Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
52136-Z
4,�Of SOpTyo� Town of Southold * P.O. Box 1179 0 53095 Main Rd Southold, New York 11971 CERTIFICATE OF OCCUPANCY No: 46384 Date: 08/08/2025 THIS CERTIFIES that the building ACCESSORY ADDITIONS/ALT'ERATIONS Location of Property: 2265 Long Creek Dr Southold, NY 11971 Sec/Block/Lot: 52.-84 Conforms substantially to the Application for Building Permit heretofore,filed in this office dated: 07/01/2025 Pursuant to which Building Permit No. 52136 and dated: 07/31/2025 Was issued, and conforms to all of the requirements of the applicable provisions of the law. The occupancy for which this certificate is issued is: "As built" deck reconstruction and outdoor shower as applied for. The certificate. is issued to: Bruce Anderson, Susan Anderson Of the aforesaid building. SUFFOLK COUNTY DEPARTMENT OF HEALTH APPROVAL: ELECTRICAL CERTIFICATE: PLUMBERS CERTIFICATION: . Bruce Anderson 8/ 2025 r utho ' Si ature •a �aof souls° TOWN OF SOUTHOLD BUILDING DEPARTMENT Vol • °� TOWN CLERK'S OFFICE SOUTHOLD, NY BUILDING PERMIT (THIS PERMIT MUST BE KEPT ON THE PREMISES WITH ONE SET OF APPROVED PLANS AND SPECIFICATIONS UNTIL FULL COMPLETION OF THE WORK AUTHORIZED) Permit#: 52136 Date: 07/31/2025 Permission is hereby granted to: Bruce A Anderson 2265 Long Creek Dr Southold, NY 11971 To: legalize "as built" deck reconstruction and outdoor shower as applied for per Trustees approval. Additional certification may be required. Premises Located at: 2265 Long Creek Dr, Southold, NY 11971 SCTM#52.-8-4 Pursuant to application dated 07/01/2025 and approved by the Building Inspector. To expire on 07/31/2027. Contractors: Required Inspections: Fees: As Built Addition/Alteration $1,137.00 CO-RESIDENTIAL $100.00 Total $1,237.00 Building Inspector Sufot,� Town Hall Annex ��� Giy� Telephone(631)765-1802 54375 Main Road - P.O.Box 1179 Southold, NY 11971 0959 We � off° • ��� 6 �D 4110 , S BUILDING DEPARTMENT ��,`id; aoe5 TOWN OF SOUTHOLD rO�'nof"00'' 4fho/aag CERTIFICATION Date: als Zs- Building Permit No. Ownerj;"C 3Su S 01, �C�V'Ro (Please rint) Plumber: , %/S (Please print) I certify that the solder used in the water supply system contains less than 2/10 of 1%lead. (Plumbers Signature) Sworn to before me this day of/4 FdS 20Cl-� yam+!q.StAPQN afNowft $IOh01SM709 7799 Ex0es Jan.6,2a Notary Publi , Su.P;.- 4 ILL County 1 OF SOUIyo� # # TOWN OF SOUTHOLD BUILDING DEPT. 631-765-1802 INSPECTION [ ] FOUNDATION 1 ST/ REBAR ( ] ROUGH PLBG. [ ] FOUNDATION 2ND [ ] SULATION/CAULKING [ ] FRAMING /STRAPPING [ FINAL [ ] FIREPLACE & CHIMNEY [ ] FIRE SAFETY INSPECTION [ ] FIRE RESISTANT CONSTRUCTION [ ] FIRE RESISTANT PENETRATION [ ] ELECTRICAL (ROUGH) [ ] ELECTRICAL (FINAL) [ ] CODE VIOLATION [ ] PRE C/O [ ]. RENTAL R MARKS: �A Gk (�h f C-1.1 HL� C-C�) DATE O IINSPECTORIX��44g Ij Mejia, Evelin From: Bruce Anderson <bruceanderson9131 @gmail.com> Sent: Friday,August 8, 2025 9:58 AM To: Mejia, Evelin Subject: [SPAM] - Re: [SPAM] - Re:2265 Long Creek Drive, Southold Evelin 1� We opted not to install a generator. Bruce On Fri, Aug 8, 2025, 9:36 AM Mejia, Evelin<evelimn@southoldtownny.�ov,>wrote: Hi Bruce, I received the Certification letter-thank you for getting that in so quickly. I'm processing the CO now,John will likely sign this when he's back from today's inspections. I will contact you once its ready for pickup. I noticed on the Trustees C of C they mentioned.the installation of a generator...was the generator actually installed? If so, I do not see that you have a permit or pending application in for this.The generator will need a separate CO. I've attached the permit application to this email.We will need the completed permit application,the specs of the generator(or photo of the sticker on the unit)and a survey showing the exact location of the generator. Kind regards, Evelin Wejia OfficeAssistant Town Of Southold Building Department Annex Building 54875 Main Road P.O.Box 1179 Southold,NY 11971 (681)765-1802 . 1 From: Mejia, Evelin Sent:Wednesday,August 6, 2025 11:28 AM To: 'Bruce Anderson' <bruceanderson9131@Rmail.com> Subject: RE: [SPAM] - Re: 2265 Long Creek Drive,Southold Hi, The one submitted with the application does not specifically state "Footings, Framing&Strapping". King regards, EveCin JKejia Office Assistant Town Of Southold Building Department Annex Building 54575 Main Road P.O.Box 1179 Southold,NY 11971 (631)765-1802 From: Bruce Anderson [mailto:bruceanderson9131@emaii.com] Sent:Wednesday,August 6, 2025 11:24 AM 2 i E;TT I September 6, 2024 Town of Southold Building Department Main Road Southold, NY 11971 RE:2265 Long Creek Drive,Southold I have inspected the repairs to the Deck. I certify to the best of my knowledge and experiance that all work was done according to New York State Residential Building Codes. JOSEPH@FI8CHETTI.COM FISCHETTIENGINEERING.COM 63 1 -765-2954 1 725 H O B A R T ROAD S O U T H O L D , N E w Y O R K 1 1 97 1 Ll EN 61NEERIN13 )I , June 21,2025 Town of Southold Building Department Main Road Southold, NY 11971 RE: 2265 Long Creek Drive,Southold I have inspected the outside shower that drains to a gravel base and I certify to the best of my knowledge and experiance that the work was done according to New York State Residential Building Codes. 4 .JOSEPH(Q FISCHETTI.COM FISCHETTIENGIN EMIR ING.COM 63 1 -765-2954 1 725 H O B A RT ROAD S O U T H O L D , NEW Y O R K 1 1 97 1 in""OP111 SA T'L . _ ' 1 August 6,2025 Q Town of Southold Building Department Main Road guild`ng papa Soy hu�d� Southold, NY 11971 -town in of RE: 2265 Long Creek Drive,Southold I have inspected the repairs to the Deck. I certify to the best of my knowledge and experience that the footings,framing,and the strapping was done according to New York State Residential Building Codes. , nc Q .J0SEPH Co!' PISCHETTI.Gom FIB cH'E-rT1ENGINEERING.`COM 631 -765-2954 1 72 .5 H09ART ,RO.AD S:0UTH0LD ,'NEW YORK 1 1 97 1 FIELD INSPECTION REPORT DATE COMMENTS FOUNDATION (1ST) -------- ............... -------------------------------------- -- FOUNDATION (2ND) ROUGH FRAMING& PLUMBING 44% INSULATION PER N. Y. STATE ENERGY CODE V4 /A - ---------- ------------ FINAL ADDITIONAL COMMENTS f3 - 1 Pa,;t 9--5-7 P+c o r-e- c 1I i) lei 0 M, X ............. o ------ .J ----- - ............ Q SFF �Q TOWN OF SOUTHOLD—BUILDING DEPARTMENT Town Hall Annex 54375 Main Road P. O. Box 1179 Southold,NY 11971-0959 Telephone (631)765-1802 Fax(631) 765-9502 hos://www.southoldtownn . ov Date Received APPLICATION FOR BUILDING PERMIT For Office Use Only ® C E E PERMIT NO. 591'-3�-- Buflcling Inspector: J U L 1 2025 Apphcattons and for 44be filled ouf m their:entiretq Incomplete ` „applicatto�s will not be accepted:,Where`the Applicant is riot tfie owner,an Building Department Owner's Authorization form(Page 2j shall be completed Town of Southold Date:June 16,2025 OWNER(Sj OF PROPERTY r4 Name:Bruce Anderson SCTM#1000-52-8-4 Project Address:2265 Long Creek Drive, Southold Phone#:516-380-4907 Email:bruceanderson9131 @gmail.com Mailing-Address:2265 Long Creek Drive, Southold, NY 11971 CONTACT PERSON Name:see owner Mailing Address. Phone#: Email: "1x\ DESIGN PROFESSIONA,L INFORMATION t Name:Joseph Fischetti, P. E. Mailing Address:PO BOX 616, Southold, NY 11971 Phone#:631-765-2954 Email: CONTRACTOR!NI`ORMATION v Name:N/A Mailing Address: Phone#: i Email: RESCRlPTION OF PROPOSED CONSTRUCTI01t f x ❑New Structure ❑Addition ❑Alteration []Repair ❑Demolition Estimated Cost of Project: other replace deck and add outdoor shower(as built) $$40,000 Will the lot be re-graded? ❑Yes ®No Will excess fill be removed from premises? ❑Yes BNo � t W �PROPEAVMINfORMATION= tt Existing use of property:Residential Intended use of property:same Zone or use district in which premises is situated: Are there any covenants and restrictions with respect to this property? Dyes MNo IF YES, PROVIDE A COPY. 8 Check°Box After Reading The owner/coMracfor/des!gn professional is responsible for all drainage and storm water issues as provided by Chapter 236 of the Towr1 Code APPLICATION IS HEREBY,MADE to th¢'Bwldmg Department for the issuance of a Builtl�gg Permtpursuant to the Building Zane Oi finance of the Town of Southold,Suffolk,County,New York and other applicable Laws,Ordtnahces or Regulations`for the construction of buddings addttions,alterations or for removal or demolit�on`as herein described The applicant agrees to`comply with all applicable laws,ordmarices,budding code housing code and regulations and to admit authorized Inspectors on premises and m bw)dmg(s}for necessary mspectians False statements madefierem ale punishable as a ClassA mtstleneanor pursuant fo Section 210 45 of the New Yprk State Penal Law': ;: 4 Application Submitted By 'nt na e):Bruce Anderson ❑Authorized Agent MOwner Signature ofApplicantrye_.. _ Date: 2� STATE OF NEW YORK) SS: COUNTY OF ) v ems_ V O being duly sworn,deposes and says that(s)he is the applicant (Name of individual signi g contract)above named, (S)he is the dW Vw—� (Contractor,Agent,Corporate Officer,etc.) of said owner or owners,and is duly authorized to perform or have performed the said work and to make and file this application;that all statements contained in this application are true to the best of his/her knowledge and belief;and that the work will be performed in the manner set forth in the application file therewith. Sworn before me this day of7UJ 2025 (7—Z Not ubli 0 WENOY A.STAPON. NoIII y Public,State of M Y'A j No.0100709.79 PROPERTY OWNER AUTHORIZATION IT, (Where the applicant is not the owner) QWvjv*F Jan. I, residing at v do hereby authorize to apply on my behalf to the Town of Southold Building Department for approval as described herein. Owner's Signature Date Print Owner's Name 2 Glenn Goldsmith,President of S�ury Town Hall Annex A.Nicholas Krupski,Vice President ,`O� ��� 54375 Route 25 P.O. Box 1179 Eric Sepenoski 41 Southold,New York 11971 Liz Gillooly G Q Telephone(631) 765-1892 Elizabeth Peeples • �O Fax(631) 765-6641 BOARD OF TOWN TRUSTEES TOWN OF SOUTHOLD Permit No.: 10435A Date of Receipt of Application: July 10, 2023 Applicant: Bruce & Susan Anderson SCTM#: 1000-52-8-4 Project Location: 2265 Long Creek Drive, Southold Date of Resolution/Issuance: August 16, 2023 Date of Expiration: August 16, 2026 Reviewed by: Liz Gillooly, Trustee Project Description: Reconstruct existing 620sq.ft. deck, and 4'x5' stairs; install 4'x6' concrete slab; reconstruct 3.5'x9' access,.stairs in kind/in-place; install generator and outdoor shower beyond 100' from wetland boundary. Findings: The project meets all the requirements for issuance of an Administrative Permit set forth in.Chapter 275'of the Southold Town Code. The issuance of an Administrative Permit allows for the operations as indicated on the survey prepared by Kenneth M. Woychuk Land Surveying, PLLC', received on July 10, 2023, and stamped approved on August 16, 2023 and the site plan prepared by Suffolk Environmental. Consulting, Inc., dated July 4, 2023, and stamped approved on August 16, 2023. Special Conditions: None' Inspections: Final Inspection. If the proposed activities do not meet the requirements for issuance of an Administrative Permit set forth in Chapter 275 of the Southold Town Code, a Wetland Permit will be required. This is not a determination from any other agency. Glenn Goldsmith, President Board of Trustees Glenn Goldsmith,President I SOUTH Town Hall Annex A. Nicholas Krupski,Vice President ,�0� ®�® 54375 Route 25 P.O.Box 1179 Eric Sepenoski i�d Southold,New York 11971 Liz Giilooly G Q Telephone(631) 765-1892 ® E HzWetlke ®� Fax(631) 765-6641 COUNTY, JUL 3 1 2025 BOARD OF TOWN TRUSTEES Buliding Department TOWN OF SOUTHOLD Town of Southold i CERTIFICATE OF COMPLIANCE #2275 C Date:July 15,2025 THIS CERTIFIES that the reconstruction of existing 620sq.ft. deck,and 4'x5'stairs: installation of 4'x6'concrete slab• reconstruction of 3 5'x9' access stairs in kind/in-place; installation of generator and outdoor shower bqyond 100'from wetland boundary, At 2265 Long Creek Drive,Southold i Suffolk County Tax Map#1000-52-8-4 Conforms to the application for a Trustees Permit heretofore filed in this office Dated July 10,2023 pursuant to which Trustees Administrative Permit#10435A Dated August 16,2023,was issued and conforms to all of the requirements and conditions of the applicable provisions of law. The project for which this certificate is being issued is Ifor the reconstruction of existing 620sq.ft.deck,and 4'x5'stairs, installation of 4'x6'concrete slab-, reconstruction of 3 5'x9'access stairs in kind/in-place; installation of generator and outdoor shower beyond 100'from wetland boundary. i The certificate is issued to BRUCE&SUSAN ANDERSON owners of the aforesaid property. Authorized Signature l NunemaWr, Amanda From: Bruce Anderson <bruceanderson9131 @gmail.com> Sent: Thursday,July 31, 2025 12:24 PM To: Nunemaker,Amanda Subject: [SPAM] - 2265 Long Creek Drive Attachments: 20250731-1207.pdf Amanda, I hope this communication finds you well..To answeryour questions, the Deck and Shower are built and certified by Joseph Fischetti P E. As for the DEC, neither the deck or shower are regulated by DEC. I attach DEC's Dart Search that provides the short description along with its controlling regulations that certify at item#50 NPN (No Permit Necessary). Hope this satisfies your questions. Bruce ATTENTION:This email came from an external source. Do not open attachments or click on links from unknown senders or unexpected emails. . 1 . . (PARSE DateReceied; 0Sl912022; Issued as''of©9/28/20 - Cgmpoifte Status: - . Complete as of o9/27I2023 VIRWdlast flAinor hor _ DMS-R, CONSTRUCT DOCK:4!k4 DescrF i®n: STEPS,ADD GREEIVHQUSE, GEPJERATfJR; SHtJ4lER E B Pubiicatioh written- - y. -C®Mments Uue: SEOR Maass:: `type Il-Action SEOR ' Not Applicable Determination: lead'Agency.m konei Designated Lnv ronpne tal The application is not subject to the J os#m Department's.Environmental Justice p01.icy.(CP-29). Either the permits needed for the project are not subject to the policy or it has been determinedAhat the.project Would not ,a#ect a Potential Environmental -_ -ustice_Arp1:_. 6 CRR-N*V 661.5 r NKCRR STATE coMPiLATIOAT oi�coD� RrnEs�: . . = R&GUI ATIONS OF THE u['ATE OF TITLE 6.DEPART MENT Oi� MgRONMLrNTAL CONSERVATION CHAPTER X.DIVISION OF WATER ItESOURCE3 ; 'SUBCHAPTERA.GENERAL ARTICLE x.MISL`ELLANEOiTS RULES P_.RT 66_i_.TIi�AL WL'TT. CELL Ll1ND USE 1tEGU .ATIOItiTS ND 6 CRR-NY 66x.5' 6 CRR-NY 661.5 661.