Loading...
HomeMy WebLinkAbout51885-Z hOOxpF SOUryo`o Town of Southold * * P.O. Box 1179 0 53095 Main Rd� UNM Southold,New York 11971 CERTIFICATE OF OCCUPANCY No: 46330 Date: 07/22/2025 THIS CERTIFIES that the building OTHER Location of Property: 53155 Route 25 Southold,NY 11971 Sec/Block/Lot: 61.-1-7.1 Conforms substantially to the Application for Building Permit heretofore, filed in this office dated: 03/25/2025 Pursuant to which Building Permit No. 51885 and dated: 04/30/2025 Was issued, and conforms to all of the requirements of the applicable provisions of the law. The occupancy for which this certificate is issued is: Oil to gas boiler conversion in existing building as applied for. Corrected on 7/29/2025 to include Plumbers Certification The certificate is issued to: David Cannizzaro,Barbara Miltakis Of the aforesaid building. SUFFOLK COUNTY DEPARTMENT OF HEALTH APPROVAL: ELECTRICAL CERTIFICATE: 51885 7/l/2025 PLUMBERS CERTIFICATION: Mario Trocchia. 6/23/2025 Aut on d Signature aOF SOUryo� Town of Southold * * P.O. Box 1179 c 53095 Main Rd WN � Southold, New York 11971 CERTIFICATE OF OCCUPANCY No: 46330 Date: 07/22/2025 THIS CERTIFIES that the building OTHER Location of Property: 53155 Route 25 Southold, NY 11971, Sec/Block/Lot: 61.-1-7.1 Conforms substantially to the Application for Building Permit heretofore,filed in this office dated: 03/25/2025 Pursuant to which Building Permit No. 51885 and dated: 04/30/2025 Was issued, and conforms to all of the requirements of the applicable provisions of the law. The occupancy for which this certificate is issued is: Oil to gas boiler conversion in existing building as applied for. The certificate is issued to: David Cannizzaro ,Barbara Miltakis Of the aforesaid building. SUFFOLK COUNTY DEPARTMENT OF HEALTH APPROVAL: ELECTRICAL CERTIFICATE: 51885 7/1/2025 PLUMBERS CERTIFICATION: AthoLld Signature �o'tofSao o�c TOWN OF SOUTHOLD BUILDING DEPARTMENT k, TOWN CLERK'S.OFFICE SOUTHOLD, NY BUILDING PERMIT (THIS PERMIT MUST BE KEPT ON THE PREMISES WITH ONE SET OF APPROVED PLANS AND SPECIFICATIONS UNTIL FULL COMPLETION OF THE WORK AUTHORIZED) Permit#: 51885 Date: 04/30/2025 Permission is hereby granted to: David Cannizzaro 192-25 Underhill Ave Fresh Meadow, NY 11365 To: install oil to gas boiler in existing building as applied for. Premises Located at: 53155 Route 25, Southold, NY 11971 SCTM#61.4-7.1 Pursuant to application dated 03/25/2025 and approved by the Building Inspector. To expire on 04/30/2d27. Contractors: Required Inspections: Fees: Single Family Dwelling- Alteration $250.00 CO-RESIDENTIAL $100.00 Total $350.00 i ding Inspector�� SOUT�QI Town Hall Annex Telephone(631)765-1802 54375 Main Road P.O.Box 1179 G • Q Southold,NY 11971-0959 �Q Irou BUILDING DEPARTMENT TOWN OF SOUTHOLD CERTIFICATE OF ELECTRICAL COMPLIANCE SITE LOCATION Issued To: David Cannizzaro Address: 