HomeMy WebLinkAboutPBA-06/12/2006
KENNETH L. EDWARDS
MARTIN H. SIDOR
GEORGE D. SOLOMON
JOSEPH L. TOWNSEND
MAIUNG ADDRESS:
P.O. Box 1179
Southold, NY 11971
PLANNING BOARD MEMBERS
JERILYN B. WOODHOUSE
Chair
OFFICE WCATION:
Town Hall Annex
54375 State Route 25
(cor. Main Rd. & Youngs Ave.)
Southold, NY
Telephone: 631 765-1938
Fax: 631 765-3136
PLANNING BOARD OFFICE
TOWN OF SOUTHOLD
AGENDA
June 12, 2006
6:00 p.m.
SETTING OF THE NEXT PLANNING BOARD MEETING
Board to set Monday, July 10, 2006 at 6:00 p.m. at the South old Town Hall, Main
Road, Southold, as the time and place for the next regular Planning Board Meeting.
PUBLIC HEARINGS
6:00 p.m. - Malon Industries. Inc.: The site plan amendment includes parking
changes and a drive-up window for a bank on a 1.2356-acre parcel in the B Zone
located approximately 83.35' wlo Cox's Lane, on the nlslo NYS Road 25, known as
32845 NYS Road 25 in Cutchogue. SCTM#1000-97-5-4.5
6:05 p.m. - Osprey's Dominion Conservatorv: This amended site plan is for the
proposed alteration and expansion of an existing 1,357 sq. ft. building and approved
conservatory building and dormer of 1,995 sq. ft. to include a 1,462 sq. ft. addition
which includes a site plan change in parking to 41 required spaces and 59 overflow
spaces provided on 4.46 acres in the AC Zone located on the nlslo New York State
Road 25 and 1,506' elo Peconic Lane known as 44075 Main Road in Peconic.
SCTM#(s) 1000-75-1-20.1 & 20.2
6:10p.m. - Orient Fire District Tower: This site plan is for the co-location of Nextel @
85' height, Cingular @ 75' height & Verizon @ 65' height on a proposed 90'
communications flagpole tower with firelpolice emergency communication mounted on
a cross bar @ 90' height and includes a 43'x46'x 6' high fenced enclosure on a 4.4-acre
parcel in the R-80 Zone located on the slslo Main Road at the sle intersection of Main
Road and Tabor Road in Orient. SCTM# 1000-18-5-13.8
,
Southold Town Planning Board Agenda
Page Two
June 12, 2006
Hearings Held Over From Previous Meetings:
BCB Realtv HoldinQ Corp.: This site plan is for the demolition of an existing
restaurant building, new construction of two buildings that includes a building on the els
with 3,964 sJ. of first floor office space and a 3,706 sJ. second floor apartment space
with three apartments, and a building on the wls with 4,424 sJ. of commercial bank
space with drive-up teller service on a 1.41-acre parcel in the B Zone located on the
nlslo NYS Road 25 approximately 259' wlo Moore's Lane known as 74825 Main Road
in Greenport. SCTM# 1000-45-4-8.3
Charnews, Daniel: This proposal is to subdivide a 23.4004 acre parcel into two lots
where Lot 1 equals 3 acres and Lot 2 equals 20.4004 acres. The. property is located on
the wlslo Youngs Avenue and the elslo Horton Lane, approximately 375' south of CR
48 in Southold. SCTM#1000-63-1-25
Baxter, Mark: This proposal is to subdivide a 6.7898-acre parcel into 2 lots where Lot
1 equals 4.4417 acres and Lot 2 equals 2.3841 acres. The property is located on the
nlslo Main Bayview Road, approximately 325' elo Smith Drive South, in Southold.
SCTM#'s1000-78-7-5.3 7 5.4
CONSERVATION SUBDIVISIONS, STANDARD SUBDIVISIONS, RE-
SUBDIVISIONS (Lot Line Changes)
Final Determinations:
Grattan, Barbara: This proposal is to subdivide a 27.446-acre parcel into two lots
where Lot 1 equals 1.838 acres and Lot 2 equals 25.608 acres. The property is located
on the w/s/o Depot Lane, 147' nlo School House Lane in Cutchogue. SCTM#102-1-9
Dubner. Steven: This proposal is for a clustered conservation subdivision to subdivide
a 53.77-acre parcel into five lots where Lot 1 equals 46.22 acres, Lot 2 equals 3 acres,
Lot 3 equals 1.5 acres, Lot 4 equals 1.3 acres and Lot 5 equals 1.7 acres in the A-C
Zoning District. The property is located on the slslo County Road 48 and the elslo
Cox's Lane, approximately 1320' wlo Bridge Lane in Cutchogue. SCTM#1000-84-4-6.1
,
Southold Town Planning Board Agenda
Page Three
June 12, 2006
Setting of Preliminary Hearings:
Old Orchard at Cutchoaue: Proposal is to subdivide a 4.619-acre parcel into four lots,
where Lot 1 equals 67,913 sJ., Lot 2 equals 40,621 sJ., Lot 3 equals 40,082 sJ. and
Lot 4 equals 44,830 sJ. The property is located on the nlw of New Suffolk Road and
Cedars Road in Cutchogue. SCTM#1000-109-6-9.1
Conditional Sketch Determinations:
Brokaw, Bennett: This proposal is to subdivide a 4.997-acre parcel into two lots where
Lot 1 equals 80,000 sf and is currently improved with a single-family residence and
metal garage, and Lot 2 equals 137,665 sf, inclusive of the 5,200 sf flag strip. The
property is located on the slslo Bergen Avenue, approximately 1299' wlo Cox Neck
Road in Mattituck. SCTM#1 000-113-7-1.1
Conditional Sketch Extensions:
Old Orchard at Cutchoaue - SCTM#1 000-1 09-6-9.1
Pawluczvk. Bertha (Estate of): This proposal is to subdivide a 4.193-acre parcel into
two lots where Lot 1 equals 40,000 sq.ft. and Lot 2 equals 142,667 sq.ft. The parcel is
located on the 5/5/0 CR 48 in Peconic. SCTM#1000-84-5-4
CONSERVATION SUBDIVISIONS, STANDARD SUBDIVISIONS, RE-
SUBDIVISIONS (Lot Line Changes) - STATE ENVIRONMENTAL
QUALITY REVIEW ACT
Lead Agency Coordination:
Brokaw, Bennett - SCTM#1000-113-7-1.1
Nickart Realtv: This proposal is to subdivide a 34,896 sq.ft. parcel into two lots where
Lot 1 equals 17,438 sq.ft. and Lot 2 equals 17,438 sq.ft. in the R-40 Zoning District.
The property is located on the 5/5/0 North Road, approximately 900' wlo Bayberry Lane
in Southold. SCTM#1000-52-2-13
.
,
South old Town Planning Board Agenda
Page Four
June 12, 2006
Verity. Michael: Proposal is to subdivide a 5.54-acre parcel into five (5) lots, where Lot
1 equals 21,454 square feet, Lot 2 equals 21,593 square feet, Lot 3 equals 25,081
square feet, exclusive of the flag strip, Lot 4 equals 20,477 square feet, exclusive of the
flag strip, and Lot 5 equals 146,285 square feet, inclusive of 71 ,581 square feet of
clustered open space. The property is located on the north side of Main Road and the
westside of Sound Road in East Marion. SCTM#1000-35-1-4
SITE PLANS
Set Hearings:
RWM Enterprises. Inc. (aka Colonial) - This amended site plan proposes to remove
one of the five existing buildings and rearrange the 23 existing parking spaces on a
121,355 sq. ft. parcel in the B Zone located on the slw corner of the intersection of
Route 25 and Locust Lane on the slslo Route 25 in Southold. SCTM# 1000-62-3-22.1
SITE PLANS - STATE ENVIRONMENTAL QUALITY REVIEW ACT
Type II Actions:
RWM Enterprises. Inc. (aka Colonial) - SCTM# 1000-62-3-22.1
Sheren Medical Buildina: This new site plan is for the proposed construction of a
2,940 square foot one-story building for 2 medical offices that requires 15 parking
spaces (20 proposed) on a vacant .49-acre parcel in the General Business Zone
located on the slslo Suffolk County Road 48, approximately 1,251' elo Youngs Avenue
in Southold. SCTM #1000-55-5-10
Unlisted Coordinated Reviews:
M&R Developina: This site plan is for construction of a new 7,600 sq. ft. light industrial
building divided into eight (8) separate units with six (6) units equaling 1,000 sq. ft. of
area each and two (2) units equaling 800 sq. ft. of area each, where site plan build out
includes 24 parking spaces on a 40,000 sq. ft. vacant parcel in the LI Zone located
approximately 218' slo Corporate Drive on the wlslo Commerce Drive in Cutchogue.
SCTM#: 1000-96-1-1.8 .
,...-
.
. .
.
Southold Town Planning Board Agenda
Page Five
June 12, 2006
Montauk Bus Service: This site plan proposes construction of a new 3,180 sq. ft bus
terminal building with site build out that includes 19 employee parking spaces and 16
bus parking spaces on a vacant 1.083-acre parcel in the LI Zone located approximately
417' slo Corporate Drive on the wlslo Commerce Drive known as 115 Commerce Drive
in Cutchogue. SCTM# 1000-96.-1-1.2
BOND DETERMINATIONS
Dubner, Steven: SCTM#1000-84-4-6.1
OTHER
Yield Map & Existing Resources and Site Analysis Plan (ERSAP)
Determination
Tall Pines at Paradise Point: This proposal is for a Standard Subdivision to subdivide
a 19.825-acre parcel into five lots where Lot 1 equals 40,571 s.f., Lot 2 equals 40,436
s.f., Lot 3 equals 40,337 s.f., Lot 4 equals 40,000 s.f. and Lot 5 equals 40,000 s.f. in the
R-80 Zoning District. The property is located on the wlslo Paradise Point Road
approximately 1,207' slo North Bayview Road in Southold. SCTM#1000-81-2-5
Verity, Michael: SCTM#1000-35-1-4
WORK SESSION AGENDA
SOUTHOLD TOWN PLANNING BOARD
SITE PLANS
For Monday June 12, 2006 at 4:30 p.m.
RECEIVED
Mandatol;y Site Plan Agenda Items:
JUN 1 2 2006
. Orient FD
Action:
Status:
Recommendations:
Attachments:
SCTM: 1000-18-5-13.8
Received comments from the Town Engineer
Public hearing scheduled for Monday, June 12,2006.
Accept Town Engineer's comments
None
Southold Town Cieri
. ARC Meeting Minutes June 1, 2006
Action: ARC held a meeting on June 1,2006. Received meeting minutes for review.
Status: Received meeting minutes.
Recommendations: Review meeting minutes and accept/reject recommendations.
Attachments: None
Addition Site Plan Agenda Items (if time allows):
. Peconic Recycling & Transfer SCTM: 1000-95-2-7
Action: Received proposed new site plan application for a recycling and transfer
station in the North Fork Industrial Park (Tide Group Subdivision)
Discuss proposed new site plan application
Accept new site plan and begin review.
A-I
Status:
Recommendations:
Attachments:
. Warex Project 2006
Action:
Status:
Recommendations:
Attachments:
. Corazzini Asphalt
Action:
Status:
Recommendations:
Attachments:
SCTM: 1000-142-1-27
Received proposed amended site plan application to expand existing gas
station to include a drive thm car wash.
