHOLD, NEW YORK 11971
JOSHUA Y. HORTON
SUPERVISOR
TOWN HALL - 53095 MAIN ROAD
Fax, (516) - 765 - 1366
Tel, (516) -765 -1560
OFFICE OF THE ENGINEER
TOWN OF SOUTH OLD
Bennett Orlowski, Jr.
Chairman - Planning Board
Town Hall, 53095 Main Road
Southold, New York 11971
December 15, 2003
Re: Peconic Landing
Final Planning Board Inspection Report
Release of Performance Bonds
D ~C~IH~
~ DEe 1 6 2003
Southold Town
Planni'" Boa",
Dear Mr. Orlowski:
As per your request, Victor L'Eplattenier and I have completed a final review of the Peconic
Landing Site for compliance with the Final Site Plan that was approved by the Planning Board. All of
the Maintenance Bond items have been completed in a satisfactory manner with the exception of the
proposed walkway along the Top of Bluff on the northerly side of the property.
This item has been deleted from the project by the developers of the site. Due telthe nature of
the proposed construction and the proximity to fragile slopes contained within the 8!luff Face, this
would be considered a recommended change to the site plan.
Our site inspection revealed the installation of split rail fencing along the landward side of the
Top of Bluff on the easterly side of the Site. The inspection also revealed that some of the
underbrush in the area adjacent to the Bluff has been cut further back to accommodate the
installation of this fencing. At this time, it is recommended that the Town Trustees be given the
opportunity to do a final inspection of the Bluff area and provide their input regarding compliance with
Coastal Erosion Regulations. On your behalf, I have contacted the Trustees office and suggested
that they do a final inspection prior to release of the Performance Bonds.
At this time, with the exception of the Trustee matter as noted above, the project is considered
complete and meets the minimum requirements established by Town Code and Planning Board
approvals. If you have any further questions concerning this matter, please contact my office.
CC: Peter Harris
(Superintendent of Highways)
rn.~
YOUNG & YOUNG
400 Ostrander Avenue
Riverhead. New York 11901
i)
):
Telephone 631-727-2303
Facsimile 631-727-0144
admin@youngengineering.com
HOWARD W YOUNG, Land Surv'ejm
THOMAS C WOLPERT, Professional Engineer
ROBERT C TAST, Architect
RONALD E. PFUHL, Landscape Architect
November 11, 2003
ATfN: Mr. Bennett Orlowski, Jr., Chairman
Town of Southold Planning Board
53095 Main Road
P.O. Box 1179
Southold, New York 11971-0959
RE: PECONIC LANDING
at Greenpcrt, T/O Southold, New York
(97-0290)
Dear Mr. Orlowski:
We hereby request, on behalf of Peconic Landing at Southold, Inc.,
that the Town complete a final site plan inspection of the above referenced
facil ity .
We ur.derstand that, upon completion of the final site plan inspection,
the developer (Retirement Living Services) will be in a position to request
release of any remaining monies related to site improvements, ie. street
trees - $50,000 and pedestrian paths - $76,000.00.
If you have any questions regarding this matter, please do not
hesitate to contact us.
Very truly yours,
TCW/sjt
Thomas C. Wolpert, P.E.
cc: Retirement Living Services
ATfN: Mr. Dennis M. Wilhelm
Charles R. Cuddy, Esq.
Planning
Engineering
Land Surveying
Architecture
)
')
MEMORANDUM
To:
From:
Files
Victor L'Eplattenler, Site Plan Reviewp-
Peconic Landing
SCTM: 1000-35-1-25,et al
Re:
Date:
December 15,2003
Jamie Richter and I went to Peconlc Landing today to perform an Inspection to
determine If the final bond could be reduced to zero, at the request of Tom
Wolpert, P.E.
Jamie has determined that virtually all of the required cOnstruction is
complepi, as determined by the engineering reports on file, and verified by on
site In,Jpection. However, he noted some recent conditions, which need to be
addreissed, as follows:
1. He noted intensive clearing along the bluff, up to the fence line of a
recent split rail fence, behind several of the cottages, probably to
enhance the view of the L.I.Sound.He will notify the Trustees so they can
perform an Inspection and report If Peconlc Landing Is In violation.
2. Some rocks between ponds 1 and 2 appear missing or fallen, although
they do not Interfere with drainage or water flow, but make the barrier
appear Incomplete or broken.
3. The approved walkway along the bluff, representing a $79,000 item In the
approved Bond, was not built, at the discretion of Peconic Landing. This
Is O.K. With Jamie, since It was not required to be constructed.
4. The presence of excess debris and brush in the maintenance area was
noted, and Jamie will contact Peconic Landing to get It cleaned up
ASAP.
Jamie will send me a memo regarding the Bond release, and If the Trustees
sign off on the clearing along the bluff, a resolution for the PB can be written
for the next available meeting.
Cc: B.Semon
, ,
)
)
PLANNING BOARD MEMBERS
BENNETT ORLOWSKI, JR.
Chairman
RICHARD CAGGIANO
WILLIAM J. CREMERS
KENNETH L. EDWARDS
MARTIN H. SIDOR
P.O. Box 1179
Town HaIl, 53095 State Route 25
Southold, New York 11971-0959
Telephone (631) 765-1938
Fax (631) 765-3136
PLANNING BOARD OFFICE
TOWN OF SOUTHOLD
MEMORANDUM
To: James A. Richter, R.A.
Office of Town Engineer
From: Victor L'Eplattenier, Site Plan Revie#--
Re: Peconic Landing
SCTM: 1000-35-1-25,et al
Date:
November 20,2003
,/
/j
/1
, .
Attached is a copy of a request from Thomas Wolpert P, E., to
complete a final site inspection, and subsequent release of the
remaining Bond amounts.
Upon your return in December, can we please schedule a joint site
visit to assess the status of construction remaining (if any)? Also, is
Tom's presence on the site visit necessary, or should we just do it
ourselves?
Please advise me which dates in early December you would be
available for the inspection, and let me know the steps required to
release the final Bond.
Thanks for your assistance in this matter.
Cc: B.Semon
.
r'
YOUNG & YOUNG
400 Ostrander Avenue
Riverhead, New York 11901
)
)
>Vk",I--
~Jv'-
Telephone 631-12/'-2303
Facsimile 631-121-0144
admin@youngengineering.com
HOWARD W YOUNG, Land Survryor
THOMAS C WOLPERT, Professional Engineer
ROBERT C TAST, Architect
RONALD E PFUHL, Landscape Architect
November 11, 2003
ATTN: Mr. Bennett Orlowski, Jr., Chairman
Town of Southold Planning Board
53095 Main Road
P.O. Box 1179
Southold, New York 11971-0959
RE: PECONIC LANDING
at Greenport, TIO Southold, New York
(97-0290)
0 Itl!:ltiHW
NOV 1 3 2003 0
!~
Southold Town
Plannin. B08r~
Dear Mr. Orlowski:
J
,
We hereby request, on behalf of Peconic Landing at South old, Inc.,
that the Town complete a final site plan inspection of the above referenced
faCility.
/
We understand that, upon completion of the final site plan ir~~ection,
the developer (Retirement Living Services) will be in a position to request
release of any remaining monies related to site improvements, ie. street
trees - $50,000 and pedestrian paths - $76,000.00.
If you have any questions regarding this matter, please do not
hesitate to contact us.
Very truly yours,
~t.W~ecC
TCW/sjt
Thomas C. Wolpert, P.E.
cc: Retirement Living Services
ATTN: Mr. Dennis M. Wilhelm
Charles R. Cuddy, Esq.
Planning
Engineering
Land Surveying
Architecture
YOUNG & YOUNG
400 Ostrander Avenue
Riverhead, New York 11901
)
)
S'~//8F
1;fbNt.-
Telephone 631-72/-2303
Facsimile 631-727-0144
admin@youngengineering.com
HOWARD W YOUNG, Land Surveyor
THOMAS C. WOLPERT, Professional Engineer
ROBERT C. TAST, Architect
RONALD E. PFUHL, Landscape Architect
November 11, 2003
ATTN: Mr. Bennett Orlowski, Jr., Chairman
Town of Southold Planning Board
53095 Main Road
P.O. Box 1179
Southold, New York 11971-0959
RE: PECONIC LANDING
at Greenport, TIO Southold, New York
(97-0290)
0 IEfClElWE 0'
NOV 1 3 2003
L.=I
Soullwld ToWl
Plannin. Boa'"
Dear Mr. Orlowski:
We hereby request, on behalf of Peconic Landing at Southold, Inc.,
that the Town complete a final site plan inspection of the above referenced
facility.
We understand that, upon completion of the final site plan inspection,
the developer (Retirement Living Services) will be in a position to request
release of any remaining monies related to site improvements, ie. street
trees - $50,000 and pedestrian paths - $76,000.00.
If you have any questions regarding this matter, please do not
hesitate to contact us.
Very truly yours,
~t.W~e,C
Thomas C. Wolpert, P.E.
TCW/sjt
cc: Retirement Living Services
ATTN: Mr. Dennis M. Wilhelm
Charles R. Cuddy, Esq.
Planning
Engineering
Land Surveying
Architecture
ELIZABETH A. NEVILLE
TOWN CLERK
REGISTRAR OF VITAL STATISTICS
MARRIAGE OFFICER
RECORDS MANAGEMENT OFFICER
FREEDOM OF INFORMATION OFFICER
Town Hall, 53095 Main Road
P.O. Box 1179
Southold, New York 11971
Fax (631) 765-6145
Telephone (631) 765-1800
southoldtown.northfork.net
OFFICE OF THE TOWN CLERK
TOWN OF SOUTHOLD
THIS IS TO CERTIFY THAT THE FOLLOWING RESOLUTION NO. 283 OF 2002
WAS ADOPTED AT THE REGULAR MEETING OF THE SOUTHOLD TOWN BOARD
ON APRIL 25, 2002:
RESOLVED that the Town Board of the Town of South old herebv aooroves the reduction in
the amount of the oerformance bond for roads. drainafle. and other imorovements for
Peconic LandinI!. Greenoort. NY SCTM# 1000-35-1-25, from $3,964,216.00 to
$1,670,836.00.
~~;(L..
Elizabeth A. Neville
Southold Town Clerk
THE SUFFOLK COUNTY NATIONAL BANK
TRUST & FINANCIAL SERVICES GROUP
3880 Veterans Memorial Highway, Bohemia, NY 11716
(631) 285-6601 Fax (631) 285-6610
RECEIVED
Dan A. Cicale
Senior Vice President
& Trust Officer
DEe 2 7 2002
SOBtlsold Town Clerk
December 23, 2002
Ms. Holly Stevens
Retirement Living Services, LLC
100 Allyn Street
Hartford, CT 069103
Re: Peconic Landing at Southold, Inc. Escrow Custodial Account No. 60 00 6971 323
Dear Holly:
This will confirm that $1,538,836.00 plus interest of$12,758.71 was wire to:
The Bank of New York
ABA #021000018
GLA#111-565
Acct. #648111
Account Name: Peconic Land Const AC PRJ FD
We released the $1,538,836.00 under Resolution #839 of2002, adopted at the
regular meeting of the Southold Town Board on December 17,2002 and the interest
under letter dated, July 31, 2001 from William G. Thompson, President.
Should you have questions, please do not hesitate to call.
Very truly yours,
~
Dan A. Cicale
cc: Charles Cuddy, Esq.
William G. Thompson, President
Elizabeth A. Neville, Southold Town Clerk
Bennett Orlowski, Jr. Planning Board Chairman
04/02/2004 15:34
5313599080
PAGE 03/03
FROM : SOUTHDLD TOWN PLANNING BORRD
FRX NO. : 631 765 3136
Feb. 11 2BB4 B2:56PM P2
--,
Il.tOll.ARD CAGGIANO
WILLIAM J. CREMJilllS
&ENNETEl L. &DWMIJS
MARTIN H. SIDOR
P.O. lloll U79
Tawn HaU, M09S State Raute 25
Southold, Now Yorio 11971.09!i9
'l'..l..phon. (631) 765-1938
~-"" (631) 765.3136
PLANNING BOARD MEMDERS
.n:&Ll.nt 1'1. WOOOHOU$I':
ChaJr
PI...A.NNlNG BOARD OFFICE
1'OWN OF SOU'l'HOLD
February 10, 2004
Elizabeth A. Neville. Town Clerk
Town of Southold
P.O. Box 1179
Southold, NY 11971
Re: Peconlc Landing at Southold. Inc.
Located on the north side of Main Road,1, 121' east of Sound Rd., in Greenport
SCTM#1000-35-1-25 Zone: HD
Dear Ms. Neville:
The following took place at a meeting of the Southold Town Planning Board on Monday,
February 9,2004: ""mel\ '*
r(:..CD
RESOLVED, that the Southold Town Planning Board1elease the remaining $ 132,000.
bond as a performance guarantee for improvements and recommends same to the
Town Board.
i
!
"
Please contact this office if you have any questions regarding the above.
Very truly yours,
c.~.4. .:::??~ -"'./4'1 ' <. ...<..
~rilyn B~Woodhouse
Chairperson
Att.
IS/OS . 02 WED 14: 56 FAX 516 765 6145
SOUTHOLD CLERK
~001
*********************
... TX REPORT ...
*********************
TRANSMISSION OK
TXlRX NO
CONNECTION TEL
CONNECTION ID
ST. TIME
USAGE T
PGS. SENT
RESULT
3473
2856610
IS/OS 14: 55
00'34
1
OK
ELIZABETH A. NEVILLE
TOWN CLERK
REGISTRAR OF VITAL STATISTICS
MARRIAGE OFFICER
RECORDSMAN~GEMENTOFFlCER
FREEDOM OF INFORMATION OFFICER
Town Hall, 53095 Main Road
P.O, Box 1179
Southold, New York 11971
Fax (6al) 765-6145
Telephone (631) 765-1800
southoldtown.northfor k.net
OFFICE OF THE TOWN CLERK
TOWN OF SOUTHOLD
May 15, 2002
Dan A Citale
Senior Vic....President & Trust Officer
Suffolk County National Bank
The Financial Planning Center
3880 Veterans Memorial Highway
Boh~mj... New York 11716
Dear Mr. Cicale:
I am writing this letter In =dance with oW" telephone IXInversation this morning, The Southold Town
Board and Planning Board are requiring a new performam:e bcmd for Peconic Landing in the all1Punt of
$1,670,83600. Addition.al improvements have taken place in llCCOrduc. with the Town Engineer's revised bond
estimatc dated March 5, 2002, Therefore, the amount that you would wire to Peconic Landing would b. the
difference between the aJITent peri:ormance bond in the IIJ1DllJlt pf S2,6Z4.341.00. less Sl,670,836.00, or
$953,505.00. My apologies to you for III\Y iDconvenieoce ar mimnderltanding.o. I hope this will clarify the
transaction for you. Shauld yau have any tiuther questions with regard la lbi. letter, please call me al 631 765-
1800, ""t. 228.
