Loading...
HomeMy WebLinkAbout47157-Z TOWN OF SOUTHOLD BUILDING DEPARTMENT ti_ x TOWN CLERK'S OFFICE o . SOUTHOLD, NY BUILDING PERMIT (THIS PERMIT MUST BE KEPT ON THE PREMISES WITH ONE SET OF APPROVED PLANS AND SPECIFICATIONS UNTIL FULL COMPLETION OF THE WORK AUTHORIZED) Permit#: 47157 Date: 11/29/2021 Permission is hereby granted to: Kalich, Richard 605 Saltaire Way Mattituck, NY 11962 To: Construct accessory cabana'at existing single family dwelling as applied for.. *Construction of new dwelling, followed by in ground pool, must commence prior to contruction of pool cabana. At premises located. at: 4660 Blue Horizon Bluffs, Peconic SCTM #473889 NUF &L Sec/Block/Lot# 74.-1-36.62 Pursuant to application dated 11/17/2021 and approved by the Building Inspector. To expire on 5/31/2023.. Fees: ACCESSORY $236.40 CO-ACCESSORY BUILDING $50.00 Total: $286.40 Building Inspector /% 3 `�g1yFF01K�,, TOWN OF SOUTHOLD—BUILDING DEPARTMENT co a- Town Hall Annex 54375 Main Road P. O. Box 1179,Southold,NY 11971-0959 Telephone (631) 765-1802 Fax(631) 765-9502 https://www.southoldtownny.gov Date Received APPLICATION FOR BUILDING PERMIT For Office Use Only D E C " d E PERMIT NO. Building Inspector: NOV 1 7 2021 - DD ;Applications and forms must befilled out in their entirety, Incomplete BUILDING DEPT. ';applications will not be accepted Where the Applicant is not the owner,an TOWN OF SOUTHOLD Owner's Authorization form(Page 2)shall be complet"ed n Date: �;OWNERji OF'PROPERTY Name: GGI SCTM#1000- ` ,L/-- Project Address: 0 (vr? p�lZty/� Phone#: (7/7 ' 3311 ` G �o 37 Email: /Vl � m o k�o c12 e,,il00= carp Mailing Address: ✓ rJ?t!/'e W RCffi*,�Gk— A-Y CONTACT PERSON Name: I./4r60 r Mailing Address: ,6 0 Ait- Phone#: �J,f 7'3 Email: 1,iclwoott `DESIGN PROFESSIONAL INF.,ORMATION k Name: Mailing Address: Phone#: Email: CONTRACTOR:INFORMATION Name: Mailing Address:- Phone#: Email: PTION OF PROPOSED CONSTRUCTION ew Structure ❑Addition ❑Alteration ❑Repair ❑Demolition Estimated Cost of Project: [--]other $ Will the lot be re-graded? ❑Yes Will excess fill be removed from premises? ❑Yes. o 1 PROPERTY INFORMATION Existing use of property: '%0US(yt A6 I— Intended use of property: &V Zone or use district in which premises is situated: Are there any covenants and restrictions with respect to �7p this property? DYes (moo IF YES, PROVIDE A COPY. ❑Check Box After Reading: The owner/contractor/design professional is responsible for all drainage and storm water issues as provided by Chapter 236 of the Town Code. APPLICATION IS HEREBY MADE to the Building Department for the issuance of a Building Permit pursuant to the Building Zone Ordinance of the Town of Southold,Suffolk,County,Newyork and other applicable Laws,Ordinances or Regulations,for the construction of liulldings, additions,alterations or for removal or demolition as herein described.The'applicant agrees to comply with all applicable laws,ordinances,building code, housing code and regulations and to admit authorized inspectors on premises and In building(s)for necessary inspections.False statements made herein are punishable as a Class A misdemeanor pursuant to Section 210.45 of the New York State Penal Law. cation Submitted By(print name): 6eef (7/v/08-7-e uthorized Agent; Downer Signature of Applicant: Date: 7 —2- 1-STATE OF NEW YORK) SS: COUNTY OF ) being duly sworn, deposes and says that(s)he is the applicant (Name of individual signing contract)above named, (S)he is the Qi (Contractor,Agent,Corporate Officer,etc.) of said owner or owners, and is duly authorized to,perform or have performed the said work and to make and file this application;that all statements contained in this application are true to the best of his/her knowledge and Belief; and that the work will be performed in the manner set forth in the application file therewith. Sworn before me this day of 1W� ` ,204 ary Pubht BETSYA.PERKINS PROPERTY OWNER AUTHORIZATION Notary Public,State of New Yor (Where the applicant is not the owner) No.01PE6130636 Qualified in Suffolk Count Commission Expires July 111, I, ��it�l l�Cfil residing at af/fyc�L//C/'/s 2-do hereby authorize to apply on my behalf to the Town of Southold Building Department for approval as described herein. Ow er's�SSiignature Date Pril t Owner's Name 2 ABBREVIATIONS DRAWING LIST & AT MIN.1 MINIMUM -ADAM VOLOSIK ACOUST.0 ACOUSTICAL MISC.0 MISCELLANEOUS ARCHITECTURAL:A-SERIES 528 South Harbor Rd. A.D.o AREA DRAIN MTD.,If MOUNTED ROOF outhold,NY 11971 r0.1 :631.806.2537 ADJUS.0 ADJUSTABLE MTL.,' METAL A 0.1 COVER SHEET A.F.F.P, ABOVE FINISHED FLOOR MATERIAL APPROVED AS NOTED A 0.2 SPECIFICATIONS ALUM.0 ALUMINUM N.Al NUMBER APPROX.10 APPROXIMATE N.I.C.1] NOT APPLICABLE DATE:_#_-7/5,7 1-g it -aq.>f A 0.3 WIND DIAGRAMS w. _v_ j ARCH.[] ARCHITECT,ARCHITECTURAL NOJI NOT IN CONTRACT B .,r; BLDG.0 BUILDING N.T.S.� NUMBER FEE. Y:-')I NOTIFY BUILDING DEPARTMENT AT A 1.0 SITE PLAN BLK.11 BLOCK O.C.o NOT TO SCALE 765-1802 8 AM TO 4 PM FOR THE BLKG.0 BLOCKING O.D.11 ON CENTER FOLLOWING INSPECTIONS: BM1 BEAM O.H.' OUTSIDE DIAMETER 1. FOUNDATION - TWO REQUIRED A 2.1 PLANS BOT.:' BOTTOM OPP.: OPPOSITE HAND FOR POURED CONCRETE B.P.0 BUILDING PAPER PERIM.9 OPPOSITE 2. ROUGH - FRAMING & PLUMBING BSMT.[1 BASEMENT PERP.0 PERIMETER 11/2" 3. INSULATION A 3.1 ELEVATIONS&BUILDING SECTIONS B`TWN�r, BETWEEN PG.11 PERPENDICULAR 1st FLOOR 1 4. FINAL - CONSTRUCTION MUST WITH ALL CODES OF CL 9 CENTERLINE PL.D PAGE 2 BE COMPLETE FOR C.O. NEW YORK STATE & TOWN CODES A 4.1 WALL SECTIONS ALL CONSTRUCTION SHALL MEET THE CAB-' CABINET PLUMB.'1: PLATE 31' " REQUIREMENTS OF THE CODES OF NEW AS REQUIRED AND CONDITIONS OF CER.0 CERAMIC PLYWD.0 PLUMBING CABANA YORK STATE. NOT RESPONSIBLE FOR CL.'G! CLOSET PR.Li PLYWOOD WATER CLOSET DESIGN OR CONSTRUCTION ERRORS. OIUTHOLD TOWN ZBA - CLG.0 CEILING P.S.F.10 PAIR SOUTHOLD TOWN PLANNING BOARD COL..] COLUMN P.S.1.0 PER SQUARE FOOT 211 SOUTHOLD TOWN TRUSTEES CONCJ,i CONCRETE P.T.D POUNDS PER SQUARE INCH CONST.9 CONSTRUCTION PTD.11 PRESSURE TREATED . . .DEC CONT. CONTINUOUS P,V.C:' PAINTED L DO NOT PROCEED WITH CPT." CARPET QTYI� POLYVINYL CHLORIDE CLEAN OUT 4" TO SEPTIC FRAMING UNTIL SURVEY TRAP .._TAN�K TANK 1 7-1 CTR.'j CENTER QUANTITY HOUSETRAP OF FOUNDATION LOCATION C.V.G.P, CLEAR VERTICAL GRAIN R,D.9 RADIUS,RISER D.9 DRYER REFRIG.0 ROOF DRAIN AND HAS BEEN APPROVED. 7 7;!� Lj DIA.0 DIAMETER REINF.[I REFRIGERATOR BASEMENT SLAB CLEAN OUT C T G iN 0 017" DIMA DIMENSION REQUA REINFORCING DN.9 DOWN RF.0 REQUIRED D.S.6 DOWNSPOUT RM..1 ROOF DWJ DISHWASHER R0.0 ROOM PLUMBER CERTIFIC171CN DWG.1 DRAWING SCHED.!.' ROUGH OPENING ON LEAD CONTENT BEFO[�'7 TRUSS PI-ACARDING HEOUjf-,�E, E.I.F.S.0 EXTERIOR INSULATED FINISH SYSTEM SECT._ SCHEDULE y ELECJ�' ELECTRICAL SHT.] SECTION 2 RISER DIAGRAM'- CABANA CERTIFICATE OF OCCUPAN Q"r ELEV.11 ELEVATION S[W. SHEET N-T-S SOLDER USED IN WATER SUPPLY SYSTEM CANNOT EQ.D EQUAL SPEC.' SIMILAR EXIST.110 EXISTING SQ.1: SPECIFICATIONS EXCEED 2110 OF 10,,o LEAD, F.D.9 FLOOR DRAIN S.S.0 SQUARE FIN.0 FINISH STD.: STAINLESS STEEL All exterior li(Thting FLOUR.] FLOURESCENT STL.g STANDARD 6 FLR.0 FLOOR STORD STEEL Installed, replaced or FLSG.1 FLASHING STRUC.. STORAGE repaired shall conform to Chapter 172 FOUND! FOUNDATION SUSPA STRUCTURAL FTCFEET,FOOT SW.0 SUSPENDED Of the Town Code R SWITCH GA.' GAUGE TEL.1' TREAD GALV.LI GALVANIZED T&Gj TELEPHONE G.C.