HomeMy WebLinkAbout49734-Z �o��,pf SOUI,yo`o Town of Southold
* * P.O. Box 1179
�0 53095 Main Rd
Southold, New York 11971
CERTIFICATE OF OCCUPANCY
No: 46602 Date: 10/22/2025
THIS CERTIFIES that the building COMMERCIAL
Location of Property: 64500 CR 48 Greenport,NY 11944
Sec/Block/Lot: 40.-3-5
Conforms substantially to the Application for Building Permit heretofore, filed in this office dated: 04/14/2021
Pursuant to which Building Permit No. 49734 and dated: 09/20/2023
Was issued, and conforms to all of the requirements of the applicable provisions of the law.
The occupancy for which this certificate is issued is:
"As built seasonal Cabin #2 in existing campground as applied for per ZBA#7384SE dated
8/20/2020.
The certificate is issued to: HNF Resorts LI LLC
Of the aforesaid building.
SUFFOLK COUNTY DEPARTMENT OF HEALTH APPROVAL: C-20-0055 7/23/2025
ELECTRICAL CERTIFICATE: 49734 09/09/2025
PLUMBERS CERTIFICATION: Jorge Naranjo 04/04/2025
utho ized i nature
� 1
SUFFo�A' TOWN OF SOUTHOLD
BUILDING DEPARTMENT
x TOWN CLERK'S OFFICE
'SOUTHOLD, NY
BUILDING PERMIT
(THIS PERMIT MUST BE KEPT ON THE PREMISES
WITH ONE SET OF APPROVED PLANS AND SPECIFICATIONS
UNTIL FULL COMPLETION OF THE WORK AUTHORIZED)
Permit#: 49734 Date: 9/20/2023
Permission is hereby granted to:
HNF Resorts LI LLC
PO BOX 89
Greenport, NY 11944
To: (cabin #2) legalize "as built" seasonal cabin in existing campground as applied for per
ZBA, Planning & SCHD approvals. Replaces 46348.
At premises located at:
64500 CR 48, Greenport
SCTM #473889
Sec/Block/Lot#40.-3-5
Pursuant to application dated 4/1412021' and approved by the Building Inspector.
To expire on 3/21/2025.
Fees:
PERMIT RENEWAL $512.60
Total: $512.60
Building Inspector
o�SUFFo�,��o
TOWN OF SOUTHOLD
BUILDING DEPARTMENT
y z TOWN CLERK'S OFFICE
"o • ! SOUTHOLD, NY
BUILDING PERMIT
(THIS PERMIT MUST BE KEPT ON THE PREMISES
WITH ONE SET OF APPROVED PLANS AND SPECIFICATIONS
UNTIL FULL COMPLETION OF THE WORK AUTHORIZED)
Permit #: 46348 Date: 6/4/2021
Permission is hereby granted to:
HNF Resorts LI LLC
690 Queen St
Greenport, NY 11944
To: (cabin #2) legalize "as built"seasonal cabin in existing campground as applied for per
ZBA, Planning & SCHD approvals.
At premises located at:
64500 CR 48, Greenport
SCTM #473889
Sec/Block/Lot#40.-3-5
Pursuant to application dated 4/14/2021 and approved by the Building Inspector.
To expire on 12/4/2022.
Fees:
AS BUILT-COMMERCIAL ADDITIONS/ALTERATIONS $975.20
CO-COMMERCIAL $50.00
Total: $1,025.20
Building nspector
o�tpF SO(/j�ol
� o
Town Hall Annex Telephone(631)765-1802
54375.Main Road
P.O.Box 1179 G • Q
Southold,NY 1 1 97 1-0959 �Q
�yc4UfV m
BUILDING DEPARTMENT
TOWN OF SOUTHOLD
CERTIFICATE OF ELECTRICAL COMPLIANCE
SITE LOCATION
Issued To: HNF Resorts LI LLC
Address: 64500 CR 48 City: Greenport St: NY Zip: 11944
Building Permit#: 49734 Section: 40 Block: 3 Lot: 5
WAS EXAMINED AND FOUND TO BE IN COMPLIANCE WITH THE NATIONAL ELECTRIC CODE
Contractor: Electrician: Woodhollow Contr License No: 60139ME
SITE DETAILS
Office Use Only
Indoor Basement Service Solar F
Outdoor I✓ 1st Floor r Pool Spa
Renovation (- 2nd Floor r Hot Tub F, Generator (—
Survey f Attic Garage Battery Storage r
INVENTORY
Service 1 ph I— Heat Duplec Recpt 32 Ceiling Fixtures 5 Bath Exhaust Fan 1
Service 3 ph F Hot Water Gas GFCI Recpt 2 Wall Fixtures 3 Smoke Detectors 2
Main Panel 100A A/C Condenser 1 Single Recpt Recessed Fixtures CO Detectors
Sub Panel A/C Blower 1 Range Recpt Ceiling Fan Combo Smoke/CO 1
Transfer Switch UC Lights Dryer Recpt- Emergency Strobe Heat Detectors
Disconnect Switches 9 4'LED Exit Fixtures
Other Equipment: Minisplit, Fridge, 100A Panel
Notes: Cabin 2
Inspector Signature: X - Date: September 9, 2025
Sean Devlin
Electrical Inspector sean.deviinc@-town.southold.nv.us
64500CR48Cabin2
Town Hall Annex 'ZO Telephone(631)765-1802
54375 Main Road
.P.0.Box 1179 gn:" E
Southold,NY 11971-0959
0.
BUILDING DEPARTMENT
TOWN OF SOUTHOLD
l CERTIFICATION
APR 4 2025
Date: O LP-- 01 P a2p;LS
Building Permit No.
Owner: H fNF Q LLC
(Please print)
Plumber: 0
-- -'�-'" v
0-1
(Please print)
I certify that the solder used in the water supply system contains less than 2/10 of 1%lead.
(Plumbers Signature)
Sworn to before me this
ADVENDIZO TOR ES
day of 20 NOTARY PUBLIC,STATE OF NEW YORK
Registration No. 01T06231053
Qualified in SUFFOLK County
Commission Expires 11/22/2026
Notary Public, . County
1
pF SOUIyOIo 1 l l� -l ��� r_
# # TOWW(YF SOUTHOLD BUILDING DEPT.
Caum, 631-765-1802
INSPECTION
[ ] FOUNDATION 1ST/ REBAR [ ] ROUGH PLBG.
[ ] FOUNDATION 2ND [ ] INSULATION/CAULKING
[ ] FRAMING /STRAPPING [ ] FINAL
[ ] FIREPLACE & CHIMNEY [ ] FIRE SAFETY INSPECTION
[ =] FIRE RESISTANT CONSTRUCTION [ ] -FIRE RESISTANT PENETRATION
[ ] ELECTRICAL (ROUGH) ELECTRICAL (FINAL)
[ ] CODE VIOLATION [ ] PRE C/O [ ] RENTAL
REMARKS:
P �
DATE �? �-� INSPECTOR
# TOWN OF SOUTHOLD. BUILDING DEPT..
• ,o
°ycou 631-765-1802
INSPECTION'
[ ] FOUNDATION 1ST/ REBAR- [ ] ROUGH PLBG..
[ ] FOUNDATION 2ND [ ] INSULATION/CAULKING
[ ] FRAMING /STRAPPING [ ] FINAL
[ ] -FIREPLACE & CHIMNEY [ ] FIRE SAFETY INSPECTION
[ ] FIRE RESISTANT CONSTRUCTION, [ ]- FIRE RESISTANT PENETRATION
rl
ELECTRICAL (ROUGH) [ ] ELECTRICAL (FINAL)
CODE VIOLATION [ ] PRE C/O [ ] RENTAL
REMARKS:
v--au r c G
V DATE INSPECTOR
�o�aOF SOUTyolo
TOWN OF SOUTHOLD BUILDING DEPT.
lourm �o 631-765-1302
qqi-(q1 N S PECTIN
[ ] FOUNDATION 1ST/ REBAR [ ] ROUGH PLBG.
[ ] FOUNDATION 2ND [ ] I - LATION/CAULKING
[ ] FRAMING /STRAPPING [ FINAL
[ ] FIREPLACE & CHIMNEY [ ] FIRE SAFETY INSPECTION
[ ] FIRE RESISTANT CONSTRUCTION [ ] FIRE RESISTANT PENETRATION
[ ] ELECTRICAL (ROUGH) [ ] ELECTRICAL (FINAL)
[ ] CODE VIOLATION [ ] PRE C/O [ ] RENTAL
REM RKS-
4a wve/
s
� lyvlu&
ID
DATE LO INSPECTOR
hO�*of 50UlyO�
* # TOWN OF SOUTHOLD BUILDING DEPT.
""outm, 631-765-1802
li
INSPECTION .
[ ] FOUNDATION 1 ST/ REBAR [ ] .ROUGH PLBG.
[ ] FOUNDATION 2ND [ ] INS TION/CAULKING
[ ] FRAMING /STRAPPING [ INAL
[ ] FIREPLACE & CHIMNEY [ ] FIRE SAFETY INSPECTION
[ ] FIRE RESISTANT CONSTRUCTION [ ] FIRE RESISTANT PENETRATION
[ ] ELECTRICAL (ROUGH) [ ] ELECTRICAL (FINAL).
[ ] CODE VIOLATION [ ] PR Cf- [ ] RENTAL
REMARKS:
c AAd
r r
` i�c v=-
C�
INSPECTOR
SOUTgp�o
# # TOWN OF SOUTHOLD BUILDING DEPT.
631-765-1802
INSPECTION
[ ] FOUNDATION 1ST/ REBAR [ ] ROUGH PLBG.
[ ] FOUNDATION 2ND [ ] INSKATIOWCAULKING
[ ) FRAMING /STRAPPING [ FINAL
[ ] FIREPLACE & CHIMNEY [ ] FIRE SAFETY INSPECTION
[ ] FIRE RESISTANT CONSTRUCTION j ] .FIRE RESISTANT PENETRATION
[ ] ELECTRICAL (ROUGH) [ ] ELECTRICAL (FINAL)
[ ] CODE VIOLATION [ ] PRE C/O [ ] ' RENTAL
REMARKS:
( 16n41
MIRA&,
� c
Jk 11 656tE
\-lol
nn
DATE
INSPECTORIX�66&n"-
OF SOUTyo�
# TOWN OF SOUTHOLD BUILDING DEPT. �
�Tcou 631-765-1802 C, ,6v1,5 l
INSPECTION .
[ ] FOUNDATION 1 ST/ REBAR [ ] ROUGH P G.
