Loading...
HomeMy WebLinkAboutTR-4254Board Of $outhold Town Trustees SOUTHOLD, NEW YORK PERMIT NO. t'~e~'~"Y DATE: .!g/6/93 ISSUED TO ANTHONY & VIOLA TAMBURRINO Authorizatio. Pursuant fo the provisions of Chapter 615 of the Laws of the State of New York, 1893; and Chapter 404 of the Laws of the State of New York 1952; and the Southold Town Ordinance en- titled "REGULATING AND THE PLACING OF OBSTRUCTIONS IN AND ON T~WN WATERS AND PUBLIC LANDS and the REMOVAL~.OF~SAND, GRAVEL OR OTHER MATERIALS FROM LANDS UNDER TOWN WATERS;" and in accordance with the Resolution of The Board adopted at a meeting held on lZ/6/93 . 19 93 , and in consideration of the sum of $ 150.00 paid by Costello Marine for. Anthony Tamburrino .... of Southold N.Y. and subject to the Terms and Conditions llsfed on the reverse side hereof, of Southold Town Trustees authorizes and permits the following: Wetland Permit to extend existing bulkhead return 10' landw and fill void with 3-4 c.y. of clean fill. Waters Edge Way, Hog Neck Bay, Southold all in accordance with the detailed specifications as presented in the originating application. IN WITNESS WHEREOF, The said Board of Trustees here- by causes its Corporate Seal to be affixed, and these presents to be subscribed by a majority of the said Board as of this dat.e. TRUSTEES John M. Bredemeyer, III, President Albert J. Krupski, Jr., Vice President Henry P. Smith John B. Tuthill William G. Albertson Telephone (516) 765-1892 Fax (516) 765-1823 BOARD OF TOWN TRUSTEES TOWN OF SOUTHOLD SUPERVISOR SCOTT L. HARRIS Town Hall 53095 Main Road P.O. Box 1179 Southold, New York 11971 December 8, 1993 Costello Marine Contracting Co. P.O. Box 2124 Greenport NY 11944 Re: ANTHONY & VIOLET TAMBURRINO SCTM #88-5-56 Dear Sue: The following action was taken by the Board of Town Trustees during its regular meeting held on December 6, 1993 regarding the above matter: WHEREAS, Costello Marine contracting Co., on behalf of ANTHONY & VIOLET TAMBURRINO applied to the Southold Town Trustees for a permit under the provisions of the Wetland Ordinance of the Town of Southold, application dated October 15, 1993, and, WHEREAS, said application was referred to the Southold Town Conservation Advisory Council for their findings and recommendations, and, WHEREAS, a public hearing was held by the Town Trustees with respect to said application on Monday, December 6, 1993 at which time all interested persons were given an opportunity to be heard, and, WHEREAS, the Board members have personally viewed and are familiar with the premises in question and the surrounding area, and, WHEREAS, the Board has considered all the testimony and documentation s,,hmitted concerning this application, and, WHEREAS, the Board has determined that the project as proposed will not affect the health, safety and general welfare of the people of the town, NOW THEREFORE BE IT, RESOLVED that the Board of Trustees approves the application of A~VfHON~f & VIOLA TAMBURRINO to extend existing bulkhead return 10' landward and fill void with 3-4 c.y. of clean fill. Permit will expire two years from the date it is sighed. Fees must be paid, if aDplicable, and permit issued within six months of the date of this notification. %~o insDections are required and the Trustees are to be notified upon completion of said project. Permit will be issued upon payment of the following fees for work to be done below Mean High Water Mark: Fees: ry truly yours, John M. Bredemeyer III President, Board of Trustees JMB/djh cc. CAC TRUSTEES John M. Bredemeyer, III, President Henry P. Smith, Vice Pre~ideht Albert I. Kmpskl, Jr. Joht~ L. Bedno~ld, John B. Tuthill Telephone (516) 765-1892 Fax (516) 765-1823 BOARD OF TOWN TRUSTEES TOWN OF SOUTHOLD SUPERVISOR SCO~ L. HARRIS Town Hall 53095 Main Road P.O. Box 1179 $outhold, New