-, GENERAL CONTRACTOR T.0.0 TONGUE AND GROOVE EXTERIOR WINDOWS 8t DOORS CABANA G.W.B.0 GYPSUM WALL BOARD T.O.CJ TOP OF H.B.0 HOSE BIB T.0,S..,- TOP OF CONCRETE r-rcmm inmTcrm. vtrqumEo UNIT# LOCATION TYPE MANUFACTURER MANUFACTURER'STRANSOM MULL UNIT SIZE ROUGH OPENING FINISH NOTES HDWR' HARDWARE T.O.WL' TOP OF STEEL HEM.o HEMLOCK TYRE TOP OF WALL 101.1 CABANA CASMENT MARVIN UCAP4092 UCAP4056 3 1/2"SPACE 3'-4"X 12'-5 3/4" T-5"X 12'-6 3/4" STONE WHITE HORIZJ! HORIZONTAL T.R's, TYPICAL 101.2 CABANA CASMENT MARVIN UCAP4092 UCAP4056 3 1/2"SPACE 3*-4"X 12'-5 3/4" T-5"X 12'-6 3/4" STONE WHITE H.M.0 HEAT MIRROR VERT.1i TOILET PAPER DISPENSER 101.3 CABANA CASMENT MARVIN UCAP4092 UCAP4056 3 1/2"SPACE T-4"X 12'-5 3/4" T-5"X 12'-6 3/4" STONE WHITE SYMBOL KEY H.V.A.C.t' HEATING VENTILATION&AIR CONDITIONIIN G W. VERTICAL I.D.9 INSIDE DIAMETER Wk WASHER 101.4 CABANA CASMENT MARVIN UCAP4092 UCAP4056 3 1/2"SPACE T-4"X 12'-5 3/4" 3'-5"X 12'-6 3/4" STONE WHITE WALL CONSTRUCTION kl] INCH,INCHES W.C.1i WITH 102.1 CABANA CASMENT MARVIN UCAP4056 3'-4"X 4'-7 1/8" T-4"X 4'-7 5/8" STONE WHITE INSUL.9 INSULATION,INSULATED WD.0 WATER CLOSET 102.2 CABANA CASMENT MARVIN UCAP4056 3*4'X 4'-7 1/8" 3'-4"X 4'-7 5/8" STONE WHITE CONSTRUCTION ABOVE INT.1'' INTERIOR W.H,D WOOD 102.3 CABANA CASMENT MARVIN UCAP4056 T-4"X 4'-7 1/8" 3'4"X 4-7 5/8" STONE WHITE LAMA LAMINATED WIND WATER HEATER DENOTES DIMENSION TO FACE 01 LAV.0 LAVATORY W.W.M...'u, WINDOW 102.4 CABANA CASMENT MARVIN UCAP4056 3*4'X 4W 1/8" 3'4"X 4W 5/8" STONE WHITE FINISH,ROUGH OPE'NINGS(WINDOWS) LB, POUND WIG: WELDED WIRE MESH 103.1 CABANA CASMENT MARVIN UCAP4056 3*4'X 4W 1/8" T-4"X 4'-7 5/8" STONE WHITE OR DOOR SIZES L.F_' LINEAR FOOT X0 WITHOUT 103.2 CABANA CASMENT MARVIN UCAP4056 3'4"X 4W 118" 3'-4"X 4'-7 5/8" STONE WHITE DENOTES DESIRED ALIGNMENTS OF LVR.',� LOUVER YD.0 INDICATES TIMES OR BY CABANA 1 V-1 0 31/32"X 8--1 11/32" 1 V-11 131/32-X 8'-2 23/32- STONE WHITE FINISHED SURFACES OR ELEVATIONS MAX. MAXIMUM YARD 104 SLIDING DOOR MARVIN ULSDSTKSBR12080 MECH.,.j MECHANICAL DENOTES CENTERLINE UNLESS MFR.1 MANUFACTURER OTHERWISE SPECIFIED GENERAL NOTES: SECTION/ELEVATION NUMBER 1.)ANY ERRORS,OMMISSIONS,OR CONFLICTS FOUND IN ANY PART OF THESE CONSTRUCTION DOCUMENTS SHALL BE BROUGHT TO THE ATTENTION OF THE ARCHITECT BEFORE PROCEEDING WITH THE WORK. DRAWING SHEET NUMBER 2.)WRITTEN DIMENSIONS ALWAYS TAKE PRECEDENCE OVER SCALE.DO NOT SCALE THE DRAWNGS. 3)ALL CONSTRUCTION SHALL COMPLY WITH THE LATEST EDITION UNIFORM BUILDING CODE AS ADOPTED AND DETAIL NUMBER ANY OTHER LOCAL,STATE AND NATIONAL CODES,ORDINANCES AND REQUIREMENTS GOVERNING THIS CONSTRUCTION. DRAWING SHEET NUMBER 4.)VERIFY BOTH EXISTING AND FINISH GRADES WITH THE DRAWINGS. 5.)VERIFY ALL BUILDING LOCATIONS AND CONC.PAD ELEVATIONS WITH THE DRAWINGS PRIOR TO PROCEEDING. EXTERIOR WINDOW/DOOR NUMBER 6.)VERIFY ALL CONDITIONS AND DIMENSIONS AT THE JOB SITE BEFORE PROCEEDING.VERIFY ALL FIELD DIMENSIONS OF EXISTING CONDITIONS. 7.)ALL DIMENSIONS AND NOTES SHOWN ON ONE PORTION OF A DRAWING SHALL APPLY TYPICALLY TO ALL INTERIQP I DOOR NUMBER OPPOSITE HAND OR SIMILAR CONITIONS UNLESS OTHERWISE NOTED, 8.)DETAILS SHOWN ARE TYPICAL.SIMILAR DETAILS APPLY IN SIMILAR CONDITIONS UNLESS OTHERWISE NOTED. I PERMIT SET 13 NOVEMBER 2021 WALL CONSTRUCTION TYPE 9.)ALL DIMENSIONS ARE TO FACE OF FRAMING UNLESS OTHERWISE NOTED. N 0, ISSUANCE DATE 10.)VERIFY ALL ARCHITECTURAL DETAILS WITH THE STRUCTURAL REQUIREMENTS BEFORE THI:_ORDERING ELEVATION DESIGNATION ABOVE U-13" RELEASES OF OR INSTALLATION OF ANY ITEMS. DATUM UNLESS OTHERWISE SPECIFIED 11.)SKYLIGHT LOCATION AS SHOWN ON THE FLOOR PLANS SHALL BE CENTERED IN THE SPACE UNLESS SEAL: OTHERWISE NOTED.ALL LIGHT FIXTURES ARE SHOWN ON THE ELECTRICAL PLANS. AXIS NUMBER 12.)VERIFY ALL PRODUCT DIMENSIONS WITH THE MANUFACTURER FOR PROPER FIT AND INSTALLATION. CENTERLINE AXIS c:j) ARC cl C,.%JOLO am: ITT 0 3 LEGEND qTF of EARTH CONCRETE GRAVEL -a KOM STEEL Elm! BATT INSULATION RIGID INSULATION PROJECT: GYPSUM WALLBOARD Blue Horizon Bluffs MASONRY Cabana-,-, BLOCKING I t ! I P i,, i ,J� FRAMING MEMBERS KPI, Ul PLYWOOD LAMINATED VENEER LUMBER FINISHED WOOD Pcconic, NY DRAWING NAME: COVER SHEET DRAWING NUMBER: DRAWN BY: AC\7 SET: CHECKED BY: ACV CIS SCALE: SHEET: CURRENT ISSUE DATE: O01 GENERAL CONDITIONS CONCRETE SPECIFICATIONS FRAMING NOTESAII headers to be (2) 2x12 or (2) 1-3/4 x 11-7/8 microlams unless noted otherwise. 1) The contractor is responsible for checking all dimensions and conditions on the job. Where conditions 1) Interior and exterior footings, slabs, and walls shall be 3000 PSI, Type I concrete unless otherwise noted. 1) Double floor joists shall be located under all parallel partitions unless noted otherwise. Spacing between 528 South Harbor Rd. prevent obtaining dimensions they should be brought to the attention of the architect or engineer. floor joists should allow for plumbing in plumbing walls. 1) For masonry block, horizontal joint reinforcement shall consist of at least (2) wires of W1.7 spaced not Southold,NY11971 2) Contractor to verify soil bearing capacity to be not less than 4000 PSF. No footings or slabs are to be more than 16"on center vertically. :631.806.2537 2) Construction contractor and his subcontractors agree that in accordance with generally accepted construction cast on uncontrolled fill, loose soil, organic material, frozen ground, mud, clay or other unsuitable materials. If 2) All floor joists must be restrained at the ends to prevent rotation by either a rim joist, end blocking, practices, construction contractor and his subcontractors will be required to assume sole and complete any of these situations are present it should be brought to the attention of the engineer. tension bridging or joist hangers supporting the depth of the joist. 2) For block and veneer masonry, horizontal masonry wall ties shall be a 3 wire ladder type No. 9 gauge responsibility for job site conditions during the course of construction of the project including safety to all W1.7 . Splices shall be lapped a minimum of 6 . Minimum embedment of wire to be r2 the thickness of the persons and property and that this requirement shall be made to apply continuously and not be limited to 3) Contractor to verify existing and seasonal ground-water level. If level is within 2 feet of the bottom of the 3) Two rows of blocking to be installed every 4'along the foundation wall that is parallel with floor joists. The veneer unit. Cross ladder wires to be smooth No. 12 gauge wire 16"on center. Space reinforcement every 16" working hours. Contractors agree to defend, indemnify and hold design professionals harmless from any and all basement footing the architect/engineer should be contacted. plywood floor is to be nailed into this blocking. vertically. liability, real or alleged, in connection with the performance of work on this project. The contractor is responsible for the stability of the structure during erection. 4) Concrete shall be air-entrained with an air content not less than 5% or more than 7%. 4) Floor plywood to be glued and nailed to floor joists 4"on edges and 6"in field with 8d common ring-shank 3) For cavity wall, brick veneer ties shall be spaced no more than 16"apart horizontally and vertically. nails. Fasten each plywood panel totally as installation progresses. If using tongue-and-groove plywood glue the Maximum air space to be 1"-If larger than 1 require adjustable anchors. Corrugated ties should be corrosion 3) All work performed by the contractors shall conform to the requirements of local, municipal, state and 5) Concrete slump shall not be more than 5". Engineer has approval to reject concrete if slump is larger than tongue-and-groove. Keep edge nails 3/8"from edges. Follow manufacturers'guidelines for spacing between the resistant and at least 22-gauge, 6"long and 7/8"wide. Ties shall penetrate into the mortar joint half the federal laws as well as any other governing requirements, whether or not specified on drawings or in specified. panels. thickness of the veneer and have at least a 5/8 inch or mortar cover to the exposed face. A minimum of an specifications. Contractor to be responsible for required inspection(s) of his work. 8d nail or fastener having equivalent or greater pullout strength to hold anchor to stud wall. Locate the nail or 6) If concrete is delivered in an outdoor temperature lower than 40 degrees F it should be heated to insure 5) All walls over 8'high to be blocked @ mid-span. fastener within 1/2 inch of the 90-degree bend in the anchor. Corrugated ties are not to be used with metal 4) The contractors shall notify the architect/engineer immediately if he cannot comply with the work called for that it will arrive at the job site having a temperature of not less than 60 degrees F or greater than 85 degrees studs. on the drawings. F. 6) All post widths to be as wide or wider than multiple member width that it is supporting. 