Loading...
HomeMy WebLinkAboutTR-10695 �����, S��T�� Town Hall Annex Glenn Goldsmith, President 54375 Route 25 A. Nicholas Krupski, Vice President �� P.O. Box 1179 Eric Sepenoski 3 ,� Southold, New York 11971 � Liz Gillooly rn �� Telephone (631) 765-1892 Elizabeth Peeples Fax (631) 765-6641 BOARD OF TOWN TRUSTEES TOWN OF SOUTHOLD SOUTHOLD TOWN BOARD OF TRUSTEES YOU ARE REQUIRED TO CONTACT THE OFFICE THE TIV TIES CHECKED BOARD OF TRUSTEES 72 HOURS PRIOR TO COMMENCEMENT OF THE OFF BELOW INSPECTION SCHEDULE Pre-construction, hay bale line/silt boom/silt curtain 111 day of construction '/2 constructed When project complete, call for compliance inspection; Glenn Goldsmith, President OF S0�/r Town Hall Annex 54375 Route 25 A. Nicholas Krupski,Vice President ,`o ®�O P.O. Box 1179 Eric Sepenoski J Southold, New York 11971 Liz Gillooly G @ Telephone(631) 765-1892 Elizabeth Peeples Fax(631) 765-6641 ®�yc®UNT`1,� BOARD OF TOWN TRUSTEES TOWN OF SOUTHOLD January 7, 2025 Anthony Portillo AMP Architecture PO Box 152 Mattituck, NY 11952 RE: AJIT KUMAR & JENNIFER ECCLESTONE 1490 PARADISE POINT ROAD, SOUTHOLD SCTM# 1000-81-3-20 Dear Mr. Portillo: The Board of Town Trustees took the following action during its regular meeting held on Wednesday, September 18, 2024 regarding the above matter: WHEREAS, AMP Architecture on behalf of AJIT KUMAR & JENNIFER ECCLESTONE applied to the Southold Town Trustees for a permit under the provisions of Chapter 275 of the Southold Town Code, the Wetland Ordinance of the Town of Southold, application dated June 28, 2024, and, WHEREAS, said application was referred to the Southold Town. Conservation Advisory Council and to the Local Waterfront Revitalization Program Coordinator for their findings and recommendations, and, WHEREAS, the LWRP Coordinator recommended that the proposed application be found Inconsistent with the LWRP, and, WHEREAS, the Board of Trustees has furthered Policy 6.3 of the Local Waterfront Revitalization Program to the greatest extent possible through the imposition of the following Best Management Practice requirements: issuing a permit for the as-built structures; no tree removal permitted; and WHEREAS, a Public Hearing was held by the Town Trustees with respect to said application on September 18, 2024, at which time all interested persons were given an opportunity to be heard, and, 2 WHEREAS, the Board members have personally viewed and are familiar with the premises in question and the surrounding area, and, WHEREAS, the Board has considered all the testimony and documentation submitted concerning this application, and, WHEREAS, the project complies with the standards set forth in Chapter 275 of the Southold Town Code, WHEREAS, the Board has determined that the project as proposed will not affect the health, safety and general welfare of the people of the town, NOW THEREFORE BE IT, RESOLVED, that for the mitigating factors and based upon the Best Management Practice requirement imposed above, the Board of Trustees deems the action to be Consistent with the Local Waterfront Revitalization Program pursuant to Chapter 268-5 of the Southold Town Code, and, RESOLVED, that the Board of Trustees APPROVE the application of AJIT KUMAR & JENNIFER ECCLESTONE for the existing two-story dwelling with entry stoops; to restore the existing dry-storage shed with roof deck, dry-storage shed decking, steps with landings, and retaining wall landward of dry-storage shed by replacing all footings under all structures with new, replace northerly wood walk to dry-storage shed deck, replace southerly top landing with steps down to dry-storage shed deck, replace dry- storage shed deck and steps down to a concrete slab at bottom of bank;_repair roof of deck above dry-storage shed with new roof membrane; replace all railings with new; remove and replace in-place retaining wall landward of dry-storage shed; replace siding on dry-storage shed; remove outdoor shower from dry-storage shed; existing steps to beach off bulkhead to remain; install stepping stones landward of top of bank; install a drywell to contain roof runoff; revegetate an approximately 2,057sq.ft. area throughout the bank face using native species; and to establish and perpetually maintain a 623sq.ft. non-turf buffer along the landward edge of the top of the bank; with the conditions that all decking associated with the dry-storage shed be thru-flow decking; and no tree removal is permitted; and as depicted on the site plan prepared by AMP Architure, received on December 11, 2024, and stamped approved on January 7, 2025. Permit to construct and complete project will expire three years from the date the permit is signed. Fees must be paid, if applicable, and permit issued within six months of the date of this notification. Very truly yours, 4 Glenn Goldsmith President, Board of Trustees wn rt BOARD OF SOUTHOLD TOWN TRUSTEES SOUTHOLD,NEW YORK PERMIT NO. 10695 DATE: SEPTEMBER 18,2024 ISSUED TO: AJIT KUMAR& JENNIFER ECCLESTONE PROPERTY ADDRESS: 1490 PARADISE POINT ROAD, SOUTHOLD -SCTM# 1000-81-3-20 AUTHORIZATION Pursuant to the provisions of Chapter 275 of the Town Code of the Town of Southold and in accordance with the Resolution of the Board of Trustees adopted at the meeting held on December 18,2024 and in consideration of application fee in the sum of$1,25 0.00 paid by AJIT KUMAR&JENNIFER ECCLESTONE'and subject to the Terms and Conditions as stated in the Resolution,the Southold Town Board of Trustees authorizes and permits the following: • Wetland Permit for the existing two-story dwelling with entry stoops; to restore the exist'ing dry-storage shed with roof deck,dry-storage shed decking,steps with landings,and retaining wall landward of dry- storage shed by replacing all footings under all structures with new,replace northerly wood walk to dry- storage shed deck,replace southerly top landing with steps down to dry-storage shed deck,replace dry- storage shed deck and steps down to a concrete slab at bottom of bank; repair roof of deck above dry- storage shed with new roof membrane; replace all railings with new; remove and replace in-place retaining wall landward of dry-storage shed; replace siding on dry-storage shed.; remove outdoor shower from dry-storage shed; existing steps to.beach off bulkhead to remain; install stepping stones landward of top of bank; install a-drywell to contain roof runoff; revegetate an approximately 2,057sq.ft.area throughout the bank face using native species;and to establish and perpetually maintain a 623sq.ft.non- turf buffer along the landward edge.of the top of the bank;with the conditions that all decking associated with the dry-storage shed be thru-flow decking; and no tree removal is permitted; and as depicted on the site plan prepared by AMP Architure, received on December 11,2024,and stamped approved on January 7,2025. r is IN WITNESS WHEREOF,the said Board of Trustees hereby causes its Corporate Seal to be affixed, and these presents to be subscribed by a majority of the said Board as of the day and year written above. X-a .`r Oj � �a �,'�a V V *A TERMS AND CONDITIONS The Permittee ART KUMAR&JENNIFER ECCLESTONE, 1490 Paradise Point Road, Southold,New York as part of the consideration for the issuance of the Permit does understand and prescribe to the following: 1. That the said Board of Trustees and the Town of Southold are released from any and all damages, or claims for damages, of suits arising directly or indirectly as a result of any operation performed pursuant to this permit, and the said Permittee will, at his or her own expense, defend any and all such suits initiated by third parties, and the said Permittee assumes full liability with respect thereto,to the complete exclusion of the Board of Trustees of the Town of Southold. 2. That this Permit is valid for a period of 36 months,which is considered to be the estimated time required to complete the work involved, but should circumstances warrant, request for an extension may be made to the Board at a later date. 3. That this Permit should be retained indefinitely, or as long as the said Permittee wishes to maintain the structure or project involved,to provide evidence to anyone concerned that authorization was originally obtained. 4. That the work involved will be subject to the inspection and approval of the Board or its agents, and non-compliance with the provisions of the originating application may be cause for revocation of this Permit by resolution of the said Board. 5. That there will be no unreasonable interference with navigation as a result of the work herein authorized. 6. That there shall be no interference with the right of the public to pass and repass along the beach between high and low water marks. 7. That if future operations of the Town of Southold require the removal and/or alterations in the location of the work herein authorized, or if, in the opinion of the Board of Trustees,the work shall cause unreasonable obstruction to free navigation,the said Permittee will be required, upon due notice,to remove or alter this work project herein stated without expenses to the Town of Southold. 8. The Permittee is required to provide evidence that a copy of this Trustee permit has been recorded with the Suffolk County Clerk's Office as a notice covenant and deed restriction to the deed of the subject parcel. Such evidence shall be provided within ninety(90)calendar days of issuance of this permit. 9. That the said Board will be notified by the Permittee of the completion of the work authorized. 10. That the Permittee will obtain all other permits and consents that may be required supplemental to this permit,which may be subject to revoke upon failure to obtain same. 11. _ No right to trespass;or interfere�with riparian rights. This permit does not convey to the permittee any right to trespass upon the lands or interfere with the riparian rights of others in order to perform the permitted work nor does it authorize the impairment of any rights,title, or interest in real or personal property held or vested in a person not a party to the permit. PROJEG-T / ZON6NG DATA -SHELTER 1 5 L A N D 5 0 U N D- DRAINAGE SYSTEM INSTALLATION NOTES: PROJ�GT SCOPE: w ra_rwxx A MINIMUM 10'SEPARATION IS REQUIRED BETWEEN DRYWELLS 8 z --""""�2 WATER SERVICE LINE,UNDERGROUND UTILITY LINES,SEPTIC • PROPOSED RESTORATION OF FRAME =w a TAX MAP 1000-61-5-20 rE�g �,�,J� M COMPONENTS,LEACHING FIELDS,SEWER COMPONENTS,OTHER DRY STORAGE SHED, DECK, WALK, 9 H'SH WATER"^w IV&ft _ DRYWELL5,AND THE EDGE OF ALL FOUNDATION WALL5 STEP5. 2 z w a ZONING DISTRICT R-80 NO =i ---------- --�---- �_ A MINIMUM 5' SEPARATION 15 REQUIRED BETWEEN DRYWELLS 8 15�~x -' RTY LINES PROPOSED RETAINING WALL a LOT AREA O.5 ACRES ITT (� A MINIMUM 20 SEPARATION IS REQUIRED BETWEEN DRYWELLS AND REPLACEMENT z a w 'a""` ° is w000 BURIED PROPANE FUEL TANK5. • PROPOSED NON-TURF SUFFER 2 GofO - ADDITION Z-32222;3/6/Ol -L � 5 CONNECT ALL GUTTER LEADERS TO NEAREST DRYWELL • PROPOSED REVEGETATION AT BANK. w w _ PROPOSED DRY WELL o E z FA D1o� DRAINAGE SYSTEM CALCULATIONS: CofO - ONE FAMILY DWELLING Z-52223;ONE FAMILY DWELLING " • __ _ _ - •�T T�°F ?0'm a WTTOM eu�� +MYST� EXI5TING(RESTORED) ROOF DECK= 145.2 Sq.Ft. w e o;u _ NOTE: MINIMAL DISTURBANCE TO THE BLUFF WILL BE DONE. HAND m w a � 145.2 5c�.Ft.X 0.1-1= 25 PULLING OF IM/ASIVE 5PEGIE5: EN5LI5H IVY(HEDERA HELIX)AND o='z g ru FGI¢iION OF£LOPE 16 _ �'�: +MfAlILN9 WALL FEMA FLOOD ZONE X of VE 13 E„agos�, Y.