Very truly yours,
~On/,JA
Eli2a~h-A N;ville .~
SaUlhold Town Clerk
ELIZABETH A. NEVILLE
TOWN CLERK
REGISTRAR OF VITAL STATISTICS
MARRIAGE OFFICER
RECORDS MANAGEMENT OFFICER
FREEDOM OF INFORMATION OFFICER
Town Hall, 53095 Main Road
P.O. Box 1179
Southold, New York 11971
Fax (631) 765-6145
Telephone (631) 765-1800
sou tholdtown.northfork.net
OFFICE OF THE TOWN CLERK
TOWN OF SOUTHOLD
May 15, 2002
Dan A. Cicale
Senior Vice-President & Trust Officer
Suffolk County National Bank
The Financial Planning Center
3880 Veterans Memorial Highway
Bohemia, New York 11716
Dear Mr. Cicale:
I am writing this letter In accordance with our telephone conversation this morning. The Southold Town
Board and Planning Board are requiring a new performance bond for Peconic Landing in the amount of
$1,670,836.00. Additional improvements have taken place in accordance with the Town Engineer's revised bond
estimate dated March 5, 2002. Therefore, the amount that you would wire to Peconic Landing would be the
difference between the current performance bond in the amount of $2,624,341.00, less $1,670,836.00, or
$953,505.00. My apologies to you for any inconvenience or misunderstandings. I hope this will clarify the
transaction for you. Should you have any further questions with regard to this letter, please call me at 631 765-
1800, ext. 228.
Very truly yours,
~On~jL
Eliza~h A. N;ville .~
Southold Town Clerk
ELIZABETH A. NEVILLE
TOWN CLERK
REGISTRAR OF VITAL STATISTICS
MARRIAGE OFFICER
RECORDS MANAGEMENT OFFICER
FREEDOM OF INFORMATION OFFICER
\
CE OF THE TOWN CLERK
TOWN OF SOUTHOLD
May 15,2002
Dan A. Cicale
Senior Vice-President & T Officer
Suffolk County National B nk
The Financial Planning Cen er
3880 Veterans Memorial Hig
Bohemia, New York 11716
Dear Mr. Cicale:
Town Hall, 53095 Main Road
P.O. Box 1179
Southold, New York 11971
Fax (631) 765-6145
Telephone (631) 765-1800
southoldtown.northfork.net
I am writing this letter In accordance with our telephone con . on this morning. The Southold Town
Board and Planning Board are requiring a new performance bond for nie Landing in the amount of
$1,670,836.00. Additional improvements have taken place in accordance with th own Engineer's revised bond
estimate dated March 5, 2002. Therefore, the amount that you would wire to P Die Landing would be the
difference between the current perfonnance bond in the amount of $2,624,341.0 , less $1,670,836.00, or
$935,505.00. My apologies to you for any inconvenience or misunderstandings. lope this will clarify the
transaction fur you. Should you have any further questions with regard to this letter, ease call me at 631 765-
1800, ext. 228.
Very truly yours,
Ol)e'~~
(
OFFICE OF THE TOWN CLERK
TOWN OF SOUTHOLD
05/15/2002 WED 01:13 FAX
15/0~ u~ \'Vt<~1J 1~1: 15 t'AA. 51U 7t55 6145
ELIZABETH A. NEVILLE
TOWN CLERK
REGISTRAR OF VI'fA!. STATISTICS
MARB.lAGE OFFICER
RECORDS MANAGEMENT OFnCER
FREEDOM OF INFORMATION OF~'lCE}t
~~ ~l
1\~\ . 'lJ
~ -vt~/I
Dan A. Ciowe
Senior Vice-President &. Trost Oflie~
S"flblk County National Bank
The Financial Planning Center
3880 Veterans Memorial Highway
Bohemia. New York 11716
Dear Mr. Cicale:
~UUTliULU \..iLb1<.f\
I4i 001
10 uUJ.
Town Hall. 53095 Main Road
P.O. Boot 1179
Southold, New York 11971
Fa>: (631) 765.6145
Telephone (631) 765-1800
southoldtown.northfork.net
~~
I
\\)
~J~. l' ;Y I ,\9"
/~t u" ~'7
May IS, Z002
1 am writing this 1_ In IUlCOrd1lllCOO witb ow telephone __lion this lDoming. T.bB Soutbold Town
Board and P1anrJiDg Board are ~Iliring a I1ClW porfom\anc:e bond fbr Pecanio Landing iP the amount of
$1,670,836.00. AddltioQa/ intproveman15 have taken pl/loe in Il4'COrdanc:e witb lbe TD\lII1l Engin_'s revised bond
estimate dllted March 5, 2002, Therefore, tbe amount that YOIl wollkl wire Ul Peconio Landing would b. the
dif!:.~!m.'<!l etwecn the current pcd"ormauc:e bond In th, ID1<lWlt of 62.4 34 I... $1.670.836.00, or
g'35 595.00 y apologies 10 you for any iDoonvmienc:e or misunderstanding I hope this wm clarify the
transactioo for you. Should you have any f\l.ttlKr questiCltlS with regml. to this le11 pkasc ...u me at 631 765.
1800. e><t. 228. ~. (,:;). ~ . ~q \
tJPUlfif
1l1e
~)~
""" -'''.. S,~,. -
. !....p .c,'r ~ .'\ I
i ...~;i .,~',i',\ U"\J
f1ilS
V cry truly you""
~Q2(l!ud&
Elizablllh A. Neville
SoutholcJ Town Clerk
c:;;, (, :1 Lf 3 4- /
! I r; 7D', 7;3 ~
05
4tJjI/JI
, .
,
:;;;'&~)7 ql
t:>z.1
I ~
~
'v ' ;::.:;-,€. ,t" "u .:.R
L.-6
9.!::, -<
, "Co.......
...."... .....' ""..> ..", """;)
f
r I -e (.c/.U..
~ -A-~ I
~'.',_~'._ ....,d.....
"-,-rO~$} $ b
\ ~s. \..{ e
.q
COJ /@(~()
/;
15/05 '02 wED 13:16 FAX 516 765 6145
SOUTHOLD CLERK
I4J 001
*********************
*.. TX REPORT *..
*********************
TRANSMISSlON OK
TV RX NO
CONNECTION TEL
CONNECTION ID
ST. TIME
USAGE T
PGS. SENT
RESULT
3469
2856610
15/05 13:14
01'12
3
OK
ELIZABETH A. NEVILLE
TOWN CLERK
REGISTRAR OF VI'!'AL STATISTICS
MARRIAGE OFFICER
RECORDS MANAGEMENT OFf'ICER
FREEDOM 01<' INFORMATION OFFICER
Town Hall, 53095 Main Road
P.O. Box 1179
Southold, New York 11971
Fa:.: (631) 765.6145
Telephone (631) 765.1800
southoldtown.northfor k.net
OFFICE OF THE TOWN CLERK
TOWN OF SOUTHOLD
May IS, 2002
Dan A. Cicale
Senior Vi~Ptesident & Trust Officer
Suffolk County National Bank
The Financial Planning Center
3880 Veterans Memorial Highway
Bohemia, New York 11716
Dear Mr. Cicale:
] am writing this letter In ac<:ordanc:e with our telephone c:o.nversation this moming. The Southold Town
Board and Planning Board are requiring a new petfonnance bond for Peconic Landing in the amoUllt of
$1,670,836.00. Additional improvements have taken place in lI4'COrclance with the Town Engineer's revised bond
estimate dated March S, 2002. Therefore, the amount that you would wire to Peoonic Landing would be the
difference between the current performance bond in the amount of $2,624,342., les. $1,670,836.00, or
$935,595.00. My apologies to you for any inconvenience or misunderstandings. I hope tbis will clarifY the
transaction for you. Should you have any further questions with regud to this letter, please can me at 631 765.
J 800, ext. 228.
Very truly you,,",
~~~
Southold Town Clerk
ELIZABETH A. NEVILLE
TOWN CLERK
REGISTRAR OF VITAL STATISTICS
MARRIAGE OFFICER
RECORDS MANAGEMENT OFFICER
FREEDOM OF INFORMATION OFFICER
OFFICE OF THE TOWN CLERK
TOWN OF SOUTH
Dan A Cicale
Senior Vice-President & Trust Officer
Suffolk County National Bank
The Financial Planning Center
3880 Veterans Memorial Highway
Bohemia, New York II 716
Dear Mr. Cicale:
ay 15, 2002
Town Hall, 53095 Main Road
P.O. Box 1179
Southold, New York 11971
Fax (631) 765-6145
Telephone (631) 765-1800
southoldtown.northfork.net
\
I am writing this letter In accordance with our telephone nversation this morning. The Southold Town
Board and Planning Board are requiring a new performance bon for Peconic Landing in the amount of
$1,670,836.00. Additional improvements have taken place in accordan .th the Town Engin_'s revised bond
estimate dated March 5, 2002. Therefore, the amount that you would . e to Peconic Landing would be the
difference between the current performance bond in the amount of 2,624,342., less $1,670,836.00, or
$935,595.00. My apologies to you for any inconvenience or misund dings. I hope this will clarify the
transaction for you. Should you have any further questions with regsrd t this letter, please call me at 631 765-
1800, ext. 228.
. Q~
h A Neville
old Town Clerk
ELIZABETH A. NEVILLE
TOWN CLERK
REGISTRAR OF VITAL STATISTICS
MARRIAGE OFFICER
RECORDS MANAGEMENT OFFICER
FREEDOM OF INFORMATION OFFICER
Town Hall, 53095 Main Road
P.O. Box 1179
Southold, New York 11971
Fax (631) 765-6145
Telephone (631) 765-1800
sou thold town.northfork.net
OFFICE OF THE TOWN CLERK
TOWN OF SOUTHOLD
May 2, 2002
Dan A. Cicale
Senior Vice President & Trust Officer
Suffolk County National Bank
The Financial Planning Center
3880 Veterans Memorial Highway
Bohemia, New York \1716
Dear Mr. Cicale:
The Southold Town Board at their regular meeting held on April 25, 2002
adopted a resolution approving a reduction in the amount of the performance bond for
roads, drainage, and other improvement for Peconic Landing from $3,964,216.00 to
,$1,670,836.00. Please execute a new Performance Guarantee Agreement signed bv
Peconic Landinfl: and Suffolk County National Bank in the reduced amount and send two
_originals directlv to me for signature bv the Town Supervisor.
If you have any questions, or need any further infonnation, please do not hesitate
to call me at 631765-1800, Ext. 228.
Very truly yours,
~o~
Elizabeth A. Neville
Southold Town Clerk
cc: D. Wilheim, Peconic Landing
Charles R. Cuddy, Esq.
Planning Board
15/05 '02 wED 11:24 FAX 516 765 6145
SOUTHOLD CLERK
[@OOI
*********************
*** TX REPORT ***
*********************
TRANSMISSION OK
TXlRX NO
CONNECTION TEL
CONNECTION ID
ST. TIME
USAGE T
PGS. SENT
RESULT
3464
2856610
15/05 11: 23
00'58
2
OK
ELlZABE1'H A. NEVILLE
TOWN CILERK
REGISTRAH OF VITAL S'I'A.TISTICS
MARRlAGB OFFICER
R)<:CORDfl MANAGEMBNT Or'f1CER
FllliEDOM OF INFORMATION on'ICER
Town Hall, 53095 Main Road
P.O. Box 1.179
Southold, New York 11971
Fax (631.) 765-6145
Telephone (631) 765-1800
sou tholdtown.nerthforlt.net
OFFICE OF THE TOWN CLERK
TOWN OF SOUTHOLD
May 2, 2002
Dan A. Cicale
Senior Vice President & Trust Officer
Suffolk County National Bank
The Financial Planning Center
3880 Veterans Memorial High.way
Bohemia, New York 11716
Dear Mr. Cicale:
The Southold Town Board at their regular meeting held on April 25, 2002
adopted a resolution approving a reduction in the amount of the performance bond for
roads, drainage, and other improvement for Peconic Landing from $3,964,216.00 to
c $1,670,836.00. Please execute a new Performance Guarantee Agreement signed bv
peconic Landin2 and Suffolk CO\lJ1tv National Bank in the ......tlnoed amonnt and send two
_originals directly to me for silmature by the Town Sunervisor.
If you have any questions, or need any further infonnation, please do not hesitate
to call me at 631 765-1800, Ext. 228.
Very truly yours,
15/05 '02 wED OR:22 FAX 516 765 6145
SOUTHOLD CLERK
411 001
*********************
.** TX REPORT ***
*********************
TRANSMISSION OK
TXlRX NO
CONNECT I ON TEL
CONNECTION ID
ST, TIME
lISAGE T
PGS. SENT
RESULT
3460
2856610
15/05 09:21
00'51
2
OK
ELIZABETH A. NEVILLE
TOWN CLERK
REGISTRAR OF VITAL STATISTICS
MARRIAGE On'ICEa
RECORDS MANAGEMENT OFFICER
FREEDOM OF INFORMATION OFFICER
Town Hall, 53095 Main Road
P.O. Box 1179
Southold, New York 11971
Fax (631) 765-6145
Telephone (631) 765.1800
southoldtown.northfork .net
OFFICE OF THE TOWN CLERK
TOWN OF SOUTHOLD
May 2, 2002
Dan A. Cicale
Senior Vice President &. Trust Officer
Suffolk County National Bank
The Financial Planning Center
3880 Veterans Memorial Highway
Bohemia, New York 11716
Dear Mr. Cicale:
The Southold Town Board at their regular meeting held on April 25, 2002
adopted a resolution approving a reduction in the amount of the performance bond for
roads, drainage, and other improvement for Peconic Landing from $3,964,216.00 to
$1,670,836.00. Please execute a new Performance Guarantee Agreement signed by
Peconic Landing and Suffolk County National Bank in the reduced amount and send two
originals directly to me for signature by the Town Supervisor.
If you have any questions, or need any further infoIlIllltion, please do not hesitate
to call me at 631 765-1800, Ext. 228.
ELIZABETH A. NEVILLE
TOWN CLERK
REGISTRAR OF VITAL STATISTICS
MARRIAGE OFFICER
RECORDS MANAGEMENT OFFICER
FREEDOM OF INFORMATION OFFICER
Town Hall, 53095 Main Road
P.O. Box 1179
Southold, New York 11971
Fax (631) 765-6145
Telephone (631) 765-1800
southoldtown.northfork.net
OFFICE OF THE TOWN CLERK
TOWN OF SOUTHOLD
THIS IS TO CERTIFY THAT THE FOLLOWING RESOLUTION NO. 283 OF 2002
WAS ADOPTED AT THE REGULAR MEETING OF THE SOUTHOLD TOWN BOARD
ON APRIL 25, 2002:
RESOLVED that the Town Board of the Town of South old herebv approves the reduction in
the amount of the oerformance bond for roads. draina2e. and other improvements for
Peconic LandinI!:. Greenuort. NY SCTM# 1000-35-1-25, from $3,964,216.00 to
$1,670,836.00.
~Qr~r~Ir'
Elizabeth A. Neville
Southold Town Clerk
RESOLUTION
APRIL 25, 2002
v - 283
RESOLVED that the Town Board of the Town of Southold herebv approves the reduction in
the amount of the performance bond for roads, drainal!e, and other improvements for
Peconic LandinI!. Greenport. NY SCTM# 1000-35-1-25, from $3,964,216.00 to
$1,670,836.00.
,
(
. ,
~IfES'Cl
IV. - 2
"
APRIL 25, 2002
FOR DISCUSSION
POSSffiLE RESOLUTION
Recommended reduction by Planning Board for revised bond estimate for Peconic Landing
RESOLVED that the Town Board of the Town of Southold hereby approves the reduction in the
amount of the performance bond for roads, drainage, and other improvements for Peconic
Landing, Greenport, NY SCTM# 1000-35-1-25, from
, .
