Loading...
HomeMy WebLinkAboutTR-5489Board Of Southold Town Trustees SOUTHOLD, NEW YORK PERMIT NO. ,~"~.~"~ DATE: ...~pb.. ?~.....~00Z ISSUED TO ......~.~ ~Q~..O.~.R. ................................................... Pursuant to the provisions of Chapter 615 of the Laws of the State of New York, 1893: and Chapter ~ of the Laws of the State of New York 1952: and the Sou~hold Town Ordinance en- titled "REGULATING AND THE PLACING OF OBSTRUCTIONS IN AND ON TOWN WATERS AND PUBLIC LANDS end the REIvlOVAL OF SAND, GRAVEL OR OTHER IvlATERIALS FROM LANDS UNDER TOWN WATERS;t~. and in accordance with the Resolution of The Board adopted at a meeting held on ....~,~m~.j. .~.~ t.. 20g.~ ...... and in consideration of the sum of $..~.0.~.:.~0 .....paid by .... Jam(¢~...~. R~Fob.9, .];rtc ................................................... of ........ ~.9.~t.l~:rOP. tpr~ ........................... N. Y. and subject to the Terms and Conditions listed on the reverse side hereof, of Southold Town Trustees authorizes and permits the following: Wetland Permit to reconstruct inkipd/inplace 85 linear ft. of timb bulkhead,excluding ramp. Backfill with clean fill from an upland source,only as necessary. Replace 16 wood piles 16'X10", on center;m~mmal d~sturbance for repl.ace.ment of exist.pi!es ' all in accordance with the detailed specifmcatmons as pre~ented mn ~e originating application, inkind/inplace, and restore the lawn as exists,with the condition of a 10' non-turf buffer landward of bulkhead. IN WITNESS WHEREOF, The said Board of Trustees here- by causes ifs Corporate Seal to be affixed, and these presents to be subscribed by a majority of the said Board as of this date. TER~S ,,nd CONDITIONS The Peflmlttee Erwin Rodger ~ ~t 225 East Side Ave., Mattituck N. Y~ a~ pa.'of the consideration for the isman~e of the l¥~mk doesunde~stnnd and pe~o4be to the fol- lowing: 1. That the said l~atd of Trustees and the Town e~ S0uthold axe felet~ed fern any nod all ~-,~-~es, or ,4,~,~ fe~ damag~ of suits azising directly of tndltecdy as · result of any o1~' 2. That tbls Pem~ is' valkl ~o~ ~t period of 24 for aa e~ttenslon may be made to the ]~m=rd at a 5. That ~ Permit should be te~;fl~d imlef'mkdy, o~ as long as the ~M p~-r.~l~ee wishes to ,~.l~tain the stmauze ot project involved, to ptovlde evlde~e to anyone ~ that aud~ ocizatlon was odginaHy cbtainecl. 4. /bet the work involved wUl be subject to the imt~ctioa ~d approval of the Beezd et its agents, and non-mmp!~_-,~_ with. the ptovlslons of the ~ appilcrtton, n~y be c~se for x~cat~on of this Pe~nit by r~,olu~oa of the said Board. 5. That there will be no unt~.~mble interference with mtvigstlon as · result of d~e work befle~ a~thotlzed. 7. That E futuze oj~n'adons o~ ~ Town of Soathold zequire the removal ami/or /nthe location of the vaxt~ beteln authorized, or i~, in the optnk~ o~ the Bo~d of Trustees, the. Nvotk t~,ll ~ ~le obsttucUo~ to free tmviga~ the said Pegmlttee will be upon dee nmiee, to remove or ~ltet d~ work ot project herein stated ~4tlmut etpensea to the Town 8. ~ the said Board will be notified by the [~emittee ot ~1~ ~ Of ~ ~ ~ odzed. 9. That the Petmittee wU1 dxain aU other F~;~ and ~o~efl~ dmt n~y be te~ ~ plement~l to this permit which may be subject to ~evoke upon fdhste to e~-;~ sam~ Albert J. Krupski, President James King, Vice*President Artie Foster Ken Poliwoda Peggy A. Dickerson Town Hall 53095 Route 25 P.O. Box 1179 Southold, New York 11971-0959 Telephone (631) 765-1892 Fax ~631) 765-1366 February 21, 2002 BOARD OF TOWN TRUSTEES TOWN OF SOUTHOLD Mr. Thomas E. Samuels James H. Rambo, Inc. 229 Bishops Lane Southampton, NY 11968 RE: ERWIN RODGER 225 East Side Ave., Mattituck SCTM#99~3-20 Dear Mr. Samuels: The Board of Toxvn Trustees took the following action during its regular meeting held on Wednesday, February 20, 