Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
51386-Z
of souryo`o Town of Southold * * P.O. Box 1179 � o 53095 Main Rd Courm,`' i Southold, New York 11971 CERTIFICATE OF OCCUPANCY No: 46162 Date: 05/13/2025 THIS CERTIFIES that the building SOLAR PANEL Location of Property: 160 Inlet View E Mattituck, NY 11952 Sec/Block/Lot: 100.-3-10.13 Conforms substantially to the Application for Building Permit heretofore, filed in this office dated: 09/27/2024 Pursuant to which Building Permit No. 51386 and dated: 11/15/2024 Was issued, and conforms to all of the requirements of the applicable provisions of the law. The occupancy for which this certificate is issued is: Roof mounted solar panels to an existing single-family dwelling as applied for. The certificate is issued to: David Tarr,Kerry Tarr Of the aforesaid building. SUFFOLK COUNTY DEPARTMENT OF HEALTH APPROVAL: ELECTRICAL CERTIFICATE: 51386 3/17/2025 PLUMBERS CERTIFICATION: uthor ed i ature I OfSU0ly�lG TOWN OF SOUTHOLD BUILDING DEPARTMENT `� • TOWN CLERK'S OFFICE QouMr, SOUTHOLD, NY BUILDING PERMIT (THIS PERMIT MUST BE KEPT ON THE PREMISES WITH ONE SET OF APPROVED PLANS AND SPECIFICATIONS UNTIL FULL COMPLETION OF THE WORK AUTHORIZED) Permit#: 51386 Date: 11/15/2024 Permission is hereby granted to: David Tarr 67 Stuyvesant Ave Larchmont, NY 10538 To: Install roof mounted solar panels to an existing single-family dwelling as applied for per manufacturers specifications. Additional certification may be required. Premises Located at: 160 Inlet View E, Mattituck, NY 11952 SCTM# 100.-3-10.13 Pursuant to application dated 09/27/2024 and approved by the Building Inspector. To expire on 11/15/2026. Contractors: Required Inspections: Fees: SOLAR PANELS $100.00 CO-RESIDENTIAL $100.00 ELECTRIC -Residential $125.00 Total S325.00 Building Inspector o��oF so�ryol � o Town Hall Annex Telephone(631)765-1802 54375 Main Road G P.O.Box 1179 ;6 �o Jamesh southoldtownny.gov Southold,NY 11971-0959 1 . �ycoiJNT`II BUILDING DEPARTMENT TOWN OF SOUTHOLD CERTIFICATE OF ELECTRICAL COMPLIANCE SITE LOCATION Issued To: David Tarr Address: 160 Inlet View East city:Mattituck st: New York zip: 11952 Building Permit#: 51386 Section: 100 Block: 3 Lot: 10.13 WAS EXAMINED AND FOUND TO BE IN COMPLIANCE WITH THE NATIONAL ELECTRIC CODE Contractor: GreenLogic LLC Electrician: Robert Skypala License No: 43858-ME SITE DETAILS Office Use Only Residential X Indoor X Basement Service Commerical Outdoor X 1st Floor Pool New X Renovation 2nd Floor Hot Tub Addition Survey Attic Garage INVENTORY Service 1 ph Heat Duplec Recpt Ceiling Fixtures Bath Exhaust Fan Service 3 ph Hot Water GFCI Recpt Wall Fixtures Smoke Detectors Main Panel A/C Condenser Single Recpt Recessed Fixtures CO2 Detectors Sub Panel A/C Blower Range Recpt Ceiling Fan Combo Smoke/CO Transfer Switch UC Lights Dryer Recpt Emergency Strobe Heat Detectors Disconnect Switches 4'LED Exit Fixtures 11 Sump Pump Other Equipment: 20.352.kw with 53 panels[REC460AA PURE-RX] , 53 MICRO-INVERTERS [IQ8X-80-M-US], 1 AC Combiner Panel, 1 NON Fused Disconnect, 1 125a Disconnect Notes: SOLAR PV SYSTEM Inspector Signature: Date. 3/17/25 160 inlet view east OESOUIyo� �� /GD f P is 80 # # TOWN OF SOUTHOLD BUILDING DEPT. co 631-765-1802 INSPECTION [ ] FOUNDATION 1 ST/ REBAR [ ] ROUGH PLBG. - [ ] FOUNDATION 2ND [ ] INSULATION/CAULKING [ ] FRAMING /STRAPPING [ ] FINAL [ ] FIREPLACE & CHIMNEY [ ] FIRE SAFETY INSPECTION [ ] FIRE RESISTANT-CONSTRUCTION [ ]- FIRE RESISTANT PENETRATION- [ ] ELECTRICAL (ROUGH) V] ELECTRICAL (FINAL) [ ] CODE VIOLATION [ ] PRE C/O [ ] RENTAL REMARKS: 60 kr ,olat,4 f geed / G7L DATE a .INSPECTOR oF So�,y° o te4 U6"ez,) 5-. TO N OF SOUTHOLD BUILDING DEPT. co 631-765-1802 INSPECTION " [ ] FOUNDATION 1 ST/ REBAR' [ ] ROUGH PLBG. [ ] FOUNDATION 2ND [ . ] INSULATION/CAULKING [ ] FRAMING /STRAPPING [ ] .FINAL [ ] FIREPLACE & CHIMNEY [ ] FIRE SAFETY INSPECTION [ ] FIRE-RESISTANT CONSTRUCTION [ ] FIRE RESISTANT PENETRATION [ ] ELECTRICAL (ROUGH)-- ELECTRICAL (FINAL) [ ] CODE VIOLATION [ ] PRE C/O [ ] RENTAL REMARKS: 6t) tor DATE Z o2 INSPECTOR *OE so(/j�,°lo # # TOWN OF SOUTHOLD BUILDING DEPT. _ 765-1802 INSPECTION [ ] FOUNDATION 1ST [ ] ROUGH PL13G. [ ] FOUNDATION 2ND [ SULATION/CAULKING [ ] FRAMING/STRAPPING [ ] FINAL 5014-� [ ] FIREPLACE & CHIMNEY [ ] FIRE SAFETY INSPECTION a [ ] FIRERESISTANT CONSTRUCTION [ ] FIRE RESISTANT PENETRATION [ ] ELECTRICAL (ROUGH) [ ] ELECTRICAL (FINAL) [ ] CODE VIOLATION [ ] PRE C/O REMARKS: S� O .9 � 0 DATE �' INSPECTOR ` r i 40 + Ail Ak IA lot R •�► C c l .r J A M E S J. S TOUT A R C H I T E C T & Assoc. 2 G R E G L A N E E AST NORTHP0R TN. Y. 631 - 8 58 9388 Post Install Letter January 24,2025 ; `1 RE: Tarr Residence APR 2 8 2025 160 Inlet View, E Mattituck, NY 11952 ;u . _w. .,,R Tr Permit# 51386 To Whom it may concern: This letter is to confirm that as of this date January 24, 2025, I, James J Stout, NYS license 021633 have visually inspected the placement and installation of the roof top solar panels at the above listed address. The solar panels have been installed as per manufacturer's guidelines and specifications. The racking system design and installation complies with the 2020 NYSRC and provisions of ASCE 7-16. The installation was done as per approved Building Department plans. This certification letter must be presented to the municipality within 120 days of the issuance date to ensure compliance with safety procedures and continuity of service. Thank you for your cooperation in this matter. James J. Stout ARC 21 33 oQ TF NE3�y FIELD INSPECTION REPORT I DATE COMMENTS •o oi FOUNDATION (1ST) --- ------------------------------------ � C FOUNDATION (2ND) z 0 G ROUGH FRAMING& PLUMBING • � 0 Q INSULATION PER N.Y. "� w STATE ENERGY CODE FINAL L v ADDITIONAL COMMENTS o $ova 2 ( -zozyP �Pr�rG a c" o a e, a'.. 4- Vie C r� _ X z , d r b TOWN OF SOUTHOLD—BUILDING DEPARTMENT Town Hall Annex 54375 Main Road P. O. Box 1179 Southold,NY 11971-0959 Telephone (631) 765-1802 Fax (631) 765-9502 https://www.southoldtownny.go_v "W j��5gz Date Received APPLICATION FOR BUILDING PERMIT For Office Use Only f _ SEP 2 � 2024 PERMIT NO. Building Inspector: � p@pa+l'ID11@'fill PrppA itruns and iarmstmust be filled out�n their_ent re#y Incomplete gulldl 9{�o�{hold applications will riot be accepted Where the Applicant is not th"e owner,an down Owner's Authorkki'6n form jPage 2}shall be completes) ; a E.