-•-:'�-�; .-- -- - REP� 25/8.12= 3 VERTICAL FT.OF 4'DIA POOL REQUIRED COMMON PERIWINKLE(VINGA MINOR). ANY AREAS WHERE INVASIVE Zit o<:n - ao�.- X 3' DEEP DRYWELL SPECIES ARE REMOVED,NATIVE NON FERTILIZATION DEPENDENT J a w N WETLANDS DISTRICT TOP OP SAW �� -; sr• m Woa� a a Z o x 64TOIA;OCT. 25,2006 ,,�,�,ST[P VEGETATION WILL BE PLANTED AND A SUITABLE SEED MIX WILL SE x a,x EXCAVATION CALCULATIONS ADDED TO ANY P157URBED AREAS. z o¢w W OAK 0 WETLANDS DISTRICT 9425;APRIL Il,20I9 T� I e' _ _ EXCAVATION a RETAININ6 WALL C WALK FOOTINGS; AREA OF DISTURBANCE ON BLUFF TO BE APROX 5%OF THE SCRUARE Y(~Z ,-.Y.. --^ - - _,, .,,„ .r .`T«.q;:.: 'm maW wSH WA WAR/.` Aa7;--- 4M� - = FOOTAGE OF THE BLUFF. N o S=3 .*� F . •.xv`>, - Y ,:•' .;sa Tet 1 ---------- --- ------------- 60 5F ®3' O"DEPTH NOTE:NO TREE REMOV IS PERMITTED W TH THIS PERMIT.ANY TREE ¢_o APPROX. 150 G T LOT C®�/ERA6E A 7G' i'. � .` �- ]91aRr AL I N a¢w a a _ ,° °,.' u :s '."_ "�""g• ��,� F sr DRYWELL EXCAVATION;_ TRIMMING OR REMOVAL ASSOCIATED WITH THIS PROJECT WOULD o,,,o L.!o PFtIHGIPAI 91LLDIN69 a S= m -z:-' ', ite.;T ;;,,,+.- ' l3 5.P.®4'-O"DEPTH = APPROX.52 CUBIC FEET REQUIRE A SEPARATE TREE LETTER AND INSPECTION FROM A r f fOLD TiOWN G®D€ 250-4 :' �.' �I�, ,f* ¢r m o 1.4, MEMBER OF THE BOARD OF TRUSTEES. F % LOT I °< �'oe w z a w a o DESCRIPTION(FOOTPRINT) AREA Z r w��ia Iq. -5HEL TER I SLAND �=3ao COVERAGE � � S O U K D'� o o�r,_ TOTAL LOT AREA I------------------- --- 69.06' �Zr- 527°Ib'12"W 'w W'o z w AREA LANDWARD OF BULKHEAD 11,541.3 S.F. �aH o 1 < g m w w i TIE LINE ALONG APPARENT I ~r EXISTING 2 STORY FRAME HOUSE 1,150.1 S.F. 6.690 g> i HIGH WATER MARK II/6/18 N o 'I r 0 Ja o a 2-�-------------- -- --J_ �ooacoi EXISTING GARAGE 555.2 S.F. 2.0% I I$ - "- 1 _ -BEACH- "`ji EXISTING ROOF DECK(DRY 145.2 S.F. 0.5% I I (PROP.5%NATIVE STORAGE SHED BELOW) I 1 I REVEGETATION r, EXISTING STOOPS 55.0 S.F. 0.2% i ( a BANK Q 1 m EXI5TIN6 FRAME STEPS 9 155.1 S.F. O.99S •_. ' 1 I ry WOOD L-- LANDINGS I � ---� � GO OD LKH AD BULKHEAD SPIER LINE Fw,ve a STaw.vp.E0r I O ZONE�(EI __ _ �_ _ ( ACCESSORY STRUCTURES EXI5TINC, WOOD BIN 13.8 S.F. 0.1% , i O > T ZONE x 6 a Y`1J >_ FLOOD ZONE .� - --' - W U D TOTAL AREA OF ALL STRUCTURES 1851.0 S.F. 10.6% z � BOUNDRY g_ y+ W _W W µ PROF.RESTORATION OF G) m T� _ FRAME DRY STORAGE I ® BOTTOM OF BANK 112 -4�"--'"--" -s"meµ - - SHED W/DECK OVER -F'J MAXIMUM LOT COVERAGE ALLOWED: 20% i O w °` !- PROP. IN-PLACE, ' L,r. z ® O PORTION OF 5LOPE 14 ' - W RETAINING WALL rHb w7o•e 'may Ib-r",� ....w v _ - REPLACEMENT IMPERVIOUS SURFACES< 8" FROM GRADE 1 (/� < EXCEEDS 25% _ --__y_ U EXISTING GONG. APRON 25A S.F. 0.1% 8 W PROPOSED - i ® � � 2D-�w V __��- 12.1' � `' REPLACEMENT � C TOP OF BANK 22-�-' i ," -�-" "W OF WOOD Q EXI5TING DRIVEWAY APRON 205.0 S.F. �,� WALK d STEPS ^, TOTAL LOT COVERAGE INCLUDING l!! 2081.4 S.F. I I.9% I _� --) �3 5 0p / BUFFER O"OAK L� STRUCTURES<8" FROM GRADE O Ili 1 TREE G NG. sSx void' :.? .._�,,.� .. .y-,. ;:_ ::r:s_,syfir;:.-::,.ark,.:`'•.:b"a;. r- m GOVcR Y AGG€SSORY STRUG R€GiU IREMNTS r==,�} : • ' 'T x•': �' C/) ml 9. 21.9 STEPPING STONES W/ =' ' O 100'FROM HIGH WATER MARK "1 ❑❑C 40%OPEN SPACE Q �ySOUTI-fOLD TOWN GO>DE 28.0 15' '_ ---- -- ------------ --- -- -r- -�- .1cl � ems. ��JJ } _ Q PIER LINE m� 1 FRAME n "� "`� . V� Fs EXIST. PROPOSED COMPLIES w PRINCIPAL BUILDINGS CONIC. HOUSE ' i gI ff � x IGOVERIL MAXIMUM HEIGHT 15, 11.4 11.4 YES , R w DEC 1 1.4' m DAI `" a MINIMUM SIDE YARD 10.0' 15.4' 15.4' YES I � Q 1 10.6' O 1 1 2024 MINIMUM REAR YARD 10.01 21.2' 21.2' YES Hx•»7cE 'Aaem U r-' I 1200 145.2 145.2 S.F. YES I 1 Southold Town Q' = 0 r f MAX.SQUARE FOOTAGE 5 F S.F. I Board otTrustees n.Q N W z \ ' 1 ' - 100'FROM BULKHEAD Y C.) Q O m . •: • �O\5E PO\NIT�p,0 ENL,4RC ED PARTIAL SITE PLAN o o a o P pPp SCALE: 1" - 50'-0" j 0 N �1 PROP05EM 51 TE PLAN SITE LAYOUT NOTES: qq�� 1. THIS 15 AN ARCHITECT'S SITE PLAN 6 IS °rE t tb� O SCALE: 1" = 50'-0" SUBJECT TO VERIFICATION BY A LICENSED ~� O NOTE: SURVEYOR. THE INFORMATION SITE PLAN HATCH KEY: REPRESENTED ON THIS SITE PLAN 15 TO THE 3` FLOOD MAP DATA FROM SURVEY ��� ' ` `•':_ u S�.y f � MAP#;5&I05GOI61H ARCHITECT'S BEST OF KNOWLEDGE. ® PROPOSED DRY STORAGE SHED MAP DATE: 9/25/2004 8 DECK RESTORATION 2.SURVEY INFORMATION WAS OBTAINED SUBJECT PROPERTY � �'�+: tI ��cJ\t;�'•,'I � a"r FLOOD ZONE X 8 VE 13 i FROM A SURVEY DATED MAY, 10 2022 W PROPOSED WALK 8 STEPS = I. 51TE PROTECTION/SILT FENCING TO BE REPLACEMENT AND PREPARED BY: INSTALLED AS REQUIRED BY SOUTHOLD TOWN. KENNETH M.WOYGHUK PROPOSED NON-TURF SUFFER LAND SURVEYING,PLLG 2.SURFACE WATER5 ARE LOCATED WITHIN 500' PO BOX 153 OF THE PROPERTY. PROPOSED NATIVE AQUEBOGUE,N.Y. 11931 (NON-FERTILIZER DEPENDENT) TELEPHONE: (631)298 1588 3.ELEVATIONS REFERENCE NAVD88 REVEGETATION o a W Q aU) J� a s rmw� I oow3 FzrQ U J � PROPOSED BUFFER AREA Q Q U __BETWEEN EXIST.HOSSE TO BANK to N W NDTH VARIS -- o Z J oQF J 0=J O w J r z I 4 �FWma 695'TO TIE LINE 0 055ERVFL HIGH I"ATER m >g W oxzJ� CEASTN6 SE 2 STORY 44,0'TO FACE OF BULKHEAD I Q a Z Q FRAME HO IS NOT Q w x PART OF THIS FILING PROPOcSM 56ry TURNBUCKLE N Q G U RAILING REPLACE)KM I i o LL w x Q Z EXI5TIN aS PROP.EPDN.ROOF N=J�tA1E I z F N d 0 0- >U Na¢wQ eXI5TIN6 ROOF DECK T7 -�-�-- 69'TO TIE LINE o OBSERVED HIGH HATER o x¢ w o I.Fx-j0 A 212'TO FACE OF BULKHEAD d Q F LL TOP OF BANK PROP.SIDING; z z a w a o HO.SELECTION PROPOOED 56°N TA7/1BUCKLE 0 z z r RAILIN6 REPLAGE)ffAlT N W 1= Q PROP.SONOTlEES I o I., Z Z •LA)✓DM6 o x 3 Q U O o O N U R7�LK.E EXIST. TREAD'6 STRIN6ER5 z W (SEE PAGE S7) Q N 3 c am!K STORAGE SHED FLOOR i LANDING G z w W o r N w a � azcai rid .� wo— ¢ loom. PROP.50NOTtmE6 a LAWNS REPLACE EXIST. TREA( STRIHS-2) (SEE PACE 5.2i BOTTOMS F �- TOP OF BULYJ✓=AD Wb' +J PROP.OOZY.PAD I ......._. _�.—_—.—. _—.—_—.—. ELEV. •STAIR BASE `EBAOi� / 1 • (SEE PAGE S4) EXIST.BULIOffAD �J AVEWIGE GRADE 6 EOTTOM OF BULKHEAD TO REMAIN rl M EXIST.STEPS 4J TO REMAIN 1 0 5 10 20 SITE SECTION a BANK GRAPHICSCALE 18"-1'-0" � SCALE: I/8" = I'-O" Q PROPO5W 56'H TUME3UCKLE RAILING R6'L4GETffM `A_ ROOF MRMBRAIE { � E {CCJJ- E ' YV E EXISTINGSHOOER a TOP of BAKK ALL PLUMBM6 TO BE REMOVED 1 DEC 11 2024 0 a PROP.P.GONG.RETAIMNG °q (I HALL IN-PLACE r, `� A�� EXIS Iw S HALL F" S Southold Town W z %-I LDP� BANK Board of Trustees Q N a } \1/ ROTE,MMIMAL ASIVE SPEV . TE BLIA PILL BE GONE. HAND R7LLINB OF IM/ASIVE SPECIES ENBLISH NY(1ffDERA HELIw AtWAID C \ W z 1 C4MMON RE R M g MN A MMOR7. ERT AREAS NPERE ZIEW E c PROPOSD 06'H TUFUgY1 C)0.E `\\ / SPECIES ARE LL BE PL NATIVE)O FERTILIZATION SE ppPE KLL RMLIN6 REPLACEMENT VE6ETATON N O BE PLANTED AI D A SVITABLP 5£ED Mx FALL i .0 ADDED TO ANY DISTAiBED AREAS. Q O C ( FAREA OOTAGE D�TAi9ANC THE PON B1.UF'P TO BE AFROX 51,OF T/E'AJARE WW Q EST. VEGETATED ,NO TREE REMOV S ITTED NITH THIS PE IT. THE � a Y ( / %OPr� TWMMIN6 OR REl'IOVAL AEGOCIAT9 NTr TiS PRo.CST WOIP D Q O EXIST. BANK LL 0 cn VEGETATM }rEMB[R Op TE BOARD OF Ta15TEE5. SEIAIKLOPED �A. N le ri TOP OF EXIST.BULKlEADA'"✓ (�// e^Z, p ♦♦♦ 6 f,T •A 11 4k p 5 10 20 -' EASTELEVATION e BANK GRAPHIC SCALE 1/8'=1' SCALE: 1/8" o a W a z N w gs rwLL� Zmw3 O O i J Ezra O J � O 2 W x OJxaF LL J O w J o La JJ I � a Yz o b L. 3: w02�w m�Lgw o x z J W z U O a N a r w a aazox w O LL O¢ zoLLox zz� oa�Tno oar Ex1.Io3 NL¢wa O W O N O LxFxm ¢r om Owam.-1 / N K.BOTTOM OF BANK w z 4 z 1,o BOTTOM OF IRAHKJ >U w a 0 o w 3 z z PROP.GONG.PAD x~a o oo�rF �y ACSTAIR 15EE PASS O PROPOE�D . E Qawo ccW gT�ADr(MW-FL&4 RAILING REA AC- ( E97RINSEL4 LaZ UPASE Sy V PROP. E6— 96'TABGKl E UoSCYLS w o RAILING FWI ACZl4 ^a n `t r O O L U PROF.50NOTUBES• EIOST.4•X4'P05T5 a (5EE PA6E 5-v HEW THRLLFLOW m DEGge�� EXIST. ° PROPO^tS%•TURI✓sJGKLE 1'-4' PROP.SOHOTu�� TwL1H6 T7EPl.GE/'ElIT v 1 •LANDIN5 I I I EXISTING LANDING EXISTING ° ry f1 14552P. O f^U'1 EP9 W M FYICT EXIST. EXIST, {� W FLOYJBRAAM,SLEEPERS DECKING ABODE I .— 1} STOR.AGF_ STORAGE STORAGE IYQ[i I 1 NEW T FW-FLOW f D'FLKIN6 z PROPOSED 56•'Mit@UGKLE g E RAILING f✓EPUK.EFEHT C) flDEE ®® L U) GIIiTER HIGH �` '� O O /7 8 POINT.BELOW �WHSPoIrt . -i PROP.P.GONG.RETAINIHS ° ,Q WALK WALL.IN-PLK.E r LEADER TO PRY YELL (' b RJEPL STHG RET I WAALLLL '� REPLACE EXIT. 024 TREADS 5TRINGERS(EEE PAEE 5-y I�I�TOP t7P BARKEX 5TINO TOP OF BALK LgNDIN6 EEfv TsarPLaW Jlll es PROP. �PAGE 5-I '1 �!!e 9'-O' C WALK(SEE PAGE 5-I) O /�fiyr W Zo r I ti o S 10 S So 20 PROP05D PECK Qw EX15T. PROP05ED 5TORA E SHED PLAN GRAPHICSCALE EX15T. d rZ N SGALE: 115" = P-O;' p SGALE: 115" = I'-O" Y W Q O H Q D a O N J 61 (n �, 4 i46J i 0 c1 •. :h. < .'uJ It j `� N o J �`� eZyy T11 l 3'x 2'-6"x 12" Concrete Sla to Grade BOTTOM OF BANK Foundation Notes: z PR11PE z The contractor is to verify all measurements in the field and any RAILI .R EMr T discrepancies are to be brought to the Engineer prior to W W construction. c — — a o a 00 ,� ti 1 -All concrete 4,000 psi after 28 days minimum. Q. 3.5 x 16 i Paralam Plus PSL _ _ 2-All rebar ASTM A-615 Grade 60. —12'-1" 3' 0" ca 3-Footings are to be installed on undisturbed virgin soil.The - - Q• bottoms of all footings are to be installed a minimum of 3'below - - con grade unless indicated otherwise. 4-Follow cold weather concrete treatment relative to add mixtures (3)2x8 MCQ RAILING POSED 36' in accordance with ACI 212.3R. Use Air-Entraining admixtures I RAILING REPLACEMENT 9 Per ASTM C260,AASHTO M154 or Water Reducing and Set- Replace I Controlling Admixtures per ASTM C494,AASHTO M 194 only. Do Existing Beam i EXISTING not use Calcium Chloride or other corrosive type admixtures. In Place DECK Y o 145.2 S.F. 'ot LL L- ' u- L a N PROP. E.P.D.M. 4 (3) Crl (— MEMBRANE] SLEEPERS I I UO S-1 as W/ DECKING ABOVE O �- w °x° � w � m Notes: IiC,4N .- a 2 = PROPOSED 36' *All measurements are to be verified in the field and cn 3 .� M RAILING REPLACEMENT any discrepancies are to be brought to the attention of Q the Engineer. (3) CQ °4 --_- W *Concrete used for footings is to be 3,500 psi after GUTTER HIGH GUTTER OD O POINT, BELOW o } H 28 days minimum. ————— I CD WALK DOWNSPOUT b I I LEADE.' TO DRY WELL *All pressure treated lumber is to be MCQ No.2 or Ica Existing i u o i 3.5 x 16 m EXISTING better Southern Yellow Pine. I rn - —I— — — am-Pius �� _ o I *All nails, bolts, nuts and washers are to be hot X .r Q. I C0 dipped galvanized. lL = I 2x ccn I I w$ *All bolted connections are to be made with A-325 bolts. LL I EXISTING � O I TOP OF BANK LAND N a (3�2x8 MC t3 2E m s-2 OP OF BANK S-1 00 Roofing Renovation Detail Deck Floor Framing Renovation Detail Design Loads: g Roof-Live Load-40 psf Scale:1r2•=1'-o• -Dead Load- 15 psf D E C E I V E Deck Floor -Live Load-40 psf ! -Dead Load-15 psf ackfill -Wind Loads-130 mph-ASCE-7 MWFRS-Method 2 Southold Town 3" Board of Trustees .•_•.•_-_•.• 3"— . . . . . . . . . . . . I =� Design Criteria- �= 12" *2020 NYS Residential Code R301.1.1 and utilized the . . . . • methods and procedures stipulated in Chapter 2 Engineered New 2 x 8 MCQ . . . .'. . o. 5 Rebar 12"OC Design and Chapter 3 Prescriptive Design in the 2018 FJ Sistered to Existing ;:.' impson PC6Z American Forest and Paper Association Wood Frame New(3)2 x 8 MCQ . . . . . . . . . . . . ._ : 6w Construction Manual(2018 WFCM)for One and Two Family Replacement of Existing impson PC6Z �;;-• Dwelling Units and ASCE 7. . . . . . . . . . . . .. .. . . . . . . . . . . . . . . . . •: : �:: Grade ��OF F;Ep/ . . . . . z: e O� �F- Grade '•'.'