Loading...
HomeMy WebLinkAbout51391-Z ",oF soulyo`o Town of Southold * * P.O. Box 1179 0 53095 Main Rd uNrc:�` Southold, New York 11971 CERTIFICATE OF OCCUPANCY No: 46213 Date: 06/.03/2025 THIS CERTIFIES that the building SOLAR PANEL Location of Property: 920 Kimberly Ln Southold, NY 11971 Sec/Block/Lot: 70.-13-20.15 Conforms substantially to the Application for Building Permit heretofore, filed in this office dated: 09/27/2024 Pursuant to which Building Permit No. 51391 and,dated: 11/18/2024 Was issued, and conforms to all of the requirements of the applicable provisions of the law. The occupancy for which this certificate is issued is: Roof mounted solar panels to an existing single-family dwelling as applied for. The certificate is issued to: Lauren Gordon Of the aforesaid building. SUFFOLK COUNTY DEPARTMENT OF HEALTH APPROVAL: ELECTRICAL CERTIFICATE: 51391 4/14/2025 PLUMBERS CERTIFICATION: Aut ized ignature oFsa&T TOWN OF SOUTHOLD BUILDING DEPARTMENT • �� TOWN CLERK'S OFFICE SOUTHOLD, NY BUILDING PERMIT (THIS PERMIT MUST BE KEPT ON THE PREMISES WITH ONE SET OF APPROVED PLANS AND SPECIFICATIONS UNTIL FULL COMPLETION OF THE WORK AUTHORIZED) Permit#: 51391 Date: 11/18/2024 Permission is hereby granted to: Jay P Mandelbaum 1107 Fifth Ave Apt 7N New York, NY 10128 To: Install roof mounted solar panels to an existing single-family dwelling as applied for per manufacturers specifications. Additional certification may be required. Premises Located at: 920 Kimberly Ln, Southold, NY 11971 SCTM#70.-13-20.15 Pursuant to application dated 09/27/2024 and approved by the Building Inspector. To expire on 11/18/2026. Contractors: Required Inspections: Fees: SOLAR PANELS $100.00 CO-RESIDENTIAL $100.00 ELECTRIC -Residential $125.00 Total S325.00 Building Inspector oF so�ryol Town Hall Annex Telephone(631)765-1802 54375 Main Road P.O.Box 1179 G • Q Southold,NY 11971-0959 �� a BUILDING DEPARTMENT TOWN OF SOUTHOLD CERTIFICATE OF ELECTRICAL COMPLIANCE SITE LOCATION Issued To: Jay P Mandelbaum Address: 920 Kimberly Ln City:Southold St: NY . Zip: 11971 Building Permit#: 51391 Section: 70 Block: 13 Lot: 20.15 WAS EXAMINED AND FOUND TO BE IN COMPLIANCE WITH THE NATIONAL ELECTRIC CODE Contractor: Electrician: GreenLogic License No: SITE DETAILS Office Use Only Indoor Basement F, Service r Solar (✓ Outdoor 1st Floor r Pool r Spa Renovation F. 2nd Floor [— Hot Tub r Generator r Survey Attic F Garage ri Battery Storage r INVENTORY Service 1 ph Heat Duplec Recpt Ceiling Fixtures Bath Exhaust Fan Service 3 ph 177Hot Water GFCI Recpt Wall Fixtures Smoke Detectors Main Panel A/C Condenser Single Recpt Recessed Fixtures CO Detectors Sub Panel A/C Blower Range Recpt Ceiling Fan Combo Smoke/CO Transfer Switch UC Lights Dryer Recpt Emergency Strobe Heat Detectors Disconnect Switches 4'LED Exit Fixtures Other Equipment: 11.205kW Roof Mounted PV Solar Energy System w/ (27)SPR MAX3-415BLK-R, Combiner Panel w/ (3)220 & (1)215 Breaker,AC Disconnect, on Backfed 60A Breaker Notes: Solar Inspector Signature: X Date: April 14, 2025 Sean Devlin Electrical Inspector sean.devlin(a�-town.southold.ny.us 920KimberlySolar SOUTy�� � # TO IG fSOUTHOLD BUILDLN DEPT. �O • �O 765-1802 INSPECTION [ ] FOUNDATION 1ST [ ] ROUGH PLBG. [ ] FOUNDATION 2ND : -[ :] INSULATION/CAULKING [ ] FRAMING/STRAPPING [ ] FINAL [ ] FIREPLACE & CHIMNEY [ ] FIRE SAFETY INSPECTION [ ] FIRE RESISTANT CONSTRUCTION [ ] FIRE-RESISTANT PENETRATION [ ] ELECTRICAL(ROUGH) ELECTRICAL (FINAL) [ ] CODE VIOLATION [ ] PRE /O REMARKS: ALi DATE INSPECTOR 73;j ,� �o�aOF SOUTyo� TOWN OF SOUTHOLD BUILDING.DEPT. �ou 631-765-1802 [ .-] . FOUNDATION 1ST/ REBAR _ [ ] ROUGH PLBG.. . ] FOUNDATION 2ND [ ] SULATIOWCAULKING [ ] FRAMING/STRAPPING jvj FINALso (fh✓ FIREPLACE -&--CHIMNEY " [ ] FIRE SAFETY INSPECTION [ ] FIRE RESISTANT CONSTRUCTION [ ] FIRE RESISTANT PENETRATION' [ ] ELECTRICAL (ROUGH) j ] ELECTRICAL (FINAL) [ ] CODE VIOLATION . [ ] .PRE C/O [ ] .RENTAL REMARKS: DATE ?�OY� INSPECTOR J A M E S J. S TOUT A RCHITECT & Assoc . 2 G R4G LANE EAST NORTHPORT N. Y. 631 - 8 58 9388 Post Install Letter March 28, 2025 RE: Mandelbaum Residence 920 Kimberly Lane Southold, NY 10128 To Whom it may concern: This letter is to confirm that as of this date March 28, 2025, I, James J Stout, NYS license 021633 have visually inspected the placement and installation of the roof top solar panels at the above listed address. The solar panels have been installed as per manufacturers' guidelines and specifications. The racking system design and installation complies with all applicable codes. The installation was done as per the approved Building Department plans. The analysis of the documents supplied by the client relies on sound engineering judgment and relevant experience. However, regardless of the professional's qualifications or thoroughness of the investigation, preexisting conditions cannot always be anticipated beyond the scope of direct observation. No additional guarantees, whether expressed or implied, are provided regarding the professionals' recommendations outlined in this letter. This certification letter must be presented to the municipality within 120 days of the issuance date to ensure compliance with safety procedures and continuity of service. Thank you for your cooperation in this matter. James J. Stout E D A1?�, 3 �t�Q, FIELD INSPECTION REPORT I DATE COMMENTS FOUNDATION (1ST) - - ------------------------------------ FOUNDATION (2ND) �O ROUGH FRAMING& .� PLUMBING O r INSULATION PER N.Y. H STATE ENERGY CODE _ FINAL ADDITIONAL COMMENTS ZIF PD- aq-aF, dos} �� d r� b H =O��gUfFO�,�coGy TOWN OF SOUTHOLD—BUILDING DEPARTMENT y z Town Hall Annex 54375 Main Road P. O. Box 1179 Southold,NY 11971-0959 Telephone(631) 765-1802 Fax(631) 765-9502 https://www.soutlioldtownny.gov y' Date Received APPLICATION FOR BUILDING PERMIT For Office Use Only E C W PERMIT NO. 1 Building Inspector: SEP 3 O 2024 Applications and'forms must be filled out in:their entirety.Incomplete applications will not be accepted. Where the Apphcant^is not the owner,an Building Department Owner's Authorization fo�m,,(Page 2)shall be.completed. Town Of Southold Date: 02(1P 1.2 OWNER(S)OF PROPERTY Name:Jay Mandelbaum SCTM#1000-70-13-20.15 Project Address:g20_Kimberly Lane,_Southold. NY 11971 Phone#: _ Email: �_. Gj3fig vv�a►ld�l ��w. 9-�(.a_�>ti, Mailing Address: ..