Loading...
HomeMy WebLinkAbout#7927SE Hotel Moraine - North Road Hotel, LLC RECEIVED HARRIS BEACH ATTORNEYS AT LAw July 30, 2024 JUL 3 0 Z024 THE OMNI 333 EARLE OVINGTON BLVD,SUITE 901 ZONING BOARD OF APPEALS UNIONDALE, NEW YORK 11 553 Via Electronic Mail Only 516.880.8484 (&iimfCc southoldtowny qov and BRIAN S.STOLAR Elizabeth.sakarellos town.southold.n .us SENIOR COUNSEL 516.880.8383 Zoning Board of Appeals FAX: 516.880.8483 Town of Southold BSTOLAR@HARRISBEACH.COM 54375 Route 25 Southold, New York 11971 RE: Motel Moraine—Application #7953 Dear Board Members: I am the Village Attorney for the Village of Greenport (the "Village") and write to you regarding the pending Motel Moraine application. It is the Village's understanding that North Road Hotel, LLC d/b/a Motel Moraine is applying to the Zoning Board of Appeals to construct(a) a new motel building with 10 new motel units and (b) an addition to an existing motel building with 4 new motel units (the "Project"). The premises utilizes the Village of Greenport sanitary system (the "Village System") to accommodate the sanitary discharge emanating from the current motel. The construction of 14 new motel units will create additional sanitary discharge and necessarily increase the sanitary flow into the Village System. Any increase in the discharge amount to the Village System requires agreement with the Village for the additional flow. Accordingly, the Village requests that if the Zoning Board approves the above application, the approval include a condition that the applicant obtain any necessary sanitary sewer approvals from the Village. In addition, the Village currently prohibits any new or expanded sewer discharge into the Village System. The Village's primary sewage collection system piping was damaged recently and, as determined by the Village, any further pipeline failure damage could cause extensive environmental harm and threaten the health and safety of residents, and additional sewage flow from new or expanded connections poses an imminent threat to the public's health, safety and welfare. This prohibition remains in effect until at least December 2024. Please take the above into account in your review of this application. Zoning Board of Appeals HARRIS BEACH July 30, 2024 ATTORNEYS AT LAW Page 2 Thank you. Very truly yours, Is/Brian S. Stolar Brian S. Stolar c: Ms. Heather M. Lanza, AICP Mr. Mark Terry Paul DeChance, Esq. Julie McGivney, Esq. Planning Board, Town of Southold Mr. Adam Hubbard Mayor and Trustees, Village of Greenport C� COUNTY OF SUFFOLK r, EDWARD P.ROMAINE SUFFOLK COUNTY EXECUTIVE DEPARTMENT OF ECONOMIC DEVELOPMENT AND PLANNING SARAH LANSDALE COMMISSIONER V b4' ELISA PICCA CHIEF DEPUTY COMMISSIONER Town of Southold R� �34 RECEIVED 53095 Main Road 5 2B24 JUL 18 2024 P.O.Box 1179 �UL 21 Southold,NY 11971 Appeals out o d own Attn: Heather Lanza,Planning Director Zoning Board of App Planning board Re: Hotel Moraine Expansion Zoning Action: Site Plan Municipal File No./Public Hearing Date: N/A S.C.T.M.No.: 1000 040000 0100 001000 S.C.P.C. File No.: ZSR-24-42 Dear Director Lanza: The Suffolk Planning Commission at its special meeting on July 10,2024,reviewed the referral from the Town of Southold entitled, "Hotel Moraine Expansion"referred to it pursuant to Section A14-14 thru A14-25, Article XIV of the Suffolk County Administrative Code. The attached Resolution signifies action taken by the Commission relative to this application. Very Truly Yours, �,74��e C�y� By Christine DeSalvo Joseph E. Sanzano,Planning Director JES/cd Division of Planning and Environment cc: Brian Cummings, Senior Planner H.LEE DENNISON BLDG■ 100 VETERANS MEMORIAL HWY,2""FI■ P.O.BOX 6100 a HAUPPAUGE,NY 11788-0099 a (631)853.5191 File No. SD-24-04 Resolution No. ZSR-24-42 of the Suffolk County Planning Commission Pursuant to Sections A14-14 to through A14-25 of the Suffolk County Administrative Code WHEREAS, pursuant to Sections A14-14 through A14-25 of the Suffolk County Administrative Code, a referral was received on June 6, 2024 at the offices of the Suffolk County Planning Commission with respect to the application of"Hotel Moraine Expansion"located in the Town of Southold; and WHEREAS, said referral was considered by the Suffolk