Loading...
HomeMy WebLinkAbout300 Latham Ln Key, Span Energy 448 East Main Street Patchogue, NY 11727 Received $ 194.00 ELIZABETH A. NEVILLE, TOWN CLERK Town of Southold Southold, New York 11971 Phone: 631-765-1800 RECEIPT #152 1 - Permits on 01/08/2002. Thank you. FileNo. ./602./ IS c!L/ TOWN OF SOUTHOLD HIGHWAY DEPARTMENT Peconic Lane Peconic, New York 11958 (631) 765-3140 Permit No. APPLlCATIONIPERMIT FOR ffiGHW AY EXCAVATION AND REPAIR Ref.#T100117760 APPLICATION IS HEREBY made to the Superintendent of Highways of the Town of Southold for tbe issuance of an Excavation Permit pursuant to Chapter 83 urthe Code ortbe Town of South old, Suffolk County, New Yor~ and other applicable laws, ordinances or regulations for the excavation herein described. The applicant agrees to comply with all applicable laws, ordinances, codes and regulations, and to permit authorized inspectors to make necessary inspections of the job site. Print or Tvoe 1) KEYSPAN ENERGY - GAS CONSTR. DEPT. -175 E. OLD COUNTRY RD. - HICKSVILLE. NY 11801 Name of Applicant Address 2) Mr. William Arnold - 300 Latham La. - Orient Point Name of Owner of Premises Address 3) ODen & restore a bell hole on the sls erass area. a trench east for 180' in the sls SlTass area. missile across the road to the w/s l!rass area then trench north for 250' in the w/s Slrass area & missile a I!as DiDe under the road to a new house. Work Description and Location (Street Number, Hamlet, Cross Street) (a) Is construction located within 75 feet of tidal wetlands? *Yes No *lfyes, other Town permits may be required. 4) Builder's License No. Plumber's License No. Electrician's License No. Other Trade's License No. ~-;:- . 9<3v~ ~ Sign of ppli nt 01-03-02 Date a) Attach plot plan showing location of proposed excavation and relationship to adjoining premises or public streets or areas, and giving a detailed description of layout of excavation. 5) b) Attach all other necessary permits and licenses for this project. c) Work covered by this application may not commence before issuance of a Highway Excavation Permit by the Town Clerk. 6) Tax Map: Section ,Block ,Lot 7) Starting Date: Completion Date: 8) Work Schednle: Phase Comoletion Date Excavation........................................... .............................. Facility Installation. .......................................................... .... Backfill & Compaction......................................................... Pavement Replacement......................................................... 9) Under which authority is the application made: 10) Estimated Cost of Proposed Work: $ 11) Remarks: Page 1 of3 D-39 T100117760 12) Insurance Coverage: (Attach Copy) a) Insurance Company: b) Policy# c) State whether policy of certification on file with the Highway Department: d) Coverage required extended to the Town: Bodily injury and property damage: $300,000/$500,000 Bodily Injury, and $50,000 property damage. 13) Security: a) b) Surety Bond of$ Maintenance Bonded provided: or Certified Check provided in the total amount 2 years or 3 years 14) Fees for aoolications and oenruts: Basic AODlication Fee.............. ... $25.00 AI. ~Service Connections excavations@$20.00=$ 40.00 No. A2. _/Additional Excavations same service@$10.00=$ No. B. Excavations 18" in depth or less: 0-100 1.f. ~ $10.00 I.f. @ $0. 10 ~ $ Additional C. Excavations 18" in depth to 5' in depth: 430' 0-100 I.f. ~ $30.00 330 I.f. @ $0.30 ~ $ 99.00 Additional D. Excavations 5' in depth and over: 0- I 00 I.f. ~ $50.00 I.f.@ $0.50 ~ $ Additional Utility Repair Excavations @ $1 0.00 ~ $ E. No. Repairs same service @ $5.00 ~ $ Additional F. Notice to public utilities proof must be provided and attached to this application prior to issuance of permit. . . . TOTAL COST $194.00 Authorization is hereby granted to the Town Clerk of the Town of Southold to issue a Highway Exca .on Permit to; KEYSPAN ENERGY DELIVERY in accordance with this application. Received by the TO~Clerk I - 7 - 0 OJ-.- ./- Date Permit Issued f 'fc{L.... Permit No. Note: Permit expires one (1) year from Date of Issuance. No work to start without 48 hour notice to the Superintendent of Highways. Permit must be available for inspection. ~E NDENTOFHIGHWAYS TO OF aD, N}7YO~ V~~ _ 'k.M..... /E7~,e. L-u. ,ij,ru:. e 'J" //,//D>- Date / ...j~ oV D-39 Page 2 of 3 (AX -02' 021WED' 15~5 . . .. I FQ.IlllA ERM ,NO, OPA~ON lI1iJJ ~. I I) I~ :~ f ~ IlCf I,.. I I BU GAS DESIGN PATCH ~S~516 7585136 KtY~AN/6.s". REQUEST FOR STREET OPENING PERMIT o STATE ~, ='Q~ D .NASSAU o . 5...1H"d' '"1".'....6 Wn: -" ... .... ... , ... \. -, ~ ~ ~ i'-: r I \~ ,y --f 1- ~, lI' I ~ 'l *'~ ~ j I'''~ ~ ~c;: ~ '" I ~ l>> ~. lP l> of- J " I 1 &" "" I " l: ~ 1_ ,;r. .!........3 P~-c. _ .... .... k- ~ ~ t. ~ ,.. ~ i,.!".i' , 'J~, ,. , J ' " : I'D' - -$1. ~.kd' '1-85' "'- t!.!..,SL VII Lillo ~L 1Tt.,iJ UiJl. 1~$'f',J./t