__. v� ._. - -.� 'CONTACTIPERSON Name:Barbara - GreenLogic LLC Mailing Address:97 North Sea Road, Southampton, NY 11968_ Phone#:631_-771-5152 x117 Email:Barbara@Greenlooic.com .DESIGN PROFESSIONAL INFORMATION: Namej Mailing Address: Phone#:^� ?J _ CJ 3 g Email: -� huW� a - - CONTRACTOR INFORMATION: - Name:GreenLogic LLC Mailing Address:97 North Sea_Road, Southampton, NY 11968 Phone#:631-771-5152 Email•AM@Greenlo Ic.com DESCRIPTION OF PROPOSED CONSTRUCTION ❑New Structure ❑Addition ®Alteration ❑Repair ❑Demolition Estimated Cost.of.Project: EEOther Solar Panels $ 45,000 Will the lot be re-graded? ❑Yes ®No Will excess fill be removed from premises? ❑Yes ©No 1 PROPERTY INFORMATION Existing use of property. Intended use of property: �J Zone or use district in which premises is situated: Are there any covenants and restrictions with respect to this property? Dyes ❑No IF YES, PROVIDE A COPY. 8 CheCk Box'After Reading .The owner/contractor/design.professional is'responsible'for all'drainage and'storm water issues as provided by Chapter 236 of the Town Code.APPLICATION ISMEREBY MADE to the Building Department for the issuance of a Building Permit pursuant to the Building'Zone Ordinance of the Town of Southold,Suffolk,County,New York and.other applicable Laws,Ordinances or Regulations,for the construction of buildings, additions,alterations or for removal or demolition as herein described.,The'applicant agrees to comply with all applicable laws,ordinances,building code, housing code and regulations and to admit authorized inspectors on premises amd in buildings)for necessary inspections:False statements made herein are unish'able as a Class A.misdemeanor. ursuent'to'Section 210 45 ofahe New York State Penal Law Application Submitted By(print name):GreenLogic LLC BAuthorized Agent []Owner Signature of Applicant: Date: STATE OF NEW YORK) SS: COUNTY OF Suffolk ) Nesim Albukrek being duly sworn,deposes and says that(s)he is the applicant (Name of individual signing contract)above named, (S)he is the Contractor (Contractor,Agent,Corporate Officer,etc.) of said owner or owners, and is duly authorized to perform or have performed the said work and to make and file this application;that all statements contained in this application are true to the best of his/her knowledge and belief; and that the work will be performed in the manner set forth in the application file therewith. Sworn before me this / /J Q�day of I 20a 6",e ,l0—F:., c�.E�n o� Notary Public BAR13ARA A.CASCIOTTA Notary pUbiic,State of New York PROPERTY OWNER AUTHORIZATION No.d in Suffolk SuffolkCo C (qualified n 969 (Where the applicant is not the owner) Commission Expires May II� t� Jay Mandelbaum residing at g2S i N4 5:4 do hereby authorize GreenLogic LLC to apply on my behalf to the Town of Southold Building Department for approval as described herein. %I FSC y� Ow is Signature Date �01- VaC,1e1 6t1VL-, Print Ow er's Name 2 t BUILDING DEPARTMENT- Electrical Inspector TOWN OF SOUTHOLD S % Town Hall Annex - 54375 Main Road - PO Box 1179 Southold, New York 11971-0959 Telephone (631) 765-1802 - FAX (631) 765-9502 rogerr(a southoldtownny_gov — seand(a�southoldtownny.gov APPLICATION FOR ELECTRICAL INSPECTION ELECTRICIAN INFORMATION (All Information Required) Date: 9/26/2024 Company Name: GreenLogic LLC Name: Robert Skypala License No.: 43858-ME email: BarbaraCGreenlogic.com Phone No: 631-771-5152 ✓❑I request an email copy of Certificate of Compliance Address.: . 97 North Sea Road Southampton, NY 11968 JOB SITE INFORMATION (All Information Required) Name: Jay Mandelbaum Address: 920 Kimberly Lane, Southold, NY Cross Street: Phone No.: 917-693-8889 Bldg.Permit email: jpmandelbaum@aol.com Tax Map District: 1000 Section: 70 Block: 13 Lot: 20.15 BRIEF DESCRIPTION OF WORK (Please Print Clearly) Roof mounted solar electric system **(27) Maxeon SPR-MAX3-415-BLK-R panels Et (27) Enphase IQ8HC-72-M-US micro inverters (1) Enphase IQ Gateway ENV2-IQ-AMI System Size:. 11.205KW Check All That Apply: Is job ready for inspection?: DYES 0 NO ❑Rough In ❑✓ Final Do you need a Temp Certificate?: QYES . [:]NO Issued On Temp Information: (All information required) Service Size ❑1 Ph ❑3 Ph Size: A # Meters Old Meter# ❑New Service ❑ Service Reconnect [] underground []Overhead # Underground Laterals 01 ❑2 ❑H Frame [—]Pole Work done on Service? ❑Y ❑N Additional Information: PAYMENT DUE WITH APPLICATION Electrical Inspection Form 2020.xlsx GREENLOGIC® ENERGY May 21, 2025 ly " L MAY 2 9 2025 �uildint� The Town of Southold down ofi gcwthold Building Department 54375 Route 25 P.O. Box 1179 Southold, NY 11971 Project Info: Building Permit No. 51391 Jay Mandelbaum 920 Kimberly Lane Southold, NY To the Building Inspector: Enclosed please find the Engineer's Certification Letter for the above referenced address. Can you please close the building permit and send the Certificate of Occupancy after inspection? Please let me know if you have any questions about the installation. Sincerely, Xa tbaw Caiciatta Barbara Casciotta Account Manager Barbara@Greenlogic.com 631-771-5152 Ext. 117 GREENLOGIC LLC •www.GreenLogic.com Tel: 631.771.5152 Fax: 631.771.5156 SOUTHAMPTON ROSLYN HEIGHTS 97 North Sea Rd.,Suite 3 200 S. Service Rd.,#104C Southampton, NY 11968 Rosyln Heights, NY 11577 SURVEY OF: PROPERTY LOCATED AT SOUTHOLD LOT No. 15 AS SHOWN ON MAP OF PARADISE BY THE BAY FILED: NOVEMBER 4. 1976: FILE No. 6463 TOWN OF SOUTHOLD S F OML# COUNT,Y.