Loading...
HomeMy WebLinkAbout50581-Z JZ ao�SUEFQ[��OGy� Town of Southold 8/7/2024 P.O.Box 1179 o53095 Main Rd Southold,New York 11971 CERTIFICATE OF OCCUPANCY No: 45438 Date: 8/7/2024 THIS CERTIFIES that the building SOLAR PANEL Location of Property: 1000 Bayer Rd,Mattituck SCTM#: 473889 Sec/Block/Lot: 107.-9-29 Subdivision: Filed Map No. Lot No. conforms substantially to the Application for Building Permit heretofore filed in this office dated 3/18/2024 pursuant to which Building Permit No. 50581 dated 4/24/2024 was issued, and conforms to all of the requirements of the applicable provisions of the law. The occupancy for which this certificate is issued is: roof-mounted solar panels and batter s� torage system to existing single-family dwelling as applied for The certificate is issued to Giron,Jose&Giron-Hernandez,Ciriaco of the aforesaid building. SUFFOLK COUNTY DEPARTMENT OF HEALTH APPROVAL ELECTRICAL CERTIFICATE NO. 50581 7/12/2024 PLUMBERS CERTIFICATION DATED 0 vw 000 d Signature �So�Fni,��o TOWN OF SOUTHOLD BUILDING DEPARTMENT y 2 TOWN CLERK'S OFFICE "o • SOUTHOLD, NY BUILDING PERMIT (THIS PERMIT MUST BE KEPT ON THE PREMISES WITH ONE SET OF APPROVED PLANS AND SPECIFICATIONS UNTIL FULL COMPLETION OF THE WORK AUTHORIZED) Permit#: 50581 Date: 4/24/2024 Permission is hereby granted to: Giron, Jose 1000 Bayer Rd Mattituck, NY 11952 To: install roof-mounted solar panels and energy storage system (located outdoors) to existing single-family dwelling as applied for. At premises located at: 1000 Bayer Rd, Mattituck SCTM #473889 Sec/Block/Lot# 107.-9-29 Pursuant to application dated 3/18/2024 and approved by the Building Inspector. To expire on 10/24/2025. Fees: SOLAR PANELS $100.00 ELECTRIC $125.00 CO-ALTERATION TO DWELLING $100.00 Total: $325.00 Building Inspector �o��pF SO(/r�Ql 0 Town Hall Annex Telephone(631)765-1802 54375 Main Road P.O.Box 1179 G Q � �o seen.devlin(a)-town.southold.ny.us Southold,NY 11971-0959 Q �yCot fff N,Oc� BUILDING DEPARTMENT TOWN OF SOUTHOLD CERTIFICATE OF ELECTRICAL COMPLIANCE SITE LOCATION Issued To: Jose Giron Address: 1000 Bayer Rd city:Mattituck st: NY zip: 11952 Building Permit#: 50581 Section: 107 Block: 9 Lot: 29 WAS EXAMINED AND FOUND TO BE IN COMPLIANCE WITH THE NATIONAL ELECTRIC CODE Contractor: Electrician: Sunrun License No: 33878ME SITE DETAILS Offce Use Only Residential X Indoor X Basement Service Commerical Outdoor X 1 st Floor Pool New X Renovation 2nd Floor Hot Tub Addition Survey X Attic Garage INVENTORY Service 1 ph Heat Duplec Recpt Ceiling Fixtures Bath Exhaust Fan Service 3 ph Hot Water GFCI Recpt Wall Fixtures Smoke Detectors Main Panel A/C Condenser Single Recpt Recessed Fixtures CO Detectors Sub Panel A/C Blower Range Recpt Ceiling Fan Combo Smoke/CO Transfer Switch UC Lights Dryer Recpt Emergency Strobe Heat Detectors Disconnect Switches 4'LED Exit Fixtures Sump Pump Other Equipment: 10.8kW Roof Mounted PV Solar Energy System w/ (27) HanwhaQcellQpeak40.OW Modules on 7.6kW SolarEdge Inverter, 60A AC Disco, Tesla PwrWall 2 w/200A Backup Gateway Notes: w/ 100A MainBreaker, Dedicated Loads Panel 20 Circuit/ 8 Used 220,230,250&260 Breaker SOLAR & BATTERY STORAGE Inspector Signature: . Date: July 12, 2024 S.Devlin-Cert Electrical Compliance Form OP SObTy�� * # TOWN OF SOUTHOLD BUILDING DEPT. 631-765-1802 -INSPECTION � C [ ] FOUNDATION 1ST [ ] ROUGH PLBG. [ ] FOUNDATION 2ND [ ] ULATION/-CAUULKING [ ] FRAMING /STRAPPING [ FINAL �!q-! [ ] FIREPLACE & CHIMNEY [ ] FIRE SAFETY INSPECTION [ ] FIRE RESISTANT CONSTRUCTION [ ] FIRE RESISTANT PENETRATION [ ] ELECTRICAL (ROUGH) [ ] ELECTRICAL (FINAL) [ ] CODE VIOLATION [ ] PRE C/O [ ] RENTAL REMARKS: 9aAvV ode a DATE l (2!e4INSPECTOR oF so�T GRC, f G # # TOWN OF SOUTHOLD BUILDIN %DE y u�m� 631-765-1802 INSPECTION [ ] FOUNDATION 1 ST/ REBAR [ ] ROUGH PLBG. [ ] FOUNDATION 2ND [ ] INSULATION/CAULKING [ ] FRAMING /STRAPPING [ ] FINAL [ ] FIREPLACE & CHIMNEY ( ] FIRE SAFETY INSPECTION [ ] FIRE RESISTANT CONSTRUCTION [ ] FIRE.RESISTANT'PENETRATION [ ] ELECTRICAL (ROUGH) [ ] ELECTRICAL (FINAL) [ ] CODE VIOLATION [ ] PRE C/O [ ] RENTAL REMARKS: P2 AA DATE INSPECTOR MIGHTY ■ ENGINEERING CO. DRIVEN TO EXCEED EXPECTATIONS May 16,2024 Subject: Post Installation Approval Letter Job Number: 216R-OOOGIRO JUL 12 2024 Client: JOSE GIRON Building Department Address: 1000 BAYER RD,MATTITUCK,NY, 11952 Town of Southold Building Permit: 50581 To Whom It May Concern The purpose of the review was to verify the installation is in conformance with the approved plan set and that any potential modifications from those plans meet the intent of the approved plan set. I certify that the PV racking system's attachments have been observed to be installed in conformance with the approved plan set. The installation complies with the code provisions listed below. -2020 NEW YORK STATE RESIDENTIAL CODE WITH 2O18 IRC/IBC/IEBC ASCE Version 7-16,NEC 2017,NDS 2018 • Basic Wind Speed V=128 mph, Exposure Category B • Ground Snow Load=25 Psf Sincerely, h�p'E OF HA yak Digitally signed by Manouchehr Hakhamaneshi 103982 _: DabE:2024.05.16 A�fES510NP� 12:47:02-04'00' Mighty Engineering Co 11708 Roxborough Rd Charlotte,NC 282111(980)689.9776 1 info@mightyengineeringco.com FIELD INSPECTION REPORT DATE COMMENTS ^ o ro t-� FOUNDATION (1ST) OC ------------------------------------ C FOUNDATION (2ND) z 0 q ' � H ROUGH FRAMING& PLUMBING a 1 r INSULATION PER N.Y. y STATE ENERGY CODE rI\ FINAL ADDITIONAL OMMENTS cp-A, z yX a � r � 0 z x d b H z yr- o.P. TOWN OF SOUTHOLD—BUILDING DEPARTMENT`:. y; Town Hall Annex 54375 Main Road P:. .0. Box 1179 Southold;NY 11971-0959 Telephone, 631 765-1802 Fax 631 765=9502 h s //WwW.southoldtoy ov Date Received. . • APPLICATIO:N=FOR BUILDING PERMIT s Lm ttf S For Office Use Only PERMIT NO., Building Inspctor.:' - - - .e. Applications,and form"s:iiust lie filled out in'fheirentirefy,Incomplete, _ n will not lie:acce`ted:-.1Nhere the A' 'licant,is:not.tlie ownei^ an.;:' A a IiGatIQ $ rSm ;Owners Authorizatioii.:foFm.{Page 2)'shbil be coimpleted. 5 `'. � I` E.L��'% r.),.� y g �... Date: S OF PROPERTY: OWNER(.) a - • :N :- , SCTM#1000-!'��'OD-®�p' Q f�'•c�'c��-(,�'�D . Project Address: .,�-' F� � /fir o . ... 2�' /"1 : . .Ph one#: Timail: C�.c3/ . .�g� ���CE Mailing Address: CONTACT PERSON: Name:- 1C� -Mailing Address: ClC �S /� _J'j 1 Phone'#: ' l �-�_ - Email: � .S._[O;C _ •;lam a13:.:11� - _ _ _ — _ M F IVIATIO A :INOR:E�SION L :,:•aUES16N'PROFS - Name:.. : . . Mailing Address: : .. ,.: ... . '7 : i2UX�l.I�'e:�v �i /�d : Phone#: � .�; :� �... i:a Email: CONTRACTOR INFORMATION: . Name: Malling:Address: Lji U Phone#: ` LC� 30 Email: - POSED.`COIVSTRUCT ION-•.' •.DEB• PTION'OF�PRb .t•.w:. CRI- New Structure DAddition DAiferation ❑Repair El Demolition Estimated Cost:of.Proje : ❑Other -- $ / � Will the lot be re-graded? ❑Yes [I No Will excessfill be removed.fr6m premises? DYes ❑No :PROPERTY, NFORMi4TION- Existing use of property: 'Intended use of property: Zone or use district in.which premises is situated: Are there:aby covenants and restrictions with respect to this.property? ❑:Yes.ONo IF YES, PROVIDE A COPY. pia'a 6=: t` or d `i n' iofessional is res•onsible:foi;all drains ie aed'storm water issues as ro e ;C(ieckox After Reading::The owner/con tact •/ es_g=p, p g P Y: Cha��ter 236'of the Town Ccde;APPLICATION MHEREBY•MADE to'the'Bulld'ing%Department for:the issuance'of a Building.Permit pursuant to the Building Zone,., ::Ordinance;of the Town of Southold,Suffolk Caunty,•New,Yorkand other applicable Laws,:OFdiriances.or Regulations,for the copstruction of,buildings, :.;di` additions,alterations or for removal or demolition as hereiq described The. iiearit_agrees to ebmply with all applieable.laws;ordinance's,:building code, housing code'and regulations and to admd authorized inspedors.on pr"emises and in building(s).for necessary inspections:False statements made herein are, punishable as a,Class A misdeiiieanor•pursu'n to,Section A049'of.the ewYorkState Penal,Law:• ;. Application Submitte. .d By(print name): /'7i c ti t lc Ca—c�ti i uthorized Agent ❑Owner Signature of Appfican e •C 4- Date: STATE OF NEW YORK) SS: COUNTY OF ). being'duly sworn, de oses;"and.says that (s)he is the-applicant (Narrie:of individual signing contract)above named, . Mhe.is the (Contractor,Agent;Corporate Officer,etc.) of said.owner.or owners, and:is.duly authorized:to.perform or have performed the said work and to make and:file this application;that all statements contained in this application are-true to the best.of his/her knowledge and belief;and : :that the work will be:performed in the mannet set fo0\i1VM6�a:pplication file therewith. � S 0 G Sworn:before me this NO.01,D E6338933'; /S�da of /GHv L. 2� � UALIFIED IN Y SSAU COUNT — �,': otaryPublic �. PROPERTY Ow RIZATION (Where the applicant is not the-owner) residing at 1000 15a e- P,d 140___t+C_L, &J 1 . 5 do hereby authorize to apply:on. my behalf to the Town of Southold Building.Department for approval as described herein. Owner's Signature Date -Print Owner's Name s Lo LLa u u Lta �i 2024 fi, SUffpl�, y BUILDING DEPARTMENT- icalt4ec�c� �a0 Gy TOWN OF SOUTHOLD Town Hall Annex- 54375 Main Roa�u A�0lt1 'I�9ent, "'oy Southold, New York 11971- §of Southold a�,j`j'�"l-:�.•,:r'��a A;Y Telephone (631)765-1802 - FAX (63 i) 765-3502 rogerrO-southoldtownhygov- seand@southoldt6Wn4y.gov. APPLICATION FOR ELECTRICAL INSPECTION ELECTRICIAN INFORMATION (AU Information Required) Date: —Z�- Company.Name:ido r L-17 Electrician's Name m` U U2 a License No.:He,;; ag7�• Elec. email:: Elec. Phone No: /- z//-,4 ❑I request an email copy of Cefificate of Compliance` Elec. Address.: /?7 Ca-jA a ve AekeX Qd.: .WeStbv-y,w;�. l/s%U_ JOB SITE INFORMATION (All Information Required) Name: Address: io 0 0 2C.� �7--y4:lvc .AJ v i�t So7 Cross Street: Phone No.: /,. E-- G [r,5 Fr Bldg.Permit#: email: 3 //& Tax Map District: 1000. Section: i D Block: f Lot: BRIEF DESCRIPTION OF WORK, INCLUDE SQUARE�FOOTAGE (Please.Print•Clearly):77 /-)S& 114-1,'u-7 o f taut' �dv���a/ v/�� /�c�cIs.. l.7 c.�a 3.5il-LO Square Fobtadei:11, Circle All That Apply: Is job ready for inspection?: . YES❑NO ❑Rough In ❑ Final Do you need a Temp Certificate?; YES aNO Issued On Temp Information: (All information required) Service Size❑1 Ph❑3 Ph Size: A #Meters Old Meter# ❑New Service[]Fire Reconnect❑Flood Reconnect hservice Reconnect[]Underground❑Overhead #Underground Laterals 1 F12 H Frame D Pole Work done on Service? ..n Y' N Additional Information:. f PAYMENT DUE WITH',APPL'ICATION c � rUffpt�,c c BUILDING DEPARTMENT-E lcallaec'td�r 2 TOWN OF SOUTHOLD g Town Hall Annex- 54375 Main RoaffuVA&692101i Dent of Southold Southold, New York 11971- � 4% ap'� y` Telephone (631) 765-1802 - FAX (631) 765-9502 - • 1 �`�� roaerr southoldtownny�aov-seande-southoldtownny.dov ''�=.:•:ter- APPLICATION FOR ELECTRICAL INSPECTION ELECTRICIAN INFORMATION (All Information Required) Date: L -ZL Company Name:Jua.1- n h ����, Electrician's Name m C1 v u License No.: a 7 8 Elec. email: Elec. Phone No: /- ❑I request an email copy of Certificate of Compliance Elec. Address.: /?? JOB SITE INFORMATION (All information Required) Name: �'�r•��, Address: ��OU /z� � •Svc /lI'� �tSoa Cross Street: Phone No.: /- Q,'- G 9-3 Fr Bldg.Permit#: r / email:/�.f1-n :tea, 3 //& �ai1 U Tax Map District: 1000 Section: i D 7 Block: #7 Lot: BRIEF`DESCRIPTION OF WORK, INCLUDE SQUARE FOOTAGE (Please Print Clearly): 6 0/CL, prp7 eij° 6717 J 10- A�so %��fS �� ) its /� - �oruc�wcti�l. �3•sncw Sqdare Footage: Circle All That Apply: Is job ready for inspection?: YES❑NO Rough In ❑ Final Do you need a Temp Certificate?: YES F:TNO Issued On Temp Information: (All information required) Service Size❑1 Ph❑3 Ph Size: A #Meters Old Meter# ❑New service[]Fire Reconnect[-]Flood Reconnect❑Service Reconnect❑Underground❑Overhead #Underground Laterals 1 2 H Frame F1 Pole Work done on Service? Y FIN Additional Information: PAYMENT DUE WIT PPLICATION PERMIT# Address: Switches Outlets GFI's Surface Sconces H H's UC Lts Fridge HW POOL Fans Mini Fr. W/D PanelPump Exhaust Oven Sump Heater Trnsfmr Smokes DW Generator Salt Gen. Carbon Micro GrbDis Water Bond Lights Heat Pucks ERV HOT TUB/SPA Inst Hot DeHum Transfer Disc Combo Cooktop Minisplit Blower AC AH Hood Blower Service Amps Have Used Sub Amps Have Used Comments (N)100A 5 12=40 VAC PA SUB PANEL SINGLE PHASE SERVICE METER M (I NEW ® PSEGU 98311880 100AMAIN UTILITY ACC P.9816006205 - p� BREAKER GRID IH)erEcuanwr / /� (Vl / (E)RELOCATED ' SERVICE ENTRANC P CONDUCTORS E NON-BACKUCTORS rexnr wE�ER / LOADS (N)200A BACKUP CTR GATEWAY WITH RR MAIN /� REA RAT 2 ..,,11 P.��,OF NE OPPOSI END, 4 TR TES LA p-WERrygLL z,13s K1Ii,sKw G)�0P0pK KA OF BU BAR /1'"2 (1)ENERG1�STditkGE SYSTEM / _ 120=NOMINAOkC VOLTAGE, 24A�IAK AC CURRENT,NEMA 3R bRVICE ENTRANCE "Opp T!`..` `O N r- w Imo_! CONDUCTORS OPPOSITE E OF BUSS ,� (1)SOLAR PV CURRENT j EKISTINO i 100A MAIN. TRANSFORMER y��e106286 / (N)LOCKABLE SOLAREDGE TECHNOLOGIES: p�O�.M . BREAKER BLADE TYPE SE760OH-USSN $10N�� [J �(Z 1 (END FED) • AC DISCONNECT 7600 WATT INVERTER JUNCTION BOX ++(L (E)FACILITY- �i�-- 3 3 2 OR EOON,u.ENr 1 PV MODULES Digitally signed. ZrS� LOADS ti EXISTING NOTE:TOTAL GENERATION BACKFEED=70125A ,OOA �� HAryWHA O-CELLS:O.PEAK DUO BLK V MAIN USED FOR INTERCONNECTION CALCULATIONS o�.--• `r // ML-010�/T 400 �%� MAIN S '�. (27)IXIZERS by BABAK - PANEL (27) IZERS WIRED IN: SQUARED LOAD RATED DC DISCONNECT (1)S RIES OF(13)OPTIMIZERS DU222RB WITH AFCI,RAPID SHUTDOWN (1)SERIES OF(14)OPTIMIZERS K;o�VIA N 3R,60A,2P COMPLIANT SOLAREDGE POWER OPTIMIZERS 120t240VAC S440 CONDUIT SCHEDULE Date: 2024.03.14 S CONDUIT CONDUCTOR NEUTRAL GROUND �-<: --- 1 NONE (4)10 AWG PV WIRE NONE (1)8 AWG BARE COPPER 14:3$:2-1=04'00' 2 1.PVC OR EQUIV. (4)10 AWG THHN/THWN-2 NONE (1)10 qWG THHWTHWN-2 3 1"PVC OR EQUIV. (2)8 AWG THHN/THWN-2 (1)10 AWG THHN/THWN-2 (1)8 AWG THHWTHWN-2 .�u n r u n 4 I"PVC OR EQUN. (2)10 AWG THHNfTHWN-2 (1)10AWG THHN/fHWN-2 "I 8 AWG THHN/T-, 5 1"PVC OR EQUIV. (2)3 AWG THHWTHWN-2 (1)3 AWG THHWTHWN-2 0)8 AWG THHWT}(WN-2 i 00825-ME muNrwOUE ROacRoao,t+esr6URr,Nr nsso PHONE BOS.SmYEi Fl1%!6.]BB.NJY CUSTOMER RESIDENCE: MODULE CHARACTERISTICS JOSE GIRON HANWHA Q-CELLS:Q.PEAK DUO BLK ML-G10+/1'400: 400 W 1000 GAYER RD,MATTITUCK, 000 OPEN CIRCUIT VOLTAGE: 45.55 V S440 OPTIMIZER CHARACTERISTICS 52 MAX POWER VOLTAGE: 38.09 V MIN INPUT VOLTAGE: 8 VDC TEL(631)295-6838 SHORT CIRCUIT CURRENT: 12.18 A MAX INPUT VOLTAGE: 60 VDC APN:1000-107-00-09-00-029-000 MAX INPUT ISC: 14.5 ADC MAX OUTPUT CURRENT: 15 ADC PROJECT NUMBER: 216R-000GIRO SYSTEM CHARACTERISTICS.INVERTER 1 DESIGNER: (415)58D-6920 BK3 SYSTEM SIZE: 10800 W JULIET FRANCISCO SYSTEM OPEN CIRCUIT VOLTAGE: 14 SYSTEM OPERATING VOLTAGE: 400 V SHEET MAX ALLOWABLE DC VOLTAGE: 480 V ELECTRICAL SYSTEM OPERATING CURRENT: 27 A SYSTEM SHORT CIRCUIT CURRENT: 30 A REV:Al 3/14/2024 PAGE PV-4.0 I' } M) ARRAY TRUE MAG PV AREA SITE PLAN-SCALE=3132"=1'-0" SITE PLAN-SCALE=1132"=1'-0" PITCH AZIM AZIM (SQFT) AR-01 27° 203° 215' 190.2 ® ROOF PATHWAYS AR-02 33'28° 21° 169.1 (T TYP) AR-03 45' 202' 214° 211.4 AMP BG SP SE 4 a FIRE SETBACKS (N)ARRAY AR-02 H4Ky�y'.p� O PL n (E)DRIVEWAY a (E)RESIDENCE Pc `J'�`� 103982 INv AC ` OFESSION�� NOTE:ESS SHALL BE INSTALLED 3FT FROM DOORS AND s u n r u n WINDOWS IN ACCORDANCE WITH R327.4 (N)ARRAY AR-03 : ..r'=�; yr 00625-ME (N)ARRAY AR-01 -� mwnwauE Roacnonn.v.EsreuRv.Nr++sso FA%BB�B.20]2 CUSTOMER RESIDENCE: ` JOSE GIRON j 1000 BAYER RD,MATTITUCK, ROOF PATHWAYS NY,11952 (3'TYP) j � TEL(631)295.6838 •yr APN:1000-107-00-09-00-029.000 PROJECT NUMBER: 216R-OOOGIRO i soLAR 415 SBOli920 ex2 AC ELECTRIC VEHICLE MICROGRID GROUNDING MODULES DESIGNER: ( ) LEGEND SM SUNRUN METER A AC DISCONNECT(S) EV MD JULIET FRANCISCO SUPPLY EQUPMENT INTERCONNECT DEVICE ELECTRODE SCALE:NT9 NOTE:NOT ALL ITEMS LEGEND DC +LL ENERGY STORAGE INTERIOR EQUIPMENT SHEET WILLAPPEAR IN....PLAN pM DEDICATED PV METER DC DISCONNECTS) �r SYSTEM MA METER ADAPTER L J SHOWN AS DASHED bNR MONNT SITE PLAN SNR MOUNT ..FIT COMMUNICATION -I SE SERVICE ENTRANCE I S J SUB-PANEL INV INVERTER(S) AM ACREL METER BI BACKUP INTERFACE WIRES BG BACKUP GATEWAY O L J REV:Al 3/14/2024 OMP MAIN PANEL LC PV LOAD CENTER SEM SOLAREDGE METER CB IQ COMBINER BOX BP BACKUP LOADS PANEL a POWERWALL ENERGY GP GENERATION PANEL PAGE PV_2.0 ❑O STORAGE SYSTEM(ESS) O 14 Suffolk County Ucpt.of I icensing &Con,umor Affoirt 115• i} I!I.IlI Il,rl R(141iId,F11r II( F!J:'1 Nrime AIJI 1("f( L IVA Business Name Ihls rtnr;din'i Ihrtl flat !j,;l n.n Insl:dL'dnvt Sl rvnu In, o;crer is t11,1y IlrenSt>rl y II r!t:r.i,nFy of tall ilh Licensc Nlnnbcr: 11.5.11.10 r10 .iGor7ragn Issued: (1J/7.'3/ZU14 _ ,6;'.:Vie.:;;?5 x_-.;4Q1., y. ,.. ,•w Suffolk County Dept. of Labor, Licensing & Consumer Affairs n^ASTER ELECTRICAL LICENSE Name SAMY MOUNAS Business Name SUNRUN INSTALLATION SERVICES -r,s r.rrt '�es INC. Ihat :hc 0"Y I r.er,s�'.° 33878 'he ( = J,ty r.l ,,Jfolk bc.ense Num E Issur-d b 01/ RrrSF Dr:.-g0 Expires: 10r0112025 (.i,n;rnis5rin�r SUNRINC-02 TWANG ACORN" DATE(MMIDDNYYY) CERTIFICATE OF LIABILITY INSURANCE F9/1/2023 THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER.THIS CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S),AUTHORIZED REPRESENTATIVE OR PRODUCER,AND THE CERTIFICATE HOLDER. IMPORTANT: If the certificate holder is an ADDITIONAL INSURED,the policy(les)must have ADDITIONAL INSURED provisions or be endorsed. If SUBROGATION IS WAIVED, subject to the terms and conditions of the policy,certain policies may require an endorsement. A statement on this certificate does not confer rights to the certificate holder In lieu of such endorsement(s). PRODUCER License#OC36861 DAMEACT Walter Tanner Alliant Insurance Services,Inc. PHONE FAX 560 Mission St 6th FI (A/C,No,Ext): (A/C,No): San Francisco,CA 94105 aDoaEss:Walter.Tanner@alliant.com INSURERS AFFORDING COVERAGE NAIC# INSURER A:Evanston Insurance Company 35378 INSURED INSURER B:Zurich American Insurance Company 16535 Sunrun Installation Services,Inc INSURER C:American Zurich Insurance Company 40142 775 Flero Lane,Suite 200 Ph#805-540-7643 INSURER D: San Luis Obispo,CA 93401 INSURER E INSURER F: COVERAGES CERTIFICATE NUMBER: REVISION NUMBER: THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES.LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. INSR ADDL SUBR POLICY EFF POLICY EXP L TYPE OF INSURANCE N POLICY NUMBER LIMBS A X COMMERCIAL GENERAL LIABILITY EACH OCCURRENCE $ 2,000,000 CLAIMS-MADE � ISES R OCCUR MKLVSENV104332 10/112023 10/1/2024 DAMA ETOREoNTEDurrence $ 1,000,000 REM MED EXP(Any oneperson) 5,000 PERSONAL&ADV INJURY 2,000,000 GEN'L AGGREGATE LIMIT APPLIES PER: GENERAL AGGREGATE 2,000,000 X POLICY�SECT LOC PRODUCTS-COMPIOP AGG 5,000,000 X OTHER:Retention:$200,000 Per Project Agg $ ,000,000 B COMBINED SINGLE LIMIT 2,000,000 AUTOMOBILE LIABILITY Ea acc de t $ X ANY AUTO BAP614287702 10/1/2023 10/1/2024 BODILY INJURY Perperson) $ OWNED SCHEDULED AUTOS ONLY AUTOS BODILY INJURY Per accident $ HIRED NpN-OWNED PROPERTY AMAGE AUTOOS ONLY AUTOS ONLY Per accident $ X i5ow oea.: X CoII.:NotCovered LiabilityDed.: $ 1,000,000 UMBRELLA LIAB OCCUR EACH OCCURRENCE $ EXCESS LIAB CLAIMS-MADE AGGREGATE $ DED I I RETENTION$ $ C WORKERS COMPENSATION X STA TE ERH AND EMPLOYERS'LIABILITY WC614287602 10/1/2023 10/1/2024 1,000,000 ANY PROPRIIETORIPARTNEWEXECUTIVE YIN N E.L.EACH ACCIDENT $ Mandatory in NH)EXCLUDED? F N/A 1,000,000 E.L.DISEASE-EA EMPLOYE If yes,describe under 1,000,000 DESCRIPTION OF OPERATIONS below E.L.DISEASE-POLICY LIMIT $ DESCRIPTION OF OPERATIONS I LOCATIONS/VEHICLES (ACORD 101,Additional Remarks Schedule,may be attached If more space Is required) Workers'Compensation Policy WC614287601 Deductible:$1,000,000. Evidence of insurance CERTIFICATE HOLDER CANCELLATION SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE Town of Southold THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN ACCORDANCE WITH THE POLICY PROVISIONS. 