[ ] FOUNDATION 2ND [ ] IN ATION/CAULKING
[ ] FRAMING/STRAPPING [ FINAL
[ ] FIREPLACE & CHIMNEY [ ] FIRE SAFETY INSPECTION
[ ] FIRE RESISTANT CONSTRUCTION [ ] FIRE RESISTANT PENETRATION
[ ] ELECTRICAL (ROUGH) [ ] ELECTRICAL (FINAL)
[ ] CODE VIOLATION [ ] PRE C/O [ ] RENTAL
1
REMARKS: �. 7 l
mu
'40
� t � _1n►tiS S� �
A -OM LAAabadqF7
-
I --%() mej
� S�I�
TE -INSPECTOR
hO�NOE SO(/TyOlo
# TOWN OF SOUTHOLD BUILDING DEPT.
o N 631-765-1802
C �✓
. l
INSPECTION
FOUNDATION 1ST/ REBAR ROUG G
[ ] FOUNDATION 2ND [ ] I LATION/CAULKING
[ ] FRAMING /STRAPPING [ FINAL
[ ] FIREPLACE & CHIMNEY [ ] FIRE SAFETY INSPECTION
[ ] FIRE RESISTANT CONSTRUCTION [ ] FIRE RESISTANT PENETRATION
[ ] ELECTRICAL (ROUGH) [ ] ELECTRICAL (FINAL)
[ ] CODE VIOLATION [ ] PRE C/O [ ] RENTAL
REMARKS: S
�40 NA6,-
1
DATE INSPECTOR ti
Condon Engineering, P.C.
New York State Licensed Professional Engineers
1755 Sigsbee Road 631-298-1986
Mattituck,.New York 11952 Fax 631-298-2651
cond onen g i neeri ng.com
October 14, 2021 E C u
D
OCT 1 9 2021 , D
Mr. Mike Verity BUILDING DEPT.
Chief Building Inspector TOWN OF sOUTHOLD
Southold Town Building Department
53095 Route 25
P.O. Box 1179
Southold, New York 11971
Re: Eastern Long Isl Camp Ground Cottage Footings-690 Queen Street, Greenport.
Permit#s 46347, 46348 6349,46350,46351, 46353, 46354, 46355, 46356, 4:6457,46358,
46359,46360, 463 1, 46362,46363, 46364, 46365, 46366, 46367
Dear Mr. Verity:
Hnspected the sono tubes footings on the property for the proposed cottagers and,found them
- to-be-installed-in-accordance-with-.the-plans-filed-with._the-Building_Department._The_sono-tubes._._-_____
were found to be properly installed and filled with concrete.
To the best of my knowledge the sono tubes are installed in accordance with New York Building
Code standards.
If you have any questions, please call me at 631-298-1986.
Yours truly,
0 ondon, P.E.
SAP J. c
F 051
pROFESS10��
Ll ���� �^� �� "� �� �� Ja �� U 07 �
—� -1 » ����/ ��-�� ����/ �� 8�/ ��� �� �� k� U YY U�
IJJ
U U 8pQ 5 pOp4 Condon Engineering, P C
New York State Licensed Professional Engineers
1755 SigsbeeRmad 631-298-1986
Mmttituck, New York 1i952 Fax 631~298-3681
cwndmnenQineednQ.cmm
'
' April 5. 2O24
Mr. Mike Verity
Chief Building Inspector
Southold Town Building Department
53DS5 Route 35
P.O. Bmz11T9
8outho|d, New York 11S71
Re: Eastern Long |e|ond Camp Ground Cottage Footings-8SO Queen 8tremt, Graenport
Dear Mr. Verity:
| inspected the plumbing and insulation in cottages#2,#3,#10,#13 and#17.The piping was
found to be installed as shown on the plans and to have no leakage.The installation was found
- tobe installed as shown on the plans.
To the best of my knowledge the plumbing and insulation were installed in accordance with
building code standards.
If you have any questions, please call me sd631-29B-1886.
Yours truly, 051684
OF NEq1),
'
qSIN
'
Thomas P. Walsh, Architect, P.C.
700 Veterans Memorial Highway,Suite CL-140
Hauppauge, NY 11788
Phone: 631-348-4500 Fax: 631-348-4509
Date:1019124 r
Town of Southold-Fire Marshal
Town Hall Annex
54375 Main Road, P.O. Box 1179,
Southold, NY 11971 N 0,; -'24
Subject: Eastern Long Island Camp Ground, 690 Queen St,Greenport, NY 11944
To whom it may concern,
This letter shall serve to certify that all of the units 1-19& the Pavilion were tested at
200lbs for a period of 2 hours and there was no change in pressure. This test was witnessed by
Gregory E.Sulger and Thomas P. Walsh.All of the lines have since been filled with glycol for
freeze protection. Therefore, a water flow test cannot be conducted without compromising the
system.A manual test was performed on all of the water flow switches.All alarms'are active.
Very my yours
Th as P. NO
LIC#019767
a ECE � � E
Condon Engineering, P.C. FEB 1'2 2025
New York State Licensed Professional Engineers
Building Department
1755 Sigsbee Road � �°�thold
Mattituck, New York 11952 Fax 631-298-2651
condonengineering.com
' l
February 12, 2025
Mr. Mike Verity r
Chief Building Inspector
Southold Town Building Department
53095 Route 25
P.O. Box 1179,,
Southold, New York 11971
Re: Eastern Long Island Camp.Ground Cottages-690 Queen Street, Greenport
Dear Mr. Verity:
I inspected the installed insulation a"he site.The insulation in the Pavilion, and cottages#1,#4,
#5,#6,#7,#8#9#11 #12,#14,#15,#16,#18 and#19 were found to be installed as shown on the
plans. Cotag ,# Q,.#�1an°dk#1�r7We� nspectetl in April:
To the best of my knowledge the insulation was installed in accordance with building code
standards.
If you have any questions, please call me at 631-298-1986.
Yours truly,
OF NFL
on, P.E. �� J. c00 o
4
l A 0 1684
�FFSSION A���
c
l
OFFICE LOCATION: Qg SQ(/r MAILING ADDRESS:
Town Hall Annex O�� y�� P.O. Box 1179
54375 State Route 25 . ~ Southold,NY 11971
(cor.Main Rd.&Youngs Ave.)
Telephone: 631 765-1938
Southold,NY www:southoldtownny.gov
E
October 22, 2025 PLANNING BOARD OFFICE
TOWN OF SOUTHOLD GT 2 2D25
Ms. Patricia C. Moore, Esq. ,;, 4rg",r,
51020 Main Road
Southold, NY 11971
Re: Approved.Amended Site Plan for Eastern Long Island Kampground Cabins
64500 CR 48, Greenport SCTM#1000-40.475
Dear Ms. Moore:
The Planning Board has found that the requirements of the above-referenced Amended
Site Plan have been completed based on the site inspections made September 14,
2025 and October 10, 2025; and, the Planning'Board work session on October 20,
2025. The approved structures and associated improvements are in general
conformance with the approved amended site plan entitled "Eastern Long Island
Kampground" prepared by John J. Condon P.E., dated December 16, 2019, and last
revised September 24., 2020. Contingent upon the site's continued compliance with all
applicable provisions of the Town Code, the Planning Board supports the issuance of a
Certificate of Occupancy by the Building Department.
This letter does not condone any changes from the approved site plan and approvals
from other agencies; Planning Board approval is required "prior to any significant
changes to the site.
If you have any questions regarding this Site Plan or its process, do not hesitate to
contact this office.
Respectfully`
Brian A. Cummings
Senior Planner
cc: Michael Verity, Chief Building Inspector
Sean Magnuson, Owner
FIELD INSPECTION REPORT DATE COMMENTS • _
b
FOUNDATION(IST)
------------------------------------
C
FOUNDATION(2ND)
• z
� o
ON
COD
ROUGH FRAMING&
PLUMBING
W
11)
VA
r
INSULATION PER N.Y. � y
STATE ENERGY CODE
a
D
i
FINAL
ADDITIONAL COMMENTS
a
Uv i�c ivs
l2�It 23. " v r-C c# /Oca1 4S f f� �P GK cK z
y 8ft
/ 1 /R+ 1 # o l`l t
0- r `d C
9 -9- E'�
� a
gi
L
z
Q�
d
ob
� y
��oS�FPOt��oGy. TOWN OF SOUTHOLD—BUILDING DEPARTMENT
Town Hall Annex 54375 Main Road P. O. Box 1179 Southold,NY 11971-0959
�yol �ao� Telephone (631) 765-1802 Fax(631) 765-9502 https://www.southoldtownnov_
Date Received
APPLICATION FOR BUILDING PERMIT
For Office Use Only
PERMIT NO. Building Inspector: APR 1 4 2021
Applications and forms must be filled out in their_entiretylncomplete 5 -s, ,-_Gti-
applrcatior s will nQt be accepted Where the AppUcant istnot the owner,an ,.
5
Owner's Author�zaton form(PageZl shall be corripleted T'
i
£v-'_, k A�� ✓R. ?t" k
Date:4/12/21
01NNER(S) FP
Name:HNF RESORTS INC. SCTM#1000-40.-3-5
Physical Address:690 QUEEN STREET GREENPORT NY 11944
Phone#:631-477-0022 Email:INFO ELIKAMPGROUND.COM
Mailing Address:690,QUEEN STREET, GREENPORT NY 19944
"
CONTACT:PERSN sn °'
x.
w
Name:SEAN MAGNUSON
Mailing Address:SAME AS ABOVE
Phone#:631-953-3899 Email:
DESIGN PROFESStONALrINFORMATION
Name:CONDON ENGINEERING
Mailing Address:1755 SIGSBEE RD.MATTITUCK NY
Phone# 631-298-1986 Email CONDONENG@OPTONLINE.NET
CONTRACTOR INFORMATION w
Name:SEE ATTACHED
Mailing Address:
Phone#: Email:
DESCRIPTION'OF�PROPOSEDCOJ�ISTRUCTIONj '�'W��gEDROOM CABIN` t , ��� '
®New Structure ❑Addition ❑Alteration ❑Repair ❑Demolition Estimated Cost of Project:
❑Other $.,...... .., _...._.. .. .__._.__..., :.... ,.._. ..._.._......_
Will the lot be re-graded? ®Yes ❑No Will excess fill be removed from premises? Dyes ®No
1
PROPERTY.-,,INFORMATION Existing use of property:TOUREST CAMP Intended use of property:TOU RI ST CAMP
...........
Zone or use district in which premises is situated: Are there any covenants and restrictions with respect to
RR-RE50RVREC RE AT 1 10" this property? ®Yes ONO IF YES, PROVIDE A COPY.
X After Reading The 6*h6r/to"n'tr" rofdssio"
4Ctpq' ��igr!�p .storm water,issues
Chapted236 of the T �Fdd�.,.A��,LIC-AT1644S HEREBY A6 tolhe Buidingl for ile.