-NE WORK ROXANNE ROAD RAD = 25.00' SCALE: 1'=30' LEN = 36.24' N 84°22'20"E NOTE: THE EXISTENCE OF RIGHT OF WAYS. 179.13' WETLANDS AND/OR EASEMENTS OF RECORD IF ANY. NOT SHOWN ARE NOT GUARANTEED. RAD = 25.00' ro LEN 39.27' - m ya 11 H LP 00 LA C O 14, I 59i � I fTl I CONCRETE ►•LI I Z FOUNDATION iv TR TOP OF FND r Z EL 14.9 of41 .N'' I N 9 s c I �W N o O O cfl Wo 01 I � SURVEYED BY: I 12.3 PAUL BARYLSKI LAND SURVEYING PATCHOGUE NY 11772 SHED PHONE 631-294-6965 22.4' L4 FAX 631-627-3186 b N PAULBARYLSKIaYAH00.CDM JUNE 6. 2024 \ g 84°22'20"W OFA ETCCTTIIONE72 9 OFRATION OR ADDITION TO THIS TIE NEW YOWL STATE EDUCATION LAM.VEY IS A VIOLATION 00' 259. COPIES OF THIS SURVEY MAP NOT BEARING THE LAND SURVEYORS INKED LOT I4 OR EMBOSSEDED m SEAL SHALL NOT BE CCNSIOER TO BE A VALID TRUE COPY. GUARANTEES OR CERTIFICATIONS INDICATED HEREON SHALL RUN ONLY TO I THE PERSON FOR WHOM THE SURVEY IS PREPARED.AND ON HIS BEHALF TO THE TITLE COMPANY.GOVERNMENTAL AGENCY AND LENDING INSTITUTION LISTED HEREON.AND A TO THE ASSIGNEES OF THE LENDING INSTITUTION. GUARANTEES OR CERTIFICATIONS ARE NOT TRANSFERABLE TO ADDITIONAL INSTITUTIONS OR SUBSEQUENT OWNERS. 5881 SYSTEM SUMMARY TOTAL KW RATING: (AC POWER) 10.386 (PV) j TOTAL KW RATING: (DC POWER) 11.205 (PV) Y. COMPONENT SPECIFICATION SUNPOWER BRAND, MODEL: SPR-MAX3-415-BLK-R 27 PV MODULE: 415 W DC(NOMINAL), EACH ENPHASE BRAND, MODEL: IQ8HC 27 PV INVERTER: (MICRO-INVERTER) 384 VA, 1.58 A, 240V AC, EACH North Fork Woodworks REVISIONS- GREENLOGIC® 920 Kimberly Lane ct ENERGY Southold, NY 11971 2.) AS BUILT CONFIGURATION ELIMINATING THE COST OF ENERGY 1.) INITIAL SUBMITTAL WITH APPLICATION Page 2 of 4 Drawing No: KIMBERLY-3LD2 Revision: 2 Revised: 4/04/2025 EQUIPMENT& COMPONENT SCHEDULE TAG DESCRIPTION SPECIFICATION PV-SA-I PHOTOVOLTAIC SUB-ARRAY SUN POWER SPR-MAX3-415-BLK-R, 1-CIRCUIT OF 9-MODULES PV-SA-2 PHOTOVOLTAIC SUB-ARRAY SUNPOWER SPR-MAX3-415-BLK-R, 1-CIRCUIT OF 9-MODULES PV-SA-3 PHOTOVOLTAIC SUB-ARRAY SUN POWER SPR-MAX3-415-BLK-R, 1-CIRCUIT OF 9-MODULES AC-DSC-I AC DISCONNECT SWITCH 250V, 100A, NEMA-311, NON-FUSED SAFETY SWITCH AC-CMB-I AC COMBINER PANEL ENPHASE X-IQ-AM1-240-5C, 240V, 80A, NEMA-3R, 1-PH BKR-1...BKR-3 CIRCUIT BREAKER, PV-SA-1 ... PV-SA-3 MATCH AC COMBINER PANEL BRAND, 2-POLE, 20A BKR-M CIRCUIT BREAKER, PRODUCTION MONITOR MATCH AC COMBINER PANEL BRAND, 2-POLE, 15A BFB CIRCUIT BREAKER, GRID-TIE BREAKER, MATCH MAIN PANEL BRAND,RATING: 2-POLE, 60A REVISIONS North Fork Woodworks &G-REENLOGIC0 920 Kimberly Lane ENERGY Southold, NY 11971 2.) AS BUILT CONFIGURATION ELIMINATING THE COST OF ENERGY 1.) INITIAL SUBMITTAL WITH APPLICATION Page 3 of 4 Drawing No: KIMBERLY-3LD2 Revision: 2 Revised: 4/04/2025 ELECTRICAL LOAD SUMMARY,AC CIRCUITS TAG POWER, MAX VOLTAGE MAX.AC VOLTAGE, NOMINAL RANGE CURRENT PV-SA-1 3,456 WATTS 211-264 VAC 14.22 A AC 240 V,AC PV-SA-2 3,456 WATTS 211-264 VAC 14.22 A AC 240 V,AC PV-SA-3 3,456 WATTS 211-264 VAC 14.22 A AC 240 V,AC CONDUCTOR SCHEDULE TAG TYPE AWG. / EGC A NMB 10 / 1 B SER 6 / 6 C SER 6 / 6 1.) CONDUCTOR TYPES AND SIZES TO BE ADJUSTED FOR TEMPERATURE, DISTANCE,AND DERATING FACTORS. 2.) ELECTRICAL CONDUITTO BE MINIMUM PVC SCHEDULE 40,ADJUST FOR SITE CONDITIONS. 3.) ALL ELECTRICAL MATERIALS AND INSTALLATION METHODS TO COMPLY WITH NEC AND LOCAL CODE REQUIRMENTS. 4.) NOTE: PV ARRAY EQUIPMENT GROUNDING CONDUCTOR TO BE#6 COPPER, MINIMUM REVISIONS North Fork Woodworks GREENLOGIC® 920 Kimberly Lane ENERGY Southold, NY 11971 2.) AS BUILT CONFIGURATION ELIMINATING THE COST OF ENERGY 1.) INITIAL SUBMITTAL WITH APPLICATION Page 4 of 4 Drawing No: KIMBERLY-3LD2 Revision: 2 Revised: 4/04/2025 ---- -- -------------- -- ----- -- NEW EQUIPMENT -- PV-SA-1 A AC-COMBINER PANEL (TYPICAL SYSTEM SCHEMATIC, AL' AY � AC-CMB-1 FIN REQUIRES LOCALTIONMAHJVARY, i AND UTILITY APPROVAL EXISTING SERVICE N • • • 2 1 (EXTERNAL NEMA-3R) B ) I 120/240, 1 PH, 3W I , I PV-SA-2 A AC-DSC-1 1200A KWH A B N AC EXTERNAL C N • • • 2 1 BKR-1 DISCONNECT i TYPICAL PV MODULE WITH I I BKR-2 i INTEGRAL DC/AC INVERTER II � TYP-. PV ARRAY ^ I I �� MAIN II BKR—N I _ PV-SA-N A j I FUOSED N ' ' ' 2 1 7EGC TYPICAL PV MODULE WITH , I I N I INTEGRAL DC/AC INVERTER III I BF III 4 EGC III I I N I � Eo-0 I I I I I I I AC DISTRIBUTIOkGEC I I EGC IRREVERSIBLE BOND, TYP. i 4 CU 111------- #6 CU-i�------------ -------- (EXISTING) ------- ------------------------- 3-LINE ELECTRICAL DIAGRAM REVISIONS North Fork Woodworks Pf-D - 920 Kimberly Lane ��Nl;. 53. ' �' GREENLOGIC ENERGY Southold, NY 11971 2.) AS BUILT CONFIGURATION \�* ; ELIMINATING THE COST OF ENERGY 1.) INITIAL SUBMITTAL WITH APPLICATION r9 oz163� oQ Page 1 of 4 Drawing No: KIMBERLY-3LD2 Rec'isi'on �� Revised: 4/04/2025 --------------NEW EQUIPMENT------------------------ EXISTING SERVICE PV—SA-1 A AC—COMBINER PANEL 120/240, 1 PH, 3W ' • AC—CMB-1 B , n1 • • • (PV LOADS ONLY) I V , 200A KWH 41 PV—SA-2 AFan I I • • • I A B N I (✓ • • • AC-DSC-1 - i eKR-1 AC DISCONNECT TT T I BKR-2 ' PV-SA-3FM A ' I . . . 1 I 2 I BKR-3 r ' ---- — I I -/ MAIN I I I BKR-4 A B N I PV-SA-4 A j l j JFUSED( rmn I N IIII IEGC N TYPICAL PV MODULE WITH IIII I INTEGRAL DC/AC INVERTER IIII EGC I13 � IIII I � EGC IIII I I I I IIII - I I EXISTING AC PANELEXISTING IIII I I I GEC LL_IL----------- - GEC ------- -�#6 CU 11.205kW DC -------------------- 10.368kW AC PROPOSED 3-LINE ELECTRICAL DIAGRAM REVISIONS North Fork Woodworks &GREENLOGICO 920 Kimberly Lane ENERGYSouthold, NY 11971 ELIMINATING THE COST OF ENERGY 1.) INITIAL SUBMITTAL WITH APPLICATION Page 1 of 3 Drawing No: Kimberly-3LD1 Revision: 1 Revised: 8/14/24 EQUIPMENT&COMPONENT SCHEDULE TAG DESCRIPTION SPECIFICATION PV-SA-1 PV ARRAY SPR-MAX3-415-BLK-R ENPHASE IQ8HC-72-M-US, 1-CIRCUIT OF 8-MODULES PV-SA-2 PV ARRAY SPR-MAX3-415-BLK-R ENPHASE IQ8HC-72-M-US, 1-CIRCUIT OF 8-MODULES PV-SA-3 PV ARRAY SPR-MAX3-415-BLK-R ENPHASE IQ8HC-72-M-US, 1-CIRCUIT OF 8-MODULES PV-SA-4 PV ARRAY SPR-MAX3-415-BLK-R I ENPHASE IQ8HC-72-M-US, 1-CIRCUIT OF 3-MODULES ELECTRICAL LOAD SUMMARY AC CIRCUITS TAG POWER, MAX VOLTAGE MAX.AC VOLTAGE, NOMINAL RANGE