Loading...
HomeMy WebLinkAbout50720-Z hoy�aoF souls°�° Town of Southold * * P.O. Box 1179 r woe 53095 Main Rd °`��ouxrr Southold, New York 11971 CERTIFICATE OF OCCUPANCY No: 46144 Date: 05/05/2025 THIS CERTIFIES that the building ACCESSORY-NEW STRUCTURE Location of Property: 4745 Eliiahs Ln Mattituck, NY 11952 Sec/B lock/Lot: 100.4-11 Conforms substantially to the Application for Building Permit heretofore,filed in this office dated: 04/10/2024 Pursuant to which Building Permit No. 50720 and dated: 05/21/2024 Was issued, and conforms to all of the requirements of the applicable provisions of the law. The occupancy for which this certificate is issued is: Accessory equipment shed (24x48) to an existing single-family dwelling as applied for. The certificate is issued to: Jonathan Shipman , Jennifer Shipman Of the aforesaid building. SUFFOLK COUNTY DEPARTMENT OF HEALTH APPROVAL: ELECTRICAL CERTIFICATE: 50720 4/21/2025 PLUMBERS CERTIFICATION: utho ' d SignatureU o�suFFol TOWN OF SOUTHOLD �� ay BUILDING DEPARTMENT y x TOWN CLERK'S OFFICE o rV1SOUTHOLD, NY BUILDING PERMIT (THIS PERMIT MUST BE KEPT ON THE PREMISES WITH ONE SET OF APPROVED PLANS AND SPECIFICATIONS UNTIL FULL COMPLETION OF THE WORK AUTHORIZED) Permit #: 50720 Date: 5/21/2024 Permission is hereby granted to: Shipman, Jonathan PO BOX 1472 Mattituck, NY 11952 To: Construct an accessory equipment shed (24x48) to an existing single-family dwelling as applied for. Must maintain a minimum rear and side yard setback of 15 feet. At premises located at: 4745 Elijahs Ln, Mattituck SCTM # 473889 Sec/Block/Lot# 100.4-11 Pursuant to application dated 4/10/2024 and approved by the Building Inspector. To expire on 11/20/2025. Fees: ACCESSORY $701.00 CO-ACCESSORY BUILDING $100.00 Total: $801.00 Building Inspector Of SOUr�QI � o Town Hall Annex Telephone(631)765-1802 54375 Main Road P.O.Box 1179 CAR • Southold,NY 1 1 97 1-0959 �Q BUILDING DEPARTMENT TOWN OF SOUTHOLD CERTIFICATE OF ELECTRICAL COMPLIANCE SITE LOCATION Issued To: Jonathan Shipman Address: 4745 Elijahs Ln City: Mattituck St: NY Zip: 11952 Building Permit#: 50720 Section: 100 Block: 4 Lot: 11 WAS EXAMINED AND FOUND TO BE IN COMPLIANCE WITH THE NATIONAL ELECTRIC CODE Contractor: Electrician: T Best Electrical License No: 49446ME SITE DETAILS Office Use Only Indoor Basement r Service (- Solar (— Outdoor 1st Floor [✓ Pool F Spa r Renovation 2nd Floor I— Hot Tub Generator (- Survey 1- Attic Garage Battery Storage (— INVENTORY Service 1 ph 1 Heat Duplec Recpt 17 Ceiling Fixtures Bath Exhaust Fan Service 3 ph r Hot Water GFCI Recpt 2 Wall Fixtures 7 Smoke Detectors Main Panel A/C Condenser Single Recpt Recessed Fixtures 32 CO Detectors Sub Panel 100A A/C Blower Range Recpt Ceiling Fan Combo Smoke/CO Transfer Switch UC Lights Dryer Recpt Emergency Strobe Heat Detectors Disconnect Switches 13 4'LED Exit Fixtures Other Equipment: Modine Heater, 100A Sub Panel 24 Circuits / 15 Used Notes: Accessory Three Car Garage Inspector Signature: X r Date: April 21, 2025 Sean Devlin Electrical Inspector sean.devlinl'D-town.southold.ny.us 4745EI1jahsGarageElectric Of SOUt�°� TOWN OF SOUTHOLD BUILDING DEPT. co 631-765-1802 INSPECTION [ FOUNDATION 1 ST/ REBAR [ ] ROUGH PLBG. [ ] FOUNDATION 2ND . [ ] INSULATION/CAULKING [ ] FRAMING/STRAPPING [ ] .FINAL [ ] FIREPLACE & CHIMNEY [ ] .FIRE SAFETY INSPECTION [ ] FIRE'RESISTANT CONSTRUCTION • - [ ] FIRE RESISTANT PENETRATION [ ] ELECTRICAL (ROUGH) [ ] ELECTRICAL (FINAL) [ ] CODE VIOLATION [ ] PRE C/O [ ] RENTAL REM RKS: dwo'6 �A�' DATE INSPECTOR �Ol_%l SOUTyo� TOWN OF SOUTHOL-D :BUILDING DEPT. 631-765-1802 �o INSPECTION [ ] FOUNDATION 1 ST/-REBAR [ ] ROUGH PLBG. [ ] . UNDATION 2ND [ ] INSULATION/CAULKING FRAMING/STRAPPING [ ] FINAL [ ] FIREPLACE-& CHIMNEY [ ] FIRE SAFETY INSPECTION [ ] FIRER ESISTANT CONSTRUCTION : [ ] FIRE RESISTANT-PENETRATION [ ] ELECTRICAL (ROUGH) [ ] ELECTRICAL (FINAL) [ ] CODE VIOLATION [ ] PRE C/O [ ] RE TAL REMARKS: Ole, DATE lO INSPECTOR OF SOUIy�� # TOWN OF SOUTHOLD BUILDING DEPT. `yC0UNi1 631-765-1802 -�ov INSPECTION [ ]. FOUNDATION 1 ST/ REBAR [ ] ROUGH PLBG. [ ] FOUNDATION-21SID [ ] INSULATION/CAULKING [ ] FRAMING/STRAPPING [ ] .FINAL [ . ] FIREPLACE& CHIMNEY [ ] FIRE SAFETY INSPECTION [ ] FI =RESISTANT CONSTRUCTION [ ] FIRE-RESISTANT PENETRATION [ ELECTRICAL (ROUGH) [ ] ELECTRICAL (FINAL) [ ] CODE VIOLATION [ ] PRE C/O [ ] RENTAL REMARKS: V r DATE 11 Jq 71Mk- INSPECTOR aOF SOGIyO� eP 7 7 '1 * # TOWN OF SOUTHOLD BUILDING DEPVAA 631-765-1802 INSPECTION [ ] FOUNDATION 1 ST/ REBAR f ] ROUGH PLBG. [ ] FOUNDATION"2ND [ ] INSULATION/CAULKING [ ] FRAMING /STRAPPING [ ] FINAL [ ] FIREPLACE & CHIMNEY [ ] FIRE SAFETY INSPECTION [ ] FIRE RESISTANT CONSTRUCTION j ] FIRE RESISTANT PENETRATION [ ] . ELECTRICAL (ROUGH) ELECTRICAL (FINAL) [ ] CODE VIOLATION ] PRE C/O [ ] RENTAL REMARKS: 3 G Cj DATE Zt INSPECTOR _ SOUIyOIo �V # * TOWN OF SOUTHOLD BUILDING DEPT.. . cOU 631-765-1802 INSPECTION [ ] FOUNDATION 1 ST/REBAR [ ] ROUGH PLBG. [ ] FOUNDATION 2ND I[ ] SULATION/CAULKING [ ] FRAMING /STRAPPING [ FINAL 5kt-o( - [ ] FIREPLACE & CHIMNEY [ ] `FIRE SAFETY INSPECTION ] -FIRE RESISTANT CONSTRUCTION [ ] FIRE RESISTANT PENETRATION [ ] ELECTRICAL (ROUGH) [ ] ELECTRICAL (FINAL) [ ] CODE VIOLATION [ ] PRE C/O [ ] RENTAL REMARKS: DATE ANSrECTOR FIELD INSPECTION REPORT I DATE C MENTS n ..-o 3o yWWI- 40 - 01 FOUNDATION (IST) ------------------------------------ �C FOUNDATION (2ND) r z H ROUGH FRAMING& PLUMBING Q • S r Q � r INSULATION PER N.Y. STATE ENERGY CODE FINAL ADDITIONAL COMMENTS _ g yo-, 7�Z 5 D � H O LINz H x d b H i '�O�$uff0lK�oGy� TOWN OF SOUTHOLD—BUILDING DEPARTMENT Town Hall Annex 54375 Main Road P. O. Box 1179 Southold,NY 11971-0959 mo o• �a� Telephone (631) 765-1802 Fax(631) 765-9502 https://www.southoldtownny.gov f Date Received APPLICATION FOR BUILDING PERMIT For Office Use Only t PERMIT NO. Building Inspector: / APR 1 0 2024 Applications and forms must be filled out:in their entirety.Incomplete applications will not be accepted. Where the Applicant is not the owner,an L �L7!ae1 z�xtc �r�i Owner's Authorization form(Page 2)shall be completed. Date: OWNER(S)OF PROPERTY: Name:Jonathan Shipman SCTM#1000-100-04-11 Project Address:4745 Elijahs Lane, Mattituck Phone#:6314569122 Email:shamrocktree2175@yahoo.com Mailing Address:4745 Elijahs Lane, Mattituck CONTACT PERSON: Name:Brooke Epperson Mailing Address:PO Box 152, Mattituck, NY 11952 Phone#:631 603 9092 Email:beppel-son@a mparchitect.com DESIGN PROFESSIONAL INFORMATION: Name:Anthony_ Portillo Mailing Address:PO Box 152, Mattituck, N.Y.11952_ Phone#:631 603 9092 Email:aportillo@amparchitect.com CONTRACTOR INFORMATION: Name: Mailing Address: Phone#: Email: DESCRIPTION OF PROPOSED CONSTRUCTION ®New Structure ❑Addition ❑Alteration ❑Repair ❑Demolition Estimated Cost of Project: ❑Other Accessory Structure $100,000 Will the lot be re-graded? ❑Yes ®No Will excess fill be removed from premises? RYes RNo 1 PROPERTY INFORMATION Existing use of property:S Intended use of property: Si (Ij T&-I'h Zone or use district in which premises is situated: Are there any covenants and restrictions with respect to this property? ❑Yes,'O1Vo IF YES, PROVIDE A COPY. Check Box After Reading: The owner/contractor/design professional is responsible for all drainage and storm water issues as provided by Chapter 236 of the Town Code. APPLICATION IS HEREBY MADE to the Building Department for the issuance of a Building Permit pursuant to the Building Zone Ordinance of the Town of Southold,Suffolk,County,New York and other applicable Laws,Ordinances or Regulations,for the construction of buildings, additions,alterations or for removal or demolition as herein described.The applicant agrees to comply with all applicable laws,ordinances,building code, housing code and regulations and to admit authorized inspectors on premises and in building(s)for necessary inspections.false statements made herein are punishable as a Class A misdemeanor pursuant to Section 21045 of the New York State Penal law. C � Application Submitted By(print name): az' e authorized Agent ❑Owner Signature of Applicant: I c � Date: STATE OF NEW YORK) SS: COUNTY OF Zf o&-, being duly sworn,deposes and says that(s)he is the applicant (Name of individual signing contract)above named, (S)he is the (Contractor,Agent,Corporate Officer,etc.) of said owner or owners,and is duly authorized to perform or have performed the said work and to make and file this application;that all statements contained in this application are true to the best of his/her knowledge and belief;and that the work will be performed in the manner set forth in the application file therewith. Sworn before me this 0 day of 20 o Ll ccp� Nota u c CEE AUFENAN ,ER PROPERTY OWNER AUTHORIZATION [NOT:ARYUBLIC,STATE OF NEWYORK(Where the applicant is not the owner) ation No. 01A00019644fied in Suffolk County \ on Expires January 9,2028 I, )onck-k-10 V-) �,�"L 2DOgjn residing at LC— do hereby authorize Aya-�, tC'��ao to apply on my behalf to the Town of Southold Building Department for approval as described herein. I ►0I 24 Go\ n`er,-s-Signature \ Date Print Owner's Name 2 Lea 11� E D O�OS�FFpj,�COG BUILDING DEPARTMENT- Electrical Inspector . a ti� uilding Department TOWN OF SOUTHOLD o - Town of So *Ml n Hall Annex- 54375 Main Road - PO Box 1179 o • Southold, New York 11971-0959 Telephone (631) 765-1802 - FAX (631) 765-9502 jameshaa,southoldtownny.gov - seand(a)-southoldtownny.gov APPLICATION FOR ELECTRICAL INSPECTION ELECTRICIAN INFORMATION (All information Required) Date: /acas Company Name: FL�_:-c—T('LC_ Electrician's Name: License No.:_N( r Elec. email: e t C 1 lLC� qua Elec. Phone No: (. 1- 33- 33 Mfrequest an email copy of Certificate of Compliance Elec. Address.: JOB SITE INFORMATION (All Information Required) Name: Address: 745 r 1�CaVL5 Rc,,_T­FIT­LC N Cross Street: 1 Phone No.: 6 3 Bldg.Permit#: 507 Zt email: vtcu-t� 'act' 14 LOO, Tax Map District: 1000 Section: Block:,. Lot: BRIEF DESCRIPTION OF WORK, INCLUDE SQUARE FOOTAGE (Please Print Clearly): Square Footage: 1 600 Circle All That Apply: Is job ready for inspection?: ❑ YES <NO_ ❑Rough In ❑ Final Do you need a Temp Certificate?: ❑ YES LSd""" Issued On Temp Information: (All information required) Service Size❑1 Ph❑3 Ph. Size: A #Meters Old Meter# ❑New Service❑Fire Reconnect❑Flood Reconnect❑Service Reconnect❑Underground❑Overhead i # Underground Laterals M 1 2 H Frame Pole Work done on Service? Dy N Additional Information: PAYMENT DUE WITH APPLICATION pd ��o fee*109 \12. D . J AN - 8 2025 O�OS�FFQj�C BUILDING DEPARTMENT-Electrical Inspector , �Gy taiidirtg. p De artment TOWN OF�SOUTHOLD �. � . o Town of Sou$ S6 Hall Annex- 54375;Main Road PO Box 11179 " Southold, New York 11971-0959 �F Telephone (631) 765-1802 - FAX (631) 765-9502 jamesh(a,southoldtownny qov — seand(E)southoldtownny.gov APPLICATION FOR ELECTRICAL INSPECTION ; ELECTRICIAN INFORMATION (All Information Required) _ Date: Company Name: Electrician's Name: License No.:_H F Elec. email: j e Elec. Phone No: (031- 33- -S request an email copy of Certificate of Compliance Elec. Address.: 9 f��vJ S S`T Ce ���i�0�iG 3 JOB SITE INFORMATION (All Information Required) Name: jig �-k Address: 7 4 S [5: t 3-V Rc1 ,T(lT-\_LC 1 Cross Street: 5oi Phone No.: 6 ,3[ -Q 5(2 - k Oa Bldg.Permit#: 507 at email: ccz a Tax Map District: 1000 Section: Block:' Lot: CCU BRIEF DESCRIPTION OF WORK, INCLUDE SQUARE FOOTAGE (Please Print Clearly): �C� l Square Footage: 16bO .Circle All That Apply: Is job ready for inspection?: ❑ YES NO Rough In ❑`Final Do.you need a Temp Certificate?: YES�:P�O Issue&On Temp Information: (All information required) Service Size❑1 Ph❑3 Ph. Size: A # Meters Old Meter# ❑New Service❑Fire Reconnect[]Flood Reconnect❑Service Reconnect[:]Underground[]Overhead # Underground Laterals n 1 F12 H Frame Pole Wydk done on Service? Y N Additional Information: PAYMENT DUE WITH APPLICATION I-q-95 Pd AeOLOO sec jog 11a PERMIT# Address: Switches 'St All Outlets ( I ' GFI s i Surface I Sconces I � UC Lts Fridge HW POOL Fans Mini Fr. W/D PanelPump Exhaust Oven Sump Heater Trnsfmr Smokes DW Generator Salt Gen. Carbon Micro GrbDis Water Bond j Lights Heat Pucks ERV HOT TUB/SPA Inst Hot DeHum Transfer Disc Combo Cooktop Minisplit Blower AC AH Hood Blower Service ` Amps 100 Have Used Sub A ps 1 Have Used - Commerts ETCO)KMWA\T]EIK Scott A. Russell SUPERVISOR MANAGEMENT SOUTHOLD TOWN HALL-P.O.Box 1179 y 53095 Main Road-SOUTHOLD,NEW YORK .11971 � �+✓ C .L oW n of So u th o l d CHAPTER 236 - STORMWATER MANAGEMENT REFERRAL FORM ( APPLICANT INFORMATION TO BE COMPLETED BY THE APPLICANT ONLY FOR PROPERTIES ONE ACRE IN AREA OR LARGER. ) ;# - - - - - - - - - - - - - - - - - - - -- - - - - - - - - - - - i'4 ` s `APPLICANT:: (Property Owner-, Design Professional, Agent, Contractor, Other) ,.3 Date: NAME. , . f Contact Information: vDQ"pq kx5 n 2ago nv�- cJ�n`,�e-c • c-�5 � fE-Mail&Tefephnne Numbe,t i c)bq 2 r 7 Property Address / Location of Construction Site: S.C.T.M. #: 1000 ii District p� l "• ection Block Lot TO BE COMPLETED BY SOUTHOLD TOWN ENGINEERING DEPARTMENT — _ - - - - - - - - - - - - - - - - - - - - - - - - - - - - i„ Area of Disturbance is less than I Acre. No S.P.D.E.S. Permit is Required! Project does Not Discharge to Waters of the State. No S.P.D.E.S. Permit is Required ! ;i Area of Disturbance is Greater than I Acre &Storm-water Runoff Discharges Directly to Waters of the State of New York. THE APPLICANT MUST OBTAIN a S.P.D.E.S. Permit )!` a ai DIRECTLY From N.Y.S. D.E.C. Prior to Issuance of a Building Permit. Area of Disturbance is Greater than t Acre& Storm-water Runoff Flows Through Southold Town's NIS4 Systems to Waters of the State of New York. THE APPLICANT MUST OBTAIN a S P D E S Permit through the Southold Town Engineering Department Prior to Issuance of a Building Permit. Aid M i' Reviewed By: Date: Z F OR Vt 0 cvtr'P-Tnc nrrnh, - 7n 1() �� r V l" � (� � t,/ SURVEY OF PR ERTY N SITUATE: MATTITUGK JUL 16 8009 TOWN: SOUTHOLD - SUI=FOLK COUNTY, NY SQ4R0.6F 4 W E IPALS SURVEYED 04-15-200a SUFFOLK COUNTY TAX # 1000 - [00 - 4 - II Npvi JONAT ;SIAN.Bc ps� 1 JENNHTIR&L SEMPVAN° 'VOOded W=MC ABSTRAC r Tel B N-NA'n0NAL'BAl,M- 1 77- 1 G_t Y o •` i open cir op o e o, / / 4 o New ,NOTESs / Cx '7' D�JY6veW bOvyaf YGIR�. J � S' '. WsV d YCt1ar�71 rP6reai+ ` /y / � Nir fak Sbt�EC�GW Iu.r. ■ MONUMENT FOUNDcl ne.q rm.d areuw s...r•amvtee 0 PIPE FOUND . '\�� / / � q "" .r`.� ».ate' ' d / �7] •� J'- mu.O'e!