66rike df WBWdlq'i-,permit pursuant to 8ui101r6.i6ne.-
Ordinance oft eToVn'df9outhb1d;su4
Ordinances or Regulations;for the construdiort of buildings,
-c6iri�lj';�ith Alappl!6�lq laws;�rdln6` Mid a Mo it!on ap herein`.described.
� ing code
hougmg code and u1i .... ...d�q�. drtih,46i6rized
punishablen �OSectbfi�# kh"
e NeW1*
P. 14
Application Submitted By(pri me): @Authorized Agent [30wner
Signature of Applicant: Date:
...........
STATE OF NEW YORK) CONNIE D.BUNCH
Notary Public,State of New York
SS: No.01 BU6185050
COUNTY OF Qualified In Suffolk County
Commission Expires April 14,2 Oa"IL
being duly sworn,deposes and says that(s)he is the applicant
(Name of individual signing c tract) above named,
(S)he is the
T—T7 (Contractor,Agent,Corporate Officer,etc.)
of said owner or owners,and is duly authorized to perform or have performed the said work and to make and file this
application.;that all statements contained in this application are true to the best of his/her knowledge and belief;and
that the work will be performed in the manner set forth in the application file therewith.
Sworn before me this
'34t-lday of 20aL
Notary Public
PROPERTY OWNER AUTHORIZATION
(Where the applicant is not the owner)
SEAN MAGNUSON residing at 825 QUEEN STREET, GREENPORT, NY
do hereby authorize EILEEN WINGATE, QUIET MAN STUDIO to apply on
my behalf to the;Town f Southold Building Department for approval as described herein.
cell, 4/13/2021
00 ner's Siate
SEAN MA=SON
Print Owner's Name
2
BOARD MEMBERS UUr Southold Town Hall
Leslie Kanes Weisman,Chairperson, \OF S y0 53095 Main Road•P.O.Box 1179
�� l0 Patricia Acampora Southold,NY 11971-0959
Eric Dantes Office Location:
G Q Town Annex/First Floor,
Robert Lehner[,Jr. • �O 54375 Main Road(at Youngs Avenue)
Nicholas Planamento lij'COU � Southold,NY 11971
httpJ/southoldtowmy.gov R C � 7ED
ZONING BOARD OF°APPEALS
` ;3aQ
TOWN OF SOUTHOLD .
Tel.(631)765�1809•Fax(631)765-9064 A U G 2 5 2020
a.
Sout ld ToWn Clerk
FINDINGS,DELIBERATIONS AND DETERMINATION
MEETING OF AUGUST 20,2010
ZBA FILE No.: 7384SE.
NAME OF.APPLICANT: IM Resorts Inc
PROPERTY LOCATION: 690 Queen Street, Greenport,NY SCTM No. 100040-3-5
SBQRA DETERMINATION: The.Southold Town Zoning Board of Appeals declared Lead Agency
status for the SEQRA review.of the special.,exception application and an—uncoordinated review was
conducted. It was determined that-:.this is an Unlisted:Action pursuant:t0 State Environmental_Quality
Review.Act(SEQRA)6 NYCRI; .Part 617- as it does n.,t t meet any offhe thresholds of a Type 1 Action,,
not does`it meet.any'of the criteria on the Type II list of actions and'that the Southold Town Zoning Board
of Appeals,pursuant to SEQRA,hereby made a determination of non-significance for the proposed action .
and grants a Negative D.eclarmion.
SUFFOLK.COUNTY ADMINISTRATIVE CODE: This application was=referred as required under the
Suffolk County Ad histrative Code Sections A 14-14 to 23, and the Suffolk County Department of
Planning issued its reply'dated January 24, 2020 stating that this application is considered a matter for.
Iocal determination as there appears to be no significant county-wide or inter--community impact.
LWRP DETERMINATION: The relief,permit, or interpretation.requested in this application is listed
under the Minor Actions exempt list and is-not subject to review under Chapter 268.
TOWN OF SOUTHOLD PLANNING BOARD: The Planning Board offered continents on this
application in their June 24, 2020 memorandum. The Planning Board generally has no objection to the
Special Exception and cabin size due to the fact that the existing site and,use thereof received Special
Exception approval in 1976 and Site Plan approval in 1976 and 2005. The Planning Board currently has
not.endoised a Site Plan for this proposal and reserves the right to make any necessary changes to the Site
Plan after reviewing all proposals thoroughly.
PROPERTY FACTSMESCRIPTION: Subject property consists of 23.61 acres located in the Resort
Residential (RR)Zoning District. The property is a campground with both mobile &tent sites currently
available. The property is improved with an office/bathroom facility, sites for mobile homes, and tent
camping sites.
BASIS OF APPLICATION: Request for Special Exception per Code Section 280-35B(5) and Town
Code Article 1, Section 253-1, the applicant is requesting permission to alter the existing Tourist and
Page 2,August'20,2020
#7384SE;HNF Resorts,Inc.
SCTM No,-1A00407-3-5 ;r
Trailer campground by removing twenty(20)tent sites.and constructing twenty(20)seasonal cottage`s,'as
well .as variances for twenty(20) cottages measuring 504 sf where the code only allows cottages to
measure a maximum of 450 SF in size; located at: 64500 County Rd 48, Greenport,SCTM# 1000-40-3-5
VARIANCE RELIEF REQUESTED: The applicant's proposal was amended to convert 33 existing tent
camping sites to 20 seasonal use cabins of approximately 504 sq. ft. with an exterior covered porch,
where only 450 sq. ft. cabins are allowed. The cabin floor plans also depict a 90 sq.ft. covered porch to
be attached to the cabins for an overall size of 594 sq. ft.. In addition, a 600 sq. ft. pavilion with an .
exterior deck will also be constructed.
ADDITIONAL INFORMATION: The proposed 20 cottage'sites are a reduction of the currently 33
existing tent.sites. There are certificates of occupancy for all of the existing campground buildings &
inground swimming..pool. The current site.plan was approved in 2006, and:alIows for 63 seasonal RV
sites, 90 short term:RV/Pop Up sites, and 33 tent sites. The site plan also approves 186 parking spots
with an 80=car overflow. The original campground& trailer park came about from a Special Exception
permit approval ZBA file#2147 dated July 22, 1976.
A Letter of No-Jurisdiction was issued by the New York State Department of.Conservation (NYSDEC)
indicating that no permit is required from the agency, but advised that no construction, disturbance,.
clearing or sedimentation of any kind may take place within 100 feet of NYS regulated freshwater
wetlands without a.permit.
SPECIAL EXCEPTION:
FINDINGS OF FACT/REASONS FOR BOARD ACTION:
The Zoning Board of Appeals held a public hearing on this application on August 6,2020.at which time
written and oral evidence were presented. Based upon all testimony,documentation,personal inspection
of the property and surrounding neighborhood,and other evidence,the Zoning Board finds the following
facts to be true and relevant and makes the following findings:
The Board has reviewed the General Standards governing Special Exception uses set forth in Section 280-
142 and finds:
A. That the use will not prevent the orderly and reasonable use of adjacent properties or of properties
in adjacent use districts. The subject property has legally existed as a tourist camp since 1976 without
adverse impacts
B. That the use will not prevent the orderly and reasonable use of permitted or legally established
uses in the district wherein the requested use is located or of permitted or legally established uses in
adjacent use districts.No new uses are beingproposed in this'application
C. That the safety, the health, the welfare,the comfort, the convenience or the order of the town will
not be adversely affected by the proposed use and its location. The proposed cabins will meet all
county sanitary regulations and will be serviced by Suffolk County Water and Greenport Village
Sewer System. The site is readily accessible to fire and police protection.
-------------D.--T-ha�the-use-will-be-in-harmony-with-and-promote the-gener-al-purposes-and-intentof-this----- —-- —-
chapter. The cabins will be in compliance with the Town's storm water management code
Page 3,August 20,2020
#7384SE,HNF Resorts,Inc.
SCTM No. 1000-40-3-5 E. That the use will be compatible with its surroundings and with the character of the neighborhood
and of the community in general, particularly with regard to visibility, scale and overall appearance.
The property is screened from the road, and is adjacent to Moore's Woods.
F. That all proposed structures, equipment and material,shall be readily accessible.for fire and police-
protection.The existing unimproved road will be. widened for better fire and police access and the
campground has its own fire emergency plan and fire truck on site
G.That the proposal shall comply with the requirements of Chapter 236,Stormwater Management
In making such determination, consideration was also given to:
A. The character of the existing and probable development of uses in the district and the
peculiar suitability of.such district for the location of any of suchpermitted uses.
B. The conservation of property values and the encouragement of the most appropriate uses
of land.
C. The effect that the location of the proposed use and the location that entrances and exits
may have upon the creation or undue increase of vehicular.traffic congestion on public
streets,highways or sidewalks to assure the public safety.
D. The availability of adequate and proper public or private water supply and facilities for
the treatment,removal or discharge of sewage,refuse or other effluent.(wl ether liquid,
solid, gaseous or.otherwise)that may be caused or created`by or as a result of.the use.
E. Whether the use or the materials incidental.therete .oir'-produced thereby may give off
obnoxious gases;odors,smoke or soot.
F: Whether the use will cause disturbing emissions of electrical discharges,dust,light,
vibration or noise.
G. Whether the operation in pursuance of the use will cause undue interference with the
orderly enjoyment by the public of parking or of recreational facilities, if existing or if
proposed by the Town or by other competent governmental agencies.
H. The necessity for bituminous-surfaced space for purposes of off-street parking of vehicles
incidental to the use and whether such space is reasonably adequate and appropriate and
can be furnished by the owner of the plot sought to be used within or adjacent to the plot
wherein the use shall be located.
I. Whether a hazard to life, limb or property because of fire,flood, erosion.or panic may be
created by reason of or as a result of the use or by the structures to be used therefor or by
the inaccessibility of the property or structures thereon for the convenient entry and
operation of fire and other emergency apparatus or by the undue concentration or
assemblage of persons upon such plot.
J. Whether the use or the structures to be used therefor will cause an overcrowding of land
or undue concentration of population.
K. Whether the plot area is sufficient, appropriate and adequate for the use and the
reasonably anticipated operation and expansion thereof.
L. Whether the use to be operated is unreasonably near to a church, school,theater,
recreational area or other place of public assembly.
--------- -M:-Whether--the site-of-the-pr-oposed-use-is-par-ticularl-y-suitable-for-such-use.--------_._..------------------------.--___._.. ---------
N. Whether adequate buffer yards and screening can and will be provided to protect adjacent
properties and land uses from possible detrimental impacts of the proposed use.
Page 4,August 20,2020 -
#7384SE,HNF Resorts,Inc.
SCTM No, 1000-40-3,-5.
O. Whether adequate provision can and will be made for the collection and disposal of
stormwater runoff, sewage, refuse and other liquid, solid or gaseous waste which the
proposed use will.generate.