� Date:9/25/2024 OWNER(S)¢OFPROPERTY ._ ., �? r _. Name:David Tarr SCTM#1000-100-3-10.013 Project Address:160 Inlet View East,yMatt t , NY 11952m Phone#: Email @'gmail.com Mailing Address�:67 Stuvvesant Avenue, Larchmont, NY 10538 CONTACT PERSON z Name Barbara - GreenLogic LLCnA Mailing Address:97 North Sea Road, Southampton NY 11968 Phone#:631 771-51 52 x117 _ Email:BarbaraC@Greenlogic.com �DESIGN.PROFESSIONAL;INFORMATION Name:James J Stout Architect & Associates Mailing Address 2 Greg Lane, E. Northport, NY 11731 Phone#:631 ,.858 9388 Email stouthub@jqMesstoutarch.com CONTRACTOR INFORMATION ' ....... .. . �P x Name:GreenLogic LLC Mailing Address 97 North Sea Road, Southampton, NY 11968 Phone#:631 771 5152 Email:AM@Greenlogic coma p,ESCRIPTION QF PROPOSED CONSTRUCTION , ❑New Structure ❑Addition ®Alteration ❑Repair ❑Demolition Estimated Cost of Project: (]Other Solar Panels $ 81,000 Will the lot be re-graded? ❑Yes ®No Will excess fill be removed from premises? ❑Yes ®No 1 PROPERTY INFORMATION Existing use of property:One family residence Intended use of property One—fa rnity PeSi en Zone or use district in which premises is situated: Are there any cov Hants and restrictions with respect to this property? es o IF YES, PROVIDE A,COPY. B Check Box After Reading.. The owner/contractor/design professional is responsible for all drainage and storm water issues as provided by' "Chapter 136'of the Town Code. APPLICATION 1S.HEREBY MADE to the Building Department for the-ssuance of'a Building;Permit pursuant to the Building Zone Ordinance of the Town of Southold;-Suffolk,County,Newyork and other applicable laws,Ordinances or Regulations,forthe construction of buildings, additions,alterations or for removal or demolition asberein.descri6ed.'The applicant"agrees to comply with all applicatile'lawg,:ordinances,building code, housing code and regulations and to admit authorized inspectors on premises and in building(s)for necessary inspections.False statements made herein are - .:punishable as a Class A miedemeanor,pursuant to Section 210.45 of the New York State Penal Lawn Application Submitted By(print name):GreenLogic LLC BAuthorized Agent ❑Owner Signature of Applicant: Date: �l--SAW STATE OF NEW YORK) SS: COUNTY OF Suffolk ) Nesim Albukrek being duly sworn,deposes and says that(s)he is the applicant (Name of individual signing contract)above named, (S)he is the Contractor (Contractor,Agent,Corporate Officer,etc.) of said owner or owners,and is duly authorized to perform or have performed the said work and to make and file this application;that all statements contained in this application are true to the best of his/her knowledge and belief;and that the work will be performed in the manner set forth in the application file therewith. Sworn before me this day of �� 20 09 Notary Public BARBARA A CASCIOTTA Notary Publl"We of New Yodt PROPERTY OWNER AUTHORIZATION NO'01 Cu&Iteed In Suffolk County (Where the applicant is not the owner) ComtnWalonE*mMg111,XV I, �Gd`C`� �G`�r residingat G--T :5+U/VeSC.� Aue- LI' hOA1� l I T do hereby authorize GreenLogic LLC to apply on my behalf to the Town of Southold Building Department for approval as described herein. l� bg Owner's Signature Date �) Print Owner's Name 2 BUILDING DEPARTMENT- Electrical Inspector TOWN OF SOUTHOLD Town Hall Annex - 54375 Main Road - PO Box 1179 co -IM Southold, New York 11971-0959 ¢ ; Telephone (631) 765-1802 - FAX (631) 765-9502 ?' rogerrna.south oldtownn^y.aov -r seandCc)-southoldtownny.gov APPLICATION FOR ELECTRICAL INSPECTION ELECTRICIAN INFORMATION (All Information Required) Date: 9/25/2024 Company Name: GreenLogic LLC Name: Robert Skypala License No.: 43858-ME email: Barbara@Greenlogic.com Phone No: 631-771-5152 ❑1 request an email copy of Certificate of Compliance Address.: , 97 North Sea Road Southampton, NY 11968 JOB SITE INFORMATION (All Information Required) Name: David Tarr Address: 160 Inlet View East, Mattituck, NY 11952 Cross Street: Phone No.: 631-905-9646- Builder Bldg.Permit#:- 5 1 3(a(P email: dmtarr@gmail.com Tax Map District: 1000 Section: 100 Block: 3 Lot: 10.013 BRIEF DESCRIPTION OF WORK (Please Print Clearly) Roof mounted solar electric system `*(53) REC460AA PURE-RX panels Et (53) Enphase IQ78x micro inverters (1) Enphase IQ Gateway ENV2-IQ-AMI System Size: 24.380KW Check All That Apply: Is job ready for inspection?: DYES ❑✓ NO ❑Rough In ❑✓ Final Do you need a Temp Certificate?: EYES ❑NO Issued On Temp Information: (All information required) Service Size ❑1 Ph -❑3 Ph Size: A # Meters Old Meter# ❑New Service ❑ Service Reconnect ❑ Underground ❑Overhead # Underground Laterals ❑1 ❑2 ❑H Frame ❑Pole Work done on Service? ❑Y ❑N Additional Information: PAYMENT DUE WITH APPLICATION Electrical Inspection Form 2020.xlsx GREENLOGICO ENERGY April 24, 2025 APR 28 2025 The Town of Southold Building Department 54375 Route 25 P.O. Box 1179 Southold, NY 11971 Projectlnfo: Building Permit No. 51386 David Tarr 160 Inlet View East Mattituck, NY To the Building Inspector: Enclosed please find the Engineer's Certification Letter for the above referenced address. Can you please close the building permit and send the Certificate of Occupancy after inspection? Please let me know if you have any questions about the installation. Sincerely, .mil wt6a ca ea-6c&tta Barbara Casciotta Account Manager Barbara@Greenlogic.com 631-771-5152 Ext. 117 GREENLOGIC LLC•www.GreenLogic.com Tel: 631.771.5152 Fax: 631.771.5156 SOUTHAMPTON ROSLYN HEIGHTS 97 North Sea Rd., Suite 3 200 S.Service Rd.,#104C Southampton, NY 11968 Rosyln Heights, NY 11577 A5-BUILT SITE INFORMATION: TEST HOLE DATA -SUFFOLK COUNTY TAX MAP ID: 1000-100-03-10.13 (W sr Hou Dw By uc eaurn=smL.Tces -EXISTING 5 BEDROOM HOME,PROPOSED RENOVATION FOR ONE ADDTIONAL OF NE&V y AT�160 4U WW EAS! -ODAREA: 48TIA77 36 q BEDROOMS. ac ���� 0.0��O�� w� �NY'f�z) HARB O RETIE W ROAD -PROPERTY LOCATED AT 160 INLET VIEW EAST o MATTITUCK,TOWN OF SOUTHOLD,SUFFOLK COUNTY,NEW YORK r Lam®Sao•umm -LOT 13,MAP OF INLET EAST ESTATES.FILED:MAY,01 1975,MAP#:G249 .+ s.a' -SURVEY PROVIDED BY:PECONIC SURVEYORS P.C.,DATED:JANUARY,21 2021 Z� 2 ERM sr(W -VERTICAL DATUM-NAVD'1988 DATUM -SURFACE WATER LOCATED WITHIN 300'OF PROPERTY LINE. oe4075 ORM SM.(ye Abandonment of the existing sanitary system must be in N O -PUBLIC WATER,ALL HOMES WITHIN 150LF CONNECTED TO PUBLIC WATER. O S510. � ox GENERAL NOTES: conformance with the Department's requirements. 1. DESIGN FOR 6 BEDROOM HOME. Submit completed form WWM-080 as proof 2. I/A OWF5 SANITARY REPLACEMENT DESIGN-SOUTHAMPTON 51F GRANT PROJECT. vALF RIM sus( 3.SITE PLAN AND REFERENCE ELEVATIONS TO BE USED FOR VA OWT5 SANITARY SYSTEM w - E CONSTRUCTION ONLY.EXACT PROPERTY BOUNDARIES,UTILITY LOCATIONS AND ELEVATIONS ARE NOT GUARANTEED. NO WA ° �� i� 4.REFERENCE ELEVATIONS BASED ON PROPERTY SURVEY. 