4) Debonded shear anchors shall be used for connection between the steel columns and the masonry wall. 5) The contractors shall notify the architect/engineer of any discrepancies between the drawings, notes, 7) If the weather reports the temperature of the ambient air will fall below freezing for 3 consecutive days, 7) 2x6 strong backs (2) on all ceiling joists 8'D.C., unless the ceiling is on engineered floor i-joist. They are to be located every 16"vertically in every other course. specifications and field conditions before commencing any work and request clarification. Contractor shall notify cold weather concrete specifications will need to be followed. Contact Engineer if this is going to occur. architect/engineer of any design defects which the contractor actually identifies or reasonably should have 8) Splices of top plates shall not be closer than 6'. Studs to fall under all splices, top and bottom. Studs to 5) Where block masonry and steel columns meet a void may form which shall be filled with a identified in the drawings or specifications. 8) The addition of any admixtures to concrete shall be approved by the Engineer. line up vertically with roof rafters wherever possible. pre-compressed self adhering foam sealant. 6) Contractor to verify new work with survey. 9) Two concrete strength test cylinders, 6"in diameter by 12"shall be taken from each truck delivery unless 9) All gable end walls with cathedral ceilings to be balloon framed unless otherwise shown. 6) Self adhering flashing shall be used at steel corners where end dams are Located along the web. They are otherwise approved by the Engineer. Compressive strength tests to be taken for each day's pour exceeding 5 to be made of 40 mil rubberized asphalt. 7) Contractor to provide all necessary protection and security for his work until turned over to owner. Fire cubic yards. Two specimens to be tested @ 28 days. Field cured cylinders shall be cured under field conditions 10) Exterior wall ply to cover roof top plate completely and be nailed with 8d common nails 3"on center, extinguishers must be provided on each floor during construction. in accordance with "Making and Curing Concrete Test Specimens in the Field"(ASTM C 31). The alternate is to Use staggered into both the top and bottom plate. 7) All lintel flashings to have end dams. ACI-14 Section 26-12 specification. 8) Contractor shall be responsible for cutting, fitting or patching to complete the work or make the parts fit 11) All roof plywood to be nailed with 8d ring shank nails 4"O.C. on edges and 4"in the field unless 8) Horizontal expansion joints are to be located directly below every shelf angle. together properly. 10) All rebars to be grade 60 KSI steel and shall be free of rust, scale and dirt. otherwise noted. Nail heads shall not penetrate surface of plywood. Nail Guns need to be set to the proper pressure. 9) Where reveals in the brick occur, the brick below shall be chamfered so as to not create a ledge. These 11) All rebars shall be securely tied in place and adequately supported. All rebar splices to be minimum 30". brick units shall be 100% solid (no cores). If the brick is to be un-chamfered the reveal depth shall not be Rebar shall be continuous through corners with splices located not closer than 3'from corners. 12) Exterior plywood shall be continuous over all plate to plate and plate to rim board interfaces and may butt greater than %". together at mid-depth on rim board. Exterior plywood to run continuous from sill plate over rim joist to studs. 9) The contractor shall fully responsible for the removal or replacement of damaged or defective material 12) Footings below columns to be 3'x 3'x l'unless otherwise noted. "L"shaped plywood to be placed around upper window and door corners. 10) Vertical expansion joints shall be located at every exterior steel column except of the corners. or poor workmanship. Theyy shall replace or repair as directed by the architect/engineer, all such damaged or defective materials, which shall appear within a period of two years from the date of substantial completion of 13) All footings are to have their rebar placed no closer than 3"to the supporting soil. 13) Three rows of blocking to be installed every 4'along gable rake walls. The plywood roof is to be nailed into 11) Shelf angles or lintels shall continue through corners and be mitered. the job. this blocking. 14) No weight shall be placed upon footings or walls until 7 days after placement as long as the concrete 12) Not less than two-thirds of the brick width shall be placed on a lintel or shelf angle. the The contractor(s) shall remove all rubbish, waste materials and surplus materials that are a by-product of strength has reached 2500 psi-or by engineer's approval. 14) All roof rafters to be connected to top plate with Simpson H2.5A hurricane ties unless otherwise shown. Hip their work. Debris, dirt and dust to be kept to a minimum and to be confined to the immediate construction rafters to be tied to top Plate with Simpson HCP4 (double hip) or HCP1.81 (single hip). Note that partially 13) Masonry block cells adjacent to all windows, doors, inside and outside corners, and adjacent to control area. 15) Contractor to notify Engineer for inspection of all rebar work prior to placement of concrete. enclosed structures shall use a Simpson H10 hurricane tie. joints shall be grouted and contain #5 rebar vertically. 11) Contractors shall provide all necessary protection for his workers. 16) Concrete pours over 9'shall be thoroughly consolidated by suitable means during placement using a 15) Interior shear walls to be r2"plywood, nailed with 8d nails 3"O.C. on edges and 6"in field with all edges 14) Mortar shall be type S for block and N for brick. Sand is to be free of salt, dirt or any other organic 12) The construction drawings and specifications are supplied to illustrate the design and the general type of mechanical vibrator. blocked and nailed unless otherwise noted. Bottom plate to be nailed into joists below with 16d nails 3"on center. matter. Water is to be potable. construction desired and are intended to imply the finest quality of construction, material and workmanship 17) Back filling against foundation shall not take place until first floor is anchored to foundation. Backfill 16) All exterior columns to have continuous galvanized metal straps from girder below to girder above. Straps 15) Weep holes are to be located above all windows, doors and base flashings. Spacing to be 24"on center throughout. material shall be clean course sand. Equipment used for backfilling shall not come closer to the wall than the to be Simpson CS 16 and connected with (11) 10d common nails each end. with a minimum of two. Weep holes to have installed weep tubes or plastic head joint ventilators w/ mesh 13) The contractor height of the backfill.s) shall maintain a current and complete set of construction drawings on the site during all 17) Columns resting on concrete to be connected at the base concrete with a Simpson Post Base fastener and (non-woven laminated). phases of construction for use by all trades. 