York 11971 COASTAL EROSION MANAGEMENT PERMIT APPLICATION TOWN WETLANDS PERMIT APPLICATION TRUSTEE LANDS PERMIT APPLICATION office ~oastal Erosion Permit Application /~etland Permit Application ~rustee Lands Permit Application ~andfather __~ompleted Apps. Date: ~-i~-~ __~ariance Required, 5Neighbors notified Date: SEQRA Type ~Coord. Revievffdopt.,mand. ~'I~IISp. comp./date: __SEQRA Determin;/date:£~ Public Hearing/date: Findings: Permit Vote: (Y/N): Special Conditions: {also see file) Use Only: ~pplication Fee: Application Number; SC~ %1000- ~- ~-~ Project Name (If any) Date Prepared: /~/ Il / Applicant: COSTE LL~ ) Interest: {owner, consultant,lessee,etc.) /%~T Owner of Property: TAIq~[~R'?;N~F~ Address ~.< u3~v~_P~ ~ ~.~^',-I Phone Subject Property Location: {Provide LILCO Pole location map) Distance to cross Streets if not on THIS IS NOT A PERMIT County of Suffolk State of New York ~EO~E b, ~QATELLO &~. BEING DULY SWORN DEPOSES AND AFFIRMS THAT HE/SHE IS THE APPLICANT FOR THE ABOVE DESCRIBED PERMIT(S) AND THAT ALL STATEMENTS CONTAINED HEREIN ARE TRUE TO THE BEST OF HIS/HER K~IOWLEDGE AND BELIEF, AND THAT WORK WILL BE DONE IN THE MANNER SET FORTH IN THIS APPLICATION AND AS MAY BE APPROVED BY THE SOUTHOLD TOWN BOARD O~ TRUSTEES. THE APPLICANT AGREES TO HOLD THE TOWN OF SOUTHOLD AND THE TOWN TRUSTEES HARMLESS AND FREE FROM ANY AND ALL DAMAGES AND CLAIMS ARISING UNDER OR BY VIRTUE OF SAID PERMIT(S), IF GRANTED. IN COMPLETING THIS APPLICATION, I HEREBY AUTHORIZE TIlE TRUSTEES, THEIR AGENT(s) OR REPRESENTATIVEIs), TO ENTER ONTO MY PROPERTY TO INSPECT THE PREMISES IN CONJUNCTION WITH REVIEW OF THIS APPLICATION. SWORN TO BEFORE ME THIS S~GNATURE NOTARY suggested space for location Map THIS IS NOT A PERMIT PnOJECT I.D. NUMSER 6t ?..2t Appendix C- ~tete Environmental Quality Review SHORT ENVIRONMENTAL ASSESSMENT FORM For UNLISTED ACTIONS Only PART J--PROJECT INFORMATION (To be completed by Applicant or Project sponsor) 1. APPLICANT*ISPONSOR 2. PROJECT NAME 3. PROJECT LOCATION: MUnicipality ,~ouT ~(~ County 4. PRECISE LOCATION (Street address end road tntersecllons, promlnenl landmarks, sic., or provide map) SEQR IS PROPOSED ACTION: DESCRIRE PROJECT BRIEFLY: t AMOUNT OF ~ND AFFECTED: Initially 0 ~cres Ulllmalely ~ acrel WILL PROPOSED ACTION COMPLY WITH EXISTING ZONING OR OTHER EXISTING LAND USE RESTRICTIONS? No I~ No, describe briefly WHAT IS PRESENT LAND USE IN VtCINI~Y OF PROJECT? ~Reslde.tlal [] Industrial [] Commercial Describe: ~L~tT~_P--~'~(~) ~ T [] Agriculture tO. DOES ACTION INVOLVE A PERMIT APPROVAL, OR FUNDING. NOW OR ULTIMATELY FROM ANY OTHER GOVERNMENTAL AGENCY (FEDERAL, STATE OR LocALt? No t! yes. Iisi agency(s) and permltlapprovate I ~. DOES ANY ASPECT OF THE ACTION HAVE A CURRENTLY VALID PERMIT OR APPROVAL? Yea ~Ho H yes, Iisi agency name and permltlapprovel t2. AS A RESULT OF PROPOSED ACTION WILL EXISTING PERMIT~APPROVAL REQUIRE MODIFICATION? . I CERTIFY THAT THE INFORMATION PROVIDED ABOVE IS TRUE TO THE BEST OF I~'~ KNOWLEDGE I! the action Is In the Coastal Area, and yo[I ate a state agency, complete the Coastal Assessment Form before proceeding with this assessment OVER AUTHORIZATION FORM Date~ owner of Business/prOperty name do herby give costello Marine Contractin orp. the authority to act as agent in my behalf in applying for all cf the necessary permits in order for work to be done on my property described above. Signature ~;-(~ PERHIT NUNBER 1-¢r38-00881/00001-0 FACU'JTY/PROGRAM NIANBER(S) U~der tile Envlre/lentll EF~{'IVE DATE #ove~ber &~ 1~3 EXPIRATION DATE(S) Octuber 31~ 1995 TYPE OF PERHIT · Nm4 0 R~'~el ~ Mocl~flcation ~ Permit to Cormtruct 0 Permit to Operste t Article ~$, Title 5: Protectlo~ ~ 6NYCRR 608: Water ~uallty 0 A~tlcle 27, Title ?; 6NYCRR ~60~ of Waters Certlflcetl~ Solid Waste Article IS, Title 15: Mater Supply