Loading...
HomeMy WebLinkAbout47980-Z �54�OS�FFO(IrCpGy Town of Southold 7/7/2024 a P.O.Box 1179 o - Qll53095 Main Rd Southold,New York 11971 CERTIFICATE OF OCCUPANCY No: 45332 Date: 7/7/2024 THIS CERTIFIES that the building SOLAR PANEL Location of Property: 285 Willow Dr, Greenport SCTM#: 473889 Sec/Block/Lot: 33.-6-9 Subdivision: Filed Map No. Lot No. conforms substantially to the Application for Building Permit heretofore filed in this office dated 5/20/2022 pursuant to which Building Permit No. 47980 dated 6/21/2022 was issued, and conforms to all of the requirements of the applicable provisions of the law. The occupancy for which this certificate is issued is: roof mounted solar panels and battery storage units to existing single family dwelling as applied for. The certificate is issued to ITIA LLC of the aforesaid building. SUFFOLK COUNTY DEPARTMENT OF HEALTH APPROVAL ELECTRICAL CERTIFICATE NO. 47980 6/18/2024 PLUMBERS CERTIFICATION DATED YAU/1 �0/00'z A thor' d Signatu o�S�FFDI TOWN OF SOUTHOLD BUILDING DEPARTMENT y 2 TOWN CLERK'S OFFICE SOUTHOLD, NY BUILDING PERMIT (THIS PERMIT MUST BE KEPT ON THE PREMISES WITH ONE SET OF APPROVED PLANS AND SPECIFICATIONS UNTIL FULL COMPLETION OF THE WORK AUTHORIZED) Permit#: 47980 Date: 6/21/2022 Permission is hereby granted to: ITIA LLC 45-09 Greenpoint Ave Sunnyside, NY 11104 To: Install roof mount solar to existing single family dwelling as applied for. Disconnects must be located on the exterior, labeled, and readily accessible as per code. At premises located at: 286 Willow Dr, Greenport SCTM #473889 Sec/Block/Lot# 33.-6-9 Pursuant to application dated 5/20/2022 and approved by the Building Inspector. To expire on 12/21/2023. Fees: SOLAR PANELS $50.00 ELECTRIC $100.00 CO-RESIDENTIAL $50.00 Total: $200.00 Building Inspector o��OF SO(/ryOl o Town Hall Annex Telephone(631)765-1802 54375 Main Road P.O.Box 1179 G Q sear.devlina-town.southold.ny.us Southold,NY 11971-0959 RUNT`!, BUILDING DEPARTMENT. TOWN OF SOUTHOLD CERTIFICATE OF ELECTRICAL COMPLIANCE SITE LOCATION Issued To: ITIA LLC Address: 285 Willow Dr city:Greenport st: NY zip: 11944 Building Permit#: 47980 Section: 33 Block: 6 Lot: 9 WAS EXAMINED AND FOUND TO BE IN COMPLIANCE WITH THE NATIONAL ELECTRIC CODE Contractor: Electrician: EmPower License No: 65990ME . SITE DETAILS Office Use Only Residential X Indoor X Basement X Service Commerical Outdoor X 1st Floor X Pool New X Renovation 2nd Floor Hot Tub Addition Survey X Attic Garage INVENTORY Service 1 ph Heat Duplec Recpt Ceiling Fixtures 1 Bath Exhaust Fan Service 3 ph Hot Water GFCI Recpt Wall Fixtures Smoke Detectors Main Panel A/C Condenser Single Recpt Recessed Fixtures CO Detectors Sub Panel A/C Blower Range Recpt Ceiling Fan Combo Smoke/CO 1 Transfer Switch UC Lights Dryer Recpt Emergency Strobe Heat Detectors Disconnect 2 Switches 1 4'LED Exit Fixtures Sump Pump Other Equipment: 7.47kW Roof Mounted-PV Solar Enery System w/ (18) SPR--415W Modules, 150A Tesla Gateway, (2) Tesla Powerwalls Only Backing-Up (1) 150A Panel Notes: Solar & Battery Storage Inspector Signature: Date: June 18, 2024 S.Devlin-Cert Electrical Compliance Form r3F SOUlyolo 7 �/ TOWN OF SOUTHOLD BUILDING DEPT. URV, 631-765-1802 INSPECTION [ ] FOUNDATION 1ST [ ] ROUGH PLBG. [ ] FOUNDATION 2ND [ ] INSULATION/CAULKING [ ] FRAMING /STRAPPING [ ] FINAL [ ] FIREPLACE & CHIMNEY [ ] FIRE SAFETY INSPECTION [ ] FIRE RESISTANT CONSTRUCTION [ ]. FIRE RESISTANT PENETRATION [ ] ELECTRICAL (ROUGH). �] ELECTRICAL (FINAL) [ ] CODE VIOLATION [ ] PRE C/O ,t [ ] RENTAL REMARKS: / f cr- C- DATE INSPECTOR OF SOUIyOIo 1.47 # # TOWN OF SOUTHOLD BUILDING DEPT. 631-765-1802 INSPECTION [ ] FOUNDATION 1ST [ ] ROUGH PL13G. [ ] FOUNDATION 2ND [ ] INSULATION/CAULKING [ ] FRAMING /STRAPPING [ ] FINAL [ ] FIREPLACE & CHIMNEY [ ] FIRE SAFETY INSPECTION [ ] FIRE RESISTANT CONSTRUCTION [ ] FIRE RESISTANT PENETRATION [ ] ELECTRICAL (ROUGH) ELECTRICAL (FINAL) [ ] CODE VIOLATION [ ] PRE C/O [ ] RENTAL REMARKS: DATE INSPECTOR O��OF SOUTyO !l / q �_o ^ _ P f # _ TOWN OF SOUTHOLD BUILDING DEPT. 631-765-1802 INSPECTION [ ] FOUNDATION 1 ST/ REBAR' - [ ] ROUGH PLBG. ] FOUNDATION 2ND [ ] INSULATION/CAULKING [ ] FRAMING /-STRAPPING [ ] FINAL [ ] FIREPLACE & CHIMNEY [ ] FIRE SAFETY INSPECTION [ ] FIRE RESISTANT CONSTRUCTION [ ] FIRE RESISTANT PENETRATION [ ] ELECTRICAL (ROUGH) ELECTRICAL (FINAL) [ ] CODE VIOLATION ] PRE C/O [ ] RENTAL REMARKS: Ate ea Jl I aAcrj- 0A d DATE S INSPECTOR ✓ �apE SOUTyO G/ h� l0 # # . TO N OF SOUTHOLD' BUILDING DEPT. cau�+,� 631-765-1802 INSPECTI-ON [ ] FOUNDATION 1 ST/ REBAR [ ] ROUGH PLBG. [ ] FOUNDATION 2ND [ ] INSULATION/CAULKING [ ] FRAMING /STRAPPING [ ] FINAL [ . ] FIREPLACE & CHIMNEY [ .] FIRE SAFETY INSPECTION [ ] FIRE RESISTANT CONSTRUCTION [ ]-- FIRE RESISTANTPENETRATION [ ] ELECTRICAL (ROUGH) ELECTRICAL (FINAL) [ ] CODE VIOLATION rl PRE C/O [ ] RENTAL REMARKS: C DATE -- INSPECTOR OF 50Ujyolo � 7� # TOWN OF SOUTHOLD BUILDING DEPT. Comm a� 631-765-1802 INSPECTION [ ] FOUNDATION 1 ST/REBAR [ ] ROUGH PLBG. [ -] FOUNDATION 2ND [ ] INSULATION/CAULKING [ ] .FRAMING /STRAPPING [ FINAL [ ] FIREPLACE'& CHIMNEY [. ] FIRE SAFETY INSPECTION [ ] FIRE RESISTANT CONSTRUCTION [ ] FIRE RESISTANT PENETRATION [ ] ELECTRICAL (ROUGH) [ ] ELECTRICAL (FINAL) [ ] CODE VIOLATION [ ] PRE C/O [ ] RENTAL REMARKS: �a.l�- 5 —wl � I DATE �a?7~'o� INSPECTOR _ Gregory Sachs, PE 999 Stewart Avenue (516)-544-4592 Suite 210 permitting@empower-solar.com Bethpage, NY 11714 June 17th, 2024 Town of Southold Building Department JUL ` 1 2024 54375 Route 25 Southold, NY 11971 Building Department Town of Southold Permit#:47980 285 Willow Drive Greenport, NY 11944 Section:033.00 Block:06.00 Lot: 009.000 To Whom It May Concern: The Solar Electric installation at 285 Willow Drive, Greenport, NY 11944(LLC, ITIA(Dongaris,. Spiro) Residence) has been inspected and meets the New York State Building Code standards for construction and the provisions of ASCE 7.The solar panels have been secured to the roof and the.Tesla Powerwall Units have been mounted in the basement as per the manufacturer's attachment detail shown on the approved drawings, and are in compliance with the structural engineer's requirements.The project is consistent with the specifications set forth in the permit application. OR/t�� sac J, o c��: A w - - Y- I MSEa rVg� Gregory Sachs, PE FIELD INSPECTION REPORT DATE COMMENTS o- - t� FOUNDATION (1ST) _ 8 ------------------------------------ t FN FOUNDATION (2ND) t� O ROUGH FRAMING& PLUMBING H 1 r INSULATION PER N.Y. y STATE ENERGY CODE v ;1761 , As FINAL �� N �C /�� C. a. ADDITIONAL OMMENTS 'Jill r � kA CNJ o x r� x e b 1 P � 1 =o�gt►fF01k�oGy2 TOWN OF SOUTHOLD—BUILDING DEPARTMENT H Town Hall Annex 54375 Main Road P. O. Box 1179 Southold,NY 11971-0959 Telephone(631) 765-1802 Fax(631) 765-9502 https://www.southoldtowM.gov Date Received APPLICATION FOR BUILDING PERMIT For Office Use Only 4716" PERMIT NO. Building Inspector: I� In II rl MAY.. 2 Applications and forms must be filled out in their entirety:Incomplete BUILDING DEPT. applications will not be accepted. Where the Applicant is not the owner,an TOWN OF SOUTHOLD Owner's Authorization form(Page 2)shall be completed. Date: 5/17/2022 OWNER(S)OF PROPERTY: Name: Spiro Dongaris u,C• SCTM#1000- 033.00-06.00-009.000 Project Address: 285_Willow Drive.,Green ort,_N_Y_11.9_4_4 Phone#: e718-7_8_4�7490 Email: sdongaris@athenica.com Mailing Address: 285 Willow Drive, Greenport, NY 11944 CONTACT PERSON: Name: Sara McCaffrey (EmPower CES, LLC.) Mailing Address: 4589 Austin Blvd., Island Park, NY 11558 Phone#: (516)-544-4592 Email: permitting@empower-solar.com DESIGN PROFESSIONAL INFORMATION: Name: Gregory D. Sachs Mailing Address: 4589 Austin Blvd., Island Park, NY 11558 Phone#: (516)-544-4592 Email: permitting@empower-solar.com CONTRACTOR INFORMATION: Name: EmPower CES, LLC. Mailing Address: 4589 Austin Blvd., Island Park, NY 11558 Phone#: (516)-544-4592 Email: permitting@empower-solar.com DESCRIPTION OF PROPOSED CONSTRUCTION ❑New Structure ❑Addition ❑Alteration ❑Repair ❑Demolition Estimated Cost of Project: [Other (21) Roof mounted solar panels, and (2) Tesla Battery Pack $ 58,455.59 Will the lot be re-graded? ❑Yes 1XNo Will excess fill be removed from premises? ❑Yes DQNo 1 PROPERTY INFORMATION Existing use of property: Residential 1_F_amily Intended use of property: Residential 1 Family Zone or use district in which premises is situated: Are there any covenants and restrictions with respect to this property? Dyes KNo IF YES, PROVIDE A COPY. ICI Check Box After Reading: The owner/contractor/design professional is responsible for all drainage and storm water issues as provided by Chapter 236 of the Town Code. APPLICATION IS HEREBY MADE to the Building Department for the issuance of a Building Permit pursuant to the Building Zone Ordinance of the Town of Southold,Suffolk,County,New York and other applicable Laws,Ordinances or Regulations,for the construction of buildings, additions,alterations or for removal or demolition as herein described.The applicant agrees to comply with all applicable laws,ordinances,building code, housing code and regulations and to admit authorized inspectors on premises and in building(s)for necessary inspections.False statements made herein are punishable as a Class A misdemeanor pursuant to Section 210AS,of the New York State Penal Law. Application Submitted By(print name): Sara McCaffrey ICIAuthorized Agent ❑Owner Signature of Applicant: Date: STATE OF NEW YORK) SS: COUNTY OF ) Sara McCaffrey being duly sworn,deposes and says that(s)he is the applicant (Name of individual signing contract) above named, (S)he is the Agent (Contractor,Agent,Corporate Officer,etc.) of said owner or owners,and is duly authorized to perform or have performed the said work and to make and file this application;that all statements contained in this application are true to the best of his/her knowledge and belief;and that the work will be performed in the manner set forth in the application file therewith. Sworn before me this day of 'Iulw�vl ,20-11L Notary Public PROPERTY OWNER AI ITHORIZA ION Ryan M, Moser (Where the applicant is not the ow; e TARY PUBLIC,BTATB®F NW. PORK Registmilon No,09MA(X12500 Cual�Isd In Naseau County Commisslorl .XPIM December 28,2024 I, Spiro Dongaris (ZTy1q I u-C residing at 285 Willow Drive, Greenpo , do hereby authorize Sara McCaffrey to apply on my behalf to the Town of Southold Building Department for approval as described herein. Owner's Signature Date SgiV0 log fiS rint Owner's N e 2 ij BUILDING DEPARTMENT-Electrical Inspectdr Y. 2 1 n 9 D OtiG TOWN OF SOUTHOLD II if LPING DEPT.15-31 v:SOUTHOLD Town.Hall Annex- 54375 Main Road - PO Box 1.179 Southold, New York 11971-0959 ii Telephone (631) 765-1802 - FAX (631) 765-9502 rogerr(cD-southoldto.w.nny.go-v---,7!!-seand(&-southoldto.wnny.ciov. APPLICATION FOR ELECTRICAL INSPECTION ELECTRICIAN INFORMATION (All information Required) Dat& 5/17/2022 Company Name: - EmPowerCES,-LLC. Name: Timothy Crotty License No.: ME-65990 email: permitting(@.em PoWer-solar.com- Address: 4689 Austin Blvd.,-Island Park,-NY-11-558-- Phone No.: (616)-544-4592 JOB SITE INFORMATION (All information Required) Name:__-Spiro Dongaris S lA .kLc Address: 285 Willow DriNte,-Green port, NY 11944 Cross Street: Phone No.:____(718)-784-7490 Bldg.Permit#: email: sdongari.s@athenica.com Tax Map_District: 1000 SecttQ1T_033.00_________ Block: 06.00 Lot: 009.000 BRIEF DESCRIPTION OF WORK (Please Print Clearly) 0 Installation of roof mounted solarpane[s es 7.56kW total-system-si;z-(21)SPR-360w ACPV modules e. and (2)Tesla Battery Packs Circle All That Apply: Is job ready fot inspection?: YES / NO Rough In Final Do you need a Temp Certificate?: YES / NO Issued On Temp Information: (All information required) Service Size I Ph 3 Ph Size: -A # Meters bid Meter# _ New Service- Fire Reconnect-Flood Reconnect-Service Reconnected- Underground -Overhead #Underground Laterals 1 2 H Frame Pole Work done on Service? Y N 'Additional Information',' .PAYMENT-DUE WITH-APPLICATION Request for Inspection FormAs 1. ' k Y 2, BUILDING DEPARTMENT-Electrical Inspector TOWN OF SOUTHOLD It o E ILDING DEPT. Town Hall Annex - 54375 Main Road - PO Box 1179 v*i of snUTHOLD Southold, New York 11971-0959 Telephone (631) 765-1802 - FAX (631) 765-9502 roQerr -southoldtownny.gov— seandRsoutholdtownny.gov APPLICATION FOR ELECTRICAL INSPECTION ELECTRICIAN INFORMATION (All Information Required) Date: 5/17/2022 Company Name: EmPower CES, LLC. Name: Timothy Crotty License No.: ME-65990 email: permittingem ower-solar.com Address: 4589 Austin Blvd.,.Island Park, NY 11558 Phone No: (516)-544-4592 JOB SITE INFORMATION (All Information Required) Name: 'Spiro Don aris Address: 285 Willow Drive, Green port, NY 11944 Cross Street: Phone No.: 718 -784-7490 Bldg.Permit#: 9-7 q email: sdongaris@athenica.com Tax Map District: 1000 Section: 033.00 Block: 06.00 Lot: 009.000 BRIEF DESCRIPTION OF WORK (Pleas—Print Clearly) Installation of roof mounted solar panels (2fi)$PR-360w ACPV modules 7.56kW total system size r and (2)Tesla Battery Packs Circle All That Apply: Is job ready for inspection?: YES / NO Rough In Final Do you need a Temp Certificate?: YES / NO Issued On Temp Information: (All information required) Service Size 1 Ph 3 Ph Size: A # Meters Old Meter# New Service - Fire Reconnect- Flood Reconnect-Service Reconnected- Underground - Overhead # Underground Laterals 1 2 H Frame Pole Work done on Service? Y N Additional Information: PAYMENT DUE WITH APPLICATION Request for Inspection Form.xls PERMIT # Address: Switches Outlets G FI's Surface Sconces H H's 1 UC Lts Fans Fridge HW Exhaust Oven WAD Smokes DW Mini Carbon Micro Generator Combo Cookto p Transfer AC AH Hood Service Amps Have Used Special: ,comments 4 r�/�ej/' P\ ?c4 - - - -- --- ---- ----- - _---- _ SONGS DER SHOWNHEREON ARE 1937 0554�� II r �tI -- -- - SYMBOL LEGEND L '{ C] M111L T.T 1710 0 UANN(RE .oQ�!TEST NaT I' f N IIl�r 0 /IA FN0 -1NLEf IB;RE; I,'/IA'SET no YANG •h. ••0 5"Oi FI EYAnfj:S ®YARD wlEi • D[lLAFO 1• �l \ (/�n 7 CCl,• WILILY POLE 0 YARD INLET .WEIWID FLAG MAY 2°`� �l'I �- CUT WRE m ETLCIRC UETER CANT,CANTLELER -� -�UNIITI'Pap.wA1,11 (M CAS MEIER FE FENCE UGTT POLE I@ WATER LIFTER MAS•MASONRY �^ 9Q1 pR CAS VALLE PLAT;PLATFORM I I CF'] -o-_ ! ' ) WATER VALLE W.W,wNOow WELL 13UILDINGQEPT. -��TQNAOC�N[E(SK) p/WBAYW.NDO'N ;II '� -.-•OLUN!LLM,FIN£ CV 0/HULERRARC TOU�ln1 nF SOU HOLD _y sy WRE FENCE ( )fl/D ROOF 01fA CELLAR ENTRANCE I.E. A ya ENT.I1vmmI DI oTPRES5E0 CURB A/C UNIT rl ills CROSS c"7 f.OL,CEhERM1Y 01 LNE A STAKE bl L _ _G/L.ON LUTE __-- -- •'�� �i ` I 1 It r FND 'L PR9' J INLET -POND ROAD ;i; . s'o so o00" E (60' WIDE) E ,'•RImF I MIT ,TOT: wn IN - Ab; utrayaucxrn - iZp O ;a 65.5' O '. �' AyMlli OPlhw\\ �•! I• •.III 'p -j L+xti RE9OFtRE ', �.' •JJ FM LOT 72 TAX LOT 6 { pp70Yf j OAI II II�� • 1-4 Jam; "y FM LOT I6 TAX LOT 8 O/L f 1 O 7(L6• Z E FX LOT 71 I TAX LOT 7 rrf A4111 aS ra•TALFD,eTN. �E DD' GO FM LOT 70WTI 'I RxR •2�U.59' �� -�..-.,,;�,.� TAX LOT 8 GRAPHIC SCALE 6 D� r(fjr(y rAX LOT ;� If� A'X Ro � ° G A Lor to .•v:. imc.k-eaun,DLirri Noose 1, 1. CONFLICTING MONUMENTAHON FOUND IN THE VICINITY LOT AREA ( IN FEET) IE Of THIS PROPERTY AND HISTORICAL DEEDS AND OLD I SURJEYINO RECORDS WDUTE THE POSSIBILITY OF II 54,308.70 S.F. 1 inch = 40 fL VARYING INTERPRETATIONS OF THE PHYMCAL 1.25 AC. POSITIONING OF THE ONES OF THIS PROPERTY; 1 oFN ),Y . ,- - SURVEY OF PROPERTY IS CLL1C i LOT 16 I *°j<;�.. v•'pL.; 1 f A - MAP OF r HOMESTEAD ACRES AT GREENPORT land surveying mjs1andSUrve COn1 FILE GATE: 07/17/1989 MAP N0. 8150 J Y• P:631-957-2400 I SITUATE DR.:MC CREW.;JM SCALE:1"- 40' GREENPORT TOWN OF 50UTHOLD G $ -_ TAX MAP No, _- - DATE SURVEYED:04/08/2021 JOB No.S21=0962 1000-033,00-06.00-009.000 SUFFOLK COUNTY, NEW YORK I\�s..roa.wn�wnlmmc-dl-...... A.n arAa»am.-..Tr - --- ' ad a.rYat•Arrq woT er,�..wnary suTiw.•md�e�r,.ex+.r«,....v.-dr,M Tuearoa.mosa�.rl II ...-r+wl,a...".L'Cw'....«.:_-=oa.o,..o.....e<n7'. 'a�e.''` a1'" ��^mr�n� uwzwNttMml M.roM.Vo o•as.mos✓tau.��..lIM.mt.Rr+.swRurou�.gN.ays++X�aaw+a s•.owaO.ar' as9 wa om.rrdmvu.rrmms.�o.modOe rsq ni raxrma Arw lxnD t.w M14.vha y.dAVAgAw.rnMINr R\unuld ne/5s.rltwa w',q�wmrrrnvt r� Tam. vl?.T4 m•w wu..xt wa. .a.:riduas.a,Aw Na.arl Ra.,yW�YmI 4a'uM r#'•N1t1,V.{n/u Ni EYal.59 W1MP1 ryAYYu!YJ1 Al«6�q TIT•1�'#R'.,'JBRO.M'ruVS�M�KA�.oF2lugcaVY M.b Y.✓d wlb`ytlaLTd' { I Meyer, Nancy From: Meyer, Nancy Sent: Monday, May 8, 2023 3:04 PM To: 'Ines Fernandez' Subject: RE: [SPAM] - Re: Delivery Status Notification (Failure) Hi Inez, The most recent set has not been approved yet. The engineer is showing a fire rated room, however there aren't any construction details given, nor does it include any dimensions, required clearance distances, details of the door, etc. Additionally,the electrical inspector has noted that there is an air handler located within this room which the homeowner has already built, and that does not meet code. He also feels the room was constructed too close to the existing electrical panel, not maintaining the required 3 foot clearance in front. Please have the engineer amend the drawing to reflect what was actually constructed, along with the details necessary for code, so we can review it. If you or the engineer have any questions,feel free to reach out to the building department. Thank-you, .Nancy Meyer Building Inspector Town of Southold Building Department Annex Building 54375 Main Road Southold,NY 11971 (631) 765-1802 From: Ines Fernandez<iernandez@empower-solar.com> Sent: Monday,April 10, 2023 2:40 PM To: Meyer, Nancy<nancym@southoldtownny.gov> Subject: [SPAM] - Re: Delivery Status Notification (Failure) Good afternoon Nancy, I tried calling you just now. We haven't received the latest permit plan set approved, could you please send a copy via email and mail? Please advise. Thank you! On Fri, Feb 10, 2023 at 12:01 PM Ines Fernandez<iernandez@empower-solar.com>wrote: Good morning Nancy, i Have these plans been approved? i I d 1 �1 EMPOCES-01 ABELLO A�o� CERTIFICATE OF LIABILITY INSURANCE DATE 516/2 D/YYYY) /6/2022 THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER.THIS CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S),AUTHORIZED REPRESENTATIVE OR PRODUCER,AND THE CERTIFICATE HOLDER. IMPORTANT: If the certificate holder is an ADDITIONAL INSURED,the policy(ies)must have ADDITIONAL INSURED provisions or be endorsed. If SUBROGATION IS WAIVED, subject to the terms and conditions of the policy,certain policies may require an endorsement. A statement on this certificate does not confer rights to the certificate holder in lieu of such endorsement(s). PRODUCER License#0757776 CONTAcr NA E: HUB International Insurance Services Inc. PHONE 600 Corporate Pointe (A/C,No,Ext):(310)568-5900 (AA/C.No):(310)568-9098 Suite 600 EMIILSS• Culver City,CA 90230 INSURERS AFFORDING COVERAGE NAIC# INSURER A:Southwest Marine&General Insurance Company 12294 INSURED INSURER B:JameS River Insurance Company 12203 EmPower CES LLC INSURER C 4589 Austin Boulevard INSURER D Island Park,NY 11558 INSURER E INSURER F: COVERAGES CERTIFICATE NUMBER: REVISION NUMBER: THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES.LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. INSR TYPE OF INSURANCE ADDL SUBR POLICY EFF POLICDY EXP LIMITS D D POLICY NUMBER IMMIDDIYYYYl A X COMMERCIAL GENERAL LIABILITY EACH OCCURRENCE $ 1,000,000 CLAIMS-MADE �OCCUR X PK202200006109 5/4/2022 5/4/2023 PREMISEsO RENTED occurrence) 500,000 MED EXP(Any one erson 5,000 PERSONAL BADVINJURY $ 1,000,000 GEN'L AGGREGATE LIMIT APPLIES PER: GENERAL AGGREGATE $ 2,000,000 POLICY X JEOT LOG PRODUCTS-COMP/OP AGG $ 2,000,000 OTHER: $ AUTOMOBILE LIABILITY EOMBII accaED SINGLE LIMIT $ ANY OWNED SCHEDULED O BODILY INJURY Per person) $ OWNED AUTOS ONLY AUTOS D BODILY INJURY Per accident $ AUTOS ONLY AUOTOS ONLY PPe�accCent AMAGE $ B UMBRELLA LIAB I X I OCCUR EACH OCCURRENCE $ 5,000,000 X EXCESS LIAB CLAIMS-MADE 001306870 5/4/2022 5/4/2023 AGGREGATE $ 5,000,000 DED RETENTION$ WORKERS COMPENSATION A AND EMPLOYERS'LIABILITY Y/N STTUTE ANY PROPRIETOR/PARTNER/EXECUTIVE E.L.EACH ACCIDENT $ OFFICER/MEMBER EXCLUDED? N/A (Mandatory in NH)If yes E.L.DISEASE-EA EMPLOYE $ ,describe under DESCRIPTION OF OPERATIONS below I E.L.DISEASE-POLICY LIMIT $ DESCRIPTION OF OPERATIONS I LOCATIONS/VEHICLES (ACORD 101,Additional Remarks Schedule,may be attached if more space is required) The certificate holder Is listed as additional insured per attached endorsement#GL0202 0218. CERTIFICATE HOLDER CANCELLATION SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE Town of Southold THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN 54375 Route 25 ACCORDANCE WITH THE POLICY PROVISIONS. Southold,NY 11971 AUTHORIZED REPRESENTATIVE ACORD 25(2016/03) ©1988-2015 ACORD CORPORATION. All rights reserved. The ACORD name and logo are registered marks of ACORD NY S f F PO Box 66699,Albany,NY 12206 New York State Insurance Fund I ny8ifaom CERTIFICATE OF WORKERS' COMPENSATION INSURANCE A A A A A A 522407627 AMWINS BROKERAGE OF NEW YORK 200 ELWOOD DAVIS ROAD SUITE 200 LIVERPOOL NY 13088 Emma. SCAN TO VALIDATE AND SUBSCRIBE POLICYHOLDER CERTIFICATE HOLDER EMPOWER CES LLC TOWN OF SOUTHOLD 4589 AUSTIN BLVD 54375 ROUTE 25 ISLAND PARK NY 11558 SOUTHOLD NY 11971 POLICY NUMBER I CERTIFICATE NUMBER POLICY