Loading...
HomeMy WebLinkAboutTR-6291 . . James F. King, President Town Hall Jill M. Doherty, Vice-President 53095 Route 25 Peggy A. Dickerson P.O. Box 1179 Southold, New York 11971-0959 Dave Bergen John Holzapfel Telephone (631) 765-1892 Fax (631) 765-6641 BOARD OF TOWN TRUSTEES TOWN OF SOUTHOLD YOU ARE REQUIRED TO CONTACT THE OFFICE OF THE BOARD OF TRUSTEES 72 HOURS PRIOR TO COMMENCEMENT OF THE WORK, TO MAKE AN APPOINTMENT FOR A PRE-CONSTRUCTION INSPECTION. FAILURE TO DO SO SHALL BE CONSIDERED A VIOLATION AND POSSIBLE REVOCATION OF THE PERMIT. INSPECTION SCHEDULE _ Pre-construction, hay bale line _ 1 sl day of construction - ~ constructed ./ Project complete, compliance inspection. Board Of Southold 'Town Trustees SOUTHOLD, NEW YORK PERMIT NO. ._. .c,~91... DATE: .!.:.~..:. .~.5.'....~gg6 ISSUED TO ....~~!.~~.."'~.~~.~~~~,.....................................__..... .................................. ............. i\utQurii!attutt ,. _"._n Punuant to the provisions of Chapter 616 of the Laws of the State of New Yor~, 1893i and Chapter 404 of the laws of the . State of New Y or~ 1962i and the Southold Town Ordinance en- titled..'REGULA liNG AND .THE.PLACING OF QBSJRUCI1Q~S IN AND ON TOWN WATERS AND PUBLIC lANDS and.the REMOVAL OF SAND, GRAVEL.OR OTHER MATERIAls...F-i-OM LANDS. UNDER TOWN - W A TERS;t'. and in accordance with' the Resolution of The Board adopted at a meeting held on .ouX~.!?~,...l:?..L 2006. d . 'd f f th f $ 250 00 - 'd b . ............. an In consl. era Ion 0 e sum 0 ................~............ pal Y .. .....I.'.~.~.~.!....~9:~ ~.:i:.~.~.............. ._. ... ............ .... ..... ......... ...............................................:..................... of ........._.........~.~.~.~.~E.~m.!.~J~~.4............................. N. y, and. subiect 10 the Terms and Conditions listed on the reverse slde hereof, of Southold Town' Trustees authorizes and permits the foUowing: Wetland Permit to construct a 4'XSO' wood pile and timber pier 1 with associated steps and tnstall' an S'X20' float, 3.5'X20' ram and tie-off pilings all waterward of the apparent high water lin and a&flepicted on the plan prepared by Docko, Inc. last dated all in accordance with the detailed specifications as presented in . the originating application, February 15, 2006. . . IN WITNESS WHEREOf, The said Board of Trustees here- by causes its Corpo~at~ S~al to be a~xed, and these t!esents to be subscn"bed by a malority of the said Board .as of t IS dat~. .. . . : . , TERMS and CONomQNS ne Penntuee Peter Baccile . .ddiDg at E~uestrian Ave., Fishers Island _ ....:". N. y..:~... tan. of dte coosidetatioo lor the iss.'''~ of <<he Peaolt docs ~ and {ltC$aU)e to the lot-- . ~: 1, 1:hat. tb.c said -Poatd of Trustees and the TQWIl of Southold ate rd~ -from my aod ~ damages, oc da1ms for .~ of suits .nsi.o&. cfuedly or taditedi, as a ~ of my ope:r. ~petfolmCdpunuaot:!(O:~...~t.~.!b,~ ~. ~~.~,,~.~otbct ~ ~. defend..any and all $UCb suit(inttl.tec1by tbltd,fatties, and the aid t>eanittee ~ full IiabU1t1 with m('<<t thereto. tq.tb~p1eteexdusiOQ of the. &ud of Trustte$ of the Town of ~. 2. That chis ~ h'.,Jid for . pedod of : 24, .P1OS. ~. Is ~ to be . estimated time. required to 'COmplete the 'WOrk iayolYCd, but - Should ~ wutaOt, ~.- lor m ~on may be made to the l).oud at a latu ~ . ~. lUat this Permit should be retained indef'toitdy, or as long as the said Pettnlttce ~ . to'maintain the structure o( ptQject involved, to provide evidence to anyone cnncemed that aUb- ~tion was ori8ioaUy obtained. - . . I 4. That the work involved will be subject to the io$pection aad apptanl of ihe Boud Ot Its ag-eots, and ooa.-compUance with the provisions of the odgUiatiog applicatioo, maybe cause tOt rcwcanon of this Pctmit by teSOl~tiOQ of the said Board. s. That there will be nouo.teasooable interference with navigadoo as a result of the wed: bm:in authorized, . . . 6, That tbete sha11 be M interference with the tight of :Chc public to pass and ~ tloag the beach between high . and. low water <<narks. . 7. That if lucure opentioos of the Town of South9ld require che.lUIlCm1 and/or alceradoas ia the JQcation. of -1bc 'ROCk betein-chodzed. or If, ia the opIaJoo. oi.. Boara of Tmstees, che . wodcshaU cause un.reasooable obsttudtOll to ftee oavig1doo, tho said PeImktee wilt be ~ upon due notice, to tuDO:VC or a1t~ &is wodc or project herein stated ~ apeases to the Town' - of $op(hold. . . ". . 8. That the Aid Boatd will be notirtcd by the Peaniuee ot the ~edoo.:OE the wotJc.1UCb- " orhed. . . . . 9. That the.Peunittee wiU dJtain all other permi1s and ~ti.6at ID&f be requhe4 . . pIemeotal to chis permit ~ may-be subject to revoIce apocl failure.. ofxahl amc. . - - .. . ., .. ., , . . James F. King, President Town Hall Jill M. Doherty, Vice-President 53095 Route 25 P.O. Box 1179 Peggy A. Dickerson Southold, New York 11971-0959 Dave Bergen John Holzapfel Telephone (631) 765-1892 Fax (631) 765-6641 BOARD OF TOWN TRUSTEES TOWN OF SOUTHOLD February 15, 2006 Mr. Keith Neilsen Docko, Inc. P.O. Box 421 Mystic, CT 06355 RE: PETER BACCILE EQUESTRIAN AVE., FISHERS ISLAND SCTM#9-3-11 Dear Mr. Neilsen: The Board of Town Trustees took the following action during its regular meeting held on February 15, 2006 regarding the above matter: WHEREAS, Docko, Inc. on behalf of PETER BACCILE applied to the Southold Town Trustees for a permit under the provisions of Chapter 97 of the Southold Town Code, the Wetland Ordinance of the Town of Southold, application dated October 26,2005, and, WHEREAS, said application was referred to the Southold Town Conservation Advisory Council and to the Local Waterfront Revitalization Program Coordinator for their findings and recommendations, and, WHEREAS, a Public Hearing was held by the Town Trustees with respect to said application on February 15, 2006, at which time all interested persons were given an opportunity to be heard, and, WHEREAS, the Board members have personally viewed and are familiar with the premises in question and the surrounding area, and, WHEREAS, the Board has considered all the testimony and documentation submitted concerning this application, and, 2 . e WHEHEAS, the structure complies with the standards set forth in Chapter 97 of the Southold Town Code, WHEREAS, the Board has determined that the project as proposed will not affect the health, safety and general welfare of the people of the town, NOW THEREFORE BE IT, RESOL VED, that the Board of Trustees approve the application of PETER BACCILE to construct a 4'X 80' wood pile and timber pier with associated steps and install an 8'X 20' float, :3.5'X 20' ramp and tie-off pilings all waterward of the apparent high water line, and as depicted on the plan prepared by Docko, Inc. last dated February 15, 2006. Permit to construct and complete project will expire two years from the date the permit is signed. Fees must be paid, if applicable, and permit issued within six months of the date of this notification. Inspections are required at a fee of $50.00 per inspection. (See attached schedule.) Fees: $50.00 Very ~rs'o< .t:f James F. King President, Board of Trustees JFKJlms . . James F. King, President Town Hall Jill M. Doherty, Vice-President 53095 Route 25 Peggy A. Dickerson P.O. Box 1179 Southold, New York 11971-0959 Dave Bergen John Holzapfel Telephone (631) 765-1892 Fax (631) 765-6641 BOARD OF TOWN TRUSTEES TOWN OF SOUTHOLD TO: r? .Q'7l/) tJncc( u Please be advised that your application dated 10 h. ft, /~ has been reviewed by this Board at the regular meeting of c2/t':S and the following action was taken: ~} Application Approved (see below) ~) Application Denied (see below) ~) Application Tabled (see below) If your application is approved as noted above, a permit fee is now due. Make check or money order payable to the Southold Town Trustees. The fee is computed below according to the schedule of rates as set forth in Chapter 97 of the Southold Town Code. The following fee must be paid within 90 days or re-application fees will be necessary. COMPUTATION OF PERMIT FEES: ~ FinaJ i ~Ctt.tY\ e~ r- ~ SD/OO - ~e U~~cl ~lllf") b~~C\ J.\ l'lIOltJ TOTAL. FEES DUE: $ SD,()JJ BY: .James F. King, President Board of Trustees . . .James F. King, President Town Hall Jill M. Doherty, Vice-President 53095 Route 25 Peggy A. Dickerson P.O. Box 1179 Southold, New York 11971-0959 Dave Bergen John Holzapfel Telephone (631) 765-1892 Fax (631) 765-6641 BOARD OF TOWN TRUSTEES TOWN OF SOUTHOLD Southold Town Board of Trustees Field Inspection/W orksession Report Date/Time: 2/1/ Db I I Name of Applicant: fe.M\ ~ e-\ \L Name of Agent: ~uJt"Z) ~v , Property Location: SCTM# & Street q- '3......-11 t: -1!- ~-I-\l'LV) ~ve. f~' - Brief Description of proposed action: ~ Lf xqs f ~ 'I~ cl--"~K <( 'L;~ I ~\b~+- --'~ 'J I Ra '3 . ':-, )to l") rvtp Type of area to be impacted: 1~ltwater Wetland Freshwater Wetland - Sound Front --,-Bay Front Distance of proposed work to edge of above: Part of Town Code proposed work falls under: . .t..JA1apt. 97 _ Chapt. 37 _ other Type of Application: ~ Wetland _Coastal Erosion _Amendment _Administrative _Emergency Info needed: - Modifications: ffif)'VL .:..l 0 t ~ (\t) r+~ 0+ ~+~~y' tn ~~ ~~~: = t l) ,.' I . . Z*.,~:.\ ({l:~ Conditions: Present Were: 0king 0.Doherty _P.Dickerson_D. Bergen_I.Holzapfel Other: - (\[) ceA [) (\ d. a..~ ~ . .. . , .,. .- f ' "~ "-,,..;.-~ .'., ..~~. ,w.;~~~ 'Ii' o. ..'. ~,. \'''' .' ... 4'" " . f , .. ).!'i: .~i'~ ..~'~; t~if/r'" -:.oa.:;; , i'J1 . ~,.(: <,,' - 1'~ ....~.. I "f/" t... "'''~~'' f. - '1 Il~. . ~." 'I" , ,u ~ ., -, ~ ',." ..~l " 'li' ~ ;J,.I' . ',., t '1.- . '. , " ~ ,f L- .. ... ;:" " ...~ : '" ~ It. 'I' ". '. . \ - ..... .. I -- '. - ....-,,- "..,"......._'~ ' . '~..~-'...._- . .~. ~~-. ,...." ~,""': "';",0" _ '-.:'\;... ~.,:.~ . .~.,'" - ~- , . I -."-f-i.~:--- ~-~" ~... ~ i " /- ~.<.:-.. # .. ;"':'. ..-' .;... .., '. ~. ',". . ~ .... ~,~- ,. ,.... "~ .. ".. ... ~. - , - .L.'~ "p~. -.... ...... -' "' ~. '-. " .~ ,,:~~-.,. '~f.;:.1. '. . ......,. ""r. * "~~~' " ~'f ,,11. .' "- ....p.:.. " : . . "';~/;':'" ..~. - .... " 4Y _ .. I..... ~ '.... " ~. ~". - ...... _'.~ '.' 'It. . . -~ .. t,.... ~ " ,. '.'.. . ..:., ....".1... / . . . . . / . . . I .... ~ '... ;,. . " -,. , ' , . .. ' , .....!, " " "" ,- . , ;. '. ,'C':' t- , "~i.> '. .'\. '.., -,.. ~ ~.... . ..\ '. It , .:.:' ., .... - . ". . . :.' :( .''-;'-:t . .~ . .~\: . '. . ""~'d'< , ' ., " , . . .'.", I""~~~-; ..' .c.. ':::'" . '. ,...- . . -:.. ~ ~ .::;. "'.~. :~;;,.: ~:( ~;1;. .' ,,~ : J;..;:~;,.,', o_~.. "'"",,_.;~ -.;!,;_ ,"" . ': j "'-.~, ' -., ~ ""~, . ..... " .. ~'- - feb 9 2006 Field Inspec. . ,..... -j~ u -:I :..4- ~ - ,. . feb 9 2006 Field Inspec. . . . Telephone Town Hall (631) 765-1892 53095 Route 25 P.O. Box 1179 Southard, New York 11971-0959 CONSERVATION ADVISORY COUNCIL TOWN OF SOUTHOLD At the meeting of the Southold Town Conservation Advisory Council held Wed., November 9, 2005, the following recommendation was made: PETER BACCILE to construct 95 If. of 4' wide fixed wood pile and timber pier and install an 8'X 20' float with ass.ociated 3.5'X 20' wood ramp and tie off pilings. Located: Equestrian Ave., Fishers Island. SCTM#9-3-11 The CAC did not make an inspection, therefore no recommendation was made. I . , ." l... ' ~..A_ _",..-_ ;._...... ~ '-"':1-'-" '...... ....:.- ~'--~...",,:'- __~_~CC,,:. _ ~, " 0.. . ~ # ...., - . ,G ' -c . _ _ ,,_", , ,,:~~;-~ --~-::::;=; - '. ---- -...-... .-- ~~ ~-.: ~~~::-:: :'::-::-"':-:::.' .;. . . . I , I . . ""'. -....-~..T.\_....:(.;O..&l ..... ~~., "'~;~~~ '''~'';' ~!". J:,~i ,;:.~~ -'1 i~~'~~I~"~ -:.~ ~ ,,,!.~'1:;' . ~~/I'""":~ ~;) .." ~-"'i"~ lor';'" , .. .~~' _.... tilt .. .... . , .,. , . ~'/.,,~ _ J ~\" ....-:~ .. ......;'. ~. \}"-:.. . i_I<. ~,,~~~. '.'C.iL~ ..~ ':'~:~1-~~. ! , /.' ".... '-\'-'';'-.'' , ._,-, '~Q~..... 1 "'~~7.....v,. "- ,-,.~.,.i .. ;it.;' .~~. ~ :'O_r".........-....... 1 h '.~ l- ,. U I ~. ~.~, " l / . ...1 ~ .---.:....-. .., I , , I i "- - --"~ =-~ -'-" ~ --, .:..::_-- ....0.-.""'1"_. ------ --. ";;;. .- -~ .-'- .. -- -. .. - -- ..- ',..., ---~ . . . . . TAX ASSESSOR'S MAP 009, SECTION 3, LOT 11 PROJECT: "NEW FIXED PIER & FLOAT" WATERWAY: BAY HARBOR LOCATION: FISHERS ISLAND, TOWN OF SOUmOLD SUFFOLK COUNTY, NEW YORK APPLICANT: PETER BACCILE DATE: OCTOBER 3,2005 r AGENT: DOCKO, INC. a - -1 , --- - ~'V c-;t$> - .,.. y HAY HARBOR 5 t.lAlc) ~ . ~ f -1II "oj , ~ I 2.1A -';:_1'1... 2 lAlcl ~... .', ~ ? .--~ - - ScnooIOl.trkll~ --sc.t-- lfydranlflllltrlctLInt --H-- UNlESS DRAWN Or~ER.ISE. 'Ll PROPERTI(S NOTICE .RE WITHIN 'HE F"Ol.LOWINC OtSTRICTS. fir, Dlslrlct Line --f'-- Ilet\l5I01.I'lctllnt --A-- SCHOOl . SEWER ..n --- MAINTENANCE, Al TERA HON, SALE OR 'al...