18) All footings to rest on virgin undisturbed soil. If soil is disturbed, mechanical compaction to 95% Modified the to with a Simpson type Post Ca with 12 10d nails each end. P P YP P ( ) 16) Lap flashing joints a minimum of 6". if flashing material is not self-adhering set lapped flashing on a 14) No changes or modifications to the work shall be made without approval of the owner and/or Proctor test in soil lifts not exceeding 6". continuous bed of mastic that is compatible with flashing material. Flashings to be copper, lead coated copper 18) Bored or holes or notching in studs shall not exceed 25% of the stud depth. If hole or notch is between or stainless steel. architect/engineer. Failure to obtain this approval shall cause the contractor or sub-contractor to assume full 19) Concrete wall design assumes backfill is well drained. 40 o and 60% of the stud depth than the stud shall be doubled. responsibility for subsequent modification of the work required by owner or any regulatory authority. 20 Anchor bolts to be 5 8"x 12""J"or "L"sha ed hot dipped galvanized or stainless steel located 32"on center 17) Extend flashing to lap at all corners. 15 The architect en ineer assumes no responsibility for construction means, methods, techniques, sequences, or ) / p pP g 19) Contractor verifies that he has reviewed the installation guide for the engineered wood products for this / 9 P Y q q unless otherwise noted and a maximum of 12"from all corners. Minimum embedment to be 7". Provide not less project. 18) Flashings to continue through vertical expansion joints. procedures or for safety precautions and progress in conjunction with the work. There are no warranties, nor than two (2) anchor bolts on any one sill. Anchor bolts to have nut and washer tightened to sill. Washers shall any merchantability of fitness, nor a specific use expressed or implied in the use of these plans. be a minimum of 3/16"x 3"x 3"square plate washers unless otherwise shown. Bolts to be located down the 20) First floor i joists to have (4) 10d nails installed in its'bottom flange to the double sill plate. 19) Flashings to extend beyond the face of wall to form a drip. center of the sill plate. Deviation of more than 1"will not be acceptable. A hot dipped galvanized or stainless 16) Contractor is responsible for costs attributed p trailer rental, cell phone bills, site lighting, portable toilets, steel 5/8"x 12"threaded rod can be substituted for anchor bolts by being epoxied into place using Simpson 21 When engineered floor I-Joists or Tri-Force open web joists are used, rim joists to be Timberstrand 1-1 4" 20 Bond beams to have their horizontal rebars snow removal, site utilities, temporary heat/AC, temporary power, site security, testing labs and surveyor.. Acrylic Tie. LSL rim board. p � � / ) s continue around corners 2'or 40 bar diameters which ever is more. All splicing of rebars to be 40 bar diameters. Bond beams to be located at the top and bottom of wall 17) The contractor shall retain the services of licensed professionals for code compliance for the electrical, unless otherwise shown. mechanics! and plumbing systems which are not part of these drawings. All work by electrical, mechanical and 21) Contractor to install damp-proofing on all foundation walls and footing base that comes in contact with 22) TJI Joists to have solid blocking and web stiffeners, when above walls or posts sit directly above. soil. See Drainage. 21) Vertical rebars to be located within 8"of corners and end walls. Vertical and horizontal bars shall be plumbing contractors shall be in accordance with 2020 Residential & Building Code of New York State & WFCM 23) Web stiffeners to be 5/8"on TJI 110 joists, 7/8"on 230 joists and 360 joists and 2x4 for 560. 1/8"gap placed around all openings and extend past each other a minimum of 40 bar diameters. 2018. 22) All basement wall rebar to have a concrete cover of 1-3/4"measured from the inside face of the wall. to be left at the fop between stiffener and flange of joist. Tolerance for reinforcement placement shall be +/- r2". Vertical reinforcement rebars shall be placed nearest the 22) Adequate bracing for walls taller than 8'sholl be constructed per OSHA guide lines and approved by the inside face of the wall. 24) Two or three Microlam LVL's shall be connected with 3 rows of 16d nails 12"O.C. Four Microlam LVL's engineer prior to construction. shall be bolted with 2 rows of r2"bolts @ 12"O.C. 23) Provide (2) #5 rebars continuous reinforcing at top of all foundation walls. Set rebars 2"from top and 23) Extend fleshings to lap at all corners. sides of wall. 25) Anthony Power Beams may be substituted for LVL's as long as the wood dimensions are not less than the 24) Provide (2) #5 rebars continuous reinforcing in wall footings placed 3"from soil and 3"from outside specified LVL. 24) Waterproof insulation is to be used in cavity walls where shown. GENERAL NOTES footing edge unless otherwise shown. 26) Web stiffeners to be installed on cantilever TJI's @ support points. 25) Steel lintel bearing to be 8"minimum on concrete block and 4"on brick units. LOCATION LiVE LOAD DEAD LOAD L.L. DEFLECTION 25) (2) #5 rebars to be placed on all four sides of window and door openings and other large openings. 27) Do not bevel cut I-Joist beyond the inside face of support. 26) Stack Bond to have installed a minimum of (1) #5 rebar in each piece of block. First Floor 40 PSF 10 PSF L/480 Each end of the #5 rebar to extend 2'beyond the opening. Second Floor 30 PSF 10 PSF L/480 28) Full width engineered lumber can be substituted for (2) or (3) members of the some type lumber. 27) Wall reinforcing shall not be less than #5 @32"on center vertical and (2) #5 rebars for bond beam. Decks 40 PSF 10 PSF L/,360 26) Stepped footing not to exceed V vertical for every 2'horizontal. Rebar to continue through stepped footings Exterior Balcony 40 PSF 10 PSF L/360 and bent through steps. 29) Hangers are „hown on plan. Contractors to consult architect/engineer if hanger is not shown in drawings. Porch (enclosed) 40 PSF 10 PSF L/480 Contractor verifies that he has reviewed Simpson "Wood Construction Connectors"catalog for fastening details. All 27) Pilasters to be 12"wide x 4 r2"deep and contain (4) #5 rebars vertically tied to footing rebar and top of deck hardware to be Simpson Z-Max or stainless steel. Z-Max to use hot dipped galvanized nails and stainless FOUNDATION DRAINAGE Attic (non-storage) 10 PSF 5 PSF L/360 P PP wall rebar. Vertical caged bars to be 2"off inside edges and hooked back to rebars in footing and upper wall steel hangers to use stainless steel nails. Attic (storage) 20 PSF 5 PSF L/360 i with #3 stirrups at 6"on center placed vertically. 1) All drainage stone to be free-draining granular material such as course sand and pea gravel. Ceilings w/plaster 40 PSF 20 PSF L/360 30) Contractor to provide crawl space ventilation openings to be not less than 1/1,500 of the under floor area Roof (w. fin. clg.) 25 PSF snow 15 PSF L/240 28) All steel columns to be bolted to footings. where a vapor retarder and openings placed to provide cross ventilation. Ventilation not required when ground 2) Drainage pipe to be 4"in diameter, 2000 psi perforated polyethylene drain pipe with slotted holes on all Roofing (no fin. clg.) 25 PSF snow 10 PSF L/240 surface is covered with an approved vapor retarder, the perimeter walls are insulated and the space is sides and installed above the footing and below the slab level. Pipe to be covered with filter fabric. Drainage to 29) Steel column top plate to be minimum r2"thick and cover all supporting members. Base plates to be 10"x conditioned. drywells. Ceiling beam sizes may have to be increased for heavy storage attics. 10"unless otherwise noted. 31) Ceiling joists used or collar beams to be nailed with (8) 10d common nails at the joist rafter connection 3) Filter fabric to be Mirafi 140 N or approved by Engineer. 