53095 Route 25 Southold,NY 11971 AUTHORIZ�E-D�REPRESENTATIVE ACORD 25(2016/03) ©1988-2015 ACORD CORPORATION. All rights reserved. The ACORD name and logo are registered marks of ACORD YORK Workers' CERTIFICATE OF STATE Compensation NYS WORKERS' COMPENSATION INSURANCE COVERAGE Board 1a.Legal Name&Address of Insured(use street address only) 1b.Business Telephone Number of Insured Sunrun Installation Services Inc. (415)946-7500 225 Bush Street Suite 1400 1c.NYS Unemployment Insurance Employer Registration Number of San Francisco,CA 94104 Insured 50-86426 4 Work Location of Insured(Only required if coverage is specifically limited to certain locations in New York State,i.e., 1 d.Federal Employer Identification Number of Insured or Social Security a Wrap-Up Policy) Number 2.Name and Address of Entity Requesting Proof of Coverage(Entity 3a.Name of Insurance Carrier Being Listed as the Certificate Holder) AMERICAN ZURICH INSURANCE COMPANY Town of Southold Town Hall Annex Building 3b.Policy Number of Entity Listed in Box"1a" 54375 Route 25 P.O.Box 1179 WC 6142876-02 Southold,NY 11971 3c.Policy effective period 10/01/2023 to 10/01/2024 3d.The Proprietor,Partners or Executive Officers are included.(Only check box if all partners/officers included) all excluded or certain partners/officers excluded. This certifies that the insurance carrier indicated above in box"3"insures the business referenced above in box"1 a"for workers' compensation under the New York State Workers'Compensation Law.(To use this form,New York(NY)must be listed under Item 3 on the INFORMATION PAGE of the workers'compensation insurance policy). The Insurance Carrier or its licensed agent will send 'this Certificate of Insurance to the entity listed above as the certificate holder in box"2". The insurance carrier must notify the above certificate holder and the Workers'Compensation Board within 10 days IF a policy is canceled due to nonpayment of premiums or within 30 days IF there are reasons other than nonpayment of premiums that cancel the policy or eliminate the insured from the coverage indicated on this Certificate.(These notices may be sent by regular mail.)Otherwise,this Certificate is valid for one year after this form is approved by the insurance carrier or its licensed agent,or until the policy expiration date listed in box"3c",whichever is earlier. This certificate is issued as a matter of information only and confers no rights upon the certificate holder.This certificate does not amend, extend or alter the coverage afforded by the policy listed,nor does it confer any rights or responsibilities beyond those contained in the referenced policy. This certificate may be used as evidence of a Workers'Compensation contract of insurance only while the underlying policy is in effect. Please Note:Upon cancellation of the workers'compensation policy indicated on this form, if the business continues to be named on a permit,license or contract issued by a certificate holder,the business must provide that certificate holder with a new Certificate of Workers'Compensation Coverage or other authorized proof that the business is complying with the mandatory coverage requirements of the New York State Workers'Compensation Law. Under penalty of perjury,)certify that I am an authorized representative or licensed agent of the Insurance carrier referenced above and that the named insured has the coverage as depicted on this form. Approved by: Mark Albi (Print name of aauthorized representative or licensed agent of insurance carrier) in Approved by: 1411a'46G 10-01-2023 (Signature) (Date) Title: VP/Underwriter Telephone Number of authorized representative or licensed agent of insurance carrier: (415)946-7500 Please Note:Only insurance carriers and their licensed agents are authorized to issue Form C-105.2.Insurance brokers are NOT authorized to issue it. C-105.2(9-17) www.wcb.ny.gov vOR workers'STATE Compensation CERTIFICATE OF INSURANCE COVERAGE Board NYS DISABILITY AND PAID FAMILY LEAVE BENEFITS LAW PART 1.To be completed by NYS disability and Paid Family Leave benefits carrier or licensed insurance agent of that carrier 1 a.Legal Name&Address of Insured(use street address only) 1 b.Business Telephone Number of Insured Sunrun Installation Services Inc. 202 Commerce Dr., Ste. 7 Moorestown, NJ 08057 1c.Federal Employer Identification Number of Insured Work Location of Insured(Only required if coverage is specifically limited to or Social Security Number certain locations in New York State,i.e.,Wrap-Up Policy) 2.Name and.Address of Entity Requesting Proof of Coverage 3a.Name of Insurance Carrier (Entity Being Listed as the Certificate Holder) The Prudential Insurance Company of America Town of Southold 53095 Route 25 3b.Policy Number of Entity Listed in Box 1a Southold, NY 11971 CG-52830-NY 3c.Policy Effective Period 1/112024 To 12/31/2024 4. Policy provides the following benefits: ■❑ A.Both disability and Paid Family Leave benefits. ❑ B.Disability benefits only. ❑ C.Paid Family Leave benefits only. 5. Policy covers: ❑■ A.All of the employer's employees eligible under the NYS Disability and Paid Family Leave Benefits Law. ❑ B.Only the following class or classes of employers employees: Under penalty of perjury,I certify that I am an authorized representative or licensed agent of the insurance carrier referenced above and that the named insured has NYS disability and/or Paid Family Leave benefits insurance coverage as described above. - Date signed January 02, 2024 By (Signature of Insurance carrier's authorized representative or NYS licensed Insurance agent of that insurance carrier) Telephone Number 215-658-7318 Name and Title Carolynn Smith -VP Contracts IMPORTANT: If Boxes 4A and 5A are checked,and this form is signed by the insurance carrier's authorized representative or NYS Licensed Insurance Agent of that carrier,this certificate is COMPLETE.Mail it directly to the certificate holder. If Box 413,4C or 5B is checked,this certificate is NOT COMPLETE for purposes of Section 220,Subd.8 of the NYS Disability and Paid Family Leave Benefits Law. It must be emailed to PAU@wcb.ny.gov or it can be mailed for completion to the Workers'Compensation Board,Plans Acceptance Unit,PO Box 5200,Binghamton,NY 13902-5200. PART 2.To be completed by the NYS Workers'Compensation Board(only if sox 413,4C or 513 have been checked) State of New York Workers' Compensation Board According to information maintained by the NYS Workers'Compensation Board,the above-named employer has complied with the NYS Disability and Paid Family Leave Benefits Law(Article 9 of the Workers'Compensation Law)with respect to all of their employees. Date Signed By (Signature of Authorized NYS Workers'Compensation Board Employee) Telephone Number Name and Title Please Note:Only insurance carriers licensed to write NYS disability and Paid Family Leave benefits insurance policies and NYS licensed insurance agents of those insurance carriers are authorized to issue Form DB-120.1.Insurance brokers are NOT authorized to issue this forum. I' DB-120.1 (12-21) 11111111 iiiiiiuiiiiiiiuiuiiii(iiii11 l/jMIGHTY ENGINEERING:CO. :March..14,2024 'RE: .. CERTIFICATION:LI=TTER .... ... .... .. :Project Address: JOSE GIRON RESIDENCE 1000 BAYER RD .. .: . .... .. .... .. . MATTITUCK,NY:11952 Design Criteria: .... .. . ... .... .. . .... .. Applicable Codes=2020 NYSRC,2018 IRC/IBC/IEBC,ASCE 7-16 and 2018 Nb5 :... .: Risk Category II' = ..... -Wind Speed=128:mph,Exposure Categbry:6,Partially/Fully Enclosed Method "' . •. •=Ground Sriow'Load=.25.psf .... ROOF•AR-01:2 x 6 24"OC,Roof DL=7 psf,Roof LUSL=19 psf Non=P Roof LUSL=13.8 psf P ; -ROOF AR-02,2 x-6.@ 24 OC,'Roof.DL.=7 psf,-Roof LUSL= 19.psf(Non-PV),Roof LUSL=.13.5.psf(PV) -ROOF AR-03:2 x 6 24"OC,Roof DL:=.7 sf,Roof LUSL=.15 psf Non-P Roof LUSL=.8 Osf P :. ..:: . :.. To Whom It May Concern, ..... :A structural evaluation of loading,was'conducted fort he:above address based on the design criteria listed:above. 'Existing roof.structural.fr.aming has been reviewed for additional loading due td installation of:PV Solar System on the roof.-The structural' ' review applies to:the sections of roof that is:directly supporting the solar PV:system. Based on this evaluation, I'certify'thatthe alteration to:the existing structure by,installation,of the PV system meets the prescriptive compliance requirements of the applicable existing:building and/or.new building provisions adopted/referenced•above. . . .... Additionally,the PV module assembly including-attachment hardware has-been reviewed to be in-accordance.with.the manufacturer's. .... . .. .• 'specifications and to meet and/or•exceed the requirements:set.forth by the referenced codes. ...: LYINiTH,ALL .CODES OF - ms NEW.YORK STATE&:TOWN CODES: SR EQUIRED AND'CONDITfONS OF Sihcerei ; :.: •w.r- SOUTHOLD N ZBA :. APPR ED AS NOTED ..._.,,�___.___SOUTH O TOWN BLANNINC BOARD" b. �EOFNEWy ,Di (tall signed b TOWN OA B.P.;r :: y�Q aEHR HAAy'�9� . � 9 y 9 y .... SO OLD T W :TRUSTEES: Manouchehr SBY. _ 'Hakhamarieshi o� 'N* v . . ..DEC . .. NOTIFY BUILDING DEPARTMENTAT ;o39az _ =--Date:=2024.03.14 SOUTH OLD.OLD HPG 631-765-1802 8AM TO 4PM FOR.THE pR0 °� " FEsswN.Y r. 09:48:35-04 00 . SCHD FOLLOWING INSPECTIONS: .1 . FOUNDATION-TWO REQUIRED ... ® �+I p 'FOR.POUREDCONCRETE .... CCUPANCY O .:.. . 2. ROUGH:-FRAMING&PLUMBING. . .. . . .3. . INSULATION . . .... . .. . �• .. . .. USE.IS UNLAWFUL' 4. ::FINAL-CONSTRUCTION MUST � • ELECTRICAL BE:COMPLETEFOR C.O. ...... ...: WITHOUT CERTIF.ICA.I: INSPECTION REQUIRED ALL CONSTRUCTION SHALL MEET THE = : .REQUIREMENTS OFTHECODESOFNEW . � �.�: : . . . _ � C�CUPANCY: :": : : . . .. YORK STATE. NOT RESPONSIBLE FOR: DESIGN OR CONSTRUCTON ERRORS: . . ... . Mighty En ine6jir ..Co I,1708 Roxborou h Rd:Charlotte,NC 28211 (980)689.9776 1 info@irmiglityengineeringco`com. ;PgIof11 SHEET INDEX SCOPE OF WORK GENERAL NOTES PAGE B DESCRIPTION .SYSTEM SIZE:1080OW DC,7600W AC •ALL WORK SHALL COMPLY WITH 2O20 NEW YORK STATE RESIDENTIAL CODE PV-1.0 COVER SHEET 'MODULES:(27)HANWHA Q-CELLS:Q.PEAK DUO BILK WITH 2O18 IRC/IBC/IEBC,MUNICIPAL CODE,AND ALL MANUFACTURERS'LISTINGS ML-G10+lT 400 AND INSTALLATION INSTRUCTIONS. PV-2.0 SITE PLAN •INVERTERS:(1)SOLAREDGE TECHNOLOGIES: PHOTOVOLTAIC SYSTEM WILL COMPLY WITH NEC 2017. PV-3.0 LAYOUT SE760OH-USSN •RACKING:RL UNIVERSAL,SPEEDSEAL TRACK ON COMP, •ELECTRICAL SYSTEM GROUNDING WILL COMPLY WITH NEC 2017. PV-4.0 ELECTRICAL SEE DETAIL SNR-DC-00436 ENERGY STORAGE SYSTEM:(1)TESLA:POWERWALL, PHOTOVOLTAIC SYSTEM IS UNGROUNDED.NO CONDUCTORS ARE SOLIDLY OF NEW PV-5.0 SIGNAGE 13.5KWh,5KW INVERTER OUTPUT,LITHIUM-ION BATTERY GROUNDED IN THE INVERTER.SYSTEM COMPLIES WITH 690.35. Q'�� wY0 (WEIGHT:251.3LB EACH) �'t NR HAKyA`.per •BACKUP GATEWAY:(1)200A TESLA POWERWALL CONTROL •MODULES CONFORM TO AND ARE LISTED UNDER UL 61730. * 0 7y PANEL •NEW 100 AMP SUB-PANEL TO BE INSTALLED. •INVERTER CONFORMS TO AND IS LISTED UNDER UL 1741. i n RACKING CONFORMS TO AND IS LISTED UNDER UL 2703. 103982 •SNAPNRACK RACKING SYSTEMS,IN COMBINATION WITH TYPE I,OR TYPE II F�p'�OFESSIDNP� MODULES,ARE CLASS A FIRE RATED. •RAPID SHUTDOWN REQUIREMENTS MET WHEN INVERTERS AND ALL Digitally signed / CONDUCTORS ARE WITHIN ARRAY BOUNDARIES PER NEC 690.12(1). •CONSTRUCTION FOREMAN TO PLACE CONDUIT RUN PER 690.31(G). by Manouchehr •ARRAY DC CONDUCTORS ARE SIZED FOR DERATED CURRENT. H akh a rn a nes h •12.18 AMPS MODULE SHORT CIRCUIT CURRENT. Date: 2024.03•1 4 •15.23 AMPS DERATED SHORT CIRCUIT CURRENT(690.8(A)&690.8(B)]. 4;37.27 -04'00' •ESS SHALL BE INSTALLED 3FT FROM DOORS AND WINDOWS IN ACCORDANCE WITH R327.4 •ESS SUBJECT TO VEHICLE IMPACT WILL BE PROTECTED BY AN APPROVED BARRIER IN ACCORDANCE WITH THE 2020 NEW YORK STATE RESIDENTIAL CODE SECTION R327.9 AND THE 2020 FIRE CODE OF NEW YORK STATE SECTION 312.2. S u n r u n •ROOMS AND AREAS WHERE ENERGY STORAGE SYSTEMS ARE INSTALLED SHALL BE PROTECTED ON THE SYSTEM SIDE BY NO LESS THAN 5/8 INCH TYPE X GYPSUM BOARD OR EQUIVALENT,INSTALLED ON THE WALLS AND CEILING OF THE ROOM OR AREA IN ACCORDANCE WITH THE 2020 NEW YORK STATE RESIDENTIAL CODE SECTION R327.8. 00825-ME •ENERGY STORAGE SYSTEM CONFORMS TO AND IS LISTED UNDER UL 9540. ABBREVIATIONS VICINITY MAP ENERGY STORAGE SYSTEM LIVE PARTS ARE NOT ACCESSIBLE DURING neAN Po�Roa awD.vesTamr „eao A AMPERE ROUTINE MAINTENANCE.SYSTEM VOLTAGE IN ACCORDANCE WITH NEC 706.30 P1O1'E3°03°B' AND EXCEPTION 1 NEC 706.30(A). AC ALTERNATING CURRENT 0' - -ADDITIONAL DISCONNECTING MEANS SHALL BE INSTALLED WHERE ENERGY CUSTOMER RESIDENCE: AFC ARC FAULT CIRCUIT INTERUPTER STORAGE DEVICE INPUT AND OUTPUT TERMINALS ARE MORE THAN 5 FT FROM JOSE GIRON AZIn AZIMUTH CONNECTED EQUIPMENT,OR WHERE THE CIRCUITS FROM THESE TERMINALS 1000 BAYER RD,MATTITUCK, PASS THROUGH A WALL OR PARTITION PER 706.7(E). NY,11952 COMP COMPOSITION ••i i •LISTED,COMBINATION TYPE AFCI SHALL BE INSTALLED WHERE BACKED UP 9 DO DIRECT CURRENT \ CIRCUIT WIRING IS EXTENDED MORE THAN 6FT AND DOES NOT INCLUDE ANY TEL.(637)295-083e (E) EXISTING ADDITIONAL OUTLETS OR DEVICES PER NEC 210.12(D). APN:1000-107-00-09-00-029-000 ESS ENERGY STORAGE SYSTEM •THE CAPACITY OF THE STANDALONE SYSTEM SUPPLY SHALL BE EQUAL TO OR PROJECT NUMBER: r GREATER THAN THE LOAD POSED BY THE SINGLE LARGEST UTILIZATION 216R-0OOGIRO MSP MAIN SERVICE PANEL EQUIPMENT CONNECTED TO THE SYSTEM PER NEC ARTICLE 710.15(A) (N) NEW xP a"O'w• •ALL PASS-THROUGH CONDUCTORS MUST COMPLY WITH NEC 312.8 DESIGNER: (415)5808920 ex3 PREFAB PRE-FABRICATED T cw o e - JULIET FRANCISCO PSF POUNDS PER SQUARE FOOT i8 SHEET PV PHOTOVOLTAIC COVER SHEET RSD RAPID SHUTDOWN DEVICE P TL TRANSFORMERLESS ;°•pe E REV:Al 3/14/2024 v vous Q • -••Q PAGE PV-1.0 ARRAY TRUE MAG PV AREA SITE PLAN-SCALE=3/32"=1'-0" SITE PLAN-SCALE=1132"=V-0" PITCH AZIM AZIM (SQFT) ® AR-01 27' 203' 215' 190.2 ROOF PATHWAYS AR-02 28' 21' 33' 169.1 (3'TYP) AR-03 45' 202' 214' 211.4 8 G S&P g SE a d' FIRE SETBACKS g (1e^ P> (N)ARRAY AR-02 ,Of NE►y y HgKy�'�.p� t N 3 z C pL (E)DRIVEWAY ` e _ (E)RESIDENCE 't `�'�� 103982 c��V wv 0 'i a SSIONP� NOTE:ESS SHALL BE INSTALLED 3FT FROM DOORS AND s u n r u n WINDOWS IN ACCORDANCE WITH R327.4 (N)ARRAY AR-03 �- (N)ARRAY AR-01 00825-ME - - �� ,n wrtvcwE Roar ROAo,L�srewr,Nr„sao n�orE ea.sm.s�e� CUSTOMER RESIDENCE: _ JOSE GIRON 1000 GAYER RD,MATTITUCK, ROOF PATHWAYS NY,11952 (3 TYP) � 'I TEL.(631)295-6838 A P N:1000-107-00-09-00-029-000 PROJECT NUMBER: a216R-0OOGIRO LEGEND $D� DESIGNER: (415)580-6920 ex3 SM SUNRUN METER AC AC DISCONNECT(S) EV ELECTRIC VEHICLE MD MICROGRID �GROUNDING Moou�a eCALE:NTS O � SUPPLY EQUPMENT INTERCONNECT DEVICE ELECTRODE JULIET FRANCISCO NOTE:NOT ALL ITEMS IN LEGEND DC + ENERGY STORAGE F-I INTERIOR EQUIPMENT SHEET WILL APPEAR IN SITE PLAN PM DEDICATED PV METER DC DISCONNECT(S) MF MA METER ADAPTER SYSTEM L J SHOWN AS DASHED SNRMOUNf SITE PLAN ® O ❑ O COMMUNICATION O SNR MOUN(QSKIRT SE SERVICE ENTRANCE SP SUB-PANEL INV INVERTER(S) AM ACREL METER BI BACKUP INTERFACE T WIRES BG BACKUP GATEWAY [PAGE V:Al 3/14/2024 MP MAIN PANEL LC PV LOAD CENTER E SOLAREDGE METER CB IQ COMBINER BOX BP BACKUP LOADS PANEL a POWERWALL ENERGY GP GENERATION PANEL PV-2.0 O 0 e a O STORAGE SYSTEM(ESS) ROOF INFO FRAMING INFO ATTACHMENT INFORMATION DESIGN CRITERIA Max OC Max Landscape Max Landscape Max Portrait Max Portrait MAX DISTRIBUTED LOAD:3 PSF Name Type Height Type Span Spacing Detail OC Spacing Overhang OC Spacing Overhang Configuration SNOW LOAD:25 PSF WIND SPEED: AR-01 COMP SHINGLE-RLU 2-Story 2X6 RAFTERS 14'-8" 24" RL UNIVERSAL,SPEEDSEAL TRACK ON 6'-0" 2'-4" 4'-0" 2'-0" STAGGERED 128 MPH 3-SEC GUST. COMP,SEE DETAIL SNR-DC-00436 FASTENERS: RL UNIVERSAL,SPEEDSEAL TRACK ON 5/16":2.5"MIN.EMBEDMENT AR-02 COMP SHINGLE-RLU 2-Story 2X6 RAFTERS 14'-8" 24" COMP,SEE DETAIL SNR-DC-00436 6'-0" 2'-4" 4'-0" 2'-0" STAGGERED AR-03 COMP SHINGLE-RLU 1-Story 2X6 RAFTERS 15'-1" 24" RL UNIVERSAL,SPEEDSEAL TRACK ON 6'-0" 2'-4" 4'-0" 2'-0" STAGGERED COMP,SEE DETAIL SNR-DC-00436 D1-AR-01-SCALE:1/8"=V-0" D2-AR-02-SCALE:1/8"=1'-0" AZIM:203" AZIM:21" PITCH:27" PITCH:28` i l 24 4'-�, .��,OF NEW,, O h�vyE�R HAKy�O'P'� 101S" —6'TYP— N 101S" —6'TYP— 103982 2,_7„ 1$„ A ;P4 SS1 1'-0" 1'-10" — 18'-8" — 1'-5" sunrun 00825-ME D3-AR-03-SCALE:1/8"=1'-0" ADM:202° ncu U«£no KaonowEs.s a rv,+sx A�em.so.sm� PITCH:45" 2'-2„ CUSTOMER RESIDENCE: INSTALLERS SHALL NOTIFY ENGINEER OF ANY JOSE GIRON POTENTIAL STRUCTURAL ISSUES OBSERVED 1000 BAYER RD,MATTITUCK, PRIOR TO PROCEEDING W/INSTALLATION. NY,11952 —6'TYP— -IF ARRAY(EXCLUDING SKIRT)IS WITHIN 12" BOUNDARY REGION OF ANY ROOF PLANE 00 APN:631)295�83a (1000.107-00 09-00-029-000 EDGES(EXCEPT VALLEYS),THEN PN 17-5 ATTACHMENTS NEED TO BE ADDED AND PROJECT NUMBER: OVERHANG REDUCED WITHIN THE 12" 216R-OOOGIRO BOUNDARY REGION ONLY AS FOLLOWS: "ALLOWABLE ATTACHMENT SPACING DESIGNER: (415)580-6920 ex3 INDICATED ON PLANS TO BE REDUCED BY 50%. JULIET FRANCISCO "ALLOWABLE OVERHANG INDICATED ON SHEET PLANS TO BE 1/5TH OF ALLOWABLE 1'-6" ATTACHMENT SPACING INDICATED ON PLANS. LAYOUT 25'-5 6'_2"— 3'�"{_ REV:Al 3/14/2024 PAGE PV-3.0 (N)100A 5 120240 VAC SUB PANEL SINGLE PHASE SERVICE O METER �1 NEW M PSEGU B8311880 100A MAIN UnUTY ACC#96160082D5 BREAKER GRID Iro (E)RELOCATED SERVICE ENTRANCE T �M�� NON-BACKUP CONDUCTORS O LOADS (N)200A BACKUP TRL GATEWAY WITH O 100A MAIN OF NEWy (N)30A ESS 2 h� �O�K KAV7� 0BREAKERAT �� OPPOSITE END 4 TR I TES LAP OWERWALL 2,13.5 KWh,5KW * 0 OF BUSEND �� s _1.L. (1)ENERGY STORAGE SYSTEM 120240V NOMINAL AC VOLTAGE, Ck: 24A MAX AC CURRENT,NEMA 3R r (N)40A n^ JJ}yyy/ SERVICE ENTRANCE PV BREAKER AT �\ 1 CONDUCTORS OPPOSITE END OF SEAR _PV CURRENT � 106286 �1 EXISTING TRANSFORMER /QQ(ESSS'l P I ODA MAIN (N)LOCKABLE SOLAREOGE TECHNOLOGIES. P ,CJ BREAKER BLADE TYPE SE760OH-USSN 1 (END FED) AC DISCONNECT 7000 WATT INVERTER A TKN wx PV MODULES 3 3 2 pREpIAVALENf 1 HANWHA"ELLS:O.PEAK DUO BLK Digitally signed (E)FACILITY EXISTING NOTE:TOTAL GENERATION BACKFEED=70.00A OLD�AD�R�AT�E� �� // ML-GIOHT 400 h LOADS 125A USED FOR INTERCONNECTION CALCULATIONS °�`� / OPT MIZERS WIRED IN: by BABA K (27)MODULES �� MAIN ✓.PANEL (1)SERIES OF(13)OPTIMIZERS SQUARED DC DISCONNECT (t)SERIES OF(14)OPTIMIZERSKAVIANU222RB WITHAFCI,RAPID SHUTDOWN SOLAREDGE POWER OPTIMIZERS 3R,BOA2P COMPLIANT SW 720200VAB Date: 2024.03.14 CONDUIT SCHEDULE # CONDUIT CONDUCTOR NEUTRAL GROUND 14:38:21 -041001 1 NONE (4)10 AM PV WARE NONE (1)6 AM BARE COPPER 2 1"PVC OR EQUIV. (4)10 AM THHWTHWNF2 NONE (1)10 AWG THHWTHWN-2 3 1"PVC OR EQUIV. (2)8 AM THHNITHWN-2 (1)10 AM THHWTHWN-2 (1)8 AM THHWTHWT4-2 s u n r u n 4 1•PVC OR EQUIV. (2)10 AWG THHWTHWN-2 (1)10 AM THHW WN-2 (1)6 AWG THHWTHWN-2 5 1•PVC OR EQUN. (2)3 AWG THHWTFANN-2 (1)3 AM THHWTHWN-2 (1)8 AM THHWTHVML2 00825-ME ,n c'NruouE R w awo,wrsreuar,Nr„wo HONE eos. .ue7 FNtl6.Xl.x@ CUSTOMER RESIDENCE: JOSE GIRON MODULE CHARACTERISTICS 1000 BAYER RD,MATTITUCK, NY,11952 HANWHA O-CELLS:O.PEAK DUO BLK OPEN IR UIT 45. W S440 OPTIMIZER CHARACTERISTICS: TEL.