HomeMy WebLinkAbout51902-Z �o4a°F SO�lyo�o Town of Southold
* * P.O. Box 1179
oac 53095 Main Rd
Southold, New York 11971
CERTIFICATE OF OCCUPANCY
No: 46453 Date: 08/29/2025
THIS CERTIFIES that the building EV CHARGER
Location of Property: 1210 Arshamomague Ave Southold, NY 11971
Sec/Block/Lot: 66.-2-28
Conforms substantially to the Application for Building Permit heretofore,filed in this office dated: 03/28/2025
Pursuant to which Building Permit No. 51902 and dated: 05/07/2025
Was issued, and conforms to all of the requirements of the applicable provisions of the law.
The occupancy for which this certificate is issued is:
EV charger on exterior wall of single-family dwelling as applied for.
The certificate is issued to: Paul Kesicki ,Kirsten Kesicki
Of the aforesaid building.
SUFFOLK COUNTY DEPARTMENT OF HEALTH APPROVAL:
ELECTRICAL CERTIFICATE: 51902 08/20/2025
PLUMBERS CERTIFICATION:
Autho ' d Signatur
Of sou y° TOWN OF SOUTHOLD
BUILDING DEPARTMENT
TOWN CLERK'S OFFICE
SOUTHOLD, NY
BUILDING PERMIT
(THIS PERMIT MUST BE KEPT ON THE PREMISES
WITH ONE SET OF APPROVED PLANS AND SPECIFICATIONS
UNTIL FULL COMPLETION OF THE WORK AUTHORIZED)
Permit#: 51902 Date: 05/07/2025
Permission is hereby granted to:
Paul Kesicki
1210 Ashamomaque Ave
Southold, NY 11971
To:
install EV charger on exterior wall of single-family dwelling as applied for. Protection from vehicular
impact must be installed.
Premises Located at:
1210 Arshamomaque Ave, Southold, NY 11971
SCTM#66.-2-28
Pursuant to application dated 03/28/2025 and approved by the Building Inspector.
To expire on 05/07/2027.
Contractors:
Required Inspections:
Fees:
EV Charger $125.00
ELECTRIC -Residential $100.00
CO-RESIDENTIAL $100.00
Total S325.00
Building Inspector
o��pF SO!/r�ol
� o
Town Hall Annex Telephone(631)765-1802
54375 Main Road
P.O.Box 1179 CA-
Southold,NY 1 1 97 1-0959 '4
BUILDING DEPARTMENT
TOWN OF SOUTHOLD
CERTIFICATE OF ELECTRICAL COMPLIANCE
SITE LOCATION
Issued To: Paul Kesicki
Address: 1210 Arshamomaque Ave City:Southold St: NY Zip: 11971
Building Permit#: 51902 Section: 66 Block: 2 Lot: 2$
WAS EXAMINED AND FOUND TO BE IN COMPLIANCE WITH THE NATIONAL ELECTRIC CODE
Contractor: Electrician: JFF Electric License No: 49343ME
SITE DETAILS
Office Use Only
Indoor I✓' Basement F Service (- Solar
Outdoor (✓ 1st Floor F Pool 17 Spa F
Renovation I— 2nd Floor r- Hot Tub r Generator (—
Survey rF71 Attic rr-1
Garage Battery Storage I-
INVENTORY
Service 1 ph F Heat Duplec Recpt Ceiling Fixtures Bath Exhaust Fan
Service 3 ph (- Hot Water GFCI Recpt Wall Fixtures Smoke Detectors
Main Panel A/C Condenser Single Recpt Recessed Fixtures CO Detectors
Sub Panel A/C Blower Range Recpt Ceiling Fan Combo Smoke/CO
Transfer Switch UC Lights Dryer Recpt Emergency Strobe Heat Detectors
Disconnect 100A Switches 4'LED Exit Fixtures
Other Equipment: 100A Breaker, 100A WP Ext. Disconnect, Ford EV Charger
Notes: EV Charger
Inspector Signature: X l Date: August 20, 2025
Sean Devlin'
Electrical Inspector sean.devlin(&-town.southold.ny.us
1210ArshamomaqueEVcharger
of so to
2 ion
# TO\�WOF SOUTHOLD BUILDING
°ycou 631-765-1802
INSPECTION
[ ] FOUNDATION 1 ST/ REBAR [ ] ROUGH PLBG.
