Loading...
HomeMy WebLinkAbout1000-83.-3-6.1 OFFICE LOCATION: �����f s0(/TyQI MAILING ADDRESS: Town Hall Annex O P.O. Box 1179 54375 State Route 25 Southold, NY 11971 (cor.Main Rd. &Youngs Ave.) va G Q Telephone: 631765-1938 Southold, NY 11971 � • �O olyIrou LOCAL WATERFRONT REVITALIZATION PROGRAM P I. rrrT 8C MG TOWN OF SOUTHOLD RECEIVED MEMORANDUM -- - - 10—C T19 2022 Sothold Town To: Donald Wilcenski, Chair Planning Board Town of Southold Planning Board d From: Mark Terry, AICP Assistant Town Planning Director LWRP Coordinator Date: October 14, 2022 Re: Key Capture Energy Battery Storage Site Plan SCTM#: 1000-83-3-6.1 Zoning District—LI This site plan is for the construction of a 60MW Lithium-Ion Battery Energy Storage System and a new LIPA substation. The battery storage facility is comprised of 272 battery energy storage container units, 34 power conversion system units, a 1,000 sq. ft. point of interconnection building. The LIPA substation will require a 2.54-acre parcel to be created for LIPA ownership, and will contain a 392 sq. ft. LIPA substation building, lightning masts and±13 utility poles connecting to CR 48 by way of an access easement over Town of Southold land. The parcel is ±27 acres in the Light Industrial zoning district, Cutchogue. The proposed action has been reviewed to Chapter 268, Waterfront Consistency Review of the Town of Southold Town Code and the Local Waterfront Revitalization Program (LWRP) Policy Standards. Based upon the information provided on the LWRP Consistency Assessment Form submitted to this department, the proposed action is CONSISTENT with the LWRP. Pursuant to Chapter 268, the Board shall consider this recommendation in preparing its written determination regarding the consistency of the proposed action. Cc: Mara Cerezo, Planner