(631)295-6838 OPEN CIRCUIT VOLTAGE: 45.55 V MAX POWER VOLTAGE: 38.09 V MIN INPUT VOLTAGE: 8 VDC APN:1000-107-00-09-0D-029-000 SHORT CIRCUIT CURRENT: 12.18 A MAX INPUT VOLTAGE: 60 VDC PROJECT NUMBER: MAX INPUT ISC: 14.5 ADC 216R-0OOGIRO MAX OUTPUT CURRENT: 15 ADC DESIGNER: (415)5SM920 ex3 SYSTEM CHARACTERISTICS•INVERTER 1 JULIET FRANCISCO SYSTEM SIZE: 10800 W SHEET SYSTEM OPEN CIRCUIT VOLTAGE: 14 V ELECTRICAL SYSTEM OPERATING VOLTAGE: 400 V MAX ALLOWABLE DC VOLTAGE: 480 V SYSTEM OPERATING CURRENT: 27 A REV:Al 3/14/2024 SYSTEM SHORT CIRCUIT CURRENT: 30 A PAGE PV-4.O INVERTER 1 PHOTOVOLTAIC / • NOTES AND SPECIFICATIONS: •SIGNS AND LABELS SHALL MEET THE REQUIREMENTS OF THE NEC 2017 ARTICLE 110.21(B),UNLESS ELECTRICAL SHOCK HAZARD PHOTOVOLTAIC SYSTEM MAXIMUM SYSTEM VOLTAGE a80 B IF REQUESTED BY THE LIOCAL AH1.FIC �nONS ARE REQUIRED BY SECTION 690,OR COMBINER PANEL •SIGNS AND LABELS SHALL ADEQUATELY WARN OF HAZARDS USING EFFECTIVE TERMINALS ON LINE AND LOAD DO NOT ADD LOADS MAXIMUM CIRCUIT CURRENT: 30 ADC WORDS,COLORS AND SYMBOLS. SIDES MAY BE ENERGIZED IN RATEDMAX e e •LABELS SHALL BE PERMANENTLY AFFIXED TO THE EQUIPMENT OR WIRING THE OPEN POSITION LABEL LOCATION: a ,e e•e e•e e e 15 a METHOD AND SHALL NOT BE HAND WRITTEN. PHOTOVOLTAIC AC COMBINER OF •LABEL SHALL BE OF SUFFICIENT DURABILITY TO WITHSTAND THE ENVIRONMENT APPLICABLE). INVOLVED. LABEL LOCATION: PER CODE(S):CEC 2019:705.12(B)(2)(3)(c), LABEL LOCATION: •SIGNS AND LABELS SHALL COMPLY WITH ANSI Z535.4-2011,PRODUCT SAFETY INVERTER(S),AC/DC DISCONNECT(S), NEC 2017:705.12(B)(2)(3)(c) INVERTER(S).DC DISCONNECT(S). SIGNS AND LABELS,UNLESS OTHERWISE SPECIFIED. AC COMBINER PANEL(IF APPLICABLE). PER CODE(S):CEC 2019:690.53,NEC 2017:690.53 •DO NOT COVER EXISTING MANUFACTURER LABELS. PER CODE(S):CEC 2019:690.13(B),NEC 2017:690.13(B) RN�N THREE POWER SUPPLY 1� SOURCES:UTILITYGRID, POWER SOURCE OUTPUT CONNECTION BATTERY AND PV SOLAR DO NOT RELOCATE THIS ELECTRIC SYSTEM OVERCURRENT DEVICE LABEL LOCATION: LABEL LOCATION: UTILITY SERVICE METER AND MAIN F NEW SERVICE PANEL. Q`\ Y0 ADJACENT TO PV BREAKER OF PER CODE(S):CEC 2019:706.11 8 h't epK KA V/q APPDCABLE).PER CODE(S):CEC 2019: 705.12(B)(3),NEC 2017:705.12(B)(3),705.12(B)(2)(3)(b),NEC 2017: 706 11(A)6 706 11(B) 705.12(B)(2)(3)(b) = W 106286 SSIONP� O. SOLAR PV LABELLOCATION: BUILDING SUPPLIED BY UTILITY s u n ru n INSTALLED WITHIN TOF RAPID SHUT DOWN GRID AND PHOTOVOLTAIC SWITCH PER CODE(S):CEC 2019:690.56(C)(3),NEC _. __ 4"— 2017:690.56(C)(3),IFC 2012:005.11.1,IFC 2018: SYSTEM 1204.5.3,CFC 2019:1204.5.3 SOLAR PV SYSTEM EQUIPPED ® 00825-ME WITH RAPID SHUTDOWN 177 "�6B R°""'°° �. .�, •• • W CUSTOMER RESIDENCE: LABEL LOCATION: ILL] JOSE GIRON INTERIOR AND EXTERIOR DC CONDUIT EVERY 10 FT, 1000 GAYER RD,MATTITUCK, AT EACH TURN,ABOVE AND BELOW PENETRATIONS, 3" TURN RAPID SHUTDOWN NY,11952 ON EVERY JB/PULL BOX CONTAINING DC CIRCUITS. SWITCH TO THE"OFF" PER CODE(S):CEC 2019:690.31(G)(3),690.31(G)(4), POSITION SWITCH TO THE"OFF N TEL.(631)295.6838 NEC 2017:690.31(G)(3),690.31(G)(4)IFC 2012: APN:1000.107-00-09-00-029-000 605.11.1.4 PV SYSTEM AND REDUCE SHOCK HAZARD IN THE PROJECT NUMBER PV : PHOTOVOLTAIC • ARRAY, DISCONNECT EM 216R-0OOGIRO DISCONNECT- OPERATING 11 EXTERIOR GND FLOOR DESIGNER: (415)58M920 ex3 AMPSMAIN PANEL- NOMINAL OPERATING AC VOLTAGE: 240 VAC INTERIOR BASEMENT JULIET FRANCISCO LABEL LOCATION: LABEL LOCATION: SHEET LABEL LOCATION: ON OR NO MORE THAT 1 M(3 FT)FROM THE SERVICE POINT OF INTERCONNECTION S IG NAGE AC DISCONNECT(S),PHOTOVOLTAIC SYSTEM POINT OF INTERCONNECTION. DISCONNECTING MEANS TO WHICH THE PV SYSTEMS (PER CODE:NEC690.56(B),NEC705.10,225.37,230.2(E)) PER CODE(S):CEC 2019:690.54,NEC 2017:690.54,NEC 2014:690.54,NEC ARE CONNECTED. 2011:690.54 PER CODE(S):CEC 2019:690.56(C)(1)(a),NEC 2017: REV:Al 3/14/2024 690.56(C)(1)(a) PAGE PV-5.0 pow«sd by r i+ �a�.rr��t•rn�'sm H, w •'3r�u.'C .� CiCElts • I®' .u.a rcw. I � I I TOP Ifuuwo f+V �� Oui•YIY T�•NA rr.. 2019 10.40032587 Q.ANTUM TECHNOLOGY:LOW LEVELISED COST OF ELECTRICITY `+p J Higher yield per surface area,lower BOS costs,higher power classes,and an efficiency rate of up to 19.9%. INNOVATIVE ALL-WEATHER TECHNOLOGY Optimal yields,whatever the weather with excellent low-light and temperature behaviour. ENDURING HIGH PERFORMANCE Long term y eld security with Anti LID Technology,Anti PID Technology,Hot-Spot Protect and Traceable Quality Tra.Q°A. �. EXTREME WEATHER RATING High-tech alum mum alloy frame,cart fied for high snow(5400Pa)and wind loads(4000Pa). p A RELIABLE INVESTMENT Inclusive 12-year product warranty and 25-year linear performan,:e warranty-. STATE OF THE ART MODULE TECHNOLOGY Q.ANTUM DUO combines cutting edge cell separation and innovative wiring with Q.ANTUM Technology. APT test conditions according to IEC/TS 62804-1:201�,method B 1-/500 V,168h) See date sheet on rear for further information. THE IDEAL SOLUTION FOR: Rooltop arrays on Rooftop arrays on residential buildings commercial and industrial bui dings Engineered in Germany OCIELLS MECHANICAL SPECIFICATION ormat 66 3 in x 39-4 in x 1.26in(including frame) (1685m_m x 1000mm x 32mm) ---------wruws.w r�o•ausmq Vyeight 41.2lbs(18.7kg) Front Cover 0.13in(3.2mm)thermally pro-stressed glass with A,a«rra„sr.osrrpa..,l •,,,• + anti-reflection technology BICk Cover Composite film Frame Black anodized aluminum Cell 6 x 20 monocrystalline G.ANTUM solar half cells `v,, ® sacnmomm, Junction Box 2.D9-3.98in x 1.26-2.36in x 0.59-0.71in � L4'+ (53-101 mm x 32-60mm x 15-18mml IP67,with bypass diodes Cable 4mms Solar cable,(+)>_43.3in(1100mm),(-)>-43.3in(1100mm) + yµ�� a•o�..s.�+. Connector Staubk MC4,Hanwha Q CELLS HGC4,Amphenol UTX, Renhe 05-6,Tongling TL-CableOlS,JMTHY JM601;I1368 or I sx•pra, os,AtA I"I•--•t!!r) Friends PV2e;IP67TosAs esma ELECTRICAL CHARACTERISTICS POWER CLASS 316 320 325 an MINIMUM PERFORMANCE AT STANDARD TEST CONDITIONS,STC (POW ER I OL Lk ANICE+5 W/-0 W) Power at MPP' P.m (W1 315 320 325 330 E Short Circuit Current' Isc JAI 999 10.04 10.10 10.15 Open Circuit Voltage' Voc IV) 39.84 40.10 40.36 40.62 5 Current at MPP I" (AI 9.51 9.56 9.61 967 Voltage at MPP VM,. (VI 33.14 33.47 33.81 34.14 Efficiency' q (%) a18.7 x_19.0 >_19.3 219.6 MINIMUM PERFORMANCE AT NORMAL OPERATING CONDITIONS,NMOT Power at MPP PM. (W1 235.9 239.6 2434 247.1 a Short Circuit Current Isc (A) 8.05 8.09 8.14 8.18 E Open Circuit Voltage Vac IV) 37.56 37.81 38.06 38.31 Current at MPP I,•,,. (A) 7.48 752 7.57 7.61 Voltag.at MPP V,,,,, IV) 31.53 31.85 32.17 3248 'Measurement loleranpas Po.13%.1,,Va 15%at STC 1000 W/m2,2512`C,AM 1.5 according to IEC 60904-3•'80OW/mt,NMOT,spectrum AM 1.5 A Q CELLS PERFORMANCE WARRANTY PERFORMANCE AT LOW IRRADIANCE u u r `,...,..•.....,,.«..« At least 98%of nominal power doing first year.Thereafter max.0.54% W� r degradation per year At least 93.1% i - of nominal power up to 10 years At , i A. - least 85%of nominal power up to pa 25years P All data within E a » es.Full warranties in eccadence with see 40o roe 0 0o soao the warranty terms ofltte0CELLS o «� _ _ sales organisation d your respective V r w u w w Country. ~EARS Typical module performance under low Irradiance conditions in comparison to STC conditions(25'C.1000 W/ms) m R TEMPERATURE COEPRCIENTS M Temperature Coefficient of I,c a !3,/k) 40.04 Temperature Coefficient of Va 9 (%/KI -0.27 Temperature Coefficient ofP,,,, I ,ttt' -035 NormA I`Aodvle Operating Temperature NMOT ('FI 109s5.4(4323'C) � PROPERTIES FOR SYSTEM DESIGN Maximum System Voltage V IVI 1000(IEC)/1000(UL) II p Maximum Series Fuse Rating (ADC) 20 re Rating based on ANSI/UL 1703 C(IEC)/TYPE 2(UL) Max.Design Load,Push(Pull' (bs/ft7 75(3600Pe)/55(2667Pa) Permitted Module Temperature -40'F up to+185'F on Continuous Duty40`C up to+85'-C) u a.. ^,.sh/Pull' (lbs/fill Ill(540OPa)/84(4000PA) g ee Instal at Ma at S F QUALIFICATIONS AND CERTIFICATES PACKAGING INFORMATION � UL 1703. , I ty Tested.CE-cornphant,[CC 61215.20: l _ _�_, Number of Modules per Pallet 32 8 AWkcat or+Class It.U.S.Patent No.9,893,215(solar cols Number of Pallets per 53'Tra der 30 C SPa Number of Pallets per 40'HC-Container 26 DBE Pallet Dimensions(LxWxH) 69.3x45.3.46.9m(1760x1150x1190mm) tt Pallet Weight 1415lbs(642kg) Note:insiatlauon msvuctrons must be followed.See the instal ation andopi ratxg manualor contact our technical service depar tmenl for further informai,)non approved instaiiation and use of this product. Hanwha O CELLS America Inc. 400 Spectrum Center Drive,Suite 1400.Irvine.CA 92618,USA I M 41 949 748 59 96 1 W"L mquiry@usq-celb.com I t1l11I1*www.q•ee1Is.us solar=@@ • Single Phase Inverter with HD-Wave Technology • for North America SE3000H-US/SE380OH-US/SE5000H-US/ SE6000H-US/SE760OH-US/SE10000H-US/SE1140OH-US r � solar,�,�' ,4-11) ��rarte, e�2.25 Waira h m 'e,ia r•J\� ssss too * 0 m - � o s ® I 7 e I O Optimized installation with HD-Wave technology Specifically designed to work with power optimizers Record-breaking efficiency Fixed voltage inverter for longer strings Integrated arc fault protection and rapid shutdown for NEC 2014 and 2017,per article 690.11 and 690.12 UL1741 SA certified,for CPUC Rule 21 grid compliance Extremely small High reliability without any electrolytic capacitors Built-in module-level monitoring 11111111111',D Outdoor and indoor installation wave Optional: Revenue grade data,ANSI C12.20 Class 0.5(0.5%accuracy) www.solaredge.us , solar=@@ Single Phase Inverter with HD-Wave Technology for North America SE3000H-US/ SE38OOH-US/ SE50OOH-US/ SE6O00H-US/ SE760OH-US / SE1O0O01-1-US / SE1140OH-US SE3000H US SE3800H-US SE5000H-US SE6000H-US SE760OH-US i SE30000H-US SE1140OH-US OUTPUT Rated AC Power Output 3000 3800 @ 240V 5000 6000 @ 240V 7600 10000 11400 VA .............. ...... ................ .5000 @,208V, Max.AC Power Output 3000 3800 @ 240V 5000 6000 @ 240V 7600 10000 11400 VA 3300.e.?pW . 5000 @.208y, AC Output Voltage Min:Nom:Max. Vac �183-208 229)........................... ............... ................ ................ ................. ................ ................. ................. ........... AC Output Voltage Min:Nom:Max. ✓ Vac (211.240:264)........................... ... ........ ................ ................ ........... ...... ................ ................. ................. ........... AC Fre uen Nominal 59.3-60-60.5111 Hz Maximum Continuous Output Current 16 24 A .2.....08V ....................................... ................ ................ ................ ................. ................ ................. ................. ........... Maximum Continuous Output Current 12.5 16 21 25 32 42 47.5 A .0240V.................................... ................ ...............I ................ ................. ................ ....:............ ................. ..... Islanding.. ..P ...... GFDI Threshold 1 A ............... ... .... ..rotection.. ...,.. ............................................................ Utility Monitoring, - --- �- � - ���� �� � -��� -- ������� � ....... Country Configurable Thresholds Yes INPUT Maximum DC Power 30 @240V 4650 5900 7750 90 11800 15500 17650 W Maximum DC Power @208V 5100 7750 ......... .......... Transformer-less,Ungrounded Yes ......... ................................................. .......................................... Maximum Input Volta a 480 Vdc Nominal DC Input Voltage .. 380 400 Vdc..... ................ ................ ................. ................ Maximum Input Current 208V 9 13.5 ................ ............... Maximum Input Current�240V 8.5 10.5 13:5 16.5 20 27 30;5 Adc . .. .... . Max.Input Short Circuit Current 45 Adc Reverse-Polarity Protection Yes Ground-Fault Isolation Detection 600kaSensitivity .. ... .. ....... ......... ........... .. . ..... ....... ................ . .............. .................. Maximum Inverter Efficiency 99 99.2 % .......................... ................................ . ... ........... CEC Weighted Efficiency 99 % Nighttime Power Consumption <2.5 _ W ADDITIONAL FEATURES ..... _ Supported Communication Interfaces RS485 Ethernet ZigBee(optional) Cellular(optional) ................ ......................Revenue Grade,Data.AN51,C1220 .... _........................ ........ ..... ....9ptiona112) Rapid Shutdown-NEC 2014*and 2017 ...... . . 690.12 Automatic Rapid Shutdown upon AC Grid Disconnect STANDARD COMPLIANCE Safety _ U1.1741,UL1741 SA UL1699B,CSA C22 2 Canadian AFCI according to T.I.L.M 07 ~— ................ ................. ........ .. Grid Connection Standards IEEE1547 Rule 21 Rule 14(HI� .. ........ . .......................I............ Emissions FCC Part_15 Class B INSTALLATION SPECIFICATIONS AC Output Conduit Size/AWG Range 3/4"minimum.../14.-.6.AWG. ......... ..... . 3/4"minimum/14-4 AWG ....... .... . .... .... ...... DC Input Conduit Size/#of Strings/ 3/4"minimum/1-2 strings/14-6 AWG 3/4"minimum/1-3 strings/ AWG 4119!...................I............ . ...........146 AWG Dimensions with Safety Switch(HxWxD) 17.7 x 14.6 x 6.8 /450 x 370 x 174 21.3 x 14.6 x 7.35/540 x 370 in/mm .......................I....I........... ....................I..........— ............ ................................... . Weight with Safety Switch 22/10 25.1/114 I 26.2/11.9 38.8/17r6............i Ib/k$_ Noise ............. <25 <50 dB ... A Cooling NaturalConvection I Natural convection . Operating Tempereture Range 13 to+140/ 25 to+601a1 40 F/ 40 C option)1ai F/°C Protection Rating NEMA 3R(Inverter with Safety Switch) Ill For other regional settings please contact SolarEdge support 1=i Revenue grade inverter P/N:SEb H-USOOONNC2 l31 For power de-rating information refer to:https://www.solaredge.mm/sites/default/files/se-temperature-derating-note-na.pdf 141-40 version P/N:SExxxxH-U5000NNU4 • i System designed with All parts fit in a box for easy ` maximum versatility for any � logistics arrays including staggered Drop-in features make the - � - install process intuitive and fast Simple design allows system to be installed by single installer U Listed to UL Standard 2703 for on the roof Ground in /Bondin and Fire g g Classification SnapNrack RL Universal is designed to provide the fastest, most intuitive install experience for residential roofs. The direct mount system features four basic components for easy material management. Features incredible flexibility with a single Universal mounts that fit module heights from 32 - 40 mm and the highest spansof any current rail less system. Flash Track with Patented Umbrella Technology • Single Umbrella lag screw secures flashing and flash track to roof in one complete action • Umbrella technology provides weatherproofing with a long- lasting mechanical seal • Flash track is designed for maximum versatility with 6 inches of North-South adjustability for all Mounts Mounts • Single mount used at all locations on array • Extreme time saver by eliminating link interference through the flexibility of the Mount to change orientation • Features a rock-in channel nut design for easy attachment to Flash Track • Slotted riser provides leveling for easy height adjustments Links • Simple design provides mounting platform between two to four modules • Clamps onto top of modules securing them in place while providing 1► row-to-row bonding • Next row of modules easily slides into place as with the Mounts Skirt • Easily locks to bottom of module mounts and links for clean aesthetics • Ensures a strong structure for leveling and alignment of first row of modules 4 • Skirt length is compatible with both portrait and landscape module orientations Quality. Innovative . Superior. SnapNrack Solar Mounting Solutions are engineered to optimize material use and labor resources and improve overall installation quality and safety. . • SnapNrack Solar DESCRIPTION: DRAWN BY:SNAPNRACK, RL UNIVERSAL, MOUNT mwatkins SnapH Fuck uck REVISION: PART NUMBER(S): .--T S A 595TREET,29TH FLOOR•SAN FRANCISCO,CA 94105 USA PHONE(415)58M900•FAX(415)580-6902 242-02155 THE INFORMATION INTHISDRAWNGIS CONFIDENTIAL AND PROPRIETARY ANY REPRODUCTION.DISCLOSURE.OR USE THEREOF IS PROHIBITEDWA OUT THE WRITTEN CONSENT OF SUNRUN SOUTH LLC. 10 5 0 4 3 1 8 1 2 o 6 PARTS LIST ITEM QTY DESCRIPTION 1 1 SNAPNRACK, RL UNIVERSAL, RISER, MILL 2 1 SNAPNRACK, RL UNIVERSAL, LEVELER, MILL 3 1 SNAPNRACK, RL UNIVERSAL, MOUNT BOTTOM, MILL 4 1 SNAPNRACK, RL UNIVERSAL, MOUNT TOP, BLACK 5 1 SNAPNRACK, RL UNIVERSAL, BONDING CLIP 6 1 SNAPNRACK, DROP IN/ROCK IN CHANNEL NUT 7 1 BOLT, FLANGE, 5/16IN-18 X 3/4IN, CLEAR, SS 8 1 BOLT, FLANGE, SERRATED, 5/16IN-18 X 1IN, SS 9 1 SNAPNRACK, RL UNIVERSAL, MOUNT SPRING, SS 10 1 BOLT, FLANGE, SERRATED, 3/8IN-16 X 2-3/4IN, 1/2IN TRIM HEAD, 1.2IN THREAD, BLACK, SS MATERIALS: 6000 SERIES ALUMINUM, STAINLESS STEEL OPTIONS: DESIGN LOAD (LBS): 623 UP, 674 DOWN, 505 SIDE ULTIMATE LOAD (LBS): N/A TORQUE SPECIFICATION: 12 LB-FT CERTIFICATION: UL 2703, FILE E359313 WEIGHT (LBS): 0.73 DESCRIP:TION:; ' DRAWN BY: . k. SNAPNRAGK; RL UNIVERSAL,.MOUNT mwatkins: Snap ruC . .... . .. .... R EVISION: ;:S. . .Mounting Solutions ..PART NUMBER(S):. . . .. .. .. .. ." .. 95 MARKS .. .. .. .. .. .. .. .. 9410 .. .... .. .. .... .. T PHONE(415 6 OE900: .. 5 F SAN FRANCISCO,OCA 5 USA 242_02155 .. TIRE INFORMATION IN TNIS DRAWNG IS CONMDE(NIIALAND PROPRIETARY.ANY .. .. .. .. .. .. .. .. E REPROO CTION,DISCLOSURE,ORUSETHEREOFISPROU-CT-WITIOUT TN .... .. .... .. ... ..