5.ON51TE UTILITY MARK-OUTS TO BE PERFORMED BY CONTRACTOR PRIOR TO PERFORMING SITE WORK. S 1100, 1 G.SOIL TEST HOLE DATA PROVIDED BY MC DONALD GE05EKVICE5 TEST HOLE INFORMATION Design Professional's Certification Required. i� el 52.0 1 7.EXISTING SEPTIC SYSTEM TO BE LOCATED,PUMPED AND ABANDONED OR REMOVED AS NECESSARY SCALE=NT5 / ' PER 5CDH5 STANDARDS.EX5TING SEPTIC SYSTEM LOCATION COULD NOT BE CONFIRMED AT THIS W Submit P.E.or R.A.Certification For TIME.SEPTIC TANK AND LEACHING POOL TO BE LOCATED BY CONTRACTOR PRIOR TO PERFORMING U The Installation and Construction of the Sewage Disposal System ¢ 1 1 Q �{ SITE WORK. Z Use Form WWM-073 I � �'Q� �O�/ 1 ` 8.INTERIOR PLUMBING AND INVERT TO BE RELOCATED BY LICENSED PLUMBING CONTRACTOR AS 0�� SHOWN ON PLANS.BASEMENT LEVEL PLUMBING DRAIN FIXTURES TO BE ATTACHED TO NEW EJECTION 0) PUMP'IN BASEMENT 5LA13 BY LICENSED PLUMBING CONTRACTOR. W V_ PROPOSED I/A OWF5 SEPTIC SYSTEM FOR UP TO 6 BEDROOM RESIDENCE: W 3:}• � 1 t^ 1. ONE(1)FUJI CEN-7 I/A OWF5 Z W Z S�4O �G '� 2. ONE(1)FUJI MAC I OOP BLOWER,VENT AND FUJI CONTROL ASSEMBLY. Y 'CJL9E �� _ APPROXIMATE ` �+ 3.ONE(1) 1 O'DIAMETER BY 13'EFFECTIVE DEPTH PRECAST LEACHING POOL = V LOCATION OF ( f� 4.ONE(I) I O'DIAMETER FUTURE EXPANSION. W W� EXISTING BURIED 1 W 2 Z H EXISTING WASTELINE TO BE "0/ ELECTRIC SERVICE TO tt� a GENERAL SANITARY SYSTEM AND INSTALLATION NOTES: EXTENDED AND RECONNECTED TO BE VERIFIED IN FIELD t/ I. I/A OWT5 SEPTIC SYSTEM DESIGNED FOR UP TO 6 BEDROOM HOME PER SUFFOLK COUNTY PROPOSED FUJI CEN-7 I/A OWTS DEPARTMENT OF HEALTH STANDARDS(5CDH5). +- WA 1 2. SANITARY GRAVITY DRAIN PIPE TO BE 4-INCH PVC 5DR35 AND 4-INCH CAST IRON AT FUJI CONTROL PANEL, MAC BLOWER ASSEMBLY AND VENT �T HOLE el 38.0+/- WAFASI R G !'I FOUNDATION. Q O 3. OWi5 SHALL BE TESTED FOR WATER TIGHTNESS PRIOR TO ARRIVING ON51TE U51NG THE ~ I/A OWTS 2-INCH CARBON VENT �/ SERIVCE 1 1 METHOD APPROVED BY MANUFACTURER. i 1 d H 4. THE DESIGN ENGINEER SHALL OVERSEE THE OWT5 DURING SYSTEM STARTUP. PROPOSED FUJI CEN-7 I/A OWTS ,� OMO H 5. THE OWT5 INSTALLER SHALL BE LICENSED,HOLD AN ENDORSEMENT FROM 5CDH5 AND BE A w FUJI AUTHORIZED IN5TALLER. / G. THE OW175 INSTALLER SHALL REGISTER THE ON51TE TREATMENT SYSTEM WITH 5CDH5. THE 1* vem Q� j N DE51GN ENGINEER SHALL PROVIDE RECORD DOCUMENTS AS REQUIRED BY 5CDH5. (� i 7. AN OPERATION AND MAINTENANCE CONTRACT BETWEEN THE MAINTENANCE PROVIDER AND THE ONE R� PROPOSED 10' X 13' PRECAST �� c E T tAY `-ce�meter Ixom PROPERTY OWNER SHALL BE PROVIDED TO 5CDH5. CONC TE LEACHING POOL. n ° ASPS 'c_c� el 65, 8. A GARBAGE GRINDER SHALL NOT BE INSTALLED UPSTREAM OF THE OWT5. 9. WATER SOFTENER BACKWASH SHALL NOT BE FLUSHED TO PPOP05ED SEPTIC SYSTEM. 10. CONTRACTOR TO CONFIRM INVERT ELEVATION OF THE SEWER LINE LEAVING BUILDING PRIOR EXISTING SANITARY SYSTEM COMPONENTS TO BE LP �-� �,, CO Zi �� +a°� c-�`� well / TO THE START OF CONSTRUCTION.ANY DEVIATION SHALL BE REPORTED TO THE ENGINEER OF PUMPED AND ABANDONED OR REMOVED PER +LPi aTs °1d c ` ��m-� �� + RECORD. M SCDHS STANDARDS. �� \ \ STD �- .� �j$ 1 1. CONTRACTOR I5 RESPONSIBLE TO OBTAIN TOWN BUILDING PERMITS AS NECESSARY PRIOR TO Z o^o ++� \ i:� u- �i �r0' INSTALLATION OF THE PROPOSED SEPTIC SYSTEM. M exrs '1) + 143 i \ \ �LPi W60D 12. NOTE THERE 15 A HOUSE TRAP. I/A OWT5 TO BE VENTED THROUGH 2 INCH CARBON VENT. v o r- DECK in / eljlk/ \ \ U) i W a o \ LEGEND Q Z /-' catch basin Q-CAST IRON LF-UNPARFOOT U� CO-GTEANOUT LP-LEACHING POOL Cl) ti"'`, CP-E)05TING 5ANITAWCE55POOL MA%-MARIMUM P =W i PRO OSED ,.;,' W .• CTG-CUT TO GRADE MIN-MINIMUM L Y / 8' FUTURE '��. � ! �� STING PRIVATE WELL SERVICE. DB-DISTRIBUTION BOX � OWF5-ON51TE WASTEWATER TREATMENT 5YSTENI ^ j a-� > = EL-ELEVATION Pr-PERCOLATION TEST U Q I EXPANSION I 0 FOR IRRIGATION PURPOSES ONLY. •ti EX-UPAN51ON POOL 5CDH5-5UFFOL7 COUNTY DEPARTMENT OF HEALTH SERVICES LLJ E%15-DZTING 5T-5EPnCTANK N FIT-FINISHED FLOOR ELEVATION TH-TEST HOLE (n 7 I 4`, Q GE-GRADE ELEVATION V.VENT Q W W\ AEI t I , " -- ��y / GPD-GALLONS PER DAY TYP-TWICAL } Q 0� HEGE-HIGHEST E)CPECrED GROUNDWATER WM-WATER METER O VA OWT5�{ ... INVERT INNOVATIVE/ALTERNATIVE OWiS LLj iE IE-INVERT ELEVATION � O Q O Z C> W W W I i ` •�$0�` NEW DRYWELL FOR 2ND FLOOR ROOF C %�,� \ % /� I I S� 9ET? TO BE DESIGNED BY OTHERS SUFFOLK COUNTY DEPARTMENT OF HEALTH SERVICES �O / 1 I / gE PERMIT FOR APPROVAL OF CONSTRUCTION FOR A W�! \ SINGLE FAMILY RESIDENCE ONLY; op�1 i (I) DW DATE:02-01-23 W s� \% I I I �� SCALE: 1:40 Z7_,W �0�, •V I 0�+y� DATE 8/8/23 S F. O. R-23-0180 DESIGNER:TAO � \ \ ; I +Q� APPROXIMATE LOCATION OF PROPOSED APPROVED O ` DRYWELL FOR USE AS POOL SHEET: CONTRACTOR IO BE N FIELDNFlRMED BY FOR MAXIMUM OF 6 BEDROOMS SANITARY SITE PLAN 0 y�. SCALE= 1:40 EXPIRES THREE YEARS FROM DATE OF APPROVAL _ 4 �•1� J- W •Y, OJ r >, SEE ATTACHED SPECIAL CONDITION, D 40' 80' y W GRADING PLAN AND/OR PLOT PLAN. K090 J A M E S J. S TOUT A R C H I T E C T & ASSOC. 2 G REG L A N E E AST NORTHP0RT N. Y. k 3 1 - 8 58 9388 COMPLY WITH ALL CODES OF Letter of Certification NEW YORK STATE&TOWN CODES AS REQUI ED AND CONDITIONS OF June 24,2024 000LDTMMA 8WHOLDTOWNR MM3191M RE: Tarr Residence WAOMT=MUSTE6S 160 Inlet View East NX&DEi Mattituck, NY 11952 SOUiN01DFJpC SCHO To whom it may concern: Additional I, James J. Stout, registered architect NYS license number 021633 would like to Certification submit the following: May Be Required. I have inspected and analyzed the roof structure at the above mentioned address and have determined the structure and the panel attachment to be adequate to support the new additional load imposed by the proposed solar panel system and complies with the 140-mph wind design load as per 2020 Residential code of NYS (RCNYS), 2020 Energy conservation construction code of NYS (ECCCNYS),the Long Island Unified Solar Permit Initiative(LIUSPI) and the ASCE 7-16. The existing 2"x 8"@ 16"o.c.. roof rafters will provide the required support. II I-- ELECTRICAL �iE d 15eonrle� rnu4 YJ, INSPECTION REQUIRED Thank you, 10 C C-ed 01t'S'1 oe-,, 1 njoe led James J. stout QY1d acm5g b1� Architect . APPROVED AS NOTED o I - 5-2'-fB.� ao0,::BY. NOTIFY BUILDING DEPARTMENT AT 631-765-1802 SAM TO 4PM FOR THE 3. FOLLOWING INSPECTIONS: FOUNDATION-TWO REQUIRED FOR POURED CONCRETE 11r ROUGH-FRAMING&PLUMBING FINAL�.� INSULATION qT6 o Fiyo BE COMPLETE F RUCTION MUST OR C O. ALL CONSTRUCTION SHALL MEET THE REQUIREMENTS OF THE CODES OF NEW YORK STATE. NOT RESPONSIBLE FOR DESIGN OR CONSTRUCTION ERRORS GREENLOGICO ENERGY GreenLogic,LLC Approved Tarr,David 160 Inlet View East Mattituck,NY 11952 Surface#A: Total System Size:24.380kW Array Size:9.660kW 1 circuit of 7 on a 20A breaker 1 circuit of 7 on a 20A breaker 1 circuit of 7 on a 20A breaker Azimuth:160° Pitch:21° Monitoring System: N EnPhase Panel/Array Specifications: Panel:REC460AA PURE-RX Racking:IronRidge Panel:68.0"X 48.1" Array:39'10 114"X 12'1" Surface:41'1"X 15'6" egend• 21 REC pha Pure-RX 460W 211Q8 Microlnverters ® Ir idge XR-100 Racking 0 54 IronRidge Flash Foot 2 Id W"Douglas Fir Rafter 16"O.C. Notes: Number of Roof Layers:1 Height above Roof Surface:4" Materials Used:IronRidge,REC,EnPhase Added Roof load of PV System:2.32psf EngineerlArchitect Se al:' BRED C, ,r r I �9 10214 33 40 Drawn By:MA Drawing#1 of 11 Date:6/21/2024 REV:A Drawing Scale:3/16"=1.0' GREENLOGICO ENERGY GreenLogic,LLC Approved Tarr,David 160 Inlet View East Mattituck,NY 11952 Surface#A: Total System Size:24.380kW Array Size:9.660kW 1 circuit of 7 on a 20A breaker 1 circuit of 7 on a 20A breaker 1 circuit of 7 on a 20A breaker Azimuth:160° Pitch:21' Monitoring System: N EnPhase Panel/Array Specifications: Panel:REC460AA PURE-RX Racking:IronRidge �<r Panel:68.0"X 48.1" Array:39 10 1/4"X 12'1" Surface:41'1"X 15'6" Legend: ® 21 REC Alpha Pure-RX 460W 21 IQ8X Microlnverters ® Iron Ridge XR-100 Racking • 541ronRidge Flash Foot 2 8 8 W"Douglas Fr Rafter 16"O.C. Notes: -311 Number of Roof Layers:1 Height above Roof Surface:4" Materials Used:IronRidge,REC,EnPhase Added Roof load of PV