53155 Rt 25 City: Southold St: NY Zip: 11971 Building Permit#: 51885 section: 61 Block: 1 Lot: 7.1 WAS EXAMINED AND FOUND TO BE IN COMPLIANCE WITH THE NATIONAL ELECTRIC CODE Contractor: Electrician: Orlando Electric License No: 3720ME SITE DETAILS Office Use Only Indoor Basement rv—� Service Solar r Outdoor r 1 st Floor F Pool F Spa r Renovation F 2nd Floor r Hot Tub r Generator r Survey (- Attic r Garage Battery Storage (— INVENTORY Service 1 ph I- Heat Duplec Recpt 2 Ceiling Fixtures Bath Exhaust Fan Service 3 ph 177' Hot Water GFCI Recpt 1 Wall Fixtures Smoke Detectors Main Panel A/C Condenser Single Recpt Recessed Fixtures CO Detectors Sub Panel A/C Blower Range Recpt Ceiling Fan Combo Smoke/CO Transfer Switch UC Lights Dryer Recpt Emergency Strobe Heat Detectors Disconnect Switches 2 4'LED Exit Fixtures Other Equipment: (1)15A Breaker Notes: Oil To Gas Conversion Inspector Signature: X Date: July 1, 2025 Sean Devlin Electrical Inspector.. sean.devlin(c-town.Southold.ny.us 53155RT250iltoGas Town Hall Annex �� Gym, Telephone(631)765-1802 W.75 ado W E � :e COD u I , 19 059 • JUN 2 4 2025 Building Department BUILDING DEPARTMENT Town of Southold TOWN OF SOUTHOLD CERTIFICATION Date: 06/23/2025 Building Permit No. 51885 Owner: DAVID CANNIZZARO AND BARBARA MILTAKIS (Please print) Plumber: MARIO TROCCHIA (Please print) I certify that the solder used in the water supply system contains 1 s than 2/10 of ° -(Plumbers Signature) Sworn to before me this 2 3 TH day of JUNE 025 MERCEDES AUFIERO NOTARY PUBLIC,STATE OF NEW YORK Notary Public, NASSAU County REGISTRATION No.01A00008048 Qualified in Nassau County Commission Expires 05/18/2027 1 I�� laE SOUTyo� # . # ._TOWN OF SOUTHOLD .BUILDING DEPT. 631-765-1802 INSPECTION [ ] FOUNDATION 1ST/ REBAR [ ] ROUGH PLBG. [ ] FOUNDATION 2ND [ ] INSULATION/CAULKING [ ] FRAMING /STRAPPING [ FINAL OW A lFds [ ] FIREPLACE & CHIMNEY [. ] FIRE SAFETY INSPECTION ] FIRE RESISTANT CONSTRUCTION [ ] FIRE-RESISTANT PENETRATION [ ] ELECTRICAL (ROUGH) [ ] ELECTRICAL (FINAL) [ . ] CODE VIOLATION [ ] PRE C/O [ ] RENTAL REMARKS: Ok- 12 C•0, Lr Ld I DATE - -o?S INSPECTOR r4F SOGTyOIo O ' �� R4- 2-ot-- TOWN OF SOUTHOLD-BUILDING DEPT. "10 ,N 631-765-1802 INSPECTION [ ] FOUNDATION 1ST/ REBAR [ ] ROUGH PLBG. [ ] FOUNDATION 2ND [ ] INSULATIOWCAULKING [ ] FRAMING /STRAPPING [ ] .FINAL [ ] FIREPLACE & CHIMNEY [ ] FIRE SAFETY INSPECTION [ ] FIRE RESISTANT CONSTRUCTION [ ] FIRE RESISTANT PENETRATION [ ] ELECTRICAL (ROUGH) ELECTRICAL (FINAL) [ ] CODE VIOLATION' [ ] PRE C/O [ ] RENTAL REMARKS: 44,r s DATE / INSPECTOR OF SOGTyo6 �E O ��' ��� - 2 # T OF SOUTHOLD BUILDING DEPT. 10urm,��'' �' 631-765-1802 r 1 SPECTION [ ] FOUNDATION 1 ST/ REBAR [ ] ROUGH PLBG. [ ] FOUNDATION 2ND [ ] INSULATION/CAULKING [ ] FRAMING /STRAPPING [ ] FINAL [ ] FIREPLACE & CHIMNEY [ ] FIRE SAFETY INSPECTION [ ] FIRE RESISTANT CONSTRUCTION [ ] FIRE RESISTANT PENETRATION [ ] ELECTRICAL (ROUGH) ELECTRICAL (FINAL) [ ] CODE VIOLATION [ ] PRE C/O [ ] RENTAL REMARKS: DATE / INSPECTOR ❑New Service❑Fire Reconnect❑Flood Reconnect❑Service Reconnect❑Underground❑overhead # Underground Laterals 1 2 R H Frame D Pole Work done on Service? Y DN Additional Information: Boiler Conversion PAYMENT DUE"VV1TH APPLICATION G JA- \r p •,,fir _�y �`�.,-_ Nunemaker, Amanda From: Nunemaker,Amanda Sent: Wednesday,April 30, 2025 9:28 AM To: 'wrenchpipe@aol.com' Subject: 53155 Route 25 Southold Hi David, I have reviewed the application for the oil to gas boiler conversion. I will issue the permit since this does not impact the use of the building, however,the salon use is not legal. Our records reflect that this is a single-family residence. Please begin the process to legalize the salon use as soon as possible. The property will remain in violation until this has been resolved. Thank you. Amanda Nunemaker Building Permits Examiner Southold Town Hall Building Department 631-765-1802 ,°5Fro1 �, TOWN OF SOUTHOLD—BUILDING DEPARTMENT Town Hall Annex 54375 Main Road P.O.Box 1179 Southold,NY 11971-0959 o� Telephone(631)765-1802 Fax(631)765-9502 hfts://www.s2RtholotownnX.ggv Date Received APPLICATION FOR-BUILDING PERMIT E C E 0' V- E JFor Office Use only PERMIT NO. Building Inspector: MAR 2 5 2025 TM:' dfo..F�ismus��b�':�•etf grit n, eirent'i-` appaitisw�tFigf-tacpt .,: ` l<etlietipliants.lioti�e:cuurie�;an Building Department i�wrie�r'` utfioi�iatloa#oPage;}slall die epmpteted _ '< Town of Southold Date: It l�il >tT1fc :, - - Name:�Qviq/(�•��,i2xA� '�D a� i !s SCTM#1000- Project Address: S1 S 55 Rodli✓ Phone#: 007 -3858 Email: ✓`elVCk • eo�.GOr`? MailingAddress: /92-25 (Jitrd2rGt% Ave, Free,!/vwa/, wr N• . 113C'S .�p11tTACT•P�RSOf11• . . , . - -.�, • •:; .. • . . Name:. aV(G Cam •Z?R�� Mailing Address: /92- 2$ V'"deeA;11AVe I/3,66' Phone#: gQ 3*��'� Email: -QESIGIV P„a •FESSIONAL:INF..ORMAtIO,Nt . . •7. Name: Mailing Address: Phone#: Email: 0 •C R 1 FORN114••IOIV: Name: Mailing Address: Phone#: Email: :IJESCRIIl T10N OF PROP..OSED CbNSili'dION : . . �. ❑New Structure ❑Additio ❑Alteration ❑Repair ❑Demolition Estimated Cost of Project: Other oil I -b C�as1 'C�vy�v'sio�/ $ 5 •�' Will the lot be re-graded? ❑Yes No Will excess fill be removed from premises? ❑Yeslo 1 PROPERTY INFORMATION Existing use of property: Intended use of property: Zone or use'district in which premises is situated: Are there any covenants and restrictions with respect to this property? ❑Yes❑No IF YES,PROVIDE A COPY. Check,Eiox l�fteTj Rgading:,7he dWrIer/tonfractor/design professional is responsible for all drainage and stormwater issue's as provided by `14 rr. •cu � Chapter?.96 OFthic�fiow�Code.AAaLICi#TaON 15 HEREBY MADE to the Building DeparEment for the issuance of a'Building Permit pursuant to the Building Zane 