1) Wood frame dwellings to be designed in accordance with the 2020 Residential & Building Code of New York 30) Concrete slab control joints to be 1/4'"depth of slab and not exceed more than 25'center to center unless otherwise shown. 1 PERMIT SET 13 NOVEMBER 2021 State & WFCM 2018. Wind speed to be used is 130 mph. Exposure B category to be used for urban, suburban spacing. Joints should be laid out to form floor panels as nearly square as possible not exceeding a ratio of 4 Drainage pipe cleanouts to be brought above grade & capped just below finished grade with rubber cap. NO. ISSUANCE DATE or wooded and Exposure C to be used for open and shoreline areas. Earthquake Use Group I, Site Class D, ) g p p g g pp 9 P 1-1/2 to 1. Joints can be either formed, tooled, saw cut or Zipstrip. 32) Floor to floor tension ties (Simpson CS 20 x 36") to be installed every 32 around house perimeter holding Clean outs to be located !'before 90 degrce. bend. RELEASES Seismic Design Category B. second floor studs to first floor studs unless otherwise shown. Tension ties to be located on each side of door 31) Welded wire mesh should be positioned in the top 2"of the slab. Flat sheets to be used with an overlap of or window openings over 4'and within 2' from all corners unless otherwise shown. (9) 8d nails to be installed at 5) Bring sand backfill 3"to 4"above grade to allow for settling. Add 4"native soil to top at end of job. 2) These plans are designed to meet or exceed the requirements of the 2020 Residential & Building Code of 1 . SEAL: New York State & WFCM 2018. When building in other jurisdictions, variations or adjustments may be required. each end Verify any such requirements with local code or enforcement officers. 6) If pumps are required they are to be checked & tested twice per year. �Ep An 32) Under the slab shall be placed 4' of compacted sand or crushed gravel over a 15 mil vapor retarder with 33) Roof ridge tension strap to be LSTA-18 with (4) 8d nails each end. �'t;� G.VOLO FhiT' 3 The architect pp p joint overlaps of 6"minimum. Use Vapor Block VB15 from Raven Industries. 7) Ground adjacent to foundation shall be sloped away from house 5/8"per foot for 10'(5% slope). Swoles /eng f certification applies only to this Ian's conformance to the 2020 Residential & 34) Double LVL's or dimensioned lumber shall be installed around all fireplace, stair openings and skylights with shall have longitudinal slopes r4"per foot minimum (2% slope). 4U Q 11 Building Code of New Yoorkrk S State & WFCM 2018. 33) Sub-grade preparation under slab -The existing sub-grade should be cleared of top soil and organic connector hardware. ' t , * 4) Glazed openings must be protected with glass, certified to meet the large missile test (impact-resistant) or matter and stockpiled separately. Pronounced soft and hard spots should be excavated and refilled and 8) Foundation wall waterproofing to be Tuff-N-Dri with drainage/insulation board Warm-N-Dri. * compacted with a soil similar to the surrounding soil. 35) All crickets to have minimum pitch of r4'per foot. with structural shutters with a minimum thickness of 7/16"and a� maximum panel span of 8'. Panels shall be - precut and predrilled. Attachment hardware to be corrosion resistant #8 wood screws 2-1/2"screws w/ 2" 34 Granular fill, such as crushed ravel, sand or a mixture of sand and ravel shall be used as fill under the ��' 032421 y0� embedment placed 8"on center. vapor barrier. if soil is disturbed, mechanical compaction to 95% Modified Proctor test in soil lifts not exceeding 36) Joist hangers shall be used on all flush headers. STRUCTURAL STEEL 9rFOF NEB 5) Garage door openings to have additional bracing and heavier gauge tracks/hardware to protect against 130 6". 37) All framing on or near salt water shall be fastened with hot dipped galvanized or stainless steel nails and 1) Shop Drawings -Submit shop drawings for Engineers approval prior to fabrication. Ship drawings to include fasteners. complete details and schedules for fabrication and assembly of structural steel member, procedures and miles per hour winds. Garage door glazed opening protection for wind-born debris shall meet the requirements 35) Curing of concrete slabs open to the elements is to be done by keeping the slab wet and at temperatures diagrams. include details of cuts, connections, camber, holes, and other pertinent data. Include welds by standard of an approved impact-resisting standard or ANSi/DASMA 115. between 40 and 70 degrees F or using a curing compound. AWS symbols and show size, length and type of each weld. Provide setting drawings, templates and directions for installation of anchor bolts and other anchorages. 6) Electrical work shall conform to national electrical code (latest edition) and any applicable local codes. 36) No vehicles shall be placed on the slab until the 28 day strength is achieved. 38) 4x4 deck posts are to be bolted to the rim or band joist w/ (2) r2"x 6"hot dipped galvanized bolts, 2" from the edge of the joist. All posts to be connected w/ Simpson Strongtie DTT deck tension ties which will 2) Code for fabrication to be American Institute of Steel Construction (AISC) 15th Edition. 7) Contractor to verify all dimensions before starting. 37) Curing of concrete walls and slabs open to the elements is to be done by keeping them wet and at require blocking(wrvw.strongtie.com/deck). The spacing of the posts are not to exceed 6'on center. temperatures between 40 and 70 degrees for 7 days or using a curing compound. 3) Qualifications for welding work -Qualify welding procedures and welding operations in accordance with AWS 8) If header sizes are not shown, contractor to contact architect/engineer. 39) Garage door shall have a minimum of (5) 3/8"x 3"lag bolts supporting each garage door rail for 8'x 8' Qualification requirements. Welders shall have current evidence of passing the appropriate qualification tests. The 38) Minimum concrete cover for rebars to be 3"when concrete cast against the ground, %" when concrete not door and (8) lag bolts for 8'x 16'door. Contractor to verify that door is impact resistant. engineer may request evidence at any time during the project. 9) Do not scale drawings. Follow dimensions only. I exposed to weather or in contact with ground and 1-1/2"when concrete exposed to weather or in contact with ground. 40) All window end door flashings are to be installed per the manufacturer. Where details are not provided by 4) Structural steel shapes to be A992, plates and bars to be A36 or A572 Grade 50. 10) Contractor to verify by testing if lead based paint, asbestos, mold or other hazardous substances are I the manufacturer pan flashing shall be installed at all window and door openings. Other fleshings around window present before starting work. and doors shall comply with 2020 RC of NY R703.4 Flashing. 5) Anchor bolts to be ASTM A325 or GR 55 F1554. Acrylic adhesive anchors can be substituted for cast in place anchors with Engineers approval. 11) The EPA's Renovation, Repair and Painting (RRP) law requires that contractors performing renovation, repair FRAMING NOTES , and painting projects that disturb more than six square feet of paint in homes, child care facilities and schools 41) Vented roofs in attics to have a net open area equivalent to 1/300 of the attic floor area and provide a vapor retarder installed on the warm side of attic ventilation. 6) High strength threaded fasteners, heavy hexagon structural bolts, nuts and washers to be A325 or A490 built before 1978 must be certified and trained to follow specific work practices to prevent lead contamination. 