Article t5, Title 15: Water Transport Article 15, Title 15: Leng Island ~ell$ Article 15, Htle 2?: Wild, Scenic and Recrestlotm{ Rivers 0 Article t?, Titles T, 8: SPOES 0 Article 27, Title 9; 6NYCRR 37~: Hazardous Vaate Nsnaoement O Article 19: Air Pollution Control 0 Article 34: Coastal Erosion #anaOement 0Article 23, Title 272 Nlned Land Article · Article 25: TidalBI~./~./..J~ffCRR 380: Radiation Control Other: PERHIT ISSUED TO A~tho~ & Violet Tal~U~rlnQ ADDRESS OF PERNITTEE 200 Laurel La., Syosetto NY 1179t CORTACT PERSON FOR PERNITTEO ~ORK Caste/ia #srlne P.O, Box 21240 Gree~oort, NY 11~ AND ADORES$ OF PROJECT/FACILITY taatxJrrino Protoert¥ - 85 gate? sedge gay TELEPHONE #UNBER LOCATION OF PROJECT/FACILZTY Southold Extend existing timber return 10 feet and place 5 cubic yards of backfH[. All uork shall be in accordance with the attached #YSOEC aFproved plan. By acceptance of this pemtt, the pemltteeagrees that the pemit is contingent upon strict comp[lence uith the CL, all applicable regulatim-a, the General Cenciltl(ws specified (aee pege~) and any Special Conditions included as part of hla permit. '~'PU~Y-REGIONAL PER#IT ADMINISTRA- J ADDRESS I .,,.. 40. ,o. Page 1 of 4 ~ IZI~DITI(]"8 Inspect ions 1. The permitted site or facility, Including relevant records, is subject to in- inspection at reasonable hours and intervals by an authorized representative of the Deparb~unt of Envlrc..untal Conservation (the Department) to determine v~ether the permittee is corplylng with this permit and the ECL. Such represen- tat lye may order the work suspended pursuant to ECL 71-0301 and SN=A 401 (3). ,~ copy of this permit, including all referenced maps, dra~vings and special conditions, mJst be available for Inspection by the Deparl~ent at all times at the project site. Failure to produce a copy of the permit upon request by a Deparl~¥ent representative is a violation of this permit. Pewnit Q~anges and Rana~ls 2. The Deparb~unt reserves the right to nodlfy, suspend or revoke this permit ,~hen: a) the scope of the permitted activity Is exceeded,or a violation of any condition of the permit or provisions of the ECL and pertinent regula- tions is found; b) the permit wes obtained by misrepresentation or failure to disclose relevant facts; c) nevvrmterlal tnforrmtion is discovered; or d) envir(~.untal conditions, relevant technology, or applicable I~v or regulation have material ly changed since the permit wes issued. The penmittee ~ust sub~it a separate written application to the Deparb~unt for renewal, rrodlfication or transfer of this permit. Such application rrust include any fora6, fees or supplemntal InfonYatlon the Deparb,'ent requires. ~ renewal, rrodification or transfer granted by the Dpparb~ent prust be invwiting. 3he permittee rrust subnit a renewal application at least: a) 180 days before expiration of permits for State' Pollutant Discharge El iminatlon Syst~n (Si=CBS), Hazardous V~bste Managufu~t Facilities (FIEF), major Air PoI lution Control (/~°C) and Sol id V~bste M~nageTent Facilities (~/~:); and b) 30 days before expiration of all other permit types. Unless expressly provided for by the Deparl, unt, issuance of this permit does not rn3dify, supersede or rescind any order or determination previously issued by the Depar~r~nt or any of the te,~=, conditions or requiru~unts contained in such order or determination. Legal abligations of Pewnittee The permittee has accepted expressly, by the execut ion of the appl icat ion, the full legal responsibility for all dureges, direct or indirect, of v~atever nature and by v~u~'ever suffered, arising out of the project described in this permit and has agreed to indeTnify and save harmless the State fr(~n suits, actions, d=,uges and costs of every nu~e end description resulting fron this project. This permit does not convey to the permittee any right to trespass upon the lands or interfere with the riparian rights of others in order to perform the permitted work nor does it authorize the irrpairrmnt of any rights, title, or interest in real or personal property held or vested in a parson not a party to the permit. 