County Planning Commission at its meeting on July 10, 2024; now, therefore be it RESOLVED, pursuant to Section A14-16 of the Suffolk County Administrative Code and Section 239- m 6 of the General Municipal Law, the referring municipality within thirty (30)days after final action, shall file a report with the Suffolk County Planning Commission, and if said action is contrary to this recommendation, set forth the reasons for such contrary action; and be it further RESOLVED, that the Suffolk County Planning Commission Approves the variance and site plan for Hotel Moraine Expansion with the following comments to be offered to the Town of Southold for its consideration and use: 1. The applicant is encouraged to utilize green infrastructure to minimize community and environmental impacts' and reduce both private and public development costs. As such, the Applicant should review the Suffolk County Planning Commission publication on Managing Stormwater-Natural Vegetation and Green Methodologies and incorporate into the proposal, where practical, design elements contained therein; i.e., rain gardens, permeable pavement and bio-swales.* 2. New and reconstructed areas need an operational plan to keep catch basins, stormwater grates and drywelis clear and functioning. Proposed infrastructure should promote drainage from floods.The applicant may be required to prepare a NYS Stormwater Pollution Prevention Plan (SWPP) for the redevelopment of the site and receive all required state and local approvals before commencing work at the subject property. 3. The applicant should be directed to begin/continue dialogue with the Village of Greenport verify ability to receive additional wastewater and received required approvals to utilize VSD-01 district. 4. All new commercial buildings to the greatest extent possible, should be designed and constructed to minimize energy consumption and improve environmental quality. The applicant should be encouraged to review the Suffolk County Planning Commission Guidebook particularly with respect to renewable energy&energy efficiency and incorporate where practical, for later development stages, elements contained therein applicable for ccmponentsof the proposal;i.e. rooftop solar panels,permeable pavement, etc.** 5. As discussed in the Suffolk County Planning Commission Guidebook all new development with parking lots should have plans for (2%) of off street parking stalls to become future EV charging stations,which will aid with greenhouse gas reduction. 6. The applicant should be directed to review the Suffolk County Planning Commission Guidelines on public Safety and Universal design and incorporate where practical design elements therein. 7. The Applicant should/start continue dialogue with the Suffolk County Department of Public Works with respect to any anticipated roadway improvements Old Country Road (CR48). 8. The applicant should be required to acknowledge in writing to the municipal board that the approval of the action with or without conditions in no way commits either the municipality or the County of Suffolk to any program to protect the property from shoreline erosion through the construction of engineering or other works. 9. Consistent with the Suffolk County Planning Commission's Guidebook's Specific Design Policies for applications in the vicinity of residentially zoned land. The subject property should be encumbered by appropriate operational restrictions to adequately protect nearby residences (i.e., limitations on lighting, hours of operation,truck deliveries,garbage pick-up, truck idling, trash compaction,etc.). 'Link to Suffolk County Planning Commission publication Managing Stormwater-Natural Vegetation and Green Methodologies: htt s llsuffolkcounl n _ ovl orialslolformsdoesl I nnin ! Plan in C mmiss' nf2Q1 IfU! n in A 2Q tartnwater. df •Link to Suffolk County Planning Commission Guidebook: 3itt s:llsuft [kcounl n ovl rtaislt7lformsdats t nnin Puhli tians12t7 3 5 rfalk Caun[ P[annino Commis ion Guidebna df DATE: 7/10/24 ZSR-24-42 File No.: SD-24-04 Hotel Moraine Expansion Site Plan and Variance Town of Southold COMMISSION ACTIONS OF DISAPPROVED RESOLUTION AYE NAY ABSTAIN ABSENT BALDWIN, STEPHANIE—At Large X CASEY, JENNIFER-Town of Huntington X CONDZELLA, JOHN—Town of Riverhead X DOTY, DAVID—Town of East Hampton X FINN,JOHN -Town of Smithtown I X FLYNN, DANIEL—Town of Southampton X GALLE, ELIZABETH—Town of Shelter Island X GERSHOWITZ, KEVIN G.