HomeMy WebLinkAbout51638-Z Of SOUryo!° Town of Southold
* * P.O. Box 1179
�0 53095 Main Rd
umv. Southold, New York 11971
CERTIFICATE OF OCCUPANCY
No: 46119 Date: 04/17/2025
THIS CERTIFIES that the building SOLAR PANEL
Location of Property: 16465 New Suffolk Ave New Suffolk, NY 11956
Sec/Block/Lot: 117.-6-32.1
Conforms substantially to the Application for Building Permit heretofore,filed in this office dated: 12/20/2024
Pursuant to which Building Permit No. 51638 and dated: 02/12/2025
Was issued, and conforms to all of the requirements of the applicable provisions of the law.
The occupancy for which this certificate is issued is:
Roof mounted solar on existing single-family dwelling as applied for.
The certificate is issued to: David Frankel
Of the aforesaid building.
SUFFOLK COUNTY DEPARTMENT OF HEALTH APPROVAL:
ELECTRICAL CERTIFICATE: 51638 4/4/2025
PLUMBERS CERTIFICATION:
4utho -ad Signat e
of Sao T TOWN OF SOUTHOLD
BUILDING DEPARTMENT
`� • TOWN CLERK'S OFFICE
cauffm SOUTHOLD, NY
BUILDING PERMIT
(THIS PERMIT MUST BE KEPT ON THE PREMISES
WITH ONE SET OF APPROVED PLANS AND SPECIFICATIONS
UNTIL FULL COMPLETION OF THE WORK AUTHORIZED)
Permit#: 51638 Date: 02/12/2025
Permission is hereby granted to:
David S Frankel
68 Bradhurst Ave Ph N
New York, NY 10039
To:
Install roof mount solar on existing single family dwelling as applied for.
Disconnects must be located on the exterior, labeled, and readily accessible.
Premises Located at:
16465 New Suffolk Ave, New Suffolk, NY 11956
SCTM# 117.-6-32.1
Pursuant to application dated 12/20/2024 and approved by the Building Inspector.
To expire on 02/12/2027.
Contractors:
Required Inspections:
Fees:
CO-RESIDENTIAL $100.00
ELECTRIC -Residential $125.00
SOLAR PANELS $100.00
Total 325.00
Building Inspector
tio��OF SOUTyQI
Town Hall Annex Telephone(631)765-1802
54375 Main Road
P.O.Box 1179 G • Q
Southold,NY 11971-0959 'Q
�y&4UNTY,�c`�
BUILDING DEPARTMENT
TOWN OF SOUTHOLD
CERTIFICATE OF ELECTRICAL COMPLIANCE
SITE LOCATION
Issued To: David S Frankel
Address: 16465 New Suffolk Ave City: New Suffolk St: NY Zip: 11956
Building Permit#: 51638 Section: 117 Block: 6 Lot: 32.1
WAS EXAMINED AND FOUND TO BE IN COMPLIANCE WITH THE NATIONAL ELECTRIC CODE
Contractor: Electrician: Trinity Solar License No: 57843ME
SITE DETAILS
Office Use Only
Indoor Basement r Service F Solar
Outdoor R 1 st Floor r Pool F Spa r
Renovation I—I 2nd Floor r Hot Tub I Generator F
Survey Attic r Garage Battery Storage r
INVENTORY
Service 1 ph r Heat Duplec Recpt Ceiling Fixtures Bath Exhaust Fan
Service 3 ph 1- Hot Water GFCI Recpt Wall Fixtures Smoke Detectors
Main Panel A/C Condenser Single Recpt Recessed Fixtures CO Detectors
Sub Panel A/C Blower Range Recpt Ceiling Fan Combo Smoke/CO
Transfer Switch UC Lights Dryer Recpt Emergency Strobe Heat Detectors
Disconnect Switches 4'LED Exit Fixtures
Other Equipment: 4.92kW Roof Mounted PV Solar Energy System w/ (12) Hanwha 410W Modules
Notes: Solar
Inspector Signature: X Date: April 4, 2025
Sean Dev
Electrical Inspector sean.devlinCa_town.southold.ny.us
1.6465NewS uffo IkSolar
fif so
TOWN OF SOUTHOLD BUILDING DEPT.
cou ,N 631-765-1802
I NSPECTION
[ ] FOUNDATION 1 ST/ REBAR [ ] ROUGH PLBG.
[ ] FOUNDATION 2ND [ ] INSULATION/CAULKING
[ ] FRAMING /STRAPPING [�NAL &01, i
[. ] FIREPLACE & CHIMNEY [ ] FIRE SAFETY INSPECTION
[ ] FIRE RESISTANT CONSTRUCTION [ ] FIRE RESISTANT PENETRATION
[ ] ELECTRICAL (ROUGH) j ] -ELECTRICAL (FINAL)
[ . ] CODE VIOLATION [ ] PRE C/O [ ] RENTAL
REMARKS: O� �/t dk.
DATE Lam INSPECTOR.
ho��OE 50UTyOlo s l b (./ I v ICJ P1 /�j
# # TOWN OF:SOUTHOLD BUILDING DEPT.
cou 631-765-1802
INSPECT[ON
[ ] FOUNDATION 1ST/ REBAR [ ] ROUGH PLBG.
[ ] FOUNDATION 2ND [ ] INSULATION/CAULKING
[ ] FRAMING /STRAPPING [ ] FINAL
[ ] FIREPLACE:& CHIMNEY : [ ] FIRE:SAFETY INSPECTION
FIRE'RESISTANT CONSTRUCTION [ ]''FIRE RESISTANT PENETRATION
[ ] ELECTRICAL (ROUGH) ] ELECTRICAL (FINAL)
[ ] CODE VIOLATION [/ ] PRE C/O [ ] RENTAL
REMARKS:
DATE LP J INSPECTOR
51 co313
-t
rTr)' n i
SOLAR
Southold Town, NY APR. 7 2025 March 17, 2025
Town Hall Annex Building54375 Route 25 P.O. Box 1179
Southold, NY 11971 r.
RE: DAVID S FRANKEL Trinity Solar No.
16465 New Suffolk Avenue 2024-07-1126401
New Suffolk, NY 11956
To the Building Official:
I hereby certify that I am a Licensed Professional Engineer in the State of New York.The solar photo-voltaic(PV)system installed at the
above-referenced location conforms to the manufacturers'requirements/specifications.The PV system complies with all applicable laws,
codes and ordinances as specified by all applicable codes, including 2020 Residential Code of New York State and the 2018 IRC, and the
provisions of ASCE7-16.
Regards,
Ayracon Almaraz, PE
Structural Engineer-Trinity Solar
Of NE Jy y
V. 4 O,p�
100315
AROFESS10Na�
NY License No:100315,expiration date:12/31/2026
Trinity Solar 2180 5th Avenue,Unit 1 Ronkonkoma,NY 1(631)319-7233
FIELD INSPECTION REPORT DATE COMMENTS
FOUNDATION (1ST) ---- - ----- ,�
------ ------
cz
� C
FOUNDATION (2ND) j
z
— o
ROUGH FRAMING& - Z�
PLUMBING -
INSULATION PER N.Y.
STATE ENERGY CODEEle
-
• �C' os /its / C.�2fi' c '� 2�,��frL -4�_ �/J
FINAL .a OK� •Q• � �j( �(GG _
ADDITIONAL COMMENTS '
_'I 2 �bc3{' 1 Yl b-1Zi��/ �QiG✓ a'K O
-- o
_ x
--- x
- b
gpFF01K
=cos coGy TOWN OF SOUTHOLD—BUILDING DEPARTMENT
y Town Hall Annex 54375 Main Road P. O. Box 1179 Southold,NY 11971-0959
�y�ol ao� Telephone (631) 765-1802 Fax (631) 765-9502 https://www.southoldtownny.gov
Date Received
APPLICATION FOR BUILDING PERMIT
Pr'71
ter
For Office Use Only r) ��t�,f y .�`
PERMIT NO. i� Building Inspector:
• .. _ ! W ..a DEC 2 0 2024:
Applications and forms must be filled out in their entirety.Incomplete
applications will not be accepted. Where the Applicant is not the owner,an '��^^����('t+,rqq� ,,,�,.