•'•'-'-'. '.'.'.'.'. 4 Opt ::;: � � � " New(3)2 x 8 MCQ/ 8 impson ABW66Z . Ot ' Plans are prepared by Condon Engineering,P.C. It is 4 a violation of the New York State Education �p raw,Article 145,Section 7209,for any person unless acting under the direction of a licensed Simpson ABW66Z c� - �.r,• ;`- ;.;�: �.=� { .�• Professional Engineer,Architect,or Land Surveyor,to alter any item in any way.If an tiers bearing N •.: �•:=• . ;;i:_�-.:; . . the seat of an Engineer,Architect,or Land Surveyor is altered,the altering Engineer,Architect,or �•'-' - - ' ' �• Land Surveyor shall affix to the item his/her seat and the notation'Altered by'foAouved by hisRrer signature and the date of such alterations,and a specific description of the alteration. •' 3w " 5' 12"Sonotube Footing Scale: 1/4" = V-0' Condon Engineering, P.C. Kumar Deck/Shed Section Detail No. 5 Rebar 12 OC A scale-12'-1-0• Drawn by : JJC 1755 Sigsbee Road 1490 Paradise Road B Replaced Retaining Wall Section Detail Mattituck, New York 11952 Southhold, New York scale:l/2"=1 0• Date : 12-9-2024 (631) 298-1986 i � 1 I ---------------- I 6x6 Pressure Treated Colum 8"0 Bolt Simpson ABW66Z = - 3.5 x 16 Paralam Plus PSL —flail- 3.5 x 16 Paralam Plus PSL ECE IE I 0 EC 1 ; nnn f Southold Town Board of Trustees Xx2'-6"x12" Concrete Sla to Grade �E OF E ,� r J. C p �.,o� Scale: 1/4" = 1'-0' Condon Engineering, P.C. Kumar Deck/Shed Plans are prepared by Condon Engineering,P.C. It is a violation of the New Yak State Education Law,Article 145,Section M,for any person unless acting undcrthe direction of a licensed Drawn by : JJC 1755 Sigsbee Road 1490 Paradise Road Professional Engineer,Architect,or Land Surveyor,to after any itm in anyway.If an Rem bearing Southhold, New York the seal of an Engineer,Architect or Land Surveyor is altered,tte altering Engineer.Architect,or Mattituek, New York 11952 Land Surveyor shall affix to the item his/her seal and the not rdon'Aftered by followed by his W Date : 12-9-2024 (631)298-1986 signature and the date of such alterations,and a specific desaipfon of the alteration. .S 'OLD TRU'STEES OUT;H . No. �OG�iS � � nEaa ht /a4 ISSYCd TO ! d # Address THIS. NOTICE MUST BE DISPLAYED DURING CONSTRUCTION .TOWN TRUSTEES OFFICE,TOWN OF SOUTHOLD SOUTHOLD, N.Y. 11.971 TEL.: 765 1892 AM P Architecture Address:10200 M a in Road,Unit 3A,PO Box 152,Mattituck NY 11952 Phone:(631)603-9092 Design + Build December 9, 2024 Kumar Residence Trustees Site Plan Revisions 1490 Paradise Point Road Southold, N.Y. 11971 SCTM #1000-81-3-20 To Whom It May Concern, Accompanying this letter are revised documents to clarify the following information: • All decking associated with the dry storage shed be replaced with Thru-Flow decking. • All language referring to "cabana" changed to dry storage shed. • Any tree trimming or removal associated with this project would require a separate tree letter and inspection from a member of the board. Please contact our office if you have any questions. Thank you, Mathew Smith D ECEIVE DEC 1 1 2024 Southold Town Board Of Trustees Page 1 of 1 Glenn Goldsmith,Pm,�au,`.it ����0 COGy.` Town Hall Annex A.Nicholas Krupski,Vice President .� 54375 Route 25 0 Eric Sepenoski W ,� P.O.Box 1179 Liz Gillooly 4 • o�� Southold,NY 11971 Elizabeth Peeples Wa Telephone(631)765-1892 Fax(631)765-6641 Southold Town Board of Trustees Field Inspection Report Date/Time:,S Vr cwbw (I—u2ACompleted in field by: GEliM6ekk ftuc e� AMP Architecture on behalf of AJIT KUMAR & JENNIFER ECCLESTONE requests a Wetland Permit for the existing two-story dwelling with entry stoops; to restore the existing cabana with roof deck, cabana decking, steps with landings, and retaining wall landward of cabana by replacing all footings under all structures with new, replace northerly wood walk to cabana deck, replace southerly top landing with steps down to cabana deck, replace cabana deck and steps down to a concrete slab at bottom of bank; repair roof of deck above cabana with new roof membrane; replace all railings with new; remove and replace in-place retaining wall landward of cabana; replace siding on cabana; remove outdoor shower from cabana; existing steps to beach off bulkhead to remain; install stepping stones landward of top of bank; install a drywell to contain roof runoff; revegetate an approximately 2,057sq.ft. area throughout the bank face using native species; and to establish and perpetually maintain a 623sq.ft. non-turf buffer along the landward edge of the top of the bank. Located: 1490 Paradise Point Road, Southold. SCTM# 1000-81-3-20 Type of area to be impacted: Saltwater Wetland Freshwater Wetland Sound Bay Part of Town Code proposed work falls under: Chapt. 275 Chapt. 111 other Type of Application: Wetland Coastal Erosion Amendment Administrative Emergency Pre-Submission Violation Notice of Hearing card posted on property: Yes No Not Applicable Info needed/Modifications/Conditions/Etc.: liese,m all +retS &nj ahv retAovaj mti uims a free Icjjte�_ Present Were: ✓ G. Goldsmith N. Kru ski E. Sepenoski L. Gillooly 7E. Peeples PROJECT/ ZONING_.pA_Tt�_-------' -SHELTER ISLAND 5 O U N Dom• DRAINAGE SYSTEM INSTALLATION NOTE5: PROJECT _ s�•ia�w A MINIMUM IO'5EPARATION 15 REQUIRED BETWEEN DRYWELL5 $ �O6 WATER SERVICE LINE,UNDERGROUND UTILITY LINES,SEPTIC . PROPOSED RESTORATION OF FRAME u 3 z TAX MAP# 1000-5I-5-20 �LM��A-�� COMPONENTS,LEACHING FIELDS,SEWER COMPONENTS,OTHER m a o „ 1Ve e , CABANA, DECK, WALK, 8 STEPS. z r 3 �-____ DRYWELLS,AND THE EDGE OF ALL FOUNDATION WALLS . PROPOSED RETAINING WALL o o W ZONING DISTRICT R-50 NO ------------ A MINIMUM 5'SEPARATION 15 REQUIRED BETWEEN DRYWELLS $ ? REPLACEMENT = a= PROPERTY LINES LOT AREA O.5 ACRES �v�er�isoN !� A MINIMUM 20'SEPARATION 15 REQUIRED BETWEEN DRYWELL5 AND • PROPOSED NON-TURF BUFFER rn a o w BURED PROPANE FUEL TANKS. PROPOSED REVEGETATION AT BANK. g z CofO -ADDITION Z-32222;3/6/01 E, CONNECT ALL 6UTTER LEADERS TO NEAREST DRYWELL PROPOSED DRY WELL w o a W • 0 J GofO - ONE FAMILY DWELLING Z-32223;ONE FAMILY DWELLING :_ :-- = _ o W o r a ®a..aar e-, ----- •�TavmoN w DRAINAGE SYSTEM CALCULATIONS: _ m a EXISTING(RESTORED)ROOF DECK= 145.2 5 Ft. =r W O O -L' .0 o 3 w FEMA FLOOD ZONE X f VE 13 rom oN o'ye'e ___ - - _____ nnu 145.2 Set.Ft.X O.Il= 25 0=z g W exrsos 2�° •••= -'-- ,• - = N eNr 25/5.-12= 3 VERTICAL FT.OF 4'DIA POOL REQUIRED _ ____ _ PROVIDE(1)4'cP X 3'DEEP DRYWELL a W- WETLANDS DISTRICT 647g Tww A;OCT.25,2006 % : '` " m _m a LL= �•e - ."�; EXCAVATION CALCULATIONS NOTE: MINIMAL DISTURBANCE TO THE BLUFF WILL BE DONE. HAND a 0 WETLANDS DISTRICT 9425;APRIL 11,2019 ms- i ;/y:, PULLING OF INVASIVE SPECIES, ENGLISH IVY(HEDERA HELIX)AND a o°�z 3 �i.� EXCAVATION®RETAINING WALL d WALK FOOTING5; COMMON PERIWINKLE(VINGA MINOR). ANY AREAS WHERE INVASIVE >r z= IW'FROM MIEN YNT6i 1'IARC 9TEPPINB 9TOIGM1 W J o W a _ ___ +oso►o�svice 60 S.F.6 3'-0"DEPTH=APPROX.150 CUBIC FEET SPEVE5 ARE REMOVED,NATIVE NON FERTILIZATION DEPENDENT z w 2 w a ------- F __ _-- -- _ VEGETATION WILL BE PLANTED AND A SUITABLE SEED MIX o s=� LOT COVERAGE � < ADDED TO ANY DISTURBED AREAS. W a-o a - PwNcm,.i en�°rn eo0c �� SS DRYWELL EXCAVATION; 1e n 6 N SOUTHOLD TOWN GQp,.E 280-4 - 13 S.F.®4'-O"DEPTH-APPROX.52 CUBIC FEET a==a 1 AREA OF DISTURBANCE ON BLUFF TO BE APROX 5%OF THE SQUARE ¢r�o m _ ! FOOTAGE OF THE BLUFF. W am Z�LL %LOTe, z4Wao DESCRIPTION(FOOTPRINT) AREA COVERAGE ,, we -SHELTER 1 �- ° =3 a o N U S O LLr TOTAL LOT AREA 20,412.0 S.F. L_ 527"16'12"K Wo r F=o w w ---�---- ---------- --- `roomanawew 61:1.06' a W a o AREA LANDWARD OF BULKHEAD 1-7,541.3 S.F. T l i c a a EXISTING 2 STORY FRAME HOUSE 1,150.1 S.F. 6.6% I TIE LINE ALONG APPARENT 1 1 Y 3 j } $> I HIGH WATER MARK II/6/18 I 1 = W z cai w _ ___ a win aoa EXISTING GARAGE 555.2 S.F. 2.0% I 2 T - ------- ---__ , -�- 'o a a u EXISTING ROOF DECK (CABANA I I -BEACH...---- 1 BELOW) 1452 S.F. 0.5% (PROP.5%NATIVE EXISTING STOOPS 55.0 S.F. 0.2% I REVE ATION aTBANK .0 r W !! O 1 EXISTING FRAME STEPS B 1 m I WOOD L IS5.l S.F. OA% LANDINGS iee CON OD LK Ap BULKHEAD PIER LINE EXISTING WOOD BIN 15.5 S.F. 0.190 STa�� r �ZONE X 6 =� - -- ---= ! ACCESSORY s772UGTURES 4J FLOOD ZONE-7 - - �� U HoocG7 BOUNDRY e_ �. - „ --- --Y�.- 1 PROP,RESTORATION OF /1� ry, TOTAL AREA OF ALL STRUCTURES 1851.0 S.F. 10.6%. NN to- m- FRAME CABANA Vl m MAXIMUM LOT COVERAGE ALLOWED: 20% BOTTOM OF SANK 12 7 W�-- �-mo _W j_-. - W/DECK OVER 4-1 _ _ _ W--1- PROP.IN-PLACE, -� PORTION OF SLOPE 14 -'� --"'--'-- Z' - RETAINING WALL IMPERVIOUS SURFACES<8"FROM GRADE soe EXCEEDS 25% 16-r --� M. C EXISTING GONG.APRON 25.q S.F. O.I% 2o- -_ " ry m \1 REPLACEMENT PROP05ED EXISTING DRIVEWAY APRON 205.0 S.F. 1.2% i �' W_ O REPLACEMENTWOO TOP OF BANK -v- i W 12.1' TOTAL LOT COVERAGE INCLUDING Ig �i " .' ���/ �\ 3.4 _ WALK a STEPS STRUCTURES<5" FROM GRADE 2051A S.F. IIA% �i 4'� PROP. l n G) O BUFFER I._ - Q BO"OAK 1 GONG. i�¢ COVER !��� ACCESSORY STRUGTURE�EQUIREA4€NT 100'FROM HIGH WATER MARK I /9 C]❑ / 5TEPPIN5 STONES W/ SOUTHOLD TOWN CODE .8_0-15 ---- - ___ 40%OPEN SPACE r Q PIER LINE a 2 STORY r E >,111 Ire EXIST. PROPOSED COMPLIES iCOVER N am``r° L� v LJ E PRINCIPAL BUILDINGS O FRAME 4 GONG. HOUSE ow i = MAXIMUM HEIGHT 15, 11.4 11.4 YES IS w 1 1.4' MINIMUM SIDE YARD 10.0' 13.4' 13.4' YES AUG 2 9 2024 � , R 8•q� • Q 1 10.6' MINIMUM REAR YARD 10.0' 21.2' 21.2' YES 9 q'b'm 1 Z ~ w+•xxs :,woes U �'. I Q z e0i MAX.SQUARE FOOTAGE 1200 145.2 145.2 S.F. YES 1 O S.F. S.F.. � �,� Southold Town Q a n. } �,�,. ___�.___________________ Board of Trustees U w Z INn I _100'FROM BULKHEAD Y p J "0 ENLARC ED PART I PAL SITE PLAN0 a w a �5E "' SCALE: P = 50'-0" O U) PROPOSED 51 TE PLAN 51T'E LAYOUT NOTES: t� fi °-r I. THIS 15 AN ARCHITECT'S SITE PLAN 8 IS 1 � D AR ° a `H SCALE: I" = 50'-0" `� d SUBJECT TO VERIFICATION BY A LICENSED '-b � _ �y 0 NOTE: SURVEYOR. THE INFORMATION � a .. FLOOD MAP DATA FROM SURVEY 51TE PLAN HATCH KEY: REPRESENTED ON THIS SITE PLAN 15 TO THE ^� ARCHITECT'S BEST OF KNOWLEDGE. / `� `.jib �- - MAP#:36103G016-IH _ p r PROPOSED CABANA d DECK � � (}� •(:c;;,�4�� `� 1 SUBJECT PROPERTY `' MAP DATE: q/25/20041 ® RESTORATION 2.SURVEY INFORMATION HAS OBTAINED FLOOD ZONE X 8 VE 13 < +� FROM A SURVEY DATED MAY,10 2022 i' PROPOSED WALK b STEPS I. 517E PROTECTION/SILT FENCING TO BE ® REPLACEMENT AND PREPARED BY: + � ". t N INSTALLED AS REQUIRED BY SOUTHOLD TOWN. I PROPOSED NON-TURF BUFFER KENNETH M.WOYGHUK •y 2.SURFACE WATERS ARE LOCATED WITHIN 500' PAONBDOX 1�VEYIN6,PLLG Q m OF THE PROPERTY. PROPOSED NATIVE (NON-FERTILIZER DEPENDENT) AQUEBOGUE,N.Y. 111151 3.ELEVATIONS REFERENCE NAVD88 REVEGETATION TELEPHONE: (63)2q8 1588 a N Z N Y swam mw0 oaw3 zxa PROPOSM BUFFER AREA G<P EXIST.XWSE TO BANK V K"VAWES NNW F O Z-i x V aQ.in - W W 8B3'To TIE LINE•OBSERVED HI&H WATER m Ca g w CEXI5nNk5 2 STORT 44,0'TO FACE OF BULKHEAD z o K OF H _ �aFyNN PART 7119 LING FROPOSW 56"H I x N RNLMB REPLACEMENT I Z V w x Z. EXI5TIN63�HOUSE PROP.EPD.M.ROOF rEMBRAM Z QO w a �� I V VN=3 EXI5TIN6 ROOF DECK N n¢w a 6B'TO TIE LINE•OBSERVED HI&H WATER 0-O N O ax�mm PROP.SmMS; 21.2'TO FACE OF BULKHEAD TOP OF BANC HD.SELC2TION FROF0.5m 06•H Z z a W Q 0 Z ��.SONDTUSES RAILING REPLACEMENT I N W C Q •LAIVINS cOi o"'z mxFao LL DUST. Hz. TREADS s�STRIENISINS I z x N H CABANA FLoaR O LANDIN& O ui w N 3 m ELEV..165' G w�a O -� _ z¢oaa o gTLFwx azca ¢ n a O R a mw.m0 PROP.SONOTUBEi H L1 LT a U •LA/DINB REPLACE EXIST. TREADS■STRINSERS BOTTOM OP BAHC TOP OF BULKHEAD -� -��� 70 ELEV.a6b'_—_— PROP.CONC.PAD +J •STAIR BASE EFi�Nlm-tAIN , ' AVERAGE&RACE O BOTTOM OF BULKHEAD To EXIST.BULKHEAD V W W EXIST.STEPS, TO REMAIN 0 5 10 20 SITE SECTION a BANK GRAPHICSCALE C 1 0) SCALE: 115" = 1'-0" Q n Q� L.L Q PROPOSW Ob'H RAILING REPLACEMENT RHO �7 ROOF MT MEFBRME TOP OF BA "ALL EXSTRk81NB TO NC BE RBYN® C E 0 v PROP IF KALL ',PiONG E RPTAMM6 ' I � TEPL•LEFETNf OP O ti EXIST. EXI5TIN6 HETAIWN&WALL A U G 2 9 2024 z VERDPW DI 'y a Z SLOPED 1 = LV BANK � . m o i f/ NOTE,MINIMAL D15TURBANCE TO TIE BLUFF KLL BE DONE.HAND } C,0MFULL'Ns OF IHJASNE SPE A HI EN.A M'(EAS MH.IM IN AND C U W Z cFWIES FERIKW.LE 'N A VE NOW ANT AREAS N VEE INVASIVE Southold Town c t/) � VE&ETS ARE POLL ,NATIVE NOW FERTILIZAnoN DEPENDENT PROPOSED PLA VFf=To V BE PLANTED AND A SUITABLE e�MIX WILL BE \ J p RAILM6 REEPLACEMENT / ADDED TO ANr DISTURBED AREAS. Board of Trustees �/ Q O C ` AREA OF DISWIMANCE ON BLUFF TO BE APROX 5%OF THE SWAIM � Y EAST. FOOTABB OP 1HE BLUFF. __ W a VE6ETA7ED Y ExlST. sAaac LL O O SAW It TOP OF EXIST.BULKHEAD t� H/° �•�• a b� r N 1 G 5 10 20 Q �_-.