P. Whether the natural characteristics of the site.are such that the proposed use may be.
introduced there without undue disturbance or disruption of important natural features, .
systems or processes and without risk of pollution to groundwater and surface waters on
and off the site.
AREA VARIANCE:
FINDINGS OF FACT/REASONS FOR BOARD ACTION:
The Zoning Board of Appeals held a public hearing on this application on August 6,2020 at which time
written and oral evidence were presented. Based upon all testimony,documentation,personal inspection
of the property and surrounding neighborhood,and other evidence,the Zoning Board finds the following
facts to be true and relevant and makes the following findings:
1. Town Law 5267-b(3)(b)(1). Grant of the variance will not produce an undesirable change in the
character of the neighborhood or a detriment to nearby properties. The area where the proposed cabins
are to be located is already cleared for tent camping sites with parking. Due to the size of the property,
and it being adjacent to Moore's Woods,there will be no detrimental effect to the surrounding
neighborhood.
2. Town Law 62674(3042). The benefit sought bythe applicant:cannot be,achieved.by some method,
feasible for the applicant to pursue.,other than an area variance. The proposed cabins are.504 sq.ft. with
a 90 sq.ft. covered porch,(total 594 sq.ft.)which is more than the allowable 450 sq..feet.The applicant's
agent stated that the applicants.determined that they could not adequality fit the modern day needs of
potential campers within the size limits currently permitted by code.
3. Town Law 4267-b(3)(b)(3). The variance granted herein is mathematically substantial, representing
12%relief from the code.However,this variance is mitigated by the fact that the sites are already cleared
for tent camping with prior approvals,the overall square footage for all of the cabins will only be 10,080
square feet of lot coverage over a 23.61-acre property, and that site plan approval by the Planning Board
will be required.
4. Town Law 426.7-b(3)(b)(4). No evidence has been submitted to suggest that a variance in this
residential community will have an adverse impact on the physical or environmental conditions in the
neighborhood. The applicant must comply with Chapter 236 of the Town's Storm Water Management
Code and conditions set by this board.
5. Town Law§267-b(3)(b)(5). The difficulty has been self-created. The applicant purchased the parcel
after the Zoning Code was in effect and it is presumed that the applicant had actual or constructive
knowledge of the limitations on the use of the parcel under the Zoning Code in effect prior to or at the
time of purchase.
6. Town Law U67-b. Grant of the requested relief is the minimum action necessary and adequate to
enable the applicant to enjoy the benefit of 20 seasonal rental cabins while preserving and protecting the
character of the neighborhood and the health,safety and welfare of the community.
Page 5,August 20,2020
#7384SE,HNF Resorts,Inc.
SCTM No. 1000-40-3-5
RESOLUTION OF THE BOARD: In considering all of the above factors and applying the balancing test
under New York Town Law 267-B,motion was offered by Member Lehnert,seconded by Member
Weisman(Chairperson),and duly carried,to
GRANT, a Special Exception, as applied for,and GRANT.the variance as applied for,as shown on the
Site Plan and Architectural Plans prepared by John J. Condon,LPE,last revised.February 17,2020,
SUBJECT TO THE FOLLOWING CONDITION:
1. The applicant must obtain site plan approval from the Planning Board.Failure to do so will
render this Special Exception Permit and variance relief null and void.
NOTE: Violations of Conditions. A violation of any limitation or condition of a special
exception approval or of any provision of this chapter applicable to a special exception.
use shall constitute a violation of this chapter. The Zoning Board ofAppeals shall retain
jurisdiction and shall have the right, after a public hearing to modify, suspend or revoke
such approval or any term or condition thereof or to impose thereon one or more new
conditions,pursuant to Article VCV, Section 280-141.of the Town Code.
Any deviation from the variances) granted herein as shown on the architectural drawings, site plan
and/or survey:cited above, such as.alterations; extensions, or demolitions;..are not authorized under this
application when involving nonconformtties under the.zoning code. This.action.does not authorize'or.
condone any current or future.use, setback or other feature of the subject property that.may violate.the
Zoning Code, other than such uses, setbacks and other featurii.as are.expressly addressed iuthis action.
In the event that this an approval subject to conditions, the approval shall.notbe.deemed effective:until
such time that the foregoing conditions are met,and failure to comply therewith will,render this approval
null and void.
The Board reserves the right to substitute a similar design that is deminimis in nature for an alteration:
that does not increase the degree of nonconformity.
Pursuant to Chapter 280-146(B),of the Code of the Town of Southold.any variance granted by the
Board of Appeals shall become null and void where a Certificate of Occupancy has not been
procured,and/or a subdivision map has not been fled with the Suffolk County Clerk,within three
(3)years from the date such variance was granted. The Board of Appeals may,upon written
request prior to the date of expiration,grant an extension not to exceed three(3)consecutive one(1)
year terms.
Vote of the Board: Ayes:Members Weisman(Chairperson)Acampora,Dantes,Lehnert,and Planamento
(5-0).
L
Leslie Kanes Weisma C hairperson
Approved for filing 12020
BOARD MEMBERS Southold Town Hall
Leslie Kanes Weisman,Chairperson �� !� 53095 Main Road •P.O. Box 1179
Patricia Acampora Southold,NY 1 1 97 1-0959
Eric Dantes G Office Location:
• �O Town Annex/First Floor,
Robert Lehnert,Jr.. �l� 54375 Main Road(at Youngs Avenue)
Nicholas Planamento Co(!(1m,� Southold,NY 11971
http://southoldtownny.gov
ZONING BOARD OF APPEALS
TOWN OF SOUTHOLD �, � j f ,
May 19, 2021 Lr ce. t, V +r
Tel.(631)765-1809•Fax(631)765-9064 �'�
Eileen Wingate
Quite Man Studio MAY 2 0 2021
2805 West Mill Road
Matttuck;NY 119,52 EI;- DEC DEPe
RE: Request for De lVlinimus Deterriiriaton ,
App'ea1`No. 7384SE, FINF Resorts, Inc.
690 Queen Street, Greenport
SCTM No. 1:0004073-5
Dear Ms. Wingate;
I am in receipt of your correspondence, dated May 11, Z021, requesting a de mint mx us determination in the:.
above re0ereneed Zoning Bp
ar 9T Appeals Special Exception Perrnit and Are Variance decision
In your letter;you request a de minirnus approval for a Special Exception and Area Variancey:to construct 20 ,
seasonal use cabins which exceed he ttiaxiinum square feef in areairi accordance with the Town Code,upon
an-existing:carh t6ua You explain that upon recommendation of the Town.'s Planning Board, that.the
revised site plan depicts.a to location of the.cabins.in order to preseive as many trees aspossible,and that the
number of cabins have keen reduced to -1 "Furthermore,you stated that the cabrri,re locations ineet.a11
zoning requirements pursua'nt.:to Ch.apter 253`of the Town Code.
Based upon the information provided,I have determined that your request is de minimus in nature because .
the changes do not increase the degree of non-cQnfor'mity,and the.decision continues to follow the general
standards governing Special.Exception Uses.
Please be advised that conditions set forth in Appeal No. 1384SE still apply. We ask that you submit to our `
office two amended signed and stamped surveys/site plans depicting the aforementioned changes.
Contact our office if you have any further questions or.concerns. I will instruct the office to send a copy of
this letter to the Building Department and the.Planning Department.
Teslie
y,
ties Weisman
Chairperson
cc: Michael Verity, Chief Building Inspector
Heather Lanza; Planning Director
fi
OFFICE LOCATION; wn a a
y r MAILING ADDRESS:
f.�
Town Hall Annex {} z6 S ti P.O.Box 1179
54375 State Route 25 , ' Southold IVY 7 1971.
(cor.Main Rd. &Youngs Ave.)
Southold, NY ° Telephone: 6.3 765 1938
! ::wwwsoulholdtownny.gov
PLANNING BOARD OFFICE
.TOWN,OF-SOUTHOLD. ,
October 6, 2020
Ms. Eileen Wingate
280.5 W6st'Mill:Road / ..
Mattituck,,;NY 11952 '
Re: Site,,Plan Approval: Eastern Long Island Kam.pground Cabins
64500 CR 48 Greenport.
SCTM#1000-40.-3-5
r
Dear Ms. Wingate:
The following resolutions were adopted at-a meeting of the Southold Town Planning Board
on October-5;2020: ...
WHEREAS, this amended site plan is tc replace 33 existing tent sites with the proposed
construction of 20 seasonal cabins at 504 sq.., ft, each and.a 600 sq. ft. pavilion as part of
an existing campground on 23.32 acres in the RR Zoning District,.:Green.port; and
WHEREAS, on December 20, 2019 and January 9, 202.0, Eileen Wingate, authorized
agent, submitted an Amended Site<Plan Application for review; and
WHEREAS, on February 5, 2020 and February 7, 2020, Eileen Wingate, authorized agent,
submitted an.Amended Site Plan Application fee and other information for review; and
WHEREAS, on February 10, 2020, the Southold Town.Planning Board determined the
application as complete for review;.and,:
WHEREAS, on February 10, 2020, the Planning Board, pursuant to State Environmental
Quality Review A--It (SEQRA) 6 NYCRR, Part 617, determined that the proposed action is
an Unlisted Action as it does not meet any of the thresholds of a Type ! Action, nor does it
meet any of the criteria on the.Type':I1 list,.of actions; and
WHEREAS, on February 12, 2020.,:the Rlanning Board, pursuant to.Southold Town .Code
§280-131 C., distributed the application to the required agencies for their comments; and
www.con onenglneenn 'r; �UQ.I ---
� tee. Q✓�� �
�i M l := t " ' r° '...,:;.. ...• x: C �s "a1d�ttti � o-vti�e tir
t
NEW YORK STATE DEPARTMENT OF ENVIRONMENTAL CONSERVATION
'-melon el—ft'h Bile Whii11KZ A,�4' 1%,R-J '
.Suw-@ stmysrodk,50Merle Read,stwW mA 33nt"a
'jt*A3A'4A�"3'+�1s 4"-0272
www.dec,ny.gov
Q6cember 1.2;,�019
Eastern-Long.tstand Kampground:
Sean 'a Mini`.
Gre6ri} t, Phlf.-1 944
RE; Delineation of a portion'of the wetlands adjacent to your property, Eastern Long .
Isiand.Kaulpgrounds(SCTM# 1000-40-3-5)
Dear Mr. Magnuson,
The Qapartment:of Environmental Conservation implements.icte: 4, which is the:::
Fresh Water Wetland.Act Under.Article 24'tha Departmentbas Urisfttion over all
regutated,freshwaterwetlands and 100 feet landward of
those wetlands .Many.actiurties
: ► ; t r d ii rt tecX 7 st i "f " o o f a area
eeroilA.
.