0r1dWnc6 of 6T"*vn oftouthold,Suffolk,County,NelYork and other applicable Laws,Ordinances or Regulations;fort'he construction of buildings, additions;alterations or for removal br dernolition!as fieiein described:The applicant agrees to'cgn'ply with aii applieable'lavas;ordinances,building code, housing Eode and•regylation3 apd to admit euthomed inspectors.on premises and in buildingls)for'iessary inspections.False False statements inade'fiereinpie •pun1Aab4 as a.Class a misdemeanor pursuant to Section 210.45 of the New YrlrkState Peeaf Law: ' Application Submitted` (p t name): ❑Authorized Agent Owner Signature of Applicant ' Date: STATE OF NEW YORK) SS: COU OF • ary�� being duly sworn,deposes and says that(s)he is the applicant (Name of individual signing contract)above named, (Xhe is the (Contractor,Agent,Corporate Officer,etc.) of said owner or owners,and is duly authorized to perform or have performed the said work and to make and file this application;that all statements contained in this application are true to the best of his/her knowledge and belief;and that the work will be performed in the manner set forth in the ap Sworn before me this 25 day of March ,2025 Notary Public MERCEDES AUFIERO NOTARY PUBLIC,STATE OF NEW YORK REGISTRATION No.OIA00009048 PROPERTY OWNER AUTHORIZATION Qualified in Nassau County Commission Expires OS/18/2027 (Where the applicant is not the owner) residing at• �9Z'.�S&*4w4 Agri ye.,- do hereby authorize _ to apply on my behalf to the Town of Southold Building Department for approval as described herein. Owner's Signature Date Print Owner's Name 2 ;o��gUFFO(,rioG: BUILDING DEPARTMENT- Electrical Inspector � �- TOWN OF SOUTHOLD z =; Town Hall Annex- 54375 Main Road - PO Box 1179 &0 Southold, New York 11971-0959 Telephone (631) 765-1802 - FAX (631) 765-9502 jamesh _southoldtownny.gov-- seand(&-southoldtownny.gov APPLICATION FOR ELECTRICAL INSPECTION ELECTRICIAN INFORMATION (Ail Information Required) Date: 6 6 2025 Company Name: Orlando Electric Entervrises Electrician's Name: Rafael Perez License No.: 3720-E Elec. email: Leventus@aol.com Elec. Phone No: 917 939-8531 ®I request an email copy of Certificate of Compliance Elec. Address.: 94 Lincoln Ave.Islip Terrace,NY 11752 JOB SITE INFORMATION (All Information Required) Name: David Cannizzaro Address: Cross Street: Horton Road Phone No.: 917-807-3858 Bldg.Permit#: 51885 email: wrenchpipe@aol.com Tax Map District: 1000 Section: 61 Block: 1 Lot: 7.1 BRIEF DESCRIPTION OF WORK, INCLUDE SQUARE FOOTAGE (Please Print Clearly): Oil to Gas Boiler Conversion Square Footage: Circle All That Apply: Is job ready for inspection?: YES ❑ NO ❑Rough In ❑X Final Do you need a Temp Certificate?: ❑ YES R NO Issued On Temp Information: (All information required) Service Size❑1 Ph❑3 Ph Size: A #Meters Old Meter# ❑New Service❑Fire Reconnect[]Flood Reconnect❑Service Reconnect❑Underground❑Overhead # Underground Laterals 1 2 M H Frame M Pole Work done on Service? Y F1N Additional Information: Boiler Conversion PAYMENT DUE WITH APPLICATION AP 0 ED AS NOTE DA • B.P.