System:2.32psf EngineerlArchitect Seal: �COD,tip` C, 10 i 33 J J�9T�I ,NS44 V Drawn By:MA Drawing#2 of 11 Date:6/21/2024 REV:A Drawing Scale:3/16"=1.0' GREENLOGICO ENERGY GreenLogic,LLC Approved Tarr,David 160 Inlet View East Mattituck,NY 11952 Surface#A: Total System Size:24.380kW Array Size:9.660kW 1 circuit of 7 on a 20A breaker 1 circuit of 7 on a 20A breaker 1 circuit of 7 on a 20A breaker Azimuth:160" Pitch:21" Monitoring System: EnPhase Panel/Array Specifications: Panel:REC460AA PURE-RX 1 Racking:IronRidge Panel:68.0"X 48.1" Array:39'10 1/4"X 12'1" Surface:41'1"X 15'6" Legend: 2 ® 21 REC Alpha Pure-RX 460W 21 IQSX Microinverters Iron Ridge XR-100 Racking • 54 IronRidge as Foot 2 a a W"Douglas Fir Rafter 16"O.C. 3 Notes: Number of Roof Layers:1 Height above Roof Surface:4" Materials Used:IronRidge,REC,EnPhase Added Roof load of PV System:2.32psf Engineer/Architect Seal: / ��keD C C7,i g ) 5 1021 33 bQ Drawn By:MA Drawing#3 of 11 Date:6/21/2024 REV:A Drawing Scale:3/16"=1.0' GR-EENLOGIC" ENERGY GreenLogic,LLC Approved Tarr,David 160 Inlet View East Mattituck,NY 11952 Surface#B: Total System Size:24.380kW Array Size:2.760kW 1 circuit of 6 on a 20A breaker Azimuth:340° Pitch:21° Monitoring System: EnPhase PanellArray Specifications: Panel:REC460AA PURE-RX Racking:IronRidge Panel:68.0"X 48.1" Array:11' "X 12'1" Surfac .41'1" 15'6" egend• ® 6 RE Alpha Pure-RX 460W 61Q Microlnverters ® Ridge XR-100 Racking • 21 IronRidge Flash Foot 2 8 8 W"Douglas Fir Rafter 16"O.C. Notes: Number of Roof Layers:1 Height above Roof Surface:4" Materials Used:IronRidge,REC,EnPhase Added Roof load of PV System:2.32psf Engineer/Architect Seal: BRED AC �`�i S / �gr�r021 3�ypQ r I F f~ Drawn By:MA Drawing#4 of 11 Date:6/21/2024 REV:A Drawing Scale:3/16"=1.0' GREENLOGICO ENERGY GreenLogic,LLC Approved Tarr,David 160 Inlet View East Mattituck,NY 11952 Surface#B: Total System Size:24.380kW Array Size:2.760kW 1 circuit of 6 on a 20A breaker Azimuth:340" Pitch:21° Monitoring System: EnPhase PanellArray Specifications: Panel:REC460AA PURE-RX Racking:IronRidge Panel:68.0"X 48.1" Array:1 V 4 3/8"X 12'1" Surface:41'1"X 15'6" Legend: ® 6 REC Alpha Pure-RX 46OW 6 IQBX Microlnverters ® Iron Ridge XR-100 Racking • 21 IronRidge Flash Foot 2 8 8 W"Douglas Fir Rafter 16"O.C. Notes: Number of Roof Layers:1 Height above Roof Surface:4" Materials Used:IronRidge,REC,EnPhase Added Roof load of PV System:2.32psf Engineer/Architect Seat: 01 Drawn By:MA Drawing#5 of 11 Date:6/21/2024 REV:A Drawing Scale:3116"=1.0' GREENLOGICO ENERGY GreenLogic,LLC Approved Tarr,David 160 Inlet View East Mattituck,NY 11952 Surface#B: Total System Size:24.380kVV Array Size:2.760kW 1 circuit of 6 on a 20A breaker Azimuth:340° Pitch:21° Monitoring System: EnPhase PaneUArray Specifications: Panel:REC460AA PURE-RX 4 Racking:IronRidge Panel:68.0"X 48.1" Array:11'4 3/8"X 12'1" Surface:41'1"X 16 6" Legend: 4 ® 6 REC Alpha Pure-RX 460W 61Q8X Microinverters ® Iron Ridge XR-100 Racking • 21 IronRidge as Foot 2 8 8 W"Douglas Fr Rafter 16"O.C. 4 Notes: Number of Roof Layers:1 Height above Roof Surface:4" Materials Used:IronRidge,REC,EnPhase Added Roof load of PV System:2.32psf Engineer/Architect Seal: t �9 �021 TF OF,N�� Drawn By:MA Drawing#6 of 11 Date:6/21/2024 1REV:A Drawing Scale:3/16"=1.0' GREENLOGIC" ENERGY GreenLogic,LLC Approved Tarr,David 160 Inlet View East Mattituck,NY 11952 Surface#C• Total System Size:24.380kW Array Size:11.960kW 1 circuit of 8 on a 20A breaker 1 circuit of 10 on a 20A breaker 1 circuit of 8 on a 20A breaker Azimuth:250" Pitch:37* rin Monitoring System: EnPhase Panel/Array Specifications: Panel:REC460AA PURE-RX Racking:IronRidge Panel:68.0"X 48.1" Array:34'1 7/8"X 20'2" Surface: 0"X 22'3" Legend: ® 26 R C Alpha Pure-RX 46OW 261 Microlnverters ® Iro idge XR-100 Racking • 72 IronRidge Flash Foot 2 HE W"Douglas Fir Rafter 16"O.C. Notes: Number of Roof Layers:1 Height above Roof Surface:4" Materials Used:IronRidge,REC,EnPhase Added Roof load of PV System:2.32psf Engineer/Architect Seal: ------------- •� I021 33 O ,O JN��y Drawn By:MA Drawing#7 of 11 Date:6/21/2024 REV:A Drawing Scale:3/16"=1.0' GREENLOGICO ENERGY GreenLogic,LLC Approved Tarr,David 160 Inlet View East Mattituck,NY 11952 Surface#C: Total System Size:24.380kW Array Size:11.960kW 1 circuit of 8 on a 20A breaker 1 circuit of 10 on a 20A breaker 1 circuit of 8 on a 20A breaker Azimuth:250' Pitch: Monitorinrin g System: -EnPhase Panel/Array Specifications: Panel:REC460AA PURE-RX Racking:IronRidge Panel:68.0"X 48.1" Array:34'1 7/8"X 20'2" Surface:37'10"X 22'3" Legend ® 26 REC Alpha Pure-RX 460W 26 IQ8X Microinverters ® Iron Ridge XR-100 Racking • 72 IronRidge Flash Foot 2 8 8 2x8"Douglas Fir Rafter 16"O.C. Notes: 17 Number of Roof Layers:1 Height above Roof Surface:4" Materials Used:IronRidge,REC,EnPhase Added Roof load of PV System:2.32psf Engineer/Architect Seal: V ' RSD C % 7 h 10'? �33 yQQ Drawn By:MA Drawing#8 of 11 Date:6/21/2024 REV:A Drawing Scale:3/16"=1.0' GREENLOGIC° ENERGY GreenLogic,LLC Approved Tarr,David 160 Inlet View East Mattituck,NY 11952 Surface#C: Total System Size:24.380kW Array Size:11.960kW 1 circuit of 8 on a 20A breaker 1 circuit of 10 on a 20A breaker 1 circuit of 8 on a 20A breaker Azimuth:250' Pitch:37* rin Monitoring System: 5 6 EnPhase PanellArray Specifications: Panel:REC460AA PURE-RX Racking:IronRidge 5 6 Panel:68.0"X 48.1" Array:34'1 7/8"X 20'2" Surface:37'10"X 22'3" Legend: ® 26 REC Alpha Pure-RX 460W 5 6 26 IQBX Microinverters ® Iron Ridge XR-100 Racking • 721ronRidge Flash Foot 2 8 8 W"Douglas Fir Rafter 16"O.C. 7 6 Notes: Number of Roof Layers:1 Height above Roof Surface:4" Materials Used:IronRidge,REC,EnPhase Added Roof load of PV System:2.32psf 7 Engineer/Architect Seat: / ��kED C —� 5 3 e + 1k +9t io21 33 roe Drawn By:MA Drawing#9 of 11 Date:6/21/2024 REV:A Drawing Scale:3116"=1.0' No Vent Pipes Will Be Covered By The Solar Array GREENLOGICO ENERGY Legend: GreenLogic,LLC Approved Tarr,David AR-Access Roof AP-Access pathway,36"minimum width SVO—Setback at ridge 160 Inlet View East per R202 definitions per R324.6.1 as per R324.6.2.1 Mattituck,NY 11952 Total System Size:24.380kW 1 circuit of 7 on a 20A breaker(3x) 4 1 circuit of 6 on a 20A breaker \ 1 circuit of 8 on a 20A breaker(2x) Meter 1 circuit of 10 on a 20A breaker Azimuth:250° Isk- Monitoring System: EnPhase PanellArray Specifications: Panel:REC460AA PURE-RX Racking:IronRidge Q Panel:68.0"X 48.1" Surface:90'5"X 45' Legend: 53 REC Alpha Pure-RX 46OW FR V 53 IQ8X Microlnverters ® Iron Ridge XR-100 Racking • 147 IronRidge Flash Foot 2 I I I I I fj 8 2x8"Douglas Fir Rafter 16"O.C. I I I I I Notes: I I I I I x Number of Roof Layers:1 IAPI IAPI I Height above Roof Surface:4" I I I I I x x Materials Used:IronRidge,REC,EnPhase I I I I Added Roof load of PV System:2.32psf I I --- I I I Engineer/Architect Seal: ---- -- ------ — D Ca / 1 REC 460 Panels ��AED C ` ��5 g 1. �9 6 REC i021$ �, y0Q T��,_ 460W Panel �thi 26 REC 460W Panels Drawn By:MA Drawing#10 of 11 Date:6/21/2024 REV:A Drawing Scale:1116"=1.0' GREENLOGICO ENERGY GreenLogic,LLC Approved Tarr,David 160 Inlet View East JOB MATERIAL-LIST Mattituck,NY 11952 r Total System Size:24.380kW 1 circuit of 7 on a 20A breaker(3x) 1 circuit of 6 on a 20A breaker i s 1 circuit of 8 on a 20A breaker(2x) 1 circuit of 10 on a 20A breaker i Azimuth:250' Material list W.. 1 Rail Material list tom. Monitoring System: ---� - ---- _ �T� __ __ _____.