� ::. WfUTIEN CONSENT OF SUNRUN SOUTH LLC.'� . . q . J..41 :. .. .. 2:35: :. 1:5.0 ::.."' 1.55 66 . .. .. .. 2.00 .. 1.24 GO :. ' ... . . SLOT may. 2 63 : ;' -1::50 -ALL DIMENSIONS-IN INCHES :':.POWERWA'L:L.': Tesla Powerwall is a:f'dIIy-integrated.AC battery system for residential or.light commercial use..Its rechargeable:lithium-ion L battery pack provides energy storage for solar:s.e consumption, . .. . tim e-based cohtrbl:'and backup. POWerw6l'S electrical interface provides a simple Connection to ".':..'anybome or building. Its revoluti6hary.compact design achieves ' market-leading energy density and is.easy to install, enabling: owners to quickly realize the benefits of reliable, . I' ower. PERFORMANCE:SPECIFICATIONS: : : :NIECHANICAL:SPE:CIFICATIONS AC Voltage:(Nominal) 120/240 V Dimensions' :': I150 mm x 753 mm x 147 mm:' : _ _ FeedAh Type : ... .: 'Split,Phase ght'Wei 114 kg(251.311is) :': in .'Grid Frequency 60 Hz': — . . . Mounting options Floor or wall mount Total.Ene?§y' 1'4 kWh . . 'Dimensions and weight differ slightly if manufactured before March 2019:':.-: Usable-Energy'. 13.5 kWh Contact Tesla:foradditional information: ... ... :'75'3rom 147mm Real Power,max continuous: 5 kW(charge and discharge) <5.751nj' ' (29.6 in) Real Power,peak(10s,off-grid/backup). 7 kW(charge and discharge) Apparent Power,max continuous: 5.8 kVA(charge and discharge) Apparent Power,peak: 7.2 kVA((charge and discharge): .. . V: o :�..L.w (10s,off-grid/backup) Load Stait'Capability 88 A LRA for each Powetwall a ' Maximum Supply Fault Current : : 10 kA Maximum Output Fault Cu'rreht• 32 A: (45.3 in) Overcur'rent Protection Device 30 A ' Imbalance for Split-Phase Loads 100% - - :::'Power Factor Output Range.: +/-'1.0 adjustable Power Factor Range(full-rated power) _ +/-'0:85' Internal Battery PC Voltage .50 V "' Round Trip Efficiency?� ENVIRONMEN:TAL'SPECIFI CAT LO.NS Warranty.. 10 years Operating Temperature -20DC to 50DC:(-4°F to 1#-.F) 'Values provided for 250C(770F),3:3 kW charge/discharge power, . Recomrriende'd Temperature 00C:t'.6300C(320F to 860F} zAC to battery to AC,at beginning of.life: • . - • Operating Humidity(RH)': Up to 100% condensing'. Storage Conditions -200C to 300.C.(-40F to 860F) COMPLIANCE INFORMATION Pp.to 95%RH,non-condensing':: Sf t.. • ' a e o Energy(SoE):25%,ini ial Certifications _ UL 1642' UL 1741,UL 1973, UL 9540,IEEE'1547,ON 38.3 „ ,. .Maximum Elevation 3000 m(9843 ft) Grin Connection Worldwide Compatibility :Environment Indoor and outdoor rated Emissions: Part 15 Class B,ICES'003. Enclosure Type. .NEMA 3R ' Environmental - RoHS Directive•2011/65/EU' Ingress Rating IP67,(Battery&.Power Electronics) ' IP56(Wiring Compartment) Seismic AC156,IEEE 693-2005(high) . . ... .. "' Wet'Location Rating: Yes.:Meets the unit level performance ' Fire Testing.:' criteria of UL 9540A : Noise Level @-1m <4d..dBA at 300C(860F) : . f = F. L n : T�$LA.COM/ENERGY . . .. . . . . .. . . TYPICAL SYSTEM-LAYOUTS : : WHOLE HOME BACKUP sa ------------ :Optional: Solar. Solar inverter- :i " --------------------------- Main panel - Backup Gateway. .. Utility meter... .. Grid Inc u ing .. service disconnect ss s. Powerwall_ Whole home backup w . :`PARTIAL HOME BACKUP -- ---------- :Optional: =Solar Fo .: . -. oo Solar inverter' '- ---------------=-=---=-' Sub panel Backup Gateway .. Main:panel Utility meter Grid N. Powerwall.. Backup loads :..Home loads T = 5 L n NA-BACKUP-2.02;1-11-15 ::TIE LA.COM/ENERGY p l�J a 024 V( .• ' :. mm. ' P gr� mid' �^:.,.;�• � � '_ -_ -�... Fi _ ..4 F ' i i -� :�,-�•' s xa Powerwall 2 AC.Jnstallatk Manual :with Backup :Gateway For the latest Powerwall-installation documents:in all sup ported languages, visit: - :. www:tesla:com/support/powerwall. " To secure the full.10-year prod uct'warranty, Powe.rwali:.must be registered by compieting;the commissibni.ng process and.sending system information to Tesla.­_ Warning: Read t is.entire document before installing.or using Powerwall. Failure to do so or to follow any of the instructions or warnings in.this.document can result in electrical shock, serious injury,'or death, or:can damage Powerwall, potentially rendering it-inoperable.::" PRODUCT SPECIFICATIONS .. " All specifications:and descriptions:contained in this document are verified:to be accurate: at the time of.printing. However, because continuous improvement-is a goal at Tesla,-we reserve the.right to make:product mod ifications.at anytime.. The images provid.eci in this document:are for demonstration purposes only. Depending on product version and market region, details:may-appear slightly different. ERRORS OR OMISSIONS To communicate any inaccuracies or.omissions in this:rrranual, send ah:email to: enerav-pubs&tesla.com. ELECTRONIG.DEVICE: PROPER.D QU"DISPOSAL REWIRED The crossed=out wheeled trashcan symbol on an electrical or electronic:product or its: : m docuentation rrieans.ikcat the used'product should not be mixed with household waste. Proper disposal, parr lielp.save.valuable'resources_and help prevent harm.to human.. health and the environment. Penalties:may-be applicable:for improper disposal: Please recycle by takin.g.the product to a designated collection.point where it will be.accepted free.of. .. . charge.:Contact your local authority or the product retailer for details on recycling options. MADE IN THE USA ©2019 TESLA, INC..All rights reserved. . . _ All information in this:document is subje-ct.to copyright:and,other intellectual property rights:: of Tesla, lnc. and its licensor...Tliis material rnay.noE be modified;:reproduced or copied, in whole or impart, without the prior written permission of Tesla, Inc. and.its Iicensors.'Additional information is available upon request:The following are:trademarks or registered trademarks': . . . , of Tesla, Inc. in the'United States and-other countries: TESLA TESLA MOTORS I `1: .:POWER All other trademarks contained-'in this document are the property of their respective owners and their use herein does not imply.-sponsorship or endorsement of their products or services:.: The unauthorized :.use:of any trademark displayed in this:document or on the product is strictly i ited. TABLE OF .CONTENTS: IMPORTANT SAFETY.INSTRUCTIONS::.:.............................:.:..:........:::..............................:......... ................ :.;..:.......::,::...... 3.. .. .. .:Symbols Used.... :.:.................................:..:..:.:.:.::................................... .:..::..:.::........................................:..:.::.................................3: . . General.Information. ............::.:..:..:..::.....::..........................::.:..:.:.. ................................ :. 4 Environmental Conditions.:.:..:..:...::.: 5.. .. 1: Registering Powerwall............................:..:..:.:.: ............................ ........I........,.......... .............................6 2. Specifiedtidhs....................... ...: .................................,.. . ' 6 Powerwall-Electrical Specifications...............................................::.............................::..:..:....::....... :..:..............6.. .. .. . . . Powerwall Environmental Specifications...:::.:...................................:..........................................................................................6. Powerwall.Mechanical Specifications.. ..................... ..................................... ................................. 7 Backup Gateway.Electrical Specifications:...::..:.......: " 7 Backup Gateway Environmental Specifications...........................::..::.::.:;.:..,..............................,;...:.::.:._.:.:........ 7: . .. .. . .. .. .. . . Backup:Gateway Mechanical:Specifications.........:..:..::..:.::..:.....................................::..::.:..:...................................:.:..::.:..:..:...7 3. Site Requirements....:...........: . .. :.........:..::... ........................ Powerwall Physical.Requirements........:.........:;.:,, .............:.;..'.. :;.:................................8: Powerwall Identification....:..:...:..:..:..: ....................................:........................................:.......:...:.:........................................ 8 Powerwall Dimensions and Space Requirernents.......................:..::..::....::..:.:...........................:...:..:.........:.:.......................10..: :. .. . .Powerwall Recommended Temperature Range.................. . .....11: Powerwaltlnstallation Requirements........................ :..:..::..::.:........................................:..::.............................................:............. 11 Backup Gateway Installation Requirements................................:.:::.,.:,.:,.:,..:.:.........................:.::.:..:,.:......:..........................12: : 4_ InstallatiQn.InStrU'ct10nS............................::..:..:....:::::...........;..,,...;.;..,.....:;..:..:...:.::.:....... :..:................ ....13: . .: :::. Powe'rwall:Box Contents........::..::.:..: 13 .Accessory Bag Contents...........................:;..:,.:.::...................................:.............................................. 13: ;Backup Gateway Box Contents.................................. ...............:...... ............................ 13 ' : . . Required Tools..........................:...:..:.::....................................:..::..::.::........................................:..::. ..13 Required Supplies......... ...................................... ..... 14: Step.l:Plan the Installation.Site....::..:.....::. :.:.:...:.:..:........ ..........: .:.:...:.:..:..14 . . . . . Wiring.Specifications......................................................................;:.:,. .: .............................;......:..:............15 Step 2.Transport•and Unpack Power.wall.: ..:..:...........................:..:..:.:.:.:: 16 :: :: Step3.;Anchor the Powerwall:Mounting Bracket..:.:.............:....:.. ;.:.: :.:. 18 Step:4.prepare Powerwall:for Mounting.:.....:.........:.:..:::...:::... 24. Step S. Mount Powerwall on the Bracket...:.;...................... Step 6.:Prepare the Backup Gateway for Mounting.............::...........................:...................:................................ ..:..........::28 .. .. Step 7. Install a Circuit.Breaker in-the Backup Gateway.:......................... .................................................:.........:..::..30.. .. .. . Step 8. Mount the:Backup Gatewa y..:...:.:.:..::.::..................................:........::.:..................................:..::.:.::...............................3.: Step'9. Connect Powerwall:and the Backup Gateway.......:............................:.:.::.:..:.......::.............................:.:..:..:.......:34 Step 10: Make AC;Power.Connections....:..:.:...::.......... :.:..;:....,:. ::..:..:....:..::..39 . . Step 11. Install Endigjy Metering for the:System............................. .................,............................ :............................42: Step 12.:Close the Wiring Cor'npartments, Apply:Labels;and Turn On the:System...........................:.:..::.:..:..:56 ��.r=:�:-1' T Step 13. Commission the System..;..;,..................... .........:........ ........................:.............:............................. Step;14. Finish and Demonstrate the Installation.............................................. 61 Troubleshooting....:..::...:..............................:..:..:.:.:.::..:..:. ........... .................62 Technical Su pp" .................... .....::........i:.............................. . : . ...........................:..:..:............................................ ..... 63 Maintehahte.............................:.: :.: :: .........................................................:.:.::....:. Appendix A. Wiring:-Reference....................:....:..:..:..:. .: Powerwall.....:...........................:..:.:..:. ..:.:.............................. 64 ...'.;.::,:.: ;. ...............................:..:... ,......:............................:..:;..:.::...... Backup Gateway....................:. : : ........................ AP eridix B. Revision Log g....................................:........ .......66, ali install al . . . Po:werw installation, IMPORTANTSAFETY IN . :':.SAVE THESE. IMPORTANT SAFETY INSTRUCTIONS This manual contains important instructions for.the Tesia'Powerwall:2 AC and Backup: :. Gateway:that must be followed.during instal latiorl::and maintenance of.the system. P:owerwall and Backup Gateway installation and service roquire knowledge o:f high voltage electricity and should.only be.performed by TesIa Certified Installers. Tesla:assumes no liability- for injury:or property damage:due' to repairs attempted by unqualified.individuals or a:failure to properly follow:these.instructions. These:warnings and:cautions must be followed where' :using Powerwall bad:the Backup Gateway: Symbols Used. .. . These symbols indicate important safety-information in this guide or on the:equipment: . AWARNING::indicates'a hazardous situation which,.if.not.avoided;could.,.result in injury . or death.: :: :: . .. .. .. CAUTION: indicates a hazardous situation which;if not avoided, could result in minor •__ injury or damage to the equipment.. NOTE: indicates an important step or tip:that leads to best:results, but is not safety or damage- related. • REFER TO-OPERATING INSTRUCTIONS: indicates that user should refer to 1 operating or installation.ih' structions before proceeding. : :. RISK-OF ELECTRIC:SHOCK: indicates components that,present:risk of electrical shock. A ��. CAUTION, RISK:OF ELECTRIC:SHO:CK, ENERGY STORAGE TIMED . ir/;; DISCHARGE: Discharge.time is 5 minutes from de-eriergization. .. .. . 8 MkPA e 81D'IRECTIONAL:TE'RMINAL: Indicates.location of combined:input/output.cdn'hector on the-equipment. PROTECTIVE CONDUCTOR.TERMINAL Indicates:location of grounding connection on thee :ipmbht. Il: . �A. General lnformation WARNING: Read this entire document:before installing or:using Powerwall. Failure to do , so.or to follow any:of the instructions or:.warnings in this document can result iri.electrical .. . . . shock, serious:injury, br death; or can damage. Powerwall, potentially rendering it'inoperable:. . .. . .. . .. WARNING: A fja. ery can present.a risk of electrica(shock; fire, or explosion from vented gases. Observe ro er.precautions.:: p: p .. WARNING: Powerwall installation must be carried out..only by Tesla Certified Installers .:who have been trained in dealing with:high voltage electricity. A WARNING: Powerwall:is.heavy. Use of lift:equipment is recommended. A.WARNING: .Use Powerwall only::as directed. .. A WARNING: Do not use Powerwall if it is defective, appears cracked; broken, or otherwise damaged, or fails:to operate. A WARNING: Before begi:rtoing the wiring p6r:tibn of the installation,:ensure that Powerwall is switched off, acid been any associated circuit breakers'and disconnect switches:(if applicable for the installation). WARNING: Do.not attem f to o en disassemble, re.pair,.tamper with, o.r. modify: Powerwall. Powerwall and its components are not user.serviceable. Batteries:in:Powerwall are not-replaceabie. Contact the Tesla.Certified Installer who installed the system for any repairs. wARNiP G:.To:prote6f Powerwall and its components from damage when.transporting, handle with care.:Do:not impact, pull; drag,, or step on Powerwall. Do not subject Powerwall to- any strong.force. To help prevent damage, leave Powerwall in its sfiippi.ng packaging,un.. it_is ready to be;installed. ' A WARNING: Do not insert.foreigri objects into any part of-Powerwall. WARNING:.Do not;expose Powerwall or its components to direct flame.. : WAF2NING: Do not install.Powerwall near Beating equipment., ::AWARNING::Do riot immerse Powerwall or its components in water or:othe'rfluids. 4' ' Powerwall InstallationVanual CAUTION: Do not use:solvants to clean Power wall, or expose Powerwall to flarnmable-.or harsh chemicals or vapors.: CAUTION: Do not use fluids,:parts, or accessories othe' r-than,those specified-in this: manual; including use of non=genuine Tesla parts oraccessories, or parts or accessories riot purchased directly from.Tesla or'a Tesla-certified party. CAUTION: Do not place Powerwall in' 'a' storage:condition for.rilore:than one (1).rri6ntfi; or permit:the electrical feed on the.Powerwall to be severed for more than.one (1) month,, without placing Powerwall into a storage condition in accordance with TesVs storage specifications.. .. CAUTION: Do not paint any y part of Powerwall, including any internal or-external :components such as:the exterior shell:or'.casing. A CAUTION: Do not cohhect Powerwall directly to photovoltaic (PV) solar wiring' • CAUTION: When'installing Powerwall-in a garage or near vehicles,,keep it out of the .. driving path.-If possible, install:Powerwall on a si.d.e wall and/or above:the height of vehicle bumpers. Environmental Conditions. WARNING:.Iristall'Powerwall in a:location that prevents damage from.f.loodirig. WARNING: Operatind:orstoring Powerwall.in.temperatures:outside:its specified range might cause damage to.Powerwall. WARNING: Do not expose Powerwall'to ambient.temperatur.es:above 60°C(140°F)or :. ' below.=3.0°.0 (-220F). ®! .CAUTION: Enaure.that no water sources are above:or.near Powerwall,;jncluding downspo.u.ts,.sprinklers, or fau.cets: ®CAUTION: Ensure that snow does riot accumu late.around Powerwall.: M. __I.. I . ..Re:gistering Powerwall Tesla Powerwall comes with a warranty whose term.depends on the connection of P.owerwall :.to the Internet. To secure the:full 10-year-warranty for Powerwall;.i.t:must be reliably:connected to th 16t&het to allow remote firmware upgrades from Tesla..lf a:n•Internet connection is not established.or is .interrupted for an exterfded period, and Tesla is unable to.contact the owner,.the warranty may be limited to 4 years. To.ensure'thd the owner can:receive the full 10-.year warranty, be sure to complete the commissioning process:So:that registration.information is sent'to'-Tesla. For more information,, refer to the Powerwall Warranty for your region at www:tesla.com. 2. Specifications PoWerwall Electri.cal'Specifications Usable Energyl. " 13.5 kWh AC Voltage.(Nominal)and ., ;: 120 V,240 V: 24 A. w. Maximum Cdhtin.uous Current Frequency(Nominal.) 60 Hz Real Power, max continuous; , . . . 5.k,W (charge and discharge) Real Power, peak(10 s, off-grid/backup) :: 7 kW(charge and:discharge) Apparent Power, max continuous 5.8 kVA(charge and discharge) Apparent;Power;peak(10 s,off-grid/backup) 7.2 kVA(charge and discharge) . . . . Power.Factor(full-rated power) : :+/- 0.85 Overvolta e Cate or 9 9. Y. . � : .'