R 77,i s!L7L_t.7'r�rF ..4
Owner's Authorization form(Page 2)shall be completed. Al
. _
Date:11/25/2024
OWNER(S)OF-PROPERTY:
Name:David Frankel SCTM#1000-117.00-06.00-032.001
Project Address:16465 New Suffolk Ave. New Suffolk, NY 11956
Phone#:631-734-4135 Email:davidfrankeleditor@.gmail.com
Mailing Address:6465 New Suffolk Ave. New Suffolk, NY 11956
CONTACT PERSON:
Name7rinity Solar- Samuel Magliaro -
Mailing Address:2180 5th Ave Unit 1 , Ronkonkoma, NY 11779
Phone#:631-319-7233 Emailtrittany�gaumer@trinity-solar.com
DESIGN PROFESSIONAL-INFORMATION:
Name:Trinity Solar- ,. racon V Almaraz
Mailing Address:2211 Allenwood Rd. Wall, NJ 07719
Phone#:-(631)319-7233 Email:Ayracon.Almaraz@trinity-solar.com
CO NTRACTO R.,I N FORMATION:
Name:Trinity Solar- Samuel Magliaro
Mailing Address:2180 5th Ave Unit 1A, Ronkonkoma, NY 11779
Phone#:(631)319-7233 Emailtrittany_gaumer@trinity-solar.com
DESCRIPTION OF PROPOSED CONSTRUCTION
❑New Structure ®Addition ❑Alteration ❑Repair ❑Demolition Estimated Cost of Project:
❑Other' $21,465.79
'Will the lot be re-graded? Dyes ONO Will excess fill be removed from premises? ❑Yes ❑No
• 1
PROPERTY INFORMATION
Existing use of property: Intended use of property:SOlar PaCle�$
Zone or use district in which premises is situated: Are there any covenants and restrictions with respect to
this property?..❑Yes ❑No IF YES, PROVIDE A COPY.
❑Check Box After Reading: The owner/contractor/design professional is responsible for all drainage and storm water issues as provided by
Chapter 236 of the Town Code.,APPLICATION IS HEREBY MADE to the Building Department for the Issuance of a Building Permit pursuant to the Building Zone
Ordinance of the Town of Southold,Suffolk,County,New York and other applicable Laws,Ordinances or Regulations,for the construction of buildings,
additions,alterations or for removal or demolition as herein described.The applicant agrees to comply with all applicable laws,ordinances,building code,
housing code and regulations and to admit authorized Inspectors on premises and In building(s)for necessary Inspections.False statements made herein are
punishable as a Class Amisdemeanor pursuant,toSection 210.45 of the New York State Penal Law.
Application Submitted By(print na );Trinity Solar- Samuel Magllar0 BAuthorized Agent ❑Owner•
Signature of Applicant: Date:
I
STATE OF NEW YORK)
SS:
COUNTY OF S
SGM 7 being duly sworn,deposes and says that(s)he is the applicant
(Name of individual signin ontract)above named,
(S)heisthe /4
(Contractor,Agent,Corpo to Officer,etc.)
of said owner or owners,and is duly authorized to perform or have performed the said work and to make and file this
application;that all statements contained in this application are true to the best of.his/her knowledge and,belief;and
that the work will be performed in the manner set forth in the application file therewith.
-Sworn before me this
l� day of 20 0�
Not Pu is
SARAH YARBROUGH
NOTARY PUBLIC-STATE OF NEW Y RK
55
PROPERTY OWNER AUTHORIZATION No.07 Suffolk
Co
Qualified in Suffolk County
(Where the applicant is not the owner) My Commission Expires 09-2640 6
,, David Frankel residing at 6465 New Suffolk'Ave. New Suffolk, NY 11956
�
do hereby authorize Trinity Solar- Samuel Magliaroto apply on
my behalf to the Town of Southold Building Department for approval as described herein.
lii s. �XX 12- 19 r21-P
Owner's Signature Date
�Q,yid Franl�,el
Print Owner's Name
2
OSVffp� �' BUILDING DEPARTMENT- Electrical Inspector
CG TOWN OF SOUTHOLD
Town Hall Annex - 54375 Main Road - PO Box 1179
y Southold, New York 11971-0959
ems' Telephone (631) 765-1802 - FAX (631) 765-9502
•��,., 4�,�,,,;,.t roge rr(cD south oldtownny,,aov —.sea nd OD-so utholdtown ny.-gov
APPLICATION FOR ELECTRICAL INSPECTION
ELECTRICIAN INFORMATION (All Information Required) Date:
Company Name: Trinity Solar
Name: Richard Guarneri
License No.: ME-57843 email: Rich.guarneri@trinity-solar.com
Address: 2180 5th Ave Unit 1A, Ronkonkoma, NY 11779
Phone No.: (631)319-7233
JOB SITE INFORMATION (All Information Required)
Name: David Frankel
Address: 6465 New Suffolk Ave. New Suffolk, NY 11956
Cross Street: New Suffolk Road
Phone No.: 631-734-4135
BIdg.Permit#: 5 1 (0 52r email: davidfrankeleditor mail.com
Tax Map District: 1000 Section: 117.00 Block: 06.00 Lot: 032.001
BRIEF DESCRIPTION OF WORK (Please Print Clearly)
Installation of a utility approved,grid inter-tied,flush mount,roof mounted,12 Hanwha 410 solar panels,4.92kW photovoltaic electricity generating system.
Construction Cost:$21,465.79
Circle All That Apply:
Is job ready for inspection?: YES / NO Rough In Final
Do you need a Temp Certificate?: r YES / NO Issued On
Temp Information: (All information required)
Service Size 1 Ph 3 Ph Size: A #Meters Old Meter#
New Service- Fire Reconnect- Flood Reconnect- Service Reconnected - Underground - Overhead
# Underground Laterals 1 2 H Frame Pole Work done on Service? Y N
Additional Information:
PAYMENT DUE WITH APPLICATION '
Request for Inspection Form.xis
PERMIT# Address:
Switches
Outlets
GFI's
Surface
Sconces
H H's
UC Lts Fridge HW POOL
Fans Mini Fr. W/D PanelPump
Exhaust Oven Sump Heater
Trnsfmr
Smokes DW Generator Salt Gen.
Carbon Micro GrbDis Water BondLights
Heat Pucks ERV
HOT TUB/SPA
Inst Hot DeHum Transfer Disc
Combo Cooktop Minisplit Blower
AC AH Hood Blower
Service Amps Have Used
Sub Amps Have Used
Comments
NIOIF LAND OF S yAfS
06'
99,99,
NVOIF 0.7 J t".
0 Zee O'lcc
OU/S
DeA,fA R 7-INI
LOIS DeAM R 7-INI L/
23,386 SO. F7.
S'a /o. OO E' Ise
8.00, -
c d>
0.2
of
/C .4�WJE.S:f
0 .
N
w
09 207.09,
to 108.59.
IVIOIFJOHN&
C\l
►ERTRUOE
HARTUNG 18,844SQ,
FT
18,319
SO. FT 6
o
CO
/7.4
CO
JVC
�IF LAND,Oc
f IKEN
ICDONNELL &
y
FOL OUGHNEY CIE
9q.06'
s/-,e *0
N 84, 0, 00. S,
W.
192-56'
NE►
SUFFO�
AVENUE , le
1-4ao V
®o®
EcoFasten.
® For Installers. By Installers.
1
COMPLETE RAIL-BASED RACKING SYSTEM
ClickFit is one of the fastest installing rail-based systems
in the industry. Thanks to its Click-in rail assembly, the / :: Composition Shingle,
Tile,Metal
rails can be connected to any of EcoFasten's composition
shingle, tile, and metal roof mounts in seconds without
the need for fasteners or tools. The ClickFit system is f�
made of robust materials such as aluminum and coated ::::
;` mmmm Rail-Based
steel, to ensure corrosion-resistance and longevity.
ClickFit conforms to UL 2703 and has been tested in
extreme weather conditions including wind,fire, and snow.
Structural-Attach
FEATURES & BENEFITS Direct-Attach I
• Tool-less,fastener-free rail attachment
• Fully integrated bonding
• Click-On Mid&End Clamps
• Compatible with a variety of EcoFasten roof attachments !°
11 YEAR WARRANTY
FAST INSTALLING SYSTEM FEATURING _ 4
o , o
CLICK—IN RAIL ASSEMBLY
FIT
INTERNAL SPLICE
Tool-free bonded internal Splice
installs in seconds.
MLPE MOUNT
Attach Module Level Power
MID CLAMP Electronics to the top of the rail.
Click-on mid clamp features integrated `
bonding pins and fits modules 30-50
m m in width.