[ ] FOUNDATION 2ND [ ] INSULATION/CAULKING
[ ] FRAMING/STRAPPING [ ] FINAL
[ ] FIREPLACE &-CHIMNEY [ ] -FIRE SAFETY INSPECTION
[ ] FIRE RESISTANT CONSTRUCTION [ ] FIRE RESISTANT PENETRATION
[ ] ELECTRICAL (ROUGH) '[ELECTRICAL (FINAL)
[ ] CODE VIOLATION [(]__PRE C/O [ ] RENTAL
REMARKS:
DATE Aa z INSPECTOR
I� �o��OF SOUIyO�
TOWN OF SOUTHOLD BUILDING DEPT.
orm, 631-765-1802
INSPECTION
[ ] FOUNDATION 1ST/ REBAR [ ] ROUGH PLBG.
[ ] FOUNDATION 2ND [ ] I SULATIOWCAULKING
[ ] FRAMING /STRAPPING [ FINAL L V
[ ] FIREPLACE & CHIMNEY [ ] FIRE SAFETY INSPECTION
[ ] FIRE RESISTANT CONSTRUCTION [ ] FIRE RESISTANT PENETRATION
[ ] ELECTRICAL (ROUGH) [ ] ELECTRICAL (FINAL)
[ ] CODE VIOLATION [ ] PRE C/O [ ] RENTAL
REMARKS: `�� C- 0 jb ec c
DATE o •a0•a INSPECTOR
FIELD INSPECTION REPORT DATE COMMENTS
FOUNDATION (IST)
------------------------------------- --
FOUNDATION (2ND) CIO
ROUGH FRAMING&
PLUMBING
INSULATION PER N.Y.
STATE ENERGY CODE
FINAL
ADDITIONAL COMMENTS
0
o�S�FfojK000 TOWN OF SOUTHOLD—BUILDING DEPARTMENT
Town Hall Annex 54375 Main Road P. O.Box 1179 Southold,NY 11971-0959
Telephone(631)765-1802 Fax(631)765-9502 https://www.southoldtownn goy
Date Received
APPLICATION FOR BUILDING PERMIT
For Office Use Only EC E O V E
PERMIT NO. 5jq�
Building Inspector
_ MAR 2 8 2025
a �;i��''�`' i r.. �G, u�-' }�� P ��,A+y __i^ l t,�l„a � ,.r ray 4 w 5h. � f,f�:�"� a�;'�r-� •:,
sAPplicatlons and farms must be f Iled out�in theirentirety Incomplete r
applications wtllrno be accepted Wherethe Applicant�s not the ovi►ner�any z Building Department
Owner's Authorization form(Page 2)shall be complgted � "; {_ `
y4r�'�t•T �afr's k c r,,o i�-� r �y y, a yti ,,u�` , -ir F ti b' } w �'">!� .,� r,�,,yr w ,� Town of Southold
Date:03/14/2025
O,1I�IN�R S\\OFnPROPERTY"h n r f t a s" ' f x ti �f� i 4 }�}k Y d t S is 44c Pa Fx-r y
t at_1��
Name:Paul Kesicki. SCTM#1000-
,t-ble-,7-0�-0?6-.1,�.���,.�,� ;'�. ,' ,�z.,
Project Address 1210 Arshamomaque Ave, Southold, NY 11911
Phone#:631-492-0507 Email:KESICKIPAUL@GMAIL.COM
Mailing Address:1210 Arshamomaque Ave, Southold, NY 11971
�CONTACY PERSON.,.. y a f v. R {g �ifF i oy yA= ( r Nckx ;�F r Z 1 h A 4t p 1 t k t ➢� ap
i x"e�'y ,t t`Y^�;•`.., Yr,.. � +'.try�.;:t.+..,w hsiY :i.t',:,-�t��.i,,,b':.:n'h ° ;.'ih.:f, x36:t�t J xy`�.7 �" � '� �.R�?", st � ,�vrgaf f`�ss f k;
Name:John Felbinger
Mailing Address:20 Clark St East Rockaway, NY 11518
Phone#:516-887-4876 Email Jackjr@Jffelectnc com
DESIGN PROFESSIONAL:INFORMATION
Name:N/A
Mailing Address:
Phone#: Email:
Name:John Felbinger
Mailing Address:20 Clark St East Rockaway, NY 11518
Phone# 516 887-4876 Email ack r ffelectnc com
,p4r
�Y
DESCRIPrTIO OF PROPOSED CONSTRUCTION
r R rr n i 1�}a^? fr{G6 ; �'r��
❑New Structure ❑Addition ❑Alteration ❑Repair ❑Demolition Estimated Cost of Project:
DOther EV Charging Station $3920
Will the lot be re-graded? ❑Yes IgNo Will excess fill be removed from premises? ❑Yes W No
1
PROPERTY INFORMATION
Existing use of property:Residential Intended use of property:Residential/Single Family
Zone or use district in which premises is situated: Are there any covenants and restrictions with respect to
this property? OYes ❑No IF YES,PROVIDE A COPY.