CURRENT PV-SA-1 3320 WATTS 211-264 VAC 13.50 A AC 240 V,AC PV-SA-2 3320 WATTS 211-264 VAC 13.50 A AC 240 V,AC PV-SA-3 3320 WATTS 211-264 VAC 13.50 A AC 240 V,AC PV-SA-4 1245 WATTS 211-264 VAC 5.06 A AC 240 V,AC PROPOSED EQUIPMENT SPECIFICATIONS REVISIONS North Fork Woodworks GREENLOGICO 920 Kimberly Lane ct ENERGY Southold, NY 11971 ELIMINATING THE COST OF ENERGY 1.) INITIAL SUBMITTAL WITH APPLICATION Page 2 of 3 Drawing No: Kimberly-3LD1 Revision: 1 Revised: 8/14/24 i •ti,E EQUIPMENT&COMPONENT SCHEDULE TAG DESCRIPTION SPECIFICATION AC-CMBP AC COMBINER PANEL 25OV, 200A, NEMA-1, 1-PH, 3-WIRE BKR-1 CIRCUIT BREAKER, PV-SA-1 MATCH AC COMBINER PANEL BRAND, 2-POLE, 20A BKR-2 CIRCUIT BREAKER, PV-SA-2 MATCH AC COMBINER PANEL BRAND, 2-POLE, 20A BKR-3 CIRCUIT BREAKER, PV-SA-3 MATCH AC COMBINER PANEL BRAND, 2-POLE, 20A BKR-4 CIRCUIT BREAKER, PV-SA-4 MATCH AC COMBINER PANEL BRAND,2-POLE, 20A AC-DSC-1 AC DISCONNECT SWITCH (LINE TAP) 25OV, 100A, NEMA-1, FUSED; FUSE RATING: 100A CONDUCTOR SCHEDULE TAG TYPE CONDUIT AWG. / EGC A USE-2/PV/UF 3/4"PVC-40 12 / 6 B THWN-2 2" PVC-40 4 / 6 C THWN-2 2"EMT 4 / 6 1.)CONDUCTOR TYPES AND SIZES TO BE ADJUSTED FOR TEMPERATURE,DISTANCE,AND DERATING FACTORS. 2.) ELECTRICAL CONDUIT TO BE MIN. PVC SCHEDULE 40,ADJUST FOR SITE CONDITIONS. 3.) ALL ELECTRICAL MATERIALS AND INSTALLATION METHODS TO COMPLY WITH NEC AND LOCAL CODE RE- QUIREMENTS. 4.) NOTE:GROUNDING ELECTRODE CONDUCTOR TO BE#6 COPPER. PROPOSED EQUIPMENT SPECIFICATIONS REVISIONS North Fork Woodworks GREENLOGICO 920 Kimberly Lane ct ENERGY Southold, NY 11971 ELIMINATING THE COST OF ENERGY 1.) INITIAL SUBMITTAL WITH APPLICATION Page 3 of 3 Drawing No: Kimberly-3LD1 Revision: 1 Revised: 8/14/24 e +s -- ENPHASE. . } .. Ilk- ,. - rBlic Z a , IQ8HC Microinverter r Our newest IQ8 Series Microinverters are the industr 's first micro rid-formin * Easy to install y g g,software- ' defined microinverters with split-phase power conversion capability to convert DC power to Lightweight and compact with plug- AC power efficiently.The brain of the semiconductor-based microinverter is our proprietary `and-piayconnectors application-specific integrated circuit(ASIC),which enables the microinverter to operate in ;• power line communication(PLC) grid-tied or off-grid modes.This chip is built in advanced 55 nm technology with high-speed i 'between components digital logic and has superfast response times to changing loads and grid events,alleviating I constraints on battery sizing for home energy systems. Faster installation with,simple two-wire, cabling Enphase 'High productivity and'reliability i • Produces power even when the grid is down* =-y--e--••_ L 1• More than.one million cumulative hours l of testing Part of the Enphase Energy System, IQ8 Series Microinverters redefine IQ8 Series Microinverters integrate with reliability standards with more than one s' Class it double-insulated enclosure the IQ Battery,IQ Gateway,and the million cumulative hours of power-on #. Optimized for the latest high-powered Enphase App monitoring and analysis testing,enabling an industry-leading ! PV modules . software. limited warranty of up to 25 years. Microgrid-forming` '• Complies with the latest advanced grid i' support CERTIFIE Remote automatic updates for the i latest grid requirements• Connect PV modules quickly and easily IQ8 Series Microinverters are UL Listed Configurable to support a-wide range to the IQ8 Series Microinverters that have as PV rapid shutdown equipment and of grid profiles Integrated MC4 connectors, conform with various regulations when Meets CA Rule 21(UL 1741-SA)and IEEE installed according to the manufacturer's 1547t2018(UL,1741-5B) instructions. 108Series Microinverters cannot be mixed together *Only when installed with IQ System Controller 2 meets UL 1741. with previous generations of Enphase microinverters (IQ7 Series,IQ6 Series,and so on)in the same system. ©2023 Enphase Energy.All rights reserved.Enphase,the a and CC logos,IQ,and certain other marks listed at m https://anphase.com/tradeark-usage-quidelines are trademarks of Enphase Energy,Inc,in the US and other countries. Data subject to change. IQ8HC-MC4-DSH-00047-2.0-EN-US-2023-09-11 IQ8HC Microinverter INPUT DATA(DC) UNITS JOSHC-72-M-US Commonly used module pairings W 320-540 Module compatibility To meet compatibility,PV modules must be within the maximum input DC voltage and maximum module I listed below. Module compatibility can be checked at https://enphase.com/Installers/mlcrainverters/calculator. MPPT voltage range V 29,5-45 Operating range V 18-58 Minimum/Maximum start voltage V 22/58 Max.input DC voltage v 60 Max.continuous operating DC current A 14 Max.input DC short-circuit current A 25 Max,module 1. A 20 Overvoltage class DC port II DC port backfeed current mA 0 PV array configuration Ungrounded array;no additional DC side protection required;AC side protection requires max 20 A per branch circuit OUTPUT .. . VAC 108 08 VAC Peak output power VA 384 366 Max,continuous output power VA 380 360 Nominal grid voltage(L-L) V 240,split-phase(L-L),180° 208,single-phase(L-L),120° Minimum and maximum grid voltages V 211-264 183-229 Max,continuous output current A 1.58 1.73 Nominal frequency Hz 60 Extended frequency range Hz 47-68 AC short circuit fault current over three cycles Arms 2.70 Max.units per 20 A(L-L)branch circuit' 10 9 Total harmonic distortion % <5 Overvoltage class AC port III AC port backfeed current mA 18 Power factor setting LO Grid-tied power factor(adjustable) 0.85 leading,..0.85 lagging Peak efficiency % 97,31 97.21 CEC weighted efficiency % 97.00 96.50 Nighttime power consumption mW 22 29 MECHANICAL DATA UNITS Ambient temperature range -40°C to 65°C(-40°F to 149°F) Relative humidity range 4%to 100%(condensing) DC connector type Staubli MC4 Dimensions(H x W K D);Weight 212 mm MY)r 175 mm(6.9")•30.2 mm(1.2");1.1 kg(2.43 Ibs) Cooling Natural convection-no fans Approved for wet