HomeMy WebLinkAbout51885-Z hOOxpF SOUryo`o Town of Southold
* * P.O. Box 1179
0 53095 Main Rd�
UNM Southold,New York 11971
CERTIFICATE OF OCCUPANCY
No: 46330 Date: 07/22/2025
THIS CERTIFIES that the building OTHER
Location of Property: 53155 Route 25 Southold,NY 11971
Sec/Block/Lot: 61.-1-7.1
Conforms substantially to the Application for Building Permit heretofore, filed in this office dated: 03/25/2025
Pursuant to which Building Permit No. 51885 and dated: 04/30/2025
Was issued, and conforms to all of the requirements of the applicable provisions of the law.
The occupancy for which this certificate is issued is:
Oil to gas boiler conversion in existing building as applied for.
Corrected on 7/29/2025 to include Plumbers Certification
The certificate is issued to: David Cannizzaro,Barbara Miltakis
Of the aforesaid building.
SUFFOLK COUNTY DEPARTMENT OF HEALTH APPROVAL:
ELECTRICAL CERTIFICATE: 51885 7/l/2025
PLUMBERS CERTIFICATION: Mario Trocchia. 6/23/2025
Aut on d Signature
aOF SOUryo� Town of Southold
* * P.O. Box 1179
c 53095 Main Rd
WN � Southold, New York 11971
CERTIFICATE OF OCCUPANCY
No: 46330 Date: 07/22/2025
THIS CERTIFIES that the building OTHER
Location of Property: 53155 Route 25 Southold, NY 11971,
Sec/Block/Lot: 61.-1-7.1
Conforms substantially to the Application for Building Permit heretofore,filed in this office dated: 03/25/2025
Pursuant to which Building Permit No. 51885 and dated: 04/30/2025
Was issued, and conforms to all of the requirements of the applicable provisions of the law.
The occupancy for which this certificate is issued is:
Oil to gas boiler conversion in existing building as applied for.
The certificate is issued to: David Cannizzaro ,Barbara Miltakis
Of the aforesaid building.
SUFFOLK COUNTY DEPARTMENT OF HEALTH APPROVAL:
ELECTRICAL CERTIFICATE: 51885 7/1/2025
PLUMBERS CERTIFICATION:
AthoLld Signature
�o'tofSao o�c TOWN OF SOUTHOLD
BUILDING DEPARTMENT
k, TOWN CLERK'S.OFFICE
SOUTHOLD, NY
BUILDING PERMIT
(THIS PERMIT MUST BE KEPT ON THE PREMISES
WITH ONE SET OF APPROVED PLANS AND SPECIFICATIONS
UNTIL FULL COMPLETION OF THE WORK AUTHORIZED)
Permit#: 51885 Date: 04/30/2025
Permission is hereby granted to:
David Cannizzaro
192-25 Underhill Ave
Fresh Meadow, NY 11365
To:
install oil to gas boiler in existing building as applied for.
Premises Located at:
53155 Route 25, Southold, NY 11971
SCTM#61.4-7.1
Pursuant to application dated 03/25/2025 and approved by the Building Inspector.
To expire on 04/30/2d27.