Conduetln+ .these Octivi�abv. ftdU th6bbb fit 4f a ►t fr n tips[ r# nt Is a
violation of Article_2 Qf'the Erv�r+o mentaf,-on.ervafion..Law (ECL)_ n .6NYCRR.F'art
� 3 the.regulations.prorhulgated:.under Article:24). Activities greater#f4an 100 f®et'
from NY,State regulated freshwater wet ands would not require an Article 74
µ rmlt.from thisXieParfinent:
Clf] P313 �y
for the purposes of derwreation the wetland boundary for a propel project in the
southeast:corner of-the property:The management of the facility is proposing to
construct a number of*cabins within the wooded'poMort of the lot; around an existing
cleared trail, all in the southeast corner of the property. 'Staff investigated the wetlands
to the east,south and west of the proposed protect No other wetland on or adXacent
<f + ii+ b
t �'.''#� thy�Ff
To the.east of the project, stafffound the regulated freshwater wetlands.to be greater-
than 200 feet from the property line. As such, staff did"not bother to place any flags to
demarcate the boundary.
ss► a� are aat of
i 'ii
rnrlrt►nro3snt i
Ct„rts�runiton
Tti>tfi�e :#n1. et Von5n ar3d I red : �aho tse
The ra 41e a l It r,-fie e d loser .its°
location than to the east of the project and staff placed seven flags along the wetland
boundary.
To the west and southwest of the project, the wetland moves away from the project,' but
there is a small pocket-of wetland. Staff plaoe±tt:2:flags at the ' where that small
pociket comes.:e es e df .f the.
wettandF fit' 6 e:p_5t and f :' :, t it t 1 fee a t the
property.
The existing:, legally cleared campground.is located to the north of the proposed project
and-there are no reoulated freshwater w.etlandswlthin 100 feet of the project in that
location.
Again,actwities great®r than loo feet from regulated:wetlands do.no#require
ArE�cle 24:permits from:thta Department:The:wetlands come closest to the:prioJect.in
the southwestern portion of the project and may come close to.100 feet from the
pfopertp line You Should.haO 84 d file wetland st ruueyred and places a stifle
pta..forth.e protect#o cor�frm the distances es pa �n fhe field Forthe$mall
ss ances-eafd fAW € �cr. t pf , 4.
. ,{ t r
and fherefore;eny regulated act! ir would be even farther from fihe wetland Va
Qn any site
plan for the project you should show a.Limit of Gleanrtg,:Grading an'd Ground
Dfaturbance line That'is a work line, in that no.work,of any kind would take place.
beyond#fret ale. [f tl at line Es 100 feet-or greater from all of the�+aetlend.flags:Yau..vrc'uld::
opt need ari lrticfe 24 perrnit:frarn this Department.
Sincere
Dan Lewis
� CE W �
ILDING DEPARTMENT- Electrical Inspector
EC 1 1 2023 TOWN OF SOUTHOLD
Town Hall Annex - 54375 Main Road - PO Box 1179
co
Southold, New York 11971-0959
Telephone (631) 765-1802 - FAX (631) 765-9502
,
iamesh(a-)southoldtownny.gov — seand(aDsoutholdtownny.gov
APPLICATION FOR ELECTRICAL INSPECTION
ELECTRICIAN INFORMATION (All Information Required) Date: 11-Dec 2023
Company Name: Woodhollow Contracting, Corp
Electrician's Name: Nicholas Gasparo
License No.: ME-60139 Elec. email: cshcherbelis@woodhollowdesigns.com
Elec. Phone No: 516-827-5916 911 request an email copy of Certificate of Compliance
Elec. Address.: 103 School St Lindenshurst NY 11757
JOB SITE INFORMATION (All Information Required)
Name: HNF Resorts LI /Eastern Long Island Kampground CW21'a
Address: 64500 County Rd 48 Greenport, NY 11944
Cross Street:
Phone No.:
BIdg.Permit; q:�,3 __ __.... _ ._ . _.. email: sean@magnuson.one
Tax Map District: 1000 Section: Block: Lot:
BRIEF DESCRIPTION OF WORK, INCLUDE SQUARE FOOTAGE (Please Print Clearly):
800 AMP Meter Pump
2-400 Amp Switches
4 Main Breaker Panels
20 Sub panels Square Footage:
Circle All That Apply:
Is job ready for inspection?: YES ❑X NO ❑Rough In Final
Do you need a Temp Certificate?: YES NO Issued On
Temp Information: (All information required)
Service SizeF11 Ph❑3 Ph Size: A # Meters Old Meter#
❑New Service0 Fire ReconnectDFlood Reconnect OService Reconnect❑Underground Eloverhead
# Underground Laterals 1 2 H Frame Pole Work done on Service? Y DN
Additional Information:
PAYMENT DUE WITH APPLICATION Li 116le
PERMIT 4 Address
SWltches
O ulletS
GFI's
Surface
Sconces
H H's
UC Lts
Fans Fridge HW
Exhaust Oven WAD
smokes DW Mini
-arbon Micro Generator
-ombo Cooktop Transfer
ar AH Hood Service
Amps Have Usec
-pedal
:on,ments
PERIVIIT# 3 :A00NSS: HNF Resorts LI LLC
Eastern Long Island Kampground
:'SWAthes ct 64500;CR 48 /690 Queen St
Greenport, NY 11944
Outlets
Tax Map ID: 1000-40-03-05
GFrs c 2-
Surface
Sconces
-Ws 0
UC US 0 Fridge 1 HW
Fans C> Mijifr. 0 -W/D fibi
.Pump
kfip
. .Exhaust 1 �Oven sump 0 Hea ter
Trntftnr A114-
Smokes 3 Ow Generator 0
- Salt=Gen.
e-
,80pd
Carbon 0 Micro I GrbD!s 0 W t.
Lights
'
Heat -Pucks 0 ERV 0 1 V
OrTUDLS
lnst=Hot Q -D;eHum0 Transfer P
Desc
Combo 0 Coo*top C) Minisplit I--Over'WIT Alower
JV f�-
AC o AH o 'Ado:d 0 Bldwer
Hav e Used
Service ®:Amps
Sub t Oz5 Amps X Have Used
Comments
r---NRE=11 Lap
g Depclrtmerd
yf:.7s I DCV in
PROPOSED 2"0 ATER MAIN SAF
S-Tco ER l:-"•::1'';':' ® _�
1 ono N PROPOSED 4"0 WATER MAIN
#18ca
#4
II I Q
rn
O INV -LLU ` QN4N
Nm DECK
" I DW _0 DECK -I
i
(�►
I #2 :!. :. L: I .I (°
::i :::::`t': (n
Culp
Az
,s.i DECK
AMR: AIT
/ DECK
ES
--_-- / AMP
CAW SrTE/u — DECK x rm #3
/ PAYlLUON'
:��✓ : . DECK Sk
im
"` o #14s
>a\ A I I
Afq
JIM
DC
VFE
. _ _
% 4" \-
t>-e -
:•.
- — _ - , - - -
C /
J.
05
DECKI I
\ !y a
dF
VILLAGE OF
/ I
\ :k __r: G( ENPORT
VACANT LAND
_ \ .tos / j .., :/ � �••/tx1Ld, ... I�,Q\ 1..->"•:_,1*;:•F.. v ,
rm #7
A.
y #13
` o \.•_:.`�, -sue: .� ::`' \ \
` rs
c�m,..mwa>�as .pm.b.ye"m:yea,",,,aea"tQ
x24
ROPOS 4gW \ ;p \ \ #9 tneasi.w�e:.�.cma.rnr,m ma..avamaowmaaefta..we,
xBS \ / � AT \ V �
` Scale: 1"=20'-0"
N Condon Engineering, P.C. Eastern Lon
>0 4wHK � _� Drawn by:JJC 1755 Sigsbee Road Camp Grounds S P-�
"X Mattituck,New York 11952
O p Date:3.13-2021 (631)298-1986 690 Queen Street
O O Greenport.New York
i�. ntbUK i RESIDENTIAL(RR)ZONE
14. THE SITE IS SERVICED BY THE GREENPORT SEWER DISTRICT,GREENPORT ELECTRIC
AND SUFFOLK COUNTY WATER AUTHORITY.
[tiffolk
Lin®(S) UST Be Inspected By The
County Dept. Of Huth Services;
Call 852-5754, 48 Hours In Advance
To 3cheduie fr>$pectfon(s).
ENOINIEER'S CERTIFICATION REQUIRED.
SUBMIT P.E. QR R.A. CERTIFICATION
FOR INSTALLATION AND CONSTRUCTION
OF
,� -Srw �i•cs ��
FOR FINALAPFROVAt. Tysie.� �.,i lleco., f'
Q o o w
a� ro
APR 0.2' 2021
0 1. Q 1 a E
17, W TJ P
4/2I2021S COMMENTS -
36/11 CABIN RE1/ISIONS
8 10121/26/2020 SCDHS COMMENTS
.9/28/202UTOWN.C.OM 'EN
TS.
�c w ', 7/22/2020'REV BL'DGS.
c Z v 4 9 �, p A 6%22/2020$001HS.COMMENTS
SCDHS,:COMMEfTS
5/26/2020: CDMS:GOMMENTB
� � � o o � .�� ► � ft!_VISIONS,
c� in . 'Co a)
� O
HEALTH DEPARTMENT APPROVAL STAMP
r
- n W
0 19'2
S.C.T.M.: DIST. 1000 SEC.40 BLK, 03 LOT:05 £SSIO�A�"� I
idon Engineering, P.C. EASTERN LONG ISLAND I
KAMPGROUND
1755 Sigsbee Road 690 QUEEN STREET
Mattituck, New York 11952 GREENPORT, NY 11944 of
(631) 298-1986 (631) 298-2651 fax
www.condonengineering.com� OVERALL SANITARY PLAN
e�
SUBJECT
PREMISES
KEY MAP
SCALE t'=soo'
I
SHEET 1 OF 2
SLIFFOLK COUNTY DEPARTMENT OF HEALTH SERVICES
APPROVAL OF CONSTRUCTED WORKS
DATE _ 7/23/25 H,S, Red. No C-20-0055
The sewage disposa; and eater supply facilities
at this location have been inspected and/or
certified by t,)is departs-entor otter agenc6s
and found to be satisfactory
JO:vA T HA�N PAI. P E. CHIEF
OFFICE OF WASTEVVXFER MANAGEMENT
COMcheck Software Version 4.1.5.1a,� -
Envelope Compliance Certific j
Project Information ''
4
Energy Code: 90.1 (2016)'Standard
Project Title: Eastern Long Island Campground4 Bedroom Cabin
Location: Greenport New York
Climate Zone:"
Project Type: New Construction
Vertical Glazing/Wall Area: 10%.