�1s re.a.an+ywp�od+n. / ff _ a0 Oi 11 YId)b IN YY GO�i9 STAKE SET Area = 435bO S. F. JOHN C. EHLERS LAND SURVEYOR �� Area = 1.0000 Acres � 6 EAST MAIN STREET N.Y.S.11C.NO.50202 i GRAPHIC SGALE I ""' RCVERHEAD,N.Y.11901 �369-8288 Fax 369-8287 REF.—\1Compagserverlpros109109-126.pm �� a�,�z Mtiti r. � "' f,•.� c:yam. ;fit-o,� I ' STORAGE EgXgB EQUIPMENT SHED SOLUTIONS low • ti If you are in need of a hefty garage. or large pole barn,then look no V �� • further than our post and beam Equipment Shed.Multiple giant iv •— bays provide ample overhead space for driving in heavy equipment or moving materials in and out. 24X48 EQUIPMENT SHED idudesa COMPLETE PRE-CUT KIT ,,,.riiern lock framiNy. e board and batten s0ing,and a corrugated meta( Base Area: 1 152 sq.ft. roof Note:Pictures m,ay,retlect client upgrades and modifications that do not come standard �•+« •■•••• Total Interior Area: 1152 sq.ft. Recommended Foundation: ~°•— Compacted 12"Crushed Gravel 2"x6"rough sawn Hemlock f ,,.. ..,....., ..,.,..,, .,..-._.. Overall Dimensions: 18'8"H Exposed Collar Ties i.. - s x 49'10"W x 25'2"D 1"x4"rough sawn Hemlock Estimated Weight:26700 Ibs Strapping 20"On Center Sill Plates Corrugated 29g Metal 6x6 Treated Sill Plate Roofing,Color: Evergreen COMPLETE PRE-CUT KIT: walls 12"Overhang on Front&Gable Walls 6x6 Hemlock Post&2x 12 Rough Openinqs: Box Beam Framing 4(qty) 128"x109"Rough Opening Wall Height:Front: 122 Rear:90" Additional Teatures Siding: 1"rough sawn 2(qty)Wood Louvered Vent Pine Board&Batten Assembly 9 Logistics 1x12"rough sawn Pine Fascia Wormation Trim; I"rough sawn Pine Shadow, • ••-• Door and Corner Trim Estimated Assembly Time: .. .. Two People:60 hrs .• •• Roof Estimated Shipping Cube Sizes ` • • •-• Saltbox Roof Style Cube 1:42"x60"x192"Cube 2: Roof Pitch:Front: 12/12 Rear:8/12 42"x60"x192"Cube 3:42"x60"x192" 2x12 Ridge Pole Cube 3:42"x48"x 192" 2x8 rough sawn Hemlock Rafters 24"On Center EQUIP.24X48.PCK .T :� Jamaica Cottage Shop, Inc. 170 Winhall Station Road S. Londonderry,VT 05155 f Voice 802-297-3760 Fax 802-297-2825 plans@JamaicaCottageShop.com 24A8 Equipment Shed Introduction O� CD Thank you for choosing Jamaica p Cottage Shop. We are confident that you will truly enjoy this project. Take your time,read these instructions all the way through CD and study the drawings. Gather your tools and materials and read these instructions and study the drawings again. Take note of the half- lap joints in the upper corners "� N Measure carefully. We use rough- cut full dimension hemlock for our framing and eastern white pine for CR everything else(except floors). This native rough-sawn lumber can and o does vary in size and width.A 1/4" 1 M difference is not uncommon. Such m N lumber may not be available in g your area. If you are experiencing difficulty finding the lumber or ifCD you are just short on time,pre-cut lumber packages for these plans are ;U possible through Jamaica Cottage Shop, Inc. Contact us fora quote for N a pre cut lumber package. x One rule of thumb we have here is that every building we turn out is ' unique—in some ways reflecting the personalities of the craftsmen who build them. The same is true for your building. Have fun and send us a picture when you're done! The information in these plans has been carefully researched and reviewed but Contact us for a quote errors may exist. Please contact us with any mistakes or discrepancies. We strive to for a Pre Cut Kit. provide our clients with a quality product and encourage feedback. www.JamaicaCottageShop.com Page 2 Jamaica Cottage Shop, Inc. 170 Winhall Station Road S. Londonderry,VT 05155 Voice 802-297-3760 Fax 802-297-2825 plans@JamaicaCottageShop.com 10 24A8 Equipment Shed Introduction Copyright page O1995-2018 By Jamaica Cottage Shop, Inc. All rights reserved. These plans are owned solely by Jamaica Cottage Shop, Inc. They are protected intellectual property rights that CANNOT BE SOLD,collected, transmitted, saved on any network,or distributed for cash reimbursement. Plans are intended for one time use. Purchasing of these plans does not constitute the right to manufacture market or sell the plans or buildings. No part of this publication may be reproduced or transmitted in any form or by any means,electronic or mechanical, including photocopy;recording, or any other information storage and retrieval system, without the written permission of Jamaica Cottage Shop, Inc. The information in these plans has been carefully researched,and all efforts have been made to ensure accuracy. Jamaica Cottage Shop, Inc.Assumes no responsibility for injuries suffered or for damages or losses incurred during the use of or as a result of following this information. It is important to study all directions carefully before taking any action based on the information and advice presented in these plans. When using any commercial product, always read and follow label directions. Where trade names are used,no discrimination is intended and no endorsement by Jamaica Cottage Shop, Inc. is implied. Disclosure Information: Some cutting of lumber may be required during assembly of this kit. Due to the rough sawn lumber that we build from, a 1/4"variance is common. Extra lumber is included to compensate . Fascia and Shadow Trim boards are generally sent long to be cut to a tight fit. If a tight fit is desired on siding boards,cutting will be required, extra material is included for this. Please read our warranty page to become familiar with our policies-http:// jamaicacottageshop.com/warranty/ These plans will match the floor plan-A, enclosed, any modifications, such as changing rough openings,will require on-site cutting and possibly extra materials. Substitutions of lumber lengths and species are common and will not affect the outcome of building the design. Time required to assemble a kit is only an estimate and cannot factor in all the variable of each job site. Some kits are more complicated than others and may require the advice and assistance of a licensed contractor. Please contact us for recommendations of contractors we have worked with. Our tech support department will gladly help you through any troubles you may encounter. They can be reached at 866.297.3760 www.JamaicaCottageShop.com Page 4 Jamaica Cottage Shop, Inc. 170 Winhall Station Road S. Londonderry,VT 05155 Voice 802-297-3760 Fax 802-297-2825 plans@JamaicaCottageShop.com 24A8 Equipment Shed Table of Contents ExplodedView....................................................................................................................... 1 Introduction...........................................................................................................................2 Specifications..........................................................................................................................3 Tableof Contents...................................................................................................................5 SafetyWith Tools...................................................................................................................6 MaterialList ..........................................................................................................................7 Hardware................................................................................................................................9 CutList..................................................................................................................................10 FloorPlan.............................................................................................................................16 ConcreteSlab.......................................................................................................................17 PierConfiguration...............................................................................................................20 Sills........................................................................................................................................21 RearPosts.............................................................................................................................23 RearBox Beams...................................................................................................................24 DoorPosts&Beams...........................................................................................................26 BeamTop Plates...................................................................................................................28 TemporaryBracing..............................................................................................................29 Nailers&Angle Braces.......................................................................................................31 BearingWall Siding.............................................................................................................32 Rafters...................................................................................................................................34 PlumbingRafters.................................................................................................................36 CollarTies............................................................................................................................37 BirdBlocking.......................................................................................................................38 RoofStrapping.....................................................................................................................39 UpperGable Siding ............................................................................................................40 FlyRafters-Assembly..........................................................................................................41 FlyRafters-Installation.......................................................................................................42 Installing Fascia&Shadow Trim.......................................................................................43 DoorCasing Trim...............................................................................................................48 DoorTrim............................................................................................................................49 CornerTrim.........................................................................................................................50 Cutting&Installing the Battens .......................................................................................51 Installinga Vent...................................................................................................................53 Corrugated Metal Roofing.................................................................................................54 Optional Asphalt Shingle Roofing....................................................................................57 Pictures.................................................................................................................................59 AppendixA- Rafters........................................................................................................60 RafterPatterns......................................................................................................................63 AppendixB-Making Doors..............................................................................................75 Appendix C- Site Choice&Preparation.........................................................................76 Jamaica Cottage Shop, Inc. 170 Winhall Station Road S. Londonderry,VT 05155 Voice 802-297-3760 Fax 802-297-2825 plans@JamaicaCottageShop.com 24A8 Equipment Shed Safetyoo DOING JOBS YOURSELF AROUND THE HOME CAN BE FUN AND SAVE MONEY. BUT TRAGICALLY, PEOPLE ARE INJURED AND KILLED DOING DIY EVERY YEAR. IT'S EASY TO AVOID ACCIDENTS. It's not just about having the right tools,but knowing how to use them correctly. -Be prepared Fact: Reading the instructions are guaranteed to save time in the long run. "SHOULD I GIVE IT AGO?" Before you start any job, you need to weigh it up and decide whether to go ahead.Ask yourself: • Is it something I can take on myself? • Do I have the right tools and protective equipment? • Do I need to get in the experts? Cutting corners could mean putting yourself at risk, it can end up costing more than you think. NEVER underestimate the difficulty of the job, especially if you are unfit or nervous about heights-get someone else to do it. If you decide to take on a DIY project,however small: • Don't rush or take short-cuts. Take the time the job needs. • Never think it's a waste of time reading the instructions. USE THE RIGHT TOOLS AND PROTECTIVE EQUIPMENT FOR THE JOB. "MAKING DO"WON'T DO. TOP TIP: Some jobs must be left to the experts. Get someone qualified for tasks involving gas, or any major electrical or building works and ask them for#free estimate. www.JamaicaCottageShop.com Page 6 Jamaica Cottage Shop, Inc. 170 Winhall Station Road S. Londonderry,VT 05155 Voice 802-297-3760 Fax 802-297-2825 plans@JamaicaCottageShop.com -*. 