Discuss proposed amended site plan application
Accept amended site plan and begin review.
B-1
SCTM: 1000-84-1-32.1
Received proposed amended site plan application to include 655.2 sq. ft. office
addition.
Discuss proposed amended site plan application
Accept amended site plan and begin review.
C-l
. North ForkCustom Audio & Video SCTM: 1000-125-1-19.7
Action: Received comments from the Town Engineer
Status: Review revised Notice of Disapproval and letter from the Town Engineer.
Recommendations: Accept Town Engineer's comments
Attachments: D-l
S:\Planrung\2006\ Work Session\Site Plans\6-12-06 Site Plan Work SessionAGENDA.doc
,;
KENNETH L. EDWARDS
MARTIN H. SIDOR
GEORGE D. SOLOMON
JOSEPH L. TOWNSEND
MAIUNG ADDRESS:
P.O. Box 1179
Southold, NY 11971
OFFICE WCATION:
Town Hall Annex
54375 State Route 25
(cor. Main Rd. & Youngs Ave,)
Southold, NY
PLANNING BOARD MEMBERS
JERILYN B. WOODHOUSE
Chair
Telephone: 631 765-1938
Fax: 631 765-3136
PLANNING BOARD OFFICE
TOWN OF SOUTHOLD
June 13, 2006
Charles R. Cuddy, Esq.
445 Griffing Avenue
Riverhead, NY 11901
Re: Proposed Amended Site Plan for Malon Industries 09/05
Located on the n/s/o New York State Road 25 and 83.35' w/o Cox's Lane
in Cutchogue SCTM # 1000-97-5-4.5 Zoning District: B
Dear Mr. Cuddy:
The Southold Town Planning Board, at a meeting held on Monday, June12, 2006,
adopted the following resolutions:
The final public hearing was closed.
WHEREAS, the amended site plan includes parking changes and a drive-up window for
a bank on a 1.2356-acre parcel in the B Zone located approximately 83.35' w/o Cox's
Lane, on the n/s/o NYS Road 25, known as 32845 NYS Road 25, in Cutchogue.
SCTM#1000-97-5-4.5; and
WHEREAS, Malon Industries, Inc. is the owner of the property located approximately
83.35' w/o Cox's Lane, on the n/s/o NYS Road 25, known as 32845 NYS Road 25, in
Cutchogue; and
WHEREAS, on April 12, 2005, the Southold Town Planning Board granted final
approval on the site plan prepared and certified by Harold E. Gebhard a Licensed
Architect, dated December 11, 2003 and last revised March 16, 2005 and authorized
the Chairperson to endorse the final site plans, and the requirements of that site plan
remaining effect, except as modified herein: and
WHEREAS, on September 9, 2005, the agent, Charles R. Cuddy, Esq., working for
Christine Malon, submitted an amended formal site plan for approval; and
WHEREAS, on December 1, 2005, the Architectural Review Committee reviewed the
architectural drawings and associated site plan materials and tabled the application
pending a drawing of the west side elevation and sign details; and
~.
.
Malon Industries 09/05
Page Two
June 13, 2006
WHEREAS, on January 6, 2006, the New York State Department of Transportation
responded after review and noted "the proposed changes do not appear to have a
significant impact on the traffic operation of the State Highway or the site; therefore all
other permit requirements remain as specified" under existing highway work permit
number 10-02-0161 and the Southold Town Planning Board accepts this approval; and
WHEREAS, on January 19, 2006, the Cutchogue Fire District responded that no
additional requirements and/or recommendations for fire access are necessary; and
WHEREAS, on March 21, 2006, the Suffolk County Department of Planning responded
after review and determined this matter is for "local determination as there appears to
be no significant county-wide or inter-community impact(s)" and the Planning Board
accepts this pursuant to 239L & M General Municipal Law; and
WHEREAS, on April 25, 2006, the Southold Town Building Inspector reviewed and
certified the amended site plan for a "Commercial Center ( Retail and Office Space)"
use; and
WHEREAS, on May 4, 2006, the Architectural Review Committee reviewed the
architectural drawings and associated site plan materials and approved the construction
"subject to signage and additional light cuts: maximum height from grade not to exceed
6' to top of sign" and the South old Town Planning Board reviewed the subject condition
did not change the signage previously approved on the April 12, 2005 site plan; and
WHEREAS, on May 9, 2006, the Southold Town Planning Board acting under the State
Environmental Quality Review Act (6 NYCRR), Part 617.5 c (7), made a determination
that the proposed action was a Type II and not subject to review; and
WHEREAS, on May 31,2006, the Southold Town Engineer reviewed the amended site
plan materials and approved the drainage of existing conditions along with the proposed
construction subject to comments/conditions and the Southold Town Planning Board
incorporates such comments /conditions as requirements in this approval; and
WHEREAS, the Southold Town Planning Board, pursuant to Chapter 58, Notice of
Public Hearing, has received affidavits that the applicant has complied with the
notification provisions; and
WHEREAS, the following items shall be required:
. The owner agrees to the Planning Board's current requirement of a total of 47 parking
spaces, as opposed to the 57 required by Southold Town Code for the proposed uses
and the Planning Board waives the parking requirements to that limited extent in
consideration of the applicants' proposed installation of the drainage swale on the
north side ofthe property, landscaping and proposed installation of the cross
easement to the property on the west side as noted on the amended site plan.
~.-
,
Malon Industries 09/05
Page Three
June 13,2006
· The owner agrees to be bound by all of the requirements of the executed Cross
Easement Agreement dated April 27, 2006 as approved by the South old Town
Planning Board.
· All outdoor lighting shall be shielded so that the light source is not visible from
adjacent properties and roadways. Lighting fixtures shall focus and direct the
light in such a manner as to contain the light and glare within property
boundaries. The lighting must meet town code requirements.
· If necessary, the applicant must obtain a SPDES General Permit (NYR-10H057)
for Storm Water Discharges (General Permit Number GP-02-01) from the New
York State Department of Environmental Conservation for the construction
activities.
· All approved signs shall meet Southold Town Zoning Codes and shall be subject
to approval of the South old Town Building Inspector.
· As per the landscape survivability guarantee, the applicant agrees to replace any
of the landscaping which dies within three (3) years of planting; be it therefore
RESOLVED, that the Southold Town Planning Board has reviewed the proposed action
under the policies of the Town of Southold Local Waterfront Revitalization Program and
has determined that the action is consistent provided that the best management
practices outlined in the April 26, 2006 memo prepared by the LWRP Coordinator are
implemented; and be it further
RESOLVED, that pursuant to Southold Town Code 100-254 Part B Section 5, the
Planning Board is granting approval for less than the required number of spaces for the
proposed use and the Planning Board shall have the right to review the parking
requirements in the future if a change of use or intensity of use is proposed at the site;
and be it further
RESOLVED, that pursuant to Southold Town Code 100-254 Part I, the applicant agrees
to incorporate all the requirements, comments, and recommendations of each reviewing
agency as referenced above and as indicated on the site plan and corresponding
attachments; and be it further
RESOLVED, that the Southold Town Planning Board grant approval on the amended
site plan prepared by Harold E. Gebhard, Architect dated December 11, 2003 and last
revised February 15, 2006 and the following Architectural Plans A-1, A-4 & A-5 dated
April 18, 2005 and last revised December 9, 2005, the Planning Board authorizes the
Chairperson to endorse the amended site plans subject to the following conditions:
Malon Industries 09/05
Page Four
June 13,2006
1. The applicant/agent/owner agrees to file and record within sixty (60) days the
executed Cross Easement Agreement dated April 27, 2006 as approved by the
South old Town Planning Board in the Office of the Suffolk County Clerk. After filing
and recording the Cross Easement Agreement submit a copy to the South old Town
Planning Department.
2. The site plan approval requires that all work proposed on the amended site plan
shall be completed within three (3) years from the date of this resolution.
3. Prior to the request for the Certificate of Occupancy, the owner or authorized
agent must request the said Building Inspector and the Planning Board to
perform an on-site inspection to find the site improvements are in conformity with
the approved amended site plan.
4. If the as-built site improvements vary from the approved amended site plan, the
Planning Board reserves the right to request a certified as-built site plan detailing
all the changes.
5. Any changes from the approved amended site plan shall require Planning Board
approval, and any such changes without Planning Board approval will be subject
to referral to the Town Attorney's Office for possible legal action.
The Planning Board will issue a final amended site plan approval in the form of a letter
following a site inspection and at the time the site improvements are found to be in
conformance with the approved site plan.
Three copies of the approved amended site plan are enclosed for your records. As per
the Town Code, one copy each will be distributed to the Building Department and Town
Engineer/Highway Department.
If you have any questions regarding the above, please contact this office.
Very truly yours,
/.1' J 11 /ff-? <- -L ~~
Jerilyn B. Woodhouse
Chairperson
Ene.
cc: Southold Town Board, Southold Town Building Dept., Southold Town Engineer,
Suffolk County Planning Dept., NYS Dept. ofTransportation, File
,C
KENNETH L. EDWARDS
MARTIN H. SIDOR
GEORGE D. SOLOMON
JOSEPH L. TOWNSEND
MAIUNG ADDRESS:
P.O. Box 1179
Southold, NY 11971
PLANNING BOARD MEMBERS
JERILYN B. WOODHOUSE
Chair
OFFICE WCATION:
Town Hall Annex
54375 State Route 25
(cor. Main Rd. & Youngs Ave.)
Southold, NY
Telephone: 631 765-1938
Fax: 631 765-3136
PLANNING BOARD OFFICE
TOWN OF SOUTHOLD
June 13, 2006
Mr. Frederick W. Koehler
P.O. Box 198
Peconic, NY 11958
Re: Proposed Amended Site Plan for Osprey's Dominion Conservatory
Located on the n/s/o New York State Road 25 and 1,506' elo Peconic Lane
known as 44075 Main Road in Peconic
SCTM #: 1000-75-1-20.1 & 20.2 Zoning District: AC
Dear Mr. Koehler:
The South old Town Planning Board, at a meeting held on Monday, June 12, 2006,
adopted the following resolutions:
The final public hearing was closed.
WHEREAS, the amended site plan is for the proposed alteration and expansion of an
existing 1,357 sq. ft. building and approved conservatory building and dormer of 1,995
sq. ft. to include a 1,462 sq. ft. addition which includes a site plan change in parking to
41 required spaces and 59 overflow spaces provided on 4.46 acres in the AC Zone
located on the n/s/o New York State Road 25 and 1,506' elo Peconic Lane known as
44075 Main Road in Peconic. SCTM#(s) 1000-75-1-20.1 & 20.2; and
WHEREAS, Frederick W. Koehler is the owner of the property located on the elo
Peconic Lane known as 44075 Main Road in Peconic; and
WHEREAS, on August 9,2005, the Southold Town Planning Board granted final
approval on the site plan prepared by J. Grammas Consulting and certified by Carlos E.
