HomeMy WebLinkAbout52060-Z TOWN OF SOUTHOLD
BUILDING DEPARTMENT
TOWN CLERK'S OFFICE
SOUTHOLD, NY
BUILDING PERMIT
(THIS PERMIT MUST BE KEPT ON THE PREMISES
WITH ONE SET OF APPROVED PLANS AND SPECIFICATIONS
UNTIL FULL COMPLETION OF THE WORK AUTHORIZED)
Permit#: 52060 Date: 07/02/2025
Permission is hereby granted to:
Philip Weber
1 Steers Ave
Northport, NY 11768
To:
construct repairs (new decking and railing) to existing deck addition of a single-family dwelling as
applied for. No structural work to be completed.
Premises Located at:
160 The Strand, East Marion, NY 11939
SCTM# 21.-5-7
Pursuant to application dated 06/02/2025 and approved by the Building Inspector.
To expire on 07/02/2027.
Contractors:
Required Inspections,
FOOTING/REBAR, FRAMING/STRAPPING , DRAINAGE, FINAL,
Fees:
Single Family Dwelling- Alteration $250.00
CO-RESIDENTIAL $100.00
Total $350.00
tailding Inspector
TOWN OF SOUTHOLD—BUILDING DEPARTMENT
rc„ Town Hall Annex 54375 Main Road P. O. Box 1179 Southold,NY 11971-0959
' Telephone (631) 765-1802 Fax (631) 765-9502 Nlll f/WkVW S0Lli& fl(J LL)�V f YAX�j
Date Received
E C E � U E
For Office Use Only
p 2 29
PERMIT N0. Building lens actor., �..�� ���JLJ
Applications and forms must be filled out in their entirety.Incomplete
applications will not be accepted. Where the Applicant Is not the owner,an Building Department
Owner's Authorization form(Page 2)shall be completed. Town of Southold
Date:
OWNER(S)OF PROPERTY:
Name: =SCTM
#1000-
Project Address: ('0 — i
b
Phone#: �?�, „ � Email: c �.
Mailing Address:
CONTACT PERSON:
ry
Name: _
Mailing Address: w
Phone#: Email* j /J /d /fat
DESIGN PROFESSIONAL INFORMATION:
Name:
Mailing Address:.
Phone#: mail: -
CONTRACTOR INFORMATION:
Name: h
Mailing Address: w
Phone#: l_ Email:
DESCRIPTION OF PROPOSED CONSTRUCTION
❑New Structure ❑Addition ❑Alteration 'Repair ❑Demolition Estimated Cost of Project:
❑Other +
Will the lot be re-graded? ❑Yes [KNO Will excess fill be removed from premises? ❑Yes Po
as 01 5" Z,
PROPERTY INFORMATION
Existing use of property: Intended use of property:
Zone or use district in which premises is situated: Are there any covenants and restrictions with respect to
this property? ❑Yes ❑No IF YES, PROVIDE A COPY.
❑ Check Box After Reading:: The owner/contractor/design professional Is responsible for all drainage and storm water Issues as provided by
Chapter 236 of the Town Code. APPLICATION IS HEREBY MADE to the Building Department for the issuance of a Building Permit pursuant to the Building Zone
Ordinance of the Town of Southold,Suffolk,County,New York and other applicable Laws,Ordinances or Regulations,for the construction of buildings,
additions,alterations or for removal or demolition as herein described.The applicant agrees to comply with all applicable laws,ordinances,building code,
housing code and regulations and to admit authorized Inspectors on premises and in building(s)for necessary inspections.False statements made herein are
punishable as a Class A misdemeanor pursuant to Section 210.45 of the New York State Penal Law.
/4f14A-> /J �J)f5Q K
Application Submitted By(print name): ❑Authorized Agent ❑Owner
Signature of Applicant: �/,z Date: 3�a8�aoaS
STATE OF NEW YORK)
S+S/::�
COUNTY OF SL17-TO I K )
'Lie Yv reber being duly sworn, deposes and says that(s)he is the applicant
(Name of individual signing contract)above named,
(S)he is the comra
(Contractor,Agent, Corporate Officer,etc.)
of said owner or owners, and is duly authorized to perform or have performed the said work and to make and file this
application;that all statements contained in this application are true to the best of his/her knowledge and belief;and
that the work will be performed in the manner set forth in the application file therewith.