24A8 Eauinment Shed Millwork & Hardware Hardware Sueeested Tools 34- Metal Roof @ 148"Long Skill Saw or Hand saw 17-Metal Roof @ 109" Saw-z-all or chain saw 5-Ridge Cap @ 126" Hammer 1-Ridge Cap@48" Nail puller(cats paw or crow bar) 25'tape measure 151bs- 16d Framing Nails Chalk line 8lbs-16D HDG Nails Extension Cord 18lbs-8d HDG Nails Tin Snips 8 lbs-6D HDG Nails Staple gun 1600-Roofing screws Pencil Speed Square Four-foot level Cordless Drill '/a"drive bit for drill Razor Knife Chisel Ladders IF "is t usWargees of lumber that must be lifted high above 4 e ground. Assistance from a crane, forklift,or man-lift would greatly help installing rafters and roofing. www.JamaicaCottageShop.com Page 8 Jamaica Cottage Shop, Inc. 170 Winhall Station Road S. Londonderry,VT 05155 Voice 802-297-3760 Fax 802-297-2825 plans@JamaicaCottageShop.com 24x48 Equipment Shed Hardware This building is fastened together using a variety of nails and screws. _ Please use this page as a guide to what to use where. The 16d framing nail, Figure 1, should be used for all framing of flooring, '""'""" walls and rafters. Wherever there is 2"or 4"material and the nail will not be exposed to the elements,the 16d Figure 1 framing nail should be used. The 8d galvanized nail,Figure 1, should be used for the siding and 1" 6d Galvanized Nail Figure 2 trim. Wherever there is 1"material that will be exposed to the elements, the 8d galvanized nail should be used. 6D Galvanized Nails will be used for attaching battens. Figure-2 The roofing screws,Figure 3, are used to apply the metal roofing and should Roofing Screws Figure 3 1/4" Nut Driver Figure 4 match your roof color. The longer of the two roofing screws should be used for the ridge cap. The '/4"nut driver, Figure 4, is the driver necessary for the roofing screws. www.JamaicaCottageShop.com Page 9 ape Jamaica Cottage Shop, Inc. 170 Winhall Station Road S. Londonderry,VT 05155 Voice 802-297-3760 Fax 802-297-2825 plans@JamaicaCottageShop.com r.. '� M I24x48 Equipment Shed Floor Plan o, rn m o - N N CflC G X O Cfl _a = O N W X O CO X O Cfl CD N g r- x � m O CO O N N CD X O CD � s N N A www.JamaicaCottageShop.com Page 16 Jamaica Cottage Shop, Inc. 170 Winhall Station Road S. Londonderry,VT 05155 Voice 802-297-3760 Fax 802-297-2825 plans@JamaicaCottageShop.com 24A8 Equipment Shed Concrete Slab Step 1. You may also use a concrete slab for your building To to sit on. Begin with a prepared compacted gravel pad. Figure 1. Your gravel pad should be at least a foot larger than the concrete pad on all sides. For example, if your concrete pad will be 288"x 432", your gravel pad should be 312"x456"square and level. We recommend using a transit to level your site. Step 2. Build your form. Figure 2. The form will be the barrier that will stop your concrete from spreading, so the interior dimensions of the form should be the exact dimensions Figure 1 of the building. For example, for a 24x24 Garage,the interior dimensions of your forms should be288'x288". Step 3. Once your form is created, it will need to be squared. To square your frame, measure diagonally from corner to corner. When the measurements are equal,the frame is squared. Brace your squared frame by nailing a piece of lumber from corner to corner on top of the form. This will keep your frame squared until it is pegged. Step 4. Continue by hammering 2x2 pointed pegs at 3' intervals,giving the perimeter of the slab more depth and % strength, as it will be supporting your building walls. if your building calls for a third,center, skid, dig a center trench 12" wide by 8"deep, so the concrete will be thicker to support this third skid as well. Figure 2 Step 6. Lay a 6 millimeter vapor barrier on top of the gravel pad inside your form. The vapor barrier should extend along the entire bottom of your pad, into your trenches and up the sides to the top of your form. `� ' , ,� , ,,:•f Step 7. Reinforce your pad with wire mesh. Cut the pieces of the steel wire mesh to length. The pieces should be cut so that, when in place,the edges will be 3 inches away from the form. To eliminate the mesh curl,flip the mesh sheet over and place it in the form opposite the way it was rolled up. Overlap each mesh sheet and twist the cut ends together to join them. Space bricks out evenly under the mesh throughout the form. Be sure , the edges of the mesh are at least 3 inches away from the form. Figure 3 www.JamaicaCottageShop.com Page 17 Jamaica Cottage Shop, Inc. 170 Winhall Station Road S. Londonderry,VT 05155 Voice 802-297-3760 Fax 802-297-2825 plans@JamaicaCottageShop.com 24A8 Equipment Shed Concrete Slab - Continued Step 8. Before pouring your I doncret, sia concrete,bring any services to the wire mesh building through the slab, such as water,heat and/or electrical. % P-P Step 9. You are now ready to pour your concrete. Your concrete 12-1 slab should be 12"x12"around 1 _ g Compacted Hard Fill the exterior edges,and under any 1 `^vapor Barrier under concrete Fuotln_ additional skids, and reinforced with wire mesh. The rest of the slab Figure 4 should be 4"thick. Figure 4. Step 10. Once the concrete has cured,usually 1-3 days,remove the forms and the slab will be ready to `- build on. Figure 5. *NOTE If you desire, skids can be S replaced with treated 6 x6 sill plates around exterior and where the skids would sit. Figure 6. If you are in } an area prone to earthquakes or high winds,you may wish to anchor your ~� r `•J>'. �, ',�� cottage to your concrete slab. There are a number of anchor solutions Figure 5 including the anchor bolt, steel flat plate and mud sill anchor. Figure 7. Concrete slab C—Me Slat-n-Grade Foundation ` l S o' r`,Fran 6x6 PT Sill � rer Sill Film. Figure 6 IMtd Sill) — 1131 4nchm Bolt 1 Foundation 121 Steel gat Plata Ralnfa hint i nl Mud SIII A-hor i Figure 7 www.JamaicaCottageShop.com Page 18 Jamaica Cottage Shop, Inc. 170 Winhall Station Road S. Londonderry,VT 05155 Voice 802-297-3760 Fax 802-297-2825 plans@JamaicaCottageShop.com 24A8 Equipment Shed Concrete Slab - Continued Gravel bed should be larger than the 48'o" building size by 1'on all sides- Figure-1 The concrete slab should Have 12"x12" footer along the edges Figure-2&3 o_ fBuilding Footprint Fi ure-1 Gravel Bed Extents 48' 0" N Fi ure-2 Gravel 12" Around Perimeter 6"Concrete Slab with 12"x 12" Rim Footer 12" 1 12" 6" Fi ure-3 www.JamaicaCottageShop.com Page 19 C - Jamaica Cottage Shop, Inc. 170 Winhall Station Road S. Londonderry,VT 05155 Voice 802-297-3760 Fax 802-297-2825 plans@JamaicaCottageShop.com 24A8 Equipment Shed - Sills PT.0606.14400.S L 1 I Fi ure-1 PT.0606.14800.SL2 PT.0606.15612.SL3 Layout the sills to form the 48'back side of the building. Arrange the sills so the lap joint are oriented correct- ly.The end sill are set first and then the center sill swill fit in place. Use 16D Galvanized nails to attach.Figure-1 The gable sills fit into the ends of the bearing sills.Start with the rear gable sill and then ass the4 front gable sills. The front 12"corner sills are fit into the laps of the gable sills and the door sills are placed approximately for now. Figure-2 PT.0606.14400.SL4 PT.0606.14912.S L5 PeT.0606.01200.S L 7(3) 2goo 129to 'PT.0606.01200.S L6 Fi ure-2 www.JamaicaCottageShop.com Page 21 Jamaica Cottage Shop, Inc. 170 Winhall Station Road S. Londonderry,VT 05155 Voice 802-297-3760 Fax 802-297-2825 plans@JamaicaCottageShop.com 24A8 Equipment Shed Sills - Continued Fi ure-1 PT.0606.14400.S L4 PT.0606.14912.S L5 Figure-1 shows the gable sill sand the direction of the lap joints. After assembling the sills,check them for square.Measure corner to corner for each side and check that mea- surements are the same.Rack the sills until square. Figure-2 644" Fi ure-2 www.JamaicaCottageShop.com Page 22 Jamaica Cottage Shop, Inc. 170 Winhall Station Road S. Londonderry,VT 05155 Voice 802-297-3760 Fax 802-297-2825 plans@JamaicaCottageShop.com ' 24x48 Equipment Shed Rear Posts Fi ure-I H.0606.08300.C P _ r 'i 145 1/2" 142 1/210 142 1/2'1 145 1/2" H.0606.08300.WP 5 Begin by setting the posts along the rear wall and the center posts of the gable wall.Figure-1 Corner posts need to be placed so that the tenon runs along the rear wall and the flat side faces in -Figure-2 The Center post tenon on the gable wall needs to run parallel to the gable wall. Figure-3&4 4" 611 2" 12 121' i " 2 2" A.0606.08365-W Q- enons are Parallel to Sills V o_ O ?j O rn O CO O O M O O LO r �O O O 0 , . a a H.0606.OMW.CP i Tenon is set to Inside Fi ure-4 Fi ure-2 � � Fi ure-3 www.JamaicaCottageShop.com Page 23 Jamaica Cottage Shop, Inc. 170 Winhall Station Road S. Londonderry,VT 05155 Voice 802-297-3760 Fax 802-297-2825 plans@JamaicaCottageShop.com 24x48 Equipment Shed Rear Box Beams ,H.O212.144OO.B61 0212.14214.GB1 _may Fi ure-1 Once the posts are set,start building the box beams by placing 2x12's on the outside of the beams.Nail through the beam sides into the tenon. Figure-1 /-'H.0212.14400.B B 1 (4 Fi re-2 H.0212.14214.BB2 www.JamaicaCottageShop.com Page 24 Jamaica Cottage Shop, Inc. 170 Winhall Station Road S. Londonderry,VT 05155 ..y Voice 802-297-3760 Fax 802-297-2825 plans@JamaicaCottageShop.com 24x48 Equipment Shed ,. Rear box Beams _ Continued H.0212.13800.GB2 H.0212.14214.B B2 -, H.0212.14400.BB1 % Then add the interior sides of the beams.Nail into the tenons of the posts. Figure-2 H.0212.14214.BB } �—R0212.14400.BAB1 H.0212.13800.B B Fi ure-2 www.JamaicaCottageShop.com Page 25 Jamaica Cottage Shop, Inc. 170 Winhall Station Road S. Londonderry,VT 05155 Voice 802-297-3760 Fax 802-297-2825 plans@JamaicaConageShop.com 24A8 Equipment Shed Door Posts & Beams H.0606.11512.CP Fi re-1 i i - I I Now attach the corner door posts and extend the box beam to fit into the notches of the H.0212. 14400.BB1 corner posts.Figure-1 Figure-2&3 shows the location and dimen- sions of the notches. y 218 12" H.0606.11512.WP3 r 2 I NH.0606.11512.WP3 2„ ' N 2„ oN i 2„ Ln �H.0212.14400.G63 12" 71" to Bottom Figure-2 j Fig=ure-2 www.JamaicaCottageShop.com Page 26 Jamaica Cottage Shop, Inc. 170 Winhall Station Road S. Londonderry,VT 05155 Voice 802-297-3760 Fax 802-297-2825 plans@JamaicaConageShop.com 24A8 Equipment Shed Door Posts & Beams - Continued Fi ure-1 t 129„ 129„ 129., H.0606.11512.DP 8 129rr H.0212.14400.BB 1 8 1091, 1091, 129►, 10911 129., 129AP 129., Double up the door posts and nail the Sills. Figure-1 H.0212.14400.884 The front box beam is built up and nailed to the tenons. Figure-2 Figure-3 shows box beams sides sandwiching the tenons of the double posts. Fi ure-3 www.JamaicaCottageShop.com Page 27 Jamaica Cottage Shop, Inc. 170 Winhall Station Road S. Londonderry,VT 05155 Voice 802-297-3760 Fax 802-297-2825 plans@JamaicaCottageShop.com 24x48 Equipment Shed Beam Top Plates Fi ure-1 - H.0206.09000.TP3 j 1 H.020619200.TP1 ti H.0206.19200.TP2 1 l l H.0206.12000.TP5 H.0206.10800.TP4 After the box beams sides are complete,add the top plate 2x6's.Figure-1&2 Nail through top plate and to the beam on both sides. The rear corners are mitered to meet at a 45 degree angle over the post. Figure-3 H.0206.19200.TP1 H.0206.19200.TP1 b 45 Degree mitered corners Fi ure-2 _ www.JamaicaCottageShop.com Page 28 Jamaica Cottage Shop, Inc. 170 Winhall Station Road S. Londonderry,VT 05155 Voice 802-297-3760 Fax 802-297-2825 plans@JamaicaCottageShop.com 24x48 Equipment Shed Temporary Bracing Fi ure-1 H.020414400.T B 3 m H.0204.03600.TB�6 H.020414400.TB 3 Check the building for Plumb and square before attaching braces. Use 2 pieces of 2x4x36"to join the 2x4x12's to span the depth of the building. Attach to the door posts and rear center posts under the beam,across the bearing walls. Blocking can be used to attach the brace to the door posts. Angle the braces up from ther back wall to hit the front wall as high as possible. Figure-1-3 s H.O2O4.0060O.TB(3) H.0204.14400.T6 i 96„ 1 H.0204.03600.T6 -- Nail Braces to blocks r i *Kee door openings clear of bracing* H.0204.14400.TB Fi ure-2 Figure-3 www.JamaicaCottageShop.com Page 29 Jamaica Cottage Shop, Inc. 170 Winhall Station Road S. Londonderry,VT 05155 Voice 802-297-3760 Fax 802-297-2825 plans@JamaicaCottageShop.com 24A8 Equipment Shed Temporary Bracing - Continued Fi ure-1 H.0204.00600.TB 2 H.0204.16800.TB 10 i 2x4x14'Boards are used to diagonally brace the structure. Span between the beam and the top plates to support. Fig- ure-1&2 t %r t Do not sink the nails so it is easier to ! remove the boards when the building is complete. \ i i H.0204.16800.TB(10 -- H.0204.006007B(2) Fi urc-2 The braces are removed from the drawings moving forward to maintain visual clarity, But they are intended to stay up until the roofing material is on.They will ensure a plumb, d level structure. www.JamaicaCottageShop.com Page 30 Corr- Jamaica Cottage Shop, Inc. 170 Winhall Station Road S. Londonderry,VT 05155 r Voice 802-297-3760 Fax 802-297-2825 plans@JamaicaCottageShop.com 24x48 Equipment Shed Nailers & Angle Braces H.0206.04200.AB(8) "c_ I I 42" H.0206.13612.WN 4 Set the nailers along the rear bearing and gable walls.36"from the Sill. Fi ure-2 Figure-1 Angle braces are then attached in the corners. H.0206.04200.AB 8 42"Braces along the rear and gable walls and the door openings. Figure-2&3 42„ H.0206.13500.WN 4 H.0206.042oo.AB(8) Fi ure-3 www.JamaicaCottageShop.com Page 31 Jamaica Cottage Shop, Inc. 170 Winhall Station Road S. Londonderry,VT 05155 Voice 802-297-3760 Fax 802-297-2825 plans@JamaicaCottageShop.com 24A8 Equipment Shed Bearing Wall Siding P.0106.03212.S1 2 j _ � I ! � iding boards spaced�to fill the length of the building. Ex- tra lumber is included if you l would like a tight fit,cutting will be required 87 1/2" P.0112.08712.S I Fi ure-1 48-Rear 24-On each Gable Place siding on the rear wall.Figure-1 Siding should sit flush with the top of the beam.Figure-2 Hang above grade by 2-3/4" Figure-3 Use four nails at the beams,nailer's &Sills Figure-4 On the following page: Attach siding around the front door openings and along the lower gable wall. Fi ure-5&6 - lush With top plate -- , Use 4-8D Nails At i Box Beams, Nailers& Sills Fi ure-4 1-3 4 www.JamaicaCottageShop.com Page 32 Jamaica Cottage Shop, Inc. 170 Winhall Station Road S. Londonderry,VT 05155 WMA Voice 802-297-3760 Fax 802-297-2825 plans@JamaicaCottageShop.com 24A8 Equipment Shed Siding - Continued P.0112.04312.S 1(8) Fi ure-5 P.0112.03112.S1 8 P.0106.01912.S 18 P.0112.01334.S1 16 P.0110.01334.S 18 y 129" P.0112.12000.S1 5 Figure-5 Shows half of the door opening siding.The opposite side is the same and each door way is the same as the others. EI 0 129" 129" 129" 129" Fi ure-6 www.JamaicaCottageShop.com Page 33 Jamaica Cottage Shop, Inc. 170 Winhall Station Road S. Londonderry, VT 05155 Voice 802-297-3760 Fax 802-297-2825 plans@JamaicaCottageShop.com 24A8 Equipment Shed Upper Gable Siding Figure-1 (b r N r-d r N � .►-/r� �,-^� ,�/� ,�-/-�� ,�-/r� ,a/-�� �,,-/^r� '&-a/� '9-/-�4 ,6./-�4 ,r-/r� ,r-/r� ,0/-�4 rrr.�^.4 ,9-/4 � ,a/-�4 ,a/r� ,r./-�0 8,-/-�4 f,-/r� 0,-/-�* ,►-/�� 6'-^+ Q VJ I V/ Vl � V! V/ VI VI VJ Vl V/ V/ VJ VI VI V/ Vl Vl VI V! V/ VI V/ VI . N N N N N N N N N N N N N N N N N N N N N N N N * r-I r-1 r-1 ri ri ri .--1 r-i rd .--I r-1 ri .--1 r 4 r-1 .--1 ,--I ri %-1 r-4 r-4 r 4 ,--1 r-1 M r-1 M M N a% r-1 v-i M M N M -4 M Ln i N MW-1 M M M -4 O Ln %D w m O ri N [f M Nv-1 O O T 00 !N tD wD Ln V M N N O O O O .