1) All framing lumber to be Douglas Fir #2 or better in an S-Dry condition. bolts. PROJECT: a - venting baffles on underside of roof running 12) Any alteration, repair addition or conversion to an existing dwelling requiring a building permit requires that 2) Aii sill plates that sit on concrete to be a minimum double 2x6 ACQ pressure treated or Micronized Copper 42) Unvented cathedral or vaulted roofs/ceilings to have aircontinuous from soffit to roof vent or on the underside of the plywood roof a minimum of 3"of closed cell 7) Electrodes for welding AWS A5.1 or A5.5 E7OXX. Welding temperatures shall be in accordance with the AiSC all sleeping rooms in the house be upgraded with hard-wired and interconnected smoke alarms. Azole (MCA). Fastening of rim board to sill to be 10d toe nails 6"on center. All nails penetrating into the P y Blue Horizon Bluffs spray foam (R-20) with a class 11 vapor retarder built-in or painted on for condensation control. Fiberglass Batt and AWS specifications. Any structural steel damaged in welding is to be replaced or reinforced as acceptable to pressure treated sill plate shall be hot dipped galvanized or stainless steel. insulation can be added under. the engineer. 13) Excavations deeper than 5'must be constructed according to OSHA regulations. Soft or sandy soils must Cabana have at least a 1:1 slope. Hard or compact soils must have at least 1:2 slope. 3) Termite shield shall be either copper flashing or COP -R-Shield and extend 1"minimum on each side of the 8 Structural steel rimer point to be SSPC -Paint 13. Exposed steel to have one coat of a zinc rich p p p primer, concrete wall. Sill sealer to be used with this product. MASONRY SPECIFICATIONS an intermediate coat of epoxy and a finish coat of urethane. 14) Grade property 5% in first 10'from the building. Elsewhere the site to be sloped away at 2%. Foundation wall to extend a minimum 8"above grade. 4) All deck framing to be Micronized Copper Azole (MCA) rated for ground contact specified as either UC4A 1) All masonry work to comply with Building Code Requirements for Masonry Structures and Specification for 9) Non metallic shrinkage resistant grout to be premixed, non-corrosive and non-staining consisting of (ground contact general use), UC4B (ground contact heavy duty) or UC4C (ground contact extreme duty). UC3B Masonry Structures, TMS 4021602-16. Mason to follow 2020 Building & Residential Code of NY & WFCM 2018. selected silica sand, Portland cement, shrinkage compensating agents, plasticizing and wafer reducing agents. 15) Under slab areas -after the service lines have been installed, all plastic or copper lines should be properly can be used for exterior construction that does not come in contact with the ground. Nails to be hot dipped or bedded (clean fill, no rocks) and tested for leaks prior to backfilling. All copper lines should be checked for stainless. 2) All horizontal and vertical joints to be 3/8"thick. 10) Fabricate and assemble structural assemblies in shop to greatest extent possible. Fabricate items of dents or abrasions and wrapped in split foam insulation. structural steel in accordance with AISC specifications and as indicated on final shop drawings. 5) Two rows of blocking to be installed every 4'along concrete foundation walls where the first floor joists are 3) The cavity between the brick and block or insulation shall be kept free of mortar and shall not be less PeConiC, NY 16) All trades that are installing piping under the slab must install color coded caution tape 12"above their running parallel to the foundation wall if the wall is taller than 8'. The plywood floor is to be nailed into this than a 1"space. work. Use red for electric, blue for water, green for sewer, yellow for gas and orange for phone%able. Mark blocking. location of new work with color coded spray paint after trenches have been backfilled. 4 Mortar joints between concrete blocks shall be made straight and with uniform thickness. Bed joints for the 11) All connections should be constructed as shown on the drawings. Alternate connection designs shall only be sum wallboard membrane, 5 8"wood structural ) g allowed with nor approval of the engineer. Calculation and shop drawings shall be submitted bearing the DRAWING NAME: 6) Floor assemblies using 1 Joists shall be provided a r2"gyp / face and web shells shall be fully mortared. p pp 9 p g g 17) Copper joints will not be allowed under the slab and must be placed in a wall manifold. panel membrane, or equivalent on the underside of the framing member. This is not required over crawl spaces engineer's seal and signature. SPECIFICATIONS (See IRC R302.13). 5) Horizontal and vertical cells of concrete blocks that contain reinforcing bars, ledger bolts or other inserts 18) Asphalt roof shingles installed must meet 130 mph rating & wrappers shall bear label indicating compliance shall be filled solid with cement grout. 12) Connections made with unmarked bolts and nuts will be rejected. All bolting to be Snug-tight. with ASTM D 3161 class F. Contractor to follow nailing per manufacturer. Drip edge to be installed on all eaves 7) Fastening of exterior plywood to rim joists (box beam) and double top plates to be 2 rows of 8d nails 3" and rakes. on center. Fastening of plywood to double sill plate to be 3"on center staggered into each 2x member. 6) Grout pours shall not be made in lifts higher than 5'. The grout should be well consolidated in place. Lifts 13) Connections shall be detailed or scheduled. No connections shall consist of welds developing 10,000 pound shall stop 2"below the top block. Grout mix shall be fine and conform to ASTM specification C476. Mix to be a capacity. Minimum weld size shall be 3/16"fillet. 19) Contractor is responsible for all flashings. 8) Fastening of top and bottom plate on interior walls to be (2) 16d nails every 12". Top plate to be nine sack mix. Grout to have a minimum compressive strength of 3500 psi. connected to ceiling joists or with blocking spaced not more than 12"on center with (2) 16d nails every 12". 14) Gas cutting torches shall not be used to correct fabrication errors without the approval of the engineer. 7) All brick shall conform to ASTM spec C62 and C216. DRAWING NUMBER: 9) All deck ledgers to be pressure treated Micronized Copper Azole 2x material. Ledgers to be attached with 15) All structural steel that is located in exterior unheated spaces, including steel directly exposed to weather DRAWN BY: ACV DRAWING V"lag or thru bolts w/ washers 12"O.C. top and bottom staggered and located not closer than 2"from top and 8) The grout space in the parapet walls shall not be less than the sum of the diameters of the vertical and shall be power fool cleaned and painted with three coats of oil based paint in accordance with the Steel bottom edges and ends. Hole for lag bolts into rim joist to be 5/16"and ledger r2". All Railing posts to be horizontal bars plus r4"clear on each side of the bars. The grout space shall not be less than 2"thick. Structures Painting Council. CHECKED BY: ACV CD connected w/ Simpson Strongtie DTT deck tension ties (www.strongtie.com/deck). 