Loading...
HomeMy WebLinkAboutTR-6113 MAILING ADDRESS: S PLANNING BOARD MEMBEhS P.O. Box 1179 JERILYN B.Chair USE �O��OF S Chairr U�jyol Southold, NY 11971 O KENNETH L.EDWARDS � � OFFICE LOCATION: Town Hall Annex MARTIN H. SIDORIldc GEORGE D.SOLOMON 54375 State Route 25 G Q JOSEPH L.TOWNSEND � �� (cor. Main Rd. &Youngs Ave.) Southold, NY P4UMY,� Telephone:_631.7.6.b-1938 Fax: 631 766-3136 PLANNING BOARD OFFICE TOWN OF SOUTHOLD MAR 6 2006 To: Town of Southold Zoning Board of Appeals From: Mark Terry, Senior Environmental Planner _ LWRP Coordinator MAR 6 2006 Date: March 3, 2006 (REVISED) - Re: Proposed residence for.Nicholas Aliano ZBA#5846 SCTM#1000-83-1-12 The proposal is to construct a single-family dwelling, two wood retaining walls with concrete footings, a proposed driveway and septic system within 100' of the top of bluff line. The following permits were issued for the proposed action: 1. December 28, 2004; New York State Department of Environmental Conservation Tidal Wetland Permit# 1-4738-03391/0001 2. April 20, 2005; Town of Southold Board of Trustees Permit# 6113. The proposed action has been reviewed to Chapter 95, Waterfront Consistency Review of the Town of Southold Town Code and the Local Waterfront Revitalization Program (LWRP) Policy Standards. Based upon the information provided on the LWRP Consistency Assessment Form submitted to this department, as well as the records available to me, it is my recommendation that the proposed action is INCONSISTENT with the denoted following Policy Standards and therefore is INCONSISTENT with the LWRP. Note that the surveys approved by the New York State Department of Environmental Conservation (DEC), last revised July 19, 2004, and those approved by the Board of Trustees, last revised August 31, 2005 are different. The survey approved by the DEC shows the northwest corner of the residence at 48' from the top of bluff line and the retaining wall 27' from the top of bluff line. Two surveys were submitted to the Zoning Board of Appeals. Survey A (last revised January 18, 2006) and Survey B (last revised February 14, 206). Survey A proposes to locate the northwest corner of the residence at 42' from the top of bluff line and 7' of the eastern concrete retaining wall footing seaward of the coastal erosion hazard line. The survey correlates with the Board of Trustees approval. Survey B (as built), shows the location of the existing footings for the residence at 42' from the top of bluff line and the eastern concrete retaining wall footings 33' from the top of bluff line and outside of the coastal erosion hazard area. Policy Standard 4.1 Minimize losses of human life and structures from flooding and erosion hazards. The following management measures to minimize losses of human life and structures from flooding and erosion hazards are suggested: A. Minimize potential loss and damage by locating development and structures away from flooding and erosion hazards. 1. Avoid development other than water-dependent uses in coastal hazard areas. Locate new development which is not water-dependent as far away from coastal hazard areas as practical. a. No development is permitted in natural protective feature areas, except as specifically allowed under the relevant portions of 6 NYCRR 505.8. b. Avoid hazards by siting structures to maximize the distance from Coastal Erosion Hazard Areas. Aerial photos (attached) indicate that the bluff/cliff on the property is unstable and erosive. This observation is supported in a report authored by William L. Jaeger, P.E., L.S dated January 24, 2006. However, it is unclear to what exact area the term "bluff' applies to in the report. The report states: "The bluff is currently unstable with no toe control and some vegetated overburden." The report further states that: "The current bluff instability is unrelated to the construction of the foundation..." Note that, no evaluation of the clearing of the moderate to severe slopes in relation to bluff/cliff/slopes instability and erosion was made in the report. In addition, the report does not address the potential instability of the area down slope of the eastern retaining wall which consists of severe slopes cleared of vegetation. Due to lot size and area of moderate to severe slopes, there is limited ability to site the residential structure to avoid erosion hazards. However, to further Policy 4.1 A,1b it is recommended that the Board evaluate the relocating of the residence foundation to the west to avoid slopes greater than 15% to the greatest extent practical. To further Policy 4.1 and stabilize the bluff areas it is further recommended that: a. The applicant re-vegetate the face of all bluff in conjunction with providing toe protection in the form of gabions or other stone control methods as recommended in the engineering report prepared by William L. Jaeger, RE, P ap L.S. In addition, it is also recommended that vegetative erosion control methods be employed on all bluff/cliff areas with slopes greater than 15%. Policy S. Protect and improve water quality and supply in the Town of Southold. The property is not served by public water. Water supply is proposed via private well. To further protect ground water quality and conserve water supply to the greatest extent possible it is recommended that the reviewing Boards encourage the following best management practices for landscaping, lawn establishment and maintenance post construction to further the conservation of water and retain water quality: 1. Minimize irrigated/fertilized lawn areas; replace proposed turf areas with indigenous trees and understory. Policy 6. Protect and restore the quality and function of the Town of Southold ecosystem Policy Standards 6.1 Protect and restore ecological quality throughout the Town of Southold. A. Avoid adverse changes to the Long Island Sound and the Peconic Bay ecosystems that would result from impairment of ecological quality as indicated by: 1. Physical loss of ecological components Physical loss is often the most obvious natural resource impairment to identify. It usually results from discrete actions, such as filling or excavating a wetland or clearing an upland forest community prior to development. 2. Degradation of ecological components Degradation occurs as an adverse change in ecological quality, either as a direct loss originating within the resource area or as an indirect loss originating from nearby activities. Degradation usually occurs over a more extended period of time than physical loss and may be indicated by increased siltation, changes in community composition, or evidence of pollution. B. Protect and restore ecological quality by adhering to the following measures. 1. Maintain values associated with natural ecological communities. Each natural ecological community has associated values which contribute to the ecological quality of the Town of Southold. These values should be assessed on a case-by-case basis. 2. Retain and add indigenous plants to maintain and restore values of natural ecological communities. a. Protect existing indigenous plants from loss or disturbance to the extent practical. P3� � b. Include use of suitable indigenous plants in the landscaping plans for new development and in redevelopment projects where loss or disturbance of existing indigenous plants could not be prevented during construction. The property has been mostly cleared of vegetation, including areas seaward of the Coastal Erosion Hazard Line. Prior to construction, no clearing limits were established to mitigate and/or stabilize moderate to severe slopes or preserve indigenous vegetation to "the extent practical". Due to the fact that the lot has been mostly cleared of vegetation there is little ability to further Policy 6.1 B, 2a. To comply with a Board of Trustee permit condition and to assist in the stabilization of the steep slopes, a planting plan, dated January 26, 2006 has been submitted by the Cramer Consulting Group which includes indigenous plant species. Plants are grouped and located within the retaining walls and below the eastern concrete retaining wall. Slopes will be hydro-seeded with an unspecified grass species. The lawn area is proposed to be planted in sod. The effectiveness and success of the planting plan in furthering Policy 6.1 B, 2b cannot be assessed without knowing the percent slope post construction grading and the erosion control methods (if any) that will be employed at the toe of the bluff/cliff. C. Reduce adverse impacts on ecological quality due to development. 1. Reduce adverse effects of existing development. 2. Mitigate impacts of new development. The proposed action will result in a physical loss of a vegetated bluff ecosystem. The ability to reduce adverse impact of development is limited due to the fact that clearing and grading has already occurred on site. The applicant has mitigated some impacts of new development through the placement of haybales and silt fencing during construction. To further Policy 6.2 C.2, the following is recommended: 1. The submittal of a re-vegetation plan proposing high density plantings of indigenous drought tolerant plant species on all slopes greater than 15% to provide more effective slope stabilization and minimize fertilization and irrigation requirements. Policy Standard 6.3 Protect and restore tidal and freshwater wetlands. A. Comply with statutory and regulatory requirements of the Southold Town Board of Trustees laws and regulations for all Andros Patent and other lands under their jurisdiction. 1. Comply with Trustee regulations and recommendations as set forth in Trustee permit conditions. B. Comply with statutory and regulatory requirements of the State's wetland laws. A 2. Comply with the regulatory requirements of the Freshwater Wetlands Act for the protection of mapped freshwater wetlands. 3. Comply with the regulatory requirements of the Tidal Wetlands Act for the protection of mapped tidal wetlands including coastal fresh marsh; intertidal marsh; coastal shoals, bars and flats; high marsh or salt meadow; littoral zones; and formerly connected tidal wetlands. Chapter 37 defines a bluff as: "Any bank or cliff with a precipitous or steeply sloped face adjoining a beach or a body of water. The waterward limit of a bluff is the landward limit of its waterward natural protective feature. Where no beach is present, the waterward limit of a bluff is mean low water. The landward limit is twenty-five (25) feet landward of the receding edge or, in those cases where there is no discernible line of active erosion, twenty-five (25) feet landward of the point of inflection on the top of the bluff. The "point of inflection" is that point along the top of the bluff where the trend of the land slope changes to begin its descent to the shoreline." As discussed above, the landward limit of the bluff/cliff is unclear. Therefore, a recommendation regarding the compliance of the proposed action to Chapter 37 cannot be made at this time. Chapter 97 of the Town of Southold Town Code also defines a bluff as: "Any bank or cliff with a precipitous or steeply sloped face adjoining a beach or a body of water. The waterward limit of a bluff is the landward limit of its waterward natural protective feature. Where no beach is present, the waterward limit of a bluff is mean low water. The landward limit is twenty-five (25) feet landward of the receding edge or, in those cases where there is no discernible line of active erosion, twenty-five (25) feet landward of the point of inflection on the top of the bluff. The ','point of inflection" is that point along the top of the bluff where the trend of the land slope changes to begin its descent to the shoreline." Chapter 97 regulates actions within 100 feet of a Bluff line; the action includes; Bluff line. (1) Residence: 100 feet. (2) Driveway: 100 feet. (3) Sanitary leaching pool (cesspool): 100 feet. (4) Swimming pool and related structures: 100 feet. Pursuant to Chapter 97 of the Town of Southold Town Code, residential structures, sanitary leaching pools and driveways require a minimum 100' setback from the top of bluff line. On the survey approved by the DEC (dated last revised July 19, 2004) and Board of Trustees (dated last revised September 3, 2004, the applicant proposes a 48' setback from the foundation wall (northwest corner) to the top of bluff line. Therefore the proposed action is inconsistent with the Policy 6.3 B3. Due to lot configuration and setback requirement there is limited to no ability to locate the residence or retaining walls to meet the minimum 100' setback and further or meet the Policy 6.3 B3. P, 5-16 Policy Standard 9.2. Protect and provide public visual access to coastal lands and waters from public sites and transportation routes where physically practical. A. Avoid loss of existing visual access. 