- Ol.Idct lhl --'1-- llatClr'"lc:dDl.tdd L.... - HSf - - r., " HYDRANT OIS TRI8UTION Of ANY PORTION OF THE - L~'D1I'rklllnt --l-- ~.D1a1rk;tllnt--"'-- LJCHf .. ...'[A SlofFOlK COUNTY TAX MAP IS PROtI8IT[D PARr. A[f'USE 11 - Plll"~ DlSlr1c1 1.... --p-- 100'Uol...-lllllrlcll"--..-- .&l,t8Ul#J.K:( nST[wAl[A WITHOUT 'RHTEN P[RUlSSlON OF THE - S.....OIslrl.c;tllr>to --5-- ~"'l PR()P(Rrv TAX SERVICE "erNeY. \ . \ . I. ~ ! ~___r" LOCATION MAP \ ~~!---- .. -.... . PROJECT: "NEW FIXED PIER & FLOAT" I I 32 ~ ..' I It 0 . . 33 WATERWAY: HAYBARBOR I l.~ -' LOCATION: FISHERS ISLAND, TOWN OF SOUmOLD I.. . . I 1 SUFFOLK COUNTY, NEW YORK I I -----~-------------------- APPLICANT: PETER BACCILE I I , DATE: OCTOBER 3,1005 ! ! ------ &~" I----r---- 35 AGENT: DOCKO, lNC, . I i I , I Lig~t- . - I ........2 / _......-: I ~:. I ! I - - - I , :' I \W. I -. I - I I I I 0 I I ...... I .. ~ I I y,- I ,. I . . / I ,. I ---~-- I 0 I I .....,. ! to ~-- I . .--- ' I ~ 52 I .. I ,f. ;I,t ~ ",. '" f I ",./ 30 I I ".--- l I I -'L~ .. I I I /" - I I i ",. ~ I . " I ./ ... -~ , (---- , I " '-J ",. ~ , I ',~ ",. .. I , ",. liX '-. I ' . J/ '~ / '~.l- 23 . , I '1 . . , , "" , , , , , , , , , I , , ~\ , 31 . , , ~. , , , S 0 , , I, , , . - .' 45. , .- '. "; . I \ ! ..,~ i " @ . -~ .--..- - - r .. . .- . Docko. Inc~ - p.o. Box 421, Mystic, CT 06355 (860) 572-8939 Fax: (aeRh8~r72592U~i1: docko@snet.net , )1 I NYS DOS Department of Coastal Resources 41 State Street, 8th Floor Albany, NY 12231 Re: Peter Baccile, Fishers Island New Fixed Pier & Float To Whom It May Concern: On behalf of our client, we submit the attached Federal Consistency Assessment Form for a new fixed pier and float in Hay Harbor on Fishers Island, New York. We enclose herewith the following in support of this permit application: .:. Two prints each of plans titled: Project: "New Fixed Pier & Float" Waterway: Hay Harbor Location: Fishers Island, Town of Southold Suffolk County, New York Applicant: Peter Baccile Date: October 3, 2005 .:. Two copies of Corps of Engineers, NYS DEC and Town of Southold Application forms, Location Map, Tax Assessor's Map and NYS DOS Coastal Management Federal Consistency Assessment Forms. I trust that you will find this application package complete and acceptable: please let me know if the need for further information arises. Very truly yours, DOC 0 Keith B. Neilson, P.E. KBN:jm Enclosures CC: Peter Baccile NYS DEC: Regulatory Affairs Town of Southold: Krupski File: 05-03-1679 BACCILE i, COASTAL MANAGEMENT PROGRAM Federal Consistency Assessment Fonn An applicant, seeking a pennit, license, waiver, certification or similar type of approval from a federal agency which is subject to the New York State Coastal Management Program {CMP, shall complete this assessment fonn for any proposed activity that will occur within and/or directly affect the State's Coastal Area. This fonn is intended to assist an applicant in certifying that the proposed activity Is consistent with New York Stale's CMP as required by U.S. Department of Commerce regulations {15 CFR 930.57{. It should be compOleted at the time when the federal application is prepared. The Department of State will use the completed fonn and accompanying infonnation In its review ofthe applicant's certification of consistency. A. t~PPLlCANT 1. Name: PETER BACCILE -, Address: EQUESTRIAN A VENUE. FISHERS ISLAND. NEW YORK 06390 ,.. ~i. Telephone: Area Code (212) 622-4466 B. PROPOSED ACTIVITY Brief description of activity: CONSTRUCT 95 (+I-) LF OF 4-FOOT WIDE FIXED WOOD PILE AND TIMBER PIER AND INSTALL AN 8' X 20' FLOAT WITH ASSOCIATED 3.5' X 20' RAMP AND TIE-QFF PILINGS ALL WATERWARD OF THE APPARENT HIGH WATER LINE. Purpose of activity: THIS IS A PRIVATE DOCK FOR RECREATIONAL BOATING 1. Location of activity: SUFFOLK FISHERS ISLAND. TOWN OF SOUTHOLD OFF OF PENINSULA RD. County City, Town or Village Street or Site Description 2. Type of federal penn it I license required: U.S. ACOE. NYS DEC,TOWN OF SOUTHOLD 3. Federal application number, if known: 4. If a state pennitl license was issued or is required for the proposed activity, identify the state agency and provide the application or pennit number, if known: 5. C. COASTAL ASSESSMENT Check either "YES' or 'NO' for each of the following qu,estlons. The numbers following each question refer to the policies described in the CMP document (see footnote on page 2) which may be affected by the proposed activity. YES ~ 1. Will the proposed activity!UY!! In any of the following: a. Large physical change to a site within the coastal area which will require the preparation of an environmental impact statement? (11, 22, 25, 32, 37, 38, 41, 43). . . . . . . . . . . . . . . . . . . . - -L b. Physical alteration of more than two acres of land along the shoreline, land under water or coastal waters? (2, 11, 12,20,28, 35, 44). . . . . . . . . . . . . . . . . . .. . . . . . . . . . . . . . .. . . . . . - -2L c. Revitalization I redevelopment of a deteriorated or underutilized waterfront site? (1). . . . . . . -L - d. Reduction of existing or potential public access to or along coastal waters? (19, 20) . . . . . . -A.. - e. Adverse effect upon the commercial or recreational use of coastal fish resources? (9,1 0). . . -L f. Siting of a facility essential to the exploration, development and production of energy - resources in coastal waters or on the Outer Continental Shelf? (29).. . . . . . . . . . . . . . . . . - -L g. Sitlng of a facility essential to the generation or transmission of energy? (27). . . . . . . . . . . - -L h. Mining, excavation, or dredging activities, or the placement of dredged or fill material in coastal waters? (15, 35). . . . .. . . . . . . . . . . . . . . . . . .. . .. . . . . . . . .. .. . .. . . . . . . . . . - -L i. Discharge of toxies, hazardous substances or other pollutants into coastal waters?{8,15,35) -L j. - Draining of stonnwater runoff or sewer overflows into coastal waters? (33) . . . . . . . . . . . . . - -1L k. Transport, storage, treatment, or disposal of solid wastes or hazardous materials? (36, 39). -L - I. Adverse effect upon land or water uses within the State's small harbors? (4)........... -1L - 2. Will the proposed activity affect or be located in, on, or adjacent to any of the following: a. State designated freshwater or tidal wetland? (44) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . -1L b. Federally designated flood and I or state designated erosion hazard area? (11, 12, 17). . . . .1L - c. State designated significant fish and I or wildlife habitat? (7)... . . . . . . . . . . . . . . . . . . . . . . .1L d. State designated significant scenic resource or area? (26) . . . . . . . . . . . . . . . . . . . . . . . . . .. - .lL e. State designated important agricultural lands? (26)................................ - .lL f. Beach, dune or barrier island? (12)...................... . . . . . . . . . . . . . . . . . . . . . .. - -A.. g. Major ports of Albany, Buffalo, Ogdensburg, Oswego or New York? (3)................ - -A.. h. State, country, or local park? (19,20)........................................... - -L i. Historic resource listed on the National or State Register of Historic Places? (23). . . . . . . . .. = -L - 1 - 3. Will the proposed activity reauire any of the following: a. Waterfront site? (2, 21, 22). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . -1L - b. Provision of new public selVices or infrastructure in undeve:Jped or sparsely populated sections of the coastal area? (5)....... . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . - --X- c. Construction or reconstruction of a flood or erosion control structure? (13,14,16)....... - --1L d. State water quality pennit or certification? (30, 38, 40) . . . . . . . . . . . . . . . . . . . . . . . . . . . . - --1L e. State air quality pennit or certification? (41, 43) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . - -X- 4. Will the proposed activity occur within and I or affect an area covered by a State approved Local waterfront revitalization program? (see policies in local program document) . . . . . . . . . - --1L D. ADDITIONAL STEPS 1. If all of the questions in Section C are answered "NO', then the applicant or agency shall complete Section E and Sub the documentation required by Section F. 2. If any of the questions In Section are answered 'YES', then the applicant or agent Is advised to consult the CMP, or where appropriate, the local waterfront revitalization program document. The proposed activity must be analyzed in more detail with respect to the applicable state or local coastal policies. In the space provided below or on a separate page (s), the applicant or agent shall: (a) identify, by their policy numbers, which coastal policies are affected by the activity, (b) briefly assess the effects of the activity upon the policy; and (c) state how the activity is consistent with each policy. Following the completion of this written assessment, the applicant or agency shall complete Section E and submit the documentation required by Section F. E. CERTIFICATION The applicant or agent must certify that the proposed activity is consistent with the State's CMP or the approved local waterfront revitalization program, as appropriate. If this certification cannot be made, the proposed activitY shall not be undertaken. If this certification can be made, complete this Section. "The proposed activity complies with New York State's approved Coastal Management Program, or with the applicable approved local waterfront revitalization program, and will be conducted in a manner consistent with such program." Applicant 1 Agent's Name: PETER BACCILE 3. Address: EQUESTRIAN AVENUE. FISHERS ISLAND. NY 06390 Telephone: Area Code (212) 6~6 ~ Date: lo\\3l0~ Applicant 1 Agent's Signature: ~,~ ,( a ~ F. SUBMISSION REQUIREMENTS 1. The applicant or agent shall submit the following documents to the New York State Department of State, Division of Coastal Resources and Waterfront Revitalization, 162 Washington Avenue, Albany, NY 12231. a. Original signed fonn. b. Copy of the completed federal agency application. c. Other available infonnation which would support the certification of consistency. 2. The applicant or agent shall also submit a copy of this completed fonn along with his I her application to the federal agency. 3. Ifthere are any questions regarding the submission of this fonn, contact the Department of State at (518) 474-6000. See attached narrative "Th~se state and local ~ocuments are available for inspection at the offices of many federal agencies, Department of Envlro.nmental ConselVatton and Department of State regional offices, and the appropriate regional and county planning agencies. Local program documents are also available for inspection at the offices of the appropriate local government. -2- FCAF Revised 1216/93 .i. . PETER BACCILE HAY HARBOR, FISHERS ISLAND NARRATIVE STATEMENT & SUPPLEMENTAL INFORMATION OCTOBER, 2005 GENERAL Peter Baccile owns parcel 1000-09-03-11 on Equestrian Avenue located off the southeast end of Hay Harbor on Fishers Island. The site is generally moderately sloped, sandy gravel earthen materials, vegetated with grass, shrubs, ground cover and trees. The frontage of the property is approximately 500 feet along Hay Harbor at the southerly end abutted by the BonsaI family to the west and Crisps to the east. The waterfront consists of a sandy beach at the base of the steeply clopped coastal bluff in the vicinity of the pier and otherwise boulders. It is Mr. Baccile's desire to rebuild the existing fixed pier and install a new hinged ramp to a floating dock system. This existing shoreward end of the pier has left non-vegetated sediments over which the new pier extension will be built. The new pier will go from an end elevation of five feet, sloping upward and crossing over the intertidal zone at a typical height of four feet above the bottom sediments until reaching a finished elevation and then a level landing to shore. This supplemental narrative has been prepared in accordance with the requirements of Town of Southold, Ordinance No.6, 2004, related to docks and shorefront improvements. In addition, various coastal policies under the New York State Coastal Management Act are addressed herein for review by the New York State Department of State. DESCRIPTION OF WORK As mentioned in the introductory paragraph, this project is to replace a fixed wood pile and timber pier and extend that pier to shore in accordance with existing guidelines set forth in the Town of South old ordinance No.6, 2004. It is envisioned that this structure will be built utilizing the following general sequence and methodology. ~ The marine contractor will arrive by water