PERIOD DATE Z 2546 6,' 563452 05/01/2022 TO 05/01/2023 04/12/2022 THIS IS TO CERTIFY THAT THE POLICYHOLDER NAMED ABOVE IS INSURED WITH THE NEW YORK STATE INSURANCE FUND UNDER POLICY NO. 2546 624-4. COVERING THE ENTIRE OBLIGATION OF THIS POLICYHOLDER FOR WORKERS' COMPENSATION UNDER THE NEW YORK WORKERS' COMPENSATION LAW WITH RESPECT TO ALL OPERATIONS IN THE STATE OF NEW YOM EXCEPT AS INDICATED BELOW. IF YOU WISH TO RECEIVE NOTIFICATIONS REGARDING SAID POLICY, INCLUDING ANY NOTIFICATION OF CANCELLATIONS, OR TO VALIDATE THIS CERTIFICATE, VISIT OUR WEBSITE AT HTTPS:/IWWW.NYSIF.COWCERT/ CERTVAL.ASP.THE NEW YORK STATE INSURANCE FUND IS NOT LIABLE IN THE EVENT OF FAILURE TO GIVE SUCH NOTIFICATIONS. TI4IS POLICY AFFORDS COVERAGE TO THE SOLE PROPRIETOR,PARTNERS AND/OR MEMBERS OF A LIMITED LIABILITY COMPANY. DAVID SCHIEREN GREG SACHS EMPOWER CES LLC THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS NOR INSURANCE COVERAGE UPON THE CERTIFICATE HOLDER THIS CERTIFICATE DOES NOT AMEND,EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICY. NEW YORK STATE INSURANCE FUND VALIDATION NUMBER: 263370983 DIRECTOR,I SURANCE FUND UNDERWRITING I�'®r000000000001103333008411111 Farm WC•CBRT-NOPRINi Vaeiam 3(OB292019)[WC Policy-2S466244] U-26.3 1� [00000000000103336584][0001-000025166244][iiZ][L58fi5•A][Ch�Nop�tT�j01�00001] PORE Compensation K workers'STAT CERTIFICATE OF INSURANCE COVERAGE Board NYS DISABILITY AND PAID FAMILY LEAVE BENEFITS LAW PART 1.To be completed by NYS disability and Paid Family Leave benefits carrier or licensed insurance agent of that carrie 1a.Legal Name&Address of Insured(use street address only) 1b.Business Telephone Number of Insured EMPOWER CES LLC DBA EMPOWER SOLAR 310-534-7994 4589 AUSTIN BOULEVARD ISLAND PARK,NY 11558 1c.Federal Employer Identification Number of Insured Work Location of Insured(Only required if coverage is specifically limited to or Social Security Number certain locations in New York State,i.e.,Wrap-Up Policy) 522407627 2.Name and Address of Entity Requesting Proof of Coverage 3a.Name of Insurance Carrier (Entity Being Listed as the Certificate Holder) ShelterPoint Life Insurance Company Town of Southold 54375 Route 25 3b.Policy Number of Entity Listed in Box"1 a" Southold, NY 11971 DBL252634 3c.Policy effective period 05/10/2021 to 05/09/2023 4. Policy provides the following benefits: © A.Both disability and paid family leave benefits. B.Disability benefits only. C.Paid family leave benefits only. 5. Policy covers: © A.All of the employer's employees eligible under the NYS Disability and Paid Family Leave Benefits Law. B.Only the following class or classes of employer's employees: Under penalty of perjury,I certify that I am an authorized representative or licensed agent of the insurance carrier referenced above and that the named insured has NYS Disability and/or Paid Family Leave Benefits insurance coverage as described above. Date Signed 5/9/2022 By C�Ui Gt�i (Signature of insurance carrier's authorized representative or NYS Licensed Insurance Agent of that insurance carrier) Telephone Number 516-829-8100 Name and Title Richard White, Chief Executive Officer IMPORTANT: If Boxes 4A and 5A are checked, and this form is signed by the insurance carrier's authorized representative or NYS Licensed Insurance Agent of that carrier,this certificate is COMPLETE. Mail it directly to the certificate holder. If Box 4B,4C or 5B is checked,this certificate is NOT COMPLETE for purposes of Section 220, Subd.8 of the NYS Disability and Paid Family Leave Benefits Law. It must be emailed to PAU@wcb.ny.gov or it can be mailed for completion to the Workers'Compensation Board, Plans Acceptance Unit, PO Box 5200, Binghamton, NY 13902-5200. PART 2.To be completed by the NYS Workers'Compensation Board(only if Box 4B,4c or se have been checked) State of New York Workers' Compensation Board According to information maintained by the NYS Workers'Compensation Board,the above-named employer has complied with the NYS Disability and Paid Family Leave Benefits Law(Article 9 of the Workers'Compensation Law)with respect to all of their employees. Date Signed By (Signature of Authorized NYS Workers'Compensation Board Employee) Telephone Number Name and Title Please Note:Only insurance carriers licensed to write NYS disability and paid family leave benefits insurance policies and NYS licensed insurance agents of those insurance carriers are authorized to issue Form DB-120.1.Insurance brokers are NOT authorized to issue this form. p DB-120.1 (12-21) 4, Additional Instructions for Form D13-120.1 By signing this form, the insurance carrier identified in Box 3 on this form is certifying that it is insuring the business referenced in Box I for disability and/or Paid Family Leave benefits under the NYS Disability and Paid Family Leave Benefits Law. The insurance carrier or its licensed agent will send this Certificate of Insurance Coverage (Certificate)to the entity listed as the certificate holder in-Box 2. The insurance carrier must notify the above certificate holder and the Workers'Compensation Board within 10 days IF a policy is cancelled due to nonpayment of premiums or within 30 days IF there are reasons other than nonpayment of premiums that cancel the policy or eliminate the insured from-coverage indicated on this Certificate. (These notices may be sent by regular mail.)Otherwise, this Certificate is valid for one year after this form is approved by the insurance carrier or its licensed agent, or until the policy expiration date listed in Box 3c,whichever is earlier. This Certificate is issued as a matter of information only and confers no rights upon the certificate holder. This Certificate does not amend, extend or alter the coverage afforded by the policy listed, nor does it confer any rights or responsibilities beyond those contained in the referenced policy. This Certificate may be used as evidence of a NYS disability and/or Paid Family Leave benefits contract of insurance only while the underlying policy is in effect. Please Note: Upon the cancellation of the disability and/or Paid Family Leave benefits policy indicated on this form, if the business continues to be named on a permit, license or contract issued by a certificate holder,the business must provide that certificate holder with a new Certificate of Insurance Coverage for NYS disability and/ or Paid Family Leave Benefits or other authorized proof that the business is complying with the mandatory coverage requirements of the NYS Disability and Paid Family Leave Benefits Law. NYS DISABILITY AND PAID FAMILY LEAVE BENEFITS LAW §220. Subd. 8 (a) The head of a state or municipal department, board, commission or office authorized or required by law to issue any permit for or in connection with any work involving the employment of employees in employment as defined in this article, and not withstanding any general or special statute requiring or authorizing the issue of such permits, shall not issue such permit unless proof duly subscribed by an insurance carrier is produced in a form satisfactory to the chair,that the payment of disability benefits and after January first, two thousand and twenty-one, the payment of family leave benefits for all employees has been secured as provided by this article. Nothing herein, however, shall be construed as creating any liability on the part of such state or municipal department, board, commission or office to pay any disability benefits to any such employee if so employed. (b)The head of a state or municipal department, board, commission or office authorized or required by law to enter into any contract for or in connection with any work involving the employment of employees in employment as defined in this article and notwithstanding any general or special statute requiring or authorizing any such contract, shall not enter into any such.contract unless proof duly subscribed by an insurance carrier is produced in a form satisfactory to the chair,that the payment of disability benefits and after January first, two thousand eighteen, the payment of family leave benefits for all employees has been secured as provided by this article. DB-120.1 (12-21)Reverse I Suffolk County Dept.of Labor,Licensing&Consumer Affairs HOME IMPROVEMENT LICENSE 1 _ Name GREGORY SACHS Business Name s eed,dies that the EMPOWER CES LLC DBA veris duly licensed he Courty o1 suf'olk License Number:H-50211 Rosalie Drago Issued: 05/30/2012 Conmisstoner Expires: 5/1/2024 Suffolk County Dept.of Labor,Licensing&Consumer Affairs h? MASTER ELECTRICAL LICENSE Name TIMOTHY M GROTTY Business Name rhis certifies that the Empower CES LLC DBA nearer is duly licensed ,y the County of suffolk License Number:ME-65990 Rosalie Drago Issued: 11/12/2021 Commissioner Expires: 11/01/2023 =0. APPROVED AS NOTED OCCUPANCY OR DATE: 6= B.P.# 9�6 USE IS UNLAWFUL EE °� BY: WITHOUT CERTIFICATE `:OTIFY BUILDING DEPARTMENT AT OCCUPANCY ,5.1802 .&AM TO 4 PM FOR THE :,c:,LLOWING INSPECTIONS: FOUNDATION -:TWO REQUIRED, FOR POURED CONCRETE 2. ROUGH - FRAMING & PLUMBING 3. INSULATION 4. FINAL - CONSTRUCTION .MUST- BE COMPLETE FOR C.O. COMPLY WITH ALL`CODE S OP ALL CONSTRUCTION SHALL;MEET THE REQUIREMENTS OF THE CODES OF NEW NEW YORK STATE & TOWN CODES' YORK STATE. NOT RESPONSIBLE FOR AS REQUIRED AND CONDITIONS OF DESIGN OR CONSTRUCTION ERRORS. SOUTH6b TOWN ZBA SOUTHOLD TOWN PLANNING;BOARD'. SOUTHOLD TOWR TRUSTEES N.Y;S.,DEC RETAIN STORM WATER RUNOFF PURSUANT TO CHAPTER 236 OF THE TOWN CODE. Gregory Sachs, PE 4589 Austin Blvd, (516)-544-4115 Island Park, NY 11558 permitting@empower-solar.com May 12, 2022 To Whom It May Concern: The purpose of this letter is to certify that the existing roof structure located at: 285 Willow Drive,Greenport, NY 11944 can support the additional load of the solar energy system, in addition to wind, snow and gravity. Portions of roof structure covered and not covered with photovoltaic panels are in compliance with R324.4.1.1. Furthermore, it has been determined that the structure complies with the 2020 Residential Code of New York State including the ASCE 7. Please see Table 1 below for specific data relating to the calculations for each roof structure involved in the solar energy system installation. Table 1 Rafter Snow Wind Max Span Layers of Roof Surface (ft) spacing Cross Section Load Speed Kneewall Collar Ties Shingles (in) (psf) (mph) South 1 1 15.33 16 Nominal 2x8 20 135 No No 1 iw Sincerely, �pF N D. Gregory Sachs, PE c (D l; MAY�2',0 2022 10-. QC�P� TOWN OL OF ,'R7FSS� 1 2 3 4 5 6 7 8 9 10 11 12 13 EMPOWER SOLAR 4589 AUSTIN BLVD ISLAND PARK,NY 11558 TEL:516-837-3459 RESIDENTIAL FAX:516-706-1789 - www.empOwer-soIar.com SOLAR PROJECT THE INFORMATION DISCLOSED HEREIN IS THE SOLE H PROPERTY OF EMPOWER CES,LLC.UNAUTHORIZED REPRODUCTION OR DISTRIBUTION OF THIS PROJECT TEAM MATERIAL IS STRICTLY PROHIBITED WITHOUT PRIOR SPECIFIC WRITTEN PERMISSION PROFESSIONAL SEAL OWNER: ITIA LLC G G rAE w PHONE: (718)784-7490 �1�, D S��,Q� ENGINEER OF RECORD: F ( " ln«pOn- '� SOLAR INSTALLER:: GREGORY SACHS, PE F ? N EMPOWER SOLAR t y uj w 4589 AUSTIN BLVD z aRa 4589 AUSTIN BLVD In�etppA ISLAND PARK, NY 11558 poll ISLAND PARK, NY 11558 �'�� - " N tv PHONE:516-837-3459 Fp Q 53 QY E i� 1 PHONE: 516-837-3459' E gs�0� µy._ L G a _ 285 willow Dr, r �t D Greenport,NY 11944 1 ��t y1 D, REV: DESCRIPTION: DATE: 1 11 1 j PROJECT LOCATION DATA: SHEET INDEX: PROJECT NAME: ADDRESS: ST-01 COVER SHEET ITIA LLC 285 Willow Drive, Greenport, NY S-01 EQUIPMENT LOCATIONS 11944 S-02 STRUCTURAL PROJECT LOCATION: SE-01 ELECTRICAL c 285 Willow Drive, Greenport, NY 11944 . o� PROJECT#; SCTM: 1000-033.00-06.00-009.000 PROD.PHASE: PERMIT DATE: B � B DESIGNED BY: ED CHECKED BY: GS SCALE: NTS MAP TITLE: COVER SHEET A A SHEET: ST-01 1 2 3 1 4 5 6 7 8 9 10 11 12 13 i— 1 2 3 4 5 6 7 8 9 10 11 12 13 EMPOWER ' EQUIPMENT LEGEND: , S O L A R 4589 AUSTIN BLVD NY 11558 MODULES ISLAND PARK, 5 MAIN SERVICE PANEL TEL: 516-837-345459 FAX: 516-706-1789 www.empower-soIar.com UTILITY METER [6] TESLA POWERWALL 1 THE INFORMATION DISCLOSED HEREIN IS THE SOLE " ZED SOUTH ROOF-1: " REPRODUCTION OR DISTRIBUT O OF TNALITHORHIS MATERIAL IS STRICTLY PROHIBITED WITHOUT 3❑ INVERTERS 7 SUB PANEL 21 SUNPOWER 360W-ACPV PANELS PRIOR SPECIFIC WRITTEN PERMISSION TOTAL POWER: 7.56 kW PROFESSIONAL SEAL ORIENTATION: 164°; PITCH:34° TYPE 1: FLUSH MOUNT 4❑ SOLAR+BATTERY �$ SERVICE DISCONNECT SOLAR ACCESS: 94% G DISCONNECT TSRF: 94°/D G OF NEWyO �`( D. F Lu F co � � �- �t i�N CL / w E 0 E 3: DRIVEWAY O - D D REV: DESCRIPTION: DATE: JPROJECT NAME: SETBACK LEGEND DONGARIS RESIDENCE F2]l PROJECT LOCATION: 36"CLEAR PATH pI I Ia TTTI IIII TITI IIII -g+eH+f7H c c 285 WILLOW DRIVE L� GREENPORT,NY 11944 $ ® 18" RIDGE SETBACK PROJECT#: 5466 cJ ❑ ❑ ACCESS ROOF DAOE:PHASE: ERMIT 0512I2022 B lu B DESIGNED BY:. ED CHECKED BY: GS SCALE: NTS TITLE: 6 EQUIPMENT LOCATIONS ROOFLAYOUT A NOT TO SCALE A SHEET: S-01 1 2 3 4 5 6 7 8 9 10 11 12 13 f 1 2 3 4 5 6 7 8 9 10 11 12 13 EMPOWER SOLAR 4589 AUSTIN BLVD SUNPOWER MODULES ISLAND PARK,NY 11558 o ON INVISIMOUNT RACKING TEL:516-837-3459 SHINGLES FAX:516-706-1789 www.empower-solar.com TH ION DISCLOSED HEREIN IS THE SOLE H H PROPERT Y TEMPOWER CES,U.C.UNAUTHORIZED RAFTERS REPRODUCTION OR DISTRIBUTION OF THIS MATERIAL IS STRICTLY-PROHIBITED WITHOUT PRIOR SPECIFIC WRITTEN PERMISSION PROFESSIONAL SEAL G G of N E W y D. F TYPICAL ROOF SECTION F + * �y NOT TO SCALE �r t`�'' ' N SUNPOWER PANEL SPECS E MODULE POWER(Wdc) QTY MODEL# LENGTH WIDTH DEPTH WEIGHT TABLE S-1.1: MAX.ATTACHMENT SPACING E ^SS`O�P SPR-360 21 SPR-A-SERIES-AC 72.2" 40.0" 1.57" 46.5 LB PORTRAIT: 5'-4" LANDSCAPE: 8'-0" SPR-E/X-SERIES-AC 61.4" 41.2" 1.81" 42.9 LB NOTES: D 1. TOTAL SYSTEM DC POWER:7.56 kW D REV: DESCRIPTION: DATE: 2. RACKING SYSTEM INSTALLED IN ACCORDANCE WITH CODE-COMPLIANT INSTALLATION PROJECT NAME: MANUAL 3.ATTACHMENTS TO BE SECURED TO ROOF ASSEMBLY USING 5 mm STAINLESS STEEL SCREWS ITIA LLC AND/OR 5/16"STAINLESS STEEL LAG BOLTS SPACED ACCORDING TO TABLE S-1.1 4. ALL ATTACHMENTS TO ROOF, MOUNTING BRACKETS & HARDWARE MEET OR EXCEED NYS PROJECT LOCATION: c CODE REQUIREMENTS c 285 Willow Drive, Greenport, 5. INSTALLATION TYPICALLY MAINTAINS 7/8 INCH SPACING BETWEEN MODULES NY 11944 6. SIZES OF STRUCTURAL MEMBERS THAT WERE NOT ACCESSIBLE FOR DIRECT MEASUREMENT ARE BASED ON OBSERVATIONS OF ACCESSIBLE MEMBERS, CONSTRUCTION DEPTH OR PROJECT#: BOTH IN ADDITION TO KNOWLEDGE OF STANDARD CONSTRUCTION PRACTICES AT THE PROJ.PHASE: PERMIT TIME OF CONSTRUCTION DATE: B 7. THIS DOCUMENT CERTIFIES THAT THE ROOF STRUCTURE HAS BEEN CHECKED FOR WIND, B DESIGNED BY: ED SNOW, UNBALANCED SNOW, LIVE AND DEAD LOADS BASED ON ASCE 7-10 CHAPTER 30 - CHECKED BY: GS WIND LOADS - COMPONENTS AND CLADDING (C&C) AND FOR CONFORMANCE WITH THE SCALE: NTS 2020 RESIDENTIAL CODE OF NEW YORK STATE. THIS CERTIFICATION DOES NOT APPLY TO TITLE: ANY ADDITIONAL ROOF ALTERATIONS AFTER THE DESCRIBED INSTALLATION 8.THIS ROOF STRUCTURE AS SHOWN IS ADEQUATE TO SUPPORT THE PROPOSED LOADS STRUCTURAL 9. REFER TO STRUCTURAL LETTER FOR SITE SPECIFIC AND ROOF SURFACE DATA A 10. ENERGY STORAGE SYSTEM INSTALLATION TO CONFORM WITH THE REQUIREMENTS OF THE A SHEET: 2020 RESIDENTIAL CODE OF NEW YORK STATE S-02 1 2 3 4 5 6 7 8 9 10 11 12 13' 1 2 3 4 5 6 7 8 9 10 11 12 13 EMPOWER MAXIMUM ESS RATING BASED ON LOCATION (R327.5) I S O L A R INDIVIDUAL ESS UNIT RATING AGGREGATE ESS RATING 4589 AUSTIN BLVD ISLAND PARK,NY 11558 0 20 kWh 40 kWh TEL: 516-837-3459 FAX: 516-706-1789 www.empower-soIar.com W THE INFORMATION DISCLOSED HEREIN IS THE SOLE H BASEMENT TESLA POWERWALL SPECS H PROPERTY OF EMPOWER CES.LLC.UNAUTHORIZED REPRODUCTION OR DISTRIBUTION OF THIS INDIVIDUAL ESS UNIT RATING QTY. AGGREGATE ESS RATING MATERIAL IS STRICTLY PROHIBITED WITHOUT PRIOR SPECIFIC WRITTEN PERMISSION 14 kWh 2 28 kWh PROFESSIONAL SEAL 0 �_ DRIVEWAY G TESLA POWERWALL SPACE REQUIREMENTS(R327.3.1) G MINIMUM LATERAL WALL SPACE 38" 0 6 MINIMUM CLEARANCE FROM LEFT SIDE 2" OF NEW }% s MINIMUM CLEARANCE FROM RIGHT SIDE 6" O�Y D. q �f- F B ❑ ❑ MINIMUM CLEARANCE ABOVE SINGLE POWERWALL 2" �� �C' \ N MINIMUM CLEARANCE ABOVE SIDE-BY-SIDE POWERWALLS 12" e z 10 ROOF LAYOUT MINIMUM CLEARANCE BETWEEN SIDE-BY-SIDE POWERWALLS 10" NOT TO SCALE MAXIMUM HEIGHT ABOVE GROUND 5' E E O pPOFESS�O�P BASEMENT LEGEND: D p REV: DESCRIPTION: DATE: 4 SERVICE DISCONNECT �8 MAIN SERVICE PANEL(EXISTING) PROJECT NAME: NOTES: DONGARIS RESIDENCE 51 SUBPANEL DATA MONITORING 1. ENERGY STORAGE SYSTEMS (ESS) TO BE INSTALLED WITH CONFORMANCE TO APPLICABLE PROJECT LOCATION: SECTIONS OF R327 AS PER 2020 RESIDENTIAL CODE OF NEW YORK STATE. C 2. ESS LISTED AND LABELED FOR RESIDENTIAL USE IN ACCORDANCE WITH UL 9540. C 285 WILLOW DRIVE TESLA GATEWAY 10 TESLA POWERWALL(INTERIOR, BASEMENT 3. ESS TO BE INSTALLED IN ACCORDANCE WITH THE MANUFACTURER'S INSTRUCTIONS AND GREENPORT,NY 11944 MOUNTED ON 5/8"TYPE X GYPSUM) THEIR LISTING. INDIVIDUAL UNITS MAY HAVE A SEPARATION DIFFERENCE LESS THAN 3' AS PER R327.3.1. PROJECT#- 5466 PV&ESS DISCONNECT 11 PATH OF TRAVEL TO DISCONNECT FROM 4. ESS TO BE INSTALLED IN STORAGE OR UTILITY SPACE AS PER R327.4. PROD.PHASE: PERMIT WILLOW DRIVE 5. MAXIMUM INDIVIDUAL ESS UNIT RATING AND AGGREGATE ESS RATING SHALL COMPLY WITH DATE: 05i12/2022 B REQUIREMENTS OF R327.5. B DESIGNED BY: CC 6. ESS SHALL BE INSTALLED IN ACCORDANCE WITH LISTING AND LABELING REQUIREMENTS AS CHECKED BY. GS PER R327.6. SCALE: NTS 7. ROOMS AND AREAS IN WHICH ESS ARE INSTALLED SHALL BE PROTECTED BY TITLE: INTERCONNECTED SMOKE ALARMS IN ACCORDANCE WITH SECTION R-314 AS OUTLINED IN R327.7. ENERGY STORAGE SYSTEM SPECIFICATIONS 8. ROOMS AND AREAS CONTAINING ESS SHALL BE PROTECTED ON THE SYSTEM SIDE.BY A 5/8-INCH TYPE X GYPSUM IN ACCORDANCE WITH SECTION R327.8 AND R302. A SHEET: 9. ESS INSTALLED IN A LOCATION SUBJECT TO VEHICLE DAMAGE SHALL BE PROTECTED BY APPROVED BARRIERS. S-03 1 2 3 4 5 6 7 8 9 10 11 12 13 1 2 3 4 5 6 7 8 9 10 11 12 13 EMPOWER NOTES: S o L A It 4589 AUSTIN BLVD ISLAND PARK,NY 11558 1. NEUTRAL&GROUND ARE BONDED TOGETHER(ORIGIN OF GEC FOR SOLAR TEL: 516-837-3459 ELECTRIC SYSTEM) FAX: 516-706-1789 2. GEC FROM SOLAR ELECTRIC SYSTEM BONDED TO EXISTING GEC IN THE MAIN www.empower-so[ar.com STANDARD INVERTER ASSEMBLY: SERVICE PANEL USING'SPLIT-BOLT CONNECTOR' THE DISCLOSED HEEIN IS THE SOLE H 3. IN SOME CASES POWER FOR DATA MONITORING ENCLOSURE MAYBE H PROPERTY OFT EION MPOWER CES,L CR UNAUTHORIZED DERIVED FROM MAIN SERVICE PANEL REPRODUCTION OR DISTRIBUTION THIS MATERIAL IS STRICTLY PROHIBITED WITHOUT HOUT 4: CONNECT UTILITY SIDE TO PANEL LUGS PRIOR SPECIFIC WRITTEN PERMISSION PROFESSIONAL SEAL 5. USE TAP RULES FOR SIZING TAP CONDUCTORS(NEC 240.21) 6. SIZE GEC AND EGC AS PER NEC 250.66, NEC 250.122 RESPECTIVELY 7. PROTECT GEC AND EGC SUBJECT TO PHYSICAL DAMAGE AS PER NEC G SOLAR 250.64(B), NEC 250.120(C) G ARRAY 1 8. FINAL SCHEMATIC SPECIFIC TO THIS INSTALLATION AVAILABLE UPON REQUEST of NE Vy yo INVERTER(S) AC �j0' 5 ff/-� DISCONNECT CO �. y F F f' Gi? w cS�O 0845' v pRoFESs`��P E E STANDARD EXTERIOR INTERCONNECTION: STANDARD INTERIOR INTERCONNECTION: D D REV: DESCRIPTION: DATE: PROJECT NAME: INTERIOR EXTERIOR INTERIOR EXTERIOR ITIA LLC PROJECT LOCATION: 6 c 285 Willow Drive, Greenport, MAIN TAP BREAKER MAIN NY 11944 SERVICE ENCLOSURE M 1 PANELETTE SERVICE M PANEL PANEL PROJECT#: UTILITY UTILITY PROJ.PHASE: PERMIT METER METER DATE: B B DESIGNED BY: ED 1 CHECKED BY: GS SCALE: NTS TITLE: ELECTRICAL A A SHEET: S E-01 1 2 3 4 5 6 7 8 9 10 11 12 13 X SUNPOWERS - Sunftwer®X-Series: X22-370 I X22-360 SunPowero Residential AC Module Built specifically for use with the SunPower Equino>ff system,the only fully integrated solution designed,engineered,and warranted byone manufacturer. Maximum Power. Minimalist Design. VA i Industry-leading efficiency means more power and savings ANNE-C per available space.With fewer modules required and hidden microinverters, less is truly more. Highest Lifetime Energy and Savings. Designed to deliver 60% more energy over 25 years in real-world conditions like partial shade and high temperatures.' so% F---------------------------------- 3 140% ------------ Fundamentally Different. ;i 130% And Better. 120% SunPower�X-Seriesup to >+ 110% 60%u _ a - ----- 100% more d90% lifetime L 80% energy 70%Ln - N 0 5 10 15 20 25 . The SunPower°Maxeon°Solar Cell Years of operation • Enables highest-efficiency modules available 2 • Unmatched reliability' Best Reliability. Best Warranty. • Patented solid metal foundation prevents breakage and corrosion © With more than 25 million modules deployed around OK' ` the world,SunPower technology is proven to last.That's why we stand behind our module and microinverter with the industrys best 25-year Combined Power and Product Warranty,including the highest Power Warranty in solar. Factory-integrated Microinverter I 100% • Simpler,faster installation c 0 S16% Minn Integrated wire management, 94% rapid shutdown i 92% 12/• E • Engineered and calibrated by 8844 more Sun Power for Sun Power modules ° 8a% qonventional Modtilepower e ' - --- 84% in year 10 au% 25 0 5 10 15 20 25 Years of operation X-Series:X22-370 I X22-360 SunPower"Residential AC Module AC Electrical Data Inverter Model:Enphase IQ AS(IQ7)(S-96-ACM-US) @240 VAC @208 VAC Peak Output Power 320 VA 320 VA Max.Continuous Output Power 315 VA 3"15 VA Nom.