HomeMy WebLinkAbout51535-Z *of SOUTyo`o Town of Southold
* * P.O. Box 1179
0 53095 Main Rd
UN".N k Southold, New York 11971
CERTIFICATE OF OCCUPANCY
No: 46135 Date: 05/01/2025
THIS CERTIFIES that the building SOLAR PANEL
Location of Property: 1975 Skunk Ln Cutchogue, NY 11935
Sec/Block/Lot: 97.4-9
Conforms substantially to the Application for Building Permit heretofore,filed in this office dated: 11/12/2024
Pursuant to which Building Permit No. 51535 and dated: 01/09/2025
Was issued, and conforms to all of the requirements of the applicable provisions of the law.
The occupancy for which this certificate is issued is:
Roof mounted solar panels to existing single-family dwelling as applied for.
The certificate is issued. to: Siarhei Palianok , Ina Palianok
Of the aforesaid building.
SUFFOLK COUNTY DEPARTMENT OF HEALTH APPROVAL:
ELECTRICAL CERTIFICATE: 51535 4/28/2025
PLUMBERS CERTIFICATION:
Aut6o'rizu Signatur
ofsft, TOWN OF SOUTHOLD
BUILDING DEPARTMENT
• TOWN CLERK'S OFFICE
SOUTHOLD, NY
BUILDING PERMIT
(THIS PERMIT MUST BE KEPT ON THE PREMISES
WITH ONE SET OF APPROVED PLANS AND SPECIFICATIONS
UNTIL FULL COMPLETION OF THE WORK AUTHORIZED)
Permit#: 51535 Date: 01/09/2025
Permission is hereby granted to:
Siarhei Palianok
1975 Skunk Ln
Cutchogue, NY 11935
To:
Install roof mount solar to existing single family dwelling as applied for.
Disconnects must be located on the exterior, labeled, and readily accessible.
Premises Located at:
1975 Skunk Ln, Cutchogue, NY 11935
SCTM#97.-4-9
Pursuant to application dated 11/12/2024 and approved by the Building Inspector.
To expire on 01/09/2027.
Contractors:
Required Inspections:
Fees:
CO-RESIDENTIAL $100.00
ELECTRIC -Residential $125.00
SOLAR PANELS $100.00
Total 325.00
Building Inspector
��J&4PRAL
CE I� COMPLIANCE
Town H N 2
54375 ain RoadP.O.s RS4��i : Siarhei Paliano
Southold, AAdA3j:-0959 1975 Skunk Ln Ql e St: NY Zip: 11935
Building Permit#: 51535 Section: ' 97 Block: 4 Lot: 9
WAS EXAMINED AND FOUND
�TO� BE IINCOMPLIANCE WITH THE NATIONAL ELECTRIC CODE
Contractor: TCK 1�7'0r+n§fthH0LD License No: 57843ME
SITE DETAILS
Office Use Only
Residential Indoor Basement r Service I— Solar
Commercial 1- Outdoor rv-1-. 1st Floor Pool r Spa F
New Renovation 2nd Floor F Hot Tub r Generator (—
Addition (- Survey 1 Attic (- Garage Battery Storage r
INVENTORY
Service 1 ph r Heat Duplec Recpt Ceiling Fixtures Bath Exhaust Fan
Service 3 ph Hot Water GFCI Recpt Wall Fixtures Smoke Detectors
Main Panel A/C Conden Single Recpt Recessed Fixtures CO Detectors
Sub Panel A/C Blower Range Recpt Ceiling Fan Combo Smoke/CO
Transfer Switch Dryer Recpt Emergency Strobe Heat Detectors
Disconnect Switches 4'LED Exit Fixtures
Other Equipment: 9.02kW Roof Mounted PV Solar Energy System w/ (22) Hanwha 41 OQpeak
DuoG10+ Modules, Rapid Shutdown, InverterUSE760OH-USMN131-75, On Backfed 40A
Notes: Solar
Inspector Signatu X Date: May 13, 2025
Sean Devlin
Electrical Inspector sean.deviine-town.southold.ny.us
S.Devlin-Cert Electrical Compliance Form 2
SOUT��I _
Town Hall Annex Telephone(631)765-1802
54375 Main Road
P.O.Box 1179 G • Q
Southold,NY 11971-0959 'Q
lh
rev(,<.cd
BUILDING DEPARTMENT "-e_4
TOWN OF SOUTHOLD
�-� .a,7
CERTIFICATE OF ELECTRICAL COMPLIANCE
SITE LOCATION
Issued To: Ina Palianok
Address: 1975 Skunk Ln City: Cutchogue St: NY Zip: 11935
Building Permit#: 51535 Section: 97 Block: 4 Lot: 9
WAS EXAMINED AND FOUND TO BE IN COMPLIANCE WITH THE NATIONAL ELECTRIC CODE
Contractor: Electrician: Trinity Solar License No: 57843ME
SITE DETAILS
Office Use Only
Indoor FV- Basement r Service r Solar
Outdoor W 1 st Floor F Pool r Spa
Renovation I— 2nd Floor F Hot Tub r Generator (—
Survey rV1 Attic I— Garage Battery Storage r
INVENTORY
Service 1 ph F Heat Duplec Recpt Ceiling Fixtures Bath Exhaust Fan
Service 3 ph r Hot Water GFCI Recpt Wall Fixtures Smoke Detectors
Main Panel A/C Condenser Single Recpt Recessed Fixtures CO Detectors
Sub Panel A/C Blower Range Recpt Ceiling Fan Combo Smoke/CO
Transfer Switch UC Lights Dryer Recpt Emergency Strobe Heat Detectors
Disconnect Switches 4'LED Exit Fixtures
Other Equipment: 10.25kW Roof Mounted PV Solar Energy System w/E(2-'$ -10WSE-U650:MOdules,-
Rapid Shutdown, USE760OH-USMNBL75 Inverter, On Backfed 40A Breaker
Notes: Solar
Inspector Signature: X Date:
April28, 2025
Sean Devlin
Electrical Inspector sean.devii n(a-town.Southold.ny.us
1975SkunkSolar
SOGTyOIo
# TOWN 0 OUTHOLD BUILDING DEPT.
631-765-1802
INSPECTION
[ ] FOUNDATION 1ST/ REBAR ' [ ] ROUGH PLBG.
[ .] FOUNDATION 2ND [ ] INSULATION/CAULKING
[ ] FRAMING /STRAPPING [ ] FINAL
[ ] FIREPLACE & CHIMNEY [ ] FIRE SAFETY INSPECTION
[ ] FIRE-RESISTANT CONSTRUCTION ' [ ] FIRE RESISTANT PENETRATION
[ J ELECTRICAL (ROUGH) j�ELECTRICAL (FINAL)
[ ] CODE VIOLATION [ ] PRE.C/O [ ]. RENTAL
REMARKS: L.-
r
I
DATE . INSPECTOR
oo� OF SOUIyo
* TOWN OF. SOUTHOLDBUILDING DEPT.
coorm, '' 631-765-1802
INSPECTION
[ ] FOUNDATION 1ST/ REBAR [ ] ROUGH PLBG.
[ ] FOUNDATION 2ND [ ] INSULATION/CAULKING
[ ] FRAMING/STRAPPING [ Pf FINAL 501X.e--,
[ ] FIREPLACE & CHIMNEY [ ] FIRE SAFETY.INSPECTION
f ] FIRE RESISTANT CONSTRUCTION [ ] FIRE RESISTANT PENETRATION .
[ ] LECTRICAL (ROUGH) [ ] ELECTRICAL (FINAL)
[ CODE VIOLATION [ ] PRE C/O , [ ] RENTAL
REMARKS:
a d� .
DATE INSPECTOR
a �
1 i
i
� i S
I
i
w�
3
+ri' t
i•
K
� r
s i _
t � _
"k
yf _
a s� �Sso�y
also L '
.. �� �` W
?IELD INSPECTION REPORT DATE COMMENTS
-a
FOUNDATION (1ST) - ---- -------
- -------
---------------------------------
- C
FOUNDATION (2ND)
z
�o
ROUGH FRAMING& .�
PLUMBING -
i
- r
INSULATION PER N.Y.
STATE ENERGY CODE
T
UaQ 1.9-5
FINAL
ADDITIONAL COMMENTS
-- S
-- r
k
-o
i7 O
— N z
x
n ' -
o�gt1FF0(N�oG TOWN OF SOUTHOLD—BUILDING DEPARTMENT
y Town Hall Annex 54375 Main Road P. O. Box 1179 Southold,NY 11971-0959
Telephone(631) 765-1802 Fax (631) 765-9502 https://www.southoldtownny.gov
Date Received
APPLICATION FOR BUILDING PERMIT
For Office Use Only
PERMIT NO. BuildingIns ector: 9
p NOV 1 2 2024
'Applications and forms must be filled out in their entirety.Incomplete
applications will`not be accepted. Where the Applicant is not the owner,an
Owner's Authorization form(Page 2).shall be completed. .
Date:10/28/24
OWNER(S)OF PROPERTY:
Name:Ina Palianok SCTM# 1000-097.00-04.00-009.000
Project Address`1975 Skunk Ln. CUtChogUe, NY 11935
Phone#:631-800-6325� Email:polensi@gmailYcom„_ _�____�
MailingAddress:1975 Skunk Ln. Cutchogue, NY 11935
CONTACT PERSON: '
Name:_Trinity Solar- Samuel Magliaro
MailingAddress:2180 5th Ave Unit 1A, Ronkonkoma,-NY 11779
Phone#:(631)319-7233 Email:brittanygaumer@trinityYsolar.com
DESIGN PROFESSIONAL INFORMATION:
Name:Trinity_ Solar- Ayracon V. Almaraz____
Mailing Address:2211 Allenwood Rd. Wall, NJ 07719
Phone#_(631.)319.-7233 Email:AyraconAmaraz@trinityTsolar.com
CONTRACTOR INFORMATION: -
Name_Trinity_ Solar- Samuel Magiiaro
Mailing Address:2180_5th Ave Unit 1A, Ronkonkoma,-NY 11.779_
Phone#:(631)319-7233 Email:brittanv.oaumer@trinity_-gglar com
DESCRIPTION OF PROPOSED CONSTRUCTION
❑New Structure igAdditi ❑Alteration ❑Repair ❑Demolition Estimated Cost of Project:
❑Other ��,r $38,622.82
Will the lot be re-graded? ❑Yes El No Will excess fill be removed from premises? ❑Yes El NO
1
PROPERTY INFORMATION
Existing use of property: Intended use of property:$Qlar PanG'�$
Zone or use district in which premises is situated: Are there any covenants and restrictions with respect to
___ ---- this property? ❑Yes ❑No IF YES, PROVIDE A COPY.
•Check Box After Reading: The owner/contractor/desigg professional Is responsible for all drainage and storm water Issues as provided by
Chapter 236 of the Town Code.'APPLICATION IS HEREBY MADE to the Building Department for the issuance of a Building Permit pursuant to the Building Zone
Ordinance of the Town of Southold,Suffolk;County,New York and other applicable Laws,Ordinances or Regulations,for the construction of buildings,
additions,alterations or for removal or demolition as herein described.The applicant agrees to comply with all applicable laws,ordinances,building code,
housing code and regulations and to admit authorized inspectors on premises and In building(s)for necessary inspections.False statements made hereinare
punishable as a Class,A misdemeanor pursuant to Section 210.45 of the New York State Penal Law. '
Application Submitted By(print name):Trinity Solar- Samuel Maglial"O ®Authorized Agent ❑Owner
Signature of Applicant: t Date:
STATE OF NEW YORK)
SS:
COUNTY OF S,&AI& )
JOM(A-6 �'00 \C\�_C) being duly sworn,deposes and says that(s)he is the applicant
(Name of individual signing contract)
above named,
(S)he is the NtOA
(Contractor,Agent,Corporate Officer,etc.)
of said owner or owners,and is duly authorized to perform or have performed the said work and to make and file this
application;that all statements contained in this application are true to the best of his/her knowledge and belief;and
that the work will be performed in the manner set forth in the application file therewith.
