March 12, 2002
Mr. Fred Vaupel, Project Manager
KeySpan Corporation
117 Doctors Path
Riverhead, N. Y. 11901
Re: Temporary Substation at Mattituck - Request for Site Plan Waiver
Sound Avenue, Mattituck
SCTM: 1000-121-5-1.1 Zone: R-80
Dear Mr. Vaupel:
The following resolution was adopted by the Southold Town Planning Board at a
meeting held on March 11,2002:
WHEREAS, KeySpan Energy, acting as an agent for LIPA, is planning to construct a
temporary electric substation at the above location, which will be leased from the Suffolk
County Water Authority for a period not exceeding nine months commencing June,
2002; and
WHEREAS, the temporary transformer will sit approximately 16 ft. above grade and will
be installed on pre-cast concrete beams, enclosed by a 60 ft. by 60 ft. fenced area
spread with Dolomite. The fence will be 7 ft. height standard chain link, with a 1ft.
barbed wire extension along the top for security purposes; and
WHEREAS, temporary poles will be installed along the access and egress easements
to allow electrical power to transition from the LIPA power infrastructure to the
temporary substation transformers via overhead distribution feeders; and
WHEREAS, upon completion of the new Jamesport substation in December, 2002, this
temporary substation will be disconnected from service, removed, and the temporary
site completely restored; and
KeySpan Mattituck Substation - Paqe Two - 3/12/02
WHEREAS, the long range plan includes complete removal of the old Mattituck
substation on the south side of Middle Road (Route 48), east of Cox Neck Road, in the
year 2004, and KeySpan/LIPA agreed, in a letter dated February 6, 2002, to remove all
structures, equipment, and buildings and will not use the Mattituck site to store
equipment, material and or vehicles and that the site will be restored to a state that will
be aesthetically pleasing to the surrounding community; and
WHEREAS, due to the temporary nature of the equipment and the footings for the
proposed Sound Avenue substation, KeySpan/LIPA has requested the Town of
Southold to grant a site plan waiver, and
WHEREAS, KeySpan/LIPA has submitted a plan, elevation drawings, and details on
surveys received on January 30, 2002 describing the temporary substation installation,
and
WHEREAS, the Town of Southold recognizes the critical nature of the need to provide
adequate and uninterrupted electrical power during the temporary transmission
conversion period by using substations to distribute power loads; and
WHEREAS, any violation of the conditions of this resolution may be grounds for
rescinding this waiver; be it therefore
RESOLVED, that the Southold Town Planning Board grant a waiver of site plan
requirements.
Please contact this office if you have any questions regarding the above.
Very truly yours,
Bennett Oriowski, Jr.
Chairman
CC:
Building Dept
Zoning Board of Appeals
Director of Code Enforcement
L,NJREL LAKE
s~
o.
~OT,C~ ~ COUNTY OF SUFFOLK (~)
J .,.,,,~,~,~t~;~ J ~ Red Property Tax Service Agency
SECTION NO
121
LIP^
Long Island Power Authority
117 Ooctors Path
Riverhead, NY 11901
February 6, 2002
Mr. Bennett Orlowski
Chairman, Planning Board
Town Hall, Main St.
Southold, NY 11971
Subject: Temporary Substation Installation at Mattituck
Dear Mr. Orlowski,
This letter is in response to additional clarification requested by the Southold Planning Department
subsequent to your review of LIPA's request for Site Plan waiver for the Temporary Mattituck substation.
With regard to the removal of the Old Mattituck substation located on the East Side of Main Street, east of
Cox Neck Lane, Mattituck NY, LIPA's plan includes the following:
· Energize Temporary Mattituck in the June/July 2002 time frame.
· Construct new Jamesport substation and energize from existing 69 kV line on Middle Road/Sound
Ave. in December 2002 contingent upon site plan approval from the Town of Riverhead.
· Remove and restore Temporary Mattituck no later than March 2003.
· Convert 23-69 kV from Riverhead - Jamesport in the 2002/2003 time frame contingent upon a line
routing agreement with the Town of Riverhead.
· Convert 23/69 kV between Jamesport and Southold in 2004 contingent upon a line routing agreement
with the Town of Southold.
· Subsequent to converting the 23 kV infrastructure between Jamesport and Southold, completely
remove the Old Mattituck substation.
· Remove all structures, equipment and buildings.
· LIPA has not yet made a decision regarding their long-range plans for this property.
· LIPA has no intention of using this site to store equipment, material and or vehicles.