2002 regarding the above matter: WHEREAS, Thomas E. Samuels on behalfofERWIN RODGER applied to the Southold Town Trustees for a pernfit under the provisions of the Wetland Ordinance of the Town of Southold, application dated January 28, 2002, and, WHEREAS, said application xvas referred to the Southold Town Conservation Advisory Council for their findings and recommendations, and, WHEREAS, a Public Hearing was held by the Town Trustees with respect to said application on February 20, 2002, at which time all interested persons were given an opportunity to be heard, and, WHEREAS, the Board members have personally viewed and are familiar with the premises in question and the surrounding area, and, WHEREAS, the Board has considered all the testimony and documentation submitted concerning this application, and, WHEREAS, the structure complies with the standards set forth in Chapter 97 of the Southold Town Code, WHEREAS, the Board has determined that the project as proposed ',,,'ill not affect the health, safety and general welfare of the people of the toxvn, NOW THEREFORE BE IT, RESOLVED, that the Board of Trustees approve the application of ERWIN RODGER to reconstruct inkind/inplace 85 linear fi. of timber bulkhead, excluding ramp. Backfill with clean fill from an approved upland source, only as necessary. Replace 16 xvood piles 16'X 10", 6' on center; minimal disturbance for replacement of existing piles, inkind/inplace, and restore the lawn as exists, and with the condition of a 10' non-turf buffer landward of the bulkhead. BE IT FURTHER RESOLVED that this detemfination should not be considered a determination made for any other Department or Agency, which may also have an application pending for the same or similar project. Permit to construct and complete project will expire two years fi-om the date it is signed. Fees must be paid, if applicable, and permit issued within six months of the date of this notification. Two inspections are required and the Trustees are to be notified upon completion of said project. Fees: None Very truly yours, Albert J. Krupski, Jr. President, Board of Trustees AJK/lms DEC Teleuhone (631) 765-1892 Town H',dl. 53095 MaLu Road P.O. Box 1179 Southold, New York 11971 SOUTHOLD TOWN CONSERVATION ADVISORY COUNCIL At the meeting of the Southold Town Conservation Advisory Council held Tuesday, - February 12, 2002, the following recommendation was made: Moved by Bret Hedges, seconded by Melvyn Morris, it was RESOLVED to recommend to the Southold Town Board of Trustees APPROVAL WITH A CONDITION of the Wetland Permit Application of ERWIN RODGER to reconstruct inkind/inplace 85 linear ft. of timber bulkhead, excluding ramp. Backfill with clean fill from an approved upland source, only as necessary. Replace 16 wood piles 16'X 10", 6' on center; minimal disturbance for replacement of existing piles, inkind/inpJace, and restore the lawn as exists. Located: 225 East Side Ave., Mattituck. SCTM#99-3-20 The CAC recommends Approval with the Condition of a 10' non-turf/non-fertilization buffer behind the bulkhead. Vote of Council: Ayes: All Motion Carried 7123101 ?< I / New Ydrk State Department of Environmental Conservation Division of Environmental Permits Rm 121, Building 40-SUNY Stony Brook, New York 11790-2356 Telephone (631) 444-0365 Facsimile (631) 444-0360 Erin M. Crotty Commissioner No~¢mbcr [9. 