1. Limit physical blockage of existing visual access by development or activities due to thescale, design, location, or type structures. 2. Protect view corridors provided by streets and other public areas leading to the coast. 3. Protect visual access to open space areas associated with natural resources. B. Minimize adverse impact on visual access. 1. Provide for view corridors to the coast in those locations where new structures would block views of the coast from inland public vantage points. 2. Use structural design and building siting techniques to preserve or retain visual access and minimize obstruction of views. 3. Visual access requirements may be reduced where site conditions, including vegetative cover or natural protective features, block potential views. Visual access from Glen Road, a public road,will be impaired as a result of the construction of a residence with an approximate ridge height elevation at 92'35"; based upon a building height from the top of the foundation to the ridge of 37'9". However, the extent of the impairment of visual access caused by the residential structure cannot be accurately assessed without a view shed analysis. Correspondingly, due to lot size, percent of protected natural features and slopes, there is limited ability to meet or further this policy and subpolicies as it relates to this action. Please contact me at(631) 765-1938 if you have any questions regarding the above. l MAILING ADDRESS: ti PLANNING BOARD MEMBER:. / P.O. Box 1179 ` WERT,d..YN B WOODHOUSE �O_``�OF so Southold, Southold, NY 11971 �' I V Chair V`� O OFFICE LOCATION: b°f /KENNETH L.EDWARDS Town Hall Annex ^ J MARTIN H.SIDOR cn ,r 54375 State Route 25 (`� P GEORGE D SOLOMON O JOSEPH L.TOWNSEND � (cor Main Rd. &Youngs Ave.) DSouthold, NY VD-r- 4UNTY,`� Telephone: 631 765-1938 Fax: 631 765-3136 PLANNING BOARD OFFICE TOWN OF SOUTHOLD To: Town of Southold Zoning Board of Appeals From: Mark Terry, Senior Environmental Planner LWRP Coordinator Date: February 28, 2006 Re: Proposed residence for Nicholas Aliano ZBA#5846 SCTM#1000-83-1-12 The proposal is to construct a single-family dwelling, two concrete retaining walls and septic system within 100' of the top of bluff line. The following permits were issued for the proposed action: 1. December 28, 2004; New York State Department of Environmental Conservation Tidal Wetland Permit# 1-4738-03391/0001 2. April 20, 2005; Town of Southold Board of Trustees Permit# 6113. The proposed action has been reviewed to Chapter 95, Waterfront Consistency Review of the Town of Southold Town Code and the Local Waterfront Revitalization Program (LWRP) Policy Standards. Based upon the information provided on the LWRP Consistency Assessment Form submitted to this department, as well as the records available to me, it is my recommendation that the proposed action is INCONSISTENT with the denoted following Policy Standards and therefore is INCONSISTENT with the LWRP. Note that the surveys approved by the New York State Department of Environmental Conservation (DEC), last revised July 19, 2004, and Board of Trustees (last revised September 16, 2004) and those submitted to the Town of Southold Zoning Board of Appeals are different. The survey submitted to the DEC and Board of Trustees shows the northwest corner of the residence at 48' from the top of bluff line. Two surveys were submitted to the Zoning Board of Appeals. Survey A(last revised January 18, 2006) proposes to locate the northwest corner of the residence at 42' from the top of bluff line. Survey B (last revised February 14, 2006) proposes to relocate the residence 50' from the top of bluff line and re-orient the residence. A portion of the eastern concrete retaining wall (closest to Duck Pond Road) is located within the Coastal Erosion Hazard Line. On the survey submitted and approved by the DEC and the Board of Trustees, the concrete retaining wall is proposed at 27' from the top of bluff line. On Survey A, submitted to the Zoning Board of Appeals, the applicant proposes to locate the concrete retaining wall 22' from the top of bluff line. Survey B proposes a 33' setback from the top of bluff line and locates the concrete retaining wall landward of the Coastal Erosion Hazard Area. Policy Standard 4.1 Minimize losses of human life and structures from flooding and erosion hazards. The following management measures to minimize losses of human life and structures from flooding and erosion hazards are suggested: A. Minimize potential loss and damage by locating development and structures away from flooding and erosion hazards. 1• Avoid development other than water-dependent uses in coastal hazard areas. Locate new development which is not water-dependent as far awa from coastal hazard areas as practical. a. No development is permitted in natural protective feature areas, except as specifically allowed under the relevant portions of 6 NYCRR 505.8. b. Avoid hazards by siting structures to maximize the distance from Coastal Erosion Hazard Areas. The proposed residential structure is landward of the Costal Erosion Hazard Line. A portion (approximately 7') of the eastern concrete retaining wall is located seaward of the Coastal Erosion Hazard Line. Aerial photos (attached) indicate that the bluff/cliff on the property is unstable and highly erosive. This observation is supported in a report authored by William L. Jaeger, P.E., L.S dated January 24, 2006. However, it is unclear to what exact area the term "bluff' applies to in the report. The report states: "The bluff is currently unstable with no toe control and some vegetated overburden." The report further states that: "The current bluff instability is unrelated to the construction of the foundation..." Note that, no evaluation of the clearing of the moderate to severe slopes in relation to bluff/cliff instability and erosion was made in the report. In addition, the report does not address the potential instability of the area down slope of the eastern concrete retaining wall which consists of severe slopes cleared of vegetation. Due to lot size and area of steep slopes, there is limited ability to site the residential structure to avoid erosion hazards. To further Policy 4.1 A,1b it is recommended that the Board evaluate the relocating of the residence foundation to the west to avoid slopes greater than 15% to the greatest extent practical. To further Policy 4.1 and stabilize the bluff areas it is recommended that: a. The applicant re-vegetate the face of the bluff in conjunction with providing toe protection in the form of gabions or other stone control methods as recommended in the engineering report prepared by William L. Jaeger, P.E, L.S. In addition, it is also recommended that vegetative erosion control methods be employed on all bluff/cliff areas with slopes greater than 15%. Policy 6. Protect and restore the quality and function of the Town of Southold ecosystem Policy Standards 6.1 Protect and restore ecological quality throughout the Town of Southold. A. Avoid adverse changes to the Long Island Sound and the Peconic Bay ecosystems that would result from impairment of ecological quality as indicated by: 1. Physical loss of ecological components Physical loss is often the most obvious natural resource impairment to identify. It usually results from discrete actions, such as filling or excavating a wetland or clearing an upland forest community prior to development. 2. Degradation of ecological components Degradation occurs as an adverse change in ecological quality, either as a direct loss originating within the resource area or as an indirect loss originating from nearby activities. Degradation usually occurs over a more extended period of time than physical loss and may be indicated by increased siltation, changes in community composition, or evidence of pollution. B. Protect and restore ecological quality by adhering to the following measures. 1. Maintain values associated with natural ecological communities. Each natural ecological community has associated values which contribute to the ecological quality of the Town of Southold. These values should be assessed on a case-by-case basis. 2. Retain and add indigenous plants to maintain and restore values of natural ecological communities. a. Protect existing indigenous plants from loss or disturbance to the extent practical. b. Include use of suitable indigenous plants in the landscaping plans for new development and in redevelopment projects where loss or disturbance of existing indigenous plants could not be prevented during construction. 4 ) The property has been mostly cleared of vegetation, including areas seaward of the Coastal Erosion Hazard Line. Prior to construction, no clearing limits were established to mitigate and/or stabilize severe slopes or preserve indigenous vegetation to "the extent practical". Due to the fact that the lot has been mostly cleared of vegetation there is little ability to further Policy 6.1 B, 2a. To comply with a Board of Trustee permit condition and to assist in the stabilization of the steep slopes, a planting plan, dated January 26, 2006 has been submitted by the Cramer Consulting Group which includes indigenous plant species. Plants are grouped and located within the retaining walls and below the eastern concrete retaining wall. Slopes will be hydro-seeded with a unspecified grass species. The lawn area is proposed to be planted in sod. The effectiveness and success of the planting plan in furthering Policy 6.1 B, 2b cannot be assessed without knowing the percent slope post construction grading and the erosion control methods (if any) that will be employed at the toe of the bluff/cliff. C. Reduce adverse impacts on ecological quality due to development. 1. Reduce adverse effects of existing development. 2. Mitigate impacts of new development. The proposed action will result in a physical loss of a vegetated bluff ecosystem. The ability to reduce adverse impact of development is limited due to the fact that clearing and grading has already occurred on site. The applicant has mitigated some impacts of new development through the placement of haybales and silt fencing during construction. To further Policy 6.2 C.2, the following is recommended: 1. The submittal of a re-vegetation plan proposing high density plantings of indigenous drought tolerant plant species. Policy Standard 6.3 Protect and restore tidal and freshwater wetlands. A. Comply with statutory and regulatory requirements of the Southold Town Board of Trustees laws and regulations for all Andros Patent and other lands under their jurisdiction. 1. Comply with Trustee regulations and recommendations as set forth in Trustee permit conditions. B. Comply with statutory and regulatory requirements of the State's wetland laws. 2. Comply with the regulatory requirements of the Freshwater Wetlands Act for the protection of mapped freshwater wetlands. 