-i r-1 r--1 rl r-1 r 4 r-1 *-1 -1 r-1 O O 10 O O O O O O O N N N N N N N N N N N N N N N N N N N N N N N N r-1 r1 ri r-1 ri r-1 rl ri r1 ri T-4 ri r-1 ri r-1 ri r 1 r-1 r-4 r-1 r-4 r-1 r-1 r-1 r-1 ri ri r-� ri ri r-1 r-1 ri r-L r 4 ri r-1 r-f ri r i ri r♦ r-1 ri ri r-) r-4 ri O O O O O CD COO O O CD O O O O O O O O O O CD O a: ci ci Ii a a a a a: a: a: a the length of the building. Extra lum- ber is included if you would like a Attach siding to the upper gable wall.It hangs below the \ lower siding by 6"over the lower siding. Nail to the rafters and gable nailers. Figure-1 611 • Fi urc-2 www.JamaicaCottageShop.com Page 40 'p Jamaica Cottage Shop, Inc. 170 Winhall Station Road S. Londonderry,VT 05155 Voice 802-297-3760 Fax 802-297-2825 plans@JamaicaCottageShop.com 24x48 Equipment Shed Fly Rafters-Assembly Fi re-1 154-1/2" �I 24-1/2" 24" 24" 24" 24" 24" Ridge Endue\ H.0108.15412. 71 rH.0208.00700.FB(7) Front Gable Fly Rafter 110 Exterior View 450 Ridge End 154-1/2" r� A ont Gable Fly Rafter terior View The fly rafters are best built on the ground on saw horses and then attached to the building as a unit. Figure-1 shows the front gable fly rafter. Figure-2 shows the rear gable fly rafter,which is split into 2 pieces. Rear Gable Fly Rafter Exterior View 24"oc H.O108. i2000.FR H.0 l08.11114.FR ridge End 120" I 111-1/4" Fi re-2 www.JamaicaCottageShop.com Page 41 Jamaica Cottage Shop, Inc. 170 Winhall Station Road S. Londonderry,VT 05155 Voice 802-297-3760 Fax 802-297-2825 plans@JamaicaCottageShop.com 24A8 Equipment Shed Fly Rafters-Installation H.0108.12000.FR 1-1.0108. 11114.FR Fi ure-1 I H.0108.15412.FR Attach the fly rafters flush with the top of the siding and roof strapping.Figure-1&2 Blocks built up for nailing Fascia H.0108.15412.FR H.0108. 12000.FR I Fi ure-2 www.JamaicaCottageShop.com Page 42 Jamaica Cottage Shop, Inc. 170 Winhall Station Road S. Londonderry,VT 05155 Voice 802-297-3760 Fax 802-297-2825 plans@JamaicaCottageShop.com 24A8 Equipment Shed Installing Fascia & Shadow Trim t Set the bearing Fascia first. Use a level to set the height from the roof strapping. Nail to the rafter ;.>.set Bearing Fasda ends and top beam with galvanized nails. with a level from — the roof stapping - Then cut the fascia board flush to the bearing siding. Trim boards are generally shipped a little long to allow it to be cut to an exact fit. Figure-1 2.Tiim Fkrh to bearin sidin Bearing Fascia Figure-1 _N' The Gable Trim is set flush with the roof strap- - ping. Nail to through the siding into the rafter. _-- Cut any overhang flush to the bearing fascia. =~ == Trim boards are generally shipped a little long to �3.Set Gable Fawla flush allow it to be cut to a exact fit. Figure-2 cd6 with roof stye io na tls`y � `7 \ Bearing Fascia 4.in Rush with Beam Tiim Fi ure-2 T The corner is now trimmed off to finish the fas- \ cia. Figure-3 Install the fascia all around the building before starting the shadow trim install. The shadow trim will follow the same steps. b Figures3-4-5-6 On following pages show part - -�___7_ g� placement. Corner level withth Bearing Fascia � 1'l`.'.U I-C-? www.JamaicaCottageShop.com Page 43 Jamaica Cottage Shop, Inc. 170 Winhall Station Road S. Londonderry,VT 05155 Voice 802-297-3760 Fax 802-297-2825 plans@JamaicaCottageShop.com 24A8 Equipment Shed Fascia Nail Fascia every 24"with 8D Galvanized nails. Figure-1,2,3&4 8"Fascia Trim is used on the front to allow enough overhang but not interfere with the JP.0112.14400.FT door trim.Trim is intentionally sent long and can be trimmed with hand saw P.0112.16200.FT P.0108.15600.FT , P.0108.14400.FT P.0108.14400.FT P.0108.15600.FT P.0112.09400.FT c * Front Fascia is 1x8* Fi re-1 I TANT* Co all around the whole building before starting shadow install. 11° 12/12 Front Pitch 45 degrees 8/12 Rear Pitch - 134 degrees P.0112.14400.Ff Fi re 22 P.0112.16200.ffi www.JamaicaCottageShop.com Page 44 Jamaica Cottage Shop, Inc. 170 Winhall Station Road S. Londonderry,VT 05155 Voice 802-297-3760 Fax 802-297-2825 plans@JamaicaCottageShop.com 24A8 Equipment Shed Fascia 1M ORTAN omp e e fascia install F'`�ure-3 P.O112.162OO.FT _ around the whole building before starting shadow install. P.O112 14400.� J P.0112.09400.FT - P.0112.14400.FT P.0112.14400.FT P.O112.156OO.FT P.0112.15600.FT Trim is intentionally sent long and can be trimmed with hand saw Fi ure-4 i --- _�__ I I L _ / P.0112.16ZOO.FT _ I j I � I P.0108.15600.FT Trimlevel I� ! to bearing fascia I www.JamaicaCottageShop.com Page 45 Jamaica Cottage Shop, Inc. 170 Winhall Station Road S. Londonderry,VT 05155 Voice 802-297-3760 Fax 802-297-2825 plans@JamaicaCottageShop.com 24A8 Equipment Shed Shadow P.0104.12500.ST Fi ure-1 - P.0104.15500.ST y Y �41. ji Ago P.0104.13400.ST P.0104.19200.ST P.0104.12000.ST P.0104.14400.ST P.0104.13400.ST _ Nail Shadow every 24"with 8D Galvanized nails. im is intenti n be Figure-1,2,3,&4 -- .., tri med wi A w - P.0104.15500.ST Trim level P.0104.13400.ST I to bearingshadow Figure-2 www.JamaicaCottageShop.com Page 46 Jamaica Cottage Shop, Inc. 170 Winhall Station Road S. Londonderry,VT 05155 Voice 802-297-3760 Fax 802-297-2825 plans@JamaicaCottage5hop.com 24x48 Equipment Shed Shadow P.0104.15500.ST P.0104.12500.ST P.0104.12000.ST P.0104.13400.ST P.0104.14400.ST P.0104.19200.ST P.0104.13400.ST 110 Fi ure-4 110 I P.0104.15400.FT ' P.0112.12000.FT www.JamaicaCottageShop.com Page 47 Jamaica Cottage Shop, Inc. 170 Winhall Station Road S. Londonderry,VT 05155 Voice 802-297-3760 Fax 802-297-2825 plans@JamaicaCottageShop.com 24A8 Equipment Shed Door Casing Trim P.0107.07200.DC(4) - I P.0107.04300.DC 8 — P.0107.08000.DC(s) 127" Fi ure-1 asrn sou Lbe flush with theding on outside o Trim the doors with Ix7 casing.Start with the top header piece and e door work down so the bevel cuts will line up.Figure-1&2 P.0107.07200.DC Al P.0107.04300.DC 8 P.0107.08000.DC(8)] Fi ure-2 www.JamaicaCottageShop.com Page 48 Jamaica Cottage Shop, Inc. 170 Winhall Station Road S. Londonderry, VT 05155 Voice 802-297-3760 Fax 802-297-2825 plans@JamaicaCottageShop.com _ 24A8 Equipment Shed Door Trim L 1.1 % v P.0104.04434.DT - . _��� - Fi ure-1 P.0104.07212. DT ---- -- --- --- - T �— i 1 — T---r l 11T, ' P.0104.08200.DT After installing the casing attach the 1x4 door trim. The angles are cut at 22.5 degrees on the corners. Figure-1,2&3 P.0104.07212.DT 22.5° .0104.07212.DT P.0104.04434.DT o _ --- - ---- � -P.0104.04434.DT ' P.0104.08200.DT 22.5° P.0104.08200.DT Fi ure-2 Fi ure-3 �_�� f ill www.JamaicaCottageShop.com Page 49 1 II IIII � 11: Ilnllllll , i C '. • gable corners . •. • Then the ftdl length boards are :•attached.Nails in pairs to 1111 III ' 1 Jamaica Cottage Shop, Inc. 170 Winhall Station Road S. Londonderry,VT 05155 Voice 802-297-3760 Fax 802-297-2825 plans@JamaicaCottageShop.com 24A8 Equipment Shed Cutting & Installing the Battens Your battens should be left packaged until ready to use. Do not allow battens to be exposed to the elements, sun or rain. 4x4 Top plate XXX),•- XX Battens are installed over the seam where two siding boards meet. Figure- 1. Install battens after all trim is done. Battens will fit up to the fascia and around the windows. Figure 2. 2 Nails each Using the 6d galvanized nails,nail battens with a pattern of 2 nails side by side in the same increments as the siding,nailing into the floor and rim joists, XXX X horizontal nailers,top plates and rafters. On small battens, one nail will suffice. 2x4 nailer Do not nail into knots,as this will cause the wood to split. Some battens are supplied long and will need 2X6 floor joist I XXX '` XX trimming for a tight fit. Look for angle cut battens for the gable ends. Fi�_ure-1 Figure-2-34 On the following two pages show where each batten goes P.3402.08800 .BT 47 JA- f I L 11 111 Figure www.JamaicaCottageShop.com Page 51 Jamaica Cottage Shop, Inc. 170 Winhall Station Road S. Londonderry,VT 05155 Voice 802-297-3760 Fax 802-297-2825 plans@JamaicaCottageShop.com 24x48 Equipment Shed Battens - Continued Fi ure-3 -� m m m m mmm m •r � 'v a .-� ,-� .-� .1 .� F— F— F— F— ; F— F— F— F— F— H F— F— F— F— F— W O N 00 O N m m a0 0o oO [� m m m m m m m m m 000iD r` OD at O N M v- sr j 4 4 4 4 4 4: 4 � N N N N N N N N � �C OD 01 N V �D OD O N V 0 OD O N 0 0 ! O O O O O O N ` O O; Q% O r` �O Z Ln et M N N *-4 (n M M M N N rn (n M (n ni N I N N N N N N N N N N N s a s n: a 0 0 0 Vr vw v v i v v v v v •r v v (n C" M M M M M M M M M M M M M a s a s a a a a a a o- a a a a P.3402.08200.BT 23 - DT-fP�3440�2604112.BT -- -- P.3402.02912.BT — — P.3402.01612.BT IJ P 3402.01100.BT 7 I Fi ure-4 � I www.JarnaicaCottageShop.com Page 52 Jamaica Cottage Shop, Inc. 170 Winhall Station Road S. Londonderry,VT 05155 Voice 802-297-3760 Fax 802-297-2825 plans@JamaicaCottageShop.com 24x48 Equipment Shed Rafters H.0206.14400.RA The ridge pole will be in 4 pieces. 12/12 Pitch 45° The 2 ends are 145"and the center --- H.0206.23078.RA 8/12 Pitch 34° is 144". Set the rafters in sections by attaching two rafters on the same side and then attaching the ridge pole.Add the opposing raf- 0),�ry ters to support the ridge pole.Then add another section of ridge pole and rafters at the end of the ridge pole.Then fill in remain rafters at N 24"on center. Figure-1&2 Figure-3&4 show the rafters offset the be flush with gable siding. H.021n_1a9;nn_Rp Fi ure-1 145" 1"towards the outside of th " building. They should be _. flush to the siding to provide a - nailer for the upper level gable siding. H.0208.14400.R P Fi re-2 H.0208.24000.R P 27 End Rafters are set End Rafters are set ush towable siding flush to gable sidin Top Plate � Siding Box Bert Fi ure-3 Fi ure-4 www.JamaicaCottageShop.com Page 34 Jamaica Cottage Shop, Inc. 170 Winhall Station Road S. Londonderry,VT 05155 Voice 802-297-3760 Fax 802-297-2825 plans@JamaicaCottageShop.com f* 24A8 Equipment Shed Rafters - Continued Ridge poles share a rafter at 1-1.0212.14500.RP Fi ure-1 the breaks in the sections. Figure-1&2 H.0212.14400.R P 145" 144" 144" 145" R 0212.14400.R P � 1_. ",. lamb the rafters after you install them 4_P.0212 14FM RP '77--- Fill in remaining rafters at 24"OC. Except for the end rafters which are 25"OC. Rafter Span Across L Figure-3 Fi u—re-2 Sections of Ri_ dQe 25" 25" 24" On Center-Typical f f Flush To Gable Sidin 1 Fi a-3 www.JamaicaCottageShop.com Page 35 Jamaica Cottage Shop, Inc. 170 Winhall Station Road S. Londonderry,VT 05155 Voice 802-297-3760 Fax 802-297-2825 plans@JamaicaCottageShop.com 24A8 Equipment Shed Plumbing Ratters After the rafters are installed they need to be plumbed.Create a brace by nailing 2-12'2x4's together.Use 2x4x36"pieces to span the joint and nail on each side. Figure-1 Attach the brace to the ridge and extend down to the floor at a 45 degree angle. Push on the brace to bring the rafters to plumb and then attach the bottom of the brace to a 2x4 block on the floor. Figure-2 Fi ure-1 q—H .0204.03600 .TB H.0204. 14400 .TB Joined 2x4 Brace-24" Long Fi ure-2 � IJJ i i .R Span Frame to Ridge ith a straight board Use the braces to rack the rafter to plumb. Then Secure the brace to a block on the Sills Fi ure-3 www.JamaicaCottageShop.com Page 36 � I �" / 1 i� 1 •� i � 1 i 1 / 1 _' 1 1 1 i �-�� ,I, it i1' ��► lip 1�► r ail IMF' 1 1 i i .s E, , ii �� ! llPY li !i , . �► �Il�n�ri��i ! )v �, 1111111,_____ _._. , f Jamaica Cottage Shop, Inc. 170 Winhall Station Road S. Londonderry,VT 05155 Voice 802-297-3760 Fax 802-297-2825 plans@JamaicaCottageShop.com 24A8 Equipment Shed Bird Blocking Fi re-1 P.0110.02218.BB 22 P.01 10.02238.B B(2) End Blocking Place bird blocking between the rafters to seal the overhangs.Use 1x10 For the front overhang.They will sit on the top plate and extend to the edge of the rafters. The rear rafters sit flush with the rear siding Figure 1&2 Fi ure-2 Rear raftelidin sit flush with rear Fi ure-3 www.JamaicaCottageShop.com Page 38 Jamaica Cottage Shop, Inc. 170 Winhall Station Road S. Londonderry,VT 05155 Voice 802-297-3760 Fax 802-297-2825 plans@JamaicaCottageShop.com 24A8 Equipment Shed Roof Strapping Leave first course 2"down from the ridge.This gives the ridge cap a spot to attach. Figure-1 The next courses will go 24"on center. Use a level to set the last 2 11 2" course so it does not interfere with the trim. Figures-2 Stagger seams on the course as you progress down- Figure3&4 H.0104.19200.RS 24 Fi ure-3 T i Roof strapping can be split in 2' Increments 1 Stagger the seams between courses H.0104.19200.RS 33 Fi =ure-4 i IS1f�T T7-7 7- : i _ lJ•IJ/)�TT-T-T TAT _T-T�1 t i--L7i I -V- -T T 7TF TT T 1 11i / [ __l-_T —r T—-- _-- , - --- Loof strapping can be split in 2' Increments ta er the seams between courses Fi ure-2 www.JamaicaCottageShop.com Page 39 Jamaica Cottage Shop, Inc. 170 Winhall Station Road S. Londonderry,VT 05155 Voice 802-297-3760 Fax 802-297-2825 plans@JamaicaCottageShop.com 24A8 Equipment Shed Pier Configuration 5701/2" Fi ure-1 142 3/4" 142 1/2" 142 1/2" 142 3/4" X LDoors � 142" 141 141" 142" Measurements to Center of Piers If using piers to support the building,place one pier under each post location. Posts should be at least 48"Deep with a footing on the bottom. Be sure posts are square and level.Figure-1,2&3 12" Another option for piers is Helical threaded steel Gable and Rear Piers are centered posts.They are driven under Sills Z into the ground and then built on top of, the same " as concrete piers. Contact us for a recommended Fi ure-2 installer.Figure-4 00 v Front corner are inset to support Sills Recommended depth x 8" of piers is 48" on foot- ing in undisturbed soil. #t4 Reba r Reinforcement Figure-3 www.JamaicaCottageShop.com Page 20 11 WN -AmMINE 4L • . low SON AL ��•— 1��__�- �/, a u--� �/G--�'=%.■■. ■,� 0 1 1 1 APPROVED AS NOTED DATE-S-21-2-f B.P.# 507Z0 COMPLY WITH ALL CODES OF FEE$d I. O0 By; NEW YORK STATE&TOWN CODES REQU RED AND CONDITIONS OF NOTIFY BUILDING DEPARTMENT AT T 631-765-1802 SAM TO 4PM FOR THE FOLLOWING INSPECTIONS: TNIKG�� FOUNDATION--;;TWO REQUIRED V=TOWNTAUSTO FOR POURED CONCRETE tuDw ROUGH-FRAMING&PLUMBING SOUtII(}LDNPC INSULATION 01) FINAL-CONSTRUCTION MUST BE COMPLETE FOR C.O. ALL CONSTRUCTION SHALL MEET THE REQUIREMENTS OF THE CODES OF NEW YORK STATE. NOT RESPONSIBLE FOR DESIGN OR CONSTRUCTION ERRORS Il'b llrJcJ L' uC`E Ca iuu,E-pj RETAIN STORM WATER RUNOFF PURSUANT TO CHAPTER 236 OF THE TOWN CODE All exterior lighting Installed,replaced or repaired shall conform to Chapter 172 of the Town Code pz N26°02'40"W 'n 150.00' - - - - - - - - - - - - - 1 � I � I Q Lu '�,r J IO.O' I Q MIN. � c c 6' o Q I _ � PROPOSED EQUIPMENT SHED a0 ,s_ O L cu -- i I OX N 771 FACE E O C>3 1 r- k,, c s Q o a• xY i i A r -001 ,O0 LOCATION &SCOPE � I � � �. , ��� h� •;� � ,t „ . � F PROJECT LO ATI SITE PLAN &ZONING DATA r4 ryya # aS «r,r GENERAL NOTES LU O 002.00 ENERGY TABLE • I 4 ` STRUCTURAL DESIGN CHARTS e`r. F i� I —OO�.00 HOLDOWN,ANCHOR BOLT, • STRAPPING, & NAILING DETAILS FASTENING SCHEDULELu '.