__ EnPhase Panel/Array Specifications: Cast Aluminum Mounting Block w/Black Aluminum Flashing i 147 ; Panel:REC460AAPURE-RX —�� 5/16"x0.75"FenderWasher 147 Racking:IronRidge — ! —1 Panel:68.0"X 48.1" 5/16"x4.75"Hex-Head lag Screw 147 Surface:90'5"x 45' --------- Legend: 53 REC Alpha Pure-RX 460W ® 53 IQ8X Microinverters ® Iron Ridge XR-100 Racking — • 147 IronRidge Flash Foot 2 8 8 2x8"Douglas Fir Rafter 16"O.C. -- — Notes: Number of Roof Layers:1 Height above Roof Surface:4" Materials Used:IronRidge,REC,EnPhase Added Roof load of PV System:2.32psf Engineer/Architect Seal: e � � 4T 1021 -3 ydQ Drawn By:MA Drawing#11 of 11 Date:6/21/2024 REV:A Drawing Scale:1/16"=1.0' t- L OR _1 3 2025 :° �--� -------------- NEW EQUIPMENT -----------------� EXISTING SERVICE - 120/240, 1 PH, 3W (TYPICAL SYSTEM SCHEMATIC, l: FINAL INSTALLATION MAY VARY, REQUIRES LOCAL AHJ 1 AND UTILITY APPROVAL) i 200A IKWH I PV-SA-1 A AC-COMBINER PANEL AC-CMB-1 AC-DSC-2 AC-DSC-1 L17• • • 2 1 (PV ONLY) B AC EXTERNAL C AC DISCONNECT p DISCONNECT (TAP SWITCH) TYP. PV ARRAY n I PV-SA-N A I A B N I • • • BKIR-1 125A T. . . —L — C.B. 200A / MAIN BKR—N NON— FUSED 1 TYPICAL PV MODULE WITH' I I A B N INTEGRAL DC/AC INVERTER I I I I BKR—M ® 1 EGC I EGC II I 1 II N I I , II I I I N EGC PM-1 I I II I I I I E I I MBJ EGC II I I I I I I I I AC DISTRIBUTION I I I IV MAIN C/T I NEW EGC I '(NON—CRIT AL LOADS)' --- L---------------i------ #6CU MIN. -- -----; y IRREVERSIBLE BOND, TYP. EREO C � EXISTING1GEC r fo71 33 0 REVISIONS Tarr, David GREENLOGICO 160 Inlet View East ENERGY Mattituck, NY 11952 2.) REVISED TO REFLECT ASBUILT CONFIGURATION ELIMINATING THE COST OF ENERGY 1.) INITIAL SUBMITTAL WITH PV APPLICATION Page 1 of 5 ` IDrawing No: TARR-3LD2 Revision: 2 Revised: 1/30/2025 SYSTEM SUMMARY TOTAL KW RATING: (AC POWER) 20.352 (PV) TOTAL PV KW RATING: (DC POWER) 24.380 (PV) QTY. COMPONENT T SPECIFICATION REC BRAND, MODEL: REC460AA PURE-RX 53 PV MODULE: 460 W DC (NOMINAL), EACH ENPHASE BRAND, MODEL: IQ8X-80-M-US 53 PV INVERTER: (INTEGRAL TO MODULE) 384 VA, 1.58 A, 240V AC, EACH REVISIONS Tarr, David ct GREENLOGIC® 160 Inlet View East ENERGY Mattituck, NY 11952 2.) REVISED TO REFLECT ASBUILT CONFIGURATION ELIMINATING THE COST OF ENERGY 1.) INITIAL SUBMITTAL WITH PV APPLICATION Page 2 of 5„ Drawing No: TARR-3LD2 Revision: 2 Revised: 1/30/2025 4 PV ARRAY COMPONENT SCHEDULE TAG DESCRIPTION SPECIFICATION REC SOLAR, MODEL: REC460AA PURE-RX, PV-SA-1 PHOTOVOLTAIC SUB-ARRAY INVERTER: ENPHASE IQ8X-80-M-US, 1-CIRCUIT OF 8-INVERTERS REC SOLAR, MODEL: REC460AA PURE-RX, PV-SA-2 PHOTOVOLTAIC SUB-ARRAY INVERTER: ENPHASE IQ8X-80-M-US, 1-CIRCUIT OF 8-INVERTERS REC SOLAR, MODEL: REC460AA PURE-RX, PV-SA-3 PHOTOVOLTAIC SUB-ARRAY INVERTER: ENPHASE IQ8X-80-M-US, 1-CIRCUIT OF 9-INVERTERS REC SOLAR, MODEL: REC460AA PURE-RX, PV-SA-4 PHOTOVOLTAIC SUB-ARRAY INVERTER: ENPHASE IQ8X-80-M-US, 1-CIRCUIT OF 9-INVERTERS REC SOLAR, MODEL: REC460AA PURE-RX, PV-SA-5 PHOTOVOLTAIC SUB-ARRAY INVERTER: ENPHASE IQ8X-80-M-US, 1-CIRCUIT OF 9-INVERTERS REC SOLAR, MODEL: REC460AA PURE-RX, PV-SA-6 PHOTOVOLTAIC SUB-ARRAY INVERTER: ENPHASE IQ8X-80-M-US, 1-CIRCUIT OF 10-INVERTERS PM-1 PRODUCTION MONITOR ENPHASE IQ GATEWAY REVISIONS Tarr, David GREENLOGIC° 160 Inlet View East ct ENERGY Mattituck, NY 11952 2.) REVISED TO REFLECT ASBUILT CONFIGURATION ELIMINATING THE COST OF ENERGY 1.) INITIAL SUBMITTAL WITH PV APPLICATION Page 3 of 5 Drawing No: TARR-3LD2 Revision: 2 Revised: 1/30/2025 EQUIPMENT&COMPONENT SCHEDULE TAG DESCRIPTION SPECIFICATION AC-CMB-I AC COMBINER PANEL, CRITICAL LOADS 25OV, 125A, NEMA-1, 1-PH, 3-WIRE, MAIN-LUG BKR-1...BKR-7 CIRCUIT BREAKER, PV-SA-1...PV-SA-7 MATCH AC COMBINER PANEL BRAND, 2-POLE, 20A BKR-M CIRCUIT BREAKER, PM-1 MATCH AC COMBINER PANEL BRAND, 2-POLE, 20A AC-DSC-1 AC DISCONNECT BREAKER (LINE TAP) 25OV, 200A, SERVICE RATED, CIRCUIT BREAKER RATING: 125A AC-DSC-2 AC DISCONNECT SWITCH (EXTERIOR) 250V, 125A, NEMA-311, NON-FUSED REVISIONS Tarr, David GREENLOGIC® 160 Inlet View East ct ENERGY Mattituck, NY 11952 - 2.) REVISED TO REFLECT ASBUILT CONFIGURATION ELIMINATING THE COST OF ENERGY 1.) INITIAL SUBMITTAL WITH PV APPLICATION Page 4 of 5 Drawing No: TARR-3LD2A Revision: 2 Revised: 1/30/2025 iK ELECTRICAL LOAD SUMMARY,AC CIRCUITS TAG POWER, MAX VOLTAGE MAX.AC VOLTAGE, NOMINAL RANGE CURRENT PV-SA-1 3,072 WATTS 211-264 VAC 12.64 A AC 240 V,AC PV-SA-2 3,072 WATTS 211-264 VAC 12.64 A AC 240 V,AC PV-SA-3 3,456 WATTS 211-264 VAC 14.22 A AC 240 V,AC PV-SA-4 3,456 WATTS 211-264 VAC 14.22 A AC 240 V,AC PV-SA-5 3,456 WATTS 211-264 VAC 14.22 A AC 240 V,AC PV-SA-6 3,840 WATTS 211-264 VAC 15.80 A AC 240 V,AC CONDUCTOR SCHEDULE TAG TYPE CONDUIT AWG. / EGC/GC A NM-B NM-B 10 / 10/xx B THWN-2,AL SER 1/0 / 2/xx C THWN-2, Cu SER 1/0 / 2 /xx D THWN-2 1-1/2" FMC 2 / xx/ 4 E THWN-2 3/4" LTFC 12 / 12/xx 1.)CONDUCTOR TYPES AND SIZES TO BE ADJUSTED FOR TEMPERATURE, DISTANCE,AND DERATING FACTORS. 2.) ELECTRICAL CONDUITTO BE MINIMUM PVC SCHEDULE 40,ADJUST FOR SITE CONDITIONS. 3.) ALL ELECTRICAL MATERIALS AND INSTALLATION METHODS TO COMPLY WITH NEC AND LOCAL CODE REQUIRMENTS. 4.) NOTE: EQUIPMENT GROUNDING CONDUCTOR TO BE#6 COPPER, MINIMUM REVISIONS Tarr, David GREENLOGICO 160 Inlet View East CENERGY Mattituck, NY 11952 2.) REVISED TO REFLECT ASBUILT CONFIGURATION ELIMINATING THE COST OF ENERGY 1.) INITIAL SUBMITTAL WITH PV APPLICATION Page 5 of 5 Drawing No: TARR-3LD2 Revision: 2 Revised: 1/30/2025 SOLAR'S MOST TRUSTED R E C 4—� REE""ALP-HA" "s, Y tRI�E15 PU RE E PRODUCT 5PECIFICATION5 rah•,, 'pp ETFANEL SIZE 'F 1MODULE COMPATIBLE WITH MILPE t g�� REC 25 YEA WARRANTY L -FREE EAD •- � \ i ;�r: _ is ;. a r a§ ELIGIBLE RDH5 COMPLIANT AMW t;, REC PRODUCT 5PEEIREATION5 • MOST • _-.. aG�0 N CiATA ....... ........ . .. 88 half=cut bifacial REC � �' Cell type heterojunctian cells ""'""` "' �--- �`--, "' = � with lead-free;gaplesstechnology � � ' � ' ) 0.12 in solar glass with anti-reflective surface treatment f Glass: in accordance with EN 12150 G6.9 60.9 Backsheet. Highly resistant polymer it Frame: Anodized aluminum(black) 4-p"ert,4bypassdiodes,tead-free $ c lunation box: IP68 rated,in accordance with 1ECb2790 - Connectors: Staubli MC4 PV-KBT4/KST4(12 AWG) f in accordance with IEC 62852,IP68 only when connected Cable:; 12 AWG solar cable,66.9+66.9in Ja t in accordance with EN 50618 os=o,ez1 A r � -„ -- -- r Dimensions: 68.0 x 48.1 x 1.2 in(22.4 sq-ft) «,.. . ..,:...•. I.B 0.9 ... 1i.4 G I Weight:; 516lbs �N Origin: Made in Singapore Measurements in inches �LECTRICAIART s: -,", cCade RECxxxAA �, m'' ERT1FlCA7!{�i15 :"l' .-_ � . _ _ _,. fZ IEC 61215:2021,1EC 61730:2016,Power Output=RP.,:x(Wp) 450 46.0 470' UL 61730 ID Watt CI ass Sort ing-(W) 0/+10 0/+10 0/+10 IEC62804 1EC61701 Salt alt Mist ' Nominal PowerVoltage-.VMFF(V) 54.3 -54.9 55.4 IEC62716 Ammonia Resistance u Nominal Power Current-I...