Performance Sim.Specs: 'EnergyPlt s 8A-.*O 009{EPW! USA_CT,-Bridgeport-Sikorsky.Mem.AP.725040 TMY3.epw)
Construction,Site: Owner/Agent .' Designer/Contractor
690'.Queen Street East Qrn Lpn Island-Campground John J.Condon,;P E..
Greenport,NY ,,:Fh:_.. ;.•..>
Condon Engineering, PC
1755 Sigsbee Road
Mattituck, NY 11952
631-298-1986
Building Area Floor Area.
1-Motel : Residential 499
Envelope Assemblies
Assembly Gross Area . Cavity Cont. Proposed . .B.udget U-
or RWValue R-Value U-Factor Factor(a)
Perimeter
Roof 1:Attic'Roof with Wood Joists,[Bldg:.Use 1-Moteq 499 49:0 0.0 0.021 0.021
Floor 1:Wood-Framed,[Bldg..Use 1 Motel] 499 30.0 0.0 0.033 . 0.033
NORTH
Exterior Wall 3:Wood-Framed, 16"o.c_,[Bldg.Use 1-Motel] 144 21:0 0.0 0.062 0.064
Window:6:Wood Frame:Operable,Perf.Specs.:Product ID CXW14, 10 — — 0.260 0.310
SHGC 0.34,VT 0.57,[Bldg.Use 1-Moteq(b)
Window 7:Wood Frame:Operable,Perf.Specs.:Product ID CXW14, .10 — — 0.260 0.310
SHGC 0.34,VT 0.57,[Bldg.Use 1-Motel](b)
EAST
Exterior Wall 2:Wood-Framed,16"o.c.,[Bldg.Use 1-Motel] 224 21.0 0.0 0.062 0.064
Window 3:Wood Frame:Operable,Perf.Specs.:Product ID CW13, 5 0:260 0.31.0
SHGE 0.34;VT 0.57,:[Bldg:Use-1-=-Motel]-(b)-
Window 4:Wood Frame:Operable,Perf.Specs.:Product ID CX14, 10 — — 0.260 0.310
SHGC 0.34,VT 0.57,[Bldg.Use 1-Motel](b)
Window 5:Wood Frame:Operable;Perf.Specs.:Product ID CX14, 10 — 0.260 0.310
SHGC 0.34,VT l).57,[Bldg.Use 1-Motel](b)
SOUTH .
Exterior Wall 1:'Wood-Framed, 16"o.c.,[Bldg.Use 1-Motel] 144 21.0 0.0 . 0.062 0.064
Window 1:Wood Frame:Operable,Perf.Specs.:Product ID CXW14, 10 — = 0.260 0.310
SHGC 0:34,VT 0.57,[Bldg.Use 1 -Motel](b)
Window 1 copy 2:Wood Frame:Operable,Perf.Specs.:Product ID 10 — — 0.260 0.310
CXW14,SHGC 0.34,VT 0.57,[Bldg.Use 1-Motel](b)
Door 1:Wood,Swinging,[Bldg.Use 1-Motel] 2 — — 0.300 0.370
Project Title: Eastern Long Island Campground-2 Bedroom.Cabin Report date: .03/05/21
Data filename: C:\Users\Owner\Favorites\ComChecks\2 Bedroom Cottage.cck Page 1 of 10
Assembly. Gross Area Cavity Cont. Proposed Budget U-
:W or R-Value R-Value, U-Factor Factor(.)
Perimeter
� WEST
Exterior Wall 4:Wood-Framed, 16"o.c.,[Bldg.Use 1 -Motel] 224 21.0 0.0 0.062 0.064
Window 7:Wood Frame:Operable,Perf.Specs.:Product ID CW13, 5 — — 0.260 0.310
-`' SHGC 0.34,VT 0.57,[Bldg.Use 1-Motel](b)
(a)Budget U-factors are used for software baseline calculations ONLY,and are not code requirements.
(b)Fenestration product performance must,be-certified.in accordance•with-NFRC and requires supporting documentation.
Envelope PASSES:'Ddsign-1%better than code
Envelope Compliance Statement`
Corrp,liance Staters The proposed envelope design;represented,.in this document is.consistent with the.building plans,
specifcations,an 'other calculations submitted with this permit application:.The proposed envelope systems have been
designed to meet the 90.1 (2016)Standard re q . ements in COMcheck Version 4.1.5.1 and to comply with any applicable
mandatory requirements listed in the Inspection klist.
Name Title.. Date• .
Project Title: Eastern Long Island Campground-2,Bedroom Cabin Report date: 03/05/21
Data filename: C:\Users\Owner\Favorites\ComChecks\2 Bedroom Cottage.cck Page 2 of 10
CABIN #2
Fire Sprinkler Reports
for
Eastern:Long Island Campground,
690 Queen Street
Greenpoit, New York
OF NEW,,,
J- CC7✓D
oy
APPROVED AS NOTE 1684
DATE:- Z/ Z B.P #
FEE 3!P0 BY: Prepared By:
NOTIFY FIRE MARSHAL AT 631-765-1802
FOR THE FOLLOWING INSPECTIONS: John Condon
1. ROUGH INSPECTION Condon Engineering,P.C.
2. COMPLIANCE TESTING 1755 Sigsbee Road
3. FINAL INSPECTION Mattituck,New York
631-298-1986
ALL WORK SHALL COMPLY WITH NYS January 31,2024
CODES AND APPLICABLE NFPA
STANDARDS
Fire-Fire Sprinkler Hydraulics Calculation Program Elite Software Development,Inc.
Condon Engineering Sri i �'ti Cabin#2
Mattituck, NY 11952 :,` Page 2
General Project Data Report
General Data
Project Title: Cabin#2 Project File Name: Cabin 2..fiw
Designed By: John Condon Date: January 31, 2024
Code Reference: NFPA 13 R Approving Agency: LOCAL JURISDICTION
Client Name: - Eastern Long Island Campground Phone:
Address: 690 Queen Street City, State Zip Code: Greenport, New York
Company Name: Condon Engineering, P.C. Representative: John Condon
Company Address: 1755 Sigsbee Road City And State: Mattituck, New York
Phone: 631-298-1986
Building Name: Cabin#2 Building Owner:
Contact at Building: Phone at Building:
Address Of Building: 600 Queen Street City, State Zip Code: Greenport, New York
Project Data
Description Of Hazard: Light Hazard Sprinkler System Type: Wet
Design Area Of Water Application: 144 ftz Maximum Area Per Sprinkler: 144 ftz
Default Sprinkler K-Factor: 5.60 K Default Pipe Material: SCHED 40 STEEL RLK
Inside Hose Stream Allowance: 0.00 gpm Outside Hose Stream Allowance: 0.00 gpm
In Rack Sprinkler Allowance: 0.00 gpm
Sprinkler Specifications
Make: Reliable Model: G5-56
Size: 1/2 Temperature Rating: 135 F
NONE
Water Supply Test Data
Source Of Information: SCWA
Test Hydrant ID: 825134000 Date Of Test: 1-11-2021
Hydrant Elevation: 0 ft Static Pressure: 66.00 psi
Test Flow Rate: 1503.00 gpm Test Residual Pressure: 52.00 psi
Calculated System Flow Rate: 91.70 gpm Calculated Inflow Residual Pressure: 51.59 psi
Available Residual Pressure At 65.92 psi
System Flow:
Calculation Project Data
Calculation Mode: Demand
HMD Minimum Residual Pressure: 7.00 psi Minimum Desired Flow Density: 0.09 gpm/ftz
Maximum Water Velocity: 20.00 ft/s Maximum Frictional Loss/100 feet: 20.00 psi
Number Of Active Nodes: 26
Number Of Active Pipes: 25 Number Of Inactive Pipes: 0
Number Of Active Sprinklers: 6 Number Of Inactive Sprinklers: 0
C:\...\Cabin 2.fiw Wednesday, January 31, 2024, 12:30 PM
Fire-Fire Sprinkler Hydraulics Calculation Program Elite Software Development;Inc.
Condon Engineering !1 # Cabin#2
Mattituck;AY 11952 'ti Pa e 3
Fire Sprinkler Input'Data
�Node�InputData- �, �� �; r k � � � .
ry,
low
,e !" M. ...4. ,.rY.. b :din ,La 4 d
Area Group Sprinkler Pressure Node Elev(ft) Non-Sprinkler
Node Node Description Branch Dia. KFactor(K) Estimate (psi) Branch Non- Flow(gpm)
No. Branch Description (in) Branch Len. Branch Stnd Stnd Fittings Branch Sprk
(ft) Fittings (ft) KFactor(K)
1 Sprinkler A 5.60 7.80 11.00 0.00
--- 0.000 0.0 ---- 0.0 0.00
2 Sprinkler A 5.60 7.72 - 11.00 0.00
--- 0.000 0.0 ---- 0.0 0.00
3 Sprinkler A 5.60 7.70 11.00 0.00
---- 0.000 0.0 ---- 0.0 0.00
4 Sprinkler A 5.60 7.46 11.00 0.00
--- 0.000 0.0 ---- 0.0 0.00
5 Sprinkler A 5.60 7.03 11.00 0.00
---- 0.000 0.0 ---- 0.0 0.00
6 Sprinkler A 5.60 7.00 11.00 0.00
---- 0.000 . 0.0 ---- 0.0 0.00
7 No Discharge ---- N/A 8.11 11.00 0.00
---- 0.000 0.0 ---- 0.0 0.00
8 No Discharge ---- N/A 8.13 11.00 0.00
--- 0.000 0.0 ---- 0.0 0.00
9 No Discharge ---- N/A 8.19 11.00 0.00
---- 0.000 0.0 ---- 0.0 0.00
10 No Discharge --- N/A 8.66 11.00 0.00
--- 0.000 0.0 ---- 0.0 0.00
11 No Discharge ---- N/A 8.50 11.00 0.00
---- 0.000 0.0 --- 0.0 0.00
12 No Discharge ---- N/A 9.14 11.00 0.00
---- 0.000 0.0 ---- 0.0 0.00
13 No Discharge ---- N/A 16.68 -3.00 0.00
--- 0.000 0.0 ---- 0.0 0.00
15 No Discharge ---- N/A 19.74 -3.00 0.00
--- 0.000 0.0 --- 0.0 0.00
16 No Discharge ---- N/A 18.19 3.00 0.00
---- 0.000 0.0 ---- 0.0 0.00
17 No Discharge ---- N/A 24.20 3.00 0.00
--- 0.000 0.0 ---- 0.0 0.00
C:\...\Cabin 2.fiw Wednesday, January 31, 2024, 12:30 PM
Fire-Fire Sprinkler Hydraulics Calculation Program Elite Software Development,Inc.