.• Category]llf. . .. .. . .. .. Maximum upp y:Fau t 10 kA ::Current . .. Maximum Output Fault Current:; .32 A Round Trip•Efficiency. (Beginning of Life)';. ;. 90/ Values provided for:25'.0(77°F), 3.3 kW charge/discharge pourer .' z Power factor accuracy 14.3%of-nominal Poweewall'Environmental'Specifications Operating Tempera'' et" -20°C to 506C(-4°F to 122°F) . . RecorTimbnded Temperature 0°.0 to 30°C(32°Ft6 86°F) Operating HUmidity.(RH).g . . Up to 100%,condensing .. :storage Conditions:(up-to 12 months) : :: -20°C to 30'C(-4°F to 86°F): Up.to 95%'RH;-non.condensing :State of Energy(SOE)::25% initial Maximum Altitude; 3000 m (9843 ft) Noise Level @ 1 rri < 40 dBA at 30°C (86°F) Enclosure Type IVEMA 3R Ingress Rating IP67(battery and power.electronics) IP56 (wiring). Wet Location Rating Yes Pollution:Degree Rating :; :: PD3' Seismic'Rating AC156, IEEE 693-20b5 (high) :3 Performance may be de-rated in extreme ambient temperatures.::. • 6 Po.werwalI InstallationNanual Powerwall Mechanical Specifications . Height: : 1150 mm (45.3 in) Width . . . . 753 mm:(29.6.in) bepth . .. 147-mm (5.8 in) Weight 114•kg (251 Ibs) '.Powerwalls with part numbers 1092170-XX-H.and lower and 2012170-XX-B.and Dower have the.following specifications:1150 k 755 -155 mm,125 kg. Backup.Gateway Electrical Specifications::. Maximum Continuous Current 200'A . Maximum Input Short Circuit Current 10 kA Overcurrent Protection Breaker4•. . 100.-200 A; Service-Entrance Rated Overvoltage Category.. Category,IV .. . :: 4C Meter Revenue grade(+/-1%) 4 Circuit breaker.required for.in:staIlation-at service.entrance Backup Gateway.Environmental:Specifiications.: :. • Operating Temperature 20°C to 50°C•(-4°F to 122°F) Operating.Humidity(RH) Up.to 100%, condensing . Maximum Elevation .. .. . 3000 m.(9.843 ft):: Enclosure Type ::. NEMA 3:R: ::... . . Ingress Rating. IP44 Polluti.oh Degree Rating PD3 Backup Gateway Mechanical Specifications Height :. .: :7.40 mm (29.1 in) Width :. 378 mm(.14.9 in) Depth 129 mm.:(5.f in) Weight : 16.4 kg (36 1bs) 3. Si.te,:Requlrements . : ::Powerwall Phj sisal Requirements : Powerwall c6h-be mounted on.a .00r or wall.-When floor-mounted:, it.must also be anchored to an adjacent wall. In both:types of installation; the,wall must be:capable of supporting the full .. .. . weight of Powerwall•and its mounting.hardware. The wall.i' Ust extend to al:l e�dges,of the = system, allowing:n6 access to the back Of-the unit once it is'h-iounted. Powerwall-includes a mounting:bracket (Figure:l) that supports the unit in both floor.- and: .wall=mount confidurat ons, and includes shims to level the.ur.t.in floor-mount configurations. . Do not use othe'r:fiardware to anchor Rowerwall to the w''Wor floor. Powerwall Identification : ::Newer Powerwalls have slightly different.mounting dimensions that affect bracket-mounting . .. height See Figure 1 for details. 1Q92170'-XX-H and lower: 1092170-XX-J and higher 2012170-XX-B.6nd.lower 1. 17 .-XX-C and higher-, .755.mm(29.7 in) = a .. .. 753 mm(29.6 in). " 395"mm +o.o—o o= ,a 154 in) LS • 11 �• �I ❑ oll 1150 mm ,.o (45.3 in) ii .. .. :. of . . M. i°. . ❑ jAl m. 8 in 2 0 . 61 CD OCO O'�LSJ 1 i 292 mm': OxO. o °•4 u of 2 f : J,,20 rhm o'. .o mrr (9.76in) :o 'o 0 0. o J e rn" 623 mm g ) (2.48 ) .54 ) 6 m I 72 2. in ::�(•24 in Figure 1: Powerwall 2.Mounting Bracket.Dimensions " " 8 " " : " Po.werwall Installation:Manual . ,' 659;mrn 'In) � mm(20 in) .. O8 4rrim(T6 06. 305 mm' 12 in ( ) .. .. 5,82 mm Q (23 ir) 0 0000 00©"0' . .640 mrn(25.2 inj .Figure 2: Powerwall 2:Mounting Bracket: Dimensions Pow&ctill:requires adequate clearance for installation, cabling, arid:airflow. Do not mb:unt any other objects within the clearance space (F:igure' 3), except those explicitly.required by the installation (fore, ample, conduit, a junction box, or an electrical disconnect, depending on :. local installation'codes). Do'not install anything-above Powerwall.that limits access to-the unit or that might fall and damage the unit. Do not:mount Powerwall horizontally or upside down. .:NOTE: Powerwall has a pump and fari:that'enable Powerwsll to maintain ideal:battery temperature.They produce a:gentle' hum during operation, comparable to'a typical . refrigerator;.The noise level depends on the ambient temperature'and:the power level of::. oper:ation.'Consider:'these rnoise levels:when.choosin' g where to.install Powerwall'.' :. .9 Powerwall-Dimensions and S :: e"Requiremer:ts 753- m: 50 mm 29.6 in (2 in) r _ F ri 1.150 m rim' : ::(45:3 in) 50 mm. 150 mm ::(2:in .. .. . .. .. .. . Ile147 mm: Figure 3. Powerwall 2 Dimens:ions and Space Requirements . ..Powerwalf Space Requirements Minimum lateral wall space 960 mm:(38 in) .. 'Minimum clearance from:left side(air intake) 50 mm (2 in)...,: Minimum clearance from right side(air.exhaust) 150 mm (6 in).: : .' Minimum.clearance above single Powerwall 50;mrr1.(2.in) Minimum clearance above side by-side Powerwalls 300 mm:(12 in) Minimum clearance,betwaen side-by-side Poworwalls 250 mm (10 in) as Maximum.height above ground.. .. . 1.5 m.(5 ft).to bottom of unit. .. . Maximum slope . ::. +/r:2.*side-to-side : . . +/=5°front-to-.back. . 10 Po.werwall Installation:Manual rq Powerwall-Recommended Terimperature:Range Powerwall-is rated to operate in temperatures from. -40F to 1220F:(=209C to 500C). However, for best performance Tesla recommends installing Powerwall in locations with ambient : :temperature betweeh:32°F to 86°F'(0°.0 to 30°C) year rouhd..When outside this recommended temperature:range, charge power.may be reduced and Powerwall will.utilize its thermal control system more frequently to maintain.battery cell temperature, which will reduce the energy efficiency of the system:Systems that experience long outages(>4 hours)-': in cold weather systems may.need to curtail PV,and reduce energy used for preconditioning. • For cold climates Tesla'strongly recommen:d.s installing Powerwall indoors when possible (particularly when long outages are expected): For hot climates Tesla..recommends keeping Powerwall out.of direct sunlight. .. •. _. :Installation in full s:un:raises the temperature inside the enclosure above ambient'. temperature.This temperature rise is riot a safety. risk,.but may impact:battery performance.:To optimize performance, avoid installing Powerwall in locations that are : . . exposed.to the sun for extended periods.: Additionally; if stored in.a cold environment before instal.I.a.tio.n,.it:niay take s.ev.eral.hours for .. :Powerwall to raise:.its internal temperature using pre-conditioning. Tesla recommends storing: Powerwalls in.a warm location prior to installation to help efficiently commission and.test the system: .: :.:.. Powerwall.lnstallation Requirements Powerwall=comes with a separate Backup Gateway.and power met:er.:to enable integration with.solar systems and the'electrical grid. The Backup Gateway.communicates with the :system by means of wireless and wired connections. Wiring'arid conduit (w.here.required) must be provided by the installer.:.Where conduit is required; the installation must comply-with'' local codes and UL514B regui.rements. Ae isolation and interconnection requirements between:the;Powerwall systei-n and the electrical panel are subject to.-local codes. Ensure that the installation meets local isolation.and, interconnection requirement's:::. All U.S. and Canada electrical installations must be done in accordance with local codes and the National.Electric Code (NEC):ANSI/NFPA 70.or-the Canadian Electrical Code CSA.C22.1. When Powerwall is installed in a.dwellin unit,fiire detection and protection e ui meht'shbuld p q P. ::be installed in accordance with local=building and fire codes. All installations must conform to the laws, regulations- codes, and:standards applicablb.ih.the jurisdiction of installation. - Backup Gateway Insta ation Requirements r r v. The Backup Gateway must be wall-mounted anti can be configures!.for cable entry at the top, .. bottom, or sides of.the enclosure. It requires adequate clearance for installatfon.a.nd cabling or; , conduit. Wiring and conduit (where required) must be provided by the instal ler.,Where conduit is required, the installation must comply.with local codes and U.L514B requirements. ' Mount the Backup'Gateway vertically in the orientation.sho.wn:below (Figure 4.)'. Do not mount the Bac up Gatewa ens osure �brizonta p s•y y or u si e: own. All installations must conform to the laws, regulations, codes, and.staridards applicable:in:the jurisdiction of installation. . . . . 378 rnm . . . . 129 mm, i, (14.9 in). . (5.1 in) . sw 740 min (29.1 in) Figure 4: Backup Gateway Dimensions: 12 Po.werwall Installation:Manua( 4. Installation Instructions :Powerwall Box Contents • Poworwall 2 AC unit • Mounting bracket Accessory-Bag'Contents. • :(1)3=pi.n AC power harness.(600 V,105 deg G) i. • (3)WAGO:lever nuts for AC power connections • (1) 4-pin terminal.block connector(black) for connection to.Gateway • (l) 4-pin terminal block connector(green)with-12,0=Ohm terminating-resistor . • (1)T2Q.Torx driver bit (1) 1-inch insulation bushing for conduit entry to Powerwall. . • (2)shims for leveling floor-mounted'units • '(1) Safety Instructions.document ' • On the outsi e of the box:'printed Tes a Battery Emergency Response.Guide (ERG) Backup Gateway Box.Contents . • '.(l.).Backup Gateway e.ncldsure •: (1)Powerwa/12 4G-0wner'sManual'. • Accessory.: bag:containing labels: . (to'be'applied only if Gateway is installed at the service entrance.with'a circuit breaker): (•1) Rating label for Backup Gateway door. •. o (1)"Warning label for Backup Gateway dead front.panel - - - .. (1) Meter Kit contammg: o (1)4-conductor voltage line harness: :o.' (1) Meter antenna:eictension cable o " (2)3-pin wiretaps o (2),Meter antenna extensioh:knockout plugs (1/2=inch and 3/4-inch) . . . . • : o • ;(2)4 mmz(12 AWG) wire jumpers . - -- • ••. � o, (2) Self-drilling.screws for mounting•the meter o (1)Wirenut .. Requ.ired:.Tools :Personal protective equipment(safet glasses,gloves,., rotective footwear)-- -.p .. .. Y. p.. Drill and drill bit for drilling pilot holes in'mounting surface:. • Torque_screwdriverwith 1/4-inch bit holder.(for the provided T20,TorX_bit) • : Large(5 mm)flathead driver bit(for ground:bar) • Small (2 mm),flathead screwdriver(for wiring connector.spring terminals) • Torque wrench with 5/16-inch Allen bit(for Backup Gateway power connections). • Wire strippers/cutters for 0.2 mmz to•12.0 mm2(24.AWG to 250 kcmil) wires: • Installaffon tools (level,:stud sensor, tape mea'ure, pencil, painter's:fape, flashlight) . „• :Lift equipment capable of lifting and supporting 125 kg.(276.Ibs): • Ratchetin;g:strap to- secure Powerwall t6lift equipment Digital camera'or..smartph(?np for documenting)the installation WARNING: Powerwall.is-heavy.-Wear appropriate personal protective equipment;(such as gloves .;and protective footwear) when handling:the:unit. Only a sufficie'nt;number of trained movers should lift Powerwall..Use of lift equipment:is 'recommended. .. .. .. . : . .13.: Required-Supplies • Mounting bracket hardware(see"Step 3: Anchor. the Powerwall.Mounting Bracket") .. "•: Conduit fitting.or cable gland (depending on local electrical requirements). . • Conduit or:raceway(depencling.oh.16cal electrical requirements) • Minimum 300 V rated 4-conductor(with one twisted pair)shiel.d.ed copper(Cu)cable.(for communication connection between Powerviiall-and the Backup.Gateway) "• Minimum.6.00 V;90 deg C rated.copper(Cu)cable(for.power con nections.to:Powerwall and th.e... BackupGateway) • Conduit adapter(if necessary for cable entry into Powerwall wiring'compartment) • Siernens HS-style conduit:hub(for entry into:the;top of the Backup.Gateway enclosure),:,,:.: Step 1..Flan:tho Installation.Site The installation location for: Powerwall must accommodate placement:.of the Backup :Gateway :. and meet a conditions:described above in;"Site Requirements." lb addition,-consider the :following points when:choosing where to:install Powerwall.- Wall mounting: Choose a wall capable of supporting the full weight:of.Powerwall, with:one of the following'characteristics: wood studs at.regu'lar'i'ntervals, plywood sheeting of:sufficient :thickness, solid concrete or masonry' or:metal studs of sufficient gauge. . Floor mounting: Choose a level surface adjacent to-a wall space:that.meets all the requirements for wall mounting described above. Make sure the area is isolated from hazards . that may damage the.unit, such as vehicle traffic or flooding:. Cable:entry: Determine whether cables will be routed'into Powerwall:from the side or from the .. back of the unit..With.side cbbI6-entry, a conduit fitting.or cable glarid must.be used to seal the entry into the wiring compartment. With back cable;entry, a wire cover:should be used to. seal the entry:into the wiring .compartment. NOTE: If Powerwall.is.mounted'on a wall .with studs spaced 24.in (610'mm) a'part,.cable entry . frorri the back o:f:Powerwall may be blocked. Backup Gateway configuration: Determine whether. cable entry into the:Backup Gatbwu y will be.from thetop, bottom, or side,-(Optional:•when cable entry.is from the bottom half of the .:enclosure, the back panel of the unit may be rotated 18.0 degrees to simplify cable runs.) NOTE.-'For. cable entry at the•top of the Backu.p.Gateway enclosure, an.HS-style hub'sf ould:be used in:order..to maintain enclosure ingress protection. Electrical service connection: The Backup Gateway is service entrance rated,.and can be r . . located•between the service entrance and the main.electrical panel.•When installed at the• service entrance, appropriate o:V.ercurrent protection must be installed'in the Backup.:Gateway. -.The Backup Gateway.can accommodate two different circuit.breaker sizes::100/125 A or .. 150/200.A. .. . . . . . . . . . . Conduit or-raceway: Calculate the amount and -'ize,of conduit or:raceway needed for the- :.installation, based on.fill limits and lo.cal.code requirements, With conduit, an adapter may be required between the entry into the:Powerwall wiring compartment and the conduit. .. 14 :. Po.werwalllnstallation:Manual V1/irin S _ edficati6ns. Powerwall'and the Backup,Geteway require ppwer:and communication cable connections:as shown in the following'tables. Position PbW:erwall, the Backup Gateway, meters, and other electrical components to minimize cable lengths, based:on local code requirements. Backup Gateway to Service Enary Electrical Panef 'Cable Gauge Strip Length Maximum Cable.Length: :- 16-120 fY M2 (6 AW6-250 kcmil) :. 32 mm (1.1/4 in) •_ .. [based on;local code] Backup Gateway,to 7n't&net router.-. Cable Gauge Strip.Length Maximum Cable Length CATS=shielded (24 AWG bnly): (RJ-45 connector) 45 m (150:f0 Powerwall to Backup Gateway Communi3ation/72V Power. • Cable Gauge, : Strip Length.' Maximum Cable Length* 1.5 mm?(1(5 AWG) 10 mm (3/8 in).. 45 m (156 ft):.. :0.8 mm2(18 AW:G):: ::" " 10:mm (3/8 in) :: 27 m (90 ft) _. * Total length of cable, including:daisy-chained connections, through,last Powerwaf(in'chain :Powerwall.to electrical pane/ Cable Gauge. :. Strip'Length Maximum:Cable Length 6-10 mM2.(.10-8 AWG) 13 mm (1/2:1ri') 45 m (150;ft) Energy Meter to:Backup Gateway.Communication (Opti6na1'PS4B5 Wired Connection) Cable Gauge Strip Length Maximum:Cable Length .0.25-1.5 mrri2(24-16 AWG) 10 mm.(3/8 in) 50 m(164 ft) CATS-shielded'(.24.AWG only*) JO mm (3/8 in) 1.50 m (164 ft) * Do not use CATS-26 AWG.cable Energy Meter- Current Transformer Leads Cable Gauge Maximum Cable Length CT Extension Kit(P/N 1125547-03=x) 4.5 m (15:ft) 0.25-1.5 mm (24-76 AWG) 15 m (50 ft) 'C"AT5-shielded 04 AWG only*) 15 m (50 ft) Do not use CATS-26 AWG cable. Step 2.:Transport'6nd Unpack Powerwall. . CAUTION: Powerwall:i's heavy.,Wear appropriate personal,protective equipment (such as gloves and protective.footwear) when:handling the unit: Only a sufficient number of trained movers should.lift Powerwall.:Use of lift equipment-is:recommended_ For.mbre information, :. refer to,Pgwerwall2 Transportation and Storage Guidelines. ':I-.:Keep Powerwall In its box until ready for installation. 8tor�,the box flat on.: back (front : . . facing up) during transport::The box can be carried in any orientation to:the job site.. 2. Open the box by.cutting the packing straps; removing.the.lid, and setting.it aside. 3::Remove the moiantin_g bracket. .. fr. Figure:5: Removing the Mounting Bracket .4..Verify that the contents of the bracket box and accessory bag are complete and undamaged (see:"Povw.erwall Box Contents" and "Powe'rwal(Accessory Bag:Corit.ents," above);: and examine.Powerwall for any damage. Report damage to Tesla,:if found. 5. Find the bottom of Powerwall by.identifying the feet at the base of the unit:. 6. Open'the bottom edge of the'boX"(nearest.the bottom of Powerwall) by removing the staples the the cardboard back. - :7, Move the lift equipment into place:next to the bottom of:the Powerwall box. 8. Gras :the to of the Powerwall and carefully tilt it upright ht until it.sits.verticall ' :. p:. p .. .. . Y:. p g Yin the box, • . . . with.the front of the.unit facinj:the lift equipment. " : 16 Po.werwall Installation:Manual . . . h Fig:ure'& Removing Poweewall from Its Box:. :: :b::P.osition the Powerwall on the lift.equipment, with the:mounting cleats facing:away from the: lift equiprhent:' :_10.Strap the Powerwall:to the lift equipment with a ratcheting:tie-down strap: i .. I : :. I . . . Step 3::Anch6r the Powerwalf Mounting Bracket 1. Before mounting the wall, bracket, double-check that the mouhting'location will allow access I: to the chosen cabfe.entry port (side-or back) during installation. If applicabl' .use ' stud : sensor to locate.and'mark the centers.-of:the studs in the wall.. 2. Determine the appropriete,type and number of:fasteners for the:mounting bracket:location. Be sure to take into account the thickness of the mountirig blra:cket, washers,:and wall material.': . . . . . . . . . . . . . . . 