with barge-mounted crane and push boats. The existing fixed pier will be demolished and materials will be deposited in a land or barge-based dumpster for removal from the site and the island. ~ New piles will be driven starting at the new landing end of the pier and proceeding waterward to shore at roughly 10-foot intervals to the current end of the existing pier. These piles will be driven by double-acting air hammer to a bearing resistance of approximately 20 tons. This generally results in about ten feet of embedment of the pile in the bearing stratum. These piles will be 12-inch nominal diameter measured at three feet from the butt. " . ~ After the piles are installed, split caps (otherwise known as split clamps) consisting of pressure treated Southern Pine timbers ranging from 3 x 10 to 4 x 12 nominal dimension, will be bolted to the piles transversely. Stringers will be then laid on the split caps parallel to the length of the pier. In all likelihood, three runs of stringers will be set and will probably consist of3 x 10 pressure-treated Southern Pine. ~ The outer stringer on each side will be bolted or spiked to the pile to take care of any uplift forces that this pier might be exposed to. ~ After the stringers have been connected to the piles and split caps, the decking will be installed in accordance with Town of Southold's Ordinance No.6, 2004. This decking will be Timber Tech plastic / composite or similar material with the brushed side mounted up. The Timber Tech will be either gray, brown or natural in color. Decking will be attached to the stringers utilizing stainless steel flathead square-drive wood screws about 3 inches long and will be set with a 1/8" to W' gap between members. The decking will run level at an elevation of five feet until it is at a point four feet above the existing bottom sediments and then slope upward at 1 foot vertically per 10 feet horizontally, or less, paralleling as closely as possible the slope of the existing intertidal zone until reaching the finished elevation. At this point the decking will level off and run straight to the shore landing. ~ The alignment of the existing pier will be maintained throughout its length of reconstruction running over the non-vegetated beach. ~ The piles will be about three feet above the deck surface and have horizontal members mounted to them. ~ A top rail of Timber Tech material will be installed on the top of the rail. ~ A new hinged ramp will be installed at the dockside end of the pier so as to land on the float. This will be a wood ramp, made of pressure-treated framing and posts and Timber Tech decking, or aluminum. ~ Water and electricity will be run out on the pier in the space between the stringers so that trickle chargers on the boats may be powered during tie-ups. In addition, the water will allow boats to be rinsed off after usage. A power post with an internal light will be mounted to the end of the pier with receptacles to provide power to the boats from extension cords. The power post will also have a coiling arm for storage of the hose between uses. Because the dock may be used during the hours of darkness, low- intensity lights will be mounted on staggered piles or dock rail posts to illuminate the walking surface. This system will be manually controlled so that the lights will only be on when necessary for safety of the users. REOUIREMENTS OF SECTION 97-25 OF THE WETLANDS LAW 6. 2004 The permittee acknowledges that the validity of this permit is subject to the approval of other governmental or municipal authorities. The permittee does, by the acceptance of this permit, assume all responsibility for operations undertaken pursuant to this permit, and shall take all precautions for the prevention of injuries to persons and property resulting from such operations. By such acceptance, the permittee also agrees to indemnify and save harmless the Town and its officers. . . The permittee gives consent to the Town and its officers, employees and agents to enter upon the premises where such operations are being conducted to make such inspections to determine whether said operations are being conducted in conformity with the permit. The permittee will notify the Trustees in writing one week prior to initiation of any and all operations. The permittee will notify the Trustees in writing upon completion of operations such that the site can be inspected for issuance for a certificate of compliance. In response to Sub-section 2a and the General Rules for Standards of Residential and Commercial Docks, the following additional information is offered. 1. Permits for the work are being applied for through the Town, US ACOE, NYS DEC and a coastal zone consistency determination by the NYS DOS. 2. The new piles to be installed will be of sturdy, durable and stable materials; in all likelihood, CCA pressure-treated Southern Yellow Pine piles with new braces of the same materials. These members will be a minimum of 3 x 8's and more often, 3 x 10's with at least one 3;.t bolt per connection, and in many cases, two %" bolts per connection. This pier is a fixed, pile-supported timber structure with a float and therefore does not adversely affect the free circulation of water or reduce the effects of fluctuating water levels in H~y Harbor. In addition, it does not present any adverse modification of the shoreline. The pier's elevation is such that in extreme high flood tides the structure will be flooded. The structured timber materials are specifically grown for this purpose and and are capable of withstanding full immersion and represent the standard of the industry. With the connections described above, this structure will be able to survive repeated inundations and even incident waves at higher tide elevations. 3. There is no plan to replace decking on the existing pier at this time. It is our belief that the replacement of piles will constitute pulling existing piles and driving new piles in or very near the same holes to the maximum extent possible in order to retain the existing pier alignment and support intervals. The use of CCA pressure-treated piles and timbers can be approved for this project in accordance with Local Law 6. 4. The pier will not be decked with CCA pressure-treated Southern Pine. This pier / walkway provides a safe pedestrian surface for access to the berthed boat. 5. The existing pier is a long-standing structure and favors the easterly side of the property. The 15-foot clearance specified in this paragraph should not be an issue because this project does not involve any real alternation or realignment of the pier, merely reconstruction of the deteriorated pier. " , . 6. Upon receipt of the pennit for this project, appropriate permit numbers will be affixed to the most seaward face of the pier for identification from the water. 7. There are no permanent structures located above the pier decking nor are any planned at this time other than the power post and railing which are fixed by function. 8. It is currently possible to provide a five-foot passage way on the upland to get around this pier and that access ability will be retained landward of the fringe marsh. There is no room to walk: under the pier at low tide. Foot traffic in this area is rare, if at all. lD. This pier is a pre-existing structure built around 1960 and maintained under provisions of a Grandfathered structure over the years. NEW YORK STATE COASTAL MANAGEMENT PROGRAM These application documents include a copy of the Federal Consistency Assessment Form utilized for the New York State Coastal Management Program under the jurisdiction of the New York State Department of State. The following policies have been identified as pertinent to this application and the reason for consistency associated with this project is outlined in each respective case. Policy 2 -Water Dependent Uses - This project is to restore the fully functional water dependent use of the existing dock at this site. The existing deteriorated structure must be replaced in support of recreational boating. Policy 5 - Use of Existing Developed Shorefront - This project utilizes existing developed shorefront and the site of a dock for many decades. The project will be primarily to re-build the pier and extend it to a logical shoreward terminus to make it more safely and reliably usable in most weather conditions. Policy 7 - Significant Fish & Wildlife Habitat - Protection of significant fish and wildlife habitat has been considered in the development of this project layout. The dock extension to the shoreward point of beginning will be over un-vegetated shoreline fringe and will not jeopardize the integrity of existing spartina fringe outcrops. Thus there should be an environmental benefit to the project because of the creation of structure in the water column where barnacles, algae and crustaceans will inhabit. Policy 8 - Protection & Preservation of Habitat - Protection and preservation of habitat has also been considered in this project and the dock structure is being kept to its minimal configuration consistent with standards of the industry and restrictions set forth in the Wetlands Law, No.6, 2004 set forth by the Town of South old and standards of the NYS DEC. Policy. 11 - Minimize Damage to Natural Resources - The dock reconstruction and extension project has been laid out in such a way so as to minimize damage to natural resources as identified in Policy 7 above. 1- . . Policy 14 - No Measurable Increase in Flooding - This project consists of reconstruction and extension of an open wood pile and timber pier and in no way adversely affect waterflow and circulation in Hay Harbor or flooding potential of the area. Flood levels all around Fishers Island are dictated by water levels in Long Island Sound and Block Island Sound and this structure will have no adverse influence on it. Policy 15 - No Dredging - Dredging is not required in this project. The floating dock system has been laid out in its current location and configuration to avoid any dredging requirements. The depth of 4 feet has been reached as generally recommended by the NYS DEC. Policy 19 - Impact on Public Access - Public access will not be jeopardized or impeded as a result of this project. As a matter of fact, there is almost no public access usage of the public trust lands or waters at this site. The intertidal zone is significantly covered by a tidal wetlands fringe marsh and the shallow sub-tidal waters do not present any opportunity or enticement for public access in the area. The pier has been a long-standing structure in its current location and configuration and the waterward encroachment will not change as a result of this project. Thus, public access to the State's lands and waters will not be adversely affected by the project. Policy 20 - Public Trust Compatibility with Existing Adioining Properties and Land Uses- Public Trust compatibility with existing adjoining properties and land uses has also been considered in this project. Nearby properties have small docking facilities similar to this one and this docking facility will not interfere with existing or proposed facilities on immediately adjoining properties. Policy 21 - Water Dependent Recreation - This project is consistent with water-dependent recreational opportunities policies set forth in this section. Policy 24 -Scenic Resources, Impairment or Loss - This policy is designed to prevent impairment or loss of scenic resources. The reconstruction of the inland section of the structure, the fixed wood pile and timber pier, will not represent any new encroachment or structure which would create a loss of scenic resources. The elevated inboard landing section to be extended will be largely over-shadowed by the tree growth on the site on the nearshore lands south of the house and the anticipated filling in of the spartina fringe marsh. Policy 25 - Enhance Overall Scenic Ouality - The new dock structure will be consistent with the scenic quality of the area and prevent loss of scenic resources as described in Policy 24 above. The new pier structure will improve the scenic quality of Hay Harbor as compared to the existing deteriorated structure. Policy 44 - Preserve and Protect Tidal W etlands - It is acknowledged that the fragmented fringe marsh of spartina alterna flora along the Baccile shorefront is a valuable resource. The extension landward of the fixed wood pile and timber pier has taken advantage of the existing un-vegetated strip of the shoreline in order to avoid adverse wetlands impact. The raised height of the pier should allow opportunities for the expansion of the spartina fringe marsh naturally up to, and to an extent, beneath the wood pier. I . . SUMMARY This project represents a new fixed pier and float for recreational boating access the Peter Baccile property on Fishers Island. A copy of all US Army Corps of Engineers, NYS DEC and Town of Southold applications are attached as substantiation for this project. This project complies with applicable standards of the New York State Coastal Management Act and Local Ordinance No.6, 2004 and its approval is respectfully requested. Respectfully submitted, DOCKO, INC. ~lbJdi Keith B. Neilson, P.E. ',- . DDckD. Inc. ~ p.o. Box 421, Mystic, CT 06355 (860) 572-8939 Fax: (860) 572-7569, e-mail: docko@snet.net October 25, 2005 NYS DEC Environmental Permits Building 40, SUNY Stony Brook, NY 11790-2356 Re: Peter Baccile New Fixed Pier & Float To Whom It May Concern: On behalf of Mr. Peter Baccile we request a Tidal Wetlands Permit including Water Quality Certifications, as necessary, for a new fixed pier and. float in Hay Harbor on Fishers Island, New York. We enclose the following in support of this permit application: .:. Four prints each of plans titled: Project: "New Fixed Pier & Float" r \.1 Waterway: Hay Harbor Location: Fishers Island, Town of Southofd Suffolk County, New York Applicant: Peter Baccile Date: October 3,2005 .:. Four copies of the NYS DEC Joint Application, including the Short Environmental Assessment Form, Tax Assessor's Map, Photographs and Location Map. I trust that you will find this application package complete and acceptable; please let me know if the need for further information arises. Very truly yours, DP;;~~ .... Keith B. Neilson, P.E. KBN:jm Enclosures CC: Peter Baccile US ACOE NYS DOS Town of Southold: Krupski File: 05-03-1679 BACCILE \, . 