Loading...
HomeMy WebLinkAboutHaack Cantrell, Elizabeth From: Cantrell, Elizabeth Sent: Tuesday, June 10, 2025 12:11 PM To: 'Patricia C. Moore'; Betsy Perkins; Madison Messina Subject: 700 Deep Hole Dr., Mattituck; SCTM# 1000-115-12-10 Pat, Regarding your letter received June 2, 2025 for the property referenced above. The Board discussed your letter with their Legal Counsel and I was asked to reply. On October 16, 2024 the Board closed the public hearing and approved a resolution for a fixed dock and a 75' wide non-disturbance buffer. The property owner must submit two sets of revised project plans that depict all of what the Board formally approved, both the approved dock (with dimensions) and a 75' wide non-disturbance buffer along the landward edge of wetlands so that a Wetland Permit can be written, and upon receipt of all required dock/final inspection fees then be issued. After the Wetland Permit has been issued the property owner has the right to come in and apply for an Amendment to the Wetland Permit. ECiza6eth Cantreff Administrative Assistant Town of Southold Board of Trustees Phone: (631) 765-1892 Fax: (631) 765-6641 i 5 d PATRICIA C. MOORE Attorney at Law 51020 Main Road Southold,New York 11971 Tel: (631) 765-4330 Fax: (631) 765-4643 June 2, 2025 By Hand President Goldsmith and Board Southold Town Trustees � Town Hall Annex, 54375 Main Road, Southold,NY 11971 A5 E Premises: 700 Deep Hole Drive, Mattituck SCTM#1000-115-12-10 Permit not issued yet "'"` ( ''`'�� " Dear President Goldsmith and Board: The applicant Wolfgang Peter Haack filed a permit for a dock. The permit has not been issued yet. In review of the public hearing on the above application, the LWRP misled the board and referred to a 75' non-disturbance buffer in a permit 6140 from 2005 which had expired and was void. The owner was accused of violating a non-disturbance buffer and told that the non- disturbance buffer had to be shown on his plans. In fact, the house was constructed in conformity with a permit issued in 2017 (8978). This permit did not include a 75' non-disturbance buffer. The existing house was constructed, and Trustees issued a C of C in 2019. A reasonable buffer was offered at the hearing but rejected because the Board believed that a 75' buffer had been a condition of the permit for the house and violated by the owner. Mr. Haack has been trying to clear this up with the Board and there have been no response regarding this matter. How does the Board wish to proceed with the correction? Please advise. Very iru,ly ours, Path% is C. Moore Mr. Haack Encls. Board of Trustees 22 October 16, 2024 structure put in a place, vegetation is always preferred in some areas that is just insufficient, and so we have seen a gradual approach with this property, first trying to shore up one piece of it and then now needing to come back. So the need here is understood after conducting a site visit.Is there anyone else here wishing to speak regarding this application? (No response) . Any questions or comments from the Board? (No response) . Hearing none, I make a motion to close the hearing. TRUSTEE KRUPSKI: Second. TRUSTEE GOLDSMITH: All in favor? (ALL AYES) . TRUSTEE GILLOOLY: I make a motion to approve this application, to remove sandbags upon completion, and by Trustees and DEC reviewing conditions on site and deeming vegetative solution to be insufficient in this location, we are thereby issuing a permit to bring this into consistency with the LWRP. TRUSTEE KRUPSKI: Second. TRUSTEE GOLDSMITH: All in favor? (ALL AYES) . MS. TROVITCH: Thank you, very much, Trustees. Have a great night. TRUSTEE KRUPSKI: You as well. TRUSTEE PEEPLES: Number 4, WOLFGANG P. & BRENDA J. HAACK requests a Wetland Permit to construct a dock consisting of a 4'x55' 'fixed catwalk with Thru-Flow decking; a 31x14' wood ramp; and a 61x20' floating dock situated in an "L" configuration and secured by four (4) 10" diameter dolphin piles. Located: 700 Deep Hole Drive, Mattituck. SCTM# 1000-115-12-10 The Trustees most recently visited"the site on October 9th, 2024, and Trustee Goldsmith noted not enough water depth for a float, and exceeds pier line. The Conservation Advisory Council resolved to support this application and recommends the dock is located within the pier line, moving it back six feet. The Conservation Advisory Council recommends a fixed dock if the water depth is inadequate. The LWRP found this application to be inconsistent with the LWRP Policy 9. Number one, a permit for a dock was granted in 2005. Number two, further extension of the dock into public waters hinders the use of the waters. Number three, the extension further encroaches into a navigable channel and appears to extend past the pier line. Number four, the narrowness of the channel in this location should not be decreased for structure. Number five, a 75-foot non--disturbance buffer applies to the property established by Wetland Permit 6140. a i71 �..,,jj q ��- [ !l [LEI k 1 JUN 2025 � ' f ' i Board of Trustees 23 October 16, 2024 Is there anyone here who wishes to speak in regard to this application? MR. HAACK: Good evening, ladies and gentlemen. I am the property owner. We can go ahead, I looked at a couple of things that we can do, what you suggested, we can move the dock back the six feet. If you would like, I can chock it 18 inches off the bottom, if that would be acceptable to the Board. TRUSTEE PEEPLES: I think when we were there reviewing, there is a concern with the water depth and the use of a float with the water depth. There is also, we noted that the proposed dock would be, would exceed the pier line between the immediately adjacent docks, meaning there is a line drawn between those two and your proposed dock, and actually looks like the entire float sort of exceeds that area. And then if we are looking at, once the dock is then pulled back to comply with the pier line of the immediately adjacent docks, there would, there is, looks like it would be around two feet of water, which would not be adequate for a floating dock. So we believe that a fixed dock would be more appropriate for that location. MR. HAACK: Okay, so I would have to redesign that and get back. Or we can redesign that and get back. Or we can chock it 18 off the bottom, if that helps. TRUSTEE GILLOOLY: Unfortunately, our code now is, you need at least 30 inches of water depth in order to have a floating dock, and so we don't allow chocking, unfortunately, at this time. MR. HAACK: Okay, fair enough. That's why it was moved that little bit out, to bring the back of that float to the 30-inch mark. TRUSTEE PEEPLES: Right. I understand the design of the project, yes. So I think if this was able to be dialed back to be within the pier line, modified to be a fixed dock, and then the, to address the LWRP in regards to the previous permit, which was -- MR. HAACK: 2006, ma'am. TRUSTEE PEEPLES: Yes. Permit number 6140, there was a 75-foot non-disturbance buffer that was part of that permit. So that would just be something that we would want to see on your proposed plans. And then a re-vegetation plan in order to have some of that area that may have been cleared, to be reinstated. And then I did have one clarification point. The description says a 31x14 ' wood ramp. But I guess if we are changing it to the fixed dock, that would not -- yes, there was a discrepancy in the size of those. But all of that would just be addressed, and then we would need a new description, or the notes that correspond with the revised design. MR. HAACK: Thank you. TRUSTEE PEEPLES: Sir, thank you, for your, the discussion with all of this. We have an option that, at your request, we could table this application or we could move forward with it and then IP gg@@;;pp 1,y3Spy Board of Trustees 24 October 16, 2024 condition it subject to new plans. MR. HAACK: I would assume just condition to new plans, I would assume would be the most logical at this point. TRUSTEE PEEPLES: That is something the Board would be agreeable - - --- -- with it.. I just want to make sure that you are comfortable wi-th ---- -that since you are the applicant. MR. HAACK: I would have to at this point. Thank you. TRUSTEE PEEPLES: Okay, is there anyone else here who wishes to speak? Yes? MR. HEANEY: My name is Sean Haney, Heaney Marine Construction. I had a question. If we are taking off the floating dock to get into the pier line, it looks like then could the fixed dock be possibly extended out into that pier line? It almost looks like, you know, the fixed dock could then be pushed out to the p ier line then, so he's gaining a little bit of fixed dock but he's taking away the floating dock. TRUSTEE PEEPLES: Yes, if I understand you correctly, you are basically noting that the fixed catwalk would be extended out to incorporate, and then -- MR. HEANEY: Yes. TRUSTEE PEEPLES: Yes. Great. That is correct. So as long as the seaward-most side of the complete project is within the pier line then that would be sufficient. TRUSTEE GOLDSMITH: And if you didn't want to do the "L, " you can do a "T, " and some people do a stepdown. So as long as the seaward end of that fixed dock now does not exceed past the seaward end of the floating docks on either side. MR. HEANEY: Right. Understandable. Got it. Thank you. MR. HAACK: Thank you, very much. TRUSTEE PEEPLES: Is there anyone else wishing to speak? (No response) , Any other questions or comments from the Board? (Negative response) . Hearing none, I make a motion to close the hearing. TRUSTEE GILLOOLY: Second. MS. HULSE: One moment. (After a brief pause, this proceeding continues as follows) . TRUSTEE PEEPLES: I make a motion to rescind my motion to close. TRUSTEE SEPENOSKI: Second. TRUSTEE KRUPSKI: You don't have to vote to rescind. You don't need a second. TRUSTEE PEEPLES: Okay. Sir, would you mind approaching the microphone at the podium please. MR. HAACK: Yes, ma'am, TRUSTEE PEEPLES: Thank you, very much. So speaking with legal counsel, we want to make sure everything is very clear. Again, the Board is prepared to move forward with this application this evening, but just want to confirm. Would you design it with a "T" or an "L"? �1 a ; JN P 2025ti Board of Trustees 25 October 16, 2024 MR. HAACK: I apologize, I hate to waste time. But would it make a real difference? I don't know, to be honest with you, whether it's an "L" or a "T. " Does it impact the bluff or anything? If so, then I'll redesign it. Just let me know. _._ ._.._... _._._ . TRUSTEE GOLDSMITH: That' s .the only thing. We are trying to forward with it tonight, but if you are not sure, we can table it for you to get together with your contractor. MR. HAACK: I would like to go with an "L. " Remain the same, just remove that ramp, and push the pier line back the six feet. That way we'll keep everything else as designed. TRUSTEE PEEPLES: So essentially we'll end up with a four-foot fixed pier that will terminate with an "L" and that will all be within the pier line, correct? MR. HAACK: Yes, ma'am. Moving it back the six feet and the removing the ramp so is it will become a fixed. TRUSTEE PEEPLES: Okay. TRUSTEE SEPENOSKI: And the length of the "L. " (Board members perusing drawings) . MR. HAACK: I just think that would be a little easier. Because I would not have to touch any vegetation. There is no vegetation, for some reason, there, where the L is. I would not have to touch anything that is already grown on that slope. So I think that would make more sense to hold that slope in. TRUSTEE KRUPSKI: Because there is a non-disturbance