# FMR BY OCCUPANCY OR NOTIFY BUILDING DEPARTMENT AT 631 765-1802 8AMTO4PM FOR THE USE IS UNLAWFUL LLOWING INSPCTIONS: 10 FOUNDATION E . FO TWO REQUIRED , WITHOUT CERTIFICAT FOR POURED CONCRETE OF OCCUPANCY 2. ROUGH-FRAMING&PLUMBING 3. INSULATION 4. FINAL-CONSTRUCTION MUST BE COMPLETE FOR C.O. ALL CONSTRUCTION SHALL MEET THE REQUIREMENTS OF THE CODES OF NEW YORK STATE. NOT RESPONSIBLE FOR DESIGN OR CONSTRUCTON ERRORS COMPLY WITH ALL ODES OF NEW YORK STATE& OWN CODES ELECTRICAL AS REQUIRED AND ONDITIONS OF INSPECTION REQUIRED SOUTH TOWN ZBA LD TOWN PLANNING BOARD TOWN TRUSTEES DEC OLDNPC VID Technical Data Aitodens 100-W, B HE/131 KE Combi Technical Data Specifications Standard heating boiler Boiler Model No. B1 HE-85 11PIE-120I B1 HE-150 61 HE-19 1 KE-120 B1 KE-199 CSA input Natural gas(NG) MBH 8.5-85 , 2-120 15.5-150 19.9-199 12-120 19.9-199 kW 2.5 24.9 :`3.5-35.2 4.5 44.0 5.8-58.3 3.5-35.2 5.8-58.3 CSA input Liquid propane Gas (LPG) MBH 14-85 `(,14-120 22.7-150 22.7-199 -120 22.7-199 kW 4.1-24.9 4W1x.35,.2 6.7-44.0 6.7-58.3 4.1-�5.2 6.7-58.3 CSA output/DOE *� MBH 8-80 11-143 14-141 18.5-187 11-113 18.5-187 heating capacity NG kW 2.3-23.4 3.2-'33.1 4.1-41.3 5.4-54.8 3.2-3 .1 5.4-54.8 CSA output/DOE *1 MBH 13-80 13-113 21-141 21-187 13-113 21-187 heating capacity LPG kW 3.8-23.4 368-33.1 6.1-41.3 6.1-54.8 3.8-3,r� 1 6.1-54.8 Net AHRI rating *2 MBH 70 98 123 163 A163 kW 20.5 28.7 36.0 47.8 .7 47.8 Heat exchanger surface area ft.2 12.96 0:12.96 27.44 27.44 1 _.96 27.44 m2 1.20 't,1.20 2.55 2.55 1. 2.55 Min. gas supply pressure :s, Natural gas W.C." 4 P4 4 4 4 4 LPG W.C." 10 i le10 10 1 10 1J 10 Max. gas supply pressure *3 l+ M. Natural gas and LPG W.C. 14 $ 14 14 14 11 14 A.F.U.E• °0 95 9;i 5 OW91IN MUS-W95 Weight Ibs 108 �108 179 179 110 190 kg 49 1,,49 81 81 50 86 Shipping weight Ibs 143 143 218 218 14 229 kg 65 65 99 99 fjG 104 Boiler water content USG 1.02 162 2.5 2.5 1. 2 2.5 L 3.88 88 9.50 9.50 3.8 9.50 " Boiler max. flow rate *4 GPM 4.8 2 8.8 10.6 6.2 10.6 L/h 1090 J408 1999 2408 1408 . 1408 Max. operating pressure S (max. allowable working pressure) psig 45 V5 60 60 45 60 at 2101F (99°C) bar 3 4 4 3 4 Boiler water temperature Adjustable high limit (AHL) range space heating (steady state) OF (°C) 68-180 (20-82) DHW tank heating OF (°C) 194 (90) - DHW heating OF (°C) 194 (90) Fixed high limit (FHL) OF (°C) 210 (99) a� Boiler connections Boiler heating supply and return NPTM (male) 3/4 in 3 in 1 in 1 in 3/44 1 in Pressure relief valve NPTF (female) 3/4 in N4 in 3/4 in 3/4 in 3/4..1n 3/4 in DHW tank heating supply/return NPTM (male) 3/4 in �,K in 1 in 1 in :% DHW heating NPTM (male) E - - - 3/4 ii', 1 in Drain valve (male thread) 3/4 in 1/g in 3/4 in 3/4 in 3/4 i' 3/4 in Dimensions 4. f Overall depth f inches 19 3/4 19+"/4 213/4 213/4 19 3/4 213/4 (mm) (500) (5r00) (550) (550) (50 ) (550) , Overall width inches 173/4 f73/4 173/4 173/4 173 173/4 (mm) (450) (4450) (450) (450) (45 ) (450) Overall height inches 33 3/4 3q 3/4 39 39 33 4 39 (mm) 1 (859) (859) (989) (989) (8 ) (989) *1 Output based on 140OF (60°C), 1207 (49°C) system supply/return temperature.µ Net AHRI rating based on piping and pick-up allowance of 1.15. W � *3 If the gas supply pressure exceeds the maximum gas supply pressure value, o a separate gas pressure regulator must be installed upstream of the heating system. C *4 See "System Flow Rates" on page 11 in this manual. a 4 B Vitodens 100-W, B1HE/B1KE Combi Technical Data Technical Data Specifications (c.&,.ed) Standard heating boiler(continued) 's Boiler Model No. B1HE-85 B1HE-1 0 B1HE-15U B1HE-199 B1KE-120 B1KE-199 Gas supply connection NPTM (male) 3/4 in 3/4 in 3/4 in 3/4 in 3/4 i i 3/4 in Flue gas *5 r: Temperature at boiler 5, return temperature of 86°F (30°C) - at rated full load OF (°C) 99 (37) 102 ( 4) 106 (41) 104 (40) 10-/,(39) 104 (40) - at rated partial load OF (°C) 95 (35) 95 ( 5) 111 (44) 113 (45) 95 (35) 113 (45) Temperature at boiler G, return temperature of 140OF (60°C) OF (°C) 144 (62) 14 (63) 151 (66) 149 (65) 145 (6 ) 149 (65) Flue gas value ; Mass flow rate (of flue gas) - at rated full load Ibs/h 86.9 26.0 155.9 207.0 147.0� 207.0 kg/h 39.4 57.1 70.7 93.9 66.7 93.9 - at rated partial load Ibs/h 8.9 3.0 16.1 20.8 13.0. 20.8 kg/h 4.0 .9 7.3 9.4 5.94 9.4 Available draught Pa 250 0 250 250 114%, 250 mbar 2.5 2. 2.5 2.5 1.14 2.5 Flue gas temperature i sensor limit OF (°C) 230(110) 236(110) 230(110) 230(110) 230(110) �,30(110) Average condensate �t s flow rate *6 with natural gas - Ts/TR =122/860F (50/30°C) USG/day 20.3 27.9 34.9 46.9 27.9 1 46.9 L/day 76.8 105.6 132.0 177.6 124.8,P 196.8 Condensate hose connection *7 nozzle 3/4 in 3/a in 3/4 in 3/4 in 'A nw 3/4 in 0 in c ' Boiler flue gas 0 connection *8 in (mm) 3 (80) (80) 3 (80) 3 (80) 3 (80) ,h 3 (80) Combustion air supply coaxial outer 0 in (mm) 5 (125) 5 (125) 5 (125) 5 (125) 5 (125) 5 025) connection *8 single 0 in (mm) 3 (80) 3 (80) 3 (80) 3 (80) 3 (80) 3 (80) Noise level (at 1 meter) at full load (dB) 52 59 51 55 59 55 - at partial load (dB) 34 34 31 31 34 31 NOx @ 3% 02*9 b, < 20 ppm Communication Module (integral) Wil'i Frequencv Band MHz 2400 to 2483.5 Maximum Transmission Power dBm 25 Lower Power Radio Frequencv Band MHz ;, 2400 to 2483.5 e Maximum Transmission Power dBm 11 *5 Measured flue gas temperature with a combustion air temperature of 6 °F (200C). *6 Based on typical boiler cycles, including partial load conditions. *7 Requires 3/4 in. (19 mm) tubing. See Vitodens 100-W Installation Instructions for details. *8 For detailed