RECEIVED
ifF / 'L ;b (4) /(<57>
Highway Department
Town of Southold
275 Peconic Lane. P.O. Box 178
Peconic, NY 11958-0178
PETER W. HARRIS
Superintendent APR 1 8 2002
Tel. (631) 765-3140
(631) 734-5211
Fax (631) 765-1750
~oufhold Town Clerl
MEMORANDUM
TO:
Elizabeth A. Neville
Southold Town Clerk
Peter W. Harris, Superintendent /~
Southold Town Highway Department ~
FROM:
DATE:
April 16, 2002
RE:
PECONIC LANDING - REVISED BOND ESTIMATE -
SUFFOLK COUNTY TAX MAP # 1000 - 35 -1 - 25
I am in receipt of a letter from Southold Town Engineer James Richter in
connection with the above-referenced project which pertains to a revised
Bond Estimate in the sum of $1,670,836.00. Please be advised that I
have no problem with this request.
PWH: Jes
.
. ~
WILLIAM J. CREMERS
KENNETH L. EDWARDS
GEORGE RITCHIE LATHAM, JR.
RICHARD CAGGIANO
4t-.;JS-o:J. / j/
P.O. Box 1179
Town Hall, 53095 State Route 25
Southold, New York 11971-0959
Telephone (631) 765-1938
Fax (631) 765-3136
PLANNING BOARD MEMBERS
BENNETT ORLOWSKI, JR.
Chairman
PLANNING BOARD OFFICE
TOWN OF SOUTHOLD
April 9, 2002
Elizabeth A. Neville, Town Clerk
Town of Southold
P.O. Box 1179
Southold, N.Y. 11971
RE: Peconic Landing - Revised Bond Estimate
SCTM: 1000-35-1-25
Dear Ms. Neville:
The following resolution was adopted by the Southold Town Planning Board at a
meeting held on Monday, April 8, 2002:
BE IT RESOLVED that the Southold Town Planning Board recommend to the Town
Board the adoption of the revised Bond Estimate in the amount of $1,670,836.00, dated
March 5, 2002 for the above-referenced project. This estimate has been modified to
reflect the amount of work completed to date and the estimated value of work remaining
to complete the project, as determined by the Town Engineer, and recommended to the
Town Board.
Please contact this office if you have any further questions regarding the above. '
Very truly yours, II
6~o~;r'
Bennett Orlowski,Jr.
Chairman
encl.
cc: Charles Cuddy, Esq.
Dan Cicale, Sr. V.P., Suffolk County National Bank
ELIZABETH A. NEVILLE
TOWN CLERK
REGISTRAR OF VITAL STATISTICS
MARRIAGE OFFICER
RECORDS MANAGEMENT OFFICER
FREEDOM OF INFORMATION OFFICER
Town Hall, 53095 Main Road
P.O. Box 1179
Southold, New York 11971
Fax (631) 765-6145
Telephone (631) 765-1800
sou tholdtown.northfork.net
OFFICE OF THE TOWN CLERK
TOWN OF SOUTHOLD
THIS IS TO CERTIFY THAT THE FOLLOWING RESOLUTION NO. 283 OF 2002
WAS ADOPTED AT THE REGULAR MEETING OF mE soumOLD TOWN BOARD
ON APRIL 25. 2002:
RESOLVED that the Town Board of the Town of South old bereby annroyes tbe reduction in
tbe amount of the nerformance bond for roads. drainaee. and otber imnroyements for
Peconic Landine. Greennort. NY SCTM# 1000-35-1-25, from $3,964,216.00 to
$1,670,836.00.
~Q~1L.
Elizabetb A. Neville
Soutbold Town Clerk
ELIZABETH A. NEVILLE
TOWN CLERK
REGISTRAR OF VITAL STATISTICS
MARRIAGE OFFICER
RECORDS MANAGEMENT OFFICER
FREEDOM OF INFORMATION OFFICER
Town Hall, 53095 Main Road
P.O. Box 1179
Southold, New York 11971
Fax (631) 765-6145
Telephone (631) 765-1800
southold town.northfork.net
OFFICE OF THE TOWN CLERK
TOWN OF SOUTHOLD
THIS IS TO CERTIFY THAT THE FOLLOWING RESOLUTION NO. 283 OF 2002
WAS ADOPTED AT THE REGULAR MEETING OF THE SOUTHOLD TOWN BOARD
ON APRIL 25, 2002:
RESOLVED that the Town Board of the Town of South old herebv approves the reduction in
the amount of the performance bond for roads, drainal!e, and other improvements for
Peconic LandinI!, Greenport, NY SCTM# 1000-35-1-25, from $3,964,216.00 to
$1,670,836.00.
P!~"L.ll,fa~....(I...
Elizabeth A. Neville
Southold Town Clerk
.
THE SUFFOLK COUNTY NATIONAL BANK
THE FINANCIAL PLANNING CENTER
3880 Veterans Memorial Higbway, Bobemia, New York, 11716 (631) 285-64>01, Fax (631) 285-6610
Dan A. Cicale
Senior Vice President
& Trust Officer
RECEIVED
Ms. Holly Stevens
Retirement Living Services LLC
100 Allyn Street
Hartford, CT 06103
November 6,2001
NOV 7 2001
Southord Town CIeri.
Re: Peconic Landing at Southold, Inc. Escrow Custodial
Account No. 60006971 323
Dear Holly:
This will confIrm that $1,339,875. plus interest accrued to date of$162,662.54
was wired to:
u.S. Trust Company of New York
ABA No. 021001318
BenefIciary Name: Peconic Landing Project Fund
BenefIciary Account No. 01168800 Attn: Miriam Moraca
Reference: Performance Assurance Account
We released the $1,339,875. based on Resolution #735 of2001, adopted October
23,2001 at a meeting of the Southold Town Board authorizing reduction of the
$3,964,216. performance bond for Peconic Landing at Southold.
The interest is being drawn per a letter dated July 31, 2001 from William G.
Thompson, President.
Holly, I will need written authorization for the above wire instructions as the
account agreement shows different instructions. I am also enclosing an account history
from inception of account.
Very truly yours,
cZ>a--;4 L c- CLLL
Dan A. Cicale
Senior Vice President
& Trust Officer
cc: Charles Cuddy, Esq.
William G. Thompson, President
Elizabeth A. Neville, Southold Town Clerk
Bennett Orlowski, Jr., Planning Board Chairman
~-
GIARLES R. CUDDY
ATT01<NEY AT LAW
445GR1FF1NG AVENI:E
R1VERHEAD, NEW YORK
~~L_~Address
P.O. Box 1547
I~iverhead, ;-..JY 11901
TEL: (631) 369-82JXl
FAX: (631) 369-CUO{J
E-mail: crcuddy@earthlink.net
November 24, 2000
Jean Cochran, Supervisor
Town of Southold
Main Road
southold, NY 11971
Re: Performance Guarantee Agreement - peconic Landing
Dear Mrs. Cochran:
Enclosed is one (1) fully executed copy of the
Performance Guarantee Agreement. We anticipate deposit
of the funds in Suffolk County National Bank this week.
CRC:ms
Encs.
cc: Greg Yakaboski, Town Attorney
Bennett Orlowski, Chairman, Planning
Very truly yours,
C~R~r:!o
Board
NOV 2 7 2000
L_'~
,
i
--.J
ELIZABETH A. NEVILLE
TOWN CLERK
REGISTRAH OF VITAL STATISTICS
MARRIAGE OFFICER
RECORDS MANAGEMENT OFFICER
FHEEDOM OF' INFORMATION OFFICEH
Town Hall, 53095 Main Road
P.O. Box 1179
Southold, New York 11971
Fax (631) 765-6145
Telephone (631) 765-1800
OFFICE OF THE TOWN CLERK
TOWN OF SOUTHOLD
THIS IS TO CERTIFY THAT THE FOLLOWING RESOLUTION WAS ADOPTED AT
THE REGULAR MEETING OF THE SOUTHOLD TOWN BOARD ON NOVEMBER
14,2000:
WHEREAS, Peconic Landing is required to provide a letter of credit, cash, or other
security satisfactory to the Town to serve as a performance guarantee for the total cost of
furnishing, installing, connecting and completing all of the street grading, paving, storm drainage
and utilities for the project known as "Peconic Landing, be it
RESOLVED by the Town Board of the Town of South old that the Supervisor, Jean W.
Cochran is hereby authorized to execute a Performance Guarantee Agreement whereby Peconic
Landing will deposit "Performance Bond" money at Suffolk County National Bank in the sum of
$3,964,216.00 subject to the approval of the Town Attorney.
a~..u~Q2;k...lk.
Elizabeth A. Neville
South old Town Clerk
~ 1~/~8/2808 18:35 631~b~~~~~
~ r;. UJJ.JUl
r~ (J-,/tJ'+
.,
""'DI'III_m Ga8l'8llfee AR'I"MIIleat
AGBEEMENT madc1bis 2J.... day of /I/ry V:i:It1I... ~ . 2000 b die beDefit of1he TOlW of
Soulbold, New York (dIe-r_") by IIId IDIOII8 Pecoaic , ~ -* ~ IDc., aNew York DllIl-
profit c:oq>oo~ wi1h aplaceofbo....:..~ ill SO'IlML\ New YcIIk ("Pecaaic r ~ die Town of
Soo~ NewYcIIk (lbe"TOWIl") IDIl SuSiolk CouatyNlIIioaaI BalIk, a New York bllllkiq
~ (dIe"BBDkj. .
WHBREAS, Peoaoie J.andirlg is UIIIIerlakiDg to eoastruet a retiremeat community -* its
property on Route 2S in 1he T_ (the '?rojec:t"); lIJId
WHEREAS, Pealaic L8ncIiIlS is requlrecl to provide a leiter, of crecIit, cash or other securily
lilI1isfiK:tmy to 1110 Town to ICI'YO as a porformaaGe Jl1IlIDt.eo fOr 1110 tolIIl east of ~ instUling,
o:,..nvfing aDd comp1eliDg III of1be street gxadiDg. pavia&. sIDnD. drainage aDd utilities (1he
*'ImproVeD1eD1s; and
WHBRBAS, the Project will bo ~ed in part fi:om proeeecII of c:crtain boncIa issued
under the Indenture of Trust, dated IS ofNowmber I, 2000 (the "Bond TnIl~, by IJld
between the Suffolk County 1ft(1'JItrial Deve10pmeat AgeDI:y IJld UDited State& Trust Company of
New YOlk, as TNStcc (tbe "Trustee") IJld by a loin tiom tbe "l.CDdm" id~ in the Buildillg
Loan IJld B"'...... Costs Loan ApccmaJI, dated 8$ of November I, 2000 IIIDDIIg sud1 Lmd-=rs,
BNP Pen"baa, actiDg through its New York Brmeb, IS AdmiIIiIlrltive Aseat. UJd Peconie
Landing;
NOW, lHEREFORE. for wluable lXlIISideration. die neeipt IIIId sufficiency whereafis hereby
aclmowledged. 1be parties hereto agree IS mIlows:
1. 'P..rlh""",,~ Guarantee. Peoaoic I ........i1!i shall deposit the sum of 1hree milliDD, nine
hUDdred sixty four thoaI". two hundred sivteen doIWs ($3,964,216.00). (die "'PerformaDce
Guanatee") wid11he 8IIlk upoD 1he CXIOO'dinn orchis J.ar--rt- 'The Bank IIuIIl hokldle
Ped'ormaDce GuaranlIIc, _die same III3J be .ptb........ from time to time by padial pJ- UIlde.r
paragPIPh 2 below, mr die Mu.At of1be Town in III interest beariD& trust ICCOUIIt wi1h all '"~...t
earned dJereon beiDg caasidend part of1be Performmce Guanotee b JI1II1IOH5 of1bis Apement
2. "-mt'ftt ofPedOnnanc:e nUA1'1II\fH! If -* any time or times during 1110 1em1 of1his
Agreement, the Town provides 1he Bank wi1h a written request mr 1be PerformaDcle Guar8ntee or any
portion ~ signed by 1he Town Supervisor, wi1h copies to Peoaoic I......<Ii1lg at Sou1boId, Ine:. at
FeatheI" BiI1. P.O. Box 430. SOllfhnltl,. NY 11971,lIIIII Cbarles R. Cuddy, Esq., P.O. Box 1547,
Rived1ead, NY 11901. statiDg that Peconic: '{ JOnn.wog bas failed to coastruc:t any or all of the
Jmprowm- IS required by 1be 1iDaI sUo plaD fOr the Project, lIJId upon ~ of a 30 day period
duriD& wbid1 Pec:oaie , .andiwog may CURl any IIJe&od clefauIt" lbe Bank shall ddiver to 1he Town the
PerlbnDance Gu.u...ac or the portiaD dJeceofreques1ed by tbe Town. In 110 event IIbaII the Bank
release any po.r1ioa of the Perbmaoce Gl.aJ:aotee to Pecoaie , ........ing or to any Olber perIClIl or entity
witblJut 1110 prior wriUco eoDHIIi of the Town. 'Ibll BIIIk IbaII DOt rcleaso 1he PdxmIau:le GuarIIIltoo
or ~ portion tbereclexccpt in ~ with the ....;UIIa. ~_ of the TDWIL PRIIIl time 110 time.
Peoaoic T _"'fnl may request release or a portion of the escrowed funds when a portim of the subject
work is c:ompleted lIDd ICOeptecI by the TcnMI F~ as c:omplimt with Town requip.rnenm
~ ~11/~8/2eee
le;::lo
b.:l.l..:Ib';1:Jt;JOtJ
-.................-- ., ...........-.
:Requests tor svd1 nIIease CID occur 110 more hqualy1ban 1bur (4) times peryear. Accepcanc:e
and/or certiB--- by ~ T_ may DOt 1IIIRUlIIIabIy be wilbheIcI.
All fimds so TCIeased at the requat otP--:e L-~ tbI1I. be tnIIIfcrrcd by tbe
Bd directly to the Trustee for depoIit in the "Project Puod" IS defWd in the Boud 1rvI-".
IIIld in acc:otdaace with POllODic: I ....~. ~ with die Trustee aDd the I<<lcIers.
3, ImD. um.. fer'nbnaMA cutiar by wrl1ten.."......... of'dIe TOWD, this Agreement
sbaIl teTmin..... tIuw (3))'OlIIlI6oaI. die _ of'ila Cl<>C"'l.ooI. III: which time die Jiak sb8Il pay 1he
PerlbrmaDce Gua...&.o.1DJI"ber willa my iIdeRst 8IIIIed ---. .. my 8IDOUIItS previously
rcle8sed IIIlder paI'lIII'IIpb 2 above. .. cIireetecI in. wriaina by 1ho T_ and in 1110 absmce of any such
direction 10 TruslI!e tor c:leposit in ~ "Project Funcl.",
4. T .i""'''''' afBmk 'Ibe BalIk sbaIl be ob1iP""J oaIy 1br~ ~ of such duties
as Ire ~ set b'lhherein and may rely aaclllb8ll bo,.. ~ in Idiu& ~ III;y iastnmu:nt or
sigro"'ure beJiewd by iUo be pnuine IIId 10 haw beIIIl siancd ClI'PIeladed by 1he proper party ClC
parties duly autborized 10 do so. TheBaak IbaD haw 110 resy-ihility fur die ~ of any writing
<'nnfeluplatcd herein IIld may rely wi1hout liability upcm die III ........16 1beno( The Baak shall not be
1iable Cor any ob1iptioq taken or omitted by it in good fiIi1h and believed by it 10 be IUtborized benlby,
and sbaIl DOt be IiIbIe fix' any...;_I... of'faa ClC error of'jJutr_ or for any acts or ..wions of'any
kind uaIess ....- by wiDfUI...;-'V'duct or gross nowir- Pecaaie T .......___....10 m"-iV
the Bank and bold it haImless ftum lIIId ..S"ilMtany IIld all liabilities incurIed by it hereunder.