Cala, Registered Architect, dated December 17, 2003 and last revised August 31,2004
and authorized the Chairperson to endorse the final site plans, and the requirements of
that site plan remaining effect, except as modified herein: and
WHEREAS, on February 14, 2006, the applicant, Frederick W. Koehler, submitted an
amended formal site plan for approval; and
Osprey's Dominion Conservatory
Page Two
June 13, 2006
WHEREAS, on February 16, 2006, the Suffolk County Department of Health Services,
Reference No. C1 0-04-012, approved the revised plans to include the 1,462 square foot
addition from their original approval on July 12, 2005; and
WHEREAS, on March 1, 2006, the Architectural Review Committee reviewed the
architectural drawings and associated site plan materials and approved the project
pending submission of proposed lighting and catalog cuts; and
WHEREAS, on March 24, 2006, the New York State Department of Environmental
Conservation responded that a permit is not necessary as long as all work is outside of
any tidal or freshwater wetlands boundary; and
WHEREAS, on April 3, 2006 the Planning Board accepted the "Landscape
Development Planting Plan" dated March 24, 2006 and supporting materials prepared
by Richard W. Gibney, R.LA including the removal of a 40" caliper sycamore maple
located on the south side of the property east of the existing driveway entrance and
replacing it with three (3) 2 - 2.5" caliper red maples; and
WHEREAS, on April 5, 2006, the owner and President of Osprey Dominion Vineyards,
Frederick W. Koehler, submitted a formal request to withdraw the windmill application
known as L1PA Windturbine; and
WHEREAS, on April 6, 2006, the Suffolk County Department of Planning responded to
the applicant's request stating the proposed expansion is not on property in which the
County owns development rights and has no objection to the proposed expansion; and
WHEREAS, on April 17 , 2006, the Southold Fire District responded that adequate fire
protection has been supplied; and
WHEREAS, on April 20, 2006, the Southold Town Building Inspector reviewed and
certified the amended site plan for a "winery" use; and
WHEREAS, on May 1, 2006, the New York State Department of Transportation
responded after review and determined a Highway Work Permit is not required "as long
as all work is progressed outside the Route 25 highway ROWand the Route 25
highway ROW is not used to perform any work"; and
WHEREAS, on May 4, 2006, the Architectural Review Committee reviewed the
proposed lighting and catalog cuts and approved the project; and
WHEREAS, on May 8, 2006, the Southold Town Engineer reviewed the amended site
plan materials and replied that all items have been addressed in a satisfactory manner;
and
Osprey's Dominion Conservatory
Page Three
June 13, 2006
WHEREAS, on June 9, 2006, the Suffolk County Department of Planning responded
after review and determined this matter is for "local determination as there appears to
be no significant county-wide or inter-community impact(s)" and the Planning Board
accepts this pursuant to 239L & M General Municipal Law; and
WHEREAS, the Southold Town Planning Board, pursuant to Chapter 58, Notice of
Public Hearing, has received affidavits that the applicant has complied with the
notification provisions; and
WHEREAS, the following items shall be required:
1. All outdoor lighting shall be shielded so that the light source is not visible from
adjacent properties and roadways. Lighting fixtures shall focus and direct the
light in such a manner as to contain the light and glare within property
boundaries. The lighting must meet town code requirements.
2. If necessary, the applicant must obtain a SPDES General Permit (NYR-10H057)
for Storm Water Discharges (General Permit Number GP-02-01) from the New
York State Department of Environmental Conservation for the construction
activities.
3. All signs shall meet Southold Town Zoning Codes and shall be subject to
approval of the Southold Town Building Inspector.
4. As per the landscape survivability guarantee, the applicant agrees to replace any
of the landscaping which dies within three (3) years of planting; be it therefore
RESOLVED, that on April 5, 2006, the owner and President of Osprey Dominion
Vineyards, Frederick W. Koehler, formally withdrew the windmill application known as
L1PA Windturbine pursuant to Southold Town Code !;100-254 B (6); be it further
RESOLVED, that on April 11 ,2006, the Southold Town Planning Board, acting under
the State Environmental Quality Review Act (6 NYCRR), Part 617.5 c (7), makes a
determination that the proposed action is a Type II and not subject to review; and be it
further
RESOLVED, that the Southold Town Planning Board has reviewed the proposed action
under the policies of the Town of Southold Local Waterfront Revitalization Program and
has determined that the action is consistent provided that the best management
practices outlined in the June 5, 2006 memo prepared by the LWRP Coordinator are
implemented; and be it further
RESOLVED, that pursuant to South old Town Code 100-254 Part I, the applicant agrees
to incorporate all the requirements, comments, and recommendations of each reviewing
agency as referenced above and as indicated on the site plan and corresponding
attachments; and be it further
..
Osprey's Dominion Conservatory
Page Four
June 13, 2006
RESOLVED, that the Southold Town Planning Board grant approval on the amended
site plan prepared by Carlos E. Cala of J. Grammas Consultants dated December 17,
2003 and last revised April 24, 2006 and the Landscape Development Planting Plan
prepared by Richard W. Gibney dated March 24, 2006 and authorize the Chairperson to
endorse the site plans with the following conditions:
1. The site plan approval requires that all work proposed on the site plan shall be
completed within three (3) years from the date of this resolution.
2. Prior to the request for the Certificate of Occupancy, the owner or authorized
agent must request the said Building Inspector and the Planning Board to
perform an on-site inspection to find the site improvements are in conformity with
the approved amended site plan.
3. If the as-built site improvements vary from the approved amended site plan, the
Planning Board reserves the right to request a certified as-built site plan detailing
all the changes.
4. Any changes from the approved amended site plan shall require Planning Board
approval, and any such changes without Planning Board approval will be subject
to referral to the Town Attorney's Office for possible legal action.
The Planning Board will issue a final site plan approval in the form of a letter following a
site inspection and at the time the site improvements are found to be in conformance
with the approved site plan.
A copy of the approved amended site plan is enclosed for your records. As per the
Town Code, one copy each will be distributed to the Building Department and Town
Engineer/Highway Department.
If you have any questions regarding the above, please contact this office.
Very truly yours,
h:::~
Chairperson
Ene.
cc: File
South old Town Engineer
Southold Town Building Dept.
Suffolk County Dept. of Health Services
Suffolk County Planning Commission
New York State Dept. of Transportation
--:r
'--
KENNETH L. EDWARDS
MARTIN H. SIDOR
GEORGE D. SOLOMON
JOSEPH L. TOWNSEND
MAILING ADDRESS:
P.O. Box II 79
Southold, NY II971
"
PLANNING BOARD MEMBERS
JERILYN B. WOODHOUSE
Chair
OFFICE WCATION:
Town Hall Annex
54375 State Route 25
(cor. Main Rd. & Youngs Ave.)
Southold, NY
Telephone: 631765-1938
Fax: 631 765-3136
PLANNING BOARD OFFICE
TOWN OF SOUTHOLD
June 13, 2006
Lawrence C. Re
Munley, Meade, Nielsen & Re
36 North New York Avenue
Huntington, NY 11743
Re: Proposed Site Plan for Orient FD Telecom
Located on the slslo Main Road at the sle intersection of Main Road and Tabor
Road in Orient.
SCTM#1000-18-5-13.8 Zoning District: R-80
Dear Mr. Re:
The Southold Town Planning Board, at a meeting held on Monday, June12, 2006,
adopted the following resolutions:
The final public hearing was closed.
WHEREAS, the site plan is for the co-location of Nextel @ 85' height, Cingular @ 75'
height & Verizon @ 65' height on a proposed 90' communications flagpole tower with
firelpolice emergency communication mounted on a cross bar @ 90' height and
includes a 43'x46'x 6' high fenced enclosure on a 4.4-acre parcel in the R-80 Zone
located on the slslo Main Road at the sle intersection of Main Road and Tabor Road in
Orient. SCTM# 1000-18-5-13.8; and
WHEREAS, Orient Fire District is the owner of the property located on the slslo Main
Road at the sle intersection on Main Road and Tabor Road in Orient; and
WHEREAS, on March 31,2005, the South old Town Zoning Board of Appeals granted a
Variance described under Appeal Number 5408 allowing the construction of a 90 ft.
wireless communications flagpole and related equipment enclosure; and
WHEREAS, on November 9, 2005, the agent, Lawrence C. Re, working for New
Cingular Wireless PCS, LLC, submitted an amended formal site plan for approval; and
WHEREAS, on November 18, 2005, the New York State Department of Transportation
responded after review and determined a permit would not be necessary as long as all
work is out of the State ROW; and
i
Orient FD Telecom Project
Page Two
June 13, 2006
WHEREAS, on November 21, 2005, the Orient Fire District responded that no additional
requirements and/or recommendations for fire access are necessary; and
WHEREAS, on November 28, 2005, the Suffolk County Department of Planning
responded after review and determined this matter is for "local determination as there
appears to be no significant county-wide or inter-community impact(s)" and the Planning
Board accepts this pursuant to 239L & M General Municipal Law; and
WHEREAS, on December 1, 2005, the Architectural Review Committee reviewed the
architectural drawings and associated site plan materials and tabled the application
pending the receipt of further information; and
WHEREAS, on January 12, 2006, the Architectural Review Committee reviewed the
architectural drawings and associated site plan materials and made recommendations;
and
WHEREAS, on April 13, 2006, the Southold Town Zoning Board of Appeals, under
previous Appeal number 5408, granted a Variance described under Appeal Number
5863 allowing the relocation of the communications flagpole and related equipment
enclosure; and
WHEREAS, on April 13, 2006, the Southold Town Zoning Board of Appeals granted a
Variance described under Appeal Number 5805 for public utility antennas and
telecommunications use; and
WHEREAS, on May 30,2006, the South old Town Building Inspector reviewed and
certified the amended site plan for a "Wireless Communication Facility on an Existing
Telecommunications Tower" use; and
WHEREAS, on May 31,2006, the South old Town Engineer reviewed the amended site
plan materials regarding the relocation of the wireless communications tower and
related equipment enclosures and requested further information; and
WHEREAS, on June 1, 2006, the Architectural Review Committee reviewed the revised
architectural drawings and associated site plan materials and approved the application
subject to conditions, and, subject to their approval, the Planning Board incorporates
this recommendation in the site plan; and
WHEREAS, on June 12, 2006, the Southold Town Engineer reviewed the amended site
plan materials and approved the drainage of existing conditions along with the proposed
construction subject to comments/conditions and the Southold Town Planning Board
incorporates such comments /conditions as requirements in this approval; and
WHEREAS, the Southold Town Planning Board, pursuant to Chapter 58, Notice of
Public Hearing, has received affidavits that the applicant has complied with the
notification provisions; and
"
Orient FD Telecom Project
Page Three
June 13, 2006
WHEREAS, the following items shall be required:
1. All outdoor lighting shall be shielded so that the light source is not visible from
adjacent properties and roadways. Lighting fixtures shall focus and direct the
light in such a manner as to contain the light and glare within property
boundaries. The lighting must meet town code requirements.
2. All signs shall meet South old Town Zoning Codes and shall be subject to
approval of the Southold Town Building Inspector.