LIPA has demonstrated its commitment and concem to the Southold community by partnering with them
for an amenable resolution regarding the 23/69 kV transmission conversion effort. Please be assured that
LIPA will work with the Town to ensure that subsequent to the removal of the Old Mattituck substation,
the property is restored to a state that will be aesthetically pleasing to the surrounding conmnunity.
Please don't hesitate to contact me should you have any additional concerns regarding this very important
Pro¸
T&D
KeySpan Energy
Cc: M. Hervey, LIPA
V. L'Eplattenier, Town of Southold
8outhoid Town
P/arming Board
IPA
Long Island Power Authority
117 Doctors Path
Riverhead, NY 11901
January 29, 2002
Mr. Bennett Orlowski
Chairman, Planning Board
Town Hall, Main St.
Southold, NY 11971
Subject: Temporary Substation Installation at Mattituck
Dear Mr. Orlowski,
This letter is in response to additional information requested by the Southold Planning Department
subsequent to your review of LIPA's request for Site Plan waiver for the Temporary Mattituck substation.
LIPA, is planning to construct a temporary 6 MVA, 69-13 kV substation off Sound Ave. in Mattituck,
NY in the June/July 2002 timeframe. The plan includes installation ora 69-13 kV transformer bank
and associated equipment on Suffolk County Water Authority property, located on Sound Ave., west
of the existing Mattituck substation (P/O Lot 1.1, Dist. 1000; Sect. 121; Blk 05). Please refer to our
survey, file No. SO-84 submitted with the site plan waiver request. The single 6 MVA transformer
will be connected to temporarily supply two (2) Mattituck distribution circuits during the construction
ofanewtwo(2) 14MVA, 69-13 kV substation in JamesportNY. Subsequent to its scheduled
December 2002 completion and in-service, the temporary substation at Mattituck will be disconnected
from service, removed and the temporary site completely restored.
The temporary transformer will sit approximately 16' above grade and will be installed on pre-cast
concrete beams. Dolomite will be spread throughout the enclosed 60'X60' fenced portion of leased
property (owned by Suffolk County Water Authority). The fence will be 7' height standard chain link
with a 1' barbed wire extension along the top (typical substation design standard). A temporary pole
line will be installed along ingress and egress easements to transition LIPA's 69 kV infrastructure from
Sound Ave. to the temporary transformer bank and install an overhead distribution feeder from the
temporary transformer bank to LIPA's 13 kV infrastructure along Sound Ave. Please refer to Sketch
No: Temp-Matt-1 included with the site plan waiver request for location of temporary poles.
Three poles will be installed inside the substation fence to house the associated substation equipment.
A 50', class 1 pole direct embedded 7' in the ground will be installed on the south side of the
substation property for the 69 kV take off structure and associated 1200A air break switch. A 30',
class 2 pole direct will embedded 5' in the ground will be installed to house the potential transformer
and fused disconnect. A 35', class 2 pole direct embedded 5'-6" will be installed on the north side of
the substation to house the 15 kV, 600A air circuit recloser.
Due to the temporary nature of this equipment and the fact that poured footings/foundations will not be
installed, we've requested the Town of Southold to grant LIPA a site plan waiver for this project.
The long-range plan also includes the complete removal of the old Mattituck substation on the East Side of
Main Street, east of Cox Neck Lane, Mattituck NY in the 2004 time frame.
For your convenience, included is an elevation drawing which, depicts and confirms the transformer bank
installation and associated equipment dimensions identified in this letter.
Please contact me at (631 ) 548-7060 at your earliest convenience to review the above information and
answer and or clarify any additional questions you may have.
Thank
r your cooperation and continued support on this very important project.
T&D
KeySpan Energy )
Cc: M. Hervey, LIPA
H. Dully, KeySpan Energy Real Estate
V. L'Eplattenier, Town of Southold
LIP^
Long I.land Power Au~holtty
117 Doctors Path
Riverhead, NY 11901
January 16, 2002
Mr. Bennett Orlowski
Chairman, Planning Board
Town Hall, Main St.
Southold, NY 11971
JAN g g 2 2
Subject: Temporary Substation Installation at Mattituck
Dear Mr. Orlowski,
KeySpan Energy, acting as an agent for LIPA, is planning to construct a temporary 6 MVA, 69-13 kV
substation off Sound Ave. in Mattituck, NY in the June/July 2002 timeframe. The plan includes
installation of a 69-13 kV transformer bank and associated equipment on Suffolk County Water Authority
property, located on Sound Ave., west of the existing Mattituck substation (P/O Lot 1.1, Dist. 1000; Sect.
