Loading...
HomeMy WebLinkAbout52060-Z TOWN OF SOUTHOLD BUILDING DEPARTMENT TOWN CLERK'S OFFICE SOUTHOLD, NY BUILDING PERMIT (THIS PERMIT MUST BE KEPT ON THE PREMISES WITH ONE SET OF APPROVED PLANS AND SPECIFICATIONS UNTIL FULL COMPLETION OF THE WORK AUTHORIZED) Permit#: 52060 Date: 07/02/2025 Permission is hereby granted to: Philip Weber 1 Steers Ave Northport, NY 11768 To: construct repairs (new decking and railing) to existing deck addition of a single-family dwelling as applied for. No structural work to be completed. Premises Located at: 160 The Strand, East Marion, NY 11939 SCTM# 21.-5-7 Pursuant to application dated 06/02/2025 and approved by the Building Inspector. To expire on 07/02/2027. Contractors: Required Inspections, FOOTING/REBAR, FRAMING/STRAPPING , DRAINAGE, FINAL, Fees: Single Family Dwelling- Alteration $250.00 CO-RESIDENTIAL $100.00 Total $350.00 tailding Inspector TOWN OF SOUTHOLD—BUILDING DEPARTMENT rc„ Town Hall Annex 54375 Main Road P. O. Box 1179 Southold,NY 11971-0959 ' Telephone (631) 765-1802 Fax (631) 765-9502 Nlll f/WkVW S0Lli& fl(J LL)�V f YAX�j Date Received E C E � U E For Office Use Only p 2 29 PERMIT N0. Building lens actor., �..�� ���JLJ Applications and forms must be filled out in their entirety.Incomplete applications will not be accepted. Where the Applicant Is not the owner,an Building Department Owner's Authorization form(Page 2)shall be completed. Town of Southold Date: OWNER(S)OF PROPERTY: Name: =SCTM #1000- Project Address: ('0 — i b Phone#: �?�, „ � Email: c �. Mailing Address: CONTACT PERSON: ry Name: _ Mailing Address: w Phone#: Email* j /J /d /fat DESIGN PROFESSIONAL INFORMATION: Name: Mailing Address:. Phone#: mail: - CONTRACTOR INFORMATION: Name: h Mailing Address: w Phone#: l_ Email: DESCRIPTION OF PROPOSED CONSTRUCTION ❑New Structure ❑Addition ❑Alteration 'Repair ❑Demolition Estimated Cost of Project: ❑Other + Will the lot be re-graded? ❑Yes [KNO Will excess fill be removed from premises? ❑Yes Po as 01 5" Z, PROPERTY INFORMATION Existing use of property: Intended use of property: Zone or use district in which premises is situated: Are there any covenants and restrictions with respect to this property? ❑Yes ❑No IF YES, PROVIDE A COPY. ❑ Check Box After Reading:: The owner/contractor/design professional Is responsible for all drainage and storm water Issues as provided by Chapter 236 of the Town Code. APPLICATION IS HEREBY MADE to the Building Department for the issuance of a Building Permit pursuant to the Building Zone Ordinance of the Town of Southold,Suffolk,County,New York and other applicable Laws,Ordinances or Regulations,for the construction of buildings, additions,alterations or for removal or demolition as herein described.The applicant agrees to comply with all applicable laws,ordinances,building code, housing code and regulations and to admit authorized Inspectors on premises and in building(s)for necessary inspections.False statements made herein are punishable as a Class A misdemeanor pursuant to Section 210.45 of the New York State Penal Law. /4f14A-> /J �J)f5Q K Application Submitted By(print name): ❑Authorized Agent ❑Owner Signature of Applicant: �/,z Date: 3�a8�aoaS STATE OF NEW YORK) S+S/::� COUNTY OF SL17-TO I K ) 'Lie Yv reber being duly sworn, deposes and says that(s)he is the applicant (Name of individual signing contract)above named, (S)he is the comra (Contractor,Agent, Corporate Officer,etc.) of said owner or owners, and is duly authorized to perform or have performed the said work and to make and file this application;that all statements contained in this application are true to the best of his/her knowledge and belief;and that the