�N I' •,:`,m5''".ems' \ EAST ELEVATION BANGGRAPHIC z_Gl... CA 50ALE: 1/8" = 1'-0" c a W Q Z W g" Y K �oWowO o8W3 Fz�Q ¢aa� Z xn p F oZ�= ol�Q� z S?�ma 0o3W m W a g w o=z�'W zoo�w J Q Z W =aQWx p a 0 W U z O 0 p x Y H 3 aI Z f o'or 0wO W p�p S 0 OTTOMOaAc / BOTTOM of ex d-aa Sm ,Z„Q o F U g f w-_ PROP.COW,PAD ¢S F-Q O oW3zz .STAIR BASE 0.O,� REPLAG9 EXIST. Z=Q O Qw32x TREADS 1 sTRINSE� RAILM6 BEM T O a z m p<IL JL_ O ? audl QU fxJ PROPOSED 56' o f ° a F� - Y N H} RMLIN6 REPLACEMENT •1 0 Y III C N a 0 a O•I. T. W c R o PROP.soMT m -12•-r p o a c, EXISTING OUT s110Y8t 1 EXIST.4'X4'POSTS PLI tNS TO EE R840VFD REPLACE EXIST. Dsmw EXIST.2'x4'GJ. pl .24.OZ. MST. CD SISTER 2St4'GAL (�@ PROP.$ONOTJBES PROPO`SM W 2-4 i� y .24.oz. I .LANDING RAILIHB REPLAGO-EM �J EXISTING T g aPWK o U 4 (D m -EXIST"- -EXI T, EXIST wI-DEGXINSAWM \ +J STORAGE REPuce ewer. o -1 DeGI°NG RA POSW 5 A•CEYENT U a �rn • PROP.50NOlV8ES —— /1r '(���J .LANDING WrTER RICH EIII'fER 4 O \` W a PONT.K DaYasPaur . p dl y PROP.P.GONG.RETAINING O 'P LEADER TO DRY YELL R�EHE - i i EXISTI/Yl RETARllNG wOF mppp REPLACE EXIST. . WAL� i �,� i TREADG 1 sTRINEERs mFROPOSW Q N RAILING REPLACEMENT L- Q' EXISTING TOP OF eAMBC EXISTING v I I TOP OF BA1JIc Lit Nj LANDING REPLACE EXIST.% .,,II���—_��i}}II Ill PROP. PROPKALK .90N'm.E� E1 DECKIIYa 3•-0• .LAI�IN6 j a Z � � QM Z !'I 11- W EXIST. / PROPOSED CABANA PLAN GRAPHIC SCALE 5 10 EXI5T. / PROPOSED DECK PLAN GRAPHIC SCALE 5 10 1/8�1-0 C V w z cn SCALE: 1/b" = P-O" SCALE: I/8" = I'-O" Y Y o J W Q = a N ®A�� o ® W E p _v AUG 2 9 2024r t� Southold To Board of Trustees �37 Ar- N \14 L� o �a N 0801640" W I 14.48' S . C . Told ® # DISTRICT ® 11000 SECTION : 81l. BLOCK : 3 LOT : 20 n o z Q D r\r z T41SCR eFC G 6 \ `r 6';�° a BARON°cry 5646,�L� o LL w �RFF R\S °�E Fy r �6-70 C °L OAD \ LAND N/F OF \ \ STEVEN KOLYER PO \ MOH. J PIPE U.P.I" \ LAND N/F OF / \ JAMES MILLER O� / RES �6_ . PIPE \ MON. \ /9,\ U.P. COY pt�b� 2S)• GARAGE D� n o, O 0 C °NC Fq \ QjSO'\ CONC. MON. STEPS Q M.H. ti �1�T7fd- LAND N/F OF 1V6-�.o 2nd FLR. OVER 72Q 4A0 �� NO PETER MIGNEREY J.,I,10 ENCLOSED PORCH ` 3 // / o ti /co CONC. RF��INS ENCLOSED o 0 2 STY FRAME o 30"' 0 K /I I /Ill /Ill l/8/D SEAWALL °F TO rye. PORCH �oN\ �o DFLC 24N3 42• P� / I //f I I / c CO MOH. qy //� / l �-Y / / WOOD PLAT. WOOD DE6K VAR/�� 0 K/ NCO 410 00 �'•9/ � � `� � / / / / / 00 do / / � 1p CIV ti O MON. / / r,ram N �`0 L / / '�NO/ cb I / � EGEI V a JUN 2 8 2024 SouttiWd Town Bo2Rf ofTrtlstees THE WATER SUPPLY, WELLS, DRYWELLS AND CESSPOOL LOCATIONS SHOWN ARE FROM FIELD OBSERVATIONS FEMA MAP#36103C01 67H EFFECTIVE 09/25/2009 AND OR DATA OBTAINED FROM OTHERS. AREA: 20,412.31 SQ.FT. or 0.47 ACRES ELEVATION DATUM: NAVD88 ------------------------- UNAUTHORIZED ALTERATION OR ADDITION TO THIS SURVEY IS A VIOLATION OF SECTION 7209 OF THE NEW YORK STATE EDUCATION LAW. COPIES OF THIS SURVEY MAP NOT BEARING THE LAND SURVEYOR'S EMBOSSED SEAL SHALL NOT BE CONSIDERED TO BE A VALID TRUE COPY. GUARANTEES INDICATED HEREON SHALL RUN ONLY TO THE PERSON FOR WHOM THE SURVEY /S PREPARED AND ON HIS BEHALF TO THE TI TL E COMPANY, GOVERNMENTAL AGENCY AND LENDING INS TI TU T/ON LISTED HEREON, AND TO THE ASSIGNEES OF THE LENDING INSTITUTION, GUARANTEES ARE NOT TRANSFERABLE. THE OFFSETS OR DIMENSIONS SHOWN HEREON FROM THE PROPERTY LINES TO THE STRUCTURES ARE FOR A SPECIFIC PURPOSE AND USE THEREFORE THEY ARE NOT INTENDED TO MONUMENT THE PROPERTY LINES OR TO GUIDE THE ERECTION OF FENCES, ADDITIONAL STRUCTURES OR AND OTHER IMPROVEMENTS. EASEMENTS AND/OR SUBSURFACE STRUCTURES RECORDED OR UNRECORDED ARE NOT GUARANTEED UNLESS PHYSICALLY EVIDENT ON THE PREMISES AT THE TIME OF SURVEY SURVEY OF: DESCRIBED PROPERTY OF NjEFLI/' CERTIFIED TO: AJIT KUMAR; MAP OF: �P �0� . FILED: SITUATED AT: BAYVIEW ` C) TOWN OF: SOU I HOLD J���• KENNETH M IVOYCHUK LAND SURVEYING, PLLC SUFFOLK COUNTY, NEW YORK Professional Land Surveying and Design P.O. Box 153 Aquebogue, New York 11931 FILE #222-57 SCAI F: 1 "-20 DATE: MAY 10, 2022 PHONE (631)298-1588 FAX (631) 298-1588 N. Y.S. LISC. NO. 050882 3'x 2'-6"x 12" Concrete Sla to Grade BOTTOM OF BANK Foundation Notes: i = = QPRePI LJJ Jb- Q The contractor is to verify all measurements in the field and any w RAILI PL EM�fT �, discrepancies are to be brought to the Engineer prior to c _ _ W o W construction. 03El — 0- m _ _ n 3.5 x 16 - - _ 1 -All concrete 4,000 psi after 28 days minimum. i co Paralam Plus PSL 2-All rebar ASTM A-615 Grade 60. - - m 3-Footings are to be installed on undisturbed virgin soil.The o bottoms of all footings are to be installed a minimum of 3'below („ grade unless indicated otherwise. ----------- - ------- x -- WO (3)2x8 MCQ PROPOSED 36' 4-Follow cold weather concrete treatment relative to add mixtures I RAILING REPLACEMENT T2'-,C in accordance with ACI 212.3R. Use Air-Entraining admixtures per Replace I ASTM C260,AASHTO M154 or Water Reducing and Set- Existing Beam Controlling Admixtures per ASTM C494,AASHTO M 194 only. Do In Place I EXISTING not use Calcium Chloride or other corrosive type admixtures. DECK 0) o \ 145.2 S.F. I `L "- (3) C �` LL w N ` PROP. E.P.D.M. _ c A A W MEMBRANE] SLEEPERS I n N O t V/ J' DECKING ABOVE I X 00 - �1 X00 - E F I1 W X CO W X (O J I C CV CV o Notes: PROPOSED 36' (I 3 3 M RAILING REPLACEMENT All measurements are to be verified in the field and I I1 ---- (3) CQ o Qy any the discrepancies are to be brought to the attention of Concrete used for footings is to be 3,500 psi after GUTTER HIGH GUTTER W POINT, BELOW 00 m N 28 days minimum. Y WALK DOWNSPOUT LEADER TO DRY WELL ® I .� All pressure treated lumber is to be MCQ No.2 or la Existing i —i — — 3.5 x 16 -----) m W AT better Southern Yellow Pine. 1 am P-IusRSL ----- 00 _ a� X C 1 __-_- o 'All nails, bolts, nuts and washers are to be hot i cov �x dipped galvanized. I 1 1 I 1 W o 'All bolted connections are to be made with l I LL I A-325 bolts. U EXISTING I 1 00 TOP OF BANK LANDING � (3)2x8 MC B I �F m 2 OP OF BANK - - S-1 I 00 I 1 X I 3'—t)" N 12'-1' �-3'-0"-•—� =J 2x8 M Roofing Renovation Detail Design Loads: Deck Floor Framing Renovation Detail le:„� �_,, . Roof-Live Load-40psf ��-� a -Dead Load-15 psf Deck Floor -Live Load-40 psf -Dead Load-15 psf r ' ry rr C) ackfill C_Q . . -Wind Loads- 130 mph-ASCE-7 MWFRS-Method 2 c 3 c- _ 3» j: _ Design Criteria- •Q rc; _ . . . . . . _ . . _ . . �tfie� 12» 2020 NYS Residential Code R301.1.1 and utiliz 0. New 2 x 8 MCQ •• o. 5 Rebar 12"OC methods and procedures stipulated in Chapter 2 Engineered FJ Sistered to Existing '_'.'_'.'_'.'_'.'_-_ -' Design and Chapter 3 Prescriptive Design in the 2018 -_•_•_' ' ' . ' . . ' . =?� impson PC6Z American Forest and Paper Association Wood Frame _ Construction Manual 2018 WFCM for One and Two Family New(3)2x8MCQ . . - - - . . . . . . . . . _ -- 6" ( ) Replacement of Existing impson PC6Z ._ r - -4_____, Dwelling Units and ASCE 7. . . . . . . . . . . . f..•F, il . . . . . . . . . .-_ - _ _ - '�•}. Grade i. MG 2 J 20V, Grade _ . ;` : I co as ` . . . . . ,tj y New(3)2 x 8 MCQ/ ' '_ _'_'_ . _ _ _ . - 8 impson ABW66Z Plans are preps by Condon Engineering,P.C. It is a violation of the New York State Education Simpson ABW66Z • M - _ =_; "-` - `a ~ Professional Engineer ect�LaP�unless altera iteacrov underm a direarrywa .ofa Kan `t •- =�=-' -::: '�=_,• ,-.:._ -: _ ArCnit or Land sue. �r anyway-IFarriterri bearing �. �ES5��NP c- •S �_. -.V•._s• the seal of an`., Engineer,Architect or Land Surveyor is altered,the altering Engineer,Architect,or ";�1A'� F. Land Surveyor shall affix to the item hsftw seal and the nolation'Altered by'foAowed by hM*r ' :.:•y - ,: signature and the date of such alterations,and a specific description of the alteration. L3" 51 12"Sonotube Footing Scale: 1/4" = V-0' Condon Engineering, P.C. Kumar Section Detail No.5 Rebar 12"O� n ale:,/._,,-0, eplaced Retaining Wall Section Detail Drawn by : JJC 1755 Sigsbee Road Deck / Cabana R B scale-lrr-1'-0' Date : 8-22 2024 Mattttuck, New York 11952 1490 Paradise Road (631)298-1986 Southhold, New York r lel I I d I t1l 11 I 6x6 Pressure Treated Colum s 0 Bolt Simpson ABW66rr r. 3.5 x 16 Paralam Plus PSL z - . f 3.5 x 16 Paralam Plus PSL 3'x 2'-6"x 12" Concrete Sla to Grade 10 .��OF N�'�✓r AUG 29 2021 �. v -I_, r Ess�o Scale: 1/4" = 1'-0' Condon En ineerin P.C. Kumar Plans are prepared by Condon Engineering,P.C. It is a violation of the New Yak State Education g g� Law,Article 145,Section 7209,for any person unless acting under the direction of 6cerrsed Drawn by : JJC Deck / Cabana Professional Engineer,Archih�ct,or Land Surveyor,to alter any iem in any way.If an item bsarirg 1755 Sigsbee Road the seal of an Engineer,Architect,or Land surveyor is altered,tte altering En sneer,Ardifea,or Mattituck, New York 11952 1490 Paradise Road Lana surveyor shall afroc to tlne item hismer seal and the notation•ARered W followed by hisfier Date : 8-22-2024 signature and the date of such atterarions,and a spea7ic desaVion of the alteration. (631)298-1986 South hol d, New York AMP Architecture Address:10200 Main Road,Unit 3A,Mattituck NY 11952 Phone:(516)214-0160 Design + Build 05/02/2024 Kumar Residence 1490 Paradise Point Road Southold, NY 11971 SCTM: 1000-81-3-20 All photos taken on 12/14/23 Photo #1: Facing North Photo #2: Facing Northeast C f _ . Photo #3: Facing Southeast Photo #4: Facing Southwest Page 1 of 2 A M P Arch itectu re Address:10200 Main Road,Unit 3A,Mattituck NY 11952 • • .• Design + Build d ' • • • • #6: Facing East Photo 47 Facing Northeast �4 Photo Glenn Goldsmith,President o�OSVFFD(,�coG _ Town Hall Annex A.Nicholas Krupski,Vice President y�4 54375 Route 25 Eric Sepenoski CD ,? P.O.Box 1179 Liz Gillooly y • 0!�'r Southold,NY 11971 Elizabeth PeeplesOlr '1� Telephone 631 765-1892 Fax(631)765-6641 Southold Town Board of Trustees Field Inspection Report Date/Time: 3 17, I Completed in field by: 'tame-i� Anthony Portillo of AMP Architecture on behalf of AJIT KUMAR & JENNIFER ECCLESTONE request a Pre-Submission Inspection to discuss the proposed restoration/reconstruction of the existing framed cabana, deck, retaining wall, wood walks and bluff stairs. Located: 1490 Paradise Point Road, Southold. SCTM# 1000-81- 3-20 Type of area to be impacted: Saltwater Wetland Freshwater Wetland Sound Bay Part of Town Code proposed work falls under: Chapt. 