locations;Pollution degree Yes;PD3 Enclosure Class it double-insulated,corrosion-resistant polymeric enclosure Environ.category;UV exposure rating NEMA Type 6;outdoor COMPLIANCE CA Rule 21(UL 1741-SA),UL 62109-1,IEEE 1547:2018(UL 1741-SB),FCC Part 15 Class B,ICES-0003 Class B,CAN/CSA-C22.2 NO.107.1-01 Certifications This product Is UL Listed as PV rapid shutdown equipment and conforms with NEC 2014,NEC 2017,and NEC 2020 section 690.12 and C22.1-2018 Rule 64-218 rapid shutdown of PV systems for AC and DC conductors when installed according to manufacturer's instructions. (1)No enforced DC/AC ratio.See the compatibility calculator at https://enphase.com/installers/microinverters/calculator. (2)Nominal voltage range can be extended beyond nominal if required by the utility. (3)Limits may vary.Refer to local requirements to define the numberof microinverters per branch in your area. IQBHC-MC4-DSH-00047-2.0-EN-US-2023-09-11 4 � Revision history REVISION DATE DESCRIPTION DSH-00047-2.0 September 2023 Updated module compatibility information DSH-00047-1.0 i May 2023 Preliminary release ©2023 Enphase Energy.All rights reserved.Enphase,the a and CC logos,IQ and certain other marks listed at https://enphase.com/trademark-usage-quidelines are trademarks of Enphase Energy,Inc.in the US and other countries. Data subject to change. IQBHC-MC4-DSH-00047-2.0-EN-US-2023-09-11 maxeon MAXEON 3 SOLAR PANEL 405-420 W I Up to 22.2% Efficient ® Ideal for residential w Black backsheet, lat applications IV black frame More Lifetime Energy Designed to maximise energy generation through leading efficiency,enhanced performance in high temperatures,and higher energy conversion in low-light conditions like mornings,evenings and cloudy days. Uncompromising Durability _ Engineered to power through all types of weather conditions with crack- HO PST OT resistant cells and reinforced connections that protect against fatigue PROTECTED and corrosion,to an electrical architecture that mitigates the impact of shade and prevents hot-spot formation. Superior Sustainability Clean ingredients, responsible manufacturing,and lasting energy production for 40 years make Maxeon panels the most sustainable choice in solar. FAAF The Industry's Longest Warranty 11 Maxeon panels are covered by a 40-year warranty'backed by extensive third-party testing and field data from more than 33 WARRANTY million panels deployed worldwide. Power I Product I Service Product and power coverage 40 Years Year 1 minimum warranted output 98.0% Maximum annual degradation 0.25% d Learn more about the SPR-MAX3-XXX-BLK-R I� p, maxeon.com MAXEON 3 POWER:405-420 W I EFFICIENCY: Up to 22.2% Electrical Data IOperating Condition And Mechanical Data SPR-MAX3- SPR-MAX3- SPR-MAX3- SPR-MAX3- Temperature -40°Fto+185°F(-40°Cto+85OC) 420-BLK-R 415-BLK-R 410-BLK-R 405-BLK-R -- -- -._-----_---------•--------......._........__................... Impact Resistance 1 inch(25 mm)diameter hail at 52 mph(23 m/s) ( Nominal Power Pnom)Z 420 W 415 W 410 W 405 W Solar Cells 112 Monocrystalline Maxeon Gen 3 Power Tolerance +5/0% +5/0% +5/0% +5/0% Panel Efficiency 22.2% 21.9% 21.6% 21.4% Tempered Glass High-transmission tempered anti-reflective Rated Voltage(Vmpp) 35.5 V 35.3 V 35.1 V 34.9 V junction Box IP-68,Staubli(MC4),2 bypass diodes .. ............._-_-.... Rated Current(Impp) 11.82 A 11.75 A 11.68 A 11.61 A Weight 46.7 Ibs(21.2 kg) Open-Circuit Voltage(Voc) 40.7 V 40.7 V 40.7 V 40.7 V Wind:50 psf,2400 Pa back Max.Load a Snow:112 psf,5400 Pa front Short-Circuit Current(Isc) 12.65 A 12.64A 12.63 A 12.62 A HVHZ:7112 psf,5400 Pa front and back Max.System Voltage 1000 V UL&1000 V IEC I Frame Class 1 black anodized(highest AAMA rating) Maximum Series Fuse 25 A j Power Temp Coef. -0.27%/OC Voltage Temp Coef. -0.236%/OC � 1 m 1, In [ m]Current TempCoef. 0.058%/°C FRAME PROFILE� � � � Certification_ -_ s and Compliance I (A) E� _ _.. ...._...... ... _._.......... ........... .._ _ .... ....... _- .. ., Standard Tests' UL 61730,IEC 61215,IEC 61730 Quality Management Certs ISO 9001:2015,ISO 14001:2015 i B Ammonia Test IEC 62716 71.34 in Desert Test IEC 60068-2-68,MIL-STD-810G I 11612 mm] (A)Cable Length:48.2 in+/-0.4 in Salt Spray Test IEC 61701(maximum severity) [1225 mm+/-10 mm] (B)Long Side:1.3 in 132 mm] PID Test 1000 V:IEC 62804 j Short Side:0.9 in[24 mm] Available Listings UL,TUV IFLI Declare Label First solar panel labeled for ingredient transparency and LBC-compliance.° First solar panel line certified for material health, Cradle to Cradle CertifiedTM water stewardship,material reutilization, 140 mm Silver renewable energy&carbon management,and social fairness.' i Please read the safety and installation instructions. Green Building Certification Panels can contribute additional points toward r_ Visitwww.maxeon.com/us/InstallGuideUL. Contribution LEED and BREEAM certifications. i Paper version can be requested through EHS Compliance RoHS,ISO 45001:2018,Recycle Scheme,REACH techsupporLROW@maxeon.com. SVHC-163 j LEAD C FREE r%Amda 'e . entlUtocndfo ROMS[OMPIUVIT 1 40-year warranty is not available in all countries or all installations and requires registration, otherwise our 25-year warranty applies.Service availability varies by country and installation provider. 2 Standard Test Conditions(1000 W/mx irradiance,AM 1.5,25°C).NREL calibration Standard: SOMS current,LACCS FF and Voltage. 3 Type 2 fire rating per UL 61730,Class C fire rating per IEC 61730. 4 Maxeon DC panels first received the International Living Future Institute Declare Label in 2016. 5 Maxeon DC panels are Cradle to Cradle CertifiedTm Silver- www.c2ccertified.org/products/scorecard/maxeon_solar_panels_-_maxeon_corporation.Cradle to Cradle Certified TM is a certification mark licensed by the Cradle to Cradle Products Innovation Institute. 