END CLAMP
Click-on end clamp fits modules END C A P
30-50mm in width.
The slide-on end caps allow the
end clamps to be accurately
positioned on the rail in seconds,
while providing an aesthetically-
pleasing, finished install.
L- FOOT
f The ClickFit rail simply clicks
tf' into our proprietary composition
x-
shingle & the L-foot without the
need to use fasteners or tools. '
i
i
J '
COMPOSITION SHINGLE
Combine the versatile ClickFit
L-Foot with the watertight
GF-1 flashing for a fast
installation on composition
shingle roofs.
GF-t FLASHING&L-FOOT
TILE ROOFS
Use the adjustable ClickFit Tile
Hook for attaching the ClickFit
system to the roofs.Works with
., Flat, S, and W the profiles.
IS
i-r r,/'• CLICKFIT TILE HOOK
STANDING S EAM METAL ROOFS _ _
Combine the ClickFit L-Foot
s with SimpleBlock°-U for a
i fast installation on standing
seam metal roofs.
SIMPLEBLOCK-U -- �
FIT
PRODUCT PART PART BOX =QPALTEIT
IMAGENUMBER DESCRIPTION QUANTITY
ASSEMBLED WITH(1)GF GROMMET AND INCLUDES(1)5/16"EPUM BONDED WASHER
- GF1M GAL BLK 810 GF18X10"BLKMT 50 3200
W/2"HL PLCMT
- GF7 GAL BLK 812 GF7 8X12"GALVALUME BLK 50 2600
FLASHING
HARDWAREALL , , OO
1500004 CF L-FOOT 100 5000
(NO HARDWARE NEEDED)
1500005 CF TILE HOOK US 20 480
1510045 CF TILE HOOK SUB-FLASHING 20 2160
TILE HOOK FLSH F ST TILE HOOK FLASH 12 576
FLAT SIERRA TAN
TILE HOOK FLSH-W ST TILE HOOK FLASH 12 576
W SIERRA TAN
TILE HOOK FLSH-S ST TILE HOOK FLASH 12 576
S SIERRA TAN
SIMPLEBLOCK-U-AL 2"SIMPLEBLOCK SSR-AL 25 4400
ALL HARDWARE INCLUDED WITH OO
1500004 CF L-FOOT ASSY 50 5000
I (NO HARDWARE NEEDED)
I
.�i 1500033 CF RAIL 21(_7F N/A 108
n
1500034 CF RAIL4 FT) N/A 108
(-10. FT)
OF RAIL 8 FT)
1500035 ( IL420 N/A 108
1008051 CF RAIL SPLICE 100 3200
r ` 1510070 CF WIRE MGMT CLIP 1000 TBO
150002E MODULE JUMPER,8IN 25 25000
3d (204MMI
�� 1510057 CF MLPE MOUNT 400 17600
r
a�
PRODUCT PART PART BOX PALLET
IMAGE NUMBER DESCRIPTION LQUANTITY QUANTITY
1510041 CF ENOCAP,BLK LABELED 100 4900
1510015 CF HO ENDCLAMP 20 5600
30MM,BLK
1510016 CF HO ENDCLAMP 50 5600
32MM,BLK
1510017 CF HD ENDCLAMP 50 5600
35MM,BLK
151001B CF HO ENDCLAMP 50 5600
38MM,BLK
1510019 CF HO ENDCLAMP 50 5600
40MM,BLK
1510020 CF HO ENDCLAMP 50 5600
45MM,BLK
1510011 CF HO MIOCLAMP 50 5600
j 30-40MM,BLK
1510012 CF HO MIOCLAMP 50 5600
i 40-50MM,BLK
ROCK-IT V3 SKIRT A65 35MMMM&&R SKIRT V3 40MM 65" 8 255
ROCK IT V3 SKIRT A79 ROCK IT SKIRT
79 6 256
35MM&40MM 79"
ROCK IT V3 SKIRT ABO ROCK IT SKIRT V3 8 256
35MM&40MM 80"
ROCK IT V3 SKIRT B65 ROCK IT SKIRT V3 8 256
32MM&38MM 65"
ROCK IT V3 SKIRT B79 ROCK IT SKIRT79 8 256
32MM&38MM 79"
ROCK IT V3 SKIRT B80 ROCK I7 SKIRT3 8 256
38MM 8
32MM&38MM 0
1500003 CF UNIVERSAL SKIRT 50 5750
CLAMP BLK
POLY KIT LAS SCREW 4 POLY KIT LAG 50 480
SCREW 4"(501
SCRW OP 15-13XC3 ROOFING SCRW 1000 60000
#15 X 3"DRILL PT
INCLUDESBOLT AND
1510001 CONOUITMOUNT-BRKT 50 10350
jl CONOUITMOUNT-TILE CONDUIT MOUNT-TILE SYSTEM 60 4320
7CL
ICKFIT
I
EWA Nol
�• \ s i;�.F � � \\ �\�\�\\` \\� �\ � ♦ t ,(>\ •.fir` w .. -�-�.. ~° ..
k � t. �� K * t" ti ~;��A \`\\• \\`' ��r , cr i s 4s 0",
� k,
g4,
x,N,.�''' x,w1�Z!x„�C�T�. \ - R�" ,�%�• � '� _ � . g�v'° Aw`i�` et,� ^'' i!(' ii:.�.�s•4 \,.
Fw�� P�l; ����.Sit�i•� �'`�: I °{ .�:,�7s w�,;;,.E' .;n..?M�' �� ��;61'��±�'� .�a��x � 4. "�c;.,+��`�.{+ F- i 1�T�h"� 5� ,its, > 'G',..
.',� f ":� ;4�YN��_ F �~�������';.4�.`R�'°$:tr�l. �A''•. Nr '�'-t"a�,�1: ,���;', S''.+•_trta, .r `�; <•y��ak���,u.,z'�"�,3�Fi,���'EL�4c. > t.��Y,..�$,r.„ ���i,�` `'Q
`A,k,"'�,it��'"'' '� friy:>��'C,� ��;F'"__�"�{'=�'3 t�iL `j. j,� ��.` tf�. ,��aSw�t-X�t ' :'�'.;?�vx��,,^�`�E'n•���.,, �' 'S8`Tt"�3� 4it ���nti^s�:^> .��'."k'�'K�`}�{, '>`�.^.:.��
r �'�H S ,s.,X.. _s: ,nr ''�-:ge.�'- �.ern .:�».�.. sA�.•v.„�'3c.:i ,,.x, ,.�k \.,a����t��n",,;. t?.�t{',�s,....��.%fi ..tc.„•rab....x..�_.�,�,. ��'fie.�':5�"�.. �'���"�
• IL November 22,2024
SOLAR y Trinity Solar No.2024-07-1126401
Southold Town,NY RE:DAVID S FRANKEL
Town Hall Annex Building54375 Route 25 P.O.Box 1179 16465 New Suffolk Avenue
Southold,NY 11971 New Suffolk,NY 11956
To the Building Official:
The following information constitutes a summary of the relevant design criteria and recommendations for the support of a new photovoltaic(PV)system on
the existing roof framing components at the above-referenced location.Trinity Solar,LLC has confirmed this structure is permitted by the local jurisdiction and
has provided all relevant documentation regarding the existing structure.As of the date of this evaluation,no concerns nor deficiencies related to the existing
structure have been reported.Therefore,this assessment is based on the premise the existing structure is in good condition and capable of supporting the
existing loads.This evaluation is strictly limited to the support of the PV system and does not extend to any other structural elements not directly involved in
the solar panel installation.If any discrepancies from the actual conditions are identified,or if concerns regarding the existing structure arise,this office must
be notified prior to proceeding with the installation.All spans listed below are horizontal projections.
1.Existing Roof Framing:
•Conventional roof framing at R3:2X6 at 24 o.c.;existing rafter span is the max unsupported span=1 V-2"
2.Roof Loading:
•3.00psf-New PV array load(PV panels,mounting rails,and hardware)
•4.49psf-Existing roof dead load(0.98psf-2X6 at 24"o.c.roof rafters,3.51 psf-roof covering)
•20psf-Ground snow load -per AHJ(Authority Having Jurisdiction)
•Exposure Category C,130mph design wind speed
3.Existing Roof Modification:
•R3-No modification required.Existing roof framing is acceptable for PV installation.