there, I guess was a condition of the house, none of that, can be trimmed or anything like that. MR. HAACK: It's not touched anyway. Since I have the DEC and ACE permits for you, I'll contact DEC and Corps of Engineers with the updated plan and then resubmit that paperwork to you also. TRUSTEE GOLDSMITH: Thank you. MR. HAACK:, Thank you. TRUSTEE PEEPLES: Thank you, very much. Okay, is there anyone else here who wishes to speak? Any other questions or comments from the Board? (Negative response) . Hearing none, I make a motion to close the hearing. TRUSTEE GILLOOLY: Second. TRUSTEE GOLDSMITH: All in favor? (ALL AYES) . TRUSTEE PEEPLES: I make a motion to approve this application with the following stipulations: That the dock is modified to become a fixed pier in an "L" configuration, with the "L" to not exceed 20 feet long, and that the entirety of the dock is dialed back to be within the pier line at the immediately adjacent docks. And to reinstate the 75-foot non-disturbance buffer. And it would include a planting and re-vegetation plan for this area, based on the previous permit 6140, and by reinstating the non-disturbance buffer and moving the dock back within the pier line, it thereby bring it into consistency with the LWRP. And subject to new plans. That is my motion. J U N w. 2025 QF ur Michael J.Domino,President so Town Hall Annex O�� y�l John M.Bredemeyer III,Vice-President �. Q P.O. Route 25 P.O.Box 1179 Glenn Goldsmith Southold,New York 11971 A. Nicholas Krupski S c Telephone(631) 765-1892 Greg Williams COUNTY Fax(631) 765-6641 yN� BOARD OF TOWN TRUSTEES TOWN OF SOUTHOLD CERTIFICATE OF COMPLIANCE # 1562C Date: March 12,2019 THIS CERTIFIES that the construction of a two-story dwelling and attached garage with a footprint of 1 369s .ft.• construct a 94s .ft. deck against the seaward side of dwellin • install a new sanitary system landward of dwelling: install gutters to leaders to drywells to contain roof runoff,and to install a driveway; At 700 Deep Hole Drive Mattituck Suffolk County Tax Map#1000-115-12-10 Conforms to the application for a Trustees Permit heretofore filed in this office Dated Januaa 13, 2017 pursuant to which Trustees Wetland Permit#8978 Dated March 22,2017,was issued and conforms to all of the requirements and conditions of the applicable provisions of law. The project for which this certificate is being issued is for the construction of a two-story dwelling and attached garage with a footprint of 1 369sq ft• construct a 94sq ft deck against the seaward side of dwelling, install anew sanitaKy.system landward of dwellin • install gutters to leaders to dnaells to contain roof runoff and to install a driveway. The certificate is issued to Peter Haack owner of the aforesaid property. �Authorized Signature BOARD F SOUTHOL OWN TRUSTEE, SOUTHOLD,NEW YORK PERMIT NO. 8978 DATE: MARCH 2222017 ISSUED TO: PETER HAACK PROPERTY ADDRESS: 700 DEEP HOLE DRIVE, MATTITUCK A s..4; SCTM# 1000-115-12-10 AUTHORIZATION Pursuant to the provisions of Chapter 275 of the Town Code of the Town of Southold and in ting hold on March 22,2017,and in accordance with the Resolution of the Board of Trustees adopted at the mee consideration of application fee in the sum of $250.00 paid by Peter Haack and subject to the Terms and Conditions as stated in the Resolution, the Southold Town Board of Trustees authorizes and permits the following: Wetland Permit to construct a two-story dwelling and attached garage with a footprint of ard side of dwelling; install a new sanitary 1,369sq.ft.; construct a 94sq.ft.deck against the seaw system landward of dwelling; install gutters to leaders to drywells to contain roof runoff; and to IML411 a driveway; and as depicted on the survey prepared by Fox Land Surveying,dated August 15,2016,and stamped approved on March 22,2017. IN WITNESS WHEREOF, the said Board of Trustees hereby causes its Corporate Seat to be affixed, - I and these presents to be subscribed by a majority of the said Board as of this date. T WK4 A. Nicholas Krupski Absent tk (iay°M o:19^dlhi Su:IIaMO 0.1-M al II 0 S-EI-SIt-000t 1°I x y 19^d/M 6ul am \;. (aaloM a!19n ) B-C:-SIt-000I loi xny) _ d 41 h1 9uIIlaMO) (JOIoM al!q^d 4)!M fiu:Ilau O) (/a 9 LLJo UJ U G3� V O - 3A 18 a 3-1 O H d33® a 3N -_.- —J m'o / 1NbbCAN ' o a.� r ,00'OS M�O-Vloi,GOSI o vl 0 z o vI LL N 661 j \ LL I O V U N I I • m m (V i m owl I Iw Mm d: Q II 7w I I3w II 11 -II W O O Q I � W 0 i9 I L_J\ w� Lo U O x N y Q Q U1 N I �\ ss I IaN w II LT\ I I W w U Q Q a % Z \ ¢ w L N O w J �;-, to U Z v Y Q 7 0 0U m~O O�cmv NO z - L �IQ I VI z . a 1_ Tcn co � 4�5 1 I 3 I i i I IJ i I I r c � w I n a Y � o 3 Wn 7I pp o ¢ 3�zi 1 i t l0 0 Uw� Z o 0-3 I 4 — `w O =m,.Qi�o w¢ ODT ++ N C� -N O LL°J II C�Z m 0; Q3 Q Di II ¢ F w -1 I � q X 3NO2 "`I K� � II Z U K w (�� 4�- W II Z✓1 1"S 3V 3NOZ IS � U ^'+-I w a=OQ O W r C n 3 0 \ li.mow N n v ,ri \2Ppox',�irSE O e10N� K � Z R M>i °' P l-10�—E DBE REED p Z o on © q¢=O a U Do ! 00000� yQ J �2mN _n N� U Q Z Z^ L ��" N d' Q 2 Q VVi O n'l W V i'Z ~ m w \ n �I O U I I' Board Of Southold Town Trustees SCTM#115-12-10 SOUTHOLD, NEW YORK PERM IT NO. DATE: ....MaY... ISSUED To .................K....ATH w..,....RY.N ..........NIEDORODA..:........................................................................................ u AW,4 or!tat ililt c Pursuant to the provisions of Chapter 615 of the Laws of the.State of New York, 1893; and Chapter 404 of the Laws of the State of New York 1952; and fie, Southold Town Ordinance en- titled ."REGULATING AND THE PLACINGOF OBSTRUCTtQNS ; IN AND ON TOWN WATERS AND PUBLIC LANDS and the REMOVAL of SAND, GRAVEL,OR OTHER MATERIALS.-FROM LANDS UNDER TOWN WATERS;". and in accordance with 'the Resolution of The Board adopted at a meeting held on _NAY.:.�g.�.....-. 2..0.0.5, and in consideration of the sum of ...250 A.QQ... _. paid by Kathryn Niedoroda .... ............................................ .......................................... of ...............R.attituck.............................................. N. Y. and. subject to the Terms and Conditions listed on the reverse side hereof, of Southold Town Trustees authorizes and permits the following: Wetland Permit to construct a 24.5'x 50'dwelling with 10'x 24.5'attached deck,on-site sewage disposal system,pervious driveway,clear and maintain a 4'wide pervious path to the proposed dock,4'x 60'low profile fiberglass grid dock(2'above grade),with the condition of a 75'non disturbance buffer seaward of the •house,a haybale line during construction,and drywells on the house to contain roof runoff,and all as depicted on the plans drawn by Robert Fox and last dated 10118/05. all in accordance with the detailed specifications as presented in •the originating application, IN WITNESS WHEREOF, The said Board of Trustees here- by causes its Corporate Seal to be affixed, and these presents to be subscn'bed by ii-majority of fhe said Board as of this date. .r.riZe (2 � Xllktf1 l-.D—NN 6�.� b E C 3r" SNi O x Or VV S �1°L9 ZO`fl N °1^Q1 9d 8'9i "hC k'_'t"_gym F N3�LL VII O' yJ X1a9 ggn�gu 3 } J p"n��E p6 t v °° "hm.v 4o.z3• ° d�0 d x v )ccp Hoi6 \SDI! tthh III_9�('0B� GG 40 C� O Zl - 50.00, - 71a.2e co WW . x New 9 4333` I � Avenue nve '1 � 33 - m° UI �_ t,\ _ y�N -9 II{..JILI Q! Nl� �,n �n..cyfS 02 •fi m pp tv N LL I 0 T_' f'r1 .d o� w �6 3 T9 o6 1-4 N U Deck m QIa%m0 O v O d6 HO O ZONE C/] H ZONE 9 .. a 10 of 5bpa I_ 4 6 v w m -L.� r fielice I10g 135o9g, m q , i meek w� IEE p C)N i coo > t � ie I� I T.. r�[ Z t 8LLoM=SAN J (D GI ' a 50:9 o�m� r ' 'D aJ)cnu) �aH �a� F 01{ Glenn Goldsmith, Preside).it Town Hall Annex lee A.Nicholas Krupski, Vice President , °. 54375 Route 25 Eric Sepenoski �'' z ''., P.O. Box 1179 Liz Gillooly Via. � z Southold,NY 11971 Elizabeth Peeples � � ' - Telephone(631)765-1892 Fax(631)765-6641 Southold Town Board of Trustees Field Inspection Report Date/Time: 1 Completed in field by: WOLFGANG P. & BRENDA J. HAACK requests a Wetland Permit to construct a dock consisting of a 4'x55' fixed catwalk with Thru-Flow decking; a 3'x14' wood ramp; and a 6'x20' floating dock situated in an "L" configuration and secured by four (4) 10" diameter dolphin piles. Located: 700 Deep Hole Drive, Mattituck. SCTM# 1000-115-12-10 Typ of area to be impacted: Saltwater Wetland Freshwater Wetland Sound Bay Part of Town Code proposed work falls under: Ahapt. 275 Chapt. 111 other Type of Application: Wetland Coastal Erosion Amendment Administrative Emergency Pre-Submission Violation Notice of Hearing card posted on property: Yes No Not Applicable Info needed/Modifications/Conditions/Etc.: 0, 1 n j�ta� a,;.®ih 6i?G'`f P99�•3 �� `P OS' 4` '� Present Were: / G. Qoldsmith N. Kru ski /E. Sepenoski L. Gillooly n/ E. Peeples I I I I I I I I I I I 1 CJt O1 lJt I 1 1 1 EXI5TIN6 I ' DOCK I I 1 I I I I I I I I I I I I I I I I I vl � �. I W 1 N �, o 0 o I� •I• •� •� \\•� iv cp I I u 1 1 1 I I I DOGK NOT TO PROJEGT \ I y y y I H % I — I\ AVE! BEYOND EXI5TIN6 ADJACENT M I I EXISTIK6 \ J I I I NEIGHBORING DOCKS \ I 14, I I i BOAT RACK EXISTING I I I l I I 0 5HED I ti LEV.=2,2' I AI y \ / � � T I — 205.42� EXI5TIN6 I � i I ' — 5 8l•1620" E DRYWELL N EXISTING �- ti 1 6.00' I N N �1 3y\ ^�� v v v -1-k I I 5EPTIG 5Y5TEM T— I I10.0' I I DEEP HOLEI ti \ v 1� v 1 1 I 1:61 1 ELEV.=12.0' i I CREEK \ I I I I � - - I 1 . i:,,s:::: I 1 \o v v I I NYT 8 v iv � cp 0 I O::, - - ' 13.5 \, I '— 60.4' -o 14.00' I w 55.00' I I EXISTING I PROPANE TANK r — — O w J ®O q�1 EXI5TIN6 2 5TORY -- �_ �L ----------- I_ ___ DWELLING �o I I I w 1 JE ::\3 - - - --1 of `T _ I EIR5T EL. ELEV.=14.4' �nEXISTING2 STORY DEGK �PRO P05ED FIXED DOCK / / 13.5, 4 31.3'PROP05ED RAMPII I I I I O O / "� / I 1 \ — - - - - - ITER OVi Vi A N I N , \ _ I I PROP05ED FLOATING DOCK 1 I — \ / D - - - - - - - - - AE-6 ,' j I / NI8�820" W EXISTING '— — — — — ELEV.=11.8' .�U� 2 2 2�2� / I EXI5TIN6 WOOD I'X'ZONE HVAG GONDEN5ER5 Southold Towl / BULKHEAD I Board ofTru eCs i EXI5TIN6 DOGK I � � I I � � I BU I LD I N6 I N�CRN1 AT I DN 100 DEEP HOLE DRIVE - MATTITUGK, NY IIg52 I D15T: 1000 5EG: 115 BLK: 12 LOT: 10 ZONE: R-40 FEMA: AE-6 I$ 'X' ZONE LOT 51ZE = 50.0' X 1205.42' IRRE6 = q,g14.1150. FT. �L®T FLAN 5GALE: I" = 10-1 (2) 10" DIA. GGA TIMBER ALL INFORMATION BA5E:D UPON SURVEY PREPARED BY FOX LAND 5URVEYIN6, DATED DOLPHIN PILES q-26-2016. THE GONTRAGTOR SHALL BE RE5PON51BLE TO RETAIN A LIGEN5ED LAND SURVEYOR TO GHEGK 4 VERIFY ALL LINE5,BOUNDARIE5,5ETBACK5 $ ELEVATION5 4 1 DIMEN51ON5 PRIOR TO E:XGAVATION. REPORT ANY 015GREPANGIE5 TO THE ARCHITECT PRIOR TO PROCEEDING WITH THE WORK. _.. TO fI -I '- ; FLOATIN6 BOAT DOCK BY -- -- AGGUDOGK OR APPROVED EQUAL — gar4 + • r- 1': ITof r: :fl "d3f:.,.+a. 14 t, ,•�••�• ,'"�}"�•,,a f' r i- Iw 7 i t t I. Q NEiAE( ' 1 1, — , . — z � F— } t . LOCATION OF PROPERTY Q � I ' s ; ; } I •.r '.:e..•1#' # ;.'r 1.�.'y `�•. . -C Y OIf'.y� -'_ ? ::i.' !.'. :!...IS4 '�'p.y�F X. �trt N .. y, f:cs"4 t• •#`+.• t'{t,` �ip- � -{� id�-.q6--.j�. } Fll ' ` .� •�.�'•• ;_;., �, { 4 141-0" 551_0" ,,, at •' g w i, ' _i �. 1 12-21-25 REVI5ED PER DEG GOMMENT5 ;ZONE �-} r: G-}.i '�' � t_ �II � 0 ISSUED TO DOB ,. ;t.. i _{ # I- k date:.!'. �•� revlsfon: � .r. .. 0 0 0 0 J description: k -oIyf� .: #, ",' .,: '- a -,.' `• �-. .... , ,-r '�e .• ♦, .t� , A-•#.-.-d_, f.a .-j" i �"S.. ..�. .� j ,...� J. rar � , • i l ._I 1. ..j,., ..1... ..�„ - (. : DOCK , -- PROPOSED w . I I _ _ -c_..- ,_ e -;- - . �. ,t:,... ., . Y.. s ,. ... . .... . �:.. .y : - • f I �, I ! � 4' ^ : I I _ �- . � ; ,.., fi` i I- ,-�- FOR fi . � >.. �. .•..x,,.- .... ,.. '1 7. -1 : -}- t , I I ' -I t 1 I I I f I F t E. �, � �.:-...