'When choosing fasteners. The following'guidelines apply to both wall- and floor-mount installations. q. NOTE:The details;below are rriiriimum:guidelines and are not-guaranteed to be applicable. :Refer to local building:codes to ensure the use of appropriate fasteners. Refer.to Powerwaii2 Anc orage.Detai s for complete ryr ounting information. Wood Studs'(spaced at.12, 16, 20 or 24 inches) If anchorin g 'directl into-wood studs, use at.least four one.in each corner 1/4-inch wood screws with washers, of sufficient length for at least.2;5:i;n (64 mm) embedment into t e stu s. I I I I 1. ,.. . ,.. .. .. .. .. .. .. .I ❑ I ., .. .. .. .. .. .. .. .. I 'I ono Figure.7:'Anchoring the Bracket to Wood:Studs If anchoring to.blocking between:wood studs, us'e rn.inimum 2 x 4 in:bl.ocks, end-nailed .into studs with'two 16d (90 ri)m) nails.or: toe-nailed into studs with four 8d (6.0:mm):. hails..Use at least four (one in each corner)-1/4-inch wood screws with washers,:of sufficient-length for at least 2,5 in (6.4 mm)'embedment into the blockin g•' I I I sm I I I ❑ ; .. . . . O Figure 8: Anchoring the Bracket to.Blocking between Wood Studs 18 " P.owerwall Installation:Manuaf q. I Plywood .. . • If anchorin.g.to,plywood wall material, the plywood,must be minimum 1/2-inch thick. Use at least:four(one in each:corner) 1/4-inch:wood screws with wcish:ers; of sufficient length:to penetrate at.least 1/4 inch beyond..the backside o.f the.plywbbd. .. .. ._ .. .. .. —-—-- ---_--- ME v GID Figure 9: Anchoring the Bracket to Plywood' Metal Studs (spaced at 12 :16,20 or 24 inches) . . . If anchor.i'rig:directly to meta l.s:tuds, studs must be minimum 18 gau.ge. Use:at least four.: (one in each corner)#14 sheet metal screws with washers, of sufficient length to penetrate at least 3:thre6 s beyond the stud. oo�o o�oo b. i i ❑ i i I ❑ i .i: .. .. .. .. .. .. oho oa�o .. .. .. .. .. .. a Figure-10:;Anchoring the Bracket to Metal Studs :. :. . ' E. ram ' =- 19 . . . . . . . . is .If:anchoring to backing between metal studs,:studs must be minimum 25 gau.ge,:and. • �. backing must be m%nimu.m 22 gauge. U56_6t.least eight (two.in.each corner).#14 sheet metal screws.with washers, of:5ufficient length to:penetrate at least-3:threads beyond.., the backing.. ; ;:' i:i . i I I I :.' - i. i �o Figure 11: Anchoring the Bracket to Metal Backing If anchori.ng-to backing between metal studs in an'outdoor•high•wind area, studs must be minimum 25 gauge;:and backing must be minimum 22 gauge. Use at least twelve (three in each..corner) #'14 sheetmetal screws with washers; of"sufficient.length to"' penetrate at aeast 3 threads beyond the backing.: :: I I I i i ❑ Figure 12: Arich&i.n the Bracket-to Metal Backin• �g g -:High:Wind Area I : -- I I 20"" :. :, Po.werwall Installation:Manual Concrete;or-Masonry Minimum strength must be 2500 PSI (concrete) or 1500 PSI (masonry).. .. . Use at least:f:our(one in each corner, in any available anchor slot) 1/4-inch fasteners : with washers, of sufficient;lehdth for at least.1,5 in (38 mm).embedrhdht into the . rnai.e.rial. Ensure that all-fasteners are at least 1.5 in (38 mm) away from the edges:of masonry blocks or bricks: 0 - — ------ - - - Figure 13:'Anchoring the Bracket.to Concrete or'Masonry. Channel:Strut.(Unistrut) :Struts must bee minimum l-5/8;in x-1-5/8 in,-12 gauge. .. If mounting:on.wood studs,attach the strut to at ]'east three studs,-using:at least one .1 4-inch wood screw:with:washer per stud, of:sufficient length for.at feast-2.5.in (64 :. mm) embedment int6.the studs. If mounting on"metal studs, attach the strut to atfeastthree studs,,using at least two #14 sheet:metal screws with.washers per stud, of sufficient length to penetrate at least.: : . 3 threads beyond the_'studs. • To attach the bracket-to the struts, use at least four (one:i.n each corner) 1/4.inch .. hexhead•screws with washers and strut nuts. o�:oo oo:�o Figure 14: Anch:oring the Bracket to Channel Strut 2 :: :. NOTE:.Both floor and wall.mount:installatibns require.tfie cleats on:the-back 'f Pbwerwall-to. be fully:ehgaged in the mouritirig bracket. Consider. the floor contour:when measuring for.: . .. .. floor-mounted installations. ' ;. 3.-Use the bracket as a'guide:to mark the location of pilot holes for:the required fasteners. Use, a level tobl:t.o ensure that-the bracket is level: : ::4. Drill the pilot holes-for the fasteners: 5. Attach.the,bracket to the mounting surface:with the required fasteners as described.ebove. 6. Verify that the.bracket is firmly attached:to the wall....,: T (Back cable:entry installation onlyj brill'a hole in the wall that corresponds to the location-of, the back'cable entry port'bn:P.6werwall. The diameter of the port�and Ibcation of its-center are shown below in relation to the Powerwall chassis (Figure:15)and'in relation.to:the:installed'' - : mounting bracket;(Figure 16). 62:rnm(2.4 in) 336 mm (1.375 in) 814 mm { 132.O m) .. Figure 15: Back Cable Entry Port Location (Viewed from Front of Powerwall) " : 22 : " " : Po.werwall Installation:Manual . 14 mm . . . mm 055:.in 0 55. in - -- ------ -- - -= = ------: -- 35 mm. S�35'mm .. An _ __ ________ j1 .375 in 1 - .24 mm 68 :rnm 0:95 in; (2.7 in). :._-..:.. EiL Original.Loeation Updated Location', -Figure 16::Sack Cable.Entry"Port Location -DETAIL'(Viewed from-Front of Powerw.all) :. :.&_(Optional) Use:painter's tape to mark the location of the bracket flanges on the wall, the location of the cleat s:an the front of::the Powerwall, and:the-center lines of.the bracket and chassis-to aid in aligning the:unit. w. 23 SteP.4. Pre are Powerwall for Mountin P 1. Switch:bff:Powerwall bY:moving the switch'oh.the right side of the'unit to the OFF.position. WARNING: Switching off,Powerwall disengages.the' Enable_line.but does'not.disconnect AC volta*ge.. Voltage may be:present on the AC:connection leads unless the Backup:Gateway, any associated circuit.break&s;'and the.AC disconnect (if applicable) are switched off: I o I � II Figure 17::Switching Powerwall Off 2. Remove the left side cover.from Powerwall.bY.carefully pulling.o.uC on the plastic straps near the top and bottom-ofthe cover, and:detaching it from the.clips along the length of the unit. . . TERN AA Figure II& Removing the Left Side Cover 24 Po.werwall InstallationNanual �. (Side cable:eritrjr installations:oriljr) Remove the side cable entry door from-the left side:, cover by.sliding it out of its slot. Figure 19: Removing the Side Cable Entry Door as 4. (Back cable entry installations only) Remove the plug from tlie:back cable entry portion Pow.erwall and lace it.in the side cable entr... p.. . Y port: .. .. ZI 0 ®. Figure 20: Moving the Back Cable Entry.Plug to.the.Side Cable Entry Porte 5. Take a photo and record the serial number,of the Powerwall in the back of the Owner's Manual:that.came with the:Baekup Gateway.The serial number can:be:found on a labei.bn the left,side of the unit,'and:also on the.lid of its packaging.-: Step 5::Mount Powerwall.on't6e Bracket:,. : . . 1. Move:tlie lift equipment close:to the wall and remove the tie-down strap securing the. Powerwall to the:lift.eguipment. 2.'Adju5t the height of'the-Powerwall so that its:mounting cleats.are:just.above the flanges-on the bracket::(If the bracket:and cleat locations:are marked with tape,'use those marks to,:.: gauge the height.) :. . . 3.'Begin to lower'the Powerwall so that the to.p:cleat:engages'the top flange on the bracket:. Ensure that:the bottom cleat'al.igns with the bbt:tom flange of the:bracket. :4.-With both cleats:engaged, lower:the Powerwall onto the:bracket. When:the:cleats are seated.in the bracket; the locking:mechanism at the center of the top flange should click into place.- -NOTE: = : To remove:Powerwall from the:mounting bracket,:place''a thin piece of sheet metal between the.Powerwall unit.and.the bracket to.compress the-locking mechanism,"and.lift the " Powerwall:straight up. o ' .,. . ,off . . . .. .. .. ' i I �41 mw I Figure 21:.M6unting Power-wall on'the Bracket :. 26 " :, Po.werwalI Installation:Manual . . . . .. 5. Make sure the unit is centered on the bracket;. (.If.th,e center lines;of the chassis and bracket . . are marked:with tape, use those marks to align the-centers.) :6; (Floor mount:ins:tallations only) Use:the provided shims:to ensure that Powerwall is level. The unit should be level within +/- 2 degrees side-to-side and within.+/- 5 degrees front-to, back to;ensure proper coolant:flow. Figure 22: Leveling Powerwall.with.a Shim NOTE: Updated versions of:Pbwerwalls (see Fig&61>include ability to remove feet.fbr aesthetics: Remove the feet:for:any wall-mounted installations. Do h6t:remove if ground mounted. . . .. . . . . . . Ste P.6::Pre are the Backu Gatewa for Mountin P P: Y. 9 1. Remove'the Backup Gateway:from its packaging:and verify that the contents are complete and undamaged (see."Backup Gateway.Box Contents,"above}.- 2.'Take.a photo and record the serial number.of the Backup Gateway-in the'back of thee. Owner's:Manual that came:Mth:the system. The serial number can be found on a label:on the inside of the enclosure door, and also:on the outside of i.ts packaging. 3. Open the Backup Gateway:enclosure and remove the enclosure-door... 4. Remove the screw at.the bottom of the.dead front panel and remove it from the enclosure. .. .. .. . �o o : a a Figure 23: Removing the Dead Front.Panel from the.Enclosure 5. Take photos and record the serial number and short.ID:number of the Energy Meter in the back of the Owh&rs'Manual that came.with the system.:Thb Energy Meter'sdrial:number and short ID number ap pear on the.side of the meter Wi,-Fi sensor housing.. 6.. Determine whether cable entry to.the_Backup Gateway will be from the top, bottom, or side. : : , of:the enclosure.If cable entry will be:from the top, skip:to.Step 7, "Install a Circuit Breaker in the Backup Gateway." 7. (Optional) To configure the Backup Gateway for cable entry.from the bottom or.sides,'do . . . . floe following: • Remove the four fasteners holding the:back panel assembly:in:place and remove it. from the.enclosure. - Rotate the-back panel assembly:180 degrees and ,reinstall it in the enclosure. 28 Po.werwall Installation:Manual ----- -- - ------------ . �0 - 0 L:. .. o® o Figure 24: Rotating the Back Panel Assembly in the Enclosure • Remove and rotate the dead.front panel insert (an d.:its insulation) 180 degrees, and reattach it to Compensate for-the,inverted back panel:. -- ----------- ---- .. Fig.ure:25: Rotating the Dead Front Panel:.lr75ert it :�_a:.��-j f__�. 8. Determine-if a circuit breaker is required for the installation: If a circuit breaker,is•required, proceed-to the next step, "Install a Circuit.Brea ker in the.. . . .. .. Backup Gateway:" .. • If:n.o circuit breaker is.required,skip to Step 8, "Mount the:Backup Gateway: Step 7. Install'a:Circuit Breaker.:in the Backup Gateway If the Backup.Gateway is to;be located between the electrical service-entrance and the main electrica1.par)el, a circuit breaker must be add ed.to:the service I l.et.of:the Backup Gateway. if no circuit breaker is-required, skip'to Step-8, "Mount the Backup Gateway.":, . ... . . .. .. ®WARNING: If a circuit'breaker is not adcled tp-the Backup Gatewa ensure that:: . Y, appropriate overcurrent protection is provided for:the installation, •A CAUTI.ON: To reduce.the risk of-fire,'connect.only•to a circuit.provi.ded-With 200..A. .. .. maxirrium.b:rarich-circuit overcurrent protectiori;.iri:accordance With the.National Electrical .. Code, ANSI%NFPA:7.0. The following,circuit breaker models (purchased.separately),are.$up.ported: Circuit.Breaker Model A UL 7. ., ype Rating Current,at 50 °C Current at 30 °C • iemens MBK 100.A :: EQ8681'. ;100 A 87 A.'..: 100,A .. Siemens MBk 125A E08682 125:A 110 A '125 A Siemens MBK150A.. .. EQ8693_ . . .150 A 130.A. 150.A. . .. .. Siemens MBK 2-OOA::' EQ8695 :: 200 A 170 A.: 200 A:. ': 1. Determine'the level of o.vercurre.nt protection.required,uired, based on-local code re uiremerits. . :2.:Remove the service inlet terminal-lu s:from the Backu :GateWa. _ g p y. (It may be n:'ecessary to remove t e.meter current transformers to access the.M10 nuts holding.the lugs in place.) @'• Q .. .. Figure 26:• Removing the Inlet Service Terminal Lugs.. 30 Po:werwall Installation:Manual 3. Install:the corresponding size circuit breaker at.the service inlet terminals-in the Backup Gateway,.an'd-replace the M10 nuts to secure the.breaker. Tighten tho'nuts to 5.6 Nrim-(5.0.tb 4. Remove the appropriate.punch-outs in the.dead front panel insert for.the circuit-breaker.aa shown,below.- or smaller (1 .O:A or 125 A) circuit breakers, remove_punchouts B and.G;_for larger(150 A or 200.A) circuit breakers,:remove punchouts:A-andMMMUMIMUM B. - DIIE:M IN 7E11A SM=Ia~: Fig u.re:27 Dead Front Insert Panel Punchouts:for Circuit Breakers .- . tep: owt the Backup Gateway 1. Determine the mounting location. The Backup:Gateway enclosure:has 3 mounting.holes: <sh_own below in:.redj,,lf needed, two additional mounting points (shown below:in grey) are also available. To.use=these additional mounting points, the back panel must be removed and .'. the points drilled out. 267 mm (10.6 in) '41 mhi .. 528 mm 695 mm. .. (20's in) .: (27.3 in) 133 mm. .. .. Figure 28;:Backup Gateway Mounting Hole'L:ocations (Back View) .: 2. Drill pi.lot:hioles in the mounting surface for the fasteners. 32 : :.: :P.o.werwall instal lation:Manual 3. Attach the Backup'Gatewa.y enclosure to'the:mounting surface: Use a level tool to:ensure that the enclosure is level.. .. -- .. Figure 2. :. Mounting the Bac ,up:,:,ateway h_ 1 -; L �:��7:l ,r :.: .. :.:. ..33 . . Step 9._Connect PoWerwall and the Backup Gateway 1. Using the:provided Torx-T20:bit, remove the cover from the wiring compartment on:the:left side of Powerwall. . . : . Figure 30;: Removing the;Wiring Compartment Cover Depending on local requirements, Powerwall wiring can.be:installed through conduit or .. .. through a cable.gland. Refer to local codes to determine wiring.requirements: . . . --O � — O . 0000 �: 00 u O0 3 2::.: 00 0� L2a:d9 : I 0 35.rani i . (1.315 in) 77 Figure 31: Powerwall 2 AC Wiring Compartment Inlet.and Connectors' :1:.: Communication-OUT Connector. (out to next Powerwall in chain;.termination for single.Powerwall or for last Powerwall in chain) Communication IN Connector. . . (fPom Gateway.or from previous Powerwall in chain ).. . " 3 AC Connector 4 Grouri .Lug .• 34 .:Powerwall Installation:Manual 2. (Conduit:installations only ).Run conduit as needed and attach the.conduit fitting to the inlet of the: wiri.rig,compartment:The wiring compartment inlet accepts a.standard 1-inch conduit fitting' 50 mM 46 mm .. . i.l� .8:in.. j I _ _ _ .. '� �. :I� •. .. . ; I± E� I � r r 1.1 776:mm :.:I 76 mm' i (30.6 in) (3 n). . .. . .. 06i � mm .. I .. .. .. .. .. .. .. .. .. ' i ., (1.2.in) 31 mm:. Original.Location Updated Location. ..... Figure 32: Powerwall.ZAC Side Cable Port Entry Location 3. (Conduit installations only) If the conduit connector does not have an integrated bushing; affix the provided insulation bushing to;t••e conduit opening:on the inside of th.e,wiring .:compartment. NOTE: Ensure that all conduit joints and outlets have smooth edges sp that wiring is-not :.damaged as it is ron through the con .oit. : " - - - b •r it . .35 4. Run:the.4-conductor communication cable;-the:AC power conductors and equipment:- grounding 'conductor rohn t:e.'Backup Gateway.enc osure t roug -:the conduit or cable gland -.and-pull them into:the Powerwall wiring.compartment._ NOTE::The required'wire;gpVge for the 4=conductor communication cable depends:on the length.of.th:e cable. See "Wiring:Specifications" an:pa' 12. 5: On each end of.the:4-conductor communication cable.,:st�i:p.and insert the wires into the "provided 4-.pi.n corinectors.according'to the following table and diagram (Figure 33)..On.the ' ' Powerwalf side, use the black connector provided in the accessory.bag: On the Backup: Gateway side, use:the connector that came plugged into the corresponding socket in the .. Backup atewajr:.. :: .. ... .. 6. On the,Backup Gateway,5ide:of.the 4-condu.ctor:communication'cable., cut the cable shield. The shield should.be termiriated'a.t.the.Powerwall chassis.ground lug only... .. .. Figure 33:'Communication Connector Wiring Communication Connector.Wiring 'Terminal Connector Terminal Name'. 'R.ecommended Wire-Color Wire Gauge. Strip Length 1 12V+ (Logic+) Brown 2 GND (Logic-) White Blue: [See p:121: :.. 10-rrim (3/8'in} 3:::.: CAN HI 4 CAN LO.. . . .. .. Yellow ... . . .. .. Cable Shield/Drain Wire (Terminate atPowerwall chassis ground lug only) 7. On the Backup Gateway side,strip the end.of the equipment grounding conductor..and. .. insert it in.the ground bar in th-e;Backup Gateway enclosure (Figure.34j._The ground bar i' identified with the following symbol:. =:;:Tighten the screw ln:the Backup Gateway ground bar. to 5.5 Nm (50 Ib=-Jn). 8. On the:Backup Gateway side, plug the 4-pin connector into the 4-pin socket at thee bottom .leftb.f the enc osure:(Figure 34). :36 : :.:. . .:P.o:werwall Installation:Manual 0 O ow o a. - .. .. O 0 e . O o - o000000 ® ®� o ....-"Ground SHIELD- - - -- - !I �o 0 0 o a o0 o e0000 oo e:.: CN+ Figure.34::Bac up Gateway:Ground and Con emunication Connections. , 9. On th Pbw c.erwall side,:plug•the:4-pin connetor:into the bottbm'4� npi socket (labeled:"IN") in-the Powerwal.l..wiring.compartment, . .. . 00 I . 61- o00o L2Mail - GND ® I .. . . . . CN+ �. . - - M. SHIELD • - - -:'-:.:. ... . . . - w Ground. . . .'. .. .. . . .. .. Figure 35:.Powerall Ground..and.Communication Connections . . .. .. :.10.:Pl.ug the proVided:4=pin connector:with the terminat(ho:120-Ohm resistor:intb:the top 4-pih :_socket (labeled'OUT") in the Powerwall wiring compartment. (In multi-Powerwall'installations;, use this connector only in_thea,est•Powerwall:in tf�e.chain.) Figure36:-Connector Wit: Terminating Resistor: 000a ®W :� O o000 .. L� a �� � . i. 133) . .. :. Figure 37: Powerwall.Communitatiori:Termination 11. On th.e Powerwall side, strip the end of the e.odio rent groundino'dbaductor and wrap the: communication"cable.drain wire around the grdunding.conductor.lead. 12'.'lnsert the grounding conductor and drain wire in the-Powerwall chassis.ground lug (Figure,'. 36). Tfie:ground lug is identi;fiec{ with the following:symbol: —- . Tighten the screw in.fhe :: ground lug to 4::5 Nan:(40 lb-in). 38 " " :Po.werwall Installation:Manual . . . .. .. Step 10;:Make AC Power-Connections: 1. Determine:whether the installation requires that neutral be bonded to ground in the Backup Gateway. In most cas:es,.if the Backup:.Gat:eway is to be located.between the:electr.ical service . . ..... . . ..... :entrance and the main electrical panel;-neutral should be bonded to ground. Otherwise, bonding should be removed: .The,Backup Gateway;ship ' with neutral bonded to ground:.:To remove bonding,;disconnect :and remove the green wire between the ground bar and the:neutral terminals. . . ® o CID O . . o0 ° o0 00 00, . .. 'Figure 38: Backup'Gateway Ground Bar (top left) Bonded to Neutral (bottom right) .. . . . .. . . . . 