(L-L)Voltage/Range2(V) 240/211-264 208/183-229 Max.Continuous Output Current(A) 1.31 1.51 Max.Units per 20 A(LL)Branch Circuit3 12(single phase) 10(two pole)wye CEC Weighted Efficiency 97.5% 97.0% Noin.Frequency 60 Hz Extended Frequency Range 47-68 Hz AC Short Circuit Fault Current Over 3 Cycles 5.8 A rms Overvoltage Class AC Port III AC Port Backfeed Current 18 mA Power Factor Setting 1.0 Power Factor(adjustable) 0.7 lead./ 0.7 lag. No active phase balancing for three-phase installations DC PowerData Warranties, Certifications,and Compliance SPR-X22-370-E-AC SPR-X22-360-E-AC 25-year limited power warranty Warranties 25-year limited product warranty Nominal Power 7(Pnom) 370 W 360 W 03 Power Tolerance +5/-0% +5/-04 UL 171 /IEEE-17 Module Efficiency Module s 22.7% 22 1% Certifications UL 17441 and •UL 1741 AC Module(Type 2 fire rated) Temp.Coef.(Power) -0.29%/eC -0.29%/'C Compliance UL 62109-1/IEC 62109-2 FCC Part 15 Class B •Three bypass diodes ICES-0003 Class B Shade Tolerance -Integrated module-level inaxirnum CAN/CSA-C22.2 NO.107.1-01 power point tracking CA Rule 21 (UL 1741 SA)' -• •- • • (includes Volt/Var and Reactive Power Priority) TestUL Listed PV Rapid Shutdown Equipment( Operating Temp. -40°F to+140'F(-40'C to+60°C) Max.Ambient Temp. 122'F(50°C) Enables installation in accordance with: •NEC 690.E(AC module) Max.Load Wind:62 psf,3000 Pa,305 kg/m2--front&back NEC 690.12 Rapid Shutdown(inside and outside the array) Snow:125 psf,6000 Pa,611 kg/m2 front NEC 690.15 AC Connectors,690.33(A)-(E)(I) Impact Resistance 1 inch(25 mm)diameter hail at 52 mph(23 m/s) When used with InvisiMount racking and InvisiMount accessories Mechanical Data (UL2703): Solar Cells 96 Monocrystalline Maxeon Gen III Module grounding and bonding through InvisiMount Class A fire rated Front Glass High-transmission tempered glass with When used with AC module Q Cables and accessories(UL 6703 and anti-reflective coating UL 2238)6: Environmental Rating Module:Outdoor rated Rated for load break disconnect Inverter:NEMA Type 6 Class II PID Test Potential-induced degradation free Frame Class 1 black anodized(highest AAMA rating) I+ 1558 mm(bt.31n.) y Weight 42.9 Ib(19.5 kg) I I } Recommended Max. 13 in.(33 mm) Module Spacing 46 mm 1 SunPower360 W compared to a conventional module on same-sized arrays(260 W,16% (1.8[n) efficient,approx.1.6 m"),4%mot e energy per watt(based on third-parry module characterization and PVSim),0.75%/yr slower degradation(Campeau,Z.etal."SunPower 4 Module Degradation Rate,"SunPower white paper,2013). 1046mm omm 2 Based on search of da tasheet va lu es from webs!Les of top 10 manufacturers per IHS,as of (41.2 in) January 2017. 3#1 rank in"Fraunhofer PV Durability Initiative for Solar Modules:Part 3:•PVTech Power Magazine,2015.Campeau,Z.eta]."Sun Power Module Degrada Lion Rate,•SunPowerwhi to paper,2013. 393 mm 4Factorysetto1547a-2014defauItsettings.CARuIe21defauIt settings proFile set during (15.5(n.) commissioning.See the Equinox Installation Guide 4518101 for more information. 5 Standard Test Conditions(1000 W/m2-i rradiance,AM 1.5,25°C).N R E L calibration standard:SOMS current,LACCS FF and voltage.All DC voltage is fully contained within the module. 437 mm 6 This product is UL Listed as PVRSE and conforms with NEC 2014 and NEC 2017 690.12; V7.2 IN and C22.1-2015 Rule 64-218 Rapid Shutdown of PV Systems,for AC and DC conductors; when installed according to manufacturer's instructions. acnooae See more d www.sunpower.com/facts se extended facts for more reference information. � SUNPOWER � For more details,see extended datasheet www.sunpower.corllldataslleets LISTED E4=0 Specifications included In this datasheet are subject to change without notice. t02018 SunPower Corporation.All Rights Reserved.SUNPOWER,the Module Fire Performance;Type 2 SUNPOWER logo and MAXEON are registered trademar ks of SunPower Please read the Safety and Installation Instructions for details. 531 945 ReVA Corporation in the U.S.and other countries as well.1-800-SUNPOWER. sunpower.com 1 � 1.I.Simple and Fast Installation - - - - -- Integrated module-to-rail grounding Pre-assembled mid and end clamps Levitating mid clamp for easy placement Mid clamp width facilitates consistent,even - — module spacing UL 2703 Listed integrated grounding W ` - - Flexible Design -- —• Addresses nearly all sloped residential roofs —� Design in landscape and portrait with up to 8' r rail span Pre-drilled rails and rail splice Rails enable easy obstacle management Customer-Preferred Aesthetics #1 module and#1 mounting aesthetics Elegant Simplicity Best-in-class system aesthetics Premium,low-profile design SunPower° InvisiMount' is a SunPower-designed Black anodized components rail-based mounting system.The InvisiMount system Hidden mid clamps and new capped,flush addresses residential sloped roofs and combines faster end clamps installation time, design flexibility, and superior aesthetics. Part of Superior System The InvisiMount product was specifically envisioned and Built for use with SunPower DC and AC modules Best-in-class system reliability and aesthetics engineered to pair with SunPower modules. The resulting • New optional rooftop transition flashing,rail- system-level approach amplifies the aesthetic and mounted J-box,and wire management rail clips installation benefits—for homeowners and for installers. Combine with SunPower modules and SunPower EnergyLinkO monitoring app sunpower.com ' ��IIII�IIIdh��lllll6�ll ° i i mvi'sielMolint Cdrnlpohents Module'i Mid Clamp and Rail Module'/End Clamp and Rail Mid Clamp End Clamp Rail&Rail Splice Ground Lug Assembly(for DCsystems only) *0 _ I,nviSiMount Compsn.entDetails InvisiMountOperating • • • Mid Clamp Black oxide stainless steel 300 series 63 g(2.2 oz) Temperature -40°C to 90°C(-40°F to 1940 F) End,Clamp Black anodized aluminum 6000 series 110 g(3.88 oz) • 3000 Pa uplift Max.Load(LRFD) 6000 Pa downforce Rail Black anodized aluminum 6000 series 830 g/rn(9 oz/ft) Rail Splice Aluminum alloy 6000 series 830 g/m(9 oz/ft) Ground Lug 304 stainless steel Roof Attachim ent HardWare Supported• ®- •• Assembly (A2-70 bolt;tin-plated copper lug) 106.5 g/m(3.75 oz) Composition Shingle Rafter Attachment Application Composition Shingle Roof Decking Attachment Curved and Flat Tile Roof Attachment Universal interface for other roof attachments InvisiMount Component ' .• Mid Clamp Uplift 664 Ibf Shear 5401bf • • Ceirtifications Uplift 899 lbf 25-year product warranty End Clamp Warranties Shear 2201bf 5-year finishwarranry Rail Moment:upward 548 Ibf-ft UL 2703 Listed Moment:downward 580 Ibf-ft Certifications Class A Fire Rated Moment:upward 548 Ibf-ft Rail Splice Moment:downward 580 Ibf-ft Roof ' Uplift 10001bf Hardware Warranties L-foot . Refer to roof attachment hardware manufacturer's documentation. Shear 390lbf 'Module frame that is compatible with the InvisiMount system required for hardware interoperabiliry, z SunPower recommends that all Equinoxrm,InvisiMountlm,and AC module systems always be designed using the SunPower Design Tool.If a designer decides to instead use the component capacities listed in this document to design a system,note that the capacities shown are Load and Resistance Factor Design(LRFD) design loads,and are NOT to be used for Allowable Stress Design(ASD)calculations;and that a licensed Professional Engineer(PE)must then stamp all calculations. Should you have any questions please contact SunPower Technical Support at 1-800-SUNPOWER(1-800-786-7693). sunpower.com Co 2017 SunPower Corporation.All Rights Reserved.SUNPOWER,the SUNPOWER logo,EQUINOX,and INVISIMOUNT are trademarks or registered trademarks of SunPower Corporation. 509506 RevE All other trademarks are the property of their respective owners.Specifications included In this datasheet are subject to change without notice. Datasheet ` POWERWALL Tesla Powerwall is a full y-integrated AC battery system for •,�'w,.,. .�,�r.�;,� residential or light commercial use. Its rechargeable lithium- ion battery pack provides energ y storage for solar self- consumption, time-based control, and backup. Powerwall's electrical interface provides a simple -MAC} connection to any home or building. Its revolutionary compact design achieves market-leading energy density and is easy to install, enabling owners to quickly realize the benefits of reliable, clean power. PERFORMANCE SPECIFICATIONS MECHANICAL SPECIFICATIONS AC Voltage(Nominal) 120/240 V Dimensions' 1150 mm x 753 mrin x 147 mm Feed-In Type Split Phase (45.3 in x 29.6 in x 5.75 in) Weight' 114 kg(251.3 Ibs) Grid Frequency 60 Hz Mounting options Floor or wall mount Total Energy' 14 kWh 'Dimensions and weight differ slightly if manufactured before March 2019. Usable Energy' 13.5 kWh Contact Tesla for additional information. Real Power,max continuous 5 I<W(charge and discharge) 75�rnm 147 mm (2_.6 n) (5.75 in) Real power,peak(10s,off-grid/backup) 7 kW(charge and discharge) ) Apparent Power,max continuous 5.8 kVA(charge and discharge) 1e ,� Apparent Power,peak(10s,off-grid/backup)7.2 kVA(charge and discharge) T o - L. w Maximum Supply Fault Current 10 kA Maximum Output Fault Current 32 A 1150 mm Overcurrent Protection Device 30 A (45.3 in) Imbalance for Split-Phase Loads 100% Power Factor Output Range +/-1.0 adjustable Power Factor Range(full-rated power) +/-0.85 Internal Battery DC Voltage 50 V i Round Trip Efficiency 1-2 90% (`— Warranty 10years ENVIRONMENTAL SPECIFICATIONS 'Values provided for 250C(770F),3.3 kW charge/discharge power. 2AC to battery to AC,at beginning of life. Operating Temperature -200C to 500C(-40F to 1220F) Recommended Temperature OOC to 300C(320F to 860F) COMPLIANCE INFORI\,1ATION Operating Humidity(RH) Up tolOCi%,condensing _ Storage Conditions -200C to 300C(-40F to 860F) Certifications UL 1642,UL 1741,UL 1973, Up to 95%PH.non-condensing UL 9540,IEEE 1547,UN 38.3 State of Energy(SoE):25%initial Grid Connection Worldwide Compatibility Maximum Elevation 3000 rn(9843 ft) Emissions FCC Part 15 Class B,ICES 003 Environment Indoor and outdoor rated Environmental RoHS Directive 2011/65/EU Enclosure Type NEMA 3R Seismic AC156,IEEE 693-2005(high) Ingress Rating IP67(Battery&Power Electronics) IP56(Wiring Compartment) Wet Location Rating Yes Noise Level @ 1 m < 40 deA at 300C(860F) T o 5 L n TESLA.CGM/ENERGY TYPICAL SYSTEM LAYOUTS WHOLE HOME BACKUP --------------- Optional; ♦ I / Solar 10 T Solar inverter '------------------------ Main panel Backup Gateway Utility meter Grid including service disconnect T v 5 L'n 4- Powerwall Whole home backup PARTIAL HOME BACKUP ---------------- ----- Optional ♦ i / Solar oo FOti o0 Solar inverter I -------------------------- Sub panel Backup Gateway Main panel Utility meter Grid T■■LFl n Powerwall Backup loads Home loads T E i= L n NA-BACKUP- 019-C6-11 TESLA.COWENERGY Gregory Sachs, PE 4589 Austin Blvd, (516)-544-4115 Island Park, NY 11558 permitting@empower-solar.com May 12,2022 To Whom It May Concern: The purpose of this letter is to certify that the existing roof structure located at: 285 Willow Drive,Greenport,NY 11944 can support the additional load of the solar energy system,in addition to wind,snow and gravity. Portions of roof structure covered and not covered with photovoltaic panels are in compliance with 11324.4.1.1: Furthermore, it has been determined that the structure complies with the 2020 Residential Code of New York State including the ASCE 7. Please see Table 1 below for specific data relating to the calculations for each roof structure involved in the solar energy system installation. Table 1 Rafter Snow Wind Max Span Layers of Roof Surface ft spacing Cross Section Load Speed Kneewall Collar Ties ( ) (in) (psf) (mph) Shingles South 1 15.33 16 Nominal 2x8 20 135 No No 1 Sincerely, Gregory Sachs, PE D DD OCT - 5 2022 OF N E IN DEPT.�FtY D. BUILDINGSy��'�- TOUT OF SOUTHOL D CO nor.. N W uJ �p�� 08 4 5'3 AROFESS�O�P 4 LS 1 2 3 4 5 6 7 8 9 10 11 12 13 EMPOWER SRO LA.R 4589 AUSTIN BLVD ISLAND PARK,NY 11568 o TEL:516_837-3459 RESIDENTIAL FAX:51er-s1789 www.empo wr- oiar.com H SOLAR PROJECT H PROPER OFEMNDPONERCESLLCC..UNAUmOflIZED REPRODUCTION OR DISTRIBUTION OF THIS PROJECT TEAM. MATERIAL SPECIS S FIC WRITTEN PROHIBITED MISS UT PRIOR SPECIFIC WRITTEN PERMISSION PROFESSIONAL SEAL OWNER: ITIA LLC pF N E l�y G G Q RY D- co � C�� PHONE: (718)784-7490 W 3 b•R-e -�f ENGINEER OF RECORD: m Z F >s1}etp°n SOLAR INSTALLER. GREGORY SACHS,PE F �L EMPOWER SOLAR ip�� Og 4 53� 41_ 4589 AUSTIN BLVD tn�e�QpPd¢ 4589 AUSTIN BLVD ISLAND PARK,NY 11558 '�RpSS1pNP Ci`�e�QO60 ISLAND PARK,NY 11558 PHONE:516-837-3459 E � PHONE:516-837-3459 E c f o �� 0 1 .'Greenport NY11944 1 Y� } D REV: DESCRIPTION: DATE PROJECT LOCATION DATA: SHEET INDEX: PROJECT NAME: ST Oa-COVE 285 Willow Drive,Greenport,NY S-01 EQUIPMENT LOCATIONS f_ 11944 S-02 STRUCTURAL PROJECT LOCATION: C �� SE-01 ELECTRICAL c 285 Willow Drive,Greenport, NY 11944 PROJECT#: SCTM:1000-033.00-06.00-009.000 PROJ.PHASE: PERMIT DATE: B B DESIGNED BY: ED tt CHECKED BY: GS SCALE NTS MAP TITLE: COVER SHEET A A SHEET: , ST-01 1 2 21 4 5 6 7 8 9 10 11 12 13 1 2 3 4 5 6 7 8 9 10 11 12 13 EMPOWER EQUIPMENT LEGEND: SO w R 4589 AUSTIN BLVD 11558 MODULES MAIN SERVICE PANEL ISLAND:516-8,NY 345 F 1-1TEL:516-837-3459 FAX:516-706-1789 www.empawer-soIar.com UTILITY METER TESLA POWERWALL THE MFORM DISCLOSED HEREIN IS THE SOLE H SOUTH ROOF-1: H FE REPRODUCTION OR 0 SETRIBUTION OF THIS MATERIAL IS STRICTLY PROHIBITED WITHOUT 18 SUNPOWER 415W-ACPV PANELS PRIOR SPECIFIC WRITTEN PERMISSION ❑g INVERTERS 7 SUB PANEL TOTAL POWER:7.47 kW PROFESSIONAL SEAL ORIENTATION:164°;PITCH:34' TYPE 1:FLUSH MOUNT NE Vy 4❑ SOLAR+BATTERY ❑$ SERVICE DISCONNECT SOLAR ACCESS:94% O y G DISCONNECT TSRF:94% p�Y D. =�? w F W A v 08453� _/ O pRoFESSx-�P E E DRIVEWAY O \V D 6 REV: DESCRIPTION: DATE: PROJECT NAME: . GEN NGARISRESIDEN 2 ® 36"CLEAR PATH PROJECT LOCATION: c c 4 285 WILLOW DRIVE GREENPORT,NY 11944 lHl$ ® 18"RIDGE SETBACK PROJECT# 5466 PROJ.PHASE: PERMIT 5 ❑ 1 1 1 1 1 1 1 1 1 U I I I I I I 1 11 ® ACCESS ROOF DATE: 0 5/1 212 02 2 B Mal B DESIGNED BY: ED CHECKED BY: GS SCALE: NTS TITLE: 6 EQUIPMENT LOCATIONS ROOF LAYOUT A NOT TO SCALE A SHEET: S-01 1 2 3 4 5 6 1 8 9 10 11 12 13 1 2 3 4 5 6 7 8 9 10 11 12 13 EMPOWER SOLAR 4589 AUSTIN BLVD SUNPOWER MODULES ISLAND PARK,NY 11558 o ON INVISIMOUNT RACKING TEL:516-837-3459 SHINGLES FAX:516-706-1789 www.empower-solar.com THE INFORMATION DISCLOSED HEREIN IS THE SOLE H RAFTERS H PROPERTY OF EMPOWER CES,LLC.UNAUTHORIZED REPRODUCTION OR DISTRIBUTION OF THIS MATERIAL IS STRICTLY PROHIBITED WITHOUT PRIOR SPECIFIC WRITTEN PERMISSION PROFESSIONAL SEAL OF NEWYO G uj `¢ z F TYPICAL ROOF SECTION �Z NOT TO SCALE O 8 4 531 P\• pROFESS� SUNPOWER PANEL SPECS E MODULE POWER( QTY MODEL# LENGTH WIDTH DEPTH WEIGHT TABLE S-1.1:MAX.ATTACHMENT SPACING E .......... I SPR-415 118 SPR-A-SERIES-AC 72.2" 40.0" 1.57" 46.5 LB PORTRAIT: 5'4 LANDSCAPE: SPR-E/X-SERIES-AC 61.4" 41.2" 1.81" 42.9 LB NOTES: D 1. TOTAL SYSTEM DC POWER:7.47 kW D REV: DESCRIPTION: DATE 2.RACKING SYSTEM INSTALLED IN ACCORDANCE WITH CODE-COMPLIANT INSTALLATION PROJECT NAME: MANUAL MENTS-TO-BE-SECUREB T-E)RAAFAcSSEMBL-!-bsiNG-5-mm-STAINLESS STEEL AND/OR 5116"STAINLESS STEEL LAG BOLTS SPACED ACCORDING TO TABLE S-1.1 4. ALL ATTACHMENTS TO ROOF, MOUNTING BRACKETS & HARDWARE MEET OR EXCEED NYS PROJECT LOCATION: c CODE REQUIREMENTS c 285 Willow Drive,Greenport, 5.INSTALLATION TYPICALLY MAINTAINS 7/8 INCH SPACING BETWEEN MODULES NY 11944 6.SIZES OF STRUCTURAL MEMBERS THAT WERE NOT ACCESSIBLE FOR DIRECT MEASUREMENT ARE BASED ON OBSERVATIONS OF ACCESSIBLE MEMBERS, CONSTRUCTION DEPTH OR PROJECT#. BOTH IN ADDITION TO KNOWLEDGE OF STANDARD CONSTRUCTION PRACTICES AT THE PROJ.PHASE: PERMIT ,TIME OF CONSTRUCTION DATE B 7. THIS DOCUMENT CERTIFIES THAT THE ROOF STRUCTURE HAS BEEN CHECKED FOR WIND, B DESIGNED BY: ED SNOW, UNBALANCED SNOW, LIVE AND DEAD LOADS BASED ON ASCE 7-10 CHAPTER 30- CHECKED BY: GS WIND LOADS -COMPONENTS AND CLADDING (C&C)AND FOR CONFORMANCE WITH THE SCALE: NTS 2020 RESIDENTIAL CODE OF NEW YORK STATE.THIS CERTIFICATION DOES NOT APPLY TO TITLE: ANY ADDITIONAL ROOF ALTERATIONS AFTER THE DESCRIBED INSTALLATION 8.THIS ROOF STRUCTURE AS SHOWN IS ADEQUATE TO SUPPORT THE PROPOSED LOADS STRUCTURAL 9.REFER TO STRUCTURAL LETTER FOR SITE SPECIFIC AND ROOF SURFACE DATA A 10.ENERGY STORAGE SYSTEM INSTALLATION TO CONFORM WITH THE REQUIREMENTS OF THE A SHEET: 2020 RESIDENTIAL CODE OF NEW YORK STATE S-02 1 2 3 4 5 6 7 8 9 10 11 12 13 1 2 3 4 5 6 7 B 9 10 11 12 13 MAXIMUM ESS RATING BASED ON LOCATION(R327.5) EMPOWER I -S.O L A It, INDIVIDUAL ESS UNIT RATING AGGREGATE ESS RATING 4589 AUSTIN BLVD ISLAND PARK,NY 11558 C. 20 kWh 40 kWh TEL:516-837-3459 FAX:516-706-1789 www.em p o w e r-so Iar.c o m w THE INFORMATION DISCLOSED HEREIN IS THE SOLE H > BASEMENT TESLA POWERWALL SPECS H PROPERTY OF EMPOWER DES,LLC.UNAUTHORIZED RE PRODUCTION OR DISTRIBUTION OF THIS MATERIAL IS STRICTLY PROHIBITED WITHOUT INDIVIDUAL ESS UNIT RATING QTY. AGGREGATE ESS RATING PRIOR SPECIFIC WRITTEN PERMISSION 14 kWh 2 28 kWh PROFESSIONAL SEAL 0 G —�i DRIVEWAY G �OF NEj'V TESLA POWERWALL SPACE REQUIREMENTS(R327.3.1) Q'� oRY MINIMUM LATERAL WALL SPACE 38" O C s MINIMUM CLEARANCE FROM LEFT SIDE 2- K I A , y (n s MINIMUM CLEARANCE FROM RIGHT SIDE 6" r = = F " ❑ ❑ MINIMUM CLEARANCE ABOVE SINGLE POWERWALL 2" r B MINIMUM CLEARANCE ABOVE SIDE-BY-SIDE POWERWALLS 12" 'O ROOF LAYOUT MINIMUM CLEARANCE BETWEEN SIDE-BY-SIDE POWERWALLS 10" �� 0845 NOT TO SCALE MAXIMUM HEIGHT ABOVE GROUND 5' E E D BASEMENT LEGEND: D REV: DESCRIPTION: DATE: 4❑ SERVICE DISCONNECT 8] MAIN SERVICE PANEL(EXISTING) PROJECT NAME: NOTES: DONGARIS RESIDENCE 1j SUBPANEL g DATA MONITORING 1. ENERGY STORAGE SYSTEMS(ESS)TO BE INSTALLED WITH CONFORMANCE TO APPLICABLE PROJECT LOCATION: SECTIONS OF R327 AS PER 2020 RESIDENTIAL CODE OF NEW YORK STATE. D 2. ESS LISTED AND LABELED FOR RESIDENTIAL USE IN ACCORDANCE WITH UL 9540. C 285 WILLOW DRWE FTESLA GATEWAY 1Q TESLA POWERWALL(INTERIOR,BASEMENT 3. ESS TO BE INSTALLED IN ACCORDANCE WITH THE MANUFACTURER'S INSTRUCTIONS AND GREENPORT,NY 11944 MOUNTED ON 518"TYPE X GYPSUM) THEIR LISTING. INDIVIDUAL UNITS MAY HAVE A SEPARATION DIFFERENCE LESS THAN 3' AS PER R327.3.1. PROJECTM 5466 7] PV 8 ESS DISCONNECT 11 PATH OF TRAVEL TO DISCONNECT FROM 4.ESS TO BE INSTALLED IN STORAGE OR UTILITY SPACE AS PER R327.4. PROJ.PHASE: PERMIT WILLOW DRIVE 5. MAXIMUM INDIVIDUAL ESS UNIT RATING AND AGGREGATE ESS RATING SHALL COMPLY WITH DATE: 05112J2022 B REQUIREMENTS OF R327.5. B DESIGNED BY: CC 6.ESS SHALL BE INSTALLED IN ACCORDANCE WITH LISTING AND LABELING REQUIREMENTS AS CHECKED BY: GS PER R327.6. SCALE: NTS 7.ROOMS AND AREAS IN WHICH ESS ARE INSTALLED SHALL BE PROTECTED BY TITLE: INTERCONNECTED SMOKE ALARMS IN ACCORDANCE WITH SECTION R-314 AS OUTLINED IN R327.7. ENERGY STORAGE SYSTEM SPECIFICATIONS 8.ROOMS AND AREAS CONTAINING ESS SHALL BE PROTECTED ON THE SYSTEM SIDE BY A 5/8-INCH TYPE X GYPSUM IN ACCORDANCE WITH SECTION R327.8 AND R302. A SHEET: 9.ESS INSTALLED IN A LOCATION SUBJECT TO VEHICLE DAMAGE SHALL BE PROTECTED BY APPROVED BARRIERS: S-03 1 2 3 4 5 6 7 8 9 10 11 12 13 1 2 3 4 5 6. 7 8 9 10 11 12 13 EMPOWER NOTES: So L A R 4589 AUSTIN BLVD ISLAND PARK NY 11558 c 1.NEUTRAL&GROUND ARE BONDED TOGETHER(ORIGIN OF GEC FOR SOLAR TEL:516-837-3459 ELECTRIC SYSTEM) FAX:516-706-1789 2.GEC FROM SOLAR ELECTRIC SYSTEM BONDED TO EXISTING GEC IN THE MAIN www.em powe r-solar.co STANDARD INVERTER ASSEMBLY: SERVICE PANEL USING'SPLIT-BOLT CONNECTOR' E ISTHESOLE H 3.IN SOME CASES POWER FOR DATA MONITORING ENCLOSURE MAYBE H PPRROPERTYOFEM TION DISCLOSED CES,L CRURAUTHORPFD DERIVED FROM MAIN SERVICE PANEL REPRODUCTION OR DISTRIBUTION M THIS ATERIAL IS STRICTLY PROHIBITED WITHOUT HOUT 4.CONNECT UTILITY SIDE TO PANEL LUGS PRIOR OI WRITTEN PE0.MISSION 5.USE TAP RULES FOR SIZING TAP CONDUCTORS(NEC 240.21) PROFESSSISIONAA L SEAL 6.SIZE GEC AND EGC AS PER NEC 250.66,NEC 260.122 RESPECTIVELY 7.PROTECT GEC AND EGC SUBJECT TO PHYSICAL DAMAGE AS PER NEC O J'O 250.64(B),NEC 250.120(C) G D.G SOLAR '��' �Y S ARRAY 1 8.FINAL SCHEMATIC SPECIFIC TO THIS INSTALLATION AVAILABLE UPON �� �O CS �C, NJ REQUEST co Q' ��►- v INVERTER(S) AC 0 gs+,- d w DISCONNECT _ F F �FQ O p4 5:' pROrESS �P E E STANDARD EXTERIOR INTERCONNECTION: STANDARD INTERIOR INTERCONNECTION: D D REV: DESCRIPTION: DATE PROJECT NAME: INTERIORtENCLOSURE XTERIOR INTERIOR EXTERIOR PROJECT LOCATION: c MAIN c 285 Willow Drive,Greenport, MAIN SERVICE O 1 BREAKER SERVICE O NY 11944 PANEL PANELETTE PANELPROJECTikUTILITY UTILITY PROD.PHASE: PERMIT METER METER DATE: B B DESIGNED BY: ED CHECKED BY: GS SCALE NTS TITLE: ELECTRICAL A A SHEET: S E-01 1 2 3 4 5 6 7 8 9 10 11 12 13 X SUNPOWER® Sun Power@X-Series: X22-370 I X22-360 SunPower' Residential AC Module Built specifically for use with the SunPower Equinox"°"system,the only fully integrated solution designed,engineered,and warranted byone manufacturer. Maximum Power. Minimalist Design. RAWIndustry-leading efficiency means more power and savings ANNIF iis--c per available space.With fewer modules required and hidden microinverters,less is truly more. Highest Lifetime Energy and Savings. Designed to deliver 60%more energy over 25 years in real-world conditions like partial shade and high temperatures.' i ,sowsC---------------------------------- Fundamentally Different. CL` '30% a And Better. ! a 120� up to 1 T 110% 60% Io ,00% more E90% lifetime 80% dule energy 70% N so% o s ,o ,s 20 25 The SunPower®Maxeon®Solar Cell I Years of operation • Enables highest-efficiency modules available' I' • Unmatched reliability' i I Best Reliability. Best Warranty. Patented solid metal foundation prevents breakage and corrosion I With more than 25 million modules deployed around r' the world,SunPower technology is proven to last.That's z / why we stand behind our module and microinverter with the industrys best 25-year Combined Power and IProduct Warranty,including the highest Power Warranty y i in solar. Factory-integratedMicroinverter • Simpler,faster installation c 984 a 96% • .Integrated wire management, a 94% rapid shutdown ! a 92» • Engineered and calibrated by v 88% more SunPower for SunPower modules ;' 86% power i 7 i m e496 in year R BOX+ J25 0 5 10 15 20 25 Years of operation X-Series:X22-370 I X22-360 SunPower®Residential AC Module AC Electrical Data Inverter Model:Enphase IQ 7XS(IQ7XS-96-ACM-US) @240 VAC @208 VAC Peak Output Power 320 VA 320 VA Max.Continuous Output Power 315 VA 315 VA Nom.