3. As per the landscape survivability guarantee, the applicant agrees to replace any
of the landscaping which dies within three (3) years of planting; be it therefore
RESOLVED that, on June 12,2006, the Southold Town Planning Board, acting under
the State Environmental Quality Review Act (6 NYCRR), Part 617.5 c (11&13), makes a
determination that the proposed action is a Type II and not subject to review; and be it
further
RESOLVED, that the Southold Town Planning Board has reviewed the proposed action
under the policies of the Town of Southold Local Waterfront Revitalization Program and
has determined that the action is consistent provided that the best management
practices outlined in the December 23, 2005 memo prepared by the LWRP Coordinator
are implemented; and be it further
RESOLVED, that pursuant to Southold Town Code 100-254 Part I, the applicant agrees
to incorporate all the requirements, comments, and recommendations of each reviewing
agency as referenced above and as indicated on the site plan and corresponding
attachments; and be it further
RESOLVED, that the Southold Town Planning Board grant approval on the site plan
drawings T-1, A-1 & A-2 prepared by Michael Walker Design/Builder, LLC and certified
by Michael Walker, Architect dated December 6, 2004 and last revised March 6, 2006
and authorize the Chairperson to endorse the site plans with the following conditions:
1. The site plan approval requires that all work proposed on the site plan shall be
completed within three (3) years from the date of this resolution.
2. Prior to the request for the Certificate of Occupancy, the owner or authorized
agent must request the said Building Inspector and the Planning Board to
perform an on-site inspection to find the site improvements are in conformity with
the approved amended site plan.
3. If the as-built site improvements vary from the approved amended site plan, the
Planning Board reserves the right to request a certified as-built site plan detailing
all the changes.
,
Orient FD Telecom Project
Page Four
June 13,2006
4. Any changes from the approved amended site plan shall require Planning Board
approval, and any such changes without Planning Board approval will be subject
to referral to the Town Attorney's Office for possible legal action.
The Planning Board will issue a final site plan approval in the form of a letter following a
site inspection and at the time the site improvements are found to be in conformance
with the approved site plan.
A copy of the approved amended site plan is enclosed for your records. As per the
Town Code, one copy each will be distributed to the Building Department, Zoning Board
of Appeals and Town Engineer/Highway Department.
If you have any questions regarding the above, please contact this office.
Very truly yours,
t::~
Chairperson
Ene.
cc: Southold Town Zoning Board of Appeals
Southold Town Building Department
Southold Town Engineer
Suffolk County Planning Department
New York State Department of Transportation
File
KENNETH L. EDWARDS
MARTIN H. SIDOR
GEORGE D. SOLOMON
JOSEPH L. TOWNSEND
MAIliNG ADDRESS:
P.O. Box 1179
Southold, NY 11971
PLANNING BOARD MEMBERS
JERILYN B. WOODHOUSE
Chair
OFFICE WCATION:
Town Hall Annex
54375 State Route 25
(cor. Main Rd. & Youngs Ave.)
Southold, NY
Telephone: 631 765-1938
Fax: 631 765-3136
June 13,2006
PLANNING BOARD OFFICE
TOWN OF SOUTHOLD
Mr. James V. DeLucca, RA
12 Linda Lane East
Riverhead, NY 11901
Re: Montauk Bus Service
Located approximately 417' slo Corporate Drive on the wlslo Commerce Drive in
Cutchogue.
SCTM# 1000-96-1-1.2 Zone: Light Industrial
Dear Mr. DeLucca:
The following resolution was adopted by the Southold Town Planning Board at a meeting held
on Monday, June 12,2006:
WHEREAS, this site plan proposes construction of a new 3,180 sq. ft. bus terminal building
with site build out that includes 19 employee parking spaces and 16 bus parking spaces on a
vacant 1.083-acre parcel in the LI Zone located approximately 417' slo Corporate Drive on the
wlslo Commerce Drive known as 115 Commerce Drive in Cutchogue. SCTM# 1000-96-1-1.2;
be it therefore
RESOLVED, that the Southold Town Planning Board, pursuant to Part 617, Article 6 of the
Environmental Conservation Law acting under the State Environmental Quality Review Act,
initiates the SEQR lead agency coordination process for this unlisted action.
If you have any questions regarding the above, please contact this office.
Very truly yours,
&.J~
erilyn B. Woodhouse
Chairperson
cc:
Southold Town Building Department
Southold Town Solid Waste District
Suffolk County Water Authority
Suffolk County Dept. of Public Works
File
Southold Town Engineer
Suffolk County Dept. of Health Services
Suffolk County Planning Department
KENNETH L. EDWARDS
MARTIN H. SIDOR
GEORGE D. SOLOMON
JOSEPH L. TOWNSEND
MAIliNG ADDRESS:
P.O. Box II 79
Southold, NY II97I
PLANNING BOARD MEMBERS
JERILYN B. WOODHOUSE
Chair
OFFICE WCATION:
Town Hall Annex
54375 State Route 25
(cor. Main Rd. & Youngs Ave.)
Southold, NY
Telephone: 631 765-1938
Fax: 631 765-3136
June 13, 2006
PLANNING BOARD OFFICE
TOWN OF SOUTHOLD
Mr. James V. DeLucca, R.A.
12 Linda Lane East
Riverhead, NY 11901
Re: Proposed Site Plan for M & R Developing
Located approximately 218' slo Corporate Drive on the wlslo Commerce Drive in Cutchogue.
SCTM#: 1000-96-1-1.8 Zone: Light Industrial District
Dear Mr. DeLucca:
The following resolution was adopted by the Southold Town Planning Board at a meeting held on
Monday, June 12,2006:
WHEREAS, this site plan is for construction of a new 7,600 sq. ft. light industrial building divided
into eight (8) separate units with six (6) units equaling 1,000 sq. ft. of area each and two (2) units
equaling 800 sq. ft. of area each, where site plan build out includes 24 parking spaces on a 40,000
sq. ft. vacant parcel in the LI Zone located approximately 218' slo Corporate Drive on the wlslo
Commerce Drive in Cutchogue. SCTM#1 000-96-1-1.8; be it therefore
RESOLVED, that the Southold Town Planning Board, pursuant to Part 617, Article 6 of the
Environmental Conservation Law acting under the State Environmental Quality Review Act,
initiates the SEQR lead agency coordination process for this unlisted action.
If you have any questions regarding the above, please contact this office.
Very truly yours,
~~~';.f1~4!'~<<---:><..-.
Jerilyn B. Woodhouse
Chairperson
cc:
Southold Town Building Department
South old Town Solid Waste District
Suffolk County Water Authority
Suffolk County Dept. of Public Works
File
Southold Town Engineer
Suffolk County Dept. of Health Services
Suffolk County Planning Department
KENNETH L. EDWARDS
MARTIN H. SIDOR
GEORGE D. SOLOMON
JOSEPH L. TOWNSEND
MAIUNG ADDRESS:
P.O. Box 1179
Southold, NY 11971
PLANNING BOARD MEMBERS
JERILYN B. WOODHOUSE
Chair
OFFICE WCATION:
Town Hall Annex
54375 State Route 25
(cor. Main Rd. & Youngs Ave.)
Southold, NY
Telephone: 631 765-1938
Fax: 631 765-3136
PLANNING BOARD OFFICE
TOWN OF SOUTH OLD
June 13, 2006
Mr. Ronald Hill
rlh Land Planning Services, Inc.
8595A Cox Lane
Cutchogue, NY 11935
Re: Proposed Site Plan for BCB Realty Holding Corp.
Located at 74825 Main Road in Greenport
SCTM#1000-45-4-8.3 Zone: B - General Business District
Dear Mr. Hill:
The following resolutions were adopted at a meeting of the Southold Town Planning
Board on Monday, June 12, 2006:
The final public hearing was closed.
WHEREAS, the proposed site plan involves the demolition of an existing restaurant
building, proposed new construction of two buildings that includes a building on the els
with 3,964 sq. ft. of first floor office space and a 3,706 sq. ft. second floor apartment
space with three apartments, and a building on the wls with 4,424 sq. ft. of commercial
bank space with drive-up teller service on a 1.41-acre parcel in the B Zone; and
WHEREAS, 74825 Main Road, LLC is the owner of the property located on the nlslo NYS
Road 25 approximately 259' wlo Moore's Lane known as 74825 Main Road in Greenport,
SCTM# 1000-45-4-8.3; and
WHEREAS, on April 19, 2005, the South old Town Building Department issued a Notice of
Disapproval on Form No.3 indicating: "The proposed construction and uses require site
plan approval from the South old Town Planning Board"; and
WHEREAS, on April 22, 2005, the Southold Town Building Department issued a second
Notice of Disapproval on Form NO.3 indicating: "The proposed construction is not
permitted pursuant to Article X, Section 100-103.C"; and "The proposed bank building is
noted as having 72.5 feet of linear frontage"; and "In addition, the proposed construction
and uses require site plan approval from the Southold Town Planning Board" ; and
WHEREAS, the agent, Ronald Hill of rlh Land Planning Services, Inc., submitted a formal
site plan for approval on June 2, 2005; and
BCB Realtv Holdinqs Corp
Paqe Two
June 13.2006
WHEREAS, on July 7,2005, the agent, Ronald Hill, submitted the light details and
information known as Attachment A for all the proposed site plan lighting, and the Planning
Board accepts this for approval; and
WHEREAS, on July 7,2005, the LWRP Coordinator reviewed the action for the
Southold Town Trustees and recommended that "the proposed action is generally
consisent with the Policy Standards and therefore is consistent with the LWRP provided
that the following outstanding items are submitted and standard best management
practice are implemented to further the intent of the LWRP Policies" and the following
water conservation measures were recommended:
1. Require that the setbacks set by the Board are to remain undisturbed in a natural
state into perpetuity.
2. Prior to any construction, the establishment of a hay bale line and silt fence
should be installed immediately landward of the setback line.