275 Chapt. 111 other Type of Application: Wetland Coastal Erosion Amendment Administrative Emergency Pre-Submission Violation Notice of Hearing card posted on property: Yes No Not Applicable Info needed/Modifications/Conditions/Etc.: Vvib1 re,vituy �w'H�PX ih ZPAQ,rdl► 6 kCaal s�,dw� �s h�s-tihca.l �h 14 v _l7a,v�l>: •►S wa, I yea�-IA-4td -I-o � a111 ,�,rv� ihCFa,�i han-h►�� area. lQn_�wr,�d� br�,�� Present Were: v G. Idsmith v N. Kruppki v E. Sepenoski L. Gillooly ✓E. Peeples 02 "` SOOTHOLD m+aua Oa 11 A FD 28 b 2..•i' \ \: ,] °M1 IAIW r :: a� k*• F• zaA 5w s an z au 3 ry e e s ' P Zlu EN COUNTY O S ICE f, E •"'et�iawec Mane+ 1°P a.r - e" LK C) N '� w IOOD .. SECTION NO --y w••w ]ICN SNf CR E�' -\ —._...._.._ N Y I F hUF O�gc Y Y E .a�N ey, T F OFFICE LOCATION: �'� MAILING ADDRESS: Town Hall Annex P.O.Box 1179 54375 State Route 25 Southold, NY 11971 (cor. Main Rd. &Youngs Ave.) Telephone: 631 765-1938 Southold, NY 11971 LOCAL WATERFRONT REVITALIZATION PROGRAM TOWN OF SOUTHOLD To: Glenn Goldsmith, President Town of Southold Board of Trustees From: Mark Terry, AICP LWRP Coordinator Date: September 18, 2024 Re: LWRP Coastal Consistency Review for AJIT KUMAR & JENNIFER ECCLESTONE SCTM# 1000-81-3-20 AMP Architecture on behalf of AJIT KUMAR & JENNIFER ECCLESTONE requests a Wetland Permit for the existing two-story dwelling with entry stoops; to restore the existing cabana with roof deck, cabana decking, steps with landings, and retaining wall landward of cabana by replacing all footings under all structures with new, replace northerly wood walk to cabana deck, replace southerly top landing with steps down to cabana deck, replace cabana deck and steps down to a concrete slab at bottom of bank; repair roof of deck above cabana with new roof membrane; replace all railings with new; remove and replace in-place retaining wall landward of cabana; replace siding on cabana; remove outdoor shower from cabana; existing steps to beach off bulkhead to remain; install stepping stones landward of top of bank; install a drywell to contain roof runoff; revegetate an approximately 2,057sq.ft. area throughout the bank face using native species; and to establish and perpetually maintain a 623sq.ft. non-turf buffer along the landward edge of the top of the bank. Located: 1490 Paradise Point Road, Southold. SCTM# 1000-81-3-20 The proposed action has been reviewed to Chapter 268, Waterfront Consistency Review of the Town of Southold Town Code and the Local Waterfront Revitalization Program (LWRP) Policy Standards. Based upon the information provided on the LWRP Consistency Assessment Form submitted to this department, as well as the records available to me, it is my recommendation that the action is INCONSISTENT with the LWRP. 1. The as-builts do not meet policy 6.3 which supports the Boards authority and permit process. 2. The Cabana is an unpermitted structure on a bank usually subject to erosion and storm damage. 3. If approved, it is recommended to retain trees but allow "limbing up" to establish views if necessary. Pursuant to Chapter 268, the Board of Trustees shall consider this recommendation in preparing its written determination regarding the consistency of the proposed action. Cc: Honorable Lori Hulse, Attorney YFOZ/r Caroline Burghardt,Chairperson Town Hall,53095Main Rd. Lauren Standish,Secretary P.O.Box 1179 Southold,NY 11971 Telephone(631)765-1889 Conservation Advisory Council Town of Southold At the meeting of the Southold Town Conservation Advisory Council held on Wed., September 11, 2024 the following recommendation was made: Moved by Carol Brown, seconded by Nancy May, it was RESOVLED to NOT SUPPORT the application of AJIT KUMAR & JENNIFER ECCLESTONE for the existing two-story dwelling, garage, stoops and wood bin at garage. Proposed restoration of cabana with roof deck, restoration of frame steps and landings, reconstruction of retaining wall, and proposed drywell. Proposed 623 sf. non-turf buffer at top of bank, proposed native revegetation at bank, approx. 2,057 sf., and proposed stepping stones w/40% open space 44 sf. Located: 1490 Paradise Point Road, Southold. SCTM#81-3-20 Inspected by: Carol Brown, Nancy May The CAC does Not Support the application because the area is environmentally unsound and the cabana is over 100 sf. The bank is currently well-stabilized with bayberry. Vote of Council: Ayes: All Motion Carried Jr _� A M P Arch i t e c t u re Address:10200 Main Road,Unit 3A,PO Box 152,Mattituck NY 11952 Phone:(631)603-9092- - ... Design + Build D J August 27, 2024 , LL„JJKuamr Trustees Site Plan Revision 2024 1490 Paradise Point Road Southold, N.Y. 11971 SCTM#1000-81-3-20 -, To Whom It May Concern, Accompanying this letter are revised documents to clarify the following information: • Clarified the amount of native revegetation • Clarified that plumbing for the outdoor shower shall be removed from the existing structure. • Added Engineering Drawings for the proposed retaining wall that will replace in the same location the existing wood retaining wall. Please contact our office if you have any questions. Thank you, Mathew Smith E EIVIE AUG 2 9 2024 Dj MaTown Page 1 of 1 Cantrell, Elizabeth From: msmith@amparchitect.com Sent: Friday, September 6, 2024 11:02 AM To: Cantrell, Elizabeth Cc: 'Anthony Portillo'; 'Kyle' Subject: RE: Kumar& Ecclestone; SCTM# 1000-81-3-20 application Hi Elizabeth, To answer your questions see below in RED Mathew Smith, RA, LEED AP Design Director A M P Architecture Design + Build Office: 631-603-9092 www.amparchitect.com From:Cantrell, Elizabeth<elizabethc@town.southold.ny.us> Sent: Friday, September 6, 2024 8:36 AM To: 'msmith@amparchitect.com'<msmith@amparchitect.com> Cc: Brooke Epperson<bepperson@amparchitect.com>; 'Anthony Portillo'<aportillo@amparchitect.com> Subject: Kumar& Ecclestone;SCTM#1000-81-3-20 application Importance: High Good Morning, In further reviewing said application please provide this office with a determination of two items. 1. Given the scope of work proposed, is this considered a Demolition (as per Town Code Definition)? Based on our determination the amount of removal would be approximately 74 SF limited to the reconstruction of the retaining wall and stairs necessary to make the descent of the bank safe for the home owner. The remainder of the structure is being repaired and is approximately 202 sf of repair work taking place. We do not believe this repair work would exceed 50%of the market value of the cabana and staircase. We have reached out to the Building Department for confirmation but may not receive an answer prior to 2pm today. 2. Reviewing the survey and the elevations,this could possibly be considered a bluff. Survey states bank. Typically our Site Plans rely on the licensed surveyor information, however based on the Definition in Town Code a Bluff slopes greater than 20%and has a height of greater than 20 Feet between the toe and top of bluff. Based on sheet WTL-02 the Bank is less than that as the Bottom starts at+6.6' Elevation and the Roof Deck which is above the Bank is noted at+23.3' This would make the Bank less than 16.7 feet tall and therefore should stay defined as a Bank. For both question please respond in writing your determination and how you came to each determination as soon as possible. If you could have this information by 2:OO13M today it would be helpful. Legal noticing to the local newspapers must be submitted by end of day today. 1 1 Elizabeth Cantrell Administrative Assistant Town of Southold Board of Trustees Phone: (631)765-1892 Fax: (631)765-6641 2 Glenn Goldsmith,President ��¢ SO&P Town Hall Annex A.Nicholas Krupski,Vice President a`d ��� 54375 Route 25 P.O.Box 1179 Eric 5epenoski / Southold,New York 11971 Liz Gillooly CA �r Elizabeth Peeples ® Telephone (631) 765-1892 Fax(631) 765-'6641 C " EVE D BOARD OF TOWN TRUSTEES JUN 2 8 2024 DI TOWN OF SOUTHOLD This Section For Office Use Only Southold Town Coastal Erosion Permit Application Board of Trustees Wetland Permit Application Administrative Permit --Amendment/Transfer/Extension .� Received Application: t}�`Ytr�- y Received Fee: $ 1��- _ Completed Application: Incomplete: . SEQRA Classification: Type I__ Type II Unlisted Negative Dec. Positive Dec. Lead Agency Determination Date: Coordination:(date sent): 4LWRP Consistency Assessment Form Sent: CAC Referral Sent: �i.q \ Date of Inspection: a Receipt of CAC Report: _ Technical Review: Public Hearing Held: Resolution: Owner(s) Legal Name of Property (as shown on Deed): Ajit Kumar } Jenll`.�� E -C e t Mailing Address: 29 Joralemon Street, Brooklyn, NY 11201 Phone Number: 917.843.2478. S1 Suffolk County Tax Map Number: 1000 -M-3-20 Property Location: 1490 Paradise Point Road, Southold, NY 11971 1,446.57' Northeasterly from the intersection of Paradise Point Road & Cedar Beach Road (If necessary,provide LILCO Pole #, distance to cross streets, and location) AGENT(If applicable):AMP Architecture Mailing Address: PO Box 152, Mattituck, N.Y. 11952 Phone Number: 631-603-9092 Email: msmith@amparchitect.com Cj &� AMP Architecture Address:10200 Main Road,Unit 3A,PO Box 152,Mattituck NY 11952 Phone:(631)603-9092 Design + Build May 1st, 2024 Re: Kumar Residence 1490 Paradise Point Road Southold, N.Y. 11971 SCTM No. 1000-81-3-20 To Whom It May Concern, Enclosed please find a wetland permit application for 1490 Paradise Point Road,Southold, NY. Project Description: Existing structures to remain: Existing 2 Story Frame Dwelling(Primary Residence): 1,150.1 SF Existing Garage:353.2 SF Existing Stoops @ 2 Story Frame Dwelling:33 SF Existing Wood Bin @ Garage: 13.8 SF Proposed Restoration&Reconstruction of the following: Proposed Restoration of Cabana w/Roof Deck: 145.2 SF 12'-0"x 12'-1" Proposed Restoration of Frame Steps&Landings 155.7 SF. Proposed Reconstruction of Retaining Wall:55 SF. Proposed Drywell: 13 SF,(1),Vo by 3' Deep Proposed Additional Items: Proposed Non-Turf Buffer @ Top of Bank: 623 SF Proposed Native Revegetation @ Bank:Approximately 2,057 SF Proposed Stepping Stones w/40%open Space:44 SF Please contact our office if you have any questions. Thank you, Mathew Smith, RA LEED AP Page 1 of 1 Board of Trustees Application GENERAL DATA Land Area(in square feet): 20,412.31 S.F. Total 17,541.31 S.F. Landward of ExistinBulkhead Area Zoning: R-80 Non-Conforming Previous use of property: Residential Intended use of property: Residential Covenants and Restrictions on property? Yes __ _No If"Yes", please provide a copy. Will this project require a Building Permit as per Town Code? Yes _nNo If"Yes",be advised this application will be reviewed by the Building Dept. prior to a Board of Trustee review and Elevation Plans will be required. Does this project require a variance from the Zoning Board of Appeals? =Yes _Z__No If"Yes", please provide copy of decision. W✓ his project demolition as per Town Code or as determined by the Building Dept.? reg," any Yes No Does the structure(s) on property have a valid Certificate of Occupancy? Yes F_No Prior permits/approvals for site improvements: Agency Date BD / C of O/Z-32222 03.06.2007 BD / C of O/Z-32223 03.06.2007 Trustees/ Permit No.: 6479A ❑ No prior permits/approvals for site improvements. Has any permit/approval ever been revoked or suspended by a governmental agency? ✓�No ❑ Yes If yes, provide explanation: Project Description (use attachments if necessary): Proposed restoration of frame cabana, deck, retaining wall, walk, & steps. Proposed non-turf buffer & revegetation at bank. Proposed dry well. See project description attached for full description and SF. Board of Trustees Application WETLAND/TRUSTEE LANDS APPLICATION DATA Purpose of the proposed operations. Protection & restoration of the bluff, retainment & structure. Vegetating the buffer & managing storm water to protect the bluff from', erosion. As well as stepping stones with 40% space between. Area of wetlands on lot: 2,871 (Beach) square feet Percent coverage of lot: 14 % Closest distance between nearest existing structure and upland edge of wetlands: 21_2. _feet Closest distance between nearest proposed structure and upland edge of wetlands: N/A feet Does the project involve excavation or filling? ❑ No Yes' If yes, how much material will be excavated? 