Condon Engineering i 1� Cabin#2
Mattituck,NY 11952 r,yam,,, Page 4
Fire'Sprinkler Input Data
Node'Input 'Data
Area Group Sprinkler Pressure Node Elev(ft) Non-Sprinkler
Node Node Description Branch Dia. KFactor(K) Estimate(psi) Branch Non- Flow(gpm)
No. Branch Description (in) Branch Len. Branch Stnd Stnd Fittings Branch Sprk
(ft) Fittings (ft) KFactor(K)
1$ No Discharge ---- N/A 28.35 -4.00 0.00
---- 0.000 0.0 ---- 0.0 0.00
20 No Discharge ---- N/A 28.72 -4.00 0.00
--- 0.000 0.0 ---- 0.0 0.00
30 No Discharge -- N/A 29.23 -4.00 0.00
--- 0.000 0.0 ---- 0.0 0.00
31 No Discharge ---- N/A 30.51 -4.00 0.00
--- 0.000 0.0 ---- 0.0 0.00
32 No Discharge ---- N/A 30.93 -4.00 0.00
---- 0.000 0.0 ---- 0.0 0.00
33 No Discharge ---- N/A 35.03 -4.00 0.00
---- 0.000 0.0 ---- 0.0 0.00
No Discharge ---- N/A 36.32 -4.00 0.00
35 _-_ 0.000 0.0 ---- 0.0 0.00
36 No Discharge --- N/A 42.54 -4.00 0.00
-- 0.000 0.0 ---- 0.0 0.00
37 No Discharge ---- N/A 51.28 4.00 0.00
--- 0.000 0.0 ---- 0.0 0.00
40 No Discharge ---- N/A 51.59 4.00 0.00
--- 0.000 0.0 ---- 0.0 0.00
C:\...\Cabin 2.fiw Wednesday, January 31, 2024, 12.30 PM
Mattituck,NY"11952`'Hydraulics a c ulation.Program:
enkler nng Elite Software Development Inc.
It ! ti< Cabin"#2
Condon'Engp e ; ,... _. _ ,.. .. �.4 .: _ ...
Fire Sprinkler Input Data .
Pipe Input Data
Nominal Nominal Fitting Total CFactor
Beg. End. pipe Description Diameter Type Fitting Length Length Length (gpm/inch-
Node Node (inch) Group Data (feet) (feet) (feet) psi)
1 11 SCHED 40 STEEL BLK 1.000 0 T 5.00 3.50 8.50 120
2 11 SCHED 40 STEEL BLK 1.000 0 T 6.00 3.50 9.50 120
3 9 SCHED 40 STEEL BLK 1.000 0 T 2.50 3.50 6.00 120
4 8 SCHED 40 STEEL BLK 1.000 0 T 5.00 3.50 8.50 120
5 7 SCHED 40 STEEL BLK 1.000 0 ET 9.50 4.90 14.40 120
6 7 SCHED 40 STEEL BLK 1.000 0 ET 10.00 4.90 14.90 120
7 8 SCHED 40 STEEL BLK 2.000 0 1.50 0.00 1.50 120
8 9 SCHED 40 STEEL BLK 2.000 0 3.00 0.00 3.00 120
9 10 SCHED 40 STEEL BLK 2.000 0 T 5.50 7.10 12.60 120
11 10 SCHED 40 STEEL BLK 2.000 0 T 7.50 7.10 14.60 120
10 12 SCHED 40 STEEL BLK 2.000 0 E 2.50 3.50 6.00 120
12 13 SCHED 40 STEEL BLK 2.000 0 E 15.00 3.50 18.50 120
13 15 SCHED 40 STEEL BLK 2.500 0 ET 78.00 12.70 90.70 120
15 16 SCHED 40 STEEL BLK 2.000 0 2E 6.00 7.00 13.00 120
16 17 Backflo Prev 6.000 Loss
17 18 SCHED 40 STEEL BLK 2.000 0 2E 7.00 7.00 14.00 120
18 20 SCHED 40 STEEL BLK 2.500 0 T 2.50 8.50 11.00 120
20 30 SCHED 40 STEEL BLK 4.000 0 165.00 0.00 165.00 120
30 31 SCHED 40 STEEL BLK 4.000 0 EL 400.00 11.30 411.30 120
31 32 SCHED 40 STEEL BLK 4.000 0 T 120.00 14.20 134.20 120
32 33 SCHED 40 STEEL BLK 3.000 0 21-T 332.00 17.70 349.70 120
33 35 SCHED 40 STEEL BLK 3.000 0 111.00 0.00 111.00 120
35 36 Backflo Prev 6.200 Loss
36 37 SCHED 40 STEEL BLK 2.000 0 2L 105.00 4.20 109.20 120
37 40 SCHED 40 STEEL BLK 6.000 0 T 712.00 21.40 733.40 120
CA...\Cabin 2.fiw Wednesday, January 31, 2024, 12:30 PM
Fire-Fire Sprinkler Hydraulics Calculation Program Elite Software Development,Inc.
Condon Engineering i1 i N Cabin#2;
Mattituiik;NY 11952 : rlri ... Page 6
Fire Sprinkler.Output Data
Ou rall Node 03'rso�upi,�gs Output Data �M.Ull ;r ftot
Pipe Segment Pipe Pipe Sprinkler Flow Non-Sprinkler Flow Beg. Node Imbalance
Beg. End. Type Flow Rate At Beg. Node Out(+) In (-) Residual Flow At Beg.
Node Node Group (gpm) (gpm) (gpm) (gpm) Pressure(psi) Node(gpm)
1 11 0 -15.64 15.64 0.00 0.00 7.80
2 11 0 -15.56 15.56 0.00 0.00 7.72 0.00011
3 9 0 -15.54 15.54 0.00 0.00 7.70 0.00012
4 8 0 -15.29 15.29 0.00 0.00 7.46 0.00010
5 7 0 -14.85 14.85 0.00 0.00 7.03 0.00007
6 7 0 -14.82 14.82 0.00 0.00 7.00 0.00008
7 5 0 14.85 0.00 0.00 0.00 8.11 -0.00007
7 6 0 14.82
7 8 0 -29.67
8 4 0 15.29 0.00 0.00 0.00 8.13 0.00000
8 7 0 29.67
8 9 0 -44.96
9 3 0 15.54 0.00 0.00 0.00 8.19 0.00000
9 8 0 44.96
9 10 0 -60.50
10 9 0 60.50 0.00 0.00 0.00 8.66 0.00000
10 11 0 31.20
10 12 0 -91.70
11 1 0 15.64 0.00 0.00 0.00 8.50 -0.00000
11 2 0 15.56
11 10 0 -31.20
12 10 0 91.70 0.00 0.00 0.00 9.14 0.00000
12 13 0 -91.70
13 12 0 91.70 0.00 0.00 0.00 16.68 0.00000
13 15 0 -91.70
15 13 0 91.70 0.00 0.00 0.00 19.74 0.00000
15 16 0 -91.70
16 15 0 91.70 0.00 0.00 0.00 18.19 -0.03947
16 17 0 -91.74
17 16 0 91.74 0.00 0.00 0.00 24.20 0.03947
17 18 0 -91.70
18 17 0 91.70 0.00 0.00 0.00 28.35 0.00000
18 20 0 -91.70
CA...\Cabin 2.fiw Wednesday, January 31, 2024, 12:30 PM
Fire-Fire Sprinkler Hydraulics Calculation Program Elite Software Development,Inc.
ft4
Condon Engineering Cabin#2
Mattituck, NY 11952 Page 7
Fire Sprinkler Output Data
11
Overalls Node,:Groupings .Output Data.(cont',d),
,Pipe Segment Pipe Pipe Sprinkler Flow Non-Sprinkler Flow Beg. Node Imbalance
Beg, End. Type Flow Rate At Beg. Node Out(+) In (-) Residual Flow At Beg.
Node Node Group (gpm) (gpm) (gpm) (gpm) Pressure(psi) Node(gpm)
20 18 0 91.70 0.00 0.00 0.00 28.72 0.00000
20 30 0 -91.70
30 20 0 91.70 0.00 0.00 0.00 29.23 0.00000
30 31 0 -91.70
31 30 0 91.70 0.00 0.00 0.00 30.51 0.00000
31 32 0 -91.70
32 31 0 91.70 0.00 0.00 0.00 30.93 0.00000
32 33 0 -91.70
33 32 0 91.70 0.00 0.00 0.00 35.03 0.00000
33 35 0 -91.70
35 33 0 91.70 0.00 0.00 0.00 36.32 -0.03947
35 36 0 -91.74
36 35 0 91.74 0.00 0.00 0.00 42.54 0.03947
36 37 0 -91.70
37 36 0 91.70 0.00 0.00 0.00 51.28 0.00000
37 40 0 -91.70
40 37 0 91.70 0.00 0.00 -91.70 51.59
CA...\Cabin 2.fiw Wednesday, January 31, 2024, 12:30 PM
Fire Fire Sprinkler Hydraulics Calculation Program Elite.Software Development,Inc.
Condon Engineering r �� ' Cabin#2
Mattituck,NY 11952 i11ti. Page 8
Fire Sprinkler Output Data
Overall Pipe Output Data
Beg. Nodal Spk/Hose Residual Nom. Dia. q (gpm) F. L./ft Pipe-Len. pF-(psi)
Elevation Q (gpm) (psi/ft) Fit-Len.