Sworn before me this
day of lVbi eA�xr ,20 a
Not fy blic
SARAH YARBROUGH
NOTARY PUBLIC-STATE OF NEW ORK
PROPERTY OWNER AUTHORIZATIO No.01YA6441255
(Where the applicant is not the owner) Qualified in Suffolk county
My Commission Expires 09-26-2 26
Ina Palianok residing at 1975 Skunk Ln. Cutchogue
NY 11935 do hereby authorize Trinity Solar- Samuel Magliaroto apply on
my behalf to the To of thold Building Department for approval as described herein.
&y
Owner's Signatde Date
rmnle
Print Owner's Name
2
�,svfOt,ir BUILDING DEPARTMENT-Electrical Inspector
TOWN OF SOUTHOLD
'. Town Hall Annex- 54375 Main Road - PO Box 1179
y z : Southold, New York 11971-0959
Telephone (631) 765-1802 - FAX (631) 765-9502
rocaerr(aD-southoldtown�.gov - seand agsoutholdtowniy.gov
APPLI.GATION FOR ELECTRICAL INSPECTION
ELECTRICIAN INFORMATION (All Information Required) Date: 10/28/24
Company Name: Trinity Solar
Name: Richard Guarneri
License No.: ME-57843 email: Rich.guameri@trinity-solar.com
AddreSS: 2180 5th Ave Unit IA,Ronkonkoma,NY 11779
Phone No.: (631)319-7233
JOB SITE INFORMATION (All Information Required)
Name: Ina Palianok
Address: 1975 Skunk Ln.Cutchogue,NY 11935
Cross Street: Main Rd.
Phone No.: 631-800-6325
Bldg.Permit#: c, i �j�j �j email
Tax Map District: 1000 Section: 097.00 Block_ 04.00 _._ Lot:oo9.000
BRIEF DESCRIPTION OF WORK (Please Print Clearly)
Installation of a utility approved,grid inter-tied,flush mount,roof mounted,25 Hanwha 410 solar panels, 10.25kW photovoltaic electricity generating system.
Circle All That Apply:
Is job ready for inspection?: YES / Rough In Final
Do you need a Temp Certificate?: YES / NO Issued On
Temp Information: (All information required)
Service Size 1 Ph 3 Ph Size: -A # Meters Old Meter# _
New Service - Fire Reconnect- Flood Reconnect- Service Reconnected- Underground - Overhead
#Underground Laterals 1 2 H Frame Pole Work done on Service? Y N
Additional Information:
PAYMENT DUE WITH APPLICATION
Request for Inspection Formals
rT-r)- n 6 ty
October 30,2024
S O L A R Trinity Solar No.2024-09-1171270
Southold Town,NY RE:SIARHEI PALIANOK;INA PALIANOK
Town Hall Annex Building54375 Route 25 P.O.Box 1179 1975 skunk lane
Southold,NY 11971 Cutchouge,NY 11935
To the Building Official:
The following information constitutes a summary of the relevant design criteria and recommendations for the support of a new photovoltaic(PV)system on
the existing roof framing components at the above-referenced location.Trinity Solar,LLC has confirmed this structure is permitted by the local jurisdiction and
has provided all relevant documentation regarding the existing structure.As of the date of this evaluation,no concerns nor deficiencies related to the existing
structure have been reported.Therefore,this assessment is based on the premise the existing structure is in good condition and capable of supporting the
existing loads.This evaluation is strictly limited to the support of the PV system and does not extend to any other structural elements not directly involved in
the solar panel installation.If any discrepancies from the actual conditions are identified,or if concerns regarding the existing structure arise,this office must
be notified prior to proceeding with the installation.All spans listed below are horizontal projections.
1.Existing Roof Framing:
•Conventional roof framing at R4 and R5:2X6 at 16 o.c.;existing rafter span is the max unsupported span=14'-0"
2.Roof Loading:
•3.00psf-New PV array load(PV panels,mounting rails,and hardware)
•6.14psf-Existing roof dead load(1.47psf-2X6 at 16"o.c.roof rafters,4.67psf-roof covering)
•20psf-Ground snow load -per AHJ(Authority Having Jurisdiction)
•Exposure Category B,130mph design wind speed
3.Existing Roof Modification:
•R4 and R5-No modification required.Existing roof framing is acceptable for PV installation.
4.Attachments:
•The maximum allowable spacing of the ECOFASTEN-L-FOOT*attachments can't exceed more than 48".Attachments to be fastened using quantity(1)
5/16"x 4"Lag Bolt with a minimum penetration depth of 3"-this is adequate to resist all stated demand loads above.Install attachments,rails,and panels
per manufacturer requirements.Stagger attachments to distribute load.
*ATTACHMENT TO BE SECURED TO RAFTERS NO LESS THAN 2x4 IN SIZE WITH A MINIMUM 7/16"DECK.CONTRACTOR TO INFORM THIS
OFFICE IF ANY ITEM ABOVE DIFFERS FROM SITE CONDITIONS.
The installation,described above,is in general conformance with the manufacturers'specifications and complies with all applicable laws,codes,and
ordinances as specified by applicable codes,including the 2020 Residential Code of New York State and ASCE 7-16.
It should be noted that only PV-supported roofs are reviewed.Trinity Solar is not responsible for any construction flaws or defects that may currently exist in
areas of the structure that are not directly related to the PV installation.'
Regards,
Ayracon Almaraz,PE
Structural Engineer-Trinity Solar
4F NEIP'l,
V.
�FQ 100315 <
ss�oNa`'
License No.100315,expiration date:12/31/2026
Trinity Solar 2180 5th Avenue,Unit 1 Ronkonkoma,NY (631)319-7233
INSTALLATION OF NEW SKUNK LANE.
OF NEW
ROOF MOUNTED PV SOLAR SYSTEM iR . •
1975 SKUNK LANE a
100315
CUTCHOUGE NY 11935
,s SS1o�P�'
Ex : 12/31 2026
Issued/Revisions
SUED TO T-5 HIP FOR PERM IT 10/18/2024
VICINITY MAP SITE NO DESCRIPTION DATE
SCALE: NTS Project Title:
OCCUPANCY OR SIARHEI PALIANOK;INA PALIANOK-
W��� TRINITY ACCT# 2024-09-1171270
USE IS UNLA Project Address:
WITHOUTCERTIFICATE 1975 SKUNK LANE
CUTCHOUGE,NY 11935
41.0249,-72.4640
GENERAL NOTES GENERAL NOTES CONTINUED GENERAL NOTES CONTINUED ABBREVIATIONS CONTINUED SHEET INDEX OF OCCUPANCY
Drawing Title:
1. THE INSTALLATION CONTRACTOR IS 8, THE DC VOLTAGE FROM THE PANELS IS 14. B) CURRENT PREVAILING UTILITY JB JUNCTION BOX PV-1 COVER SHEET W/ SITE INFO & NOTES
RESPONSIBLE FOR INSTALLING ALL ALWAYS PRESENT AT THE DC COMPANY SPECIFICATIONS, kCMIL THOUSAND CIRCULAR MILS
EQUIPMENT AND FOLLOWING ALL DISCONNECT ENCLOSURE AND THE DC STANDARDS,AND REQUIREMENTS kW KILO-VOLT AMPERE PV-2 ROOF PLAN W/ MODULE LOCATIONS PROPOSED PV SOLAR SYSTEM
DIRECTIONS AND INSTRUCTIONS TERMINALS OF THE INVERTER DURING 15 THIS SET OF PLANS HAVE BEEN kW KILO-WATT
CONTAINED IN THE DRAWING PACKAGE AND DAYLIGHT HOURS,ALL PERSONS PREPARED FOR THE PURPOSE OF kWH KILO-WATT HOUR PV-3 ELECTRICAL 3 LINE DIAGRAM
INFORMATION RECEIVED FROM TRINITY. WORKING ON OR INVOLVED WITH THE MUNICIPAL AND AGENCY REVIEW AND L LINE MAIN CIRCUIT BREAKER
2. THE INSTALLATION CONTRACTOR IS PHOTOVOLTAIC SYSTEM ARE WARNED APPROVAL.ONCE APPROVED,THE mce MDP MAIN DISTRIBUTION PANEL A P APPENDIX Drawing Information
RESPONSIBLE FOR INSTALLING ALL THAT THE SOLAR MODULES ARE INSTALLATION CONTRACTOR IS MLO MAIN LUG ONLY - DRAWING DATE: 10/1S/2024
EQUIPMENT AND FOLLOWING ALL ENERGIZED WHENEVER THEY ARE RESPONSIBLE FOR INSTALLING ALL MTD MOUNTED �/�/��F DRAWN BY: BL