9 cubic yards How much material will be filled? 9 cubic yards Depth of which material will be removed or deposited: 4 feet Proposed slope throughout the area of operations: 0-26% Manner in which material will be removed or deposited: Areas will excavated using, machinery and hand tools. Excess will be used for backfill and/or removed. Statement of the effect, if any, on the wetlands and tidal waters of the town that may result by reason of such proposed operations (use attachments if appropriate): The proposed operations will have no adverse effects. Proposed storm water management, buffer, and retainment repairs to stabilize the bank. i i i i 617.20 Appendix B Short Environmental Assessment Form i Instructions for Completing Part 1 -Project information. The applicant or project sponsor is responsible for the completion of Part I.: Responses become part of the application for approval or funding,are subject to public review,and may be subject to further verification. Complete Part I based on information currently available. if additional research or investigation would be needed to fully respond to any item,please answer as thoroughly as possible based on current information. i Complete all items in Part 1. You may also provide any additional information which you believe will be needed by or useful to the lead agency;attach additional pages as necessary to supplement any item. i Part l -Project and Sponsor Information Name of Action or Project: Kumar Residence Project Location(describe,and attach a location map): 1490 Paradise Point Road, Southold, NY 11971 i Brief Description of Proposed Action: Proposed restoration of frame cabana, deck, retaining wall, walk, & steps. i i Name of Applicant or Sponsor: Telephone: 631-603-9092 AMP Architecture E-Mail: msmith@amparcliitect.com Address: PO Box 152 j City/PO: State: Zipi Code: Mattituck NY 11952 1.Does the proposed action only involve the legislative adoption of a plan,local law,ordinance, NO YES administrative rule,or regulation? If Yes,attach a narrative description of the intent of the proposed action and the environmental resources that ❑ may be affected in the municipality and proceed to Part 2. If no,continue to question 2. 2. Does the proposed action require a permit,approval or funding from any other governmental Agency? NO I YES If Yes,list agency(s)name and permit or approval: I❑ iR/I j DEC & Southold Building Department 3.a.Total acreage of the site of the proposed action? 0.5 acres b.Total acreage to be physically disturbed? 009 acres c.Total acreage(project site and any contiguous properties)owned or controlled by the applicant or project sponsor? 0•5 acres i 4. Che I land us at occur on,adjoining and_ngar the prop action. ❑ Urban Rural(non-agriculture) u]ndustrial Commercial Residential(suburban) Forest ❑Agriculture OAquatic ❑Other(specify): Parkland Page 1 of 4 i I 5. Is the proposed action, NO YES N/A a. A permitted use under the zoning regulations? K _1i b.Consistent with the adopted comprehensive plan? :R 6. Is the proposed action consistent with the predominant character of the existing built or natural !NO YES. landscape? Z 7. Is the site of the proposed action located in,or does it adjoin,a state listed Critical Environmental Area? NO YES If Yes,identify: y � ❑ 8. a.Will the proposed action result in a substantial increase in traffic above present levels? !NO YES , ✓ I b.Are public transportation service(s)available at or near the site of the proposed action? ✓ c.Are any pedestrian accommodations or bicycle routes available on or near site of the proposed action? ( v/ 9.Does the proposed action meet or exceed the state energy code requirements? NO. YES If the proposed action will exceed requirements,describe design features and technologies: N/A �✓ 10. Will the proposed action connect to an existing public/private water supply? NO YES If No,describe method for providing potable water: N/A ❑ 11.Will the proposed action connect to existing wastewater utilities? NO. YES , If No,describe method for providing wastewater treatment: N/A ❑ 12. a.Does the site contain a structure that is listed on either the State or National Register of Historic NO YES Places? ✓ b. Is the proposed action located in an archeological sensitive area? ✓ I' 13.a.Does any portion of the site of the proposed action,or lands adjoining the proposed action,contain ! NO �!, Y ES wetlands or other waterbodies regulated by a federal,state or local agency? ✓ b. Would the proposed action physically alter,or encroach into,any existing wetland or waterbody? If Yes,identify the wetland or waterbody and extent of alterations in square feet or acres: I 14. Identify the typic bitat types that oc n,or are likely to be found on t roject site. Check all that apply: Shoreline Forest Agricultural/grasslands Early mid-successional ✓ Wetland HUrban Suburban 15.Does the site of the proposed action contain any species of animal,or associated habitats, listed NO YES by the State or Federal government as threatened or endangered? ✓ i 16.is the project site located in the 100 year flood plain? NO YES PNO17.Will the proposed action create storm water discharge,either from point or non-point sources? J✓p If Yes, a. Will storm water discharges flow to adjacent properties? �✓ NO YES b.Will storm water discharges be directed to established conveyance systems � ff an drains)? If Yes, briefly describe: NO t��m ES r we _) I Page 2 of 4 I I 18. Does the proposed action include construction or other activities that result in the impoundment of NO 'YES water or other liquids (e.g.retention pond, waste lagoon,dam)? If Yes,explain purpose and size: ❑ ❑ i 19.Has the site of the proposed action or an adjoining property been the location of an active or closed NO ; YES solid waste management facility? If Yes,describe: 20.Has the site of the proposed action or an adjoining property been the subject of remediation(ongoing or NO YES completed)for hazardous waste? If Yes,describe: ❑ I AFFIRM THAT THE INFORMATION PROVIDED ABOVE IS TRUE AND ACCURATE TO THE BEST OF MY KNOWLEDGE Applicant/sponsor n . AMP Architecture (AnthonyPortillo) DateD5/01/24 Signature:. i I Part 2-Impact Assessment. The Lead Agency is responsible for the completion of Part 2. Answer all of the,following questions in Part 2 using the information contained in Part I and other materials submitted by the project sponsor or otherwise available to the reviewer. When answering the questions the reviewer should be guided by the concept"Have my responses been reasonable considering the scale and context of the proposed action?" No,or Moderate small to large impact impact may may occur occur I. Will the proposed action create a material conflict with an adopted land use plan or zoning regulations? 2. Will the proposed action result in a change in the use or intensity of use of land? 3. Will the proposed action impair the character or quality of the existing community? ❑ 4. Will the proposed action have an impact on the environmental characteristics that caused the establishment of a Critical Environmental Area(CEA)? 5. Will the proposed action result in an adverse change in the existing level of traffic or affect existing infrastructure for mass transit,biking or walkway? 6. Will the proposed action cause an increase in the use of energy and it fails to incorporate reasonably available energy conservation or renewable energy opportunities? 7. Will the proposed action impact existing: ❑ a.public/private water supplies? b.public/private wastewater treatment utilities? El 8, Will the proposed action impair the character or quality of important historic,archaeological, i ❑ architectural or aesthetic resources. 9. Will the proposed action result in an adverse change to natural resources(e.g.,wetlands, ❑. ❑ waterbodies,groundwater,air quality,flora and fauna)? Page 3 of 4 I No,or Moderate small to large impact impact may may occur occur 10. Will the proposed action result in an increase in the potential for erosion,flooding or drainage problems? El El 11. Will the proposed action create a hazard to environmental resources or human health? Part 3-Determination of significance. The Lead Agency is responsible for the completion of Part 3. For every question in Part 2 that was answered"moderate to large impact may occur",or if there is a need to explain why a particular element of the proposed action may or will not result in a significant adverse environmental impact,please complete Part 3. Part 3 should,in sufficient detail,identify the impact,including any measures or design elements that have been included by the project sponsor to avoid or reduce impacts. Part 3 should also explain how the lead agency determined that the impact may or will not be significant.Each potential impact should be assessed considering its setting,probability of occurring, duration,irreversibility,geographic scope and magnitude. Also consider the potential for short-term,long-term and cumulative impacts. Check this box if you have determined,based on the information and analysis above,and any supporting documentation, that the proposed action may result in one or more potentially large or significant adverse impacts and an environmental impact statement is required. ElCheck this box if you have determined,based on the information and analysis above,and any supporting documentation, that the proposed action will not result in any significant adverse environmental impacts. Town of Southold-Board of Trustees Name of Lead Agency Date President Print or Type Name of Responsible Officer in Lead Agency Title of Responsible Officer Signature of Responsible Officer in Lead Agency Signature of Preparer(if different from Responsible Officer) PRINT Page 4 of 4 i Board of Trustees Application I AFFIDAVIT 1 I ' I Ajit Kumar&Jennifer Ecclestone BEING DULY SWORN DEPOSES AND AFFIRMS THAT HE/SHE IS THE APPLICANT FOR THE ABOVE DESCRIBED PERMITS)AND THAT ALL STATEMENTS CONTAINED HEREIN ARE TRUE TO THE BEST OF HIS/HER KNOWLEDGE AND BELIEF,AND THAT ALL WORK WILL BE DONE IN THE MANNER SET FORTH IN THIS APPLICATION AND AS MAY BE APPROVED BY THE SOUTHOLD TOWN BOARD OF TRUSTEES THE APPLICANT AGREES TO HOLD THE TOWN OF SOUTHOLD AND THE BOARD OF