3. Comply with the regulatory requirements of the Tidal Wetlands Act for the protection of mapped tidal wetlands including coastal fresh marsh; intertidal marsh; coastal shoals, bars and flats; high marsh or salt meadow; littoral zones; and formerly connected tidal wetlands. Chapter 37 defines a bluff as: "Any bank or cliff with a precipitous or steeply sloped face adjoining a beach or a body of water. The waterward limit of a bluff is the landward limit of its waterward natural protective feature. Where no beach is present, the waterward limit of a bluff is mean low water. The landward limit is twenty-five (25) feet landward of the receding edge or, in those cases where there is no discernible line of active erosion, twenty-five (25) feet landward of the point of inflection on the top of the bluff. The "point of inflection" is that point along the top of the bluff where the trend of the land slope changes to begin its descent to the shoreline." As discussed above, the landward limit of the bluff/cliff is unclear. Therefore, a recommendation regarding the compliance of the proposed action to Chapter 37 cannot be made at this time. Chapter 97 of the Town of Southold Town Code also defines a bluff as: "Any bank or cliff with a precipitous or steeply sloped face adjoining a beach or a body of water. The waterward limit of a bluff is the landward limit of its waterward natural protective feature. Where no beach is present, the waterward limit of a bluff is mean low water. The landward limit is twenty-five (25) feet landward of the receding edge or, in those cases where there is no discernible line of active erosion, twenty-five (25) feet landward of the point of inflection on the top of the bluff. The "point of inflection" is that point along the top of the bluff where the trend of the land slope changes to begin its descent to the shoreline." Chapter 97 regulates actions within 100 feet of a Bluff line; the action includes; Bluff line. (1) Residence: 100 feet. (2) Driveway: 100 feet. (3) Sanitary leaching pool (cesspool): 100 feet. (4) Swimming pool and related structures: 100 feet. Pursuant to Chapter 97 of the Town of Southold Town Code, residential structures, sanitary leaching pools and driveways require a minimum 100' setback from the top of bluff line. On the survey approved by the DEC (dated last revised July 19, 2004) and Board of Trustees (dated last revised September 3, 2004, the applicant proposes a 48' setback from the foundation wall (northwest corner) to the top of bluff line. Therefore the proposed action is inconsistent with the Policy 6.3 B3. Due to lot configuration and setback requirement there is limited to no ability to locate the residence or retaining walls to meet the minimum 100' setback and further or meet the Policy 6.3 B3. Policy Standard 9.2. Protect and provide public visual access to coastal lands and waters from public sites and transportation routes where physically practical. A. Avoid loss of existing visual access. 1. Limit physical blockage of existing visual access by development or activities due to the scale, design, location, or type structures. r 2. Protect view corridors provided by streets and other public areas leading to the coast. 3. Protect visual access to open space areas associated with natural resources. B. Minimize adverse impact on visual access. 1. Provide for view corridors to the coast in those locations where new structures would block views of the coast from inland public vantage points. 2. Use structural design and building siting techniques to preserve or retain visual access and minimize obstruction of views. 3. Visual access requirements may be reduced where site conditions, including vegetative cover or natural protective features, block potential views. Visual access from Glen Road, a public road, will be impaired as a result of the construction of a residence with an approximate ridge height elevation at 92135"; based upon a building height from the top of the foundation to the ridge of 37'9". However, the extent of the impairment of visual access caused by the residential structure cannot be accurately assessed without a view shed analysis. Correspondingly, due to lot size, percent of protected natural features and slopes, there is limited ability to meet or further this policy and subpolicies as it relates to this action. Please contact me at (631) 765-1938 if you have any questions regarding the above. C-P February 27, 2006 Chairwoman Ruth Oliva ,, Board of Appeals �0 J 3I� Town of Southold P.O. Box 1179 Southold, New York 11971-0959 RE: ZBA File REF. No 5846 Dear Chairwoman Oliva: As requested, a site review was conducted for the construction of a house on the above- mentioned site located at Glen Ct., Cutchogue. The following are the observations and recommendations associated with the bluff and eastern slope of the property. Observations: This visit revealed that a "Stop Work Order" has been issued for the construction of the house due to installation of the foundation within the coastal hazard line. As indicated on the blue print, and confirmed during the site visit, the house is sited on a point of land approximately 45 feet south of the bluff face and on the edge of the eastern slope. In order to facilitate the installation of the foundation, cuts into the slope were made at least 10 feet deep and 45 feet wide. Additionally, the entire eastern slope face has been denuded(Photos 1-5). The investigation into the stability of the bluff revealed that severe erosion is occurring at the toe, face, and the top of the bluff. The top of the bluff is partially vegetated with brambles, herbaceous plants, and trees. A 10-foot vertical face, topped with an overhanging lip of vegetation, is found on the upper portion of the bluff. The bluff face is composed of sandy soils, mixed with gravel, cobblestones and a few large boulders. Sparse herbaceous vegetation and a few trees and shrubs exist on the bluff face. At least one gully runs vertically down the bluff face, indicating a concentrated flow from either hydrostatic pressure/ground water seeps or from runoff over the top of the bluff. (Photos 4, 5, 9-13) The vegetated toe of the bluff and the asphalt access point at the end of Duck Pond Road, just to the east of the bluff are continually being eroded with each high tide. Active sloughing of sediment at the toe, as well as, movement of sediment down the bluff face was witnessed numerous times while on site at low tide. It should be expected that the erosion of the bluff will continue to increase with each tidal cycle and may be exponentially severe with storm events. It is assumed that for this reason, bulkheading has been installed both to the east and directly west of this property. (Photos 12 -14) Recommendations: Agency due to low oxygen levels. Thus, the potential impact of the nutrient loading on Long Island Sound from this septic system should be considered. Lawns and landscaping activities have severe limitations due to the droughty and sandy soil characteristics. As discussed above, vegetation on this slope is imperative for slope stability. However, due to the droughty nature of the soils it will be difficult to successfully establish vegetation on this area without irrigation. It is recommended that no sprinkler irrigation be used on this slope because irrigation acts as a catalyst for erosion. Therefore native plants adapted to drought and saline conditions are recommended for the landscaping and vegetative cover of this area. A listing of native plants appropriate for this site is included with this letter and is further addressed in the bluff revegation section found below. Lastly, and of equal concern is maintaining structural stability of the house from the bluff exposure. As noted above, the entire bluff is unstable due to active erosion of the top, face, and toe. Currently, a distance of approximately 40 feet exists between the house and the bluff. In order to stabilize the bluff, at least 15 feet of the top of the bluff will be required to be cut back in order to obtain an natural angle of repose for bluff stability. This will reduce the distance between the house structure and the bluff edge to 25 feet. As you are aware, bluffs are dynamic environments that are easily compromised by both natural forces (storms) and human impacts. Hence there is no guarantee that future bluff erosion will not occur even if full stabilization of the bluff is achieved. Respectively, a stop work order on this construction due to encroachment of the coastal hazard line is extremely warranted at this location and continuation of construction is cautioned. Regardless of the decision to issue or deny this variance, it is highly encouraged that actions are taken to restore the bluff and the eastern slope to a stable environment. Specific to the bluff, it is important to recognize that even with the best vegetative cover on the bluff face, it will be compromised by erosion if the toe and top of the bluff are not stabile. The first measure of protection is to stabilize the toe of the bluff. Unfortunately, toe erosion at this site cannot be stabilized by vegetating the toe, due to the high degree of tidal erosion. Therefore, a solid structure similar to a bulkhead or rock wall will probably be required for full toe protection. Jay Tanski, NY Sea Grant (631) 632-8730 is a professional in coastal erosion abatement structures and should be contacted regarding the appropriate toe protection structure. Permits from the New York State Department of Environmental Conservation and possibly the Army Corps of Engineers must be secured for such an installation. During this installation, the least amount of activity possible should occur on the bluff face, they are very unstable environments and easily damaged. Secondly, the overhanging lip of vegetation and vertical face, should be cut back to a natural 45-degree angle in order stabilize this portion of the bluff. This may involve the removal of the vegetation along the top of the bluff. Next, any additional tree or shrubbery, within 3 feet of the bluff edge and on the bluff face should be cut to ground level, leaving the roots intact. The cutting of trees prevents them from toppling due to wind forces, while allowing the remaining roots to hold the soil, thereby preventing erosion. Any debris, including the cut trees should be removed from the bluff face while The first concern is that this site, and all the construction sites on Duck Pond Road are in violation of the new Environmental Protection Agency's Phase II Stormwater Runoff Regulations enforced under the New York State Department of Environmental Conservation (NYS DEC) Law. This law states that any construction site disturbing more than one acre of land, which has a hydraulic link, is required to submit and implement a Sediment and Erosion Control Plan. Duck Pond Road serves as a direct hydraulic link to Long Island Sound, has bare and actively eroding soils, and inappropriately installed erosion control fencing (photo 6 & 7) and no vegetative covering on exposed soils. Therefore, even with a certified NYS DEC Sediment and Erosion Control plan, the entire disturbed area along Duck Pond Road is in violation under NYS DEC law. In order to be in compliance with the Phase II regulations, a certified Sediment and Erosion Control plan must be developed, implemented, and maintained to avoid the $25,000 per day violation fee. Preventing runoff and sediment pollution into water bodies is the goal of these regulations. Therefore the correct installation of silt fencing and establishment of temporary vegetation on any exposed soils should occur. The enclosed literature provides diagrams on the correct methods for silt fence installation. This is critical since vegetation will not be fully established until after the spring rains. These rains have the potential to cause severe gullies on the slope, sediment-laden runoff and in the worst-case scenario, landslides. Therefore, every effort should be made to install and maintain the correctly installed silt fencing along the entire extent of Duck Pond Road. Vegetation should be established on this slope as soon as weather permits. A temporary cover of cereal rye or oats is recommended or if a permanent cover is desired the recommendations for the bluff revegetation (listed later in this letter) should be followed. The vegetation will hold the soil to the hill, helping to prevent sloughing and potential landslides. The siting of the house on the eastern slope is the second concern due to the steep slope and soil type. The Suffolk County Soil Survey identifies this location (and the entire sloped area where construction is occurring on Duck Pond Rd) as having Carver and Plymouth soils (CpE) with slopes between 15-35 %. The soil survey lists the limitations of this soil as severe for the installation of home sites (due to slopes), septic systems (slopes), lawns and landscaping (sandy surface area), pipeline locations (stability), and paths and trails (sandy surface area). Due to the"severe" limitations of this site, it should not be developed and opened to erosion. A footnote of the soil survey lists an additional concern with the septic systems as a pollution hazard for water bodies due to the sandy nature of the soils. This is important to recognize, as the installation of the septic system on this property would be a maximum of 150 feet from Long Island Sound. A Total Maximum Daily Load for nitrogen has been established for Long Island Sound by the Environmental Protection ensuring that minimal damage to the bluff occurs (i.e. trees not be dragged down the bluff face). The debris should not be deposited on the beach. Once these actions are completed then the revegetation of the bluff should occur. `Cape' American beach grass is the most recommended species to be established on the bluff, top of bluff face, behind of the toe stabilization structure and on the eastern slope. This grass serves as an effective