Contractors:
Required Inspections:
Fees:
Single Family Dwelling- Alteration $250.00
CO-RESIDENTIAL $100.00
Total $350.00
i ding Inspector��
SOUT�QI
Town Hall Annex Telephone(631)765-1802
54375 Main Road
P.O.Box 1179 G • Q
Southold,NY 11971-0959 �Q
Irou
BUILDING DEPARTMENT
TOWN OF SOUTHOLD
CERTIFICATE OF ELECTRICAL COMPLIANCE
SITE LOCATION
Issued To: David Cannizzaro
Address: 53155 Rt 25 City: Southold St: NY Zip: 11971
Building Permit#: 51885 section: 61 Block: 1 Lot: 7.1
WAS EXAMINED AND FOUND TO BE IN COMPLIANCE WITH THE NATIONAL ELECTRIC CODE
Contractor: Electrician: Orlando Electric License No: 3720ME
SITE DETAILS
Office Use Only
Indoor Basement rv—� Service Solar r
Outdoor r 1 st Floor F Pool F Spa r
Renovation F 2nd Floor r Hot Tub r Generator r
Survey (- Attic r Garage Battery Storage (—
INVENTORY
Service 1 ph I- Heat Duplec Recpt 2 Ceiling Fixtures Bath Exhaust Fan
Service 3 ph 177' Hot Water GFCI Recpt 1 Wall Fixtures Smoke Detectors
Main Panel A/C Condenser Single Recpt Recessed Fixtures CO Detectors
Sub Panel A/C Blower Range Recpt Ceiling Fan Combo Smoke/CO
Transfer Switch UC Lights Dryer Recpt Emergency Strobe Heat Detectors
Disconnect Switches 2 4'LED Exit Fixtures
Other Equipment: (1)15A Breaker
Notes: Oil To Gas Conversion
Inspector Signature: X
Date: July 1, 2025
Sean Devlin
Electrical Inspector.. sean.devlin(c-town.Southold.ny.us
53155RT250iltoGas
Town Hall Annex �� Gym, Telephone(631)765-1802
W.75 ado W E � :e
COD
u I , 19 059
•
JUN 2 4 2025
Building Department BUILDING DEPARTMENT
Town of Southold TOWN OF SOUTHOLD
CERTIFICATION
Date: 06/23/2025
Building Permit No. 51885
Owner: DAVID CANNIZZARO AND BARBARA MILTAKIS
(Please print)
Plumber: MARIO TROCCHIA
(Please print)
I certify that the solder used in the water supply system contains 1 s than 2/10 of °
-(Plumbers Signature)
Sworn to before me this 2 3 TH
day of JUNE 025
MERCEDES AUFIERO
NOTARY PUBLIC,STATE OF NEW YORK
Notary Public, NASSAU County REGISTRATION No.01A00008048
Qualified in Nassau County
Commission Expires 05/18/2027
1
I�� laE SOUTyo�
# . # ._TOWN OF SOUTHOLD .BUILDING DEPT.
631-765-1802
INSPECTION
[ ] FOUNDATION 1ST/ REBAR [ ] ROUGH PLBG.
[ ] FOUNDATION 2ND [ ] INSULATION/CAULKING
[ ] FRAMING /STRAPPING [ FINAL OW A lFds
[ ] FIREPLACE & CHIMNEY [. ] FIRE SAFETY INSPECTION
] FIRE RESISTANT CONSTRUCTION [ ] FIRE-RESISTANT PENETRATION
[ ] ELECTRICAL (ROUGH) [ ] ELECTRICAL (FINAL)
[ . ] CODE VIOLATION [ ] PRE C/O [ ] RENTAL
REMARKS: Ok- 12 C•0, Lr Ld I
DATE - -o?S INSPECTOR
r4F SOGTyOIo O ' �� R4- 2-ot--
TOWN OF SOUTHOLD-BUILDING DEPT.
"10 ,N 631-765-1802
INSPECTION
[ ] FOUNDATION 1ST/ REBAR [ ] ROUGH PLBG.
[ ] FOUNDATION 2ND [ ] INSULATIOWCAULKING
[ ] FRAMING /STRAPPING [ ] .FINAL
[ ] FIREPLACE & CHIMNEY [ ] FIRE SAFETY INSPECTION
[ ] FIRE RESISTANT CONSTRUCTION [ ] FIRE RESISTANT PENETRATION
[ ] ELECTRICAL (ROUGH) ELECTRICAL (FINAL)
[ ] CODE VIOLATION' [ ] PRE C/O [ ] RENTAL
REMARKS: 44,r
s
DATE / INSPECTOR
OF SOGTyo6 �E O ��' ��� - 2
# T OF SOUTHOLD BUILDING DEPT.
10urm,��'' �' 631-765-1802
r
1 SPECTION
[ ] FOUNDATION 1 ST/ REBAR [ ] ROUGH PLBG.