TRUSTEES HARMLESS AND FREE FROM ANY AND ALL DAMAGES AND CLAIMS ARISING UNDER OR BY VIRTUE OF SAID PERMIT(S),IF GRANTED. IN COMPLETING THIS APPLICATION,I HEREBY AUTHORIZE THE TRUSTEES,THEIR AGENT(S)OR REPRESENTATIVES,INCLUDING THE CONSERVATION ADVISORY COUNCIL,TO ENTER ONTO MY PROPERTY TO INSPECT THE PREMISES IN CONJUNCTION WITH THIS APPLICATION, INCLUDING A FINAL INSPECTION. I FURTHER AUTHORIZE THE BOARD OF TRUSTEES TO ENTER ONTO MY PROPERTY AND AS REQUIRED TO INSURE COMPLIANCE WITH ANY CONDITION OF ANY WETLAND OR COASTAL EROSION PERMIT ISSUED BY THE BOARD OF TRUSTEES DURING THE TERM OF THE PERMIT. I I I ' Signature of Property Owner Signature of - , perry Owner I I I I SWORN TO BEFORE ME THIS X2M DAY OF �- ,20 I I ' I I Notary Pu lie KANIALP SON,.i Notary Public,State-of New York • pIp,D1S060$9949 Qualified,in-Kings County cor6mission tkolres March M,2027 I i I f Board of Trustees Application 's AUTHORIZATION (Where the applicant is not the owner) UWe,Ajit Kumar&Jennifer Ecclestone owners of the property identified as SCTM# 1000-81-3-20 in the town of Southold .New York,hereby authorizes AMP Architecture to act as my agent and handle all necessary work involved with the application process for permit(s)from the Southold Town Board of Trustees for this property. P or p rty Owner's Signature Property Owner' Signature SWORN TO BEFORE ME THIS` 4-�" DAY OF v ybd c ti ,20—IJ-4 r KAMAL P.50NI t ) Notary Public,State of New York Notary Public No.01S06089949 Qualified In Kings County Commission Expires March 31,2027 APPLICANT/AGENT/REPRESENTATIVE TRANSACTIONAL DISCLOSURE FORM The Town of Southold',Code of Ethics prohibits conflicts of interestonthe part of town officers and employees.The purouse of this forts,is to provide information which can alert the town of possible conflicts of interest and allow-it to take whatever action is necessary tQ avoid-same. YOUR NAME: Alit Kumar&Jennifer Ecclestone (Last name,first name,Middle initial,unless you are applying in the name of someone else or other entity,such as a company.If so,indicate the other person's or company's name.) NAME OF APPLICATION: (Check all that apply.) Tax grievance Building Variance Trustee Change of Zone Coastal Erosion Approval of plat Mooring Exemption firom plat or official map Planning Other (lf"Other•,name the activity.) Do you personally(or through your company,spouse.sibling,parent,or child)have a relationship with any officer or employee of the Town of Southold? "Relationship"includes by blood,marriage,or business interest."Business intertsr means a business, including a partnership.in which the town officer or employee has even a partial ownership of(or employment by)a corporation in which the town officer or employee owns more than 5%of the shares. YES F— NO If you answered-YES",complete the balance of this form and date and sign where indicated. Name of person employed by the Town of Southold_ Title br position of that person Describe the relationship between yourself(the applicantlagenUreprewntative)and the town officer or employee.Either check the appropriate line A)through D)and/or describe in the space provided The town officer or employee or his or her spouse,sibling,parent or child is(check all that apply): ELA)the owner of greater than 5%ofthc shares of the corporate stock of the applicant � (when the applicant is a corporations B)the legal or beneficial owner of any interest in a non-corporate entity(when the applicant is not a corporation); 12) an officer,director,partoei,or employee of the applicant;or the actual applicant. DESCRIPTION OF RELATIONSHIP Submitted this 2-3 day of 20 Z Signature Print Name I — n t-�L-rt" &,c 1r6f'xuL Form TS 1 \ I APPLICANT/AGENT/REPRESENTATIVE TRANSACTIONAL DISCLOSURE FORM The Town of Southold's Code of Ethics prohibits conflicts of interest on the part-of town officers'arid employees.The p4mose of this form is to provide information which can alert the town of possible coriflicts.of interest and allow it to take whatever action is necessary to avoid same. YOURNAME: Anthony POrtiIIO (Last name,first name,.tpiddle initial,unless you are applying in the name of someone else or other entity,such as a company.If so,indicate the other person's or company's name.) NAME OF APPLICATION: (Check all that apply.) Tax grievance Building Variance Trustee Change of Zone Coastal Erosion Approval of plat Mooring Exemption from plat or official map Planning Other (If"Other",name the activity.) Do you personally(or through your company,spouse,sibling,parent,or child)have a'relationship with any officer or employee of the Town of Southold? "Relationship"includes-by blood;marriage,or business interest:"Business interest"means.a business, including a partnership,in which the town officer or employee has even a partial ownership of(or employment by.)a corporation in which the town officer or employee owns more than,5%of the shares. YES F• NO i If you answered"YES",complete the balance of this form and date and sign where indicated. Name of person employed by the Town of Southold Title or position of that person Describe the relationship between yourself(the applicant/agent/representative)and the town officer or employee.Either check the appropriate line A)through D)and/or describe in the space provided. The town officer or employee or his or her spouse,sibling,parent,o'r child is(check all that apply): f2A)the owner of greater than 5%of the shares of the corporate stock of the applicant � (when the applicant is a corporation); B)the legal or beneficial owner of any interest in a non-corporate entity(when the applicant is not a corporation); C)an officer,director,partner,or employee of the applicant;or D)the actual applicant. DESCRIPTION OF RELATIONSHIP I Submitted this Z d fe�, 20 �!1 Signature _ Print Name �a Fortn TS 1 _.__oard of Trustees Applicat.' zt, PROOF OF MAILING OF NOTICE ATTACH CERTIFIED MAIL RECEIPTS APPLICATION NAME & SCTM#: NAME: �re 3 - l9. q e'l -3 - a l STATE OF NEW YORK COUNTY OF SUFFOLK , residing at , being duly sworn, deposes and says that on the day of , 20 , deponent mailed a true copy of the Notice set forth in the Board of Trustees Application, directed to each of the above named persons at the addresses set opposite their respective names; that the addresses set opposite the names of said persons are the address of said persons as shown on the current assessment roll of the Town of Southold; that said Notices were mailed at the United States Post Office located at , that said Notices were mailed to each of said persons by CERTIFIED MAIL/RETURN RECEIPT. Signature Sworn to before me this Day of , 20 Notary Public n Board of Trustees Application PROOF OF MAILING OF NOTICE ATTACH CERTIFIED MAIL RECEIPTS APPLICATION NAME & SCTM# Ajit Kumar- SCTM: 1000-81-3-20 NAME:, ADDRESS, D7ESE '�_ 81-3-19.4 1600 Paradise Point R Miller B Family Irry Trt Southold, NY 11971 LJ 7 202481-3-21 6906 Dartmouth Ave Mignerey Peter C College Park, MD 2074 I&wii Mignerey Alice C rustees 81-2-4 666 Greenwich St Apt 436 Lev Zachary New York, NY 10014 Lev Erica � � ! e, D IN u f 2 2024 scut To Board of Trustees STATE OF NEW YORK COUNTY OF SUFFOLK Nicole Dippnta ,residing at 10200 Main Road. Unit 3A Mattituck, NY 11952 , being duly sworn, deposes and says that on the 10 day of.._ September , 20 24 , deponent mailed a true copy of the Notice set forth in the Board of Trustees Application, directed to each of the above named persons at the addresses set opposite their respective names; that the addresses set opposite the names of said persons are the address of said persons as shown on the current assessment roll of the Town of Southold; that said Notices were mailed at the United States Post Office located at 140 Love Lane, Mattituck, NY 11952-3296 that said Notices were mailed to each of said persons by CERTIFIED MAIL/RETURN RECEIPT. 4- A- Signature Sworn to before me this- -7 � Day of 5"+eCY1 ICJ 20 2 y DARCEE AUFENANGER NOTARY PUBLIC,STATE OF NEW YORK Registration No.01 A00019644 Qualified in Suffolk County Notary Public Commission Expires January 9,2028 Postal o - oRECEIPT nly -0 • Only •. • , Impel • Col. r3F"Tar%Y11M ''►�'tf.k, New,'` ': y fl -C ;� L <.s :3 �'as tTli,ij Ij ; U ..ss\ �,.i.".t .:a :.`a`•+ '..';• &:r-t Ems. 5 rl.l Certified Mail Fee GC a {fet: nj Certified Mail Fee �. _ Rom') I f1J fit°v•! Fi0 N $ art°eJ:t ?ti; `.w; 0 „ fo rs9 0 " i F�dre Services&Fees(check box,add fee ppfp�rate) - EMra Services&Fees(check box,add fee* typtoqdata!`" Return Recel ardcopy) $ ° ' ❑a Services Receipt(hardoopy) $, '>I't.•I t11`/ +�� ! �(,( ❑ pt(h �© rr N `,,,.�.;,v-> �{, I ❑Retum Recelpt(electronic) .$ {-(�.FI��{ - � OStrrlark p ❑Return Receipt(electronic) $` t )IJ{ Postmark JN p d..- 'Flo :;: sCn Here 9r I � ❑Certified Mail Restricted Delivery '$ ),( t Here 0 ❑Certified Mail Restricted Delivery $ — `/"� y7-•t �•!�,�. p: ❑Adult Signature Required $ O []Adult Signature Required $ 'fig' +, T _°_,C-„r O? + ❑Adult Signature Restricted Delivery$ s•u=y ❑Adult Signature Restricted Delivery$ ` � -�—� � Postage Postage $0°73 r r� �� it /j it/2024 I Total Postage and Fees l r! t3+u1 j a t ni Total, stage and Fees N ,s `a."...w �,. ru N Sent To Zn�� Sent To ; i� ''D. ----------------------- = - - / ��r- J/,�('J.-- ------------- �treetandAp o,iWplu'-W-- Siieet a d A t.No or PO BI lti r 3------------- II uy -�"------"_---------------ll-�------ ---- - ------------------------------------------------------- +N 100 l M f- :r• r - r Postal RECEIPT CERTIFIED MAIL" Domestic mail Only ca Ir cCti171� vi go �5 i ^ .' Ak ®1 rU Certified Mail Fee roc l Jru t! I O $ S «� Extra Services&Fees(check box,ad$dfeersl�P=�1 fll ❑Return Receipt_(hI n1lO $ �C1 I Postmark ❑Return Receipt(electronic) s!;i t i t i t o Here 3 ❑Certified Mail Restricted Delivery $' 1-3 ❑Adult Signature Required $ c� ❑Adult Signature Restricted Delivery$ O Postage r j t°% .f rtr ')d I,4 rl �,,1},;/�I� ru ru Total Postage and Fees " rent T I T J I d 1 ru C3 Sir et and APt. o.,or \Box No - .�a ------------------- - 2 S G tte`t - -~------------ II '` _:i��o---�------------------------ City .v Glenn Goldsmith,President %'OFOLA' Town Hall Annex A.Nicholas Krupski,Vice President „�� Gy 54375 Route 25 Eric Sepenoski y a P.O.Box 1179 Liz Gillooly p Southold,NY 11971 Elizabeth Peeples �Lgfpl � �a0� F!n BOARD OF TOWN TRUSTEESTOWN OF SOUTHOLD of BOARD OF TRUSTEES: TOWN OF SOUTHOLD Ci E IV, �. In the Matter of the Application of AJIT KUMAR& JENNIFER ECCLESTONE AUG 2024 COUNTY OF SUFFOLK AC:STATE OF NEW YORK Town ofTrusbm AFFIDAVIT OF POSTING DO_NOT COMPLETE THIS_FORM�UNfiIL:.THE POSTING HA'S-:REMA-I NVD IN,.P.L�1�:CE` OR-�AT LEAST SEYENDA�'"S"PRIOR�TOTHE�PLI�L�'C� HARI �DATE=COIVIPLET -THIS'FOR1l%IOIV= IH7'HrDAY OR�L^ATER° I, W I COIe �l rIM!lc/-- , residing at/dba being duly sworn, depose and say: That on the I day of f 207AA, I personally posted the property known as by placing the Board of Trustees official noticing poster where it can easily be seen from the street, and that I have checked to be sure the noticing poster has remained in place for a full seven days immediately preceding the date of the public hearing. Date of hearing noted thereon to be held Wednesday, September 18,2024. Dated: q 1711� (signature) Sworn to before me this \ 7 day of 3VIk 202 H DAReEE AUFENANGER NOTARY PUBLIC,STATE OF NEW YORK �! Registration No.01AU0019644 Qualified in Suffolk County Notary Public Commission Expires January 9,2028 �' � 7 '• 'S � 'f9a "t. •� j�.