sediment trap and erosion control measure due to plant density and its substantial root systems. Cape-American beach grass is a hardy native perennial, that thrives on Long Island's harsh conditions found at this site: doughty sandy soils, & salt exposure. It is these characteristics that have extensively promoted the use of Cape-American beach grass to restore, create and protect bluffs and dunes from both wind and water erosion. Cape American beach grass is readily available from nurseries and for best results should be transplanted when is it dormant; late fall, winter, or early spring months. This limits you to planting it during the months of December through March. Thus, construction and planting activities should be scheduled around this planting time to ensure successful vegetative establishment. The beach grass should be planted as three culms (plantlets) every 12 to 18 inches apart in a grid pattern (See enclosed planting guides for fertilization and additional information). Planting should occur from the top of the bluff to the toe. To increase diversity and reduce the threat of disease, a warm season grass seed mixture should be broadcast on the slope just prior to planting the beach grass. Treading on the soil during planting of the beach grass will effectively "plant" the seed and ensure good soil to seed contact. The seed mixture and complete method for planting the Beach Grass is listed within the USDA Stabilization of Eroding Bluffs document enclosed with this letter. Additionally, other low growing species such as Black-Eyed Susan, Montauk Daisy, Virginia creeper, Beach Rose (Rosa virginica) Eastern Prickly Pear Cactus, Seaside Goldenrod, Golden Aster, Sweet Fern, and Beach Pea are strongly recommended. Once all of the above recommendations are implemented, preventative measures need to be taken to ensure future erosion does not occur. As this is a residential area, humans, pets, and wildlife (deer) must be prevented, as much as practical, from traveling down the bluff face. Cactus and Cape American beach grass can be planted together up to the bluff edge behind the toe protection structure. Behind this planting, roses and shrubs can be established to further discourage access. Cape American beach grass is easily damaged by foot traffic and is essential to holding soils in place. Therefore, any vegetation die-off whether natural or human caused should be repaired as soon as possible. Fostering an understanding of the importance of bluffs is critical to their protection. As the community uses this bluff area extensively, the installation of signage would serve as the perfect means to educate the public on the sensitive bluff environments and the efforts they can employ to protect the bluff (i.e. no walking on the bluff). It is recommended that such signs be placed at the access point. This is an inexpensive means to foster an appreciation for the bluff while dually protecting the bluff and stairway by those who utilize this area for its natural beauty. Due to the close proximity to the saline waters, the methods for revegating the eastern slope should be followed as recommended for the revegation of the bluff face. As discussed, the use of native plantings is important on this site not only to try to restore the environment in the most natural way but also because irrigation should not be employed due to erosion concerns. Therefore the use of native plants which are drought and salt tolerant will be much more successful in establishing vegetation on this slope. Enclosed are the following various pieces of literature to assist in planting and restoring the bluff and eastern slope to a stabile condition: photos of the site, a list of nurseries, which supply the recommended plantings, plant information, and Phase II Stormwater regulations and requirements. Please feel free to contact me with any questions or concerns regarding these recommendations. I can be reached at my office at 727-2315 x3, Monday through Friday 7:30 am to 4:00 pm. Sincerely: Polly L. Weigand Soil District Technician a �yy x� 1 a ca •* C a � , 6�A L � 'IT P"Lit �„C�tk r 7. 1!. ��^' rs - �Rx tri���r '+::Jq� •N �. ;� "�S$`. „71�+�, �4 - `9'r l � w"" _ r '4. ES ,tr��' �'r`,�y'""Nl� �-utt j ✓e. �s * '.f to ,.. '"` .a� .�,�r ""` .Sf �✓"' � s r,...'+ >.:.. . '�� yyEEit� c � �# ar �� �: �fk. Jr � .� `Y:.b' wp.ti.� a •>!7 � aat'awatCx�.f. "� .i'Y.. 3 tR• < ..+5a :��"a�� { t ci+ �a r. m��4+'.. �� s�'"',i?Tq 4 t{ ' p .i Jk� ..r`8it11e:x� '� ::Yf'd, �� s� �4,{ k r,�le.w �r�iFSR�:r'�fi•/�#�-. :a� f'+µ , '�* ,.k�_$ ,' i" �:, �+ r.J � ti... 'l +' 4 ,fin;✓•�'t"'t`( f •.. NfR Ni ww— WA IM IVA 42 }y F la 'S�fn���31s✓����r�k+l�. ,rt.y�.St,J S,�f�y .. �@ A'9r' �... �r ,� � 3.` ,. { Y'V'=4 7 Yns"' ' 0.N x �** ♦ - 41,M jil � ILl h i no rem 1 Vp ed7" t , a �4 Vertical Face Photo 8 Photo 9 Photo 10 i r a. East to West Across Beach Photo 11 Photo 12 Photo 13 Photo 14 y, I, r� "�i'���i�'7�.x.��,���"�! fir,� ,��f �r:��i•il. �a r+ Toe Erosion Bulkhead Erosion of Public Access Point Duck Pond Rd. Vertical Face Photo 8 Photo 9 Photo 10 n j}+ East to West Across Beach Photo 11 Photo 12 Photo 13 Photo 14 fl s. E�,z T f^ r� e �• a se ,� x: f��`-:sem, .� �:•. "a .$���.�.. � x �� ��' a yt � �'..;Tay. ,..±�.. ,, .. ,.: .:f K>. wn" '..> y T�- j aa. .... :: k, r !:`.. � V � i, i x...✓.'fib.. <... w< �, n a,.r ._... " s$�.. F ..,� � ,.:.. �.20:'.moi'.::',� ...`.. 4'. c "" .'ft,,...:•.&yi •:..y. .^., i. aC. ��� "*4^.s�I... '" .'fi. .. _�a'.;�v, •� °an`+<�. '.. a^,.£":Ls,, Els?% .5-tea �¢ � s., •.stns.:'` a ;'� �, y�.�<�c�y4 *.- y�,k ;� t � s,. i s Bulkhead c ' Toe Erosion �t Erosion of Public Access Point Duck Pond Rd. Photo . Photo 2 Photo 3 Bluff F dation edge E 5`S r d � a � x N' Photo 4 Photo 5 �0 . F � z £ y. Sd E � 3 e- �« ,E w E M V: s 'u rF +� t�Y3v � � '""�d..d.S fi.�.•'�-- +.}*liya'�a.,y.. 'd" •...4 .�*. Irv.`g Gully /rrE§ HAWKINS WEBB JAEGER PLLC ENGINEERS ■ ARCHITECTS ■ SURVEYORS ■ PLANNERS ESTAB 1872 WILLIAM L.JAEGER II, P.E., L.S MATTHEW D. CRANE L.S EDWARD R. MILLER,AIA FRANCIS A.HAWKINS 1913 HERMAN P HAWKINS 1962 CHARLES S.WEBB JR.L.S 2004 January 18, 2006 Nicholas Aliano 970 Route# 25A Miller Place,New York 11764 Re: (05-190)—Foundation inspection for new construction on tax parcel # 1000-83-1-11 & 12 Dear Mr. Aliano: On January 9, 2006 I inspected the foundation on the above referenced tax parcel located in Cutchogue,New York for the purpose of determining its' structural soundness. The foundation was constructed on a relatively flat portion of the subject parcel which has a slope with a maximum pitch of 1 on 2 commencing just off the rear wall of the foundation. The lot has an upper soil stratum of silty sand and a lower stratum of fine to coarse sand (based upon a test hole by Mc Donald Geoscience). The topographic and foundation location surveys reveal that the rear wall of the foundation was constructed where the lowest natural grade was at elevation 52.0. The foundation footing along the rear and right rear walls is 12"thick steel reinforced on a 2' spread footing that steps from 2' to 6' and could be seen to be well into virgin soil. The foundation location survey reveals that the top of footing (top of foundation stem wall) for this foundation is at elevatiorl 54.6, which places the bottom of the footing 4'-6' into virgin soil. " The left side of the foundation is about 42' from the top of a 45' high bluff which has a slope of approximately 1 on 1.2. The base of this bluff is approximately at elevation 9 and the bottom of the footing adjacent to (and 42' from)the bluff is at elevation 54 making the footing 45' above and 96' from the base of the bluff, which makes the theoretical slope from the foundation footing to the toe of bluff a 1 on 2.1 slope. Based upon the topography,the foundation elevation, and the reported nature of construction, I find that the bottom of the footing was constructed on virgin soil uphill from a slope of 1 on 2 to the rear and above a theoretical slope of 1 on 2.1 from the toe of the bluff. The soil bearing capacity for the material on this site is about 2 ton per square foot and its' natural slope of repose is approximately 1 on 1.5. Therefore, based upon the information provided,the foundation is resting on structurally adequate material and the radiation of the loading is fully within the surrounding material. Should you have any questions, or wish something additional please feel free to 11. of NEW r0 Sincerely, ��� il�VdtQ '�� William L. J er P.E.,L.S. P 3239 Route 112—Bldg. 8-Suite 1, Medford, NY 11763 log PHONE (631)732-7777 FAX(631) 732-7760 b� Visit our web site at www.hwiaeger.com �SS���AL EHG��Ef-P PROJECT DESCRIPTION (Please include with Z.B.A. Application) Applicant(s) ArC541011je2 M t"o I. If building is existing and alterations/additions/renovations are proposed. A Please give the dimensions and overall square footage of extensions beyond existing building. Dimensions/size Square footage B Please give the dimensions and square footage of new proposed foundation areas which do not extend beyond the existing building, Dimensions/size Square footage II If land is vacant. Please give dimensions and Qverasl squar otage of new construction Dimension/size X Square footage Height III Purpose and use of new construction requested in this application Aliy � aJu IV Additional information about the surrounding contours or nearby buildings that relate to the difficulty in meeting the code requirement(s) /�rDlcd.0 Cdrt/S-�c/rca/ D� mat G7�r+Pa � of — �S/o�PS Ado Seo /1PlLr� diric� S ccLi 7'V 1a �Zfaou Tease �, o�r � of pr�joL V Please subs pit vii (7) hotos/set§ after staki g corners of the proposed new construction. 7/02 \ Please note Further changes, after submitting the.above information, must be placed in writing and may require a nei,i, Notice of Disapproval to shoot, changes to the initial plans If additional tune is needed, please contact our QUiice, or please check with Building Department (765-1802) or Appeals Department (765-1809) if you are not sure Thank you. 7 1 PATRICU C.MOORE Attorney at Law 51020 Main Road Southold,New York 11971 Tel. (631)765-4330 Fax.(631)765-4643 Margaret Rutkowski Betsy Perkins Secretary January 26, 2006 Southold Town Zoning Board of Appeals Ruth Oliva, Chairwoman Southold Town Hall 53095 Main Road Southold, NY 11971 Re: Aliano Variance (1) Variance from Bluff (2 ) Variance from front yard (alternative relief) Dear Chairwoman and Board members : Enclosed please find planting plan required as a condition of the Trustees permit prior to issuance of the certificate of occupancy. In anticipation of the Zoning Board hearing Cramer Consulting Group completed the planting plan immediately. If you need anything else please do not hesitate to contact ' me. Very t ly yours, Patricia C. Moore cc : Southold Town Trustees Mr. Aliano ���, 'r r�w(� NII `�`� r:.;",•:�--'i `o E LI C �4, ill t t tt I I ; t JAN 2 7 2006 `.-`_�! s Tov-ni f OVERALL SITE - r' PLANTING NOTES: NQ +1 - Appropriate erosion control measures to be taken to precent erosion of SIJtry slope and silting of adjoining property and roads. Measures to Include, A_\Q 1+-' but not limited to,stacked straw bales,silt screen fencing,mulching,etc. Erosion control measures to be constantly monitored and appropriate steps taken to Immediately correct and/or repair to provide proper protection. Erosion control measures to remain ineffect until slope Is stabilized with --_-_-- vegetation. Where possible,existing trees,shrubs,stumps and roots to remain on n slope to provide stability,provide opportunity for additional plant growth and restablishment of previous vegetation. O Slope to be hydro-seeded Immediately after final grading. Hydro-seeding appllcatiuon and mixture to be according to manufacturer's specifications. ♦I \ \ 'f� Suitable plant material can be substituted for plant material specified on \\.\ `\ this planting plan only with the approval of the landscape architect. Jk i' -�-i/ ii , -_ '� 1111- ( rY♦♦ \ \ \ \ i i/i �i i �� �_ � � 1 1 ♦ \ \ Year Plant material to be monitored for a two period to assure a minimum ��i /� iiii/ i -,i, ,_- ♦ 1 1 1 1 jr \ ^'1\ \\\ survival rate of 60%during that period. w\RAIS �� Proposed lawn area to be sod. `^ .—._...-.--r mss--- /i/ - i — i i i-i.