3. Where practical, the Board should require the installation of pervious parking
areas and gutters and leaders on each building leading into drywells; and
WHEREAS, on July 20,2005, the Southold Town Trustees issued a permit under the
provisions of Chapter 97 of the South old Town Code Wetland Ordinance under Permit
Number 6158 with conditions and such permit conditions are included in this approval; and
WHEREAS, on August 9,2005, the Southold Town Building Department issued a third
Notice of Disapproval on Form NO.3 indicating the following: "The proposed
construction is not permitted pursuant to Article X, Section 100-103.A&C", "Both
proposed buildings are noted as being +/- 75 feet from the right-of-way and the
proposed bank building has +/- 70 linear feet of frontage" and "In addition, the proposed
construction and uses require site plan approval from the Southold Town Planning
Board"; and
WHEREAS, on August 16, 2005, the Southold Town Building Department issued a
fourth Notice of Disapproval on Form NO.3 indicating the following: "The proposed
construction is not penmitted pursuant to Article X, Section 100-103.C", "The proposed
bank building has +/- 70 linear feet of frontage" and "In, addition, the proposed
construction and uses require site plan approval from the Southold Town Planning
Board"; and
WHEREAS, on August 18, 2005, the Architectural Review Committee reviewed the
architectural drawings and associated site plan materials and approved the application with
conditions that the signage and signage lighting be submitted for review and the Southold
Town Planning Board accepted the approval; and
WHEREAS, on September 1, 2005, the Southold Town Zoning Board of Appeals granted a
Variance described under Appeal Number 5739 as applied for; and
WHEREAS, on December 19, 2005, the Suffolk County Department of Planning
responded after a review and determined this matter is for "local determination as there
appears to be no significant county-wide or inter-community impact(s)" and the Planning
Board accepts this pursuant to 239L & M General Municipal Law; and
BCB Realtv Holdinas Corp
Paae Three
June 13. 2006
WHEREAS, on January 12, 2006, the Architectural Review Committee reviewed the
revised site plan materials and approved the application contingent upon reduction of
the height and width of the main street sign and the Southold Town Planning Board
accepted the approval; and
WHEREAS, on January 19, 2006, the Suffolk County Department of Health Services
issued a SPDES permit number 0254851 and reference number C10-05-0013 for the
proposed site plan build out; and
WHEREAS, on January 30, 2006, the New York State Department of Transportation
reviewed an application for a highway work permit and assigned case number 05-190P
pending submission of a revised site plan; and
WHEREAS, on February 6, 2006, Chief Volinski of the Greenport Fire Department
reviewed and approved the site plan dated May 10, 2005 and last revised February 25,
2006 and the Planning Board accepts this approval; and
WHEREAS, on February 14, 2006, the Southold Town Planning Board, acting under the
State Environmental Quality Review Act, pursuant to 6 NYCRR Part 617.7, performed a
coordinated review of this unlisted action and, as lead agency, made a determination of
non-significance and granted a Negative Declaration; and
WHEREAS, on March 1, 2006, the Architectural Review Committee reviewed the
revised sign detail materials and approved the complete application and the Southold
Town Planning Board accepted the approval; and
WHEREAS, on March 7, 2006, the New York State Department of Environmental
Conservation issued a "NOTICE OF NEED FOR A PERMIT" stating the review
conducted did not pickup the wetland boundary flagged on the most recent plan
submitted to this office; and
WHEREAS, on March 16, 2006, the Southold Town Engineer reviewed the site plan
materials and approved the proposed drainage with comments and the Planning Board
incorporates his recommendations in this site plan; and
WHEREAS, on April 20, 2006, the New York State Department of Environmental
Conservation issued a "Notice of Complete Application" for an applied permit Article 24
Freshwaters Wetlands"; and
WHEREAS, on April 25, 2006, the Southold Town Building Inspector reviewed and certified
the site plan for "Bank, Apartments and Office Building" use with reference to the ZBA
Appeal # 5739; and
WHEREAS, on May 8, 2006, the Southold Planning Board agreed to leave the hearing
open until June 12, 2006 pending receipt of the owner, agent and/or applicant executing
and filing with the Office of the County Clerk the Covenants and Restrictions as approved
by the Southold Town Planning Board and submission of a recorded copy to the Southold
Town Planning Department for the file with the addition of the non-disturbance open space
requirement of the west side of the property; and
BCB Realtv Holdinqs Corp
Paqe Four
June 13.2006
WHEREAS, on May 15, 2006, the New York State Department of Transportation
conditionally approved a Highway Work Permit under case number 05-190P and the
Southold Town Planning Board accepts this conditional approval; and
WHEREAS, on May 19, 2006, the Suffolk County Department of Health Services granted a
variance under reference number S1 0-060001 and the Southold Town Planning Board
accepts this variance; and
WHEREAS, on May 25, 2006, the New York State Department of Environmental
Conservation issued approval under Permit Number 1-4738-03563/00001 with 11
conditions and the South old Town Planning Board accepts this conditional approval;
and
WHEREAS, the Southold Town Planning Board, pursuant to Chapter 58, Notice of Public
Hearing, has received affidavits that the applicant has complied with the notification
provisions; and
WHEREAS, the following five items shall be required:
1. The owner agrees to be bound by all of the requirements of the executed Covenants
and Restrictions dated May 16, 2006 and filed with the Office of the County Clerk on
June 7, 2006 as approved by the Southold Town Planning Board.
2. All outdoor lighting shall be shielded so that the light source is not visible from
adjacent properties and roadways. Lighting fixtures shall focus and direct the light in
such a manner as to contain the light and glare within property boundaries. The
lighting must meet town code requirements.
3. The applicant must maintain a SPDES General Permit (NYR-10H057) for Storm
Water Discharges (General Permit Number GP-02-01) from the New York State
Department of Environmental Conservation for the construction activities.
4. All signs shall meet South old Town Zoning Codes and shall be subject to the
approval of the Southold Town Building Inspector and signage recommendations of
the Architectural Review Committee approval dated March 1, 2006.
5. Landscape survivability guarantee, the applicant agrees to replace any of the
landscape which dies within three years of planting; be it therefore
RESOLVED, that pursuant to South old Town Code 100-254 Part 1, the applicant agrees to
incorporate all the requirements, comments, and recommendations of each reviewing
agency as referenced above and as indicated on the site plan and corresponding
attachments; and be it further
RESOLVED, that the South old Town Planning Board has reviewed the proposed action
under the policies of the Town of South old Local Waterfront Revitalization Program and has
determined that the action is consistent provided that the best management practices
outlined in the July 7,2005 memo prepared by the LWRP Coordinator for the South old
Town Trustees; and be it further
BCB Realtv Holdinas Corp
Paae Five
June 13. 2006
RESOLVED, that the Southold Town Planning Board grant approval on the site plan
prepared by East End Drafting Associates, LLC. and certified by James J. Deerkoski, P.E.
dated January 3, 2005, and last revised February 25, 2006 including five pages (SP5,
SP5A, SW1 and the DOT SP1 of 2 and 2 of 2), and a set of architectural plans dated April
4, 2005 last revised August 20, 2005, including seven pages (A 1 - A7) and authorize the
Chairperson to endorse the final site plan with the following conditions:
1. The owner, agent and/or applicant shall receive approval from the Suffolk County
Department of Health Services for the approved construction and submit such
approval to the Southold Town Planning Department for review along with one
copy of the Suffolk County Clerk filed Covenant. If such approval varies from this
approved site plan, the Planning Board reserves the right to the review of a new
and site plan application.
2. The owner, agent and/or applicant shall comply all requirements of each
condition of the New York State Department of Environmental Conservation
approval Permit Number 1-4738-03563/00001 and submit to the Southold Town
Planning Department one copy of the Suffolk County Clerk filed Covenant for the
property as indicated in condition number 10 of the permit.
3. The owner, agent and/or applicant shall comply with all conditions of the New
York State Department of Transportation conditionally approved Highway Work
Permit under case number 05-190P prior to any construction on the site.
4. The site plan approval requires that all work proposed on the site plan shall be
completed within three (3) years from the date of this resolution.
5. Prior to the request for the Certificate of Occupancy, the owner or authorized agent
must request the said Building Inspector and the Planning Board to perform an on-
site inspection to find the site improvements are in conformity with the approved site
plan.
6. If the as-built site improvements vary from the approved site plan, the Planning
Board reserves the right to request a certified as-built site plan detailing all the
changes.
7. Any changes from the approved site plan shall require Planning Board approval, and
any such changes without Planning Board approval will be subject to referral to the
Town Attorney's Office for possible legal action.
8. The Planning Board will issue a final site plan approval in the form of a letter
following a site inspection and at the time the site improvements are found to be in
conformance with the approved site plan.
A copy of the approved site plan is enclosed for your records. As per the Town Code, one
copy each will be distributed to the Building Department, Zoning Board of Appeals, Town
Trustees and Town Engineer/Highway Department.
BCB Realty Holdinqs Corp.
Paqe Six
If you have any questions regarding the above, please contact this office.
Very truly yours,
~JL)~~
t.ferilyn B. ~oodhouse
Chairperson
enc.
cc: Southold Town Zoning Board of Appeals
Southold Town Building Department
Southold Town Board of Trustees
Southold Town Engineer
June 13. 2006
KENNETH L. EDWARDS
MARTIN H. SIDOR
GEORGE D. SOLOMON
JOSEPH L. TOWNSEND
MAlUNG ADDRESS:
P.O. Box 1179
Southold, NY 11971
OFFICE WCAll0N:
Town Hall Annex
54375 State Route 25
(cor. Main Rd. & Youngs Ave.)
Southold, NY
Telephone: 631 765-1938
Fax: 631 765-3136
PLANNING BOARD MEMBERS
JERILYN B. WOODHOUSE
Chair
PLANNING BOARD OFFICE
TOWN OF SOUTHOLD
June 13, 2006
Mr. Steve Fontana
CBD Group
29 Central Avenue
Hauppauge, NY 11788
Re: Proposed New Site Plan for Dr. Scott Sheren Medical Office
Located on the slslo Suffolk County Road 48, approximately 1,251' elo Youngs Avenue
in South old
SCTM #: 1000-55-5-10 Zoning District: General Business (B)
Dear Mr. Fontana:
The following resolution was adopted by the South old Town Planning Board at a meeting held on
Monday, June 12, 2006:
WHEREAS, this new site plan is for the proposed construction of a 2,940 square foot one-story
building for 2 medical offices that requires 15 parking spaces (20 proposed) on a vacant .49-
acre parcel in the General Business Zone located on the slslo Suffolk County Road 48,
approximately 1,251' elo Youngs Avenue in Southold. SCTM #1000-55-5-10; be it therefore
RESOLVED that the Southold Town Planning Board, acting under the State Environmental Quality
Review Act (6 NYCRR), Part 617.5 c (7), makes a determination that the proposed action is a Type
II and not subject to review.
If you have any questions regarding the above, please contact this office.
Very truly yours,
erilyn B. Woodhouse
Chairperson
cc: Southold Town Building Department
Southold Town Engineer
Mark Terry, LWRP Coordinator
Suffolk County Department of Public Works
Suffolk County Planning Commission
File
KENNETH L. EDWARDS
MARTIN H. SIDOR
GEORGE D. SOLOMON
JOSEPH L. TOWNSEND
MAIUNG ADDRESS:
P.O. Box 1179
Southold, NY 11971
PLANNING BOARD MEMBERS
JERILYN B. WOODHOUSE
Chair
OFFICE WCATION:
Town Hall Annex
54375 State Route 25
(cor. Main Rd. & Youngs Ave.)
Southold, NY
Telephone: 631 765-1938
Fax: 631 765-3136
PLANNING BOARD OFFICE
TOWN OF SOUTHOLD
AGENDA
June 12, 2006
6:00 p.m.
SETTING OF THE NEXT PLANNING BOARD MEETING
Board to set Monday, July 10, 2006 at 6:00 p.m. at the Southold Town Hall, Main
Road, Southold, as the time and place for the next regular Planning Board Meeting.
PUBLIC HEARINGS
6:00 p.m. . Malon Industries, Inc.: The site plan amendment includes parking
changes and a drive-up window for a bank on a 1.2356-acre parcel in the B Zone
located approximately 83.35' wlo Cox's Lane, on the nlslo NYS Road 25, known as
32845 NYS Road 25 in Cutchogue. SCTM#1000-97-5-4.5
6:05 p.m. - Osprey's Dominion Conservatory: This amended site plan is for the
proposed alteration and expansion of an existing 1,357 sq. ft. building and approved
conservatory building and dormer of 1,995 sq. ft. to include a 1,462 sq. ft. addition
which includes a site plan change in parking to 41 required spaces and 59 overflow
spaces provided on 4.46 acres in the AC Zone located on the nlslo New York State
Road 25 and 1,506' elo Peconic Lane known as 44075 Main Road in Peconic.
SCTM#(s) 1000-75-1-20.1 & 20.2
6:10 p.m. - Orient Fire District Tower: This site plan is for the co-location of Nextel @
85' height, Cingular @ 75' height & Verizon @ 65' height on a proposed 90'
communications flagpole tower with firelpolice emergency communication mounted on
a cross bar @ 90' height and includes a 43'x46'x 6' high fenced enclosure on a 4.4-acre
parcel in the R-80 Zone located on the slslo Main Road at the sle intersection of Main
Road and Tabor Road in Orient. SCTM# 1000-18-5-13.8
.