4.Attachments:
•The maximum allowable spacing of the ECOFASTEN-SMART FOOT*attachments can't exceed more than 48".Attachments to be fastened using quantity
(2)#14 x 3"Structural Screws for a rail system or#12 x 3"for rail-less system with a minimum penetration depth of 2.5"-this is adequate to resist all stated
demand loads above.Install attachments,rails,and panels per manufacturer requirements.Stagger attachments to distribute load.
*ATTACHMENT TO BE SECURED TO RAFTERS NO LESS THAN 2x4 IN SIZE.ONLY INSTALL ATTACHMENT ON ASPHALT SHINGLE ROOFS OF
SLOPES GREATER THAN 2:12-OR-9.46°WITH A MINIMUM 7/16"DECK.CONTRACTOR TO INFORM THIS OFFICE IF ANY ITEM ABOVE DIFFERS
FROM SITE CONDITIONS.
The installation,described above,is in general conformance with the manufacturers'specifications and complies with all applicable laws,codes,and
ordinances as specified by applicable codes,including the 2020 Residential Code of New York State and ASCE 7-16.
It should be noted that only PV-supported roofs are reviewed.Trinity Solar is not responsible for any construction flaws or defects that may currently exist in
areas of the structure that are not directly related to the PV installation.
Regards,
Ayracon Almaraz,PE
Structural Engineer-Trinity Solar
OF NE PI y
V.
100315
A'QOFESSIONa�
License No.100315,expiration date:12/31/2026
Trinity Solar 12180 5th Avenue,Unit 1 1 Ronkonkoma,NY 1(631)319-7233
Single Phase Inverter
with HD-Wave Technology
for North America F
SE3OOOH-US / SE38OOH-US / SE5O0OH-US / SE6O0OH-US /
SE76OOH-US / SE10OOOH-US / SE1140OH-US '..'..'
12-25
EAR
WAR )N
LA
i I
i
® solar=,- �., ,m, ® ® aolarZ-=L _4D_. j
0 t
t
{
i
Optimized installation with HD-Wave technology
/ Specifically designed to work with / UL1741 SA certified,for CPUC Rule 21 grid compliance
power optimizers
/ Record-breaking efficiency / Extremely small
/ Quick and easy inverter commissioning directly
from a smartphone using the SolarEdge SetApp ® Built-in module-level monitoring
/ Fixed voltage inverter for longer strings
/ Outdoor and indoor installation
/ Integrated arc fault protection and rapid
shutdown for NEC 2014 and 2017, per article / Optional: Revenue grade data,ANSI C12.20
690.11 and 690.12 Class 0.5 (0.5%accuracy)
solaredge.com solar
® Single Phase Inverter
Wit HD-Wave Tec nology for North America
SE3000H-US / SE380OH-US / SE5000H-US / SE6000H-US/
SE760OH-US / SE10000H-US / SE1140OH-US
APPLICABLE TO INVERTERS WITH
PART NUMBER SEXXXXH-XXXXXBXX4
OUTPUT
Rated AC Power Output 3000 3800 @ 240V 5000 6000 @ 240V 7600 10000 11400 @ 240V VA
3300 @ 208V 5000 @ 208V 10000 @ 208V
Maximum AC Power Output 3000 3800 @ 240V 5000 6000 @ 240V 7600 10000 11400 @ 240V VA
3300 @ 208V 5000 @ 208V 10000 @ 208V
AC Output Voltage Min.-Nom.-Max. ✓ ✓ ✓ ✓ ✓ ✓ ✓ Vac
(211-240-264)
AC Output Voltage Min.-Nom.-Max. ✓ ✓ ✓ Vac
(183-208-229)
AC Frequency(Nominal) 59.3-60-60.50) Hz
Maximum Continuous Output 12.5 16 21 25 32 42 47.5 A
Current @240V
Maximum Continuous Output _ 16 - 24 - - 48.5 A
Current @208V
Power Factor 1,adjustable-0.85 to 0.8S
GFDI Threshold 1 A
Utility Monitoring,Islanding
Protection,Country Configurable Yes
Thresholds
;INPUT
l
Maximum DC Power @240V 4650 5900 7750 9300 11800 15S00 17650 W
Maximum DC Power @208V 5100 7750 15500 W
Transformer-less,Ungrounded Yes
Maximum Input Voltage 480 Vdc
Nominal DC Input Voltage 380 400 Vdc
Maximum Input Current @240VP 8.5 10.5 13.S 16.5 20 27 30.5 Adc
Maximum Input Current @208Vt=1 - 9 13.5 27 Adc
Max.Input Short Circuit Current 45 Adc
Reverse-Polarity Protection Yes
Ground-Fault Isolation Detection 600ko Sensitivity
Maximum Inverter Efficiency 99 99.2 %
CEC Weighted Efficiency 99 99 @ 240V %
98.5 @ 208V
Nighttime Power Consumption <2.5 W
m For other regional settings please contact SclarEdge support
'n A higher current source may be used;the inverter will limit its input current to the values stated
r
® Sin le Phase Inverter
Wit HD-Wave Technology for North America
SE3000H-US / SE380OH-US / SE5000H-US / SE6000H-US/
SE760OH-US / SE10000H-US / SE1140OH-US
ADDITIONAL FEATURES
Supported Communication Interfaces RS485,Ethernet,ZigBee(optional),Cellular(optional)
Revenue Grade Data,ANSI C12.20 Optionalt3l
Inverter Commissioning with the SetApp mobile application using built-in Wi-Fi Access Point for local connection
Rapid Shutdown-NEC 2014 and Automatic Rapid Shutdown upon AC Grid Disconnect
2017 690.12
"STANDARD COMPLIANCE
I
Safety 1-11-1741,UL1741 SA,UL16998,CSA C22.2,Canadian AFCI according to T.I.L.M-07
Grid Connection Standards IEEE1547,Rule 21,Rule 14(HI)
Emissions FCC Part 15 Class B
,INSTALLATION SPECIFICATIONS
AC Output Conduit Size/AWG 1"Maximum/14-6 AWG 1"Maximum/14-4 AWG
Range
DC Input Conduit Size/#of Strings/ 1"Maximum/1-2 strings/14-6 AWG 1"Maximum/1-3 strings/14-6 AWG
AWG Range
Dimensions with Safety Switch 17.7 x 14.6 x 6.8 /450 x 370 x 174 21.3 x 14.6 x 7.3/540 x 370 x 185 In/
(HxWxD) mm
Weight with Safety Switch 22/10 25.1/11.4 1 26.2/11.9 38.8/17.6 lb/kg
Noise <25 <50 dBA
Cooling Natural Convection
Operating Temperature Range -40 to+140/-40 to+60(4) F/-C
Protection Rating NEMA 4X(Inverter with Safety Switch)
*Revenue grade inverter P/N:SExxxxH-US000BNC4
to Full power up to at least 50'C/122'F,,for power de-rating information refer to:https://www.solaredge.com/sites/default/files/se-temperature-derating-note-na.pdf
m SolarEdge Technologies,Inc.All rights reserved.SOLAREDGE,the SolarEdge logo,OPTIMIZED BV SOLAREDGE are trademarks or registered trademarks of SolarEdge Technologies,Inc All Ro H S
other trademarks mentioned herein are trademarks of their respective owners.Dale:52019N01/ENG NAM.subject to change without notice.
OPEAK DUO BLK
IVIL-G10+ SERIES Qce11s
385-410 Wp 1132 Cel Is
20.9% Maximum Module Efficiency
MODEL O.PEAK DUO BLK ML-G10+
Breaking the 20%efficiency barrier
111r,111111I111I11ILIl1L Q.ANTUM DUO Z Technology with zero gap cell layout
boosts module efficiency up to 20.9%.
A reliable investment
Rn Inclusive 25-year product warranty and 25-year linear
Warranty performance warranty'.
Enduring high performance
�Vf Long-term yield security with Anti LeTID Technology,
cells Anti PID Technology2 and Hot-Spot Protect.
Extreme weather rating
CP High-tech aluminium alloy frame,certified for
high snow(5400 Pa)and wind loads(4000 Pa).
Innovative all-weather technology
- Optimal yields,whatever the weather with excellent low-light
and temperature behaviour.
6 busbar 12 busbar
cell technology cell technology
n The most thorough testing
programme in the industry
Qcells is the first solar module manufacturer to pass the
most comprehensive quality programme in the industry:The
new"Quality Controlled PV"of the independent certification
Institute TUV Rheinland.
'See data sheet on rear for further information.