§tise guidelines-. (a) (1)An Y type of use designated in this section as a use not requiring a Permit for the type of involved is not subject to the Permit requirements of this Part, (2)Any type of use designated in this section as a generally compatible use for the type of area involved is. with that type n that and with the preservation,draya protection and enhancement of the present and potential value of tidal wetlands if undertaken in that area.The compa#ibiiity of a particular use depends on the particular location,design and Probable compatible the proposed use,Generally compatible uses are subject to the permit.requirements of this Part. p obable impac4 of (3)Any type of use designated in this"section as a presumptively incorrapatible use for the Presumed not to be compatible with the type-of area Involved or with the preservation,protection ocenha c of area lement of the r and potential values of tidal wetlands if undertaken in that area.Any such use►Nano .p to the permit requirements f t this present (4)Any type of use designated in this section as an incompatible use is;not compatible-with the type of area involved or with the preservation,protection or enhancement of the present and potential values of tidal wetlands if undertaken in that area.A such use is subject to the permirregwrements of this Part. n Any (1)Nothing in this subdivision shall be deemed to remove any burden of proof Imposed licant b this Part.. posed on an ap p y section 869.8 of (b)The classification of uses in coastal fresh marshes,lntertlda]marshes,coastal shoals,bars and flats,high marshes or salt meadows,littoral zones,and,adjacent areas,shall be as respectively indicated in the following chart; ABBREVIATIONS Area Categories Use Categories - �FM--COaslal Fresh Marsh N15W-L l iSs loot Requiring a Permit tM Jntertidal Marsh GC _. -- p—Generally Campatible Use==Penyrit Required� SNt 11-Costal Shoals,Bars and Flats Plp--Presumptively Incompatible Use—Pem��Required '� Littoral Zone I—incompatible Use � _ - __ . gH High Mach or Satt Meadow d=-Permit*Required AA--Atljacent Area NA—Not Applicable _ Uses _. 1. The continuance of lawfully existing uses(inciuding but not limited to residential, Area and Cate o s_. FM,111y,yM Use SM,LZ na 'commercial,industrial,agricultural,recreational and public use)and the continuance of fall activities normally and directly associated with any such use,where such continuance.. does not involve expansion or signcant ®; -Ds o"shin or removing the natucafproducts of a tidal wetland(or adjacent area)in the _, .. .. - tPP1.�- 'NON i NPN + process of recreational or commercial fishing,shelJfishmg,aquacufture,huntingor a- trrgAping,Including the erection and maintenance of temporary aides or blinds. i 7. __ NPN Conducting educational and research activities not involving any material alteration of NPN t�pN ;the area involved. .8 Establishing walking trails withou#material,alteration of the NON 9NPN,area involved. ° NPN Establlshin , 2 plantings. - a _ NPN 10. Establishing recreational moorings. p GA '�NP GC NPN . . t9. Operation of motor vehicles,including but not 11mil- NPN. NPed to air boats and'other N NPN vehicles,for educational or scientific research Purposes(provided this item shall!not, errainT include operation..of aircraft or mechanically 12. ®peration of motor vehicles,including but no I milted to air boats andotheaajlb-terroin G vehicles,for other than educational or scientific purposes(provided this item shall not GCp NPN } Include the use of aircraft or mechanical) 13 Operation of aircraft or mectianicaN Y Propelled vessels other than air boats)., Pip- y propeli"ed vessels other than air beats. - NPN, GCp NPN 14 Constructing one open pile catwalk and/or dock not greater than four feet in width for any principal building. x NPN NPN h 15. t onstructin9 open pile catwalks acid docks more than four feet in width,or construdting° more than one open pile catwalk and/or dock not greater than four feet in wide for any _G�p✓w^ GCA F-GCp principal building ; 17 Installin a floatln docks totallin� 200 N �_1ti. Installing a floating docks)totalling less than 200 square feet in area. --, a �W-� -�_ Pip g. O _ . GCp GC ` 9 square feet or more in area mNPN NON 1t3, Relocation or rearrangement of floating docks,open pile docks,and similar structures _. A GCp GCp..; 1 _ within an established marina or boat basin where such activities involve no disturbance of a tidal wetland other than removing or relocating anchors or p lings..Constructing solid fill docks. p - Pip NPN NPN ;2®• Permanent or seasonal-' of any vessel or structure to be used as a single family _. dwelling,multiple family dwelling,commercial use building, _ A,- -- Pll? GCp , public or seriii-publlc building, 9,industrial use building or w. _ Ordinary maintenance and repair(not involving expansion or sub GCp stantial restoration, CCp_ Pip reconstruction or modification)of existing functional structures,,facilities,or improved areas,including but not limited to bridges,roads,highways,railroad beds,bulkheads, docks,beaches,piers,wharves,pilings,dolphins,buildings,landscaped or paved areas, lawns,and agricultural€� mosquito control ditches,-ditches,—Including for example,replacing broken boards in docks,repainting structures,reddving pilings,resurfacing s Installing or removing lawful structures on a seasonal basis.g ' Paved areas, _ - _. � . 22 in kind and in-place replacement of existing functional bulkheads and similar structures. NPN _ NPN N 23 Routinebsach regradingland Cleaning,both above and below mean high water mars NP -�- _GCA GC £24• Substantial restoration or reconstruction,of existing functional structures P GCp any kind,except for those covered by Items 22 and 26 g or facilities of ?�P NPN NPN ,(provided,where the installation of a new structure or facility is listed in this subdivision as NPN for a particular type of area,the substantial restoration or reconstruction of such a structure or facility on that area shall be treated in the same manner as the installation o such a new structure or i fac�lrty). . _ f 25 Expansion or substantial modification of existing functional facilities and structures, GCp GCp GCp ;except for chose actions covered by isms 26,33,34 or 38(provided where the, installation of a new structure or facility is listed in this subdivision as NPN or GCp,the t expansion or substantial modification of such a structu same manner in that area)• re or'facJiity,shell be treated in the f 26 Substantial restoration,reconstruction,modification or expansion of existing functional ? E residential structures which are and will continue to be located 75 feet or rriore Pip GCp GCp ;or more in New York City)from the most landward edge of any tidal wetland. (or 30 feet :27 Dred in 9 g• - 28 Maintenance dredging. _.f_ NA NPN 29 Construction of groins,bulkheads and other shoreline stabilization structures. Pip Flp Pip 30 FiJlin . ucture - P nA GGp GCA 1 .9 - - -- -- .o...,J.uyr�c.uludrAr'oneg — _ .. w .. . vv 39• N-IVew agr(cultural activities not covered by items 35-3r3. • GCp _ GCp GCA ; 40. {Connection of eiecfric,gas,sewer,water,telephone or other utilities from an existing PI distribution utility facility to an existing structure, p _ r Ptp ; GCp { 41. installation of underground electric,sewer,water,or other utilities where suc NPN h installation ;` GCp GCp will involve restoration of existing ground elevation,:other than activities covered by item 40. 