End. KFactor Discharge Pressure Inside Dia. PE-(psi)
Node (K) (feet) WPM) (psi) C-Value Velocity Fittings Tot-Len. PT-(psi)
(fps) Type-Grp (ft)
5 5.60 11,00 14.85 7.03 1.00 14.85 0.07505 9.50 1.081
7 0.00 11.00 0.00 8.11 1.049 14.85 ET 4.90 0.000
SCHED 40 STEEL BLK 120 5.51 0 14.40 1.081
6 5.60 11.00 14.82 7.00 1.00 14.82 0.07473 10.00 1.113
7 0.00 11.00 0.00 8.11 1.049 14.82 ET 4.90 0.000
SCHED 40 STEEL BLK 120 5.50 0 14.90 1.113
4 5.60 11.00 15.29 7.46 1.00 15.29 0.07921 5.00 0.673
8 0.00 11.00 0.00 8.13 1.049 15.29 T 3.50 0.000
SCHED 40 STEEL BLK 120 5.68 0 8.50 0.673
7 0.00 11.00 0.00 8.11 2.00 0.00 0.00993 1.50 0.015
8 0.00 11.00 0.00 8.13 2.067 29.67 ----- 0.00 0.000
SCHED 40 STEEL BLK 120 2.84 0 1.50 0.015
3 5.60 11.00 15.54 7.70 1.00 15.54 0.08165 2.50 0.490
9 0.00 11.00 0.00 8.19 1.049 15.54 T 3.50 0.000
SCHED 40 STEEL BLK 120 5.77 0 6.00 0.490
8 0.00 11.00 0.00 8.13 2.00 0.00 0.02142 3.00 0.064
9 0.00 11.00 0.00 8.19 2.067 44.96 ----- 0.00 0.000
SCHED 40 STEEL BLK 120 4.30 0 3.00 0.064
9 0.00 11.00 0.00 8.19 2.00 0.00 0.03710 5.50 0.468
10 0.00 11.00 0.00 8.66 2.067 60.50 T 7.10 0.000
SCHED 40 STEEL BLK 120 5.78 0 12.60 0.468
11 0.00 11.00 0.00 8.50 2.00 0.00 0.01090 7.50 0.159
10 0.00 11.00 0.00 8.66 2.067 31.20 T 7.10 0.000
SCHED 40 STEEL BLK 120 2.98 0 14.60 0.159
1 5.60 11.00 15.64 7.80 1.00 15.64 0.08259 5.00 0.702
11 0.00 11.00 0.00 8.50 1.049 15.64 T 3.50 0.000
SCHED 40 STEEL BLK 120 5.81 0 8.50 0.702
2 5.60 11.00 15.56 7.72 1.00 15.56 0.08185 6.00 0.778
11 0.00 11.00 '0.00 8.50 1.049 15.56 T 3.50 0.000
SCHED 40 STEEL BLK 120 5.78 0 9.50 0.778
10 0.00 11.00 0.00 8.66 2.00 0.00 0.08010 2.50 0.481
12 0.00 11.00 0.00 9.14 2.067 91.70 E 3.50 0.000
SCHED 40 STEEL BLK 120 8.77 0 6.00 0.481
12 0.00 11.00 0.00 9.14 2.00 0.00 0.08010 15.00 1.482
13 0.00 -3.00 0.00 16.68 2.067 91.70 E 3.50 6.062
SCHED 40 STEEL BLK 120 8.77 0 18.50 7.544
CA...\Cabin 2.fiw Wednesday, January 31, 2024, 12:30 PM
Fire-Fire Sprinkler Hydraulics Calculation Program Elite Software Development,Inc.
Condon Engineering !+' Cabin#2
Mattituck, NY 11952 E s�W: Page 9
Fire Sprinkler Output Data
Qverall Pipe Output Data (cont'd)
Beg. Nodal Spk/Hose Residual Nom. Dia. q(gpm) F. L./ft Pipe-Len. PF-(psi)
Elevation Q WPM) (psi/ft) Fit-Len.
End. KFactor Discharge Pressure Inside Dia. PE-(psi)
Node (K) (feet) (gpm) (psi) C-Value Velocity Fittings Tot-Len. PT-(psi)
(fps) Type-Grp (ft)
13 0.00 -3.00 0.00 16.68 2.50 0.00 0.03371 78.00 3.057
15 0.00 -3.00 0.00 19.74 2.469 91.70 ET 12.70 0.000
SCHED 40 STEEL BLK 120 6.15 0 90.70 3.057
15 0.00 -3.00 0.00 19.74 2.00 0.00 0.08010 6.00 1.041
16 0.00 3.00 0.00 18.19 2.067 91.70 2E 7.00 -2.598
SCHED 40 STEEL BLK 120 8.77 0 13.00 -1.557
16 Backflo 3.00 18.19 91.74
Prev
17 6.00 psi 3.00 24.20
17 0.00 3.00 0.00 24.20 2.00 0.00 0.08010 7.00 1.121
18 0.00 4.00 0.00 28.35 2.067 91.70 2E 7.00 3.031
SCHED 40 STEEL BLK 120 8.77 0 14.00 4.152
18 0.00 4.00 0.00 28.35 2.50 0.00 0.03371 2.50 0.371
20 0.00 4.00 0.00 28.72 2.469 91.70 T 8.50 0.000
SCHED 40 STEEL BLK 120 6.15 0 11.00 0.371
20 0.00 -4.00 0.00 28.72 4.00 0.00 0.00312 165.00 0,514
30 0.00 -4.00 0.00 29.23 4.026 91.70 --- 0.00 0.000
SCHED 40 STEEL BLK 120 2.31 0 165.00 0.514
30 0.00 -4.00 0.00 29.23 4.00 0.00 0.00312 400.00 1.282
31 0.00 -4.00 0.00 30.51 4.026 91.70 EL 11.30 0.000
SCHED 40 STEEL BLK 120 2.31 0 411.30 1.282
31 0.00 -4.00 0.00 30.51 4.00 0.00 0.00312 120.00 0.418
32 0.00 -4.00 0.00 30.93 4.026 91.70 T 14.20 0.000
SCHED 40 STEEL BLK 120 2.31 0 134.20 0.418
32 0.00 -4.00 0.00 30.93 3.00 0.00 0.01170 332.00 4.093
33 0.00 4.00 0.00 35.03 3.068 91.70 2LT 17.70 0.000
SCHED 40 STEEL BLK 120 3.98 0 349.70 4.093
33 0.00 4.00 0.00 35.03 3.00 0,00 '0.01170 111.00 1.299
35 0.00 -4.00 0.00 36.32 3.068 91.70 ----- 0.00 0.000
SCHED 40 STEEL BLK 120 3.98 0 111.00 1.299
35 Backflo -4.00 36.32 91.74
Prev
36 6.20 psi -4.00 42.54
CA...\Cabin 2.fiw Wednesday, January 31, 2024, 12:30 PM
i Fire-Fire Sprinkler Hydraulics Calculation Program Elite Software Development,Inc..
Condon Engineering ,f/ "0 Cabin#2
Mattituck,NY 11952 {, .' Page 10
Fire Sprinkler Output Data -
Overall Pipe Output Data (conVd)
q (gpm) F. L./ft Pipe-Len.
Beg, Nodal Spk/Hose Residual Nom. Dia. PF-(psi)
Elevation Q WPM) (psi/ft) Fit-Len.
End. KFactor (feet) Discharge Pressure Inside Dia. Velocity Fittings Tot-Len. PE-(psi)
Node (K) (gpm) (psi) C-Value (fps) Type-Grp (ft) PT-(psi)
36 0.00 -4.00 0.00 42.54 2.00 0.00 0.08010 105.00 8.746
37 0.00 -4.00 0.00 51.28 2.067 91.70 2L 4.20 0.000
SCHED 40 STEEL BLK 120 8.77 0 109.20 8.746
37 0.00 -4.00 0.00 51.28 6.00 0.00 0.00042 712.00 0.311
40 0.00 -4.00 0.00 51.59 6.065 91.70 T 21.40 0.000
SCHED 40 STEEL BLK 120 1.02 0 733.40 0.311
CA...\Cabin 2.fiw Wednesday, January 31, 2024, 12:30 PM
Fire-Fire Sprinkler Hydraulics Calculation Program i Elite Software Development,Inc.
Condon Engineering 'k Cabin#2
Mattituck, NY 11952 'r Page 11
Fire Sprinkler Output Data
Overall Sprite er Output Data
Flowing Area Group Sprinkler Sprinkler Residual Flowing Area Flowing Sprinkler
Sprinkler Elevation Pressure 2 Density Discharge
Node No. Code KFactor(K) (feet) (psi) (ft ) (gpm/ft2) (gpm)
1 A 5.60 11.00 7.80 144.00 0.109 15.64
2 A 5.60 11.00 7.72 144.00 0.108 15.56
3 A 5.60 11.00 7.70 144.00 0.108 15.54
4 A 5.60 11.00 7.46 144.00 0.106 15.29
5 A 5.60 11.00 7.03 144.00 0.103 14.85
6 A 5.60 11.00 7.00 144.00 0.103 14.82
Sub Totals For Group A 864.00 0.106 91.70
Totals For All Groups 864.00 0.106 91.70
J
C:\...\Cabin 2.fiw Wednesday, January 31, 2024, 12:30 PM
Fire Fire Sprinkler Hydraulics Calculation Program - Elite Software Development,.Inc.
Condon Engineering K, Cabin#2
Mattituck,NY 11952 Page 12
Fire Sprinkler Output Summary.
Hydraulically Most Demanding Sprinkler Node
HMD Sprinkler Node Number: 6
HMD Actual Residual Pressure: 7.00 psi
HMD Actual Flow: 14.82 gpm
Sprinkler Summary
Sprinkler System Type: Wet
Specified Area Of Application: 144.00 ft2
Minimum Desired Density: 0.090 gpm/ft2
Application Average Density: 0.637 gpm/ft2
Application Average Area Per Sprinkler: 24.00 ft2
Sprinkler Flow: 91.70 gpm
Average Sprinkler Flow: 15.28 gpm
Flow Velocity And Imbalance Summary
Maximum Flow Velocity( In Pipe 10- 12) 8.77 ft/sec
Maximum Velocity Pressure ( In Pipe 10- 12 ) 0.52 psi
Allowable Maximum Nodal Pressure Imbalance: 0.0100 psi
Actual Maximum Nodal Pressure Imbalance: 0.0094 psi
Actual Average Nodal Pressure Imbalance: 0.0025 psi
Actual Maximum Nodal Flow Imbalance: 0.0395 gpm
Actual Average Nodal Flow Imbalance: 0.0061 gpm
Overall Network Summary
Number Of Unique Pipe Sections: 25
Number Of Flowing Sprinklers: 6
Pipe System Water Volume: 1740.09 gal
Sprinkler Flow: 91.70 gpm
Non-Sprinkler Flow: 0.00 gpm
Minimum Required Residual Pressure At System Inflow 51.59 psi
Node:
Demand Flow At System Inflow Node: 91.70 gpm
C:\...\Cabin 2.fiw Wednesday, January 31, 2024, 12:30 PM
Fire Fire Sprinkler Hydraulics Calculation Program ti, Elite Software Development,Inc.
Condon Engineering ft 13 Cabin#2
Mattituck,NY 11952 t ' Page 13
Fire Sprinkler Output Data
� � r m taay id_.c'� �a i ,, fiy.�-5'�"�'yx�t 2 r�.'�.,�� 'w+ S 7 •� � ; t:;
Hydraulic.Supply/DemallndIGlraphG
100
90
80
70
Q
� 60
in 50
0)
L
li
40
30
20
10
0
2 4 6 8 10 12 14 16 18 20
Flowrate(x100) gpm
Supply Curve Data
Static Pressure: 66 psi
Test Residual Pressure: 52 psi
Test Flow Rate: 1503 gpm
Demand Curve Data
Calculated Residual Pressure: 51.59 psi
Calculated Flow Rate: 91.70 gpm .
Excess Available Residual Pressure At Calculated Flow: 14.33 psi
Pressure Required For First Sprinkler Downstream From Inflow Node To Flow: 18.69 psi
C:\...\Cabin 2.fiw Wednesday, January 31, 2024, 12:30 PM