95-1~ (8100) plp . JOINT APPLICATION * 1m] New York State FOR PERMIT United States Army Corps of Engineers Applicable to agencies and perrott categories listed In Item 1. PI...... read aU Instructions on back. Attach addilionallnformalion as needed. Please print legibly or type. 1. Check ",..mils applied for: 2. Name of Applicant (Use full name) Telephone Number (daytime) PETER BACCILE (212) 622-4466 NYS Dept. of Environmental Conservation o Stream Disturbance (Bed and Banks) Mailing Address o Navigable Waters (Excavation and Fill) 73 BURNING TREE ROAD Post Office Zip Code o Docks. Moorings or Platforms GREENWICH 06380 (Construct or Place) o Dams and Impoundment Structures 3. Taxpayer 10 (If applicant is not an individual) (Construct Reconstruct or Repair) o Freshwater \/\etlands 4. Applicant Is alan: (check as many as apply) o Tidal Wetlands o Municipality I Governmental Agency o Coastal Erosion Control o Oovner 0 Operator o Lessee o V'vlld, Scenic and Recreational Rivers 5. If applicant is not the CMlner, identify owner here - otherwise, you may provide AgenUContact Person information. o 401 ""arer Quality CertifICation Owner or Agent/Contact Person o Oovner 0 AgentlContact Person Telephone Number (daytime) o Potable Water Supply Keith B. Neilson, P.E., Docko, Inc. (860) 572-8939 o Long Island \/\ells Mailing Address o Aquatic Vegetation Control P. O. Box 421 Post Office StatAl Z1D Code o Aquatic Insect Control Mystic CT 06355 o Fish Control 6. Project I Facility Location (mark location on map, see instruction la_) Counlv: T ownICitvNillaae: Tax Mao Section! Block lLot Number. NYS OffIce of General Services Suffolk Southold, F.1. 1000 -09-3- 11 (Stare Oovned Lands Under Warer) o Lease, License, Easement or Location (inc:ludinQ Street or Road) T.leDhone Number (davtime) other Real Property Interest (212) 622-4466 Utility Easement (pipelines, conduits, cables, etc.) Post OffIce 7. Name of Stream or Waterbody (on or near project site) o Docks, Moorings or Platforms Fishers Island Hay Harbor (Construct or Place) 8. Name of USGS Quad Map: Location Coordinates: Adirondack Park Agency NEW LONDON CT - RI - NY o Freshwarer Wetlands Permit NYTM-E NYTM-N 4 o V'vlld, Scenic and Recreational Rivers 9. Project Description and Purpose: (Category of Activity e.g. new constructionJinstallation, maintenance or replacement; Type of Structure or Activity e.g. bulkhead, dredging, filling, dam, dock, taking of water; Type of Marerials and Quantities; Structure and Work Area Dimensions; Need or Purpose Served) Lake George Park Convnlsslon CONSTRUCT 95 (+/-) LF OF 4-FOOT WIDE FIXED WOOD PILE AND TIMBER o Docks (Construct or Place) PIER AND INSTALL AN 8' X 20' FLOAT WITH ASSOCIATED 3.5' X 20' RAMP AND o Moorings (Establish) TIE-OFF PILINGS ALL WATERWARD OF THE APPARENT HIGH WATER LINE. THIS STRUCTURE IS TO REPLACE AN EXISTING. LONG-STANDING, BUT us Army Corps of Engineers DETERIORATED DOCK SYSTEM IN THE SAME LOCATION. o Section 404 (Waters of the United States) o Section 10 (Rivers and Harbors Act) o Nationwide Permil (5) Identify Number(s) For Agency U.. Only: DEC APPLICATION NUMBER US ARMY CORPS OF ENG INEERS se: 11. Will Project Occupy 12. Proposed Start 13. Estimated Completion State Land?0 o Date: Date: Yes No IMMED. 14. Has Work Begun on Project? (It yes. attach 0 0 15. List Previous Permit I Application Numbers and Dates: (It Any) explanation of why work was started without pennit) Yes No 16. Will this Project Requllll Additional 0 0 ~I:':; List: us ACOE, TOWN OF SOUTH OLD Federal, State, or Local Permits? Yes No 17. If applicant is not the owner, both must sign the application I hereby affirm that information provided on this form and all attachments submitted herewith is true to the best of my knCMIledge and belief. False statements made herein are punishable as a Class A misdemeanor pursuant to Section 210.45 of the Penal Law. Further, the applicant accepts full responsibility for all damage, direct or indirect, of wharever nature. and by whomever suffered, arising out of the project desaibed herein and agrees to indemnify and save harmless the Slate from suits, actions, damages and costs of every name and desaiptio n said project. In addition. Federal Law. 18 U.S.G., Section 1001 provides for a fine of not more than $10,000 or imprisonment for not more than 5 y rs, or both here an arn.t n y and willingly falsifies, conceals, or covers up a marerial fact; or knCMIingly makes or uses a fal , fic -cious or fraudulent stateme t r- ~ Date I, Signature of Appli Tille Date - tb Signature of ONne Title ii' '/ PROJECT 10 NUMBER I 617.20 SEaR . APPENDIX C STATE ENVIRONMENTAL QUALITY REVIEW SHORT ENVIRONMENTAL ASSESSMENT FORM for UNLISTED ACTIONS Only PART 1 - PROJECT INFORMATION ( To be completed by Applicant or Project Sponsor) 1. APPLICANT! SPONSOR 2. PROJECT NAME PETER BACCILE NEW FIXED PIER & FLOAT 3.PROJECT LOCATION: FISHERS ISLAND, TOWN OF SOUTHOLD SUFFOLK Municipality County 4. PRECISE LOCATION: Street Addess and Road Intersections. Prominent landmarkS etc - or provide map PRIVATE DRIVEWAY OFF OF EQUESTRIAN AVENUE 5. IS PROPOSED ACTION: [Z] New D Expansion o Modification! alteration 6. DESCRIBE PROJECT BRIEFLY: CONSTRUCT 95 (+/-) LF OF 4-FOOT WIDE FIXED WOOD PILE AND TIMBER PIER AND INSTALL AN 8' X 20' FLOAT WITH ASSOCIATED 3.5' X 20' RAMP AND TIE-OFF PILINGS ALL WATERWARD OF THE APPARENT HIGH WATER LINE. THIS STRUCTURE IS TO REPLACE AN EXISTING, LONG-STANDING, BUT DETERIORATED DOCK SYSTEM IN THE SAME LOCATION. 7. AMOUNT OF LAND AFFECTED: Initially 0.1 acres Ultimately 0.1 acres 8. WILL PROPOSED ACTION COMPLY WITH EXISTING ZONING OR OTHER RESTRICTIONS? [Z]Yes o No It no, describe briefly: 9. WHAT IS PRESENT LAND USE IN VICINITY OF PROJECT? (Choose as many as apply.) [Z] Residential o Industrial o Commercial DAgriculture 0 Park I Forest! Open Space D Other (describe) 10. DOES ACTION INVOLVE A PERMIT APPROVAL, OR FUNDING, NCNV OR ULTIMATELY FROM ANY OTHER GOVERNMENTAL AGENCY (Federal, State or Local) [Z]Yes DNO If yes, list agency name and permit I approval: 11. DOES ANY ASPECT OF THE ACTION HAVE A CURRENTLY VALID PERMIT OR APPROVAL? DYes [Z]No If yes, list agency name and permit ! approval: PROPOSED ACTION WILL EXISTING PERMIT! APPROVAL REQUIRE MODIFICATION? ABOVE IS TRUE TO THE BEST OF MY KNOWlEDGE Date: ) (0 If the action is a Costal Area, and you are a state agency, complete the Coastal Assessment Form before proceeding with this assessment " \.1', . PART" - IMPACT ASSESSMENT (To be completed by Lead Agency) A. OOES ACTION EXCEED ANY TYPE I THRESHOLD IN 6 NYCRR, PART 617.4? If yes, coordinate the review process and use the FULL EAF. Dyes DNo B. WILL ACTION RECEIVE COORDINATED REVIEW AS PROVIDED FOR UNLISTED ACTIONS IN 6 NYCRR, PART 617.61 If No, a negative declaration may be superseded by another involved agency. Dyes DNo C. COULD ACTION RESULT IN ANY ADVERSE EFFECTS ASSOCIATED WITH THE FOLLOWING: (Answers may be handwritten, if legible) C1. Existing air quality, surface or groundwater quality or quartity, noise levels, existing traffic pattern, solid waste production or disposal, potential for erosion, drainage or flooding problems? Explain briefty: I C2. L. .g_"". _. h_. ~._ M""'" ~......, ~. ~ oo~_., .....ho...... ""....'" ","",,0 """" 03. [...hoO", Iou.... .... "".... '" ...,'" .pe.... .Igoffi,,~ h_ "'.......... "' ."'........ _, Ex...... _, I 04. J oo~..,........ ""'00'.... u ""lolly _. ~. ""'" .. ~ ~ ,.......,,,, ~"..... M "",.".1",", __1 _.. ""'" I r . I 05. rh. ~"'quonl ......pmont. ~ "',.... - -.. .. ,"'.... by tho """",,,, """0'1 Ex~.o ...." I C6. Long term, short term, cumulative, or other effects not identified in C1-C5? Explain briefty: I I C7. Other impads (indudlng chanaes in use of either auartitv or type of eneraY? Explain briefly: I I D. WILL THE PROJECT HAVE AN IMPACT ON THE ENVIRONMENTAL CHARACTERISTICS THAT CAUSED THE ESTABLISHMENT OF A CRITICAL ENVIRONMENTAL AREA (CEA)? (If yes, explain briefty: I o V", 0 No I E. IS THERE, OR IS THERE LIKELY TO BE, CONTROVERSY RELATED TO POTENTIAL ADVERSE ENVIRONMENTAL IMPACTS? If yes explain: o V", 0 No I . I PART 11I- DETERMINATION OF SIGNIFICANCE (To be completed by Agency) INSTRUCTIONS: For each adverse effect identified above, determine whether it is substantial, large, important or otherwise significant. Each effect should be assessed in connection with its (a) setting (i.e. urban or rural); (b) probability of occurring; (c) duration; (d) irreversibility; (e) geographic scope; and (f) magnitude. If necessary, add attachments or reference supporting materials. Ensure that explanations contain sufficient detail to show that all relevant adverse impacts have been identified and adequately addressed. If question d of part ii was checked yes, the determination of significance must evaluate the potential impact of the proposed action on the environmental characteristics ofthe CEA. Check this box if you have identified one or more potentially large or significant adverse impads which MAY occur. Then proceed directly to the FUll EAF and/or prepare a positive declaration. Check this box if you have determined, based on the information and analysis above and any supporting documentation, that the proposed adiol WILL NOT result in any significant adverse environmental impads AND provide, on attachments as necessary, the reasons supporting thi determination. Name of Lead Agency Date Pnnt or Type Name of Responsible Officer In Lead Agency Title of Responsible Officer Signature of Responsible Officer In Lead Agency Signature of Preparer (If different from responSible officer) \, , . t Docko, Inc. . . p.o. Box 421, Mystic, CT 06355 (860) 572-8939 Fax: (860) 572-7569, e-mail: docko@snet.nE October 25, 2005 Mr.. Michael Vissichelli U.S. Army Corps of Engineers Jacob Javits Federal Center, Room 1937 New York, New York 10278-0Q90 Re: Peter Baccile New Fixed Pier & Float Dear Mr. VissicheIli: On behalf of Mr. Peter Baccile we request a Department of the Army Permit for a new fixed pier and float in Hay Harbor on Fishers Island, New York. We enclose herewith the following in support of this permit application: .:. Two prints each of plans titled: Project: "New Fixed Pier & Float" Waterway: Hay Harbor Location: Fishers Island, Town of SouthoId Suffolk County, New York Applicant: Peter BacciIe Date: October 3, 2005 .:. Two copies of Corps of Engineers and NYS DEC Application Forms, Location Map, Tax Assessor's Map, photographs and NYS DOS Federal Consistency Assessment Form. I trust that you will find this application package complete and acceptable; please let me know if the need for further information arises. Very truly yours, D~~ Keith B. Neilson, P.E. KBN:jm Enclosures CC: Peter Baccile NYS DEC: Environmental Permits Town of Southold: Krupski File: 05-03-1679 BACCll..E \, > ~ APPLICATION FOR DEPARTMENT OF THE ARMY PERMIT OMB APPROVAL NO. 0710-003 (33 CFR 325) Public reporting burden for this collection of information is estimated to average 5 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection ofinfonnation.. Send comments regarding this burden estimate of any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Service Directorate of of Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302; and to the Office of Management and Budget, Paperwork Reduction Project (0710-0003), Washington, DC 20503. Please 00 NOT RETIJRN your fonn to either of those addresses. Completed applications must be submitted to the District Engineer having jurisdiction over the location of the proposed activity. PRlVACY ACT STATEMENT Authority: 33 USC 401, Section 10; 1413, Section 404. Principal Purpose: These laws require pennits authorizing activities in, navigable waters of the United States the discharge of dredged or fill material into waters of the United States, and the transportation of dredged material for the purpose of dumping it into ocean waters. Routine Uses: Infonnation provided on this form will be used in evaluating this application for a pennit. Disclosure: Disclosure of requested information is is voluntary. If infornlation is not provided, however, the pennit application cannot be processed nor can a pennit be issued. One set of original drawings or good reproducible copies which show the location and character of the proposed activity must be attached to this application (see sample drawings and instructions) and be submitted to the District Engineer having jurisdiction of the proposed activity. An application that is not completed in full will be returned. (ITEMS 1 THRU 4 TO BE FILLED BY THE CORPS) 1. APPLICATION NO. 2. FIELD OFFICE CODE 3. DATE RECEIVED 4.DATE APP. COMPLETED ITEMS BELOW TO BE FIUED BY APPliCANT 5. APPLICANT'S NAME 8. AUTHORIZED AGENT'S NAME &: TITLE PETER BACCILE DOCKO, INC. KEITH B. NEILSON, P.E. 6. APPLICANT'S ADDRESS 9. AGENT'S ADDRESS 73 BURNING TREE ROAD P. O. BOX 421 GREENWICH, CT 06380 MYSTIC, CT 06355 7. APPLICANT'S PHONE NO'S W/AREACODE 10. AGENT'S PHONE NO'S W/AREA CODE a. Residence (212) 622-4466 a. Residence b. Business b. Business (860) 572-8939 11. STATEMENT OF AUTHORIZATION I hereby authorize, DOCKO, INC. to act in my behalf as my agent in the processing of this application and to furnish, upon request, supplemental inforn pport of this pennit ap Iication. '3 oS- APPLICANTS SIGNATURE PETER BACCILE NAME, LOCATION AND DESCRlPTION OF PROJECT OR ACTIVITY 12. PROJECT NAME OR TITLE (See instructions) NEW FIXED PIER & FLOAT 13. NAME OF WATERlIODY, IF KNOW (if applicable) 14. PROJECT STREET ADDRESS (if applicable) HAY HARBOR PRIVATE DRIVEWAY OFF OF EQUESTRIAN AVENUE FISHERS ISLAND 15. WCATION OF PROJECT SUFFOLK NY COUNTY STATE 16. OTHER LOCATION DESCRIPTIONS, IF KNOWN, (See instructions) LAT. 410 15'42" N, LONG. 72001' 20" W SITE IS LOCATED ON SOUTHEAST SHORE OF HAY HARBOR. 17. DIRECTIONS TO THE SITE: TAKE FERRY OR TRAVEL BY AIR TO FISHERS ISLAND. GO EAST ON wmSTI..ER AVENUE APPROXIMA TEL Y 1/2 MILE TO EQUESTRIAN A VENUE, BEAR LEFT AND PROCEED EAST AGAIN TO 'THE SITE JUST PAST THE CREST OF 'THE HILL. ENG FORM 4345, Feb. EDITION OF SEP 91 IS OBSOLETE. (Propoh'em:CECW-OR j .. 18. Nature of Activity (D.Jscriplion of project, include all features) CONSTRUCT 95 (+/-) LF OF 4-FOOT WIDE FIXED WOOD PILE AND TIMBER PIER AND INSTALL AN 8' X 20' FLOAT WIlli ASSOCIAIED 3.5' X 20' RAMP AND TIE-OFF PILINGS ALL WATERWARD OF TIlE APPARENT mGH WATER LINE. 19. Project Purpose (Describe the reason or purpose of the project, see inslJuctions) THIS IS A PRIVATE DOCK FOR RECREATIONAL BOATING. USE BLOCKS 20-22 IF DREDGED AND/OR FILL MATERIAL IS TO BE DISCHARGED 20. Reason (s) for Discharge N/A 21. Type (s) of Material Being Discharged and the Amount of Each Type in Cubic Yards N/A 22. Surt'ace Area in Acres of Wetlands or Other Waters Filled (see instJUctions) N/A 23. Is Any Portion of the Work A1ro:ady Complete? Yes NoX IF YES, DESCRIBE THE COMPLETED WORK 24. Addresses of Adjoining Property Owners, Lessees, Etc., Whose Property Adjoins the Waterbody (ifmore than can be entered here, please attach a supplemenlallist). WEST: FRANK A. BONSAL, JR., NEW ENTERPRISE ASSOC., 1119 ST. PAUL ST., BALTIMORE, MD 21202 EAST: PETER CRISP, HORSESHOE ROAD, MILL NECK, NY 11765 25. List of Other Certifications or ApprovalslDenials Received from other Federal, State or Local Agencies for Work Described in This Application AGENCY TYPE APPROVAL. IDENT. NUMBER DATE APPUED DATE APPROVED DATE DENIED NYSDEC Tidal Wetlands Pending Oct"'()5 Town of Southold Tidal Wetlands Pending Oct...()5 .Would include but is not restricted to zoning, building and flood plain permits. 26. Application is hereby made for a permit or pennits to authorize the work described in this application. I certifY that the infonnation in this application is -'~o~~~ro~"~-~>OO"-W~7;l~T;:"~o/~/cXl SIGNATURE OF APPUCANT 9 SIGNATURE OF AGENT DATE PETER BACCILE KEITH B. NEILSON, P.R, DOCKO, INC. The application must be :ligned by the person who desires to undertake the proposed activity (applicant) or it may be signed by a duly authorized agent if the statement in block 11 has been filled out and signed. 18 U.S.C. Se<.--tion 1001 provides that: Whoever, in any manner within the jurisdiction of any department or agency of the United States knowingly and willfully falsifies, conceals, or covers up any trick, scheme, or discuises a material fact or makes any false, fictitious or fraudulent statements or representations or makes or uses any false writing or document knowing same to contain any false, fictitious or fraudulent statements or entry, shall be fined not more than $10,000 or imprisoned not more than five years or both. .U.S.GPO: 1994-520.1478/820 18 :r. ..' '.~'.~.'.,-.' Iso ---- .'.., .". ~ /" FISHERS J . .........\ · · ~- ~~~. - c::" ,=-=~J? V 'j1 .-..'-... . .. ~. ---=--- .. ,. ..,---_.-:....,- ................. .-. . . . ' .".. C.: ......, ~,.... '.,. . . Jr" . . .... ......J .' ". \....... '.'.-.. ,..:,.. "._.. ~~ ) NOF<TH HILL- , . '. . .. F/SHEF<S .. ..: .... .~ ! ~_ ISL-AND - . t,.:... ~,', /\,. 'l'?::'~~) ~ (, . :' .0'.' \ ',~ 1~ I=l I=l I=l I=l ~ 1~ ." ,~. .~. . NOTES: / .'. ':. .~..f ~ 1. ELEVATlON DAiUM IS APPAAENT MEAN lD'VV . :.... .~ ~ . WATER /'/' HAY HARBOR ~ .' ><:i, ~' 2 TlDE DATA IS TAKEN FROM 2005 NOAA /-., :..;' ~ , '.'~ _.-.--1 , TlDE TABLES. ~NCE STATlONS: , .' /" ~~ ---=--- r> -- ,,'( . WEST HAJ<8QR .AND SILVER EEL COVE ;,..,;;' ~ ~ .~ _ ~ . . ~ FISHER'S ISLAND. NEW YORK. N/F PROPERTY OF,.:,.~. ~ 3. PROJECT DESCRlPllON: PROJECT: CI<ISP 7 ~. '~...~.. CONST1<UCT 80~ LF OF 4-FT WIDE FIXED ~ NEW FIXED PIER __ V.< WOOD PlLE.AND TlMBER PIER WITH AND FLOAT ~ .... . ASSOCIATED STEPS.AND INSTALL.AN 8' X 20 \ f p" ---=--- FLOAT WITH ASSOCIATED 35 X 20 RAMP .AND . ' !. / ~ TlE-OFF PlUNGS ALL WATERWAI<D OF THE <\ N/F PROPERTY OF / \"~' APPAAENT HIGH W~TER UNE. . '.' BONSAL ~/S;TE ," F .', J' " 4.PROJECTPUI<POSE: ..._. <,\.~ . PI<O=7::.=<-Y ,(\. /. ~ _ , THIS ISA PRIVATE DOCK FOR I<ECI<EATlONAL . . f. -. . BPCr:=., ,7 . . BOATlNG. '..".. '<,:;::::::;:: '>~~..>\;;j-. ....-- ~'... ')..:. . /', : __,./ "'\ ~L-.-..>~,.:\. .. ...:.....1.,- ! '. ...... 5. THESEAPPLICA11ONDAAWlNGSREPl<ESENT .......... l. \:,,?;~(/" '\i- /--.,/.'__' A COMPlLATlON OF SURVEYS FOR PERMIT ,'''.,"", ~ "';--::c::";'~J?:'.'."';'<.> PURPOSES.THEYAAENOTCONST1<UCTlON y . ~ ',\... '" :. .'/..... .. CONTf<.,ACT DOCUMENTS .',' ".'-.}'. '),.,J'-,,>'.',"'_--"'< 6.ADJOININGPROPERTY~ERS: J ~". (".-'~j; ~~~ ~=OD,4D 1119 St. P,t>,UL St. MILL NECK. NY 11765 GRAPHIC SCALE 1. = 500' BAL TlMORE, MD 21202 ~ 250 ~ ~ PROJECT: NEW FIXED PIER It FLOAT REVISED 11-29-05 P.B. L.C)CATlON: FISHERS ISLAND, TCMIN OF SOUTHOLD PIER !DESCRlPllON SUFFOLK COUNTY, NEW YORK REVISED 2-15-06 T.Q.S. WA>TERWAY: HAY HAJ<8QR PIER! DESCI<IPTlON DATE: OCTOBER 3, 2005 FE B 2 3 2006 APPLICANT: PETER B.ACCILE AGENT: SHEET 1 OF 4 DOCKO, INC. Keit\1 B. Neilson, PE Mystic, CT 06355 860 '572 8939 FAX 860 5727569 D'lN'G 05-03-1679 EMAlL: docko@snet.net Keith Neil",,", Docko "c_ 2/16/2006 9-.45 AM Bocclle_lC_dwg APPROVfr r -, IjOARD OF Ii. . , 0 -' " ....'~ - N ~ ~ -1.8 ~~ -13 TO'h'N OF SOUTHOlD 0 -2 -1- ~ ~~O .) \d-"!.\~ -25 ... EXISTING BOULDER (TYP)---' /M\..W- ~ Q ~- s ~ ~- ~ ~ AAWL .ALONG ~ F;\cE OF STONE WALL -1.9 "', -1.4 ~ ~ ~ ~ ~ "-3 ~ FLOAT STONE ALL BE1Vv'EEN SEAWALL AND BOlTOM OF BANK (TYP) SITE PROPERTY OF B.ACCILE GRAPHIC SCALE l' = 40 . SUI<VEY by J. DEMPSEY ~ ASSOCLATES I I I 40 20 0 40 PROJECT: NEW FIXED PIE/< It FLOAT REVISED 11-29-05 P.B, LOCAll0N: ASHEI<S ISLAND, TO\VN OF SOUTHOLD FOOT'PI<INT SUFFOLK COUNTY, NEW YORK REVISED 2-15-06 T,Q.S. WATERWAY: HAY HAABOR FOOT'PI<INT DATE: OCTOBER 3. 2005 APPLICANT: PETER BACCILE ,AGENT: SHEET 2 OF 4 DOCKO, INC. Keith B. Neilson, PE Mystic, CT 06355 860 572 8939 FAX 860 572 7569 DWG 05-03-1676 .-~;~. EMAlL docko@snet.net Keith Neilsen. Pocko nc_ 21161XJ06 9:23 AM Bocdle.;2P.dwg ~ ~ NEW 4-FT WIDE FIXED PlEf< BEGINING EL 77':t: NEW STEPS TO BEACH' STONE SEAWALL TOP EL VAF<JES (TYP) ~ BOTTOM OF BANK STONE FILL BETWEEN ~ ~ SEAWALL AND BOTTOM OF BANK (TYP) -1.8 NOTE: DECKING - NGr CCA 1l<EATED, H.AJ<DWOODS MUST BE CERTFIED BY FOI<EST STEWAl<DSHIP COUNCIL AJ<E..A OF SITE \ SPIKE GRASS PROPERTY \ ~ OF -, BACCILE PL.A..N 'v"/EVV GRAPHIC SCALE l' = 30 . SURVEY by J. DEMPSEY ~ ASSOClATES ............... I I 30 20 10 0 30 PI<OJECT: NEW FIXED PIER Ii FLOAT I<EVISED 2-15-06 T.o.S, LOCATION: FISHERS IS~D. TOWN OF SOUTHOLD DOCK SEPARAll0N SUFFOLK COUNT'(. NEW YORK WATERWAY: HAY HARBOR DATE: OCTOBER 3. 2005 APPLICANT: PETER Bf>CCILE ,AGENT: SHEET 3 OF 4 DOCKO, INC. Keith B. Neilson. PE Mystic, CT 06355 860 572 8939 FAX 860 572 7569 r.:MIG 05-0.3-1676 EI"1AJL: docko@snet.net KeIth Nell5en, Docko Inc_ 2/16/2006 839 .AM Bocdle..,3l.dwg NEW PIE/< SUPPO~ PILING TOP EL 4-FT \ NEW T1E-OFF 4-Ff ABOVE DECK (TYP) ;- PILING TOP EL. DECK NEW WATE/< and \VIDll-i END DECK 77~ (TYP) ELECTI<IC , UTILITIES EL 5:t NEW DECK NEW SPLIT STI<INGE/< (TYP) TEMPOI<ARY ----- --- --AHWL-- SAWDUST CLAMP and C/<OSS BI<.ACE COLLECTION - - - - liYPJ i; I. :!.:..__ I - -flL'Wt.. - - -- BOOM EN r::::::;; 'v"J E'-^/ Gf<APH1C SCALE 1. = 10 ' I I I 10 5 0 10 NEW 4-FT WIDE FIXED PIE/< ~~'K ~, NEW FLOAT J<ESTRAJNT BEGINNING EL 71'% l' I.) PILE EL 78'% (TYP) MAXIMUM SLOPE 7:70 NEW 3.5' X 20' NEW 8' X 20' NEW STEPS !<AMP ~ FLOAT(TYP) TO BEACH "~~' . = !i "DECK EL 5'% 1 ~~t~0!i:j,. I: - - '-; " "dC"- .. 1 .. ..... '.)::,':' I I ~ I . .. . ;~..':..';' .z~;:."~ ~-- ----.... .-.' .o"-v -,,", I I, . . . 35 :r~':::~~~-~:.t:~l::':~,.::;: . :':li~ :~,,~;: ;.".,...,;~~_: ,,r.'..:-' '.. . . 1 ~-= ;.'..' .,',.' '.' "",' i. " i.' ...~~'>""~I ,""';-=. I- . .." .,. ,'" ". flL'Wt..O.O v: :'~'.:.: 1:~./:.:.'.':' I.', ;: : ..~. !':'" '(j~l~~~j~~:,'i~~~:;.,'I.' ......: J ~..~:..:,.:,.:. ,:> ',':'".1.'.' ":~:"'::::';.:: .....~. ~..i\...~~...~ ".I....~~.. ;..l,.~-..,,-v.. ...... ,...., '.', I. ,"" '[' '!>I'~;---"','''I,':'''"1;,.' '", ,,' jl...,I......./' .'. j' ~ .~,;-" ::~,,;~::-.....'. ......,..... -,.."..... I' ...... . ,--..~I....",~_ - '~.,'" J'. .. . ..' , " 1. .. .;$...1':.'...... ."..... . ..... . I ' , '.. ~'-'-.~""I"-'''"'-' )It.... " ""_.---,.... v .yv." ,'" . ....... . ." .. ", . J .1;1' - ,:.""""..':0''',"\,;';:5. I!"";':{> I '~-::":":l ',',.,:!.':. ;,~::~~~~.~I~ ~~~.';.~::"".:::\;':>~: :::,::;,:~~::{~.;:><:> iE>OSllNGSTONE NEW~UPP~/<T~l ~~/<J i '~~iii~~/~~" II" ".,',: ",' BANK PI<OTEGnON PILING (TYP) (TYP) PF<CJF/LE FEB r Gf<APHIC SCALE 1. = 20 ' I I I I 20 10 0 20 Pl<OJECT: NEW FIXED PIE/< ~ FLOAT LOCATION: RSHERS ISLAND. TOWN OF SOUTHOLD SUFFOLK COUNTY. NEW YORK WATERWAY: HAY ~R DATE; OCTOBER 3, 2005 .APPUCANT: PETER BACCILE AGENT: SHEET 4 of 4 DOCKO, INC. Keith B. Neilson. PE Mystic, CT 06355 860 572 8939 FAX 860 572 7569 DWG 05-03-1676 EMAJI..; docko@snet.net Kelt11 Neilsen, Docko Inc. 2/16/2006 3:14 PM Bocctle_ 4l-do",g .