• \ 1 11 1 l \ \ {'r I -bs-- /i i i i ice/ �\ ♦rI 1 1 1 R 1 ` 1 `ISP\ ti 1 1 1 `\ - r %moi i i i i:l ��♦♦,��♦ 1 ` � 1F o6ss11 1 1 1 1'tN \ ,( z5�� �-'/ -/i-i i�� � ♦♦♦♦ � \ 1 1 l 11L",g'v"�11 G`� r N y"CA $; 5l I\ 1 1244dl X2.11 f_R 1rp i N s 1q-PM •-1�%:i:�v Q7 , 9' •�_ \ �O`t,�tp� 1 19.RY I 1 1 1 11-MP`, 1,J \\\, I"•p i7' ` 1 ` ` 1 1 I 1 I i 1.11..ry ,` Proposed Retaining Walls r '�„ �� 1/ I 1 Each Approx.4'High � 11 01 11 1 to, p 3V P'. PLANTING PLAN 5 EYOR ` ` � ALIANO AT CUTCHOGUE P.O.BOX SURVEYORS.P.C. P.O.TRA a0s ; ; 5 ;;;; Cr ler C nsLll 'I$Group SOUTH 0, 11971 1 1 t" SOUTHOLD,N.V.11971 1 1 K / // Lwfion: "'""Y 13.100' ! / I/ I' e/o Glenn Court,w/o Duck Pond Road,Cutchogue,Town of Southold LOT NUMBERS REFER TO'MAP OF VISTA BLUFF`FILED G� \ / CwplYM feN waT,,:.R-/r2flN�y�K AolpWp�wery Praj eci AAUN01 Ta LatA 1000A3-1-11$12 MARCH 15,1968 AS FILE NO.5989. \ G 7 1 / P.O.ItoX 8535,Mille fldte,NC W Yell'11764 ��,\ 1'\9 ,• (631)476m=4 nava 01/26/06 y;.,b: As Scaled G ELEVATIONS REFERENCED TO N.G.V.D. Daip-I ay. TWC D—ay: TWC 0_1.d8y: 1000-83-01 11 ArE.A=6,4'4 Sit.FT TO TIE LINE Ro`ism[ '1000-8-3-01 t_AREA=34.324 SO.FT TO TIE LINE amt 1 or 3 PLANT LAYOUT PLAN ` `` \ ` �F E o OK 1 11 \ \ o 1 11 1 1 11 1 1P�♦1 y / / 3\\JVA l li 1 l l 40\ R4 \\ 1 1 1 • 1 , - 1 1 \ \ oc \ 1 � Proposed Retaining Walls 1 1 l •1 l \ 1 I I\ i ` \ \' Each Approx. 4' High l 1 1 �l P l \ \ \ 5-M� 0020 20 kA \ �o I d Rq I I \ 8-MP \ \ \ \ \ \ \ 101 \ pdse�j \\ \ \ \\ \ 3 1\JV \ Lowp re�i -RfFf-TO \ \ \\ \ \ \ \ \ \ \\ 0 o 0. I I I 12-M PI I I I f \ 19-fIZR 10l- PM 1 I 000 rn \ \ \ 6-'R 1 11 I \ \ \17-M P _JV Cramer Consulting Group 01/26/06 0' 10' 20' 30' 40' 1 , l \ l ` I, PLANTING PLAN ALIANO AT CUTCHOGUE / } Sheet 2 of 3 •, 1 PLANT SCHEDULE - Symbol Scientific Name Common Name i Size Quantity iv Juniperus vis iniana Eastern Redcedar 6-7' 17 MP Myrica pensylvanica Northern Bayberry 18-24" 35 RR Rosa Ru osa _ Rugosa Rose 18-24" 78 RRS Rosa Ru osa Ru osa Rose 6-12" 40 RA Rhus Aromatica _ Fran rant Sumac 112-18" j 20 PM Prunus maritime Beach Plum 18-24—j— 47 Existing '---- — -� - Grade 3"Mulch A PLANTING DETAILS - - ;�;,, L { ProposedGrade n J Ic «. ��'J� 6., 8„Min. L,i v Planting on _ I 1v 6"Min. 1 11 1 Slope Detail /\ Note:Sec other Planting Details for more infornwtion.Not to=dc. I �•Tree trpriksup`poi19 S/N'= irubberthtue or'equal c W � Slope to roan muxr `"�--^-1.1•�augCguy wire~� - �� �!�J /p,y� 3"wood mule •C` q� J"wwal 4�h a•'mound arvwd eche of pN Stake or equal 6"mound around edge of pit Ltancn t/)of hnrlap ball Finished i de >' Backidl mktsu Finished T�per secs DrpchWarks whb ball s&c Depth s•arlc with OWI size j`Roos ball� Loosen 1/3 of burlap ball UQ 1 !p Backfill mixture 00 bb Undisturbed sells as per spec r ^r9C�6 Uadhturtatl rulh Cedar stakes minimum g Evergreen Planting 16 (11� Shrub Planting l foot into undisturbed soils. Note:Trecs to be staked with Cramer Consultin Grou 01/26/06 Detail Vol to scale Detail Not to scale. short stakes OR long cedar stakes 9 P as shown. PLANTING PLAN ALIANO AT CUTCHOGUE Sheet 2 of 3 Albert J. Krupski,President so Town Hall James King,Vice-President ,�O 53095 Route 25 Artie Foster P.O. Box 1179 Ken Poliwoda Southold,New York 11971-0959 Peggy A. Dickerson !' O Telephone(631)765-1892 An Fax(631)765-6641 BOARD OF TOWN TRUSTEES TOWN OF SOUTHOLD COASTAL EROSION MANAGEMENT PERMIT Permit #6113 Date: April 20, 2005 SCTM# 83-1-11,12 Name of Applicant/Agent: Cramer Consulting Group Name of Permittee: Nicholas Aliano Address of Permittee: 970 Route 25A, Miller Place, NY 11764 Property Located: 3705 Duck Pond Rd, end of east side of Glen Court, Cutchogue DESCRIPTION OF ACTIVITY: Permit to construct a single family dwelling and retaining walls with the condition of drywells to contain runoff and plantings seaward of the retaining walls after construction and all as depicted on the plans surveyed by Peconic Surveyors and last dated Aug. 31, 2005. Permit to construct and complete project will expire two years from the date the permit is signed. SPECIAL CONDITIONS: (apply if marked) Bluff restoration through a re-vegetation plan is a necessary special condition of this permit. _A relocation agreement is attached hereto and is a necessary special condition of this permit. A maintenance agreement is attached with application and is a necessary special condition of this permit. Albert J. Krupski, Jr. President, Board of Trustees AJK/hkc gUFFO(,� Albert J. Krupski, President 0�� C� Town Hall James King,Vice-President h'Z' Gy 53095 Route 25 Artie Foster O P.O. Box 1179 Ken Poliwoda W Southold, New York 11971-0959 Peggy A. Dickerson Oifi O�� Telephone (631) 765-1892 Fax(631) 765-3999'3/ BOARD OF TOWN TRUSTEES TOWN OF SOUTHOLD TO: ( MC hOlA (w0, ata' Please be advised that your application dated has been reviewed by this Board at the regular meeting of q WO I 018_ and the following action was taken: (_Application Approved (see below) ( ) Application Denied (see below) Application Tabled (see below) If your application is approved as noted above, a permit fee is now due. Make check or money order payable to the Southold Town Trustees. The fee is computed below according to the schedule of rates as set forth in the instruction sheet. The following fee must be paid within 90 days or re-application fees will be necessary. COMPUTATION OF PERMIT FEES: - a ,06 �-UZ v 01 L_�Ot L(h n tu/d-a y uv C d c c c/D- ?T O tLin o n e ufi0 fu rL? W a TOTAL FEES DUE: $ z�nn' SIGNED: �� e PRESIDENT, BOARD OF TRUSTEES • �gpFFO(,��, Telephone p Town Hall (63 1)765-1892 A 53095 Route 25 O P.O.Box 1179 Southold,New York 11971-0959 CONSERVATION ADVISORY COUNCIL TOWN OF SOUTHOLD At the meeting of the Southold Town Conservation Advisory Council held Mon., April 11, 2005, the following recommendation was made: Moved by Don Wilder, seconded by Jennifer Mannino, it was RESOLVED to recommend to the Southold Town Board of Trustees DISAPPROVAL of the Wetland Permit application of NICHOLAS ALIANO to construct a single-family dwelling and retaining walls. Located: 3705 Duck Pond Rd., Cutchogue. SCTM#83-1-11&12 The CAC recommends Disapproval of the application because all activities are proposed too close to the top of the bluff. Vote of Council: Ayes: All Motion Carried New York State Depment of Environmental Conserion Division of Environmental Permits 4 Building 40 - SUNY, Stony Brook, NY 11790-2356 Telephone (631) 444-0368 Facsimile 16311444-0360 Website: www.dec.state.ny.us - Erin M. Crotty Commissioner December 28, 2004 Mr. Nicholas Aliano �Ivvl1�— 970 Route 25A ) MAH_l T • ' Miller Place, NY 11764 RE: 1-4738-03391 00001 Bead of Tmstees Dear Permittee: In conformance with the requirements of the State Uniform Procedures Act (Article 70, ECL) and its implementing regulations (6NYCRR, Part 62)1) we are enclosing your permit. Please read all conditions carefully. If you are unable to comply with any conditions, please contact us at the above address. Also enclosed is a permit sign which is to be conspicuously posted at the project site and protected from the weather. Sincerely, Claire K.Werner Environmental Analyst CKW/ls _ NEW STATE DEPARTMENT OF ENVIRONMENTASERVATION DEC PERMIT NUMBER EFFECTIVE DATE -03391/00001 ecember 28, 2004 FACILITY PROGRAM NUMBER(S) PERMIT EXPIRATION DATE(S) Under the Environmental December 28, 2009 Conservation Law TYPE OF PERMITS New ❑Renewal ❑Modification IS Permit to Construct ❑ Permit to Operate ❑ Article 15, Title 5: Protection of Waters ❑ Article 17, Titles 7, 8: SPDES ❑ Article 27, Title 9; 6NYCRR 373: Hazardous Waste Management ❑ Article 15,Title 15:Water Supply ❑ Article 19:Air Pollution Control ❑ Article 34: Coastal Erosion ❑ Article 15, Title 15:Water Transport ❑ Article 23,Title 27: Mined Land Management Reclamation ❑ Article 15, Title 15: Long Island Wells ❑ Article 36: Floodplain Management ❑Article 24. Freshwater Wetlands ❑Article 15,Title 27: Wild, Scenic and ❑ Articles 1, 3, 17, 19, 27, 37; 6NYCRR Recreational Rivers ■ Article 25:Tidal Wetlands 380: Radiation Control ❑ 6NYCRR 608:Water Quality Certifica- ❑ Article 27, Title 7; 6NYCRR 360: tion Solid Waste Management PERMIT ISSUED TO TELEPHONE NUMBER Nicholas Aliano (631) 744-5000 ADDRESS OF PERMITTEE 970 Route 25A, Miller Place, NY 11764 CONTACT PERSON FOR PERMITTED WORK TELEPHONE NUMBER Cramer Consulting Group, P.O. Box 5535, Miller Place, NY 11764 631 476-0984 NAME AND ADDRESS OF PROJECT/FACILITY Aliano property, Glen Court, Southold SCTM#1000-83-1-11 & 12 COUNTY TOWN WATERCOURSE NYTM COORDINATES Suffolk Southold I Long Island Sound DESCRIPTION OF AUTHORIZED ACTIVITY: Construct a single family dwelling, septic system, driveway and retaining walls. All work must be done in accordance with the attached plans stamped NYSDEC approved on 12/27/04. By acceptance of this permit, the permittee agrees that the permit is contingent upon strict compliance with the ECL, all applicable regulations, the General Conditions specified (see page 2 & 3) and any Special Conditions included as part of this permit. PERMIT ADMINISTRATOR: ADDRESS Mark Carrara CKW Region 1 Headquarters, Bldg. #40, SUNY, Stony Brook, NY 11790-2356 AUTHORIZED SIGNATURE �— DATE � Page 1 of 4 December 28, 2004 N ORK STATE DEPARTMENT OF ENVIRONMENTAL CO VATION ADDITIONAL GENERAL C (TIONS FOR ARTICLES 15 (TITLE 5),W25, 34 AND 6NYCRR PART 608 ( TIDAL WETLANDS) 1. If future operations by the State of New York require an alteration in the position of the structure or work herein authorized, or if, in the opinion of the Department of Environmental Conservation it shall cause unreasonable obstruction to the free navigation of said waters or flood flows or endanger the health, safety or welfare of the people of the State, or cause loss or destruction of the natural resources of the State, the owner may be ordered by the Department to remove or alter the structural work,obstructions,or hazards caused thereby without expense to the State, and if, upon the expiration or revocation of this permit, the structure, fill, excavation, or other modification of the watercourse hereby authorized shall not be completed, the owners, shall, without expense to the State,and to such extent and in such time and manner as the Department of Environmental Conservation may require, remove all or any portion of the uncompleted structure or fill and restore to its former condition the navigable and flood capacity of the watercourse. No claim shall be made against the State of New York on account of any such removal or alteration. 2. The State of New York shall in no case be liable for any damage or injury to the structure or work herein authorized which may be caused by or result from future operations undertaken by the State for the conservation or improvement of navigation, or for other purposes, and no claim or right to compensation shall accrue from any such damage. 3. Granting of this permit does not relieve the applicant of the responsibility of obtaining any other permission, consent or approval from the U.S.Army Corps of Engineers, U.S. Coast Guard, New York State Office of General Services or local government which may be required. 4. All necessary precautions shall be taken to preclude contamination of any wetland or waterway by suspended solids, sediments, fuels, solvents, lubricants, epoxy coatings, paints, concrete, leachate or any other environmentally deleterious materials associated with the project. 5. Any material dredged in the conduct of the work herein permitted shall be removed evenly, without leaving large refuse piles, ridges across the bed of a waterway or floodplain or deep holes that may have a tendency to cause damage to navigable channels or to the banks of a waterway. 6. There shall be no unreasonable interference with navigation by the work herein authorized. 7. If upon the expiration or revocation of this permit, the project hereby authorized has not been completed, the applicant shall, without expense to the State, and to such extent and in such time and manner as the Department of Environmental Conservation may require, remove all or any portion of the uncompleted structure or fill and restore the site to its former condition. No claim shall be made against the State of New York on account of any such removal or alteration. 8. If granted under 6NYCRR Part 608,the NYS Department of Environmental Conservation hereby certifies that the subject project will not contravene effluent limitations or other limitations or standards under Sections 301, 302, 303, 306 and 307 of the Clean Water Act of 1977 (PL 95-217) provided that all of the conditions listed herein are met. 9. At least 48 hours prior to commencement of the project, the permittee and contractor shall sign and return the top portion of the enclosed notification form certifying that they are fully aware of and understand all terms and conditions of this permit. Within 30 days of completion of project, the bottom portion of the form must also be signed and returned, along with photographs of the completed work and, if required, a survey. 