42. Installation of electric,gas,sewer,water or other utlities,'other than activide covered by GC hems 40 or 41. - P .CCP GCp - 43 ;Installation of. dry well,retention basin,filter,open swale or pond. pip 44. New d(schar a of an - - �- . P1P _ : GCp , g y pollutant requiring a SPDES permit pursuant to the environmental `�� Flp Pip GCp 'conservation law and complying with the requirements for the issuance of such a permit. ` _ p 45 fnst Mellon of a sewage disposal septic tank,c0sspooi,'Ieach field or seepage pit and P P' `discharge of any pollutant into such facilities not requiring a SPDES'-s'ee it pursuant to article 17 of the environmental conservation law. 4G• Cin onstruction of Constructionof scomme-918 rc at pmily dwellins and m>aitipte family dwel(ttlgs. P P ,��p- GCp and semi-public buildings requiring water-acess;us and untles dertaking nguiringwacommereterasal andpublic- f P GCp : :industrial use activities requiring water access. 148. 'Construction of commarcialand Industrial use facilities'not requiring water access and Pip pip GCp public or semi-public buildings not requiring water access;and undertaking commercial and industrial:,use activities not requiring water access. 49. Construction of accessory structures or facilities for any use iisfied in items 48 and 47, '" w_. Plp: PI PIP `other than accessory structures or facilities covered by item or covered specifically in this list. 50. Construction of accessory structures or facilities for existing residential struGures where _ ., �. _Ill `•, PIP GCP t such accessory structures or facilities are and will continue to.be in the development restrictions of this Park full compliance with 551• Construction of accessory structure or facilities for any use I�sted in item 48r NA 52•_ Disposal of any chemical,petrochemical or other toxic mafenai an " NA NP N _, PIP pip Plp including Y pesticide ! S3. The use or application of an chemical, etrochemical or other toxic material,rncludin , pA Y P ... I 1 :any pesticide,where not authorized by law, g 54• The storage of any chemical,petrochemicator othertoxic material,including any Pesticide,for wholesale purposes or for purposes of distribution to persons other than ` the ultimate user of such materials. - 1 PIP The use or application of any chemical,.petrochemical orother toxic material,includm any pesticide,where otherwise authorized by law,or the storage of any such material fors V Purposes other than wholesaling or distribution to persons other than the ultimate users of such materials. 56. Disposal of solid wastes as defined in section 27=050? of°the environmental conservation' NPN NPN f NPN `law. „ -_ 57. 'Att � T . , �T_ Y type regulated activity not specifecally fisted in`this chart and any subdivision of land. Pip - P _ p(c)Formerly connected tidal wetlands. - � � "-- - P- P For formerly connected tidal wetlands,uses not requiring a permit,generally compatible uses,presumptively incompatible uses and incompatible uses shall be deemed to be the same respectively as the type of wetland which a particular formerly connected tidal wetland most closely resembles. (d)Uses not specifically listed in subdivision(b). For any regulated activity covered by item 57 in subdivision(b)of this section,the regional permit-administrator shall on a case-b case basis,classify such cases as GCp,Pip,or i under subdivision(b)of this section,utilizing the listed Items as a guideline classification. Y g eNne for such 6 CRR-NY 661.5 Current through March 15.202s Aft NEW YORK STATE.DEPARTVIENT OF ENVIRONMENTAL CONSERVATION Facility DEC ID 1-4738-04.908 PERMIT Under the Environmental Conservation Law (ECL) Permittee and Facility Information Permit Issued To: Facility:'.. BRUCE?ANDERSON E1NDT RSON PROPERTY 2265 LONG CREEK DR 2265 LONG CREEK DR11000-52-8-4 SOUTHOLD;NY 1.1-971 SOUTHOLD,NY 11971 Facility Application Contact: S.UFFOLK ENVIRONMENTAL CONSULTING INC PO BOX,<2003 BRIDGJ.9HAMPTON, NY 11.932-2003 (631),5 7-51.60 r ................, tr, Facloty Location: in SOUTHOLD in SUFFOLK COUNTY Facility Principal Reference.Point: NYTM-E: 717.1.95 NYTM-14: 4550.967 Latitude 4�1°04'51.5" I ongitude _72°24'S1 9" -., Authorized Activity.. Reconstruct or repair-'d`exi 4i stairway or walkway on a bluff or dune. All work shall be done a strict conformano' ith the attached plans prepared by Suffolk Environaie,ntal Consulting, dated 7/4/23, and stamped."NYSDEC-Approved"on 9/28/2023 Permit Authorizations: Tidal.Wetlands =iJ`nd`er Artiele 25� Permit ID 1-4738 0490$/0000:1. New Permit Effective Date: 9/28/2023 Expiration Date: 9/27/2028 NYSDEC Approval By acceptance of this permit, the.permittee agrees that the permit is contingent upon strict compliance with the ECL all"ap.plicable.regulations,and.all conditiQns'in:cluded as part of this permit. Permit Administrator: SHERRI L AICHER, .Regional Permit Administrator Address: NYSDEC Region 1 Headquarters. SUNY c Stony BrookI50 Circle IZd Stony oolc,, NY l 1790 -3409 o Authorized Signature: N _ _ Date l oZ�j Page 1 of 5 A► NEW YORK STATIC,DEPARTMENT Of ENVIRONMENTAL CONSERVATION � Facility DEC ID 1-4738-04908 LDistribution List SUFFOLK ENVIRONMENTAL CONSULTING INC Bureau of.Marine Habitat Protection DANIELLE A ST'ANGO-TORRt Permit Components NATURAL RESOURCE PERMIT CONDITIONS GENERA.L:'CONDITIONS, APPLY TO ALL AUTHORIZED PERMI"TS NOTIFICATION OF OTHER PERMITTEE OBLIGATIONS NATURAL RESOURCE PERMIT CONDITIONS Apply to the Following Permits: TIDAL WETLANDS 1 Regulated Activities Authorized By This Permit This permit ONLY authorizes those regulated activities/-st titied "ASAP'Auth6rized,Activity", Tlie DepaiI ent,does not.issue after the-fact of as built permits. This permit does not authorize activities, or legitimize the , existence of strtitctuies, which would have required a permit but for which no.permit or other` author i7ation has'been.granted by the Depaf`tment,,., 2 Con'formance With Plans Ali activities authorized.by this permit must be instricE confaniiance with}the approved.plains submitted by the applicant-or applicant's agent as part of the permit application. Such,approved plans were prepared by Suffolk Environmental.Consulting,.dated 7/4/23, and stamped NYSDEC Approved on 9/28/23. 3. Notice°of Conimeneement�'At least 48�hours-prior to`.commencement of the project,the permittee and contractor shall:sign.aiid.zetwrn.the top..po gqq of the encl:osed;notification.foriii.certifying that they are fully aware of and understand all terms and conditions ofthis permit. Within 30 days of cdiinpletion of project, the bottom portion of the form must also be signed and returned, along with photographs-of the completed work. 4: Stairwuy.Design The stairway:must be elevated a minimum of three (3) feet over grade to minimize disturbance or loss of the'natural vegetation and reduce the potential for causing oi accelerating erosion of the bluff, dune or hill. Disturbq.nce to the natural vegetation or topography seaward of the crest (top) of the bluff, dune or hill must be restricted.to an eight(8) foot wide:are'a,including the width ofthe stairway, as shown on the approved plans 5. No Alteration-of:Bluff foe Stairway Alteration of the existing grade of the bluff.or hill during construction of the stairway is prohibited. Page 2 of 5 NEW YORK STATE DEPARTMENT OF ENVIRONMENTAL CONSERVNTtON Facility DEC ID 1-4738-04908 C. Equipment, Material.Stored Away from Crest of Bluff The storage of construction equipment and materials shall be confined to upland areas landward of the crest ofthe bluff or hill and outside of dune areas. 