�'—� t I C�-0O4.00 FRAMING GRAPHICS BEAM CONNECTION PATTERNS r 1 FIREBLOCKING DETAILS U A-101 ,0O PROPOSED FOUNDATION PLAN • PROPOSED FLOOR PLAN I I LOCATION MAP W z z SCALE: NTS A-201 ,00 PROPOSED EXTERIOR ELEVATIONS Q x x —�j0 ,0O BUILDING SECTIONS i I DESIGN DETAILS JAMA I C A GOTTAOE SHOP 24X4a EOU I FMENT SHED I I I I I I I I FO�EGT DATA : DRAINAGE SYSTEM INSTALLATION NOTES: i • A MINIMUM 10' 5EPARATION 15 REQUIRED BETWEEN DRYWELLS 8 PROJECT / ZONING DATA WATER SERVICE LINE, UNDERGROUND UTILITY LINES, SEPTIC COMPONENTS, LEAGHINS FIELDS, SEWER COMPONENTS, OTHER EXIST. EXIST. DRYWELLS, AND THE EDGE OF ALL FOUNDATION WALLS SHED SHED TAX MAP # 1000-100.-4-II • A MINIMUM 5' SEPARATION 15 REQUIRED BETWEEN DRYWELLS 8 ZONING DISTRICT AG NON CONFORMING A MIN MUM 2O' SEPARATION 15 REQUIRED BETWEEN DRYWELLS AND _ BURIED PROPANE FUEL TANKS. EXIST. 5AINITARY SYSTEM _ �- -(I) 1000 GAL SEPTIC _ , � I LOT AREA 1.0 ACRES CONNECT ALL GUTTER LEADERS TO NEAREST DRYWELL • SEE ALSO DETAIL THIS PACE. \ CofO - ONE FAMILY DWELLING #Z 10116 08/2511150 TANK (5T) I n XIS I DRAINAGE CALCULATIONS -(2) V MIA X 6' H10H "� DW Cof0 -COVERED PORCH #57470 05/12/2015 LEACHING POOL (LP) X ADDITION AND ALTERATION NEW IMPERVIOUS SURFACE AREA; en CofO - ADDITION/ALTERATION #5g760 07/11/2018 PROPOSED EQUIPMENT SHED 1,256 S.F. z TO DWELLING uj LP a (2"5TORAINFALL EVENT x VOLUME OROOF COVERAGE) 20a.5 G.F. o ST 22.4' STORAGE PROVIDED PER VERTICAL FOOT 42.2 G F U LOT COVERAGE OF 5'0 DRYWELL DEPTH TOTAL DRYWELL DEPTH REQUIRED SOUTHOLD TOWN CODE 2aC-5 (VOL. REO'.D / VOL. PROV. PER FT DEPTH) 5.0 FT. EXIST. L 07 PROVIDE (I) 8'� x 5' DEEP DRYWELL u.l OUTDOOR DESORPTION (FOOTPRINT) AREA COVERAGE a BASEMENT o ENTRY "B I L I GO TOTAL LOT AREA 45,560.0 S.F. 2 I' 37.8' I DOOR" EXISTING DWELLING 2,446.0 S.F. 5.6% 5" THICK REINFORCED CONCRETE PROJECT: EXISTING SHEDS 192.0 S.F. 0.4% GRASS SHOULDER AREA (TYP) 24" DIAMETER SH I PMAN f(� EXIST. DWELLING; NO I PROPOSED EQUIPMENT SHED 1,151.0 S.F. 2.6% OR F N SURFACE COVER 8 FRAME PROPOSED WORK EQUIPMENT SHED TOTAL AREA OF ALL STRUCTURES 578a.0 S.F. 8.7g6 MAXIMUM LOT COVERAGE ALLOWED: 20gb I — ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ z 4745 ELIJAHS LN 60.4' g _1 11= ° ° ° ❑ ° ❑ ° ❑ ❑ ° ❑ I=1 I MATTITUCK NY 11952 ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ EXIST. PORCH EXIST. I AGCES50RY STRUCTURE REQUIREMENTS I—I �_�1 -� / DRIVEWAY ry -III- I PRECAST GONG. DRAWING TITLE: EXIST. UNDERGROUND 50UTHOLD TOWN GODS 280-I5 Qz I I=j I I lwaTER LEACHING RING. SEE PROJECT LOCATION &SCOPE WATER LINE FROM WELL I PROPOSED COMPLIES CALCULATIONS ON TO HOU5E / EXIST. WALKWAY SITE PLAN FOR REOV SITE PLAN & ZONING DATA EFFECTIVE DEPTH 2'—O" DIAMETER AS 2'—O" MAXIMUM HEIGHT 22, IC1.5' YES MIN. PER SITE PLAN MIN. CLEAN SAND 4 GRAVEL FILL MINIMUM SIDE YARD 15.0' 15.0' YES EXIST. WELL PAGE: i MINIMUM REAR YARD 15.0' 15.0' YES I I K I I W MAX. SQUARE FOOTAGE 1,200 S.F. 1,151.0 S.F. YES G-001m00 p , 0 � I i 0 m — DATE: 04/09/24 1 OF 6 — — — — — — — — z 526°02'40"E 150.00' SITE LAYOUT NOTES: I. THI5 15 AN ARCHITECT'S SITE PLAN $ IS SUBJECT TO VERIFICATION BY A LICENSED SURVEYOR. THE: INFORMATION � REPRESENTED ON THIS SITE PLAN 15 TO THE ARCHITECT'S BEST OF KNOWLEDGE. EL ( J S 2. SURVEY INFORMATION WAS OBTAINED I " " ``• ;w FROM A SURVEY DATED JULY I6 200el a aFr t c AND PREPARED BY: JOHN G. EHLERS LAND SURVEYOR H p E :.. r b EAST MAIN STREET RIVERHEAD N.Y. 1Ig01 _. -. SITE PLAN SCALE: 1" = 15'-0" NOTES SP:�G I I GAT I ONS FOUNDATION, CONCRETE. AND MASONRY CARPENTRY WOOD FRAMING MATERIAL STANDARDSBBR Y I AT I O I`t.J IT 15 THE CONTRACTOR'S RESPONSIBILITY TO KEEP THIS GONSTRUGTON DOCUMENT BINDED I. CONTRACTORS TO VERIFY ALL DIMENSIONS OF EXISTING FOUNDATION AS IT I. ALL LUMBER SHALL BE DOUGLAS FIR LARCH #2 4 BETTER (Fb = 5-15) UNLE55 THE PROVISIONS OF THI5 STANDARD ARE NOT INTENDED TO PREVENT THE USE TO&ETHER AT ALL TIMES. IT 15 ALSO THE CONTRACTOR'S RESPONSIBILITY TO READ ALL NOTES, APPLIES TO THE NEW WORK BEING PERFORMED AND SHALL COORDINATE THE OTHERWISE NOTED. OF ANY MATERIAL OR METHOD OF CONSTRUCTION NOT SPECIFICALLY BD. BOARD IN5UL. INSULATION SUB-GONTRAGTOR5 IN SUCH A MANNER TO ASSURE THAT THE CONDITIONS OF PRESCRIBED HEREIN. WHEN IT CAN BE SHOWN, AND THE AUTHORITY HAVING SPECIFICATIONS,AND BE FAMILIARIZED WITH THE PLANS PRIOR TO WORK THE FIRST AND SECOND FLOORS ARE TAKEN INTO ACCOUNT. 2. ALL LUMBER IN CRAWL SPACES TO BE I6" ABOVE SCRATCH GOAT. MAINTAIN JURISDICTION FINDS BY EXPERIENCE, MODELING, OR TESTING BY AN APPROVED f2 6" MIN. FOUNDATION EXPOSURE. AGENCY, THAT A PRODUCT OR PROCEDURE PROVIDES EQUIVALENT OR BFE BASE FLOOD ELEVATION INT. INTERIOR Q GENERAL 2. ALL FOOTINGS TO BEAR ON FIRM,VIRGIN, UNDISTURBED SOIL GREATER STRUCTURAL SAFETY OR DURABILITY, SUCH PRODUCT OR PROCEDURE BLDG. BUILDING K KIP5 (1000 LB5) 0 I. NO WORK TO START UNTIL APPROVED PLANS ARE OBTAINED FROM THE 3. SILLS TO BE P.T. AND SECURELY FLASHED WITH A TERMITE SHIELD, ALSO SHALL BE DEEMED TO CON=ORM TO THE REQUIREMENT5 OF THIS DOCUMENT W APPLICABLE BUILDING DEPARTMENT. 3. SOIL TO HAVE MIN. BEARING CAPACITY OF (I) TON/50. FT., U.O.N. PROVIDE SILL SEAL/INSULATION. SIZE OF SILL TO BE (2) 2"xb", UNLESS (1) 2"xb" (THIS DOCUMENT 15 TO MEAN A REFERENCE TO THE CURRENT AMERIGAN WOOD BM BEAM MANU. SPEG.'s MANUFACTURER'S SPECIFICATIONS LL1 15 NECESSARY TO MATCH FLOOR HEIGHTS WITH THE EXISTING STRUCTURE. GOUNCIL'5 WOOD FRAME CONSTRUCTION MANUAL AND THI5 PS FORMAT, AS J cu 2. ALL CONSTRUCTION SHALL BE PERFORMED IN A WORKMAN LIKE MANNER. 4. FOOTINGS TO REST A MIN. OF 4'-0" BELOW GRADE, UNLESS APPLICABLE AS A DERIVED WORK). B.O. BOTTOM OF MAX. MAXIMUM fh ALL DIMENSIONS, CONDITIONS, AND APPLICABLE INFORMATION OF EXISTING OTHERWISE NOTED 4. AT FLUSH FRAMING USE Ib CA6E METAL JOISTS HANGERS BY "TECO" OR Q 4- N STRUCTURE/SITE SHALL BE FIELD VERIFIED BY GENERAL CONTRACTOR. EQUAL. I. IDENTIFICATION: ALL SOLID-SAWN LUMBER, GLUED LAMINATED TIMBER, BOT. BOTTOM MEGH. MEGHANIGAL .O 5. WALLS TO $E POURED CONCRETE OF SIZE SHOWN ON DRAWINGS, U.O.N. PREFABRICATED WOOD I-JOISTS, STRUCTURAL COMPOSITE LUMBER, r 5. ALL WORK SHALL CONFORM TO NATIONAL, STATE, AND LOCAL CODES 5. MINIMUM, DOUBLE HEADERS AND TRIMMERS AROUND ALL OPENIN65 IN PREFABRICATED WOOD TRUSSES, GYPSUM, HARDBOARD, AND STRUCTURAL B.O.W. BOTTOM OF WALL MIN. MINIMUM AND AUTHORITIES HAVING JURISDICTION. b. NO BACK FILL SHALL BE PLACED AGAINST FOUNDATION WALLS FLOORS,ROOFS, AND WALLS. PANELS, SHALL CONFORM TO THE APPLICABLE STANDARDS OR GRADING -0 Q UNTIL 1�1 TIER OF FRAMING 15 IN PLACE. RULES SPECIFIED IN 1.1 THROUGH 1.6. G.J. CEILING .JOIST NAVD55 NORTH AMERIGAN VERTICAL DATUM OF Ig88 >: (.04. ALL UNNOTED OR NON-VI5IBLE EASEMENTS ARE THE RESPONSIBILITY b. DOUBLE ALL JOISTS UNDER PARALLEL PARTITIONS, POSTS, AND BATH TUBS, i z 0 7. FOOTINGS TO BE POURED CONCRETE OF SIZE SHOWN ON DRAWINGS. U.O.N. I.I. LUMBER: ALL WOOD MEMBER5 USED FOR LOAD-BEARING PURPOSES, O O N OF THE OWNER/BUILDER COL. COLUMN NYC. BG NEW PORK CITY BUILDING GODS INGLUDIN6 END-JOINTED AND EDGE-GLUED LUMBER, SHALL BE IDENTIFIED a '� In _�e "t 5. ANY OMISSIONS OR DISCREPANCIES OF PLANS AND/OR JOB CONDITIONS 5. ALL OPENINGS FOR BEAM POCKETS, UTILITIES, ETC. TO BE FILLED -i. ALL BEAMS, GIRDERS, ETC. TO HAVE MIN. OF 3-I/2" BEARING BY THE 6RADEMARK OF A LUMBER 6RADIN6 OR INSPECTION A6ENGY CONT. CONTINUOUS O.G. ON CENTER � x L N SHALL BE CLARIFIED WITH THE ARCHITECT/EN6INEER BEFORE PROCEEDING SOLID WITH CONCRETE. WHICH PARTICIPATES IN AN ACCREDITATION PROGRAM, SUCH AS THE WITH THE WORK. 5. MIN. HEADER TO BE (2) 2"xl0" UNLESS OTHERWISE NOTED. AMERIGAN LUMBER STANDARDS COMMITTEE OR EQUIVALENT. THE DBL. DOUBLE OGG. OCCUPANCY O O O C9 q. ANCHOR BOLTS SHALL BE IN ACCORDANCE WITH PAGE 6-003. 6RADEMARK SHALL INCLUDE AN EASILY DISTINGUISHABLE MARK OR O m 6. NO DEVIATIONS OR CHANGES TO THE STRUCTURAL SYSTEM SHALL BE MADE q. ALL WOOD SILLS AND WOOD IN CONTACT WITH MASONRY/CONCRETE TO BE IN51CPNIA OF THE 6R.ADIN6 AOENGY WHICH COMPLIES WITH THE DE DFE SIGN FLOOD ELEVATION O.H. OVERHANG "~' Nco UNLESS APPROVED BY THE ARGHITECT/EN6INEER. 10. ALL CONCRETE TO HAVE AN ULTIMATE COMPRESSIVE 5TRENGTH AT 26 F.T. REQUIREMENTS OF U.S. DEPARTMENT OF COMMERCE P520-qq. O O O DAYS OF 4,000 P.5.1., U.O.N. Q T CONTRACTOR TO VERIFY DIMENSIONS OF FOUNDATION WITH FLOOR PLANS 10. ALL EXTERIOR SHEATHING SHALL BE NAILED AS PER FASTENING SCHEDULE 1.2. GLUED LAMINATED TIMBERS: GLUED LAMINATED TIMBERS SHALL MEET DIM. DIMENSION PBFE PRELIMINARY BASE FLOOD ELEVATION BEFORE THE START OF FRAMING II. GONG. SLAB5 TO REST ON MIN. OF 6 FINE GRAVEL OR SAND WITH ON PACE 6-003. GENERALLY, SHEATHING 15 OF 1/2" THICKNESS ON WALLS AND THE PROVISIONS OF AN51/ALTO A 1 010.1 STRUCTURAL GLUED LAMINATED D.J. 11 DECK JOISTS P. GONG. POURED CONCRETE 6 MIL. POLYETHYLENE VAPOR BARRIER UNDER ROOF AND IS OF GDX GRADE, UNLESS OTHERWISE NOTED. SEE FLOOR PLANS TIMBERS. 6. DRY WELLS AS REQUIRED BY STATE AND LOCAL CODES. FOR ADDITIONAL NAILING OR DIFFERENT NAILING REQUIREMENTS WHEN EA. EACH PL. PLATE 12. COPPER FLASH ALL JOINTS WHERE SLAB ABUTS FRAMING. APPLICABLE. 1.3. PREFABRICATED WOOD I-JOISTS: ASSEMBLIES USING PREFABRICATED ^ ` q. DO NOT SCALE DRAWINGS, WRITTEN DIMENSIONS TAKE PRECEDENCE WOOD I-JOISTS SHALL MEET THE PROVISIONS OF A57M M5055 ELEV. ELEVATION PLYWD. PLYWOOD W 15. BRICK VENEER TO BE ANCHORED WITH CORROSION RESISTANT TIES - 11. SUB FLOORING, GENERALLY, TO BE OF 3/4" THICKNESS AND OF GDX GRADE. STANDARD SPECIFICATION FOR ESTABLISHING AND MONITORING 10. OWNER/BUILDER ARE RESPONSIBLE FOR ALL INSPECTIONS, APPROVALS, (1) WALL TIE PER (5) 50. FT. NAILING AS PER FASTENING 50HEDULE ON PAGE 5-003 AND GLUED, U.O.N. STRUCTURAL CAPACITIES OF PREFABRICATED WOOD I-JOISTS,THIS EQUIP. EQUIPMENT 11 P.T. PRESSURE TREATED CERTIFICATES, CERT. OF OCCUPANCY OR COMPLETION AND U.L. APPROVAL DOCUMENT,THE GOVERNING BUILDING CODE AND ANY ADDITIONAL 14. FLASH JOINT AT BRICK LEDGE AND PROVIDE WEEP HOLES, 12. EXTERIOR SHEATHING TO BE COVERED WITH 'TYVEK' HOUSE WRAP OR REQUIREMENTS AS SET FORTH IN THE MANUFACTURER'S CODE EXIST. EXISTING REQ D REQUIRED 11. THESE SET OF DR.AWIN65 ARE THE: PROPERTY OF ANTHONY PORTILLO, RA MAX. 32-0 O.G., TO DIRECT ANY CONDENSATION TO THE EXTERIOR. APPROVED EQUAL. EVALUATION REPORT AND SHALL NOT BE ALTERED OR BE: REPRODUCED WITHOUT WRITTEN 15. APPLY (1) GOAT OF TAR BASED WATERPROOFING TO EXTERIOR OF FOUND. 15. BLOCK EXTERIOR STUD WALLS AT HALF STORY HEIGHTS AND AT 1.4. STRUCTURAL COMPOSITE: LUMBER: SINGLE MEMBERS OR ASSEMBLIES EXT. � EXTERIOR RI RISER "�J PERMISSION FROM THE ARCHITECT. " � 1 FROM FOOTING TO 2 ABOVE FINISH GRADE. UNSUPPORTED EDGE SEAMS OF EXTERIOR SHEATHING. USING STRUCTURAL COMPOSITE LUMBER SHALL MEET THE PROVISIONS OF F.A.I. FRESH AIR INTAKE RM. -� ROOM v - 12. THE ARCHITECT IS NOT RETAINED FOR SUPERVISION OF THE WORK AND 15 ASTM D5456 STANDARD SPECIFICATION FOR EVALUATION OF RESPONSIBLE FOR DESIGN INTENT ONLY. 16. NO CONCRETE OR MA50NRY WORK 15 TO BE PERFORMED IN TEMPERATURES 14. PROVIDE 'X' CR055 BRACIN6 AT JOISTS, STUDS, AND RAFTERS WHEN 5PAN5 6 STRUCTURAL BUO DI OG SITE LUMBER PROD ANY UCTS, THI5 DOCUMEN, THE REQUIREMENTS AS FAR FLOOR AREA RATIO R.R. ROOF RAFTER Q� OF 40 F AND FALLING, UNLESS APPROVED BY ARCHITECT/ENGINEER. NO EXCEED 8-O AND AT EVERY 8-O . VERNINO 15. THE CONTRACTOR SHALL OBTAIN CERTIFICATE OF OCCUPANCY. CONCRETE SHALL BE PLACED ON FROZEN SURFACES. SET FORTH IN THE MANUFACTURER'S GORE EVALUATION REPORT. F A V. FRESH AIR VENT STL. -� STEEL 15. TOP PLATES TO BE DOUBLED AND LAPPED AT CORNERS, SEE ALSO PAGE 14. THE CONTRACTOR SHALL KEEP PREMISES REASONABLY GLEAN AT ALL 1'1• NO ADDITIVES SHALL BE PLACED IN CONCRETE UNLE55 SPECIFIED BY 6-004. 1.5. PREFABRICATED WOOD TRUSSES: ASSEMBLIES USING PREFABRICATED ■ TIMES. AT THE COMPLETION OF WORK, THE CONTRACTOR SHALL REMOVE ALL ARCHITECT/ENGINEER. WOOD TRU55ES SHALL MEET THE PROVISIONS OF TH15 DOCUMENT, THE FF FINISHED FLOOR S.V. SMART VENT RUBBISH, WASTE MATERIALS, TOOLS, ETC., GLEAN 6LA55 AND LEAVE WORK 16. APPLY ALL CONDITIONS ADDRESSED IN FASTENING SCHEDULE AS 60VERNING BUILDING CODE,AND ANY ADDITIONAL REQUIREMENTS AS BROOM GLEAN. I6. PROVIDE BITUMINOUS JOINTS BETWEEN SLABS AND FOUNDATION WALLS AND NECESSARY. SET FORTH IN ANSI/TPI I NATIONAL ME516N STANDARD FOR METAL PLATE FF ELEV. FIRST FLOOR ELEVATION TBD TO BE DETERMINED WHERE EVER APPLICABLE. CONNECTED WOOD TRUSS CONSTRUCTION, THE TRU55 DESIGN DRAWINGS, r , 15. THE CONTRACTOR SHALL CARRY WORKMAN'S COMPENSATION AND GENERAL 11. PROVIDE ALL NAILING AND STRAPPING ADDRESSED ON PAOF5 0-003. OR THE MANUFACTURER'S CODE EVALUATION REPORT. F.J. FLOOR JOISTS TEMP GL. TEMPERED 5LAS5 v LIABILITY INSURANCE. ALL SHALL COMPLY WITH STATE AND LOCAL CODES Iq. UNLESS OTHERWISE INDICATED, ALL FOUNDATION FOOTIN05 ARE TO BE A AND ORDINANCES. MIN. 10" DEEP PROJECTING 6" ON EACH 51ME OF THE FOUNDATION WALL. lb. AT "WET WALL" PARALLEL TO JOISTS FRAME DOUBLE JOIST AS PER CODE. 1.6. GYPSUM: GYPSUM MATERIAL USED IN A STRUCTURAL APPLICATION SHALL FOUND. FOUNDATION THK. THICK PROVIDE TWO #4 DEFORMED BARS CONTINUOUS IN THE FOOTING. ALL 4" THICK GENERALLY, SEPARATE DOUBLE JOIST THE THICKNESS OF WALL ABOVE. SUB MEET THE PROVISIONS OF A5TM 036 SPECIFICATION FOR CYP5UM 16. THE CONTRACTOR SHOULD FULLY GUARANTEE H15 WORK AND THE WORK OF CONCRETE SLAB5 TO HAVE bxb 10/10 WELDED WIRE REINFORCING. FLOOR SHALL NEVER EXCEED A I6" SPAN. WALLBOARD, A5TM C51 SPECIFICATION FOR GYPSUM LATH, OR ASTM C7q FRGE FLOOD RESISTANT GONSTRUGTION ELEVATION T.O.W. TOP OF WALL ' ^ THE SUB-CONTRACTORS FOR A PERIOD OF AT LEAST ONE YEAR AFTER SPECIFICATION FOR GYPSUM SHEATHING BOARD. v COMPLETION OF PROJECT. 