8 Check Box After heading: The owner/contractor/design professional is responsible for all drainage and storm.water issues as provided by
Chapter 236 of the Town Code.APPLICATION IS HEREBY MADE to the Building Department for the issuance of a Building Permit pursuant to the Building Zone
Ordinance of the Town of Southold,Suffolk,County,New York and other applicable Laws,Ordinances or Regulations,for the construction of buildings,
additions,alterations or for removal or demolition as hereindescribed.The applicant agrees to comply with all applicable laws,ordinances,building code,
housing code and regulations and to admit authorized inspectors on premises and in building(s)for necessary inspections.False statements made herein are
punishable as a Gass A misdemeanor pursuant to Section 230AS of the New York State Penal law.
Application Submitted By(print name):'_Yc7\1N e.��� Authorized Agent ❑Owner
Signature of Applicant: ' Date:
STATE OF NEW YORK)
SS:
COUNTY OF
2a\.rlo �b� / being duly sworn,deposes and says that(s)he is the applicant
(Name of individual signing cco tract)above named,
(S)he is the CO r�- VA(�-%
(Contractor,Agent,Corporate Officer,etc.)
of said owner or owners,and is duly authorized to perform or have performed the said work and to make and file this
application;that all statements contained in this application are true to the best of his/her knowledge and belief;and
that,the work will be performed in the manner set forth in the application file therewith.
Sworn before me this
Al day of !r , ,20
Notary Public
CYNTHIA LARK
Notary Public,State of New York
No.01LA6421011
Qalified inPROPERTY OWNER AUTHORIZATION commissonExpires August 23
(Where the applicant is not the owner)
I, � :•,, t 1=S) * residing at is io A(4,C,-10 SV7 ; C,
lI do hereby authorize -� f_' I�cr �� to apply on
my behalf o t awn of So old Building Department for approval as described herein.
Owner's Signature Date
Print Owner's Name
2
�Ogsffi?t�`o BUILDING DEPARTMENT-Electrical Inspector
TOWN OF SOUTHOLD
y z Town Hall Annex-54375 Main Road - PO Box 1179
Southold, New York 11971-0959
4! Telephone (631) 765-1802- FAX (631) 765-9502
jamesh _southoldtownny.Qov— seand@southoldtownny.aov
APPLICATION FOR ELECTRICAL INSPECTION
ELECTRICIAN INFORMATION (All Information Required) Date: 03/14/2025
Company Name: JFF Electric, Inc.
Electrician's Name: John Felbinger
License No.: ME49343 Elec. email:jack@jffelectdc.com
Elec. Phone No: 516-887-4876 01 request an email copy of Certificate of Compliance
Elec. Address.: 20 Clark Street, East Rockaway, NY 11518
JOB SITE INFORMATION (All Information Required)
Name: Paul Kesicki
Address: 1210 Arshamomaque Ave,Southold, NY 11971
Cross Street:
Phone No.: 631-492-0507
Bldg.Permit#: 5*f OW email: KESICKIPAUL@GMAIL.COM
Tax Map District: 1000 Section: Block: Lot:
BRIEF DESCRIPTION OF WORK, INCLUDE SQUARE FOOTAGE (Please Print Clearly):
Install dedicated 100-amp 240v circuit for electric vehicle charging station protected by 100-amp
circuit breaker&disconnect.Charger will be mounted on exterior wall of house.