� ;. 1 -I _.� � .#_ }� _� I L to + • ! f l I _ v��� � PETER � Bi��ND� H�1��K tt _.i.._ ... . . ... .... .. . t I _ Ad' ,. '.' r t ,. : 7. ., __. .. .... , '-.{..' --•`t � •..., I V i I I i i , I I ! t t i I {.: i : i j. �_ I.�. -1 I ! i I� !.� t t f .�_..� 3 1 100 DEEP HOLE DRIVE - I I MATTITUGK NY " ` MAP A o o ''C M I �it�� I�I �{P -- II I_II I_ II I_ II I_ II I_ II 1_ II " v u u U U IE C I I G � \ ' ` - ---15`-1- --- q I q 2 q 2 q 2 q 2 8 8 5# k we5t 151ip, ny 117g5 SCALE: N.T.S. q" DIA. GGA TIMBER PILE E _ — _ _ 631-241--1325 bkharchiteOt® mail.Gom FIRM MAP #36103G0482H — _ _ AE-6 4 'X' ZONE (2) 10" DIA.GGA TIMBER — REINFORCED POLYPROPYLENE A drawn sheets In set: DOLPHIN PILES GANGWAY RAMP I^U " X 6 P.T. WOOD - DEGKIN6 BY "THRI1 FLOW" OR I I bkh 2 APPROVED EQUAL checked by: 0CK F�AI 5GALE: 1/4 - 111 4 ` file: 22-25 PILE FO)NDATION NOTES N ALL PILES SHALL CONFORM TO A5TM DE516NATION 025-611 5TANDARD 5PEGIFIGATION5 Cl"DIA. GGA TIMBER PILE FOR RO)ND TIMBER PILES AND 5HALL HAVE A MINIMUM TIP DIAMETER OF 8 INGHE5. DRIVEN TO 10 TONS ALL PIL=5 5HALL BE PRE55URE TREATED IN ACCORDANCE WITH THE AMERICAN WOOD I■ PRE5ERVER5 A55OGIATION 5TANDARD G3-q3 "PILES- PRE5ERVATIVE TREATMENT BY REINFORCED PRE55URE PROCESS". POLYPROPYLENE DEGKIN6 PILE5 SHALL HAVE A MINIMUM GOMPRE551VE 5TREN6TH OF &00 P51 AND SHALL BE DRIVEN TO A SAFE BEARING GAPAGITY OF 10 TON5. MINIMUM DEPTH OF I5'-0" 4 X 6 GGA D.J.0 lb" O.G. ALL PIL=5 ARE TO BE DRIVEN UNDER THE 9UPERV15ION OF A LIGEN5E0 PROFE55IONAL I I ENGINEER OR HI5 RE6ULARLY EMPLOYED SUBORDINATE;HE SHALL KEEP A L06 OF ALL b X 6 GGA 61RDER LET IN TO PILE DRIVING DATA FOR EACH PILE. I■ 1 PILE5 ARE TO BE INSTALLED AGGORDIN6 TO THE ENGINEERING NEWS FORMULA OR A5 I� THE SUPERVI51N6 ENGINEER MAY DIRECT. 5EGURE TIMBER W/TIM13ERLOK LA6 EACH PILE SHALL BE A 51N6LE PIECE OF 51JFFIGIENT LENGTH TO PA55 THROUGH ANY SCREWS OR APPROVED EQUAL FILL,MUD,5AND,ETC AND TO PENETRATE A MINIMUM DEPTH OF 10--0" BELOW MEAN-5EA LEVEL,AND HAVE A MINIMUM PENETRATION OF 5'-0" INTO GOOD BEARING MATERIAL. PILE5 SHALL BE DRIVEN TO A VERTICAL TOLERANCE OF 2% AND A HORIZONTAL TOLERANGE OF 3".A PLAN 5HOWIN6 THE FINAL LOCATIONS OF PILE5 "A5 DRIVEN" NOTING ALL DEVIATION5 FROM THE DE5I6N LOCATION SHALL BE PREPARED FROM AN AGGURA,TE SURVEY AND SUBMITTED TO THE 5UPERV151N6 ENGINEER AND ARCHITECT OF RECORD FOR REVIEW AND ANY NECE55ARY REDE516N. THE ORIER SHALL BE RE5PON51BLE FOR ALL 5UPERV15ION DURING CONSTRUCTION c5 4 X 6 GGA 0 16N O.G. 4 X 6 GGA® I6" O G. c� 4 X 6 GGA a I6 O.G. c� a- ■ Q- " � D- " /2 X 12 GGA 12 O.G. d o DECK JOISTS ,5 o 0 4 X 6 GGA® I6 O.G. RAMP J015T57 `� DECK J015T5 d� DECK J015T5 ¢ DECK JOISTS Q /4 X 6 GGA® Ib O.G.J Q 4 X 6 GGA® I6 O.G. _ _ _ _ DECK J015T5 _ DECK JOI5T 5 x Iz x x x� x x� X r�®CK fRAM I N6 PLAN SCALE: 1/4" = 1'-0" 5 GTION A 5GALE: 3/4" = 1'-0" : REINFORCED POLYPROPYLENE q" DIA. TIMBER PILE5 DEGKIN6 BY "THRU FLOW" OR APPROVED EQUAL GANGWAY RAMP (2) 10" DIA. DOLPHIN PILE5 FLOATING DOCK I 2.2' -0.4' 2.6 g-21 122 155UEI D TO DOB PER PEG COMMENTS 4.0' revision: date: description: 56 -5.4' PROPOSED DOCK -62 FOR PETER I$ BRENDA HAAGK 100 DEEP HOLE DRIVE - MATTITUGK NY 11`152 °°AIRRCHO 11 CCCU 11 Ilc 783 pat drive - west 151ip, ny II1g5 POCK ELEVA710N 631-241-7328 bkharchitect@ mail.com SCALE: I/4 - I-O drawn by: sheets in set: . bkh 2 checked by: bkh date: ' 4 I-Ig-2022 file: 22-25 SURVEY OF: PROPERTY LOCATED AT MATTITUCK TOWN OF SOUTHOL❑ ELEVATIONS REFER TO 1988 NAVD SUFFOLK COUNTY. NEW YORK ELEVATIONS SHOWN THUS -0- S.C.T.M. # 1000-115-12-10 AREA = 9.974 SF. SCALE: 1"=30' NOTE: THE EXISTENCE OF RIGHT OF WAYS. WETLANDS AND/OR EASEMENTS OF RECORD IF ANY. NOT SHOWN ARE NOT GUARANTEED. NEW SUFFOLK AVENUE 6m b°'I I,2� I l FLOATING I DOCK LAND N/F ELIZABETH HUDSON 8 TIMBER DOCK KEVIN HUDSON . � h' 6• 0 I I �1 FENCE S 87°18'20"E I 1 , SHED I (�J.5'/S 205.42 ' 110' ,L 0.6'/S FENCE W -•--- --- ----•-------•..................•------- O.L. ^1 -•--IF ..-.... 3 �. ro9 0�� STOCKADE FENCE HED m CVD POLE 6 y m 6 6 m N m z m' STOOP tit' B.0 U71L 2' w N i WALK`— ~ UTIL w Q~�I 3 9 0 3 60.3 BOX Z ^I LP 3 Co 9 rL O rn 2�' rO TANK x o L6 2 STORY FR. RES tit o �t O 6' X 20' 4' X 55' CATWAL U p FF EL 15.5 c W O I FLOATING m a 9 6 GAR SLAB 12.9 O I 2.7 X 14.0 in o a GRAVEL p 0 O I RAMP 06 j ,�2 m m 37.3 Z!� DRIVEWAY w CV U7 W ,b 1 a0 'k 13.4 1 W/B.B.C. db '� 6? 04j hh b� 20 4j 0 0 2NO STY titi M ®®AC 38.4' O 4 DECK N UNITS m (n I 2' ti ROW OF HYD. O I CONC. TREES 0 yy DEEP HOLE -2 5 I N 87 18 20 W CONC. CONC.MON. I 193.54' MON. DRIVEWAY CONC. CREEK MON. AM TIMBER DOCK I ^ m0 14 b2 1 ,L ' FLOATING- w I i ' ' ;o• ;0 4>> '� W -2.5 -4.0 DOCK' � W -4.0 �� A LAND N/F MEAGHAN BURKE L1 N 10041'03"W 51.39' _ E C E I V Gb ' SURVEYED BY: INFORMATION AS PER UNAUTHORIZED ALTERATION OR ADDITION TO THIS SURVEY IS A VIOLATION I' P A U L B A R Y L S K I LAND SURVEYING � ; OF SECTION 7209 OF THE NEW YORK STATE EDUCATION LAW. J U L 2 2 2024 PATCH 0 G U E N Y 11 2 COPIES OF THIS SURVEY MAP NOT BEARING THE LAND SURVEYORS INKED R 0 B E R T H. F 0 X GU RANTEESS OR CERTIFICATIONS ND CATOR EMBOSED SEAL SHALL NOT BE CONSIEDRED HEREONBSHALL RN TRUE COPY. CTO Y N Y S P L S # 5 019 7 PHONE 6 31—2 9 4—6 9 8 5 THE THE TITLE COMPANY.N FOR OM THE GOVERNSURVEY NTAL AGENCY ANDLENDING INSTI.AND ON HIS TUTION ALF TO MAY 2 2021 FAX 6 31-6 2 7-318 6 LISTED HEREON.AND TO THE ASSIGNEES OF THE LENDING INSTITUTION. SoubwTown P A U L B A R Y L S K I 6 Y A H O O.C O M GUARANTEES OR CERTIFICATIONS RE NOT TRANSFERABLE TO ADDITIONAL Bp�rdofTNsfie�S INSTITUTIONS OR SUBSEQUENT OWNERS. MAY 6. 2024 5845 C-. � s DOCK l.:r 1--.. �r a f P rqp-:'•rvj f�til[ o iS S Lor+PP Ft1eeD°ck` Section F97er�lo5s a !. Surveyed:Dec.27,M05 5GALE 1'-90, �i/ 120'wide waten•lott 4'x 4�w11h 4'x 12' 1' 20 Amended'Jan.k 20D5 a'r to opposite shore 'T'l25'°t•>r.9-j': May1S,2006,June 19,20,06a�' ` Mal. `ea�eaF Aug.24,2005 scT�loon-lts tz-lo TRUSTEES ~~~ 40 F e Situate:Mattiluck exisk bttm. ~ Town:Southold- °s { Suffolk County,N'( Datum MSLt NGVD29 Total Lot aru-losib sF Hatland Area=1651 sF Tide Range:2S+/- y yi�,e.tort a,•oo==15Mq025 sf sF or 16.49.od�o°en!aDre k L.Wt of coax:: end c�a�dd�tn,�q'IS'.� septta f00, 53otxidor7 i;. 17 fit• bdSting Dwc1Ng N t. O 0b , - ph c water z y Netinm Bovld��yy p,,�<� —4-r`�-GL =le•.•c.{.P..5•cr p •s �•-•t Foz.F.b.•aa: a F° :c� C� o�, S87°18'2�07: — ^218.33 tee. C4 Z: - �r•i :v s• �- Proposal S.pt1c r_ ^• '"� - -sr 'C: -.s• u QOO qp1 loot t L^.•yi t•. ..r 1 t/1 roc •�, ,s* .a� as +n ,; :$; Llmttt7l aale�roivDyw / x tt .MT dtep PDols zk rri ea t L,o �. o.n »a .,••_T »s '�� -�• •d+ UDetg13S594d •;��2 Flnt,dDapo'� ~ Praposad -1, :—G.}'C O.A. : n'9 _Da v D f 4'x 66 wl a X7� f:S °xr9tr.ets° o e : OwoNng CD �p'�a waenr •a• stake set ± p abv.9r•1 7 ' i i�i• oat Ivan- 5elmoc "� O? �xc :t .-11-06 ! _ �t•�:-I :• a �ix' .k' •m�. y .o]S lrrn �r.• -/t+ ' 't State sal r -- `'�•--i r .�, S%ke.set i• ptdpoacd (� . Cn PananblD 7-1106 V D 9 - rr m DFyesite TDrc ' ,1 �; �' _ Sery .., -7a -�, •O•."t _ .a �.� ,ter-' mmD.^1•'°I` _ n..• ••r pb c..Dt�r �,I�D.d� Ns7°i ,20nw. 2a8.6s° :� (y 151 tt,txr 11 1 gloat '1 Nrg.-ab �(�fLt•('Y `� ~'i��exist dei4•... .,Ijt N1 O I L.�'1� _t [N N l.rJdC7�,p� D ^�41i1'4' .�awon 36449 4.1 7ie11•D ! Test Halo ±a 034}Or St=PfIG DETAIL h>h.rood ddob`°id1� s;eu n.�elnng o sto tc not to r �rD�osco c Goo5alDnw - -. "�,•�',�. a<-tl.t.m 3'- l. :•�""«.a".:Y EVe 0.$ 0 ,- cc- ,n..- tD. t - medMn -- -�'.-i;t S,•.�i.••�", . er sand ._ - - •. ,toit gil.• D,I[t•s'pt Ic eon.D1 Rn 00�7s°�InQ mot.1' F.%lstM[]OwC1111g -'••i..a Dtr •1/'-oar,t ¢ SM. .deer `� C p-bre voter w.RORERTH.FOX e a,�. N ` HM PlJW'197 eon.a 9 t ! POe0X0S38 :ft"'."n nne to 'I J1 1 RIVERHEAO,NY scj::.wr Dlcn erew,s.n:er "d� V � 637-7325'fe0 Sotritt(iic Town - - � 9lMldofTrustees , SUFF01 E• - AV i a EXISTING ADJACENT DOCK _ ' 198.0�� ---------------- OD - � 1 a x WA m o R I CE ON / GRAB•DRIVEW I D tml 587rif9.2REBe2pE cE - R PROPOSED OPEN-GRAPE DECKNG TO BE I o b b q \ FLOW-THRU INTERLOCKING PANELS OR EQUAL PROPOSED FIXED ELEVATED PIER 45' LONG X 4' WIDE SUPPORTED WITH Vo PILES 0 B' O.C. (TYPICAL BOTH SIDES) _ IN SAME LOCATION AS EXISTING TO BE REMOVED _ \ W W � r EXISNNG PIER, RAMP AND FLOAT TO BE REMOVED sHfD — 186• I V E \ W U~W I8792 c� I I 2 22024 T 1�.. VEGETATED WETLANDS LOCATED AS LOCATED \ W \ BY.J. PATMWO ON 1-26-18 __ ,AdTOMfII MPROPOSED ALUMINUM RAMP \ \ BdafdOfTNSt ►^� 16' LONG X 3' WIDE IN SAME- LOCATION AS EXISTING I - PROPOSED 20' LONG X 6' WIDE FLOATING DOCK PROPERTY OWNER: -' SUPPORTED WITH (2) 10.0 PILES IN SAME LOCATION AS EXISTING JOHN L BRAUN NOTES. -• EV LYN R.BOW BRAUIN Ptivposed Pier Permit-FW s cauE 1. ELEVATIONS REFER TO N.G.V.D. 1929 DATUM COMMACK, NY 11725 "=20' 2. LOT AREA: 9,600 S.F. / 0.220 ACRES PREPARED BY: PROPOSED PW � 3. PORTIONS OF PLAN FROM SURVEY PREPARED BY: JEF.REY P TA 582 P.O. BOX 582 JOHN GERD HFJDECKER LAND SURVEYOR BOHEMIA NY 11716 TsBdTDEEP ji64 DRiYE- 42 CROWN STREET, KINGSTON, NY 12401 631-484-9332r[vc*�rox of sauTao SURVEY LATEST DATED JAN. 16, 2018 JJPATANJO®GMAILCOM JI1dP N0.trnFoWWO. f000-a- TdY i16--fE-8 i of z :.Main-R New SufTcik Ave �e f�680 Deep Hole Drive PROPOSED FIXED ELEVATED PIER 4'WIDE X 45' LONG W/THRU-FLOW DECKING tvl�ttiluCK z - PROPOSED 8'0 CCA PILES (IYP.) 10 PROPOSED 30'WIDE X 16' LONG- ALUMINUM HINDGED RAMP PROPOSED 6' WIDE X 20' LONG LOCATION MAP FLOATING DOCK SUPPOORTM W/ N.T.S. 6 `` W/ (2) 10.0 CCA PILES - 4 _ j ECEIVE { a -- W J U L 2 2 2024 h.L_2 SOIJIUMT&M —4 Proposed Pier Prylmit Plans fr-AOTED SL�IITION& LOWICIN MAPTYPICAL SECTION 680 DEEP HOLE DRIVE SCALE: H: 1'=20' AMM UCIG TOWN OF SOUTHOLD V: 1'=2' SVFFOLK COUNTY, NY TAr YIP M. 1000-11&1&-9 2 i.-.. s Aeor , S ��Mt�tl•'�l� From. Gaer.Brad!(DOS) To: Haack,W Peter CW5 USARMY NG NYARNG(USA) Subject: RE: F-2024-0192-700 Deep Hole Dr.-(DEC: 1-4738-03552/00003) Date: Friday,April 12,2024 8:54:46 AM You-donit often get email'from bradi.ga_er@dos.ny.goy.,Learn why this is important Good morning, Mr. Haack. Thank you for sending these documents,they will be added to your file. I will go through each attachment and let you know if we need anything else or if I have any questions. I do realize how overwhelming this can be,so please reach out with any questions as we move through the process. Best, Bradi Gaer(she/her) Coastal Resources Specialist 1 New York State Department of State Office of Planning, Development&Community Infrastructure 99 Washington Avenue, Suite 1010,Albany, NY 12231 (518)485-7466 bradi.gaeredos.ny.aov www.dos.ny.aov' From: Haack,W Peter CW5 USARMY NG NYARNG (USA)<wolfgang.p.haack.mil@army.mil> Sent:Thursday,April 11, 2024 2:24 PM To:Gaer, Bradi (DOS) <Bradi.Gaer@dos.ny.gov> Subject: RE: F-2024-0192-700 Deep Hole Dr.-(DEC: 1-4738-03552/00003) Ms.Gaer- Thank you so much for taking the time out to assist me yesterday, I really appreciate it.This can be a little overwhelming for a homeowner trying to file and you really helped out. I believe I have assembled all the required-documentation we spoke about. If I am missing something,or something is not completed to standard, please let me know and I will correct it as soon as possible. Thank you again-for all your assistance! Respectfully, Pete Haack CW5 W. Pete Haack Instructor/Test Pilot/ASO AASF#1,-NYARNG Per cell: 631.793.5082 Email:wolfgangp.haack.mil(@army.mil From:Gaer, Bradi (DOS) <Bradi.Gaer@dos.ny.gov> Sent:Tuesday,April 9, 2024 2:01 PM To: Haack,W Peter CW5 USARMY NG NYARNG (USA)<wolfgang_p.haack.mil(@army.mil> Cc:Tirado,Arlene CIV USARMY'CENAN (USA) <Arlene.Tirado(@usace.arm)l.mil>; Lamiroult, Kimberly L(DEC)<Kimberly.Lamiroult(@dec.ny.g_o_v>; Ferres, Rebecca (DOS)<Rebecca:Ferres(@dos.ny.gov> Subject: F-2024-0192-700 Deep Hole Dr.