�41�f��S`V �' - '•'�fyd !�A � Vzl +r'" r : + ,. 1 MAY W .F R. ju• A• dip •y -.r+' ,�j,yv. 'e5s>. �, Y� yt -,.'+•. * �r a � c' � - ` �, � Sys y�*Yi«.� �t tilt ,' 1 _ ..r r i•,r . 'r \ z 7(. 't��f 11 �` ��;�•. 41, 4'•. 4�aa;���_ a }. .K,�,�'' WM�t Z ,A a, -!,a ' � �.• 4.L r.'J �•h •blG'•�S' ! .f ` `y'4., � . �• �IO:w•i A •.f 0 tits Zoe F iii RRR ` 7 � i� ,� . .x:. •.-_au. 66" V 11 i '—mo VOI _ E _ rr � i. R.• •f• s � y h A w �\ NOTICE OF HEARING NOTICE IS HEREBY GIVEN that a Public Hearing will be held by the Southold Town Board of Trustees at the Town Hall, 53095 Main Road, Southold, New York, concerning this property. OWNER(S) OF RECORD: AJIT KUMAR &JENNIFER ECCLESTONE ! ' SUBJECT OF PUBLIC HEARING: For a Wetland Permit for the existing two-story dwelling with entry stoops;to restore the existing cabana with roof deck, cabana decking, steps with landings, and retaining wall landward of cabana by replacing all footings under all structures with new, replace northerly wood walk to cabana deck, replace southerly top landing with steps down to cabana deck, replace cabana deck and steps down to a concrete slab at bottom of bank; repair roof of deck above cabana with new roof membrane; replace all railings with new; remove and replace in-place retaining wall landward of cabana; replace siding on cabana; existing steps to beach off bulkhead to remain; install stepping stones landward of top of bank; install a drywell to contain roof runoff; revegetate an approximately 2,057sq.ft.area throughout the bank face using native species; and to establish and perpetually maintain a 623sq.ft. non-turf buffer along the landward edge of the top of the bank. Located: 1490 Paradise Point Road, Southold. s � . SCTM# 1000-91-3-20 ` TIME & DATE OF PUBLIC HEARING: Wednesday, September 18, 2024 — at or about 5:30P.M. If you have an interest in this project,you are invited to view the Town file(s)which �,, ► w.southoldtownny.govsnd/or in the Trustee Office until to the day of the hearing duringnormal ` r are available online at ww etween The hours of B a.m.and 4 p.m. BOARD OF TRUSTEES'TOWN OF SOUTHOLD'(631)765-1892 b.=5irtess da s b_ I r�p i 4v, s 424�'� 40 s •e ,j, ti. r� �", ..t•. AN TIC eA lk AL a NOTICt OF HEA -- .., NOTICE IS HEREBY GIVEN that a Public Hearing will be held by the Southold Town Board of Trustees at the Town Hall, 53095 Main Road, Southold, New York, concerning this property. OWNER(S) OF RECORD: AJIT KUMAR & JENNIFER ECCLESTONE SUBJECT OF PUBLIC HEARING: For a Wetland Permit for the existing two-story dwelling with entry stoops; to restore the existing cabana with roof deck, cabana decking, steps with landings, ' and retaining wall landward of cabana by replacing all footings under all structures with new, replace northerly wood walk to cabana deck, replace southerly top landing with steps down to cabana deck, replace cabana deck and steps down to a concrete slab at bottom of bank; repair roof of deck above cabana with new roof membrane; replace all railings with new; remove and replace in-place retaining wall landward of cabana; replace siding on cabana; existing steps to beach off bulkhead to remain; install stepping stones landward of top of bank; install a drywell to contain roof runoff; revegetate an approximately 2,057sq.ft. area throughout the bank face using native species; and to establish and perpetually maintain a 623sq.ft. non-turf buffer along` the landward edge of the top of the bank. Located: 1490 Paradise Point Road, Southold. SCTM# 1000-81-3-20 TIME & DATE OF PUBLIC HEARING: Wednesday, September 18, 2024 — at or about 5:30P.M. If you have an interest in this project, you are invited to view the Town file(s) which are available online at www.southoldtownny.gov and/or in the Trustee Office until to the day of the hearing during normal business days between the hours of 8 a.m. and 4 p.m. BOARD OF TRUSTEES * TOWN OF SOUTHOLD * (631) 765-1892 I / Town of Southold LWRP CONSISTENCY ASSESSMENT FORM A. INSTRUCTIONS 1. All applicants for permits* including Town of Southold agencies, shall complete this CCAF for proposed actions that are subject to the Town of Southold Waterfront Consistency Review Law. This assessment is intended to supplement other information used by a Town of Southold agency in making a determination of consistency. *Except minor exempt actions including,Building Permits and other ministerial permits not located within the Coastal Erosion Hazard Area. 2. Before answering the questions in Section C, the preparer of this form should review the exempt minor action list, policies and explanations of each policy contained in the Town of Southold Local Waterfront Revitalization Program. A proposed action will be evaluated as -to its si fngn ficant beneficial and adverse effects upon the coastal area(which includes all.of Southold Town).. 3: If any question in Section C on this form is answered "yes" or "no", then the proposed action will affect the achievement of the LWRP policy standards and conditions contained in the consistency review law. Thus, each answer must be explained in detail, listing both supporting and non- supporting facts. If an action cannot be certified as consistent with the LWRP policy standards and conditions,it shall not be undertaken. A copy of the LWRP is available in the following places: online at the Town of Southold's website (southoldtown.northfork.net), the Board of Trustees Office, the Planning Department, all local libraries and the Town Clerk's office. B. DESCRIPTION OF SITE AND PROPOSED ACTION SCTM# 81 -3 _20 PROJECT NAME Kumar Residence The Application has been submitted to (check appropriate response): Town Board ❑ Planning Board❑ Building Dept. ❑ Board of Trustees ❑`� 1. Category of Town of Southold agency action(check appropriate response): (a) Action undertaken directly by Town agency(e.g. capital ❑ construction,planning activity,agency regulation, land transaction) ❑ (b) Financial assistance(e.g.grant,loan,subsidy) (c) Permit, approval,license,certification: Fv Nature and extent of action: Proposed restoration of frame cabana, deck, retaining wall, walk, & steps. Location of action: 1490 Paradise Point Road, Southold, NY 11971 Site acreage: 0.5 Present land use: Single Family Residential Present zoning classification: R-80 Non-Conforming 2. If an application for the proposed action has been filed with the Town of Southold agency, the following information shall be provided: (a) Name of applicant: AMP Architecture (b) Mailing address: PO Box 152, Mattituck, NY 11952 (c) Telephone number: 631-603-9092 _ Will the action be directly undertaken,require funding,or approval by a state or federal agency? Yes ❑ No❑✓ If yes,which state or federal agency? C. Evaluate the project to the following policies by analyzing how the project will further support or not support the policies. Provide all proposed Best Management Practices that will further each policy. Incomplete answers will require that the form be returned for completion. DEVELOPED COAST POLICY Policy 1. Foster a pattern of development in the Town of Southold that enhances community character, preserves open space, makes efficient use of infrastructure, makes beneficial use of a coastal location,and minimizes adverse effects of development. See LWRP Section III—Policies; Page 2 for evaluation criteria. ❑✓ Yes ❑ No ❑ Not Applicable Proposed restoration, storm water manaaement, buffer, reveaetation, and retainment repairs to stabilize the bank. Attach additional sheets if necessary Policy 2. Protect and preserve historic and archaeological resources of the Town of Southold. See LWRP Section III—Policies Pages 3 through 6 for evaluation criteria 0 Yes ❑ No Z Not Applicable Attach additional sheets if necessary Policy 3. Enhance visual quality and protect scenic resources throughout the Town of Southold. See LWRP Section III—Policies Pages 6 through 7 for evaluation criteria ✓❑ Yes ❑ No ❑ Not Applicable The proposed work shall minimize discordant components while conserving natural scenery and character. Proposed revegetation will enhance scenic quality. Attach additional sheets if necessary NATURAL COAST POLICIES Policy 4. Minimize loss of life, structures, and natural resources from flooding and erosion. See LWRP Section III—Policies Pages 8 through 16 for evaluation criteria Yes ❑ No ❑ Not Applicable The proposed work will be in accordance with the most up to date construction codes and environmental conseryafion practices. ^ Attach additional sheets if necessary - Policy 5. Protect and improve water quality and supply in the Town of.Southold. See LWRP Section III —Policies Pages 16 through 21 for evaluation criteria 0 Yes ❑ No ❑Not Applicable Proposed storm water management will protect and improve water quality. AttacH additional sheets if necessary Policy 6. Protect and restore the quality and function of the Town of Southold ecosystems including Significant Coastal Fish and Wildlife Habitats and wetlands. See LWRP Section III=Policies; Pages 22 through 32 for evaluation criteria. ❑ Yes ❑No ❑ Not Applicable � 1 1 The quality and function of the ecosystem will not be affected. Attach additional sheets if necessary Policy 7. Protect and improve air quality in the Town of Southold. See LWRP Section III — Policies Pages 32 through 34 for evaluation criteria. ❑ Yes ❑No❑✓ Not Applicable Proposed work will not affect air quality Attach additional sheets if necessary Policy 8. Minimize environmental degradation in Town of Southold from solid waste and hazardous substances and wastes. See LWRP Section III—Policies; Pages 34 through 38 for evaluation criteria. ❑ Yes ❑ No ✓❑Not Applicable All construction debris will be disposed of properly. PUBLIC COAST POLICIES Policy 9. Provide for public access to, and recreational use of, coastal waters, public lands, and public resources of the Town of Southold. See LWRP Section III—Policies; Pages 38 through 46 for evaluation criteria. ❑ Ye❑ No 0 Not Applicable This is a private property with no permitted public access. The proposed work will not affect neighboring properties. - - Attach additional sheets if necessary WORKING COAST POLICIES Policy 10. Protect Southold's water-dependent uses and promote siting of new water-dependent uses in suitable locations. See LWRP Section III—Policies; Pages 47 through 56 for evaluation criteria. ❑Yes ❑ No ❑✓ Not Applicable Proposed work is on a private site Attach additional sheets if necessary Policy 11. Promote sustainable use of living marine resources in Long Island Sound, the Peconic Estuary and Town waters. See LWRP Section III—Policies; Pages 57 through 62 for evaluation criteria. ❑Yes ❑ No❑✓ Not Applicable The Proposed work will not affect marine resources. Attach additional sheets if necessary Policy 12. Protect agricultural lands in the Town of Southold. See LWRP Section III —Policies; Pages 62 through 65 for evaluation criteria. ❑Yes ❑ No❑✓ Not Applicable Attach additional sheets if necessary Policy 13. Promote appropriate use and development of energy and mineral resources. See LWRP Section III—Policies; Pages 65 through 68 for evaluation criteria. ❑Yes ❑ No ❑✓ Not Applicable PREPARED BY Anthony Portillo TITLE Architect/Applicant DATE 04/30/2024