2..C.onrtect the-electrical service from.the service inlet or fro.m.the maih panel (depending'on ... . . .. .. the backup configur t on) to the Backup Gateway source connection terminals according to the followingtable''and diagram.(Figure 39). Strip the ends of the wires and insert them:in the corresponding Backup Gateway'terminal lugs.-Tighten the lugs to 3.0 Nm (22 lb-ft). 'NOTE: For electrical service connections to:the Backup Gateway, use 16-120:rrim�.(6 AWG to 250 kcmil),-9.0 deg C minimum.copper (Cu)-wire. Backup Gateway AC Wiring Service Connection :Backup Gateway:Terminal Wire Gauge Strip:Length Line'1: : S1 C6 120 mm2 Line 2 S2 .A. . G- 250 kcmil) Neutral 11 r._ .: - ® o : . 1 ® Source Connection S1 . :.:. .. S2 ' •: . :.:. .. O O o 0 o N. O OO. O® O OO DO OO OQ OO L1.L1. .: L2 L2'. -N N . . . . .. .. Lo ad . . coons � • o.o o . .0.: .. Figu.fe 39: Backup Gateway'Power Connectors (shown with circuit breaker installed),: . 3::Connect Powerwall:to:the main or sub electrical panel.of the Installation (depending on the' backup configuration) according to the following.tables; for your:electrical service type:.: NOTE: For AC power connections to Powerwall; use 6-10 mm? (10=8 AWG).90.deg C M. :.: .., minimum copper.( u)wire. .. . . .... . . _.. 120/240 V Solit�Phase Service Main/Sub Panel:Breaker Terminal POwerwall Terminal : Wire_Gauge :Strip Length Line.l Ll Neutral.: : N 6-10 mni2-(10=8 AWG) 13 mm.(1/2 in): Line 2 L2: :.:. .. 40 :Po.werwall instaIIation.Manu81 - 4.'On the powerwall side, strip:the ends of the wires.and attach them:to the corresponding. leads on tfie:AC power harness::using the provided;WAGO lever nuts:.:: 5: Plug the AC powerharness into the:AC connector in the Powerwall wiring.compartment. Ehsure..that.the connector.clicks.into place. Pq FIT T — - a :.: i� oaoa � �1 ®ONl .. . . . . .. �� ... . . . Off. .. �.. �. �.. .: (.�.. i 1 .. �. . ..Figure 40: Powerwalt 2-AC Power Harness Connection ... NOTE: The Powerwall connection.to the main.elbctrical anel re uires a 30 A circuit breaker. P. . .. .. d Nand where the maximum supply short circuit current rabrid does not excee'd:10 kA..This "breaker serves as the,disconnect.for-the Pow.e.rwal.l,.and must be..w.ired in accordance with.. local widng:eodes and regulations: 41 . .. . . . . Step:11.;.Install Energy-Metering for the System The platement of meters and current transformers (CTs) depends'on .the backup :.configuration of'fhesystem (whole:h6m.e.or partial home) ai'd whether the.sife:i.ncludes solar:- . .. equipment. The.Backup Gateway includes a,pre-configured meter unit and two pre-installed Ts. ..Meter Communi.catioin:with the Gateway .:The Backup Gateway:comes with the meter pre-configured for'wireless Wi-Fi communication with the:Gateway. :-As an alternative to-wireless communication, it is possible.to:establish wired communication between the meter and'the Gateway using an optional 2-conductor meter communication harnes's (Te"sla.P N 1133339-00=A).. Up to twd:rrieters can be wired directly to the Gateway: . Installing Optional:Wired Communication Between the Meter and the Gateway.: If the meter is located outside the Gateway, the harness leads can be extended by splicing additiona.l:-wire.to the harness;:See "Wiring Specifications" on page:15;: . . The meter antenna is always required: even if the meter: is located inside the Backup Gateway-: .enclosure or connected to the Gateway using the optional.wired communication harness. NOTE: Tesla:recommends connecting the met(:Y.r)via wireless Wi-Fi rather.than using a.wired: connection. This.is because the meter.receives fi'rrriware.updates with new features and improvements, but:6h.ly.if the meter_is.communicating to.the Gateway via Wi-Fi.:Firmware updates are not possible when the meter is using.wired communication: If you must use.wired communication, connect the.m:eter to the gateway:wirelessly first to update the meter.. :: irmware, t en transition to wired communication. 1. Plug.the 2=conductor harness into the port.o.n the top of the meter. 1 2. :3:. .. aoa . 4 5. r �. .. .. .. . . . .. ..:.: :. . , Figure:41:Meter Communication Port Connection on Top of'Meter: . 42 Powerwall Installation:Manual 2. Connect;the harness leads to the Gateway Meter Communication ports by inserting them into the corresponding connector;according to.the*following table and'diagram (Figure,42). NOTE: If the meter is located outside..the.Geteway, the harness'leads can be'extended by splicing additional wire to..the harness. . . . . .. .. ... . . .. .. 1 2 3... . . .. .. #2:. 8 .. 1 #1 s 66 6 ... . . . HO2 o00000000 0 ' i. O. .. -® —®®®®— . _ .. _ .. ®.. ® ® o a ®o 0o o ... . .. .. 123456 ... ....: tAni.:f."*ned " Figure 42: Meter Communication Wiring;.: :Meter#1 Meter Terminal;.; Gateway Meter;.; Wire Gauge,: Strip Communication Port Pin Communication'Pin Length 3 RS485 B 3:. : . . 62 .5 mm2 . 6 OS485 A 2 (24-16.AWG)or mm (Harness shield);:. (GND/Shield):::.: 1 CAT5 (244 AWG) . (3/8 in) ' Meter.'#2 Meter.Terminal Gateway Meter Wire Gauge :Strip::.' Communication Port Pin 'Communication Pin . ..' Length 3.: RS485 B : . 6 0.2-1.5 rrim2 10 mm Li 6 RS485 A 5 (24-16 AWG)or (Harnesss:hield) (GNpfShield) 4 :::.: CAT5(24 AWG) (3/8 in) 43 Meter.Voltage Taps The meter ih the Backup Gateway is pre-wired for:operation inside t deackup Gateway .enclosure. If you need to remove the meter from the Backup Gateway in order-to-move it closer to a metering point, use the voltage line harness provided in the meter:kit to install the correspohding.voltage taps:ih thb.electrical .pane.•::.: . ... .. Before relocating the meter, modify:the.provided voltage line harness by combining the blue .and red leads. in Figure 43: Voltage.Line Harness with.Combined Leads. . . .. . Current Transformer Placement' CT p acement ocations inc u e the following: Site-(Grid): CTs'are.placed betweeh.the'service entrance and all loads to measure both load • and generation. Solar: If the'site includes solar equipment,-an additional;CT pair (Tesla P/N.111.2477-00-x) is required. These additional CTs are placed:after the solar irive.rter to measure the:solar output. Load:Sife and-solar meteri1.ng are.preferred. However; in whole-home backup configurations: .where it is not possible.to locate CTs between the service entrance'and the.utility.meter, load... . . .. . metering can substitute.for site metering..For example; loads could be measured by placing CTs at-the inlet to a subpanel:containing*breakers for the oads: . . : :. .. 44 :Powerwall Installation Manual Voltage Tap and Current Transformer Connections Voltage•tap:s and current transformers must be connected so they a.re:measuring the'same p.hase.' They most correspond according to the following table and diagram (Figure 44): .. .A B N C q g : C : : : .q Figure 44: Voltage Tap Port (left) and four CT Ports (right) on Bottom of Meter Meter Voltage Tap Port• Phase � � . . : .Meter CT Port Site Ll A . . . ..... .. 1 .. /q " Site L2:. : : : PAC.* 2/B: . Solar L1.:' 4/A' . solar L2 : :3..C .. *With combined leads in,voltage line.harriess, ports B and C are equivalent (correspond to L2) Meter Placement and-CT Wiring Lengths CT:leads are 1.5:m:(5 ft) long and can.be:extendecl to a maximum length of 15 m (5.0 ft), as follows: • For a total extended length of up to 4.5-m (15-ft): CT wiring,can be extend ed.with:up to one 3:m. . ft) CT extension kit (Testa P/N 1125547=03-x) •' For a total 'extended length of:up:to 15 m (50 ft): C'T:wiYing can be extended by using wire wit the o owing:properties: o Shielded, twisted pair with drain wire o Wire gauge of 0.2-1.S mm�.(24-18 AWG)': o Voltage rating equal.to or greater than all other circuits in shared en.closures or . raceways If the distance.between the meter, and the CT is.greater than 15 m (.501t),.the meter can be relocated;or a second.met.er.:can be used..When:the meter is.relocated into the main panel 'use the.antenna extehsion.to.place the antenna.on.the outside of the panel. J ... . . .. . 45 . .:.: Current Transformer Orientation CTs must.be'installed with'the label on the CT housing pointing toward the power source,: according to thefo lowing table and diagram (Figure 45):. . ..... .. Figure:45`.:CT Orientation:in' Relation to Power Flow = CT'Usage CT Orientation Site CTs':::.: CT.label facing toward.the service en.rarice grid Solar CTs -CT label facing toward the solar inverter Load CTs CT label facing.awayfrom the loads Current Transformer Capacity Each CT in the Backup Gateway and.i:n'the available accessor.y.kits has a capacity of 200 A. If the wiri.n configuration allows; it is possible to ass multiple cohductors of the same.t e. g.. p i?... p through'a single CT, provided the sum of the.conductor's current.ratings.does not exceed the CT:current handling:capacity. This is.especially useful for systems with multiple:solar inverters.'. :.:.: E e : . e, .: e . . ..... . . ..... ..Figure 46: Multiple.Conductors Passing Through Single CTs' 46 :Po.werwall Installation:Manual q. If a site.has, multiple solar inverters spaced far apa.rt;.or if a main panel has two main breakers (for example; 400 A service with two 200 A breakers), a Y-splitter cable(Testa P/N 1129625- 0.0-x) can be used to conhect two CTs:on the same phase:to a single meter port. .. e e .: e " Figure 47; Y-Cables Connpcti.ng'CTs on the Same Phase 800 A CTs are also available for largerservice sizes (Testa P/N 1447689-00.-x). The 800 A CTs. do not require a special Neurio:Ener gy meter;'butahe 800 A CT option:must be selected in the Commissioning Wizard drop:down menu on the CT page: If using.a Y-splitter with 80.b:A CTs, total current should not exceed 800.A.:...: Metering Split-phase:Solar with a Single.:CT :Metering a split-phase'solar inverter.with''bne Current Transformer (CT) is supported with firmware.version 1.37 and:later::ln this configuration,'connecting a's.ingle CT to one of the two PV inverter output phases allows total power output to be calculated by:software. :hb single CT must.be installed on the phase that corresponds to the same'CT port on the meter:(phase A'or B). It.is.possible to meter multiple s lit hase solar inverters with one CT,-if the-solar.inverter .circuits are physica[ly.:near each other:.. ... .... 1. Install both solar inverters.with the same phasing ' . ... . . .. .2. Group all.condu.ctors•of'the.same.phase-together.to.pass through a:single.CT 3, As with a,single inverter, it is.inipo,rtant that the.phaise of this CT matches:the phase of, .: .:the.:voltage reference:on the meter $ee.Steja 13.• Commission the Svstem for,details-on configuration and verification of single,-CT .,. . . .. .. monitoring. ; 7 "Whole-Home"Backup For whole'hiome backup installations where the:Backup Gateway is installed between .electrical service-eritrance and the etikity.meter, and ahead:of-all"loads (Figure 4:8),.do the 0 owing: • The pre-wired voltage taps and the two pre-installed CTs in.the Backup Gateway are• correct y:positioned for this:configuration, and do:not need to be'relocated, " If the site includes solar e ui• q pment, place additional CTs on the solar Ll and L2 wires in. t:e e ectrica pane:"' 48 Po.werwall Installation:Manual ,Utility Meter.: US. L•2 N O i rrI .. . A,� A Smeae B ! + � s s .. .. .. N A Meter CurM .. .. . Meter Voka�Semois GND L1 L2 .N ... .. .. ... .. .. .. .. 'Main Pmal I .. - .. .. .. rr .. .. F f. . e ® ® �e • �.nL2— Hom e N.. Loads — — —GND . e .. .. e .. A e e . .. ... ... .. .. 11 :.. SolarLI 66 ... l Powerwau ... L.2T. Figure 48: CT Placement for Whole.Hotne Backup . Partial-Home Backup For partial-dome backup installations where the:Backup Gateway is.iristalled on the load side :.of the main breaker and feeds a subset:of all loads (Figure 49),do the following: :, . • The:pre-wired voltage taps in the Backup.Gateway are correctly,positioned for:this. configuration, and do.riot need to be relocated. • Remove:the:two CTs from the-Backup Gateway:and:piace them on:the;correspond ing:: power wires in the main panel, between the utility:meter and ahead of any Toads. . : If tfie:site includes:solar.equipment, place additional CTs on:the solar Ll and L2:lines'in -t.e electrical pane NOTE: If a panel co.rnponent (such as:a E Os-bar) prevehts.placement of both CTs between the' ::. utility meter and the main:breaker, one CT can-be:placed on each side:of-the main breaker.;-If this is done;first ensure that:the main breaker L1 and'L2 terminals are not reversed on.the load side..(If the terminals:are reversed, ensure:that the line=side and load-side CTs are placed on .. ... :the a,ppropriate.li.ne.): 50 Powerwall Installation:Manual Utility meter. .: . ... . . .. .. A .. .. - .... MabrGm�a6mroae L1 Loads. . ... —CND- .. - .. .. L J ... .. .. ... w. a:I C,I A. ' .. .. - .. ='1 f LN NllOf��0981fpG! �y�4' .: .... I' .. .. .. .. ..: .. Bub Pontl N ...� � ... .. .. LEI MI ... ... A :M $17 =L2�.�BflC aam.B.sma.mn kup .. .. GM Ll— ..... L2aemIn L71 4 Do o" Ff WQAVI .. .. .. ..-t-_..._.___._-_.. .:�pW-.....ram---- - .�-�-_-•. -.. _-�I .. .. Figure 49: CT Placement for Partial:Home Backup li :: :.I�__ 'f�� 51 . Partial-Home Backup with:Meter Relocated to:Main Panel For partial-home backup iristsflations where the Backup Gateway is more than 4.5 m ()5 ft) :.away from the rnain:panel, the meter can be removed frorn;the_Backup Gateway and relocated .:to,the main panel (Figure 50). To remove the meter from the:Backup Gateway: 1. Unplug the pre=wired voltage line 4-conductor harness and CTs from the.:meter. .Leave.the other end .o.f.the harness connected to;the Gateway,.and secure it.out.of.the wa :with a cable tier: 2. Remove,the meter and CTs.from the Backu Gateway enclosure: ..; p: 3:- Remove the antenna from the meter enclosure and set it aside. To-install the meter. in-an'electrical anel and mount the:antenria: ..1..Using the self-drilling:screws provided.in.the meter kit; install, in the panel. . ..... Cheese a location that fakes into account the voltage line harness and CT cable.. lengths; and:that allows access to the-meter communication ports and:the antenna connector:.. .: 2; Remove a 1/2-inch:or 3/4-inch knockout from the main.pariel'enclosure near.:tke: .: meter location. . 3. Connect the ante.nn.a.extension cable to,the antenna connector on the meter. . .. .. 4. Remove the nut'at:the antenna end. of:the cable, and thread the cable through the. provided antenna mount plug that:corresponds:to the.panel knocko.ut'(1 .2-inch or 3/4.. inch)..Replace the.ca.ble nut.and attach-the antenna to the end of the cable, 5.:From the insi e o .t e pane, insert thb-assembled antenna mount through.the knockout an-d:snap it into place:::;.: To wire the,voltage taps:: 1. Plug the modified voltage line.harness into the meter. 2. Connect the voltage line harness leads to main panel terminals as follows: ... . . .. .. Voltage Harness Port/Wire-Color Panel.Connection. :A:/Black L1 breaker:terminal (15 or:20 Aj.: B+C/ Red L2 breaker terminal (15_or.20 A) N White.:: .: Neutral bus bar: .. .. . -: NOTE: If there are'-no empty breakers available in the main panel, use the'provided:jumper wire and to connect:the voltage line harness leads to an:occupied breaker terminal. Replace the:existing wire with a jumper, and connect the existing.wire:-and the voltage harness lead to'the juniper with a wiretap. To locate.the.CTs: • .Place the two CTs.from'the Backup Gateway on the corresponding power.wires'iri the . main panel- between the utility meter and ahead of any,loads. • ..If.the.site includes.solar..equipment, plac.e.ad.ditional CTs on.th.e solar Ll and L2.lines.in the electrical panel,-.: .: 52 :Po:werwall instal lation:Manual .. .. Utility Meter . - e ' ... ... .. . ... .. 9 Home.. ..... Loads .. .. .. .. . ..... ..... .m m B ..... ... N . ..... ..... .. QND .. .. .. Lt L2- N ��;� .. . . aI .. .. .. .. .. : . .... - .. . GNDL1 L2 re . . ..... q e " [n ® L2�.: Icup Loads . GND.—. .. .. .. . ..... ..... ... a ....: .. .. .. ID 10 e —Li Lt. t .. .. '301ar: L2� ... I • _- Figure_50::Voltage Tap and CT.Placemeht:for Partial'Home Backup with'Re located:Meter • Whole or:Partial-Home Backup with' Two Meters:.: For whole= or partial-horne backup instal latioris.where access to'solar:equipment is difficult, or ..where the Backup:Gateway is more thara:10,5 m (35 ft):away from the circuit:breakers for the-: - . ..... . . ..... :soar equipment.(F:igure 51), use a second meter to monitor solar energy production. ... . . .. .. The.first meter remains*in the Backup"GatoWay. The pre-Wired:voltage taps and the two pre-installed CTs in the Backup Gateway are correctly positioned for this configuration,:and do not need:to'be relocated. Th"e second meter:is Installed in the solar.subpanel. Follow the steps in the previous" . ..... . . ..... -bctibh'to install the second meter and wire the voltage taps in:the solar subpanel.: 54 - :Powerwall Installation:Manual . M.arowiemsan,aa .. ..Utility, eter._. .. 12 LI �.. .. .... G IND + Neln aar�el . L2 I: .. LI . g .. f . i.: .� .T � • ' �. � —Lz .. .'Home -=GND— I•�G 1 a a .. GND .. ':N.. ..... :. .. .. rr ' ... .. .. fI . ... . . .. .. .. .. f� GND Li L2 INo . " BackUp..—GND- .,: ' ® ® ® .�' Loads:. . ... a ... . . . .. . . .. � _ _ Solar : GIND . . . :L2 it s. .:Parawei' O . ,C711r; El Figure 51: Voltage Tap=and-CT Placement for: ac Partial Home;Bkup.with Two Meters:' L2 .: :. Ja Step:12:..Close the Wiring Compartments, Apply Labels,:a.nd Turn On the:::: : . .. System . . .. .. .. 1'.:Before closing any installed hardware;take photos of the:completed wiring in:the Powerwall;..: Gateway., and. electrical panels.. . . ..... . . ..... . . ..... 2. Ensure that all conduit or cable gland junctions and.cable entry.points are secure and properly sealed.: 3. Arrange the.communication and AC power.wires:inside the Powerwall wiring compartment. . .. .. 4'. Replace the cov.e.r.:on the Powerwall wiring compartment: Ensure that the cover seats properly on the gas.kbt so that the compartment is sealed: Using the provided.T:orx T20 bit, - tighten the:fasteners to 1.5-Nm (13 Ib=in). - S..Replace the left side..cover on Powerwall by pushing the top into'place and.wor.king'toward.. . . .. .. th:e bottom to reattach it to the clips along the length of the:.'nit. 6. Replace the-Backup Gateway dead front panel and-secure it firmly.with the original screw.. .::,.emount the. .acku.p Gateway door,;. 8. In all installations where:the.Backup Gatewayisinstalled at the,:service entry with a circuit . breaker;apply the supplied-labels as follows: Apply the supplied rating label.