(L-L)Voltage/Range'(V) 240/211-264 208/183-229 Max.Continuous Output Current(A) 1.31 1.51 Max.Units per 20 A(LQ Branch Circuit 12(single phase) 10(two pole)wye CEC Weighted Efficiency 97.5% 97.040 Nom.Frequency 60 Hz Extended Frequency Range 47-68 Hz AC Short Circuit Fault Current Over 3 Cycles 5.8 A rms Ovenroltage Class AC Port III AC Port Backfeed Current 18 mA Power Factor Setting 1.0 Power Factor(adjustable) 0.7 lead./ 0.7 lag. No active phase balancing for three-phase installations DC Power Data Warranties,Certifications,and Compliance SPR-X22-370-E-AC SPR-X22-360-E-AC Warranties 25-year limited power warranty Nominal Power'(Pnom) 370 W 360 W 25-year limited product warranty Power Tolerance +5/-0% +5/-0`1'0 UL 1703 Module Efficiency` 22.7% 22.14o Certifications UL 1741/IEEE-1547 and UL 1741 AC Module(Type 2 fire rated) Temp.Coef.(Power) -0.2996/°C -0.29%/°C Compliance UL 62109-1/IEC 62109-2 FCC Part 15 Class B -Three bypass diodes ICES-0003 Class B Shade Tolerance •Integrated module-level maximum CAN/CSA-C22.2 NO.107.1-01 power point tracking CA Rule 21 (UL 1741 SA)° •- • • (includes Volt/Var and Reactive Power Priority) Tested UL Listed PV Rapid Shutdown Equipment6 Operating Temp. -40°F to+140'F(-40'C to+60°C) Max.Ambient Temp. '122'F(50°C) Enables installation in accordance with: •NEC 690.E(AC module) Max.Load Wind:62 psf,3000 Pa,305 kg/m2 front&back NEC 690.12 Rapid Shutdown(inside and outside the array) Snow:125 psf,6000 Pa,611 kg/m2 front NEC 690.15 AC Connectors,690.33(A)-(E)(1) Impact Resistance 1 inch(25 mm)diameter hail at 52 mph(23 m/s) When used with InvisiMount racking and InvisiMount accessories Mechanical , (UL 2703): Solar Cells 96 Monocrystalline Maxeon Gen III Module grounding and bonding through InvisiMount Class A fire rated Front Glass High-transmission tempered glass with When used with AC module Q Cables and accessories(UL 6703 and anti-reflective coating UL 2238)6: Environmental Rating Module:Outdoor rated •Rated for load break disconnect Inverter:NEMAType 6 Class II PID Test Potential-induced degradation free Frame Class 1 black anodized(highest AAMA rating) Weight 42.9 lb(19.5 kg) I I Recommended Max. 1.3 in.(33 mm) Module Spacing ®i 46mn 1 SunPower360 W compared to a conventional module on same-sized arrays(260 W,16% o.814 efficient,approx.1.6 ml),4%more energy per watt(based on third-party module characterization and PVSim),0.75%/yr slower degradation(Campeau,Z.et al."SunPower Module Degradation Rate,"SunPower white paper,2013). 1046 inm , 2 Based on search of datasheet values from websites of top 10 manufacturers per IHS,as of (d1:2 In.) �•3o mm� January2017. 3#1 rank in"Frau nhofer PV Durability Initiative for Solar Modules:Part3."Pvrech Power j'— Magazine,2015.Campeau,Z.etal."SttnPowerModule Degradation Rate,"SunPowerwhite T paper,2013. 393 mm` 4 Factory set to 1547a-2014 default settings.CA Rule 21 default settings profile setcluring (i55110 commissioning.See the Equinox Installation Guide#518101 for more information. 5 Standard Test Conditions(1000 W/mz irradiance,AM 1.5,25°C).N REL calibration standard:SOMS current,LACCS FF and voltage.All DC voltage is fully contained within the module. �- 6 This product is ILL Listed as PURSE and conforms with NEC 2014 and NEC 2017 690.12; 117.21n,) and C22.1-2015 Rule 64-218 Rapid Shutdown of PV Systems,for AC and DC conductors; when installed according to manufacturer's instructions. c cmaeronrunm See more details, se extended for more reference information. w S U N P®W E R° For more details,see extended datasheet www.sunpower.com/datasheets cc7sra Specifications included in this datasheet are subjectto change withoutnotice. LISTED w'�7e ©2018SunPowerCorporation.All Rights Reserved.SUN POWER,the ModulervePedorm w:Type 2 SUNPOWER logo and MAXEON are registered trademarks of SunPower Please read the safety and Installation Instructions for details. 531 945 RevA Corporation in the U.S.and other countries as well.1-800-SUNPOWER. a: f, I Simple and Fast Installation - - I • Integrated module-to-rail grounding � _ - i Pre-assembled mid and end clamps Levitating mid clamp for easy placement ry I • Mid clamp width facilitates consistent,even module spacing —= _ UL 2703 Listed integrated grounding -- I Flexible Design s • Addresses nearly all sloped residential roofs Design in landscape and portrait with up to 8' rail span i Pre-drilled rails and rail splice ` Rails enable easy obstacle management Customer-Preferred Aesthetics #1 module and#1 mounting aesthetics Elegant Simplicity Best-in-class system aesthetics Premium,low-profile design I SunPower° InvisiMountTm is a SunPower-designed i Black anodized components rail-based mounting system. The InvisiMount system Hidden mid clamps and new capped,flush addresses residential sloped roofs and combines faster end clamps installation time, design flexibility, and superior aesthetics. Part of Superior System The InvisiMount product was specifically envisioned and � • Built for use with SunPower DC and AC modules engineered to pair with SunPower modules. The resulting Best-in-class system reliability and aesthetics New optional rooftop transition flashing,rail- system-level approach amplifies the aesthetic and mounted J-box,and wire management rail clips installation benefits—for homeowners and for installers. Combine with SunPower modules and j SunPower EnergyLinV monitoring app _��IIIIIIII II��IIIIII II��pp sunpower.com ci < ei i G InViSiMOUnit Components Module'/Mid Clamp and Rail Module'1 End Clamp and Rail Mid Clamp End Clamp Rail&Rail Splice Ground Lug Assembly(for DCsystems only) InvisiM •unt Coi-nRqnent Details InvisiMount-Operating • • • Mid Clamp Black oxide stainless steel 300 series 63 g(2.2 oz) Temperature -40°C to 90°C(-40°F to 1941 F) End Clamp Black anodized aluminum 6000 series 110 g(3.88 oz) • 3000 Pa uplift Max.Load(LRFD) 6000 Pa downforce Rail Black anodized aluminum 6000 series 830 g!m(9 oz/ft) Rail Splice Aluminum alloy 6000 series 830 g/m(9 oz/ft) Ground Lug 304 stainless steel Roof Attachment HairdwareSuppofted by •• Assembly (A2-70 bolt;tin-plated copper lug) 106.5 g/n1(3.75 oz) • Composition Shingle Rafter Attachment Application Composition Shingle Roof Decking Attachment Curved and Flat Tile Roof Attachment Universal interface for other roof attachments Uplift 664 Ibf Mid Clamp Shear 540lbf Invis.-WOUnt Warrantfes And Certifickions Uplift 899 Ibf 25-year product warranty End Clamp Warranties Shear 220 Ibf 5-year finish warranty Rail Moment:upward 548 Ibf-ft UL 2703 Listed t Moment:downward 580 Ibf-ft Certifications • Class A Fire Rated fit Rail Splice Moment;upward 548 Ibf- Moment:downward 580 Ibf-ft Roof Attachn ent Hardware Uplift 10001bf , rreAties L-foot Refer to roof attachment hardware manufacturer's documentation. Shear 390 Ibf 'Module frame that is compatible with the InvisiMount system required for hardware interoperability. 2 SunPower recommends that all Equino>O',InvisiMount"',and AC module systems always be designed using the SunPower Design Tool.If a designer decides to instead use the component capacities listed in this document to design a system,note that the capacities shown are Load and Resistance Factor Design(LRFD) design loads,and are NOT to be used for Allowable Stress Design(ASD)calculations;and that a licensed Professional Engineer(PE)must then stamp all calculations. Should you have any questions please contact SunPower Technical Support at 1-800-SUNPOWER(1-800-786-7693). sunpower.com 0 2017 SunPower Corporation.All Rights Reserved.SUNPOWER,the SUNPOWER logo,EQUINOX,and INVISIMOUNT are trademarks or registered trademarks of 5unPower Corporation. 509506 RevE All other trademarks are the property of their respective owners.Specifications included in this datasheet are subject to change without notice. Data Datasheet �` P.OWERWALL x;. Ilk Testa Powerwall is a fully-integrated AC battery system for residential or light commercial use. Its..rechargeable,lithium- 'jon battery pack provides energy storage for-s6larse1f- consumption, timerbased control-, and backup. .• ;-�* I Powerwall's electrical interface provides a.simple connection to any home or building. Its revolutionary compact design-achieves market-lead ing.energy density i and is easy.to install,enabling'Qwners,to quickly realize the j benefits of reliable, clean power. PERFORMANCE SPECIFICATIONS MECHANICAL SPECIFICATIONS AC Voltage(Nominal)' 120Z240 V Dimensions" 1150 Yimm X 753 mm x;147 min Feed``-In Type Split Phase - (45.3 in x 29.6 in x-5.75 in) Weight' 114 kg(251.3 Ills) Grid Frequency '60 Hz Mounting options Floor or wall mount Total Eder§yl 14 kWh 3Dimenslons and weight differslig tly if manufactured.- fore March 2..019. Usable.Energy" -1-&S kWh Contact Tesla for additional information. 753 rnm 147-rnm Real Power,,max continuous 5 kW(charge and-discharge); (5.75 in) Real power,peak(10s,'oWgrid/backup) 7 kW,.(charge and discharge) Apparent 1136*6�,maic continuous 5.8 WA(charge and discharge) r Apparent Power,peak(10s,.off-grid/backup).7._2 WA(charge and discharge) o, Maxlmum,5upply'FauitCurrent 10kA _ m Maxtmum.0ut0ut Fault Cutfent 32•A — l{ 0V_&urrenf Piofectl6n Device 30 A l 1150 m ri (45.3 in) Imbalance for Split-Phase Loads, 1ON {I pdwer FactorOutput Range t%-U adjusfabie I Power Factor Range.(full-rated power)'. +/=0:85; Ihteiiial 65tter9.DC Voltage 50 v �I. .Round Trip,Effictency,'l 90% *arranty i0vears, ,EN.VIR0NI','4EN-TAL SPECIFICATIONS: 'Values prgyidad(or_25°_C_(77 175,:3,3 kW char gefdischarg_e.power; ?ACao 6attery'to AG,:at'6eginning of fife: '-Operating Ternpe`rafdre' -20PC 16�506C.<-4°rT_o 122°Fj, Recommended Temperature: 96c to m-c(32-r.io 860r) Operating,'Humidity(RHj Up:to 100%;condensing COMPLIANCE INFORMATION Storage Conditions -2Ci�C,to,3Q°C(" r tg$65F). Ceftlfications UL.1642,..UL 1741;UL 1973; UI316195%RK non-condensing ;UL 540,,)EEE 154T„UN-38.3, State=of'Energy.(5pE);25Y initial' Gild_Connection Worldwide Compatibility Maximum Elevation 3000 m(9843 ft) Emissions, FCC Part 15 Class'B,ICES Q0- ;Environment ln.door and outdoc rlaW ErSbir6inhiental, R6HS Directive 2011/65/EU EridloWre Type' 3NEMA3R "•Seismic AC156,IEEE'693-20'05(N4h) Ingress Rating IP67-(Battery&Power Elecfronics) IP56'(Wiring Compartment), Wet Locatioh Rating, Yes. .Noise Level,@;1m <�10 dBA at.30cG(36°F): T r= L n TESLA,COM%ENERGY TYPICAL SYSTEM LAYOUTS WHOLE-HOME.BACKUP ;--.--------------`Optiona--------l-- ; Solar FO—I O Solar inverter- Mairi panel Backup.Gateway Utility meter Grid including service disconnect T-8 L R Powerwall Whole Kome� backup, PARTIAL HOME BACKUP ----.------------- -- Optional l Solar 00 ti o.o ;Solar inverter -,-' Sub panel Backup Gateway. Main panel Utility meter Grid n } Powerwall Backup loads' Home loads, T M a L n NA'-BACKUP-2019-06-1T TESLA.COM%ENERGY 06 � H WE � 01 so Solar DEC 1 3 2022 eulLoir�� , Mqf� WUMILD Gregory Sachs, PE 4589 Austin Blvd, (516)-544-4115 Island Park, NY 11558 permitting@empower-solar.com May 12, 2022 To Whom It May Concern: The purpose of this letter is to certify that the existing roof structure located at: 285 Willow Drive,Greenport,NY 11944 can support the additional load of the solar energy system, in addition to wind,snow and gravity. Portions of roof structure covered and not covered with photovoltaic panels are in compliance with R324.4.1.1. Furthermore,it has been determined that the structure complies with the 2020 Residential Code of New York State including the ASCE 7. Please see Table 1 below for specific data relating to the calculations for each roof structure involved in the solar energy system installation. Table 1 Rafter Snow Wind Max Span Layers of Roof Surface (ft) spacing Cross Section Load Speed Kneewall Collar Ties Shingles (in) (psf) (mph) South 1 15.33 16 Nominal 2x8 20 135 No No 1 Sincerely, Gregory Sachs, PE 1 2 3 4 5 e 7 B 9 10 11 12 13 MAXIMUM ESS RATING BASED ON LOCATION(R327.5) EMPOWER SOL LAR INDIVIDUAL ESS UNIT RATING AGGREGATE ESS RATING 4589AUSTIN BLVD IS PARK,NY 11558 0 20 kWh 40 kWh TEL:516-837-3459 FAX:516-706-1789 www.em Power solel- nEawrw"nox o¢aoscn ssaEnosom N w > BASEMENT TESLA POWERWALL SPECS H ^+W1e INDIVIDUAL ESS UNIT RATING QTY. AGGREGATE ESS RATING TSN 14 kWh 2 28 kWh PROFESSIONAL SEAL 0 G �_ DRIVEWAY G TESLA POWERWALL SPACE REQUIREMENTS(R327.3.1) 0 MINIMUM LATERAL WALL SPACE 38" e MINIMUM CLEARANCE FROM LEFT SIDE 2" e MINIMUM CLEARANCE FROM RIGHT SIDE 6" F ❑ ❑ MINIMUM CLEARANCE ABOVE SINGLE POWERWALL 2" F MINIMUM CLEARANCE ABOVE SIDE-BY-SIDE POWERWALLS 12" 10 ROOF LAYOUT MINIMUM CLEARANCE BETWEEN SIDE-BY-SIDE POWERWALLS 10" NOT TO SCALE MAXIMUM HEIGHT ABOVE GROUND 5' E E D BASEMENT LEGEND: D REV: DESCRIPTION: DATE: SERVICE DISCONNECT O MAIN SERVICE PANEL(EXISTING) PROJECT NAME: NOTES: DONGARIS RESIDENCE 5-1 SUBPANEL DATAMONITORING 1. ENERGY STORAGE SYSTEMS(ESS)TO BE INSTALLED WITH CONFORMANCE TO APPLICABLE PROJECT LOCATION: SECTIONS OF R327 AS PER 2020 RESIDENTIAL CODE OF NEW YORK STATE. C 2. ESS LISTED AND LABELED FOR RESIDENTIAL USE IN ACCORDANCE WITH UL 9540. c 285 WILLOW DRIVE 6] TESLA GATEWAY 1p TESLA POWERWALL(INTERIOR,BASEMENT 3.ESS TO BE INSTALLED IN ACCORDANCE WITH THE MANUFACTURER'S INSTRUCTIONS AND GREENPORT,NY 11944 MOUNTED ON 5/8"TYPE X GYPSUM) THEIR LISTING.INDIVIDUAL UNITS MAY HAVE A SEPARATION DIFFERENCE LESS THAN 3' AS PER R327.3.1. PROJECTB: 5466 7❑ PV&ESS DISCONNECT 11 PATH OF TRAVEL TO DISCONNECT FROM 4.ESS TO BE INSTALLED IN STORAGE OR UTILITY SPACE AS PER R327.4. PROJ.PHASE: PERMIT WILLOW DRIVE 5.MAXIMUM INDIVIDUAL ESS UNIT RATING AND AGGREGATE ESS RATING SHALL COMPLY WITH DATE: 05r122022 B REQUIREMENTS OF R327.5. B DESIGNED BY: cc 6.ESS SHALL BE INSTALLED IN ACCORDANCE WITH LISTING AND LABELING REQUIREMENTS AS CHECKED BY: GS PER R327.6. SCALE: NTS 7.ROOMS AND AREAS IN WHICH ESS ARE INSTALLED SHALL BE PROTECTED BY TLE: INTERCONNECTED SMOKE ALARMS IN ACCORDANCE WITH SECTION R-314 AS OUTLINED IN R327.7. ENERGY STORAGE SYSTEM SPECIFICATIONS B.ROOMS AND AREAS CONTAINING ESS SHALL BE PROTECTED ON THE SYSTEM SIDE BY A 5/8-INCH TYPE X GYPSUM IN ACCORDANCE WITH SECTION R327.8 AND R302. A SHEET: 9.ESS INSTALLED IN A LOCATION SUBJECT TO VEHICLE DAMAGE SHALL BE PROTECTED BY APPROVED BARRIERS. S-03 1 2 3 4 5 B 1 B 9 10 11 12 13 T 1 2 3 0 5 8 7 e 9 10 11 12 13 EMPOWER NOTES: S O'L w R 4589 AUSTIN BLVD ISLAND PARK,NY 11558 1.NEUTRAL&GROUND ARE BONDED TOGETHER(ORIGIN OF GEC FOR SOLAR TEL:516-837-3459 ELECTRIC SYSTEM) FAX:516-706-1789 2.GEC FROM SOLAR ELECTRIC SYSTEM BONDED TO EXISTING GEC IN THE MAIN STANDARD INVERTER ASSEMBLY: SERVICE PANEL USING'SPLIT-BOLT CONNECTOR' H 3.IN SOME CASES POWER FOR DATA MONITORING ENCLOSURE MAYBE H11 DERIVED FROM MAIN SERVICE PANEL 4.CONNECT UTILITY SIDE TO PANEL LUGS PROFESSIONAL SEALTEN 5.USE TAP RULES FOR SIZING TAP CONDUCTORS(NEC 240.21) 6.SIZE GEC AND EGC AS PER NEC 250.66,NEC 250.122 RESPECTIVELY — — 7.PROTECT GEC AND EGC SUBJECT TO PHYSICAL DAMAGE AS PER NEC G SOLAR 250.64(B),NEC 250.120(C) G ARRAY 1 B.FINAL SCHEMATIC SPECIFIC TO THIS INSTALLATION AVAILABLE UPON REQUEST INVERTER(S) AC DISCONNECT F F E E STANDARD EXTERIOR INTERCONNECTION: STANDARD INTERIOR INTERCONNECTION: D D REV: DESCRIPTION: DATE: _INTERIOR EXTERIOR INTERIOR EXTERIOR PROJECT NAME ITIA LLC PROJECT LOCATION: c c 285 Willow Drive,Greenport, MAIN SERVICE TAP O 1 BREAKER SERVIMA CE O NY 11944 PANEL ENCLOSURE PANELETTE PANEL PROJECTp UTILITY UTILITY PROJ.PHASE: PERMIT METER METER DATE: B B DESIGNED BY: ED 1 CHECKED BY: GS SCALE: NTS TITLE ELECTRICAL A A SHEET: SE-01 1 2 3 4 5 8, 7 8 9 10 11 12 13 X SUN POWER® Sunftwer®X-Series: X22-370 X22-360 SunPower"' Residential AC Module Built specifically for use with the SunPower Equinox"'system,the only fully integrated solution designed,engineered,and warranted by one manufacturer. Maximum Power. Minimalist Design. ArArAr Industry-leading efficiency means more power and savings AWN-4: per available space.With fewer modules required and hidden microinverters,less is truly more. Highest Lifetime Energy and Savings. L. o' , Designed to deliver 60%more energy over 25 years in real-world conditions like partial shade and high temperatures.' 15040 ___ __ ____________ 409 Fundamentally,:bifferent:; a Arid Better; v 12 Up to >, 11090 60% a ✓y'; ' 10090 more c 90% lifetime T4� � >. SM, s energy A701, 1 f s N °01, 0 5 10 15 20 25 The Sun'Powe'r'dGtaxeonOSalar.Cell+: Years of operation • ;enables highest-efficiency modules available . •,,Unmatched reliabilEty Patented solidrmsetai foundation' Best Reliability. Best Warranty. prevents breakage and corrosion : With more than 25 million modules deployed around " "Kr• ' the world,SunPower technology is proven to last.That's why we stand behind our module and microinverter with the industrys best 25-year Combined Power and ' Product Warranty,including the highest Power Warranty in solar. Factory-inCegratedMicroiriverter ;, 100% Simpler,faster installation 0 9e9s a 0vw ' `lht6grated Wire management,' ,' . v 94% rapid shutdown" E 90% 12% •:,,engineered'and caliorated by, " ; 88% more o t :Sun erfoc_SunRowermodules' , .. power eaw in year 824 0 so9e 25 0 5 10 15 20 25 Years of operation X-Series:X22-370 X22-360 SunPower°Residential AC Module AC Electrical,Data Inverter Model:Enphase IQ 7XS(IQ7XS-96-ACM-US) @240 VAC @208 VAC Peak Output Power 320 VA 320 VA Max.Continuous Output Power 315 VA 315 VA Nom.(L-L)Voltage/Range=(V) 240/211-264 208/183-229 Max.Continuous Output Current(A) 1.31 1.51 Max.Units per 20 A(LL)Branch Circuit3 12(single phase) 10(two pole)Wye CEC Weighted Efficiency 97.5% 97.0% Nom.Frequency 60 Hz Extended Frequency Range 47-68 Hz AC Short Circuit Fault Current Over 3 Cycles 5.8 A rms Overvoltage Class AC Port III AC Port Backfeed Current 18 mA Power Factor Setting 1.0 Power Factor(adjustable) 0.7 lead./ 0.7 lag. No active phase balancing for three-phase installations DC Power Data, Warranties,CEFflftadoris and Compliance SPR-X22-370-E-AC SPR-X22-360-E-AC Warranties 25-year limited power warranty Nominal Power°(Pnom) 370 W 360 W 25-year limited product warranty Power Tolerance +5/-0% +5/-0% UL1703 Certifications UL 1741/IEEE-1547 Module Efficiency` 22.7% 22.1% and UL 1741 AC Module(Type 2 fire rated) Temp.Coef.(Power) -0.29%/°C -0.29%/OC UL 62109-1/IEC 62109-2 Compliance .FCC Part 15 Class B -Three bypass diodes ICES-0003 Class B Shade Tolerance •Integrated module-level maximum CAN/CSA-C22.2 NO.107.1-01 power point tracking CA Rule 21 (UL 1741 SA)' (includes Volt/Var and Reactive Power Priority) Tested Operating ConditionsUL Listed PV Rapid Shutdown Equipment' Operating Temp. -40°F to+140°F(-40°C to+60°C) Enables installation in accordance with: Max.Ambient Temp. 1220F(500C) NEC 690.6(AC module) Max.Load Wind:62 psf,3000 Pa,305 kg/mz front&back NEC 690.12 Rapid Shutdown(inside and outside the array) Snow:125 psf,6000 Pa,611 kg/m2 front NEC 690.15 AC Connectors,690.33(A)-(E)(1) Impact Resistance 1 inch(25 mm)diameter hail at 52 mph(23 m/s) When used with InvisiMount racking and InvisiMount accessories k Mechanical D, (UL 2703): Solar Cells 96 Monocrystalline Maxeon Gen III Module grounding and bonding through InvisiMount Class A fire rated Front Glass High-transmission tempered glass with When used with AC module Q Cables and accessories(UL 6703 and anti-reflective coating UL 2238)6: Environmental Rating Module:Outdoor rated •Rated for load break disconnect Inverter:NEMA Type 6 Class II PID Test Potential-induced degradation free Frame Class 1 black anodized(highest AAMA rating) -•+— - 1558 mrn(bt.3ln.) Weight 42.9 lb(19.5 kg) Recommended Max. Module Spacing 1.3 in.(33 mm) 46 mm 1 SunPower 360 W compared to a conventional module on same-sized arrays(260 W,16% i (t.a in.) efficient,approx.1.6 ml),4%more energy per watt(based on third-party module c Ina racterizationandPVSim),0.75%/yrslowerdegradation(Ca mpeau,Z.eta1."SunPower l i Module Degradation Rate,"SunPower white paper,2013). t046 mm 2 Based or,search ofdatasheet values from websitesof top 10 manufacturers per lHS,asof (41.2frO r�33rnm— january2017. (t.3in.) 3#1rankin"FraunhoferPVDurabilitylnitiativeforSolarModules:Par,3."PViechPower Magazine,2015.Campeau,Z.etal.'Sun?owerModule Degradation Rate,"Sun Powerwhite paper,2013. 393 mm 4Factorysetto1547a-2014defaultsettings.CARule21defaultsettingsprofilesetduring (+S.s(n.) commissioning.Seethe Equinox Installation Guide#518101 for more information. 