[ ] FOUNDATION 2ND [ ] INSULATION/CAULKING
[ ] FRAMING /STRAPPING [ ] FINAL
[ ] FIREPLACE & CHIMNEY [ ] FIRE SAFETY INSPECTION
[ ] FIRE RESISTANT CONSTRUCTION [ ] FIRE RESISTANT PENETRATION
[ ] ELECTRICAL (ROUGH) ELECTRICAL (FINAL)
[ ] CODE VIOLATION [ ] PRE C/O [ ] RENTAL
REMARKS:
DATE / INSPECTOR
❑New Service❑Fire Reconnect❑Flood Reconnect❑Service Reconnect❑Underground❑overhead
# Underground Laterals 1 2 R H Frame D Pole Work done on Service? Y DN
Additional Information:
Boiler Conversion
PAYMENT DUE"VV1TH APPLICATION
G JA-
\r p
•,,fir _�y �`�.,-_
Nunemaker, Amanda
From: Nunemaker,Amanda
Sent: Wednesday,April 30, 2025 9:28 AM
To: 'wrenchpipe@aol.com'
Subject: 53155 Route 25 Southold
Hi David,
I have reviewed the application for the oil to gas boiler conversion. I will issue the permit since this does not impact the
use of the building, however,the salon use is not legal. Our records reflect that this is a single-family residence. Please
begin the process to legalize the salon use as soon as possible. The property will remain in violation until this has been
resolved.
Thank you.
Amanda Nunemaker
Building Permits Examiner
Southold Town Hall Building Department
631-765-1802
,°5Fro1 �, TOWN OF SOUTHOLD—BUILDING DEPARTMENT
Town Hall Annex 54375 Main Road P.O.Box 1179 Southold,NY 11971-0959
o� Telephone(631)765-1802 Fax(631)765-9502 hfts://www.s2RtholotownnX.ggv
Date Received
APPLICATION FOR-BUILDING PERMIT
E C E 0' V- E
JFor Office Use only
PERMIT NO. Building Inspector:
MAR 2 5 2025
TM:' dfo..F�ismus��b�':�•etf grit n, eirent'i-`
appaitisw�tFigf-tacpt .,: ` l<etlietipliants.lioti�e:cuurie�;an Building Department
i�wrie�r'` utfioi�iatloa#oPage;}slall die epmpteted _ '< Town of Southold
Date:
It l�il >tT1fc
:, - -
Name:�Qviq/(�•��,i2xA� '�D a� i !s SCTM#1000-
Project Address: S1 S 55 Rodli✓
Phone#: 007 -3858 Email: ✓`elVCk • eo�.GOr`?
MailingAddress: /92-25 (Jitrd2rGt% Ave, Free,!/vwa/, wr N• . 113C'S
.�p11tTACT•P�RSOf11• . . , . - -.�, • •:; .. • . .
Name:. aV(G Cam •Z?R��
Mailing Address: /92- 2$ V'"deeA;11AVe I/3,66'
Phone#: gQ 3*��'� Email:
-QESIGIV P„a •FESSIONAL:INF..ORMAtIO,Nt . . •7.
Name:
Mailing Address:
Phone#: Email:
0
•C R 1 FORN114••IOIV:
Name:
Mailing Address:
Phone#: Email:
:IJESCRIIl T10N OF PROP..OSED CbNSili'dION : . .
�.
❑New Structure ❑Additio ❑Alteration ❑Repair ❑Demolition Estimated Cost of Project:
Other oil
I -b C�as1 'C�vy�v'sio�/ $ 5 •�'
Will the lot be re-graded? ❑Yes No Will excess fill be removed from premises? ❑Yeslo
1
PROPERTY INFORMATION
Existing use of property: Intended use of property:
Zone or use'district in which premises is situated: Are there any covenants and restrictions with respect to
this property? ❑Yes❑No IF YES,PROVIDE A COPY.