- At Large X KAUFMAN, MICHAEL- Villages under 5,000 X KITT, ERROL—At Large X LEWIS, LASCHECA, Town of Babylon X MCCARTHY, THOMAS -Town of Southold X MCCARTHY, TIMOTHY—Town of Islip X PERRY, LISA—Villages Over 5,000 X VANDENBURG, MICHAEL-Town of Brookhaven X Motion: Commissioner Thomas McCarthy Present: 10 Seconded: Commissioner Perry Absent: 5 Voted: 10 Abstentions: 0 DECISION: Approval with Comments Date: 7/10/24 Of v)- fwu I i, i4M ��'o soar ���3ICE LOCATION: �� MAILING ADDRESS: 5 Town Hall Annex '� P.O.Box 1179 4375 State Route 25 Southold, NY 11971 car. Main Rd. &Youngs Ave.) G Telephone: 631 765-1938 -d Southold, NY 11971 ,'�►� LOCAL WATERFRONT REVITALIZATION PROGRAM TOWN OF SOUTHOLD _1qX_75�t I MEMORANDUM Received To: Leslie Weisman, Chair JUL 2 9 2024 Members of the Zoning Board of Appeals Zoning Board of Appeals From: Mark Terry, AICP Assistant Town Planning Director LWRP Coordinator Date July 29, 2024 Re: LWRP Coastal Consistency Review for ZBA File Ref NORTH ROAD HOTEL, LLC, HOTEL MORAINE#7927SE and #7953 SCTM No. 1000-40-1-1. NORTH ROAD HOTEL, LLC, HOTEL MORAINE #7927SE - Request for a Special Exception pursuant to Article VII, Section 280-35B(4) and the Building Inspector's January 24, 2024 Notice of Disapproval based on an application for a permit to construct a new motel building (10 units) and to build an addition to an existing motel building (4 units) upon a parcel that measures 3.251 acres in total area, at; located at 62005 County Road 48, (Adj. to Long Island Sound) Greenport, NY. SCTM 1000- 40-1-1; and NORTH ROAD HOTEL, LLCIMOTEL MORAINE #7953 - Request for a Variance from Article VII, Section 280-35B(4)(a) and the Building Inspector's January 24, 2024, Notice of Disapproval based on an application for a permit to construct a new motel building (10 units) and to build an addition to an existing motel building (4 additional units) at; 1) parcel is less than the code required minimum size of five (5) acres; at: 62005 County Road 48,( Adj. to the Long Island Sound) Greenport, NY. SCTM No. 1000-40-1-1. The proposed action has been reviewed to Chapter 268, Waterfront Consistency Review of the Town of Southold Town Code and the Local Waterfront Revitalization Program (LWRP) Policy Standards. Based upon the information provided on the LWRP Consistency Assessment Form submitted to this department, the proposed action is INCONSISTENT with the UAW below-listed policies and therefore, INCONSISTENT with the LWRP: Policy ]. Foster a pattern of development in the Town of Southold that enhances community character,preserves open space, makes efficient use of infrastructure, makes beneficial use of a coastal location, and minimizes adverse effects of development. The RR zoning district requires a minimum parcel size of 5 acres for hotel use. This parcel, which is 3.25 acres, does not meet this requirement, and therefore, the existing hotel use is nonconforming. The proposed expansion will consist of a 4,588 sq. ft. building with ten(10) hotel rooms and a 2,040 sq. ft. addition to an existing building with four(4) hotel rooms. To the north is the Long Island Sound waterbody. To the east is a 1.02 acre "R-80" zoned improved parcel; to the west is a 7.12 acre "RR" zoned parcel with an existing condominium complex. It is important to note that this commercial use is an outlier surrounded on one side by Residential 80 zoned properties and residences. A 15' side yard setback is proposed to the eastern property line. The concern about the 15' side yard setback is that it abuts a residential parcel with a narrow side yard. Once the new addition and building are constructed, this and other surrounding residences would be expected to experience adverse impacts from noise capable of degrading the quality of life during hotel operations. Policy 4. Minimize loss of life, structures, and natural resources from flooding and erosion. 