Square Footage: 12400
Circle All That Apply:
Is job ready for inspection?: ❑ YES 0 NO ❑Fough In ❑ Final
Do you need a Temp Certificate?: ❑ YES a NO Issued On
Temp Information: (All information required)
Service Size❑1 Ph❑3 Ph Size: A #Meters Old Meter#
❑New Service❑Fire Reconnect❑Flood Reconnect❑Service Reconnect❑Underground❑Overhead
# Underground Laterals 0 1 E12 D H Frame El Pole Work done on Service? MY N
Additional Information:
N/A
PAYMENT DUE WITH APPLICATION
'�`SUFl:O,tK { BUILDING DEPARTMENT-Electrical Inspector
� CMG TOWN OF SOUTHOLD
z Town Hall Annex- 54375 Main Road - PO Box 1179
Southold, New York 11971-0959
Telephone (631) 765-1802 - FAX (631) 765-9502
Lamesh southoldtownny.gov - seanda-southoldtownny.gov
APPLICATION FOR ELECTRICAL INSPECTION
ELECTRICIAN INFORMATION (All Information Required) Date: 03/14/2025
Company Name: JFF Electric, Inc.
Electrician's Name: John Felbinger
License No.: ME49343 Elec. email:jack@jffelectric.com
Elec. Phone No: 516-887-4876 El I request an email copy of Certificate of Compliance
Elec. Address.: 20 Clark Street, East Rockaway, NY 11518
JOB SITE INFORMATION (All Information Required)
Name: Paul Kesicki
Address: 1210 Arshamomaque Ave, Southold, NY 11971
Cross Street:
Phone No.: 631-492-0507
Bldg.Permit#: �j(q�� email: KESICKIPAUL@GMAIL.COM
Tax Map District: 1000 Section: Block: r Lot:
BRIEF DESCRIPTION OF WORK, INCLUDE SQUARE FOOTAGE (Please Print Clearly):
Install dedicated 100-amp 240v circuit for electric vehicle charging station protected by 100-amp
circuit breaker&disconnect. Charger will be mounted on exterior wall of house.
Square Footage: 12400
Circle All That Apply:
Is job ready for inspection?: YES❑✓ NO Rough In ❑ Final
Do you need a Temp Certificate?: ® YES a NO Issued On
Temp Information: (All information required)
Service Size®1 Ph❑3 Ph Size: A #Meters Old Meter#
❑NewServiceFire ReconnectOFlood ReconnectOService ReconnectQUnderground Doverhead
# Underground Laterals 1 2 H Frame 0 Pole Work done on Service? Y N
Additional Information:
N/A
PAYMENT DUE WITH APPLICATION
PERMIT# Address:
Switches
Outlets
fiord.- cav-�
G F I's
Surface
I G CA- dj�j-c C)
Sconces
H H's
UC Lts Fridge HW POOL
Fans Mini Fr. W/D
�- Panel -- -
Pump
Exhaust Oven Sump Heater
Trnsfmr
Smokes DW Generator Salt Gen.
Carbon-' M.i_cro R Grb.Dis Water Bond
Lights
Heat Pucks ERV 'cr
HOT TUB/SPA
Inst Hot DeHum Transfer Disc
Combo Cooktop Mini Alit Blower
AC AH Hood Blower
Service Amps Have Used
.. Sub Amps Have Used
Comments G
4
DWELLING-PUBLIC WATER DWELLING+PUBLIC WATER - -