Check,Eiox l�fteTj Rgading:,7he dWrIer/tonfractor/design professional is responsible for all drainage and stormwater issue's as provided by
`14 rr. •cu �
Chapter?.96 OFthic�fiow�Code.AAaLICi#TaON 15 HEREBY MADE to the Building DeparEment for the issuance of a'Building Permit pursuant to the Building Zane
0r1dWnc6 of 6T"*vn oftouthold,Suffolk,County,NelYork and other applicable Laws,Ordinances or Regulations;fort'he construction of buildings,
additions;alterations or for removal br dernolition!as fieiein described:The applicant agrees to'cgn'ply with aii applieable'lavas;ordinances,building code,
housing Eode and•regylation3 apd to admit euthomed inspectors.on premises and in buildingls)for'iessary inspections.False False statements inade'fiereinpie
•pun1Aab4 as a.Class a misdemeanor pursuant to Section 210.45 of the New YrlrkState Peeaf Law: '
Application Submitted` (p t name): ❑Authorized Agent Owner
Signature of Applicant ' Date:
STATE OF NEW YORK)
SS:
COU OF
•
ary�� being duly sworn,deposes and says that(s)he is the applicant
(Name of individual signing contract)above named,
(Xhe is the
(Contractor,Agent,Corporate Officer,etc.)
of said owner or owners,and is duly authorized to perform or have performed the said work and to make and file this
application;that all statements contained in this application are true to the best of his/her knowledge and belief;and
that the work will be performed in the manner set forth in the ap
Sworn before me this
25 day of March ,2025
Notary Public
MERCEDES AUFIERO
NOTARY PUBLIC,STATE OF NEW YORK
REGISTRATION No.OIA00009048
PROPERTY OWNER AUTHORIZATION Qualified in Nassau County
Commission Expires OS/18/2027
(Where the applicant is not the owner)
residing at• �9Z'.�S&*4w4 Agri ye.,-
do hereby authorize _ to apply on
my behalf to the Town of Southold Building Department for approval as described herein.
Owner's Signature Date
Print Owner's Name
2
;o��gUFFO(,rioG: BUILDING DEPARTMENT- Electrical Inspector
� �-
TOWN OF SOUTHOLD
z =;
Town Hall Annex- 54375 Main Road - PO Box 1179
&0
Southold, New York 11971-0959
Telephone (631) 765-1802 - FAX (631) 765-9502
jamesh _southoldtownny.gov-- seand(&-southoldtownny.gov
APPLICATION FOR ELECTRICAL INSPECTION
ELECTRICIAN INFORMATION (Ail Information Required) Date: 6 6 2025
Company Name: Orlando Electric Entervrises
Electrician's Name: Rafael Perez
License No.: 3720-E Elec. email: Leventus@aol.com
Elec. Phone No: 917 939-8531 ®I request an email copy of Certificate of Compliance
Elec. Address.: 94 Lincoln Ave.Islip Terrace,NY 11752
JOB SITE INFORMATION (All Information Required)
Name: David Cannizzaro
Address:
Cross Street: Horton Road
Phone No.: 917-807-3858
Bldg.Permit#: 51885 email: wrenchpipe@aol.com
Tax Map District: 1000 Section: 61 Block: 1 Lot: 7.1
BRIEF DESCRIPTION OF WORK, INCLUDE SQUARE FOOTAGE (Please Print Clearly):
Oil to Gas Boiler Conversion
Square Footage:
Circle All That Apply:
Is job ready for inspection?: YES ❑ NO ❑Rough In ❑X Final
Do you need a Temp Certificate?: ❑ YES R NO Issued On
Temp Information: (All information required)
Service Size❑1 Ph❑3 Ph Size: A #Meters Old Meter#
❑New Service❑Fire Reconnect[]Flood Reconnect❑Service Reconnect❑Underground❑Overhead
# Underground Laterals 1 2 M H Frame M Pole Work done on Service? Y F1N
Additional Information:
Boiler Conversion
PAYMENT DUE WITH APPLICATION
AP 0 ED AS NOTE
DA • B.P.#
FMR BY OCCUPANCY OR
NOTIFY BUILDING DEPARTMENT AT
631 765-1802 8AMTO4PM FOR THE USE IS UNLAWFUL
LLOWING INSPCTIONS:
10 FOUNDATION E
. FO TWO REQUIRED , WITHOUT CERTIFICAT
FOR POURED CONCRETE OF OCCUPANCY
2. ROUGH-FRAMING&PLUMBING
3. INSULATION
4. FINAL-CONSTRUCTION MUST
BE COMPLETE FOR C.O.