6 As per IEC 61215-2016 tested and certified. maxelon 7 Florida High Velocity Hurricane Zone(HVHZ)or equivalent US building codes.Please refer to the Safety and Installation guide for additional details. Made in Philippines(Cells) Assembled in Mexico(Module) Specifications included in this datasheet are subject to change without notice. 02023 Maxeon Solar Technologies.All Rights Reserved. 545908 REV C/LTR_US View warranty,patent and trademark information at maxeon.com/legal. Publication Date:May 2023 4_- Eood APPROVED AS NOTED DATE•l l-I 2 B.P ! COMPLY WITH ALL CODES OF E D0, DO BY: NEW YORK STATE&TOWN CODES NOTIFY BUILDING DEPARTMENT AT TEII)JRED AND CONDITIONS OF 631-765-1802 BAM TO 4PM FOR THE qvff=Tmm FOLLOWING INSPEOTIONS: UMMUMINGMW FOUNDATION-'TWO REQUIRED w1m=paw FOR POURED CONCRETE UUM ROUGH-FRAMING&PLUMBING INSULATION FINAL-CONSTRUCTION MUST BE COMPLETE FOR C.O. ALL CONSTRUCTION SHALL MEET THE ELECTRICAL REQUIREMENTS OF THE CODES OF NEW INSPECTION REQUIRED YORK STATE. NOT RESPONSIBLE FOR DESIGN OR CONSTRUCTION ERRORS -x 415connec� Ml- be, lOca-Ird ou gib, , )algr,W and read f ly acce5si ble, ,J A M E S J. S TOUT A R C H I T E C T BC Assoc . 2 G REG LANE EAST NORTHP0RT N. Y. 6. 31 - 8 58 9388 Certification Letter August 9, 2024 Re: Mandlebaum Residence 920 Kimberly Lane Southold, NY 11971 To Whom it may concern: I, James J. Stout, registered architect NYS license number 021633 would like to submit the following.I have inspected and analyzed the roof structure at the above listed address and have determined the structure and the attachment to be adequate to support the new additional load imposed by the proposed solar system and complies with the 140-mph wind design load as per 2020 Residential code of NYS ' (RCNYS), 2020 Energy conservation construction code of NYS(ECCCNYS), and the ASCE 7-16. The existing 2"x 10" @ 16'o.c. roof rafters have been analyzed and will provide adequate support. Thank you for your understanding in this matter. Sincerely, James J. Stout 5 S �rF 0� � E GREENLOGICO ENERGY GreenLogic,LLC Approved Mandelbaum,Jay 920 Kimberly Lane Southold,NY 11971 Surface#A: Total System Size:11.205kW 1 circuit of 9 on a 20A breaker 1 circuit of 9 on a 20A breaker 1 circuit of 9 on a 20A breaker Azimuth:252" Pitch: - - - - Monitorinrin g System: Enphase PaneUArray Specifications: x x x x x x x x Panel:SPR-MAX3-415-BLK-R Racking:IronRidge Panel:71.34"X 41.18" Array:31'1 5/8"X 17'10 3/4" Surface:34'6"X 20'11" Legend: ® 27 Maxeon 415W Panels 27 IQ-8HC Microlnverters ® Iron Ridge XR-100 Racking x x x 4 x, x x x\ T T T 7,L x • 42 UniRac Drk Standoff 8 6 2x10"Douglas Fir Rafter 16"O.C. /N A Notes: Number of Roof Layers:1 Height above Roof Surface:4" x x x x x Materials Used:UniRac,IronRidge, Maxeon,Enphase 777 Added Roof load of PV System-2.31psf . Engineer/Architect Seal: C r SOP ! Drawn By:MA Drawing#1 of 5 Date:8/9/2024 REV:A Drawing Scale:3/16"=1.0' GREENL®GIC® ENERGY GreenLogic,LLC Approved Mandelbaum,Jay 920 Kimberly Lane Southold,NY 11971 Surface#A: Total System Size:11.205kW 1 circuit of 9 on a 20A breaker 1 circuit of 9 on a 20A breaker 1 circuit of 9 on a 20A breaker Azimuth:252' 38* Montt rin Monitoring System: Enphase Panel/Array Specifications: Panel:SPR-MAX3-415-BLK-R Racking:IronRidge Panel:71.34"X 41.18" Array:31'1 5/8°X 17'10 314" Surface:34'6"X 20'11" Legend- X1 /K d ® 27 Maxeon 415W Panels 27 IQ-8HC Microlnverters ® Iron Ridge XR-100 Racking • 42 UniRac Drk Standoff 8 8 2x10"Douglas Fir Rafter 16"O.C. Notes: Number of Roof Layers:1 Height above Roof Surface:4" G Materials Used:UniRac,IronRidge, Maxeon,Enphase Added Roof load of PV System:2.31psf Engineer/Architect Seal: fill C1 _ C.A Drawn By:MA Drawing#2 of 5 Date:8/9/2024 REV:A Drawing Scale:3116"=1.0' .G�GREENL®G1C® ENERGY GreenLogic,LLC Approved Mandelbaum,Jay 920 limberly Lane Southold,NY 11971 Surface#A: Total System Size:11.205kW 1 circuit of 9 on a 20A breaker 1 circuit of 9 on a 20A breaker 1 circuit of 9 on a 20A breaker Azimuth:252° Pitch:38* rin - - - Monitoring System:' Enphase 1 Panel/Array Specifications: Panel:SPR-MAX3-415-BLK-R Racking:IronRidge Panel:71.34"X 41.18" Array:31'1 5/8"X 17'10 3/4" Surface:34'6"X 20'11" Legend: 2 ® 27 Maxeon 415W Panels 27 IQ-8HC Microinverters ® Iron Ridge XR-100 Racking • 42 UniRac Drk Standoff 8 8 2x10"Douglas Fir Rafter 16"O.C. Notes: Number of Roof Layers:1 Height above Roof Surface:4" 3 Materials Used:UniRac,IronRidge, Maxeon,Enphase Added Roof load of PV System:2.31psf T T \1/ Engineer/Architect Seal: �5 3. + �9l Id21 tS33 ,O - Drawn By:MA Drawing#3 of 5 Date:8/9/2024 REV:A Drawing Scale:3116"=1.0' No Vent Pipes Will Be Covered By The Solar Array GREENLOGIC® ENERGY Legend: GreenLogic,LLC Approved ,Jay baum AR-Access Roof AP-Access pathway,36" minimum width SVO—Setback at ridge 920 Mandel delKimberlyum Lane per R202 definitions : per R324.6.1 as per R324.6.2.1 Southold,NY 11971 Total System Size:11.205kW 1 circuit of 9 on a 20A breaker 1 circuit of 9 on a 20A breaker 1 circuit of 9 on a 20A breaker Azimuth:252' Monitoring System: I I Enphase I I Panel/Array Specifications: I I I I Panel:SPR-MAX3-415-BLK-R Meter Racking:IronRidge AP I I AP Panel:71.34"X 41.18" I 1 Surface:34'6"X 41'10" I I 1 1 Legend: I 1 27 Maxeon 41.5W Panels I ® 27 IQ-8HC Microinverters I I ——————————————— Iron Ridge XR-100 Racking svo svo • 42 UniRac Drk Standoff Do 2x10"Douglas Fir Rafter 16"O.C. Notes: Number of Roof Layers:1 /X\/X\1=744� Height above Roof Surface:4" Materials Used:UniRac,lronRidge, Maxeon,Enphase Ao_���;XXF_W_W Added Roof load of PV System:2.31psf Engineer/Architect Seal: 27 Maxeon 415W Panels Drawn By:MA Drawing#4 of 5 Date:8/9/2024 REV:A Drawing Scale:3/32"=1.0' -G�GRELENLOGICO I ENERGY GreenLogic,LLC Approved Mandelbaum,Jay 920 Kimberly Lane Southold,NY 11971 JOB MATERIAL LIST Total System Size:11.205kW -- -—----------------------- -------------- I circuit of 9 on a 20A breaker 1 circuit of 9 on a 20A breaker I circuit of 9 on a 20A breaker I Azimuth:252' Monitoring System: Material List Rail Material-List Enphase PanellArray Specifications: ............ Panel:SPR-MAX3415-BLK-R Unibc4!'Drk Standoffs 42 ------------------- Racking:IronRidge 5/16"x4.5"SS Lag Bolts 84 Panel:71.34"X 41.18" Stainless Steel Washers 84 Surface:34 6"X 41'10" Oatey 12920Flashing(Silver) 20 V i y Legend: Oatey 12920 flashing(Blado 22 27 Maxeon 41 5W Panels 27 IQ-8HC Microinverters Iron Ridge XR-100 Racking • 42 UniRac Drk Standoff 2x1 0"Douglas Fir Rafter 16"O.C. Notes: Number of Roof Layers:I Height above Roof Surface:4" Materials Used:UniRac,IronRidge, Maxeon,Enphase Added Roof load of PV System:2.31psf Engineer/Architect Seal: A C C, 3. S bin Drawn By:MA Drawing#5 of 5 Date:8/9/2024 REV:A • Drawing Scale:3/32"=1.0' ENPHASE. I7 IQ Gateway Smart The IQ Gateway delivers solar production and energy consumption data to Enphase Enables web-based monitoring Installer Portal monitoring and analysis software for comprehensive,remote maintenance, and control and management of Enphase systems. Provides bidirectional communications for remote With integrated production metering and optional consumption monitoring,the IQ Gateway is upgrades the platform for total energy management.It integrates with the IQ System Controller and IQ Supports power export limiting and Battery. zero-export applications t Q Simple Easy system configuration using Enphase Installer App Flexible networking with WI-FI, _ Ethernet,or cellular IQ Series Microinverters IQ System Controller The high-powered smart grid-ready IQ Series Provides microgrid interconnect device Reliable Microinverters(I06,I07,and IQ8 Series) (MID)functionality by automatically Designed for Installation indoors dramatically simplify the installation process. detecting grid failures and seamlessly or outdoors a NEMA 311 rated transitioning the home energy system enclosure from grid power to backup power. 5-year limited warranty ENV2-IQ-AM7-240 complies with IEEE®1547:2018(UL 1741-SB,3rd Ed.) ate.. IQ Battery IQ Load Controller All-in-one AC coupled storage system that is Helps prioritize essential appliances reliable,smart,simple,and safe.It provides during a grid outage to optimize backup capability and installers can quickly energy consumption and prolong design the right system size to meet the needs battery life. of both new and retrofit solar customers. Enphase LISTED ©2023 Enphase Energy.All rights reserved.Enphase,the a and CC logos,IQ and certain other marks listed at https://enphase.com/trademark-usage-nuidelines are trademarks of Enphase Energy,Inc.in the US and other countries. Data subject to change. I0-G-DSH-00111-3.0-EN-US-2023-12-20 ,fir. A IQ Gateway MODEL A 1 A 1 IQ Gateway IQ Gateway integrates revenue grade PV production metering(ANSI C12.20 t0.5%),consumption ENV-I0-AMl-240 metering(t2.5%);and battery metering U2.5%)with-IQ Battery.5P. ENV2-IQ4M1-246'(IEEE61547:2018) Includes one 200 A.continuous rated Production Current Transformer(CT). ACCESSORIESORDER Mobile Connect -Includes COMMS-KIT-01 and CELLMODEM=Mi-06-SP-05 with 5-year Sprint data plan. COMMS-CELLMODEM-Mt-06 40 based LTE-M1 cellular modem with5=year Sprint data Plan' CELLMODEM-Mt-06-SP-05' -4G:based LTE-M1 cellular modem with 5-year AT&T data plan`- CEL LM ODEM-M1-06-AT-05 Consumption monitoring CT and IQ Battery 5P metering CT CT-200-SPLIT Split-core and clamp style CTs with 2.5%accuracy enable whole home and IQ Battery 5P metering CT-200-CLAMP Communications Kit Installed at the IQ Gateway.For communications with IQ Battery and 10System Controller.Includes COMMS-KIT-01 USB cable for connection to:IQ Gateway or IQ Combiner and allows wireless communication with IQ COMMS-KIT 02 Battery and IQ System Controller.' POWER REQUIREMENTS AC power requirements <. ,120/240V,120/208YV,,or127/220YV.three=wlre:60ft IQ Gateway breaker 2-pole and maximum 20 A overcurrent protection required Typical power consumption, 5W_ Number of microinverters polled Up to 300 MECHANICAL 1 ELECTRiCAL DATA Dimensions(W x H x D) 21:3 cm x 12.6 cm:x 4.5,cm(8.4in x 5 in 1.8 in) Weight 1.09 lb 40°C to 65°C(=40°F to'149°F)[ENV-10-AM1-240]' Ambient temperature range -4&C to 50°C(-40°E to 122°F){ENV2=I0-AM1-240] 40'Cto 46"C(-40°F to 115"F)if installed in an enclosure Environmental rating IP30.For installation indoors or in an NRTL-certified,NEMA type3R or better-rated enclosure,if installing outdoors. Altitude U,pto'2,600 meters(B,530feet) , COMMUNICATION Integrated Wi-Fi 802.11b/g/n(2.4 GHz,5 GHz),for connecting the Enphase Cloud via the internet. Wi-Fi range(recommended) 10 m Ethernet Optional,802.3,Cat5E(or Cat 6)UTP Ethernet cable(not Included),for connecting to the Enphase Cloud via the internet. Mobile Connect CELLMODEM-M1-06-SP-05,CELLMODEM-M7-06-AT-05(to be purchased separately,mandatory for sites with IQ Battery) Digital 1/0 Digital input/output for grid operator control USB,2.0 For Mobile Connect and Communications Kit Access point(AP)mode For a connection between the IQ Gateway and a mobile device running the Enphase Installer App Metering ports Up to two Consumption CTs,one Production CT,and one battery CT(for IQ Battery SP) Power line communication(PLC) 90 kHz-110 kHz(Class B),to microinverters. Web API Refer to https://developer-v4.enphase.com Local API Refer to guide for local API LED indicators From top to bottom:Cloud connectivity,Wi-Fi access point mode,PV production state,PLC communications state Configured via Enphase Installer App and Enphase Installer Platform IQ-G-DSH-00111-3.0-EN-US-2023-12-20 POWER PRODUCTION/ •1' A DIGITAL 10 Maximum relays read 4 Capabilities supported Power production limiting(Production CT/s required),power export limiting(Production CT/s required and Consumption CT/s-Load with Solar configuration) Minimum 10 Gateway version v7..3.120 Cable configurations 18 AWG,UL-Std.62,600 V,105°C,and minimum 0.03 inches average thickness Signal voltage range 2.5 V-5 V(digital high),0 V-1.9 V(digital low) Terminal blocks Five terminals,up to 0.002 in' Configuration via Enphase Installer App,Enphase Installer Platform(site settings) SCOPEOF DELIVERY Package dimensions(H x W x D) 6.3 in x 10.8 in x 3.9 in Package weight 2.2lb Aluminium DIN rail 4.9 in Current transformers(CTs) One CT-200-SOLID included COMPLIANCE CA Rule 21(UL 1741-SA),IEEE®1547:2018-UL 1741-313,3rd Ed.