- (DEC: 1-4738-03552/00003) You don't often jet email,from bradi.Qaer(@dos.ny.gov.Learn why this is important ' Dear Mr. Haack, Please find attached a letter requesting all Necessary Data and Information along with Additional Data and Information regarding the proposed project at 700 Deep Hole Drive. Please note that the NYS DOS consistency review will not commence until we have all necessary data and information for the proposed activity. Thank you for submitting your project. Please let me know if you have any questions. Thank you, Bradi Gaer(she/her) Coastal Resources Specialist 1 New York State Department of State Office of Planning, Development&Community Infrastructure 99 Washington Avenue, Suite 1010,Albany, NY 12231 (518)485-7466 bradi.gaer@dos.nyaov www.dos.ny.00v STATE OF NEW YORK DEPARTMENT OF STATE ONE COMMERCE PLAZA KATHY HOCHUL 99 WASHINGTON AVENUE GOVERNOR ALBANY,NY 12231-0001 WALTER T. MOSLEY HTTPS://DOS.NY.GOV SECRETARY OF STATE August 16, 2024 W.,Peter Haack 700 Deep Hole Drive Mattituck,NY 11925 Wolfgang.p.haack.mil@anny.mil _ Re: F-2024-0192 E U.S. Army Corps of Engineers/New York District DPermit Application=Wolfgang Peter Haack: Proposes to construct a 4'x55' reinforced polypropylene thru- �k SEP Z 5 ZOZ4 flow catwalk with 9"timber piles, 2.6'x14' gangway ramp and 6'x20' floating dock with 10"timber pilings. ! Sout!►oidTaam 700 Deep Hole Drive 90domstm Town of Southold, Suffolk County on Deep Hole Creek Concurrence with Consistency Certification Dear Peter Haack: The Department of State received your Federal Consistency Assessment Form and consistency certification and supporting information for this proposed activity on April 11, 2024 and began its review of it pursuant to 15 CFR§ 930.60 on that date. The Department of State has completed its review of the consistency certification regarding the above proposed activity with the New York State Coastal Management Program. Pursuant to 15 CFR§ 930.62, and based upon the project information submitted,the Department of State concurs with your consistency certification for this activity. This concurrence is without prejudice to and does not obviate the need to obtain all other applicable licenses,permits, or other forms of authorization or approval that may be required pursuant to existing State statutes. When communicating with us regarding this matter,please contact Bradi Gaer at(518)485-7466 (e- mail: bradi.gaer@dos.ny.gov)and refer to our file#F-2024-0192. Sincerely, Matthew P.Mara io Director, Development Division Office of Planning, Development and Community Infrastructure MM/bg YORK Department STATE OfState ecc: COE/New York District—Arlene Tirado . DEC Region 1 —Kim Lamiroult 1-4738-03552/00003 LVW Town of Southold—Mark Terry ® EC VE, SEP2520 Southold Town Board of Trustees i a NEW YORK STATE DEPARTMENT OF ENVIRONMENTAL CONSERVATION Division of EnvironmentaPPerinits,Region 9" SUNY @ Stony Brook,50 Clrcle Road,Stony Brook,NY 11790 P:(531)444-03651 F:(531)444-0360 www.dec,nY;94Y 4uly-5, 2024 Peter Wolfgang Haack 700 Deep Hole Drive Mattituck; 'NY 11952 Re: NYSDEC Permit# 1-4738=03552/00.003. 'Haack Property—700 Deep Hole.Drive SCTM# 1000-1.1542-10 Dear Permittee: . In conformance with the requirements of the,State Uniform Procedures Act(Article 70, .ECL) and .its.implementing regulations (6NYCRR, Part 621) we are enclosing.your permit for the referenced activity. Please carefully read all permit conditions and special permit conditions contained in the permit to ensure compliance during the term of the permit. If you are'unable to.comply with any conditions please contact us at the above address,, Enclosed is a permit sign which is to be conspicuously posted at the project site and protected from the weather and a Notice of Commencement/Completion of Construction-. Sincerely, ht Kim Lamiroult Environmental Analyst cc: BMHP File R E V 25 2024 Southold Town Board of Trustees s vo�Ax ,Iyepartrnett>�oY' ATE Eavlronmel comiiiatlon. 1 AOL rw NEW YORK STATE DEPARTMENT OF ENVIRONMENTAL CONSERVATION Facility DEC ID 1-4738-03552 PERMIT Under the Environmental,Conservation Law CL Permittee and'Facility Information Permit Issued To: Facility: PETER WOLFGANG HAACK HAACK PROPERTY 700 DEEP HOLE DR 700 DEEP HOLE DRISCTM 1000-115-12-10 MATTITUCK,NY 11952 'MATTITUCK,NY 11952 Facility Location: in SOUTHOLD in SUFFOLK.COUNTY Facility Principal Reference Point: NYTA4-E:. 700.265 NYTM-N: 4540.738 Latitude: .40°59'27.6" Longitude: 72'.0'43.9" Project Location: Deep Hole Creek Authorized Activity: Construct 4'x.55'thru flow.catwalk,with 14'ramp, 6'x 20'float, and associated. pilings. All work shall be done in accordance with the plans.prepared by BKH.Architect,;last revised 12/21/23; and stamped, "NYSDEC Approved" on 7/5/2024. KLL Permit Authorizations Tidal Wetlands-Under Article 25 Permit ID 1-4738-03552/00003 New Permit Effective Date: 7/5/2024 Expiration Date: 7/4/2029 NYSDEC Approval By acceptance of this permit,,the,permittee agrees that the permit is contingent upon strict compliance with the ECL, all applicable regulations,.and all conditions included as part of this permit. Permit Administrator:LAURA F STAR, Deputy Regional Permit Administrator Address: NYSDEC Region 1 Headquarters SUNY @ Stony BrookJ50 Circle Rd . Stony Brook,NY 11790-3409 Authorized Signature: : .. - Date. / 'S /?} Distribution List Bureau of Marine Habitat Protection ADID - ► EVE File SEP252024 Southold Town Page 1 of:6 Board of Trustees. s NEW YORK STATE DEPARTMENT OF ENVIRONMENTAL CONSERVATION Facility DEC ID 14738703552 Permit Components NATURAL RESOURCE PERMIT CONDITIONS GENERAL CONDITIONS,APPLY TO ALL AUTHORIZED PERMITS NOTIFICATION OF OTHER PERMITTEE OBLIGATIONS NATURAL RESOURCE PERMIT CONDITIONS -Apply to the Following Permits: TIDAL WETLANDS 1. Conformance With Plans All activities authorized by this permit must be in strict conformance with the approved plans submitted by the applicant or applicant's agent as part of the permit application. Such approved plans were prepared by BKH Architect,last revised 12/21/23. . 2. Post Permit Sign The permit sign enclosed with this permit shall be posted in a conspicuous location on the worksite and adequately protected from the weather. 3. Notice of Commencement At least 48 hours prior to commencement of the project,the permittee and contractor shall sign and return the top portion of the enclosed notification form certifying that they are fully aware of and understand all terms and conditions of this permit. Within 30,days of completion of project,the bottom portion of the form must also be signed and returned, along with photographs of the completed work. 4. Storage of Equipment,Materials The storage-of construction equipment and materials shall be confined within the project work area and/or upland areas greater than 75 linear feet from the tidal wetland boundary. 5. Maintain Erosion"Controls All erosion control devices shall be maintained in good and functional condition until the project has been completed,and the area has been stabilized. 6. No Disturbance to Vegetated Tidal Wetlands There shall be no disturbance to vegetated tidal wetlands or protected buffer areas as a result of the permitted activities. 7. No Dredging or Excavation No dredging,excavating or other alteration of shoreline or underwater areas is authorized by this permit,nor shall issuance of this permit be construed to suggest that the Department will issue a permit for such activities in the future. 8. Dock, Catwalk Size Dock or catwalk shall not exceed 4 feet in width and shall be a minimum of 1 i foot above grade(as measured fiom ground to bottom of dock/catwalk decking)over tidal wetland areas. 9. Catwalk Decking-60% Open Space The catwalk decking shall be constructed of fiberglass grating with a minimum of 60%open space to reduce shading impacts. SEP 25 2024 Page 2 of 6 Southold Town Board of Trustees NEW YORK STATE DEPARTMENT OF ENVIRONMENTAL CONSERVATION Facility DEC ID 14738-03552 lo. Wood Preservatives a. Pressure treated wood used for construction of in-water structures must have undergone a treatment process approved(stamped or otherwise marked as certified)by the American Wood i Preservative Association. ' b. Wood treated with Pentachlorophenol(PCP)must not be used in marine or brackish waters. Wood treated with PCP must be aged in the open air for at least three months prior to in-water use. c. The use of creosote treated wood is prohibited both in the water and upland areas. d. Chromated Copper Arsenate(CCA)pressure treated wood must be clean and free of CCA surface deposits. Wood with surface deposits must be washed for at least 5 minutes under running water prior to use. The washing must occur greater than 100 feet landward of any regulated wetland and/or water body. (Note "E."below for handling wash water.) e. Any wood debris such as sawdust or wash water must not enter any water body,including wetlands or protected buffer areas. f , 11. No Permanent Structures on Dock No permanent structures shall be,installed on l dock/catwalk/float without first obtaining written Department approval(permit,modification,or s amendment). 12. Dock Pilings The dock shall be constructed with maximum piling dimensions of 4 inch by 4 inch for the catwalk and 6 inch diameter pilings for the float. f 13. No Structures on Pilings No structures, other than structures specifically authorized by this ' permit, shall be constructed on pilings without further authorization from the department(permit, modification or amendment). 14. Float Installation The float shall be,installed only at the approved location with a minimum water depth of 2'/2 feet,measured at apparent low tide. 15. No Floats,Ramps in Vegetated Tidal Wetlands Floats and ramps may not rest on or be stored in any vegetated tidal wetland. 16. Seeding Disturbed'Areas All areas of soil disturbance resulting from the approved project shall be stabilized with approved native vegetation(see attached list)immediately following project completion or prior to permit expiration,whichever comes first. If the project,site remains inactive for more than r . , 48 hours or planting is impractical due to the season,then the area shall be stabilized with straw or hay mulch or jute matting until weather conditions favor germination. ' 17. Seeding Disturbed Areas All areas of soil.disturbance resulting from the approved project shall be j stabilized with appropriate vegetation(grasses, etc.) immediately following project completion or prior to permit expiration,whichever comes first. If the project site remains inactive for more than 48 hours or planting is impractical due to the season,then the area shall be stabilized with straw or hay mulch or jute matting until weather conditions favor germination. IC VE I Page 3 of tEP 2 5 2024 i i Southold Town �oAPri nfTrimPm— r� NEW YORK STATE DEPARTMENT OF ENVIRONMENTAL CONSERVATION Facility DEC ID 1-4738-03552 18. No Construction Debris,in Wetland or Adjacent Area Any debris or excess material from construction of this project shall be completely removed from the adjacent area(upland)and removed to an approved upland area for disposal. No debris is permitted in wetlands and/or protected buffer areas. 