8. The permittee is responsible for obtaining any other permits, approvals, lands easeTents and rights-of-way that may be required for this project. Page 2 of 4 5ulh allllro~-ed IJlarl~ wet~' iIr~'lnti~,d b'¢ _ Co,-~t~_L:LO.~la~JJae o. 9~/2 9~9_3 __ SPECIAL CONDITIONS All dredged material shall be disposed on an upland site and be suitably retained so as to not reenter any Mater body or tidal wetland area. Return must be installed prior to the placement of fill. The storage of materials or construction equipment shall be confined to the area landward of the bulkhead. Supplementary Special Conditions (A) thru (F) attached. Page ~ of 4 SUPP~NT~RY SpEc't~k~ CONDITIONS The following conditions apply to all pormits~ A. . A copy of this permit, including all conditions and approved plans, shall be available at the project site whenever authorized work is in progress. The permit sign enclosed with the permit shall be protected from the weather and posted in a conspicuous location at the work site until all authorized work has been completed. The permittee shall require that any contractor, project engineer, or other person responsible for the overall supervision of this project reads, understands, and complies with this permit and all its general, special, and supplementary special conditions. Any failure to comply precisely with all of the terms and conditions of this permit, unless authorized in writing, shall be treated as a violation of the Environmental Conservation Law. If any of the permit conditions are unclear, the permittee must contact the Division of Regulatory Affairs at the address on page one or telephone (516) 444-0365. Co If project design modifications become necessary after permit issuance, the permittee shall submit the appropriate plan changes for approval by the Regional Permit Administrator prior to undertaking any such modifications. The permittee is advised that substantial modification may require submission of a new application for permit. At least two days prior to commencement of the project, the permittee and contractor shall sign and return the top portion of the enclosed notification form certifying that they are fully aware of and understand all terms and conditions of this permit. Within 30 days of completion of the authorized work, the bottom portion of that form shall also be signed and returned, along with photographs of the completed work and, if required, a survey. For projects involving activities to be undertaken in phases over a period of more than one year, the permittee shall notify the Regional Permit Administrator in writing at least 48 hours prior to recommencing work in subsequent years. Fo The granting of this permit does not relieve the permittee of the responsibility of obtaining a grant, easement, or other necessary approval from the Division of Land Utilization, Office of General Services, Tower Suilding, Empire State Plaza, Albany, NY 12242 (518) 474-2195, which may be required for any encroachment upon State-owned lands underwater. DEC Permit No. ? /_ A ,"'d .SC4L~ /"~ APPROVED A~ ~1 ERMS A~D CO~L~ITION~ OF TRUSTEES John M. Bredemeyer, III, President Albert J. K. mpski, Jr., Vice President Henry, P. Smith John B. Tuthill William G. Albertson Telephone (516) 765-1892 Fax (516) 765-1823 BOARD OF TOWN TRUSTEES TOWN OF SOUTHOLD SUPERVISOR SCOTT L. HARRIS Town Hall 53095 Main Road EO. Box 1179 Southold. New York 11971 S.E.Q.R.A. NEGATIVE DECLARATION NOTICE OF NO SIGNIFICANT EFFECT ON THE ENVIRONMENT APPLICATION NO. 1000-88-5-56 NAME: Anthony & Violet Tamburrino DATE: October 29, 1993 Chapt. 