~''<.".:g-;~'";,,, Docko. Inc. --- . . p.o. Box 421, Mystic, CT 06355 (860) 572-8939 Fax: (860) 572-7569, e-mail: docko@snet.net February 16, 2006 Mr. Jim King, President Southold Board of Trustees P.O. Box 1179 Southold, NY 11971 Re: Baccile Property, Fishers Island Dock Reconfiguration Dear Mr. King: Thank you for your approval of the Peter Baccile application last night. In accordance with conversations at the Trustees meeting, we have revised the application drawings to reflect the approved modifications. The dog-leg in the pier could occur anywhere along its length but we have shown it approximately 30 feet from the easterly end of the fixed pier and it now provides 45 feet of clearance between Mr. Baccile's dock and Mr. Crisfs. We have revised all of the application drawings to show this revision as of February 15t, We are submitting simultaneously the revised application documents to the US Army Corps of Engineers and the New York State DEC and DOS so that all agencies can now act on this final reconfiguration. I trust that you will find these drawings and revisions complete and acceptable and again, thank you for your consideration during this permitting process. Yours truly, ~~~~~ Keith B. Neilson, P.E. KBNjm Enclosures CC: Mr. Peter Baccile NYS DEC: Environmental Permits FEB 2 3 20015 NYS DOS US ACOE File: 05-03-1679 BACCILE J ., MAIliNG ADDRESS: PLANNING BOARD MEMBERS P.O. Box 1179 JERILYN B. WOODHOUSE Southold, NY 11971 Chair OFFICE WCATION: WILLIAM J. CREMERS Town Hall Annex KENNETH L. EDWARDS 54375 State Route 25 l"IARTIN H. SIDOR (cor. Main Rd. & Youngs Ave.) GEORGE D. SOLOMON Southold, NY Telephone: 631765-1938 Fax: 631 765-3136 PLANNING BOARD OFFICE TOWN OF SOUTHOLD To: Town of Southold Board of Trustees From: Mark Terry, Senior Environmental Planner LWRP Coordinator Date: February 14, 2006 Re: Request for Wetland Permit SCTM# 9-3-11 PETER BACCILE requests a Wetland Permit to construct 95 If. of 4' wide fixed wood pile and timber pier and install an 8'X 20' float with associated 3.5'X 20' wood ramp and tie off pilings. Located: Equestrian Ave., Fishers Island. SCTM#9-3-11 The proposed action has been reviewed to Chapter 95, Waterfront Consistency Review of the Town of South old Town Code and the Local Waterfront Revitalization Program (LWRP) Policy Standards. Based upon the information provided on the LWRP Consistency Assessment Form submitted to this department, as well as the records available to me, it is my recommendation that the proposed action is generally CONSISTENT with the Policy Standards and therefore is CONSISTENT with the LWRP with the following conditions: 1. Move location of the dock 30' north of the rock jetty, 2. No treated CCA lumber will be used. Pursuant to Chapter 95, the Board of Trustees shall consider this recommendation in preparing its written determination regarding the consistency of the proposed action. Please contact me at (631) 765-1938 if you have any questions regarding the above. .! ,. Docko. Inc. . - p.o. Box 421, Mystic, CT 06355 (860) 572-8939 Fax: (860) 572-7569, e-mail: docko@snet.net November 30, 2005 Ms Lauren Standish Southold Board of Trustees P.O. Box 1179 Southold, NY 11971 Re: Fishers Island Projects Site Visits Dear Ms Standish: I understand that Mr. Jim King and perhaps others from the Board of Trustees will be visiting Fishers Island in the near future to check on various projects for upcoming permit application hearings. I respectfully request an opportunity to meet with the delegation on Fishers Island to discuss the following projects: ~ ,...- -,~ ..... -_...."-~~. "",--"- _,' ..._ .._ ~._c4_ '".."'_' .~. _~. '. Peter Baccile, Equestrian Avenue, New Pier Susanna Doyle, off of Peninsula Road, New Pier Linda Borden on Equestrian Avenue, New Pier DEe - 2 2005 Fishers Island Yacht Club, Dredging with upland disposal Hay Harbor Club, Dredging with upland disposal .,,~~,.. " i Hay Harbor Entrance Channel, Dredging with upland ~i~p()s~L '-',.._~. Barbara Hoch, Seawall Repair & Reconstruction Your assistance is greatly appreciated. I will make the necessary arrangements to meet your delegation either on Fishers Island or at the Fishers Island Ferry Terminal in New London. Yours truly, DOCKO, INC\ ~~ KIth B. Neilson, P.E. KBN:jm CC: File: 05-03-1676 BACCILE 03-09-1488 DOYLE 05-03-1679 BORDEN 00-03-1078 F.I.Y.C. 97-03-747 HAY HARBOR CLUB 02-09-1340 F.I.CONSERV ANCY 92-05-306 HOCH . . . Town Hall 53095 Main Road Albert 1. Krupski, President P.O. Box 1179 James King, Vice President Southold, New York 11971 Henry Smith Artie Foster Telephone (516) 765-1892 Ken Poliwoda Fax (516) 765-1823 BOARD OF TOWN TRUStEES TOWN OF SOUTHOLD (' r\ (\:\ r Or' 'I \" .,-1) Ju \ (..-' Office Use Only , ,.- - .-----Received Application: -1llJ d-b(O"\ \ I - -.- """--Recei ved Fee: ~"S\1- _ --€ompleted Application --.1Q.(J(OI(){ - Incomplete - SEQRA Classification: Type I X Type I I Unlisted X Coordination: (date sent) ~AC Referral Sent: ~((O~ ----.L:. Date of Inspection: 1/ 0"\ Receipt of CAC Report: _ Lead Agency Determination: Technical Review: ~. Public Hearing Held: Il(llD/l)\ /'Resolution: LU)f(J1./ Name of Applicant PETER BACCILE Address 73 BURNING TREE ROAD, GREENWICH, CT 06380 Phone Number: (212) 622-4466 Suffolk County Tax Map Number: 1000 -09 - 03-11 Property Location: PROPERTY OFF OF EQUESTRIAN AVE. (provide LILCO Pole #, distance to cross streets, and location) AGENT: DOCKO, INC, (If applicable) Address: p, O. BOX 421, MYSTIC, CT 06355 Phone: (860 ) 572-8939 Fax: (860 ) 572-7569 1 . . Board of Trustees Application . GENERAL DATA Land Area (in SF) :Parcel= 4.5 ACRES Area Zoning: RESIDENTIAL Previous use of property: PRIVATE - RESIDENTIAL Intended use of property: PRIVATE - RESIDENTIAL Prior permits / approvals for site improvements: Agency Date ~___ No prior permits / approvals for site improvements. Has any permi t / approval ever been revoked or suspended by a governmental agency? ~- No Yes If yes, provide explanation: Project Description (use attachments if necessary) : CONSTRUCT 95 (+/-) LF OF 4-FOOT WIDE FIXED WOOD PILE AND TIMBER PIER AND INSTALL AN 8' X 20' FLOAT WITH ASSOCIATED 3,5' X 20' WOOD RAMP AND TIE OFF PILINGS ALL WATERWARD OF THE APPARENT HIGH WATER LINE. 2 . . Board of Trustees Application , WETLAND / TRUSTEE LANDS APPLICATION DATA Purpose of the proposed operations: TIllS IS A PRIVATE DOCK FOR RECREATIONAL BOATING. Area of wetlands on lot: LESS THAN ~ ACRE Percent coverage of lot: LESS THAN 10% Closest distance between nearest existing structure and upland edge of wetlands: APPROXIMATELY 50 feet Closest distance between nearest proposed structure and upland edge of wetlands: 0 feet Does the project involve excavation or filling: X No Yes If yes, how much material will be excavated? cubic yards How much material will be filled? cubic yards Depth of which material will be removed or deposited: feet Proposed slope throughout the area of operations: REMAINS UNCHANGED Manner in which material will be removed or deposited: THE MARINE CONTRACTOR WHO RE-BUILDS THE PIER WILL REMOVE THE OLD PIER COMPONENTS FROM THE SITE BY BARGE. Statement of the effect, if any, on the wetlands and tidal waters of the town that may result by reason of such proposed operations (use attachments if appropriate) : NO ADVERSE IMPACT IS ANTICIPATED ON THE WETLANDS BECAUSE ALL OF THE IMPROVEMENTS ARE IN AREAS OF THE PREVIOUS PIER AND DOCK STRUCTURES AND MINIMAL EXISTING TIDAL VEGETATION, THE PIER WILL BE ELEVATED TO PASS OVER THE SOILS AND SEDIMENTS WHERE TIDAL WETLANDS VEGETATION GROWS OR COULD GROW. 3 .Board of Trustees ApPlicat~ . COASTAL EROSION APPLICATION DATA Purposes of proposed activity: THIS SECTION NOT APPLICABLE Are wetlands present within 75 feet of the proposed activity? No Yes Does the project involve excavation or filling? No Yes If Yes, now much material will be excavated? (cubic yards) How much material will be filled? (cubic yards) Manner in which material will be removed or deposited: Describe the nature and extent of the environmental impacts reasonably anticipated resulting from implementation of the project as proposed. (Use attachments if necessary) 4 . . Albert J. Krupski, President Town Hall James King, Vice-President 53095 Route 25 Artie Foster P.O. Box 1179 Ken Poliwoda Southold, New York 11971-0959 Peggy A. Dickerson Telephone (631) 765-1892 Fax (631) 765-~"&I/ BOARD OF TOWN TRUSTEES TOWN OF SOUTHOLD BOARD OF TRUSTEES: TOWN OF SOUTHOLD --------------------------------------------------------------- In the Matter of the Application of ---~~~)---~(:~~-(-~------------------------------- COUNTY OF SUFFOLK) STATE OF NEW YORK) AFFIDA VIT OF POSTING I, k~ i-+h l\Iedsoi'l, residing.! 5 Vii 9~ DRl ve, &s+ Lyme.; GL) r;'~ -h:,,,-the... o-ppf,cmd- being duly sw , depose and say: That on the It~ay of N OV. , 2005 I personally posted the property known as p . J b placing the Board of Trustees official poster where it can easily be seen, and that I have checked to be sure the poster has remained in place for eight days prior to the date of the public hearing. Date of hearing noted thereon to be held [J led. 1]0,), t(p a ()DS A- ~ tJ n ()1 a 6cU-t I) ;Q) Y) . Dated: //-0 '7-o.s- .~ (signature) ~wom to before me this '1 day of l\h!20'05 . e . NOTICE TO ADJACENT PROPERTY OWNER BOARD OF TRUSTEES, TOWN OF SOUTHOLD In the matter of applicant: PETER BACCILE SCTM#1000-009-3-11 YOU ARE HEREBY GIVEN NOTICE: 1. That it is the intention of the undersigned to request a Permit from the Board of Trustees to: Construct 95 (+/-) LF of 4-foot wide wood pile and timber pier and install an 8' x 20' float with associated 3,5' x 2- wood ramp and tie-off pilings all at or waterward of the apparent high water line, 2. That the property which is the subject of Environmental Review i'- located adjacent to your property and is described as .:> follows: Property off of Equestrian Avenue 3. That the property which is subject to Environmental Review under Chapters 32, 37, or 97 of the Town Code is open to public comment. You may contact the Trustees Office at 765- 1892 or in writing. The above referenced proposal is under review of the Board of Trustees of the Town of Southold and does not reference any other agency that might have to review same proposal, OWNERS NAME: PETER BACCILE MAILING ADDRESS: 73 BURNING TREE ROAD GREENWICH, CT 06380 PHONE (212 ) 622-4466 Enc, : Copy of sketch or plan showing proposal for your convenience, 5 ~ PROOF OF MAILING OF NOTICE ATTACH CERTIFIED MAIL RECEIPTS U.S. Postal ServiceTrl U.S. Postal ServiceTM g; CERTIFIED MAIL" RECEIPT Ac ~ CERTIFIED MAILM RECEIPT . U1 (Domestic Mail Only; N" In"'-';"'''--,,:ce Coverage Provided) ru (Domestic Mail Only; No Insurance Coverage Provided) .:r .:r - ~ . ,0 . . . . ._ .. .. ' . ~ USE ~ OFFICI USE m m Poslage ~IT ID: 0J55 Postage $ CI 1). ~ ~ Cer1lfledFee , \ ~ CertlfledFeelj "'~~" '-'\i'd-' a f Postmark a ~ ark lJ'-). a Return RecIept Fee I Return Reclept Fee (Endorsement Required) Here a (Endorsement Required) ~ ~ ~ Restricted Delivery Fee Clerk. KD..c..- a Restricted Delivery Fee \1;: ('il~"tJ ' - . (Endorsement Required) . .-- V&.V1 U1 (EndOlllBlllent Required) \ "" ~ c: I"- I"- \. S ~ .) a Total Postage & Fees 10/25/05 a Total Postage & Fees $ ....... U .:r .:r a a a a I"- I"- STATE OF CONNECTICUT COUNTY OF NEW LONDON DOCKO, INC. , residing at 14 HOLMES STREET, MYSTIC, CT , being duly sworn, deposes and says that on the t-POfA day of L)CrO~E'J?; , 20 05', deponent mailed a true copy of the Notice set forth in the Board of Trustees Application, directed to each of the above named persons at the addresses set opposite there respective names; that the addresses set opposite the names of said persons are the address of said persons as shown on the current assessment roll of the Town of Southold; that said Notices were mailed at the United States Post Office at MYSTIC, CT , that said Notices were mailed to each of said persons by (certified) (registered) m~~ 11 ,// \ Jft~ '2Y1\-J~ Sworn to before me this ~f~ Day of ()C'~ , 200,~_- ~'--mc~ ' (t( ) . , // Notary Publlc L..-/ 6 . . ~ Board of Trustees Application County of Suffolk state of New York PETER BACCILE BEING DULY SWORN DEPOSES AND AFFIRMS THAT HE / SHE IS THE APPLICANT FOR THE ABOVE DESCRIBED PERMIT(S) AND THAT ALL STATEMENTS CONTAINED HEREIN ARE TRUE TO THE BEST OF HIS/HER KNOWLEDGE AND BELIEF, AND THAT ALL WORK WILL BE DONE IN THE MANNER SET FORTH IN THIS APPLICATION AND AS MAY BE APPROVED BY THE SOUTHOLD TOWN BOARD OF TRUSTEES, THE APPLICANT AGREES TO HOLD THE TOWN OF SOUTHOLD AND TOWN TRUSTEES HARMLESS AND FREE FROM ANY AND ALL DAMAGES AND CLAIMS ARISING UNDER OR BY VIRTUE OF SAID PERMIT(S), IF GRANTED. IN COMPLETING THIS APPLICATION, THE APPLICANT HEREBY AUTHORIZES THE TRUSTEES, THEIR AGENT (S) OR REPRESENTATIVE(S), TO ENTER ONTO MY PROPERTY TO INSPECT THE PREMISES IN CONJUNCTION WITH REVIEW OF THIS APPLICATION, Q~~~ oJ () lit DAY OF tJtftber - SWORN TO BEFORE ME THIS , 20 0.6. ~~~~ ./ Nota ic MARIAN ZAI Notary Public. State Of New York No. 31-4888037 Qualified In Richmond couEl:( Term Expires March 30. 20 7 . . . Board of Trustees Application AUTHORIZATION (where the applicant is not the owner) I, PETER BACCILE residing at 73 BURNING TREE ROAD (print owner of property) (mailing address) GREENWICH, CT 06380 do hereby authorize DOCKO, INC. , (Agent) MYSTIC, CT to apply for permit(s) from the Southold Board of Town Trustees on my behalf, (~ ) \ '~Q~ ~ (Owner's signature) 8 . . 