200l Erwin and Laurie Rodger 225 East Side :\venue Mattimck. NY 11952 RE: Permit ~ 1-4738-0292S 0000l Dear Pcm]ittec: tn conformance ~ ith the requirements or' the State Uniform Procedures Act, Article 70. ~(l_~ and its hnplementing regulations ~6NYCRR, Pa~ 62l} we are enclosing your pet'nm. Please read all conditions carefully. If you are unable to comply x~ith an) conditions, please contact us at the above address. Also enclosed is a permit sign ~xhich is to be conspicuously posted at the project site and protected from the weather. Ve~T truly yours. Matthew R, Penski Encon Program Aide MRP Enclosure Page 1 of 4 NOTIFICATION OF OTHER PERMITTEE OBLIGATIONS Item A: Permittee Accepts Legal Responsibility and Agrees to Indemnification The perm~ttee expressly agrees to ~nderr~n~f,,,, and hold harmless the Department of Environmental Conservation of the State of New York, its representatives, employees, agents, and assigns for all claims, sd[ts, actions, damages, and costs of e,,,er~ name and description, arising out of or resulting from the permittee's undertaking of activities or operation and maintenance of the facd~ty or facihbes authorized Dy the permit ,n compliance or non-compliance with the terms and conditions of the permit. Item B: Permittee's Contractors to Comply with Permit The permittee is responsible for informing its independent contractors, employees, agents and assJgns of their respons~bdit¥ to comply w~th th~s permit, inchJding all special conditions while acting as the perm~ttee's agent with respect to the permitted act~vikes, and such persons shall be subject to the same sancbons for violations of the Environmental Conservation Law as those prescribed for the perm~ttee. Item C: Permittee Responsible for Obtaining Other Required Permits The perm~ttee is responsible for obtaining any other permits, approvals, lands, easements and rights-of-way that may be required to carry out the acbv'~ties that are authorized by th~s permit. Item D: No Right to Trespass or Interfere with Riparian Rights This permit does not convey to the permittee any right to trespass upon the lands or interfere with the riparian rights of others ~n order to perform the permitted work nor does it authorize the impairment of any rights, title, or interest ~n real or personal property held or vested in a person not a party to the permit. GENERAL CONDITIONS General Condition 1: Facility Inspection by the Department The permitted s~te or faculty, ~ncluding relevant records, is subleCt to inspection at reasonable hours and intervals by an authorized representati'~e of the Department of Environmental Conservation (the Department) to determine whether the perm~ttee is complying with this permit and the ECL. Such representative may order the work suspended pursuant to ECL 71-0301 and SAPA 401(3). The perm~ttee shall provide a person to accompany the Department's representahve dunng an ~nspection to the permit area when requested by the Department. A copy of this permit, including all referenced maps, drawings and special conditions, must be available for ~nspection by the Department at all times at the project site or facility. Failure to produce a copy of the permit upon request by a Department representative is a v~olation of th~s permit. General Condition 2: Relationship of this Permit to Other Department Orders and Determinations Unless expressly provided for by the Department, issuanca of this permit does not modify, supersede or rescind ant,, order or determination previously issued by the Department or any of the terms, conditions or requirements contained in such order or determination. General Condition 3: Applications for Permit Renewals or Modifications The permittee must submit a separate written application to the Department for renewal, modification or transfer of this permit. Such applicakon must include any forms or supplemental information the Department requires. Any renewal, modification or transfer granted by the Department must be in wnting. The perm~ttee must submit a renewal application at least: a) 180 days before expiration of permits for State Pollutant Discharge Elimination System (SPDES), Hazardous Waste Management Facilikes (HWMF), major Air Pollution Control (APC'~ and Solid Waste Management Facilities (SWMF); and b) 30 days before expiration of all other permit types. Submission of apphcations for permit renewal or modification are to be submitted to: NYSDEC Regional Permit Administrator, Region 1, SLINY Bldg ~t40, Stony Brook, NY 11790-2356 General Condition 4: Permit Modifications, Suspensions and Revocations by the Department The Department reset;es the right to modify, suspend or revoke this permit. The grounds for modificakon, suspension or revocation ~nclude: the scope of the permitted acti,,ity ~s exceeded or a violation of any condition of the permit or provisions of the ECL and pertinent regulations ~s found; b) the permit was obtained by misrepresentation or fadure to d~sclose relevant facts; ct new material ~nformation is discovered; or environmental cond,bons, relevant tecnnology, or apphcable law or regulation na',,e materially changed s~nce the permit was issued QE~ PE~t. IlT t~uI.l[~Ei~ PAGE 2 OF 4 1-472~-Q90'9 00001 ADDITIONAL GENERAL CONDITIONS FOR ARTICLES 15 (TITLE 5), 24, 25, 34 AND 6NYCRR PART 608 I TIDAL WETLANDS ) if future ope~-abons dy the State of New York require an alteration in the position of the structure or work herein authorized, or /, in the opimon of the Department of Environmental Conservation it shall cause unreasonable oPstruction to the Free nav~gabon of said waters or flood flows or endanger the health, safety or welfare of the people of the State, or cause loss or destrucbon of the natural resources of the State, the owner may be ordered by the Department to remove or alter the structural work, obstructions, or hazards caused thereby w~thout expense to the State, and if, upon the expiration or revocation of this permit, the structure, fill, excavation, or other modification of the watercourse hereby authorized shall not be completed, the owners, shall, without expense to the State, and to such extent and in such brae and manner as the Department of Environmental Conservation may require, remove all or any portion of the uncompleted structure or fill and restore to ,ts former condition the navigable and flood capacity of the watercourse. No claim shall de made against the State of New York on account of any such removal or alteration. The State of New York sha~l m no case be hable for any damage or injury to the structure or work herein authorized wh~cr~ may be caused by or result from future operations undertaken by the State for the conservation or improvement of nawgation, or for other purposes, and no claim or right to compensation shall accrue from any such damage. 3 Granting of this permit does not relieve the applicant of the responsibility of obtaining any other permission, consent or approval from the U.S Army Corps of Engineers, U.S. Coast Guard, New York State Office of General Services or local government which may be required. All necessary precautions shall be taken to preclude contamination of any wetland or watenzcay by suspended sohds, sedirqems, fuels, solvents, lubncantsl epoxy coatings, paints, concrete, leachate or any other environmentally deleterious materials associated with the project. 5 Any maternal dredged in the conduct of the work herein permitted shall be removed evenly, w~thout leaving large refuse piles, ridges across the bed of a waterway or floodplain or deep holes that may have a tendency to cause damage to nawgable channels or to the banks of a waterway. 