16) Connection of wood packout fio steel beams and co'?umns 'to be wf f'''bo'its 2'on center on each side of SCALE: SHEET: 9) All pipes that pass through the masonry shall be sleeved to prevent them from bonding with the masonry. the web. Alternative connection is to use a power actuated fastener b Hilt! X DNI. Shaft of fastener to full 10) All headers to be (2) 2x 12 or (2) 1-3/4 x 11-7/8 microlams unless noted otherwise. P Y Y CURRENT 10) Full height vertical joints shall be filled with a compressible bituminous material. Horizontal reinforcing does penetrate steel flange or web. Locate 16"on center on each side of web. Do not thermally cut holes or enlarge ISSUE DATE: 002 not continue through the vertical joints. holes by burning. - I , Nci ing Schedule Joint Description lNumber of nails INail Spacing 28 South Harbor Rd. Roof Framing outhold,NY 11971 Rafter to top plate Toe Nailed 3-8d Per Rafter :631.806.2537 Ceiling Joist to top plate Toe Nailed 3-8d Per joist Ceiling Joist to Parallel Rafter Face Nailed 6-16d Each lap Ceiling Joist Laps over Partitions Face Nailed 6-16d Each lap Collar Tie to Rafter Face Nailed 3-8d Per Tie Blocking to Rafter Toe Nailed 3-8d Each end Rim Board to rafter End Nailed 2-16d Each end Wall Framing Top Plate to Top Plate Face Nailed 2-16d Per Foot Top Plate at Intersections Face Nailed 4-16d Joints ea. Side Stud to Stud Face nailed 2-16d 24 o.c. SIMPSON LSTA — 20 GAGE RIDGE STRAP — ALL ROOF RAFTERS Header to Header Face Nailed 16d 16 o.c. along edges Top of Bottom Plate to Stud end Nailed 2-16d Per 2x4 Stud 3-16d Per 2x6 Stud ICE SHIELD UNDERLAYMENT REQUIRED 4-16d Per 2x8 Stud W RRICANE CLIP `O TYP. Bottom Plate to Floor joist, Band Joist, End Joist, or Blocking (Face Nailed) 2-16d 1,2 Per Foot r E I 1 Floor Framing ALTERNATE POSITION Joist to Sill, Top Plate or Girder Toe Nailed 4-8d Per Joist OF HURRICANE CLIP. Bridging to Joist Toe Nailed 2-8d Each End USE SIMPSON H3 Blocking to Joist Toe Nailed 2-8d Each End Blocking to Sill or Top Plate Toe Nailed 3-16d each block HE Ledger Strip to Beam Face Nailed 3-16d each joist SIMPSON H2 HURRICANE CLIP MST37 METAL Joist on Ledger t0 Beam Toe Nailed 3-8d per joist NAILED FROM RAFTER TO STUD. ROVIDE 8d COMMON NAILS @ STRAP @JACK Band Joist t o Joist End Nailed 3—16 d per joist S t TYPICAL CAL ALL RAFTERS. (5) 8d 4" D.C. AT EXTERIOR EDGE OF POST W/(4) 8d p NAILS EACH END. ALL SHEATHING NAILS @ 48" Band Joist to Sill or Top Plate Toe Nailed 2-16d per foot EACH END TYP. Roof Sheathing APA EXTEND TO RATED OP OF TOPOD TP PLATE Structural Panels 8d 6 Edge 6 Field Diagonal Board Sheathing 1 x6 or 1 x8 2-8d Per Support 1 x10 or Wider 3-8d Per Support STRAP TO STUD W/ (4) 8d NAILS SIMPSON MST27 1 1/2" WIDE OP OF Ceiling Sheathing sum Wallboard 5d coolers 7 Ede 10 Field WRAP & NAIL STRAP FOUNDATION Gy psum g (4) 4d NAILS - 20 GAGE METAL STRAP @ 48" O.C. AROUND SILL PLATE + 12" FROM EACH CORNER WRAP AT ANCHOR BOLT AROUND SILL PLATE. ROVIDE (4) 8d Wall Sheathing NAILS INTO SILL PLATE. Structural Panels 8d 6 Edge 12 Field AIL SHEATHING TO SILL PLATE FLOOR JOIST Fiberboard Panels I�. 8d NAILS @ 4" O.C. 7 16 6d 3 Edge 6 Field (2) # 5 REBAR w p p D D ♦ D p p D p' D O D X 6 SILL PLATE D°^ Dp° ° ° p 0 ° DO °D p p D P p °0 ♦ D D` p D p o O D D pa.DD D °D D'p °• p DO °D D .p D D D p V D Op D D 25 32 8d 3 Edge 6 Field ACQ TREATED. D ° pDp ° O • D p D ° ♦ p ° p ° D ° ° p D p ♦ p O ° • ° ° pD p 0 D♦ D ° Opp p Da Dp D p . D p DD D p • D ° DDp p D♦ D p p pD D O D p o . D p oD p p De D p p O p pD D p ♦ D p _ DD ° ..p D ° 9, Dp ♦ D D p D p p ` p ° ° p p D♦ D ° Dp p o.p p Dp • p D O D p , p° °• p V pDpp p Da Dp p °ODp 'p Da Dp p D ppD • ° p D D ° p°^ DO G ppO p Da Dp p .D ODD.• p V♦ DD p pDp • D ° pD D D ° .p ♦ D ODppp . ppD Dp p D p ° pDD p OD p,p D ♦ D p pDODO . Dp ° Dp p p Dpp DD cp D Gypsum Wallboard 5d coolers 7 Edge 10 Field / p ° Dp DD ° ° DD ' ° ° p D ° ♦ D ° ° p Da ° p Dp D O ° DD ♦ ro ° p D p SEE FOUNDATION DWG. D . D o 8" X 12" A.B. @ 48" D.C. D D p p Da Dp ° D p D p.° D pDp ` D V p ° D ° pDpD p Da DD ° D D D ° p °DD ♦ D D OD HardBoard 8d 6 Edge 12 Field FOR DESIGN ° ° ♦ ° °' ' ° D Dp ' ° ° ' ° p` D ° D• D °' p ' D ° ° D°pD W/ FENDER WASHER. DpD D♦ DD p •pp D p D p • D V pD ° p ° ODp p D O p pD ♦ D ° OD D p ♦ D p DD D • p p p °D D D p°p D p°♦ D o D p p p . D p p D D D •p D ° p D D • D C D D p p O D• p ° p D p p p D a D p p D °p O p D O p p D a D p OD D p D• p p Do ° p D p D Dp ♦ D D p D O . p ° D p D' D p pD p p D pDD a D D < D V .OD p p OD. D ° pDpD p D♦ DD 0 D DD ♦p D D p' D pDp.♦ D V ODpp pOD♦ DO ° °pDpD p Da Dp ° D °pD •p p p Particleboard Panels 8d 6 Edge 12 Field Diagonal Board Sheathing SECTION DIAGRAM ELEVATION DIAGRAM 1 x6 or 1 x8 2-8d per support 1 x10 or wider 3-8d per support Floor Sheathing HOLD DOWN AND SHEAR CONNECTION CRITICAL PATH Structural Panels 1 or less 8d 6 Edge 12 Field greater than 1 10d 6 Edge 6 Field 'iaaonal Board Sheathing 1 x6 or 1 x8 2-8d per support a a a a 1 x10 or wider 3-8d per support a a a xxR❑❑F SHINGLES LYWOOD SHEATHING FASTNERS FOR ALL ROOF SHINGLES SHALL BE GALVANIZED STEEL, STAINLESS STEEL, 2 X 6 STUD WALL STA15-20 GAUGE ALUMINUM ❑R COPPER ROOFING NAILS MIN, ❑F 12 GAUGE SHANK WITH A MIN, ❑F 3/8" HEAD o WSTRAP TO STUD METAL STRAP @48 O.C. / (4) 8d NAILS + 12 FROM EACH CORNER ATMF1667 OF A LENGTH TO PENETRATE THROUGH THE R❑❑FING MATERIALS AND A MIN. OF WRAP AROUND SILL PLATE. USE 3/4" INT❑ THE ROOF SHEATHING, WHERE THE ROOF SHEATHING IS LESS THAN 3/4" THICK THE jhl 2 X 6 TREATED (4) 8d NAILS INTO SILL PLATE. SILL PLATE 1 PERMIT SET 13 NOVEMBER 2021 FASTNER SHALL PENETRATE THROUGH THE ROOF SHEATHING -e <, 10 0 NAIL SHEATHING TO SILL i » N0. ISSUANCE DATE 4 -- 10 0 � < 30 0 PLATE USING 8d NAILS @ 4 O.C. a El a a (2) #5 REBAR CONTINUOUS RELEASES R905,26: ASPHALT ROOF SHINGLES SHALL HAVE A MINIMUM ❑F 6 FASTNERS PER SHINGLE frER aMITE SHIELD AND ILL SEAL. GABLE ROOFS HIP ROOFS 5/8" DIA. x12" A.B. @48" SEAL: _ PROVIDE 8d COMMON NAILS @ 4" O.C. O.C. - TYP. +12" FROM GRADE 6" MIN. BELOW aED ARCy -6 < 10 100< -0 < 30 0 AT HIGH PRESSURE ZONE. TOP OF CONC. `�� a+G.vot /TF a a a a @ 6" O.C. AT ALL OTHER PORTIONS OF THE EACH CORNER. W/ FENDER WASHER. a \\ \ \ \ \ \ \\\\\ \ Q� S P i C ROOF TYP. irr WATERPROOF ALL a 1/2" EXPANSION SEAL <. URFACES BELOW . 10" GRADE (TYP.) o sTgT 03242, -ld� FOF NEB 4" CONC. SLAB Z h W/6X6 #10/#10 WWM PROVIDE 8d NAILS @ 4" O.C. AT PERIMETER INTERIOR a a 10 0 10 < 45 0 PORTIONS OF PANELS IN HIGH PRESSURE ZONES. 2" X 4" KEYWAY a a • D ♦ ♦ D < p p NOTE : a = 4 FT. IN ALL CASES (2) #5 REBAR D p p D. Op GABLE ROOFS CONTINUOUS °Dp ° D 10 0 19 < 45 0 X 16 PC. FTG. SET ON UNDISTURBED SOIL SET 36" BELOW GRADE NAILING DIAGRAM FOR COMPONENT AND CLADDING PRESSURE ZONES FOUNDATION SECTION DIAGRAM PROJECT: Blue Horizon Bluffs Cabana WINDOWS - GLAZED OPENING FOR NEW CONSTRUCTION , EXTERIOR WINDOWS MUST BE PROTECTED VIA GLAZING MEETING THE LARGE MISSILE TEST CERTIFICATION OF ZONE Il ASTM E 1886-97 AND ASTM E 1996-99 6' EACH WIND❑W TO RECEIVE OR VIA STRUCTURAL SHUTTERS WITH ATTACHMENT HARDWARE PROVIDED. NEW STRUCTURES w� Ti (1) 7/16' THICK x SIZE OF 8' C° MA C. S AN WINDOW LOCATED WITHIN ONE (1) MILE OF THE MEAN HIGH WATER MUST HAVE GLAZING CONFORMING PLUS 4' EA, SIDE CDx TO WIND ZONE III, MISSILES DEFINED IN PARAGRAPH 6 OF ASTM E 1996-99. GLAZING CONFORMING ¢ PLYWOOD TO WIND ZONE Il, MISSILES CAN BE USED AT A DISTANCE GREATER THAN ONE MILE OF THE COASTLINE. w PR❑VIDE #8 C❑RR❑SI❑N RESISTANT WOOD SCREWS w/ 2' EMBEDMENT @ 8° ❑,C, AROUND PERIMETER DRAWING NAME: PROTECTIVE PANELS TO BE PROVIDED FOR ALL AREAS BY : ❑F WINDOW A — CLEAR SHIELD HURRICANE + SECURITY PANELS — 631 — 287 5060 WIND DIAGRAMS OR B — QUICK GUARD STORM PANELS. 631 — 287 5330 OR C — PLYWOOD PANELS AS PER CODE PROTECTION DEVICES TO BE IN ACCORDANCE WITH LARGE MISSILE TEST OF HURRICANE SHUTTER DETAIL ASTM E 1996 AND OF ASTM 1886. AS NOTED IN 2015 International Residential Code. SCALE: 1 4" = 1'-0" TYPICAL AT ALL WINDOWS SCALE: N.T.S. DRAWING NUMBER: DRAWN BY: ACV SET: CHECKED BY: ACV C D SCALE: SHEET: CURRENT 003 ISSUE DATE: 28 South Harbor Rd. outhold,NY 11971 631.806.2537 cp 17 SEE ENGINEERING PLAN FOR 'QQ SEPTIC & DRAINAGE DESIGN ANO G UND DISTURBAN E'°=: _ : A WARD 0 1W :1 CREST LUFF:SE- BACK ;• . DURINGC STRU T]ON j lfiyFOF ANY GftOI�JND #STl1RBA#VCE P=. 4°SFT`' °�9NlFp TQITRI)S APPROVAe j�Rf I ��. \3 \' � 11, \ \\ .,. �. \o HAY BALES&PROJECT O ` oRcy LIMITING SILT FENCE sA TO BE 1'FROM TOP OF `' !