(A) 8.29 8.38 8.49 ISO11925-2' Ignitability(EN 13501-1 Class E) Ln IEC 62762 Dynamic Mechanical Load OpenGtrcultVoltage V�c(V)- ' 651 65:3 65,6 1EC612152:2016 Hailstone{35mm) Short Circuit Current-1,(A) 8.81 8.88 8.95 IEC62321 Lead-freeacc.to RoH5 EU 863/2015 PowerDenslty{t+VJsq-ftJ ;- 201 -'r ' _ 20.5 �.:. 17a0.-_.... FreTp21 ye ..................... T..._...� Panel Efficiency(%) 21,6 22.1 22.6 ISO14001,ISO 9001,IEC 45001,IEC 62941 .._ -- .. ... _.._ .... _ ............... _.. _..__..._ ._..�. _.. ..... .,._ . . ._ .,.w...... pv- 0- C E F Power Outpt,,+x(ut PWp) 343 350 358 0,7 b,-k a°Frm Nominal PowerVoltage-VMPF(V) 51,2 51.7 52.2 cn S c�mpuene C -Nominal Power Current-lm p(A) 6.70' 6.77 6.86 Z Open Circuit Voltage-VrcIV) 61.3 61.6 61.8 f=�nla �tE�tlN�a v Short'6rcuit Current-I'sc(A) 7.11 7.17 7.23 Nominal Module OperatingTemperature: 44°C(±2°C) Values at standard test conditions(STC:air mass AM 1.5,irradiance 1000 W/n temperature 77T(25'Q,based an a production spread with a tolerance ofP, V &I ±3%within one watt class.Nominalmodule o operating temperature NMOT:airmassAMl.S,irradiance800 Temperature -0.24%/°K wx• ¢ P g P ( P nix' Y W/m2,temperature68 tkG wmdspeed3.3ft/s(Im/s)). Wherexxx indicates the nominal power class(P,)at STC above. Temperature coefficient ofV 024%/°E AXE UM RATINGS r " „ ._ a Temperature coefficient of Is,; 0.04%/°K Operatiorialterm)erature: 40...+185`F- Standard' REC ProTrust The temperature coefficients stated are linear values o System e: 1000V InstalledbyanREC "' )MJjj}j((jN 3 Y g No Yes Yes DELIn ERY<tN� Certified Solar Professional �=��= ->-'� ���� '= Test(i5ad(front): +i000Pa(146.2tbs/sq ft) System'Sze All ¢25kV1 25 Sy aneisperpaltet: 33: Test load(rear): -4000 Pa(83.5 lbs/sq-ft) Product Warranty(yrs) 20 25 25 Panels per 40 ft GP/high cube container. 594(18 pallets) m 'Seriesfuserating: - 25A Power Warranty{yi 25' 25 25 Panels per 53 ft truck: 792(24pallets) Reverse current: 25 A Labor Warranty(yrs) 0 25 10 m 'See installation manual for mounting instructions. Power in Year 1 98% 98% 98% L' Ii LliaFtT - ,. ... Design load-Test load 11.5(safety factor) is CF Annual Degradation 0.25% 0.25% 0.25% Typicallow irradiance performanceof module atSTC- Power in Year 25` 92% 92% 92% a he REC ProTrust Warranty is onlyavailable an panels purchased through an REC Certified Solar Professional installer.Warranty � ,....._ ..,._.... :...... .. _.. . a conditions apply.Seewww.retgroup.mm for more details. i w y Available from: ......-----._ _ - - .__.... ..--...._......---.......-----_...._ € w Irradiance(W/m2).. E Founded in 1996,REC G roup is an in ternational pioneering solar energy company dedicated to empowering consumers REC Solar PTE.LTD. ^�with clean,affordable solar power.As Solar's Most Trusted,REC is committed to high quality,innovation,and a low 20 Tuas South Ave.14 carbon footprint in the solar materials and solar panels it manufactures.Headquartered in Norway with operational Singapore 637312 1` headquarters in Singapore,REC also has regional hubs in North America,Europe,and Asia-Pacific. post@recgroup.com www.recgroup.com ENPHASE. i F " _ iM1 I � IFl illl INII i�l i■,, � . _ - �Eu« IQ8X Micr®inverter Easy tcinstall 1 Our newest I08 Series Microinverters are the industry's first microgrid-forming",software-defined Lightweight;and compactwith plug - microinverters with split-phase power conversion capability to convert DC power to AC power and-play connectors, efficiently.The brain of the semiconductor-based microinverter is our proprietary application- Power line communication(PLC) " specific integrated circuit(ASIC),which enables the microinverter to operate in grid-tied or be,tweemcomponents off-grid mode.This chip is built using advanced 55-nm technology with high-speed digital logic Faster installation with simple two-wire." . and superfast response times to changing loads and grid events,alleviating constraints on battery cabling sizing for home energy systems. ,designed to support High productivity and reliability, IQ8X Microinverter is the latest addition to this family , g pport PV modules with high output DC voltage and cell counts,such as 80-half-cut cells,88-half-cut cells and 96-cells. Produces power even when the grid is down* More;than one million cumulative hours of testing 25 Class ll double-insulated enclosure :. Optimized for•the latest high-powered'- PV modules Part of the Enphase Energy System, IQ8 Series Microinverters redefine IQ8 Series Microinverters integrate with reliability standards with more than one Microgrid-forming`' the IQ Battery,IQ Gateway,and the million cumulative hours of power-on Complies with the latest advanced grid , Enphase App monitoring and analysis testing,enabling an industry-leading 1 support software. limited warranty of up to 25 years. Remote automatic updates for the latest grid requirements. .; 'Configurable to supp rto a wide range,` of grid profiles. • Me6ts•CA Rule21(UL 1741 S4)and IEEE ' 1547.2018(UL 1741-SB) • �_.� NOTE• Connect PV modules quickly and easily I08 Series Microinverters are UL Listed ios series Microinverters be mixed with to the I08 Series Microinverters with as PV rapid shutdown equipment and previous generations of Enphase microinverters(107� integrated MC4 connectors. conform with regulations when installed series,I06 Series;and so on)�in the same system 5 according to the manufacturer's IQ Microinverters ship with default settings that instructions. meet North America'siEEE:1547 intercbmectiow - standard requirements.Region-specific adjustments may be requested by an,Authority. Having,Jurisdiction(AHJ)or utility representative; %actor•ding'tothe4EE1547mterconnection - 'Meets UL 1741 only when installed with IQ System Controller 2 or 3. standard:An':IQ Gateway is required to,make these , _changes during installation. 02024 Enphase Energy.All rights reserved.Enphase,thee and CC logos,IQ,and certain other marks listed at nttes;//ennhase.com/trademark-usage-guidelines are trademarks of Enphase Energy,Inc.in the U.S.and other countries. Data subject to change. IQ8X-MC4-DSH-00185-3.0-EN-US-2024-02-12 IQ8X Microinverter INPUT DATA(OCI UNIT 1: :1 Comrnonly used module pairings w 3207540 To meet compatibility,PV modules must be within the following maximum input DC voltage and maximum module I Module compatibility — Module compatibility can be checked at htps_//enphase.com/installers/microinverters/calculator MPPT voltage range: V 43-60 Operating range V 25-79.5 Minimum and maximum start voltage ' u 30=79.5` Maximum input DC voltage V 79.5 "Maximum continuous operatind DC current A _ ` _ 10 Maximum input DC short-circuit current A 16 Maximum module l 'A "' 93 Overvoltage class DC port — II DC port backfeed current ml[ 0 , PV array configuration _ Ungrounded array;no additional DC side protection required;AC side protection requires a maximum of 20 A per branch circuit OUTPUT 1 1: :1 / A: :1 1: VIIAC Peak output power, VA'; °384, 366 Maximum continuous output power VA 380 360 