n ' G
yrppY�, N 26014'00" W 111.25' PRCtl=RTY LINE
!I A„w..Yur..m,.a...w........ � I 'Z
z 1 i � rus.Ecr PRcpERTY
W � 1
i.MwJWbru-imr � I 1 ,'I�I,,
r /! W
Q- 1 I f
Ui
IL I
pi.M'�RidH W"�Yn Y ti MY�Mel I
M Wnaptwrr�Y�wIi YY 1
-I��ynYrO YlM�nnYew.W
Nm PwW•rr rrtrowwr 1
I�r rN rrr r"r/r.w.nr 'I
n7•M TANt/01°�.Crd gOlo�FIrF � '
w a°OiY"�-Iri AliMwVwP�rA.p1 � m' PATIO
�r�Y�Y LLLL55 f
t
I Mb.Yw MW.wrerM Mrl £4TirtT t0 vCA6tEAT1IMPAIXCmCD B6rOlK TA)tIOT NO
ARGIOIe&} BLAxf I/
rp Wi YllJre rmlrrr+rn wghl 1 nml°n'°oo ura'�"n.wo,oea
AUA TMAL LM i
r rn.wr PROFOEEp �i�e°tln�•�rau�o°f mrAi.wrAgrA naw"u'
G°aT 2-STOW 2-STOW NOW D"9T Iblfi 4Y4/.P /KI
rrrr rpn b+r Yuli,ar YarY.[M PIP=PPAhW NOIIse W FRAMED ADDITION INT°N TARWINN Iu
PROF09ED ADDITION -. E�aK FV B .. _ yp pYl Wesel -• _ rRROOm A9wneN
r.�rr.MVWrgorr bac�wr I t4@OROOW TCtt}IGN+ff70Tf!-0Otl
n.w..rwwnm .. r _ _ PP.PL..71�• rrn► EM- -WBt OP bDU
��Nra Yrr�Y.w � 7 ��L9O2NT ELn143' I�/EDIIL PIPUM7 '_��s T�Vla W>mW®TATCIYa°R r` TOTAL AI�H ALL°11YGTACf eOeo OP Ntl
•^ MOINO fAlUSLSDn--
P6!ftl NV R!y MAYAL Y f W
Yq-9 no.w.sbr•M� __ _� ._.... ._ __ .._ - .. �_ 1._ _. _ ._ _._ - jYypKM µjplrm iJWa ._ •• _•___
i"w"i�wwrlWr�wwriL r}4OW IIAP MTA fltON dRVe'f •I
r wnrrruq 1 1 MAw., eY
-a gm -
„mn.TAl°.m •- - ---'-- 1 I-AM � . Z4,� .r._-_. _I'-- ---• =aeim nimcrlewdaTPSlcdsmn
eaf rrno ,§ , �Y omAum.V Rau®er eamaD
oPmearo� i 1 V e �wsrNtea/Q�A
Irrunarr.snanreu�tm. � f 1.1 r S%!�lm:. ;
grrunrMw e..Ir nW .Tm/ _ �17p�1I.rry le+.W.Y rPdM rrMiF"e C68T HA Y fW9�d IrOp'QLL' F /�� Y, •6CYATIOItr Rp9�C/INM IW ' II
I"trlr rnr Y• T t / TO MArIT KILISFARATION R f�V`I f "-•.
sm-
MIYrMn.A w'""rrr ' ' eICET LF 2.-
11O1C
:.�inemm err..r ar..ewaanr r.r - I r I ORNMAr
lu
L.P.
soP
AVAN
AA D"
POOLLeACfRas _tV7F' ^L CWJi-0+1
.I.�'-.rs nrVglwa °L Df
AD
Pve�s S o If ° Y OFNO`NJ
-I..rrranrwr/q tr c , p
qau- t 2a0�I` t' r •�P05ED 5�G SYSTENf DETAIL
.nrrrnvn..yli/..rr.e.nr _ ti Z .rr.w PROJECT:
- �ule'.�wn wyao.rryon KESIC
'- -- - 7 Rp CLsrJnlme tl '°'am.""r�Gr°"o
"°rm' RESIDE
=OLK COUNTY HEALTH DEPARTMENT APPROVAL I meeePFA�,®T L�NF Ir/>�S' n :am «�pN I=ARSHAM
✓ SOUTHOLD,N
slat:mlLrsrGEeAwMceorlvALTNSEnvloa ' - .....
PoOA AR5HAMOMAG2UE AVENUE i , --►J_ .w ► ®"""
ppvurvvaArreevu.�Ce)P'i+EVL7tON , :�, •' 6tIEPlAN
rufarwv/waom.r I -
aa PROPosEDsrPRca
ANVAvea w.wsruna".ow •wswYYrouu®R '••I tA'-"'�'Lr�•:1i NOTF3
517E PLAN -. .,��rY... ;
rOIM f17 E?NLOrB I sauw-wu.arieis'wvw��.in r'wu ri.ol+
ar ru.rr.s.mr.ew�r PAGE:
2 eeALe.1'-0'.Iao• I -r rr��r+rsw•w..,.�ur.wu.�.-►.+.