6. There shall be no unreasonable interference with navigation by the work herein authorized. If upon the expiration or revocation of this permit, the project hereby authorized has not been completed, the applicant shall, without expense to the State, and to such extent and Jn such time and manner as the Department of Environmental Conservation may require, remove all or any portion of the uncompleted structure or fill and restore the site to its former condition. No claim shall be made against the State of New York on account of any such removal or alteration. If granted under 6NYCRR Part 608, the NYS Department of Environmental Conservation hereby certifies that the subject project will not contravene effluent limitations or other limitations or standards under Sections 301,302, 303, 306 and 307 of the Clean Water Act of 1977 (PL 95-217) provided that all of the conditions listed herein are met. 9. At least 48 hours prior to commencement of the project, the permittee and contractor shall sign and return the top portion of the enclosed notification form cert,fying that they are fully aware of and understand all terms and conditions of th~s permit. Within 30 days of completion of project, the bottom portion of the form must also be signed and returned, along with photographs of the completed work and, if required, a survey 10 All actlvibes authorized by this permit must be in strict conformance with the approved p~ans submitted by the apphcant or his agent as part of the permit application. Such approved plans were prepared by RobertH. Fox last revised on 8118101 DEC PERMIT NOrthER PAGE 3 OF 4 1-4738-02928¢00001 SPECIAL CONDITIONS 1. Pnor to any construction or removal of bulkheads and other shoreline stabihzation structures ali laackfill shall be excavated landv~ard of the bulkhead and retained so as not to enter the waterway, ttdal wetland or protected buffer area 2. All peripheral berms, cofferdams, rock revetments, seawalls, gab~ons, bulkheads etc. snail be completed prior to placement of any fill material behind such structures. 3. All fill shall consist of "clean" sand, gravel, or soil (not asphalt, flyash, broken concrete or demolibon debrisl. 4. Any debris or excess material from construction of this project shall be completely removed from the adjacent area (upland) and removed to an approved upland area for disposal No debris is permitted in bdalwetlands and or protected buffer areas. 5. No dredging, excavating or other alteration of shoreline or underwater areas ~s authorized by this permit, nor shatl ~ssuance of this permit be construed to suggest that the Department will issue a permit for such achy/ties ,n the future. 6. All areas of so~l disturbance resulting from th~s project shall be stabilized immediately following project completion or prior to permit expiration, whichever comes first. The approved methodologies are as follows' a. Stabilization of the entire disturbed area with appropriate vegetation (grasses, etc.) 7. If seeding is ~mpracticaPle due to the time of year, a temporary mulch must be applied and final seeding performed at the ear~iest oppodunity when weather condibons favor germination and growth, but not more than s~x months after project completion. 8. Ali disturbeu areas ',',here soil will be temporarily exposed or stockpiled for longer than one (1) week shall be contained oy a continuous line of staked hay bales/silt curtain (or other NYSDEC approved method) placed on the seaward s~de between the fill and wetland or protected buffer area. Turps are authorized to supplement these approved methods. 9. There shall be no discharge of runoff or other effluent over or through any bulkhead or shoreline stabdization structure or ~nto any tidal wetland or adjacent area. 10. The use of wood treated with pentachlorophenol in the construction of structures that will be in contact with tidal waters is strictly prohibited. SEC PEPr,Ii¥ I~UI.IBE~ PAGE 4 OF 4. 