Southold Town Planning Board Agenda
Page Two
June 12, 2006
Hearings Held Over From Previous Meetings:
BCB Realtv HoldinQ Corp.: This site plan is for the demolition of an existing
restaurant building, new construction of two buildings that includes a building on the els
with 3,964 s.f. of first floor office space and a 3,706 s.f. second floor apartment space
with three apartments, and a building on the wls with 4,424 s.f. of commercial bank
space with drive-up teller service on a 1.41-acre parcel in the B Zone located on the
nlslo NYS Road 25 approximately 259' wlo Moore's Lane known as 74825 Main Road
in Greenport. SCTM# 1000-45-4-8.3
Charnews. Daniel: This proposal is to subdivide a 23.4004 acre parcel into two lots
where Lot 1 equals 3 acres and Lot 2 equals 20.4004 acres. The property is located on
the wlslo Youngs Avenue and the elslo Horton Lane, approximately 375' south of CR
48 in Southold. SCTM#1000-63-1-25
Baxter. Mark: This proposal is to subdivide a 6.7898-acre parcel into 2 lots where Lot
1 equals 4.4417 acres and Lot 2 equals 2.3841 acres. The property is located on the
nlslo Main Bayview Road, approximately 325' elo Smith Drive South, in Southold.
SCTM#'s100Q-78-7-5.375.4
CONSERVATION SUBDIVISIONS, STANDARD SUBDIVISIONS, RE-
SUBDIVISIONS (Lot Line Changes)
Final Determinations:
Grattan, Barbara: This proposal is to subdivide a 27.446-acre parcel into two lots
where Lot 1 equals 1.838 acres and Lot 2 equals 25.608 acres. The property is located
on the wlslo Depot Lane, 147' nlo School House Lane in Cutchogue. SCTM#102-1-9
Dubner. Steven: This proposal is for a clustered conservation subdivision to subdivide
a 53.77-acre parcel into five lots where Lot 1 equals 46.22 acres, Lot 2 equals 3 acres,
Lot 3 equals 1.5 acres, Lot 4 equals 1.3 acres and Lot 5 equals 1.7 acres in the A-C
Zoning District. The property is located on the slslo County Road 48 and the elslo
Cox's Lane, approximately 1320' wlo Bridge Lane in Cutchogue. SCTM#1000-84-4-6.1
Southold Town Planning Board Agenda
Page Three
June 12, 2006
Setting of Preliminary Hearings:
Old Orchard at CutchoQue: Proposal is to subdivide a 4.619-acre parcel into four lots,
where Lot 1 equals 67,913 s.f., Lot 2 equals 40,621 s.f., Lot 3 equals 40,082 s.f. and
Lot 4 equals 44,830 s.f. The property is located on the nlw of New Suffolk Road and
Cedars Road in Cutchogue. SCTM#1000-109-6-9.1
Conditional Sketch Determinations:
Brokaw, Bennett: This proposal is to subdivide a 4.997-acre parcel into two lots where
Lot 1 equals 80,000 sf and is currently improved with a single-family residence and
metal garage, and Lot 2 equals 137,665 sf, inclusive of the 5,200 sf flag strip. The
property is located on the slslo Bergen Avenue, approximately 1299' wlo Cox Neck
Road in Mattituck. SCTM#1 000-113-7-1.1
Conditional Sketch Extensions:
Old Orchard at CutchoQue - SCTM#1 000-1 09-6-9.1
Pawluczvk, Bertha (Estate oft: This proposal is to subdivide a 4. 193-acre parcel into
two lots where Lot 1 equals 40,000 sq.ft. and Lot 2 equals 142,667 sq.ft. The parcel is
located on the slslo CR 48 in Peconic. SCTM#1000-84-5-4
CONSERVATION SUBDIVISIONS, STANDARD SUBDIVISIONS, RE-
SUBDIVISIONS (Lot Line Changes) - STATE ENVIRONMENTAL
QUALITY REVIEW ACT
Lead Agency Coordination:
Brokaw, Bennett - SCTM#1000-113-7-1.1
Nickart Realtv: This proposal is to subdivide a 34,896 sq.ft. parcel into two lots where
Lot 1 equals 17,438 sq.ft. and Lot 2 equals 17,438 sq.ft. in the R-40 Zoning District.
The property is located on the slslo North Road, approximately 900' wlo Bayberry Lane
in Southold. SCTM#1000-52-2-13
South old Town Planning Board Agenda
Page Four
June 12, 2006
Verity. Michael: Proposal is to subdivide a 5.54-acre parcel into five (5) lots, where Lot
1 equals 21,454 square feet, Lot 2 equals 21,593 square feet, Lot 3 equals 25,081
square feet, exclusive of the flag strip, Lot 4 equals 20,477 square feet, exclusive of the
flag strip, and Lot 5 equals 146,285 square feet, inclusive of 71,581 square feet of
clustered open space. The property is located on the north side of Main Road and the
west side of Sound Road in East Marion. SCTM#1000-35-1-4
SITE PLANS
Set Hearings:
RWM Enterprises. Inc. (aka Colonial) - This amended site plan proposes to remove
one of the five existing buildings and rearrange the 23 existing parking spaces on a
121.355 sq. ft. parcel in the B Zone located on the slw corner of the intersection of
Route 25 and Locust Lane on the slslo Route 25 in Southold. SCTM# 1000-62-3-22.1
SITE PLANS. STATE ENVIRONMENTAL QUALITY REVIEW ACT
Type II Actions:
Sheren Medical Buildina: This new site plan is for the proposed construction of a
2,940 square foot one-story building for 2 medical offices that requires 15 parking
spaces (20 proposed) on a vacant .49-acre parcel in the General Business Zone
located on the slslo Suffolk County Road 48, approximately 1,251' elo Youngs Avenue
in Southold. SCTM #1000-55-5-10
Unlisted Coordinated Reviews:
M&R Developina: This site plan is for construction of a new 7,600 sq. ft. light industrial
building divided into eight (8) separate units with six (6) units equaling 1,000 sq. ft. of
area each and two (2) units equaling 800 sq. ft. of area each, where site plan build out
includes 24 parking spaces on a 40,000 sq. ft. vacant parcel in the LI Zone located
approximately 218' slo Corporate Drive on the wlslo Commerce Drive in Cutchogue.
SCTM#: 1000-96-1-1.8
Montauk Bus Service: This site plan proposes construction of a new 3,180 sq. ft bus
terminal building with site build out that includes 19 employee parking spaces and 16
bus parking spaces on a vacant 1.083-acre parcel in the LI Zone located approximately
417' slo Corporate Drive on the wlslo Commerce Drive known as 115 Commerce Drive
in Cutchogue. SCTM# 1000-96.-1-1.2
.
.
Southold Town Planning Board Agenda
Page Five
June 12, 2006
BOND DETERMINATIONS
Dubner. Steven: SCTM#1000-84-4-6.1
OTHER
Yield Map & Existing Resources and Site Analysis Plan (ERSAP)
Determination
Tall Pines at Paradise Point: This proposal is for a Standard Subdivision to subdivide
a 19.825-acre parcel into five lots where Lot 1 equals 40,571 s.f., Lot 2 equals 40,436
s.f., Lot 3 equals 40,337 s.f., Lot 4 equals 40,000 s.f. and Lot 5 equals 40,000 s.f. in the
R-80 Zoning District. The property is located on the wlslo Paradise Point Road
approximately 1,207' slo North Bayview Road in Southold. SCTM#1000-81-2-5
Veritv. Michael: SCTM#1000-35-1-4
KENNETH L. EDWARDS
MARTIN H. SIDOR
GEORGE D. SOLOMON
JOSEPH L. TOWNSEND
MAIliNG ADDRESS:
P.O. Box 1179
Southold, NY 11971
I
PLANNING BOARD MEMBERS
JERILYN B. WOODHOUSE
Chair
OFFICE LOCATION:
Town Hall Annex
54375 State Route 25
(cor. Main Rd. & Youngs Ave.)
Southold, NY
Telephone: 631 765-1938
Fax: 631 765-3136
June 13, 2006
PLANNING BOARD OFFICE
TOWN OF SOUTHOLD
Mr. Bennett Brokaw
P.O. Box 334
Westhampton Beach, NY 11978
Re: Proposed Standard Subdivision of Bennett Brokaw
The property is located on the south side of Bergen Avenue, approximately 1299 feet
west of Cox Neck Road in Mattituck.
SCTM#1000-113-7-1.1 Zoning District: A-C
Dear Mr. Brokaw:
The South old Town Planning Board adopted the following resolutions at a meeting held on
Monday, June 12, 2006:
WHEREAS, this proposal is to subdivide a 4.997-acre parcel into two lots where Lot 1 equals
80,000 square feet and is currently improved with a single-family residence and metal garage,
and Lot 2 equals 137,665 square feet, inclusive of the 5,200 sq.ft. flag strip; and
WHEREAS, an application and fee for sketch approval was submitted on May 18, 2006; and
WHEREAS, the South old Town Planning Board reviewed the proposal at their work session on
May 30, 2006; be it therefore
RESOLVED, that the Southold Town Planning Board start the SEQRA lead agency
coordination process for this unlisted action; and be it further
RESOLVED, that South old Town Planning Board finds that the survey prepared by Joseph A.
Ingegno, L.S. dated September 3, 1999 and last revised May 3, 2006 satisfies the yield map
requirement pursuant to Section A 106-11 (B) of the South old Town Code; and be it further
RESOLVED, that the Southold Town Planning Board finds that the information shown on the
survey satisfies the Existing Resources and Site Analysis Plan (ERSAP) requirement pursuant
to Section A 106-11 (A) of the South old Town Code; and be it further
RESOLVED, that the Southold Town Planning Board finds that the proposal for two (2) lots is
not subject to the affordable housing provisions pursuant to Section A106-11(B)(1)(c) of the
Southold Town Code; and be it further
RESOLVED, that the South old Town Planning Board hereby grant Sketch Approval upon the
map prepared by Joseph A. Ingegno, L.S. dated September 3, 1999 and last revised May 3,
2006, subject to the following conditions:
.
Mr. Bennett Brokaw
Page Two
June 13, 2006
1. Submission of the application and fee for Preliminary Plat Approval.
2. Submission of the preliminary map, containing the following revisions:
a. The title of the map shall read "Standard Subdivision for the Property of
Bennett Brokaw."
b. The building envelopes must be shown for each lot based on the bulk
schedule requirements for the A-C Zoning District.
c. The line that delineates the grass area on Lot 1 should be of a different type
as to distinguish it from a property line.
d. Show the water main in Bergen Avenue.
3. Submission of draft Covenants and Restrictions containing the following clauses:
a. Access to Lot 2 shall be from a private driveway within the 20'-wide flag strip
shown on the approved subdivision map.
b. Future residents of the lots on the approved subdivision map are advised that
the lots are subject to the noise, dust and odors normally associated with
agricultural activities pursuant to Article XXII, Farmland Bill of Rights, of the
Southold Town Code.
c. No further subdivision of any of the lots on the approved subdivision map in
perpetuity.
d. No changes to any of the lot lines without Planning Board approval.
e. All stormwater runoff resulting from the development of any or all of the lots
on the subdivision map shall be retained on site and shall be the
responsibility of each property owner.
f. Prior to any construction activity on Lot 2 , the project will require a General
Permit for the storm water runoff from construction activity (GP-02-01)
administered by the New York State Department of Environmental
Conservation under Phase II State Pollutant Discharge Elimination System.
