HomeMy WebLinkAboutBady, JamesREVISED NOTICE
Town o£ Southold
' l~Iain Road
Southold, New York 11971
NOTICE OF ACTION - NOT A PERMIT
1. Your application, dated .......... ..Mg....r.,c...h.....l..l..~....l...9..8..2.. ............................ has been reviewed by this
Board, at a meeting of the Trustees held on. ...........A~..r..i...1....7..,.....1..9..8...2. ....................................................
and resulting in the action, as indicated below:
(....x...x~.....)
( ............ )
( ............ )
Application approved.
Application denied.
Application tabled.
2. Comments ond remarks: Application approved to extend an existing
dock in Town Creek providing it does not extend any further out
than the Sayre dock and Beck's dock.
A PERMIT FEE
3. If your asDllcation is approved above. ,~-P'c-rmi-t--F'e~ is now due, and should be made payable
to t~ brder of ~he Board of Southold Town Trustees· This fee is computed below accardingto
the $.chec~uleof Ratesas ~et forth in the lnCtruction 5hee%~Ec~rm I/1~ ~his fee ~ust be
paia wztnzn 90 days or re-appl~'ing ana a~i~zonaT zee wz££ De.necessary.
If the Permit Fee is paid in person to the Secretary of the 8oard, The Permit will be ob(ainable
at the same time. If the fee is paid by mail, the permit will be mailed in reply.
Computation of Permit Fee:
24 ft. x 4 ft.
1 pile
= 96 sq. feet ~ $.25 per sq ft -$24.00
5.00
$29.00
Total Fee for this application ............................................................ $ ..$2c2.,.QQ .........................
Sig~edpr~" . ~ '
BOARD OF TOWN TRUSTEES
Town of $outhold
Main Road
Southolfl, New York 11971
NOTICE OF ACTION - NOT A PERMIT
1. Your application, dated ......... ,,,Ma..r,..c..h.....1...1..,.....1.,9.8..2, ............................. hos been reviewed by this
Board, et o meeting of the Trustees held on ...........A.p.~..i..1.....7..,....1.,~.~21 .....................................................
and resulting in the action, as indicated below:
(..~...)
( ............ )
( ............ )
Application approved, with provision
Application denied.
Application tabled.
2. Comments and remarks: Application approved to extend an existing
in Town Creek providing it does not extend any further out
than the Sayre dock and Beck's dock.
A PERMIT FEE
3. If your application iS approved above, ,~-F~'mi¢-De~ is now du~, and should be made payable
to t~ order of the Board of Sauthold Town Trustees. This fee is computed below according, to
the. S.chedul¢of R..at..escs set forth in the Instruction 5heet, ll~qrm 1/15. This f~ (nust be
Daze wztnzn 9u aavs or re-applyzng ano aaai~zonal' =ee wz£z De necessaz-
- tf the Permit Fee is Bald in person to the Secretary of the Board, The Permit will be obtoincble 'Y'
at the same time. If the fee is paid by mail, the permit will be mailed in reply.
Computation of Permit Fee:
24 ft. x 4 ft. = 96 sq. feet ~ $.25 per
sq. ft.
$24.00
Total Fee for this application ............................................................ $ ..2.~..t..0..O.. ...........................
Pres. Board o' ~_Tb~'i ;C3: Trees.
YOUR ORIGINAL PERMIT NUMBER
BOARD OF TOWN TRUSTEES
Town of Southold
Main Road
Southold, New York 11971
APPLICATION FOR SPECIAL ICE DAMAGE PERMIT
INSTRUCTIONS: Fill out form below and return to above address. You
should have this application approved and returned to you within a week°
1. Applicant's Name & Addres~.,:.~:~//.~/~.~.~. ...... ~.l~..~..~. .... /. ......
2 Contractor's Names & Address-
................................................. Tel. No ...............
3. The purpose of this application: Redriving or replacing openwork
dock or openwork pier piling, and mooring piles, removal of damaged
piling, repair, resetting or replacement of floating docks, ramps,
or decking, all necessitated by ice and storm damage resulting during
1981-82 winter.