7. No Disturbance to Vegetated Tidal.Wetlands., Dunes There shall be no disturbance to vegetated dune areas or vegetated tidal wetland areas as a result of the permitted activities. S.. No Construction Debris in Weiland''or Adjacent Area= Any:debris or excess material .from construction of this project shall be'conipletely removed from the.adj.aeent,area (upland)and removed to ail approved u pland area for-disposal. No debris is permitted in wetlands acid%or protected buffer-areas. 9. No Runoff DowrrBluff,into:Dunes, or onto Beach There shall be no:discharge of runoff or other effluent on or in d'iule areas, down the bluff face or onto the beach. 10. Vegetate'All.Disturbed Areas The permittee shall revegetate all exposed faces and disWrbed areas to preventaoil erosion prior to the project completion or expiration date of this permit, whichever comes first.: 1a...State.N.ot.Liable for.DAmage,.The.State.of New.York.shail.in.no..case be liable.for..any:darnage or.. . . injury'to the-structure or work herein.authorized which may be caused by or result from future operations undertaken by the State for the conservation:or improvement of navigation, or for other purposes, and no claim or right to compensation shall accrue.from any such:damage. 12. State May Order Removal or.Alteration of Work If future operations by the State of New York require an alteration n 116 pos tir6hWthe structure or work.herein authorized, or if, in the opinion o-ftl e Department of EnNiironmental.Conservad6h-jt shall cause unreasonable obstruction to the`fx`ee navigation of said waters or flood flows or endanger the health, safety or welfare of the,people of the State, or cause. loss:'or destruction of.`the natural resources of the State,the`ownenmay be ordered by the Department:to remove or alter the structural work, obstructions, or hazards caused thereby without expense to the State, and if, upon the expiration or revocation of this permit; the:structure, fill, excavation, or other modification of the watercourse hereby authorized shall not be completed,the owners,shall, without. expense to the State, and to such extent and in such time and manner as the Department of Environmental.Conservation may=requir:e;.remove:all orany portion of the uncompleted stiucture or fill and restore.to its fozmer:.condrtion tlle:navrgable and flood capacity of the watercourse No claim shall be made against the State of New York on account of any such removal or alteration. 13. Precautions Against Contamination of Waters till necessary precautions shall betaken to preclude contamination of any wetland or waterway by suspended solids, sediments, fuel's, solvents, lubricants, epoxy coatings,paints, cor1crete, leachate or any.other etrvironnlentally deleterious materials associated with the project. 14. State May Require Site Restoration. If upon.the expiration or revocation of this permit, the project hereby authorized has not been completeci;:the:applicairt shall, without expense to the State, and to such extent and in:suelI time and manner as the Department of Environmental Conservation may lawfully require, remove all or any portion of the uncompleted structure or lilt and restore the site to its fotnier condition.. No claim shall be made against the State of New York on account of any,such removal or alteration.. Page 3 of S Aft NEW YORK STATE DEPARTMENT OF ENVIRONMENTAL CONSERVATION ems' Feacility DEC 11) 1-4738-04908 GENERAL CONDITIONS - Apply to .ALL Authorized.Permits: 1.. Facility inspection by The Department The permitted site or facility, including relevant records, is subject to inspection at reasonable hours and intervals by an authorized representative_ofthe.Department. of Environmental Conservation(the Department)-to determine whether the permittee is complying with this permit and the ECL. Such representative4-Aay bider the work•stispended pursuant to ECL 71-- 0301 and WA 401(3). I`he permittee shall provide a person to accompany the Department's representative during an inspection. to the permit area;when requested by the Department. _A_copy_o.f..this;permit, including all referenced maps, drawings and.special conditions, must be available for•inspection by the Department at all tunes at the project site or facility. Failure to produce'a copy of the permi.Pon request by a Department representative is a violation of this permit. 2 Relationship of this Permit to Other Department Orders and:Determinations Unless expressly provided for bythe Departmeni, isswince of this permit does not modify, supersede or resciird any order or de&iiiination previously issued by the Department or any of the terins, conditions or tequirements contained in such order or determination. 3 A'pplicnt�nns:For Permit Renewals,l odifications-or Traiasfers Thc'per'Perini ee must submit°ix separate written application to tlie.Department for permit reiewal,.modification or transfer of this permit Such application.must inclL de any forms or supplemental information the Depaartrnenf requires: Any_renewal, modification or transfer granted by;the Department inustbe'in writing:'"Submission of applications for permit renewal, moclificat.ion ar transfer are to be submitted to` i Regional Permit Administrator NYSDEC Region 1 Headquarters SUNY a Stony'I3rookJ50 Circle Rd Stony Brocik;NY11790 3409 4, Submission,of Renewal application The permittee intist°subiri.t.a.renew�il .application at.:least 30 days .before permit expiration Tor the following permit authorizations: Tidal Wetlands. 5. Permit Modifications,Suspensions and Revocations by the.Department The.Department reserves the right to:exercise all available authority to modify, suspend or revolve this per. The grounds:for modification, suspension or revocation include: a. inate►•ially.false or inaccurate.statements in the;permit application-or s'upporting.papers; b.. failure by the permittee to comply with any terms or conditions of the permit; c.. exceeding the scope of the project as'described in the permit.application d. newly discovered material information or a material change in environmental conditions, relevant technology or applicable law or regulations since tile issuance of the existing permit;. Page 4 of 5 Aft -NEW YORK STATE DEPARTMENT OF ENVIRONMENTAL CONSERVATIONv Facility DEC 1D 1-4738-04909 e. noncompliance with previously issued permit conditions, orders of the commissioner, any provisions of the.Environmental Conservation Law or regulations of the Department related to the permitted activity. G. Permit Transfer .Permits are transferrable uriless.specifically prohibited by statute,.regulation or another permit condition. Applications for permit transfer should be submitted prior to actual! transfer of ownership. NOTIFICATION OF OTHER.PERMITTEE OBLIGATIONS Item.A: permittee Accepts Legal Responsibility