(Tesla P/N 14532537xx-y) to the inside'.of the Backup �o':Gateway door so that:its tali ns with:the bottom of the label-already. ... p g Yin pace..:: .. • Apply the supplied warnin.g label ("Service Disconnect," Tesla P/N 1453241-xx-y)to the Backup Gateway.dead front Panel,:next to the circuit.breaker. :.::.Figure 52: Apply.ing the Rating Label:(Left) and Warning Label (Right) 56 :Powerwall instal lation:Manual 9. Close and latch the Backup.Gateway door..:. .. .. - NOTE: If t e Bac.kup•Gateway is installed.outdoors or-in a high-traffic area,.the latch can be locked or zip-tied.shut: 10. Switch on the AC circuit breakers in the Backup.Gateway and for:Powerwall. :.11.;Switch on Powerwall by moving the.switch on the right.side of the unit to;the ON position. .:When Powerwall establishes communication with the Backup Gateway, the LED:on the right side of'Powerwall illuminates.:::. : .. . . . Figure 53: Switching:Powerwall On Step:13.. Comirnission the:Systdm Commissioning Overview. . . . . .. .. ... . .. .. Connect to the.Gateway: The first step:in.:commissionihQ:is to connect to the Gateway, which: .. . :::.: then allowsyouu to set up.lnternet connectivity and configure the.system. Establish the system Internet connection: Powerwall.must be connected.to the Internet in 'order to receive firmware updates and transmit performance.data. Internet.connectivity is handled by the Backup Gateway, and-can be established over Ethernet and Wi-Fi networks. Cellular.is available as a backup .when Ethernet and/or Wi-Fi are:disconnected. Configure system:settings: The Gateway has abrowser=based Commissioning Wizard that . ..... .... guides you through system configuration: Comrrm signing Procedure :.I,:Using a computer,:smartphone, or tablet:establish comm.u:n:ication with the.Gateway in one:. -:of:the following ways` Ethernet.. Connect a cdmp.uter to the Eth-ernet:port of the Gateway with a standard CAT5 or CAT6.Ethernet cable . . .. • .Launch a browser'and,enter the following'IP address: http:/%192.168.90.2 Wi�-Fi • :Using,a Wi-Fi capable computer, tablet, or.:phone, connect to:the Gateway Wi-Fi:::.: network, which a ears:as."TEG-xxx,".where xxx are the last 3 di its of the Gateway. serial nurh er. - . • ..Wi-Fi.Password: Enter. the full serial number.of the Gateway (such as"ST17C0000112"). • Launch:a browser:and-eriter the follow irig IP address: http://192.168.91.1 or http//teg : . NOTE: If the Gatewa:y.:Wi-Fi network doesn't appear or. the:connection to the Gateway fails, power cycle the Gateway_and try connecting,again.. 2. Once corrirriunication is-established, the browser. should show the login page to the Commissioning Wizard. If it does not, click Run Wizard:. . " 3. Log:into:the Commissioning:Wizard: • Username::Enter the installer.. e-mail address :. • Password`-Ehter-the full serial number of the Gateway (such as "ST1.7C00:00112") :Click Continue 58 Po:werwall Installation:Manual 4. Connect.the Gateway to the Internet by the following means (listed in order of preference). NOTE:.Ensure Wi-Fi and Etfie'rhet connections are both,configured:for best performance. Cellular is availabl.e'only.as a backup connection when Wi=F and Ethernet connections are lost.. Ethernet .:::.: In the Commissioning Wizard, :click the arrow for Ethernet Choose DHCP.(most commoh):or: Static (only if riecessary and you know the Network settings) Click Connect :Wi-Fi (2.4 GHz) In.th.e Commissioning.Wizard, click the'arrow for Wi-Fi • Enter the home Wi-Fi network:name (SS ID) Choose the:security type (most-likely WPA/WPA2) . ':Enter:the network.oasswbrcl Click the blue arrow .:NOTE: Cellular connection should only.-be' relied on as fallback connection:if W'i-Fi and/or Ethernet-.is lost. 5: Click Check Connection to verify-that-the Internet connection is working;.Click Continue. NOTE:.If the.Commissioni.ng Wizard-stalls or fails,.refresh-the browser.t.o ensure that.the.. .. Wizard-page shows the current:state of the system;and try connecting again by repeating .. steps in procedure#.4 above..lf refreshing the browser.doesn't work, check the.connection to... . . .. .. • t e Gateway network.:(You may need to:repeat procedure 91 above to reconnect-to the Gateway.network.) ... . . .. .. ... . . .. 6,.C.Iick Check fo.r. U.pdate to apply any.firmware updates.to.the Gateway-and P.owerwall. After.. . . .. .. ;th6 update is staged; click Update. Afterthe update is complete, re-establfsh:corinection to the.: Gateway. and-the Internet, starting with procedure_#1 above. 7..Select-the time zone for the installation and.click'Continue.. :8.:On the Powerwall screen, click Scan; and'ensure that•tfie correct number of Powerwalls appears. Click Verify Powerwall.to verify communication with the Rowerwall units. Click: : Continuer .:9.:The Gateway automatically detects:-the grid and selects a:grid code, If the.system is off-grid, select.Off=-Grid.and choose the:appropriate grid.code.for the installatibri..Confirm that.the selected code is correct, aril click Continue. .. :10:'On the Gen erati.on:screen, do the'follo Wing: If the system has solar, do the following: Choose the solar inverter brand:::.: • ..Choose the-solar-inverter model • Enter the lower value ofi:the PV array's'pbwer.ratings (DC or AC).: .. . ... . . .. .. '.:.:If there are additional solar inverters,:.click Add Solar.and.enter the corresponding information for each.inverter.. If the system.includes a generator, click Add Generator. Select the disconnect type for:the generator. . . . .. . ..... Enter the,generator man ufactu:rerR model, and serial number. • Enter the generator power rating in Watts)... ... . . .. .. .. When-you are finished.enterng generation information,..click Continue. 11. Th.e system automatically checks,for,pre-configured.energy meters. If necessary, you can manual l establish connections:.to-meters b doih :the followin Y y g following: (After. each meter:is added, you.may need.to.reconnect to the network with:your mobile device.) • If the system is connecting to'a Wi-Pi energy Y g 9Y meter :o.: Turn off the.power to the energ y.meter by removing-t:he:4-pin voltage. connection'from the meter. o E:nter:the.-Meter short ID o .. Enter the Meter.Serial Number..(Starts with''OBB")-and.click Connect... . . . .. o: .Turn the ener meter back on-b reconnectin the:4-.pin voltage e con.. gy__. Y .. g .. p � g . . ... the-meter. Ohte the meter. is turned on, you will have 60 seconds to connect to.. . . .. .. the.meter. . . :.o Click Connect • '.If th6'system is cohhectirig to a wired energy meter, o Click:DetectWired Meters o Note: If the energ y meter is connected with a:wired connection to the gateway, the meter Will.ndtb.e able to receive firmware updates-for new features:and: . i ovements: A Wi-Fi connection is recommended:whenever possible:: When you are finished entering meter information, click.Continue. 12. Confirm that each meter:shows "Successfully:Connected." If it-does:not, refresh the:: ..b'rawser, verify thattho ID and serial number were entere:d:c:o:rrectly, and click:Check Meter .:Connection. . ... . -.- 13. On the.Current Transformers screen do th&fd116wing for each CT in the system to-erisure that it is in the correct_lo.cation and:orientati,on: • -.Select-the applicable.function (Site, Solar;.Solar•(1 CT•x2), Generator or Load): • Adjust-the Amps/kW slider to see what the:CTs are reading... Verify the on=screen values for_the-CT against the_applicable meter(such-as the solar inverter meter or-utility meter):: I f.necessary, select th0FIi .checkbox to:inVert.the oIarit: :o.f:th6 CT readin p Y g:so.that: . o Site CTs are•positive when importing, negative when:exporting o So.lar:CTs-are positive.when the PV array is producing power o Generator. CTs are positive when the generator is running o : Load CTs are:positive when power:is:being consumed:::.. To:configure a solae:ihVerter with ohb:C•T, select the Solar:(1 CT x2) option from the. ..... .. .:dropdown list on.the:CTs page of the Commissioning Wizard. = Ensure the CT has'been:'installed on the phase as indicated in'the-Commissioning Wizard page:and.on the Neurio Energy Meter. • When metering two solar inverters, you must either meter each one independently with th4ir•own CT using:the Solar (1 CT x2).opt:ion, or meter both:together by combining 60 III t II:Po.werwa ns a ation:ManuaI ..conductors'of the same phase with only:a_single CT using the.Solar (1•CT x2) option as' described above. NOTE: Negative power flow:may indicate CT is installed on the wrong:phase! ' o If the "toward source'. CT'label is correctly.facing the solar inverter, but power flow is negative:the.CT is likely:connected on the wrong phase of the:solar: : " "inverter. o Physically.move the CT.to:the correct phase:With the label facing.the correct direction..Do not use.the Flip.checkbox i.n as this ce. • :'NOTE: Solar CTs sliouid.only meter generation sources! It is-never recommendecl:to •meter both generation and loads using-the Solar (1 CT x2) option. If absolutely unavoidable to meter solar independently from a.small amount of loads,you must ..install.the solar CT..on.the.phase without.an.y.dowristream.loads'. 14. On.the�Operation Settings screen, name the installation site, set-the,operation mode;and, set:any required export limitations (depending on your region),-and click Cont%nue. 15. On th:e System Test screen, click Start to initiate the test. 1.6. On'the Installation•Information screen; choose or enter the installer Company Name, Tesla Account Number;and: Phone Number... .: 17. On the Customer Privacy:Polfcy screen, have the homeowner review and complete:the: .: form. Click Continue:. .. :18. On the.Customer Information,screen, have the•homeowner enter.the.requested information. Click Continue. 19.-Verify the information in the Registration Email scre'E' 'd click Send. 20. Verify that_Powerwall:is capable of char' ing.and discharging,correctly. The Powerwall LED should be pulsing (changing:brightness slowly);: Step 14.:Finish 6nd Demonstrate the Installation 1. After.installation is complete; remove the protective film from Powerwall. 2: Remove the plastic straps from the:left:and right side covers=by cutting them-and carefully pulling them through the slots-in-the covers: 3..If.necessary, ask the.homeowner.to.download and install the Te'sla mobile a p.p and connect,., . . .. -. to the system. : . .. . . . .. . . . . 4. Demonstrate the capabilities:.of-the Tesla mobile.app. :.S::Simulate an outage by opening the:main breaker and show-that Powerwall.is powering backup loads. 6. Leave the:Powerwall Owner's Manual with tfie.owne'r of the newly.iiistalled system;w.ith•alI :,system serial ..nu.mers:recorded in the,back,inside cover.;. : 7.'Archive"the photos from the installation. Troubleshooting .. .. If Powerwall:is not working'correctly, perform the following steps:" • Check the-status of the LED on..thb right side of.PowerwaII. The LED:indicates status'as:follows: LED State Indication On (solid) :Powerwall enabled/Communication"with Backup Gateway;.: Njgh voltage may he present on Powerwall AC connectors On (flashing) : : :' . Powerwall enabled/No com.muriication with Backup Gateway; High voltage may be present on Powerwall AC.co n nectors .. .. On (pulsing) Powerwall enabled and charging or discharging :�Rate.of ulsin. . p g.proportional to power flow . Off Powerwall"not:enabled or s.witche:d off If it is not possible to communicate with the Backup Gateway through:the-Tesla mobile. . . . . .. . . . . app, ensure.that the home Internet connection is working. • Ensure that Powe'rwa.11:is:correctly connected to the Backup.Gateway, based-on the. , Wiring diagrams above and site design information. .:A.WARNING: Before.opening the Powerwall wiring compartment; make sure to .switch off the AC breakers for Powerwall.and the Backup.Gate:way, switch off the AC disconnect (if:applicable), and switch off Powerwall.: :WARNING: Switching off Powerwall disengages the En.ab.l.e.line blut'does.not.. .. ikbhhect AC vo tagd.:Hidh voltage may:b(.j present on the'AC connection leads .: unless the Backup Gateway;any.associated circuit breakers, and the AC-disconnect (if: ..... applicable) are switched off.. • If a brownout or blackout is experienced during backup operation: reduce the loads and check tliat:the breakers.have:no.t opened. • If Powerwall does not operate:and the ambient temperature is highJ'cr 'as;e ventilation. if-needed. • . If the Backup Gateway and Powerwall are both unresponsive: 1. Turn off Powerwall by setting its On/Off switch to'the OFF position;;. 2;.7urn off the AC'breakers for the system ($ackup Gateway.and Powerwallj., 3. Wait at .east:one minute. : - .. 4._ ,urn the AC breakers back on. - . 5. Turn'on Powerwall. 62 .:Powerwall Installation:Manual Technical:Support Resources for'Certified Installers, including service:request forms and the latest versions of installation manuals,:are.available at httb-s://w"w.tesla:com/s'upport/nowerwall. If further support is needed,:contact'the Tesla Service team at the support phone number for' your regioh':Support numbers for all regions are found at: .. https: m p www.tesla:co suport pw-e . .o rwall.. ... .. This information is useful to'have ready when'contacting Tesla: a. .- wner name: • Best point'of contact for Tesla to:refurn contact(narne,' phone number, ernail) • Powerwall part number and serial nurxiber::: • . Gateway part number and serial number :.:.:• Brief description of the issue'. . ... . ... Maintenance :.Powerwall does:not require pre-sc hod uled'preventative maintenahce. The:orily maintenance ... required by an owner-is to keep the unit free and clear.of:debris, especially-around the air intake:and:exhaust. .To clean PowerwaIj;:use a soft, lint-free cloth. If needed; the cloth can be dampened with mild. .:soapand water ohl y.:Do:not use cleaning solvents to clean Pbwerwall, or expose Pbwerwall to flammable or harsh chemicals:or vapors. .. .. .. Appen.dix-.A: Wiring.Reference Powerwall :.:.: _ 0000OUT ... . . .. . v�. i . w. rL Powerwall Wiring . Terming Name Recommended:Wire Color :Wire Gauge 1 12V.+ (Logic+) Brown 0.871.5 mm2 (184 AWG), : . :2:: .G,ND White,.: 0.8-1:5.mrn2(1.8-16 AWG) . . . .. .. 3 CN.+.(CAN.H1) Blue 0.2-1.5 mm2(24-16 AWG) 4 CN - (CAN LO) Yellow 0'.2-1.5 mm2(24-16.AWG) z Line Re' 6-10:mm. (10-8 AWG) .6 N.(Neutral) White'. 6-l0,mm2 (107'8 AWG) :.: 7 Ll (Lihe 1) : Black 6=10 mm2 (10-8 AWG): .. .8 . Chassis Ground.Lug. .. Green or Green/Yellow. .. . 6-10.mm2.(10-8 AWG) 64 : :.: P.o.werwall Installation:Manual . Backup..Gateway i.. : to} ,fl E o0000000a O F' ..G . ..H'J - J1�;_: ✓_ i ®® . o 0000 0 0 00 0 0 000000 0 . . 1234.: 123456 ' :.: Powerwall: . :.:.: Meter .. . . . ;: -- --— :-Backup Gateway Wiring Terminal Name Recommended Wire Color Wire Gauge. Powerwall Communication 1,.. 12V+ (Logic+. Brown: 0'.8-1.5 mm2.(18-16 AWG) 2 GND White : 0.8-1.5 mm2.(18-16 AWG) 3 CN +:(CAN HI) Blue 0.271:5 mm2 (24-16 AWG). :; 4 CN (CAN LO) Yellow 0,2=1.5'mm2(24-16 AWG) Meter Communication • 1 GND/Shield • . .. 0.2-1.5 mm2(24-16 AWG):.:. .. 2 RS485.H1:#1 Red 0.271.5:mm2(24-16 AWG).' RS485 LO #1:: Black: : : 0.2-1.5 mm2'(24=16-AWG) 4 GND/Shield 0.2-1.5 mm?(24-16 AWG) 5 RS48-5 HI.#2 Red : . = i::.: 0.2=T,5.mm2 (24-16 AWG):.:.: aw 6 .. .RS485 LO#2... . . .. .. Black .. .. 012-1.5 mm.(24-16.AWG) ... . . .. .. Backup Gateway.Connections A Ethernet CATS or better B Ground Bar Green or Green/Yellow 2.5:=70 mm2 (14 AWG--2 /0) C:. :Line l Source:(Sl)*:-:.: Black:::.: 16-120 mm?(6 4WG-250 kcmil).'. D • Line.2 Source(S2) Red' • • • •• •, 16-120.mm2(6 AWG-250.kcmil) E Neutral-(N) . White 16-120..mm2(6 AWG-250_kcmil) F.: Line l Load x 2- :L-1 Black.: 16-120 mm2: 6 AWG-250 kcmil �. . (.. . . . )': : :... .. G : Line 2 Load x 2 (L2): Red:: 16-120 mm2(6 AWG-250 kcmil) H Neutral:X.2(N) White ;;.: %-,120 MM2(6 AWG-250'kcmil) Appendix 'B: Revision.Log Revision Date. Description 1.0 :2017-03-21 'Iriitial Release 1.1 2017,04-04 Added specifications and mechanical install:details for Backup: Gateway Updated wire gauges, voltage and frequency ride-through, .and short-circuit.iriformation 1.2' . 2017=0.4.=0:6. • Added.pouver install details:for Backup Gateway:,: . • Communication cable shielding terminated at Powerwall :. ;:;chassis ground; not in Backup Gatewa ' • Site requirements: Powerwall top,cle' arance decreased to 50 mm: in ;.:Max height to•bottom increased:to. :::.: 1.5 m.(5 ft) a.-Bracket anchorin B g:.em bed ment in,wooden studs inc reased.:to at least 64 mm (2.5u in) 13 .: 2017-04'12 .: UpdatedBackup Gateway images 1.4 2017=04-27 . ...Added commissioning steps :Revised warranty/registration language Added steps.re: photos.of serial.numbers an-d wiring 2017-05-16 Added=Metering/CT pla.c.emer)t instr.uctions'. 1.6 2017-05-23 . :Minor corrections and.:graphic improvements 'Corrected wire-gauge conversions-(AWG to.metric) 1.7 - 2017-07-20 Updated''specifications to:match new datasheets. . : :Updated punch-out configuration on dead front panel •: Added wired meter.=to=Gateway communication option':. • Revised and.clarified commissioning steps • Amen e wiring referend6for Backup Gateway (Appendix A). • :::Moved compliance a. P.... ppendixes to se crate document. -2017-07-21.. . Corrected pin numbering in Meter Commun.icati.on.Wiring table CFig.:43) 1.9 : :. 2017=09-12 . :. U dated meter CT port information. :.: : Updated CT wire extension length criteria • Updated:IP-Address forWi=Fi connection'to Gateway (Commissioning Wizard 1.6,0.and higher) -�.:: :Updated overview of commissioning steps 1.10 2017-09-25 .0 Added meter.V.oltage harness extensioni criteria 1.11 2017-11=15 ... . ..Clarified commissioning steps Changed Backup.Gate.way to Overvoltage Category IV:' 1..12 20'18=01:-24- Added.Ground connection,in-wired meter diagram , Added:strip lengths and-additional wire gauge details :Added temperature ratings to main breaker specifications: : . --- •: :Updated commissioning steps for firmware v. 1.10.0 1:13 2018-12-.05 Up ate .energy metering installation steps .. .. 66 :Po.werwall Installation:Manual 1.14' : :. 2019=03-29 . : :Updated PoWerwall mechanical specifications Updated Accessory Bag contents • Updated. connectivity instructions • AddecHnstructions for 800 ACTs . . . . .. .. . . .. .. 1.15 :2019-05-01 •. :-.Updated communication wire gauge requirements • Updated.Neurio meter.Wi-Fi.pairing details for firmware .. .. updates:::.: . • . ..Qpd6te'd instructions,foe.met6ring.split-phase PV with a single.' CT 1,16 2019-06-06 Added. I.o.cation of back and side cable entry ports in updated mounting:layout 1.17 20.19-06-10 :'.. : :Updated recommended temperature range for PowerWali: :' . . :installation .. .. .Tesla'.lnc. Tesla,Motors Netherlands B.V. . . :.:.. 3500 Deer Creek Road Atlasstraat 779, 50.47 RG Palo Alto, CA 94 Q4 Tilbu.rg;.:Netherlands: NA BU:Rev 1.17 June 10:-2019