19. Materials Disposed at Upland Site Any demolition debris, excess construction materials,and/or excess excavated materials shall be immediately and completely disposed of in an authorized solid waste management facility..These materials shall be suitably stabilized as not to re-enter any water body, wetland or wetland adjacent area. 20. State Not Liable for Damage The State of New York shall in no case be liable for any damage or injury to the structure or work herein authorized which may be caused by or result from future operations undertaken by the State for the conservation or improvement of navigation, or for other purposes, and no claim or right to compensation shall accrue from any such damage. 21. Precautions Against Contamination of Waters All necessary precautions shall be taken to preclude contamination of any wetland or waterway by suspended solids, sediments,fuels, solvents, lubricants, epoxy coatings,paints,concrete,leachate or any other environmentally deleterious materials associated with the project. 22. State May Require Site Restoration If upon the expiration or revocation of this permit;the project hereby authorized has,not been completed,the applicant shall,without expense to the State, and to such extent and in such time and manner as the Department of Environmental Conservation may lawfully require,remove all or any portion of the uncompleted structure or fill and restore the site to its former condition. No claim shall be made against the State of New York on account of any such removal or alteration. 23. State May-Order Removal or Alteration,of Work If future operations by the State of New York require an alteration in the position of the structure or work herein authorized,or if,in the opinion of the Department of Environmental.Conservation it shall cause unreasonable obstruction to the free navigation, of said waters or flood flows or endanger the health,safety or welfare of the people of the State,or cause loss or destruction of the natural resources of the State,the owner maybe ordered by the Department to jremove or alter the structural work, obstructions, or hazards caused thereby without expense to the State, and if,upon the expiration or revocation of this permit,the structure,fill,excavation, or other modification of the watercourse hereby authorized shall not be completed,the owners, shall,without expense to the State, and to such extent and in such time and manner as the Department of ! Environmental Conservation may require,remove-all or any portion of the uncompleted structure or fill f and restore to its former condition the navigable and flood capacity of the watercourse. No claim shall I be made against the State of New York on account of any such removal or alteration. f SEP 2 5 2024 Southold Town Board of Trustees Page 4 of 6 4 ® ECG ;M� v NEW YORK STATE DEPARTMENT OF ENVIRONMENTAL CONSERVATION Facility DEC ID 1-4738-03552 SEP' 2 5 2024 �uu�nacl town GENERAL CONDITIONS -Apply to ALL Authori;ed-P-eA its.:2r Trustees 1. Facility Inspection by The Department The permitted site or facility, including relevant records,is subject to inspection at reasonable hours and intervals by an authorized representative of the Department of Environmental Conservation(the Department)to determine whether the permittee is complying with this permit and the ECL. Such representative may order the work.suspended pursuant to ECL 71-0301 and SAPA 401(3). The permittee shall provide a person to accompany the Department's representative during an inspection to the permit area when requested by,the Department. A copy of this permit,including all referenced maps, drawings and special conditions, must be available for inspection by the Department at all times at the project site or facility. Failure to produce a copy of .the permit upon request by a Department representative is a violation of this permit. 2. Relationship of this Permit to Other Department Orders and Determinations Unless expressly provided for by the Department, issuance of this permit does not modify, supersede or rescind any order or determination previously issued by the Department or any of the terms,conditions or requirements contained in such order or determination. 3. Applications For Permit Renewals,Modifications or Transfers The permittee must submit a separate written application to the Department for permit renewal,modification or transfer of this permit. Such application must include any forms or supplemental information the Department requires. Any renewal,modification or transfer granted by the Department must be in writing. Submission of applications for permit renewal,modification or transfer are to be submitted to: Regional Permit Administrator NYSDEC Region 1 Headquarters SUNY @ Stony BrookJ50 Circle Rd Stony Brook,NY11790-3409 4: Submission of Renewal Application The permittee must submit a renewal application at least 30 days before,permit expiration for the following permit authorizations: Tidal Wetlands. 5. Permit Modifications,Suspensions and Revocations by the Department The Department reserves the right to exercise all available authority to modify, suspend or,revoke this permit. The grounds for modification, suspension or revocation include: a. materially false or inaccurate statements in the permit application or supporting papers; b. failure by the permittee to comply with any terms or conditions of the permit; c. exceeding the scope of the project as described in the permit application; I ' d. newly discovered material information or a,material change in environmental conditions,relevant technology or applicable law or regulations since the issuance of the existing permit; Page 5 of 6 NEW YORK STATE DEPARTMENT OF ENVIRONMENTAL CONSERVATION Facility DEC ID 1-4738-03552 e. noncompliance with previously issued permit conditions,orders of the commissioner,any provisions.of the Environmental Conservation Law or regulations of the Department related to the permitted activity. 6. Permit Transfer Permits are transferrable unless specifically prohibited by statute,regulation or another permit condition. Applications for permit transfer should be submitted prior to actual transfer of ownership. NOTIFICATION OF OTHER PERMITTEE OBLIGATIONS Item A: Permittee Accepts Legal Responsibility and Agrees to Indemnification The permittee, excepting state or federal agencies,expressly agrees to indemnify and hold harmless the Department of Environmental Conservation of the State of New York,its representatives,employees, and agents ("DEC")for all claims, suits, actions,and damages,to the extent attributable to the permittee's acts or omissions in connection with the permittee's undertaking of activities in connection with, or operation and maintenance of,the facility or facilities authorized by the permit whether in compliance or not in compliance with the terms and conditions of the permit. This indemnification does not extend to any claims,suits,actions, or damages to the extent attributable to DEC's own negligent or intentional acts or omissions, or to any claims, suits, or actions naming the DEC and arising under Article 78 of the New York Civil Practice Laws and Rules or any citizen suit or civil rights provision under federal or state laws. Item B: Permittee's Contractors to Comply with Permit The permittee is responsible for informing its independent contractors,employees, agents and assigns of 1 their responsibility to comply with this permit,including all special conditions while acting.as the permittee's agent with respect to the permitted activities,and such persons shall be subject to the same sanctions for violations of the Environmental Conservation Law as those prescribed for the permittee. Item C: Permittee Responsible for Obtaining Other Required Permits The permittee is responsible for obtaining any other permits,approvals, lands,easements and rights-of- way that may be required to carry out the activities that are authorized by this permit. ` Item D: No Right to Trespass or Interfere with Riparian Rights This permit does not convey to the permittee any right to trespass upon the lands or interfere with the j riparian rights of others in order to perform the permitted work nor,does it authorize the impairment of any rights,title,or interest in real or personal property held or vested in a person not a party to the permit. r SEP 2 5 2024 Souti d Town Board foi�Trus ees Page 6 of 6• NEW Department of m STATE Environmental 0 m d Conservation rt 0,p N Tr i� M o U O L-------- NOTI.CE The Department of Environmental Conservation (DEC) has issued permit($) pursuant to the Environmental Conservation Law for'work being conducted at this site. For further information regarding the nature and extent Of work approved and any Departmental conditions -on it, contact the Regional -Permit Administrator listed below. .Please refer to-the permit number shown when contacting the DEC. Regional Permit Administrator SHERRI AICHER Permit Number: 1-4738=03552/00003 NYSDEC Region 1 Environmental Permits 50 Circle Road Stony Brook, NY 11790-3409 Expiration Date: '07/04/2029 Email: dep.r1@dec.ny.gov Note: This notice is NOT a permit NOTICE OF COMMENCEMENT OF CONSTRUCTION RETURN'THIS FORM-TO:COMPLIANCE Or Fax,to: 631-444-0272 Marine:Habitat Protection-NYSDEC E=Mail-.dec.sm:R1MHP-BEH@dec.ny;gov SUNY at Stony,Brook. 50'.Circle.Road Stony Brook,NY 14.790-3409' PERMIT NUMBER: EXPIRATION DATE: PERMITT,EE NAME&-,PROJECT ADDRESS: CONTRACTOR'NAME&ADDRESS: TELEPHONE-., Dear'.DEC,- !Pursuant to,the special conditions of the referenced permit,.you are hereby notified thatrthe.authorized+activity;shall copmence,ort We certify that we'have,,read the referenced permit and approved plans.arfOully understand the'.authorized,project and all,permit conditions.,We'have in5pected1he,project site,:and can.compldte the project as-described in the, permit and•asAdoieted on the.approved plans. We canido,so�in full,compliance with ail„Olan,notos,and•,pprmit conditions,The�permit, ;permit sign,an4a,pproved plains will'be,available gMhe`site'for inspection in accordance with.0eneral,ConditiggNo.'1,. '(Both signaturi*r quir6d)� PERMITTEE: DATE- SEP 2 5 2024 C;ONTRACTQR,. PATE THIS^,NOTICE�MUST,'BE SENT TO THEA'BOVEAODRESS,AT,LEAST TWO D4YSPRIOR,,TO COIVIMENCEMENT-OF THE; PROJECT AND/,OR A'IVYA'SSO.CIATED-ACTIVlTIES. FAILURE Tb RETURN THIS NOTICE,POST;THE.;PERMif 81.,,GN, OR'HAVE THE PERMITAND,APPROVED PLANSA'.VA'ILABLE AT,THE WORKRITE FOR THE'DURATION,OF'THE P.ROJECT,MA'Y SUBJECT THE PER.MI,TTEEA.'NDIOR CONTRACTOR,TO,APPL'ICA'BLE'SANCTIQNS AND'PENA'LTIES,F-,OR,NQN,=COMPLIANCE,W'.IT,H'f PERMIT�CONDITI,ONS. Cu_t along this line-.X X X X X X X NOTICE OF COMPLETIOWOF CONSTRUCTION, p iRETURN"THISFORM-TO:COMPLIANCE Or Fax to: 631-444.0272 'Marine,,'Habitat'Protection--NYSDEC E-'Mail-decsm:R1MHP=t3EH,@dec.ny,gov '59,Circle-Road Stony'.Brook,NY 11790-3409 PERMIT NUMBER: EXPIRATION DATE. PERMITTEENAME&:PROJECT ADL RESS: CONTRACTOR NAME&;ADDRESS: TELEPHONE: Pursuant to,special conditions:of We referenced permit;you are Thereby notified thatt tL authorised-acfivity.was.completed'om .,Wet have fully complied with the-terms and conditionsof.th'e.permit.and'.approved plans.(Rothusignatures required) PERMITTEE: DATE CONTRACTOR: DATE TH(S NQ.TICE WITH,PHO;TOGRAPHS'.OF THE`COMP,LETED I,ORK'ANDI R A COMPL'ETED.,SURVEY,.,AS-APPROPRIA,TE, MIDST SE SENT. TO THE,:AB.OVE R'DDRESS''WIMIN 30,,D4.,YS OF.COMPLETION.S.OF THE PROJECT t - : N 1 NEW SUFFOLK AVE' 1 i i N 11,`• ;., —•�- — — —�.---. 205.442E I DEEP HOLE CREEK Ir '• _ ---- Ji a c yrV .sz_ fPCPxe ruu --r R -in :.:t,; = =e:::::.:--,,"> :.,:Y.ec`? n oasnaiDrcar•'- .� 2�.y , .C .__. �,� '...�. .�_�_�.. _ . . 1.•.1 � b I � NT .Fpi�FiE�V.u4' � -_ I I � x ^•41 I N —;.___—_—_"_ `'1:�—ti � r1 a5(an ovc'+y .