5. llMilmAhnn of Bank. The B8Dk may resign at any time by living written DOUce thereof
10 Pec;onie Landing and 1he Town. UpoII such IlOtice, a 8Ul:Ces~or Bd Iba1l be appointed by 1he
parties. If1he pu1ies rcmainiDs ate 1IIIable 10 ugreo upoa a SUCQlllSClC BlIIIk wi1bin teI1 (10) days after
such no1ice, the Bank so resigning shall n...,;il"~ a Sllc()C&sor BlIIIl: whid1 may include any bank or
trust c:ompany with a place of business in Sufro1k County, New York. The resigning Bank shall
c:ontinue to serw umil its "lC<:esSor aa:epl51be appointment and receives the PedDrmance Guarantee.
Peconic J .lln4Ula and the T_ sbaII haw die riIbt at II\)' limo upon their ........imnus CXlIISeI1t 10
substitute a new Bank ClC Agen1s by giving wriUm IIDtice 1hereoflO 1be BlIIIl: 1hen ading.
6, AIIlIi~. The Town and the Bank admowledge that this Performance
Guuantee Asreement will be -'Ted ami po.Ited .. I:OIIatcral by Peconic LandlJIg to or on the
order of the Trustee aDd tbe T <<Iders in ~on with the fi.....ncitIg oCthe Project. Pursuant to
such assignment, Pero'lic Lauding sbaIl contUwe to perform under this agreement on behaJf of the
TnIStee and the Ienden unless certain conditions oftbe tilUlMIlg are not util1ied. The Town
and the Bank agree to contiDue to pedbnn UDder and accept the terms of this Agrcc:mcot if the
Trustee or tbe Lenden give written noti(1C to them that Pcconic Landini will no longer perform
hereuncler on their bebaIf
IN wrI'm!SS WJrnREOF, 1be parties hereto haw executed this Agreement IS of1he ~ and
year 1Jntt above-written.
WITNESS
PECONIC LANDING AT SOumOLD, INC.
: " r,1/,El8/2E1E1E1 lEI: 3~
,
b.:lJ..:Ib';j':fl:::ttl(l
......_~-"''-'o.J........,
,..,.....l.... 0"" 0'+
~'-~
Iis~A.....
s
Its
TOWN OF SOUIHOm
BY.~~ COL~
own Supervisor
-~
THE SUFFOLK COUNTY NATIONAL BANK
THE FINANCIAL PLANNING CENTER
3880 Veterans Memorial Higbway, Bobemia, New York, 1] 716 (631) 285-6601, Fax (631) 285-6610
Dan A. Cicale
Senior Vice President
& Trust Officer
RECEIVED
November 6, 2001 .
Nav 7 2001
Ms. Holly Stevens
Retirement Living Services LLC
100 Allyn Street
Hartford, CT 06103
"
Soufhold Town C1e.... !ll
o
z
-
n
Re: Peconic Landing at Southold, Inc. Escrow Custodial
Account No. 60 00 6971 32 3
s:
z
c
-
z
C1
Dear Holly:
This will confirm that $1,339,875. plus interest accrued to date of$162,662.54
was wired to:
U.S. Trust Company of New York
ABA No. 021001318
Beneficiary Name: Peconic Landing Project Fund
Beneficiary Account No. 01168800 Attn: Miriam Moraca
Reference: Performance Assurance Account
We released the $1,339,875. based on Resolution #735 of2001, adopted October
23,2001 at a meeting ofthe Southold Town Board authorizing reduction of the
$3,964,216. performance bond for Peconic Landing at Southold.
The interest is being drawn per a letter dated July 31, 2001 from William G.
Thompson, President.
Holly, I will need written authorization for the above wire instructions as the
account agreement shows different instructions. I am also enclosing an account history
from inception of account.
Very truly yours,
C)~i--~-;4 Le- C<--LL
Dan A. Cicale
Senior Vice President
& Trust Officer
cc: Charles Cuddy, Esq.
William G. Thompson, President
Elizabeth A. Neville, Southold Town Clerk
Bennett Orlowski, Jr., Planning Board Chairman
.~ If.,....
..
ELIZABETH A. NEVILLE
TOWN CLERK
REGISTRAR OF VITAL STATISTICS
MARRIAGE OFFICER
RECORDS MANAGEMENT OFFICER
FREEDOM OF INFORMATION OFFICER
Town Hall, 53095 Main Road
P.O. Box 1179
Southold, New York 11971
Fax (631) 765-6145
Telephone (631) 765-1800
OFFICE OF THE TOWN CLERK
TOWN OF SOUTHOLD
THIS IS TO CERTIFY THAT THE FOLLOWING RESOLUTION NO. 735 OF 2001
WAS ADOPTED AT THE REGULAR MEETING OF THE SOUTHOLD TOWN BOARD
ON OCTOBER 23, 2001:
RESOLVED that the Town Board of the Town of South old hereby authorizes the reduction of
the $3.964.216.00 performance bond for Peconic LandinI! at Southold in the amount of
$1.339.875.00, all in accordance with the recommendation ofthe Southold Town Planning Board
and Superintendent of Highways Raymond Jacobs.
Pt~(lQ~'tJ,..
Elizabeth A. Neville
Southold Town Clerk
#. ~....
RESOLUTION
OCTOBER 23, 2001
v - 735
RESOLVED that the Town Board of the Town of South old hereby authorizes the reduction of
the $3,964,216.00 Derformance bond for Peconic LandinI! at Southold in the amount of
$1,339,875.00, all in accordance with the recommendation of the Southold Town Planning Board
and Superintendent of Highways Raymond Jacobs.
'.
RAYMOND L. JACOBS
Superintendent
Highway Department
Town of Southold
Peconic Lane
Peconic, N.Y. 11958
October 19,' 2001
Elizabeth A. Neville, Town Clerk
Southold Town Hall
P. O. Box 1179
Southold, New York 11971
Re: Bond Reduction - Peconic Landing
Dear Ms. Neville:
I have reviewed Mr. Richter's report
of September 27, 2001 and Mr. Orlowski's
letter of October 16, 2001 in reference
to reducing the performance guarantee of
Peconic Landing and concur with their findings.
~"""llY ,
Rt~f:bs
Highway Superintendent
cc:
Bennett Orlowski, Jr.
James RILchter
Tel. 765-3140
734-5211
Fax 765.1750
. '" . ~ ......
WILLIAM J. CREMERS
KENNETH L. EDWARDS
GEORGE RITCHIE LATHAM, JR
RICHARD CAGGIANO
Town Hall, 53095 State Route 25
P.O. Box 1179
Southold, New York 11971-0959
Telephone (631) 765-1938
Fax (631) 765-3136
PLANNING BOARD MEMBERS
BENNETT ORLOWSKI, JR
Chairman
PLANNING BOARD OFFICE
TOWN OF SOUTHOLD
October 16, 2001
Elizabeth A. Neville, Town Clerk
Town of Southold
P.O. Box 1179
Southold, NY 11971
Re: Approved Site Plan for Peconic Landing at Southold
SCTM#1000-35-1-25
Dear Ms. Neville:
The following resolution was adopted by the Southold Town Planning Board at a
meeting held on Monday, October 15, 2001:
BE IT RESOLVED that the Southold Town Planning Board recommend to the Town
Board that the Performance Guarantee in the amount of $3,964,216.00 for Peconic
Landing at Southold be reduced in the amount of $1 ,339,875.00.
As noted in Mr. Richter's September 27,2001 report, with the exception of the drainage
pipe, all required construction items have been completed in a satisfactory manner. The
Planning Board is not requiring the installation of the 233 lineal feet of 36" drainage pipe
due to the location of the rock storage pile at the site.
Please contact this office if you have any questions regarding the above.
~d}4.
Bennett Orlowski, Jr.
Chairman
enc.
cc: Charles Cuddy, Esq.
Dan A. Cicale, Sr. Vice President, Suffolk County National Bank
Fax. (516) - 765 - 1366
5A
pI
((,
JAMES A. RICHTER, R.A.
ENGINEER
TOWN OF SOUTHOLD, NEW YORK. 11971
JEAN W. COCHRAN
SUPERVISOR
TOWN HALL - 53095 MAIN ROAD
Tel. (516) -765 -1560
OFFICE OF THE ENGINEER
TOWN OF SOUTHOLD
q/u
September 27,2001
Bennett Orlowski, Jr.
Chairman - Planning Board
Town Hall, 53095 Main Road
Southold, New York 11971
Re: Peconic Landing - Request for Bond Reduction
Dear Mr. Orlowski:
As per your request, I have reviewed the request for Bond Reduction from Retirement
Living Services, My report is as follows:
The proposed reduction of the Bond is indicated by the Construction Cost Estimate
dated 8/20/01 and is titled Value of Work Completed. A copy of this document has been
enclosed for your reference.
Item # 11 indicates that 233 lineal feet of 36" drainage pipe has been installed. This
item, according to field inspections, has only 160 lineal feet installed due to the location of
the rock storage pile at the site. This is the only modification to the proposed Bond
reduction and is considered a minor change to the request.
Based on the requested value of work completed and the modification to item # 11 as
listed above, the Value of Work Completed to date is one million, three hundred thirty nine
thousand, eight hundred seventy five ($ 1,339,875.00) dollars.
If you have any questions concerning this report, please contact my office.
~r~,~re'\~q'l' . 'I'~"'r
.iJ~!J'i,.jIi\rJ" ~\fttj ....1...
"\' '. '-:_-"'._-~ 'ill l .'_
,~ '.,.-\
. . )Ir. .
:.. SEP 1:18" ~';?Y'
rely,
am"A.~
::llm1.1t~~"I""6WiI1
illimm~
.~ ,....
.' 08/20/2'''"1 14: 35
6317270144
YOUNG YOUNG
PAGE 03
August 20, 2001
?~
CONSTRUCTION COST ESTJ:MATE.
Prepared for PECONtC LANDING
at Greenport. Town of SouUlold, New York
based on Bond :E$tllnate dated August 28. 1998
Prepared by Town of Southold Offtce of the Engineer
ncm DescrtDtton ow. ... UnIt ,rniT (""pst Total rn~:r
.b[a.
l Saw Cut Asphalt Pilvem.ent (S.R. 25) 1,500 L-P. 53.00 54.500.00
2 ClearInB . Grubblnar 69.4 Ac;res 52,500.00 5173,500.00
3 OemolitioD/R.elDoval of Existing
Suuetul'eS JOB S75.000.00 S75,OOO.00
4 Rou8l1 Gradl.nglUnclasslfied
Excavation 264,000 C.Y. 52.50 5660,000.00
S Catcb Basin 103 Each 52,500.00 S257.500.00
6 Leacb.\nlJ Pool (10' DIa. X r deep) 20 Each S2,OOO.00 S40,000.00
7 Concrete MaMole (4' ~.) 47 Each 52,000.00 S94,Ooo.oo
S 18- CIa. H..D.P.E. Drainage Pipe 9,SSI LoF. S25.00 5238.775.00
9 24~ Ole.. H.D.P.E, DrlUn.age PIpe 2,77S LP. $30.00 $83,340.00
10 30. Ola. H.D.P.L Dr"'~"V Pipe 407 LF. $35.00 $14.24S.OO
n 36M Dla. }LD.P.L DraInage Pipe 457 L.P. S40.00 51S,280.00
12 IS" ct.. Cast Iron Drainage Pip.. 825 L.P. S30.00 524,750.00
13 Rod< DaID 4 Each S5,OOO.00 S20.0OO.00
14 Rock Head Wall 3. Each IS,OOO.OO S15.000.00
15 Pre"allt Conaete CUlvert I Each 5100.000.00 5100,000.00
16 Pond Uner (2' Compacte" Clay) 3.156 S.Y. 515.00 547.340.00
17 Fine Grading 65,000 S.Y. 51.50 597,500.00
18 COncrete Curblnw 1.570 L.P. $10.00 $15,700.00
J9 COl1C:X'$te Sidewal1c 754 S.Y. S30.00 S22.620.00
20 3/4" Stone Blend or "RCA" 6,830 C.Y. 530.00 $204,900.00
21 AllpbAlt pavocment 14,500 Tons 560.00 5870,000.00
22 Erosion Control Strucwre 3.500 L.P_ S10.00 $35.000.00
23 Mluonry Retainlna Wall 1.166 L.P. $150.00 $174,900.00
z4 Street Tl'ee 500 Each 5200.00 $100.000.00
25 TOpsoil .. seed 85;698 S.Y. SZ.OO 1171,396.00
26 Street U8l1t 175 Each 11,500.00 1262,500.00
27 Road Restoration
(Batley. Atlantic Avenue) 1.340 LI'. 55.00 56.700.00
28 Mi..ro Sw'faclnS:
(BlIlley .. Atlantic Avenue) 4,200 S.Y. S1.20 15.040.00
29 Pedestrtan Path 7.600 S.Y. IlO.OO $76.000.00
30 Street Sign 80 Each $200.00 116.000.00
31 Fire Lan.e 2,223 S.Y. $10.00 522.230.00
32 Tl'ash Pick Up Area JOB S7,500.00
33 Matntenance .,. Protection
of Traffic JOB $10.000.00
Sub-Total - 53,964.216.00
... 6 "Admtnlstration Pee ~ 5237,85:2.96
TOTAL = $4.202,068.1'&
-.
.,....-.
08/20/2001 14:35
63172713144
Item
&t.
5
6
7
8
9
(~
"'t2
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
YOUNG YOUNG
PAGE 04
9d
Augu,st 20, 2001
CONSTRUCTION COST ZSTIMATE
Prepared for PECONIC LANDING
at ere.... .e... D. p. O:l'..t.. '. T...O. wn..... 0'..5. O. u.......tho..l. d.. ..' .lIfew Yprk
';~jlJil~''''~'' ()f'~t"';~~lete.
as of AUg;llst ::fO. 2001
nPAC'rtn1'tnn
1
2
3
Saw Cut Aapbalt PaveDlent
C1elU'1D8 '" Grubblnll
Oemol1t1on/llemoval ot J!Jdstln8
Su:uctutes
ROUSh Gradin8/Unclassifled
Excavation
Catch Basin
LeacbUllJ Pool (10' :D1a. X r deep)
Conerete MIOn'h91e (4' J)la.)
18" OIL H.D.P.E. Drainage Pipe
24" Dla. H.D.P.E. Dra1nage Pipe
~O. OIa.. H.D~P.E. Dl'amase Pipe
36" ~ ~.P.E. Dr~"Pipe
iit" tAl catlr6n'orli.lriag., J1.p.,
ROclot Dam
Rock Head Wall
Precast Con~te Culvert
pond UIler (2' Compacted Clay)
Fin.. GradinIJ
Concrete C\lI"blng
concrete Sidewalk
3/4. StOJl,e Blend or '"RCA"
Aapbalt Pavemen1:
ErOsIon Control Stnlcture
Maaomy Reta&ninIJ Wall
Street Tree
Topsoil '" seed
StNtt LtSlu:
Road RestotatIoD
(BaUey '" Atlantic Avenue)
Micro S\lI"fadng
(BaUey '" Ad_de Avenue)
pedestrIan Path
SU'eet Sign
PIre Lane
Trash Pick Up Area
MatDtlPftSlft"e 6- Protection
ot "n'afftc
-4
28
29
30
31
32
33
n." &. 'Unit
o LF.
65.93 Acres
2~ eo.....l
211,200 C.Y.
58 Each
20 Each
24 Each
5,653 LF.
1.356 L.F.
407 L.F.
I{DO ;iiJil ....f.
o '-F.
o Each
o Each
o Each
o S.Y.
o S.Y.