5 Standard Test Conditions(1000 VV/m'irradiance,AM1.5,25°Q.NRELcalibration 1_____1j standard:SOMS current.ILACCS FF and voltage.All DC voltage is fully contained within the module. t-'b-- 6 This product is UL Listed as PVRSE and conforms with NEC 2014 and NEC 2017 690.12; (17.2 In•) and C22.1-2015 Rule 64-218 Rapid Shutdown of PV Systems,for AC and DC conductors; when installed according to manufacturer's instructions. ne.ewni See more d npower.com/facts se extended facts for more reference information. wrw S V N 1 . 1/ E R@ For more details,see extended datasheet www.sunpower.comldatasheets EO�`^E"' Specifications included in this datasheetare subjectto changewithout notice. LISTED EM330 ©2018 Sun Power Corporation.All Rights Reserved.SUN POWER,the Module FireParforna :Typ,2 SUNPOWERIogo and MAXEON are registered trademarks of SunPower Please read the Safety and Installation Instructions for details. 531945 RevA Corporation in the U.S.and other countries as well.1-800-SUNPOWER. sunpower.com 777 1.212 raw Simple and Fast Installation - ' ' Integrated module-to+aUgrounding ' Pre-assembled mid and end clamps ' Levitating mid clamp for easy placement ' Mid clamp width facilitates consistent,even module spacing ' UL27O3 Listed integrated grounding Flexible Design ' Addresses nearly all sloped residential roofs ' Design in landscape and portrait with upto8' rail span ' Pre-drilled rails and rail splice ' Rails enable easy obstacle management - -------------------- [ustOrneFPrefernsdAestheb[s ' #1 module and#1 mounting aesthetics Elegant Simplicity ' 8est-in'dass system aesthetics ' Premium,low-profile design SUnPOvVerO |DViSiMouOtTM is a SUnPovver-clesigned ' Black anodized components rail-based mounting system.The |nViIiK4OUntsystem ' Hidden mid clamps and new capped,flush addresses residential sloped roofs and combines faster end clamps installation time, design flexibility, and superior aesthetics. Part 0f Superior System The |nv|siMount product was specifically envisioned and ' ' Built for use with SunPowerD[and A[modules engineered to pair with SUDPnVVe[ 000dU|eI The resulting ' Best-in-class system reliability and aesthetics ' New optional rooftop transition flashing,rail- ' system-level approach amplifies the aesthetic and mounted J'box'and wire management rail clips installation benefits—for hODOeOwn2[S and for installers. ' Combine with SunPower modules and SunPmwerEnergyLinkn monitoring app ` SUnpOVVe[.[Om 7 « t 7 ;.;«. ^ ; y,l .'s"fir F,f� p,^h.< 4 #°,J a ', r.9°L•£' •.a 1vi—F, s, ,a+' `.• ,gs 6v' :F "�t .,<R. . .gg"..�.4�:"iFR A'.! .'�'• Rid.•. 7�'P'44 ✓� MM s .-r. ;_ .b .,rw-•w?•"+:�ti,R�' .r::tom>Z.a "� k�^�Fx 5 • Invisimount components Module'/Mid Clamp and Rail Module'/End Clamp and Rail Mid Clamp End Clamp Rail&Rail Splice Ground Lug Assembly(for DC systems only) IM Mid Clamp Black oxide stainless steel 300 series 63 g(2.2 oz) Temperature —40°C to 90°C(-40°F to 194°F) End Clamp Black anodized aluminum 6000 series 110 g(3.88 oz) 3000 Pa uplift Max.Load(LRFD) 6000 Pa downforce Rail Black anodized aluminum 6000 series 830 g/m(9 oz/ft) Rail Splice Aluminum alloy 6000 series 830 g/m(9 oz/ft) Ground Lug 304 stainless steel Roof AtLachment Hardware Supported by DeSign Too! Assembly (A2-70 bolt;tin-plated copper lug) 106.5 g/m(3.75 oz) • Composition Shingle Rafter Attachment Application Composition Shingle Roof Decking Attachment Curved and Flat Tile Roof Attachment Universal interface for other roof attachments Uplift 664lbf Mid Clamp Shear 540lbf • • • Uplift 899 Ibf 25-year product warranty End Clamp Warranties Shear 2201bf 5-year finish warranty Rail Moment:upward 548 Ibf-ft UL 2703 Listed Moment:downward 580 Ibf-ft Certifications Class A Fire Rated Moment:upward S48 Ibf-ft Rail Splice Moment:downward 580 Ibf-ft Uplift 10001bf , L-foot Refer to roof attachment hardware manufacturer's documentation. Shear 3901bf 1 Module frame that is compatible with the InvisiMount system required for hardware interoperability. z SunPower recommends that all Equinoxr",InvisiMount"",and AC module systems always be designed using the SunPower Design Tool.If a designer decides to instead use the component capacities listed in this document to design a system,note that the capacities shown are Load and Resistance Factor Design(LRFD) design loads,and are NOT to be used for Allowable Stress Design(ASD)calculations;and that a licensed Professional Engineer(PE)must then stamp all calculations. Should you have any questions please contact SunPower Technical Support at 1-800-SUNPOWER(1-800-786-7693). sunpower.com ©2017 SunPower Corporation.All Rights Reserved.SUNPOWER,the SUNPOWER logo,EQUINOX,and INVISIMOUNT are trademarks or registered trademarks of SunPower Corporation. 509506 RevE All other trademarks are the property of their respective owners.Specifications included in this datasheet are subject to change without notice. Datasheet POWE ` POWERWALL i Tesla Powerwall is a fully-integrated AC battery system for residential or light commercial use. Its rechargeable lithium- !on battery pack provides energy storage for solar self- ' . .. . ' .. consumption, time-based control, and backup. 4 I ^ Powerwall's electrical interface provides a simple connection to any home or building. Its revolutionary compact design achieves market-leading energy density ''' :., •: and is easy to install. enabling owners to quickly realize the benefits of reliable, clean power. PERFORMANCE SPECIFICATIONS MECHANICAL SPECIFICATIONS AC Voltage(Nominal) 120/240 V Dimensions; 1150 r-im x 753 mm x 147 mm ('45.3 in x 29.6 in x 5.75 In) Feed-In Type Split Phase Weight' 114 kg(251.3 Ibs) Grid Frequency _ 60 Hz Mounting options Floor or wall mount Total Energy' 14 kWh 3Dimensions and weight differ slightly If manufactured before March 2019. Usable Energy' 13.5 kWh Contact Tesia for additional information. Real Power,max continuous 5 kW(charge and discharge) 753 mm 147 mrn (29.o in) (5�5 In) Real Power,peak(10s,off-grid/backup) 7 kW(charge and discharge) f Apparent Power,max continuous 5.8<VA(charge and discharge) Apparent Power,peak(10s,off-grid/backup)7.2 kVA(charge and discharge) T e 0 L H Maximum Supply Fault Current 10 kA Maximum Output Fault Current 32 A �. 1150 mm Overcurrent Protection Device 30 A (45.3 in) Imbalance for Split-Phase Loads 100% Power Factor Output Range +/-1.0 adjustable F ; Power Factor Range(full-rated power) +/-0.85 Internal Battery DC Voltage 50 V Round Trip Efficiency'-' 90% " Warranty 10years Eh,IVIROWIIENTAL SPECIFICATIONS 'Values provided for 25°C(771F),3.3 kW charge/discharge power. 2A.0 to battery to AC,at beginning of life. Operating,Temperature -200C to 500C(-4°F to 122°F) Recommended Temperature 0°C to 300C(320F to 86°F) COMPLIAi`,ICE INFORMATIONOperating Humidity(RH) _ Up to 100Y,cordensing Storage Conditions -20°C to 300C(-4°F to 86°F) Certifications UL 1642,UL 1741,UL 1973. Up to 95%RH,non-condensing UL 9540,IEEE 1547,•UN 38.3 State of Energy(SoE):25%initial Grid Connection Worldwide Compatibility Maximum Elevation 3000 m(9843 ft) Emissions FCC Part 15 Class B.ICES 003 Environment Indoor and outdoor rated Environmental RoHS Dlrect've 2011/65/EU Enclosure Type NEMA.3R Seismic AC156.IEEE 693-2005(high) Ingress Rating IP67(Batter/&Power Electronics) IP56(Wiring Compartment) Wet Location Rating Yes Noise Level @ 1 m < 40 dB at 300C(86°F) T S L n TESLA.COM/ENERGY TYPICAL SYSTEM LAYOUTS WHOLE HOME BACKUP -------------------- ----• Opbonal; ♦ I / SolarFa I i Solar inverter i -------------------------� Main panel Backup Gateway Utility meter Grid including service disconnect T H 5 L n Powerwall Whole home backup PARTIAL HOME BACKUP --------------------------- Optional I ♦ I / Solar Fo Solar inverter -------------------------- F Sub panel Backup Gateway Main panel Utility meter Grid T 9N Lit Powerwall Backup loads Home loads T M E L n NA,-E.=.CKIJP-20 19-05-11 TESL4.COM/ENERGY t 2 3 4 8 8 7 8 9 10 11 12 13 EMPOWER SOLAR 4589 AUSTIN BLVD ISLAND PARK,NY 11558 TEL:516-837-3459 RESIDENTIAL FAX:p er-706-1789 pow www.am sol ar.eom „ SOLAR PROJECT H PROJECT TEAM PERMISSION WRITTEN PROFESSIONALSEAL OWNER: ITIA LLC G G PHONE:(718)784-7490 ENGINEER OF RECORD: F -J t,-tn1� -' SOLAR INSTALLER: GREGORY SACHS,PE F EMPOWER SOLAR _ 4589 AUSTIN BLVD 4589 AUSTIN BLVD ISLAND PARK,NY 11558 ISLAND PARK,NY 11558 PHONE:516-837-3459 E IIr ( t PHONE:516-837-3459 E 1$} c ,1 �285 Willow(N, t t, D _ � Grftnpon.Ni 11944 y p REV. DESCRIPTION: DATE: PROJECT LOCATION DATA: SHEET INDEX: PROJECTNAME: ADDRESS: ST-01 COVER SHEET ITIA LLC 285 Willow Drive,Greenport,NY S-01 EQUIPMENT LOCATIONS 11944 S-02 STRUCTURAL PROJECT LOCATION: D _ t i TS£ SE-01 ELECTRICAL c 285 Willow Drive,Greenport, t--, , NY 11944 jS t 1 gg77yy PROJECTA: _ SCTM:1000-033.00-06.00-009.00OC PROJ.PHASE: PERMW B B DESIGNED BY: ED 1 1 CHECKED BY: GB SCALE: NTS MAP TITLE: COVERSHEET A A SHEET: ST-01 7 2 3 1 5 fi ] 8 9 iD 11 12 13 1 2 3 4 5 8 7 B 9 10 11 12 13 EMPOWER EQUIPMENT LEGEND: S o L w R G G ISLAND PARK,NY 7155E MODULES MAIN SERVICE PANEL TEL 516-837-3459 FAX:516-706-1789 w ww.empower solar.cam H F2] UTILITY METER 6 TESLA POWERWALL 1 SOUTH ROOF-1: " 3 18 SUNPOWER 415W-ACPV PANELS 3❑ INVERTERS 7❑ SUB PANEL TOTAL POWER:7.47 kW PRROFOF SEALESSIONAL.SEALIEN ORIENTATION:164";PITCH:34" SOLAR+BATTERY 8� SERVICE DISCONNECT TYPE 1:FLUSH MOUNT G DISCONNECT SOLAR ACCESS:94 TSRF:94% G F W F E E DRIVEWAY O D J _ D REV. DESCRIPTION: DATE: JPROJECT NAME: SETBACK LEGEND DONGARISRESIOENCE 2 ® 36"CLEAR PATH PROJECT LOCATION, C C 285 WILLOW DRIVE 4 GREENPORT,NY 11944 $ ® 18"RIDGE SETBACK PROJECTM: 5466 PROJ.PHASE' PERMIT 5 4444 ACCESS ROOF DATE: OSH2/2022 B B DESIGNED BY: EO CHECKED BY: GS SCALE: NTS TITLE: 6 EQUIPMENT LOCATIONS A _ ROOF LAYOUT NOT TO SCALE A SHEET. S-01 1 2 3 4 S 6 1 8 9 JB 11 1 12 13 1 2 3 4 5 8 7 e 8 10 11 12 13 EMPOWER SOLAR SUNPOWER MODULES 4M9AUSTP BL1 ISLAND PARK NY 1151558 o ON INVISIMOUNT RACKING TEL:516-837-3459 SHINGLES FAX:516-706-1789 w ww.em power so Iar.eom H RAFTERS H PROFESSIONAL SEALTeN G G F TYPICAL ROOF SECTION F NOT TO SCALE SUNPOWER PANEL SPECS E MODULE POWER(Wdc) QTY MODEL# LENGTH WIDTH DEPTH WEIGHT TABLE S-1.1:MAX.ATTACHMENT SPACING E SPR-415 18 SPR-A-SERIES-AC 72.2" 40.0° 1.57° 46.5 LB PORTRAIT: 5'-4" LANDSCAPE: 8'-0° SPR-E/X-SERIES-AC 61.4" 41.2" 1.81° 42.9 LB NOTES: D 1. TOTAL SYSTEM DC POWER:7.47 kW D REV: DESCRIPTION: DATE: 2.RACKING SYSTEM INSTALLED IN ACCORDANCE WITH CODE-COMPLIANT INSTALLATION PROJECT NAME: MANUAL 3.ATTACHMENTS TO BE SECURED TO ROOF ASSEMBLY USING 5 Trim STAINLESS STEEL SCREWS ITIA LLC AND/OR 5/16"STAINLESS STEEL LAG BOLTS SPACED ACCORDING TO TABLE S-1.1 4.ALL ATTACHMENTS TO ROOF,MOUNTING BRACKETS&HARDWARE MEET OR EXCEED NYS PROJECT LOCATION. c CODE REQUIREMENTS c 285 Willow Drive,Greenporl, 5.INSTALLATION TYPICALLY MAINTAINS 7/8 INCH SPACING BETWEEN MODULES NY 11944 6.SIZES OF STRUCTURAL MEMBERS THAT WERE NOT ACCESSIBLE FOR DIRECT MEASUREMENT ARE BASED ON OBSERVATIONS OF ACCESSIBLE MEMBERS,CONSTRUCTION DEPTH OR PROJECT.: BOTH IN ADDITION TO KNOWLEDGE OF STANDARD CONSTRUCTION PRACTICES AT THE PROD.PHASE PERMIT TIME OF CONSTRUCTION 7.THIS DOCUMENT CERTIFIES THAT THE ROOF STRUCTURE HAS BEEN CHECKED FOR WIND, DATE B B DESIGNED BY: ED SNOW,UNBALANCED SNOW,LIVE AND DEAD LOADS BASED ON ASCE 7-10 CHAPTER 30- CHECKED BY: GS WIND LOADS-COMPONENTS AND CLADDING(C&C)AND FOR CONFORMANCE WITH THE SCALE: NTS 2020 RESIDENTIAL CODE OF NEW YORK STATE.THIS CERTIFICATION DOES NOT APPLY TO TITLE: ANY ADDITIONAL ROOF ALTERATIONS AFTER THE DESCRIBED INSTALLATION 8.THIS ROOF STRUCTURE AS SHOWN IS ADEQUATE TO SUPPORT THE PROPOSED LOADS STRUCTURAL 9.REFER TO STRUCTURAL LETTER FOR SITE SPECIFIC AND ROOF SURFACE DATA A 10.-ENERGY STORAGE SYSTEM INSTALLATION TO CONFORM WITH THE REQUIREMENTS OF THE A SHEET: 2020 RESIDENTIAL CODE OF NEW YORK STATE S-02 1 2 3 d 5 8 / 7 8 9 10 11 12 13 Gregory Sachs, PE 4589 Austin Blvd, (516)-544-4115 Island Park, NY 11558 permitting@empower-solar.com May 12, 2022 To Whom It May Concern: The purpose of this letter is to certify that the existing roof structure located at: 285 Willow Drive,Greenport, NY 11944 can support the additional load of the solar energy system, in addition to wind,snow and gravity. Portions of roof structure covered and not covered with photovoltaic panels are in compliance with R324.4.1.1. Furthermore, it has been determined that the structure complies with the 2020 Residential Code of New York State including the ASCE 7. Please see Table 1 below for specific data relating to the calculations for each roof structure involved in the solar energy system installation.` Table 1 Rafter Snow Wind Roof Surface Max Span spacing Cross Section Load Speed Kneewall Collar Ties Layers of (ft) (in) (psf) (mph) Shingles South 1 15.33 16 Nominal-2x8 20 135 No No 1 Sincerely, Gregory Sachs, PE Y0k SAC 0• N ' 'CFNSE D Pit C 11 12 13 EWOWEP, SOLAR 4589 AUSTIN BLVD ISLAND PARK NY 11558 TEL:516-837-3459 RESIDENTIAL www.o 5cwer-so1789 www.ompcwer-soIar.com -solar.com „ SOLAR PROJECT H REIRIDUCTIO'OR CST IBUT1.x01 Tl DT# PROJECT TEAM: PROFESSIONAL SEAL OWNER:OWNER: ITIA LLC �3j`(O RK G G SAC Jl W PHONE:(718)784-7490 1— • Q Ra ENGINEER OF RECORD: rP •° 'py� `O F low% SOLAR INSTALLER: GREGORY SACHS,PE F EMPOWER SOLAR /CFNSE O PROFF 4589 AUSTIN BLVD tn1e1 QO"a Rd 4589 AUSTIN BLVD ISLAND PARK,NY 11558 totetj D'4 - ISLAND PARK,NY 11558 PHONE:516-837-3459 E ' PHONE:516-837-3459 E v f a 285 Willow Dr, D GSf2Dp0:1,NY 11944 D REV: DESCRIPTION: DATE: PROJECT LOCATION DATA: SHEET INDEX: PROJECT NAME: ADDRESS: ST-01 COVER SHEET ITIA LLC 285 Willow Drive,Greenport,NY S-01 EQUIPMENT LOCATIONS 11944 S-02 STRUCTURAL PROJECT LOCATION: c SE-01 ELECTRICAL c 285 Willow Drive,Greenport, NY 11944 PROJECT#: SCTM:1000-033.00-06.00-009.ODC PROJ.PHASE: PERMIT e c g DESIGNED BY: ED CHECKED BY: GS SCALE: NTS MAP TITLE: COVERSHEET A A SHEET: ST-01 1 2 3 4 5 6 1 8 9 10 11 12 13 1 2 3 4 1 5 1 6 7 e 9 10 11 12 13 J61 EMPOWER EQUIPMENT LEGEND: , SS AOLTA IN w ISLAND MODULES M MAIN SERVICE PANEL TEL:516-837-3459 FAX:516-706 1789 w ww.e me o w or sol a r.eoITT H E-2] UTILITY METER [6] TESLA POWERWALL H sa E SOUTH ROOF-1 3 18 SUNPOWER 415W-ACPV PANELS °"�"`� "�Pft �3 INVERTERS ❑7 SUB PANEL PA F SSIONIL SEAL TOTAL POWER:7.47 kW PROFESSIONAL SEAL E. ORIENTATION:164P;PITCH:34° UNT 4 SO TYPE 1:FLUSH MOLAR+BATTERY 8 SERVICE DISCONNECT Y 0RK G DISCONNECT SOLAR ACCESS:94/o TSRF:94/ G ��� SAC d� O e°1 y W 0' ~ " ¢1 5•e 4, 1 F W ' ' I N> /CFHSF.nT, L.L E E DRIVEWAY O D D REV. DESCRIPTION: DATE: PROJECT NAME: SETBACK LEGEND DONGARIS RESIDENCE 2 ❑ 36"CLEAR PATH PROJECT LOCATION: C C 285VMLLOW DRIVE 4 GREENPORT.NY 119" 8 ® 18"RIDGE SETBACK PROJECT#: 5466 5 ® ACCESS ROOF DATE.PHASE: �PERMIT B B DESIGNED BY: ED CHECKED BY: GS SCALE NTS TITLE.- 6 EOUIPMENTLOCATIONS A ROOFLAYOUT A NOT TO SCALE SHEET: S-01 1 2 3 4 5 6 7 8 9 10 1 11 1 12 13 1 2 3 4 5 6 7 e 9 10 11 12 13 EMPOWER SOLAR 4589 AUSTIIJ BLVD SUNPOWER MODULES ISLAND PARK,NY 11558 o ON INVISIMOUNT RACKING TEL:516-837-3459 SHINGLES FAX:516-706-1789 www.empower-solar.eom H H sae RAFTERS os xis PRIOR SPECIFIC WRITTEN PERMISSION PROFESSIONAL SEAL yYORK*d G G � 41; SAC �1y Ev Q D: 1 e �tl1 w x I y� O P F TYPICAL ROOF SECTION F !� NOT TO SCALE CFNSF.0 PROF SUNPOWER PANEL SPECS E MODULE POWER(Wdc) QTY MODEL# LENGTH WIDTH DEPTH WEIGHT TABLE S-1.1:MAX.ATTACHMENT SPACING E SPR-425 18 SPR-A-SERIES-AC 72.2" 40.0" 1.57" 46.5 LB PORTRAIT: 64" LANDSCAPE: SPR-E/X-SERIES-AC 61.4" 41.2" 1.81" 42.9 LB NOTES: D 1. TOTAL SYSTEM DC POWER:7.47 kW D REV. DESCRIPTION. DATE 2.RACKING SYSTEM INSTALLED IN ACCORDANCE WITH CODE-COMPLIANT INSTALLATION PROJECT NAME: MANUAL 3.ATTACHMENTS TO BE SECURED TO ROOF ASSEMBLY USING 5 mm STAINLESS STEEL SCREWS ITIA LLC AND/OR 5/16"STAINLESS STEEL LAG BOLTS SPACED ACCORDING TO TABLE S-1.1 4.ALL ATTACHMENTS TO ROOF,MOUNTING BRACKETS&HARDWARE MEET OR EXCEED NYS PROJECT LOCATION: c CODE REQUIREMENTS c 285 Willow Drive,Greenport, 5.INSTALLATION TYPICALLY MAINTAINS 7/8 INCH SPACING BETWEEN MODULES NY 11944 6.SIZES OF STRUCTURAL MEMBERS THAT WERE NOT ACCESSIBLE FOR DIRECT MEASUREMENT ARE BASED ON OBSERVATIONS OF ACCESSIBLE MEMBERS,CONSTRUCTION DEPTH OR PROJECT#. BOTH IN ADDITION TO KNOWLEDGE OF STANDARD CONSTRUCTION PRACTICES AT THE PROJ.PHASE: PERMIT TIME OF CONSTRUCTION GATE: B 7.THIS DOCUMENT CERTIFIES THAT THE ROOF STRUCTURE HAS BEEN CHECKED FOR WIND, B DESIGNED BY: ED SNOW,UNBALANCED SNOW,LIVE AND DEAD LOADS BASED ON ASCE 7-10 CHAPTER 30- CHECKED BY: GS WIND LOADS-COMPONENTS AND CLADDING(C&C)AND FOR CONFORMANCE WITH THE SCALE: NTS 2020 RESIDENTIAL CODE OF NEW YORK STATE.THIS CERTIFICATION DOES NOT APPLY TO TITLE ANY ADDITIONAL ROOF ALTERATIONS AFTER THE DESCRIBED INSTALLATION 8.THIS ROOF STRUCTURE AS SHOWN IS ADEQUATE TO SUPPORT THE PROPOSED LOADS STRUCTURAL 9.REFER TO STRUCTURAL LETTER FOR SITE SPECIFIC AND ROOF SURFACE DATA A 10.ENERGY STORAGE SYSTEM INSTALLATION TO CONFORM WITH THE REQUIREMENTS OF THE A SHEET: 2020 RESIDENTIAL CODE OF NEW YORK STATE S-02 1 2 3 41 5 6 7 B 9 10 11 12 13 1 2 3 4 S 6 7 8 9 70 11 12 13 EMPOWER NOTES: SOLAR 4589 AUSTIN BLVD ISLAND PARK NY 11558 1.NEUTRAL&GROUND ARE BONDED TOGETHER(ORIGIN OF GEC FOR SOLAR TEL:516-837-3459 ELECTRIC SYSTEM) FAX:516-706-1789 2.GEC FROM SOLAR ELECTRIC SYSTEM BONDED TO EXISTING GEC IN THE MAIN www.empower-solar.00m STANDARD INVERTER ASSEMBLY: SERVICE PANEL USING'SPLIT-BOLT CONNECTOR' H 3.IN SOME CASES POWER FOR DATA MONITORING ENCLOSURE MAYBE H DERIVED FROM MAIN SERVICE PANELPRIIR SPECIFIC n evEnu ss 0. 4.CONNECT UTILITY SIDE TO PANEL LUGS PROFESSIONAL SEAL E 5.USE TAP RULES FOR SIZING TAP CONDUCTORS(NEC 240.21) 6.SIZE GEC AND EGG AS PER NEC 250.66,NEC 250.122 RESPECTIVELY 7.PROTECT GEC AND EGC SUBJECT TO PHYSICAL DAMAGE AS PER NEC �3 Y O RK � G SOLAR 250.64(B),NEC 250.120(C) G SAC 1 S.FINAL SCHEMATIC SPECIFIC TO THIS INSTALLATION AVAILABLE UPON �� y ARRAY /� REQUEST INVERTER(S) AC DISCONNECT (4p) , 2 ` ogpy�y\o F F FNSFnpRO E E STANDARD EXTERIOR INTERCONNECTION: STANDARD INTERIOR INTERCONNECTION: D D REV. DESCRIPTION: DATE: PROJECT NAME: INTERIOR EXTERIOR INTERIOR EXTERIOR ITIA LLC PROJECT LOCATION: C c 285 Willow Drive,Greenport, MAIN SERVICE TAP O 1 BREAKER SERVIICE OM NY 11944 PANEL ENCLOSURE PANELETTE PANEL PROJECTq. UTILITY UTILITY PROD.PHASE: PERMIT METER METER DATE B B DESIGNED BY: ED 1 CHECKED BY: GS SCALE NTS TITLE ELECTRICAL A A SHEET: SE-01 1 2 3 4 5 6 7 8 9 10 11 12 73 1 2 3 4 5 6 7 e 9 10 11 1 12 13 EMPOWER Y�LI 1 MAXIMUM ESS RATING BASED ON LOCATION(R327.5) SOLAR INDIVIDUAL ESS UNIT RATING AGGREGATE ESS RATING 4589AUSTIN BWD IS PARK NY 1155E 0 20 kWh 40 kWh TEL:516-837-3459 WW W WAXm 5o16-�r-s o 1789 o m H ry TESLA POWERWALL SPECS H ^�OR ........... a.. INDIVIDUAL ESS UNIT RATING QTY. AGGREGATE ESS RATING RIOOR 5`ET.I.— FIC WRITTEN PEX�ss O" 14 kWh 2 28 kWh PROFESSIONAL SEAL G DRIVEWAY G SAC J1 j TESLA POWERWALL SPACE REQUIREMENTS(R327.3.1) p �k'f* ``MINIMUM LATERAL WALL SPACE 38" W co 0 MINIMUM CLEARANCE FROM LEFT SIDE 2" 4 MINIMUM CLEARANCE FROM RIGHT SIDE 6" 7 2 v O P 7 MINIMUM CLEARANCE ABOVE SINGLE POWERWALL 2" PCi •0apq aye F 9 MINIMUM CLEARANCE ABOVE SIDE-BY-SIDE POWERWALLS 12" CF4 SF.D PR04 n s MINIMUM CLEARANCE BETWEEN SIDE-BY-SIDE POWERWALLS 10" 10 1z I MAXIMUM HEIGHT ABOVE GROUND 5' FIRE RATED E ROOF LAYOUT E ROOM IN BASEMENT NOT TO SCALE D D REV: DESCRIPTION: DATE: PROJECT NAME: NOTES: DONGARIS RESIDENCE BASEMENT LEGEND: 1. ENERGY STORAGE SYSTEMS(ESS)TO BE INSTALLED WITH CONFORMANCE TO APPLICABLE PROJECT LOCATION: SECTIONS OF R327 AS PER 2020 RESIDENTIAL CODE OF NEW YORK STATE. C 4❑ SERVICE DISCONNECT �9 DATA MONITORING 2. ESS LISTED AND LABELED FOR RESIDENTIAL USE IN ACCORDANCE WITH UL 9540. D �EENPORTD IVE 3.ESS TO BE INSTALLED IN ACCORDANCE WITH THE MANUFACTURER'S INSTRUCTIONS AND THEIR LISTING.INDIVIDUAL UNITS MAY HAVE A SEPARATION DIFFERENCE LESS THAN 3' F SUBPANEL 1 p TESLA POWERWALL(INTERIOR,BASEMENT AS PER R327.3.1. PROJECTM 5466 MOUNTED CONCRETE FOUNDATION) 4.ESS TO BE INSTALLED IN STORAGE OR UTILITY SPACE AS PER R327.4. PROD.PHASE: PERMIT 5.MAXIMUM INDIVIDUAL ESS UNIT RATING AND AGGREGATE ESS RATING SHALL COMPLY WITH DATE o1A9(2023 B � TESLA GATEWAY 11 PATH OF TRAVEL TO DISCONNECT FROM REQUIREMENTS OF R327.5. a DESIGNED Y: C GS 6.ESS SHALL BE INSTALLED IN ACCORDANCE WITH LISTING AND LABELING REQUIREMENTS AS cHEDICEo BY: Gs WILLOW DRIVE PER R327.6. SCALE: NTS 7❑ PV&ESS DISCONNECT 7.ROOMS AND AREAS IN WHICH ESS ARE INSTALLED SHALL BE PROTECTED BY TITLE: 12 FIRE DETECTOR INTERCONNECTED SMOKE ALARMS IN ACCORDANCE WITH SECTION R-314 AS OUTLINED IN R327.7. ENERGY STORAGE SYSTEM SPECIFICATIONS 8.ROOMS AND AREAS CONTAINING ESS SHALL BE PROTECTED ON THE SYSTEM SIDE BY ^ ❑8 MAIN SERVICE PANEL(EXISTING) 5/8-INCH TYPE X GYPSUM IN ACCORDANCE WITH SECTION R327.8 AND R302. A SHEET: 9.ESS INSTALLED IN A LOCATION SUBJECT TO VEHICLE DAMAGE SHALL BE PROTECTED BY APPROVED BARRIERS. S-03.0 1 2 3 4 5 a 7 a 9 f0 11 1 12 13 1 2 3 4 5 6 7 e 9 10 11 12 13 tl EMPOWER soLwe 4589 AUSTIN BLVD ISLAND PARK NY 1155E TEL:516-837-3459 FAX:516-706-1789 www.e m Po we r-so I r.c o m H 'I.•'�,'. _ H14 cea uc urinuinowgo 01 10, ''`. :2�: CONCRETE PR_III sPE.Fly wa r. G FOUNDATION PROFESSIONAL SEAL EN 4: .i. G — E s T E s L a G SAC Cl o- , ' ti w u SECTION A cM a a♦ o F 1 F \ ` ' IvSr 4� 3 \\ SECTION A ..... .