DIRECTIONS AND INSTRUCTION CONTAINED EXPOSED TO LIGHT. SYSTEM COMPONENTS AS DESCRIBED IN MTG MOUNTING APPROVED AS NOTED PLY 1MTH ALL C"""` S
IN THE COMPLETE MANUAL. 9. ALL PORTIONS OF THIS SOLAR THE DRAWING PACKAGE. EVISED BY:
N NEUTRAL
3. THE INSTALLATION CONTRACTOR IS PHOTOVOLTAIC SYSTEM SHALL BE 16 ALL INFORMATION SHOWN MUST BE I
RESPONSIBLE FOR READING AND MARKED CLEARLY IN ACCORDANCE WITH CERTIFIED PRIOR TO USE FOR NEC. NATIONAL ELECTRICAL CODE _ YORK STATE S TOWN C
NIC NOT IN CONTRACT DATES /-9-a .si
UNDERSTANDING ALL DRAWINGS, THE NATIONAL ELECTRICAL CODE CONSTRUCTION ACTIVITIES. NO# NUMBER B.P., 3S AS REUUTAIED AND CONDIT m Information:
COMPONENT AND INVERTER MANUALS ARTICLE 690 8 705. L
PRIOR TO INSTALLATION.THE INSTALLATION 10. PRIOR TO THE INSTALLATION OF THIS NITS NOT TO SCALE D TEM SIZE: 10.25kW
CONTRACTOR IS ALSO REQUIRED TO HAVE PHOTOVOLTAIC SYSTEM,THE ABBREVIATIONS PCP OVER POLE CURRENT PROTECTION �� 3as v TOWN AC SYSTEM SIZE: 7.6kW
ALL COMPONENT SWITCHES IN THE OFF INSTALLATION CONTRACTOR SHALL B`• MODULE COUNT: 25
POSITION AND FUSES REMOVED PRIOR TO ATTEND A PRE-INSTALLTION MEETING AMP AMPERE PB PULL BOX
THE INSTALLATION OF ALL FUSE BEARING FOR THE REVIEW OF THE INSTALLATION AC ALTERNATING CURRENT PH PHASE NOTIFY BUILDING DEPARTMENT AT �UTiiOLD TOW1d S USED: HANWHA 410
SYSTEM COMPONENTS. PROCEDURES,SCHEDULES,SAFETY AND AL ALUMINUM PVC POLY-VINYL CHLORIDE CONDUIT MODULE SPEC#: '.Q.PEAK DUO BLK ML-G10i 410
PWR POWER 631-765-1802 8AM TO 4PM FOR THE ���yy
4. ONCE THE PHOTOVOLTAIC MODULES ARE COORDINATION. AF AMP.FRAME HIV If�IIJ UTILITY COMPANY: PSEG-LI
MOUNTED,THE INSTALLATION 11, PRIOR TO THE SYSTEM START UP THE AFF ABOVE FINISHED FLOOR CITY QUANTITY FOLLOWING INSPECTIONS-
CONTRACTOR SHOULD HAVE A MINIMUM OF INSTALLATION CONTRACTOR SHALL AFG ABOVE FINISHED GRADE RGS RIGID GALVANIZED STEEL ILY& UTILITY ACCT R 9830045303
ONE ELECTRICIAN WHO HAS ATTENDED A ASSIST IN PERFORMING ALL INITIAL AWG AMERICAN WIRE GAUGE SN SOLID NEUTRAL 1. FOUNDATION-TWO REOUIRED UTILITY METER#: 9300921
SOLAR PHOTOVOLTAIC INSTALLATION HARDWARE CHECKS AND DC WIRING C CONDUIT (GENERIC TERM OF JSWBD SWITCHBOARD Wc DEAL TYPE: SUNNOVA
COURSE ON SITE. CONDUCTIVITY CHECKS. RACEWAY,PROVIDE AS TYP TYPICAL FOR POURED CONCRETE
5. FOR SAFETY,IT IS RECOMMENDED THAT 12. FOR THE PROPER MAINTENANCE AND SPECIFIED) U.O.I. UNLESS OTHERWISE INDICATED 2. ROUGH-FRAMING&PLUMBING
THE INSTALLATION CREW ALWAYS HAVE A ISOLATION OF THE INVERTERS REFER TO CB COMBINER BOX WP WEATHERPROOF
MINIMUM OF TWO PERSONS WORKING THE ISOLATION PROCEDURES IN THE CKT CIRCUIT XFMR TRANSFORMER 3. INSULATION Rev.No. Sheet
TOGETHER AND THAT EACH OF THE OPERATION MANUAL. CT CURRENT TRANSFORMER +72 MOUNT 72 INCHES TO BOTTOM
INSTALLATION CREW MEMBERS BE TRAINED 13. THE LOCATION OF PROPOSED ELECTRIC CU COPPER OF ABOVE FINISHED FLOOR OR 4. FINAL-CONSTRUCTION MUST
IN FIRST AID AND CPR. AND TELEPHONE UTILITIES ARE SUBJECT DC DIRECT CURRENT GRADE BE COMPLETE FOR C.O. RETAIN STORM WATER RUNOFF p 1 PV 6. THIS SOLAR PHOTOVOLTAIC SYSTEM IS TO TO FINAL APPROVAL OF THE DISC DISCONNECT SWITCH �/�� A�
BE INSTALLED FOLLOWING THE APPROPRIATE UTILITY COMPANIES AND DWG DRAWING ALL CONSTRUCTION SHALL MEETTHE PURSUANT TO CHAPTER 236
CONVENTIONS OF THE NATIONAL OWNERS. EC ELECTRICAL SYSTEM INSTALLER OF THE TOWN CODE
ELECTRICAL CODE. ANY LOCAL CODE 14, ALL MATERIALS,WORKMANSHIP AND EMT ELECTRICAL METALLIC TUBING REQUIREMENTS OF THE CODES OF NEW
WHICH MAY SUPERSEDE THE NEC SHALL CONSTRUCTION FOR THE SITE FS FUSIBLE SWITCH
GOVERN. IMPROVEMENTS SHOWN HEREIN SHALL FU FUSE YORK STATE NOT RESPONSIBLE FOR
7. ALL SYSTEM COMPONENTS TO BE BE IN ACCORDANCE WITH: GND GROUND DESIGN OR/�/1NSTP1 Ln ON EMOM � � O
INSTALLED WITH THIS SYSTEM ARE TO BE A) CURRENT PREVAILING MUNICIPAL GFI GROUND FAULT INTERRUPTER NL.�7�N1•VI7 W��h7 11VV V1t GI1R (7V
"UL"LISTED.ALL EQUIPMENT WILL BE NEMA AND/OR COUNTY SPECIFICATIONS. HZ FREQUENCY (CYCLES PER n
3R OUTDOOR RATED UNLESS INDOORS. STANDARDS AND REQUIREMENTS SECOND) 9—` -
GENERAL NOTES S O L A R
IF ISSUED DRAWING IS MARKED WITH A REVISION CHARACTER OTHER THAN"A",PLEASE BE ADVISED THAT FINAL EQUIPMENT AND/OR SYSTEM CHARACTERISTICS ARE SUBJECT TO CHANGE DUE TO AVAILABLITY OF EQUIPMENT. 2211 Allenwood Road 877-786-7283
Wall,New Jersey 07719 www.Trinity-Solar.com
lb
19U
3TP. 'T1933 TUG17 .
30 83000 JJA HTCN YJWOOQ3T�Y �'.'� ;�.
2300314WOT A 3TA!? moo v,9"
�O AUTiOPM QYtA WNLQ3R ZA 1�.e_ ►n�
WOOD
02
DYE
�tG10Ftf'J0�
L y
i
ECOFASTEN CLAMP
NOTES:'REFER TO MODULE SPECS FOR MODULE DIMENSIONS (REFER TO SPEC SHEET FOR DETAILS)
`DEPICTED MODULES MAY BE PORTRAIT OR LANDSCAPE
NEW PV SOLAR MODULE,TYPICAL SOLAR MODULE SOLAR MODULE
(REFER TO EQUIPMENT SCHEDULE
FOR SPECS AND QUANTITIES) ECOFASTEN"L"FOOT ECOFASTEN RAIL [
NEW MOUNTING FOOT/ATTACHMENT (REFER TO SPEC SHEET FOR DETAILS) (REFER TO SPEC SHEET FOR DETAILS) O1 NEB y
♦ POINTS,TYPICAL (REFER TO \= T JJ\�[
ENGINEERING LETTER FOR SPACING to Q
AND DETAILS) - 2 7
NEW ECOFASTEN RAIL,TYPICAL ECOFASTEN SLOT BRACKET
TO BE MOUNTED PERPINDICULAR TO (REFER TO SPEC SHEET FOR DETAILS)
STRUCTURE(REFER TO ECOFASTEN ECOFASTEN CORRUGATED BRACKET � �[ N
SPECIFICATION/DATA SHEET FOR $ELF TAPPING SCREW
DETAILS) (REFER TO SPEC SHEET FOR DETAILS) (REFER TO SPEC SHEET FOR DETAILS) / 2
NEW END CLIP,TYPICAL O O EXISTING CORRUGATED METAL 0�Z q2
(REFER TO ECOFASTEN SPECIFICATION SOLAR MODULES SHALL NOT
/DATA SHEET FOR DETAILS) (REFER TO ENGINEERS LETTER FOR SPECS)
EXCEED PEAK HEIGHT. trA 100315
�V
NEW MID CLIP,TYPICAL EXISTING RAFTER O Cv
(REFER TO ECOFASTEN SPECIFICATION (REFER TO ENGINEERS LETTER FOR SPECIFICATION)
/DATA SHEET FOR DETAILS) J J�O��
ATTACHMENT&CLIP DETAIL PV MODULE ATTACHMENT ON CORRUGATED METAL ROOF HEIGHT FROM GROUND LEVEL TO PEAK OF ROOF
SCALE:NOT TO SCALE SCALE:NOT TO SCALE SCALE:NOT TO SCALE E x p: 12/31/2 0 2 6
ARRAY SCHEDULE
Issued/Revisions
BACK I ISSUED TO TOWNSHIP FOR PERMR 20/18/2024.
NO. DESCRIPTION DATE
Project Title:
R1 SIARHEI PALIANOK;INA PALIANOK-
(� TRINITYACCT#:2024-09-1171270
Project Address:;]CDC�
`(\ Of 1975 SKUNK LANE
�\ CUTCHOUGE,NY 11935
R5
41.0249,-72.4640
"\
\ Drawing Title:
EP M PROPOSED PV SOLAR SYSTEM
Drawing Information
d DRAWING DATE: 10/18/2024
DRAWN BY: BL
REVISED BY:
R4 ( 11
L System Information:
DC SYSTEM SIZE: 10.25kW
- AC SYSTEM SIZE: 7.6kW
MODULE COUNT: 25
MODULES USED: HANWHA 410
MODULE SPEC#: Q.PEAK DUO BLK ML-G10+410
FRON- UTILITY COMPANY: PSEG-LI
UTILITY ACCT#: 9641045303
NOTES: UTILITY METER#: 98300921
1.)ALL EQUIPMENT SHALL BE INSTALLED IN ACCORDANCE DEAL TYPE: SUNNOVA
WITH THE MANUFACTURER'S INSTALLATION INSTRUCTIONS.
2.)ARRAY BONDING TO COMPLY WITH MANUFACTURER SPECIFICATION.
3.)ALL LOCATIONS ARE APPROXIMATE AND REQUIRE FIELD VERIFICATION.
4.) AN AC DISCONNECT SHALL BE GROUPED WITH INVERTER(S) NEC 690.13(E) Rev. NO. Sheet
ROOF 1 5.) ALL OUTDOOR EQUIPMENT SHALL BE RAIN TIGHT WITH MINIMUM NEMA 3R RATING.
MODULES:0PITCH:10' 6.) ROOFTOP SOLAR INSTALLATION ONLY PV ARRAY SHALL NOT EXTEND BEYOND THE EXISTING ROOF EDGE.