20. FOR SECOND STORY ADDITIONS, EXIST. FOUNDATIONS ARE TO BE VERIFIED Iq. AT ROUGH OPENINGS PROVIDE ALL APPLICABLE NAILING AND STRAPPING FR. FRAME Tr TREAD n 1 AS IN SOLID 4 SOUND CONDITION WITH AN EXIST. FOOTING OF MIN. lb" WIDE x 6" AS PER PAGE 6-003. LT HARDBOARD: HARDBOARD USED IN A STRUCTURAL APPLICATION SHALL VJ 11. THE CONTRACTOR SHALL INDEMNIFY AND HOLD HARMLESS THE OWNER, DEEP 4 3'-0" BELOW 61RADE. MEET THE PROVISIONS OF ANSI/AHA A135.4 BASIC HARDBOARD OF FRPR. FIREPROOF TYP. TYPICAL Q ARCHITECT/ENGINEER, AND THEIR A0ENT5 AND EMPLOYEES FROM AND 20. P.T. SPECIFIES PRESSURE PRE5ERVATIVELY TREATED LUMBER IN AN51/AHA AL35.6 HARDBOARD SIDING. AGAINST ALL CLAIMS, DAMA6E5, LOSSES AND EXPENSES, INGLUDIN6 ACCORDANCE w/ AWPA 022;WHERE DRILLING AND/OR GUTTING OCCURS, FIELD 1.8 STRUCTURAL PANELS: FTC. FOOTING U.O.N. UNLE55 OTHERWISE NOTED ATTORNEYS FEES ARI51N6 OUT OF OR RE5ULTIN6 FROM THE PERFORMANCE OF TREAT LUMBER w/ COPPER NAPTHENATE WHICH SHALL CONTAIN 2% COPPER THE WORK PROVIDED THAT ANY SUCH CLAIM, DAMAGE, LOSS OR EXPENSE (A) SITE WORK METAL BY REPEATED BRUSHING, DIPPING, OR SOAKING UNTIL THE WOOD GYP. BD. GYPSUM BOARD VERT. VERTICAL 15 ATTRIBUTABLE TO BODILY INJURY, SICKNESS, DISEASE OR DEATH OR TO ABSORBS NO MORE. ALSO, FOR HARDWARE USED WITH P.T. LUMBER, 1.6.1. PLYWOOD: PLYhOOD USED IN STRUCTURAL APPLICATIONS SHALL INJURY TO OR DESTRUCTION OF TANGIBLE PROPERTY (OTHER THAN THE WORK 1. STAKEOUT 15 TO BE PERFORMED BY A LICENSED SURVEYOR CONTRACTOR 15 TO INSTALL HARDWARE THAT 15 SPECIFIED BY P.T. LUMBER MEET THE PROVISIONS OF U.S. DEPARTMENT OF COMMERCE H.D. HOLD DOWN V.I.F. VERIFY IN FIELD ITSELF INGLUDIN6 THE LOSS OR USE RESULTING THEREFROM). (5) IS CAUSED IN 2• VERIFY ALL GIVEN DATA ON DRAWINGS. IF THERE IS A DISCREPANCY, MANUFACTURER SUCH AS: HANGERS, NAILS, SCREWS, FLASHING, ANCHOR BOLTS, VOLUNTARY PRODUCT STANDARD I (PS 1) CONSTRUCTION AND WHOLE OR IN PART BY ANY NEGLI6E:NT ACT OR OMISSION OF THE REVERIE CLARIFICATION FROM ARGHITE S. IF INER PRIOR IS PROCEEDING. ETC. FOR LOCATIONS SUCH A5: LEDGER BD., SILL PLATE, DECK CONSTRUCTION, INDUSTRIAL PLYWOOD, U.S. DEPARTMENT OF COMMERCE VOLUNTARY HDR HEADER w/ WITH CONTRACTOR,IN ANY BY ANY ANYONE DIRECTLY OR INDIRECTLY ETC. ANY REFERENCES TO GGA ARE TO REPLACED WITH P.T. PRODUCT STANDARD 2 (P52) PERFORMANCE STANDARD FOR EMPLOYED BY ANY OF THEM, OR ANYONE FOR WHOSE ACTS ANY OF THEM MAY 3. EXCAVATE AND BACK FILL FOR WORK INDICATED ON DRAWIN65. WOOD-BASED STRUCTURAL- USE PANELS, APPLICABLE CODE HNGR HANGER ""' WOOD BE LIABLE REOARDLE55 OF WHETHER OR NOT IT 15 CAUSED IN PART BY A STOCKPILE TOPSOIL OBTAINED FROM STRIPPING DRIVEWAY AND BUILDING 21. LVL (LAMINATED VENEER LUMBER) DENOTES EITHER OF THE FOLLOWING: EVALUATION REPORTS. PARTY INDEMNIFIED HEREUNDER. SITE. STOCKPILE ALL EXCAVATED MATERIALS. A. WEYERHAEUSER TRU5 J015T 2.OE MICROLLAM LVL HOB. HORIZONTAL ZR ZONING RESOLUTION B. 6EOR61A PACIFIC 2.OE 5-P LAM LVL 1.6.2. ORIENTED-STRAND BOARD (055), WAFERBOARD ORIENTED-STRAND 15. ALL MATERIALS, ASSEMBLIES, AND METHOD OF CONSTRUCTION INGLUDIN6 4. NEW AND EXISTING BACK FILL MATERIAL ARE TO BE FREE OF WEEDS, TREE PSL (PARALLEL STRAND LUMBER) DENOTES: BOARD OR WAFERBOARD USED IN STRUCTURAL IONS SHALL MEET BUT NOT LIMITED TO FORM-WORK, BLOCK-WORK, FRAMING,NAILING, PLACING ROOTS, ROCKS, AND DEBRIS. ALL SURPLUS MATERIAL THAT 15 UNSUITABLE A. WEYERHAEU5ER TRU5 J015T 2.2E PARALLAM P5L THE PROVISIONS OF U.S. DEPARTMENT OF COMMERCE VOLUNTARY OF CONCRETE, ETC. ARE TO BE CAREFULLY SUPERVISED BY THE CONTRACTOR FOR BACK FILL MATERIAL SHALL BE REMOVED FROM SITE. ALL TO BE INSTALLED AS PER MANU. SPEC.'s PRODUCT STANDARD 2 (P52) PERFORMANCE VOLUNTARY PRODUCT TO BE SURE THEY ARE IN ACCORDANCE WITH THE DRAWIN65, SPECIFICATIONS, STANDARD FOR WOOD-BASED STRUCTURAL- USE PANELS OR APPLICABLE CODES AND 600D PRACTICE. DEVIATIONS FROM THE DRAWINGS 5. PROTECT TREES WITHIN EIGHT FEET OF THE BUILDING. 22. ]-JOIST FLOOR SYSTEMS SHALL BE IN ACCORDANCE WITH THE WOOD APPLICABLE CODE EVALUATION REPORTS. AND SPECIFICATIONS WILL NOT BE PERMITTED WITHOUT WRITTEN FRAMING MATERIAL STANDARDS SECTION, THE COVERNINC BUILDING CODE, AUTHORIZATION OF THE ARGHITECT/E°NCINEER. AND ANY ADDITIONAL REQUIREMENTS SET FORTH IN THE MANUFACTURER'S 1.6.3. PARTICLE BOARD: PARTICLE BOARD USED IN STRUCTURAL CODE EVALUATION REPORT. APPLICATIONS SHALL CONFORM TO ANSI A205.1 AND ANY Iq. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ANY SHOP DRAWINGS REQUIREMENTS AS SET FORTH IN THE MANUFACTURER'S CODE NEEDED, UNLESS OTHERWISE SPECIFIED. ALL DIMENSIONS AND CONDITIONS 6LA55 WINDOWS AND DOORS 25. NOTCHES IN THE TOP OR BOTTOM EDGE OF SOLID SAWN RAFTERS SHALL EVALUATION REPORT. PERTAINING ARE TO BE FIELD VERIFIED. I. ALL 6LA55 TO BE INSULATED LOW-E, UNLESS OTHERWISE SPECIFIED. NOT BE GUT IN THE MIDDLE ONE-THIRD OF THE RAFTER SPAN. NOTCHES IN THE OUTER THIRDS OF THE SPAN SHALL NOT EXCEED ONE-SIXTH OF THE ACTUAL 1.5.4. FIBERBOARD: FIBERBOARD USED IN STRUCTURAL APPLICATIONS 20. GONTRAGTOR TO REMOVE 4 RELOCATE AS REQUIRED ALL EXI5TIN& WORK 2. 6LA55 DOORS AND WINDOWS SHALL NOT BE INSTALLED UNTIL PROPER RAFTER DEPTH. WHERE NOTCHES ARE MADE AT SUPPORTS THEY SHALL NOT SHALL MEET THE PROVISIONS OF ANSI/AHA AIg4.1 CELLULOSIC. WHICH INTERFERES WITH NEW CONSTRUCTION IN A WORKMAN LIKE MANNER. CLEARANCES ARE PROVIDED. EXCEED ONE-FORTH THE ACTUAL RAFTER DEPTH. BORED HOLES ARE LIMITED FIBERBOARD OR ASTM 0206 STANDARD SPECIFICATION FOR IN DIAMETER TO ONE-THIRD THE ACTUAL RAFTER DEPTH AND THE EDGE OF THE CELLULOSIC, FIBER INSULATING BOARD. 21. ALL MATERIALS ARE TO BE INSTALLED AS PER MANUFAGTURER'5 5. ALL SLIDING &LA55 DOORS, 5KYLIOHT5, AND ANY CLASS UNIT INSTALLED HOLE SHALL NOT BE CLOSER THAN 2 INCHES TO THE TOP OR BOTTOM EDGES. SPECIFICATIONS, UNLESS NOTED OTHERWISE. 1.6.5. STRUCTURAL PANEL SIDING STRUCTURAL PANEL SIDING USED IN WITHIN 18 OF FIN15HED FLOOR SHALL BE OF INSULATED TEMPERED 6LA55, 24. NOTCHES IN EITHER EDGE OF STUDS SHALL NOT BE LOCATED IN THE STRUCTURAL APPLICATIONS SHALL MEET THE REQUIREMENTS OF U.S. UNLESS OTHERWISE NOTED. MIDDLE ONE-THIRD OF THE STUD LENGTH. NOTCHES IN THE OUTER THIRDS OF DEPARTMENT OF COMMERCE VOLUNTARY PRODUCT STANDARD 1 22. PROVIDE FIREBLOGKINC AS PER: NEW YORK ACCESSIBILITY STANDARDS. THE STUD LENGTH SHALL NOT EXCEED 25% OF THE ACTUAL DEPTH. BORED (1-5- 1), THE 60VERNIN5 BUILDING CODE, AND ANY ADDITIONAL 25. PLEASE NOTE THAT THESE PLANS ARE PROTECTED AGAIN5T ANY 4. ALL 6LA55 UNITS SHALL BE INSTALLED IN STRICT ACCORDANCE WITH HOLES SHALL NOT EXCEED 40% OF THE ACTUAL STUD DEPTH AND THE EDGE REQUIREMENTS AS SET FORTH IN APPLICABLE CODE EVALUATION UNAUTHORIZED USE UNDER FEDERAL LAW BY THE ARCHITECTURAL WORKS MANUFACTURER'S SPECIFICATIONS. OF THE HOLE SHALL NOT BE CLOSER THAN 5/5" TO THE EDGE OF THE STUD. REPORTS. COPYRIGHT PROTECTION ACT OF IggO (AWGPA), WHICH HAS SEVERE PENALTIES. 5. ALL WINDOWS TO BE CAULKED AND SEALED AS PER NEW YORK STATE NOTCHES AND HOLES SHALL NOT OCCUR IN THE SAME GROS5-5ECTION. ENERGY CONSERVATION CONSTRUCTION CODE. 2.2. FASTENERS AND CONNECTORS: ALL FASTENERS AND CONNECTORS SHALL 25. FOR NEW WALLS, A PERFORATED SHEARWALL SYSTEM IS USED. THE CONFORM TO THE STANDARDS SPECIFIED IN M 2.2.1 THROUGH M 2.2.1. GENERAL WIND PROTECTION CONNECTION NOTES: CONTRACTORS ATTENTION 15 DIRECTED TO THE APPLICABLE DETAILS, ADAPTED FROM STANDARD FOR HURRICANE RESISTANT RESIDENTIAL b. PROVIDE FLASHING PANS UNDER ALL SLIDING CLASS DOORS, WINDOWS, OR „ NOTES, AND TABLES ON PAGE 6-003 4 6-004. THE FASTENING SCHEDULE 2.2.1. BOLTS: BOLTS SHALL COMPLY WITH ANSI/ASME B 16.2.1 SQUARE AND CONSTRUCTION;55TV 10-qq AND 2018. 5BC HIGH WIND EDITION WOOD FRAME ANY OTHER TYPE OF 6LA55 UNIT WHEN WITHIN b OF AN EXTERIOR SURFACE. SPECIFIES THE REO'D NAILING FOR THE SHEATHING (ANY NAILING HEX BOLTS AND SCREWS (INCH SERIES). 12 CONSTRUCTION SPECIFICATIONS ON THE FLOOR PLANS SHALL SUPERSEDE THE FASTENING I. A CONTINUOUS LOAD PATH BETWEEN FOOTINGS, FOUNDATION WALLS, 1. ALL EXTERIOR DOORS ARE TO BE WEATHERED STRIPPED AND PROVIDE ALL SCHEDULE). HOLDOWN5 OPERATE IN CONJUNCTION WITH THE PERFORATED 2.2.2. LA6 5011REW5: LA6 SCREWS OR LA6 BOLTS SHALL COMPLY WITH ANSI/ FLOORS, STUDS AND ROOF FRAMING SHALL BE PROVIDED. SCREENS AND HARDWARE NECESSARY FOR PROPER FUNCTION OF SUCH UNITS. 5HEARWALL SYSTEM (INSTALL AS PER APPLICABLE DETAILS 4 MANU. SPEC.'s). ASME 130.2.1 SQUAB= AND HEX BOLTS AND SGREW5 (INCH SERIES). 0 O 2. APPROVED CONNECTORS, ANCHORS AND OTHER FASTENING DEVICES NOT 6. ALL &LA55 15 TO BE FREE OF SCRATCHES AND IMPERFECTIONS. 6LA55 HOLDOWN LOCATIONS ARE SPECIFIED ON THE FOUNDYFLOOR PLANS. 2.2.3. TRUSS METAL CONNECTOR PLATES: TRU55 METAL CONNECTOR PLATES U INCLUDED IN THE STANDARD BUIL.DIN6 CODE, SECTION 2506 OF IBC SHALL SHOULD BE GUARANTEED BY THE MANUFACTURER FOR A PERIOD OF 5 YEARS. 26. COLUMN BEARING A5 FOLLOWS: SHALL MEET THE REQUIREMENTS OF ANSI/TPI I NATIONAL DESIGN BE USED IN ACCORDANCE WITH MANUFACTURER'5 RECOMMENDATIONS. WOOD P05TING TO BE BLOCKED 50LIP TO FOUND. WALL w/END GRAIN, STANDARD FOR METAL PLATE CONNECTED WOOD TRU55 CONSTRUCTION, q. ALL WINDOWS TO BE ANDERSEN. IF CONTRACTOR IS TO SUBSTITUTE WITH TREATED WOOD 4 FLASHIN6. STEEL COLUMNS ARE TO BEAR UPON FOUND. THE &OVERNIN6 5UILDIN6 CODE, AND ANY ADDITIONAL REQUIREMENTS 3. METAL PLATES, CONNECTORS, SCREWS, BOLTS AND NAILS EXPOSED ANOTHER WINDOW MANUFACTURER, IT IS THE RESPONSIBILITY OF THE DIRECTLY TO THE WEATHER OR SUBJECT TO SALT CORROSION IN COASTAL CONTRACTOR TO VERIFY THAT THE CHARACTERISTICS OF THE WINDOW MATCH WALL w/ STEEL SHIMS 4 A MIN. 3/4" OF NON-SHRINK GROUT. AS SET FORTH IN THE MANUFACTURER'S GORE EVALUATION REPORTS.SECURE w/(2) I/2" m ANCHOR BOLTS (4" LONG EXPANSION BOLTS ® TABLF- R501 .1 CLIMATIC GEOGRAPHIC DESIGN CRITERIA AREAS SHALL BE STAINLE55 STEEL OR HOT DIPPED GALVANIZED. THE CHARACTERISTICS OF THE ANDERSEN WINDOW SPECIFIED. THE ci CHARACTERISTICS ARE AS FOLLOWS, BUT NOT LIMITED TO: DE516N PRESSURE, EXIST. WALLS 4 12" LONG HOOKED BOLTS ® NEW FOUND. WALLS). FOR ANY 2.2.4. METAL CONNECTORS WHERE METAL PLATE: OR STRAPPING SIZE AND ALLOWABLE DEFLECTION OF STRUCTURAL MEM5ER5 a 4. WHERE WINDOWS AND DOORS INTERRUPT WOOD STRUCTURAL PANEL ROUGH OPENING, U-FACTOR,LIGHT AREA, VENT AREA, AND E&RESS POSTING 0 G.M.U. WALL SEE PLAN FOR REQUIRED REINFORCING (® MIN. 16' 6A6E ARE SPECIFIED, MINIMUM ASTM A653, 5TRUGTURAL QUALITY, o SHEATHING AND SIDING, FRAMING ANCHORS OR CONNECTORS SHALL BE REQUIREMENTS. WIDE 3 COURSES OF SOLID BRICK MASONRY CENTERED ® POSTING,U.O.N). GRADE 33 STEEL SHALL BE USED. OTHER METAL GONNEGTOR5 SHALL GROUND SNOW LOAD 25 L55 PROVIDED AT THE TOP AND BOTTOM OF CRIPPLE STUDS, HEADER STUDS HOWEVER, WHEN COLUMN OR POSTING 15 PART OF THE LOAD PATH FOR USE MEET THE REQUIREMENTS OF THE C70VERNINO BUILDIN6 GORE AND ANY ALLOWABLE 'ME ADDITIONAL REQUIRENT5 AS SET FORTH IN THE MANUFACTURERS AND AT LEAST ONE STUD AT EACH SIDE OF OPENING. 10. WINDOWS IN TUB/SHOWER ENCLOSURES AND WITHIN STAIRWAYS SHALL BE IN A SHEARWALL, ALL ANCHORS MAKING AN ATTACHMENT ARE TO BE w/ STRUCTURAL MEMBER BASIC WIND SPEED 130 MPHPROJECT: TEMPERED 6LA55. STANDARD SHEARWALL HARDWARE (w/NOTED VALUES) 4 ANCHOR BOLTS, CODE EVALUATION REPORTS. DEFLECTION 5 RAFTERS�GS SHALL WHERE ATTACH T E5 OD TO EAI H FAIR 2OF O LUMBER IS I I. EXTERIOR GLAZING SHALL BE PROTECTED FROM WINDBORNE DEBRIS.OSINO U.O.N. WITH TOP GAF�5 ® STEEL COLUMNS TO BE MIN.Y4" BENT PLATE 6" LONG 2.2.5. NAILS: NAILS SHALT- COMPLY WITH ASTM F I66 7 STANDARD RAFTERS HAVING SLOPES GREATER THEN 5/12 F-XP05URE: CATEGORY B COLLARw/6 RISE 4 w/(2) /4 0 BOLTS THROUGH CENTER LINE OF VERTICAL LESS LOCATED IN UPPER THIRD OF ATTIC SPACE AND ATTACH TO EACH PAIR OF GLAZED OPENING PROTECTION SHALL MEET THE REQUIREMENTS OF THE LARGE SET 6" DIST.,U.O.N. - ADDITIONAL INFO. 15 FOUND ON PAGE 6-003. SPECIFICATION FOR DRIVEN FASTENERS: NAILS, SPIKES, AND STAPLES. L/I60 P M A N W/ NO FINISHED CEILING ATTACHED TO RAFTERS RAFTERS. MISSILE TEST OF ASTM Elggb AND ASTM EI666 AS MODIFIED BY 2020 NYS BG SEISMIC DESIGN GATECORY B EQUIPMENT S H E D SECTION 301.2.1.2.1. CARAOE DOOR GLAZED OPENING PROTECTION SHALL MEET 2.2.6• PNEUMATIC NAILS AND STAPLES: PNEUMATIC NAILS AND STAPLES 6. UPLIFT CONNECTORS SHALL BE PROVIDED AT EACH RAFTER BEARING. THE REQUIREMENTS OF AN APPROVED IMPACT-RESISTANT STANDARD OR SHALL MEET THE REQUIREMENTS OF THE GOVERNING BUILDING CODEAND ANY ADDITIONAL REQUIREMENTS AS SET FORTH IN THE INTERIOR WALLS 4 PARTITIONS H/160 AN51/DASMA 115. WEATHERING SEVERE 7. FLOOR TO FLOOR HOLD-DOWNS TO BE PROVIDED EVERY 45" AND EVERY MECHANICAL CONNECTIONS: MANUFACTURER'S CODE EVALUATION REPORTS. - FLOORS 4 PLASTERED CEILINGS L/360 „ 16" WITHIN 4' OF EXTERIOR CORNERS. 12. AS AN ALTERNATIVE TO NOTE #11 ABOVE, WOOD STRUCTURAL PANELS WITH 3-O A THICKNE55 OF NOT LESS THAN J" AND A 51-AN OF NOT MORE THAN 5' SHALL I. ALL MECHANICAL CONNECTIONS SPECIFIED AS "SIMPSON" MAY BE 2.2.7. SCREWS: SCREWS SHALL COMPLY WITH AN51/ASME B I6.6.1 FROST LINE DEPTH 5. SILL PLATE TO FOUNDATION ANCHORAGE;SILL PLATE SHALL BE ANCHORED BE PERMITTED A5 GLAZING PROTECTION. PANELS SHALL BE PRECUT AND SUBSTITUTED WITH AN APPROVED EQUAL PRODUCT. WOODSCREW5 (INCH SERIES). ALL OTHER STRUCTURAL MEMBERS L/240 4745 ELIJAHS LN TO THE FOUNDATION WITH ANCHOR BOLTS HAVING A MIN. BOLT DIAMETER ATTACHED TO THE FRAMING SURROUNDING THE OPENING. PANELS SHALL BE TERMITE MODERATE TO HEAVY OF9.1AND 3 x3 xj WASHERS. A MINIMUM OF ONE ANCHOR BOLT SHALL BE PREDRILLED AND SECURED WITH THE ATTACHMENT HARDWARE PROVIDED A5 2• THE SUBSTITUTION SHALL MEET ALL OF THE MINIMUM CRITERIA SPECIFIED EXTERIOR WALLS W/ PLASTER OR STUCCO FINISH H/360 MATTITUCK NY 11952 PROVIDED WITHIN 6 TO 12 INCHES OF EACH END OF EACH PLATE. ANCHOR PER THE ANGHORA&E METHOD SELECTED IN ACCORDANCE WITH TABLE BY SIMPSON MANUFACTURER. ICE BARRIER REQUIRED YES BOLTS SHALL HAVE A MINIMUM EMBEDMENT OFT' IN CONGRETE/MA5ONRY R301.2.1.2. ATTACHMENT HARDWARE SHALL BE PERMANENT FOUNDATIONS. ANCHOR BOLTS 514ALL BE LOCATED WITHIN 12" OR CORNERS CORROSION-RESISTANT AND THE ANCHORS SHALL BE PERMANENTLY INSTALLED 3. ALL LOADING CAPACITIE5 SHALL MATCH EXACTLY OR EXCEED VALUES EXTERIOR WALLS - WIND LOADS W/BRITTLE FIN15HE5 L/240 INDICATED IN "SIMPSON" PRODUCT LITERATURE. THERE MAY BE SEVERAL DRAWING TITLE: AND AT SPACING NOT EXCEEDING 4 ON CENTER. ON THE BUILDING. LOADING VALUES, CONTRACTOR SHALL CONTACT ARCHITECT IF ANY LOADING VALUES ARE LESS THAN WHAT 15 SPECIFIED BY "SIMPSON„ EXTERIOR WALLS - WIND LOADS W/ FLEXIBLE FINISHES L/120 GENERAL NOTES 4. ALL MECHANICAL CONNECTIONS SHALL BE HOT DIPPED GALVANIZED ENERGY TABLE ELECTRICAL: STRUCTURAL DESIGN CHARTS I. ALL NEWLY INSTALLED ELECTRICAL WORK OR APPLIANCES SHALL CONFORM S. INSTALLATION PROCEDURES SHALL ALWAYS BE CARRIED OUT AS PER TO 2017 NATIONAL ELECTRIC CODE,NFPA -70 AND 2020 NEW YORK STATE MANUFACTURER SPECIFICATIONS OF THE PRODUCT BEING INSTALLED. ENERGY CONSERVATION CONSTRUCTION CODE. 6. ALL FASTENING CRITERIA SHALL BE CARRIED OUT AS PER MANUFACTURER STRUCTURAL DESION LOADS 2. CONTRACTOR WILL FURNISH A FIRE UNDERWRITERS CERTIFICATE UPON SPECIFICATIONS OF THE PRODUCT BEING INSTALLED COMPLETION OF WORK. '►. VARIATIONS IN CONNECTOR CONFIGURATION SHALL BE APPROVED BY USE LIVE LOAD DEAD LOAD PAGE: 5. SMOKE DETECTORS, IN CONFORMANCE WITH NFPA 72: ARCHITECT �l - GENERALLY, VERIFY PROVIDE HARD WIRED p pG-002m00 SMOKE DETECTORS w/BATTERY BACK-UP IN: 8. ALL CONNECTORS SF'EGIFIED AS A "SIMPSON" TOP MOUNTED SEAM H/ EXTERIOR BALCONIES 40 psf 15sf HANGER SHALL BE ALLOWED TO BE SUBSTITUTED WITH A TOP MOUNTED A. EACH SLEEPING ROOM BEAM HANGER ONLY ALONG WITH SPECIFICATIONS LISTED ABOVE. DEGK5 40 psf 15 psf B. OUTSIDE OF EACH SEPARATE SLEEPING PASSENGER VEHICLE GARAGES 50 psf AS PER PLAN AREA IN THE IMMEDIATE VICINITY OF DATE: 04 09 24 THE BEDROOMS (GENERALLY THE HALLWAY) UNINHABITABLE ATTICS WITHOUT STORAGE 2 OF 6 G. EVERY LEVEL OF DWELLING (MAX CLEAR HOT< 42"9 10 psf 15 psf (BASEMENT, FIRST FLOOR, 4 SECOND FLOOR,ETC) UNINHABITABLE A77I05 WITH STORAGE (MAX CLEAR HOT > 42") 20 psf 15 psf HABITABLE ATTICS 4 ATTICS SERVED BY FIXED STAIRS 30 psf 15 psf ROOMS OTHER THAN 5LEEPIN& ROOMS 40 psf 15 psf ' ' f, R� ? r •, 5LEEPIN6 ROOMS 30 psf 15 psf STAIRS 40 psf 15 psf GUARDRAILS AND HANDRAILS 200 psf 15 psf " ROOF LOADING (LIVE _ &ROUND SNOW LOAD) 25 psf 15 psf *ALL STRUCTURAL DESIGN CONSIDERATIONS ARE IN CONFORMANCE WITH ASGE 7-lb (MINIMUM DE51GN LOADS FOR BUILDIN65 AND OTHER STRUCTURES) HOLDONN DETAILS T1'i=1 GAL NA 1 L I NO/S RAf=f=I NC FOR FASTENING SCHEDULE A ALL HARDWARE TO BE INSTALLED AS PER MANU. SPEC.'S;MANUFACTURER U F L F T, SHEAR, $ LATERAL V41 N D RE S I S TA N G F_ NOTE: TH 1 S SCHEDULE DOES NOT INCLUDE NAILING FOR METAL FRAMING STRAPS SUBSTITUTIONS MAY BE MADE WHEN LOAD CAPACITIES ARE MATCHED (SEE PAGE 0-005 FOR STRAPPING AND NAILING REQUIREMENTS, a a AND ROUGH OPENING FRAMING REQUIREMENTS) 0 *BALL STRAPPING TO BE VWx 20 5AU5E** -- "51MP5ON" EQUIVALENT - 0520 (COILED 5TRAP) ALL NAILING IS A GENERAL SPECIFICATION, IT APPLIES UNLESS NOTED OTHERWISE Lu ffUSE 10 NAI L5 IF 57RAPP I NC 15 OVER PLYWOOD; TYP. FOR ALL (SCHEDULE AS PER AWC 2015 WOOD FRAME CONSTRUCTION MANUAL TABLE 5.1) J ca , FASTENER SPEC. FA5TENEP- M HOEDOWN HOEDOWN B GONNEGTION A NA LINO O R I D DESCRIPTION AND QUANTITY SPACING L0 FOP, FOUNDAT ONIST ROOF i$ CEILING FRAMING _ � AT RAFTER TO RIDGE _ -0 O I I.DIM's ARE ALL MIN.