-'A E 4 FIRE RATED ROOM SECTION A E 3/8"=r-0° CROSS SECTION 318"=r-a" D \ D REV: DESCRIPTION: DATE PROJECT NAME: NOTES: DONGARIS RESIDENCE BASEMENT LEGEND: 1. ENERGY STORAGE SYSTEMS(ESS)TO BE INSTALLED WITH CONFORMANCE TO APPLICABLE PROJECT LOCATION: SECTIONS OF R327 AS PER 2020 RESIDENTIAL CODE OF NEW YORK STATE. C FIRE DETECTOR 2. ESS LISTED AND LABELED FOR RESIDENTIAL USE IN ACCORDANCE WITH UL 9540. G G 5WILLOWDRIVE 3. ESS TO BE INSTALLED IN ACCORDANCE WITH THE MANUFACTURERS INSTRUCTIONS AND THEIR LISTING.INDIVIDUAL UNITS MAY HAVE A SEPARATION DIFFERENCE LESS THAN 3' TESLA POWERWALL(INTERIOR,BASEMENT AS PER R327.3.1. PROJECTM 5466 MOUNTED CONCRETE FOUNDATION) 4.ESS TO BE INSTALLED IN STORAGE OR UTILITY SPACE AS PER R327.4. PROD.PHASE: PERMIT 5.MAXIMUM INDIVIDUAL ESS UNIT RATING AND AGGREGATE ESS RATING SHALL COMPLY WITH DATE 011D92023 e REQUIREMENTS OF R327.5. B DESIGNED BY: CC/IV �3 5/8-INCH TYPE X GYPSUM 6.ESS SHALL BE INSTALLED IN ACCORDANCE WITH LISTING AND LABELING REQUIREMENTS AS CHECKED BY: GS PER R327.6. SCALE: 3W ram• 4❑ FIRE RATED DOOR 7.ROOMS AND AREAS IN WHICH ESS ARE INSTALLED SHALL BE PROTECTED BY TITLE INTERCONNECTED SMOKE ALARMS IN ACCORDANCE WITH SECTION R-314 AS OUTLINED IN R327.7. ENERGYSTORAGE LOCATION S.ROOMS AND AREAS CONTAINING ESS SHALL BE PROTECTED ON THE SYSTEM SIDE BY A 5/8-INCH TYPE X GYPSUM IN ACCORDANCE WITH SECTION R327.8 AND R302. A SHEET: 9.ESS INSTALLED IN A LOCATION SUBJECT TO VEHICLE DAMAGE SHALL BE PROTECTED BY APPROVED BARRIERS. S-03.02 1 2 1 3 1 -4 1 5 6 7 B 9 10 1 11 1 12 1 13 POWERWALL Tesla Powerwall is a fully-integrated AC batte s stem for J battery Y residential or light commercial use. Its rechargeable lithium-ion T = 5 L r l battery pack provides energy storage for solar self-consumption-, time-based control, and backup. _ I Powerwall's electrical interface provides a simple connection to' j any home or building. Its revolutionary compact design achieves market-leading energy density and is easy to install,enabling owners to quickly realize the benefits of reliable, clean power. 1 PERFORMANCE SPECIFICATIONS MECHANICAL SPECIFICATIONS AC Voltage(Nominal) 120/240 V Dimensions' 1150 mm x 755 mm x 147 mm Feed-in Type Split Phase (45.3 in x 29.6 in x 5.75 in) Weight' 114 kg(251.3 Ibs) Grid Frequency 60 Hz Mounting options Floor or wall mount Total Energy 14 kWh 'Dimensions and weight differ slightly if manufactured before March 2019. Usable Energy 13.5 kWh Contact Tesla for additional information. 753 mm 147 mm Real Power,max continuous 5 kW(charge and discharge) (29.6 in) (5.75 in) Real Power,peak(10s,off-grid/backup) 7 kW(charge and discharge) Apparent'Power,max continuous 5.8 kVA(charge and discharge) Apparent Power,peak(10s,off-grid/backup) 7.2 kVA(charge and discharge) T e H L R Maximum Supply Fault Current 10 kA Maximum Output Fault Current 32 A Overcurrent Protection Device 30 A 1 (5.mm 45.3 in) Imbalance for Split-Phase Loads 100% Power Factor Output Range +/-1.0 adjustable Power Factor Range(full-rated power) +/-0.85 Internal Battery DC Voltage 50 V Round Trip Efficiency',' 90% Warranty 10years ENVIRONMENTAL SPECIFICATIONS 'Values provided for 25°C(77°F),3.3 kW charge/discharge power. ?In Backup mode,grid charge power is limited to 3.3 kW. Operating Temperature -20°C to 50°C(-4°F to 122°F) 3AC to battery to AC,at beginning of life. Recommended Temperature O°C to 30°C(32°F to 86°F) TYPICAL SYSTEM LAYOUTS WHOLE HOME BACKUP ------------ Optional; � I � Solar ro ' Solar inverter ---------------------- Main panel Backup Gateway Utility meter Grid including service disconnect T=5 L n Powerwall Whole home backup PARTIAL HOME BACKUP ------------------- ---- Optional � I i Solar o 0 0 FO Solar inverter ------------------------ Sub panel Backup Gateway Main panel Utility meter Grid 1 2 3 4 5 6 7 B 9 10 11 12 13 EMPOWER SOLAR 4589AUSTIN BLVD ISLAND PARK,NY 11558 o TEL:516-837-3459 FAX:516-706-1789 TO UTILITY GRID www.empower-solar.com BRANCH BRANCHA H (9)SPR-0i6W MODULES (9)SPR-415W MODULES H TMEPRoPE�Rrr Rusan9FO ms LLcwwrt owe TOTAL DC STC POWER 3.735 kW TOTAL DC STC POWER 3.735 kW REPn...Mom Ono (9)ENPHASE IO7HS MICRO INV (9)ENPHASE IO7H5 MICRO INV NET O vaioa s`PEci�lIc wai,", Eow�.noor TOTALAC POWER:3.456 kW TOTAL AC POWER:3.456 kW ENB PERMISSION METER M PROFESSIONALSEAL CONTINUE AB CONTINUE AS REQUIRED FOR INV.... REQUIRED FOR INV.... AC2 SPECIFIED STRINGING SPECIFIED STRINGING G -1 AC7 G (1)SPR-015WMODULE (1)SPRd15W MODULE (1)ENPHASE MICRO INV.INV.2 (1)ENPHASE MICRO INV.INV.2 AC1 AC1 F 20A GW 150A, F (1)SPR-015W MODULE INV 1 (1)SPR-415W MODULE INV 1 E-30-A } 120/240V (1)ENPHASE MICRO INV. (1)ENPHASE MICRO INV. 150A CB PVS6 NOTES:1 AC1 AC1 E E AC2 D D REV. DESCRIPTION: DATE: PROJECT NAME: LABEL DESCRIPTION LABEL DESCRIPTION DONGARIS RESIDENCE AC1 SPR AC CABLE AC2 2'PVC MSP 200A, (2)#12 AWG (3)#1 AWG 120/240V PROJECT LOCATION: (1)#4 AWG,EGC 150A CB C C ENERGY STORAGE CAPACITY: 2TPW Gmenpork NY 11W POWER 10.OkWAC ENERGY 27.0 kWh PROJECT#: PROJ.PHASE: PERMIT NOTES:' DATE: 01130R023 B 1.MSD IS THE EXPECTED LOCATION OF THE MAIN BONDING JUMPER. B DESIGNED BY: FK ENGINEERING SUPERVISION REQUIRED TO RELOCATE CHECKED BY: 2.PARALLEL CONDUCTORS TO BE INSTALLED AS PER FEEDER TAP RULES.IDEAL SCALE: NTS CONNECTION WILL BE AT DOUBLE LUGS LOCATED AT DEVICE OCPD,HOWEVER,ILL/NBS TITLE' PANEL CONDUCTORS MAYBE TAPPED ONTO CONTINUOUS FEEDER CONDUCTORS FOR GW THREE LINE UTILIZING INSULATION PIERCING TAP CONNECTORS(B-TAPS)(NOTE GW FEEDERS MUST ELECTRICAL SCHEMATIC A BE CONTINUOUS) TOTAL SYSTEM SIZE:7.47 kW A (18)SPR-415W MODULES SHEEP. (18)ENPHASE I07HS MICRO-INV. SE-01.000 1 2 3 4 5 8 7 6 8 10 11 12 13 II . re +p"' G ory Sachs, PE 4589 AuBinB , BUILDING®EPT (516)-544-4115 Island Park, NY 1immofs Un'101-® permittine@empower-solar.com May 12,2022 To Whom It May Concern: The purpose of this letter is to certify that the existing roof structure located at: . 285 Willow Drive,Greenport,NY 11944 can support the additional load of the solar energy system, in addition to wind,snow and gravity. Portions of roof structure covered and not covered with photovoltaic panels are in compliance with R324.4.1.1. Furthermore, it has been determined that the structure complies with the 2020 Residential Code of New York State including the ASCE 7. Please see Table 1 below for specific data relating to the calculations for each roof structure involved in the solar energy system installation. Table 1 Rafter Snow Wind Max Span Layers of Roof Surface (f . spacing Cross Section Load Speed Kneewall Collar Ties Shingles (in) (psf) (mph) South 1 15.33 16 Nominal 2x8 20 135 No No 1 Sincerely, Gregory Sachs, PE OF NEW�o '0(-ZY�D. 'q ,p WLu { 1 2 3 4 5 6 9 10 11 12 13 EMPOWER S 0 L,A'R, 4589 AUSTIN BLVD ISLAND PARK,NY 11558 o TEL:516-837-3459 RESIDENTIAL FAX: 706-1789 www.empowe r-solar.com H SOLAR PROJECT H THE INFORMATION NF RMATIONDISCLCSED HEREIN EIN HO IS THE SOLE PROZED REPRODUOF EMPOWERCTION OR DISTRIBUTION OF THIS PROJECT TEAM. MATER JAL IS STRICTLY PROHIBITED WITHOUT PRIOR SPECIFIC WRITTEN PERMISSION PROFESSIONAL SEAL OWNER: ITIA LLC G G .�P Y CD J I_ PHONE: (718)784-7490 r`�f dRd ENGINEER OF RECORD: F 1nletQpP SOLAR INSTALLER: GREGORY SACHS,PE F m ` EMPOWER SOLAR _ ondFd' 4589 AUSTIN BLVD N(C� mac �n\e�p 4589 AUSTIN-BLVD ISLAND PARK,NY 11558 r", 96 dTO ISLAND PARK,NY 11558 14� 4",'� PHONE:516-837-3459 E PHONE:516-837-3459 E v 0 4 D ,285 Willow Dr,.— 5 1t Greenport;NY 11944' 1 } 1 D REV: DESCRIPTION: DATE: tl PROJECT LOCATION DATA: SHEET INDEX: PROJECT NAME: ADDRESS: ST-01 COVER SHEET ITIA LLC _ 285 Willow Drive,Greenport,NY S-01 EQUIPMENT LOCATIONS 11944 S-02 STRUCTURAL PROJECT LOCATION: c �— 1 SE-01 ELECTRICAL c 285 Willow Drive,Greenport, NY 11944 o, 00, PROJECTM _ SCTM:1000-033.00-06.00-009.000 PROJ.PHASE: PERMIT _ I DATE: B I~�T{ v �_�.� B DESIGNED BY: ED I ` \ CHECKED BY: GS SCALE: NTS MAP TITLE: COVER SHEET A A SHEET: ST-01 1 2 21 4 5 6 7 8 9 10 11 12 13 1 2 3 4 5 6 7 8 9 10 11 12 13 EMPOWER. ' EQUIPMENT.LEGEND: , s 89 w e 4589 AU -A BLVD � MODULES ISLAND PARK, NY 11558 CD 5 MAIN SERVICE PANEL TEL:516-837-345459 FAX:516-706-1789 www.empower-soIar.com UTILITY METER TESLA POWERWALL THE INFORMATION PROPERTY CWERDISCLOSED HEREINISTHESOLE H F-61RIZED H SOUTH ROOF-1: REPRODUCT ONN EDISTRI DISTRIBUTION OF THIS MATERIAL IS STRICTLY PROHIBITED WITHOUT 18 SUNPOWER 415W-ACPV PANELS PRIOR SPECIFIC WRITTEN PERMISSION 3❑ INVERTERS 7❑ SUB PANEL TOTAL POWER:7.47 kW PROFESSIONAL SEAL ORIENTATION:164o;PITCH:34° 4] SOLAR+BATTERY �$ SERVICE DISCONNECT TYPE 1:FLUSH MOUNT G DISCONNECT SOLAR 4ACCESS:94/o G TSRF:94/o e ky J A; : `yC> Lli ry `-✓ ; 4 S , E E DRIVEWAY O D D REV: DESCRIPTION: DATE: JPROJECT NAME: O SETBACK LEGEND DONGARIS RESIDENCE 2Az ' I PROJECT LOCATION: ® 36"CLEAR PATH C C 285 WILLOW DRIVE 4 GREENPORT,NY 11944 8 ®HIM- 18"RIDGE SETBACK PROJECT#: 5466 PROJ.PHASE: PERMIT 5 ® ACCESS ROOF DATE: 05/12/2022 B B DESIGNED BY: ED CHECKED BY: GS SCALE: NTS TITLE: 6 EQUIPMENT LOCATIONS ROOF LAYOUT A A NOT TO SCALE SHEET: S-01 1 2 21 4 5 6 7 8 9 10 11 12 13 1 2 3 4 5 6 7 8 9 10 11 12 13 EMPOWER I I S O LA'R: 4589 AUSTIN BLVD SUNPOWER MODULES ISLAND PARK,NY 11558 o ON INVISIMOUNT RACKING TEL:516-837-3459 SHINGLES FAX:516-706-1789 www.empower-solar.com THE INFORMATION N IS THE SOLE H H PRO ES,LLCAI RW OF EMPOWE DE UNAUTHORIZED RAFTERS REPRODUCTION OR DISTRIBUTION OF THIS MATERIAL IS STRICTLY PROHIBITED WITHOUT PRIOR SPECIFIC WRITTEN PERMISSION PROFESSIONAL SEAL e G G V Y pCID u O F TYPICAL ROOF SECTION . ` LI NOT TO SCALE n���;� SUNPOWER PANEL SPECS t 'YF1Lr- E MODULE POWER(WdC) QTY MODEL# LENGTH WIDTH DEPTH WEIGHT TABLE 8-1-1:MAX.ATTACHMENT SPACING EtSS�� SPR-425 118 SPR-A-SERIES-AC 72.2" 40.0" 1.57" 46.5 LB PORTRAIT: 5'-4" LANDSCAPE: SPR-E/X-SERIES-AC 61.4" 41.2" 1.81" 42.9 LB NOTES: D 1. TOTAL SYSTEM DC POWER:7.47 kW D REV: DESCRIPTION: DATE: 2.RACKING SYSTEM INSTALLED IN ACCORDANCE WITH CODE-COMPLIANT INSTALLATION PROJECT NAME: MANUAL 3.ATTACHMENTS TO BE SECURED TO ROOF ASSEMBLY USING 5 mm STAINLESS STEEL SCREWS ITIA LLC AND/OR 5/16"STAINLESS STEEL LAG BOLTS SPACED ACCORDING TO TABLE S-1.1 4. ALL ATTACHMENTS TO ROOF, MOUNTING BRACKETS & HARDWARE MEET OR EXCEED NYS PROJECT LOCATION: C CODE REQUIREMENTS c 285 Willow Drive,Greenport, 5.INSTALLATION TYPICALLY MAINTAINS 7/8 INCH SPACING BETWEEN MODULES NY 11944 6.SIZES OF STRUCTURAL MEMBERS THAT WERE NOT ACCESSIBLE FOR DIRECT MEASUREMENT ARE BASED ON OBSERVATIONS OF ACCESSIBLE MEMBERS, CONSTRUCTION DEPTH OR PROJECT#. BOTH IN ADDITION TO KNOWLEDGE OF STANDARD CONSTRUCTION PRACTICES AT THE PROJ.PHASE: PERMIT TIME OF CONSTRUCTION DATE: B 7. THIS DOCUMENT CERTIFIES THAT THE ROOF STRUCTURE HAS BEEN CHECKED FOR WIND, B DESIGNED BY: ED SNOW, UNBALANCED SNOW, LIVE AND DEAD LOADS BASED ON ASCE 7-10 CHAPTER 30- CHECKED BY: GS WIND LOADS -COMPONENTS AND CLADDING (C&C)AND FOR CONFORMANCE WITH THE SCALE: NTS 2020 RESIDENTIAL CODE OF NEW YORK STATE.THIS CERTIFICATION DOES NOT APPLY TO TITLE: ANY ADDITIONAL ROOF ALTERATIONS AFTER THE DESCRIBED INSTALLATION 8.THIS ROOF STRUCTURE AS SHOWN IS ADEQUATE TO SUPPORT THE PROPOSED LOADS STRUCTURAL 9.REFER TO STRUCTURAL LETTER FOR SITE SPECIFIC AND ROOF SURFACE DATA A 10.ENERGY STORAGE SYSTEM INSTALLATION TO CONFORM WITH THE REQUIREMENTS OF THE A SHEET: 2020 RESIDENTIAL CODE OF NEW YORK STATE S-02 1 2 3 4 5 6 7 8 9 10 11 12 13 1 2 3 4 5 6 7 8 9 10 11 12 13 'EMPOWER NOTES: s o L w e 4589 AUSTIN BLVD ISLAND PARK,NY 11558 1.NEUTRAL&GROUND ARE BONDED TOGETHER(ORIGIN OF GEC FOR SOLAR TEL:516-837-3459 ELECTRIC SYSTEM) FAX:516-706-1789 2.GEC FROM SOLAR ELECTRIC SYSTEM BONDED TO EXISTING GEC IN THE MAIN www.empower-soIar.eom STANDARD INVERTER ASSEMBLY: SERVICE PANEL USING'SPLIT-BOLT CONNECTOR' H 3.IN SOME CASES POWER FOR DATA MONITORING ENCLOSURE MAYBE H PREOPFRTYOFFM OIVER DISCLOSED uc UNiA1UTHORIZED OF THIS DERIVED FROM MAIN SERVICE PANEL MATERIAL IREPRODUS STRICTLY PROHIB TEDTION ORNWITHOUT 4.CONNECT UTILITY SIDE TO PANEL LUGS PRIOR SPECIFIC WRITTEN PERMISSION 5.USE TAP RULES FOR SIZING TAP CONDUCTORS(NEC 240.21) PROFESSIONAL SEAL 6.SIZE GEC AND EGC AS PER NEC 250.66,NEC 250.122 RESPECTIVELY 7.PROTECT GEC AND EGC SUBJECT TO PHYSICAL DAMAGE AS PER NEC G SOLAR 250.64(B),NEC 250.120(C) G ARRAY 1 8.FINAL SCHEMATIC SPECIFIC TO THIS INSTALLATION AVAILABLE UPON �ti� 0 REQUEST ¢�( D. mac, INVERTER(S) AC lu O�d y DISCONNECT Ll fro {j? F ( iLJ ''-Ess�O E E STANDARD EXTERIOR INTERCONNECTION: STANDARD INTERIOR INTERCONNECTION: D D REV: DESCRIPTION: DATE: PROJECT NAME: INTERIORtENCLOSURE XTERIOR INTERIOR EXTERIOR ITIA LLC PROJECT LOCATION: 285 Willow Drive,Greenport, MAIN BREAKER MAIN c NY 11944 SERVICE PANELETTE SERVICE PANEL PANELPROJECTthUTILITY UTILITY PROD.PHASE: PERMIT METER METER DATE: BB DESIGNED BY: ED CHECKED BY: GS SCALE: NTS TITLE: ELECTRICAL A SHEET: S E-01 1 2 3 4 5 6 7 8 9 10 11 12 13 1 2 3 4 5 6 7 8 9 10 11 12 13 EMPOWER 1 MAXIMUM.ESS RATING BASED ON LOCATION(11327.5) I S'O L-A B INDIVIDUAL ESS UNIT RATING AGGREGATE ESS RATING 4589 AUSTIN BLVD ISLAND PARK,NY 11558 o 20 kWh 40 kWh TEL:516-837-3459 FAX:516-706-1789 Www w.em power-so Iar.com H N IS THE SOLE H PROPERTY OF EhI THE INFORNATION DISCLOSED CES,LLC UNAUTHORIZED REPRODUCTIONLi. TESLA POWERWALL SPECS REPRODUCTION OR DISTRIBUTION OF THIS cl INDIVIDUAL ESS UNIT RATING QTY. AGGREGATE ESS RATING -PRIOR SPECIFIC PER WITHOUT PRIOR SPECIFIC WRITTEN PERMISSION 14 kWh 2 28 kWh PROFESSIONAL SEAL O G � DRIVEWAY G j TESLA POWERWALL SPACE REQUIREMENTS(R327.3.1) 12 MINIMUM LATERAL WALL SPACE 38" FLU+ MINIMUM CLEARANCE FROM LEFT SIDE 2" pk- 4 MINIMUM CLEARANCE FROM RIGHT SIDE 6" Lu 7 MINIMUM CLEARANCE ABOVE SINGLE POWERWALL 2" _z 9 MINIMUM CLEARANCE ABOVE SIDE-BY-SIDE POWERWALLS 12" ;- 6 MINIMUM CLEARANCE BETWEEN SIDE-BY-SIDE POWERWALLS 10" 10 MAXIMUM HEIGHT ABOVE GROUND 5' - _. FIRE RATED r SSG E ROOM IN BASEMENT ROOF LAYOUT E NOT TO SCALE D D REV: DESCRIPTION: DATE: PROJECT NAME: NOTES: DONGARIS RESIDENCE BASEMENT LEGEND: 1. ENERGY STORAGE SYSTEMS(ESS)TO BE INSTALLED WITH CONFORMANCE TO APPLICABLE PROJECT LOCATION: SECTIONS OF R327 AS PER 2020 RESIDENTIAL CODE OF NEW YORK STATE. c 4❑ SERVICE DISCONNECT 2. ESS LISTED AND LABELED FOR RESIDENTIAL USE IN ACCORDANCE WITH UL 9540. C 285 WILLOW DRIVE g DATA MONITORING 3. ESS TO BE INSTALLED IN ACCORDANCE WITH THE MANUFACTURER'S INSTRUCTIONS AND GREENPORT,NY 11944 THEIR LISTING. INDIVIDUAL UNITS MAY HAVE A SEPARATION DIFFERENCE LESS THAN 3' a SUBPANEL 1 p TESLA POWERWALL(INTERIOR,BASEMENT AS PER R327.3.1. PROJECT#: 5466 MOUNTED CONCRETE FOUNDATION) 4.ESS TO BE INSTALLED IN STORAGE OR UTILITY SPACE AS PER R327.4. PROJ.PHASE: PERMIT 5. MAXIMUM INDIVIDUAL ESS UNIT RATING AND AGGREGATE ESS RATING SHALL COMPLY WITH DATE: 01/0 912 02 3 B � TESLA GATEWAY 11 PATH OF TRAVEL TO DISCONNECT FROM REQUIREMENTS OF R327.5. B DESIGNED BY: CCAV 6. ESS SHALL BE INSTALLED IN ACCORDANCE WITH LISTING AND LABELING REQUIREMENTS AS CHECKED BY: GS WILLOW DRIVE PER R327.6. SCALE: NTS ❑7 PV&ESS DISCONNECT 12 FIRE DETECTOR 7.ROOMS AND AREAS IN WHICH ESS ARE INSTALLED SHALL BE PROTECTED BY TITLE: INTERCONNECTED SMOKE ALARMS IN ACCORDANCE WITH SECTION R-314 AS OUTLINED IN R327.7. ENERGY STORAGE SYSTEM SPECIFICATIONS A �8 MAIN SERVICE PANEL(EXISTING) 8.ROOMS AND AREAS CONTAINING ESS SHALL BE PROTECTED ON THE SYSTEM SIDE BY 5/8-INCH TYPE X GYPSUM IN ACCORDANCE WITH SECTION R327.8 AND R302. A SHEET: 9.ESS INSTALLED IN A LOCATION SUBJECT TO VEHICLE DAMAGE SHALL BE PROTECTED BY APPROVED BARRIERS. S703.0 1 2 3 4 5 6 7 8 9 10 11 12 13 1 2 3 4 5 6 7 8 9 10 11 12 13 EMPOWER SOLAR 4589 AUSTIN BLVD ISLAND PARK,NY 11558 o TEL:516-837-3459 FAX:516-706-1789 www.em power-so I ar.com THEINFORMATION DISCLOSED HEREIN IS THE SOLE H • H PROPERTY OFEMPOWERCES,LLC.UNAUTHORQED °' '•• .. . REPRODUCTION OR DISTRIBUTION OF THIS 1 01 21• .°' 1 1 . °+ CONCRETE MATERIAL IS STRICTLY PROHIBITED W THOUT PRIOR SPECIFIC WRITTEN PERMISSION FOUNDATION PROFESSIONAL SEAL . e T E S L A T E S L A 1 Q a2� SECTION A M 'a;:. M CV �OC ` C w F Z 2 \ 3 SECTION AF;:-FcSs�O E 4 FIRE RATED ROOM SECTION A E 3/8°=r-01 CROSS SECTION 3/8"=1'-0° D D REV: DESCRIPTION: DATE PROJECT NAME: NOTES: DONGARIS RESIDENCE BASEMENT LEGEND: 1. ENERGY STORAGE SYSTEMS(ESS)TO BE INSTALLED WITH CONFORMANCE TO APPLICABLE PROJECT LOCATION: SECTIONS OF R327 AS PER 2020 RESIDENTIAL CODE OF NEW YORK STATE. C -112. ESS LISTED AND LABELED FOR RESIDENTIAL USE IN ACCORDANCE WITH UL 9540. C 285 WILLOW DRIVE FIRE DETECTOR 3. ESS TO BE INSTALLED IN ACCORDANCE WITH THE MANUFACTURER'S INSTRUCTIONS AND GREENPORT,NY 11944 THEIR LISTING. INDIVIDUAL UNITS MAY HAVE A SEPARATION DIFFERENCE LESS THAN 3' TESLA POWERWALL(INTERIOR,BASEMENT AS PER R327.3.1. PROJECT#: 5466 MOUNTED CONCRETE FOUNDATION) 4,ESS TO BE INSTALLED IN STORAGE OR UTILITY SPACE AS PER R327.4. PROJ.PHASE: PERMIT 5. MAXIMUM INDIVIDUAL ESS UNIT RATING AND AGGREGATE ESS RATING SHALL COMPLY WITH DATE: 01/09/2023 B 3❑ 5/8-INCH TYPE X GYPSUM REQUIREMENTS OF R327.5. B DESIGNED BY: CC/IV 6. ESS SHALL BE INSTALLED IN ACCORDANCE WITH LISTING AND LABELING REQUIREMENTS AS CHECKED BY: GS PER R327.6. SCALE: 3/8"=P-0" �4 FIRE RATED DOOR 7.ROOMS AND AREAS IN WHICH ESS ARE INSTALLED SHALL BE PROTECTED BY TITLE: INTERCONNECTED SMOKE ALARMS IN ACCORDANCE WITH SECTION R-314 AS OUTLINED IN R3,L7.7. ENERGY STORAGE LOCATION 8.ROOMS AND AREAS CONTAINING ESS SHALL BE PROTECTED ON THE SYSTEM SIDE BY A A 5/8-INCH TYPE X GYPSUM IN ACCORDANCE WITH SECTION R327.8 AND R302. SHEET: 9..ESS INSTALLED IN A LOCATION SUBJECT TO VEHICLE DAMAGE SHALL BE PROTECTED BY APPROVED BARRIERS. S-03.02 1 2 1 3 1 4 1 5 6 1 8 9 10 11 12 13 i X SUN POWER® - SunPowe&X-Series: X22-370 X22-360 .SunPower° Residential AC. Module Built specifically for use with the SunPower Equinox system,the only fully integrated solution designed,engineered,and warranted by one manufacturer. Maximum Power. Minimalist Design. Industry-leading efficiency means more power and savings i/AL4' per available space.With fewer modules required and hidden microinvdrters,less is truly more. Highest Lifetime Energy and Savings. Designed to deliver 60%more energy over 25 years in real-world conditions like partial shade and high temperatures.' 1so% r---------------------------------- 3 1a0% ------------- Fundamentally Different. ; Q 130% j And Better. 2D 12°% Up to >+ 11016 60% ! ! - T - I to 100% more 90% lifetime i v ao% energy odule 70% Conventional m N i i N 60% o s 10 15 20 25 The Sun Power"Maxeon®Solar Cell Years of operation • Enables highest-efficiency modules available 2 • Unmatched reliability' O Best Reliability. Best Warranty. • Patented solid metal foundation ! prevents breakage and corrosion With more than.25 million modules deployed around the world,SunPower technology is proven to last.That's why we stand behind our module and microinverter with the industrys best 25-year Combined Power and i Product Warranty,including the highest Power Warranty ! in solar. Facto ry-integrated Microinverter ; 100% • Simpler,faster installation o 98% m 96% • Integrated wire management, i (D . 94% i rapid shutdown '0 92% 0 90% SunPower 12% I Engineered and calibrated by E ss% more SunPower for SunPower modules -869e Conventional Modulepower c i ea% in year 82% 80% 25 0 5 10 15 20 25 Years of operation X-Series:X22-370 X22-360 SunPower®Residential AC Module AC Electrical Data Inverter Model:Enphase IQ 7XS(IQ7XS-96-ACM-US) @240 VAC @208 VAC Peak Output Power 320 VA 320 VA Max.Continuous Output Power 315 VA 315 VA Nom.(L-L)Voltage/Range'(V) 240/211-264 208/183-229 Max.Continuous Output Current(A) 1.31 1.51 Max.Units per 20 A(LQ Branch Circuit' 12(single phase) 10(two pole)wye CEC Weighted Efficiency 97.5% 97.09'0 Nom.Frequency 60 Hz Extended Frequency Range 47-68 Hz AC Short Circuit Fault Current Over 3 Cycles 5.8 A-rms Overvoltage Class AC Port III AC Port Backfeed Current 18 mA Power Factor Setting 1.0 ' Power Factor(adjustable) 0.7 lead./ 0.7 lag. No active phase balancing for three-phase installations DC P• �, Certifications, • • • SPR-X22-370-E-AC SPR-X22-360-E-AC Warranties 25-year limited power warranty Nominal Power 5(Pnom) 370 W 360 W 25-year limited product warranty Power Tolerance +5/-0% +5/-0% UL 1703 Certifications UL 1741/IEEE-1547 Module Efficiency" 22.7% 22.1% and UL 1741 AC Module(Type 2 fire rated) Temp.Coef.(Power) -0.2996/°C 0.29%/°C Compliance UL 62109-1/IEC 62109-2 FCC Part 15 Class B -Three bypass diodes ICES-0003 Class B Shade Tolerance •Integrated module-level maximum CAN/CSA-C22.2 NO.107.1-01 power point tracking CA Rule 21(UL 1741 SA)'' (includes VolWar and Reactive Power Priority) OperatingTested • • • UL Listed PV Rapid Shutdown Equipment° Operating Temp. -40'F to+140°F(-40°C to+60'C) Max.Ambient Temp. 122oF(50°C). Enables installation in accordance with: •NEC 690.E(AC module) Max.Load Wind:62 psf,3000 Pa,305 kg/mz front&back NEC 690.12 Rapid Shutdown(inside and outside the array) Snow:125 psf,6000 Pa,611 kg/m2 front NEC 690.15 AC Connectors,690.33(A)-(E)(1) Impact Resistance 1 inch(25 mm)diameter hail at 52 mph(23 m/s) When used with InvisiMount racking and InvisiMount accessories Mechanical . (U L 2703): Solar Cells 96 Monocrystalline Maxeon Gen III Module grounding and bonding through InvisiMount Class A fire rated Front Glass High-transmission tempered glass with When used with AC module Q Cables and accessories(UL 6703 and anti-reflective coating UL 2238r: Environmental Rating. Module:Outdoor rated Rated for load break disconnect Inverter:NEMAType 6 Class 11 PI Test Potential-induced degradation free Frame Class 1 black anodized(highest AAMA rating] Weight 42.9 lb(19.5 kg) Recommended Max. 1.3 in.