•y POOL GATE BLUFF SETBACK ^h \\.;. \ 'q</� �oii PER NYS CODE UN Ss, _ 1 —� _ POOL FENCING PER NYS CODE ry, OUTDOOR SHOWER Vol y. rAb70, PROPOSED STAGING AREA j 'P spq IV RETAINING . WALL h PROPOSED a, , 6�/8. \\ icb CONCRETE WASHOUT Al ,:.:. C \ 2 BUILDING PERMIT REVISIONS 13 NOVEMBER 2021 1 BUILDING PERMIT 13 SEPTEMBER 2021 . NO. ISSUANCE DATE T' —, RELEASES 0. SEAL: 'D ARCC.vot yi a 0• � S'T,9r 032421 ,yOQ ��? F OF NEB 1 SITE PLAN SCALE: 1/32"=1'-0" PROJECT: Blue Horizon Bluffs COVERAGE CALCS: 50,657 SF TO TOP OF BLUFF Peconic, NY 20% = 10,131 SF 1 ST FLOOR 4413 SF DRAWING NAME: POOL/CAB 2661 SF SITE PLAN GARAGE 1078 SF TOTAL 8152 SF 16% TOTAL COEVRAGE N DRAWING NUMBER: DRAWN BY: SET:CHECKED BY: CT� SCALE: 1/32"=1'-0" SHEET: ��// PROJECT No 9/22/2020 100 28 South Harbor Rd. Southold,NY 11971 631.806.2537 v 01 17'-5" 10 10'-71/4" ell 3'-9 1/2" 3'-0 1/4" DRAIN TO DRYWELL IX � j"X11 "A = L I COU TER OU OR X C. SH ER `°cam M 1/4" _... 6,-6.7/8" ... 9'-7 5/8" 71/4" - M N N -- - - _- Fn co T \00 � 00 TERRACE V 1 Ln J ....m I _ t0 CABANA ' o_ 2'X2' STONE PAVERS `� L, a TILE FLOORING OVER 4" P.C. SLAB ^^ Q -s I M r X _ _ ..__.... ........... _.. X : .. ...... , `o \ N � ( M v 1 v Q -.. ;. .... .. .. ':_ . 5 j"X11 J'APB o M 101.1 10 .2 101.3 101.4 3'-0 1/4" 3'-9 1/2" 3'-9 1/2" 3'-9 1/2" 3'-0 1/4" 10 17'-5" 3 FIRST FLOOR PLAN a SCALE: 1/4"=1'-0" /— CS 20 X 36 EVERY 32"O.C. USE WRAP STRP W/GRACE VYCOR IN CONTACT W/ PRESSURE TREATED WOOD 5/8" DIA.X 12" HOT DIPPED GALVANIZED A.B.@4 8"O.C. TYP.NOT MORE THAN 12" FROM EACH CORNER W/3"x3"x3/16"SQ.WASHER TOP OF 1ST FLOOR SUBFLOOR ELEV: 0'-0" 4"CDX PLYWOOD \ M M COP-R-TEX TERMITE SHIELD (2) #5 REBARS 00 8" 4" 10 bd #5 REBAR 16"O.C.VERTICALLY 17 5 4' 9 1/2" ° 12"O.C.HORIZONTALLY 5/8" DIA.X 12" HOT DIPPED GALVANIZED A.B.@4 8"O.C. �. \' ° TYP.NOT MORE THAN 12" \ ° FROM EACH CORNER I � — - - - - - - - - - - - - - - - � ; ° ° , a W/3"x3"x3/16"SQ.WASHER o Q I A S I - o \\., \\ 3 X 31 I I I i 12" POURED CONCRETE WALL \\\ \\ 4ThP 3'SPLICE ON REBAR ELEV: OFF 3/4" WALL — — — I \ \ ° ° °° WATERPROOF ALL SURFACES' 2 CLIENTMTG 01 JULY2021 LEV:-0'-3 3/4 I I BELOW GRADE W/WARM N DRI 1 CLIENT MTG 05 MAY 2021 J \ ° a° 3" COMPACTED CLEAN SAND BACKFILL NO. ISSUANCE DATE TOP OF OUND.SHELF — — I ELEV:-1-3 5/8" I � ° ° RELEASES TOP F FOOTING I I \\\ \\ I ELEV:-4'-6 3/4" I I \ SEAL: ARC 4"CONC.SLAB ; \ \ ° 6X6#10/#10 g� G•VOLOS c� ,°a WWM REINFORCING 4 a I I N o CRAWL SPACE I I ° ° a v 8 � * - I ( 2" P.C. RAT SLAB I I a o 0 0 iLr' I I N VAPOR BARRIER s)` 032A2� qTF OF NEB ° 8 SAND COMPACT I I I KEY WAY I I (3)#5 REBAR I I I I I IL — — — — — — — — — — — — — — — — - PROJECT: 1'-6" UNDISTURBED SOIL - - - - - - - - - - - - - - - - - - - Blue Horizon Bluffs 17'-5„ 01 Cabana TYP. FOUNDATION WALL SCALE: 1 1/2"=1'-O" 2 BASEMENT PLAN • . SCALE: 1/4"=1'-0" Peconic, NY DRAWING NAME: PLANS DRAWING NUMBER: DRAWN BY: SET: CHECKED BY: CD SCALE: 1/4"=1'-0" SHEET: PROJECT No 9/22/2020 2 1 28 South Harbor Rd. outhold,NY 11971 MAX BLDG HGT _ _ _ _ _ _ _ _ _ _ _ _ _ _ MAX BLDG HGT :631.806.2537 - - - - - - - - - - - - - - - - - - - - - - - - Y ELEV: 55' Y ELEV: 55 A TOP OF PL _ _ _ _ _ _ TOP OF PL ELEV: 44'-9 1/2" Y ELEV: 44'-9 1/2" 1"X8" HORIZ. a"X 8"VGC 4 X 10 VGC T&G VGC o __.... _ CEDAR TRIM o CEDAR TRIM CEDAR SIDING N TOP OF PL _ `li TOP OF PL _................ 2" C — . .......... _................. Y ELEV: 39'-101/2" — L—A— ELEV: 39'-101/2" CEDAR TRIM a"X 6"VGC CEDAR TRIM 4"X 6"VGC N CEDAR TRI 1"X6"VER7. 1"X6" RT. o' T&G VGC: T&G V CEDAR SIDING CEDAR IDING LL- 104 101.1 101.2 101.3 101.4 TOP OF 1ST FLOOR FFE _ _ _ _ TOP OF 1ST FLOOR FFE _ V0.5' — — — — — — — TOP OF EXIST,GRADE —� �— I— TOP OF EXIST.GRADE ELEV: 30' n, ELEV: 30' BOT OF BASMENT CLG I I BOT OF BASMENT CLG '"' ELEV: 29'-2112" I I I ' ELEV: 29'-21/2" TOP OF FOOTING — — — — — TOP OF FOOTING - - � ELEV: 25'-101/2" - - - - - - - - -- - - - - - - - - - - - - - - ELEV: 25'-101/2" 1 NORTH ELEVATION WEST ELEVATION . SCALE: 1/4"=V-0" . SCALE: 1/4"=V-0" MAX BLDG HGT MAX BLDG HGT - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - ELEV: 55' ELEV: 55' TOP OF PL _ _ _ _ _ _ _ _ TOP OF PL _ ELEV: 44'-9 1/2" ELEV: 44'-91/2" EPDM RUBBER ROOFING 1"X8" HORIZ.... T&G VGC ___ ._ a"X 10"VGC CEDAR SIDING N N CEDAR TRIM - 0 0 _. -. ........... _....4„�.,V r _ — - TOP OF PL — — — — — TOP OF PL — — CEDAR TRIM ELEV: 39'-101/2" ELEV: 39'-101/2" 4 X 8'VGC CEDAR TRIM 1"X6"VERT 102.1 102.2 102.3 102.4 103.1 103.2 T&G VGC 11 �' CEDAR SIDING 1"X6"VERT. s„ a X 6' VGC CEDAR SIDING a'X 6"VGC CEDAR TRIM CEDAR TRIM _ TOP OF 1ST FLOOR FFETOP OF 1ST FLOOR FFE — --ELEV/: 30.5' — — — — — — — — — — V:-30.5' — — w TOP OF EXIST.GRADE w TOP OF EXIST.GRADE ELEV: 30' N ELEV: 30. BOT OF BASMENT CLG I BOT OF BASMENT CLG ELEV: 29'-21/2" I I ELEV: 29-21/2" _ TOP OF FOOTING — — — — TOP OF FOOTING — — — — — — — - - -I- - - - - -�— ELEV: 25'-10112" L - - - - - - - - - - - - - - - - - - - - - - - --- - - ELEV: 25'-101/2" — — 3 SOUTH ELEVATION EAST ELEVATION . SCALE: 1/4"=V-0" 4 . SCALE: 114"=V-0" 2 CLIENT MTG 01 JULY2021 1 CLIENT MTG 05 MAY 2021 NO. ISSUANCE DATE RELEASES SEAL: ARCy G.VOLOSi IT 1 , - -a EPDM RUBBER ROOFING OVER 4" PLYWOOD SHEATHING TOP OF PL '9T Q' 3 ST 032a2� -l� OVER 2"X10" ROOF RAFTERS ELEV: 44'-91/2" O F NE PROJECT: F PL ELEV: 39'101/2" Blue Horizon Bluffs Cabana N Peconic, NY TOP OF 1 ST FLOOR FFE ELEV: 30.5' DRAWING NAME: w TOP OF EXIST.GRADE P.C.FOUNDATION TILE FLOORING OVER N EL OF BASMENT CLG WALL 4' PLYWOOD SUBFLOOR ELEVATIONS ON 12'TJI F.J.W/PTD.BD. ELEV: 29'-21/2" T TOP OF FOOTING BLDG SECTION ELEV: 25'-10112" 2" P.C.RAT SLAB DRAWING NUMBER: DRAWN BY: SET: 5 BLDG. SECTION CHECKED BY: CD . SCALE: 1/4"=V-0" SCALE: 1./4"=1'-0" SHEET: PROJECT No 9/22/2020 3 1 LL11 I 28 South Harbor Rd. Southold,NY 11971 631.806.2537 EPDM RUBBER ROOFING N 1 °O \ INSULATION BAFFLES \ \ AS REQ'D \ \ DRAFT STOP AS REQ'D ° \ CEDAR FASCIA BD 4" °° SIMPSON HURRICANE CLIP TOP OF 2ND FLOOR PLATE 1 1/8" 3/4" 2 X10" RR 3/4"AIR SPACE EPDM RUBBER \ \ ROOFING \ 2"X10"RR \ INSULATION BAFFLES \ \ AS REQ'D DRAFT STOP AS REQ'D CEDAR FASCIA BD _C\i ° SIMPSON HURRICANE CL!? 00 TOP OF 2ND FLOOR PLATE CEDAR SOFFIT BD 1"AIR SPACE N PTD.G.W.B PTD.WD.BASE CS 20 X 36 EVERY 32"O.C. CS 20 X 36 EVERY 32"O.C. USE WRAP STRP W/GRACE USE WRAP STRP W/GRACr VYCOR IN CONTACT W/ VYCOR IN CONTACT W/ PRESSURE TREATED WOOD PRESSURE TREATED WOOD 71 5/8" DIA.X 12" HOT DIPPED 5/8" DIA.X 12" HOT DIPPED GALVANIZED A.B.@4 8"O.C. GALVANIZED A.B. @4 8"O.C. TOP OF 1ST FLOOR SUBFLOOR gk TYP. NOT MORE THAN 12" TYP.NOT MORE THAN 12" TOP OF 1ST FLOOR SUBFLOOR FROM EACH CORNER FROM EACH CORNER Nr W/3"x3"x3/16"SQ.WASHER W/3"x3"x3/16"SQ.WASHER M M d 11 $"TJI -560 SERIES 4"CDX PLYWOOD 4"CDX PLYWOOD 11 a"TJI-560 SERIES M e COP-R-TEX TERMITE SHIELD COP-R-TEX TERMITE SHIELD 8' L 4 (2) #5 REBARS - (2) #5 REEARS ° 8 d 00 #5 REBAR #5 REBAR d r 16"O.C.VERTICALLY 16"O.C.VERTICALLY d ° 12"O.C.HORIZONTALLY 12"O.C.HORIZONTALLY ° d d ° d 2 CLIENT MTG 01 JULY 2021 5/8" DIA.X 12" HOT DIPPED 5/8" DIA.X 12" HOT DIPPED 1 CLIENT MTG 05 MAY 2021 e da °a GALVANIZED A.B.@4 8"O.C. GALVANIZED A.B.@4 8"O.C. ° °° NO. ISSUANCE DATE 14 TYP.NOT MORE THAN 12" TYP.NOT MORE THAN 12" a J). RELEASES ° FROM EACH CORNER FROM EACH CORNER e/ V d e' ° W/3"x3"0/16"SQ.WASHER W/3"0"0/16"SQ.WASHER ° d °. � SEAL: ° e d 12" POURED CONCRETE WALL 12" POURED CONCRETE WALL �/a ° ��ED ARCf cd G.VOtOS cc a 0324 al l l ° f I TFOF NE•� 2' y0 d °. e a° I l r ° e d a �II ° o d d PROJECT: d d ed ° Blue Horizon Bluffs .°. a I' I ° d I I d °, d' e 4 lal--d ° d ,O d ° d d Q ° d. d°' a a °° ° ° Idl° d ... e Cabana TOP OF FOOTING a ° 4"CONC.SLAB 4"CONC.SLAB d ° ° e e . ,d ° ''e ° d d TOP OF FOOTING d a - 6X6#10/#10 6X6#10/#10 - - d d ° e ° e, d WWM REINFORCING WWM REINFORCING d.° d 114"1 . a d d .. ° 1 1/4". - 00 ° , VAPOR BARRIER VAPOR BARRIER e ° dA °° °a ` .'d COMPACT SAND COMPACT SAND d° a ° ° ° d ' KEY WAY KEYWAY d ° PeCOri1C, NY (3)#5 REBAR (3)#5 REBAR DRAWING NAME: WALL SECTIONS 1 WALL SECTION NO.1 2 WALL SECTION NO.2 ■SCALE:1 1/2"=1'-0" ■SCALE: 1 1/2"=1'-0" DRAWING NUMBER: DRAWN BY: SET: CHECKED BY: CD SCALE: 1/4"=1'-0" SHEET: PROJECT No 9/22/2020 4.91