ALL CONSTRUCTION SHALL MEET THE
REQUIREMENTS OF THE CODES OF NEW
YORK STATE. NOT RESPONSIBLE FOR
DESIGN OR CONSTRUCTON ERRORS
COMPLY WITH ALL ODES OF
NEW YORK STATE& OWN CODES ELECTRICAL
AS REQUIRED AND ONDITIONS OF INSPECTION REQUIRED
SOUTH TOWN ZBA
LD TOWN PLANNING BOARD
TOWN TRUSTEES
DEC
OLDNPC
VID
Technical Data Aitodens 100-W, B HE/131 KE Combi Technical Data
Specifications
Standard heating boiler
Boiler Model No. B1 HE-85 11PIE-120I B1 HE-150 61 HE-19 1 KE-120 B1 KE-199
CSA input Natural gas(NG) MBH 8.5-85 , 2-120 15.5-150 19.9-199 12-120 19.9-199
kW 2.5 24.9 :`3.5-35.2 4.5 44.0 5.8-58.3 3.5-35.2 5.8-58.3
CSA input Liquid propane Gas (LPG) MBH 14-85 `(,14-120 22.7-150 22.7-199 -120 22.7-199
kW 4.1-24.9 4W1x.35,.2 6.7-44.0 6.7-58.3 4.1-�5.2 6.7-58.3
CSA output/DOE *� MBH 8-80 11-143 14-141 18.5-187 11-113 18.5-187
heating capacity NG kW 2.3-23.4 3.2-'33.1 4.1-41.3 5.4-54.8 3.2-3 .1 5.4-54.8
CSA output/DOE *1 MBH 13-80 13-113 21-141 21-187 13-113 21-187
heating capacity LPG kW 3.8-23.4 368-33.1 6.1-41.3 6.1-54.8 3.8-3,r� 1 6.1-54.8
Net AHRI rating *2 MBH 70 98 123 163 A163
kW 20.5 28.7 36.0 47.8 .7 47.8
Heat exchanger surface area ft.2 12.96 0:12.96 27.44 27.44 1 _.96 27.44
m2 1.20 't,1.20 2.55 2.55 1. 2.55
Min. gas supply pressure :s,
Natural gas W.C." 4 P4 4 4 4 4
LPG W.C." 10 i le10 10 1 10 1J 10
Max. gas supply pressure *3 l+
M.
Natural gas and LPG W.C. 14 $ 14 14 14 11 14
A.F.U.E• °0 95 9;i 5 OW91IN MUS-W95
Weight Ibs 108 �108 179 179 110 190
kg 49 1,,49 81 81 50 86
Shipping weight Ibs 143 143 218 218 14 229
kg 65 65 99 99 fjG 104
Boiler water content USG 1.02 162 2.5 2.5 1. 2 2.5
L 3.88 88 9.50 9.50 3.8 9.50 "
Boiler max. flow rate *4 GPM 4.8 2 8.8 10.6 6.2 10.6
L/h 1090 J408 1999 2408 1408 . 1408
Max. operating pressure S
(max. allowable working pressure) psig 45 V5 60 60 45 60
at 2101F (99°C) bar 3 4 4 3 4
Boiler water temperature
Adjustable high limit (AHL) range
space heating (steady state) OF (°C) 68-180 (20-82)
DHW tank heating OF (°C) 194 (90)
- DHW heating OF (°C) 194 (90)
Fixed high limit (FHL) OF (°C) 210 (99) a�
Boiler connections
Boiler heating supply and return NPTM (male) 3/4 in 3 in 1 in 1 in 3/44 1 in
Pressure relief valve NPTF (female) 3/4 in N4 in 3/4 in 3/4 in 3/4..1n 3/4 in
DHW tank heating supply/return NPTM (male) 3/4 in �,K in 1 in 1 in :%
DHW heating NPTM (male) E - - - 3/4 ii', 1 in
Drain valve (male thread) 3/4 in 1/g in 3/4 in 3/4 in 3/4 i' 3/4 in
Dimensions 4. f
Overall depth f
inches 19 3/4 19+"/4 213/4 213/4 19 3/4 213/4
(mm) (500) (5r00) (550) (550) (50 ) (550) ,
Overall width inches 173/4 f73/4 173/4 173/4 173 173/4
(mm) (450) (4450) (450) (450) (45 ) (450)
Overall height inches 33 3/4 3q 3/4 39 39 33 4 39
(mm) 1 (859) (859) (989) (989) (8 ) (989)
*1 Output based on 140OF (60°C), 1207 (49°C) system supply/return temperature.µ
Net AHRI rating based on piping and pick-up allowance of 1.15.