(33 mm) I Module Spacing 46 mm 1 SunPower360 W compared to a conventional module on same-sized arrays(260 W.16% efficient,approx.1.6 m'),4%more energy per watt(based on thlyd-party module characterization and PVSIm),0.75%/yr slower degradation(Campeau,Z.et al."SunPower Module Degradation Rate,"SunPower white paper,2013). 1046nnM —( 3omm� 2 Based on search of datasheetvalues from websltes oftop 10 manufacturers per IHS,as of (41.2 in.) 1'"(121a) January 2017. EIA 3#1 rank in"FraunhoferPV Durability Initiative for5olarModules:Part3:•PVrechPower TF— Magazine,2015.Campeau,Z.etal."Sun Power Module Degradation Rate,"Sun Powerwhite I paper,2013: 3�s mm• 4 Factory setto 1 547a-2014 default settings.CA Rule 21 default settings profile setcluring '(tsSiri.) • commissioning.See the Equinox Installation Guide#518101 for more information. I 5 Standard Test Conditions(1000 W/mz irradiance,AM1.5,25°C).NRELcalibration standard:SOMS current,LACCS FF and voltage.All DC voltage is fully contained within the module. _� -437mm 6 This product is UL Listed as PVRSE and conforms with NEC 2014 and NEC 2017 690.12; (17.21n.) and C22.1-2015 Rule 64.218 Rapid Shutdown or PV Systems,for AC and DC conductors; when installed according to manufacturer's instructions. Kc c®aRarmmv See wwwmore details, se extended for morashes ferencewww.su information. �� r,okos.nmMr, � � � �O� r n For more details,see extended da[asheet www.sunpower.com/datashee[s C K Specifications included inthis datasheet are subject to change without notice. LISTED u>e�0 02018 Sun Power,Corporation.All Rights Reserved.SUN POWER,the NIor54e Fee PeA--:Type 2 SUN POWERIogo and M AXE ON are registered trademai ks of SunPower Please read the safety and Installation Instructions for details. 531945 RevA Corporation in the U.S.and other countries as well.1-800-SUNPOWER. sunpower.com ti I Simple and Fast Installation - integrated module-to-rail grounding ' Pre-assembled mid and end clamps ` Levitating mid clamp for easy placement Mid clamp width facilitates consistent,even ! module spacing _-_-= -_-_ - _ -- �_ - - - .?•� UL 2703 Listed integrated grounding — - ; Flexible Design � r Addresses nearly all sloped residential roofs ` -- i Design in landscape and portrait with up to 8' rail span i' Pre-drilled rails and rail splice *� i Rails enable easy obstacle management I Customer-Preferred Aesthetics #1 module and#1 mounting aesthetics' Elegant Simplicity Best-in-class system aesthetics I SunPower° InvisiMountTm is a SunPower-designed I Premium,low-profile design g Black anodized components rail-based mounting system.The InvisiMount system Hidden mid clamps and new capped,flush addresses residential sloped roofs and combines faster end clamps i installation time, design flexibility, and superior aesthetics. I Part of Superior System I The InvisiMount product was specifically envisioned and Built for use with SunPower DC and AC modules Best-in-class system reliability and aesthetics i engineered to pair with SunPower modules.The resulting New optional rooftop transition flashing,rail i system-level approach amplifies the aesthetic and mounted J box,and wire management rail clips installation benefits—for homeowners and for installers. Combine with SunPower modules and i SunPower EnergyLink®monitoring app sunpower.com i =l�lulll�l��l�l�l�lll rt '' r •3 d .r � . 1.611 MR . . • • • InvisiM •A)qt Cornponen,s Module'/Mid Clamp and Rail Module'/End Clamp and Rail Mid Clamp End Clamp Rail&Rail Splice Ground Lug Assembly(forX systems only) Aw - InvisiMount Component Details Invisi!Vlount Operating Conditions Mid Clamp Black oxide stainless steel 300 series 63 g(2.2 oz) Temperature -40°C to 90'C(-40o F to"940 F) End Clamp Black anodized aluminum 6000 series 110 g(3.88 oz) • 3000 Pa uplift Max.Load(LRFD) 6000 Pa downforce Rail Black anodized aluminum 6000 series 830 g/m(9 oz/ft) Rail Splice Aluminum alloy 6000 series 830 g/m(9 oz/ft) Ground Lug 304 stainless steel 'Roof Supported ° Design Tool Assembly (A2-70 bolt;tin-plated copper lug) 106.5 g/m(3.75 oz) • Composition Shingle Rafter Attachment Application Composition Shingle Roof Decking Attachment Curved and Flat Tile Roof Attachment Universal interface for other roof attachments Mid Clamp Uplift 664 Ibf Shear 5401bf lrwis'MountWarrantiesAnd Certifications Uplift 899 Ibf 25-year product warranty End Clamp Warranties Shear 220 Ibf 5-year finish warranty Rail Moment:upward 548 Ibf-ft UL 2703 Listed _ Moment:downward 580lbf-ft Certifications • Class A Fire Rated Rail Splice Moment:upward 548 Ibf-ft Moment:downward 580 Ibf-ft Roof Attachment Hardware Uplift 1000 Ibf L-foot Shear 3901bf Refer to roof attachment hardware manufacturer's documentation. ' 1 Module frame that is compatible with the InvisiMount system required for hardware interoperability. z SunPower recommends that all Equinox'"',InvisiMountTh1,and AC module systems always be designed using the SunPower Design Tool.If a designer decides to instead use the component capacities listed in this document to design a system,note that the capacities shown are Load and Resistance Factor Design(LRFD) design loads,and are NOT to be used for Allowable Stress Design(ASD)calculations;and that a licensed Professional Engineer(PE)must then stamp all calculations. Should you have any questions please contact SunPower Technical Support at 1-800-SUNPOWER(1-800-786-7693). sunpower.com (0 2017 SunPower Corporation.All Rights Reserved.SUNPOWER,the SUNPOWER logo,EQUINOX,and INVISIMOUNT are trademarks or registered trademarks of SunPower Corporation. 509506 RevE All other trademarks are the property of their respective owners.Specifications included in this datasheet are subject to change without notice. Datasheet S U N POWEU POWERWALL Tesla Powerwall is a fully-integrated AC battery system for . Fi residential or light commercial use. Its rechargeable lithium-ion T = L battery pack provides energy storage for solar self-consumption, time-based control, and backup. ' Powerwall's electrical interface provides a simple connection to any home or building. Its revolutionary compact design achieves market-leading energy density and is easy to install,enabling owners to quickly realize the benefits of reliable, clean power. I • PERFORMANCE SPECIFICATIONS MECHANICAL SPECIFICATIONS -- — --- ----------- —.—---------..__._............. ----...-- ---— ---- AC Voltage(Nominal) 120/240 V Dimensions' 1150 mm x 755 mm x 147 mm -- -- -- --__...__.._._.__.._...................._._........_._......- -.-....._._......-.._..-- -- (45.3 in x 29.6 in x 5.75 in) Feed-In Type Split Phase -_._..__...._..-................._.._.... _._----.--...-_...--_-------.-_-.._._..-----._.._._._..-_._..--.---- -----.------------------------------- Weight' 114 kg(251.3lbs) Grid Frequency 60 Hz -- ----- ---_.---_..-_-._.............._.___-_.__— Mounting options Floor or wall mount TotalEnergy 14 kWh -----......---............................................._...._......_..-.__... -..:--- - -._.._:_.._....__...__................... ---------------- ---- ------ 'Dimensions and weight differ slightly if manufactured before March 2019. Usable Energy 13.5 kWh Contact Tesla for additional information. Real Power,max continuous - 5 kW(charge and discharge) 753 mm 147 mm (29.6 in) (5.75 in) Real Power,peak(10s,off-grid/backup) 7 kW(charge and discharge) ---- -- -- - -----........_.. Apparent Power,max continuous 5.8 kVA(charge and discharge) Apparent Power,peak(10s,off-grid/backup) 7.2 kVA(charge and discharge) T M L q Maximum Supply Fault Current 10 kA ---- - -- ---- ----.._..._.........__.-.. Maximum Output Fault Current 32 A -- -- 1150 mm Overcurrent Protection Device 30 A (45.3 in) ----------._.._.._._..._.__.._..__.._......-_..._....---......... ------...---._...--'-- Imbalance for Split-Phase Loads 100% Power Factor Output Range +/-1.0 adiustable Power Factor Range(full-rated power) +/-0.85 Internal Battery DC Voltage 50 V - - ...........--------- --- ---------------...._......._.._.............._...._...__..._ Round Trip Efficiency'•3 90% Warranty 10years ENVIRONMENTAL SPECIFICATIONS ---- -------....__--------..._.-------..__....._....----- ........_..._._........._._......_.............._.... 'Values provided for 25°C(77F).3.3 kW charge/discharge power. ----'- ---- --- - -- - 2In Backup mode,grid charge power is limited to 3.3 kW. Operating Temperature -200C to 50`C(74.oF to 122°F) 3AC to battery to AC,at beginning of life. Recommended Temperature 0°C to 30°C(32°F to 86°F) Operating Humidity(RH) Up to 100%,condensing COMPLIANCE INFORMATION --_-._—._......_.._.................__............_..._.__...___---.---.--..-.--_.......... _..__._.._ Storage Conditions -20°C to 30°C(-4°F to 86°F) --- --._.._.....__-_.._-._..._.... -......_._....._....................... _. ---- Certifications UL 1642,UL 1741,UL 1973, Up to 95%RH,non-condensing UL 9540,IEEE 1547.UN 38.3 State of Energy(SoE):25%initial -- - -... Grid Connection Worldwide Compatibility Maximum Elevation 3000 m(9843 ft) _....._.............. -_.........................._....._......_....._............... -..- ---................................._..........._ Emissions FCC Part 15 Class B,ICES 003 Environment Indoor and outdoor rated Environmental RoHS Directive 2011/65/EU Enclosure Type NEMA 31? --...---- -._......_._._...... -- --- -- ---- ---...._._......................- -- --._...-_......................_................- _.._..__........._......- -._.._....._..__—_... Seismic AC156,IEEE 693-2005(high) Ingress Rating IP67(Battery&Power Electronics) -- .-.....-...--.------ IP56(Wiring Compartment) ._.......-..... _- Wet Location Rating Yes Noise Level C 1m < 40 dBA at 30°C(86°F) T = S L n TESLA.COM/ENERGY TYPICAL SYSTEM LAYOUTS WHOLE HOME BACKUP ----------------------- Optional; � I � Solar F-1 ❑o ' Solar inverter '------------------------ Main panel Backup Gateway Utility meter Grid including service disconnect T=5 L'n Powerwall Whole home backup PARTIAL HOME BACKUP ---------------------- Optional � I i Solar O Solar inverter ----------------------- Sub panel Backup Gateway Main panel Utility meter Grid T c 5 L R O Powerwall Backup loads Home loads T =.5 L n NA-BACKUP-2019-06-11 TESLA.COM/ENERGY 1 2 3 4 5 5 7 8 9 10 11 12 13 EMPOWER I SOLAR 4589 AUSTIN BLVD ISLAND PARK,NY 11558 TEL:516-837-3459 FAX:51 6-706-1789 TO UTILITY GRID ww w,e m Po we r-so l a r.c o m BRANCH B BRANCH A H (9)SPR415W MODULES (9)SPR-415W MODULES H 1NE 6YreNW1 NN OSMOSEg E HE IRIS SOLE TOTAL DC STC POWER 3.735 kW TOTAL DC STC POWER:3.735 kW o TaooacTlON oR OISTRIaa or TNIs (9)ENPHASE 107HS MICRO INN (9)ENPHASE 1Q7HS MICRO INV NET NATERIALE SPECIFIC WITHOUT TOTAL AC POWER:3.456 kW TOTAL AC POWER:3.456 kW O PRIORSSIONAL I METER M PROFESSIONAL SEAL TEN CONTINUE AS CONTINUEAS REQUIRED FOR INV.... REQUIRED FOR INV.... AC2 SPECIFIED STRINGING SPECIFIED STRINGING G AC1 ACi G (1)SPR415W MODULE (1)SFR-415W MODULE (1)ENPHASE MICRO INV.INV.2 (1)ENPHASE MICRO INV.INV.2 ACT +ACI \, F --__\\fill zDA .G.W�150A F (1)SPR415W MODULE 20A -�lIZO/`24OV (1)ENPHASE MICRO INV.INV.1 INV.1 150A CB PVS6 NOTES:1 20A AC1 30A E 30A E A62 D - D REV: DESCRIPTION: DATE: PROJECT NAME: LABEL DESCRIPTION LABEL DESCRIPTION m AC1 SPR AC CABLE AC2 2"PVC MSP 1 e DONGARIS RESIDENCE (2)N12AWG (3#I'AWG OOA, �� yr• (1�AWG,EGC �L�u(1,p2(q PROJECT LOCATION: C C 285i11 ENERGY STORAGE CAPACITY: 2 TPW Greenpptt.N NY 119 11944 POWER 10.0 kWAC ENERGY 27.0 kWh PROJECTN: PROD.PHASE: PERMIT NOTES: DATE: 01/302023 B 1.MSD IS THE EXPECTED LOCATION OF THE MAIN BONDING JUMPER. B DESIGNED BY. FK ENGINEERING SUPERVISION REQUIRED TO RELOCATE CHECKED BY: X% 2.PARALLEL CONDUCTORS TO BE INSTALLED AS PER FEEDER TAP RULES.IDEAL SCALE: NTS CONNECTION WILL BE AT DOUBLE LUGS LOCATED AT DEVICE OCPD,HOWEVER,ILL/NBS TITLE: PANEL CONDUCTORS MAYBE TAPPED ONTO CONTINUOUS FEEDER CONDUCTORS FOR GW THREE LINE UTILIZING INSULATION PIERCING TAP CONNECTORS(B-TAPS)(NOTE GW FEEDERS MUST ELECTRICAL SCHEMATIC A BE CONTINUOUS) TOTAL SYSTEM SIZE:7.47 kW A (18)SPR-415W MODULES SHEET: (18)ENPHASE IQ7HS MICRO-INV. SE-01.000 1 2 3 4 5 5 7 8 9 W 11 12 13 - 1 2 3 4 5 6 7 8 9 10 11 12 13 EMPOWER Y�LI MAXIMUM ESS RATING BASED ON LOCATION(R327.5) SOLAR INDIVIDUAL ESS UNIT RATING AGGREGATE ESS RATING 4589AUSTIN BWD ISLAND PARK NY 11558 0 20 kWh 40 kWh TEL:516-837-3459 FAX:516-706-1789 Lu www.empower-so lar.com H TESLA POWERWALL SPECS H s nieunoe or rfl�s INDIVIDUAL ESS UNIT RATING QTY. AGGREGATE ESS RATING MATERIAL P'ofl�WRITTEN PERMISSION PRIOR 15 ST IC WT T N.— T.- 14 kWh 2 28 kWh PRUESSIONALSEAL O Y F.,� O R/f*& G —� DRIVEWAY G a SAC 3 TESLA POWERWALL SPACE REQUIREMENTS(R327.3.1) p �A` 12 MINIMUM LATERAL WALL SPACE 38" W '-414 „ 1 K ire D MINIMUM CLEARANCE FROM LEFT SIDE 2" r Q MINIMUM CLEARANCE FROM RIGHT SIDE 6" top s '"i 2 q O IF9 MINIMUM CLEARANCE ABOVE SINGLE POWERWALL 2" F (,C ! p0a 4cv 9 , MINIMUM CLEARANCE ABOVE SIDE-BY-SIDE POWERWALLS 12" FNSFD PROF it B MINIMUM CLEARANCE BETWEEN SIDE-BY-SIDE POWERWALLS 10" 10 MAXIMUM HEIGHT ABOVE GROUND 5' FIRE RATED E ROOF LAYOUT E ROOM IN BASEMENT NOT TO SCALE D D REV: DESCRIPTION: DATE: PROJECT NAME: NOTES: DONGARIS RESIDENCE BASEMENT LEGEND: 1. ENERGY STORAGE SYSTEMS(ESS)TO BE INSTALLED WITH CONFORMANCE TO APPLICABLE PROJECT LOCATION: SECTIONS OF R327 AS PER 2020 RESIDENTIAL CODE OF NEW YORK STATE. D 4❑ SERVICE DISCONNECT DATA MONITORING 2. ESS LISTED AND LABELED FOR RESIDENTIAL USE IN ACCORDANCE WITH UL 9540. D �ENPOWDRI 11944 3.ESS TO BE INSTALLED IN ACCORDANCE WITH THE MANUFACTURER'S INSTRUCTIONS AND THEIR LISTING.INDIVIDUAL UNITS MAY HAVE A SEPARATION DIFFERENCE LESS THAN 3' ❑5 SUBPANEL 1 p TESLA POWERWALL(INTERIOR,BASEMENT AS PER R327.3.1. PROJECTM 5466 MOUNTED CONCRETE FOUNDATION) 4.ESS TO BE INSTALLED IN STORAGE OR UTILITY SPACE AS PER R327.4. PROJ.PHASE: PERMIT 5.MAXIMUM INDIVIDUAL ESS UNIT RATING AND AGGREGATE ESS RATING SHALL COMPLY WITH DATE: 01109r2m tIv B ❑6 6.ES TESLA GATEWAY 11 PATH OF TRAVEL TO DISCONNECT FROM REQUIREMENTS OF R327.5. B DESIGNED CC S SHALL BE INSTALLED IN ACCORDANCE WITH LISTING AND LABELING REQUIREMENTS AS CHECKED BY:Y: GS WILLOW DRIVE PER R327.6. SCALE: NTS 7❑ PV&ESS DISCONNECT 7.ROOMS AND AREAS IN WHICH ESS ARE INSTALLED SHALL BE PROTECTED BY TITLE: 12 FIRE DETECTOR INTERCONNECTED SMOKE ALARMS IN ACCORDANCE WITH SECTION R-314 AS OUTLINED ENERGY STORAGE IN R327.7. SYSTEM SPECIFICATIONS 8.ROOMS AND AREAS CONTAINING ESS SHALL BE PROTECTED ON THE SYSTEM SIDE BY A �8 MAIN SERVICE PANEL(EXISTING) 5/8-INCH TYPE X GYPSUM IN ACCORDANCE WITH SECTION R327.8 AND R302. A SHEET: 9.ESS INSTALLED IN A LOCATION SUBJECT TO VEHICLE DAMAGE SHALL BE PROTECTED BY APPROVED BARRIERS. S-03.0 i 2 3 1 5 1 6 1 7 8 9 10 11 12 13 1 2 3 a 5 6 T 8 9 10 11 12 13 EMPOWER SOLAR 4589 AUSTIN BIV0 ISLAND PARK,NY 11558 o TEL:516-837-3459 FAX:516-706-1789 ! TO UTILITY GRID www-empower-s°Iar.cam BRANCH B BRANCH A H (9)SPRA15W MODULES (9)SPR-415W MODULES H noF Eu owEncEs uc uwvwo a TOTAL DC STC POWER:3.735 kW TOTAL DC STC POWER:3.735 kW 11 (9)ENPHASE 107HS MICRO INV (9)ENPHASE 107HS MICRO INV NET O Eo;a SPEc�':ic'WRITTEnavEw�is";» TOTAL AC POWER'3.456 kW TOTAL AC POWER:3.456 MN M METER PROFESSIONAL SEAL CONTINUE AS CONRNUEAS REQUIRED FOR INV.... REQUIRED FOR INV.... AC2 SPECIFIED STRINGING SPECIFIED STRINGING O AC7 AC1 G (I)SPRA15W MODULE ;ACI ULE (1)ENPHASE MICRO INV.INV.2 O INV.INV.2 AC7C7F 2DA GW 150A, F (1)SPR-415W MODULE DULE 20A - 120/240V (1)ENPHASE MICRO INV.INV. O INV.INV'1 150A CB NOTES:1 20AAC1C1 30A E 30A E AC2 D \ D REV DESCRIPTION: DATE: LABEL DESCRIPTION LABEL DESCRIPTION PROJECT NAME: DONGARIS RESIDENCE AC1 SPR AC CABLE AC2 2'P- MSP 200A, (2)k12 AWG (3)$$1 AWG 120!240V PROJECT LOCATION C (1)H4 AWG,EGC 150A CB C 209 WM—Ddva ENERGY STORAGE CAPACITY: 2 TPW creaAP°n.NY 11894 POWER 10.0 kWAC ENERGY 27.0 kWh PROJECTM PROJ.PHASE: PERMIT NOTES: DATE: 0V302023 B 1.MSD IS THE EXPECTED LOCATION OF THE MAIN BONDING JUMPER. B DESIGNED BY: FK ENGINEERING SUPERVISION REQUIRED TO RELOCATE CHECKED BY: M 2 PARALLEL CONDUCTORS TO BE INSTALLED AS PER FEEDER TAP RULES.IDEAL SCALE' NTS CONNECTION WILL BE AT DOUBLE LUGS LOCATED AT DEVICE OCPD,HOWEVER,ILL!NBS TITLE: PANEL CONDUCTORS MAYBE TAPPED ONTO CONTINUOUS FEEDER CONDUCTORS FOR GW THREE LINE UTILIZING INSULATION PIERCING TAP CONNECTORS(B-TAPS)(NOTE GW FEEDERS MUST ELECTRICAL SCHEMATIC BE CONTINUOUS) TOTAL SYSTEM SIZE:7.47 kW A (18)SPR-415W MODULES A SHEET: (18)ENPHASE 1Q7HS MICRO-INV. SE-01.000 1 2 3 4 5 6 7 e 9 10 11 12 13 1 2 3 4 5 6 7 8 9 10 11 12 13 TO UTILITY GRID EMPOWER BRANCH B BRANCH A S O L A R (8)SPR415W MODULES (10)SPR-415W MODULES TOTAL DC STC POWER:3.32 kW TOTAL DC STC POWER:4.15 kW AUSTIN Y 11558 (8)ENPHASE IQ7HS MICRO INV (10)ENPHASE IQ7HS MICRO INV ISLAND PARK,NET o O TEL:516-837-345459 TOTAL AC POWER:3.072 kW TOTAL AC POWER:3.84 kW METER FAX:516-706-1789 CONTINUEAS CONTINUEAS www.empower-solar.com REQUIRED FOR INV.... REQUIRED FOR INV.... SPECIFIED STRINGING SPECIFIED STRINGING THE INFORMATION DISCLOSED HEREIN IS THE SOLE H MSD 200A, A Io H PROPERTY OF EMPOWER CES,LLC.UNAUTHORIZED AC1 AC1 AC2 120/240V •/+7� REPRODUCTION OR DISTRIBUTION OF THIS /� -ply/ MATERIAL IS STRICTLY PROHIBITED WITHOUT 200A CB , l y/OV4 N PRIOR SPECIFIC WRITTEN PERMISSION �/ W PROFESSIONAL SEAL (1)SPR415W MODULE (1)SPR-415W MODULE NOTES:1,2 (1)ENPHASE MICRO INV. INV.2 (1)ENPHASE MICRO INV. INV.2 G AC1 AC1 G 1 GW 200A, . (1)SPR-415W MODULE (1)SPR-415W MODULE AC2 - 120/240V (1)ENPHASE MICRO INV. INV.1 (1)ENPHASE MICRO INV. INV_1 B 1X �� AC1 AC1 AC2 F F 20A v 20A AC2 1 TESLA /) — POWERWALL OA —� E TESLA `r �- 30A POWERWALL CqtW;Wg y � G 9ANA PANEL ILL/NBS PANEL _ 200A, 120/240V 120/240V 200A CB n120/240V D (/ sO 0- D REV: DESCRIPTION: - DATE: � • ENERGY STORAGE CAPACITY: 2 TPW PROJECT NAME: LABEL DESCRIPTION LABEL DESCRIPTION j� POWER 10.0 kWAC DONGARIS RESIDENCE AC1 SPR AC CABLE AC2 2"PVC ENERGY 27.0 kWh (2)#10 AWG AWG 1 ! PROJECT LOCATION: (1))# A6 AWG,EGC C C 285 Willow Drive Greenport,NY 11944 PROJECT#: PROJ.PHASE: PERMIT NOTES: DATE: 07/21/2022 B 1. MSD IS THE EXPECTED LOCATION OF THE MAIN BONDING JUMPER. B DESIGNED BY: IV ENGINEERING SUPERVISION REQUIRED TO RELOCATE CHECKED BY: xx 2. PARALLEL CONDUCTORS TO BE INSTALLED AS PER FEEDER TAP RULES. IDEAL SCALE: NTS CONNECTION WILL BE AT DOUBLE LUGS LOCATED AT DEVICE OCPD, HOWEVER, ILL/NBS TITLE: PANEL CONDUCTORS MAYBE TAPPED ONTO CONTINUOUS FEEDER CONDUCTORS FOR GW THREE LINE UTILIZING INSULATION PIERCING TAP CONNECTORS (B-TAPS) (NOTE GW FEEDERS MUST ELECTRICAL SCHEMATIC A BE CONTINUOUS) TOTAL SYSTEM SIZE: 7.47 kW A (18)SPR-415W MODULES SHEET: (18) ENPHASE IQ7HS MICRO-INV. SE-01 .000 1 2 3 4 5 6 7 8 9 10 11 12 13 Gregory Sachs, P,E 4589 Austin Blvd, (.516)-544-4115 Island Park, NY 11558 permitting@empower-solar.com May 12, 2022 To Whom-It May Concern: The purpose of this letter is to certify that the existing roof structure located at: 285 Willow Drive, Greenport, NY 11944 can support the additional load of the solar energy system, in addition to wind, snow and gravity. Portions of roof structure covered and not covered with photovoltaic panels are in compliance with R324.4.1.1. Furthermore, it has been determined that the structure complies with the 2020 Residential Code of New York State including the ASCE 7. Please see Table 1 below for specific data relating to the calculations for each roof structure involved in the solar energy system installation. Table 1 Rafter Snow Wind Max Span Layers of Roof Surface spacing Cross Section Load Speed Kneewall Collar Ties Shingles (in) (psf) (mph) r771 15.33 16 Nominal 2x8 20 135 No No 1 Sincerely, Gregory Sachs,.PE sic •� 01 I(t . " a ry G� ov`D C= PV �. 