'APT test conditions according to IEC/TS 628044:2015,metnod A(-1500V,96h)
The ideal solution for:
c�vm�ew 1 ` 2023
Rooftop arrays on T1°"^° JE�c+
a zozz
° ° residential buildings USA °°
OPEAK DUO BLK ML-G10+ SERIES
■Mechanical Specification
)4a'hal9 mml
Format 74.0in x 4111n x 1.26In(including frame)
,2.a'ageamml ,56'p955 mm1
(1879 mm x 1045mm x 32 mm)
Weight 48.5lbs(22.0kg)
Front Cover 0.13 in(3.2 mm)thermally pre-stressed glass < mon9PannPa,ansmml 149 3a,•„'
with anti-reflection technology °2•p9amml
Back Cover Composite film ® „ aow mml
Frame Black anodised aluminium
Cell 6 x 22 monocrystalline Q.ANTUM solar half cells a -E] 2.92•r2somml
Junction box 2.09-3.981n x 1.26-2.36in x 0.59-0.71 in
(53-101mm x 32-60mm x 15-18mm).IP67,Wth bypass diodes e•pmneBenolea
cv,N90°n mEuwa
Cable 4mm'Solar cable;(+)a49.21n(1250mm),(-)a49.21n(1250mm)
t 2a•p2 mm) n I
Connector Staubli MCA;IP68
oas p4smm1 T-�I03rla.smml
■Electrical Characteristics
POWER CLASS 385 390 395 400 405 410
MINIMUM PERFORMANCE AT STANDARD TEST CONDITIONS,STCI(POWER TOLERANCE+5 W/-O W)
Power at MPP' P.- PM 385 390 395 400 405 410
E Short Circuit Current' Isc [A] 11.04 11.07 11.10 11.14 11.17 11.20
Open Circuit Voltage' Voc [V] 45.19 45.23 45.27 45.30 45.34 45.37
5 Current at MPP IH [A] 10.59 10.65 10.71 10.77 10.83 10.89
2
Voltage at MPP VM [V] 36.36 36.62 36.88 37.13 37.39 3764
Efficiency' ri [%] a19.6 a19.9 a20.1 2!20.4 a20.6 2:20.9
MINIMUM PERFORMANCE AT NORMAL OPERATING CONDITIONS,NMOT2
Power at MPP P.- [W] 288.8 292.6 296.3 300.1 303.8 307.6
Short Circuit Current Isc [A] 8.90 8.92 8.95 8.97 9.00 9.03
c
Open Circuit Voltage Vpc [V] 42.62 42.65 42.69 42.72 42.76 42.79
Current at MPP I PP [A] 8.35 8.41 8.46 8.51 8.57 8.62
Voltage at MPP Vw„ [V] 34.59 34.81 35.03 35.25 35.46 35.6E
'Measurement tolerances P_±3%;Isc;Voc±S%at STC:1000 W/m2,25±2°C,AM 1.5 according to IEC 60904-3•2800 W/m2,NMOT,spectrum AM 1.5
Ocells PERFORMANCE WARRANTY PERFORMANCE AT LOW IRRADIANCE
too - no
_? ••• At least 98%of nominal power
as°.w•,e•aQe,ePme,�•
w during first year.Thereafter max.
o ss - ------------------ 0.5%degradation per year.At
__ w
n
least 93.5%of nominal power 0 lao --+----- -------
a up to 10 years.Al least 86%of
zo nominal power up to 25 years.
u,z es g All data within measurement s so
w o es a
tolerances.Full warranties In 3
a a accordance with the warranty
w$ eo terms of the Qcells sales ad 4
a o 0 0s to IS 20 2s organisation of your respective 200 400 am eoo reae �J
YEARS country. IRRADIANCE IV(%mj
'Standard terms of guarantee for the 5 Pv companies with the Typical module performance under low irradiance conditions in rvol
highest production capacity in 2021(February 2021) comparison to STC conditions(25'C,1000 W/m[).
TEMPERATURE COEFFICIENTS 7
Temperature Coefficient of I5G a [%/K] +0.04 Temperature Coefficient of Voc 0 [%/K] -0.27 S
f%/ -0.34 Nominal Module Operating Temperature NMOT °F]Temperature Coefficient of PuP 109±54
y V
(43±3°C)
■Properties for System Design
Maximum System Voltage Vsys [V] 1000(IEC)/1000(UL) PV module classification Class 11 a
Maximum Series Fuse Rating [A DC] 20 Fire Rating based on ANSI/UL 61730 TYPE 2 0
Max.Design Load,Push/Pull' [Ibs/ft2] 75(3600Pa)/55(2660Pa) Permitted Module Temperature -40°F up to+185°F
Max.Test Load,Push/Pull' [Ibs/ft'] 113(5400Pa)/84(4000Pa) on Continuous Duty (-40°C up 10+85°C) eo2
3 See Installation ManualZf
-
■Qualifications and Certificates _
ILL 61730,CE-compliant,
Quality Controlled PV-TOV Rheinland, _ _ -
.IEC 61215:2016,IEC 61730:2016, 9'.
U.S.Patent No.9,893,215(solar cells)• CCE � _
qLe�aq
,oii uwn)
0 0
Ocells pursues minimizing paper output in consideration of the global environment.
Note:Installation instructions must be followed.Contact our technical service for further information on approved installation pf this product ���'I
Hanwhd 0 CELLS Am ena)Inc.400 Spectrum Center Drive.Suite 1400.Irvine.CA 9261 S.USA I TEL+1 949 748 59 961 EMAIL hqc-inquiryatgcells.com I WEB www.g m cells.co
NOTES:
L)COMPLIES WITH NEC 2017 —
2.)REFER TO SHEET PV-3 FOR SITE SPECIFIC VALUES REQUIRED BY NEC 690
3.1
STICI(ERS,LABELS,AND PLACNARDS SHALL BE OF SUFFICIENT DURRABRITY TO WITHSTAND THE ENVIROMENT INVOLVED
•
To be and
on all DC junction boxes
and every Won DC conduit _
As
• • • m®
NEC 69031(GJ •—•• Own i ty
�,S O.L AR
NEC 690.S6(C)(I)(A)
DGunNon Box q _ �• •
Fall,
690.56(C)(3) NEC690.4(B)
L4
Service Disconnect •- (^ •NEC 690.138 NEC fi9053
fi90.56(C)(3)
SoUdeck
2N • • •
Utility tutrwcu•mug��,
r—�—� ..ate�� r •
w NEC 690.4(B) ,
J NEC 690.13(8) �..-
NEC 690.56(C)(1)(A)
If System is Backted Breaker ® ! -
NEC69053
NECWIWI
—
I
NEC 690.54
DC Disconnect
Utility Meter
Socket
® Fiw �r®
i
® • NEC690.13(0)
NEC 690.54
,r(. NEC 690.13(8)
1
L f
DC Conduit Main Service Panel Solar Meter Socket Photovoltaic Load Center
Inverter(s) Enphase Envoy Box
AC Disconnect (To Combine Inverters)
NEW SUFFOLKAVENUE•
INSTALLATION OF NEW
ROOF MOUNTED PV SOLAR SYSTEM - -
16465 N EW SU FFOLK AVEN U E
NEW SUFFOLK NY 11956 100315
R�FfSSIONp
Exp: 12/31/2026
Issued/Revisions
P1 35SUED TO TOWNSHIP FOR PERMIT 11/21/2M
#41■OEM VICINITY MAP SITE NO. DESCRIPTION DATE
L.JSCALE: NTS Project Title:
OCCUPANCYOR DAVID S FRANKEL-
RETAIN STORM WATER RUNOFF USE IS UNLAWFUL TRINITY ACCi#:2024-07-1126401
T'URSUANT TO CHAPTER 236 Project Address:
T!-4F TOWN CODE WITHOUT CERTIFICATE
16465 NEW SUFFOLK AVENUE
OF OCCUPANCY NEW SUFFOLK,NY 11956
40.99151-72.4756
GENERAL NOTES GENERAL NOTES CONTINUED GENERAL NOTES CONTINUED ABBREVIATIONS CONTINUED SHEET INDEX Drawing Title:
1. THE INSTALLATION CONTRACTOR IS 8.. THE DC VOLTAGE FROM THE PANELS IS 14. B) CURRENT PREVAILING UTILITY JB JUNCTION BOX PV-1 COVER SHEET W/ SITE INFO & NOTES
RESPONSIBLE FOR INSTALLING ALL ALWAYS PRESENT AT THE DC COMPANY SPECIFICATIONS, kCMIL THOUSAND CIRCULAR MILS
EQUIPMENT AND FOLLOWING ALL DISCONNECT ENCLOSURE AND THE DC STANDARDS,AND REQUIREMENTS kVA KILO-VOLT AMPERE PV-Z ROOF PLAN W/ MODULE LOCATIONS PROPOSEDPVSOLARSYSTEM