#'s BASED ON USE OF ONLY A Ibd } CO ENDWALL CONNECTION: COMMON NAIL w/o PREBORED HOLES. i NDWALL - ""'"~~" 2„ RAFTER TO TOP PLATE (TOE-NAIL) SEE PAGE 6-005 PER RAFTER 0 N z O (5) 2x FULL (5) 2x FULL CORNER STUD ~ .. """" �' 2.HOOD I5 A55UMED TO BE D,F,«2 4 BTR. IN DRY USE Ln HEIGHT STUD HEIGHT STUD ONNEGTED TO ., FOR STRAP - 5 8 d COMMON R.R. 2" iv SERVICE �C>3 CORNER STUD TRANSFER SHEAR NAILS ® EA. END OF STRAP. CEILING JOIST TO TOP PLATE (TOE-NAIL) SEE PAGE 6-005 PER JOIST A U r- ,GONNEGTED TO 5.SHOULD THE WOOD IN USE PRESENT A SPLIT POTENTIAL � 2 X � CV TRANSFER SHEAR \dry • HOLEENT DURING INITIAL INSTALLATION)PREBORE THE NAIL GEILIN6 JOIST TO PARALLEL RAFTER(PAGE-NAIL) SEE PAGE 6-003 EACH LAP 0 0 0 a--� C4 SIMPSON HDQb FOR ROOF SLOPES UNDER 5:12 WITH HOLES,SET NEW MEMBER, m HOEDOWN ANCHOR ® 2-I6d COMMON w -� O .;-� r- 2-Ibd COMMON LOCATIONS NOTED NAILS ® 6" O.C. 4 ROOF SPANS OF 24' OR GREATER, • . • . • • 4.NO MIXING OF NAIL SIZES OR TYPES ALLOWED N Ln NAILS ® b' O.G. 4 USE 4 8 d COMMON NAILS ® EA. • • GEILIN6 JOIST LAPS OVER PARTITIONS(PAGE-NAIL) q-Ibd COMMON EACH LAP C O O O" O.G. IF BLOCKED ON PLANS 10 O.G. IF BLOGKE , ....-• 1�/ . • CC CORNER P05T ""^-, END OF STRAP. / ?+ 5.SEE SECTION b FOR ANY REO'T TO CLINCH THE NAILS(TO a r- 0- G CORNER POST "`^-. TIGHTLY BOND THE END OF THE NAIL TO A 90° ANGLE,SEE COLLAR TIE TO RAFTER (FACE-NAIL) SEE PAGE 6-005 PER TIE "SIMPSON" HDQB THE ABOVE A55UMES A RAFTER 6RAPHIG BELOW) HOEDOWN ANCHOR ® ^��`" SPAGIN6 OF 16" O.G.; FOR SPACINGS 6.DIMEN51ONS ARE DERIVED FROM THE ND5 COMMENTARY BLOCKING TO RAFTER (TOE-NAIL) 2-5d COMMON EACH END „ SECTION 12.4-PLACEMENT OF NAILS 4 SPIKES 4 TABLE LOCATIONS NOTED a OF 24 O.G., INCREASE NAILING BY A GR 4-I. ON PLANS ° ° FACTOR OF 1.5. RIM BOARD TO RAFTER (END-NAIL) 2-I6d COMMON EACH END ~ GONNEGTION BI 4 52 AT RAFTER TO TOP PLATE TO STUD WALL FRAMING 00SNEGTI ON: HOLDONN INSTALLATION OPTIONS: • FOR NEW P. GONG. FOUND.'s '` FOR STRAP - 5 8 d* COMMON NAILS ® EA. B2�' TOP PLATE TO TOP PLATE (FACE-NAIL) 2-I6d COMMON ' PER FOOT T HOLDOWN CAST IN PLACE w/"i/5"O THREADED ROD -r" ° o• • END OF STRAP. • • U . — s WHEN IN TOWN OF ISLIP OR NAILING I TOP PLATES AT INTERSECTIONS (FACE-NAIL) 4-I6d COMMON JOISTS - EA. SIDE FOR EXIST, P. GONG. OR NEk LY CURRE2 FOUND.'s • • • • 1/5"0 THREADED ROD (PRE-DRILLED) EMBEDDED 12" INTO '' NOTE GEOMETRY EXCEEDS THAT PERMITTED IN CONCRETE w/ "51 SON" SET (HIGH STRENGTH EPDXY ---� I • • MAX. NAILING GRID ABOVE UTILIZE • • STUD TO STUD (FACE-NAIL) 2-I6d COMMON 24" O.G. M ADHESIVE), 4 FOR TEMP.'S O°F-40°F USE "VMP50N" AT I SIMP50N #H2A (OR EQUAL) RAFTER TIE 1 1 (HIGH STRENGTH ACRYLIC ADHESIVE) �"""` ^ HEADER TO HEADER (FACE-NAIL) Ibd COMMON IV' O.G. ALONG EDGES • FOR EXIST. /NEW G.M.U. (GONG. BLOCK) FOR TOENAILIN6 - 3 8 d COMMON NAILS FILL TOP 2 COURSES SOLID 4 GA5T IN PLACE HOLDONN USE SAME • TOP or BOTTOM PLATE TO STUD (END-NAIL) 2-I160d COMMON PER STUD w/'1/5"(P THREADED ROD CONNECTION "^- ."." ��"� FOR G.J. TO R.R. - q Ib d COMMON NAILS BAND JOIST, U REOUIREMENTS FOR BOTTOM PLATE TO FLOOR JOIST, 2-I6d COMMON IZ PER FOOT RAISED C.J.'s(WHEN AT G.J. TO G.J. CONNECTION: ENDJOIST, or BLOCKING (FACE-NAIL) APPLICABLE) FOR EA. PLATE TO STUD ABOVE � OR BELOW HOLDONN �G� HOLDOWN 'F,)' 2 I6 d COMMON NAILS FOR G.J. TO G.J. - 51 I6 d COMMON NAILS FLOOR FRAMING .— O EW 4 XIS FOR FOUNDATION ® ONE STORY ONLY FOR NEWLY POURED CONNECTION GI 02 • JOIST TO SILL, TOP PLATE or GIRDER (TOE-NAIL) 4-5d COMMON PER JOIST n 1 um (5) 2x FULL ENDWALL BRIDGING TD JOIST (TOE-NAIL) 2-5d COMMON EACH END Q HEIGHT STUD ACONNESTED ORNER STUD TO BLOCKING TO JOIST (TOE-NAIL) 2-Sd COMMON EACH END "5IMP50N" HD05 TRANSFER SHEAR "."• • (5) 2x FULL M� " • o AT STUD TO FLOOR A55EMBLY BLOCKING TO SILL or G2 """ TO STUD CONNECTION: TOP PLATE (TOE-NAIL) HOLDOWN ANCHOR: ® 2-I6d COMMON HEIGHT STUD ~-~'" • 5-I6d COMMON EACH BLOCK LOCATIONS NOTIED NAILS ® b" O.G. 4 ON PLANS IO" O.G. IF BLOCKED G I FOR STRAP - 5 8 d* COMMON LEDGER STRIP TO BEAM (FACE-NAIL) 5-I6d COMMON EACH JOIST CORNER POST ° NAILS ® EA. END OF STRAP JOIST ON LEDGER TO BEAM (TOE-NAIL) 5-8d COMMON PER JOI5T ° FOR EA. PLATE TO STUD ABOVE d OR 2-I6d COMMON ° BELOW - 2 Ib d COMMON NAILS BAND JOIST TO JOIST (END-NAIL) 5-I6d COMMON PER JOIST NAILS ® 0 " 0. y!''•.� """" """ "' �., BAND JOIST TO SILL or TOP PLATE (TOE-NAIL) 2-I6d COMMON I PER FOOT • •. ROOF SHEATHING ° a STRUCTURAL PANELS: INTERIOR ZONE ad COMMON 6" EDGE / 12" FIELD a° "SIMPSON" ST DI4 CONNECTION DI D2 SOLID PERIMETER EDGE ZONE a ad COMMON 6" EDGE /6" FIELD HOLDOWN INSTALLATION OPTIONS: BLOCKING o EA.BAY W GABLE ENDALL RAKE OR RAKE TRUSS w/ ad COMMON 4" O.G. UP TO 9" RAKE OVERHANG FOR NEW P. GONG. F'OUND.'s A HOLDONN CAST IN PLACE w/'T/5"lP THREADED ROD • r:.. 0 AT STUD TO FLOOR ASSEMBLY TO SILL - GE I L I NG SHEATH I NO FOR EXIST. P. GONG. OR NEWLY GURRED FOUND's • 1/5",P THREADED ROD (PRE-DRILLED) EMBEDDED 12" INTO PLATE(5) CONNECTION: D2 CONCRETE w/ _SIMPSON" SET (HIGH 5TRENOTH EPDXY fl=12ROMIN ~-~-"`"" "~- GYPSUM WALLBOARD 5d COOLERS 7" EDGE / 10" FIELD ADHESIVE), 4 FOR TEMP.'S O°F-40°F USE "SIMPSON" AT CORNER FOR STRAP - 5 8 d* COMMON NAILS ® EA. (HIGH 5TRENGTH ACRYLIC ADHESIVE) ONE #4 REBAR 5PEGIFIED ON D I ° END OF STRAP (WRAP STRAP UNDER SILL FL) WALL SHEATH I NO FOR EXIST. / NEW C.M.U. (GONG. BLOCK) TYP. FOUND. NOTE • FILL TOP 2 COURSES SOLID $ CAST IN PLACE HOLDONN ° FOZ EA. PLATE TO STUD ABOVE $ OR BELOW - w/?/8"0 THREADED ROD 2 16 d COMMON NAILS N STRUCTURAL PANELS ad COMMON b" EDGE / 12" FIELD ° ALTERNATE CONFIGURATION - ABOVE STUD TO GYPSUM WALLBOARD 5d COOLERS " EDGE / 10" FIELD FLOOR CONNECTION w/ # LPT4 SIMPSON (OR STRAP w/ E 7 z f- N A I L. I N O/S TRA F F I N O W I N D O N/DOOR HEADER STANDARD/ALTERNATE EQUAL) ® PLATFORM TO SILL PLATES _ � '^ ft OF EA.LSTRAP TO ND EA.-FIST-(FOR FLOOR SHEATH I NO (SUBFLOOR) ALTERNATE USE SIMPSON H2.5A) U NOTATION: STRUCTURAL PANELS: A - NUMBER OF ad NAILS ® EA. END OF STRAPPING(2018 WFGM,TABU 51,P. ISa);WHEN STRAPP No GONNEGTI ON E .."-~ I" or LESS: 8d COMMON 6" EDGE / 12" FIELD REQUIRES OVER 14 NAILS,USE 51MPWN 0516 STRAPPING (OR EQUAL). �" �- • GREATER THAN I": IOd COMMON 6" EDGE / 12" FIELD Ix B - NUMBER OF SILL STUDS-ON FLAT(DOES NOT APPLY TO DOORS) (2015 WFGM,TABLE 5.25B,P. aU G - NUMBER OF FULL HEIGHT KING STUDS 0 EA. SIDE OF HEADER(2015 WFGM,TABLE 5.250,P. 29 ALTERNATE AS PER TABLE 5.25D,P. 245) NAILING REQUIREMENTS ARE BASED ON WALL SHEATHING NAILED b" O.G. AT THE PANEL EDGE. w A D D - NUMBER OF Ibd NAILS,END-NAILED THROUGH ADJACENT KING STUD TO END OF HEADER® EA. SIDE AT 5TUD TO FLOOR A55EMBLY TO BILL ALTERNATIVE NAILIN6 50HEDULE5 SHALL BE USED WHERE WALL SHEATHING NAILING 115 REDUCED. Q (2018 WFGM,TABLE 3.7,P. 189) a PLATES) CONNECTION FOR EXAMPLE, IF WALL SHEATHING IS NAILED 3" O.G. AT THE PANEL EDGE TO OBTAIN HIGHER G E (2-PLY) - NUMBER OF JACK STUDS ® EA. END of 2-PLY HEADER (2018 WFGM,TABLE 3.22F,P. 8) ° ° ° ° SHEAR CAPACITIES, NAILIN6 REQUIREMENTS FOR STRUCTURAL MEMBERS SHALL BE DOUBLED, OR E (5-PLY) - NUMBER OF JACK STUDS ® EA. END OF 5-PLY HEADER(2018 WFGM, TABLE 5.2217, P. :2 5) C °d ° SLAB ON GRADE APPLICATION: ALTERNATE CONNECTORS SHALL BE USED TO MAINTAIN THE LOAD PATH. PROJECT: F - NUMBER OF I6d NAILS,END-NAILED THROUGH ADJACENT JACK 5TUD To END OF SILL(S) a EA. IDE ° °° d �c 2 - WHEN WALL 5HEATHIN6 15 CONTINUOUS OVER CONNECTED MEMBERS, THE TABULATED NUMBER OF B E (DOES NOT APPLY TO DOORS) (2018 WFGM,TABLE 5.&,P. 191) ``�,::"^-" ° ° NAILS SHALL BE PERMITTED TO BE REDUCED TO I-IbD NAIL PER FOOT. FOR STRAP - 3 8 d* COMMON NAILS ® EA. 3 - FOR ROOF SHEATHING WITHIN 4' OF THE PERIMETER EDGE OF THE ROOF, INCLUDING 4' ON EACH S H I P MA N FA5TENINO SCHEDULE B °°a a END OF STRAP (WRAP STRAP UNDER SILL PL) 51DE OF THE ROOF PEAK, THE 4' PERIMETER EDGE ZONE ATTACHMENT REQUIREMENTS SHALL BE F ROUGH OPENING FRAMING REQUIREMENTS FOR WINDOW/DOOR OPENINGS '""^-" ,^ e a 9 FOR EA. PLATE TO STUD ABOVE OR BELOW - USED. (IN ACCORDANCE WITH WOOD FRAME CONSTRUCTION MANUAL 2018 EDITION) '" - EQUIPMENT S H E :2_ I6 d COMMON NAILS AMAX NOTATION SIONAOE FOR TRUSS TYPE, PRE—ENGINEERED ROUGH WOOD, AND/OR TIMBER GONSTRUGTION OPENING HDW HDR) THE FOLLOWING 51GNAGE SHALL BE AFFIXED TO THE ELECTRIC METER BOX ATTACHED 4745 ELIJAHS LN 2'-0" 2 1 1 2 1 I 2 TO THE EXTERIOR OF STRUCTURE OR AFFIXED TO THE EXTERIOR WALL OF THE MATTITUCK NY 11952 RESIDENTIAL STRUCTURE AT A POINT IMMEDIATELY ADJACENT TO THE ELECTRIC BOX OR 4'-0" 5 1 2 5 1 1 3 SQL I G NCO TOi� SLAT GABLE ENDWALL A LOCATION LIKELY TO BE SEEN BY FIRST RESPONDERS WITH APPROVAL BY THE * - PROVIDE b(2) 2"xl0" HDR (MIN.) U.O.N. '-O" 4 I 3 4 I I 4 BRACING/STRAPPING AUTHORITY HAVING JURISDICTION: DRAWING TITLE: FOR RAKE512"OR HOLDOWN ANCHOR BOLT TOP PLATE BLOCKING 2 LESS PROVIDE � , 8'-0" 6 2 5 5 1 1 5 }— SPLICE TOP PLATE SPLICE REQUIREMENTS TOP PLATE SPLICE REQUIREMENTS BAYS BACK ® BLOGKIN6 o I2"o.c. GONSTRUGTION TYPE DESIGNATION SHALL LENGTH 4'-0" O.G. TO AGHEIVE RAKE O.H. BE "I" "II", "III", "IV", OR "V" TO INDICATE STRAPPING, & NAILING DETAILS FOR WIND - EXPOSURES BAG - FOR WIND - EXPOSURES B8G - lo'-o" 7 2 4 6 2 I 6 ALL OTHER GA5E5 ONE STORY SLAB ON GRADE ROOF THE CONSTRUCTION CLASSIFICATION OF FASTENING SCHEDULE THE STRUCTURE UNDER SECTION 602 OF 12'-O° 8 2 5 8 2 I 8 BUILDING MINIMUM SPLICE''` BUILDING MINIMUM SPLICE'='` THE NYS BC. DIMENSION (FT.) LENGTH (FT) DIMEN51ON (FTJ LENGTH (FT) TYP. 51 RAP w/(5) PAGE: 8d NAILS EA.END DESIGNATION FOR STRUCTURAL 12'-0" V-011/2'-6" 12'-O" 3'-0" OF EA. STRAP 6" DIAMETER 00, COMPONENTS THAT ARE OF TRUSS TYPE, I6'-o" 5'-0"/5'-a" I6'-0" 4'-0" ATTIC PRE-ENGINEERED WOOD, OR TIMBERG-003mOO ANG�+OR BOLT Si�EC/ I F I GAT I ONS CONSTRUCTION AS FOLLOWS: 20'-0" 4'-0"/5'-O" 20'-0" 5'-O" - "F" = FLOOR FRAMING, INCLUDING BLOCKING 2 BAYS GIRDERS $ BEAMS SPECIFICATION (2015 WFGM TABLES 5.2A 6 5.25, P. 157-160) BACK® 4'-0° o.c. Y;: "°; - "R" = ROOF FRAMING 24-0 4'-0"/5'-0" 24-0 6. BACK CORNER =51" - "FR" = FLOOR + ROOF FRAMING DATE: 04/09/24 3 OF 6 CONDITION FOR ALL STRUCTURES: %,"0 ANCHOR BOLTS ® 5a" O.G. 28'-O" 5'-O"/6'-5" 28'-O" 7'-O" 52'-0" 6'-O"/7'-b" 52'-0" 8'-O" SECOND FLOOR g NOTES: I.TABULATED SPLICE LENGTHS ASSUME TOP PLATE-TO-TOP PLATE Ij�°; CONNECTION USIN6 2-I6d NAILS PER FOOT.FOR SHORTER SPLICE :. I. MIN. 7" EMBEDMENT INTO CONCRETE LENGTHS,THE NAIL SPAGIN6 SHALL BE REDUCED IN ORDER TO 40'-0" &-o"/I0'-0" 40--0" 11'-01. BLOGKIN6 2 BAYS PROVIDE AN EQUIVALENT NUMBER OF NAILS • END w/ 5" SQUARE WASHERS AND END NUT SETUP; SACK® 4'-O" O.G. v fx x n 2.TABULATED SPLICE LENGTHS ASSUME A BUILDING LOCATED 50'-O" 10'-O"/12'-6" 50'-O" 15'-O" , : y fir d CONDITION 15 EMBEDMENT FOR G.M.U. (BLOCK) FOUND. $ FILL IN EXPOSURE B TYP. STRAP w/(3) 11 k N TOP TWO COURSES 50LID " STROKE 8d NAILS EA. END " 5.TABULATED SPLICE LENOTH5 ARE BASED ON 5 FOOT HALL 6O-O 12-O /15-O bO-oil161-011OF EA. STRAP 2. ANCHORS NOTED HEREIN ARE NOT TO BE USED FOR HEI&HT5 FOR OTHER WALL HEICWT5,H,THE TABULATED UNIT F. LATERAL LOADS SHALL BE MULTIPLIED BY H/5; �� FIRST FLOOR PLAN DIAGRAM OF ZONES OR REPLACED BY HOLD DOWNS FOR SHEARWALLS FOR ALTERNATIVE WALL HEI&HT5 MULTIPLY THE ABOVE -10-O 14-0 NOTED MIN.SPLICE LENGTH BY THE FOLLOWING FACTOR 5. ANCHOR BOLTS ARE TO BE BETWEEN 6" $ 12" (ADDITIONALLY,ROUND UP TO THE NEAREST FOOT). '•a..: v Z^ 7 O" I6'-0" 80'-O" 22'-0" FROM ENDS AND CORNERS (TWO ® CORNERS) W WALL- 1.125 REFLECTIVE REFLECTIVE (SEE DIAGRAM TO LEFT) 10,WALL- 125 BLOCKING 2 BAYS - II'WALL- 1.5T5 THIS COLUMN w/MULTIPLIER BACK 0 41-0"o.c. RED PANTONE WHITE 4. COORDINATE w/ HOLDONN LOCATIONS 12 HALL- 15 FOR 10'-0"WALL #IS7 4.TOP PLATES SHALL BE A MINIMUM OF STUD GRADE MATERIAL M 15CELLANEOU5 FRAMING GRAPHICS CONTINUOUS BUILT-UP C I RDERS, 3 OR MORE SUPPORTS (THAT EXCEED FRAMIN5 STANDARDS, IT 15 REOV FOR FRAMER TO HAVE A WORKING KNOWLEDGE OF THE AMERICAN WOOD COUNCIL [AWG] DETAIL BOOK CONNECTION PATTERN SCHEDULE AND ALL RELEVANT PORTIONS OF THE RESIDENTIAL CODE) BETWEENASSEMBLY REQUIREMENTS:I/b CL Q CONNECTION a 1/4 OF A WHEN GIRDERS MADE UP OF JOIST5 NAILED DE50RIPTION TOGETHER SIDE BY SIDE ARE CONTINUOUS OVER BLOCKING UNDER LOAD BEARING WALL PATTERN THREE OR MORE SUPPORT5, JOINTS ARE TO BE 0 NON—LOAD BEARING WALL OFFSET FROM SUPPORT A (2)ROWS IOd NAILS m 1211 O.G. MAX.52" LOCATED BETWEEN ONE SIXTH AND ONE QUARTER Lu THE SPAN LENGTH FROM AN INTERMEDIATE J co STUDS STUD B (s)ROWS lociNAILS m 12"O.C. SUPPORT. NO TWO ADJOINING JOISTS, NOR MORE C7 SUBFLOOR P THAN ONE THIRD THE TOTAL NUMBER, ARE TO BE Q 4-� (V 5UBFLOOR C (2)ROWS 1/2" 0 BOLTS m 12"O.G.STA66ERED; TWO-PIECE JOINTED ON THE SAME SIDE OF THE SUPPORT. •� L.r) DBL.m ENDS SOLE PLATE BUILT UP 61RDER P MAX.82° NAILING: O O D (2)ROWS I/2" 0 BOLTS m Ib"O.G. _ � SOLE PLATE TWO-PIECE GIRDERS ARE TO BE NAILED FROM ONE — '0 O SIDE WITH IOd NAILS