OLF.
o S.Y.
o Coy.
o Tons
3.500 L.F.
1,076 L.F.
o Each
o S.Y.
o Each
01..1".
o S.Y.
o S.Y.
o Each
o S.Y.
o
o
lJntr C:n~n
S3.00
S2,500.00
$75.000.00
S2.50
SZ,500.00
S2,OOO.00
$2,000.00
$25.00
130.00
135.00
540.00
530.00
$5.000.00
55,000_00
1100.000.00
115.00
S1.50
S10.00
530.00
$30.00
S60.00
S10.00
1150.00
S200.00
$2.00
$1,500.00
S5.00
$1.20
S10.00
$200.00
S10.00
Sub-T.otal -
.. ~ ~ A"'wlllt~t~attQIR F... -
TOTAL =
.BONO RE:.D lJC:1'lOt-l
AfAAWE.n yzyo I
=
TnI'A] Cn:Qr
10.00
SI64,825;00
S15,OOO.OO
S528.000.oo
$145,000,00
540,000.00
548,000.00
5141,325.00
S40.680.00
514.245.00
11iI.:iIae.ee ,(P:.
10.00
$0.00
SO.OO
50.00
10.00
SO.oo
SO.oo
SO.OO
50.00
10.00
535,000.00
S161,400.00
SO.OO
SO.OO
$0.00
SO.oo
$0.00
$0.00
$0.00
SO.OO
10.00
Ii, SO.oo
If I .339 <&15.00
l1.ua,7.gg.99
ISQ.&&7.78
$I,4;311,a62.?8
J I 33~ ~1~.oo
J I
. .
~ '.'"
.
08/20/2001
14:35
63172713144
YOUNG YOUNG
PAGE 05
.
f-e-
Al,lgust 20. 2001
CONSTRUCTION COST ESTIMATE
Prepared for PECONJC LANPlNG
at Greenport, Town of southold, New Yorl<
indicating VWl,le of Work Remainlng
as of August 20. 2001
I1ml De~c::=rintton Otv. &, Unit Unit Cost Total Cost.
)lIg.
1 Saw On Asphalt Pavetnent 1.500 LI'. S3.00 S4,SOO.00
2 Clearing. Grubbing 3.47 Acres S2.500.00 $8,675.00
3 DeJno1ltloD,lRemDval of Existlng
strUemres 80% $75.000.00 $60,000.00
4 Rough Gra~ed
Exc:avatlon 52.800 C.Y. $2.50 $132,000.00
5 CIltcb Bum 45 Each S2,500.00 $112,500.00
6 IAac:biDa Pool (l0' Dla. X r deep) o Each 52.000.00 50.00
7 l;o..-te "".....,.te (4' PiL) 23 Each $2,000.00 546,000.00
8 18" OiL H.D.P.E. DralDaa<! Pipe 3,898 LF. $25.00 $97,450.00
9 24" DlA- H.D.I'.1!- Dralwage Pipe 1.422 1.-1'. $30.00 $42.660.00
10 30. DIll. H.D.P.I!- Drldnage Pipe 01-1'. $35.00 SO.OO
11 36" Dla. H.D.p.1!- OralDage PIpe 224 1-1'. S40.00 $8,960.00
12 IS" Dia. Cast Iron Dralnage Pipe 825 L.F. S30.00 S24.750.00
13 Rock Datn 4 Each $5.000.00 $20,000.00
14 1tock Head wall 3 Each 55.000.00 $15,000.00
15 Precast Concrete CUlvert 1 Each Sl 00,000. 00 $100,000.00
16 Pond LIner (2' Completed Clay) 3.156 S.Y. $15.00 547,340.00
17 Fine Grading 65,000 S.Y. $1.50 597.500.00
18 Concrete Curbing 1.570 1.-1'. $10.00 SI5.700.00
19 Concrete Sidewalk 754 S.Y. $30.00 522,620.00
20 3/." Stone m....d or "RCA" 6.830 C.Y. 530.00 5204.900.00
21 ASphalt Pavement 14.500 Tons 560.00 5S70,OOO.00
22 Erosion Control StrUcttU'e 0):,.1'. $10.00 SO.OO
23 MasonrY ll..~..lnlng Wall 90 L.p. $150.00 Sl3.500.00
24 Street Tree 500 Each S200.00 SlOO.OOO.OO
25 Top.oU . Seed 85,698 S.Y. 52.00 $171.396.00
26 S,"et Ught 175 Each $1,500.00 5262,500.00
27 Road RestOratlOD
(Balley &, Atlantic Avenue) 1.340 LF, 55.00 56.700,00
28 Micro SurfaclDg
(Bailey .. Atlantic Avenue) 4.200 S.Y. S 1.20 15.040.00
29 Pedestrtan Path 7,600 S.Y. 510.00 $76,000.00
30 s,"et SlllD 80 Eacb 5200.00 $16.000.00
31 Fire LaDe 2,223 S.Y. $10.00 522,230.00
32 Trasb Pick Up Mea 100% 57.500.00 57.500.00
33 Malnl:enaJlce . PJ'otectloD
of Traffk 100% S 10,000.00 510.000.00
Sub-TotaJ- 52,621,421.00
+ 6 " Admlnlstratlon Fee - 5157.285.26
TOTAL "" S2, 778, 706.26
. '.
,
ATTORNEY AT LAW
445GRIFPING AVENUE
RIVERHEAD.NEW YORK
"I:l
rn
C"l
o
Z
-
C"l
!;
Z
C
TEL (631)369-8200 Z
FAX, (631) 369-'Xl8O ~
E-mail, c,cuddy@eMthlink.l1el
\
GIARLES R. CUDDY
MailinQ AddreSE:
P.O. Box 1547
Rive,head, NY 11901
November 24, 2000
Jean Cochran, Supervisor
Town of Southold
Main Road
Southold, NY 11971
Re: Performance Guarantee Agreement - peconic Landing
Dear Mrs. Cochran:
Enclosed is one (1) fully executed copy of the
Performance Guarantee Agreement. We anticipate deposit
of the funds in Suffolk County National Bank this week.
CRC:ms
Encs.
cc: Greg Yakaboski, Town Attorney
Bennett Orlowski, Chairman, Planning
Very truly yours,
C~R~r:!o
Board
NOV 2 7 2000
L',
..-J
. '.
f
ELIZABETH A. NEVILLE
TOWN CLERK
REGISTRAR OF VITAL STATISTICS
MARRIAGE OFFICER
RECORDS MANAGEMENT OFFICER
FREEDOM OF INFORMATION OFFICER
Town Hall, 53095 Main Road
P,O. Box 1179
Southold, New York 11971
Fax (631) 765-6145
Telephone (631) 765-1800
OFFICE OF THE TOWN CLERK
TOWN OF SOUTHOLD
THIS IS TO CERTIFY THAT THE FOLLOWING RESOLUTION WAS ADOPTED AT
THE REGULAR MEETING OF THE SOUTHOLD TOWN BOARD ON NOVEMBER
14,2000:
WHEREAS, Peconic Landing is required to provide a letter of credit, cash, or other
security satisfactory to the Town to serve as a performance guarantee for the total cost of
furnishing, installing, connecting and completing all of the street grading, paving, storm drainage
and utilities for the project known as "Peconic Landing, be it
RESOLVED by the Town Board of the Town of Southold that the Supervisor, Jean W.
Cochran is hereby authorized to execute a Performance Guarantee Agreement whereby Peconic
Landing will deposit "Performance Bond" money at Suffolk County National Bank in the sum of
$3,964,216.00 subject to the approval of the Town Attorney.
Pt~..I4.fCl.?;k ;11..
Elizabeth A. Neville
South old Town Clerk
. . 1}.1 Pl:il LtJt::Jtj
.~ 0"
f
J.t:I;,,:)~
u....~........,.,.........
'-
Perl........... GIIL.w.fee Anwmeat
AGREEMENT madc1bis 2l.. dq of /l/O'rmrtk Y . 2000 fir tbe beaefit of1be Town of
SoulbokI. New YurIt (1bc '"Town") by IDd ftIVW\8 Pecaaic T -+'I at lW1lItnLl" Iac., a New York DllIl-
profit <;O&l""'odioa. wllh a place ofbusiDess iD. S001lltnLl" New York ("Pecaaie r ..~ tbe Tovm. of
SouIbold. New YOlk (die "Town") _ SuSbIk CouatyNlIIioaI1 BalIk, a New York b~
...:Il~ (1bc"B1Dkj. .
WBBKBAS,PeoaaicI~ is underlakiDg to ClClIISlruct a rahcment community at its
property on Rou1e 2S in '!be Town (die "Project"); _
WBEREAS.1'ecaaic L8ndiIlg is requlred to provide a 1eUer, of crecIit, CIIb. or other security
S8~ to 1be Town to SCIW . a pcrformIaGc JUIDDUle fir the tDtal ClCIIIt oflbnU~ m....n~.
~g IIId (llWl!pl~ all af'1be street gndiDg. paviag. SlDnD drainage _ u1iIi1ies (die
-.rmpovememsj; and
WHEREAs. the Project will be fipI(lod in part Dom proceeda of c:crtain boflda iSIUed
under the Indenture of Trust. dated u ofNcr...wber I, 2000 (1bc '"Bond T...l"U'll"), by 8Dd
b.ltween the Suffi>1k Couuly JDdnmiaJ Development AgerJI:y 8Dd UDited States Trust Company of
New York, as Trustee (the "Trustee") aDd by alou16om 1bc "I.eada" ~ in the Building
Loan aod p..JopdCosts LolIIl Ap:cmaII, dated 8$ of November I, 2000 I01ftnI1i such L-vlers,
BNP Pan"baa. ~ 1brou8h its New York Brmcb. as .A.dminiJIrUiye Agoat, aDd Peconic
Landing;
NOW, 1HEREFORE. for valuable coosidendion, 1be m:eipt lIIId SII1Iiciency wheleofis hereby
aciaIowledged, 1be patties berelD agree. mtIows:
1. p~nn"""" Guarantee. Pecmic' .lmrlu,g shall dIlposit the sum of1hree million, nine
hundred 5ixly four diousaI'd. two huadred sixteen doI1am (Sl,964,l16.00), (1bc '"PerformaDce
Guanmtee") wi1h '!be 8Iak upGIl the C>'WdWo ofcbis ~ 1lIeBank Iba1l hold 1be
PerbmaDce GuIna18t, . tbe same 1IIIY be rech....... 80m time to time by pII1iIl Rl-- UDder
~ 2 below, fur tbe ~ oftbe Town in lID blWest beariD& trust ICCOUIIt wi1h all iht\....ot
MIned thereon beiDg ~partoftbe Po.forlllllllCll GuarIIIIM firpwpal15 of1bis Agteement.
2. ..........l'!I1t ofPelfuau.......... Gt.a...atee. If at any time or times during 1be term oftbis
Agreement, the Town provides the B8Dk with a wriUen request fir 1be performaDc:e Guarantee or any
portion ~ signed by 1be Town Supenisor, with copies to Pec:ooic: ,~ at Sou1hold, Inc. at
Fealha- Hill. P.O. Box 430, SouthoJd. NY 11971,_ C'JwoI....ll Cuddy, Esq., P.O. Box 1547,
Riwrh'el'CI. NY 11901, stating that Peconic 1: ...IIi"'8 bas failed 10 c:oostruct any or ell of 1he
Improvemen1& . required by tbe fiaaI site plan fir tbe Pmjec:t, lIIId upon IIXpiraIion of. 30 day period
during which Pecxlaio 1 .-li~ may cure lIlY IIle&ed defauk" 1bo Bank &ball doIiver 10 1be Town die
Perlbrmanal Gu...uteo or tbe portioo thereaf'reqIIllS1ed by tbIl Town. In 110 ewm lIbaII1be Bd:
release any poriOIl of the Performaace Gl..,(aee fa Pecaaic J ....ding or fIO any olber person or eDIity
without die prior wriUcD ClOGIeI1t ofdle Town. Tbe B8Dk IhaII DOt ro1eao1be PerfiormlaMle auar.ntee
Q(" lIlY portioo dIereolcxa:pt ill ~ wi1h the wriUal dirocti'llO'l ol1be Tawa. FlUID time fa time,
Pec:ooic T .......iIl! may request release of a portioo rLtbe esc:mwed DIDlIs when a porlion oftbe subject
work is completed aoclllC~ tecl by the TClWfI F-"Si-u complillllt with Town requiremMtlo
/".. :.
. .L+' ':'01 .L~JI;JU .Lu.~"",
Requesbi tbc sud1 release CID oc:cur 110 more tr.queady 1hIIIl mur (4) times pel' year. Aa:eptance
and/or ~ by fbe T_ may not 1IIIRlIlICIIIIb be wilbhe1d
AD funds 10 Ideased at tbe request o!P-";c l...ndi"lllhlll be tnDIfcrrecl by the
Bank dircc:t1y to the Trustee for depoait in the "Project Fuad" u deI1nedin the Baud Tnd_..'fe
II.Dd in accordaDce with POCODic hnd""'S's agr-m-ta with tbe Trustee and tbe I <<KIem.
3. JmD. UaIeu ....,maMA euIier byYt'liltcn IglW""eut ofdle TuWII, this Asreemem
sbaIl term..- ~ (3))'ll8I5 60m fbe cIaIc of. 0_ "';,0." lII: wblch time fbe Beak IbIIl pay the
PerliIrmmce Gw...&.o. ..,......... with aay interest umed ---. .. aay ____ prcviousIy
rdeescd wder pIlIInIIIh 2 above, . direc:t.s in writiDa by 1he Town md in die absence of any such
direc:tion 10 Trustee tbc deposit in die '"PmjeGt Fund".
4. T .Im""" af:Plllllc 1be BalIk shall be obl~ oaIy tbr1he pcdIrmaqce ofsudl duties
M arc ~ set blh beran aad may nI;y aad IIbaIl 110 JX'~ iD IdiDg ClIl aay iastrumIlIIt or
qg,..mllll believed by iUG be genuine IIIli 10 haw beIIl si&ucd CIf pm: Ilood by the ptopeI' party or
parties duly lIUlhorized 10 do 10. The Beak sbaI1 haw 110 ~~ ...aihllity fOr die COIIteats of III)' writing
~Ialed herein IIIli may nI;y wiIbout liabiIil;y upon die ",..too'ls thereof: The Beak sbaIl not be
1iable for any obli~ taken or ~ by it in good fai1h aad believed by it 10 be II1tborized hereby,
and sbaIl not be lilIhIc fix' aay ...i_l.. ofilia or CIlOI' offulgln- or for any aca: or .....wiOllS of any
kiDd 1IIIlca Cl'nwd by wiIHUJ. ~uct or sross ~ Pecaaic T .and.,..-1O mo...,;lY
fbe Bank and bald it harmless fivm IIId "I"iMt IDy lIDd aIllia1Hlities inourmcl by it hereunder.
S. R~l!nB1ion ofB8IIk. The B8Dk may resign lit any time by siving written DOliu thereof
10 p~!; Landi'lg and the Town. Upon such notice, a &1l'"C'lSsor Bani< sbaI1 be lIppOinted by the
parties. Ifdle parties remAlnills are llDable 10 ugreo upon a SW:al5lior Bank wi1hin ttI1 (10) ~ after
such 1ID1ice, the Bank so resigning shaI1 designate a SUC'WFSOT Bank wbidt may include any bank or
trust company with a place of business in Suffolk Cowity, New York. The resigning Bank shall
<:ontinue to serw 1DDi1 Us SUC'I:~or ~ the appoinlment aod raves 1he Ped'onnaru:e Guarantee.