10. All activities authorized by this permit must be in strict conformance with the approved plans submitted by the applicant or his agent as part of the permit application. Such approved plan was prepared by John T. Metzger dated 1/13/04, last revised 7/19/04. DEC PERMIT NUMBER PAGE 3 of 4 1-4738-03391/00001 ORK STATE DEPARTMENT OF ENVIRONMENTAL CO VATION N ICATION OF OTHER PERMITTEE OB TIONS Item A: Permittee Accepts Legal Responsibility and Agrees to Indemnification The permittee expressly agrees to indemnify and hold harmless the Department of Environmental Conservation of the State of New York, its representatives, employees,and agents("DEC")for all claims, suits,actions, and damages,to the extent attributable to the permittee's acts or omissions in connection with the permittee's undertaking of activities in connection with,or operation and maintenance of, the facility or facilities authorized by the permit whether in compliance or not in compliance with the terms and conditions of the permit. This indemnification does not extend to any claims, suits, actions, or damages to the extent attributable to DEC's own negligent or intentional acts or omissions, or to any claims, suits, or actions naming the DEC and arising under article 78 of the New York Civil Practice Laws and Rules or any citizen suit or civil rights provision under federal or state laws. Item B: Permittee's Contractors to Comply with Permit The permittee is responsible for informing its independent contractors, employees, agents and assigns of their responsibility to comply with this permit, including all special conditions while acting as the permittee's agent with respect to the permitted activities, and such persons shall be subject to the same sanctions for violations of the Environmental Conservation Law as those prescribed for the permittee. Item C: Permittee Responsible for Obtaining Other Required Permits The permittee is responsible for obtaining any other permits, approvals, lands, easements and rights-of-way that may be required to carry out the activities that are authorized by this permit. Item D: No Right to Trespass or Interfere with Riparian Rights This permit does not convey to the permittee any right to trespass upon the lands or interfere with the riparian rights of others in order to perform the permitted work nor does it authorize the impairment of any rights, title, or interest in real or personal property held or vested in a person not a party to the permit. GENERAL CONDITIONS General Condition 1: Facility Inspection by the Department The permitted site or facility, including relevant records, is subject to inspection at reasonable hours and intervals by an authorized representative of the Department of Environmental Conservation (the Department)to determine whether the permittee is complying with this permit and the ECL. Such representative may order the work suspended pursuant to ECL 71-0301 and SAPA 401(3). The permittee shall provide a person to accompany the Department's representative during an inspection to the permit area when requested by the Department. A copy of this permit, including all referenced maps, drawings and special conditions, must be available for inspection by the Department at all times at the project site or facility. Failure to produce a copy of the permit upon request by a Department representative is a violation of this permit. General Condition 2: Relationship of this Permit to Other Department Orders and Determinations Unless expressly provided for by the Department, issuance of this permit does not modify, supersede or rescind any order or determination previously issued by the Department or any of the terms, conditions or requirements contained in such order or determination. General Condition 3: Applications for Permit Renewals or Modifications The permittee must submit a separate written application to the Department for renewal, modification or transfer of this permit. Such application must include any forms or supplemental information the Department requires. Any renewal, modification or transfer granted by the Department must be in writing. The permittee must submit a renewal application at least: a) 180 days before expiration of permits for State Pollutant Discharge Elimination System (SPDES), Hazardous Waste Management Facilities (HWMF), major Air Pollution Control (APC) and Solid Waste Management Facilities (SWMF); and b) 30 days before expiration of all other permit types. Submission of applications for permit renewal or modification are to be submitted to: NYSDEC Regional Permit Administrator, Region 1, SUNY Bldg#40, Stony Brook NY 11790-2356 General Condition 4: Permit Modifications,Suspensions and Revocations by the Department The Department reserves the right to modify, suspend or revoke this permit in accordance with 6 NYCRR Part 621. The grounds for modification, suspension or revocation include: a) materially false or inaccurate statements in the permit application or supporting papers; b) failure by the permittee to comply with any terms or conditions of the permit; c) exceeding the scope of the project as described in the permit application; d) newly discovered material information or a material change in environmental conditions,relevant technology or applicable law or regulations since the issuance of the existing permit; e) noncompliance with previously issued permit conditions,orders of the commissioner,any provisions of the Environmental Conservation Law or regulations of the Department related to the permitted activity. DEC PERMIT NUMBER PAGE 4 OF 4 1-4738-03391/00001 • 3 ss-so- 1 "3)_sd New York State Department of Environmental Conservation NOTICE mtow �► The Department of Environmental Conservation (DEC) has issued permit(s) pursuant to the Environmental Conservation Law for work being conducted at this site. For further information regarding the nature and extent of the approved work and any Department conditions applied to the approval, contact the Regional Permit Administrator listed below. Please refer to the permit number shown when contacting the DEC. Permit Number - 38-0 � ' Regional Permit Administrator Expiration Date 02 02 02 00 NOTE: This notice is NOT a permit Compkie Land Use Snvices--/ncludigg FI=MnS,Pk sn end&a nn efal P.O.Box 5535 Miller Place,New York 11764 Thomas W.Cramer,Principal Telephone(631)476-0984—Fax(631)476-6933 September 15, 2004 Town of Southold Board of Trustees Town Hall 53095 Route 25 PO Box 1179 E C E Southold,New York 11971-0959 n SEP 1 6 2004 U Re: Glen Court, Southold,NY SCTM#: 1000-83-1-11 Southold Town Aliano Real Estate Boa e of Tros'PPS Atm: Lauren Dear Lauren: Enclosed herewith please find a copy of a survey for the above referenced indicating the coastal erosion line. Thank you for your attention to this matter. Very Truly Yours, Eileen Rowan ER/el Enc. tj IS' J�� MMMIAMMMMh Complete land U.eeSe res--ImIudrt MxLw„q,DaW and 6n»tonrnev W P.O. Box 5535 Miller Place,New York 11764 Thomas W.Cramer,Principal Telephone (631)476-0984—Fax(631)476-6933 August 2, 2004 �. tikel O Town of Southold Board of Trustees Town Hall 53095 Route 25 PO Box 1179 Southold, New York 11971-0959 Re: Glen Court, Southold,NY SCTM#: 1000-83-1-114 lZ Aliano Real Estate Dear Trustee: Please be advised that the above named is proposing the construction of a single family dwelling along with the construction of retaining walls. Kindly review the enclosed survey to determine whether the Town of Southold has jurisdiction over this project. I believe that the project is in excess of 100' from any wetlands. Thank you for your attention to this matter. Very Truly Yours, Eileen Rowan der FR � 2004 � D Southold Town Board of Trustees - ANY ALTERATION OR ADDITION TO THIS SURVEY IS A WOLAT70N OF SECTION 7209OF THE NEW YORK STA 7E EDUCATION LAW. EXCEPT AS PER S£C77ON 7209—SUBDIVISION 2. ALL CERTIFICATIONS SURVEY OF PROPERTY HEREON ARE VALID FOR THIS MAP AND COPIES THEREOF ONLY IF SAID MAP OR COPIES BEAR THE IMPRESSED SEAL OF THE SURVEYOR A T CUTCHOG UE WHOSE SIGNATURE APPEARS HEREONLOT NUMERS . TOWN OF SOUTHOLD /N THE SUFFOLKEFER COUNTY CLERKS OFFICE TO "MAP OF VISTABONFMARCHO SUFFOLK COUNTY, N. Y. 15, 1968 AS FILE NO. 5060. 1000-83-01-11 & 12 EL EVA 77ONS REFERENCED TO N.G. V.D. SCALE: 1'=30' p�W/ JANUARY 13, 2004 N i June 23, 2004 (boI7) �i July /9, 2004 (revision) /• pNW _l Sept. 3, 2004 (rev1*&, ) �t{\ u6n. 13, 2005 (revisions) r Jan. 19, 2005 (revlslons) c to Qv P' Aug. 3l, 2005 (drywells etc.iA / 15LA1� h9 55oc Ile �' ,t N63 /ROoNO , Al 1' Nr, PARK Pg3'O 1000 c 6 S 3 /'///i N � � /�_ \,� -_,�'�' • e(L- __=— \ \ \ \ \ \ \ \ 1 l \ \ CID Vit, "0 fyl Lli� ,t� \\\\ \ i e• ��P 1 1 1 1 1 1� t� 4 S 1 I , • si4. oTz 90• 00 -YV&/05 o fP 'ROVIDE 2 DRYWELLS 6' 0 • 5' DEEP TO HANDLE. I "\gym\ \� 1 GOOF RUNOFF I ' 0v' 7EV£GETATE ON TOP AND BOTTOM OF THE RETAIN/Nd \ I 5 WALLS Win., ' SANITARY SYSTEM. 1 JK 1 11 0 // SUBSURFACE SEWAGE 4, WELLAVA 1 +�ert /�/ �DO DISPOSAL SYSTEM DESIGNED BY# r 6 SAND d T � \ j�� % yhry JOSEPH H. BAER, P.E. GRAVEL m j o C/O DV/RKA AND 6- Z BARTIL UCCI U4 CONSUL TING ENGINEERS t C gv/R� (516) 364-9890 i 4 AW O A Y� -1 73 6- WELL FIN. FLR. - --� COMPACTED EL 53 SAND a GRAVEL TW Ei sP "w WALL 1000-83-01-11 ARE4=6,474 SQ. FT TO 77E UNE ELQ 1000-83-01-12 AREA=34,324 SQ. FT. TO 77E UNE P'M( 41�'roL ' Fl�l.Qm pgAL�. SCALES l' 20' sSrt\sas nr o 40 T ,\t OF NErlYO CROSS SECTION DOUBLE TIER SEPTIC SYSTEM i LP. P N"E PICAL FULL CRIB a. sf , F STAINING WALL -- _) E' 2z 1� LIC. NO. 49618 rWLM WATER POY• P lC S, P. — — — — (6 1) 6 $ ,IMAX (6 1) 765-1797 OASTAL EROSION HAZARD LINE FROM P $ 1 47 New York State Department of Environmental Conservation Division of Environmental Permits Building 40 - SUNY, Stony Brook, NY 11790-2356 Telephone (631) Facsimile 16311631) 4444-0360 Website: www.dec.state.ny.us - Erin M. Crotty Commissioner APR ecember 28, 2004 Southold TOR B Mr. Nicholas Alia oard of Trustees 970 Route 25A- Miller Place, NY 11764 RE: 1-4738-03391/00001 Dear Permittee: In conformance with the requirements of the State Uniform Procedures Act (Article 70, ECL) and its implementing regulations (6NYCRR, Part 62 1) we are enclosing your permit. Please read all conditions carefully. If you are unable to comply with any conditions, please contact us at the above address. Also enclosed is a permit sign which is to be conspicuously posted at the project site and protected from the weather. Sincerely, Claire K.Werner Environmental Analyst CKW/ls Nevv YL)RK STATE DEPARTMENT OF ENVIRONMENTAL CONSERVATION .)EC PERMIT NUMBER EFFECTIVE DATE FACILITY/PROGRAM NUMBER(S) 0 PERMIT EXPIRATION DATE(S) Under the Environmental December 28, 2009 Conservation Law TYPE OF PERMITS New ❑ Renewal❑ Modification■Permit to Construct ❑Permit to Operate ❑ Article 15; Title 5: Protection of Waters ❑ Article 17, Titles 7, 8: SPDES ❑ Article 27, Title 9; 6NYCRR 373: Hazardous Waste Management ❑ Article 15, Title 15:Water Supply O Article 19:Air Pollution Control ❑ Article 34: Coastal Erosion ❑ Article 15, Title 15: Water Transport ❑ Article 23,Title 27: Mined Land Management Reclamation ❑ Article 15, Title 15: Long Island Wells ❑ Article 36: Floodplain Management ❑Article 24: Freshwater Wetlands ❑Article 15, Title 27: Wild, Scenic and ❑ Articles 1, 3, 17, 19, 27, 37; 6NYCRR Recreational Rivers ■ Article 25: Tidal Wetlands 380: Radiation Control ❑ 6NYCRR 608:Water Quality Certifica- ❑ Article 27, Title 7; 6NYCRR 360: tion Solid Waste Management PERMIT ISSUED TO FTELEPHONE NUMBER Nicholas Aliano 31) 744-5000 ADDRESS OF PERMITTEE 970 Route 25A, Miller Place, NY 11764 CONTACT PERSON FOR PERMITTED WORK TELEPHONE NUMBER Cramer Consultinq Group, P.O. Box 5535, Miller Place, NY 11764 631 476-0984 NAME AND ADDRESS OF PROJECT/FACILITY Aliano property, Glen Court, Southold SCTM#1000-83-1-11 & 12 COUNTY TOWN WATERCOURSE NYTM COORDINATES Suffolk I Southold I Long Island Sound DESCRIPTION OF AUTHORIZED ACTIVITY: Construct a single family dwelling, septic system, driveway and retaining walls. All work must be done in accordance with the attached plans stamped NYSDEC approved on 12127/04. By acceptancd of this permit, the permittee agrees that the permit is contingent upon strict compliance with the ECL, all applicable regulations, the General Conditions specified (see page 2 & 3) and any Special Conditions included as part of this permit. PERMIT ADMINISTRATOR: ADDRESS Mark Carrara CKW Region 1 Headquarters, Bldg. #40, SUNY, Stony Brook, NY 11790-2356 AUTHORIZED SIGNATURE DATE AL=i(� I December 28, 2Page 1 of 4 004 • NEW YORK STATE DEPARTMENT OF ENVIRONMENTAL CONSERVATION ADDITIONAL GENERAL CONDITIONS FOR ARTICLES 15 (TITLE 5), 24, 25, 34 AND 6NYCRR PART 608 ( TIDAL WETLANDS) 1. If future operations by the State of New York require an alteration in the position of the structure or work herein authorized, or if, in the opinion of the Department of Environmental Conservation it shall cause unreasonable obstruction to the free navigation of said waters or flood flows or endanger the health, safety or welfare of the people of the State, or cause loss or destruction of the natural resources of the State, the owner may be ordered by the Department to remove or alter the structural work,obstructions,or hazards caused thereby without expense to the State, and if, upon the expiration or revocation of this permit, the structure, fill, excavation, or other modification of the watercourse hereby authorized shall not be completed, the owners, shall, without expense to the State,and to such extentand in such time and manneras the Departmentof Environmental Conservation may require, remove all or any portion of the uncompleted structure or fill and restore to its former condition the navigable and flood capacity of the watercourse. No claim shall be made against the State of New York on account of any such removal or alteration. 