ORIENTATION:74° r V
ROOF2 SYMBOL LEGEND PLUMBING SCHEDULE EQUIPMENT SCHEDULE
MODULES:0 CITY SPEC#
PITCH:30*ON:166° .( INDICATES ROOF DESIGNATION.REFER TO INDICATES NEW UNFUSED PV DISCONNECT TO BE SP INDICATES NEW PV ONLY SUBPANEL
OR
® ARRAY SCHEDULE FOR MORE INFORMATION 05 INSTALLED OUTSIDE (UTILITY ACCESSIBLE) TO BE INSTALLED 25 HANWHA 410(Q.PEAK DUO BLK ML-G10+410)
ROOF3
MODULES:0 INDICATES NEW PV SOLAR MODULE.RED MODULES 1 USE760OH-USMNBL75
PITCH:30° Tr i
•
ORIENTATION:346° M INDICATES EXISTING METER LOCATION � INDICATE PANELS THAT USE MICRO INVERTERS. DC INDICATES NEW DC DISCONNECT
ROOF 4 REFER TO EQUIPMENT SCHEDULE FOR SPECS. 15 ECOFASTEN 2012035 CIF STD US RAIL AL MILL 171.5
MODULES:6 - OTHER OBSTRUCTIONS
PITCH:34 INDICATES EXISTING ELECTRICAL PANEL INDICATES NEW PRODUCTION METER TO BE —a
ORIENTATION:254 EP LOCATION: INSIDE P INSTALLED OUTSIDE. SD INDICATES EXISTING SERVICE DISCONNECT SOLAR
P
ROOFS
MODULES:19 INDICATES NEW INVERTER TO BE
PITCH:34 INDICATES NEW FUSED PV DISCONNECT TO BE 2211 Allenwood Road 877-786-7283
ORIENTATION:74 OD INSTALLED OUTSIDE(UTILITY ACCESSIBLE) INSTALLED OUTSIDE. T.S INDICATES EXISTING TRANSFER SWITCH
'4 REFER TO EQUIPMENT SCHEDULE FOR SPECS Wall,New Jersey 07719 www.TrinitV-Solar.com
Engineer/License Holder:
ARRAY CIRCUIT WIRING NOTES
1. LICENSED ELECTRICIAN ASSUMES ALL RESPONSIBILITY
FOR DETERMINING ONSITE CONDITIONS AND 0� N f
EXECUTING INSTALLATION IN ACCORDANCE WITH
SOLAR MODULES MOUNTED TO ROOF ON 2 ARRAYS
NEC 2017 25-41OW MODULES W/1 SOLAR EDGE U650 PER MODULE L `
15 ADC MAX PER STRING �+O • ��7
2.)LOWEST EXPECTED AMBIENT TEMPERATURE BASED ON
ASHRAE MINIMUM MEAN EXTREME DRY BULB
TEMPERATURE FOR ASHRAE LOCATION MOST SIMILAR TO 1 STRING OF12 MODULES IN SERIES-380Vmax --- ------ -----------------------------
INSTALLATION LOCATION. LOWEST EXPECTED AMBIENT 1 STRING OF 13 MODULES IN SERIES-380 Vmax JUNCTION - - 1 ��
BOX
TEMP=-16"C I
3.)HIGHEST CONTINUOUS AMBIENT TEMPERATURE BASED *2 STRINGS TO BE TERMINATED INSIDE INVERTER 1
ON ASHRAE HIGHEST MONTH 2%DRY BULB
TEMPERATURE FOR ASHRAE LOCATION MOST SIMILAR TO - I 100315
INSTALLATION LOCATION. HIGHEST CONTINUOUS TEMP= I
33°C �0• L�S�O��v
4.)2005 ASHRAE FUNDAMENTALS 2%DESIGN
TEMPERATURES DO NOT EXCEED 47°C IN THE UNITED
STATES(PALM SPRINGS,CA IS 44.1"C). FOR LESS THAN 9 I
CURRENT-CARRYING CONDUCTORS IN AROOF-MOUNTED
Issued/Revisions
SUNLIT CONDUIT AT LEAST 0.5"ABOVE ROOF AND USING I
THE OUTDOOR DESIGN TEMPERATURE OF 4TC OR LESS
(ALL OF UNITED STATES)
5.)PV SYSTEM CIRCUITS INSTALLED ON OR IN BUILDINGS I
SHALL INCLUDE A RAPID SHUTDOWN FUNCTION THAT I
CONTROLS SPECIFIC CONDUCTORS IN ACCORDANCE WITH I P, ISSUED TO TOWNSHIP FM PERMIT 10n11/m
NEC 690.12(A)THROUGH(D)
NO. DESCRIPTION DATE
6.)PHOTOVOLTAIC POWER SYSTEMS SHALL BE PERMITTED
TO OPERATE WITH UNGROUNDED PHOTOVOLTAIC Project Title:
SOURCE AND OUTPUT CIRCUTTAS PER NEC 690.41(A)(4) 1 SIARHEI PALIANOK;INA PALIANOK-
7.)UNGROUNDED DC CIRCUIT CONDUCTORS SHALL BE
IDENTIFIED WITH THE FOLLOWING OUTER FINISH:
POSITIVE CONDUCTORS=RED EXISTING I TRINITY ACCT#:2024-09-1171270
NEGATIVE CONDUCTORS=BLACK EXISTING MAIN BREAKER LOAD CENTER 1
NEC 230.5(C)(2) 120/240V 2p4OA BACK FEED BREAKER Project Address:
UTILITY METER NEC 705.12(8)
8.)ARRAY AND SUB ARRAY CONDUCTORS SHALL BE#10 PV 240V 10 NOS' I
WIRE TYPE RHW-2 OR EQUIVELANT AND SHALL BE PROTECTED BY CONDUIT WHERE EXPOSED TO DIRECT 200A MAIN BREAKER INTERNAL REVENUE GRADE MONITORING 1975 SKUNK LANEI
200A BUSBAR CONTAINED WITHIN SOLAR EDGE INVERTER I CUTCHOUGE,NY 11935
SUNLIGHT.SUB ARRAY CONDUIT LONGER THAN 24"SHALL SOLAR EDGE PN.RWND-3D-240-MB
CONTAIN 5 20 CURRENT CARYING CONDUCTORS AND 41.0249,-72.4640
WHERE EXPOSED TO DIRECT SUNLIGHT SHALL CONTAIN<_
9 CURRENT CARRYING CONDUCTORS. 1
Drawing Title:
9.)ALL WIRE LENGTHS SHALL BE LESS THAN 100'UNLESS ^f
OTHERWISE NOTED
FLEXIBLE CONDUIT SHALL NOT BE INSTALLED ON PROPOSED PV SOLAR SYSTEM
ROOFTOP
60A UNFUSED 60A UNFUSED
ROOFTOP AND SHALL BE LIMITED T012"IF USED OUTDOORS DISCONNECT DISCONNECT D
240V 1 240V 1 INVERTER#1
11.)OVERCURRENT PROTECTION FOR CONDUCTORS Drawing Information
�m 0E¢"0�¢A¢ �0�0 m"m o*m � �
CONNECTED TO THE SUPPLY SIDE OF A SERVICE SHALL BE --- a + DRAWING DATE: 10/18/2024
LOCATED WITHIN 10'OF THE POINT OF CONNECTION NEC
DRAWN 8Y: BL
705.31 __.
�� REVISED BY, '
12.)WHERE TWO SOURCES FEED ABUSSBAR,ONE A
UTI LMY AND THE OTHER AN INVERTER,PV BACKFEED L2 N
r
o- a __....-._. ._._._.__.... ..�___.-. -_.._... , B .-
otata �,�i I System Information:
BREAKER(S)SHALL BE LOCATED OPPOSITE FROM UTILITY e e r ------------------_--_- --
NEC 70S.12(6)(2)(3)(b) L------------ - DC SYSTEM SIZE: 10.25kW
13.)ALL SOLAR SYSTEM LOAD CENTERS TO CONTAIN ONLY SQUARED SQUARE D _____- AC SYSTEM SIZE: 7.6kW
GENERATION CIRCUITSAND NO UNUSED POSITIONSOR DU222R8 DU222RB _ -J MODULE COUNT: 25
LOADS MODULES USED: HANWHA 410
MODULE SPEC#: Q.PEAK DUO BILK ML-G10+410
14.)ALL EQUIPMENT INSTALLED OUTDOORS SHALL HAVE
A NEMA 3R RATING - UTILITY COMPANY: PSEG-LI
UTILITY ACCT#: 9641045303
CALCULATIONS FOR CURRENT CARRYING CONDUCTORS UTILITY METER#: 98300921
REQUIRED CONDUCTOR AMPACITY PER STRING
DEAL TYPE: SUNNOVA
[NEC 690.8(B)(1)):(15.00*1.25)1=18.75A
PV MODULE SPECIFICATIONS
AWG#10,DERATEDTY HANWHA 410(Q.PEAK DUO BILK ML-G10+410)
AMBIENT TEMP:33"C,TEMP DEBATING FACTOR:.96 Rev.NO. Sheet
RACEWAY DERATING=4 CCC:0.80 Imp 10.89 NOTE:CONDUIT TYPE SHALL BE CHOSEN BY THE INSTALLATION CONTRACTOR
(40*.96)0.80=30.72A Vmp 3764 TO MEET OR EXCEED NEC AND LOCAL AHID REQUIREMENTS �� !pv�
30.72A'-18.75A,THEREFORE WIRE SIZE IS VALID Voc 45.37 A #6 THWN-2 TO GEC
TOTAL AC REQUIRED CONDUCTOR AMPACITY Isc 11.2 B 1"CONDUIT W/2-#8 THWN-2,1410 THWN-2,1410 THWN-2 GROUND
32.00A*1.25=40.00A
C 1"CONDUIT W/4-#10 THWN-2,1-#10 THWN-2 GROUND
AWG#8,DERATED AMPACITY
INVERTER#1-USE760OH-USMNBL75
AMBI ENT TEMP:30"C,TEMP DEBATING:1.0 p 1"CONDUIT W/4-#30 THWN-2,1410 THWN-2 GROUND
RACEWAY DERATING`-3 CCC:N/A DC AC
55A*1.0=55A Imp 26.97 Pout 7600 E I"CONDUIT W/2-#B THWN-2,1-1110 THWN-2,1-#10THWN-2 GROUND
55A'-40.00A,THEREFORE AC WIRE SIZE IS VALID Vmp 380 Imax 32 F #10 PV WIRE(FREEAIR)W/#6 BARE COPPER BONDTOARRAY Tri,
Voc 480 OCPCmin 40 SOLAR
MIA
Vnom
CALCULATION FOR PV OVERCURRENT PROTECTION G 1"CONDUIT W/2-#6 THWN-2,1-#6 THWN-2,1-#8 THWN-2 GROUND
TOTAL INVERTER CURRENT:32.00A Isc 30 Vnom 240
32.00A*1.25=40.00A 2211 Allenwood Road 877-786-7283
-->40A OVERCURRENT PROTECTION IS VALID Wall,New Jersey 07719 www.Trinity-Solar.com
Horton, LisaMarie
From: Salvatore Bruzzese <Salvatore.Bruzzese@trinity-solar.com>
Sent: Wednesday, May 7, 2025 8:48 AM
To: Horton, LisaMarie
Cc: NY Permitting
Subject: [SPAM] - Re: Palianok, Sergei- 1975 skunk lane Cutchouge NY- Electrical Cert
Good morning Lisa,
Just want to make sure you received the email below,please let me know if you need any further information
for the electrical cert to be revised.
Thank you, _
Salvatore Bruzzese �— /1� V,��� (9e G" 1 C,
�� spec — lA C aYreG� 1 PL4(3 6-1ti C t
so L� T: (631) 319-7233 ext�Fift�
TLong s�'Tand Crffice: enue, it Ronkon om , NY 11779
www.Trinity-Solar.com
9-0 4 Ila 1\ (Z
NY/LI,Nassau County Home Improvement Contractor#H2409780000 I NY/LI,Suffolk County Home Improvement Contractor#H-52821
For full license information,please visit:httr)s://www.i(inity-solor.com/locations-licenses/
If you are not the intended recipient of this confidential email,please inform the sender
From:Salvatore Bruzzese<Salvatore.Bruzzese@trinity-solar.com>
Sent:Tuesday, May 6, 2025.9:30 AM
To: Horton, LisaMarie<lisamarieh@southoldtownny.gov>
Cc: NY Permitting<permitting.ny@trinity-solar.com>
Subject: Palianok,Sergei-1975 skunk lane Cutchouge NY- Electrical Cert
Good morning Lisa,
For the attached-p-lectrical=cert;the equipment section was incorrect. Would you b�-able.,to u date it with the
ormat oni be below,
r
2 NWHA 410 (Q.PEAK DUO BLK ML-G10+410) Solar Panels, 1 USE760OH-USMNBL75
arEdge inverter
oq- LA
Salvatore Bruzzese
Applications Specialist
1
T: (631) 319-7233 ext. 1353
Long Island Office:2180 Fifth Avenue, Unit 1 1 Ronkonkoma, NY 11779
www.T(inity-Solar.com
NY/LI,Nassau County Home Improvement Contractor#H2409780000 I NY/LI,Suffolk County Home Improvement Contractor#H-52821
For full license information,please visit:https://vwvw.trinity-solar.com/locations-licenses/
If you are not the intended recipient of this confidential email,please inform the sender.
2
�SI53S
o,�nl 7�rar�5
INSTALLATION OF NEW SKUNK LANE.