DIRECTIONS AND INSTRUCTIONS TERMINALS OF THE INVERTER DURING 15 THIS SET OF PLANS HAVE BEEN kW KILO-WATT
CONTAINED IN THE DRAWING PACKAGE AND DAYLIGHT HOURS.ALL PERSONS PREPARED FOR THE PURPOSE OF kWH KILO-WATT HOUR PV-3 ELECTRICAL 3 LINE DIAGRAM
INFORMATION RECEIVED FROM TRINITY. WORKING ON OR INVOLVED WITH THE MUNICIPAL AND AGENCY REVIEW AND L LINE
2. THE INSTALLATION CONTRACTOR IS PHOTOVOLTAIC SYSTEM ARE WARNED APPROVAL.ONCE APPROVED,THE NICE! MAIN CIRCUIT BREAKER AP APPENDIX Drawing Information
RESPONSIBLE FOR INSTALLING ALL THAT THE SOLAR MODULES ARE INSTALLATION CONTRACTOR IS MOP MAIN DISTRIBUTION PANEL DRAWING DATE: il/21/2024
EQUIPMENT AND FOLLOWING ALL ENERGIZED WHENEVER THEY ARE RESPONSIBLE FOR INSTALLING ALL MLO MAIN LUG ONLY
DIRECTIONS AND INSTRUCTION CONTAINED EXPOSED TO LIGHT. SYSTEM COMPONENTS AS DESCRIBED IN MTD MOUNTED -- DRAWN BY: KTD
IN THE COMPLETE MANUAL. 9. ALL PORTIONS OF THIS SOLAR THE DRAWING PACKAGE. MTG MOUNTING wM ISED BY: -
3. THE INSTALLATION CONTRACTOR IS PHOTOVOLTAIC SYSTEM SHALL BE 16 ALL INFORMATION SHOWN MUST BE N NEUTRAL APPROVED AS NOTED COMPLY WITH ALL CODES RESPONSIBLE FOR READING AND MARKED CLEARLY IN ACCORDANCE WITH CERTIFIED PRIOR TO USE FOR NEC NATIONAL ELECTRICAL CODE
UNDERSTANDING ALL DRAWINGS, THE NATIONAL ELECTRICAL CODE CONSTRUCTION ACTIVITIES. NIC NO# NUM IN BER ER CONTRACT f1w ./a-a S e,P.# (� NEW YORK STATE &I�WN O @ .Information:
COMPONENT AND INVERTER MANUALS ARTICLE 690 705. NTS NOT TO SCALE YA AS REQUIRED AND CatVDITt JT SIZE: 4.92kW
PRIOR TO INSTALLATION.THE INSTALLATION 10. PRIOR TO THE
INSTALLATION OF THIS
CONTRACTOR IS ALSO REQUIRED TO HAVE PHOTOVOLTAIC SYSTEM,THE OCP OVER CURRENT PROTECTION AC SYSTEM SIZE: 3.8kW
ALL COMPONENT SWITCHES IN THE OFF INSTALLATION CONTRACTOR SHALL ABBREVIATIONS P POLE WWW Y ��.�1
PB PULL BOX � �� ,� B i' i�n MODULE COUNT: 12
POSITION AND FUSES REMOVED PRIOR TO ATTEND A PRE-INSTALLTION MEETING AMP AMPERERM, MO U USED: HANWHA 410
THE INSTALLATION OF ALL FUSE BEARING FOR THE REVIEW OF THE INSTALLATION AC ALTERNATING CURRENT PH 0 PHASE NOTIFY BUILDING DEPARTMENT AT (� �yy��,,yypryr�ry' Q Illl
SYSTEM COMPONENTS. PROCEDURES,SCHEDULES,SAFETY AND . AL ALUMINUM PVC PWR POWER
CHLORIDE CONDUIT 64.1_765-1802 8AM TO 4PM FOR THE $QU If11A�/•v' I� ECM Q.PEAK DUO BLK ML-G10+410
4. ONCE THE PHOTOVOLTAIC MODULES ARE COORDINATION. AF _AMP.FRAME �A��p��� ILITY COMPANY: PSEG-U
MOUNTED,THE INSTALLATION 11. PRIOR TO THE SYSTEM START UP THE AFF ABOVE FINISHED FLOOR CITY QUANTITY FOLLOWING INSPECTIONS: SWIM,y1r1'IilY�7 ILITY ACCT#:
CONTRACTOR SHOULD HAVE A MINIMUM OF INSTALLATION CONTRACTOR SHALL AFG ABOVE FINISHED GRADE RGS RIGID GALVANIZED STEEL UTILITY METER#:
ONE ELECTRICIAN WHO HAS ATTENDED A ASSIST IN PERFORMING ALL INITIAL AWG AMERICAN WIRE GAUGE SN SOLID NEUTRAL 1, FOUNDATION-TWO REQUIRED �/�
SOLAR PHOTOVOLTAIC INSTALLATION HARDWARE CHECKS AND DC WIRING C CONDUIT (GENERIC TERM OF JSWBD SWITCHBOARD HAS DEALTYPE: SUNNOVA
COURSE ON SITE. CONDUCTIVITY CHECKS. RACEWAY,PROVIDE AS TYP TYPICAL FOR POURED CONCRETE
5. FOR SAFETY,IT IS RECOMMENDED THAT 12. FOR THE PROPER MAINTENANCE AND SPECIFIED) U.0.1. _UNLESS OTHERWISE INDICATED
THE INSTALLATION CREW ALWAYS HAVE A ISOLATION OF THE INVERTERS REFER TO CB COMBINER BOX WP WEATHERPROOF 2. R(.)i%]H-FRAMING &PLUMBING
MINIMUM OF TWO PERSONS WORKING THE ISOLATION PROCEDURES IN THE CKT. CIRCUIT XFMR TRANSFORMER Rev.No. Sheet
TOGETHER AND THAT EACH OF THE OPERATION MANUAL. CT CURRENT TRANSFORMER +72 MOUNT 72INCHES TO BOTTOM `�' INJULATIOIv -
INSTALLATION CREW MEMBERS BE TRAINED 13. THE LOCATION OF PROPOSED ELECTRIC CU COPPER OF ABOVE FINISHED FLOOR OR 4. FINAL-CONSTRUCTION MUST _ _
IN FIRST AID AND CPR. AND TELEPHONE UTILITIES ARE SUBJECT DC DIRECT CURRENT GRADE P 1
1
6. THIS SOLAR PHOTOVOLTAIC SYSTEM IS TO TO FINAL APPROVAL OF THE DISC DISCONNECT SWITCH BE COMPLETE FOR C.O. P+ • U
BE INSTALLED FOLLOWING THE APPROPRIATE UTILITY COMPANIES AND DWG DRAWING ALL CONSTRUCTION SHALL MEET THE
CONVENTIONS OF THE NATIONAL OWNERS. EC ELECTRICAL SYSTEM INSTALLER
ELECTRICAL CODE.ANY LOCAL CODE 14. ALL MATERIALS,WORKMANSHIP AND EMIT ELECTRICAL METALLIC TUBING REQUIREMENTS OF THE CODES OF NEW
-
WHICH MAY SUPERSEDE THE NEC SHALL CONSTRUCTION FOR THE SITE FS FUSIBLE SWITCH
GOVERN. IMPROVEMENTS SHOWN HEREIN SHALL FU FUSE YORK STATE. NOT RESPONSIBLE FOR
7. ALL SYSTEM N IN ACCORDANCE WITH: GND GROUND
S ALL D W TH COMPONENTS
SYSTEM ARE TO BE BE A) CURRENT PREVAILING MUNICIPAL GFI GROUND FAULT INTERRUPTER DESIGN OR CONSTRUCTION ERRORS �
"UL"LISTED.ALL EQUIPMENT WILL BE NEMA AND/OR COUNTY SPECIFICATIONS, HZ FREQUENCY (CYCLES PER
3R OUTDOOR RATED UNLESS INDOORS. STANDARDS AND REQUIREMENTS SECOND)
4"
GENERAL NOTES /
SOLAR
IF ISSUED DRAWING IS MARKED WITH A REVISION CHARACTER OTHER THAN"A",PLEASE BE ADVISED THAT FINAL EQUIPMENT AND/OR SYSTEM CHARACTERISTICS ARE SUBJECT TO CHANGE DUE TO AVAILABLITY OF EQUIPMENT. 2211 Allenwood Road 877-786-7283
Wall,New Jersey 07719 www.Trinity-Solar.com
(
NOTES:'REFER TO MODULE SPECS FOR MODULE DIMENSIONS _
'DEPICTED MODULES MAY BE PORTRAIT OR LANDSCAPE
NEW PV SOLAR MODULE,TYPICAL /ECOFASTEN-CLAMP
(REFER TO EQUIPMENT SCHEDULE f' (REFER TO SPEC SHEET FOR DETAILS-
FOR SPECS AND QUANTITIES) SOLAR MODULE •SOLAR MODULE O� .•��
♦ NEW MOUNTING FOOT/ATTACHMENT-♦
POINTS,TYPICAL (REFER To ECOFASTEN RAIL ECOFASTEN SMART FOOT �5 N �/
ENGINEERING LETTER FOR SPACING (REFER TO SPEC SHEET FOR DETAILS)AND DETAILS) (REFER TO SPEC SHEET FOR DETAILS) \ tS
;^ _ 'G • �' '
NEW ECOFASTEN RAIL,TYPICAL
TO BE MOUNTED PERPINDICULAR TO
STRUCTURE(REFER TO ECOFASTEN EXISTING ASPHALT SHINGLES ` '»�
SPECIFICATION/DATA SHEET FOR - (REFER TO ENGINEERS LETTER FOR SPECS
DETAILS)
NEW END CLIP,TYPICAL _ _ S y
S.S.LAG BOLT APOC SEALANT
(REFER TO ECOFASTEN SPECIFICATION
♦ ♦ /DATA SHEET FOR DETAILS) (REFER TO ENGINEERS LETTER FOR SPECS SOLAR MODULES SHALL NOT
�
EXISTING RAFTER EXCEED PEAK HEIGHT.