1-4738-02928,00001 ~OCO~ Eastern Permits Sect[on DEPARTMENT OF THE ARMY NEW YORK DtSTRICT, CORPS OF ENGINEERS JACOB K. JAVITS FEDERAL BUILDING NEW YORK, N,Y, 10275-0090 December 17, 2001 SUBJECT: Application No. 2001-01587-L2 by Erwin & Laurie Rodger Erwin & Laurie Rodger c/o Permits S Drafting Unlimited ~.O. Box 743 Mattituck, New York 11952 Dear Mr. & Mrs. Rodger: On November 28, 2001, the New York District Corps of Engineers received a request for Department of the Army authorization to reconstruct, in-place and in-kind, 85 linear feet of timber bulkhead and place approximately 60 cubic yards clean Backfill to be trucked in from an upland location. 'The site is in Mat~Jtuck Creek, Long Island Sound located at Matuituck, Town of Southold, Suffolk County, New York. of Based on information submitted to this office, our review of the project indicates that an individual permit is not required. It appears that the activities within the jurisdiction of this office could 6e accomplished under Department of the Army Nationwide General Permit Number 3. The nationwide permits are prescriOed in the March 9, 2000 Federal Register, Final Hotice of Issuance, Reissuance, and Modification of Nationwide Permits (65 PR !2818] . The work may be performed without further authorization from this office provided /he activity complies with the permit conditions listed in Section C, the following special condition and any applicable regional conditions, copies enclosed. Special .Condition (A) The permittees understand and agrees that, if future operations by the United States require the removal, relocation, or other alteration, of the structure or work herein authorized, or if, in the opinion of the Secretary of the Army or his authorized representative, said structure or work shall cause unreasonable obstruction to the free navigation of the navigable waters, the permittees will be required, upon due notice from the Corps of Engineers, to remove, relocate, or alter the structural work or obstructions caused thereby, without expense to the United States. No claim shall be made against the United States on account of any such removal or alteration. This determi~ation covers only the work described in the submitted maEerial. Any major changes in the project ma!' require additional authorizations from the New York District. Care should be taken so that construction materials, including debris, do not enter any waterway to become drift or pollution hazards. You are to contact the appropriate state and local government officials to ensure that the subject work is performed in compliance with their requirements. This verification is valid for a period of two 5~ears from the date of this letter, unless the nationwide permit is modified, suspended or revoked. This verification will remain valid for two years from the date of this letter if the activity complies with the terms of any subsequent modifications of the nationwide permit authorization. If the nationwide permits are suspended, revoked, or modified in such a way that the activity would no longer comply with the terms and conditions of a nationwide permit, and the proposed activity has commenced, or is under contract to commence, the per~nittee shall have 12 months from the date of such action to complete the activity. Within 30 days of the completion of the activity authorized by this permit and any mitigation required by this permit, you are to sign and submit the attached compliance certification form to this office. If any questions should arise concerning this matter, please contac£ Denise Butts, of tn}' staff, a~ ~212i 264-3913. Sincerely, Marc Helman Acting Chief, Eastern Permits Section Enclosures CEN?d~- 0 P k EH DEPARTMENT OF THE ARMY NEW YORK DISTRICT. CORPS OF ENGINEERS JACOB K. JAV~TS FEDERAL BUILDING NEW YORK, N.Y. 10278-0090 NATIOAK4IDE PERMIT COMPLI~CE CERTIFICATION /~ REPORT FORM Permittee: ~r~win & Laurie Rodger Permit No. 2001-0158? Date Permit Issued: December 17, 2001 Location: Mattituck, Town of Sonthold, Suffolk County, New York within 30 days of the completion of the activity authorized by this permit and any mitigation