PecclIm: [.mvli"lllDd die T_ sbaIl have die right Gill)' time upon 1beir 1DUllli""'llS ooosent to
substitute a DeW Baok or Agm1s by giving wriUm IIOIice 1benlofto 1be BanI< 1ben actiDg.
6. Assipment. The ToWll and tbe Bank admowledge that this Performance
Guuantee ABfccmeot wiJl be ..,;&1"'" end posted II colJat.enl by Peconic T .mvll"l to or on the
order of'the TNStee aud tbe T <<MIers in ~on with the flnancing of'tbe Project. Pursuant to
such ."T--t, PeoorUc Landing IbaIl conti/Ide to pedbrm under this agrec:ment on behalf of the
TI1IStee aod the la1d<<s unless cx:rtain conditions of the financing are not satisfied. The Town
and the Bank egree to rnntinll,= to perform UDder aod acc:ept tbe tenns of this A8fecmcnt if the
Trustee or the I erodei'll give written DOtice to them that Pcconic Landini will no longec perfonn
hereunder on their bebaIt:
IN wrI'NESS WHEREOF, 1he pIl1ies hereto haw ClalCUled this At;I=neot IS offbe d.-v and
year 1IrBt above-written.
WlTNBSS
PECONIC LANDING AT SOumOLD,INC.
. (...\...'........."................
4.... '-
J
~'-~
Its President
I1s
TOWN OF SOUlHOlD
BY:~'v\ (OL~
own Supervisor
ELIZABETH A. NEVILLE
TOWN CLERK
REGISTRAR OF VITAL STATISTICS
MARRIAGE OFFICER
RECORDS MANAGEMENT OFFICER
FREEDOM OF INFORMATION OFFICER
Town Hall, 53095 Maln Road
P.O. Box 1179
Southold, New York 11971
Fax (631) 765-6145
Telephone (631) 765-1800
southoldtown.northfork.net
OFFICE OF THE TOWN CLERK
TOWN OF SOUTHOLD
THIS IS TO CERTIFY THAT THE FOLLOWING RESOLUTION NO. 283 OF 2002
WAS ADOPTED AT THE REGULAR MEETING OF THE SOUTHOLD TOWN BOARD
ON APRIL 25, 2002:
RESOLVED that the Town Board of the Town of South old berebv annroves tbe reduction in
tbe amount of the oerformance bond for roads. draina2e. and otber improvements for
Peconic Landin2. Greenoort. NY SCTM# 1000-35-1-25, from $3,964,216.00 to
$1,670,836.00.
~Q- t',I...
Elizabeth A. Neville
Soutbold Town Clerk
....... ... ....
)
.,
JAMES A. RICHTER, R.A.
ENGINEER
TOWN OF SOUTHOLD, NEW YORK 11971
JOSHUA Y.HORTON
SUPERVISOR
TOWN HALL - 53095 MAIN ROAD
Fax. (516) -765 - 1366
TeL (516) -765 -1560
OFFICE OF THE ENGINEER
TOWN OF SOUTHOLD
BOND ESTIMATE - PECONIC LANDING
SCTM # 1000-35-01-25 Revised: March 5,2002
TOTAL BOND BOND (+/-1 % QUANTITY VALUE
ITEM QUANTITY DESCRIPTION UNIT PRICE AMOUNT COMPLETE REMAINING REMAINING
1. 1,500 LF. SAW CUT PAVEMENT (S.R. 25) $ 3.00 $ 4,500.00 0% 1,500 LF. $ 4,500.00
2. 69.4 ACRE CLEARING & GRUBBING 2,500.00 173,500.00 100% 0 0.00
3. JOB DEMOLITION of STRUCTURES 75,000.00 20% 80 % 60,000.00
4. 264,000 C. Y. ROUGH GRADING /
UNCLASSIFIED EXCAVATION 2.50 660,000.00 80% 52,800 C.Y. 132,000.00
5. 103 EACH CATCH BASINS 2,500.00 257,500.00 100% 0 0.00
6. 20 EACH LEACHING POOL (10' Dia. X 7' deep) 2,000.00 40,000.00 100% 0 0.00
7. 47 EACH CONCRETE MANHOLE (4' Dia.) 2,000.00 94,000.00 95% 2 EACH 4,000.00
8. 9,551 LF. 18" DlA HDPE DRAINAGE PIPE 25.00 238,775.00 100% 0 0.00
9. 2,778 L.F. 24" DlA HDPE DRAINAGE PIPE 30.00 83,340.00 100% 0 0.00
10. 407 L.F. 30" DlA HDPE DRAINAGE PIPE 35.00 14,245.00 100% 0 0.00
II. 457 L.F. 36" DlA HDPE DRAINAGE PIPE 40.00 18,280.00 50% 224 L.F. 8,960.00
12. 825 L.F. 18" DlA CAST IRON DRAINAGE PIPE 30.00 24,750.00 100% 0 0.00
13. 4 EACH ROCK DAM 5,000.00 20,000.00 0% 4 EACH 20,000.00
14. 3 EACH ROCK HEADWALL 5,000.00 15,000.00 0% 3 EACH 15,000.00
15. I EACH PRECAST CONCRETE CULVERT 100,000.00 100,000.00 100% 0 0.00
16. 3,156 S.Y. POND LINER (2' Compacted Clay) 15.00 47,340.00 0% 3,156 S.Y. 47,340.00
17. 65,000 S.Y. FINE GRADING 1.50 97,500.00 50% 32,500 S.Y. 48,750.00
18. 1,570 L.F. CONCRETE CURBING 10.00 15,700.00 0% 1,570 L.F. 15,700.00
19. 754 S. Y. CONCRETE SIDEWALK 30.00 22,620.00 0% 754 S.Y. 22,620.00
20. 6,830 C. Y. lI," STONE BLEND or RCA BASE 30.00 204,900.00 50% 3,415 c.Y. 102,450.00
21. 14,500 TONS ASPHALT PAVEMENT 60.00 870,000.00 35% 9,425 TONS 565,500.00
22. 3,500 LF. EROSION CONTROL STRUCTURE 10.00 35,000.00 100% 0 0.00
23. 1,166LF. MASONRY RETAINING WALL 150.00 174,900.00 100% 0 0.00
24. 500 EACH STREET TREE 200.00 100,000.00 0% 500 EACH 100,000.00
25. 85,698 S.Y. TOPSOIL & SEED 2.00 171,396.00 30% 60,698 S.Y. 121,396.00
26. 175 EACH STREET LIGHTS 1,500.00 262,500.00 0% 175 EACH 262,500.00
27. 1,340 LF. ROAD RESTORATION (Bailey & Atlantic) 5.00 6,700.00 50% 1,340 L.F. 3,350.00
28. 4,200 S.Y. MICRO SURFACING (Bailey & Atlantic) 1.20 5,040.00 0% 4,200 S.Y. 5,040.00
29. 7,600 S.Y. PEDESTRIAN PATH 10.00 76,000.00 0% 7,600 S.Y. 76,000.00
30. 80 EACH STREET SIGNS 200.00 16,000.00 0% 80 EACH 16,000.00
31. 2,223 S. Y. FIRE LANE 10.00 22,230.00 0% 2,223 S.Y. 22,230.00
32. JOB TRASH PICK UP AREA 7,500.00 0% 100% 7,500.00
33. JOB MAINTENANCE &
PROTECTION OF TRAFFIC 10,000.00 0% 100% 10,000.00
ORIGINAL BOND TOTAL: $ 3,964,216.00
REMAINING BOND AMOUNT FOR
INCOMPLETE CONSTRUCTION ITEMS $ 1,670,836.00
"if'!""
\,
:'\', ,. (
ELIZABETH A. NEVILLE
TOWN CLERK
REGISTRAR OF VITAL STATISTICS
MARRIAGE OFFICER
RECORDS MANAGEMENT OFFICER
FREEDOM OF INFORMATION OFFICER
Town Hall, 53095 Main'Road
P.O. Box 1179
Southold, New York 11971
Fax (631) 765-6145
Telephone (631) 765-1800
southoldtown. northfork. net
OFFICE OF THE TOWN CLERK
TOWN OF SOUTH OLD
THIS IS TO CERTIFY THAT THE FOLLOWING RESOLUTION NO. 839 OF 2002
WAS ADOPTED AT THE REGULAR MEETING OF THE SOUTHOLD TOWN BOARD
ON DECEMBER 17, 2002:
RESOLVED that the Town Board of the Town of Southold hereby authorizes the reduction of
the performance bond for the maior subdivision of Peconic LandinI!: from $1.670,836.00 to
$132,000.00 all in accordance with the recommendation of the Southold Town Planning Board,
the Town Engineer, and the Superintendent of Highways, and subject to the approval of the
Town Attorney.
pea.L~a~~lJ...
Elizabeth A. Neville
Southold Town Clerk
V-839
RESOLUTION
DECEMBER 17, 2002
RESOLVED that the Town Board of the Town of Southold hereby authorizes the
reduction of the oerformance bond for the maior subdivision of Peconic LandinI!
from $1.670.836.00 to $132.000.00 all in accordance with the recommendation of the
Southold Town Planning Board, the Town Engineer, and the Superintendent of
Highways, and subject to the approval of the Town Attorney.
December 17, 2002
Elizabeth A. Neville, Town Clerk
. Town of Southold
P.O. Box 1179
Southold, NY 11971
RE: Peconic Landing
SCTM#1000-35-1-25
Dear Ms. Neville:
The following took place at a meeting of the Southold Town Planning Board on Monday,
December 16, 2002:
RESOLVED, to adopt the revised Bond Estimate in the amount of $132,000.00, dated
March 5, 2002, for Peconic Landing, as determined by the Town Engineer, and
recommend same to the Town Board. The revised Bond Estimate indicates the
percentage of construction items completed to date and reflects the estimated cost of
work remaining.
Please contact this office if you have any questions regarding the above.
Very truly yours,
Bennett Orlowski, Jr.
Chairman
enc.
,
~
~
SveF
) V5
1'8
JAMES A. RICHTER, R.A.
ENGINEER
TOWN OF SOUTIlOLD, NEW YORK 11971
.. .
JOSHUA Y. HORTON
SUPERVISOR
TOWN HALL - 53095 MAIN ROAD
'ax. (516) -765 - 1366
Tel (516) -765 - 1560
OFFICE OF THE ENGINEER
TOWN OF SOUTHOLD
November 7, 2002
Bennett Orlowski, Jr.
Chairman - Planning Board
Town Hall, 53095 Main Road
Southold, New York 11971
Re: Peconic Landing
Request for Bond Reduction
Dear Mr. Orlowski:
As per your request, enclosed please find a revised bond estimate that indicates the
amount of work completed to date. I have also enclosed a copy of the inspection report
from the consulting engineers office as prepared by Mr. Gino Aiello, PE.
At this time I agree with the findings of the consultant and would recommend the
reduction of the current Bond. The New Bond Total has been adjusted to represent the
quantity of work remaining and should be in the amount of $ 132,000.00.
If you have any questions concerning this report, please contact my office.
cc: Peter Harris
(Superintendent of Highways)
'.~~'
N~~ - 8 2JJ02
Gino Aiello, PE (Sidney B. Bowne & Son, LLP)
J:
*
)
')
JAMES A. RICHTER, R.A.
ENGINEER
TOWN OF SOUTHOLD, NEW YORK 11971
- .
JOSHUA Y.HORTON
SUPERVISOR
TOWN HALL. 53095 MAIN ROAD
Fax. (516).765.1366
TeL (516).765.1560
OFFICE OF THE ENGINEER
TOWN OF SOUTH OLD
BOND ESTIMATE
SCTM # 1000-35-01-25
PECONIC LANDING
Revised, March 5, 2002
TOTAL BOND BOND (+/-) % QUANTITY VALUE
ITEM QUANTITY DESCRIPTION UNIT PRICE AMOUNT COMPLETE REMAINING REMAINING
1. 1,500 L.F. SAW CUT PAVEMENT (S.R. 25) $ 3.00 $ 4,500.00 100% 0 $ 0.00
2. 69.4 ACRE CLEARlNG & GRUBBING 2,500.00 173,500.00 100% 0 0.00
3. JOB DEMOLITION of STRUCTIJRES 75,000.00 100% 0 0.00
4. 264,000 c.Y. ROUGH GRADING /
UNCLASSIFIED EXCAVATION 2.50 660,000.00 100% 0 0.00
5. 103 EACH CATCH BASINS 2,500.00 257,500.00 100% 0 0.00
6. 20 EACH LEACHING POOL (10' Dia. X 7' deep) 2,000.00 40.000.00 100% 0 0.00
7. 47 EACH CONCRETE MANHOLE (4' Dia.) 2,000.00 94,000.00 100% 0 0.00
8. 9,551 L.F. 18" DIA HDPE DRAINAGE PIPE 25.00 238,775.00 100% 0 0.00
9 2,778 L.F. 24" DIA HOPE DRAINAGE PIPE 30.00 83,340.00 100% 0 0.00
10. 407 L.F. 30" DIA HDPE DRAINAGE PIPE 35.00 14,245.00 100% 0 0.00
11 457 L.F. 36" DIA HOPE DRAINAGE PIPE 40.00 18,280.00 100% 0 0.00
12. 825 L.F. 18" DIA CAST IRON DRAINAGE PIPE 30.00 24,750.00 100% 0 0.00
13. 4 EACH ROCK DAM 5,000.00 20,000.00 75% 1 EACH 5,000.00
14. 3 EACH ROCK HEADWALL 5,000.00 15,000.00 100% 0 0.00
15. 1 EACH PRECAST CONCRETE CULVERT 100,000.00 100,000.00 100% 0 0.00
16. 3,156 SY POND LINER (2' Compacted Clay) 15.00 47,340.00 100% 0 0.00
17. 65,000 SY FINE GRADING 1.50 97,500.00 100% 0 0.00
18. 1,570 LF CONCRETE CURBING 10.00 15,700.00 100% 0 0.00
19. 754 S.Y. CONCRETE SIDEWALK 30.00 22,620.00 100% 0 0.00
20. 6,830 c.Y. %" STONE BLEND or RCA BASE 30.00 204,900.00 100% 0 0.00
21. 14,500 TONS ASP HAL T PAVEMENT 60.00 870,000.00 100% 0 0.00
22. 3,500 L.F. EROSION CONTROL STRUCTURE 10.00 35,000.00 100% 0 0.00
23. 1,166 L.F MASONRY RETAINING WALL 150.00 174,900.00 100% 0 0.00
24. 50U EACH STREET TREE 200.00 100,000.00 0% 250 EACH 50,000.00
25. 85,698 SY TOPSOIL & SEED 2.00 171,396.00 100% 0 0.00
26. 175 EACH STREET LIGHTS 1,500.00 262,500.00 100% 0 0.00
27. 1,340 L.F. ROAD RESTORATION (Bailey & Atlantic) 5.00 6,700.00 100% 0 0.00
28. 4,200 SY MICRO SURF ACING (Bailey & Atlantic) 1.20 5,040.00 100% 0 0.00
29. 7,600 S.Y. PEDESTRIAN PATH 10.00 76,000.00 0% 7,600 SY 76,000.00
30. 80 EACH STREET SIGNS 200.00 16,000.00 100% 0 0.00
31. 2,223 SY FIRE LANE 10.00 22,230.00 100% 0 0.00
32. JOB TRASH PICK UP AREA 7,500.00 100% 0 0.00
33 JOB MAINTENANCE &
PROTECTION OF TRAFFIC 10,000.00 90% 10% 1,000.00
ORIGINAL BOND TOTAL: $ 3,964,216.00
REMAINING BOND AMOUNT FOR
INCOMPLETE CONSTRUCTION ITEMS $ 132,000.00
~
VALERIE SCOPAZ, AICP
TOWN PLANNER
Telephone (631) 765-1938
Fax (631) 765-3136
Valerie.Scopaz@town.southold.ny.us
P.O. Box 1179
Town Hall, 53095 Main Road
Southold, New York 11971-0959
OFFICE OF THE TOWN PLANNER
TOWN OF SOUTHOLD
November 25, 2002
Charles Cuddy, Esq.