2. The State of New York shall in no case be liable for any damage or injury to the structure or work herein authorized which may be caused by or result from future operations undertaken by the State for the conservation or improvement of navigation, or for other purposes, and no claim or right to compensation shall accrue from any such damage. 3. Granting of this permit does not relieve the applicant of the responsibility of obtaining any other permission, consent or approval from the U.S.Army Corps of Engineers, U.S.Coast Guard, New York State Office of General Services or local government which may be required. 4. All necessary precautions shall be taken to preclude,contamination of any wetland or waterway by suspended solids, sediments, fuels, solvents, lubricants, epoxy coatings, paints, concrete, leachate or any other environmentally deleterious materials associated with the project. 5. Any material dredged in the conduct of the work herein permitted shall be removed evenly, without leaving large refuse piles, ridges across the bed of a waterway or floodplain or deep holes that may have a tendency to cause damage to navigable channels or to the banks of a waterway. 6. There shall be no unreasonable interference with navigation by the work herein authorized. 7. If upon the expiration or revocation of this permit, the project hereby authorized has not been completed, the applicant shall, without expense to the State,and to such extent and in such time and manner as the Department of Environmental Conservation may require, remove all or any portion of the uncompleted structure or fill and restore the site to its former condition. No claim shall be made against the State of New York on account of any such removal or alteration. 8. If granted under6NYCRR Part 608,the NYS Department of Environmental Conservation hereby certifies that the subject project will not contravene effluent limitations or other limitations or standards under Sections 301, 302, 303, 306 and 307 of the Clean Water Act of 1977 (PL 95-217) provided that all of the conditions listed herein are met. 9. At least 48 hours prior to commencement of the project, the permittee and contractor shall sign and return the top portion of the enclosed notification form certifying that they are fully aware of and understand all terms and conditions of this permit. Within 30 days of completion of project, the bottom portion of the form must also be signed and returned, along with photographs of the completed work and, if required, a survey. 10. All activities authorized by this permit must be in strict conformance with the approved plans submitted by the applicant or his agent as part of the permit application. Such approved plan was prepared by John T. Metzger dated 1/13104, last revised 7119/04. DEC PERMIT NUMBER PAGE 3 Of 4 1-4738-03391/00001 NEW YORK STATE DEPARTMENT OF ENVIRONMENTAL CONSERVATION NOTIFICATION OF OTHER PERMITTEE OBLIGATIONS 'Item A: Permittee Accepts Legal Responsibility and Agrees to Indemnification The permittee expressly agrees to indemnify and hold harmless the Department of Environmental Conservation of the State of New York, its representatives, employees, and agents("DEC")for all claims, suits,actions,and damages,to the extent attributable to the permittee's acts or omissions in connection with the permittee's undertaking of activities in connection with,or operation and maintenance of, the facility or facilities authorized by the permit whether in compliance or not in compliance with the terms and conditions of the permit. This indemnification does not extend to any claims, suits, actions, or damages to the extent attributable to DEC's own negligent or intentional acts or omissions, or to any claims, suits, or actions naming the DEC and arising under article 78 of the New York Civil Practice Laws and Rules or any citizen suit or civil rights provision under federal or state laws. Item B: Permittee's Contractors to Comply with Permit The permittee is responsible for informing its independent contractors, employees, agents and assigns of their responsibility to comply with this permit, including all special conditions while acting as the permittee's agent with respect to the permitted activities, and such persons shall be subject to the same sanctions for violations of the Environmental Conservation Law as those prescribed for the permittee. Item C: Permittee Responsible for Obtaining Other Required Permits The permittee is responsible for obtaining any other permits, approvals, lands, easements and rights-of-way that may be required to carry out the activities that are authorized by this permit. Item D: No Right to Trespass or Interfere with Riparian Rights This permit does not convey to the permittee any right to trespass upon the lands or interfere with the riparian rights of others in order to perform the permitted work nor does it authorize the impairment of any rights, title, or interest in real or personal property held or vested in a person not a party to the permit. GENERAL CONDITIONS General Condition 1: Facility Inspection by the Department The permitted site or facility, including relevant records, is subject to inspection at reasonable hours and intervals by an authorized representative of the Department of Environmental Conservation (the Department)to determine whether the permittee is complying with this permit and the ECL. Such representative may order the work suspended pursuant to ECL 71-0301 and SAPA 401(3). The permittee shall provide a person to accompany the Department's representative during an inspection to the permit area when requested by the Department. A copy of this permit, including all referenced maps, drawings and special conditions, must be available for inspection by the Department at all times at the project site or facility. Failure to produce a copy of the permit upon request by a Department representative is a violation of this permit. General Condition 2: Relationship of this Permit to Other Department Orders and Determinations Unless expressly provided for by the Department, issuance of this permit does not modify, supersede or rescind any order or determination previously issued by the Department or any of the terms, conditions or requirements contained in such order or determination. General Condition 3: Applications for Permit Renewals or Modifications The permittee must submit a separate written application to the Department for renewal, modification or transfer of this permit. Such application must include any forms or supplemental information the Department requires.Any renewal, modification or transfer granted by the Department must be in writing. The permittee must submit a renewal application at least: a) 180 days before expiration of permits for State Pollutant Discharge Elimination System(SPDES), Hazardous Waste Management Facilities (HWMF), major Air Pollution Control (APC) and Solid Waste Management Facilities (SWMF); and b) 30 days before expiration of all other permit types. Submission of applications for permit renewal or modification are to be submitted to: NYSDEC Regional Permit Administrator, Region 1, SUNY Bldg #40, Stony Brook NY 11790-2356 General Condition 4: Permit Modifications, Suspensions and Revocations by the Department The Department reserves the right to modify, suspend or revoke this permit in accordance with 6 NYCRR Part 621. The grounds for modification, suspension or revocation include: a) materially false or inaccurate statements in the permit application or supporting papers, b) failure by the permittee to comply with any terms or conditions of the permit; c) exceeding the scope of the project as described in the permit application; d) newly discovered material information or a material change in environmental conditions,relevant technology or applicable law or regulations since the issuance of the existing permit; e) noncompliance with previously issued permit conditions,orders of the commissioner,any provisions of the Environmental Conservation Law or regulations of the Department related to the permitted activity. DEC PERMIT NUMBER PAGE 4 OF 4 1-4738-03391/00001 95-20.1 01103)—9d New York State Department of Environmental Conservation NOTICE r The Department of Environmental Conservation (DEC) has issued permit(s), pursuant to the Environmental Conservation Law for work being conducted at this site. For further information regarding the nature and extent of the approved work and any Department conditions applied to the approval, contact the Regional Permit Administrator listed below. Please refer to the permit number shown when contacting the DEC. Permit Number - 38-p 0" Regional Permit Administrator Expiration Date 02 v2 o2Q NOTE: This notice is NOT a permit 1 b 1 .. t i • i 1 i � S _ t I - ✓` 1 ' d � ' ill •-�'2 ��..' �. .;5. ti' { S i 4 1 � • l r s OW- 7f at� '� �.� ! Y e t,,`•"mea � l ' 7• �4 O h .` 111 •. r, •' f 4•. i r. •4+' IN L 4Wjf t If"'� djr4� t •i � y _ ¢• Ti '� ?.''1,: ,� }i/�11�•� , ✓ 1 �� # ��i meg_ � � r•�) � ��� y, ��'tr �r t@t. _ { it y � •ij J 1,• '' 1 � 'f-,,,r �w}y - �ri'g; r ra►"� `1�fR'_t N:}T.` '+R IfAj� ¢'T' '. {7 ilii r p� • �� I�y, t'3:Z J✓'/ ��f l� .�. � � f„#l.� � -.� YirR..•n lJ �y. 1 ' li ^.:I N� +t$ r� .iY�I • .� ,�� �,a��� . .� � S, fir. ?;r F 1� 1 ,t y .�:ifx.',•/ �'ta 7�,' It� `t�'( � � � y � �°9C�f II � �+�• ��' a+ 1��`'� ; � 9(� • A � �rf _ Y • y, p Y � j'v Ri i 1` Y � I �,�, ri 1 /�.>'1'� � � sir � • 'j'. ; i��l yf � I 1 , 1'� �' ~i/l �W h• 4t t[ Yq qYr '.; J r`, 1 L._ r. e, •1 :, � L R . hlq • �r��•�' � �L 'fig ��,�i. _ � rl 1 `"_ � - . / . UA :� 1 titer i r' r I .•�i.�%A -i. ,� ' 4 ��t.. f ) )'�, J Iii a �1 •� �+� ; � T +e' ` -`_ .�. • ,,1-'`. �����,. #, � �. �/� �ti �'_t,� +fir'. cy• � " a � � / ; v ��3 .; �/ :x — .r >+ t t � w{� ,�ji7,,r: ? ii��4�I� t F4,�I{I 1et"'• .�/�►�r.sn '` / -k + � , ( ��.�'��„•1IM . f. � ' ; Il •a; ." 1 ^. FSP ;✓ � �' 'If f wgo . iJ lw�n Abl-�1 ,�►I i 1 - g �.�ti.v � r'!+.- < '` � 11 ,��'d q far fir 'rr'ti•1++` ���'�L�iQ �.�,.�i� ��� ,�1�?'(`'�^�� s A moi+ n�, • > i J - � �. fix: ,►�°' } d .» ►�,;.:Ca . jai �011��a gzyqr, Sun all c RIN At �ty NO 6KC 4, �� sS* _ a� . AMW a .� `� `S �! ���'��,:ems- ��* �� � �..r - � \ r i•� T 1 T.+ ' .�, . w.� :.iy ��+-F•Af :,;ilk / �'+.-',�y _tet - '�.i� �.� ♦�@.�g' �� � � �, • VVII Lt Z- L: a N• II- 3 Ak ,-fir iFf �.� TJ• �t 1 fir. . �f,` `+ �r. .' ;.� Fit / ... / "� I -• .�.,+^^",".. 3�, ; �� is Li � r a .r i 11I •� i �.Yn . .smnlr ��� �t,l, / - t,r. crn r� A(�y1�_�/�s� '(. ��r � ��yr,.� �1���'°�•iY' y�.� 'r7� �1;! � .a' ,0�lciM� � Nd cy�.y� - q;a'• I' ✓',+ ,� ;1�i ' �$-.L �'I U' � . y�� ",.1 !ri`-\`:,r •c '. �7 Vit) 1WJ�, t�",1 ciNIP � ,n r,v l� ° • _. 1'�l�, Y 'l{Si� � J rte• �'✓Z �� d 4�'��h��'"'�i.". �;`�3" �'r n��b 7•at +,-.. �1 Lp�;y '!`4 A, !�r*'.. - t*`�9��'�'i �c��„�„`� ��4• �r�-,�� i,t��"+��., r it Ido A 7 �s 1 'Tili ��1 _�i N�r,� �f°�+. v 3' t� x •h, r- .�. ;ra �air(t a,�� -..,�,�r .t "R r,• q !�¢�i} jr,�►` `t �"` '�'r< $ter':_: 1,J�f/y' �w -i►' <.�a:.:✓ ' +�h'4�°�*;o ;��:�n��n:�i.�:eN.�e�7 r ��v�r,' 1�7 �� '�� � �� �W.���''�*' If�q/ SIP '+I► j! r Ell t 1 .r \ �':GI-.,r Rµ�ri.''\ iC•"YI i ` r l �i\�� !�' �� �. p� "'VVV � �■f �irjf' IYI� J; f, �,. e. �t�`/ ��r o� ' ; i •Ip lei n� J (� � 4 < .nIlkNA 1!ia�.