SPECIAL CONDITIONS
1. No dredging or filling is permitted.
2. Repairs to existing structures shall be limited to replacement of
timbers without change in design or dimension.
3. No repair or replacement of bulkheads is permitted under this permit.
4. No freshwater or tidal wetlands are to be disturbed under any
circumstances.
.5. A yellow permit sign provided by this office shall be displayed on
the project at all times while under replacement.
6. Original permit numbers (3" high) must be permantly displayed on
project.
(Tear off and return)
'I, , certify that the work as authorized in
this permit has been completed and is now ready for your inspection.
Also, the permit number required on this project is clearly visible.
PERMIT NUMBER
Signed - Owner Signed - Contractor
NAME OF CP. EEK '~//~, h.~' fi)
BOARD OF TOWN TRUSTEES
Town Of Southold
Main Road
Southold, 1Yew York 11971
APPLICATION FOR FIXED and/or FLOATING DOCKS
"I. App cant s name a d address..J
..............
2. Contractor's nome and address: ....................................................................................................
................................................................................................................................ .?..e...l... .........................
,rief,y. e×p o,n the purpose of opp"cot,on: ........ ...........
4. After issuance of a Permit, work must be completed within one year.
LARGE
5. Secure the correct Area Map from the Clerk of this Board, and by using a/X WITHIN
A CIRCLE indicate as closely as possible the location of this dock. On th~_reverse side of this
mop, provide o SCALE DRAWING which will show Ordinary High Water Mark, the shape
and size of the dock and any supplemental pilings which are needed to hold a floating dock
or tie-ua .~ boat. Give all dimensions necessary to determine the area of the dock surface
~!CH EXTEI~DS OFFSHOR~ from the O. H. W. M. If adjacen~ property owners have
docks, specify Location and length to scale.
6. Will any portion of this construction extend offshore into Town Waters beyond an imcginaw
line or boundary formed by other similar structures along the area's shoreline? YES o~ NO.
If it does extend beyond this sc-called dcck line indicate by how far, approximately,. ......... ft.
7. Provide the fallowing documents:
(al A Licensed Engineer's Survey of the property involved.
(bi A copy of the Contractor's Plans and Specifications.
Short Environmental Assessment Form-
Wetlands Applicat Lan
8. il this construction require the Filling of any land offshore of the Ordinary High Water
Mark or the Dredging of any material from Town Lands under water? YES or NO. If it does,
Form Al4 (Application for Dredging/Filling) must be completed and attached as part of this
application.
lO.
by using a temporary marker.
.. 5. 'i-,'_.¥~31..:: .~..~:?.j; ·
' 'Z'?:.~'- A/2 Re~'~ 2/82
In requesting approval of this application, I subntit that: the information presented herein
is true and correct to the best of my know, ledge and belief; I am the person accountable for
the performance of the work in accordance with the plans and specifications attached; I have
read or am familiar with the provisions of any Southold Town Ordinance pertinent to the work
involved; and further, I intend to adhere to and abide by the Terms and Conditions of the
Permit, when and if issued to me.
TO expedite finding specific location for inspection, indicate
BOARD OF TOWN TRUSTEES
Town Of Southold
Main Road
Southold, New York 11971
Rev. 6/72
APPLICATION FOR FIXED and/or FLOATING DOCKS
]. Applicant's nome and address: -~"£R~¥
................. ...... ........ ................................................
2. Contractor's name and address:
............................................................................... ................ ............
o. ~r,efly exp ain the purpose of this application: ....~[.~q~L~......e~....~{.'J~:~. ...............
........ )P~.~5.....~.{k.s....~n.r.....~.6. r~g~. ....... ~¢.g.,r~q.~. ....... ~';7~.~ ....... ~.~.4.'.~.~,~.~ ....
..... ~.(~. ....... ~.~....~.~.~ .......................................................................................................
After issuance of a Permit, I expect to: (mark by an X)
(a) Commence work -- AT ONCE ............ ; ASAP ...~.. ...... ; UNKNOWN .............