required b~~ the permit, sign this certification and return it to the address at the bottom of this form. Please note that your permitted activit}, is subject to a compliance inspection by a U.S. Army Corps of Engineers representative. If ~ou fail to comply/ with this permit you are subject to permit suspension, modification or revocation. I hereby certif'~' that the work authorized bi~ the above referenced permit has been completed in accordance with the terms and conditions of said permit, and required mitigation was completed in accordance with the permit conditions. Signature of permittee Fold this form znto thirds, with the bottom third facLng outward. Tape it together and mail to the address be]ow or FAX to (212) 264-4260. Place Stamp Here Department of the Army New York District Corps of Engineers Jacob K. JaviEs Federal Building ATTN: CENP~N~OP-RH New York, New York 10278-0090 Alb~r~ J. Krupski, President Jemes Kin~, Vice-President Iten~ Smith Artie Ken Poliwoda Town Hall 53095 Main Ro~d P,O. Bo~ 1179 Southold, New Y~rk 11971 Telephone (516) 7~-18~ Fax (516) 76~-182S BOARD OF TOWN TRUSTEES TOWN OF SOUTHOLD Offfoe Use Only Coastal Erosion Permit Application w~Wetland Permit Application Grandfather Permit Applicatio~l-~ Waiver/Amendment/Chang s .,~e~'~ved Application: I "~eceived Fee:$ ._~__~m~let~ Application ~a' ~;- Incomplete SEQRA Classification: Type I__Type II Unlisted, Coordination:(date sent) CAC Referral Sent: Inspection: __-J)ate of of CAC Re~ort Receipt ..Lead Agency Determination: "Technical Review: -~ublic Hearing Held: .~]~O]O~- _~Resolution: Name of Applicant Erw/n Rodger Address ??5 Fast Ride Ave, Mattitnek. NY 110~;? (lPg Ft m~rth,~net of Harborview Ave.) Phone Humber: ( ) 298-8055 SUffolk county Tax Map Number: 1000 - 99 - 3 - 20 Property Location: Old Mill Haven Subd, Lot 3; LILCO Pole #E495 at North end of roadway; LILCO Pole #1' at south end of Eastside Dr. (provide LILCO Pole t, distance to cross streets, and location) James H. Rambo, Inc. applicable) 229 Bishops La.,Southampton, NY 11968 ~ard of Trustees AD~lication ~ BATA Land Ares {in square feet): Residential Area Zoning: Previous use of property: Intended ~se of property: 24 404 sq fl Same asefi~s(residence) No change (residence) Prior permits/approvals for site improvements: Ageno¥ Date NYq DF.C Nov 19, 9001 Axmy Corps of Engineers Dec 17, 2001 NYS Dept. of State, Coastal Div. Ddc. 3, 2001 No h .. No prior permits/a~prnvals for site improvements. Has any permit/approval ever ~een revoked or suspended by a govermuental agency? X No Yes If yes, provide explanation: N~t .ppllcahle Pro,eot Desurlgtion (use attachments if ~e~essary): Sheet I-A Project Description is attached. SHEET 1-A PROJECT DESCRIPTION AUGUST 9, 2001 APPLICANT (OWNER): LOCATION OF SITE: ERWlN and LAURIE RODGER 225 East Side Dr. off Baille Beach Rd., Mattltuck, T/O $outhold, C/O Suffolk, NY. LILCO/LIPA Poles: #E495 et north end of roadway #1 at south end of East Side Dr. BODY OF WATER: Canal off E/S of Mattltuck Inlet PURPOSE: Erosion control structure to match adjoining neighbors' existing bulkheads. DESCRIPTION: area. complete. Reconstruct In-kind, In-place 85 lin. ft. of timber bulkhead, excluding ramp Backfill with clean fill from an approved upland source, only as necessary to Replacement of 16 wood piles 16'L x 10"; 6' on center; Minimal disturbance for replacement of existing piles, also In-kind, in-place. Restore lawn es exists. MATERIALS: Piles: (16) 16' L, 10" butt, 6' on center Tie rods: 3/4" x 14' Sheathln& C-Loc Vinyl Series 4500, interlocking sheet pllln& 12' g Follower or cleats: 4"x6" x 18' ~ '~, ~"~,./,,~/J.,-~ Anchor Piles: 8' L. Hardware: 5/8" bolts All lumber and plltngs to be Southern yellow pine; CCA pressure treated to 1.5 Ibs./cu ff. maximum retention. All hardware to be hot,tipped galvanized. Filter