_ NEW MID CLIP/TYPICAL (REFER TO ENGINEERS LETTER FOR SPEC4 - �Fp 100315
(REFER TO ECOFASTEN SPECIFICATION AR�FESS��N��
/DATA SHEET FOR DETAILS)
[]ATTACHMENT&CLIP DETAIL []PV MODULE ATTACHMENT ON ASPHALT-SHINGLE ROOF []HEIGHT FROM GROUND LEVEL TO PEAK OF ROOF
SCALE:NOT TO SCALE - SCALE:NOT TO SCALE _ SCALE:NOT TO SCALE - EXp: 12/31/2026
ARRAY SCHEDULE
. - Issued/Revisions
BACK
■ .. P1 I5SUEDT0 TOWNSHIP FOR PERMIT 11/21/2D24
NO. DESCRIPTION DATE
Project Title:
ROOFS 0
DAVID S FRANKEL-
� �
MODULES:0.
PITCH:S' R� - - TRINITY ACCT M 2024-07-1126401
ORIENTATION:354'
ROOF MODULES:0 _ - J Project Address:
PITCH:34° - -
ORIENTATION:354'- ! -
ROOF3 16465 NEW SUFFOLK AVENUE
MODULES:22 - _ NEW SUFFOLK,NY 11956
PITCH:34 ORIENTATION:174 R7 40.9915,-72.4756
�•
ROOF
MODULES:0
ORIENTAT ION:84° RZ -- Drawing Title:
ROOF MODULES:0
-
PITCH:27°
ORIENTATION:83° PROPOSED PV SOLAR SYSTEM
ROOF
MODULES:0 - -
PITCH 30 -
ORIENTATION:264° _ - - - -- ---- - :cc--- -- -�r ---- g
Drawin Information
ROOF 7" tt t _ t ,t r t to ttt tt tt tett DRAWING DATE: 11/21/2024
MODULES:0 . s:t` t t,. LL 11
PITCH:2' _�L)� { k t_t *k. "�� -� DRAWN BY: KTD
ORIENTATION:354° ED
REVISED BY:
ROOFS -
MODULES:O _ttr t t t t t 14 t t t� R4
PITCH 23" - ��e t t` t ` System Information:
ORIENTATION:175° D �t - - `
_r... LL.
ROOF 9 ��tt��" e _� - Lee uete DC SYSTEM SIZE: 4.92kV1
MODULES:0 R6 m AC SYSTEM SIZE: 3.8kW
PITCH'23' O -
ORIENTATION:355° cm MODULECOUNT: 12 --
ROOF10
MODULES:O MODULES USED: HANWHA410
PITCH:30° ✓ MODULE SPEC#: Q.PEAK DUO BLK ML-G10+410
ORIENTATION:263° UTILITY COMPANY: PSEG-LI
ROOF 11 - UTILITYACCT#:
MODULES:0 -PITCH:2* NOTES: UTILITY METER#: _
ORIENTATION:84' 1.)ALL EQUIPMENT SHALL BE INSTALLED IN ACCORDANCE DEALTYPE: SUNNOVA
ROOF 12 WITH THE MANUFACTURER'S INSTALLATION INSTRUCTIONS. _
MODULES:0 2.) ARRAY BONDING TO COMPLY WITH MANUFACTURER SPECIFICATION.
PITCH:18' 3.)ALL LOCATIONS ARE APPROXIMATE AND REQUIRE FIELD VERIFICATION. FRONT
ORIENTATION:173° - Rev.No. Sheet
'4) AN AC DISCONNECT SHALL BE GROUPED WITH INVERTER(S) NEC 690.13(q
ROOF 13 5.) ALL OUTDOOR EQUIPMENT SHALL BE RAIN TIGHT WITH MINIMUM NEMA 3R RATING.
MODULES:0 'PITCH:34' 6.) ROOFTOP SOLAR INSTALLATION ONLY PV ARRAY SHALL NOT EXTEND BEYOND THE EXISTING ROOF EDGE., ^w �` , ^
- N 1 V 1
ORIENTATION:84° - -
ROOF 14 SYMBOL LEGEND PLUMBING SCHEDULE EQUIPMENT SCHEDULE
MODULES:0 CITY SPEC#
PITCH:34° INDICATES ROOF DESIGNATION.REFER TO INDICATES NEW UNFUSED PV DISCONNECT TO BE INDICATES NEW PV ONLY SUBPANEL
ORIENTATION:264' R1 ARRAY SCHEDULE FOR MORE INFORMATION UD INSTALLED OUTSIDE (UTILITY ACCESSIBLE) SP TO BE INSTALLED 12 HANWHA 410(Q.PEAK DUO BLK ML-G10+410)
ROOF15 _ -
MODULES:0 •
ROOF 17
- PITCH:34* � � �:4� INDICATES NEW PV SOLAR MODULE.RED MODULES 1 SE3800H-USSNBBLI4
ORIENTATION:84° M INDICATES EXISTING METER LOCATION INDICATE PANELS THAT USE MICRO INVERTERS. DC INDICATES NEW OC DISCONNECT
ROOF 16 _= REFER TO EQUIPMENT-SCHEDULE FOR SPECS. -
MODULES:o OTHER OBSTRUCTIONS
PITCH:ATI INDICATES EXISTING ELECTRICAL PANEL INDICATES NEW PRODUCTION METER TO BE IWS
ORIENTATION:264° LOCATION: IN BASEMENT n INSTALLED OUTSIDE. SD INDICATES EXISTING SERVICE DISCONNECT A R
- -
MODULES:O
PITCH:14° INDICATES NEW INVERTER TO BE
ORIENTATION:263' D INDICATES NEW FUSED PV DISCONNECT TO BE ® INSTALLED OUTSIDE. INDICATES EXISTING TRANSFER SWITCH 2211 Allenwood Road 877-786-7283
E INSTALLED OUTSIDE(UTILITY ACCESSIBLE) A TS Wall,New Jersey 07719 www.Trinity-Solar.com
REFER TO EQUIPMENT SCHEDULE FOR SPECS Y Y
Engineer/License Holder:
ARRAY CIRCUIT WIRING NOTES 'r
1.)LICENSED ELECTRICIAN ASSUMES ALL RESPONSIBILITY
FOR DETERMINING ONSITE CONDITIONS AND
EXECUTING INSTALLATION IN ACCORDANCE WITH
SOLAR MODULES MOUNTED TO ROOF ON 1 ARRAY
NEC 2017
12-41OW MODULES W/1 SOLAR EDGE S440 PER MODULE
15 ADC MAX PER STRING '
2.)LOWEST EXPECTED AMBIENT TEMPERATURE BASED ON
ASHRAE MINIMUM MEAN EXTREME DRY BULB 1STRINGOFI2MODULESINSERIES-380Vmax ___ ______ 8x8 -----_--- Div
JUNCTION ------------------------------------------------
TEMPERATUREFORASHRAE LOCATION MOSTSIMILARTO F BOX I �
INSTALLATION LOCATION. LOWEST EXPECTED AMBIENT
TEMP=-16"C I
3.)HIGHEST CONTINUOUS AMBIENT TEMPERATURE BASED 'TERMINATED INSIDE INVERTER 1 _
ON ASHRAE HIGHEST MONTH 2%DRY BULB 1 100315
TEMPERATURE FOR ASHRAE LOCATION MOST SIMILOTO I /� ` V