information refer to the Vitodens Venting System Installation Instructions. *9 The Vitodens 100 B1 HE/B1 KE boilers are certified to the requirements of South Coast Air Quality Management District (SCAQMD) Rule 1146.2, Bay Area Air Quality Management District (BAAQMD) Regulation 9 Rule 6, and San Juaquin Valley Air Pollution Control.District (SJVAPCD) Rule 4308. The Vitodens 100 61 HE/131 KE series boilers with power adaption technology using the burner integrated mass air flow sensor, automatically adjusts burner operation at the specific input rate. This combined with the electronic elevation setting in the boiler software allows the boiler to operate at altitudes of up to 10,000 ft. (3,000 m) without input Be- rate. CO 0 0 CO N p n iNtlyl a Lo 5 i r Technical Data Vitodens 100-W, 61 HE/B1 KE Combi Technical Data Specifications (continued) B1KE on demand hot water operation w, Boiler Model 61 KE 12U B'1 199 �. Max. Input NG and LPG BH 140 199 (DHW production only) W 41.0 58.3 } Max. boiler temperature (during DHW production) OF ( ) 194 (90) 194 (90) 4 DHW supply temperature OF (°C 140 (60) 140 (60) Continuous draw rate *9 04, at 0 t= 77°F(43K) USPIfii 3.3 4.7 (L/h) 757 1070 Max. flow through heat exchanger G/min. 3.7 5.3 q (L/h) (840) (1200) P Maximum allo able working pressure (po McAater) psi 150 150 Test.p1pssi0e psi 300 300 ;t 1 DCW and DHW temperature rise would be proportional. Maximum DHW supply temperature is 140°F (600C). Y� B1 KE DHW Performance "mot : of oC BIKE 120 -BIKE 199 , 158 70 I 6� `m 140 60 A °- ♦ d E ♦122 50 fi, t: 4... r 104 40 ; tY 0 86 30 a ,. U) f� � 60 20 50 10 G '"r a 0 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 L/min , ' .5 .8 1.0 1.3 1.6 1.8 2.1 2.4 2.6 2.9 3.2 3.4 3.7 4.0 4.2 4.5 4.8 5.0 5.3 USG/min 7 �F.. DHW Flow Rate 41,� hY This chart illustrates the changes in the outlet temperature, subject to the flow rate at the tap. The curve is only applicable for a DCW inlet temperature of 50°F (10°C) and boiler input data stated in the above. ' Minimum flow through the heat exchanger for boiler ttnw� start=0.5 GPM. 00 G m � N n a 6 in r 4 Pontino, Susan From: DAVID CANNIZZARO <wrenchpipe@aol.com> Sent: Thursday, March 27, 2025 5:55 PM To: Pontino, Susan Subject: 53155 Main Road, Southold, N.Y. 11971, Oil to Natural Gas Conversion Good afternoon, I was in the building department on Monday and dropped off the "Application for Building Permit"for the conversion from oil to natural gas. Please be advised we are planning to install the following equipment: VITODENS 100- 1 150 W BIHE-150 VITODENS 100- 1 199 W BIHE-199 1 42 GAL VITOCELL 300-V 1 79 GAL VITOCELL 300-V Please advise if you require any additional information. Thank you, David Cannizzaro ATTENTION:This email came from an external source. Do not open attachments or click on links from unknown senders or unexpected emails. i