617,20 - Appendix A State Environmental Quality Review FULL ENVIRONMENTAL ASSESSMENT FORM Purpose: The full EAF is designed to help applicants and agencies detennine, in an orderly manner, whether a project or action may be significant. The question of whether an action may be significant is not always easy to answer. Frequently, there are aspects of a project that are subjective or unmeasurable. It is also understood that those who detennine significance may have little or no formal knowledge of the environment or may not be technically expert in environmental analysis. In addition, many who have knowledge in one particular area may not be aware of the broader concerns affecting the question of significance. The full EAF is intended to provide a method whereby applicants and agencies can be assured that the determination process has been orderly, comprehensive in nature, yet flexible enough to allow introduction of information to fit a project or action. Ful EAF Components: The full EAF is comprised of three parts: Part 1 : Provides objective data and infonnation about a given project and its site. By identifying basic project data, it assists a reviewer in the analysis that takes place in Parts 2 and 3. Part 2: Focuses on identifying the range of possible impacts that may occur from a project or action. It provides guidance as to whether an impact is likely to be considered small to moderate or whether it is a potentlally.large impact. The form also identifies whether an impact can be mitigated or reduced. Part 3: If any impact in Part 2 is identified as potentially-large, then Part 3 is used to evaluate whether or not the impact is actually important. THIS AREA FOR LEAD AGENCY USE ONLY DETERMINATION OF SIGNIFICANCE -- Type 1 and Unlisted Actions Identify the Portions of EAF compteted for this project: o Part 1 D Part 2 DPart 3 Upon review of the information recorded on this EAF (Parts 1 and 2 and 3 if appropriate), and any other supporting infonnation, and considering both the magnitude and importance of each impact, it is reasonably determined by the lead agency that: [!]A. The project will not result in any large and important impact(s) and, therefore, is one which will not have a significant impact on the environment. therefore a negative declaration will be prepared. DB. Although the project could have a significant effect on the environment, there will not be a significant effect for this Unlisted Action because the mitigation measures described in PART 3 have been required, therefore a CONDITIONED negative declaration win be prepared. .. Dc. The project may result in one or more large and important impacts that may have a significant impact on the environment, therefore a positive declaration will be prepared. .. A Conditioned Negative Declaration is only valid for Unlisted Actions PETER BACCILE - NEW FIXED PIER & FLOAT Name of Action Name of Lead Agency Print or Type Name of Responsible Officer in Lead Agency Title of Responsible Officer Signature of Responsible Officer in Lead Agency Signature of Preparer (If different from responsible offICer) website Date Page 1 of 21 . . , PART 1-PROJECT IN FORMA TION Prepared by Project Sponsor NOTICE: This document is designed to assist in determining whether the action proposed may have a significant effect on the environment Please complete the entire form, Parts A through E. Answers to these questions will be considered as part of the application for approval and may be subject to further verification and publiC review. Provide any additional information you believe will be needed to complete Parts 2 and 3. It is expected that completion of the full EAF will be dependent on information currently available and will not involve new studies, research or investigation. If information requiring such additional work is unavailable, so indicate and specify each instance. Name of Action NEW FIXED PIER & FLOAT Location of Action (include Street Address, Municipality and County) EQUESTRIAN A VENUE, FISHERS ISLAND, NEW YORK Name of Applicant/Sponsor PETER BACCILE Address 73 BURNING TREE ROAD City I PO GREENWICH State CT Zip Code 06380 Busine. Telephone (212) 622-4466 Name of Owner (if different) Address City I PO Stale Zip Code Busine. Telephone Description of Action: CONSTRUCT 95 (+/-) LF OF 4-FOOT WIDE FIXED WOOD PILE AND TIMBER PIER AND INSTALL AN 8' X 20' FLOAT WITH ASSOCIATED 3.5' X 20' WOOD RAMP AND TIE-OFF PILINGS ALL W ATERW ARD OF THE APPARENT HIGH WATER LINE. Page 2 of 21 , . . , Please Complete Each Question--Indicate N,A. if not applicable A, SITE DESCRIPTION Physical setting of overall project, both developed and undeveloped areas. 1. Present land Use: 0 Urban o industrial D Commercial o Residential (suburban) o Rural (non-fann) D Forest D Agriculture DOther 2. Total acreage of project area: 0.1 acres. APPROXIMATE ACREAGE PRESENTLY AFTER COMPLETION Meadow or Brushland (Non-agricultural) 3 acres 3 acres Forested 1- acres 1- acres Agricultural (Includes orchards, cropland, pasture, etc.) acres acres Wetland (Freshwater or tidal as per Articles 24,25 of ECL) 1/2 acres 1/2 acres Water St.rface Area acres acres Unvegetated (Rock, earth or fill) 1/2 acres 1/2 acres Roads, buildings and other paved surfaces 1/10 acres 1/10 acres Other (Indicate type) acres acres 3. What is predominant soil type(s) on project site? a. Soil drainage: [2]well drained 100 % of site D Moderately well drained _% of site. o Poorly drained _ % of site b. If any agricultural land is involved, how many acres of soil are classified within soil group 1 through 4 of the NYS Land Classification System? acres (see 1 NYCRR 370). 4. Are there bedrock outcroppings on project site? 0 Yes [!] No a. What is depth to bedrock (in feet) 5. Approximate percentage of proposed project site with slopes: DO.10%~% 010- 15%-.!Q.% o 15% or greater _ % 6. Is prqject sUbstantia[jontiguouS t'G contain a building, site, or district, listed on the State or National Registers of Historic Places? Yes _ No 7. Is project substantially contiguous to a site listed on the Register of National Natural Landmarks? DYes [!]NO 8. What is the depth of the water table? o (in feet) 9. Is site located over a primary, principal, or sole source aquifer? DYes [!] No 10. Do hunting, fishing or shell fishing opportunities presently exist in the project area? DYes [!] No Page 3 of 21 , . . 11. Does prOject site contain any species of plant or animal life that is identified as threatened or endangered? DYes [!JNO . rcording 1<" I Identify each species: 12. Are there any unique or unusual land forms on the project site? (Le., cliffs, dunes, other geological formations? DYes [!JNO Describe: I I 1 3. Is the project site presently used by the community or neighborhood as an open space or recreation area? DYes [!] No r les, a.pia'" I 14. Does the present site include scenic views known to be important to the community? DYes 0NO I I 15. Streams within or contiguous to prqject area: I NONE I a. Name of Stream and name of River to which It is tributary I THE SITE IS LOCATED IN HAY HARBOR I 16. Lakes, ponds, wetland areas within or contiguous to project area: b. Size (in acres): I I Page 4 of 21 . . , 1 7. Is the site served by existing public utilities? [!] Yes DNo a. If YES, does sufficient capacity exist to allow connection? [!] Yes DNo b. If YES, will improvements be necessary to allow connection? DYes ~NO 18. Is the site located in an agricultural district certified pursuant to Agriculture and Markets Law, Article 25-AA, Section 303 and 304? DYes I!JNO 19. Is the site located in or substantialoontiguous to a Critical Environmental Area designated pursuant to Article 8 of the ECL, and 6 NYCRR 6177 [!] Yes No 20. Has the site ever been used for the disposal of solid or hazardous wastes? DYes I!J No B. Project Desc:I1Jtion 1. Physical dimensions and scale of prqject (fill in dimensions as appropriate). a. Total contiguous acreage owned or controlled by project sponsor: 4.5 acres. b. Project acreage to be developed: 0.1 acres initially; 0.1 acres ultimately. c. Project acreage to remain undeveloped: 4.4 acres. d. Length of project, in miles: 150 FT. (if appropriate) e. If the project is an expansion, indicate percent of expansion proposed. ~ % f. Number of off-street parking spaces existing 4-5 ; proposed 0 g. Maximum vehicular trips generated per hour: N/~~ (upon completion of project)? h. If residential: Number and type of housing units: One Family Two Family Multiple Family Condominium Initially 1 Ultimately 1 L Dimensions (in feet) of largest proposed structure: 1(. height; 4 width; 95 length. j. Linear feet of frontage along a piJ)lic thoroughfare project will occupy Is? NI A ft. 2. How much natural material (Le. rock, earth, etc.) will be removed from the site? NONE tons/cubic yards. 3. Will disturbed areas be reclaimed DYes DNO [!)N/A a. If yes, for what intended purpose is the site being reclaimed? I I b. Will topsoil be stockpiled for reclamation? DYes ~NO c. Will upper subsoil be stockpiled for reclamation? DYes [!] No 4. How many acres of vegetation (trees, shrubs, ground covers) will be removed from site? o acres. Page 5 of 21 , . . 5. Will any mature forest (over 100 years old) or other locally-important vegetation be removed by this project? , Dyes [!] No 6. If single phase project: Anticipated period of construction: -1.. months, (including demolition) 7. If multi-phased: a. Total number of phases anticipated ---.!. (number) b. Anticipated date of commencement phase 1: ---..i. month ~ year, (including demolition) c. Approximate completion date of final phase: ----2. month ~ year. d. Is phase 1 functionally dependent on subsequent phases? DYesDNo 8. Will blasting occur during construction? DYes 0NO 9. Number of jobs generated: during construction 3 ; after project is complete 10. Number of jobs eliminated by this project 0 11. Will project require relocation of any prqJects or facilities? 0 Yes 0NO If yes, explain: I I 12. Is surface liquid waste disposal involved? DYes [!] No a. If yes, indicate type of waste (sewage, industrial, etc) and amount b. Name of water body into which effluent will be discharged 13. Is subsurface liquid waste disposal involved? 0 Yes [!JNO Type 14. Will surface area of an existing water body increase or decrease by proposal? DYes [!J No If yes, explain: I I 1 5. Is project or any portion of project located in a 100 year flood plain? 0 Yes DNo 16. Will the project generate solid waste? 0 Yes 0NO a. If yes, what is the amount per month? tons b. If yes, will an existing solid waste facility be used? 0 Yes 0 No c. If yes, give name ; location d. Will any wastes not go into a sewage disposal system or into a sanitary landfill? DYes DNO Page 6 of 21 . . e. If yes, explain: 17. Will the project involve the disposal of solid waste? DYes [!]NO a. If yes, what is the anticipated rate of disposal? tons/month. b. If yes, what is the anticipated site life? years. 18. Will project use herbicides or pesticides? DYes [!] No 19. Will project routinely produce odors (more than one hour per day)? DYes [!]NO 20. Will project produce operating noise exceeding the local ambient noise levels? [!]Yes DNo 21. Will project result In an increase in energy use? DYes [!] No If yes, indicate type(s) 22. If water supply is from wells, indicate pumping capacity gallons/minute. 23. Total anticipated water usage per day 5 gallons/day. 24. Does project involve local, State or Federal funding? DYes [!] No If yes, explain: Page 7 of 21 . . 25. Approvals Required: SUbmittal Date Type o Yes DNO Town of South old October 2005 City, Town. Village Board City, Town, ViUage Planning Board Dyes DNo City, Town Zoning Board DYes DNO City, County Health Department Dyes DNo Other Local Agencies Dyes DNO Other Regional Agencies Dyes DNo o Yes D No New York State DEC October 2005 State Agencies o Yes DNO US Army Corps October 2005 Federal Agencies of Engineers c. ZonIng .,d Planning Information 1. Does proposed action involve a planning or zoning decision? 0 Yes [!] No If Yes, indicate decision required: o Zoning amendment o Zoning variance o New/revision of master plan o Subdivision o Site plan o Special use permit o Resource management plan o Other Page 8 of 21 . . 2. What is the zoning classification(s) of the site? IRESIDENTIAL I 3. What is the maximum potential development of the site if developed as permitted by the present zoning? I RESIDENTIAL I 4. What is the proposed zoning of the site? I RESIDENTIAL I 5. What is the maximum potential development of the site if developed as permitted by the proposed zoning? I I 6. Is the proposed action consistent with the recommended uses in adopted local land use plans? [!] Yes DNo I I 7. What are the predominant land use(s) and zoning classifications within a 14 mile radius of proposed action? RESIDENTIAL, EXCEPT FOR THE HAY HARBOR CLUB APPROXIMATELY 1/4 MILE NORTH. 