Loading...
HomeMy WebLinkAbout#7498 Loria REVISED PLANS 2025-05-06A, 1090 First St - SP Set recvd 5-14-2025· · · · · ·· · ·· ·· ··· ·· · · · ·· ·F I R S TS T R E E TS83°41'50"E 51.00' (DEED)63.40' (SURVEY) LOT 32 LOT 31 100.33'FLOOD ZONE VE (ELEV. 8) S02°32'46"W 2.52' (SURVEY) S36°34'49"W 3.30' (SURVEY) S01°37'32"E 81.19' (SURVEY) S04°09'00"E 14.79' (SURVEY)N06°59'10"E· · · LOT 30 · · · · · · · · N83°41'50"W 71.00' (DEED) 76.98' (SURVEY) FLOOD ZONE AE (ELEV. 6)FLOOD ZONE LINE· ORENCO SIMPLEX DISCHARGE PUMP BASIN (LIFT STA.) GEOTEXTILE LEACHING LATERALS (GEOMAT) · W/ PRESSURIZED PIPE ON TOP OF ASSEMBLY (TYP OF 2 - 39.0" WIDE X 17.0' LG) IN PROPOSED ABSORPTION BED FUJI CLEAN CEN5 ENHANCED TREATMENT UNIT TEST HOLE · · of 3 PAGE:JEFFREY T. BUTLER, P.E.,P.C.PROPOSED SANITARY SITE PLAN:SP1 LOCATION MAP: · · · · SUBJECT PROPERTY CURRENTLY: SITE DATA: LOT COVERAGE: LINE / SYMBOL LEGEND By law, excavators and contractors working in the five boroughs of New York City and Nassau and Suffolk Counties on Long Island must contact DigNet, 1-800-272-4480 or 811, at least 48 hours but no more than 10 working days (excluding weekends and legal holidays) prior to beginning any mechanized digging or excavation work to ensure underground lines are marked. Excavators and contractors can also submit locate requests online, through ITIC. If you do not currently use ITIC, please call 1-800-524-7603 for more information. of NEW YORK CITY& LONG ISLANDD gNet 800-272-4480 | 811 For safety reasons, homeowners are strongly encouraged to call as well when planning any type of digging on their property. Homeowners can contact us directly at 1-800-272-4480 or by calling 811, the national call before you dig number. For excavation work completed on personal property, it is the contractor's responsibility--NOT the homeowner's--to contact DigNet. Having utility lines marked prior to digging is free of charge. www.dignetnycli.com or www.call811.com (for other states) PROPOSED INSTALLATION: · · I/A OWTS UNIT SIZING: I/A OWTS UNIT LOAD CALCULATION: · ·· ·· ·· ·· · · · SANITARY ABSORPTION BED SIZING PROPOSED INNOVATIVE AND ALTERNATIVE ON-SITE WASTEWATER TREATMENT SANITARY SITE PLAN: PROPOSED SANITARY RISER DIAGRAM INNOVATIVE / ALTERNATIVE ON-SITE WASTEWATER TREATMENT SYSTEM PRESSURIZED SYSTEM SCDHS SETSANITARY ABSORPTION BED CALCULATION: TEST HOLE KEY MAP - NEIGHBORING LOTS IDENTIFICATION AND CONNECTION TO WATER SERVICE STATUS NEIGHBORING LOT ID / CONNECTION TO WATER STATUS ID OWNER/ADDRESS WTR SERV. · · · PARTIAL SITE PLAN - PROPOSED WORK SECTION B-B VIEW PLAN VIEW SECTION A-A VIEW A A B B FUJI CLEAN USA ENHANCED TREATMENT UNIT (ETU) MODEL CEN5 TYPICAL SLAB DETAIL FUJI CLEAN ETU MODEL CEN5 PRESSURE KPa/PSIAIR VOLUMEFUJI CLEAN BLOWERS--MAC-SERIES "R" PERFORMANCE CURVES (60 Hz)JEFFREY T. BUTLER, P.E.,P.C.FUJI CEN5 ETU DTLS FOR:'A''B' DETAIL 'B' DETAIL 'A' CONNECTION DETAIL - CONTROL PANEL AND BLOWER FUJI CLEAN - ONE LINE DIAGRAM FUJI ETU INSTALLATION DETAIL By law, excavators and contractors working in the five boroughs of New York City and Nassau and Suffolk Counties on Long Island must contact DigNet, 1-800-272-4480 or 811, at least 48 hours but no more than 10 working days (excluding weekends and legal holidays) prior to beginning any mechanized digging or excavation work to ensure underground lines are marked. Excavators and contractors can also submit locate requests online, through ITIC. If you do not currently use ITIC, please call 1-800-524-7603 for more information. of NEW YORK CITY & LONG ISLANDD gNet 800-272-4480 | 811 For safety reasons, homeowners are strongly encouraged to call as well when planning any type of digging on their property. Homeowners can contact us directly at 1-800-272-4480 or by calling 811, the national call before you dig number. For excavation work completed on personal property, it is the contractor's responsibility--NOT the homeowner's--to contact DigNet. Having utility lines marked prior to digging is free of charge. www.dignetnycli.com or www.call811.com (for other states) ASSEMBLY DETAIL 'H' FRAME DETAIL - FOR CONTROL PANEL AND GFI RECEPTACLE FUJI CLEAN GENERAL NOTES: PROPOSED BLOWER MODEL No. MAC80RII FUJI CLEAN ETU - COUNTERACTING BUOYANCY INSTALLATION DETAIL FUJI CLEAN ETU BUOYANCY CALCULATION: SP2 SCDHS SET ORENCO SIMPLEX DISCHARGE PUMP BASIN DETAIL GEOMAT LEACHING SYSTEM · · PUMP DISCHARGE CONTROL PANEL JEFFREY T. BUTLER, P.E.,P.C.ORENCO L.S. AND GEOMAT DTLS FOR:• • • • • • • • • • • • • • • • • • • • • • • · · · · · · · · · · ORENCO LIFT STATION BUOYANCY CALCULATION: SP3 ’ ’’ ’ ’ ’ ’ ’ ’ ’ ’ ’ ’SCDHS SETBy law, excavators and contractors working in the five boroughs of New York City and Nassau and Suffolk Counties on Long Island must contact DigNet, 1-800-272-4480 or 811, at least 48 hours but no more than 10 working days (excluding weekends and legal holidays) prior to beginning any mechanized digging or excavation work to ensure underground lines are marked. Excavators and contractors can also submit locate requests online, through ITIC. If you do not currently use ITIC, please call 1-800-524-7603 for more information. D gNet 800-272-4480 | 811 For safety reasons, homeowners are strongly encouraged to call as well when planning any type of digging on their property. Homeowners can contact us directly at 1-800-272-4480 or by calling 811, the national call before you dig number. For excavation work completed on personal property, it is the contractor's responsibility--NOT the homeowner's--to contact DigNet. Having utility lines marked prior to digging is free of charge. www.dignetnycli.com or www.call811.com (for other states) of NEW YORK CITY & LONG ISLAND