®9GE1AIffi IROYO.ThOi,tyAD-AL { .�awo-ro"a rvw�r�w..s SPA
mAm6mnupfod.xamt�usTlGmcc�twotEsawTswplAplW-tefm m0
q Rip
A4Mrn - rw a'KAi'orr®Yauarw °Am OB/19/19 (L-
I � p
i
APPR VED AS NOTED
DA •� B.P./
FEE- BY-
NOTIFY BUILDING DEPARTMENTAT
631-765-1802 8AM TO 4PM FOR THE
FOLLOWING INSPECTIONS:
1. FOUNDATION-TWO REQUIRED
FOR POURED CONCRETE
2. ROUGH-FRAMING&PLUMBING ELECTRICAL.
& INSULATION INSPECTION REQUIRED
4. FINAL-CONSTRUCTION MUST
BE COMPLETE FOR C.O.
ALL CONSTRUCTION SHALL MEET THE
REQUIREMENTS OFTHE CODES OF NEW
YORK STATE. NOT RESPONSIBLE FOR
DESIGN OR CONSTRUCTON ERRORS
COMPLY WITH ALL CODES OF dOV h I'C�2
NEW YORK STATE&TOWN CODES
AS REQUIRED AND CONDITIONS OF �jl�bG�jlJn
SOUTHO TOWN ZBA
SOUTH TOWN PLANNING BOARD
OLD TOWN TRUSTEES
N. ,DEC
LDHPC
-7 SCF�
OCCUPANCY OR
USE IS UNLAWFUL
WITHOUT CERTIFICATE
OF OCCUPANCY
Ford Charge Station Pro
The Ford Charge Station Pro provides level 2 charging capability at home
Designed specifically for your Ford EV,and works with all J1772 plugs
(EV industry standard)
•Backed by Ford Motor Company 3-year limited warranty'
The Ford Charge Station Pro provides up to 80 amps to maximize
your home charging speed.for your Ford electric vehicle2
•Adjustable power levels to accommodate a range of circuit breakers
(20-100 Amps)in situations where power may be limited,to enable
compatibility with almost any home electrical systems
•Fully charges your all-electric F-150 Lightning Extended Range
vehicle ovemIght4
Works with the F-150 Lightning and the Home Integration System
to provide Intelligent Backup Power to your home during an outage;
Ford's recommended installer is Sunrun.
Details Specification
•Connector uses industry standard/universal SAE J1772 Output Power Max Weight
connector.Compatible with all electric vehicles on Max 80A/19.2kW4 23.6 lbs.
the market today(that are compliant with SAE J1772), Input Voltage Weatherproof
including Tesla with a commonly used adaptor 240 VAC NEMA 4 rated for
•Up to 19.2 kW(240 VAC at 80 Amps)output Input Freq outdoor installation
•Bluetooth and WI-Fi capability(5.0 GHz and 60Hz Warranty
2.4 GHz 802.11 b/g/n) Output cord Length Limited Syr'
•Dynamic color LED lights show power,bi-directional 25 ft.
power status,vehicle connected status and Dimensions
charging status 322 mm X 595 mm
Installation x 176 mm(WxHxD)
•Capable of both indoor and outdoor installation In the box
(NEMA 4 rated)
•Capable of post-mounting •Ford Charge Station Pro,Including removable
•Capable of installation with the Home Integration outer cover
System and other home energy management solutions •25 ft.cord and charge coupler
•Cord length is 25 ft. •Wall-mounting bracket
•Integrated ergonomic coupler dock for storage •Mounting template(cardboard)
to keep debris and dust out of the plug •User and installation manual
•Integrated cable management system to keep charge •Installation hardware(some installer-specific
cord organized and off the ground conduit hardware not included)
•Ergonomically designed handle with grip
•Impact-resistant replaceable faceplate3
•Flexible wiring options to feed power into unit from rear
or either side
•Security lock has two screws that prevent the wallbox
from being removed without completely disassembling 'See your dealer for limited-warrantydetails.'Ford electric vehicles Include
entire unit the F-150 Lightning,Mustang Mach-e,E-Transit,and Ford Plug-in Electric
Vehicles.Home charging refers to AC charging(https://www.energy.gov/eere/
electricvehicles/charging-home).38ased on Internal Ford,testing.°Usable
amperage Is 800/bof home breaker amperage.Amps x Volts=Watts.5Charging
times vary based on household circuit amperage.
Vehicle Charge Port 171 Ford Charge
Approximately Stat • •