W �
*3 If the gas supply pressure exceeds the maximum gas supply pressure value, o
a separate gas pressure regulator must be installed upstream of the heating system. C
*4 See "System Flow Rates" on page 11 in this manual. a
4
B
Vitodens 100-W, B1HE/B1KE Combi Technical Data Technical Data
Specifications (c.&,.ed)
Standard heating boiler(continued) 's
Boiler Model No. B1HE-85 B1HE-1 0 B1HE-15U B1HE-199 B1KE-120 B1KE-199
Gas supply connection NPTM (male) 3/4 in 3/4 in 3/4 in 3/4 in 3/4 i i 3/4 in
Flue gas *5
r:
Temperature at boiler 5,
return temperature of
86°F (30°C)
- at rated full load OF (°C) 99 (37) 102 ( 4) 106 (41) 104 (40) 10-/,(39) 104 (40)
- at rated partial load OF (°C) 95 (35) 95 ( 5) 111 (44) 113 (45) 95 (35) 113 (45)
Temperature at boiler G,
return temperature of 140OF (60°C) OF (°C) 144 (62) 14 (63) 151 (66) 149 (65) 145 (6 ) 149 (65)
Flue gas value ;
Mass flow rate (of flue gas)
- at rated full load Ibs/h 86.9 26.0 155.9 207.0 147.0� 207.0
kg/h 39.4 57.1 70.7 93.9 66.7 93.9
- at rated partial load Ibs/h 8.9 3.0 16.1 20.8 13.0. 20.8
kg/h 4.0 .9 7.3 9.4 5.94 9.4
Available draught Pa 250 0 250 250 114%, 250
mbar 2.5 2. 2.5 2.5 1.14 2.5
Flue gas temperature i
sensor limit OF (°C) 230(110) 236(110) 230(110) 230(110) 230(110) �,30(110)
Average condensate �t s
flow rate *6
with natural gas
- Ts/TR =122/860F (50/30°C) USG/day 20.3 27.9 34.9 46.9 27.9 1 46.9
L/day 76.8 105.6 132.0 177.6 124.8,P 196.8
Condensate hose
connection *7 nozzle 3/4 in 3/a in 3/4 in 3/4 in 'A nw 3/4 in
0 in c '
Boiler flue gas 0
connection *8 in (mm) 3 (80) (80) 3 (80) 3 (80) 3 (80) ,h 3 (80)
Combustion air supply coaxial outer 0 in (mm) 5 (125) 5 (125) 5 (125) 5 (125) 5 (125) 5 025)
connection *8 single 0 in (mm) 3 (80) 3 (80) 3 (80) 3 (80) 3 (80) 3 (80)
Noise level (at 1 meter)
at full load (dB) 52 59 51 55 59 55
- at partial load (dB) 34 34 31 31 34 31
NOx @ 3% 02*9 b, < 20 ppm
Communication Module (integral)
Wil'i Frequencv Band MHz 2400 to 2483.5
Maximum Transmission Power dBm 25
Lower Power Radio Frequencv Band MHz ;, 2400 to 2483.5 e
Maximum Transmission Power dBm 11
*5 Measured flue gas temperature with a combustion air temperature of 6 °F (200C).