work will be performed in the manner set forth in the application file therewith. Sworn before me this day of ,! ,20 a S otary Public iNfCO'L M.FERRAIOLO Notary Public,State of New York No.01 FE6074187 P E ° � , NR I" )� 1 ) " II 0 N1 Oualified in Nassau Oour� (Where the applicant is not the owner) Commission Expires May 13, I, 1 V a lb residing at I Jtters �✓�hue NorfG, /V 17(0 do hereby authorize f wf -SaC C�nroc + to apply on my behalf to the Town of Southold Building Department for approval as described herein. s�ag�aaas Owner's St' nature _ Date NaKcu Print Owner's Name 2 VERANC�A° v iny'l Ra' iflihg pd "d r.',R • - a ing For Traditioha*l,and Williamsburg Styles INSTALLATION Read all instructions prior to installing product. Refer to manufacturers safety instructions when operating any tools. To register your product, ByBarrette OUTDOOR LIVING'V A WARNING: • Improper installation of this product can result in personal injury.Always wear safety goggles when cutting, drilling and assembling the product. • Incorrect installation may cause harm to the product or individual. • Not pool code approved. NOTICE: • DO NOT attempt to assemble the kit if parts are missing or damaged. • DO NOT return the product to the store. For assistance or replacement parts call: 1-800-336-2383. BEFORE YOU BEGIN: TOOLS NEEDED: Vinyl rail posts require an internal Tape Measure support system for weight-bearing purposes and therefore a post install Level kit or wood post is required inside a Drill post jacket. Post install kit and wood %2" and '/8" Drill Bits post need to be purchased separately. #2 Square Drive Bit 3" Wood Blocks Hacksaw :Rail9 1 ZPurchased Clamps Post Install Kit Safety Glasses Top View of Post Jacket Railing &Stair Railing Railing Kit Components: Top Rail Description Line Brackets&Covers' Stair Brackets` Angle Brackets&Covers' Spindles Top Rails Bottom Rails Balusters/Spindles Support Braces Square Drive Screws 'Sold separately. Bottom Rail Support Brace IJ Top Rail Balusters Line Brackets' Stair Brackets' Angle Brackets' Bottom Rail Screws Stair Railing Kit To obtain and review a copy of the warranty please visit:barretteoutdoorliving.com.You may also contact us at 1-877-279-4496 or email Cs.outdoorliving@ebarrette.com 2 VINYL RAILING NOTE: Closely follow post manufacturer's installation instructions or use a Post Jacket on an existing wood 4x4. Assembling rail section: , 1 a. Assemble your rail section by inserting balusters/spindles into rails (Fig.1). a Locking Tab b. Lock tabs on balusters/spindles must face the outer edge of the routed holes in rails. NOTE: Each kit comes with 2 tabbed balusters, space them evenly into each section (Fig. 2). 2 a One support brace is included with 6' railing kits. Measure equal distance from both ends of railing and install support brace in center of bottom rail. For 67'/2" rail: install center of support brace 333/4" from ends of rail (Fig. 3). b.Two support braces are included with 8' railing kits. Measure length of rail, divide by 3 and measure that distance from your rail to the 33'/°" 3"Support 33'/<" center of your first support brace and install Brace support brace. Repeat that step from the opposite side of your rail. For other rail lengths: install support braces evenly. Cut two 3" temporary wood spacer blocks (not 30 included)to insert under ends of railing sections to temporarily assist in aligning railing section (Fig. 4). 3"Wood 3"Support Block Brace Screw in top rail metal brackets to underside of 4 each end of rail, with#10 x 1 square drive screw (sold separately) in middle slot of bracket(Fig. 5). Do not tighten at this time (allows for adjustment). - -L %A 3