IN
ROOF MOUNTED PV SOLAR SYSTEM
1975 SKUNK LANE
CUTCHOUGE, NY 11935 �, t � 010ssl
Exp.12/31/2026
♦+`� 6 S`s -� ,( Issued/Revisions
14
n VICINITY MAP SITE NO. DESCRIPTION DATE
SCALE:NTS Project Title:
SIARHEI PALIANOK,INA PAUANOK-
TRINITY ACCT B:2024-09-1171270
Project Address:
1975 SKUNK LANE
CUTCHOUGE,NY 11935
41.0249,-72.4640
GENERAL NOTES GENERAL NOTES CONTINUED GENERAL NOTES CONTINUED ABBREVIATIONS CONTINUED SHEET INDEX
JB JUNCTION BOX PV-1 COVER SHEET W/SITE INFO&NOTES Drawing Title:
1.THEINSSIBLE FOR CONTRACTOR'S S. THE DIGALWAYS
PRJESEEFROMT DPANELS IS 14. C CURRENT EC FIC TIONS,ILITV kCMIL THCKISANDCIRCUURMILS
RESPONSIBLE D FOLLTALLINALLL DISCONNECT
ECT ENCLOSURE
THE N COMPANY SPECIFICATIONS, kVA KILOVOLT AMPERE �T
EQUIPMENT ANO FOLLOWING ALL DISCONNECT ENCLOSURE AND THE DC STANDARDS,AND REOUIREMENTB kW KILOWATT PV-2 ROOF PLAN W/MODULE LOCATIONS AS BUILT PV SONAR SYSTEM
DIRECTIONS AND INSTRUCTIONS TERMINALS OF THE INVERTER WRING 15 THIS SET OF PLANS HAVE SEEN kWH KILOWATT HOUR
CONTAINED IN THE DRAWING PACKAGE AND DAYLIGHT HOURS.ALL PERSONS PREPAREDFORTHE PURPOSEOF L LINE PV-3 ELECTRICAL 3 LINE DIAGRAM
INFORMATIONRECEIVEDFROM TRINITY. WORKINGONORINVOLVEDWITHTHE MUNICIPAL AND AGENCY REVIEW AND MLB MAIN CIRCUIT BREAKER
2.THE INSTALLATIONCONTRACTORIS PHOTOVOLTAIC SYSTEM ARE WARNED APPROVAL.ONCE APPROVED.THE AP APPENDIX Drawl Information
INSTALLATION CONTRACTOR'S MOP MAIN DISTRIBUTION PANEL
RESPONSIBLE FOR INSTALLING ALL THAT THE SOLAR MODULES ARE
EOJIPMENTANDFOLLOWINGALL ENERGIZED WHENEVER THEY ARE RESPONSIBLE FOR INSTALLING ALL MLO MAIN LUG ONLY DRAWING DATE: ]0/IB/]DZ4
DIRE CTIONSANDINSTRUCTIONCONTAINED EXPOSED TO LIGHT. BYSTEMCOMPONENTSASDESCRIBEDIN MD MOUNTED DRAWN BY: BL
]NTH
HE E COMPLETEMANUAL. & ALL PORTIONS OF THIS SOLAR THE DRAWING PACKAGE. MTG MOUNTING REVISED BY: RG
3.T INSTALLATION CONTRACTOR IS PHOTOVOLTAIC SYSTEM SHALL BE 16 ALL INFORMATION SHOWN MUST BE N NEUTRAL
RE SPONS'BLEFORREADINGAND MARKED CLEARLYINACCORD NCEWITH CERTIFIED PRIOR TO USE FOR NEC NATIONALOICONTRATRIGLCODE
UNDERSTANDING ALL0( INGS, THE NATIONAL ELECTRICAL CODE CONSTRUCTIONAGTIVITTES. NIC NOT IN CONTRACT $Sten information:
COMPONENTANDINVERTERMANLAUB ARTICLE ING S 705. NO8 NUMBER
PRIORTOINSTALATION.THEINSTALLATION [Q PRKNZ TO THE INSTALLATION OF THIS NTS NOT TO SCALE DC OC OVER CURRENT PROTECTION AC
SYSTEM SIZE: 9.02kW
P ODULE COUNT SYSTEM SIZE: IZ
7.fikW
CONTRACTOR'S ALSO REWIRED TO HAVE PHOTOVOLTAIC SYSTEM,THE ABBREVIATIONS
ALL COMPONENT SWITCHES IN THE OFF INSTALLATION CONTRACTOR SHALL P POLE
POSITION AND FUSES REMOVED PRIOR TO ATTENDAPRE-INSTALLTIONMEETING AMP AMPERE PS PULL BOX M :
THE INSTALLATION OF ALL FUSE BEARING FORTHEREVIEW OF THE INSTALLATION AC ALTERNATING CURRENT PHG PHASE MODULES USED: HANWHA4ID
SYSTEM COMPONENTS. PROCEDURES,SCHEDULES.SAFETY AND AL ALUMINUM PVC POLY-WNYLCHLORIDECONWIT rti 11 \lt) MODULE SPEC e: O.PEAK DUO BA ML61M N I0
4.ONCE THE PHOTOVOLTAIC MODULES ARE COORDINATION. AF AMP.FRAME PwR QUANTITY
I,YII V {y UTILITYCOMPANY:PSEG LI
MOUNTED,THEINSTALLATION /1. PRIORTOTHESYSTEMSTARTUPTHE AFF ABOVE FINISHED FLOOR CITY outnnrtr L �y BI•I� UTILITY ACR e: 9W1045303
CONTRACTOR SHDULD HAVE AMINIMUM OF INSTAL LATION CONTRACTOR SHALL AFG ABOVE FINISHED GRADE RGS RIGID GALVANIZEDSTEEL
ONEELECTRICWNWHOHASATTENDEOA ASSIST IN PERFORMING ALL INITIAL AWO AMERICANWIREGAUGE SIN SOLIDNEUTRALL UTILITYMETER B: 98300921
SOAR PHOTOVOLTAIC INSTALLATION HARDWARECHECKSANDDCWIRING C CONDUIT(GENERIC TERM OF JSWBD SwITcHRoM DEAL TYPE: SUNNOVA
COUELSEONSITE. DONWCTNITYCHECKS. RACEWAY,PROVIDE AS TYP TYPICAL
5.FOiSAETY,IT IS RECAMMENOEDTHAT 12 FOR THE PROPER MAINTENANCE AND SPECIFIED) U. UESHSERATHRISE INDICATED {^'r
THE INSTALLATION CREW ALWAYS HAVE A ISOLATION OF THE INVERTERS REFER TO CB COMBINER BOX XFMR TRANSFORMER I I MAY Rev.No. Sheet
MINIMUM OF TWO PERSONS WOTEKING OOF
THE ISOLATION PROCEDURES IN THE CKT CIRCUIT M TI' 1 3 2025
TOGETHERANDTHATEACHOFTHE OPERATION MANUAL. CT CURRENT TRANSFORMER �72 MOUNT 721NCHES TO BOTTOM
INSTALLATION CREW MEMBERSBETRAINED [S THE LOCATION OF PROPOSED ELECTRIC CU COPPER OFABOVE FINISHEDFLOGROR
IN FIRSTA'DANDCPR. AND TELEPHONE UTILITIES ARE SUBJECT DC DIRECT CURRENT GRAB
S.THIS SOAR PHOTOVOLTAIC SYSTEM ISTO TOFINALAPPRWALOF THE DISC DISCONNECT SWITCH
BE INSTALLED FOLLOWING THE APPROPRIATE UTILITY COMPANIESAND DWG DRAWING
CONVENTIONSOFTHENATIONAL OWNERS. EC ELECTRICAL SYSTEM INSTALLER
ELECTRICAL CODE.ANY LOCAL CODE 14. ALL MATERIALS,WORKMANSHIP AND EMT ELECTRICAL METALLIC TUSING {'� +t{•ehw
WHICHMAY SUPERSEDETHENECSHALL CONSTRUCTION FOR THE SITE FS FUSIBLE SWITCH �l{ ^tE P1 C} DIA")V '�t11i'T1 _
GOVERN. IMPROVEMENTS SHOWN HEREIN SHALL FU FUSE
7.ALL BY STEM COMPONENTS TO BE BE IN ACCORDANCE WITH: GND GROUND n A r
INSTALLED WITH THIS SYSTEM ARE TO BE N CURRENT PREVAILING MUNICIPAL GFI GROUND FAULT INTERRUPTER
'UL'USTED.ALL EQUIPMENT WILL BE NEMA ANO'OR COUNTY SPECIFICATIONS. HZ FREQUENCY(CYCLES PER
3R OUTDOOR RATED UNLESS INDOORS. STANDARDS AND REQUIREMENTS SECOND) I I I ty
GENERAL NOTES S O L AR
IF ISSUED DRAWING IS MARKED WITH A REVISION CHARACTER OTHER THANW,PLEASE BE ADVISED THAT FINAL EQUIPMENT AND/OR SYSTEM CHARACTERISTICS ARE SUBJECT TO CHANGE DUE TO AVAIIABLITY OF EQUIPMENT. 2211 Allenwood Road 977-786-7293
W ,N, Nersey07719 —.Tdn y3o'.ar.
LAMP
NOTES:•REFER TOMOWLESPECSFOANOWLECI ENSIONS E Toe%N sE q
•LIE PICTEDMOOIXES IAY BE fORTIgIT OR IANDSOVE lrtiMA
NEW PV SOIAR MODULE.TV%GL SOLARMODULE SOLAR MODULE
FORSPCSMD%2ENTTIESI E OC NEw O
(REFERT0 ANDOUANTRIES7 ECOFASTEN'L'FOO ECOFASTEN RNL .( E c 1,
_ NEW MOUNTING FOOT/ATTACHMENT IIAFEnroelEc6rEETFgeEtuy Ip[[p iosrtt W[n Fq oEiuy \�11�/ ` .1
POINTS.TY%CAL(REFERTO yS 90 �•,,� P
ENGINEERNGLETTFRFMSPADNG b ,
AND DETAILS) /
NEW ECOFASTEN RML.TYPICAL ECOFASTEN SLOT BRACKET • J
TORE MOUNTED PER%NDICUTAR TO INEiq LO B1FD A4Er EIR PCKET
STRUCTURE(REFER TO ECOFASTEN y S LY
SaEaFIGTIM—ASHEETFOR ECOFASTENNCCORR_T_ED BA KE® SELF TAPPING SCREW �3y
DETAILS) PAFERro9FEo4xEErFgceru /✓'
NEW END CUP,TYPICAL EXISTING CORRUGATED METAL
(REFERTOECDFASTENBPEDFIGTION IREFEAroENBMFEP8�2rTEeEgeaW SOLAR MODULES SHALL NOT 100315
DATA SHEET FOR DETAA.B) EXCEED PEAK HEIGHT. (
NEW Mlp 0.1P,TYPICAL EXISTING RAFTER \•�
(REFER TO ECOFASTEN 9PECIFIWTI0T1 SS10NP
I GTA 9HE ET FOR DETAILS I
ATTQ ACHMENT 8 CLIP DETAIL PV MODULE ATTACHMENT ON CORRUGATED METAL ROOF HEIGHT FROM GROUND LEVEL TO PEAK OF ROOF Exp:12/31/2026
SLALE NOT TO SfiLE 9CILE:NOT TO SCALE BfiLE:NOT TO SfiLE
ARRAY SCHEDULE Issued/Reviskm
BACK
NO. DESCRIPTION GTE
Project Title:
R1 SIARHEI PALIANOK,INA PAUANOK-
TRINITY ACCT e:2024-09-1171270
Project Address:
,1� a �L
Ac 197S SKUNK LANE
CUTCHOUGE,NY 11935
41.0249,-72.41540
5
T TT T TIa a Drawing Title:
• E M AS BUILT PV SOLAR SYSTEM
Drawing Information
Lk[k[E E DRAWING AT 111112124
DAWN BY: BL
RMSEDBY: RG
$Stem Information:
DCSVSTEMSI2E: 9.02kW
AC SYSTEMSIZE: ).6RW
MOW LE COUNT: 22
MOWIEI USED: HANWIM4ID
MODULE SIECR: a WOBDMLG-4L0
FRONT -UTILITY COMPANY:PSEGU
UTILITYACLT R: 96/1015303
NOTES: UTILITYMETERN: 9B3ro921
1.)ALL EQUIPMENT SHALL BE INSTALLED IN ACCORDANCE DEALTYPE: SUNNOVA
WITH THE MANUFACTURER'S INSTALLATION INSTRUCTIONS.
2.)ARRAY BWDING TO COMPLYSYDH MANUFACTURER SPECIFICATION.
3.)ALL LOCATIONS ARE APPROXIMATE AND REQUIRE FIELD VERIFICATION.
44 AN AC DISCONNECT SHALL BE GROUPED NTH INVERTER(S)NEC M.13(E) RBV.NO. ShPE:
ROOF 1 W ALL OUTDOOR EQUIPMENT SHALL BE RAIN TIGHT WITH MINIMUM NEMA 311 RATING.
Mow IE5:0 6)ROOFTOP SOLAR INSTALLATION ONLY W ARRAY SHALL NOT EXTEND BEYOND THE EXISTING ROOF EDGE.