(b) Complete work in -- 1 DAY ............ ; 1 MO.....~.......; 1 YR ............. ; FUTURE .............
Secure the correct Area Map from the Secretary of this Board, and by using an X WITHIN
A CIRCLE indicate as closely as possible the location of this dock. On the reverse side of this
map, provide a SCALE DRAWING which will show Ordinary High Water Mark, the shape
and size of the dock and any supplemental pilings which are needed to hold a floating dock
or tie-up a boat. Give all dimensions necessary to determine the area of the dock surface
which extends offshore from the O. H. W. M.
6. Will any portion of this construction extend offshore into 'Town Waters beyond an imagin~.~4
line or boundary formed by other similar structures along the area's shoreline? YES or(NO.)
If it does extend beyond this so-called dock line indicate by how far, approximately,. ....... ~
Provide the following documents:
(o) A Licensed Engineer's Survey of the property involved.
(b) A copy of the Contractor's Plans and Specifications.
8. Will this construction require the Filling of any land offshore of the Ordinar,¥._~[igh Water
Mark or the Dredging of any material from Town Lands under water? YES o Nr(..~ If it does,
Form A/4 (Applic6tion for Dredging/Filling) must be completed and attached as part of this
application.
In requesting approval of this application, I submit that: the information presented herein
is true and correct to the best of my knowledge and belief; I am the person accountable for
the performance of the work in accordance with the plans and specifications attached; I hove
read or am familiar with the provisions of any Southold Town Ordinance pertinent to the work
involved; and further, I intend to adhere to and abide by the Terms and Conditions of the
Permit, when and if issued to me.
Accepted by: Dated:
TO~,'/N OF SOUTHOLD
SHORT ENVI'RONk,IENTAL ASSESSk.{ENT FORkt
INSTRUCTIONS:
(a) [n order to answer the questions in this short EAF it is assumed
that the preparer will use currently available information concerning the
pro)ect and the likely impacts of the action. It is not expected that
additional studies, research or other investigations will be undertaken.
(b) If any question has been answered Yes the project may be
signiflcont and a completed Environmental Assessment Form Ss necessary.
(c) If all questions have been answered No it is likely that thls
project is not significant.
(d) Environmental Assessment
1. Will project result in a large physical change
to the project site or physically alte~ more
than l0 acres of land? ........................ _ Yes ~ No
2. Will there be a major change to any unique or
unusual land form found on the slte? .......... Yes ~ No
3. Will project alter or have a large effect on
existing body of water? ....................... Yes ~ No
4. Will project have a potentially large impact
on groundwater quality? ....................... Yes ~ No
5. W£11 project significantly effect d~alnage
flow on adjacent sites? ........................ Yes ~ No
&. Will project affect any threatened or
endangered plant or animal species? ........... Yes.~ No
7. Will project result in a major adverse effect
on alt quallty? ............................... Yes ~ No
8. ~Vill project have a major effect on visual
character of the community or scenic views or
vistas known to be important to the communlty?.__Yes X No
~. ¥~111 project adversely impact any site or
structure of hlstorlc~ prehistoric or
paleontological importance or any slte
designated as a crltical environmental area
by a local agency? ............ -.~......~....~....... Yes ~ No
la. Y/ill project have a ha)or effect on existing
or future recreational opportunities? ......... Yes ~ No
}l. ~ill project result in major traffic problems
or cause a major effect to existing
transportation systems? ....................... Yes X No
12. ~?£1l project regularly cause objectionable
odors~ nolse~ glare# vibration~ or
disturbance as a result of the project's
operation? .................................... Yes ~ No
13. ~ill project have any impact on public health
or safety? .................................... Yes X No
14. ~?ill project affect the existing community by
dlrectly causing a growth in permanent
population of more than $ percent over a one
year period or have a major negative effect
on the character of the community or
neighborhood? ................................. Yes ~ No
15. Is there public controversy concerning the
project? ...................................... Yes.~ No
PREPARER'S S~GNATURE
REPRESENTING. r,~?,.,..~ .,~,.,.r.~Y'~'~-~ "~¢. DATE ,/~£'~t J~
SOUTHOL~