�•_ 12 e,.1 ►. • i `'0�1M_i. ��:-v. fi� tv �"" - 1!�"',+' \fir•' `�\. �;,�` 1°`� � + t - 14 j \P:� `v 'T iZ r $� YJ Alm C?. % pl,`l11rMl�P'1� � L � �� `�� i/. �• 'ni X11 if •V ,�r �� - v! 11.1. '� f � ,1 �l{,�.�'i•"w 4 �r �.�� e _ �r+. y }1 � r 'Ir . �� �l jt r.ti � �. ti> v , e�, +, ��� � 5•. _ �S�r,Tili� - -' ?4�' �r a. , '6�so . env_ � t� •i � to : 1 'J �' •�t*. �i. � 1 ..r � n/ �1 , • .-fib u. ,I - �,fir`�t .. �� + + as 1 �•i.� .r. s �l �- ����.! �'� �'� - <�� . Y ! Imo^ - o F. r 6 ! ,fie,"�•', _ � , , s ,� � ey J '4x r i C f ti '•. l r r f� � 'r,.1 ♦ y �'` `1 -. ��; 1f�♦ r �i 4 �, C� + c�`�,�� 'dry ' Y i � a •L LY � IL qLT K, Jf pa �44 .1 10 { } rr ,�S L,yYyF,'.c4t..� � �1►�' � `t, r f i ��'LS.r1/ .�yf'� a -,Y t. t IM L .R '.1 y t �t Y 11 J� n � �•� 11e''y � �. fi°r U, -_ !�►�t"G a bi�. � .e ah r ; �.SX. y)) r i 41, AM wr _ y � Y «A !,•moi r.t ._ ,,. � � .� ,EYP. r ^ •�€. •. � „fib _� s .ljy ry a � . w e r_c• SR, �� rn ! 3 j � - l{ Y. �. ANY ALTERATION OR ADDITION TO THIS SURVEY IS A VIOLATION OF SECTION 7209OF THE NEW YORK STATE EDUCATION LAW. EXCEPT AS PER SECTION 7209—SUBDIVISION 2. ALL CERTIFICATIONS SURVEY OF PROPERTY HEREON ARE VALID FOR ANIS MAP AND COPIES THEREOF ONLY IF SAID MAP OR COPIES BEAR THE IMPRESSED SEAL OF THE SURVEYOR AT CUTCHOG UE WHOSE SIGNATURE APPEARS HEREON. LOT NUMBERS REFER TO "MAP OF VISTA BLUFF" FILED TOWN OF SOUTHOLD /N THE SUFFOLK COUNTY CLERKS OFFICE ON MARCH SUFFOLK COUNTY, NY 15, 1968 AS FILE NO 5060. 1000-83-01-11 & 12 EL EVA TIONS REFERENCED TO N.G. V.D. SCALE: 1 e=30' JANUARY 13, 2004 N June 23, 2004 (hoh) M July 19, 2004 /revision) '00* 149a 3 J n m 1s N63h9 GR "003 N K P�P�G1/11 o N P P��63/ $� 3\ 10 ' 00 vo i - 26-46 -- �O o � O ct, A. 1 1 1 1 1 1 A 1 h it 9 00 yy U 510.42 1�'✓ k?.' 1 I I I f ,. l l l k Qj 1 ! , 6 01 y FIE .O' 1 v _ CO& 1000-83-01-11 AREA=6,474 SO. FT TO 77E UNE Dy 1000-83-01-12 AREA=34,324 SO. FT. TO AE UNE �PtEOF NfWr ,o�N t. o Memo LIC. NO. 49618 co lC`SUdXPF _ C. (631) 6-� (631) 765-1797 P.o. kdx' "c'12 30 IRA I' IFT •i n rln el io + • M a Y: o vµ ✓✓✓ R ��8 � �al5 -F �m I Sok \ SSS \ �F Ia ' - IwI IIII { IR 0 ' gyp r fir ' 'tip ��a ezgeti ��� I 3 H • z 8 7 3 7 V SNS 3 1 .yI a 55 ` CbWkte7mdUw Bavirea--lnv/ &zWP/—zi,LkwSn-dDnwVMnWtd P.O.Box 5535 Miller Place,New York 11764 Thomas W.Cramer,Principal Telephone (631)476-0984—Fax(631) 476-6933 May 20, 2005 Town of Southold Board of Trustees Town Hall 53095 Route 25 PO Box 1179 Southold, New York 11971-0959 D h h 11 I r� Re: Glen Court, Southold,NY F - -7! SCTM#: 1000-83-1-11 MAY 2 J 2035 Aliano Real Estate SouR!oid lovfn Board of Trustees Dear Sir/Madam: Enclosed herewith please find a check made payable to the Town of-Breokhwen in the amount of$300.00 to cover fees as indicated in approval letter dated April 20, 2005. Please contact this office if you are in need of anything further. Thank you. V!e� ly_Yours, Aileen Rowan /er Enc. Office use only Coastal Emsion Permit Application ^�Ti/edand Permit Application Administrative Pernut AmendmentJTransfedE ion .—Received $.� Foc: S i C Completed Application _Incomplete _SEQRA Classification L ( F+ '. —✓ Type I Type II—Unlisted _Coordinatioa(date seM) — ----.. CAC Referral Sent: ,Date of Inspection: Board of Trustees Receipt of CAC Report: _Lead Agency Determination: Technical Review: iPitbhc Heating Held: O D Resolution pp Name of Applicant J " ( Q f'fCJ LA--S A L-1 lj-,/ 6 Address quo Al u F a sli , M I (L2 P p LA-C E- N 2 W Yft- I Ne t f Phone Number) Suffolk County Tax Map Number: 1000 - } 2) —� I r Z l(3g0Y Property Location: Z -$T Cbu g� 0 . /Ik57u) �Clnc- (provide LILCO Pole#,distance to cross streets, and location) AGENT: �R X14 l t N�`(J�? �N(��Ie60 (If applicable) /� tcCOW Address: PO ( u FK- FL /AC,S— p� �r;f Phone: 0 0 Board of Trustees Application GENERAL DATA R / Land Area(in square feet): 401 -7 4 R Area Zoning: Previous use of property: Intended use of property: -,E Prior permits/approvals for site improvements: N YJ g12-1 ( Z Dat No prior permits/approvals for site improvements. m �J6(//n 0 Has any permit/approval ever been revoked or suspended by a governmental agency? No Yes If yes, provide explanation: Project Description (use attachments if necessary): s2� ONZ ')EAT I L����tirr PNQPd 30 ' "c L-o ` W CVr F5 � N ( yd (.c h L cs 0 0 Board of Trustees Application COASTAL EROSION APPLIICATION DATA Purposes of proposed activity: Opw- RuCT 01V2 �hlyw t'tA wFLLW O- Are wetlands present within 100 feet of the proposed activity? No Yes Does the project involve excavation or filling? No__*�<_Yes If Yes, how much material will be excavated%33 (cubic yards) How much material will be filled? '3r3)0 (cubic yards) Manner in which material will beiemeved-of deposited: d �r .�_�2�_�2 uAR� I ►� � r�CP� , Describe the nature and extent of the environmental impacts reasonably anticipated resulting from implementation of the project as proposed. (Use attachments if necessary) rcx e NutZ � � 1 PROOF OF MAILING OF NOTICE ATTACH CERTIFIED MAIL RECEIPTS NAME: ADDRESS: Nicholas Aliano 11 Sailor Court, Miller Place NY 11764 Jerry&Ors Kalas 185 Whistler Drive, Manhasset NY 11030 Margaret Aliano I 1 Sailor Court, Miller Place NY 11764 Alexandros Demetriades 213 West 28'h Street, New York NY 10001 STATE OF NEW YORK COUNTY OF SUFFOLK p� 04 n1f GL NrA residing at 1 1-�R I'L�$�.�'. ✓� �dtKl�L beingkuly sworn, deposes and says that bn the la+h day of 20joS deponent mailed a true copy of the Notice set forth in the Board of stees Application, directed to each of the above named persons at the addresses set opposite there respective names;that the addresses set opposite the names of said person are the address of said persons as shown on the current assessment roll ofth�Town of outhokl;that said Notices were mailed at the United States Post Office at that said Notices were mailed to each of said persons by (certified) (registered) mail. C,r C�;o C�c0 m(01� Sworn t fore a this Day of 20_ � � � rotary Public ROM POWAN Nohry PutNb,Stdo cimm Ybdt OwllledInCotmty 0wokslon E+Vk«F•�+•n to so�� . Compkfe Ldw uv S� --6r/udtrEq Prmie.Inmru tal P.O.Bou 5535 Miller Place,New York 11764 Thomas W.Cramer,Principal (631)476-0984 April 4, 2005 RE: Board of Trustees/Town of Southold Nicholas Aliano C/O Cramer Consulting Group Glen Court, Cutchogue NY Dear Neighbor Enclosed please find a Notice of Public Hearing for the above referenced project, which is scheduled to be heard at a public hearing on April 20, 2005 at 7:00 PM. Our firm represents your neighbors, who are seeking to construct a one family dwelling. Please feel free to give me a call if you have any questions with regard to this application. Thank you for your cooperation in this matter. Thomas W. Cramer, ASLA Enclosure: NOTIC'f 7'(_) ADJ.�CENT PRO PE 1:'l 0%' NER BO.-kRD 01• I OWN OP SUIJ'i 1101.0 III the urittcr ul ;q)plicauc J --1_000ca15 ALA 4/t/ _ -_SCIMr;_ YOU ARL HEREBY GIVEN NOTICE: 1. "That it is the iutcutiun ulth w�dcrsi^ncd to nyuc 1'cnnit Drum the Bourn of"Trustees to: OONSIRUCr �N� �MI�K �tu�W�i'G 3d 'x40 ' 3. '] Itut the property which i; the subjcat o1 l�nvironntental Rccicw is located adjacent to your property and is dcsy'.�ibud as lo S* FA )l �'t�� LF-1 l OORT ( ,�7il/1L) 3. "That the project which is subjoct to I'oV1rOnILlentLl RC�ICw w/ulcr Chap[L:is 32, and/or 97 of the ''own Code is opcn to public cunuucut on: �1 L� ZCJ Z�� . You may contact the 7'l ustucs 011ico at 7o5-1892 ur iu writit�s. The above-referenced proposal is under of tlw Board of Trustees of the Town of Southold and docs not rcl'k�renc(c� any other a;;cncy that tuioht have to rev icw same proposal. OWNEkS NAME: N l e(�(JL �l LSA 1/0 MAILING ADDRESS. �,__L� -- — - — V�LU L_ I� PHONE tt: _ Co .l -Z� - - Linc: ('upy of sketch or plan showin7 prupusal dor yuur amccnicncc. A, 'r A'- ;EIA D✓N !,H -10b, ',wN i-) iHlti j(,KVEY i5 4 VIOLA TIGN GF SECTION 7209OF THE NEW YORK SCaTE EDUCATION LAW ExCEPT AS PER SECTION 7209—SUBDIOSION 2. ALL CERTIFICATIONS HEREON AREOVALID SURVEY OF PROPERTY OPT TI1 FOR THIS MAP AND COPIES THEREOF ONLY IF E ; .MAP OR R COPIES BEAR E IMPRESSED SEAL OF THE SURVEYOR WH°SE lrcNA r-ARE APPEAR HEREON AT CUTCHOG UE . NUMBERS REFER TO ',VAP OF VISTA BLUFF" FILED TOWN OF SOUTHOLD HE SuFFILh CO(lN-"r CLERK S. OFFICE ON MARCH SUFFOLK COUNTY, NY 4 FII-E ,,'O <°so 1000-83-01-11 & 12 SCALE. 1'=30' JANUARY 13, 2004 N ,lune ', _Jp4 .^ •7. NNW 14 9, c,L--; irevtsici2 / Sept. 3, 2004 Ir*vtel,,p) 4 en. :? -VS rev;`ions! Jan. 19, 2005 (revisions) 0ID I 01 V 55 LAID 55 G " O,�G P�P� 0t'tl o j' PPR x/83 0)3 t 00. - r / o, - d N63 tr eE \ N, V V V, q Tv.. A� 9_ _ 1 O : 00 \ g0• i 30.E i Sip b2 rNi I, 6 •—r"-. Op .r / .Cy „c� `�. TEN is 0 = EC 4eY — IVEcc s• uR ltZ L n " ° °,, �✓fLL _Gv. FSR. � COMPAC rEG .^J � i •. SANG Q SRA n - ,, 1000-83-01-11 AREA=6,474 S0. FT OTIEN 4 ELS, 1000-83-01-12 AREA=34,324 S0. C2 . 7' 3N��E CFOSS .SECTION J 'oLc �F SEP r/c 3YS TEM n 6 +E-A,MNd *ALL WA rb� F L'Nl!_ - UkLF'OkS, P. 5�' 'h5-SOZ:7 FAX ,r'6_t1) 755-1797 GASTAL ERGSION mAZAr�I -; i,',E I E R -TREFT -_AS-AL E,RGSION HAZARD AREA WAP 0�—�Q� x.4clo * 58-545-93 . . osuFFot,� Albert J. Krupski, President ��. CQ Town Hall James King,Vice-President = 'Y� 53095 Route 25 Artie Fostery - P.O.Box 1179 Ken Poliwoda x Southold,New York 11971-0959 Peggy A. Dickerson W Telephone��'��� � 5-1892 Fax (631) 6 7657i898WY/ BOARD OF TOWN TRUSTEES TOWN OF SOUTHOLD BOARD OF TRUSTEES: TOWN OF SOUTHOLD --------------------------------------------------------------- In the Matter of the Application of ` 2[r_nDlmrl---auai&------------------- COUNTY OF SUFFOLK) STATE OF NEW YORK) AFFIDAVIT OF POSTING I�Jf{ f/1�, NI/•�ZY/ residing at l2 z�JdOIm {� being duly sworn, depose and say: That on the 3/day of ?L// , 200I personally posted the property known as A -/ANO C�ceyCo��T. CuTctfoc�yE by placing the Board of Trustees official poster where it can easily be seen, and that I have checked to be sure the poster has remained in place for eight days prior to the date of the public hearing. Date of hearing noted thereon to be held WWI, Q O S ' Or14� 001.1.E /Yl, Dated: rSworn to efor me this 4{ day o t�200j Notary Public ENM RMAN NdwrN .01R048780Stift of M OmwdeWw Ewka Febrwr„`b`t�p,"MID Zjfi �jg�r ii WN Alf A VIN WJ-ar"ll —q NE -Ali lu X, j • c -tit llwfto� TICE OF, JEARING KIM SQUIHO D 500.RD Or 7VUSTEES oa ,pku�t��70,F,3p�3"0'96,5 60'd by th� S�utlbold.,�L York,�ncorninq lkis prc,�,ty moi� R�,J, p O*VNER(S) OF RECORD: rmctda,5 eLLIam SUBJE��,?"PVBLf HEARING-lb cenStru& A S • TIME&DATE OF PUBLIC HEARING: uw.,aprik W% erabkti qCo prn. PAHS 'TOWN OF SC"T"OLD 16:31)765 1892 0 0 Board of Trustees Application AUTHORIZATION �A f( a (� (where the applicant is not tth /� he owner) I, f V l HO LAS AU AjVd residing at c / � (print owner of property) (mailing address) e do hereby authorize (Agent) �[lERN�(�LTI•(l Wpply for permit(s) from the Southold Board of Tow Trustee on m ehalf. (Owner's signature) Board of Trustees Application County of Suffolk State of New York V ( CtULAS A (—( 4N6 BEING DULY SWORN DEPOSES AND AFFIRMS THAT HE/SHE IS THE APPLICANT FOR THE ABOVE DESCRIBED PERMIT(S)AND THAT ALL STATEMENTS CONTAINED HEREIN ARE TRUE TO THE BEST OF HIS/HER KNOWLEDGE AND BELIEF, AND THAT ALL WORK WILL BE DONE IN THE MANNER SET FORTH IN THIS APPLICATION AND AS MAY BE APPROVED BY THE SOUTHOLD TOWN BOARD OF TRUSTEES. THE APPLICANT AGREES TO HOLD THE TOWN OF SOUTHOLD AND THE TOWN TRUSTEES HARMLESS AND FREE FROM ANY AND ALL DAMAGES AND CLAIMS ARISING UNDER OR BY VIRTUE OF SAID PERMIT(S), IF GRANTED. IN COMPLETING THIS APPLICATION, I HEREBY AUTHORIZE THE TRUSTEES,THEIR AGENT(S)OR REPRESENTATIVES(S), TO ENTER ONTO MY PROPERT I SP THE PREMISES IN CONJUNCTION WITH REVIEW OF TH PL N. Signa ure SWORN TO BEFORE ME THIS 2-6 DAY OF Qdfob� 200`► NOTARY PUBLIC,Stela of New Yo1N N0.QIAM73710 Notary Public min avWletc Land Use.savlces--hwIu WPIAnwrg,[r5jgnaW FAwWnn"VAI P.O.Box 5535 Miller Place,New York 11764 Thomas W.Cramer,Principal Telephone(631)476-0984—Fax(631)476-6933 March 7, 2005 Town of Southold Board of Trustees Town Hall 53095 Route 25 PO Box 1179 r n LI � Southold,New York 11971-0959 111 Attention: Lauren Re: Glen Court, Southold,NY I i,f v' .0 SCTM#: 1000-83-1-11 Aliano Real Estate Dear Lauren: Enclosed herewith please find the following items relating to the above named application: • Application for Coastal Erosion Permit • Copy of the New York State Department of Environmental Conservation Permit. Kindly contact this office if you are in need of anything further to process this application. Thank you for your attention to this matter. Very-Truly-Yaurs,_, J :—Eileen Rowan ER/el Enc.