- 1� N im.K`. WQOCWl. ; y i r'•-% 1 s \ � - I � iF9RIDf(d(rG MCIC I ~ 1 ` \ ! I I I ' 61l;.WAD - i f 11 I� I I y I BUILDING INFORMATION p (n cn - wo ot�wuast:-fuYttnu,frcoma . Sll p -IT1 _ usr•NnG DPL,u ew a Inu n aws ra+o few nes t xme a N Q� �� � ✓ Im 5,E•50annmtt W,Fb.4m4n 5a fr. PLOT PLAN D, ,•.ems 11 p N j f aaaDMcamuraawummracmr:tGl¢r/&AIKE1b®LVG' 1 - I 9R.4rPfMLKA 1 Vt)SY DLLtftl6afONiCS YMYY�18P/era61 1 i iIs WA'®etl NMMI MY VI' NL�(O TEAeGXi�/ Q.. V 1 CDCD ,R,y ��' ''r;7�"t. •'. ^ AYaOI^cS/yPEEiE'2E SaJmM3 ZO EA'E •1��� - y_.� '�' DA7E D •r � l0[ATAI Of WGTHGI' 3 ^�1�T � I �I cLQ 431-11 1597cL5® l/.NS'c`Tti E'"" 'ONE A'•i It ,i V 0 - ;.t:;} � J LCi. :'r=?, •c-.;- 1 r<;-�t�. .!:.I PROP05ED DOGK ,i',;?'m I:ri.li •il, >il�. il;:. :..• +jj{{•;.�'_y�{-.y_� u ..:� '' .. .. _. - . PETER d- K-M TtmRr I -dn _:'.., -t��,..�t ,I;l 11:`'1 I !f 1!i 1 I: �:-'',P:r t.1«a::?, q U�� -'-r+�'{� �:li'!i?' 'li�:�i `r�:F?:->�'��.•', _wA D,•Iksa woo�laEoarvE FIRM MAP _ —— __.__._._ -k. � c� UVIE(�y knnurna*`-'a::r: l83 pot hN0-NODt bl'q,Dl Illa5 - 9U1E NfS PM VJ•rMbl�-.^_��_—..��_ 631-]41-13]B -- � ��. �rv%•x,oxdeal ��rvmt DNtanrPPNP WA:e vcNew vrarar®�rrP,prtue - -_ � _.—._—. —._ J '.I -.i,.:ti.�V bMi ilk DOCK PLAN ®. •�tii-3071 .� I. U) �vwsuucaraa*onset ayewmon�sraawn iwrlutae O PGUCU iMCV RP IMIOiolBt pLd A`D4w1.WNE A Wwlw rP[wflIXOP a wXv oemiron-as a.•rssuu oc�u�-Knr�w�rF nreuraMAr.wu+IwA � nS � O w�mAsaariansrwwlroraar sxn-rr�+nrra rYr�necrsr p O N • `; �,-� use oeim 1 nesYu w�enwow coKs�rnesrmcrxaemis No swAs � I`-' -� cuoae e• 1 croslronswe .us.surirmcrnrasmow urolaeo• � �_ >•-. /V NSNC ror2 M.81Y09tM 1A11?nWKNfOTfiBaw Lf IJ - 1 BNIK9i Ce AISBIIAYBV.Ot''�90)WIM14K 5!NLLt�AIWCPNI - 1� a:ew�ualnwwcee cmreuuroavaese � n n n N O`� _ t M�vneec�wrA�roMsa�uelee vvunans _ Iu'-'I '-+ rnarte scuff ns aeevsars�rlecnro fAY muuslurc - � fZ �� `11 xv+F,c�wreexYas ue ` ru,Kgswo,emuorowrerwrenwww arwa mvesa.eu.� - wmeoaPnnuv� t` 1es,uowmnlme++nreemeroxaeo wroeroo awnwrow. �y� O GO i rimwuawmlmn.arrwrnuwreaxwons�wrcrnu W O as+uuar..wL-0-wutlnrwrweawn•rooaer m IEtwi I1L a WArg6 i211 M R56Y leG1M1 Y W l�RHI®1AN Atl { - � �I xwwswAa�crxAusxxremwsecasmcrnl L t 1 DOCK FRAMING PLAN ll SECTION A d B .uu.sx•.ra , • PMfl�tMB1 mua nafaa swswr _ roves l - P7AIL1'F]ASPEAi@it9 j � At�CC101i1�$a�a QFA1t11" sa D0.7E si. ^f- PRO?O°.ED DOCK PoR - FETER 6 BRE HAAGK _ goo HO - ur aasx 7B3 Pa:QNe-wfk SWi,lyI'6 cauaaMb �tacu«ta PYw� DOCK ELEVATION I _ t° :� .b' R t ti.,:.'rj � Yam. ,?'•�r'" F '� }-' �i.`� fir' ,a s� •<� � m PP ".a oil Now • t r L !` *'TA rb11 t' sy .�.�'� 7i•' • �13 s ''^ � a �• � � .�. � r> '�<a � " y!R All !�` - ,. allKi \v b ._, For �e R�a 6I. �? �+3<Y 1� 7 ` l � �•� �ti� ry.�i `� ��. tr 'ft ,i 'S, w `ir;�� fiW,I. SN / '6wA r a .y,� =`�y�, ~'� aI ,-��h+�r ���"��1�t��Y�tR"•r ` :{ 3��e/�� t 7�f � �.`A{' � y !��• F3Jgt= ->k19`:` nrf;�,`'�+'"A,•Ye �y o ,s' .,.�Tir`+.`��;���'-�i�'3t� i� 'F/ /I► .'4 y� C��it s'SI� f � ' . �i1i `a 9 ,s:"� 'swab _a <' E.// V, a '�. Via, .��,., , ,•� x ;�, t,,� 8 see `'�— ". � __; �.1+,t u ,L+,X� `i� t '^:.�,� S�e.y y.�� ? ,,i},�� A`»,. �,�iy�a^� �, ';F' �►'S�°��1_+� HIM IL t � �.✓.,ice .9''a ^y�+�ti � ! ;is '`^LYt �,,.,,�-i yy�T,3t `.qR S•�r, r*.� �Y:t' i; �^� �4 �� r w .. yJ r �'3-.ti � *� ,. � j-�w�- l�tl+1����� ��'Rif_ -'�'� r�+ � �ey��y,i� - s3i �"!�-..► a! � T a y`�f �a�� �'�1.: '��� !,ta�,. ` a` \�'�r:'�� '-`f •r .� .�f� � � �,.�?,-= c-..,.a _ _� Wv or a+ Y _ ,(yp�}���ry�t�� �;sy •a {� � j �r�Q� � ! �r fr � s.' � B Y F"n,.,I� " .�.3 ,''�.. - ". �,�pyY...fi�r� .-ro a� r'-;s.'rr `►�� '.'f ii'i{C.• /7Z1`�'�'������j` :�.�". �i '" -" sj•p �` . *Ef�i3�- ��►�:;�� �� _ any $ „ty wd! el'y\�,� �. �(� n ♦p'0i�ay � �' y-�, .' ../� ..Ai ��' .��.�' / � r,] /yam! ,7A 'I YIIVI `ems D aX " ` 'a(.A.�' �►`� z yam ',e� ��� 1 r�{$�I�y s v,• ;�t �� � ♦ ..!!� ����l:�lsrdt�,��L e� � �`�. ✓. "s� .�"•i.Y 'pj�q k:,( Y.. �; � s V � �„�,. ,.f �u'� Z yE'� tit s '.rll►, itr. ?� •e�� ���I .A. a� /�t�.✓yyh ii►+3* 49K • r/+ `� 't•Oda'► �..F 'f yt ''r �� Y�l "r •"� .` }� _ r'ix- "� o�, 'ttr �.`�'r ►`` v �' ��� r�!.. ...ef�v... 4ai ^t�1" 1 ",^+•� moo. = :Y'c�. 'Qs �Y r a ag Z .ra. t+ t i, `. .yti�,�L'►` � �r J� ,�,� , �� �,,��/�t�7R... r .e y�C���.,- ,��: 1T��i,� s:.�i9�,�iE ;fit':��� a�y��>=�- e '�,.. :III' �,y�'��" '�R�, ►>. y fir• �y ��� -,� +� 1:, 'L y ��.yy,.r`�!,P '� ',{yQ�'`�t.+�t�J;:' y`'� ': �. !�" ��i� r.,'�ty Y ►`� ,/ ��'L``��ie¢7e, �..,:��,yi,r,�,E'°..%,,r�/�gr +s��,-.C` �*�-1.,. "y�` ��i�,�,`�`''. ' S� .�,�,s.._-.�-���/tt�": Fr.:.,(-;.4[YJ's f✓(/" 't;�,,e� •�L .71r.�.�- 'veaiD�F r t �„�Y�,��t. �� �x '�16.` jr�+� r i�'�yy��"r-<� �.•.r � �' -�Mr .,r�r-r�,�� f�•t�r :, � �Yk i -�" �.�`y�'S�� _.,y �,ri,�i r +;�. ti etj j� h,�`'. �;7 g_.' * wi,� ;,.. +.mx � . .40e`R-�, 'i t �� � '+'+ti►A'd y e f''�`'' `�� i � g',t � a •�3�"it! � P # ire r, '�; � s e° Se _ I T7 Dock J Tb West ��e : W.0•.s4 X ..-..•'v I r-43 ,ec'£SEL NO IOe - $ 0.2 W .ram L wtc se Bl ENPORT .r..... aea,.° S Iq 1.ow'j+ act GRRE �- m mm �l a,n n>ARa ,g x�A 1 x u '• .. � 9 " �, 1 Y° Oart,'re�rA w u rMcl32 rraaRe.e°u�rw • IW �° o-Y tl MPtN -.. ,n vta 5°'-• 1 2P ° A3 Y3.ah) ;$ a s , m e e v .; ., ,,.. I... r W�'I t�y ate,+t��° �, �:. s9... K. '�`'q� �"� <, $4e-�y`_'1.. . •e w, " r'T' ora°t9 - t2Ct.43 Is I«M«r�� gym- _^ i� la; ! "' �, z r=• ,� `; �' � '' ,JW t S�..9•- � Yc p{Sir s� I _ i w�,) 1 ,b; s�t 1 �t r MARWOO KA �° E ss.trri. >u ! yw ) 11 5 p,A .. x 9 �.�.- ^---_--A ...,llVr.�^�_ -6 •y' 00.gF"tJ25 r J eag9l in,p ao ) p a ° 2v. M 4 _ -_-._ -s: YY rAl4 19 1k — LOaMI aF SOUINOLO A 1Yi-) l 93 e 9 °- )S 1 16 S t �aYl N __ y P• i 11 .. AYC... t „� Y ti23�3 °� n YA , � j4 ,F;^d•-�"'�.,.. ��\.�:., ) -T:J � � 3. ; �K _ - 1t ° MI" aD .. , m. 13 a SUpFOLK� � A � >ti t 1 :Owl f n12 EK j °'l"id a< ,..a% b bees a�Fl 23Ata' •r \�\ \ ?.."; ' y'ir'S 4.a i' _- e _-a •1°` 1 jH , �'9 n� y e �- � y - 1?J2� �,e�Y I 29 •,• »" c� Ys 2.Al4 \N{EY ` Y !,} 20 7i a {' `"•a a `, T. 11�. t ;1• ; i x" • y w 1� a y! i p1 n. i s ten. e ..\ 1. 9 °�\�\� ,\• _. M{ i., N- s.N$ T �'a �FP��i S i�L_•� ° fit+'D N1 -- _� r \\ ., t�s°„cl. _ la. ° d-.. In3(kY _..w ! aY- ''\•e ' PM MCEl 't t21wm23 . ,�. < 8$ � •° 3 n� _...� °� Y 9�� S � � L� n. q t '' o __ •�y,Ala ,� yy m I-. A,s ra a, Jy t .,W '� Y. j2 y_{ IY� s77 5TA v)1 4 of 0-0 FOP a_HO FORPoINCA R'O:: i1B I ON. C \•e,. a✓wt..w, DL ux112na BEE SEc NO. r , 8E-UYNQ 3' I 2 \G 7',P� I T 12 i YYOS+TM {i'.9.4rV1 6FE st-r NO,23 Yn-w ac q r+. riz— ...�: COUNTY OF SUFFOLK© f NOTICE K 100e SECTION NO RuA Properly lax Eenice Aµency .*A W touTNoan 115 IF Carol Brown,Co-Chairperson Town Hall,53095Main Rd. Lauren Standish,Secretary P.O.Box 1179 Southold,NY 11971 Telephone(631)765-1889 Conservation Advisory Council Town of Southold At the meeting of the Southold Town Conservation Advisory Council held on Tues., October 15, 2024 the following recommendation was made: Moved by John Chandler, seconded by Shannon Wright, it was RESOLVED to SUPPORT the application of WOLFGANG P. & BRENDA J. HAACK to construct a residential dock consisting of a 55' fixed walkway with thru-flow decking, 14' wood ramp, and 6'X 20' floating dock. Located: 700 Deep Hole Dr., Mattituck. SCTM#115-12-10 Inspected by: John Chandler The CAC Supports the application and recommends the dock is located within the pier line, moving it back 6'. The CAC recommends a fixed dock if the water depth is inadequate. Vote of Council: Ayes: All Motion Carried i Glenn Goldsmith,President Town Hall Annex A.Nicholas Krupski,Vice President ,ic ��! 54375 Route 25 P.O.Box 1179 Eric Sepenoski it- i Southold,New York 11971 Liz Gillooly Telephone(631) 765-1892 Elizabeth Peeples Fax(631) 765-6641 BOARD OF TOWN TRUSTEES TOWN OF SOUTHOLD This Section For Office Use Only - Coastal Erosion Permit Application r EVE Wetland Permit Application Administrative Permit jilt ? 2d Amendment/Transfer/Exte sion Received Application: � ova Received Fee: $ Of L� p Completed Application: a7* Incomplete: - - SEQRA Classification: Type I__ Type lI Unlisted Negative Dec. Positive Dec. Lead Agency Determination Date: Coordination:(date sent): LWRP Consistency Assessment orm Sent: fD '� P7E ! y5 4CACReferral Sent: LDate ofInspectionReceipt of CAC Report: 24 _Technical Review: Public Hearing Held: 1� c� $puWd7own Resolution: Owner(s) Legal Name of Property (as shown on Deed): Wolfgang P. &.Brenda J. Haack Mailing Address: 700 Deep Hole Drive, Mattituck, NY 1195.2 Phone Number: 631.298.7459 (home) Suffolk County Tax Map Number: 1000 - 1000-115-12-10 Property Location: 700 Deep Hole Drive, Mattituck, NY 11952 Property on West side of road and East side of Deep Hole Creek, Approx. 700' South of New Suffolk Ave (If necessary,provide LILCO Pole#, distance to cross streets, and location) AGENT(If applicable): N/A Mailing Address: Phone Number: Email: wolfgang.p.haack.mil@army.mil ,4 hoard of Trustees Applicatiwa. GENERAL DATA Land Area(in square feet):,%974.(per survey Area Zoning:_Residential (per town land use map) Previous use of property: Private Residence Intended use of property: Erivate Residence Covenants and Restrictions on property? Yes _Z_No If"Yes", please provide a copy. Will this project require a Building Permit as per Town Code? Yes ✓�No If"Yes",be advised this application will be reviewed by the Building Dept.prior to a Board of Trustee review and Elevation Plans will be required. Does this project require a variance from the Zoning Board of Appeals? Yes ✓�No ; If"Yes", please provide copy of decision. his project reallir any demolition as per Town Code or as determined by the Building Dept.?- Yes —1✓ No Does the structure(s) on property have a valid Certificate of Occupancy? Yes=No Prior permits/approvals for site improvements: Agency Date Southold Town c/o for Solar panel inst 03/2024 ❑ No prior permits/approvals for site improvements. Has any permit/approval ever been revoked or suspended'by a governmental agency? F-1 No W] Yes If yes, provide explanation: Project Description(use attachments if necessary): Construct residential use dock on property in accordance with all applicable codes and regulations (Army Corps of Engineers, NYS DEC and Southold Town). 55' fixed walkwaywith- flo-thu decking, 14' wood ramp, UxW floating dock located on west side of property-on Deep Hole Creek Board of Trustees Application WETLAND/TRUSTEE LANDS APPLICATION DATA Purpose of the proposed operations. Residential use of dock to more easily access creek for recreational use (fishing, kayaking, swimming, boating) Area of wetlands on lot: 1000 square feet Percent coverage of lot:. 0 Closest distance between nearest existing structure and upland edge of wetlands:75 feet Closest distance between nearest proposed structure and upland edge of wetlands: 0 feet Does the project involve excavation or filling? 