E (2)ROWS I/2" m BOLTS m 24"O.G. TWO NEAR EACH END OF :I� � BETWEEN I/6 EACH PIECE, OTHERS STAGGERED WITH A DISTANCE Lp O N z O F (2)ROWS 5-3/ell TRUSSLocK SCREWS m 12"O.C. a 1/4 of A OF 16 INCHES BETWEEN NAILS IN A HORIZONTAL •� V) SGREI^JED ON(1)SIDE OF MEMBER LINE; OR GIRDERS ARE TO BE NAILED FROM EACH B (2)Rotas 5-5/5"TRUSSLOCK SCREWS m 16"O.C. SIDE w/ IOd NAIL5, TWO NEAR EACH END OF EACH X N SGREPW ON(1)SIDE OF MEMBER JOIST, OTHERS STAGGERED w/ A DISTANCE OF 52" O O O 4-+ H (2)ROWS 5-B/8'TRUSSLOCK SCREWS m 24"O.C. BETWEEN NAILS IN A HORIZONTAL LINE. 0 O m *4-J JOIST SCREWED ON(1)SIDE of MEMBER r_ a--+ � MAXIMUM OFFSET (2)ROWS 5"TRU55LOGK SGR=WS m 12"O.G. THREE-PIECE N O (o J BUILT UP GIRDER MAX.82" THREE-PIECE GIRDERS ARE TO BE NAILED w/ 20d O JOIST DEPTH,d 5cRE�D ON BOTH SIDE OF MEMBER P NAILS ON EA. SIDE w/ TWO NEAR EA. END OF EA. Q MATCHED SIZE OF BLOCKING (2)ROW5 5"TRU55LOGK SCREWS m 16"O.G. UNDER NON-LOAD SEARING FIRESTOPPING AND K SGREIAED ON BOTH SIDE OF MEMBER PIECE, INCLUDING INTERMIDIATE JOINTS, AND w/ THE ® 32" O.G. BLOCKING STUD OTHERS STAGGERED w/ A DISTANCE Or- PARTITIONS NOT MORE L (2)ROWS 5"TRUSELOCK SCREWS m 24"O.G. BETWEEN 1/b DOUBLE PLATE SCREWED ON BOTH SIDE OF MEMBER a 1/4 of A THAN 32" BETYdEEN NAILS IN A HORIZONTAL LINE. GE I L I NC BRAG I NC FOUR-PIECE CIDERS ARE TO BE ASSEMLED AS W 1.NOTE 8 HEADERS NOT NOTED WITH CONNECTION PATTERN ON SHOWN, AND NAILED w/ 20d NAILS AS SPECIFIED GABLE ENDWALL PLAN SHALL USE CONNECTION PATTERN 'A'WHEN V OR SMALLER FOR THE THREE-PIECE GIRDER. t CONNECTION PATTERN 'B'WHEN 10"OR LARGER p. 2.WHEN SCREWING OR NAILING FROM BOTH 51DES OF MEMBER- FOUR-PIECE ANCHORING: OFFSET FASTENERS 1/2"FROM ONE SIDE TO THE OTHER BUILT UP C711RDER GIRDERS ARE TO BE SECURELY ANCHORED TO L ATE LATERAL BRACE® b'O.G.CONTINUOUS 6�L 55 71RU MASONRY PIERS, NAILED TO WOOD POSTS OR �J LATE (2) lod RAILS TRUSS OR BOLTED TO STEEL COLUMNS. _ ' G.J. ( 1 • W 10) 8d NAIL_ NO FATTERNS FOR S 1 DE LOADED 5EAMS 00 . FLUSH SEAMS) m NAILS FASTENING RECOMMENDATIONS FOR SIDE-LOADED, MULTIPLE-PIECE MEMBERS * 5d COOLER NAILS m loll O.G. NAILED' BOLTED' M� N,I I h�I U c Vx4" BLOCK NAILED TO EA.BRACE 2 ROWS 16d 5 11"16d 2 RO1: 2:0LP6 ' 2 ROWSkj" W/(4) IOd NAILS COMMON COMMON DOLTS•24' BOLTS BOLTS GYPSUM BOARD 20 ga.STRAP i 12"O.G.• O 12"O.C.• OO•sT ' O 12"OG. O 6"O.G. < . TWO ROWS 12"O.G. THREE R0W5 12"O.G. *5d COOLER NAILS m loll O.G. (10) Bd NAILS BEAM SELECTION w/ STD. NAILING ° ° ° ° �J NOTE: ENDWALL 5 A5 NOTED IN NOTES '7 8 8 ° ° °° QD * DENOTES ALT.FOR USE OF DRYWALL 5CREW5 ° 4"m EDGE/12"m FIELD FULLY BLOCKED I.TOP AND BOTTOM ROWS SHOULD BE 2"FROM EDGES Q SCREWS#b - V4"TYPE H OR 5 2.BOLT HOLES ARE TO BE THE SAME DIAMETER AS THE BOLT AND SHOULD BE LOCATED 2" THO ROWS 24"O.G.STA66ERED TWO ROWS 6"O.G. FROM THE TOP AND BOTTOM OF THE MEMBER.EVERY BOLT MUST EXTEND THROUGH THE FULL INTERIOR STUD DETAIL THIGKNE55 OP THE MEMBER.USE WASHERS UNDER HEAD AND NUT. O O O ED O O O O O O OVERLAID ROOF 5.STAGGER EACH ROW OF FASTENER'S BY 12". O O D O O O O O O ATTACHMENT @ VALLEY 4.FOR A THREE-PIECE MEMBER,THE SPECIFIED NAILING IS FROM EACH SIDE. 5.FOUR-PIECE MENEiL9¢S SHOULD ONLY BE USED WHEN LOADS ARE APPLIED TO BOTH SIDE OF THE MEMBER. 6.VALUES FOR NAILING CONNECTIONS MAY BE DOUBLED FOR 6"O.G.OR TRIPLED FOR 4"O.G.NAIL SPACING. STD.NAILING FOR TOP LOADED MULTIPLE-PIECE BEAMS: ` STRAPPING W/ T 2 ROWS OF Ibd COMMON NAILS(12'O.G)FOR DEPTHS 12"OR LESS 4 Sd NAILS ® EA. END m R.R. a.5 ROWS OF 16d COMMON NAILS(12'OZ)FOR DEPTHS OF 14",16'! 16'. RJLL WIDTH 2" BLOGKIN z tu - \\\ H 0 CONSTRUCT 1 ON DETAILS N I ND LOAD PATH CONNECT ON DETAILS TOP PLATE DRILL VO INTO ROOF • INTERSECTION DETAIL DECK FOR STRAPPING INSTL. NOT TO SCALE EX15T.OR NEW NEW R.R.SET W/ R.R.BELOW UPPER.TOP PLATE LAPS 4 IOd NT11I000S LOWER TOE NAIL NOTED CONT.BLOCKING TOP PLATE R.SPIKED TO R.'s ALIGN NEW d EX. R.R.AS SHOWN KING STUDS PLAN VIEW NOTE. SIMILAR m 'SHED' WOOD JO I S WOOD JO ROOF,R.R. IN LINE CRIPPLE STUD oo BLOCK I NG JO I ST HANGE HEADER z GENERAL REOU I REMENTS FOR GENERAL REOU I REMENT5 FOR w INSTALLATION OF CLINCHED NAILS INSTALLATION OF TOE-NAILS GIRDER/HEADS WOOD GIRDER JACK STUDS MAIN MEMBER WOOD JOIST WW d' i�o• sOe � Q �- JOIST FRAM I NC OVER WOOD G I RDER JOIST FRAMING FLUSH W 1 TH G I RDER/HEADER TYPI GAL HEADER CONNECTION I. TOE-NAILS SHALL BE DRIVEN ® AN ANGLE OF PROJECT: MEMBERS DIAM.X 5 APPROX. 30° W/THE MAIN MEMBER b STARTED APPROX. Y5 THE LEG NTH OF THE NAIL FROM THE MEMBER END, S H I P M A N I. NAILS SHALL BE DRIVEN PERPENDICULAR TO AS SHOWN ABOVE THE MEMBER, STRAIGHT THROUGH AND BENT OVER A MIN. OF (5) NAIL DIAM."s AT A 010° ANGLE 2. THE MIN. PENETRATION OF THE NAIL IN TO THE MAIN EQUIPMENT SHED MEMBER,FOR THI5 APPLICATION,SHALL BE AT LEAST 51X TIMES THE DIAM. OF THE NAIL RAFTER — 5. TO AVOID SPLITTING,NO MORE THAN 2 TOE NAILS SHALL BE INSTALLED IN EA. SIDE OF A RAFTER OR CEILING JOIST WALL STUD WHEN FASTENED TO A 2"x4" TOP PLATE OR 3 TOE NAILS BOTTOM PLAT 4745 ELIJAHS LN IN EA. SIDE WHEN FASTENED TO A 2"x6" TOP PLATE. SUB FLOOR DOUBLE JOIS TOP PLATE MATTITUCK NY 1195 DRAWING TITLE: WALL STUD FRAMING GRAPHICS BEAM CONNECTION PATTERN FIREBLOCKING DETAILS DOUBLE J0157 FOR NON—BEARING WALLS ALTERNATIVE RAFTER TO WALL STUD CONNECTION PAGE: loll ND RES I STANT CONSTRUCTION CONNECTORS CONNECTION LCOA71ON: PART NUMBER: NOTES: G-0 OAMOO RIDGE—TO—RAFTERS 0520 @ 21" APPLY TO EACH PAIR OF RAFTERS RAFTER—TO—HALL H-1 APPLY TO EACH RAFTER DATE: 04/09/24 4 OF IS RAFTER—TO—PLATE H8 or H23 APPLY TO EACH RAFTER PLATE—TO—WALL STUD C520 @ 18" APPLY TO EACH WALL STUD 2ND. FLOOR WALL-70-15—. FLOOR WALL LFTA or C520 @ 56" APPLY TO EACH WALL 57UD HEADER—TO—JACK 57UD 0520 @ 12" APPLY TO EACH JACK STUD CRIPPLE STUD—TO—HEADER H3 APPLY TO EACH CRIPPLE STUD SHEAR WALL HOLDDOM ANCHOR 55T516 APPLY TO EACH 51DEWALL END ST. FLOOR—UNDER—SILL PL,4TE 0520 WRAP UNDER DOUBLE SILL PLATE (USE WITH 5" SQUARE WASHERS) USE THE FOLLOWING OR APPROVED SIMP50N METAL CONNECTORS FOR PROPER WIND RESISTANT CONSTRUCTION. " FOLLOW MANUFACTURE'S RECOMENDED INSTALLATION INSTRUCTIONS TO ACHIEVE MAXIMUM UPLIFT LOAD CAPACITY. OE ` DRAL SJ I tN�50L <E I : d EXISTING TO Bf° DEMOLISHED NEPq PARTIAL HEIGHT WOOD FRAME (L.G. STL. Q � 0� EXISTING TO RE-!MAIN APPLICABLE)MAIN I I Lu NEW WOOD FRAME (L.G. NEW FOUNDATION WALL J cu I-- I STL. WHEN APPLICABLE) m NEW I-HR FIRE 'RATED ® MIN. (2) 2"x4" STRUCTURAL Q CV WOOD FRAME (L.G. 5TL. POST FOR 4" WALLS O WHEN APPLICABLE) (MIN. (2) 2"xb" STRUCTURAL C POST FOR 6" WALLS), U.O.N. _+ >: C09 WOOD FRAM (L.0. D. O O N z 0 WHEN APPLICABLE) a Lr) 2 X N O +-+ 1 O 00m ZC9 FOUNDATION PLAN NOTE5 C N O 26 6 POURED CONCRETE AND STEEL REINFORCEMENT NOTES: Q O a: NEW REINFORCED P. GONG. SLAB I. ALL EXCAVATIONS SHALL NOT UNDERMINE EXIST. ADJACENT 50IL BEARING CAPACITY NOTE: _ OI I. NEW 4" THK. P. GONG. SLAB w/6"x6"-10/10 W.W.M. UPON FOUNDATIONS BY AN ANGLE OF 45° PROJECTED OUTWARD AND STRUCTURAL DESIGN OF FOOTIN65 ASSUMES A SOIL 2. 6 MIL POLY VAPOR BARRIER UPON DOWNWARD FROM THE BOTTOM OF EXISTING ADJACENT FOOTINGS. BEARING CAPACITY OF 1.0 TONS/S.F. Q ^ ` 3. 4" (MIN) GRAVEL BASE: ( 'W) 2. IF WATER ENCOUNTERED DURING POURING OF GONG.,EXCAVATION OCONCRETE APRON SHALL BE DE-WATERED. THE POUR SITE SHALL REMAIN DRY FOR 4 I. PROVIDE CONCRETE APRON SLAB TO TRANSITION ENTIRETY OF POUR. CONTACT ARCHITECT WHEN WATER SMOOTHLY FROM SLAB EL. TO GRADE ENCOUNTERED. 4 48'-O" 2. APRON SLOPE SHALL BE NO STEEPER THAN 1:12 5. GROSS SLOPE MEASURED PERPENDICULAR TO 5. POURED CONCRETE SHALL BE KEPT MOIST FOR A MIN. OF 14 DAYS. - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - TRAVEL OF APRON SHALL BE NO STEEPER THAN 1:48 (2% SLOPE) 4. ALL FOUNDATION WORK SHALL BE 4,000 PSI POURED CONCRETE AT I _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ v 1 .. 4. BROOM FINISH TO PROVIDE SLIP-RESISTANT SURFACE 26 DAYS AND SHALL CONFORM TO THE CURRENT AGI 515 CODE. - • TYPICAL P. GONG. FOOTING $ WALL CONSTRUCTION: 5. ALL REINFORCEMENT BAR5 SHALL BE DEFORMED CARBON STEEL 5 S ^; n , D W AOATED. GRADE 60. WWM FOR SLABS DO NOT NEED TO BE 1 J O (2) 2"xb" P.T. SILL PLATES w/COPPER TERMITE SHIELD T • d SILL SEAL COATED. In • ANCHOR BOLTS AS PER PACE 6-005 6. U.O.N., REBAR LAPS SHALL BE A MIN. OF 40 DIAMETERS. ALL LAPS I I ■ • P. GONG. FOUND. WALL AS PER DETAIL UPON SHALL BE STAGGERED. • P. GONG. FOOTING AS PER DETAIL PA-II IN • B.O. FOOT N6 5''-0" B• ASPHALTIC MASTIC LOW GRADE MINMP PROOFINO D EXTERIOR �' PROVIDECATTIME OF POURN6CHANICAL 1GES TO HOLD 8 MAINTAIN REQUIEL 4 RED CLEARANCES, • 1/2" EXPANSION JOINT ® PERIMETER OF SLAB (WHEN COVERAGES,AND PLUM5NE55. I U APPLICABLE) • MASON TO ACCOUNT FOR FINISH STONE ON THIN SET 8. CEMENT SHALL CONFORM TO ASTM 0-33 FOR STANDARD WEIGHT FOR HEIGHT OF WALL d SLAB (WHEN APPLICABLE) CONCRETE. OHOLDOWN (FOUNDATION TO IST FLOOR). 4 HOLDOWN 'D' AS PER PA6i= 6-005 GONGETE - GOLD WEATHER POURING a CONCRETE MIXTURE I PROPOSED Q OI6"x8" DEEP P. GONG. CONTINUOUS FOOTING 1. THESE SPECIFICATIONS SHALL APPLY FOR THE POURING OF I I FOUNDATION PLAN # _ AS PER DETAIL X/A-XXX ('TYPJ AS BECONCRETE IN N SUSTAINED FOR A524DER 45* F IF THAT OUR PERIOD R MORE. I , . I 1,152 S.F. FREEZE PROOF H05E BIB: 2. SPECIFICITY OF CONCRETE DESIGN MIX SHALL BE BY OTHERS. bO FASTENED w/MASONRY ANCHORS (PRECISE I ' LOCATION T.B.D. IN FIELD •- CONSULT w/OWNER) 3 ALL COLD k4EATHER CONFORM TO AGI 30PREPARATIONS AND CONCRETE POURING SHALL 4. IN NO CASE SHALL CONCRETE BE PLACED ON FROZEN GROUND / SURFACES. TEMPERATURESFROZEN REMOVED OR HEATED TO W THIN 10* F OF CONCRETE a 5. IN NO CASE SHALL CONCRETE BE PLACED ON ICE OR SNOW. I 3 REMOVE AS REO'D. I 5 FLOOR PLAN NOTES 6. THE USE OF HEAT BLANKETS OR ELECTRIC BLANKETS ARE PERMITTED WHEN NECESSARY. DOOR NOTE: '7. FORMWORK SHALL BE AT A MIN. TEMPERATURE OF 55* F OR HIGHER 6 O i ON PLANS BY INSTALL NEV4 INTE JERIOR WEN' (OR EQUAL)CALLED OUT AND SHALL BE WITHIN 10' F OF CONCRETE TEMPERATURE. 2.INSTALL NEW EXTERIOR DOORS WHEN GALLED OUT 5. CONCRETE SHALL BE AIR ENTRAINED FOR GOLD WEATHER POURING. ALLOW OPENING IN FOUNDATION ` ON PLANS BY 'THERMATRU' (OR EQUAL). I WALL FOR DOOR PER PLAN;V.I.F. 4 5.NOTE DOES NOT INDICATE EACH NEW DOOR q. NON-CHLORIDE,NON-CORROSIVE ACCELERANT ADMIXTURES ARE L - - - - PROPOSED;SEEDE516NATIONStDOORSCHEDULE. 4 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 4.PLACE DOORS 4" MIN. FROM PERPENDICULAR PERMITTED TO BE ADDED TO CONCRETE MIXTURE AS PER AGI 506 (A5TM 0414/04g4M,TYPES G AND E). Il WALLS, U.O.N. - - - - - - - - - - -I - - - - - - - - - - - - - - - - - - - - - - - - - - 5. INSTALL AS PER MANU SPEC.'s 10. CONSULT ARCHITECT WHEN STEEL EME3EDOMENT OR055 SECTIONAL 4'-a" 3'-3" 4'-a" �Y 10'-a" 10'-a" 10'-q" 6.PROVIDE (2) 2"xl0" HDR.,U.O.N. AREAS EXCEED ONE SQUARE INCH. ��1'-0 I'-O -1. SEE PAGE 6-005 FOR ALL OTHER FRAMING dl_ ELEMENTS AROUND DOORS (TYP. FOR ALL) U.O.N. 11. ONCE CONCRETE 15 PLACED. CONCRETE SHALL NOT BE EXPOSED TO REPEATED FREEZING AND THAWING UNTIL CONCRETE HAS REACHED A COMPRESSIVE STRENGTH OF 500 PSI. 2 12. PLACEMENT TEMPERATURES SHALL CONFORM TO AGI 306. d i�iZOFOSED FOUNl7AT I O1� PLAN SCALE: 1/4" = P-O" z W BUILDING CONSTRUCTION: BUILDING CONSTRUCTED PER THE MANUFACTURES 0 SPECIFICATIONS AND INSTRUCTIONS. POLE BARN O MANUFACTURE JAMAICA COTTAGE SHOP. T Q 4b'-O" Q 0 PROJECT: SHIPMAN EQUIPMENT SHE m m 4745 ELIJAHS LN MATTITUCK NY 11952 DRAWING TITLE: PROPOSED EQUIPMENT SHED p PROPOSED FOUNDATION PLAN 1,152 S.F. " PROPOSED FLOOR PLAN VENT VENT - - - - - - - - - - - - - - - - RID&ELINE - - - - - - - - - - - - - - - - - PAGE: m m A-10J. 00 I O i dJ DATE: 04/09/24 5 OF a m RO 12q"W x IOq"H RO 12q"W x IOa"H RO 121"W x IOq"H 10'-a" lo'-a" 10'-q" 10'-a" i FROFOSIED FIRST FLOOR PLAN � F SCALE: 1/4" = P-O" ELEVATION NOTES OTYPICAL ROOFING: a. I. SEE NOTE AT BUILDING SECTION FOR MINIMUM Q CONSTRUCTION STANDARDS 2. H.O. TO VERIFY FINAL COLOR 4 MATERIAL SELECTION O BEFORE INSTALLATION LJL W TYPICAL 51PINO: J cu O I. SEE NOTE AT BUILDING SECTION FOR MINIMUM ('7 Q � N CONSTRUCTION STANDARDS 2. H.O. TO VERIFY FINAL COLOR AND MATERIAL SELECTION �C 0BEFORE INSTALLATION 0 O O .-- 3 NEW 5' SEAMLESS GUTTERS d DOWNSPOUTS; O C N z 0 O (BLACK) $ (ALUMINUM) (TYP) I I a 'cu \ c dd. X N O 0O 4- i 0m •Z; C9 +- c N O Ca 2 Q Oa2 (5 3 0 2 4— - U .- 4 -E-, m o - . - U F.F. Q • — SOUTH ELEVA71ON (LEFT 5117)E) EA5T ELEVATION (FRONT) i7j 4� SCALE: 1/4" = I'-a" SCALE: 1/4" = P-O" Q I H11 I 0 2 3 Z 2 w 0 O O V Lu Q NORTH ELEVATION (RICHT SII7E) PROJECT: SCALE: I/4" = I'-o�� 1�1E5T ELEVATION (REAR) SCALE: 1/4" = I'-o" S H I P M A N EQUIPMENT SHED BUILDING 5EGTION NOTES PROVIDE STRAPPING NAILING ONEW ROOFING NOTE (TYP.): PROVIDE 5" (MIN) GONG. COVER AS PER CONNECTION 'E' IN I. INSTALL NEW STANDING SEAM METAL ROOFING. PROP05ED RIDGE HEIGHT OF ALL REBAR WITHIN P. GONG. TYPICAL NAILING/STRAPPING 4745 ELIJAHS LN 2.INSTALL ICE AND WATER SHIELD FROM FASCIA UP TO -------------------------------------------- FOUND. WALL5 d P. GONG. FT6'5. REQUIREMENTS FOR UPLIFT, 24" FROM INSIDE FACE OF STUD WALL AND AT VALLEYS ELEV. +1q- SHEAR, s LATERAL RESISTANCE" MATTITUCK NY 11952 5.INSTALL HENRY BLUESKIN PE20OHT SYNTHETIC ROOF ON PAGE 6-005 ® EA. STUD. UNDERLAYMENT(OR APPROVED EO) OVER NEW (2) 2"xb" P.T. SILL PLATES 4.1/2" CDX PLYWOOD 5HEATHIN15 (BLOCK ALL SEAMS) UPON SILL SEAL UPON COPPER DRAWING TITLE: 5. 6ALV. METAL GAP OVER RIDGE d HIPS (AS REOV TERMITE SHIELD 6.FLASH ALL VALLEYS'1. INSTALL DRIP EDGE AS REO'D 12 12 NEW 5/b"� HOOKED ANCHOR PROPOSED EXTERIOR ELEVATIONS a.INSTALL ALL A5 PER MANU. SPEG.'s 4" P. GONG. SLAB ENDN T 5PAGIIN6 AS INDICATED PROPOSED SECTION a NEW SIDING NOTE (TYP.J: 12 I b"xb"-IOxIO W.W.M. BETWEEN ON 6-005 OI. INSTALL 51DING AS PER MANU. 5PEG.'s UPON I RENTER d UPPER RS OF SLAB ASPHALTIC DAMP 2."TYVEK" HOUSE WRAP (VENTED) (OR EQUAL) UPON SECURED IN PLACE DURING POUR PROOFING TO EXTERIOR 14 b MIL POLY - z #4 HOOKED VERT. REBAR 4.EXTERIOR WALL CONSTRUCTION AS PER MANU. SPEG.'s MOISTURE RETARDER ° . , ® 48 O.G. PAGE: 4.INSTALL ALL AS PER MANU. SPEG.'s � r— �� 5. PROVIDE ALL NECESSARY TRIM FOR PROPER INSTALLATION 4" GRAVEL BASE II GRADE b.SIDIN6 SHALL EXTEND TO TOP OF FOUNDATION WALL �I ° 1 A-201m00 14 4 HOR. CONT. REBAR ® O II T P � ,I BOTTOM OF WALL (2 TOTAL)- 2 P. GONG. POUND!WALL _ a _ —� DATE: 04/09/24 6 OF IS 1 I (MIN. 4,000 P51) P. GONG. CONT. FT6. I ' (MIN. 4,000 P51 I fail a (5) #5 HOR. CONT. REBAR-- PROV. GLEAN P`� E PROP05ED FIN15HED 5LA5 COMPACT FILL ,100' ELEV. +0.0' ( i 4" �f ! BASELINE (AVERAGE GRADE) I T I( pp ELEV. +O.O' SEGTI ON I -I/A-5O 1 i FOUNDATION NALL I�)E:TA I L A-20 1.00 - SCALE: 1/4" = I'-V SCALE: 5/4" = P-O"