97 - Wetlands Chapt. 37 - Coastal Erosion RESOLVED that pursuant to Article 8 of the Environmental Conservation Law, State Environmental Quality Review and 6NYCRR Part 617, Section 617.10 and Chapter 44 of the Code of the Town of Southold, notice is hereby given that the Southold Town Trustees, as Lead Agency for the action described below, has determined that the project will not have a significant effect on the environment. Please take further notice that this declaration should not be considered a determination made for any other department or agency which may also have an application pending for the same or similar project. TYPE OF ACTION: Type II DESCRIPTION OF ACTION: Costello Marine on behalf of Anthony & Violet Tamburrino request permit to extend existing bulkhead return 10' landward and fill void with 3-4 c.y. of clean fill. Located 85 Waters Edge Way, Southold. LOCATION:SCTM #1000-88-5-56 REASONS SUPPORTING THIS DETERMINATION: 1. An on site inspection has been conducted by the Board of Trustees. 2. An environmental assessment, submitted by the applicant and reviewed and completed by the Board of Trustees, has indicated that no significant adverse effects to the environment are likely to occur should the project be implemented as planned. cc: CAC allows sufficient square footage for the house and pool. The CAC also stipulates that applicant must not allow any backwash from the pool into the creek. Willis Creek Drive. Mattituck Vote of Council: Ayes: All Motion carried. Moved by Bruce Loucka. seconded by John Holzapfel. it was RESOLVED to recommend to the Southold Town Board of Trustees APPROVAL of the Wetland Application of JANET T. SWANSON 15-3-1 to construct stairs 61' overall by u~, wide with landing at top and landing in middle section; to replace in new location, storm damaged existing stairs. 1993 Ryder Farm Lane. Orient Vote of Council: Ayes: All Motion carried. Moved by Stephen Angell. seconded by John Hagerty. it was RESOLVED to recommend to the Southold Town Board of Trustees DISAPPROVAL of the Wetland Application of HARRY AND JANET HOHN 118-6-1 to construct new stairs and catwalk from existing bulkhead to beach. The CAC recommends disapproval because there is no need for the catwalk across the pond. The catwalk would create an obstruction to wildlife and an intrusion to nesting birds on the beach. 8980 Nassau Point Road. Cutchogue Vote of Council: Ayes: All Motion carried. Moved by Bruce Loucka, seconded by Robert Keith, it was '~ RESOLVED to recommend to the Southold Town Board of Trustees TEMPORARY APPROVAL of the Wetland Application of Goldsmith's Boat Shop to install a temporary ramp made of C.C.A. pilings and 2 x 12 C.C.A. decking for the purpose of hauling and launching a seaplane and/or small boats. Ramp to be 40' long x 14' wide and will extend from bank to just beyond Iow tide line and will be removable. The CAC recommends approval' only for a TEMPORARY PERMIT of TWO YEARS. Since applicant describes the project as temporary, the permit should reflect the approval for only a limited time. If. after the two year period, the applicant still wishes to have the ramp available, he would have to reapply for a permanent permit. Main Road. Southold. Vote of Council: Ayes: All Motion carried. Moved by Bruce Loucka. seconded by John Hagerty. it was RESOLVED to recommend to the Southold Town Board of Trustees APPROVAL of the Wetland Application of ANTHONY AND VIOLET TAMBURRINO 88-5-56 to extend existing bulkhead return 10' landward and fill void with 4-5 c.y. clean fill. 85 Waters Edge Way. Southold Vote of Council: Ayes: Bruce Loucka. John Hagerty. John Holzapfel. Robert Keith. Patricia Isaksen. Betty Wells Nay: Stephen Angell (D