0 No Yes If yes, how much material will be excavated? cubic yards How much material will be filled? cubic yards Depth of which material will be removed or deposited: feet Proposed slope throughout the area of operations: _ I Manner in which material will be removed or deposited: N/A Statement of the effect, if any, on the wetlands and tidal waters of the town that may result by reason,of such proposed operations (use attachments if appropriate): Little to no effect. Project will utilize appropriate building materials in accordance with all applicable regulations. NYS DEC has approved and issued permit. Commisure with existing docks in the area and will not adversly affect navigation or slope of wetlands nor impede shoreline 61 Z20 Appendix B Short Environmental Assessment Form Instructions for.Completing Part 1 -Project Information. The applicant or project sponsor is responsible for the completion of Part 1. Responses become part of the application for approval or funding,are subject to public review,and may be subject to further verification. Complete Part I based on information currently available. If additional research or investigation would be needed to fully respond to any item,please answer as thoroughly as possible based on current information. Complete all items in Part 1. You may also provide any additional information which you believe will be needed by or useful to the lead agency;attach additional pages as necessary to supplement any item. Part l=Project and Sponsor Information Name of Action or Project: Construct residential dock on property Project Location(describe,and attach a location map): 700 Deep Hole Drive, Mattituck, NY 11952 (East side of Deep Hole Creek) Brief Description of Proposed Action: Construction of residential dock on east side Deep Hole Creek in accordance with all appli� codes and regulations for homeowner to ease access to water of creek. 55'x4' flo-thru walk way, 14'x4' wood ramp and 6'x20' floating dock email: wolfgang.p.haack.mil@army.mil Name of Applicant or Sponsor: Telephone:631.298.7459 Wolfgang Peter Haack E-Mail:wolfgang.p.haack.mil@army. Address: 700 Deep Hole Drive City/PO: State: Zip Code: Mattituck NY 11952 1.Does the proposed action•only involve the legislative adoption of a plan,local law,ordinance, NO YES administrative rule,or regulation? If Yes,attach a narrative description of the intent of the proposed action and the environmental resources that ❑ may be affected in the municipality and proceed to Part 2. If no,continue to question 2. 2. Does the proposed action require a permit,approval or funding from any other governmental Agency? NO YES If Yes,list agency(s)name and permit or approval: Army Corps of Engineers (permit)INYS DEC (permit) : I Ez i 3.a.Total acreage of the site of the proposed action? .012 acres b.Total acreage to be physically disturbed? .012 acres c.Total acreage(project site and any contiguous properties)owned or controlled by the applicant or project sponsor? 9,974 acres 4. Che I land us at occur on,adjoining an ar the propq=4 action. Urban Rural(non-agriculture) Industrial Commercial Residential(suburban) Forest [:]Agriculture ✓ Aquatic QOther(specify): Parkland Page I of 4 1 5: Is the proposed action, NO YES N/A a. A permitted use under the zoning regulations? ✓ ` b.Consistent with the adopted comprehensive plan? ✓ 6. Is the proposed action consistent with the predominant character of the existing built or natural NO YES landscape? 7. 'Is the site of the proposed action located in,or does it adjoin,a state listed Critical Environmental Area? NO YES If Yes,identify: _ - ❑ ❑ 1 ✓ I 8. a.Will the proposed action result in a substantial increase in traffic above present levels? -NO YES b.Are public transportation service(s)available at or near the site of the proposed action? ✓ c.Are any pedestrian accommodations or bicycle routes available on or near site of the proposed action. 9.Does the proposed action meet or exceed the state energy code requirements? NO., . YES If the proposed action will exceed requirements,describe design features and technologies: N/A - - _.. ❑ 10. Will the proposed action connect to an existing public/private water supply? NO YES If No,describe method for providing potable water: NIA Fv� ❑ 11.Will the proposed action connect to existing wastewater utilities? NO YES, If No,describe method for providing wastewater treatment:,_N/A ❑ 12. a.Does the site contain a structure that is listed on either the State or National Register of Historic NO YES Places? ✓ E b. Is the proposed action located in an archeological sensitive area? ✓ , 13.a.Does any portion of the site of the proposed action,or,lands adjoining the proposed action„contain NO- YES wetlands or other waterbodies regulated by a federal,state or local agency? ✓ b.Would the proposed action physically alter,or encroach into,any existing wetland or waterbody? ✓ If Yes,identify the wetland or waterbody and extent of alterations in square feet or acres: Dock will extend into wetlands and Deep Hole Creek 1 walkway 220 sq ft, ramp 54 sq ft, dock 120 sq ft 14. ntify the typic bitat types that oc n,or are likely to be found on t1M roject site. Check all that apply: Shoreline Forest Agricultural/grasslands Early mid-successional ✓ Wetland Urban ✓ Suburban 15.Does the site of the proposed action contain any species of animal,or associated habitats, listed -NO YES by the State or Federal government as threatened or endangered? ✓ 16.Is the project site located in the 100-year flood plain? NO YES' TVT 17.Will the proposed action create storm water discharge,either from point or non-point sources? NO If Yes, m ❑ ❑ a. Will stor water discharges flow to adjacent properties? �NO DYES -J b. Will storm water discharges be directed to established conveyance systems ff an m drains)? ✓If Yes,briefly describe: NO YES Page 2 of 4 18.Does the proposed action include construction or other activities that result in the impoundment of NO YES water or other liquids(e.g.retention pond, waste lagoon, dam)? J ' If Yes,explain purpose-and size: _ __- - ___-_„-__ -_ _ --_ A ❑ ❑ 19.Has the site of the proposed action or an adjoining property been the location of an active or closed .NO YES , solid waste management facility? If Yes,describe: ❑ 20.Has the site of the proposed action or an adjoining'property been the subject of remediation(ongoing or NO YES completed)for hazardous waste? If Yes,describe: —--_ _ ❑ I AFFIRM THAT THE INFORMATION PROVIDED ABOVE IS TRUE AND ACCURATE TO THE BEST OF MY KNOWLEDGE Applicant/sponsor name: ftlfgang P. Haack,. . _... _.__. Date 19 July 2024 Signature: Part 2-Impact Assessment. The Lead Agency is responsible for the completion of Part 2. Answer all ofthe.following questions in Part 2 using the information contained in Part 1 and other materials submitted by the project sponsor or otherwise available to the reviewer. When answering the questions the reviewer should be guided by the concept"Have my responses been reasonable considering the scale and context of the proposed action?" No,or Moderate •small to large , impact impact, may may occur occur 1. Will the proposed action create a material conflict with an adopted land use plan or zoning El ❑ regulations? 2. Will the proposed action result in a change in the use or intensity of use of land? i. Will the proposed action impair the character or quality of the existing community? 4. Will the proposed action have an impact on the environmental characteristics that caused the ❑ ❑ establishment of a Critical Environmental Area(CEA)? 5. Will the proposed action result in an adverse change in the existing level of traffic or ❑ ❑' affect existing infrastructure for mass transit, biking or walkway? 6. Will the proposed action cause an increase in the use of energy and it fails to incorporate ❑ ❑ reasonably available energy conservation or renewable energy opportunities? 7. Will the proposed action impact existing: ❑ ❑ a.public/private water supplies? b.public/private wastewater treatment utilities? 8. Will the proposed action impair the character or quality of important historic,archaeological, El or aesthetic resources? El 9. Will the proposed action result in an adverse change to natural resources(e.g.,wetlands, ❑ ❑ waterbodies,groundwater,air quality,flora and fauna)? Page 3 of 4 No,or Moderate small to large impact impact may may occur occur 10. W ill the proposed action result in an increase in the potential for erosion,flooding or drainage problems? 11. Will the proposed action create a hazard to environmental resources or human health? Part 3-Determination of significance. The Lead Agency is responsible for the completion of Part 3. For every question in Part 2 that was answered"moderate to large impact may occur",or if there is a need to explain why a particular element of the proposed action may or will not result in a significant adverse environmental impact,please complete Part 3. Part 3 should,in sufficient detail,,identify the impact,including any measures or design elements that have been included by the project sponsor to avoid or reduce impacts. Part 3 should also explain how the lead agency determined that the impact may or will not be significant.Each potential impact should be assessed considering its setting,probability of occurring, duration,irreversibility,geographic scope_ and magnitude. Also consider the potential for short-term,long-term and cumulative impacts. Check this box if you have determined,based on the information and analysis above,and any supporting documentation, that the proposed action may result m one or more potentially large or significant adverse impacts and an environmental impact statement is required. Check this box if you-have determined;based on the information and analysis above,and any supporting documentation, that the proposed action will not result in any significant adverse environmental impacts. Town of Southold-Board of Trustees Name of Lead Agency Date President, Print or Type Name of Responsible Officer in Lead Agency Title of Responsible Officer Signaiure of Responsible Officer in Lead Agency Signature of Preparer(if different from Responsible Officer) i PRINT __ _ , Page 4 of 4 -Board of .Trustees Application ' AFFIDAVIT Wolfghang P.& Brenda J. HaackNr Mm.. Y BEING DULY SWORN DEPOSES AND AFFIRMS THAT HE/SHE IS THE APPLICANT FOR THE ABOVE DESCRIBED PERMIT(S)AND THAT ALL STATEMENTS CONTAINED HEREIN ARE TRUE TO THE BEST OF HIS/HER KNOWLEDGE AND BELIEF,AND THAT ALL WORK WILL BE DONE IN THE MANNER SET FORTH IN THIS APPLICATION .AND AS MAY BE APPROVED BY THE SOUTHOLD TOWN BOARD OF TRUSTEES. THE APPLICANT AGREES TO HOLD THE TOWN OF SOUTHOLD AND THE BOARD OF TRUSTEES HARMLESS AND FREE FROM ANY AND ALL DAMAGES AND CLAIMS ARISING UNDER OR BY VIRTUE OF SAID PERMIT(S),IF GRANTED. IN COMPLETING THIS APPLICATION,I HEREBY AUTHORIZE THE TRUSTEES,THEIR AGENT(S) OR REPRESENTATIVES,INCLUDING THE-,, CONSERVATION ADVISORY COUNCIL,TO ENTER ONTO MY PROPERTY TO INSPECT THE PREMISES IN CONJUNCTION WITH THIS APPLICATION, INCLUDING A FINAL INSPECTION. I FURTHER AUTHORIZE THE BOARD OF TRUSTEES TO ENTER ONTO MY PROPERTY AND AS REQUIRED TO INSURE COMPLIANCE WITH ANY CONDITION OF ANY WETLAND OR COASTAL EROSION PERMIT ISSUED BY THE BOARD OF TRUSTEES DURING THE TERM_ OF THE PERMIT. ' + a Si a of 16perty O.wn Signature of Property Owner SWORN TO BEFORE ME THIS Cro DAY OF j0q . •20.a EVEL.GATMCHWAMBORN NOTARY PUBLIC.STATE OF NEW YORK Rev,,truti,)n No,OIGA6274d8 Qualified in Suffolk County , commi,,ionlIxpires Dec.24,20-M t 1 P , APPLICANT/AGENUREPRESENTATIVE TRANSACTIONAL DISCLOSURE:•FORM The Town-ofSoutftold'sCode=of:Ethicsarohibi#s"conflicts_afinfere's"t%on the:hart%of fo�yri=ofScers'aiia=emolovees The-aurnoseof this;form'-is`toaroi+ide-informa�''Con'wtic6 can;.alert tt#e fowii--A o6i<Ali conflic"ts'of %, take=wh�tever.:actiomis necessarv:tb'avo"ids`ame, <. ... . YOURNAME: ANolfganw. & Brenda J. Haack . (Last name,first name;.q'iiddle'initial;unless you are applying in the name of someone"else or other entity,such as a company.If so,indicate the other persons or company's name.) NAME OF APPLICATION: (Check-all that apply.) Tax grievance Building Variance. Trustee ✓ Change of Zane Coastal Erosion Approval of plat Mooring Exemption from plat or official map Planning Other (If"Other',name the activity.) Do you personally,;�br through youccompany,spouse„sibling,parents orchild)have:a`relationship with any,officer,gr;omployee of the Town 43outh6ld? "Relation§hip"includess'ty'blood,marriage,.or busyness i#iierest ;``Business interest"means a,bustrress, including a;pa[taerslipsiq which the 1own.ocer=or employce has even a_partial ownership:of(or,employment byj a:corpoiafion in which the'tawiroffcer or employee owns more than 5°7o'of h6shares. YES ] NOFy If you answered"YES",complete the balance of this form and date and sign where indicated. Name of person employed by the Town of Southold Title or position of that person Describe the relationship between yourself(the applicant/agent/representative)and the town officer or employee.,Either check the appropriate line A)through-D)and/or describe in the space provided. The town officer or employee or his or her spouse,sibling,parent,or child is(check all that apply): _nA)the owner of•greatcr than-5%o:oft4c,shares of the corpgfate:stock ofthe•appt egnt. _n (when the applicant is a corporation); B).the legal or beneficial owner of any interest in a non-corporate entity.