4.1 Minimize losses of human life and structures from flooding and erosion hazards. The following management measures to minimize losses of human life and structures from flooding and erosion hazards are suggested: A. Minimize potential loss and damage by locating development and structures away from flooding and erosion hazards. 1. Avoid development other than water-dependent uses in coastal hazard areas. Locate new development that is not water-dependent as far away from coastal hazard areas as practical. b. Avoid hazards by siting structures to maximize the distance from Coastal Erosion Hazard Areas. The hotel use is not water-dependent. The proposed new construction of a 4,588 sq. ft. building is seaward of the existing buildings and closer to the coastal erosion hazard area(CEHA). The CEHA demarks a high bluff on the parcel where development should be minimized, with structures set back from the bluffs. These areas are susceptible to high winds and large bluff erosion events from coastal storms including hurricanes. The intent of this policy is to protect life, structures, and natural resources from flooding and erosion hazards throughout the Town of Southold. The policy reflects state flooding and erosion regulations and provides measures for reduction of hazards and protection of resources. Definitions Coastal Barrier Resource Area is any one of the designated and mapped areas under the Coastal Barrier Resources Act of 1982, (P.L. 97-348), and any areas designated and mapped under the Coastal Barrier Improvement Act of 1990 (P.L. 101-591), as administered by the U.S. Fish and Wildlife Service, and any future designations that may occur through amendments to these laws. Coastal Hazard Area is any coastal area included within the Erosion Hazard Area as designated by the New York State Department of Environmental Conservation pursuant to the Coastal Erosion Hazard Areas Act of 1981 (Article 34 of the Environmental Conservation Law), and any coastal area included within a V-zone as designated on Flood Insurance Rate Maps prepared by the Federal Emergency Management Agency pursuant to the National Flood Insurance Act of 1968 (P.L. 90- 448) and the Flood Disaster Protection Act of 1973 (P.L. 93-234). Pursuant to Chapter 268,the Southold Town Zoning Board of Appeals shall consider this recommendation in preparing its written determination regarding the consistency of the proposed action. Cc: Paul DeChance, Town Attorney RECEIVED Southold Town Planning Board, JUL 52024 Southold< NY 11971-0959 ZONING BOARD pFAPAFgLS Dear Ms. Michaelis -7(3 a 7 S, This letter is in response to a certified letter we received on Monday 7/1/2024. The letter was mailed from Orient on 6/28/2024 and was dated 6/10/2024. The letter from Petitioner/Owner: North Road Hotel_LLC*62005 Route 48, Greenport, NY 11944. The letter proposes the expansion of existing hotel structures, one adjacent to our home at 62175 route 48, Greenport, NY 11944. We object this proposed expansion for the following reasons: 1-The proposed structure is too close to our outdoor sitting area. 2-The pollution from noise, increased traffic and outside cooling and heating units will destroy The tranquility of our outdoor area. 3- in the current situation, the existing structure on the hotel property have long hours of music And hotel guest noise that we endure. 4-We are concerned about the impact of such expansion on our property value. 5- Increased road traffic to the area will be an added hazard. 6-The hotel owner has installed a partial fence between the properties with the unfinished side of the fence facing us. This fence should be extended to the full property length. During the installation of the partial fence ; the main electric cable to our house was severed by the installers. PSEG was not contacted prior to the installation. We were left with no heat and no power during winter time. The house was 34 degrees and all the food in the refrigerator was spoiled and disposed in the garbage. I spent a lot of time to meet some electricians for estimates and finally I got it repaired only; not replaced. This caused much pain, suffering and aggravation to my health as a Disabled American Veteran. Please see my Text to Mr. Pennessi on April 3, 2024. 1 received $624.59 for the repair from Mr. Pennessi. Thank you for your attention to this matter. Jill Sharif, MD Samir Attia 1 V L