and Agrees to��Indemnificotion The permittee, excepting state or federa't agencies; expressly agrees to indemnify ind hold harmless the_ Department of Environnietatal Conservation of the State of New York, its representatives,employees, and agents ('.:DEC")for all claims, suits, actions,.and damages, to the extent attributable to the permittee's,.acts or omissions in connection with the permittee's`undertaking of activities in connection with,pro.eration and maintenance of, the facility or facilities authorized by the permit whether in compliance ormot in compliance with the terms and conditions of the permit. This indemnification does not extend to all claims, snits, actions, or damages to the extent attributable to DEC's own,negligent or intention al acts or omissions,or to any claims, suits; or acti.ons.naming the DEC and arising under Article 7$.of the New York Civil Practice Laws and Rules or any citizen suit of civil rtglts provision under federal or state laws. Item 13 Per..mittee's Contractors to Comply with Permit. The permittee is responsible for informing its independent contractors; employees,;agents and assigns of their responsibility to comply with this permit, including all special.conditions whi e acting as the permittee's agent with respect to the permitted activities, and such persons shall be subject to the same sanctions for violations of the Environmental Conservation Law as those,prescribed for the permittee: Item C Permittee:Responsible for Obtaining Other Retluired Permits The permittee is.responsible for obtaining.any.other:pemiits,.approvals;lands, easements and.ril hts-of way that may be required to carry out the activities that are.authorized..by dais permit. Item n: No Right to Trespass or Interfere with Riparian Rights This permit does not convey to the periiaittee.any right to trespass upon the lands.or interfere with the riparian.rights of others in order to perform the permitted work nor does it authorize the impairment of any rights, title, or interest in real or personal property held or vested in a person not a party to the permit. Page-5 of 5 CROSS VIEW Scale:1"=10' CROSS VIEW t Scale:1"=10' TOP of BANK ` v ±260.0'to OPPOSITE ' SHORELINE PROP.TIMBER HANDRAILBOTTOM of BANK TOP of BANK ---------- PROP. TIMBER POSTS 3t — 2 ti, 'M1 J j •;• b f ' FIR PROP T S AIRS` M r 0 s. BER _. ?. s + � �:w .� .• an.-3., . s r TYPICAL CROSS SECTION x $ No Scale �v1EAN HIGH WATER TOP PLANKING (THRU-FLOW Material) .� GIRDERS NOTE: Please be advised that all materials to be (2"xB"TYPICAL) Areated, decking to be constructed of light-penetrable �k through-flow decking. All hardware to be hot-dipped. No �. CROSS BRACE"`#idal_ w_ve ;,(z°x a TYPICAL)_ y APPROVED ASPERTERM$�-__._.__ y proposed structure. CONDITIONS OF I_ +�3E a-tS ' PERMIT N0, 5 a S a3 AERIAL VIEW ' DATE Scale:1"=10' ANDERSON Property- Proposed Access Stairs Situate: 2265 Long Creek Drive - Southold,'NY • 11971 SCTM#: 1000—052—08—04 Drawn By: R.W.A. Date: As Shuonvronmental Consulting , Inc. Comments: P.O.Box 2003•Bridgehampton,NY•11932 (631)537—5160 S.C.T.M. N0. DISTRICT: 1000 SECTION: 52 BLOCK: 8 LOT(S): 4 .,ARSHA Sp.51' TIDAL WETLANDS AS DELINEATED BY SUFFOLK ENVIRONMENTAL CONSULTING, INC. SEPTEMBER 5, 2017 N 76007,39 B MON. EXISTING MHw K WOOD STEPS 3.5'X9' TOE 0 m kindrand reconstructed K TOP Of PIPE CD �' N Cry CO J % O LO N Z, PROPOSED 46 ON GRADE 'Po N � 0 PROPOSED O o DE C� �Y NGROUND LP.GAS TANK o t� 2ND FLR 0 DEGK CANTILEVE 1REll1S�OVER PATIO POSED 00 :::AQ :•;::;iii:;:ii:j°' ?i ......... g,8' ' PROPOSED ERATOR m PROPOSED :6i::::::i:( :{ :.......::::::::: OUTDOOR SHOWER 22 ;;:::: :;:::::::::::::� NG:::::; ::: z 4'x4' ?OwE�i'a65::.:.::::''w PROPOSED 1 0 ::::� , Z DRY WELL �St. h4.5 m NYSDEC LOT COVERAGE ® .. :: 'Z.'::: '' f. o, g0. R00�0 p0 ADJACENT AREA: 36543 S.F. 0 :'::: : o SCR PROPOSED 15.0 DWELLING: 1989 S.F. �•;;;;;;;;• • ;;;;;;•;• Roof Pp(tGN SHED 4.5x7' FRONT PORCH: 535 S.F. b :•::•:::•::•::•:::•:::•::• w0001� GREEN HOUSE 6'x8' REAR DECK: 621 S.F. DRIVEWAY. 1780 S.F FY .2.AGE .w (1 WOOD STOOP: 39 S.F. pR • ::��:: : ::' PROPOSED SHORLINE STEPS: 32 S.F CO"C' :;.22 A `' DRY WELL ENCLOSED STORAGE. 25 S.F. TOTAL EXISTING COVERAGE: 5021 S.F. or 13.77 44•3 PROPOSED SHED W/GREENHOUSE: 80 S.F. o PROPOSED SLAB: 24 S.F. o PROPOSED OUTDOOR SHOWER: 16 S.F. PROPOSED GE ER4TOR: 15-SF. ._ � LOT 3 _- TOTAL PROPOSED COVERAGE: 5156 S.F. or 14.1% Cp 0 N LOT 4 w n a MON. 0 Z LOT 5 r� 0 10 9 04� p2 S cURB �� W 9p0 Ld PIPELLJ J REVISED 00-17-23 REVISED 03-22-22 712.05' UPDATED 01-05-22 THE WATER SUPPLY, WELLS, ORYWELLS AND CESSPOOL LOCATIONS SHOWN ARE FROM FIELD OBSERVATIONS AND OR DATA OBTAINED FROM OTHERS AREA: 37,325.32 SQ.FT. or 0.86 ACRES ELEVATION DATUM: UNAUTHORIZED ALTERA77ON OR ADDI77ON TO THIS SURVEY IS A V70LA77ON OF SEC77ON 7209 OF THE NEW YORK STATE EDUCA77ON LAW. COPIES OF THIS SURVEY MAP NOT BEARING THE LAND SURVEYORS EMBOSSED SEAL SHALL NOT BE CONSIDERED TO BE A VALID TRUE COPY. GUARANTEES INDICATED HEREON SHALL RUN ONLY TO THE PERSON FOR WHOM THE SURVEY 1S PREPARED AND ON HIS BEHALF TO THE T17LE COMPANY, GOVERNMENTAL AGENCY AND LENDING INS77TU77ON LISTED HEREON, AND TO THE ASSIGNEES OF THE LENDING INSTITUTION, GUARANTEES ARE NOT TRANSFERABLE. THE OFFSETS OR DIMENSIONS SHOWN HEREON FROM THE PROPERTY LINES TO THE STRUCTURES ARE FOR A SPECIFIC PURPOSE AND USE THEREFORE THEY ARE NOT INTENDED TO MONUMENT THE PROPERTY LINES OR TO GUIDE THE EREC77ON OF FENCES, ADDIT70NAL STRUCTURES OR AND OTHER IMPROVEMENTS EASEMENTS AND/OR SUBSURFACE STRUfURES RECORDED OR UNRECORDED ARE NOT GUARANTEED UNLESS PHYSICALLY EVIDENT ON THE PREMISES AT 774E 77ME OF SURVEY SURVEY OF: LOT 4 OF NFtV CERTIFIED TO: BRUCE ANDERSON; MAP OF: LONG POND ESTATES SECTION ONE IP<,- ,(N M, yotr0� SUSAN ANDERSON; FILED: DEC. 27, 1985 No.8037 CO ��' �y SITUATED AT. SOUTHOLD r � TOWN OF: SOUTHOLD 0 A. KENNETH M WOYCHUK LAND SURVEYING, PLLC SUFFOLK COUNTY, NEW YORK �2s� oso8s2 J� Professional Land Surveying and Design N / P.O. Box 153 Aquebogue, New York 11931 FILE # 17-152 SCALE: 1"=30' DATE: JAN. 10, 2018 PHONE (831)298-1588 FAX (631) 298-1588 N.Y.S. L1SC. NO. 050882 maintaining the records of Robert J. Hennessy & Kenneth M. Woychuk S.C.T.M. NO. DISTRICT. 1000 SECTION: 52 BLOCK: 8 LOT(S):4ONO E JUL 1 0 2023 -�ARSH U Southold Town Board of Trustees i 150 511 TIDAL WETLANDS AS DELINEATED BY SUFFOLK ENVIRONMENTAL CONSULTING, INC. MOH. SEPTEMBER 5, 2017 N 16op7,39"E EXISTING �pHW K WOOD STEPS gAN 3.5'X9' TpE 0 t be reconstructed in kind and place 8p,1.1K T0P 0f � N PIPE O` p o CA N c0 o to N J M z PROPOSED 66' ON GRADE 0 PROPOSED o R gpY NGROU D LP.GAS TANK v 2ND FLR OODCANTILEVE PROPOSED W TREWS OVER PATIO :.:4.::. :•: ;•;:•;;;;:iii,. :i'::::::::::::::::::::: PROPOSED ERATORPROPOSED �^ OUTDOOR SDWER 2z k::::iw: ::::::?: G...... .. z 4'x4' 2. N.:::::::::ca c� :OW�65::::::::.:::.� PROPOSED t o :i: :::. :.,::•::::..........' ' Z DRY wEu Q ;:::: ':.'.i.: :: `2 :::'::-` F OY4R 4 e!.5 m NYSDEC LOT COVERAGE ...................................30. R• • m pO ADJACENT AREA: 36543 S.F. 0 :::::::: : : ....... PROPOSED 15.0' �pOp ............ :::: :... OOf RCFI �71' SHED 4.5'x7' DWELLING: 1989 S.F. R p0 FRONT PORCH: 535 S.F. - W �g GREEN HOUSE s'xa' REAR DECK: 621 S.F. DRIVEWAY: 1780 S.F. pY ' ':'�' E `''• ('' WOOD STOOP: 39 S.F. PROPOSED SHORLINE STEPS: 32 S.F GO11C• ::.2y q;:... DRY WELL ENCLOSED STORAGE: 25 S.F. TOTAL EXISTING COVERAGE: 5021 S.F. or 13.7,1. PROPOSED SHED W/GREENHOUSE: 80 S.F. o PROPOSED SLAB: 24 S.F. o PROPOSED OUTDOOR SHOWER: 16 S.F. PROPOSED-GENERATOR: 15 S.F -- � LOT 3 TOTAL PROPOSED COVERAGE: 5156 S.F. or 14.1% o 1 -- N O LOt 4 .APPROVED BY 40Y'RD V` I R(JSTEES MOH. c� c+ -TOWN OF SC��1 I SOLD t 5 0 109 0v DATE y LLJ z O's LU PIPE L Q J LLJ 00 REVISED 00-17-23 REVISED 2-22 712.05' UPDATED 01�5 22 THE WATER SUPPLY, WELLS, DRYWELLS AND CESSPOOL LOCATIONS SHOWN ARE FROM FIELD OBSERVA71ONS AND OR DATA OBTAINED FROM OTHERS. AREA: 37,325.32 SQ.FT. or 0.86 ACRES ELEVATION DATUM: ____ ---—_ UNAUTHORIZED ALTERATION OR ADDITION TO THIS SURVEY IS A WOLAT70N OF SEC77ON 7209 OF THE NEW YORK STATE EDUCA770N LAW. COPIES OF THIS SURVEY MAP NOT BEARING THE LAND SURVEYORS EMBOSSED SEAL SHALL NOT BE CONSIDERED TO BE A VALID TRUE COPY. GUARANTEES INDICATED HEREON SHALL RUN ONLY TO THE PERSON FOR WHOM THE SURVEY IS PREPARED AND ON HIS BEHALF TO THE TIRE COMPANY, GOVERNMENTAL AGENCY AND LENDING INS777U71ON LISTED HEREON, AND TO 7HE ASSIGNEES OF 77-1E LENDING INS777U770N, GUARANTEES ARE NOT TRANSFERABLE. THE OFFSETS OR DIMENSIONS SHOWN HEREON FROM THE PROPERTY LINES TO THE STRUCTURES ARE FOR A SPECIFIC PURPOSE AND USE THEREFORE THEY ARE NOT IN7FNDED TO MONUMENT THE PROPERTY LINES OR TO GUIDE THE EREC77ON OF FENCES, ADDI-RONAL STRUCTURES OR AND OTHER IMPROVEMENTS EASEMENTS AND/OR SUBSURFACE STRUC-TURES RECORDED OR UNRECORDED ARE NOT GUARANTEED UNLESS PHYSICALLY EVIDENT ON THE PREMISES AT THE 77ME OF SURVEY SURVEY OF: LOT 4 OF Nj p,V CERTIFIED TO: BRUCE ANDERSON; MAP OF: LONG POND ESTATES SECTION ONE �P�cN M. K,0}y0 SUSAN ANDERSON; FILED: DEC. 27, 1985 No.8037 C-D SITUATED AT: SOUTHOLD TOWN OF: SOUTHOLD KENNETH M WOYCHUK LAND SURVEYING, PLLC SUFFOLK COUNTY, NEW YORK �261� 050882 JQ, Professional Land Surveying and Design N / P.O. Box 153 Aquebogue, New York 11931 FILE # 1 7-152 SCALE: 1"=30' DATE: JAN. 10, 2018 PHONE (631)298-1588 FAX (631) 296-1568 N.Y.S. LISC. NO. 050882 maintaining the records of Robert J. Hennessy k Kenneth M. Woychuk CROSS VIEW CROSS VIEW Scale: 1" = 10' Scale: 1"= 10' TOP of BANK FpEE I V E �11 260.0'to OPPOSITE !" SHORELINE 1 0 2023 PROP.TIMBER: BOTTOM of BANK HANDRAIL _ _ _ _ _ _ TOP of BANK _ _ _ _ _ �____ _T F— 9.3' —� ° CoFm d;own r Board of Trustees r 6 s R ( \� �� •'�b it� � � ?S - ' f �� B OTT OM of BANK_ - - 77 ! PROP.TIMBER POSTS i u� --- -- - L- PROP TIMBER STAIRS777777 TYPICAL CROSS SECTION i _ -- No Scale +MEAN_HIGH WATER_ - -.....- - TOP PLANKING (THRU-FLOW Material) - ,- - �� �� F BOTTOM BANK �� ,� GIRDERS � NOTE: Please be advised that all materials to be un- _ (2"X8"TYPICAL) -_ r :'BOARD O� I ,,y j TOP f B treated, decking to be constructed of light-penetrable, _ � �'TOWN ���I4,-,: through-flow decking. All hardware to be hot-dipped. No �` -DAr , CROSS BRACE tidalave etation present within the direct vicinity of the £ (2"X4"TYPICAL) --- ---- , - proposed structure. AERIAL VIEW Scale: 1" = 10' ANDERSON Property Proposed Access Stairs Situate: 2265 Long Creek Drive • Southold,tNY - 11971 SCTM#: 1000 — 052 — 08 — 04 Drawn By: R.W.A. Date: 07-04-2023 Suffolk Environmental Consulting, Inc. Scale: As Shown Comments: P.O. Box 2003 - Bridgehamp;ton, NY • 11932 (631) 537 —5160 A 1 ' 1 I I 45'-83/4" APP p ED AS NOTED i 22'-03/4" 23'-8" DATE3 Ss.R#I Sala 1 FEE • BY: 2'-211 5'-1111 5'-103/4" 5'-11" 2'-211 2'-2" 6'-51/2" 16'-511 6'-51/211 2'-2" o01NOTIFY BUILDING DEPARTMENT AT 631 765-1802 8AM TO 4PM FOR THE ( )2X10 ACQ GIRDE(t —; ; (�)2X10 ACQ GIRDEf� ; I ; FOLLOWING INSPECTIONS: w - -� - — - --� - - - - - - - ; - - - - - - - - - - 1. FOUNDATION-TWO REQUIRED ` 110-4 �2)2X10 ACQ GIRDER , ; , (2)2X10 ACQ GIRDE( , I FOR POURED CONCRETE �L � . ._..� � 2. ROUGH-FRAMING&PLUMBIN C Z o I V `_____; ; `_ I 3. INSULATION MUST W A -----' 0 1 `-----' O :o I I 1 ----J I 4. FINAL-CONSTRUCTION o I 8E COMPLETE FOR C.O. C� cn W 'Z LOWER DECK I - ALL CONSTRUCTION SHALL MEET E w I N pEtaUIREMENTS OFTHE CODES OF EW Q " %O - ,_____, �_____, �____ I " YORKSTATE. N07RESPONSIBLE o I -• •-----+ U g P E R DECK I DESIGN OR CONSTRUCTON ERROR) A ( )2X10 ACQ GIRDE(t ; ; (�)2X10 ACQ GIRDEf ; 1.4 - //.�.y\ �2)2X10 ACQ GIRDER i ; ; (2)2X10 ACQ GIRDED I COMPLY WITH ALL CODE, 1 OF CC Z •-----' ----' . 1�.� . — . — . .�. � � - - -� �-;- - - - -� - J NEW YORK STATE&TOWN OD Z O x o ; V--/ `---- ----- `---- I AS REQUIRED AND CONDITI DNS&ZD r-1 I I ; p I ,"„ Ln O ZD N 11 BOARD N N ; 1 %o SOLITHOLD TOWN TRUS IES N 1 �. . ,DEC I I .SO � L HPC , I I LEDGER BOARD TO BE FASTENDED ® �$ TO BUILDING WITH TIMBEFC�_OK® Pmi� � 14 SELF-COUNTERSINKING SCREWS ; OR BY OLYMPIC MANUFACTURING ` � ` '`i (2 SCREWS @ 32'O.C.) USr !S U' �� IFUL EXl(OIRTHSIDE)NG A _------ PROPOSED FOUNDATION PLAN 10'I� Qu �E �F�� � 1 SCALE: 1/4" = 1'-0" OF OCCUPAWNI 0_ I Addition^"l Ccrtific; tion 45'-83/4" Be required. +j w Q) Z 22'-03/4" 23'-8" z co Z Lo 2'-2" 5'-1111 5-103/411 5-11" 2'-2" 2'-211 6'-51/2" 6'-5" 6'-51/211 2'-2" U W X o LN QOOco _ r - - - - - - - - - - - -- - - - - - - - - -- - - - - - - - - - - - - Zip = ti 2XI0 ACQ GIRDE( - ; ; (�)2X10 ACQ GIRDE� ; 1 _ _ _ _ _ _ _ _ _ _ _ - _ - - - _ _ - - _ - - - - - - - - - O - - - - --� - - - - - - - -�- - -r - --, -- -- --, - , = O �2)2X10 ACQ GIRDER' ' (2)2X10 ACQ GIRDED ' - J �. _�- r r •,- _ I- I LL I `-----' •-----' -----' •-----' I O I I I 0 LOWER DECK EXISTINGIDECKTOBE I O p DEMOLISHE AND REBUILT v0 - N I ZD ZD I O UPPER DECK 1 :o d- I o I A 1 N DRAWN BY: JF I I I I I I I I 10/15/2023 I I I 1 , SCALE: SEE PLAN 1 NEVA C �,r SHEET N O: EXISTING HOUSE EXISTING FOUNDATION PLANLL (NORTH SIDE) uj SCALE: 1/4" = 1'-011 w' 0525�� Aq 'ESS10N�� A. 1 45'-83/4" 22'-03/4" 231-811 lo lo 4'-0" O ® ® 0 ® ® t Z ° W O cn W Z � � w m 0 LOWER DECK o cc z Z x " � o O E� ° Eo UPPER DECK ° ^r CL � 1-4 Ln O N N 101 EXISTING HOUSE (NORTH SIDE) tu FLOOR PLAN SCALE: 1/4" = 1'-0" +j W Q) Z 0 Z Ir-� zU-) 0) '^ J Cfl 0 N 5/4 CAP VJ Q Q O (.0 RAILING MP) - 1X4 TRIM ZZ m ti (n a: O co O _ WLL (n M - 2X4(HORIZONTAL) � ACQ @24"OC 0 5 4 DECKING _ _ _ _ �1 2X8 ACQ @16"OC ? / O^ 1X6 T&G ''�J a •„ � -- SIDING VJ (2) 2X10 (2) 2X10 N e ACQ 6X6 ACQ ACQ 4X4 ACQ 0 . 0 o POST Posrs ' ' 6• LLI - I 1X4 TRIM • / `� 5/4 DECKING OVER 'a e.• 12"dia. v 12"dia. u All i i 2X4 ACQ@16"OC DRAWN BY: JF _ - wrlirf ' ' PIER PIER O p RUSHED STONa, 12 DEEP10/15/2023 M 4�_0�� . Il II—III v d e 24"X24"X12" 24"X24"X12" — - - 8"dia. PIERS SCALE: SEE PLAN .� FTG FTG OUTDOOR, SHOWER SCALE: 3/8 — 1 -0 �oF NE , a, SHEET NO: DECK SECTION SCALE: 3 8" = 1'-0" m 1 - •fie• 525�� ��C7 ROFES S1o�P A- 2 WIND LOAD PATH CONNECTION AND CONSTRUCTION DETAIL DRAWINGS 4"MAX. GRDER 4"DIA.MAXIMUM DECKING DECKING I I EXTERIOR DECK JOIST DECK JOIST WALL Z_ f 1/2"DIAMETER LAG SCREWS, CONTINUOUS FLASHING,EXTENDED THROUGH-BOLTS WITH WASHERS PAST JOIST HANGERS,CAULKED TO (2)1/2"GALV. W S.S. OR 5"LEDGERLOK SCREWS FLOOR b PREVENT WATER INTRUSION LEDGER CARRIAGE BOLTS WITH GIRDER m AND JOIST FLUSH ON TOP JOIST WASHERS AND NUTS RIM BOARDW CAULK TO PREVENT WATER SIMPSON CBS W INTRUSION LEDGER AND ANCHOR 16.4 DECKING 1/2"DIA.EXPANSION BOLTS, ,w JOIST FLUSH ON TOP EPDXY OR ADHESIVE(PER CONCRETE FLOOR "MIN. MANUFACTURE INSTRUCTIONS) e��r'e• CORR POST �""� JO1ST 1-5/8'MIN. w/WASHERS AND NUTS .ee r DECK/PORCH RAILING 5"MAX. DECK JOISTS MIN. DECKING " �•••.