(ENV2-IQ-AM1-240), UL 61610-1 CAN/CSA C22.2 No.61010-1 Compliance Title 47 CFR,Part 15,Class B,ICES 003 IEC/EN 61010-1:2010, EN50065-1,EN61000-4-5,EN61000-6-1,EN61000-6-2 Metering:ANSI C12.20 accuracy class 0.5(PV production only) COMPATABILITY 10 System Controller SC200D111C240US01,SC200G111C240US01,EP2000101-M24OUS01,EP200G101-M240US00 l0 Battery IOBATTERY-5P-IP-NA,ENCHARGE-3T-1P-NA,ENCHARGE-10T-1P-NA Microinverter 106,197,and1Q8'Series Microinverters 8.4 l— fill1..._. q � c i ®b aGO lJ All dimensions in inches All dimensions in inches Accessories Enphase Mobile Connect Circuit breakers 4G-based LTE-Mt cellular modem with a 5-year BRK-10A-2-240V Circuit breaker,2-pole,10 A,Eaton BR210 data plan BRK-15A-2-240V Circuit breaker,2-pole,15 A,Eaton BR215 (CELLMODEM-MI-06-SP-05 for Sprint and BRK-20A-2P-240V Circuit breaker,2-pole,20 A,Eaton BR220 CELLMODEM-MI-06-AT-05 for AT&T) BRK-15A-2P-240V-B Circuit breaker,2-pole,15 A,Eaton BR215B with hold-down kit support BRK-20A-2P-240V-B Circuit breaker,2-pole,20 A,Eaton BR220B with hold-down kit support CT-200-SOLID CT-200-CLAMP 200 A revenue grade solid core Production CT 200 A clamp-style consumption and battery with<0.5%error rate(replacement SKU) metering CT with<2.5%error rate(replacement Da - iw_ SKU) I0-0-DSH-00111-3.0-EN-US-2023-12-20 Revision history DESCRIPTIONREVISION DATE DSH-001114.0 December 2023 ;Updated power,requiremeni and added IG Gateway breaker values. DSH-00111-2.0 August 2023 Updated temperature specification for ENV2-IQ-AMt-240. DSH-00111-1.0 June 2023 Updated altitude and recommended maximum microinverters on a site. ©2023 Enphase Energy.All rights reserved.Enphase,the a and CC logos,IQ,and certain other marks listed at https://enphase.com/trademark-usage-guidelines are trademarks of Enphase Energy,Inc.in the US and other countries. Data subject to change. 10-G-DSH-00111-3.0-EN-US-2023-12-20 Z& IRON RIDGE XR Rail° Family Solar Is Not Always Sunny Over their lifetime, solar panels experience countless extreme weather events. Not just the worst storms in years, but the worst storms in 40 years. High winds capable of / ripping panels from a roof, and snowfalls weighing enough to buckle a panel frame. XR Rails®are the structural backbone r` preventing these results.They resist uplift, ,,•�,.� protect against buckling and safely and efficiently transfer loads into the : f building structure. Their superior % spanning capability requires fewer roof attachments, reducing the number of roof penetrations and the amount of installation time. { -4 i r Force-Stabilizing Curve Sloped roofs generate both vertical and lateral forces on mounting rails which can cause them to bend and twist.The curved shape of XR RailsO is specially designed to increase strength in both directions while resisting the twisting.This unique a feature ensures greater security during extreme ji weather and a longer system lifetime. Compatible with Flat&Pitched Roofs Corrosion-Resistant Materials XR Rails@ are Iron Ridge®offers All XR RailsO are made of 6000•serles compatible with a range of tilt leg aluminum alloy,then protected with an FlashFootl'and options for flat anodized finish.Anodizing,prevents surface ■■� other pitched roof roof mounting and structural corrosion,while also providing attachments. applications. a more attractive appearance. r � XR Rail° Family The XR Rail@ Family offers the strength of a curved rail in three targeted sizes. Each size supports specific design loads, while minimizing material costs. Depending on your location, there is an XR Rail@ to match. -. �-tal 1 XR10 XR100 XR1000 XR10 is a sleek,low-profile mounting XR100 is a residential and commercial XR1000 is a heavyweight among rail,designed for regions with light or mounting rail.It supports a range of solar mounting rails.It's built to handle no snow.It achieves spans up to 6 feet, wind and snow conditions,while also extreme climates and spans up to 12 while remaining light and economical. maximizing spans up to 10 feet. feet for commercial applications. • 6'spanning capability 10'spanning capability 12'spanning capability • Moderate load capability Heavy load capability Extreme load capability • Clear&black anodized finish Clear&black anodized finish Clear anodized finish • Internal splices available Internal splices available Internal splices available Rail Selection The table below was prepared in compliance with applicable engineering codes and standards." Values are based on the following criteria:ASCE 7-16, Gable Roof Flush Mount, Roof Zones 1 &2e, Exposure B, Roof Slope of 8 to 20 degrees and Mean Building Height of 30 ft. Visit IronRidge.com for detailed certification letters. 90 120 None 140 XR10 X'R100 XRIUUU 160 90 120 20 140 160 90 30 160 90 40 160 80 160 r � 120 160 "Table is meant to be a simplified span chart for conveying general rail capabilities.Use approved certification letters for actual design guidance. 0 r r - ..__.._ IRON RIDGE XR100° Rail See Descri tion/Length Rail Section.Properties Property Value Total Cross-Sectional Area, 0.582 inz .46 6 Section Modulus (X-axis), 0.297 in4 Moment of Inertia,(X-axis) 0.390 in4 Moment of Inertia (Y-axis) 0.085 in4 L] Torsional Constant 0.214'in' Polar Moment of Inertia 0.126 in 1.99 APPROVED MATERIALS: 2.44 6005-T6,6005A-T61,6105-T5,6N01-T6 2.34 (34,000 PSI YIELD STRENGTH MINIMUM) .58 1.25 Clear fart Black Part Description/Length Material Weight Number Number XR-100-132A XR-100-132B XR100, Rail 132"01 Feet) 6000 Series 7.50 lbs. XR-100-168A XR-100-168B XR100, Rail 16B"(14 Feet) Aluminum 9'55 lbs. XR-100-204A XR-100-204B XR100, Rail204"(17 Feet) 11.601bs. V1.11