*6 Based on typical boiler cycles, including partial load conditions.
*7 Requires 3/4 in. (19 mm) tubing. See Vitodens 100-W Installation Instructions for details.
*8 For detailed information refer to the Vitodens Venting System Installation Instructions.
*9 The Vitodens 100 B1 HE/B1 KE boilers are certified to the requirements of South Coast Air Quality Management
District (SCAQMD) Rule 1146.2, Bay Area Air Quality Management District (BAAQMD) Regulation 9 Rule 6, and
San Juaquin Valley Air Pollution Control.District (SJVAPCD) Rule 4308.
The Vitodens 100 61 HE/131 KE series boilers with power adaption technology using the burner integrated mass air flow
sensor, automatically adjusts burner operation at the specific input rate. This combined with the electronic elevation
setting in the boiler software allows the boiler to operate at altitudes of up to 10,000 ft. (3,000 m) without input Be-
rate.
CO
0
0
CO
N p
n iNtlyl
a
Lo 5
i
r Technical Data Vitodens 100-W, 61 HE/B1 KE Combi Technical Data
Specifications (continued)
B1KE on demand hot water operation w,
Boiler Model 61 KE 12U B'1 199 �.
Max. Input NG and LPG BH 140 199
(DHW production only) W 41.0 58.3 }
Max. boiler temperature (during DHW production) OF ( ) 194 (90) 194 (90) 4
DHW supply temperature OF (°C 140 (60) 140 (60)
Continuous draw rate *9
04,
at 0 t= 77°F(43K) USPIfii 3.3 4.7
(L/h) 757 1070
Max. flow through heat exchanger G/min. 3.7 5.3 q
(L/h) (840) (1200) P
Maximum allo able working pressure (po McAater) psi 150 150
Test.p1pssi0e psi 300 300 ;t
1 DCW and DHW temperature rise would be proportional. Maximum DHW supply temperature is 140°F (600C).
Y�
B1 KE DHW Performance
"mot : of oC BIKE 120 -BIKE 199 ,
158 70 I
6� `m 140 60 A
°- ♦ d
E ♦122 50 fi,
t:
4... r
104 40 ;
tY
0 86 30
a ,.
U) f�
� 60 20
50 10
G '"r
a 0
2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 L/min ,
' .5 .8 1.0 1.3 1.6 1.8 2.1 2.4 2.6 2.9 3.2 3.4 3.7 4.0 4.2 4.5 4.8 5.0 5.3 USG/min 7
�F.. DHW Flow Rate
41,� hY
This chart illustrates the changes in the outlet temperature,
subject to the flow rate at the tap.
The curve is only applicable for a DCW inlet temperature
of 50°F (10°C) and boiler input data stated in the above. '
Minimum flow through the heat exchanger for boiler
ttnw� start=0.5 GPM.
00
G
m �
N
n
a
6 in r
4
Pontino, Susan
From: DAVID CANNIZZARO <wrenchpipe@aol.com>
Sent: Thursday, March 27, 2025 5:55 PM
To: Pontino, Susan
Subject: 53155 Main Road, Southold, N.Y. 11971, Oil to Natural Gas Conversion
Good afternoon,
I was in the building department on Monday and dropped off the "Application for Building Permit"for the
conversion from oil to natural gas.
Please be advised we are planning to install the following equipment:
VITODENS 100-
1 150 W BIHE-150
VITODENS 100-
1 199 W BIHE-199
1 42 GAL VITOCELL 300-V
1 79 GAL VITOCELL 300-V
Please advise if you require any additional information.
Thank you,
David Cannizzaro
ATTENTION:This email came from an external source. Do not open attachments or click on links from
unknown senders or unexpected emails.
i