(whet wthe applicant is not a corporation); C)an officer,director,partner,or employee of the applicant;or D)the actual applicant. DESCRIPTION OF RELATIONSHIP Submitted t ' 9 d of Jyl 2#)24 Signature Print Nam o gang. .. ,_,"Brenda J:Haack Form TS I '� Board of Trustees Application PROOF OF MAILING OF NOTICE ATTACH CERTIFIED MAIL RECEIPTS APPLICATION NAME & SCTM#: NAME: STATE OF NEW YORK COUNTY OF SUFFOLK , residing at , being duly sworn, deposes and says that on the day of , 20 , deponent mailed a true copy of the Notice set forth in the Board of Trustees Application, directed to each of the above named persons at the addresses set opposite their respective names; that the addresses set opposite the Q names of said persons are the address of said persons as shown on the current assessment roll of the Town of Southold; that said Notices were mailed at the United States Post Office located at , that said Notices were mailed to each of said persons by CERTIFIED MAIL/RETURN RECEIPT. Signature Sworn to before me this Day of , 20 Notary Public , NOTICE OF HEARING NOTICE IS HEREBY GIVEN that a Public Hearing will be held by the Southold Town Board of Trustees at the Town Hall, 53095 Main Road, Southold, New York, concerning this property. OWNER(S) OF RECORD: WOLFGANG P. & BRENDA J. HAACK SUBJECT OF PUBLIC HEARING: For a Wetland Permit to construct a dock consisting of a 4'x55' fixed catwalk with Thru-Flow decking; a 3'x14' wood ramp; and a 6'x20' floating dock situated in an "L" configuration and secured by four (4) 10" diameter dolphin piles. Located: 700 Deep Hole Drive, Mattituck. SCTM# 1000-115-12-10 { TIME & DATE OF PUBLIC HEARING: Wednesday, October 16, 2024 — at or about 5:30P.M. If you have an interest in this project, you are invited to view the Town file(s) which are available online at www.southoldtownny.gov and/or in the Trustee Office until to the day of the hearing during normal business days between the hours of 8 a.m. and 4 p.m. BOARD OF TRUSTEES * TOWN OF SOUTHOLD * (631) 765-1892 i Town of Southold LWRP CONSISTENCY ASSESSMENT FORM A. INSTRUCTIONS 1. All applicants for permits* including Town of Southold'agencies, shall complete this CCAF for proposed actions that are subject to the Town of Southold Waterfront Consistency Review Law. This assessment is intended to supplement other information used'by a Town of Southold agency in making a determination of consistency. *Except minor exempt actions including Building Permits ; and other ministerial permits not located within the Coastal Erosion Hazard Area. 2. Before answering the questions in Section C, the preparer of this form should review the exempt minor action list, policies and explanations of each policy contained in the Town of Southold Local Waterfront Revitalization -Program. A- proposed'.actfon_will.,.lie evaluated. as, to its..si ign f cant beneficial and.adverse effects.•upoii the'coastal area,(whicl .includes all.of Southold T.own). 3::, If any question in Section C on this form is answered "yes" or "no", then the proposed action will f affect the achievement of the LWRP policy standards and conditions contained in the consistency review law. Thus_, each."answer must be. exnlain'ed in s detail..listing both sunportin� and non-. sunporting.facts. If an action cannot be certified as consistent with the LWRP policy standards and conditions,:it shall not be undertaken: ' A copy of the LWRP is available in the following places: online at the Town of Southold's website(southoldtown.northfork.net), the Board of Trustees Office, the Planning Department, all local libraries and the Town Clerk's office.. B. DESCRIPTION OF SITE AND PROPOSED ACTION . SCTM# 1000 :115. _12-10 PROJECT NAME Residential Dock Construction The Application has been submitted to (check appropriate response): Town Board ❑ Planning Board❑ Building Dept. ❑ Board of Trustees I Category of Town of Southold agency action(check appropriate'response): (a) Action undertaken directly by Town agency(e.g.capital ❑ construction,planning activity,agency regulation,land iransaction) ❑' (b) Financial assistance(e.g.grant,loan,subsidy),, i (c) Permit,approval,license,certification: Nature and extent of action: Construct:residential.dock go property located-at 70.0 Deep..Hole Drive, Mattituck, NY on East side_ of Deep Hole Creek, West side of property, 55'x4' walkway with flo-thru decking 14'x4' wood ramp, 6'x20' floating dock with.approved materials Location of action: 700 Deep Hole'Driove, Mattituck, NY 11952 Site acreage: •25 Present land use: Residential Present zoning classification: Residential 2. If an application for the proposed action has been filed with the Town of Southold agency, the following information shall be provided: (a) Name of applicant: Wolfgang P. & Brenda J. Haack (b) Mailing address: 700 Deep Hole.Drive i Mattituck, NY 1195,2 (c) Telephone number: 631.298.7459 (home) Will the action be directly undertaken,require funding,or approval by a state or federal agency? Yes 0 No,❑ If yes,which state or federal agency?Army Corps Eng &NYS DEC :f. C. Evaluate the project to the following policies by analyzing how the project will further support or ' not support the policies: Provide all proposed Best Management Practices that will-further each policy. Incomplete answers will require that the form be returned for completion. DEVELOPED COAST POLICY Policy 1. Foster a pattern of development in the Town of Southold that enhances community character, preserves,open space, makes efficient use of infrastructure, makes beneficial use of a coastal location, and minimizes adverse effects of development. See LWRP Section III—Policies; Page 2 for evaluation criteria. ❑Yes ❑ No Not Applicable Proposed dock corn issurate with adjacent.docks,also.prior.dock approval.(expired) Attach additional sheets if necessary Policy 2. Protect and preserve historic and archaeological resources of the Town of Southold. See LWRP Section III'—Policies Pages 3 through 6 for evaluation criteria ❑ Yes ❑ No ❑✓ Not Applicable r . 1 Attach additional'sheetsifnecessary Policy.3. Enhance visual quality and protect scenic resources throughout the Town of Southold. See LWRP'Section III—Policies Pages 6 through 7 for evaluation criteria ❑✓ Yes 13 No ❑ Not Applicable Proposed dock comissurate with adjacent docks,also prior dock approval(expired) Propsed dock will.not impede;any<scenic views Attach additional sheets,if necessary NATURAL COAST POLICIES Policy 4. Minimize loss of life, structures, and natural resources from flooding and erosion. See LWRP Section III—Policies Pages 8 through 16 for evaluation criteria x � R1. Yes' No ❑ Not Applicable Will be constructed using approved materials that minimize environmental impact to include flow-tFirougti decking _ _. ... ..... ... which will maximize light transmission. Minimum depth of dock will preclude damage to creek floor } Will plant-vegitation (if required)that conforms with_Town'approved coastal'plantings It is designed in a manner which will not impair protective capacities of natural protective features - -- Attach additional sheets if-necessary--- µ Policy 5. Protect and improve water quality and supply in the Town of Southold. See LWRP Section III —Policies Pages 16 through 21 for evaluation criteria Z Yes Ej No ONot Applicable Will be constructed using approved materials-that minimizeµenv'ironmental impact to iriclude all'approved wood material/pilings Will not affect ground water sources . Attach a itional s eets i necessary Policy 6. Protect and restore the quality and function of the Town of Southold. ecosystems including Significant Coastal Fish and Wildlife Habitats and wetlands. See LWRP Section III—Policies; Pages 22 through 32 for.evaluation criteria. Yes ❑No ❑ Not Applicable Will be constructed using approved materials that minimize environmental impact to include flow-through decking which will maximize light transmission. Minimum depth of dock will preclude_ damage to creek floor Will plant vegitation (if required)that conforms-with Town approved coastal plantings Attach additional sheets if necessary Policy 7. Protect and improve air quality in the Town of Southold. See LWRP Section III — Policies Pages 32 through 34 for evaluation criteria. ❑ Yes ❑No❑✓ Not Applicable Attach additional sheets if necessary F Policy.8. Minimize environmental degradation in Town of Southold from solid waste and hazardous substances and wastes. See LWRP Section III—Policies; Pages 34 through 38 for evaluation criteria. ( ❑Yes ❑ No ❑Not Applicable No dredging to be performed Will be constructed using approved materials that minimize environmental impact to include all approved wood material/pilings t PUBLIC COAST POLICIES Policy 9. Provide for public access to, and recreational use of, coastal waters, public lands, and public resources of the Town of Southold. See LWRP Section III—Policies; Pages 38 through 46 for evaluation criteria. 0 Ye❑ No❑ Not Applicable Proposed dock will not obstruct public access to shoreline _ Attach additional sheets if necessary WORKING COAST POLICIES ' Policy 10. Protect Southold's water-dependent uses and promote siting of new water-dependent uses in suitable locations: See LWRP Section III!-Policies; Pages 47 through 56 for evaluation criteria. ❑✓ Yes ❑ No ❑ Not Applicable Ps d pro elc wlp nrformed ._ rogo ., - , . :� ._ ` " . - .._ - -- - •_ _ - of 'impede'naviaable waterway in creeki. _ _ Attach additional sheets"if'necessary Policy 11. Promote 'sustainable use of living marine resources in Long Island "Sound, the Peconic Estuary and Town waters. See LWRP Section III-Policies; Pages 57 through,62 for evaluation criteria. Yes ❑ No❑•Not Applicable Pr=-7777osed.dock,will protect native,stocks of aquatic life by minimizing disturbance,and providing shelter. ,for bait fish_in'the.creek Proposal will maintain long,term health of marine life"by using approved construction methods, { No bulkheading will be,requested Attach'additiional sheets-if necessary Policy M Protect agricultural lands in the Town of Southold.,See LWRP Section 1117,Policies; Pages 62 through-65 for evaluation criteria. ❑Yes ❑ No 0 Not Applicable - Attach additional sheets if necessary Policy 13. Promote appropriate use and development of energy and" mineral resources. See LWRP " Section III—Policies; Pages 65 through 68 for evaluation,criteria. ❑'Yes ❑ No ✓❑. Not Applicable PREPARED BY Wolfgang P._Haack TITLE Property Owner DATE 19July2024