4. Submission of a letter of water availability from the Suffolk County Water Authority.
5. LWRP Review by the Town of Southold.
6. Submission of the Park and Playground Fee in the amount of $7,000.
Please be advised that additional restrictive covenants and/or map changes may be
required based on comments received from other regulatory agencies or Town
Departments.
Sketch plan approval is conditioned upon the submission of the preliminary maps within six
months of the date of sketch plan approval, unless an extension of time is requested by the
applicant and granted by the Planning Board. Upon submission of a completed preliminary
application, the Planning Board will set the preliminary public hearing for the project.
If you have any questions regarding the above, please contact this office.
Very truly yours,
~4-
t!erilyn B. Woodhouse
Chairperson
KENNETH L. EDWARDS
MARTIN H. SIDOR
GEORGE D. SOLOMON
JOSEPH L. TOWNSEND
MAIliNG ADDRESS:
P.O. Box 1179
Southold, NY 11971
,
PLANNING BOARD MEMBERS
JERILYN B. WOODHOUSE
Chair
OFFICE WCATION:
Town Hall Annex
54375 State Route 25
(cor. Main Rd. & Youngs Ave.)
Southold, NY
Telephone: 631 765-1938
Fax: 631 765-3136
PLANNING BOARD OFFICE
TOWN OF SOUTHOLD
June 13, 2006
Michael Verity
P.O. Box 476
Greenport, NY 11944
Re: Proposed Standard Subdivision for the Property of Michael Verity
The property is located on the north side of Main Road and the west side of
Sound Road in East Marion.
SCTM#1000-35-1-4 Zoning: R-40
Dear Mr. Verity:
The South old Town Planning Board, at a meeting held on Monday June 12, 2006,
adopted the following resolutions:
WHEREAS this proposal is to subdivide a 5.54-acre parcel into five (5) lots, where Lot 1
equals 21,454 square feet, Lot 2 equals 21,593 square feet, Lot 3 equals 25,081 square
feet, excluding the flag strip, Lot 4 equals 20,477 square feet, excluding the flag strip,
and Lot 5 equals 146,285 square feet, inclusive of 71 ,581 square feet of clustered open
space; and
WHEREAS, an application for sketch approval was submitted on April 26, 2006 and
included the submission of a Yield Plan and Existing Resources and Site Analysis Plan
(ERSAP); and
WHEREAS, the South old Town Planning Board reviewed the submission at their work
session on May 8, 2006 and accepted the Yield Map prepared by David H. Fox, L.S.
dated October 18, 2005 depicting a total offive (5) lots; and
WHEREAS, the Southold Town Planning Board did not accept the ERSAP at their work
session on May 8, 2006 and requested that the map be revised to conform to the
requirements pursuant to Section A106-11(A) of the South old Town Code; and
WHEREAS, on June 8, 2006, the applicant submitted a revised ERSAP prepared by
David H. Fox, L.S. dated October 18, 2005 and last revised on May 16, 2006; be it
therefore
RESOLVED, that the Southold Town Planning Board start the SEQRA lead agency
coordination process for this unlisted action; and be it further
Michael Verity
Page Two
June 13, 2006
RESOLVED, that the Southold Town Planning hereby accepts the Yield Map prepared
by David H. Fox, L.S. dated October 18, 2005 and the ERSAP prepared by David H.
Fox, L.S. dated October 18, 2005 and last revised on May 16, 2006.
If you have any questions regarding the above, please contact this office.
Very truly yours,
AS (/</~
Jerilyn B. Woodhouse
Chairperson
~
KENNETH L. EDWARDS
MARTIN H. SIDOR
GEORGE D. SOLOMON
JOSEPH L. TOWNSEND
MAIUNG ADDRESS:
P.O. Box 1179
Southold, NY 11971
OFFICE WCAll0N:
Town Hall Annex
54375 State Route 25
(cor. Main Rd. & Youngs Ave.)
Southold, NY
;
PLANNING BOARD MEMBERS
JERILYN B. WOODHOUSE
Chair
Telephone: 631 765-1938
Fax: 631 765-3136
PLANNING BOARD OFFICE
TOWN OF SOUTHOLD
June 13, 2006
William C. Goggins Esq.
P.O. Box 65
Mattituck, NY 11952
Re: Proposed Standard Subdivision of Tall Pines at Paradise Point
The property is located on the wlslo Paradise Point Road, approximately 1207'
slo North Bayview Road in Southold.
SCTM#1000-B1-2-5 Zoning: R-BO
Dear Mr. Goggins:
The Southold Town Planning Board, at a meeting held on Monday June 12, 2006,
adopted the following resolution:
WHEREAS this proposal is for a Standard Subdivision to subdivide a 19.B25-acre
parcel into five lots where Lot 1 equals 40,571 s.f., Lot 2 equals 40,436 s.f., Lot 3 equals
40,337 s.f., Lot 4 equals 40,000 s.f. and Lot 5 equals 40,000 s.f. in the R-BO Zoning
District.; and
WHEREAS, an application for sketch approval was submitted on January 30, 2006 and
included the submission of a Yield Plan and Existing Resources and Site Analysis Plan
(ERSAP); and
WHEREAS, the Planning Board reviewed the Yield Map and the Existing Resources
and Site Analysis Plan (ERSAP) at several work sessions after the initial submission
and required that the maps be revised to conform to the requirements of Sections A 106-
11 (A) and (B) of the Town Code; and
WHEREAS, on March 13, 2006, the applicant submitted a revised Yield Plan prepared
by Joseph A. Ingegno, L.S. dated December 2B, 2001 and last revised on April 13,
2006, depicting a total of six (6) lots; and
WHEREAS, on March 13, 2006, the applicant submitted a revised Existing Resources
and Site Analysis Plan prepared by Howard W. Young, L.S. dated December 21,2005
and last revised on January 27,2006; and
.
Tall Pines at Paradise Point
Page Two
June 13, 2006
WHEREAS, the Southold Town Planning Board reviewed the revised Yield Map and
ERSAP at their work session on May 8, 2006 and determined that the maps conform to
the requirements pursuant to Sections A 106-11 (A) and (B) of the Town Code; be it
therefore
RESOLVED, that the Southold Town Planning hereby accepts the Yield Map prepared
by Joseph A. Ingegno, L.S. dated December 28, 2001 and last revised on April 13, 2006
and the ERSAP prepared by Howard W. Young, L.S. dated December 21,2005 and last
revised on January 27,2006
If you have any questions regarding the above, please contact this office.
Very truly yours,
~house
Chairperson
KENNETH L. EDWARDS
MARTIN H. SIDOR
GEORGE D. SOLqMON
JOSEPH L. TOWNSEND
MAIliNG ADDRESS:
P.O. Box 1179
Southold, NY 11971
OFFICE WCATION:
Town Hall Annex
54375 State Route 25
(cor. Main Rd. & Youngs Ave.)
South old, NY
PLANNING BOARD MEMBERS
JERILYN B. WOODHOUSE
Chair
Telephone: 631 765-1938
Fax: 631 765-3136
PLANNING BOARD OFFICE
TOWN OF SOUTH OLD
June 13, 2006
Abigail Wickham, Esq.
Wickham, Bressler, Gordon & Geasa, P.C.
13015 Main Road, P.O. Box 1424
Matlituck, NY 11952
Re: Proposed Clustered Standard Subdivision of the Estate of Bertha Pawluczyk
Located on the south side of CR 48 (Middle Road) in Peconic
SCTM#1000-84-5-4 Zoning District: A-C
Dear Ms. Wickham:
The following resolution was adopted at a meeting of the Southold Town Planning
Board on Monday, June 12,2006:
WHEREAS, this proposal is to subdivide a 4.193-acre parcel into two lots where Lot 1
equals 40,000 sq.ft. and Lot 2 equals 142,667 sq.ft.; and
WHEREAS, the Southold Town Planning Board granted sketch plan approval on the
maps, dated as revised March 13,2004 on June 14, 2004; and
WHEREAS, the applicant has requested an extension of time in order to obtain Health
Department approval and meet the conditions of sketch approval; therefore, be it
RESOLVED, that the Planning Board grant an extension of time for sketch plan
approval effective from June 14,2006 until December 14, 2006.
If you have any questions regarding the above, please contact this office.
Very truly yours,
~~~
Jerilyn B. Woodhouse
Chairperson
KENNETH L. EDWARDS
MARTIN H. SIDOR
GEORGE D. SOLOMON
JOSEPH L. TOWNSEND
MAILING ADDRESS:
P.O. Box 1179
Southold, NY 11971
PLANNING BOARD MEMBERS
JERILYN B. WOODHOUSE
Chair
OFFICE WCATION:
Town Hall Annex
54375 State Route 25
(cor. Main Rd. & Youngs Ave.)
Southold, NY
Telephone: 631 765-1938
Fax: 631 765-3136
PLANNING BOARD OFFICE
TOWN OF SOUTHOLD
June 13, 2006
Patricia C. Moore, Esq.
51020 NYS Route 25
Southold, NY 11971
Re: Proposed Standard Subdivision of Nickart Realty
The property is located on the south side of North Road, approximately 900 feet
west of Bayberry Lane in Southold.
SCTM#1000-52-2-13 Zoning: R-40
Dear Ms Moore:
The Southold Town Planning Board, at a meeting held on Monday June 12, 2006,
adopted the following resolution:
WHEREAS, this proposal is to subdivide a 34,896 sq.ft. parcel into two lots where Lot 1
equals 17,438 sq.ft. and Lot 2 equals 17,438 sq.ft. in the R-40 Zoning District.; and
WHEREAS, an application for sketch approval was submitted on May 11, 2006; be it
therefore
RESOLVED, that the Southold Town Planning Board start the SEQR lead agency
coordination process for this unlisted action.
if you have any questions regarding the above, please contact this office.
Very truly yours,
~use
Chairperson
KENNETH L. EDWARDS
MARTIN H. SIDOR
GEORGE D. SOLOMON
JOSEPH L. TOWNSEND
MAlUNG ADDRESS:
P.O. Box 1179
Southold, NY 11971
PLANNING BOARD MEMBERS
JERILYN B. WOODHOUSE
Chair
OFFICE WCAll0N:
Town Hall Annex
54375 State Route 25
(cor. Main Rd. & Youngs Ave.)
Southold, NY
Telephone: 631 765-1938
Fax: 631 765-3136
PLANNING BOARD OFFICE
TOWN OF SOUTHOLD
June 13, 2006
Patricia C. Moore, Esq.
51020 Main Road
Southold, NY 11971
Re: Proposed Standard Subdivision of Daniel and Stephanie Charnews
Located on the wlslo Youngs Avenue and the elslo Horton Lane in South old
SCTM#1000-63-1-25 Zoning District: R-80
Dear Ms. Moore:
The following resolution was adopted at a meeting of the Southold Town Planning
Board on Monday, June 12, 2006:
BE IT RESOLVED, that the Southold Town Planning Board hereby holds open the
public hearing for the Charnews Subdivision.
The next regularly scheduled Planning Board Meeting will be held on July 10, 2006 at
6:00 p.m.
If you have any questions regarding the above, please contact this office.