445 Griffing Avenue
Riverhead, New York, 11901
RE: Performance Bond Reduction for Peconic Landing
SCTM#1000-35-1-25
Dear Mr. Cuddy:
This is in response to your client's request for a reduction in the performance bond for
the above-referenced project.
The Planning Board has agreed to accept Mr. Richter's recommendation. If the Highway
Superintendent agrees, this proposed reduction will be sent to the Town Board at our
next public meeting in December.
A copy of Mr. Richter's recommendation is attached for your convenience.
Very truly yours,
~
Town Planner
encl.
cc: James Richter, Town Engineer
Peter Harris, Superintendent of Highways
Elizabeth Neville, Town Clerk
'. -#
J
SVd~
) V5
?B
JAMES A. RICHTER, R.A.
ENGINEER
TOWN OF SOUTHOLD, NEW YORK 11971
,.or.
JOSHUA Y. HORTON
SUPERVISOR
TOWN HALL - 53095 MAIN ROAD
Fax. (516) -765 - 1366
Tel. (516) - 765 - 1560
OFFICE OF THE ENGINEER
TOWN OF SOUTH OLD
November 7, 2002
Bennett Orlowski, Jr.
Chairman - Planning Board
Town Hall, 53095 Main Road
Southold, New York 11971
Re: Peconic Landing
Request for Bond Reduction
Dear Mr. Orlowski:
As per your request, enclosed please find a revised bond estimate that indicates the
amount of work completed to date. I have also enclosed a copy of the inspection report
from the consulting engineers office as prepared by Mr. Gino Aiello, PE.
At this time I agree with the findings of the consultant and would recommend the
reduction of the current Bond. The New Bond Total has been adjusted to represent the
quantity of work remaining and should be in the amount of $ 132,000.00.
If you have any questions concerning this report, please contact my office.
cc: Peter Harris
(Superintendent of Highways)
',I'.
N~ rf - 8 2JJIJ2
Gino Aiello. PE (Sidney B. Bowne & Son, LLP)
J:
.,
Fax. (516).765.1366
J'
JAMES A. RICHTER, R.A.
ENGINEER
TOWN OF SOUTHOlD, NEW VORK 11971
)
JOSHUA Y.HORTON
SUPERVISOR
TOWN HALL. 53095 MAIN ROAD
Tel. (516).765.1560
OFFICE OF THE ENGINEER
TOWN OF SOUTHOLD
BOND ESTIMATE - PECONIC LANDING
SCTM # 1000.35.01-25 Revised: March 5, 2002
TOTAL BOND BOND (+/-) % QUANTITY YA!J!5
ITEM QUANTITY DESCRIPTION UNIT PRICE AMOUNT COMPLETE REMAINING REMAINING
I. 1,500 L.F. SAW CUT PAVEMENT (S.R. 25) $ 3.00 $ 4,500.00 100% 0 $ 0.00
2. 69.4 ACRE CLEARING & GRUBBING 2,500.00 173,500.00 100% 0 0.00
3 JOB DEMOLITION o[STRUCTURES 75,000.00 100% 0 0.00
4. 264,000 CY ROUGH GRADING I
UNCLASSIFIED EXCAVATION 2.50 660,000.00 100% 0 0.00
5. 103 EACH CATCH BASINS 2,500.00 257,500.00 100% 0 0.00
6. 20 EACH LEACHING POOL (10' Dia. X 7' deep) 2,000.00 40,000.00 100% 0 0.00
7. 47 EACH CONCRETE MANHOLE (4' Dia.) 2,000.00 94,000.00 100% 0 0.00
8. 9,551 L.F. 18" DIA HDPE DRAINAGE PIPE 25.00 238,775.00 100% 0 0.00
9. 2,778 L.F. 24" DIA HDPE DRAINAGE PIPE 30.00 83,340.00 100% 0 0.00
10. 407 L.F. 30" DIA HDPE DRAINAGE PIPE 35.00 14,245.00 100% 0 0.00
II. 457 L.F. 36" DIA HDPE DRAINAGE PIPE 40.00 18,280.00 100% 0 0.00
12. 825 L.F. 18" DIA CAST IRON DRAINAGE PIPE 30.00 24,750.00 100% 0 0.00
13. 4 EACH ROCK DAM 5,000.00 20,000.00 75% 1 EACH 5,000.00
14. 3 EACH ROCK HEADWALL 5,000.00 15,000.00 100% 0 0.00
15. I EACH PRECAST CONCRETE CULVERT 100,000.00 100,000.00 100% 0 0.00
16. 3,156 SY POND LINER (2' Compacted Clay) 15.00 47,340.00 1000/(1 0 0.00
17. 65,000 SY FINE GRADING 1.50 97,500.00 100% 0 0.00
18. 1,570 L.F CONCRETE CURBING 10.00 15,700.00 100% 0 0.00
19. 754 S.Y. CONCRETE SIDEWALK 30.00 22,620.00 100% 0 0.00
20. 6,830 c.Y. %" STONE BLEND or RCA BASE 30.00 204,900.00 100% 0 0.00
21. 14,500 TONS ASP HAL T PAVEMENT 60.00 870,000.00 100% 0 0.00
22. 3,500 L.F. EROSION CONTROL STRUCTURE 1000 35,000.00 100% 0 0.00
23. 1,166 L.F. MASONRY RETAINING WALL 150.00 174,900.00 100% 0 0.00
24. 500 EACH STREET TREE 200.00 100,000.00 0% 250 EACH 50,000.00
25. 85,698 S.Y. TOPSOIL & SEED 2.00 171,396.00 100% 0 0.00
26. 175 EACH STREET LIGHTS 1,500.00 262,500.00 100% 0 0.00
27. 1,340 L.F. ROAD RESTORATION (Bailey & Atlantic) 5.00 6,700.00 100% 0 0.00
28. 4,200 S.Y. MICRO SURFACING (Bailey & Atlantic) 1.20 5,040.00 100% 0 0.00
29. 7,600 SY PEDESTRlAN PATH 1000 76,000.00 0% 7,600 SY 76,000.00
30. 80 EACH STREET SIGNS 200.00 16,000.00 100% 0 0.00
31. 2,223 S.Y FIRE LANE 10.00 22,230.00 100% 0 0.00
32. JOB TRASH PICK UP AREA 7,500.00 100% 0 0.00
33 JOB MAINTENANCE &
PROTECTION OF TRAFFIC 10,000.00 90% 10% 1,000.00
ORIGINAL BOND TOTAL: $ 3,964,216.00
REMAINING BOND AMOUNT FOR
INCOMPLETE CONSTRUCTION ITEMS $ 132,000.00
.
Highway Department
Town of Southold
275 Peconic Lane' P.O. Box 178
Peconic, NY 11958-0178
PETER W. HARRIS
Superintendent
Tel. (631) 765-3140
(631) 734-5211
Fax (631) 765-1750
MEMORANDUM
TO: Valerie Scopaz, Town Planner
South old Town Planning Department
FROM:
Peter W. Harris, Superintendent fwd.
Southold Town Highway Department
DATE:
November 27, 2002
RE:
PECONIC LANDING -PERFORMANCE BOND REDUCTION
SUFFOLK COUNTY TAX MAP NOS:
1000-35-1-25
In connection with the above, please be advised at this time I am in agreement with the
Town Engineer, James A. Richter, pursuant to the findings of the consultant and
recommend reduction of the current bond. The new bond total has been adjusted to
represent the quantity of work remaining and should now be in the amount of
$132,000.00.
Attachment
PWH:jes
i~D:~:~L~
Southold Town
Planning Board
VALERIE SCOPAZ. AlCP
TOWN PLANNER
Telephone (631) 765-1938
Fax (631) 765-3136
Valerie.Scopaz@town.southold.ny.us
'.
P.O. Box 1179
Town Hall, 53095 Main Road
Southold, New York 11971-0959
OFFICE OF THE TOWN PLANNER
TOWN OF SOUTHOLD
November 25, 2002
Charles Cuddy, Esq.
445 Griffing Avenue
Riverhead, New York, 11901
RE: Performance Bond Reduction for Peconic Landing
SCTM#1000-35-1-25
Dear Mr. Cuddy:
This is in response to your client's request for a reduction in the performance bond for
the above-referenced project.
The Planning Board has agreed to accept Mr. Richter's recommendation. If the Highway
Superintendent agrees, this proposed reduction will be sent to the Town Board at our
next public meeting in December.
A copy of Mr. Richter's recommendation is attached for your convenience.
Very truly yours,
/t(Llf'uLdtAf?(
Valerie Scopaz, AICP -
Town Planner
encl.
cc: James Richter, Town Engineer
Peter Harris, Superintendent of Highways
Elizabeth Neville, Town Clerk
#
~)
.^'\ Sve:
) V5
-ro
JAMES A. RICHTER, R.A.
ENGINEER
TOWN OF SOUTHOLD, NEW YORK 11971
JOSHUA Y. HORTON
SUPERVISOR
TOWN HALL - 53095 MAIN ROAD
Fax. (516)-765-1366
Tel (516) -765 -1560
OFFICE OF THE ENGINEER
TOWN OF SOUTHOlD
November 7, 2002
Bennett Orlowski, Jr.
Chairman - Planning Board
Town Hall, 53095 Main Road
Southold, New York 11971
Re: Peconic Landing
Request for Bond Reduction
Dear Mr. Orlowski:
As per your request, enclosed please find a revised bond estimate that indicates the
amount of work completed to date. I have also enclosed a copy of the inspection report
from the consulting engineers office as prepared by Mr. Gino Aiello, PE.
At this time I agree with the findings of the consultant and would recommend the
reduction of the current Bond. The New Bond Total has been adjusted to represent the
quantity of work remaining and should be in the amount of $ 132,000.00.
If you have any questions concerning this report, please contact my office.
CC: Peter Harris
(Superintendent of Highways)
,}~.
N~W - 8 2DB2
Gino Aiello, PE (Sidney B_ Bowne & Son, llP)
r
*
~
)
')
JAMES A. RICHTER, R.A.
ENGINEER
TOWN OF SOUTHOLD, NEW YORK 11971
JOSHUA Y.HORTON
SUPERVISOR
TOWN HALL - 53095 MAIN ROAD
Fax. (516)-765 - 1366
Tel (516) - 765 - 1560
OFFICE OF THE ENGINEER
TOWN OF SOUTHOLD
BOND ESTIMATE - PECONIC LANDING
SCTM # 1000-35-01-25 Revised: March 5, 2002
TOTAL BOND BOND (+/-) % QUANTITY VALUE
ITEM QUANTITY DESCRIPTION UNIT PRICE AMOUNT COMPLETE REMAINING REMAINING
1. 1,500 LF. SAW cur PAVEMENT (S.R. 25) $ 3.00 $ 4,500.00 100% 0 $ 0.00
2. 69.4 ACRE CLEARING & GRUBBING 2,500.00 173,500.00 100% 0 0.00
3. JOB DEMOLITION of STRUCTlJRES 75,000.00 100% 0 0.00
4. 264,000 CY. ROUGH GRADING I
UNCLASSIFIED EXCAVATION 2.50 660,000.00 100% 0 0.00
5. 103 EACH CATCH BASINS 2,500.00 257,500.00 100% 0 0.00
6. 20 EACH LEACHING POOL (10' Dia. X 7' deep) 2,000.00 40,000.00 100% 0 0.00
7. 47 EACH CONCRETE MANHOLE (4' Dia.) 2,000.00 94,000.00 100% 0 0.00
8. 9,551 LF. 18" DIA HDPE DRAINAGE PIPE 25.00 238,775.00 100% 0 0.00
9. 2,778 LF. 24" DIA HDPE DRAINAGE PIPE 30.00 83,340.00 100% 0 0.00
10. 407 LF. 30" DIA HDPE DRAINAGE PIPE 35.00 14,245.00 100% 0 0.00
11. 457 LF. 36" DIA HDPE DRAINAGE PIPE 40.00 18,280.00 100% 0 0.00
12 825 LF. 18" DIA CAST IRON DRAINAGE PIPE 30.00 24,750.00 100% 0 0.00
13. 4 EACH ROCK DAM 5,000.00 20,000.00 75% I EACH 5,000.00
14. 3 EACH ROCK HEADWALL 5,000.00 15,000.00 100% 0 0.00
15. I EACH PRECAST CONCRETE CULVERT 100,000.00 100,000.00 100% 0 0.00
16. 3,156 S.Y. POND LINER (2' Compacted Clay) 15.00 47,340.00 100% 0 0.00
17. 65,000 SY FINE GRADING 1.50 97,500.00 100% 0 0.00
18. 1,570 LF. CONCRETE CURBING 10.00 15,700.00 100% 0 0.00
19. 754 SY CONCRETE SIDEWALK 30.00 22,620.00 100% 0 0.00
20. 6,830 CY. Y." STONE BLEND or RCA BASE 30.00 204,900.00 100% 0 0.00
21. 14,500 TONS ASPHALT PAVEMENT 60.00 870,000.00 100% 0 0.00
22. 3,500 LF. EROSION CONTROL STRUCTURE 10.00 35,000.00 100% 0 0.00
23 1,166 LF. MASONRY RETAINING WALL 150.00 174,900.00 100% 0 0.00
24. 500 EACH STREET TREE 200.00 100,000.00 0% 250 EACH 50,000.00
25. 85,698 SY TOPSOIL & SEED 2.00 171,396.00 100% 0 0.00
26. 175 EACH STREET LIGHTS 1,500.00 262,500.00 100% 0 0.00
27. 1,340 LF. ROAD RESTORATION (Bailey & Atlantic) 5.00 6,700.00 100% 0 0.00
28. 4,200 SY MICRO SURFACING (Bailey & Atlantic) 1.20 5,040.00 100% 0 0.00
29. 7,600 SY PEDESTRIAN PATH 10.00 76,000.00 0% 7,600 SY 76,000.00
30. 80 EACH STREET SIGNS 200.00 16,000.00 100% 0 0.00
31. 2,223 S.Y. FIRE LANE 10.00 22,230.00 100% 0 0.00
32. JOB TRASH PICK UP AREA 7,500.00 100% 0 0.00
33. JOB MAINTENANCE &
PROTECTION OF TRAFFIC 10,000.00 90% 10% 1,000.00
ORJGINAL BOND TOTAL: $ 3,964,216.00
REMAINING BOND AMOUNT FOR
INCOMPLETE CONSTRUCTION ITEMS $ 132,000.00
RICHARD CAGGIANO
WILLIAM J. CREMERS
KENNETH L. EDWARDS
MARTIN SIDOR
PLANNING BOARD OFFICE
TOWN OF SOUTH OLD
December 17, 2002
Elizabeth A. Neville, Town Clerk
Town of South old
P.O. Box 1179
Southold, NY 11971
RE: Peconic Landing
SCTM#1000-35-1-25
Dear Ms. Neville:
The following took place at a meeting of the Southold Town Planning Board on Monday,
December 16, 2002:
RESOLVED, to adopt the revised Bond Estimate in the amount of $132,000.00, dated
March 5, 2002, for Peconic Landing, as determined by the Town Engineer, and
recommend same to the Town Board. The revised Bond Estimate indicates the
percentage of construction items completed to date and reflects the estimated cost of
work remaining.