Sworn before me this
day of ,! ,20 a S
otary Public
iNfCO'L M.FERRAIOLO
Notary Public,State of New York
No.01 FE6074187
P E ° � , NR I" )� 1 ) " II 0 N1 Oualified in Nassau Oour�
(Where the applicant is not the owner) Commission Expires May 13,
I, 1 V a lb residing at I Jtters �✓�hue NorfG,
/V 17(0 do hereby authorize f wf -SaC C�nroc + to apply on
my behalf to the Town of Southold Building Department for approval as described herein.
s�ag�aaas
Owner's St' nature _ Date
NaKcu
Print Owner's Name
2
VERANC�A°
v iny'l Ra' iflihg pd "d r.',R •
- a ing
For Traditioha*l,and Williamsburg Styles
INSTALLATION
Read all instructions prior to installing product.
Refer to manufacturers safety instructions when operating any tools.
To register your product,
ByBarrette
OUTDOOR LIVING'V
A WARNING:
• Improper installation of this product can result in personal injury.Always wear safety goggles when
cutting, drilling and assembling the product.
• Incorrect installation may cause harm to the product or individual.
• Not pool code approved.
NOTICE:
• DO NOT attempt to assemble the kit if parts are missing or damaged.
• DO NOT return the product to the store. For assistance or replacement parts call: 1-800-336-2383.
BEFORE YOU BEGIN: TOOLS NEEDED:
Vinyl rail posts require an internal Tape Measure
support system for weight-bearing
purposes and therefore a post install Level
kit or wood post is required inside a Drill
post jacket. Post install kit and wood %2" and '/8" Drill Bits
post need to be purchased separately.
#2 Square Drive Bit
3" Wood Blocks
Hacksaw
:Rail9 1 ZPurchased Clamps
Post Install Kit
Safety Glasses
Top View of Post Jacket
Railing &Stair Railing Railing Kit
Components: Top Rail
Description
Line Brackets&Covers'
Stair Brackets`
Angle Brackets&Covers' Spindles
Top Rails
Bottom Rails
Balusters/Spindles
Support Braces
Square Drive Screws
'Sold separately. Bottom Rail
Support Brace IJ
Top Rail
Balusters
Line Brackets' Stair Brackets' Angle Brackets'
Bottom Rail
Screws Stair Railing Kit
To obtain and review a copy of the warranty please visit:barretteoutdoorliving.com.You may also contact us at
1-877-279-4496 or email Cs.outdoorliving@ebarrette.com
2
VINYL RAILING
NOTE:
Closely follow post manufacturer's installation
instructions or use a Post Jacket on an existing
wood 4x4.
Assembling rail section: ,
1 a. Assemble your rail section by inserting
balusters/spindles into rails (Fig.1). a Locking
Tab
b. Lock tabs on balusters/spindles must face the
outer edge of the routed holes in rails.
NOTE:
Each kit comes with 2 tabbed balusters, space
them evenly into each section (Fig. 2).
2 a One support brace is included with 6' railing kits. Measure equal distance from both ends
of railing and install support brace in center of
bottom rail.
For 67'/2" rail: install center of support brace
333/4" from ends of rail (Fig. 3).
b.Two support braces are included with 8' railing
kits. Measure length of rail, divide by 3 and
measure that distance from your rail to the 33'/°" 3"Support 33'/<"
center of your first support brace and install Brace
support brace. Repeat that step from the
opposite side of your rail.
For other rail lengths: install support braces
evenly.
Cut two 3" temporary wood spacer blocks (not
30 included)to insert under ends of railing sections to
temporarily assist in aligning railing section (Fig. 4).
3"Wood 3"Support
Block Brace
Screw in top rail metal brackets to underside of
4 each end of rail, with#10 x 1 square drive screw
(sold separately) in middle slot of bracket(Fig. 5).
Do not tighten at this time (allows for adjustment). -
-L %A
3