8. Is the proposed action compatible with adjoining/surrounding land uses with a 14 mile? [!] Yes DNO 9. If the proposed action is the SUbdivision of land, how many lots are proposed? a. What is the minimum lot size proposed? Page 9 of 21 . . 10. Will proposed action require any authorization(s) for the formation of sewer or water districts? DYes 0 No I I 11. Will the proposed action create a demand for any community provided services (recreation, education, police, fire protection? DYes [!]NO a. If yes, is existing capacity sufficient to handle projected demand? DYes DNo I I 1 2. Will the proposed action result in the generation of traffic significantly above present levels? DYes0No a. If yes, is the existing road network adequate to handle the additional traffic. DYes DNo I I D. Informational Details Attach any additional information as may be needed to clarify your project. If there are or may be any adverse impacts associated with your proposal, please discuss such impacts and the measures which you propose to mitigate or avoid them. E. Verification I certify that the information provided above is true to the best of my knowledge. Date ~ APPlican~ Name PETER BACCILE S~lul5~S ~ Title OWNER & APPLICANT If the action is in the Coastal Area, and you are a slate agency, complete the Coastal Assessment Fonn before proceeding with this assessment. Page 10 of21 TOmI of Soutbold . . , LWRP CONSIS'fENq ASSES~MENT FORM . A, INSTRUCTIONS J. All applicants for permits* including Town of Southold agencies, shall complete this CCAF for proposed actions that are subject to the Town of Southold Waterfront Consistency Review Law. This assessment is intended to supplement other information used by a Town of Southold agency in making a determination of consistency. *Except for minor exempt actions including Building Permits and other ministerial permits not located within the Coastal Erosion Hazard Area. 2. Before answering the questions in Section C, the preparer of this form should review the exempt minor action list, policies and explanations of each policy contained in the Town of Southold Local Waterfront Revitalization Program. A proposed action will be evaluated as to its significant benefi~ial and adverse effects upon the coastal area (which includes all of Southold Town). 3. If any question in Section C on this form is answered "yes" or "no", then the proposed action will affect the achievement of the L WRP policy standards and conditions contained in the consistency review law. Thus. each answer must be eXDlained in detail. Iistin2 both SUDDortin2 and non-suDDortin2 facts, If an action cannot be certified as consistent with the L WRP policy standards and conditions, it shall not be undertaken. A copy of the LWRP is available in the following places: online at the Town of South old's web site (southoldtown.northfork.net ), the Board of Trustees Office, the Planning Department, all local libraries and the Town Clerk's Office. B, DESCRIPTION OF SITE AND PROPOSED ACTION SCTM# 1000-09-03-11 PROJECT NAME: New Fixed Pier & Float (Peter Baccile) The Application has been submitted to (check appropriate response): Town Board Planning Board _ Building Dept. Board of Trustees -X-- - 1. Category of Town of South old agency action (check appropriate response): a) Action undertaken directly to Town agency (e.g. capital construction, planning activity, agency regulation, land transaction) - b) Financial assistance (e.g. grant loan subsidy) - c) Permit, approval, license, certification: -L Nature and extent of action: Construct 80 ( +/-) SF of 4-foot wide fixed wood pile and timber pier with associated steps and install an 8' x 20' float with associated 3.5' x 20' ram>> and tie-off pilinBs. all waterward of the apparent high water line. , Location of en: Property off of Equest. venue . Site acreage: Parcel = 4.5 . Present Land use: Residential Present Zoning Classification: Residential 2. If an application for the proposed action has been filed with the Town of Southold agency, the following information shall be provided: a) Name of applicant: Peter Baccile b) Mailing Address: 73 Burning Tree Road. Greenwich. CT 06380 c) Telephone number: Area Code (212) 622-4466 d) Application number, if any Will the action be directly undertaken, require funding, or approval by a state or federal agency? Yesl No If yes, which state or federal Agency? US ACOE, NYS DEC - C. Evaluate tbe project to tbe following policies by analyzing bow tbe project will furtber support of not support tbe policies, Provide all proposed Best Management Practices tbat will furtber eacb policy. Incomplete answen will require tbat tbe form be returned for completion. DEVELOPED COAST POLICY Policy 1. Foster a pattern of development in tbe Town of Soutbold tbat enbances community character, preserves open space, makes efficient use of infrastructure, makes beneficial use of a coastal location, and minimizes adverse effects of development. See L WRP Section m - Policies; Page 2 for evaluation criteria. X Yes - No _ Not Applicable This facility reconstruction and extension project makes appropriate use of an existing waterfront access dock site and complies with environmental design factors published by the NYS DEC. and the DOS Coastal MatlaBement Program. Southold Local Law No. 6~ 2004 and the Southold L WRP. The pier will follow its existing. long~standing alignment but be raised to a 4-foot dock clearance over the bottom sediments until passing the landward limit of the adiacent spartina marsh. then ramp to shore. Piles and rails will be three feet above the deck. There will be no impairment of waterflow or navigation. Policy 2. Protect and preserve historic and arcbaeological resources of the Town of Southold. See L WRP Section m - Policies Page 3 tbrougb 6 for evaluation criteria, Yes - No -L Not Applicable . . . , Policy 3. Enhance visual quality and protect scenic resources throughout the Town of Southold. See L WRP Section m - Policies Pages 6 through 7 for evaluation criteria - Yes - No --X.. Not Applicable The proposed structure is reconstruction of an existing pier in place and extending it to shore and add a new ramp and float with tie-off piles.. The only visual access affected by this proiect is at the applicant's site which is surrounded by trees. The portion of the fayility visible from the Crisp's from the east will look substantially the same. NATURAL COAST POLICIES Policy 4. Minimize loss of life, structures, and natural resources from flooding and erosion. See L WRP Section m - Policies Pages 8 through 16 for evaluation criteria, Yes No X Not Applicable - - The pier and float system is locat~ in Hay Harbor and is acknowledged to be in a flood-prone area: there is wave exposure at this site when storms or fronts generate northerly winds. The pier will be designed to accommodate complete submersion and resist hydrostati~ uplift pressures due to flooding. Policy 5, Protect and improve water quality and supply in the Town of Southold, See L WRP Section m - Policies Pages 16 through 21 for evaluation criteria. - Yes - No X Not Applicable This proj~ will not have any affect on suitability of or availability of drinking water on Fishers Island. Policy 6. Protect and restore the quality and function of the Town of South old ecosystems including Significant Coastal Fish and Wildlife Habitats and wetlands. See L WRP Section m - Policies; Pages 22 through 32 for evaluation criteria, X Yes No _ Not Applicable - . . . This project is consistent with this policy because it raises the elevation of the pier landing to an acceptable height above the bottom sediment~ through which adjacent tidal wetlands may &pread (although they do not exist at the dock site currently). In addition. the NYS DEC prepared a study showing that the proposed pressure-treated Southern Pine timber products construction materials are suitable for this type of project in this location. except for decking which will be of untreated woods or composite (or plastic) materials in accordance with Law 6.2004. The design parameters shown on the drawings provides an optimum balance between acceptable design and access standards and provide opportunities for the wetlands vegetation to spread. Therefore. the pier encourages habitat enhancement. Policy 7. Protect and improve air quality in tbe Town of Soutbold. See LWRP Section m - Policies Pages 32 tbrougb 34 for evaluation criteria. Yes No X Not Applicable - - There are no air quality issues related to this project. No emissions will be generated by the dock facility. Policy 8. Minimize environmental degradation in Town of Southold from solid waste and hazardous substances and wastes. See LWRP Section m - Policies; Pages 34 through 38 for evaluation criteria, - Yes - No X Not Applicable There is no solid waste or hazardous substances to be generated from this project. The pressure-treated wood trimmings from the dock C9nstruction will be collected and disposed of in accord~ce with current regulations so as to minimize any harmful affect. PUBLIC COAST POLICIES Policy 9. Provide for public access to, and recreational use of, coastal waters, public lands, and public resources of tbe Town of Soutbold. See LWRP Sedion m - Policies; Pages 38 tbrough 46 for evaluation criteria. - Yes - No X Not Applicable This project is being built on private land. The public trust lands and waters constitutes the area between the mean high water line and mean low water line and the resources are fr9m the high tide line. out. These environmental resources are being protected by the design standards dictated by the NYS DEC and the Town. There is virtually no public use of the waterfront in this area and the reconstruction of the pier and landward extension above the apparent high water line are not likely to influence or change this f~. . . . . WORKING COAST POLICIES Policy 10, Protect Southold's water-dependent uses and promote siting of new water-dependent uses in suitable locations, See LWRP Section m - Policies; Pages 47 through 56 for evaluation criteria. X Yes - No _ Not Applicable This project is to rebuild an existing long-standing wood pile and timber pier and install a new ramp onto a new floating d.;>ck for water-de.pendent. recr~tional and transportation boating. This usage is defined as water-dependent in the LWRP because the pier and float for recreational boating and provide boat transportation access to the mainland. The reconstruction part of the prQject is to r~lace a deteriorated structure. The extension to shore is to provide continuity of access while enhancing existing habitat. Policy 11. Promote sustainable use of living marine resources in Long Island Sound the Peconic Estuary and Town waters, See L WRP Section m - Policies; Pages 57 through 62 for evaluation criteria, - Yes - No -A. Not Applicable This pier is not used for commercial fishing or shellfish industries or enterprises. Policy 12, Protect agricultural lands in the Town of Southold. See L WRP Section m - Policies; Pages 62 through 65 for evaluation criteria. - Yes - No X Not Applicable This pier is not used for or in support of any agricultural or aquaculture industries or enterprises. Policy 13. Promote appropriate use and development of energy and mineral sources. See LWRP Section ill - Policies; pages 65 through 68 for evaluation criteria. - Yes - No X Not Applicable This pier is not used for or in support of any energy or mineral mining or processing operations. PREPARED BY Keith B. Neilso~ P.E.. Docko. Inc._ TITLE Agent_ DATE October 6.2005 . . ~ Docko. Inc. --- - - p.o. Box 421, Mystic, CT 06355 (860) 572-8939 Fax: (860) 572-7569, e-mail: docko@snet.net October 25, 2005 Mr. Albert Krupski, President Southold Board of Trustees P.O. Box 1179 Southold, NY 11971 _ r) i_ Re: Pet~r Baccile New Fixed Pier & Float Dear Mr. Krupski: On behalf of Mr. Peter Baccile, we enclose herewith the following in support of his permit application for a new fixed pier and float in Hay Harbor on Fishers Island. ;.. Two prints each of plans titled: Project: "New Fixed Pier & Float" Waterway: Hay Harbor Location: Fishers Island, Town of Southold Suffolk County, New York Applicant: Peter Baccile Date: October 3,2005 ;.. Two copies of the Southold Board of Trustees permit application, U. S. ACOE and DEC applications, SEQR-Part 1, LWRP Consistency Assessment Form, Tax Assessor's Map, site photographs and location map. ;.. Check in the amount of $250.00 payable to the Town of Southold. I trust that you will find this application package complete and acceptable; please let me know if the need for further information arises. Very truly yours, DOCKO, INC. ~~ Keith B. Neilson, P.E. KBN:jm Enclosures CC: Peter Baccile US ACOE NYS DEC: Environmental Permits File: 05-03-1679 BACCILE