INSTALLATION LOCATION. HIGHEST CONTINUOUS TEMP= I AA�FfSSlO�P�
33°C I
I
4.)2005 ASHRAE FUNDAMENTALS 2%DESIGN I TEMPERATURES DO NOT EXCEED 47°C IN THE UNITED I EX p: 12 31/2026
STATES(PALM SPRINGS,CA IS 44.1°C). FOR LESS THAN 9 I
CURRENT-CARRYING CONDUCTORS IN A ROOF-MOUNTED I
SUNLIT CONDUITAT LEASTO.5"ABOVE ROOF AND USING I Issued/Revisions
THE OUTDOOR DESIGN TEMPERATURE OF 47°C OR LESS
(ALL OF UNITED STATES) _
I
5.)PV SYSTEM CIRCUITS INSTALLED ON OR IN BUILDINGS
SHALL INCLUDE A RAPID SHUTDOWN FUNCTION THAT
Pi ISSUED TO TOWNSHIP FOR PEPMrt I2/21/2024
CONTROLS SPECIFIC CONDUCTORS IN ACCORDANCE WITH I
NEC 690.12(A)THROUGH(D) I NO. DESCRIPTION DATE
6.)PHOTOVOLTAIC POWER SYSTEMS SHALL BE PERMITTED
I
TO OPERATE WITH UNGROUNDED PHOTOVOLTAIC Project Title:I
SOURCE AND OUTPUTCIRCUTTAS PER NEC690.41(A)(4) I DAVID S FRANKEL-
7.)UNGROUNDED DC CIRCUIT CONDUCTORS SHALL BE
IDENTIFIED WITH THE FOLLOWING OUTER FINISH: EXISTING I TRINITY ACCT#:2024-07-1126401
POSITIVE CONDUCTORS=RED MAIN BREAKER LOAD CENTER
NEGATIVE CONDUCTORS=BLACK EXISTING INSULATED LINE TAPS _
NEC 210.5(C)(2) 120/240V INSTALLED ON MAIN FEEDERS Project Address:
UTILITY METER NEC 705.12(A) I
8.)ARRAY AND SUB ARRAY CONDUCTORS SHALL BE#10 PV 240V 10 NOTE' I
WIRE TYPE RHW-2 OR EQUIVELANTAND SHALL BE . INTERNAL REVENUE GRADE MONITORING 16465 NEW SUFFOLK AVENUE
150A MAIN BREAKER
PROTECTED BY CONDUIT WHERE EXPOSED TO DIRECT I
CONTAINED WITHIN NY SUNLIGHT.SUB ARRAY CONDUIT LONGER THAN 24"SHALL 150ABUSBAR i NEWS9915,- 2.4756 56
SOLAR EDGE PN.RWND-3D-240-MB 40.9915,-72.4756
CONTAIN 5 20 CURRENT CARYING CONDUCTORS AND I
WHERE EXPOSEDTO DIRECTSUNLIGHT SHALL
CONTAIN 5 9 CURRENT CARRYING CONDUCTORS. DrawingTitle:
I
9.)ALL WIRE LENGTHS SHALL BE LESS THAN 100'UNLESS �F I
OTHERWISE NOTED
FLEXIBLE ROOFTOP
SHALL B PROPOSED PV SOLAR SYSTEM
SHALL NOT BE INSTALLED ON
ROOFTOP AND SHALL BE LIMITED TO 12"IF USED LOCKABLE 60A DISCONNECT
OUTDOORS FUSED W/20A FUSES D
INVERTER#1
11.)OVERCURRENTPROTECTlON FOR CONDUCTORS 240V 10 Drawing Information
CONNECTED TO THE SUPPLY SIDE OF A SERVICE SHALL BE e m m e m ---a+ " I DRAWING DATE: 11/21/2024
LOCATED WITHIN 10'OF THE POINT OF CONNECTION NEC T I DRAWN BY: KTD
705.31
REVISED BY:
12.)WHERE TWO SOURCES FEED A BUSSBAR,ONE ALl I
�� J
UTILITY AND THE OTHER AN INVERTER,PV BACKFEED I I I mLm I I - Ll L2 N 1 r
BREAKER(S)SHALL BE LOCATED OPPOSITE FROM UTILITY I 0 m I L ---------------------------- -� 0 System Information: .
NEC 705.12(B)(2)(3)(b) I -)
-J I I DCSYSTEMSIZE: 4.92kW
i --
L----- SQUARED I �`-_----J AC SYSTEM SIZE: 3.8kW
13.)ALL SOLAR SYSTEM LOAD CENTERS TO CONTAIN ONLY - ------- PN:D222NRB I I
GENERATION CIRCUITS AND NO UNUSED POSITIONS OR _
---------A MODULECOUNT: 12
LOADS MODULES USED: HANWHA410
MODULE SPECM Q.PEAK DUO BLK ML-G10+410
14.)ALL EQUIPMENT INSTALLED OUTDOORS SHALL HAVE UTILITY COMPANY: PSEG-LI
A NEMA 311 RATING
UTILITY ACCi#:
CALCULATIONS FOR CURRENT CARRYING CONDUCTORS UTILITY METER#:
REQUIRED CONDUCTOR AMPACITY PER STRING DEALTYPE: SUNNOVA
[NEC 690.8(B)(1)]:(15.00.1.25)1=18.75A
PV MODULE SPECIFICATIONS -
AWG#10,DERATED AMPACITY HANWHA 410(Q.PEAK DUO BLK ML-G10+410)
AMBIENT TEMP:33"C,TEMP DERATING FACTOR:.96 Rev.No. Sheet
RACEWAY DERATING=2 CCC:1.00 Imp 10.89 NOTE:CONDUIT TYPE SHALL BE CHOSEN BY THE INSTALLATION CONTRACTOR
(40•.96)1.00=38.40A Vmp 37.64 TO MEET OR EXCEED NEC AND LOCALAWD REQUIREMENTS 38.40A'_18.75A,THEREFORE WIRE SIZE IS VALID Voc 145.37 A #6 THWN-2 TO GEC p 1 PV
3
TOTAL AC REQUIRED CONDUCTOR AMPACITY ISC. 11.2 B I"CONDUIT W/2410 THWN-2,1410 THWN-2,1410 THWN-2 GROUND
16.00A'1.25=20.00A
C I"CONDUIT W/2-#10 THWN-2,1410 THWN-2 GROUND
AWG#10,DERATEDAMPACITY _ INVERTER#1-SE380OH-USSNBBLI4
AMBIENTTEMP:30°C,TEMP DERATING:1.0 D 1"CONDUIT W/2410 THWN-2,1410 THWN-2 GROUND
RACEWAY DERATING`-3 CCC:N/A DC . AC 0
40A•1.0=40A Imp 10.5 Pout 3800 E 3/4"CONDUIT W/2-#10THWN-2,1-#30THWN-2,1-#10THWN-2GROUND
40A'_20.00A,THEREFORE AC WIRE SIZE IS VALID Vmp 380 Imax 16
F #10 PV WIRE(FREE AIR)W/#6 BARE COPPER BOND TO ARRAY lay
CALCULATION FOR PV OVERCURRENT PROTECTION Voc 480 OCPDmin 20
TOTAL INVERTER I6.00A Isc 15 Vnom 240 G 1"CONDUR W/2-#6 THWN-2, -#6 THWN-2 *SOLAR
CURRENT:
16.00A'1.25=20.00A 2211 Allenwood Road 877-786-7283
->20A OVERCURRENT PROTECTION IS VALID Wall,New Jersey 07719 www.Trinity-Solar.com