Nominal grid voltage{L'L), vj 240,split-phase(L-Q,180° 208.single-phase(L;L),120°" Minimum and maximum grid voltage 2 V 211-264 183-229 Maxcontinuousoutputcurrent< ' A° 1.58 1.73 Nominal frequency Hz 60 Extended frequency range Hz 47-68" <" _ , AC short circuit fault current over three cycles Arms 2.70 Maximum unit 'per 20 4 L L)branch cveu'it —, 10 8 Total harmonic distortion % <5 Overv6ltag6 class AC port _ 111' - AC port backfeed current mA 18 Power factor'setting - 1.0 Grid-tied power factor(adjustable) — 0.85leading...0.85 lagging 97.3' 970 CEC weighted efficiency ( 96.5 96.5 Nighttime power consumption mw 26 12 MECHANICAL DATA -Ambient temperature range 40°C to 65°C(-40°F to 149°F) Relative humidity range 4%to 100%(condensing) DC'connectortype ' St3ubliIVIC4 ,<, Dimensions(H x W x D);Weight 212 mm MY) 175 mm(6.9") 30.2 mm(1.2");1.1 kg(2.43 lb) Cooling ." z.Y a Natural convection-`no fans Approved for wet locations;Pollution degree Yes;PD3 Enclosure Class ll double-insulated,corrosion-resistant polymeric enclosure Environmental category;UV exposure rating NEMA Type 6;outdoor COMPLIANCE CA Rule 21(UL 1741-SA),UL 62109-1;IEEE 15412018(UL 1741-SB),FCC Part 15 Class B;ICES-0003 Class B;CAN/CSA-C22.2 NO.107.1-01. Certifications`,, This pioduct Is UL Listed as PV rapld shutdown equipment and conforms wiU NEC2014,NEC'2017,"NEC 2020,and NEC 2023 section 69012 and C22:1-2018 Rule 64-218 rapid shutdown of PV systems:for AC and DC conductors when Installed according to the manufacturer's instructions. (1)No enforced DC/AC ratio. (2)Nominal voltage range can be extended beyond nominal if required by the utility. (3)Limits may vary.Refer to local requirements to define the number of microinverters per branch in your area. 108X-MC4-DSH-00185-3.0-EN-US-2024-02-12 (4)108X is not certified for use with Enphase Three Phase Network Protection Relay(NPR-3P-208-NA)and is,therefore,designed for single-phase operation only.Check with the local utility requirements If you wish to install single-phase inverters across three phases. ENPHASE. •' ' IQ Gateway Smart The IQ Gateway delivers solar production and energy consumption data to Enphase Enables web-based monitoring. Installer Portal monitoring and analysis software for comprehensive,remote maintenance, and.control and management of Enphase systems. Provides bidirectional ' communications for remote' With integrated production metering and optional consumption monitoring,the IQ Gateway is upgrades .3 the platform for total energy management.It integrates with the IQ System Controller and IQ -Supports power export IImlting and, Battery. zero-export applications L 'Simple Easy.system configurationusing Enphase Installer App':;, Flexible'etw6rkmg with WI,Fi, •• 'Ethgrnet,'or'cellular IQ Series Microinverters IQ System Controller The high-powered smart grid-ready IQ Series Provides microgrid interconnect device Reliable.- Microinverters(I06,I07,and IQ8 Series) (MID)functionality by automatically Designed for installation indoors dramatically simplify the installation process. detecting grid failures and seamlessly -or' in'a NEMA 3R rated'i' transitioning the home energy system from grid power to backup power. enclosure • 5-year liriiited warranty •-ENV2 IQ AMII-240 complies.with IEEE®15472018(UL1741 SB 3'dEd) l� 0 Z� IQ Battery IQ Load Controller All-in-one AC coupled storage system that is Helps prioritize essential appliances reliable,smart,simple,and safe.It provides during a grid outage to optimize backup capability and installers can quickly energy consumption and prolong design the right system size to meet the needs battery life. of both new and retrofit solar customers. V` LISTED O 2023 Enphase Energy.All rights reserved.Enphase,the a and CC logos,IQ,and certain other marks listed at https://enphase,com/trademark-usage-guidelines are trademarks of Enphase Energy,Inc.in the US and other countries. Data subject to change. I0-G-DSH-00111-3.0-EN-US-2023-12-20 IQ Gateway ' MODEL ENVO-AMI-2K A 1 ID Gateway,. F'IQ Gateway"integrates revenue grade PV production rrietering(ANSI C12 20`i0.5%),consumptio•n ENV IQ-AM7 240 metering(+2 5%),;and battery metering(+2.5%)with IQ Battery SP. ENV2-IQ=AMt-240(IEEE°"1$47.2018) Includes one 200 A continuous rated Productiori'Current Tearisformer(CT). ACCESSORIESORDER SEPARATELY' Mob11e Connect -Includes COMMS-KIT-01 and CELLMOD'EM M1-06-SP-OS with 5-year Sprint data plan COMM�S-CELL'MODEM M7-06 -,4G based LTE-M1 cehular-modem with:5`-year Sprint data plan CELLbfODEM Mt;d`6 SP-OS ' -4G based LTE-Mt oellu�armodem with 5 year AT& data plan- Consumption monitoring CT and IC Battery 5P metering CT CT-200-SPLIT Split-core and clamp style CTs with 2.5%accuracy enable whole home and IQ Battery 5P metering CT-200-CLAMP Commumcations Kit, :`Installed at the IQ Gateway:.For communicatlons,with'IQ Battery and IQ System Controller Includes COMMS-KIT Ot USB cable for connection to IQ Gateway"or IQ Combiner and allows wirel ass`commumcationwitFi IQ ' COMMS'=KIT 02 .: Battery,and IQ System Controller POWER REQUIREMENTS .AC Power requlrements =" 126/240'V,120y208YV,or127/220YV.Three-wire.:60Hz., IQ Gateway"breaker 2-pole and maximum 20 A overcurrent protection required Typicalpowerconsumptlon CAPACITY Number,ofmlcroinyerters'polled .<r: Up to300 MECHANICAL 1 ELECTRICAL DATA Dimensions(WxHxD)" 21.3cmz=126omx45cm^(6.4inx5Inx18m)n^ „ Weight 1.09 lb =r 401 C to WC(40'F to 149'F)[ENV IQ AMt 240] „Amblenttemperature range 40°C to 50 C(40.F to 122°F)[ENV2 IQ-AM7 2401 -4o*C to146"C(-40°.Fto 115"F if installadin an enclosure: - - a IP30.For installation indoors or in an NRTL-certified,NEMA type 311 or better Environmental rating -rated enclosure,if installing outdoors. Altitude ", ,Up to 2,600 meters CB 530 feet) COMMUNICATION Integrated Wi-Fi 802.11b/g/n(2.4 GHz,5 GHz),for connecting the Enphase Cloud via the Internet. Wi=Fi range(recommended) 10 m Ethernet Optional,802.3,Cat5E(or Cat 6)UTP Ethernet cable(not included),for connecting to the Enphase Cloud via the intemet. Mobile.Connect CELLMODEM-Mi=06-SP-05,CELLMODEM Mt=067AT-05(to be purchased separately,mandatory for sites with IQ Battery) Digital 1/0 Digital input/output for grid operator control US620 For Mobile Connect and Communications Kit Access point(AP)mode For a connection between the IQ Gateway and a mobile device running the Enphase Installer App Metering parts: 9 Up to two Consumption CTs,one Production CT,and one battery CT(for10 Battery 513)< Power line communication(PLC) 90 kHz-110 kHz(Class B),to microinverters. Web API. Refer to:https://developer-v4.enphase.coin Local API Refer to guide for local API LED indicators :From top to bottom"Cloud'connectivdy,WI FI access point mode,PV production state,PLC - communications state Configured via Enphase Installer App and Enphase Installer Platform ................... ..............................................................................................................................................................................................................................._