ORIEN SP
FITCH ATDN:)4'
ROOF2 SYMBOLLEGEND PLUMBING SCHEDULE EQUIPMENT SCHEDULE
MODULES:0 CITY SPECK
PIT[N:30' NDCATES ROOF DESIGNATION.REFER TO INDICATESNEWUNFUSEDPVDISOON ECTTOBE INDICATESNEWWONLYSUBPANEL
ORIENTATION:166' ARRAY SCHEDULE FOR MORE INFORMATION UD INSTALLED OUTSIDE(UTILITY ACCESSIBLE) SP TO BE INSTALLED 22 HANWHA 410(OPEAK DUO BLK ML-GIG.410)
ROOF3
PRCH�0 I/��I INDICATES NEW W SOLAR MODULE.RED MODULES I USE76WH-USMNBL75
ORIENTATION:346' ((.rl( INDICATES EXISTING METER LOCATION 1 ININ MPANELSTHATUSEMICROINVERTERS pC INDICATES NEW DC gSCONNECT
ROOF
RIE LLJJ REFER TO EQUIPMENT SCHEDULE FOR SPECS. 13 ECOFASTEN 2012035 OF STD US MIL AL KILL 171.5
MOW LES:3 OTHER OBSTRUCTIONS
PITCH:
34 INDICATES EP LOCATION:NIS DES ELECTRICAL PANEL IN I p I NSTALLEOOUTSID�E. TKXJ METER TO BE INDICATE.
SD SOLAR
ORIENTATION:251 111"' 111 INDI .EXISTING SERV ICE DISCONNECT
ROOFS
MODULES:19
%TCH:34 NgGTES NEW FUSED W DISCONNECT TO BE INDICATES NEW INVERTER TO BE
ORIENTATION:74 aD NSTALLED OUTSIDE(UTILITY ACCESSIBLE) ® INSTAILEDOMIDE. IMCATESEXISTINGTMNSFERSWITCH 2211 Wknwmd Road 8))-)B6-)2e3
REFER TOEQUIPMENT SCHEDULE FOR SPECS Wall,mmje eY07719 vnv T-tyW,,.Tom
if Engineer/License Holder.
ARMY CIRCUIT WIRINGNOTES pt�,OF NEw ISO
[N E l C MES ALL RESPONSIBILITY \
FOR DETERMINING ONSITE CONDITIONS AND '` ON V,
EXECUTING INSTALLATION IN ACCORDANCE WITH _ G
NEC 2017 22. 14 C WR MODULES W/]SOUR EDGNTEDTOREDFON 650 PER MODULE
IS ADC MAX PER STRING t 7�
2.1 LOWEST EXPECTED AMBIENT TEMPERATURE BASED ON
ASHM MINIMUM MEAN EXTREME DRY BULB Cr
TEMPERATURE FOR ASHME LOCATION MOSTSIMILARTO 1 STRING OF II MODULES IN SERIES-380 VmM --- ----- JUNCTION -1
INSTALLATION LOCATION.LOWEST EXPECTED AMBIENT 1 STRING OF It MODULES IN SERIES-SLID Vmaz
TEMP=-16'C i (�
3.)HIGHEST CONTINUOUS AMBIENT TEMPERATURE BASED •2 STRINGS TO BE TERMINATED INSIDE INVERTER I I �n 100315 tV�
ON ASHME HIGHEST MONTH 2%DRY BULB �$$10 p�
TEMPERATURE FOR ASHME LOCATION MOST SIMILAR 70 I 0
INSTALLATIONLOCATION.HIGHEST CONTINUOUS TEMP= I
33'C Exp:12/31/2026
4.)2005 ASHME FUNDAMENTALS 2%DESIGN I
TEMPERATURESDONOT EXCEED 47-C IN THE UNITED I
STATES(PAW SPRINGS,CA IS 44.1"C).FOR LESS THAN I
CURRENT-CARRYING CONDUCTORS IN A ROOF-MOUNTED Issued/Revisions
SUNLIT CONDUIT AT LEAST O.S'ABOVE ROOF AND USING
THE OUTDOOR DESIGN TEMPERATURE OF 47'C OR LESS I
(ALL OF UNITED STATES)
I
It PV SYSTEM CIRCUITS INSTALLED ON OR IN BUILDINGS
SHALL INCLUDE A RAPID SHUTDOWN FUNCTION THAT
CONTROLS SPECIFIC CONDUCTORS IN ACCORDANCE W ITH
NEC 690.12(A)THROUGH(0) I
NO, DESCRIPTION DATE
T PHOTOVOLTAIC POWER UNGROUNDED P SHALL PHOTOVOLTAIC
PERMITTED I Project Tide:
TO OPERATE WITH UNGROUNDED PHOTOVOLTAC
SOURCE AND OUTPUT CIRCUIT AS PER NEC G90A1 tAH4)
SIARHEI PALIANOK;INA PALIANOK-
7.)UNGROUNDED DC CIRCUITING OUTER FINISH:
SHALL BE
IO SI TIFIEC WITH THE FOLLOWING OUTER FINISH:
POSITIVE CONDUCTORS=RED EXISTING 1 TRINITY A[CT N:2024-09-1171270
NEGATIVE CONDUCTORS=BLACK EXISTING MAIN BREAKER LOAD CENTER
NEC21G.S(C)(2) 120/240V 21 BACK FEED BREAKER Project Address:
UTILITYMETER NEC 70S.12i
B.I ARRAY TYPEI SUB ARMY CONDUCTORSSHALLBE R30 PV 240V 10 NOTE:
WIRE TYPE RH W-2 OR EQU WEUNT AND SNAIL BE M IN�NAL REVENUE GRADE MONITORING 1975 SKUNK LANE
PROTECTE TO DIRECTF E 20M MAIN BREAKER I
SLINUGT.SU COMY CONDUTff WHERE LONGEEXPCYSR
THAN
200A BUSMR CONTAINED WITHIN SOLAR EDGE INVERTER I CUTCHOUGE,NY 11935
SUNLIGHT.SUB ARMY CONDUCT LONGER THAN 24"SHALL RSAND SOLAR EDGE PN.ROUND-3LF24OMB I 41.0249,-72.4640
CONTAINS 20 CURRENT DIRECT
NG GHT SHALL
CONTAIN
WHERE EXPOSED TO DIRECTSU CONDUCTORS.
CONTAIN
19 CURRENT CMflYING CONDUCTORS. --
Drawing Title:
9.)ALL WIRE IENGTHi SHALL BE LESS THAN 100'UNLESS 3 I
OTHERWISE NOTED
10.)FLEXIBLE CONDUIT SHALL NOT BE INSTALLED ON 60q UNFUSED AS BUILT PV SOLAR SYSTEM
ROOFTOP AND SHALLBE UMITED TO 12-IF USED DISCONNECT D
OUTDOORS 240V 1 INVERTER NI
11.)OVERCURRENT PROTECTION FORCONDUCTORS , Drawl Information
CONNECTED TO THE SUPPLY SIDE OF A SERVICE SHALL BE J 0 I DRAWING DATE: IW38/2024
LOCATED WITHIN IO'OF THE POINT OF CONNECTION NEC DRAWN BY: Bl
705.31 REVISED BY: RG
---T- ---- e m
U LITTY AN TWO THERA FEEERTER,MBONEA I I p SQUARED I C c 0 r -J
UTILTY AND THE OTHER AN INVERTER,PV MCKFFED m- m B �rI0�� --- E SBterE1 Information;
BREAKER(S)SHALL BE LOCATED OPPOSITE FROM UTILITY r r ------------------------ 1 ------------- 'T 000 00
xEc 7a5.1218)121181161 L___-__-°__-�
D[SYSTEM SUE: 9.OZL'W
13.1 LLSOLAR SYSTEM LOAD CENTERSTO CONTAIN ONLY I ------� ACSYSTEM SIZE: 7.L'AW
GENERATION CIRCUITS AND NO UNUSED POSITIONS OR DU222RB ---------J MODULE COUNT: 22
LOADS MODULES USED: HANWHA AID
MODULE 5 QPEAK DUO DUE MLGIO.41D
14.)ALL EQUIPMENT INSTALLED OUTDOORS SHALL HAVE
UTILITY COMPANY:PSEG-U
A NEMA 311 RATING
UTILITY ACR/: 9641w5303
CALCUEATIONS TOR CURRENT CARRYING CONDUCTORS
DEAL TYPE: SUNNOrA
(NEC G9p.gBK1IP(15.00•1.25)1-18.7SA
PV MODULE SPECIFICATIONS
AWG N30,DEBATED AMPACITY HANWHA 410(Q.PEAK DUO BLK MLGIM 410)
AMBIENT TEMP:33-C,TEMP DERATING FACTOR:.96 RBY.NO. She.!
RACEWAY DEMTING-4CCC:O.BO Imp 10
(40•.% .89 NOTE:CONDUITTKESIWLL Bf CHOSEN BY THE INSTALLATION CONTRACTOR /L
)0.B0=30.]2A Vmp 3764 TO MEET OR EXCEED NEC AND LOCAL ARID REQUIREMENTS 30.72A'18.75A,THEREFORE WIRE SIZE IS VAUD V. 145.37 -A KTHWN-2 TO GEC r\1
TOTAL AC REQUIRED CONDUCTOR AMPACITY lu 12.2 B 1"CONDUITW/24BTMIN-2,1410THWN 2,1430THWN-2 GROUND
32.000 1.25=40.00A
C 1"CONDUIT W/4410 Tini 1410 THWN GROUND
AWGMB,DEBATED C,TEMP
INVERTER 01-USE7600H-USMNBL75
AdW
AMBIENT TEMP:DEBATING
TEMP DEBATING:1.0
RACEWAY DERATING`3CCC:N/A DC M D 1'CONDUIT W/4410 THWN-2,1-N10THWN-IGROUND � �
SSA•1.0-S5A Imp 23.74 Pout 7600 E 1"CONDUIT W/248 THWN-2,1%IOTHWN 2,1410 THWN 2 GROUND
SSA'40.00A,THEREFORE AC WIRE SIZE IS VALID VInP SLID ImaP 32 V. 480 OCPDmIn 40 F N10 PV WIRE(FREE AIR)W/NUS BARE COPPER BOND TOMRAY
EALNUTION FORWOVERCURRENr PROTECTION Iu 30 V-. 240 G 1"CONDUIT W/246 TNWN-2,14G THWN.2,148 THWN-2 GROUND SOLAR
32.OM•1.25=40.00A 2211 Mknwmmd Rwd 8J)-J88J283
->4M DVERCUMENT PROTECTION IS VALID Wall,New J._07719 —TriniI,.Z .mm
D®4
®A EcoFasten,
For Installers. By Installers.
COMPLETE RAIL-BASED RACKING SYSTEM
ClickFit is one of the fastest installing rail-based systems l4'
in the industry. Thanks to its Click-In rail assembly, the Composition Shingle,; rile,Metal x
rails can be connected to any of EcoFasten's composition
shingle, tile, and metal roof mounts in seconds withoutf
the need for fasteners or tools. The ClickFit system its
made of robust materials such as aluminum and coated ::::
� Rail-Based
steel, to ensure corrosion-resistance and longevity.
ClickFit conforms to UL 2703 and has been tested in --=--- -------- —
extreme weather conditions including wind,fire, and snow.
Structural-Attach
FEATURES & BENEFITS Direct-Attach �
• Tool-less,fastener-free rail attachment _ !
• Fully integrated bonding
• Click-On Mid &End Clamps
• Compatible with a variety of EcoFasten roof attachments
FAST INSTALLING SYSTEM FEATURING }25 YEAR WARRANTY
CLICK-IN RAIL ASSEMBLY
a
INTERNAL SPLICE
Tool-free bonded internal Splice
installs in seconds.
MLPE MOUNT
Attach Module Level Power
MID CLAMP Electronics to the top of the rail.
Click-on mid clamp features integrated
bonding pins and fits modules 30-50
m m in width.
END CLAMP
Click-on end clamp fits modules END C A P
30-50mm in width.
The slide-on end caps allow the
end clamps to be accurately
positioned on the rail in seconds,
while providing an aesthetically-
pleasing, finished install.
�r t
L- FOOT
The ClickFit rail simply clicks
x
into our proprietary composition
shingle & the L-foot without the
need to use fasteners or tools. 9U, z.
"1
C 0 M P 0 S I T 10 N S H I N-G L E
Combine the versatile ClickFit
L--Foot with the watertight
GF-1 flashing for a fast
installation on composition
shingle roofs.