Very truly yours,
. 4-u/~
:.Jerilyn B. Woodhouse
Chairperson
cc: Kieran Corcoran, Ass't. Town Attorney
KENNETH L. EDWARDS
MARTIN H. SIDOR
GEORGE D. SOLOMON
JOSEPH L. TOWNSEND
MAIUNG ADDRESS:
P.O. Box II 79
Southold, NY II971
OFFICE WCATION:
Town Hall Annex
54375 State Route 25
(cor. Main Rd. & Youngs Ave.)
Southold, NY
Telephone: 631 765-1938
Fax: 631 765-3136
PLANNING BOARD MEMBERS
JERILYN B. WOODHOUSE
Chair
PLANNING BOARD OFFICE
TOWN OF SOUTHOLD
June 13, 2006
Mr. Mark Baxter
5805 Main Bayview Road
Southold, NY 11971
Re: Proposed Standard Subdivision of Mark Baxter
Located n/o Main Bayview Road, 325' e/o Smith Drive South, in Southold
SCTM#1000-78-7-5.3 and 5.4 Zoning District: R-40
Dear Mr. Baxter:
The following resolution was adopted at a meeting of the Southold Town Planning
Board on Monday, June 12, 2006:
BE IT RESOLVED that the Southold Town Planning Board hereby holds open the public
hearing for the Baxter Subdivision.
The next regularly scheduled Planning Board Meeting will be held on July 10, 2006 at
6:00 p.m.
If you have any questions regarding the above, please contact this office.
Very truly yours,
~~~
Chairperson
cc: Town Board of Trustees
,
KENNETH L. EDWARDS
MARTIN H. SIDOR
GEORGE D. SOLOMON
JOSEPH L. TOWNSEND
MAII.JNG ADDRESS:
P.O. Box 1179
Southold, NY 11971
/
PLANNING BOARD MEMBERS
JERILYN B. WOODHOUSE
Chair
OFFICE WCATION:
Town Hall Annex
54375 State Route 25
(cor. Main Rd. & Youngs Ave.)
Southold, NY
Telephone: 631765-1938
Fax: 631 765-3136
PLANNING BOARD OFFICE
TOWN OF SOUTHOLD
June 13, 2006
Ms. Marian Sumner
Peconic Land Trust
P.O. Box 1776
Southampton, NY 11969
Re: Proposed Clustered Conservation Subdivision for Steven Dubner
Located on the slslo County Road 48 and the elslo Cox's Lane, approximately
1,320' west of Bridge Lane, in Cutchogue
SCTM#s1 000-84-4-6. 1 Zone A-C
Dear Ms. Sumner:
The following resolutions were adopted at a meeting of the Southold Town Planning
Board on Monday, June 12, 2006:
WHEREAS, this proposal is for a clustered conservation subdivision to subdivide a
53.77-acre parcel into five lots where Lot 1 equals 46.22 acres, upon which the
development rights have been sold to the Town of Southold, Lot 2 equals 3 acres, Lot 3
equals 1.5 acres, Lot 4 equals 1.3 acres and Lot 5 equals 1.7 acres in the A-C Zoning
District; and
WHEREAS, on September 13, 2004, the Southold Town Planning Board granted
conditional sketch approval upon the map prepared by John C. Ehlers, LS dated as last
revised September 5, 2003; and
WHEREAS, on June 13,2005, the Southold Town Planning Board granted conditional
final approval upon the map prepared by John C. Ehlers, LS, dated as last revised May
24,2005; and
WHEREAS, on November 16, 2005, the applicant submitted copies of the recorded
Declaration of Covenants and Restrictions and the Road and Maintenance Agreement;
and
WHEREAS, on April 12, 2006, the applicant paid the park and recreation fee in the
amount of $10,500; and
Steven Dubner Subdivision
Page Two
June 13, 2006
WHEREAS, the applicant has requested that the Town of Southold accept the
Certificate of Deposit #5200009277 in the amount of $34,185, in lieu of an Irrevocable
Letter of Credit, pursuant to Section A 1 06-39(A)(1) of the Town Code; and
WHEREAS, on June 9, 2006, the applicant submitted five (5) mylars and eight (8) paper
prints of the final plat prepared by John C. Ehlers, L.S. dated July 7, 2003 and last
revised on October 6, 2005, each containing the Health Department stamp of approval;
be it therefore
RESOLVED, that the Southold Town Planning Board finds that all of the conditions of
conditional final approval have been satisfied by the applicant; and be it further
RESOLVED, that the Southold Town Planning Board accepts the Certificate of Deposit
#5200009277 in the amount of $34,185 and recommends same to the Town Board; and
be it further
RESOLVED, that the Southold Town Planning Board grant Final Plat Approval upon
the map prepared by John C. Ehlers, L.S. dated July 7,2003 and last revised on
October 6, 2005, and authorize the Chairperson to endorse the final maps, after the
Town Board accepts the Certificate of Deposit by formal resolution.
Upon endorsement by the Chairperson, the mylar maps must be picked up at this office
and filed in the Office of the Suffolk County Clerk. Any plat not so filed or recorded
within sixty-two (62) days of the date of final approval shall become null and void.
If you have any questions regarding the above, please contact this office.
Very truly yours,
~~~
Jerilyn B. Woodhouse
Chairperson
enc: map
cc: Assessors w/enc.
Building Department w/enc.
Land Preservation w/enc.
.
KENNETH L. EDWARDS
MARTIN H. SIDOR
GEORGE D. SOLOMON
JOSEPH L. TOWNSEND
MAIliNG ADDRESS:
P.O. Box 1179
Southold. NY 11971
OFFICE LOCATION:
Town Hall Annex
54375 State Route 25
(cor. Main Rd. & Youngs Ave.)
Southold. NY
I
PLANNING BOARD MEMBERS
JERlLYN B. WOODHOUSE
Chair
Telephone: 631765-1938
Fax: 631 765-3136
June 13, 2006
PLANNING BOARD OFFICE
TOWN OF SOUTHOLD
Ms. Patricia Moore, Esq.
51020 NYS Route 25
Southold, NY 11971
Re: Proposed Standard Subdivision of Barbara Grattan
located on the w/s/o Depot Lane, 147' n/o School House Lane in Cutchogue.
SCTM#1 000-1 02-1-9 Zoning: R-80
Dear Ms. Moore:
The Southold Town Planning Board, at a meeting held on Monday June 12,2006,
adopted the following resolution:
WHEREAS, this proposal is to subdivide a 27.446-acre parcel into two lots where Lot 1
equals 1.838 acres and Lot 2 equals 25.608 acres; and
WHEREAS, on March 13,2006, the Southold Town Planning Board granted Conditional
Preliminary Plat Approval upon the map prepared by Joseph A. Ingegno, L.S. dated
December 4, 2000 and last revised on June 18, 2004; and
WHEREAS, on May 11, 2006, the applicant submitted the final application and fee in
addition to the park and recreation fee; and
WHEREAS, on May 23, 2006, the applicant submitted three additional paper prints of
the final map containing the Suffolk County Department of Health Services stamp of
approval; and
WHEREAS, on May 23, 2006, the applicant submitted a copy of the recorded
Declaration of Covenants and Restrictions; be it therefore
RESOLVED, that the Southold Town Planning Board finds that all of the conditions of
Preliminary Plat Approval have been satisfied; and be it further
RESOLVED, that the Southold Town Planning Board finds that the final map is in
substantial agreement with the approved preliminary map and therefore waives the final
public hearing for this project; and be it further
RESOLVED, that the Southold Town Planning Board hereby grants Final Plat
Approval on the map prepared by Joseph A. Ingegno, L.S. dated December 4, 2000
and last revised on June 18, 2004, and authorizes the Chair to endorse the maps.
.
Barbara Grattan Subdivision
Page Two
June 13, 2006
Upon endorsement by the Chairperson, the mylar maps and paper prints must be
picked up at this office and filed in the Office of the Suffolk County Clerk within sixty-two
(62) days of the date of final approval. If the maps are not filed within this timeframe,
the subdivision shall become null and void.
If you have any questions regarding the above, please contact this office.
Very truly yours,
~house
Chairperson
enc: map
cc: Assessors w/enc.
Building Department w/enc.
Land Preservation w/enc.
KENNETH L. EDWARDS
MARTIN H. SIDOR
GEORGE D. SOLOMON
JOSEPH L. TOWNSEND
MAIUNG ADDRESS:
P.O. Box 1179
SouthoId, NY 11971
PLANNING BOARD MEMBERS
JERILYN B. WOODHOUSE
Chair
OFFICE WCATION:
Town Hall Annex
54375 State Route 25
(cor. Main Rd. & Youngs Ave.)
SouthoId, NY
Telephone: 631 765-1938
Fax: 631 765-3136
PLANNING BOARD OFFICE
TOWN OF SOUTHOLD
June 13, 2006
Mr. Jeffrey Butler P.E.
P.O. Box 634
Shoreham, NY 11786
RE: Standard Subdivision of Old Orchard at Cutchogue
The property is located on the n/w corner of New Suffolk Road and Cedars Road
in Cutchogue.
SCTM#1 000-1 09-06-9.1 Zone: R-40
Dear Mr. Butler:
The South old Town Planning Board, at a meeting held on Monday, June 12, 2006,
adopted the following resolutions:
WHEREAS, this proposal is to subdivide a 4.619-acre parcel into four lots, where Lot 1
equals 67,913 s.f. s.f. Lot 2 equals 40,621 s.f., Lot 3 equals 40,082 s.f. and Lot 4 equals
44,830 s.f.; and
WHEREAS, an application for sketch approval was submitted on November 20, 2001
but remained inactive during the Town's moratorium; and
WHEREAS, the applicant resubmitted a sketch plan on June 20, 2005 and the Existing
Resource Site Analysis Plan (ERSAP) on September 23, 2005; and
WHEREAS, on December 12, 2005, the Southold Town Planning Board granted
conditional sketch approval upon the map, prepared by Jeffrey Butler, P.E, dated last
revised October 14, 2005; and
WHEREAS, in a letter dated May 22, 2006, the applicant requested an extension of
time for conditional sketch approval, which is set to expire on June 12, 2006; and
WHEREAS, an application and fee for preliminary plat approval was submitted on May
30,2006; and
Old Orchard at Cutchogue
Page Two
June 13, 2006
WHEREAS, the Planning Board reviewed the preliminary map prepared by Jeffrey
Butler, P.E, dated last revised May 24, 2006, and the revised draft Covenants and
Restrictions at their work session on June 5, 2006; be it therefore
RESOLVED, that the Southold Town Planning Board hereby approves the extension of
time request for sketch approval, effective from June 12,2006 until December 12,2006;
and be it further
RESOLVED, that the South old Town Planning Board set Monday July 10, 2006 at 6:00
p.m. for a preliminary public hearing on the maps prepared by Jeffrey Butler, P.E, dated
last revised May 24, 2006.
Please refer to the enclosed copy of Chapter 58, Notice of Public Hearing, in regard to
the Town's notification procedure. The notification form is enclosed for your use. The
sign and the post will need to be picked up at the Planning Board Office, Southold Town
Annex. Please return the enclosed Affidavit of Posting along with the certified
mailing receipts AND the signed green return receipt cards before 12:00 noon on
Fridav Julv 7th. The siQn and the post need to be returned to the Planning Board
Office after the public hearing.
If you have any questions regarding the above, please contact this office.
Very truly yours,
~~~
Jerilyn B. Woodhouse
Chairperson