.........................._................................................................................................................................................................................................... IQ-G-DSH-00111-3.0-EN-US-2023-12-20 L Maximum relays read 4.. Capabilities supported Power production limiting(Production CT/s required),power export limiting(Production CT/s required and Consumption CT/s-Load with Solar configuration) Mlrnmum'IQ Gateway version':. 0.3:120 Cable configurations 18 AWG,UL-Std.62,600 V,105"C,and minimum 0.03 inches average thickness Signal voltage range 2.5 V-5 V'(digital high),0 V 1.9 V,(digital low) Terminal blocks S Five terminals,up to 0.002 in Configuration via Enp"sd InstallerApp Eni Installer`Platform(sire settings). W• i Package dimensions(H x W x D) 6.3 in x 10.8 in x 3.9 in Package weight` 2.21b: Aluminium DIN rail 4.9 in Currentttansformers(CT5) One CT-200 SOLID'included . „.',CA Rule 21(UL 1741-SA)IEEE®1547 2018 3:UL 1741 SB 3rd Ed.(ENV2 IQ7AMt 240)' "y UL'61010-1 'CAN/CSA C22.2 NO.61010-1 compliirice = TdIe476FR,PartlS.,CIassB,'ICES003,' IEC/EN 61010-1:2010, EN50065'1,EN61000 4 5 EN61000 6-1,EN61000 6 2 Metering,-ANSI C72.20 accuracy class 0.5(PV production only) IQ System Controller SC200D771C240US01 SC 200G1110240US01 EP2000101 M240US01 EP200G701 M240US00 IQ Battery IQBATTERY-5P-lP-NA,ENCHARGE-3T-IP-NA,ENCHARGE-10T-1P-NA N- � Micromverter r`.: -.; ": ,' „,„ IQ6 IQ7,and IQ8 Series Microinverters 1.8 8.4 8.4 O O g i . i i All dimensions in inches All dimensions in inches ...—...... — Accessories Enphase Mobile Connect Circuit breakers --......_....... - -- -- — ---..._—._.......__......._...._....._.....-.......__......_......._.--- 4G-based LTE-M1 cellular modem with a 5-year BRK-t0A-2-240V Circuit breaker,2-pole,10 A,Eaton BR210 data plan BRK-15A-2-240V Circuit breaker,2-pole,15 A,Eaton BR215 (CELLMODEM-Mt-O6-SP-05 for Sprint and BRK-20A-2P-240V Circuit breaker,2-pole,20 A,Eaton BR220 CELLMODEM-M1-06-AT-05 for AT&T) BRK-15A-2P-240V-B Circuit breaker,2-pole,15 A,Eaton BR215B with hold-down kit support _._ BRK-20A-2P-240V-B Circuit breaker,2-pole,20 A,.Eaton. BR220B with hold-down kit support CT-200-SOLID CT-200-CLAMP ........................ - ---...............................--- —........._..................._.__..._. .... 200 A revenue grade solid core Production CT 200 A clamp-style consumption and battery with<0.5%error rate(replacement SKU) 0/ P metering CT with<2.5%error rate(replacement 1, SKU) I0-G-DSH-00111-3.0-EN-US-2023-12-20 Revision history REVISION DATE DESCRIPTION DSH-00111-3.0 December-2023` Updated powerrequirement and added IG Gateway breaker values '". DSH-00111-2.0 August 2023 Updated temperature specification for ENV2-I0-AM1-240. DSH-0011110 June2023 "` _, Updated altitude,andr'ecommended maximum microinyecters on.asite. ©2023 Enphase Energy.All rights reserved.Enphase,the a and CC logos,IQ,and certain other marks listed at https://enphase.com/trademark-usage-quidelines are trademarks of Enphase Energy,Inc.in the US and other countries. Data subject to change. IQ-G-DSH-00111-3.0-EN-US-2023-12-20 �. s IRONRIDGE XR Rail° Family Solar Is Not Always Sunny Over their lifetime, solar panels experience countless extreme weather events. Not just the worst storms in years, but the worst storms in 40 years. High winds capable of ripping panels from a roof, and snowfalls weighing enough to buckle a panel frame. XR Rails®are the structural backbone preventing these results. They resist uplift, protect against buckling and safely � R and efficiently transfer loads into the 00soffll building structure. Their superior , ' , spanning capability requires fewer roof attachments, reducing the r ~ number of roof penetrations L� and the amount of installation time. ° r r 3 rt " �k- A4 obi' l 1,q Force-Stabilizing Curve fa U `' Sloped roofs generate both vertical and lateral forces on mounting rails which can cause them to 44 bend and twist.The curved shape of XR Rails@ f; f is specially designed to increase strength in both `q directions while resisting the twisting.This unique feature ensures greater security.during extreme weather and a longer system lifetime. rx Compatible with Flat&Pitched Roofs I Corrosion-Resistant Materials ` ,e XR Rails@ are Iron Ridge,9 offers All XR Rails@ are made of 6000-series compatible with '-� a range of tilt leg aluminum alloy,then protected with an FlashFoot°and options for flat anodized finish.Anodizing prevents surface other pitched roof roof mounting and structural corrosion,while also providing attachments. applications. a more attractive appearance.Lt v ,„ y "2 v XR Raile Family The XR Rail@ Family offers the strength of a curved rail in three targeted sizes. Each size supports specific design loads, while minimizing material costs. Depending on your location, there is an XR RailO to match. 'A�csM 3�qi, XR10 XR100 XR1000 XR10 is a sleek,low-profile mounting XR100 is a residential and commercial XR1000 is a heavyweight among rail,designed for regions with light or mounting rail.It supports a range of solar mounting rails.It's built to handle no snow.It achieves spans up to 6 feet, wind and snow conditions,while also extreme climates and spans up to 12 while remaining light and economical. maximizing spans up to 10 feet. feet for commercial applications. • 6'spanning capability 10'spanning capability 12'spanning capability • Moderate load capability Heavy load capability Extreme load capability • Clear&black anodized finish Clear&black anodized finish Clear anodized finish • Internal splices available Internal splices available Internal splices available Rail Selection The table below was prepared in compliance with applicable engineering codes and standards.''Values are based on the following criteria:ASCE 7-16, Gable Roof Flush Mount, Roof Zones 1 &2e, Exposure B, Roof Slope of 8 to 20 degrees and Mean Building Height of 30 ft. Visit IronRidge.com for detailed certification letters. 90 h E z" 120 „r. a� �q 'r` trx "°� ?� aif`�' None 140 XR 10 XIt00r Xt1 160 r r� ��r; � N 90 1204 f v 20 i t F m1g, 41, N11140 160 u.; 90 � ^ t tf E 30 160 € a "*l 90 s 40 P �� � � 160 �� � 80 160 , ; I _ � �, ON, 120 160 �� 'Table is meant to be a simplified span chart for conveying general rail ca.pabiliLies.Use approved certification letter`for actual des gn guidance. H, IRON RIDGE XR1008 Rail See Des cri tion / Length Rail Section Properties Property Value Total Cross-Sectional Area 0.582 in' .66 Section Modulus (X-axis) 0.297 in3 6 Moment of Inertia (X-axis) 0.390 in4 - Moment of Inertia (Y-axis) 0:085 in Torsional Constant 0.214 in3 Polar Moment of Inertia 0.126 in4 1.99 APPROVED MATERIALS: 2.44 6005-T6,6005A-T61,6105-T5,6N01-T6 2.34 (34,000 PSI YIELD STRENGTH MINIMUM) I .58:n �— 1.25 Clear Part Black Part Number Number Description/Length Material Weight XR-100-132A XR-100-132B XR100, Rail 132"(11 Feet) 7.50lbs. XR-100-168A XR-100-168B XR100, Rail 168"(14 Feet) 6000-Series 9.55 lbs. XR-100-204A XR-100-204B XR100, Rail 204 (17 Feet) Aluminum!' 11.60 lbs. V1.11