GF-1.FLASHING&L-FOOT
TILE ROOFS
i
l Use the adjustable ClickFit Tile
} Hook for attaching the ClickFit
t
system to tile roofs. Works with
Flat, S., and W the profiles.
'CLICKFITTILE HOOK
STAIN' 01 1\40 SEAM METAL ROOFS
s Combine the ClickFit L-Foot
with SimpleBlock°-U for a
fast installation on standing
seam metal roofs. i
I
SIMPLEBLOCK-U
I
ro
F T
.,PRODUCT PART PART BOX r_ PALLET
IMAGE - NUMBER DESCRIPTION QUANTITY I QUANTITY
- GF1M-GAL-BLK-870 GFi 8X10"BLK GLV 50 3200
W/2"HL PLCMT
- GF7-GAL-BLK-812 GF1 9X12"GALVALUME BLK 50 2600
FLASHING
1500004 CF L-FOOT ASSY 100 5000
IN HARDWARE NEEDED)
IS00005 CF TILE HOOK US 20 480
1510045 CF TILE HOOK SUB-FLASHING 20 2160
TILE HOOK FLSH-F ST TILE HOOK FLASH 12 576
FLAT SIERRA TAN
TILE HOOK FLSH-W ST TILE HOOK FLASH 12 576
W SIERRA TAN
TILE HOOK FLSH-S ST TILE HOOK FLASH 12 576
S SIERRA TAN
:i
SIMPLEBLOCK-U-AL 2"SIMPLEBLOCK SSR-AL 25 4400
ALL HARDWARE INCLUDED WITH OO
1500004 CF L-F00T ASSY 50 5000
[ND HARDWARE NEEDED]
1500033 CF RAIL 2T) N/A 108
(-7 FT)
CF RAIL 3166MM
1500034 (-10.4 FT) N/A 108
15011035 CF RAIL 4202MM N/A 108
(-13.8 FT)
1008051 CF RAIL SPLICE 100 3200
Y
p 1510070 CF WIRE MGMT CLIP 1000 TBD
1500028 MODULE JUMPER,8IN 25 25000
(204MM)
o} 1510057 CF MLPE MOUNT 400 17600
•I
RT PART BOX
P R BE DESCRIPTION QUANTITY QUANT1T1f
1510041 CF ENOCAP,BLK LABELED 100 4800
1510015 CFHDENDCLAMP 20 5600
30MM,BLK
1510015 CF HO ENOCLAMP 50 5600
32MM,BLK
1510017 CF HO ENOCLAMP 50 5600
35MM,BLK
1510018 CF HO 38MMO8 KMP 50 5600
1510019 CF HO 40MM,ELK
MP 50 5600
15113020 I CF HD ENOCLAMP 50 5600
45MM,BLK
1510011 CF HD MIDCLAMP 50 5600
30-40MM,BLK
1510012 CF HD MIDCLAMP 50 5600
40-50MM,BLK
ROCK-IT V3 SKIRT A65 ROCK-IT SKIRT V3 8 256
35MM&40MM 65"
ROCK-IT V3 SKIRT A79 ROCK-IT SKIRT V3 8 256
35MM&40MM 79"
ROCK-IT V3 SKIRT ABO ROCK-IT SKIRT V3 8 256
35MM&40MM 80"
ROCK-IT V3 SKIRT B65 ROCK-IT SKIRT V3 8 256
32MM&38MM 65"
ROCK-IT V3 SKIRT B79 ROCK-IT SKIRT 8 256
79
32MM&38MM 79"
ROCK-IT V3 SKIRT BSO ROCK-IT SKIRT V3 8 256
32MM&38MM 80
1500003 CF UNIVERSAL SKIRT 50 5750
CLAMP BLK
POLY KIT LAG SCREW 4 POLY KIT LAG 50 480
SCREW 4"(50)
SCRW OP 15-13X03 ROOFING SCRW 1000 60000
1 #15 X 3"DRILL PT
�y I
: 1510001 iCONDUITMOUNT-BRKT 50 10350
@ff
CONDUITMOUNT-TILE CONOUITMOUNT-TILE SYSTEM 60 4320
CLICK rIT
_ �... ',•.��—�--�-,ems �-�"�_'.-^�� - _
\
�\\N\ \;
f��B�Jjfi-�au�Y✓-?"`•n§�'�+�"Y�ya���'�.:".. . �S. \\`\\'\\\\�;�\\� M x ,x n �'pl �"�-^•���„�a�a*.,,•-
;p� Be p,. �' \\��\\/` yh'4'��c M' Sx' " :•,� f;`�: �v _ p' r `�,,,, r.: .
��d�`'w •�, �, �.�# '`5 ,�, �^Y� �"fi„c. e't4r �:
x, o ,`<��'�e `� '� �, wd c, •� a^
1--.e'er ... :+. i ri, v �°
',j`•_'+1`'� Y'�°. 3'�r'�pt'�,. �� e �M.�'c?7a `r .,�p`?�� a..r+ .i4? 'a: �„�� sj"ry
• �.��rt-c;Fr� y zc z �E �
��«t�,F._{* � ,t r k��l ..�� :�'�ti.�?:,'raain;....z•�.,n .,,a5�a x.. �,,( ����3"w•n�x.;3.: `:�t�� .� `�"'t-,�."i� ��x�"„:�'��: _ �'�<`.i�a�''� �: :.�,�,;
�� }„,-tA x t'��y FT�"""ii c� r�" d+� � t -�o ^au.:���y� t� d.� �C, � S.•f .iE ����' .�+"' �+-'�-
';:t Ne. a:`4�,. .��".,F_`3...?•',(•',�' ..�a.#iiL?' �?�,.�t a..;.�;,=sS`�n�'S,.x..,.. ,_".+�,, i�fr�'�,ai's`i�k�e'�.? r,�, .a.. ;h'C��..MT.��L ��%i. ����f.x'T...k��3�.x• -rc�u.��s'w:v'.-��^y �
40.
Sin '
le Phase Inverter Z
g
with HDWavelechnolo
gy m
for North America
1
SE3000H-US / SE38001-1-US /'SE5000H-US / SE6000H-US / I
SE7600H-US / SE10000H-US / SE1140OH-US
12
m■ I
YEAR
WARRANTY
/r+
C
�-- r Ln
111 O
� 4
I
� solar3�t:' +,MDwwa solar3EL'• ,..WD:,�m
® OI m
r—�
O O
Optimized installation with HD-Wave technology
® Specifically designed to work with ® UL1741 SA certified,for CPUC Rule 21 grid compliance
power optimizers
/ Record-breaking efficiency ® Extremely small
® Quick and easy inverter commissioning directly,
from a smartphone using the SolarEdge SetAppi ` Built-in module-level monitoring
® Fixed voltage inverter for longer strings / Outdoor and indoor installation
Integrated arc fault protection and rapid
shutdown for NEC 2014 and 2017, per article ® Optional: Revenue grade data,ANSI C12.20
690.11 and 690.12 Class 0.5 (0.5%accuracy)
solaredge.com solark-
i
1
® Single Phase Inverter
Wit HD-Wave Technology for North America
SE3000H-US / SE380OH-US / SE5000H-US / SE6000H-US/
SE760OH-US / SE1000OH-US / SE1140OH-US
APPLICABLE TO INVERTERS WITH
PART NUMBER SEXXXXH-XXXXXBXX4
OUTPUT
3800 @ 240V 6000 @ 240V 11400 @ 240V
Rated AC Power Output 3000 3300 @ 208V 5000 5000 @ 208V 7600 10000 10000 @ 208V VA
Maximum AC Power Output 3000 3800 @ 240V 5000 6000 @ 240V 7600 10000 11400 @ 240V VA
3300 @ 208V 5000 @ 208V 10000 @ 208V
AC Output Voltage Min.-Nom.-Max. ✓ ✓ ✓ ✓ ✓ ✓ ✓ Vac
(211-240-264)
AC Output Voltage Min.-Nom.-Max. ✓ ✓ ✓ Vac
(183-208-229)
AC Frequency(Nominal) 59.3-60-60.50) Hz
Maximum Continuous Output 12.5 16 21 25 32 42 47.5 A
Current @240V
Maximum Continuous Output - 16 - 24 - - 48.5 A
Current @208V
Power Factor 1,adjustable-0.85 to 0.85
GFDI Threshold 1 A
Utility Monitoring,Islanding
Protection,Country Configurable Yes
Thresholds
,INPUT
Maximum DC Power @240V 4650 5900 7750 9300 11800 15500 17650 W
Maximum DC Power @208V - 5100 - 7750 15500 W
Transformer-less,Ungrounded Yes
Maximum Input Voltage 480 Vdc
Nominal DC Input Voltage 380 400 Vdc
Maximum Input Current @240Vr=1 8.5 10.5 13.5 16.5 20 27 30.5 Adc
Maximum Input Current @208V(:) - 9 13.5 - 27 Adc
Max.Input Short Circuit Current 45 Adc
Reverse-Polarity Protection Yes
Ground-Fault Isolation Detection 600ks Sensitivity
Maximum Inverter Efficiency 99 99.2 %
CEC Weighted Efficiency 99 99 @ 240V %
98.5 @ 208V
Nighttime Power Consumption <2.5 W
For other regional settings please contact SolarEdge support
'n A higher current source may be used;the inverter will limit its input current to the values stated
® Single Phase Inverter
Wit HD-Wave Tec O ogy for North America
SE3000H-US / SE380OH-US / SE OOOH-US / SE6000H-US/
SE760OH-US / SE10000H-US / SE1140OH-US
'ADDITIONAL FEATURES I I
Supported Communication Interfaces RS485,Ethernet,ZigBee(optional),Cellular(optional)
Revenue Grade Data,ANSI C12.20 Optionall"
Inverter Commissioning with the SetApp mobile application using built-in Wi-Fi Access Point for local connection
Rapid Shutdown-NEC 2014 and Automatic Rapid Shutdown upon AC Grid Disconnect
2017 690.12
,STANDARD COMPLIANCE
Safety 1-111741,ULt!41 SA,1-11169913,CSA C22.2,Canadian AFCI according to T.I.L.M-07
Grid Connection Standards IEEE1547,Rule 21,Rule 14(HI)
Emissions FCC Part 15 Class B
,INSTALLATION SPECIFICATIONS
AC Output Conduit Size/AWG 1"Maximum/14-6 AWG 1"Maximum/14-4 AWG
Range
DC Input Conduit Size/#of Strings/ 1"Maximum/1-2 strings/14-6 AWG 1"Maximum/1-3 strings/14-6 AWG
AWG Range
Dimensions with Safety Switch 17.7 x 14.6 6.8 /450 x 370 x 174 21.3 x 14.6 x 7.3/540 x 370 x 185 In/
(HxWxD) mm
Weight with Safety Switch 22110 25.1/11.4 26.2/11.9 38.8/17.6 lb/kg
Noise <25 <50 dBA
Cooling Natural Convection
Operating Temperature Range -40 to+140/-40 to+6O14I F/°C
Protection Rating NEMA 4X(Inverter with Safety Switch)
t'r Revenue grade inverter P/N:SExxxxH-USOOOBNC4
t't Full power up to at least 50'C/122'F;for power de-rating information refer to:https://www.solaredg .com/sites/default/files/se-temperature-derating-note-na.pdf
I
®SolarEdge Technologies,Inc.All rights reserved.SOLAREDGE,the SolarEdge logo,OPTIMIZED BY SOLAREDGE are trademarks or registered trademarks of SolarEdge Technologies,Inc.All Ro H S
other trademarks mentioned herein are trademarks of their respective owners.Date:5/2019N07/ENG NAM.Subject to change without notice.
I
I
OPEAK DUO BLK
IVIL-G10+ SERIES Qcells
385-410 Wp 1132 Cel Is
20.9% Maximum Module Efficiency
i MODEL Q.PEAK DUO i3LK ML-G10+
i
L
Breaking the 20%efficiency barrier
n I,LLLLI I IL Q.ANTUM DUO Z Technology with zero gap cell layout
boosts module efficiency up to 20.9%.
