REPORT OF MEETING
June 24, 1998
June 23, 1998
DATE OF REPORT
Fisher's Island
DATE OF FIELD WORK
lOCATION
Justice Louisa Evans
Michael Horne
Company
Harold's, Inc.
Harold's, Inc.
Town of Southold
Diversified Technology Consultants
Name
Harold Cook
Keith Beardslee
ATTENDEES
Maintenance Review for Fisher's IslllI1d Sewer District! Wastewater facilities
98-067-200
I
1f
~c:? .<<'~
SU BJ ECT
PROJECT NAME I PROJECT NUMBER
1.
PUMP STATION
A. A temporary trash pump is being utilized to pump wastewater.
B. A spare Peabody Barnes Model 4X5034A pump is available at the pump station.
C. It appears that due to high flows, the station has surcharged to within 5 feet of the top
of the concrete i.e. elevation +7.
D. Harold plans to install the spare pump first and keep the trash pump for back up until
the two pumps that failed are repaired.
E. He will remove both faulty pumps and send them to WISE, Inc. for repair.
F. He estimated 10 days to get on-line with the first pump.
G. The town approved emergency repairs- Harold contacted the WISE Co.
H. The generator started and ran for 15 minutes successfully.
*NOTE: No load was placed on it.
CONCLUSION: Repair pump station. After repairs, I will inspect and pump test the station. Estimated
to be on line with one pump in 10 days.
2.
COMMUNITY LEACHING FIELD
. Keith and the writer inspected the system.
DIVERSifiED TECHNOLOGY CONSULTANTS
556 WASHINGTON AVENUE NORTH HAVEN CT 05413 2032394200 2032347376 FAX
.
~
----I----
~
.
LAND
ENGINEERED
STRUCTURES
SOLUTIONS
WATER
REPORT OF MEETING
A. The West side manhole of the influent distribution has about 3" to 5" of sludge in it and
needs to be cleaned. No flow can be observed in the West tank inlet. .If a hose is used,
keep the flow minimized to avoid suspending solids in the septic tank and damaging
the leaching field.
B. The distribution chamber was observed. The flow out of it is unequal. This is the flow
distribution to the leaching trenches. We developed a low cost alternative for this
correction. Adjustable plates should be fabricated and bolted to the existing V-notch
weirs. Harold should give an estimate for this work.
c. All 28 leaching chamber inspection manholes were located, opened and inspected.
Depths ofliquid were determined in the ones with wastewater in them.
. The following were observed:
Number seauence is from Whistler Avenue.
. Chamber No. l West: Dry Both Ends
. Chamber No 2. West: 1 Foot of Liquid Both Ends
. Chamber No. 3 West: Full to Bottom of Concrete (which is several feet from the
surface)
. Chamber No. 4 West: 1 Foot of Liquid
. Chamber No. 1 Center West: Dry Both Ends
. Chamber No.2 Center West: 2 Feet Deep Both Ends
. Chamber No.3 Center West: Dry Both Ends
. Chamber No. 1 Center East: Dry Both Ends
. Chamber No.2 Center East: Dry Both Ends
. Chamber No.3 Center East: Dry Both Ends
. Chamber No. 1 East: Dry Both Ends
. Chamber No.2 East: 2 Feet Deep, High Flow into it
. Chamber No.3 East: Dry Both Ends
. Chamber No.4 East: Dry Both Ends
TOTAL: 14 SETS OF GALLEYS
-1 Full (#3 West)
-(2) 1 Foot Deep (#1 and #4 West)
-(2) 2 Feet Deep (#2 CenterlWest) (#2 East)
-9 Dry Galleys
DIVERSIFIED TECHNOLOGY CONSULTANTS
556 WASHINGTON AVENUE NORTH HAVEN cr 06473 2032394200 203234 7376 FAX
.
~
~
~
.
LAND
ENGINEERED
STRUCTURES
SOLUflONS
WATER
REPORT OF MEETING
CONCLUSION: The system is not overloaded in total. The West side is taking too much of the flow.
Keith should check chamber #3 west once in a while to determine if the liquid rises. Meanwhile, adjust
the flow away from the West side to alleviate this condition.
SOLUTION: Provide simple distribution adjustment. Fabricate (3) 1/8" thick stainless steel V-notch
weirs and install. Harold to provide an estimate of time and materials.
WHAT NEEDS TO BE DONE:
I. Maintain the plugged manhole by removing sludge or washing and snaking the system.
2. Mow after summer season
3. Plug holes in covers if necessary during late summer if odors are evident.
4. Monitor Chamber No.3
5. Modify the flow distribution to flow East
3.
STORMW ATER FROM FOX LANE
. Four catch basins are connected to the storm sewer which empties into the sanitary.
Temporary plugging should be evaluated. We must assure stormwater does not flood
anything near Fox Lane.
4.
POTENTIAL SYSTEM LEAKS
. Check the manhole near GADA's old building to make sure that the sound waves have
not reopened the brick and mortar bulkhead allowing seawater to enter the system from
the abandoned outfall.
. We attempted to inspect the manhole at the end of Fox Lane near the shore. This
manhole could not be found.
5.
PUMP STATION FOLLOW UP:
. After the pumps are installed, the writer will test the pump station.
.:. This is the first part of the maintenance and operation review project.
pc:
Harold Cook, Harold's Construction Co., Fisher's Island wi Enclosure
Justice Louisa.Evans, Fisher's Island wi Enclosure
Michael Casey wi Enclosure
S:\911067\200\ReportofMccting\062498.doc
DIVERSIFIED TECHNOLOGY CONSULTANTS
556 WASHINGTON AVENUE NORTH HAVEN CT 06473 2032394200 203234 7376 FAX
.
piP'
12. OUTfALL
(PLUGGED)
r~' .
,,' ? '\ '.. ,':-V.rL c.J/k.
,/ ~'\ 7rR-+N;VAlL
/'
.Y-, :,~ ,,~~,'
_ _': \ '. \ " C
, ,
;'LV;':"":;" ,'.:J,: _.\ S",,;{jJI '\
, _ 'v -B~\ " \,
,.,,- -, ~,',~"V\ 0' '
__ .....) v_ ...-:'~_:; -- . \
,'- '- '
,\
---- -
GRp.,\j\IY
SEwER
'S
1(
"
,
,
,
,.j'
.: j
- "
...
,
r:ORCE
------
--
SClIOOL
RENTAL
\lOUSE
""
. '
,
~,
')\
I
/:~
/"'~
COMMUNITY
SYSTEM
" '
"
,-~~~
"~,,--- _,,/O"""-~ ,-
" -.;;..::..-- --
, -=::--..
.-::;//
--
\~..
-s-'"
<.-
.~
---.....:::---
''<''''>,
"\ -~on:-~~ < <,
rvr',J"q ~
". !,,/'Dr/O"" .~
, ~, ,
'.
'>,\
.'~
~
" "'0-;
,,:. --.::-::::'", ..,>/
,~~",::-~~-'~/' --~/'-'
,_, ,.,. ,i"""~ . .",______-- ,