cloth behind entire structure. Access from upland driveway over applicant's lawn. Board of Trustees A~p~ication WETLA~D/TRU~e~ ~ APPLICATIC~ DATA ~r~se of t~ pro~s~ o~rations~ Erosion control st~cture Replacement in-kind, in-place 85 lin fl. of timber bul~ead Excluding ramp WhlC~ e~sts; backfill with clean fill from approved source, o~ly as necessary {o ~omplete job. ~ea of wetlands on lot: 400+- s~are feet I%+- edge o~ ~Z~d~ 14 [ee~ +. ~ H~ ~ch material will ~ fill~? ~01 c~ic yar~ ~pth of which ~terial will ~ r~v~ or ~si~= ~0-12~+- feet Pro~s~ slo~ throughout the area of o~rations: 0-~ Manner in whfch ~terial will Back boa o~ Statement o£ the effect, if ~n¥, on the wetland~ and tidal waters of the town that may result by reaeon of such proposed operations (use attaobmeots if ~u~late): Only activities neceasa~ for in-kind, impJace construction wiJ~ take p~aca: There will be no dredging or other disturbance to adiacent wetland area; filter cloth will be used to retain soil, and all other appropriate precautions. Erosion control replacement structure. Are wetlands present within 75 feet of the proposed activity? X No Yes Does the project involve excavation or filling? No X yes If Yes, how much material will be excavated? ~0 %- (cubic yards) How much material will be filled? ~0+- (cubic yards) Ma~er iqwhich material will be removed or deposite~: acl noe. Describe the n&ture and extent of the environmental impacts reasonably anticipated resulting from lm~le~ent&tion of the project as proposed. (Use attachments if necesBa~y) No impactg tn thy enviro.-~,~nt~l will result ag propo~d. Filtcr cloths Will be utilized and activities are related only to in-kin& in-place construction of existing timber bulkhead, sheathing, piles and related Nc* dredEi.g ~r r~thor lyre of ~cfivity would occur. IPROJECTID NUMBER 617 20 APPENDIX C STATE ENVIRONMENTAL QUALITY REVIEW SNORT ENVIRONMENTAL ASSESSMENT FORM for UNLISTED ACTIONS Only PART I--PROJECT INFORMATION (To be completed by Applicant or Project Sponsor) I APPUCANT,'SP~'~I~EC ;~. PROJECT NAME grwin Rod~er Bulkhea~ Refacing-R~:construct[on M%tu.~.~ck,__ ~ Town of Southold Coumy Suffolk LILCO Pole ~-~g ~ 1000-99-3-20 r]~r~ and reface existinG bulkhead, 92' in length. at 225 East Side Ave., Mattituck 163 ft. n¢,rtk/northeast of Harvorview Ave. ~,~.:~-~ ~x~tiag ~ui~' a~ ~k, own on diagrams. Re-./%$~ [] Other 10. DOES ACTION iNVOLVE A PERMIT APPROVAL, OR FUNDING, NOW OR ULTIMATELY FROM ANY OTHER GOVERNMENTAL-AGENCY {Fecleral, State LoCal)? Town Trustees, Army Corps, Coastal Div of NYS DOS, NYS DEC (pendin~) t 2 AS A RESU OF PROPOSED ACTION WILL EXISTING PERMIT/APPROVAL REQUIRE MODIFICATION? .......... ApphCaat,'$porl,orName grWlll Kodger u.~ '7/¢~ /01 L ,· .............. OVER Bo~cd o~ T~ustee8 Appl~at~oll County o~ Suffolk State of New York DE~OSF~ A~D AFFI~M~ ~AT IS THE APPLICANT ~U~ ~ ~ ~ ~ ~ ~ ~L D~KS ~ C~ ~IS~NG ~ OR BY ~R~ OF SAID P~T(S), ~ ~ Ja~., 2002. SWO~ ~ Bg~ ~ ~IS DAY OF Albert J. Krupski, President James King, Vice-President Henry Smith Attic Foster Ken Poliwoda Town Hall 53095 Route 25 P.O. Box 1179 Southold. New York 11971-0959 Telephone (631) 765-1892 Fax 1631) 765-1366 BOARD OF TOWN TRUSTEES TOWN OF SOUTHOLD BOARD OF TRUSTEES: TOWN OF SOUTHOLD In the Matter of the Application of ___5_ ............... COUNTY OF SUFFOLK) STATE OF NEW YORK) AFFIDAVIT OF POSTING I,~f/~.~, residing at J ~-~ ~ being duly sworn? depose~and say: That on the3~4~day of ~/;~, , 230~ ~ pgrso~a,!l~4)os~e~ property known as ~2~cJ~~ ~,~L~ ~/~_~ by placing the Board of Trustees official poster where i~ can easily be seen, and that I have checked to be sure the poster has remained in place for eight days prior to the date of_the public hearing. Date of hearing noted thereon to be held Dated: Sworn to before me this of OOX- tary Public (signature)