•,e. 1� o'. DECKIPIG DECKING O IFC/ e•. W ••�'.•� JOIST HANGER •y •• DECK JOISTS Icy 2X ACQ LEDGER BOARD FOUNDATION WALL •e;-r e • NOTE: ,,.,;w• RAILING w Z e r" BLOCK FOUNDATION 1,4 .e' DECK JOST DECK JOIST POST FOUNDATION ►•e•;e. TO BE FILLED WITH e i JOIST HANGER Q ^ WALL ••• LOCAGROTIONS T AT ANCHOR �j!•• 2X ACQ LEDGER BOARD SIMPSON DTT2Z HOLD-DOWN i.•r•1 0'• LOCATIONS GIRDER GIRDER RIM BOARD rT, LEDGER BOARD TO RIM BOARD DETAIL LEDGER BOARD TO FOUNDATION WALL DETAIL (MIN.2X8) DECKING 2"MIN. THROUGH-BOLTS s"MAX. DECK JOIST H v O ■ m z THROUGH-BOLTS SHALL HAVE A DIAMETER OF 1/2".PILOT HOLES FOR THROUGH-BOLTS 2'MIN. SHALL BE 17/32"TO 9/16"IN DIAMETER.THROUGH-BOLTS REQUIRE WASHERS AT THE BOLT O HEAD AND NUT. SIMPSON CC SIMPSON CBS (2)1/2-GAAG LV.OR S.S. 2X BLOCKING AT EACH POST CARRIAGE BOLTS WITH ATTACHED WITH lOd THREADED EXPANSION AND ADHESIVE ANCHORS ANCHOR ANCHOR WASHERS AND NUTS NAILS TOP AND BOTTOM STAGGER FASTENERS USE APPROVED EXPANSION OR ADHESIVE ANCHORS WHEN ATTACHING A LEDGER BOARD POST CONCRETE cz 12'OC IN 2 ROWS TO A CONCRETE OR SOLID MASONRY WALL AS SHOWN IN LEDGER DETAIL.EXPANSION PIER POST-TO-DECK CONNECTION '^ AND ADHESIVE ANCHOR BOLTS SHALL HAVE A DIAMETER OF 1/2".MINIMUM SPACING AND "' • O ® 0 103 2"MIN, 5-1/2"MIN.FOR 2X8 EMBEDMENT LENGTH SHALL BE PER THE MANUFACTURER'S RECOMENDATIONS.ALL 0 6-1/2"MIN.FOR 2X!0 ANCHORS MUST HAVE WASHERS 5"MAX. 7-1/2"MIN.FOR 2XI2 LAG SCREWS ® 0 ® 3/4"MIN. LAG SCREWS SHALL HAVE A DIAMETER OF 1/2".LAG SCREWS SHALL HAVE PILOT HOLES 4"MAX. N I«I2"MIN. LEDGER LAG SCREW,THROUGH BOLT, DRILLED WITH 5/16"DIAMETER HOLES.ALL LAGS SHALL BE INSTALLED WITH WASHERS. OR ANCHOR WITH WASHER LAG BOLTS SHALL HAVE 1-1/2"UNTHREADED SHANK.LENGTH MUST PENETRATE BEYOND " RIM BOARD A MINIMUM 1/2".LAG SCREWS AND WASHERS MUST BE GALVANIZED OR S.S. CONCRETE LEDGERLOK SCREWS PIER LEDGERLOK SCREWS SHALL BE A MINIMUM LENGTH OF 5".LEDGERLOK SCREWS SHALL NOT 4"DIA.MAXIMUM BE USED FOR MASONRY,CONCRETE,BRICK VENEER STUCCO,SIDING,OR RIGID FOAM LEDGER BOARD FASTENER SPACING AND CLEARANCES INSULATION.SCREWS SHALL BEAMINIMUM DISTANCE OF 3-3/4'FROM ENDS AND I-3/4" FROM TOP AND BOTTOM EDGES. 24"X24"X12"CONC.FTG. HANDRAIL NOTES: 3'BELOW GRADE All required handrails shall be of one of the following types (ALT.:BIGFOOT FOOTING) or provided equivalent graspab!lity. Z E 1).Type I.Handrails with circular cross section shall have an � outside diameter of at least 1-1/4 Inches and not greater ^` than 2 Inches.If the handrail is not circular it shall have a 36"MIN. perimeter dimension of at least 4lnches and not greater than 6-1/4 inches with a maximum cross section of FLOOR SHEATHING NAILING AT 1/2"DIAMETER LAG SCREWS, FA-AC_ •IOIST I/2"DIAMETER LAG SCREWS, dimension of 2-1/4 Inches.b"MAXIMUM ON CENTER TO THROUGH-BOLTS WITH WASHERS IMUM THROUGH-BOLTS WITH WASHERSIOlXI WITH HOLD DOWN OR 5"LEDGE0.LOK SCREWS SIMPSON DTT22 HOLD-DOWN NAILS OR 5"LEDGERLOK SCREWS SIMPSON DTf2Z HOLD-DOWN 2).Type 11.Handrails with a perimeter greater than 6-1/4 inches shall provide graspable finger recess area on both sides of the profile.The finger recess shall begin with a STAIR RAILING , SOLID SAWN 7GIPDEP I Idistance of 3/41ncfi measured vertically from the tallestDECK I JOISTS DFCL I I portion of the profile and achieve a depth of at least 5/16 FLOOR JOISTS JOIST JOIST I I Inch within 7/8 Inch below the widest portion of the 1-1/2"SPACE I Iprofile.The required depth shall continue for at least 3/8 Inch to a level that is not less than 1-3/4 Inches below the MINIMUMTHREADED ROD MAYBE THREADED ROD MAY BE tallest portion of the profile.The minimum width of theASLOPED UP TO 1:12 MINIMUM 2X6X36" SLOPED UP TO HI handrail above the recess shall be 1-1/4 Inches to a AWAY FROM THE HOUSE ATTATCHED TO JOIST AWAY FROM THC HOUSE maximum of 2-3/4 inches.Edges shall have a minimum HANDRAILS JOIST HANGER WEB WITH 06)10d NAILS JOIST HANGER GIRDER radius of 0.01 Inches. AND CLINCH W BALUSTERS ..�..� W 10d THREADED NAIL OR#10 WOOD SCREWS, LATERAL LOAD DEVICE WITH JOISTS PARALLEL TO DECK JOISTS (PROVIDE IN (2) LOCATIONS 1N DECK) 16 a EQUAL ORGREATERTHAN 3'LONG, Q) z STAGGERED IN 2 ROWS OPEN BALUSTER ATTACHED TO WALL ''^^ HANDRAIL CONNECTION Z z Lo • ALL HANDRAILS SHALL BF CONTINUOUS THE FULL LENGTH LIJ (0 F BEAM IS CONSTRUCTED WITH 3 MEMBERS (2)THREADED NAILS OR SCREWS AT EACH END OR SHALL THE STAIRS. SS THANI-PORTION OF ALL HANDRAILS 6 ET.MIN.EXTENT OF BLOCKING ATTATCHED OUTSIDE MEMBER TO THE SPLICE END;SPLICES SHALL BE LOCATED ONLY OVER SHALL NOT BE LESS THAN 1-1/4"NOR MORE THAN 2"IN J \< _ ' 1 INSIDE MEMBERAS SHOWN. INTERIOR POSTS CROSS SECTIONAL DIMENSION,OR THE SHAPE SHALL -^ O O co ATTACH BLOCKING TO DECK WITH 1/2"DIAMETER LAG SCREWS. BEAM ASSEMBLY DETAIL PROVIDE AN EQUIVALENT GRIPPING SURFACE ,V—, Z 10d NAILS AT 4"O.C.STAGGERED THROUGH-BOLTS WITH WASHERS O OR 5"LEDGERLOK SCREWS SIMPSON DTT22 HOLD-DOWN C� 0DM t I STAIR TREAD DECK I I W U) JOIST I I \/J I I RIM BOARD THREADED ROD MAY BE STRINGER U_ MINIMUM 1-1/2"THICK FLOOR JOISTS SLOPED UP TO HE � O BLOCKING.BLOCKS MUST (SOLID OR WOOD-1) AWAY FROM THE HOUSE GIRDER FILL BAY AND FIT SNUGLY JOIST HANGER JOIST � ^^ V/ GIRDER/HEADER STRINGER TO DECK/PORCH CONNECTION 0 LATERAL LOAD DEVICE WITH JOISTS PERPENDICULARTO DECK JOISTS (PROVIDE IN (2) LOCATIONS IN DECK) I SPLICED JOISTS OVER HEADER/GIRDER CLIMATIC AND GEOGRAPHIC DESIGN CRITERIA CONNECT TY-DOWN ANCHORS TO EACH JOIST DRAWN BY: JF GROUND WIND SEISMIC FROST WINTER ICE SHIELD FLOOD NAILING SCHEDULE SNOW SPEED DESIGN WEATHERING LINE TERMITE DECAY DESIGN UNDERLAYMENT NAIL NAIL LOAD (MPH) CATEGORY DEPTH TEMP. REQUIRED NOTES HAZARDS JOINT DESCRIPTION SPACING STRINGER QTY. JOIST TO: PER TOE ®16" 10/15/2023 4-8d COMMO MODERATE SLIGHT TO SILL,TOP PLATE OR GIRDER JOIST NAIL � (2)THRU- 20 PSF 130 B SEVERE 3 FT. 11 NONE BOLTS TO HEAVY MODERATE BRIDGING 2-Ed COMMO EACH TOE I TO JOIST END NAIL I P844 POST 4 BLOCKING EACH TOE ANCHOR "dia. TO JOIST 2-8d COMMO END NAIL WOOD JOIST •• > PIER 16"TREAD SCALE: SEE PLAN BLOCKING TO: EACH TOE O• - 1). ALL FRAMING,CONSTRUCTION,COMPLIANCE TO BE PER 2015 IRC,2016 NYS UNIFORM SUPPLEMENT SILL OR TOP PLATE 3-16d COMMOI, BLOCK NAIL I " .' GIRDEyHEADER CONC.SUB LEDGER STRIP EACH FACE t t 2). ALL FRAMING MATERIAL TO BE#1 ACQ PRESSURE TREATED LUMBER. To BEAM 3-16d COMMO JOIST NAIL (AS REQ.) WOOD JOIST •o�• ••.��•• JOIST ON LEDGER PER TOE �w(•_ NE 3). ALL FASTENERS,HANGERS,AND ANCHORS TO BE GALVANIZED OR STAINLESS STEEL. TO BEAM 3•Ad COMMO JOIST NAIL •"„► DEC PIER ((��11 CC 'l ■' 8"dia. !" SHEET N •!V CONC. �,,4• PER PLAN BAND JOIST PER END • .•' `�. ■ 4). ALL PIERS AND FOOTINGS TO BE 3 FOOT BELOW GRADE. 3-16d coMMo 3'-0 4- PIER C? C roloST 1olsr NAIL FLUSH JOISTS WITH HEADER/GIRDER "•' ►•"a'• F BAND JOIST TO: PER ■ti"• '••••� CO 2-16d COMMO TOE NAIL w• Ct`"ti SILL OR TOP PLATE FOOT ALL JOISTS CONNECTED TO A FLUSH HEADER TO BE SUPPORTED WITH A 5). ALL JOISTS TO BE BLOCKED OVER GIRDERS AND AS SPECIFIED. •• � `� �� , :..• THE PROPER STEEL CONNECTOR. ;•` �\ - ;1�5 6). FLASH ALONG HOUSE WALL,OVER LEDGER WITH MIN.10"FLASHING. IF ABLE,SET FIR JOISTS APROX.1/4"HIGHER THAN LVL HEADERS r'- `a J* TO ALLOW FOR SHRINKAGE. 0 ��4A �• 052f�4 '