A reliable investment
Inclusive 25-year product warranty and 25-year linear
Warranty performance warranty'.
Enduring high performance
Long-term yield security with Anti LeTID Technology,
oceGlls Anti PID Technologyz and Hot-Spot Protect.
Extreme weather rating
High-tech aluminium alloy frame,certified for
high snow(5400 Pa)and wind loads(4000Pa).
_ Innovative all-weather technology
Optimal yields,whatever the weather with excellent low-light
and temperature behaviour.
6 busbar 12 busbar
cell technology cell technology
The most thorough testing
��-•J( programme in the industry
Qcells is the first solar module manufacturer to pass the
most comprehensive quality programme in the industry:The
new"Quality Controlled PV"of the independent certification
Institute TUV Rheinland.
'See data sheet on rear for further nformation.
2 APT test corditons according to IEC/TS 62804-1:2015,metnod A(-1500V,96h)
I
The ideal solution for:
Rooftop arrays on o°residential buildings
o _
I
K DUO BLK ML-G'I®+ SERIES
■Mechanical Specification
,<p•�,9mm,
Format 74.0 in x 41.1 in x 1.26ir(including frame) �2a noae l°.j i56'n9ssmmj
(1879mm x 1045mm x 32 rrm)
Weight 48.5 lips(22.0kg)
Front Cover 0.13 in(3.2m-n)thermally pre-stressed glass • (51-I^9Pa"h°p,6 nsmm, gz sow' "
with anti-reflection technology 29.2•ro96mm,
Back Cover Composite film
n'no°Smm1
Frame Black anodised aluminium
Cell 6 x 22 monocrystalline Q.ANTUM solar half cells urx,� ,s2•r:w mm,
Junction box 2.09-3.98in x 1.26-2.36in x 0.59-0.71in
(53-101mm x 32-60mm x 15-18mm),IP67,with bypass diodes a•md^"°^°R'
Cable 4mm'Solar cable;(+)>_49.2in(1250mm),(-j t 49.2 in(12 50 m m) II
Connector Staubli MC4;IP68 I`1-porr- D-A 063 r�
096'(24.5mm)-r-Olp33',e 5^nj
■Electrical Characteristics
(_POWER CU1S5 385 390 395 . 400' '405 - ',410,
MINIMUM PERFORMANCE AT STANDARD TEST CONDITIONS,8TC'(POWER TOLERANCE-5 W/-O W)
Power at MPP' P,,,, IM 385 390 395 400 405 410
E Short Circuit Current' Isc [A] 11.04 11.07 11.10 11.14 11.17 11.20
Open Circuit Voltage' Voc M 45.19 45.23 45.27 45.30 45.34 45.37
E Current at MPP Iupp [A] 10.59 10.65 10.71 10.77 10.83 10.89
Voltage at MPP VNP, M 36.36 36.62 36.88 37.13 37.39 37.64
Efficiency' 9 [%] 219.6 219.9 2:20.1 2:20.4 a20.6 220.9
MINIMUM PERFORMANCE AT NORMAL OPERATING CONDITIONS,NMOT2
Power at MPP PM°° [W] 288.8 292.6 296.3 300.1 303.8 307.6
'c Short Circuit Current Isc [A] 8.90 8.92 8.95 8.97 9.00 9.03
E Open Circuit Voltage Voc M 42.62 42.65 42.69 42.72 42.76 42.79
E
Current at MPP IuPP [A] 8.35 8.41 8.46 8.51 8.57 8.62
Voltage at MPP V-1 IV] 34.59 34.81 35.03 35.25 35.46 35.68
'Measurement tolerances P6,PP±3%;Is,:Voc±5%at STC:1000 W/m2,25±2°C,AM 1.5 according to IEC 60904-3•2800 W/m2,NMOT,spectrum AM 1.5
OcellsiPERFORMANEE WARRANTY PERFORMANCEIATLOWdIRRADIANCE., 1u.„ „
At least 98%of nominal power no
during first year.Thereafter max. u
°,w•w m i i I i
95 - ---- -- 0.5%degradation per year.At
a
least 93.5%ol nominal power LL +pp --+-----�------•--
up to 10 years.At least 86%of
u nominal power up to 25 years.
wz a
2fi
u ge
o All data within measurement s "
as _____________________.______
6. tolerances.Full warranties in zl
i accordance with the warranty
V so terms of the Qcells sales ad
0 es 10 is 20 26 organisation of your respective top Aop fioa aop tpoo ci
YEARS country. I RRADIANCE[W�m'1
-standard terms of guarantee for the 5 PV companies oath the Typical module performance under low-diance conditions in
highest production capacity in 2021(February 2021) comparison to STC conditions(25•C,1000 W/my.
R TEMPERATURE.COEFFICIENTS.°
Temperature Coefficient of Iso a [%/K] +0.04 Temperature Coefficient of Voo p [%/K] -0.27 9
109±5.4 '?
Temperature Coefficient of P6tPv Y _%/K] -0.34 Nominal Module Operating Temperature NMOT [`F] (43±3°C) 5
■Properties for System Design o
0
Maximum System Voltage Vsys M 1000(IEC)/1000(UL) PV module classification Class II a
Maximum Series Fuse Rating [A DC] 20 Fire Rating based on ANSI/UL 61730 TYPE 2 o
Max.Design Load,Push/PUII3 [Ibs/ft2] 75(360OPa)/55(2660Pa) Permitted Module Temperature 40°F up to+185°F
Max.Test Load,Push/PUII3 [Ibs/ft'] 113(540OPa)/84(4000Pa) on Continuous Duty (-40°C up to+85°C)
'See Installation Manual
■Qualifications and Certificates
UL 61730,CE-compliant,
Quality Controlled PV-TOV Rheinland,
IEC 61215:2016,IEC 61730IS _
U.S.Patent No.9,893,215 s olar cells), �® -
Lw
°�S C E
a16t29p =
0 0
Ocells pursues minimizing paper output in consideration of the global environment.Note:Inslallalion instructions must be followed.Contact our technical service for further information on approved installation of this prod-L Q/.Y�I I V
..arnma'3 CELLS America mc,400 Spectrum Center Drive,Suite 1400,Irene.CA 92618.USA I TEL*1 949 748 59 96 1 EMAIL hgc-ingmryegcells.com I WEB wwwgcells.com
NOTES:
1.)COMPLIES WITH NEC 2017
2.)REFER TO SHEET PV-3 FOR SITE SPECIFIC VALUES REQUIRED BY NEC 690
3.1
STICKERS,LABELS,AND PLACKARDS SHALL BE OF SUFFICIENT DURRABIUTYTO WITHSTAND THE ENVIROMENT INVOLVED
•
To be located on all OC junction boxes 9CLA4 5' E.E01MPC,1
and every 10'on DC conduit '
low ftmv
• • • u I NEC 690.31(G) .�.. -S O L AR
NEC 690.56(C)(1)(A)
I
DC Junction Box - •_ • • •
`•. -690.56(C)(3) NEC690A(B)
'a
• t
Service Disconnect
690.56(C)(3) NEC 690.13(B) NEC 690.53
Soladeck
_ 57E�tE 0 utility • e e
EIECr1buL Gina x•z L k •
.�• ��y m+` .. NEC 690.4(B)
M NEC 690.13(B)
NEC690.56(C)(1)(A)
If System is Backfed Breaker NEC 690.54 '
NEC 690.53
NEC 705,12(8)(2) �
•
NEC 690.54
DC Disconnect
_ Utility Meter if -
Socket •
I'
� 4 , NEC 690.13(13(
B)
I NEC C690.13(B) NEC 690.54 � }, I
I. h "o; � `�>.,•.. pry'(,, 14PiI
DC Conduit Main Service Panel Solar Meter Socket Photovoltaic Load Center
Inverter(s) Enphase Envoy Box
AC Disconnect (7o Combine Inverter)
i
i
• October 30,2024
Trinity Solar No.2024-09-1171270
SOLAR
Southold Town,NY RE:SIARHEI PALIANOK;INA PALIANOK
Town Hall Annex Building54375 Route 25 P.O.Box 1179 1975 skunk lane
Southold,NY 11971 Cutchouge,NY 11935
To the Building Official:
The following information constitutes a summary of the relevant design criteria and recommendations for the support of a new photovoltaic(PV)system on
the existing roof framing components at the above-referenced location.Trinity Solar,LLC has confirmed this structure is permitted by the local jurisdiction and
has provided all relevant documentation regarding the existing structure.As of the date of this evaluation,no concerns nor deficiencies related to the existing
structure have been reported.Therefore,this assessment is based on the premise the existing structure is in good condition and capable of supporting the
existing loads.This evaluation is strictly limited to the support of the PV system and does not extend to any other structural elements not directly involved in
the solar panel installation.If any discrepancies from the actual conditions are identified,or if concerns regarding the existing structure arise,this office must
be notified prior to proceeding with the installation.All spans listed below are horizontal projections.
1.Existing Roof Framing:
•Conventional roof framing at R4 and R5:2X6 at 16 o.c.;existing rater span is the max unsupported span=14'-0"
2.Roof Loading:
•3.00psf-New PV array load(PV panels,mounting rails,and hardware)
•6.14psf-Existing roof dead load(1.47psf-2X6 at 16"o.c.roof raft+-4.67psf-roof covering)
•20psf-Ground snow load -per AHJ(Authority Having Jurisdiction)
•Exposure Category B,130mph design wind speed
3.Existing Roof Modification:
•R4 and R5-No modification required.Existing roof framing is acceptable for PV installation.
4.Attachments:
•The maximum allowable spacing of the ECOFASTEN-L-FOOT`a achments can't exceed more than 48".Attachments to be fastened using quantity(1)
5/16"x 4"Lag Bolt with a minimum penetration depth of 3"-this is a equate to resist all stated demand loads above.Install attachments,rails,and panels
per manufacturer requirements.Stagger attachments to distribute load.
"ATTACHMENT TO BE SECURED TO RAFTERS NO LESS THAN x4 IN SIZE WITH A MINIMUM 7/16"DECK.CONTRACTOR TO INFORM THIS
OFFICE IF ANY ITEM ABOVE DIFFERS FROM SITE CONDITIONS
The installation,described above,is in general conformance with the manufacturers'specifications and complies with all applicable laws,codes,and
ordinances as specified by applicable codes,including the 2020 Resild ential Code of New York State and ASCE 7-16.
It should be noted that only PV-supported roofs are reviewed.Trinity Solar is not responsible for any construction flaws or defects that may currently exist in
areas of the structure that are not directly related to the PV installation.
Regards,
Ayracon Almaraz,PE
Structural Engineer-Trinity Solar
��-Of NEN'Y
CON V. 4Z 0
'0,
�I
100315
sr,
License No.100315,expiration date:12/31/2026
Trinity Solar 2180 5th Avenue,Unit 1 Ronkonkoma,NY 1(631)319-7233
I
I
I
+r I
wu�� PP y tlohrrr,csnn
f :
Lv v
Oar
O •,= r
1
1
� iCassner
:
IN .
W AUTioxsl.iZ n n�n{p0 iMls SV- W,��+1o:'.Qf t�s�Gai
iur
••';{YOB.'TAX
E1rSAP O F LA hD `°"`..=!LX%.
ATPECON IC.
f � ^•fir':.:^..Y'==�..�.
'TOWN OF
SOU TH0L.D,:t6Y J v.raa:R
-� .�,:z::»+:►�x+S...icq►.S off,.
S'CAI.£ '40`. I", Guard"feed fo the mo-, c-Tittc-Oivisisti -CFfiepgo ;:,
a. m� +n'� - TO la ins urar%Ca.Gorrtpa"aad 421e5ouf6a14,$ay
Bank as sutvr ed:Sa
Title N°'S-St493 VAN TUYL� SON
Uwsed La no Surveyass
Gwen.port ; Naw York
j
t '
:
4