121; Blk 05). The single 6 MVA transformer will be connected to temporarily supply two (2) Mattituck
distribution circuits during the construction of a new t~vo (2) 14 MVA, 69-13 kV substation in Jamesport
NY. Subsequent to its scheduled December 2002 completion and in-service, the temporary substation at
Mattituck will be disconnected from service and removed.
The temporary transformer and associated equipment will be installed on pre-cast concrete beams.
Dolomite will be spread throughout the enclosed 60'X60' fenced portion of leased property (owned by
Suffolk County Water Authority). A temporary pole line will be installed along ingress and egress
easements to transition LIPA's 69 kV infrastructure from Sound Ave. to the temporary transformer bank
and install an overhead distribution feeder from the temporary transformer bank to LIPA's 13 kV
infrastructure along Sound Ave.
Due to the temporary nature of this equipment and the fact that poured footings/foundations will not be
installed, we're requesting the Town of Southold to grant LIPA a site plan waiver for this project.
Consistent ~vith the Township's guidelines for site plan review, we request a pre-submission conference
with a member of your Planning Board staff to review our plans in greater detail and receive direction as to
how we proceed.
Prior to meeting, we ask that a member of the Planning Board provide a checklist of what information will
be required by your Department in order to make a fully informed and expeditious decision.
Please contact me at (631) 548-7060 at your earliest convenience to review the above request and schedule
a meeting to review our plans. For your records, enclosed with this letter is my business card.
Than/k4zal4 in advance for your consideration and I look forward to working with you on this very
impo/rtant 13i'oj ect.
Fr4
eroj~t Manage/~ N
T&D Project Ma)agf~ment
KeySpan Energy ~
Cc: M. Hervey, LIPA
H. Duffy, KeySpan Energy Real Estate
R. Kassner, Town of Southold
'LIPA
Long I~land Power Authority
117 Doctors Path
Riverhead, NY 11901
January 16, 2002
Mr. Bennett Orlowski
Cha/rrnan, Planning Board
Town Hall, Main St.
Southold, NY l 1971
JAN
Subject: Temporary Substation Installation at Mattituck
Dear Mr. Orlowski, - + r
KeySpan Energy, acting as an agent for LIPA, is planning to construct a temporary 6 MVA, 69-13 kV
substation off Sound Ave. in Mattituck, NY in the June/July 2002 timeframe. The plan includes
installation ora 69-13 kV transformer bank and associated equipment on Suffolk County Water Authority
property, located on Sound Ave., west of the existing Mattituck substation (P/O Lot 1.1, Dist. 1000; Sect.
121; Blk 05). The single 6 MVA transformer will be connected to temporarily supply two (2) Mattituck
distribution circuits during the construction ora new two (2) 14 MVA, 69-13 kV substation in Jamesport
NY. Subsequent to its scheduled December 2002 completion and in-service, the temporary substation at
Mattituck will be disconnected from service and removed.
The temporary transformer and associated equipment will be installed on pre-cast concrete beams.
Dolomite will be spread throughout the enclosed 60'X60' fenced portion of leased property (owned by
Suffolk County Water Authority). A temporary pole line will be installed along ingress and egress
easements to transition LIPA's 69 kV infrastructure from Sound Ave. to the temporary transformer bank
and install an overhead distribution feeder fi'om the temporary transformer bank to LIPA's 13 kV
infrastructure along Sound Ave.
Due to the temporary nature of th/s equipment and the fact that poured footings/foundations will not be
installed, we're requesting the Town of Southold to grant LIPA a site plan waiver for this project.
Consistent with the Township's guidelines for site plan review, we request a pre-submission conference
with a member of your Planning Board staff to review our plans in greater detail and receive direction as to
how we proceed.
Prior to meeting, we ask that a member of the Planning Board provide a checklist of what information will
be required by your Department in order to make a fully informed and expeditious decision.
Please contact me at (63 I) 548-7060 at your earliest convenience to review the above request and schedule
a meeting to review our plans. For your records, enclosed with this letter is my business card.
in advance for your consideration and I look forward to working with you on this very
KeySpan Energy J
Cc: M. Hervey, LIPA
H. Duffy, KeySpan Energy Real Estate
R. Kassner, Town of Southold
I I
/~ 7 ,~/=.
r i
/ f,.o ._s,=
,a-fa/,,,/ h,O~ D
F£B O0 ~
Southold Town
lR!anning B~tar~
AM D. MOORE ESQ
"ATRICIA C. MOORE ESQ
=ROFESSIONAL OFFICE/BUSINESS OFFICE
51020 MAIN RD. SOUTHOLD NEW YO,RK
CHORNO ASSOCIATES
irchitect-, pl.nners, interior deIign
(~UAKERTOWN. PENNSYLVANIA
DATE:FEB.