Please contact this office if you have any questions regarding the above.
Very truly yours,
15-R~O~/
Bennett Orlowski, Jr.pe
Chairman
enc.
RICHARD CAGGIANO
WILLIAM J. CREMERS
KENNETH L. EDWARDS
MARTIN SIDOR
P.O. Box 1179
Town Hall, 53095 State Route 25
Southold, New York 11971-0959
Telephone (631) 765-1938
Fax (631) 765-3136
PLANNING BOARD MEMBERS
BENNETT ORLOWSKI, JR.
Chairman
PLANNING BOARD OFFICE
TOWN OF SOUTHOLD
December 17, 2002
Charles Cuddy, Esq.
P.O. Box 1547
Riverhead, NY 11901
RE: Peconic Landing
SCTM#1000-35-1-25
Dear Mr. Cuddy:
The following took place at a meeting of the South old Town Planning Board on Monday,
December 16, 2002:
RESOLVED, to adopt the revised Bond Estimate in the amount of $132,000.00, dated
March 5, 2002, for Peconic Landing, as determined by the Town Engineer, and
recommend same to the Town Board. The revised Bond Estimate indicates the
percentage of construction items completed to date and reflects the estimated cost of
work remaining.
Please contact this office if you have any questions regarding the above.
Very truly yours,
8~aJ~r'
Bennett Orlowski, ff
Chairman
enc.
:
.
.
,
)
JOSHUA Y. HORTON
SUPERVISOR
TOWN HALL. 53095 MAIN ROAD
Fax. (516).765.1366
') , SveF
v' 5
1'B
JAMES A. RICHTER, R.A.
ENGINEER
TOWN OF SOlITHOLQ, NEw YORK 11971
Tel. (516) .765 -1560
OFFICE OF THE ENGINEER
TOWN OF SOUTH OLD
Bennett Orlowski, Jr.
Chairmcln - Planning Board
Town Hall, 53095 Main Road
Southold, New York 11971
Re: Peconic Landing
Request for Bond Reduction
Dear Mr. Orlowski:
November 7,2002
As per your request. enclosed please find a revised bond estimate that indicates the
amount of work completed to date. I have also enclosed a copy of the inspection report
from the consulting engineers office as prepared by Mr. Gino Aiello. PE.
At this time I agree with the findings of the consultant and would recommend the
reduction of the current Bond. The New Bond Total has been adjusted to represent the
quantity of work remaining and should be in the amount of $ 132,000.00.
If you have any questions concerning this report, please contact my office,
cc:
Peter Harris
(Superintendent of Highways)
Gino Aiel/o, PE (Sidney B. Bowne & Son, LLP)
:'A Rf.@
''Ii;
-~., -.".
N8fi - 8 2IJ62
f.
~
1
)
)
JAMES A. RICHTER, R.A.
ENGINEER
TOWN OF SOUTHOLD, NEW YORK 11971
JOSHUA Y.HORTON
SUPERVISOR
TOWN HALL. 53095 MAIN ROAD
Fax. (516)-765 -1366
Tel (516) - 765 - 1560
OFFICE OF THE ENGINEER
TOWN OF SOUTH OLD
BOND ESTIMATE -
SCTM # 1000-35-01-25
PECONIC LANDING
Revi,ed: March 5, 2002
TOTAL BOND BOND t!:L:lJ. QUANTITY VALUE
ITEM QUANTITY DESCRIPTION UNIT PRICE AMOUNT COMPLETE REMAINING REMAINING
I. 1,500 L.F. SAW CUT PAVEMENT (S.R. 25) $ 3.00 $ 4,500.00 100% 0 $ 0.00
2. 69.4 ACRE CLEARlNG & GRUBBING 2,500.00 173,500.00 100% 0 0.00
3. JOB DEMOLITION of STRUCTURES 75,000.00 100% 0 0.00
4. 264,000 c.Y. ROUGH GRADING I
UNCLASSIFIED EXCA V A TION 2.50 660,000.00 100% 0 0.00
5. 103 EACH CATCH BASINS 2,500.00 257,500.00 100% 0 0.00
6. 20 EACH LEACHING POOL (10' Dia. X 7' deep) 2,000.00 40,000.00 100% 0 0.00
7. 47 EACH CONCRETE MANHOLE (4' Di..) 2,000.00 94,000.00 100% 0 0.00
8. 9,551 L.F. 18" DIA HOPE DRAINAGE PIPE 25.00 238,775.00 100% 0 0.00
9. 2,778 L.F. 24" DIA HDPE DRAINAGE PIPE 30.00 83,340.00 100% 0 0.00
10. 407 L.F. 30" DIA HDPE DRAINAGE PIPE 35.00 14,245.00 100% 0 0.00
11. 457 L.F. 36" DIA HDPE DRAINAGE PIPE 40.00 18,280.00 100% 0 0.00
12. 825 L.F. 18" DIA CAST IRON DRAINAGE PIPE 30.00 24,750.00 100% 0 0.00
13. 4 EACH ROCK DAM 5,000.00 20,000.00 75% 1 EACH 5,000.00
14. 3 EACH ROCK HEADWALL 5,000.00 15,000.00 100% 0 0.00
15. 1 EACH PRECAST CONCRETE CULVERT 100,000.00 100,000.00 100% 0 0.00
16. 3,156 SY. POND LINER (2' Compacted Clay) 15.00 47,340.00 100% 0 0.00
17. 65,000 SY. FINE GRADING 1.50 97,500.00 100% 0 0.00
18. 1,570 L.F CONCRETE CURBING 10.00 15,70000 100% 0 0.00
19. 754 SY. CONCRETE SIDEWALK 30.00 22,62000 100% 0 0.00
20. 6,830 c.Y. y." STONE BLEND or RCA BASE 30.00 204,900.00 100% 0 0.00
21. 14,500 TONS ASPHALT PAVEMENT 60.00 870,000.00 100% 0 0.00
22. 3,500 L.F. EROSION CONTROL STRUCTURE 10.00 35,000.00 100% 0 0.00
23. 1,166 L.F. MASONRY RETAINING WALL 150.00 174,900.00 100% 0 0.00
24. 50U EACH STREET TREE 200.00 100,000.00 0% 250 EACH 50,000.00
25. 85,698 SY. TOPSOIL & SEED 2.00 171,396.00 100% 0 0.00
26. 175 EACH STREET LIGHTS 1,500.00 262,500.00 100% 0 0.00
27. 1,340 L.F. ROAD RESTORATION (Bailey & Atlantic) 5.00 6,700.00 100% 0 0.00
28. 4,200 SY. MICRO SURFACING (Bailey & Atlantic) 1.20 5,040.00 100% 0 0.00
29. 7,600 S.Y. PEDESTRIAN PATH 10.00 76,000.00 0% 7,600 S.Y. 76,000.00
30. 80 EACH STREET SIGNS 200.00 16,000.00 100% 0 0.00
31. 2,223 S.Y. FIRE LANE 10.00 22,230.00 100% 0 0.00
32. JOB TRASH PICK UP AREA 7,500.00 100% 0 0.00
33. JOB MAINTENANCE &
PROTECTION OF TRAFFIC 10,000.00 90% 10% 1,000.00
ORIGINAL BOND TOTAL, $ 3,964,216.00
REMAINING BOND AMOUNT FOR
INCOMPLETE CONSTRUCTION ITEMS $ 132,000.00
RICHARD CAGGIANO
vnLL~J.C~ERS
KENNETH L. EDWARDS
MARTIN SIDOR
,.
J ~
,
,
PLANNING BOARD MEMBERS
BENNETT ORLOWSKI, JR.
Chairman
PLANNING BOARD OFFICE
TOWN OF SOUTHOLD
December 17, 2002
Elizabeth A. Neville, Town Clerk
Town of Southold
P.O. Box 1179
Southold, NY 11971
RE: Peconic Landing
SCTM#1000-35-1-25
Dear Ms. Neville:
The following took place at a meeting of the Southold Town Planning Board on Monday,
December 16, 2002:
RESOLVED, to adopt the revised Bond Estimate in the amount of $132,000.00, dated
March 5, 2002, for Peconic Landing, as determined by the Town Engineer, and
recommend same to the Town Board. The revised Bond Estimate indicates the
percentage of construction items completed to date and reflects the estimated cost of
work remaining.
Please contact this office if you have any questions regarding the above.
Very truly yours,
h'~O~/
Bennett Orlowski, Jr.",.c
Chairman
ene.
RICHARD CAGGIANO
WILLIAM J. CREMERS
KENNETH L. EDWARDS
MARTIN SIDOR
\
PLANNING BOARD MEMBERS
BENNETT ORLOWSKI, JR.
Chairman
P.O. Box 1179
Town Hall, 53095 State Route 25
Southold, New York 11971-0959
Telephone (631) 765-1938
Fax (631) 765-3136
PLANNING BOARD OFFICE
TOWN OF SOUTHOLD
December 17, 2002
Charles Cuddy, Esq.
P.O. Box 1547
Riverhead, NY 11901
RE: Peconic landing
SCTM#1000-35-1-25
Dear Mr. Cuddy:
The following took place at a meeting of the Southold Town Planning Board on Monday,
December 16, 2002:
RESOLVED, to adopt the revised Bond Estimate in the amount of $132,000.00, dated
March 5, 2002, for Peconic landing, as determined by the Town Engineer, and
recommend same to the Town Board. The revised Bond Estimate indicates the
percentage of construction items completed to date and reflects the estimated cost of
work remaining.
Please contact this office if you have any questions regarding the above.
Very truly yours,
7 ~ ;/ (7
6~~~ a,----"-"'~ /2-,
Bennett Orlowski, Jf?' .
Chairman
enc.
. ,
,
)
JOSHUA Y. HORTON
SUPERVISOR
TOWN HALL ~ 53095 MAIN ROAD
Fax. (516).765~1366
') , SvgF
V'S
113
JAMES A. RICHTER, R.A.
ENGINEER
TOWN OF SOUTIlOLD, NEW YORK 11971
Tel. (516).765.1560
OFFICE OF THE ENGINEER
TOWN OF SOUTH OLD
Bennett Orlowski, Jr.
Chairman - Planning Board
Town Hall. 53095 Main Road
Southold, New York 11971
Re: Peconic Landing
Request for Bond Reduction
Dear Mr. Orlowski:
November 7,2002
As per your request, enclosed please find a revised bond estimate that indicates the
amount of work completed to date. I have also enclosed a copy of the inspection report
from the consulting engineers office as prepared by Mr. Gino Aiello, PE.
At this time I agree with the findings of the consultant and would recommend the
reduction of the current Bond. The New Bond Total has been adjusted to represent the
quantity of work remaining and should be in the amount of $ 132,000.00.
If you have any questions concerning this report, please contact my office.
cc: Peter Harris
(Superintendent of Highways)
Gino Aiello, PE (Sidney B. Bowne & Son, LLP)
"A R~1f1
I,'J~:, ..
N~PJ - 8 28D2
f
."
)
)
JAMES A. RICHTER, R.A.
ENGINEER
TOWN Of SOUTH OLD, NEW YORK 11971
Tel (516) - 765 - 1560
\
JOSHUA Y.HORTON
SUPERVISOR
TOWN HALL - 53095 MAIN ROAD
Fax. (516) -765 - 1366
OFFICE OF THE ENGINEER
TOWN OF SOUTH OLD
BOND ESTIMATE -
serM # 1OOO-3!Hl1-25
PECONIC LANDING
R"bed, March 5, 2002
TOTAL BOND BOND ~ QUANTITY Y8b!.!S
ITEM QUANTITY DESCRIPTION UNIT PRICE AMOUNT COMPLETE REMAINING REMAINING
1. 1,500 L.F. SAW ClIT PAVEMENT (S.R. 25) $ 3.00 S 4,500.00 100% 0 S 0.00
2. 69.4 ACRE CLEARING & GRUBBING 2,500.00 173,500.00 100% 0 0.00
3. JOB DEMOLffiON of STRUCTURES 75,000.00 100% 0 0.00
4. 264,000 c.Y. ROUGH GRADING I
UNCLASSIFIED EXCAVATION 2.50 660,000.00 100% 0 0.00
5. 103 EACH CATCH BASINS 2,500.00 257,500.00 100% 0 0.00
6. 20 EACH LEACHING POOL (10' Dia. X 7' deep) 2,000.00 40,000.00 100% 0 0.00
7. 47 EACH CONCRETE MANHOLE (4' Di..) 2,000.00 94,000.00 100% 0 0.00
8. 9,551 L.F. 18" D1A HOPE DRAINAGE PIPE 25.00 238,775.00 100% 0 0.00
9. 2,778 L.F. 24" DIA HOPE DRAINAGE PIPE 30.00 83,340.00 100% 0 0.00
10. 407 L.F. 30" D1A HOPE DRAINAGE PIPE 35.00 14,245.00 100% 0 0.00
II. 457 L.F. 36" D1A HOPE DRAINAGE PIPE 40.00 18,280.00 100% 0 0.00
12. 825 L.F. 18" DIA CAST IRON DRAINAGE PIPE 30.00 24,750.00 100% 0 0.00
13. 4 EACH ROCK DAM 5,000.00 20,000.00 75% I EACH 5,000.00
14. 3 EACH ROCK HEADWALL 5,000.00 15,000.00 100% 0 0.00
15. lEACH PRECAST CONCRETE CULVERT 100,000.00 100,000.00 100% 0 0.00
16. 3,156 S.Y. POND LlNER(2' Compacted Clay) 15.00 47,340.00 100% 0 0.00
17. 65.000 S.Y. FINE GRADING 1.50 97,500.00 100% 0 0.00
18. 1.570 L.F. CONCRETE CURBING 10.00 15,70000 100% 0 0.00
19. 754 S.Y. CONCRETE SIDEWALK 30.00 22,620.00 100% 0 0.00
20. 6,830 C.Y. '/." STONE BLEND or RCA BASE 30.00 204,900.00 100% 0 0.00
21. ]4,500 TONS ASPHALT PAVEMENT 60.00 870,000.00 100% 0 0.00
22. 3.500 L.F. EROSION CONTROL STRUCTURE 10.00 35,000.00 lOO%. 0 0.00
23. 1,]66L.F. MASONRY RETAINING WALL 150.00 174,900.00 10G% 0 0.00
24. SOu EACH STREET TREE 200.00 100,000.00 0% 250 EACH 50,000.00
25. 85.698 S.Y. TOPSOIL & SEED 2.00 171,396.00 100% 0 0.00
26. 175 EACH STREET LIGHTS 1,500.00 262,500.00 100% 0 0.00
27. 1,340 L.F. ROAD RESTORATION (Bailey & Atlantic) 5.00 6,700.00 100% 0 0.00
28. 4,200 S.Y. MICRO SURF ACING (Bailey & Atlantic) 1.20 5,040.00 100% 0 0.00
29. 7.600 S.Y. PEDESTRIAN PATH 10.00 76.000.00 0% 7,600 S.Y. 76,000.00
30. 80 EACH STREET SIGNS 200.00 16.000.00 100% 0 000
31 2,223 S Y. FIRE LANE 10.00 22,230.00 100% 0 0.00
32 JOB TRASH PICK UP AREA 7.50000 100%, 0 000
33 JOB MA]NTENANCE &
PROTECTION OF TRAFFIC 10.000.00 9()% 10% 1.000.00
ORIGINAL BOND TOT Ale $ 3.964,216.00
REMAINING BOND AMOUNT FOR
INCOMPLETE CONSTRUCTION ITEMS S 132,000.00