0 0 1 2 3 4 5 6 1 8 9 10 11 12 13 EMPOWER SOLAR 4589 AUSTIN BLVD ISLAND PARK,NY 11558 o TEL:516-837-3459 RESIDENTIAL I 516-706-1789 FAX: e mpower-solar.cam H SOLAR PROJECT H ROPER OF EMPOWEROSSEDHE UINNSTHESOLE REPRODUCTION OR DISTRIBUTION OF THIS PROJECT TEAM. MATERIAL IS STRICTLY PROHIBITED WITHOUT PRIOR SPECIFIC WRITTEN PERMISSION PROFESSIONAL SEAL OWNER: ITIA LLC 4 Y.0Rk G G ' SAC_ $� 4 d 0 } - PHONE: (718)784-7490S. qp ENGINEER OF RECORD: �O °d F SOLAR INSTALLER: GREGORY SACHS,PEA I - ^Inlet P�_„' F ^ EMPOWER SOLAR $Ft7,Pp�; _ - 4589 AUSTIN BLVD - "in�etPOnd - 4589 AUSTIN BLVD ISLAND PARK,NY 11558 ISLAND PARK,NY 11558 PHONE:516-837-3459 E PHONE:516-837-3459 E 4• `01 r+ 285 LYllow Dr, D lI Greenport,NY 1 1 944 D REV: DESCRIPTION: DATE: PROJECT LOCATION DATA: SHEET INDEX: PROJECTNAME: ADDRESS: ST-01 COVER SHEET ITIA LLC 285 Willow Drive,Greenport,NY S-01 EQUIPMENT LOCATIONS 11944 S-02 STRUCTURAL PROJECT LOCATION: c ' II SE-01 ELECTRICAL c 285 Willow Drive,Greenport, �s c NY 11944 5A PROJECT#: SCTM:1000-033.00-06.00-009.000 PROJ.PHASE: PERMIT `o i •,\ ,�` © DATE: g - - 'tp \ `,\ g DESIGNED BY: ED CHECKED BY: GS SCALE: NITS MAP TITLE: COVER SHEET A A SHEET: ST-01 1 2 3 4 5 6 7 8 9 10 11 12 13 1 2 - 3 4 5 6 7 8 9 10 11 12 13 'EMP-OWER ' EQUIPMENT LEGEND: , SO A R 4589 AU AR BLVD ISLAND PARK,NY 11558 o MODULES [5] MAIN SERVICE PANEL TEL:516-837-3459 FAX:516-706-1789 W Ww.e m p o w e r-soI ar.com UTILITY METER F6] TESLA POWERWALL THE INFORMATION DISCLOSED HEREIN IS THE SOLE H H PROPERTY OF REPRODUCTIONO R DISTRIBUTION IBUTI AN HORIZED OF THIS SOUTH ROOF-1: REPRODUCTION OR OI PROHIBIT ON OF THIS MATERIAL IS STRICTLY WRITTEN PROHIBIT WITHOUT 3 18 SUNPOWER 415W-ACPV PANELS PRIOR SPECIFIC WRITTEN PERMISSION 3❑ INVERTERS 7❑ SUB PANEL TOTAL POWER:7.47 kW PROFESSIONAL SEAL ORIENTATION:164°;PITCH:34° TYPE 1:FLUSH MOUNT 4] SOLAR+BATTERY F8] SERVICE DISCONNECT SOLAR ACCESS:94% G DISCONNECT TSRF:94% G SAC 4 F W F 1..1..E E E DRIVEWAY D D REV: DESCRIPTION: DATE: ------------- JPROJECT NAME: -SETBACK LEGEND DONGARIS RESIDENCE 2 - ❑ PROJECT LOCATION: c 36"CLEAR PATH C 285 WILLOW DRIVE 4 GREENPORT,NY 11944 8 ® 18"RIDGE SETBACK PROJECTM 5466 PHASE: PERMIT 5 ❑ ❑ ® ACCESS ROOF DATE: 05/2/2022 B B DESIGNED BY: ED CHECKED BY: GS SCALE: NTS TITLE: 6 EQUIPMENT LOCATIONS A ROOF LAYOUT A NOT TO SCALE SHEET: S-01 1 2 3 4 5 6 7 8 9 10 11 12 13 1 2 3 4 5 6 7 8 9 10 11 12 13 EMPOWER SOLAR 4589 AUSTIN BLVD SUNPOWER MODULES ISLAND PARK,NY 11558 c ON INVISIMOUNT RACKING TEL:516-837-3459 SHINGLES FAX:516-706-1789 www.empower-solar.com TH INFORMATION DISCLOSED H I� H PROPERTY OF EMPOWER I S.U.Z.C.UNAUTHORIZED RAFTERS ERS REPRODUCTION OR DISTRIBUTION OF THIS MATERIAL IS STRICTLY PROHIBITED WITHOUT PRIOR SPECIFIC WRITTEN PERMISSION PROFESSIONAL SEAL `("OR G G VIC 4 y 2 P TYPICAL ROOF SECTION Fri NOT TO SCALE SUNPOWER PANEL SPECS E MODULE POWER(WdC) QTY MODEL# LENGTH WIDTH DEPTH WEIGHT TABLE S-1.1:MAX.ATTACHMENT SPACING E SPR-425 118 SPR-A-SERIES-AC 72.2" 40.0" 1.57" 46.5 LB PORTRAIT: 5'-4" LANDSCAPE: 8'-0" SPR-E/X-SERIES-AC 61.4" 41.2" 1.81" 42.9 LB NOTES: ° 1. TOTAL SYSTEM DC POWER:7.47 kW D REV: DESCRIPTION: DATE: 2.RACKING SYSTEM INSTALLED IN ACCORDANCE WITH CODE-COMPLIANT INSTALLATION PROJECT NAME: MANUAL 3.ATTACHMENTS TO BE SECURED TO ROOF ASSEMBLY USING 5 mm STAINLESS STEEL SCREWS ITIA LLC AND/OR 5/16"STAINLESS STEEL LAG BOLTS SPACED ACCORDING TO TABLE S-1.1 4. ALL ATTACHMENTS TO ROOF, MOUNTING BRACKETS & HARDWARE MEET OR EXCEED NYS PROJECT LOCATION: C CODE REQUIREMENTS c 285 Willow Drive,Greenport, 5.INSTALLATION TYPICALLY MAINTAINS 7/8 INCH SPACING BETWEEN MODULES NY 11944 6.SIZES OF STRUCTURAL MEMBERS THAT WERE NOT ACCESSIBLE FOR DIRECT MEASUREMENT ARE BASED ON OBSERVATIONS OF ACCESSIBLE MEMBERS, CONSTRUCTION DEPTH OR PROJECTM BOTH IN ADDITION TO KNOWLEDGE OF STANDARD CONSTRUCTION PRACTICES AT THE PROJ.PHASE: PERMIT TIME OF CONSTRUCTION DATE: B 7. THIS DOCUMENT CERTIFIES THAT THE ROOF STRUCTURE HAS BEEN CHECKED FOR WIND, B DESIGNED BY: ED SNOW, UNBALANCED SNOW, LIVE AND DEAD LOADS BASED ON ASCE 7-10 CHAPTER 30- CHECKED BY: GS WIND LOADS-COMPONENTS AND CLADDING (C&C)AND FOR CONFORMANCE WITH THE SCALE: NTS 2020 RESIDENTIAL CODE OF NEW YORK STATE.THIS CERTIFICATION DOES NOT APPLY TO TITLE: ANY ADDITIONAL ROOF ALTERATIONS AFTER THE DESCRIBED INSTALLATION 8.THIS ROOF STRUCTURE AS SHOWN IS ADEQUATE TO SUPPORT THE PROPOSED LOADS STRUCTURAL 9.REFER TO STRUCTURAL LETTER FOR SITE SPECIFIC AND ROOF SURFACE DATA A 10.ENERGY STORAGE SYSTEM INSTALLATION TO CONFORM WITH THE REQUIREMENTS OF THE A SHEET: 2020 RESIDENTIAL CODE OF NEW YORK STATE S-02 1 2 3 4 5 6 7 8 9 10 11 12 13 R 3 4 5 6 7 8 9 10 11 12 13 JUN 2 5 2024 EMPGWE I- NOTES: , S O L A R pyar$mlent 4589 AUSTIN BLVD Building DeP ISLAND PARK,NY 11558 Town of Southold 0 1.NEUTRAL$GROUND ARE BONDED TOGETHER(ORIGIN OF GEC FOR SOLAR TEL:516-837-3459 ELECTRIC SYSTEM) FAX:516-706-1789 2.GEC FROM SOLAR ELECTRIC SYSTEM BONDED TO EXISTING GEC IN THE MAIN WW W.empower-sol ar.com STANDARD INVERTER ASSEMBLY: SERVICE PANEL USING'SPLIT-BOLT CONNECTOR' H 3.IN SOME CASES POWER FOR DATA MONITORING ENCLOSURE MAYBE PROPERTY REINFORMATIONOISCLDEEOHEREINISTHESOLE H REPRODUCTION R DISTRIBUTION OF THIS REPRODUCTION OR DISTRIBUTION OF THIS DERIVED FROM MAIN SERVICE PANEL MATERIAL IS STRICTLY PROHIBITED WITHOUT PRIOR SPECIFIC WRITTEN PERMISSION 4.CONNECT UTILITY SIDE TO PANEL LUGS PROFESSIONAL SEAL 5.USE TAP RULES FOR SIZING TAP CONDUCTORS(NEC 240.21) 6.SIZE GEC AND EGC AS PER NEC 250.66,NEC 250.122 RESPECTIVELY 7.PROTECT GEC AND EGC SUBJECT TO PHYSICAL DAMAGE AS PER NEC G SOLAR 250.64(B),NEC 250.120(C) G SACf 1 8.FINAL SCHEMATIC SPECIFIC TO THIS INSTALLATION AVAILABLE UPON L0 A ARRAY /1 REQUEST "a�. INVERTER(S) AC °t DISCONNECTIvb ti �0 `SE.D V!�ko E E STANDARD EXTERIOR INTERCONNECTION: STANDARD INTERIOR INTERCONNECTION: D D REV: DESCRIPTION: DATE: PROJECT NAME:' INTERIORtENCLOSURE XTERIOR INTERIOR EXTERIOR _ ITIA LLC - PROJECT LOCATION: c c 285 Willow Drive,Greenport, MAIN _ BREAKER MAIN NY 11944 SERVICE O 1 PANELETTE SERVICE O PANEL - PANEL PROJECT#: UTILITY UTILITY PROJ.PHASE: PERMIT METER METER DATE: B B DESIGNED BY: " CHECKED BY: GS SCALE: NTS TITLE: ELECTRICAL A SHEET: SE-01 1 2 3 4 5 6 7 8 9 10 11 12 13 1 ' 1 2 3 4 5 6 7 8 9 10 11 12 13 EMPOWER MAXIMUM ESS RATING BASED ON LOCATION(R327.5) I S O L A R I INDIVIDUAL ESS UNIT RATING AGGREGATE ESS RATING 4589 AUSTIN BLVD ISLAND PARK,NY 11558 C. 20 kWh 40 kWh TEL:516-837-3459 w w w FAX:516-706-1789 w.empo Wer-solar.c o m H H PROPERTY OF EMPOWER CES,LLC.UNINAUTHORIM TESLA POWERWALL SPECS, REPRODUCTION OR DISTRIBUTION OF Q THIS MATERIAL IS STRICTLY PROHIBITED WITHOUT HOUT INDIVIDUAL ESS UNIT RATING QTY. AGGREGATE ESS RATING PRIOR SPECIFIC WRITTEN PERMISSION 14 kWh 2 28 kWh PROFESSIONAL SEAL 0 G J DRIVEWAY G SAC TESLA POWERWALL SPACE REQUIREMENTS(R327.3.1) p x4 4 MINIMUM LATERAL WALL SPACE 38" O u6 1z O MINIMUM CLEARANCE FROM LEFT SIDE 2" 4 MINIMUM CLEARANCE FROM RIGHT SIDE 6" F 7 MINIMUM CLEARANCE ABOVE SINGLE POWERWALL 2" F 9 MINIMUM CLEARANCE ABOVE SIDE-BY-SIDE POWERWALLS 12" SECS4` O 11 _. e MINIMUM CLEARANCE BETWEEN SIDE-BY-SIDE POWERWALLS 10" 10 MAXIMUM HEIGHT ABOVE GROUND 5' FIRE RATED E ROOM IN BASEMENT ROOF LAYOUT E NOT TO SCALE D D REV: DESCRIPTION: DATE: PROJECT NAME: DONGARIS RESIDENCE NOTES: BASEMENT LEGEND: 1. ENERGY STORAGE SYSTEMS(ESS)TO BE INSTALLED WITH CONFORMANCE TO APPLICABLE PROJECT LOCATION: SECTIONS OF R327 AS PER 2020 RESIDENTIAL CODE OF NEW YORK STATE. c 4❑ SERVICE DISCONNECT DATA MONITORING 2. ESS LISTED AND LABELED FOR RESIDENTIAL USE IN ACCORDANCE WITH UL 9540. D 285 WILLOW DRIVE y 9 3. ESS TO BE INSTALLED IN ACCORDANCE WITH THE MANUFACTURER'S INSTRUCTIONS AND GREENPORT,NY 11944 THEIR LISTING. INDIVIDUAL UNITS MAY HAVE A SEPARATION DIFFERENCE LESS THAN 3' SUBPANEL 10 TESLA POWERWALL(INTERIOR,BASEMENT AS PER R327.3.1. PROJECT#: 5466 MOUNTED CONCRETE FOUNDATION) 4.ESS TO BE INSTALLED IN STORAGE OR UTILITY SPACE AS PER R327.4. PROJ.PHASE: PERMIT 5.MAXIMUM INDIVIDUAL ESS UNIT RATING AND AGGREGATE ESS RATING SHALL COMPLY WITH DATE: 0110 912 02 3 B r6] TESLA-GATEWAY 11 PATH OF TRAVEL TO DISCONNECT FROM REQUIREMENTS OF R327.5. B DESIGNED BY: CCAV 6.ESS SHALL BE INSTALLED IN ACCORDANCE WITH LISTING AND LABELING REQUIREMENTS AS CHECKED BY: GS WILLOW DRIVE PER R327.6. SCALE: NTS �7 PV ESS DISCONNECT 12 FIRE DETECTOR 7.ROOMS AND AREAS IN WHICH ESS ARE INSTALLED SHALL BE PROTECTED BY TITLE: INTERCONNECTED SMOKE ALARMS IN ACCORDANCE WITH SECTION R-314 AS OUTLINED IN R327.7. ENERGY STORAGE SYSTEM SPECIFICATIONS 8.ROOMS AND AREAS CONTAINING ESS SHALL BE PROTECTED ON THE SYSTEM SIDE BY A 8❑ MAIN SERVICE PANEL(EXISTING) 5/8-INCH TYPE X GYPSUM IN ACCORDANCE WITH SECTION R327.8 AND R302. A SHEET: 9.ESS INSTALLED IN A LOCATION SUBJECT TO VEHICLE DAMAGE SHALL BE PROTECTED BY APPROVED BARRIERS. S-03.01 1 2 3 1 5 6 7 8 9 10 11 12 13 1 2 3 4 5 6 7 8 9 10 11 12 13 EMPOWER SOLAR 4589 AUSTIN BLVD ISLAND PARK,NY 11558 o TEL:516-837-3459 FAX:516-706-1789 w w W.em power-so Iar.c o m H ° ° ° THE INFORMATION DISCLOSED HEREIN IS THE SOLE H PROPERTY OF EMPOWER CES,U.C.UNAUTHORIZED • . ' REPRODUCTION 00.DISTRIBUTION OF THIS IS 10 op .2�• ° 2� CONCRETE PRIORIA PECIFIIC LY WRITTEN PERMISSION N PRIOR SPECIFIC WRITTEN PERMISSION FOUNDATION PROFESSIONAL SEAL Ale•° ° 4 1 OR k T E S L A T E S L A •• °• � G ° G O ;4w 0 } SECTION A N �' z 4. 2 \ V 21��+11 �rI"[3T�� - \ SECTION A JE 4 FIRE RATED ROOM SECTION A E 3/8R=V-0R CROSS SECTION 3/8R=1'-oR D D REV: DESCRIPTION: DATE: PROJECT NAME: DONGARIS RESIDENCE NOTES: ' BASEMENT LEGEND: 1. ENERGY STORAGE SYSTEMS(ESS)TO BE INSTALLED WITH CONFORMANCE TO APPLICABLE PROJECT LOCATION: SECTIONS OF R327 AS PER 2020 RESIDENTIAL CODE OF NEW YORK STATE. C 2. ESS LISTED AND LABELED FOR RESIDENTIAL USE IN ACCORDANCE WITH UL 9540. C 285 WILLOW DRIVE FIRE DETECTOR 3. ESS TO BE INSTALLED IN ACCORDANCE WITH THE MANUFACTURER'S INSTRUCTIONS AND GREENPORT,NY 11944 - THEIR LISTING. INDIVIDUAL UNITS MAY HAVE A SEPARATION DIFFERENCE LESS THAN 3' TESLA POWERWALL(INTERIOR,BASEMENT AS PER R327.3.1. PROJECT#: 5466 MOUNTED CONCRETE FOUNDATION) 4.ESS TO BE INSTALLED IN STORAGE OR UTILITY SPACE AS PER R327.4. PROJ.PHASE: PERMIT 5. MAXIMUM INDIVIDUAL ESS UNIT RATING AND AGGREGATE ESS RATING SHALL COMPLY WITH DATE: 0110912023 B 3❑ 518-INCH TYPE X GYPSUM REQUIREMENTS OF R327.5. B DESIGNED BY: CCAV 6. ESS SHALL BE INSTALLED IN ACCORDANCE WITH LISTING AND LABELING REQUIREMENTS AS CHECKED BY: GS PER R327.6. SCALE: 3/8"=V-D- FIRE RATED DOOR 7.ROOMS AND AREAS IN WHICH ESS ARE INSTALLED SHALL BE PROTECTED BY TITLE: INTERCONNECTED SMOKE ALARMS IN ACCORDANCE WITH SECTION R-314 AS OUTLINED ENERGY STORAGE IN R327.7. LOCATION 8.ROOMS AND AREAS CONTAINING ESS SHALL BE PROTECTED ON THE SYSTEM SIDE BY A 5/8-INCH TYPE X GYPSUM IN ACCORDANCE WITH SECTION R327.8 AND R302. A SHEET: 9.ESS INSTALLED IN A LOCATION SUBJECT TO VEHICLE DAMAGE SHALL BE PROTECTED BY APPROVED BARRIERS. S-03.02 1 2 3 4 5 6 7 8 9 10 11 12 13 X S UN POW' E R ° r Sun Power®X-Series: X22-370 I X22-360 ® i Sun Power Residentia l i AC Module Built specifically for use with the SunPower EquinoxT"' system,the only fully integrated solution designed,engineered,and warranted by one manufacturer. F Maximum Power. Minimalist Design. is ii® Industry-leading efficiency means more power and savings iAUL.c per available space. With fewer modules required and hidden microinverters, less is truly more. , �j Highest Lifetime Energy and Savings. Designed to deliver 60% more energy over 25 years in real-world conditions like partial shade and high temperatures.' 150% c - -- - -- - - - -- - - - -- - - - - - - - - - - - -- - -- - - Fundamentally Different. a 130% And.Better. . : 120 Sun. ,we k$6 vies Up to .�+ 110% 60% 100% more �_- c 90°r° lifetime a, 8096 :: ,..,,-: energy N 60% 0 5 10 15 20 25 '-The $unPower°.Maxeon°Solar Cell, Years of operation � .Eriables highest-efficiency modules available? Unmatched,reliability Best Reliability. Best Warranty. Patented s61id•me'talf8un`dation- prevents breakage,andcorrosion With more than 25 million modules deployed around the world,SunPower technology is proven to last.That's IV` 25-Yr suni why we stand behind our module and microinverter complete• wer with the industrys best 25-year Combined Power and Y, Product Warranty, including the highest Power Warranty in solar. Factory-integrated Microinverter 100% • Sirn,pier,faster•installation o 98% C 96% • Integrated.wire.managem'ent;, 949. rapid shutdown 92% C 90% 12% • Engineered and calibrated by as% more SunPower for.SunPower modules 86Yo .` hp9' a ; �a s�1 power L8401. In year r`o 8290 25 80% 0 5 10 15 20 25 Years of operation CD Datasheet Q (D CT O N C 0 03 NP g.� lZfl v X-Series: X22-370 X22-360 SunPower°Residential AC Module AC Electrical Data Inverter Model:Enphase IQ 7XS(IQ7XS-96-ACM-US) @240 VAC @208 VAC Peak Output Power 320 VA 320 VA Max.Continuous Output power 315 VA 315 VA Mom.(L-L)Voltage/Range,)-(V) 240/211-264 208/183-229 Max. Continuous Output Current(A) 1.31 1.51 Max. Units per 20 A(LI_) Branch Circuit] 12(single phase) 10(two pole)wye CEC Weighted Efficiency 97.5% 97.0% Nom. Frequency 60 Hz Extended Frequency Range 47-68 Hz AC Short Circuit I-ault Current Over 3 Cycles 5.8 A rms Overvoltage Class AC Port III AC Port Backfeed Current 18 mA Power Factor Setting 1.0 Power Factor(adjustable) 0.7 lead./ 0.7 lag. No active phase balancing for Lhree-phase inslallaLions DC PowerData Warrarities, .and Co pl;iance SPR-X22-370-E-AC SPR-X22-360-E-AC Warranties 25-year limited power warranty Nominal Power (Pnom) 370 W 360 W 25-year limited productwarranty Power Tolerance +5/-0% +5/-0% UL 1703 Certifications UL 1741 /IEEE-1547 Module Efficiency 22.7% 22.1% and UL 1741 AC Module(Type 2 fire rated) Temp.Coef.(Power) -0.29%/°C -0.29%/°C Compliance UL 62109-1 /IEC 62109-2 FCC Part 15 Class B •Three bypass diodes ICES-0003 Class B Shade Tolerance Integrated module-level maximum CAN/CSA-C22.2 NO. 107.1-01 power point tracking CA Rule 21 (UL 1741 SA)4 -• Conditions (includes Volt/Var and Reactive Power Priority) T.estUL Listed PV Rapid Shutdown Equipment Operating Temp. -40°F to+140°F(-40°C to+60°C) Max.Ambient Temp. 122°F(50°C) Enables installation in accordance with: NEC 690.6(AC module) Max.Load Wind:62 psf,3000 Pa,305 kg/m2 front&back NEC 690.12 Rapid Shutdown(inside and outside the array) Snow: 125 psf,6000 Pa,611 kg/m2 front NEC 690.15 AC Connectors,690.33(A)-(E)(1) Impact Resistance 1 inch(25 mm)diameter hail at 52 mph(23 m/s) When used with InvisiMount racking and InvisiMount accessories Mechanical Data (UL 2703): Solar Cells 96 Monocrystalline Maxeon Gen III Module grounding and bonding through InvisiMount Class Afire rated Front Glass High-transmission tempered glass with When used with AC module Q Cables and accessories(UL 6703 and anti-reflective coating UL 2238)1: Environmental Rating Module:Outdoor rated • Rated for load break disconnect Inverter: NEMA Type 6 Class II PID Test Potential-induced degradation free Frame Class 1 black anodized(highest AAMA rating) I 755A coin(61.3 InJ � Weight 42.9 Ib(19.5 kg) Recommended Max. 1.3 in.(33 mm) Module Spacing 45 min 1 SunPower 360 W compared to a conventional module on same-sized arrays(260 W,16% (1.e in.) efficient,approx.1.6 mz),4%more energy perwatt(based on third-parts/module characterization and PVSim),0.75%/yr slower degradation(Campea)u,Z.et al.'•SunPower Module Degradation Rate,•SunPower white paper,2013). . 1046 mm 30 min_., 2 Based on search of datasheet values from websites of top 10 manufacturers per IHS,as of 141.2 In,) w (1.2 in.) January 2017. 3#1 rank in"Frai irihofer PV Durability Initiative for Solar Modules:Part 3."PVFech Power 1 Magazine,2015.Campeau,Z.et al."Sun Power Module Degradation Rate,•'SunPowerwhite T paper,2013. 393 mm 4 Facton,,set to 1547a-2014 default settings.CA Rule 21 default set tings profile set during, (15.51n.) commissioning.See the Equinox Installation Guide#518101 for more information. 5 Standard Test Conditions(1000W/mzirradiance,AM1.5,25°C).NRELcalibration �_�_ standard:SOMS current,I_ACCS FF and voltage.All DC voltage is fully contained within the I 437 mm module. 6 This product is UL Listed as PVRSE and conforms with NEC 2014 and NEC 2017 690.12; (n,z In,) and C22.1-2015 Rule 64-218 Rapid Shutdown of PV Systems,for AC and DC conductors; when installed according to manufacturer's instructions. � GRDSM E GRID SUPPORT UIINV RACTM See_WWWSUnpower.com/facts for more reference information. © PV N R"D WCOWN For more details,see extended datasheet www.sunpower.com/datasheets EOUIPMEW S U N UW E Ro Specifications included in this datasheet are subject to change without notice. LISTED E478330 (02018 SunPower Corporation.All Rights Reserved.SUNPOWEP.,the Module Fire Performance:Type 2 SLIN POWER logo and MAY,EOh•I are registered trademarks of SunPower Please read the Safety and Installation Instructions for details. 531945 RevA Corporation in the U.S.and other countries as well.1-800-SUN POWER. sunpower.com ....,,,^.. %t'r ^e rev :m,rw+e,,�.,w „» .z: „'�,",•^ x-r. TM .,w,., X.,.. •�,. �.:a' gkz � �'?, \,',:thy.,,, » •1T.=!* .P:..x. ..,t•• `„ :'�`•2 `±,, .v„a.L .<',\v^'•'.T .A:r,<* �'',,,. C`l•� '.'b< �'Y., ' 44v A� a� X it ill""♦ W .P+'.,'�• v 't Y w Y ">t,a. r •1 a Fes• - �. 17 e '^`C•'•;°b.:,.;:; 'r, ':^•'.,<;: ro;,e,�'°`:,<,�.`,.. •?k,•j°'.::.",6 ' ''`.D �''':i }. s:. •.£i <S° .,Y .......... = i - "-,v,'. \\a.,•" "ram 0; *:2:,, �'�.�,Y?ro�'S„3:. `.a• �.w, � :..�,,z,+i e�_,M'...° •.;a,.,s ,, ',`vim'. ,,:.,`et',g\.`\R,.v.,, -`�''' t, h ,e �'.>i'-�,;^m."�:-„�", �.xi:.' :;S?l:jR�4':°ti;:2,A�.°*�':o,?..°, •ea, .',a��`��'�„`a, .",'rn..�., za';w�,',+^,�,. ,`,>.,'v?,.....,' v Simple and Fast Installation ,.., .: :-A ' ,`:iCa. ��;.i,:::.. r;. .�,F` \fit \.:>:•::' � ,e\ v '\`., `\. \ Integrated module-to-rail grounding Pre-assembled mid and end clams ��` `���� .����2;:" �<� „ \,.���� � ;���\::,, �.,; � _< • >�. .,�' \. Levitating mid clam for'easy placement �• =`•� Mid clamp width facilitates consistent even , °: :• \ ,ram, module spacing • UL 2703 Listed integrated grounding `"<° Flexible Design : 1 • Addresses nearly all sloped residential roofs k` \ -- .x Design in landscape and portrait with up to 8' rail span S • Pre-drilled rails and rail spliceIN may. • Railmanagement ,:�. .. c, -�,%;+"y�\:•-,,,, ,,. '. 'z "�a s enable easy obstacle many ement Customer-Preferred Aesthetics • #1 module and #1 mounting aesthetics Elegant Simplicity • Best-in-class system aesthetics • Premium, low-profile design SunPower° InvisiMount"' is a SunPower-designed • Black anodized components rail-based mounting system. The InvisiMount systern • Hidden mid clamps and new capped, flush addresses residential sloped roofs and combines fasten end clamps < • installation time, design flexibility, and superior aesthetics. Part of Superior System The InvisiMount product was specifically envisioned and • Built for use with SunPower DC and AC modules Best-in-class system reliability and aesthetics engineered to pair with SunPower modules. The resulting • • New optional rooftop transition flashing, rail- system-level approach amplifies the aesthetic and mounted]-box, and wire management rail clips installation benefits--for homeowners and for installers. • Combine with SunPower modules and SunPower EnergyLink"' monitoring app rwir�rrr�va~�\ „. sunpower.com DatasheetS U N P 0 W R"' a••,r^ -�„ •,-,;,', v`„'-x';�:;" ,., :,,o,. ^S.'�•,y, cn-,rnr. ..'+�q•,-,3 �•",-«,: .'C•';•,^";". °r1;*n-„''�T'�'; `c, •:^ .?r-'^,.-„s^-�.. ;^r •an ;,,t_, " , ., �•;:�. RN '.'a�., ..°e,es..;\. ;�d'c`•;., .,+�,�+., v';o-*;'"',�+ v, ^^'1*;�< '.-," ;;"+r,"'v. .,,a\ <"a<<.^, ,""^ ;',• �4:.^`: ';?`�'"., 'z�` -v�g® `• e 7 a'71. +�i'Z' '• a)t,.aY.. .*n•*?1�.. .,. .t Z;' �'>`(,, y,•.<., .::„�',r 'i:` ; n...:.A,V,,,,., ,.,3`.: ''.; h ,.'�' ,: ,•,.o." v .L .1',0'°. c'.aa°.•-..,,, •'>".•, .'q 1.°,.yp,,l:.. ...`l�".:`< ;.;v.`:`�2•.:Wa '�',\. ;'''':`.,�•a''. "4.a`.: `T°i.r >W, : ,2, ;b'a` -a.. t a,•*>*-:'..A *, \,. .. .'; µ'3,w\a� .`-•, r'•F. ':°; e,..w .r " �,..> �+, Z�t tzi�`E,� ar:"a" ',,A, ;\`..',:, <\."''+s\'''�•*,<.>°' a•v"€ v;- ` 3',;1.•<.,.,''•��`l.>.< :''':v .<-�.�,� '.?,3;•.`' ,.'�"•�' < .."^, ,.",.. ,•a', `�`''S ,^, .`'1 ,,,.a'„''cr •,. �_.',.c" \.'',-.�,, ;t " lam`?, `,'e, !"•,. ',..`v , .',. c. ::*,v '^,:k•\;�n, v°t,,,�`�•.`"S c -< ,.. «*,"�,\.:v*, t ^aa a 1 -:'•,v ,a ..:`'\""„ € \ .;.\ .*.E ,1V �,, `\. ••ti v,. x. a;°r \• 4•� g;\',5, ::,:,'.�,: „`,.°a\;` .�•L<• v.:. <'H ,`^,,,'"l.l,. ,:,_?',;., -jzC`� .`° "•�. •v. °z vca ^� .`�'e':-"- a. �,� �.. ��"'"•'�"�• <, �•`ye ":\,.e-�, .-:'\•a-,`;q' .,e, `.e.."v,\ A-'-� .Y`v 1:,<3,�,:.•< �' `r,,•,'i�.\"�1 \ .>. '.1�,V ,`"tea •� h .*<'< a^,� r\e\,. •\"�:, ..a.'�., .\, �.` ,.,";"•::.y +gam a?;<.< ^a, 4t'+<1 b\ a 1TS ,,,. . V z&. �a .� .x .o",c.•,,.�.... .a, ,;,,c N�•. ..., ,.-,.,a.,„a,,, a,-<..,,..,:�_.'.,.�.,.. " .a".:: ..d,,.,, ,er ^$'a •.�� i§ ,.. .•F :e.,.,. i.,. ti,,...'3,..e:".•'vd'', ..,"*.,S` _`°T ,3..';,?,^..<3'�x*x-'•;; *;;,.� r. .1. ea„..,.<. Z. < .,,a,,,w...,r.'sea:.., ."':<,e<f,- ,.. "+;<*:". :•, .\v`d�a, a.ga ,..v.. .�:,.e•,e er .\. Z+:�\,e ,`�a.l;?''`.,e„ n"e.?e",.\',°, •. ,,�,,a';.;, `ye�'<; TrR :s i �• .=4rr€i'".. `�aa'=:, ,'"",.a's•".,,.�". ,`,',. =,1< ^.4.. '-...ev'<h'r:,�. '9,.•,e -d'v r'`-"�,. ..�,.,°`". •;a< a bt 'mow •a n i; �•a,�5'\;a •:. :A..'.:3<^,Ksi,,•,aa��,,•� '>', yi.<„� `„S,\:< C", :.y'i .F d;:,=�c''•*%CC,�v A %�_,�°* tv?„ c :�� �<. ;'J•N;'�i:_;`;'a5�.'�.,n v�<_s,l"N'E..^a a.;',.,.:,x••».�+,vv.xatr•L•.. s`�•'`."a�':;a. # ,;� >:a �\, �" :�:�.i�s',`,`.a,�i`$ InVisIM:•uInt Cbmponeffts, Module'/Mid Clamp and Rail Module'/End Clamp and Rail e" f= Mid Clamp End Clamp Rail&Rail Splice Ground Lug Assembly(for DC systems only) d� r r , • • •• 1' • r•' ° • • tiOns Mid Clamp Black oxide stainless steel 300 series 63 g(2.2 oz) Temperature —40°C to 90°C(-40° F to 194° F) End Clamp Black anodized aluminum 6000 series 110 g(3.88 oz) 3000 Pa uplift Max. Load(LRFD) 6000 Pa downforce Rail Black anodized aluminum 6000 series 830 g/m(9 oz/ft) Rail Splice Aluminum alloy 6000 series 830 g/m(9 oz/ft) Ground Lug 304 stainless steel 106.5 g/m(3.75 oz) Assembly (A2-70 bolt;tin-plated copper lug) Composition Shingle Rafter Attachment Application Composition Shingle Roof Decking Attachment Curved and Flat Tile Roof Attachment Universal interface for other roof attachments MAWOut • •• r .•. Uplift 664 Ibf Mid Clamp InvislMoUnt Warranties • • C o rt I ffi c. • Shear 540 Ibf Uplift 899 IV 25-year product warranty End Clamp Warranties Shear 220 Ibf 5-year finish warranty Moment:upward 548 Ibf-ft Rail UL 2703 Listed Moment:downward 580 Ibf-ft Certifications • Class A Fire Rated Moment: upward 548 Ibf-ft Rail Splice Moment:downward 580 Ibf-ft Ro4Aftachmot HardWa_reNrranties uplift 1000 1 bf L-foot Refer to roof attachment hardware manufacturer's documentation. Shear 390 Ibf 1 Module frame that is compatible with the InvisiMount system required for hardware interoperability. z SunPower recommends that all EquinOXTM, InvisiMountTm,and AC module systems always be designed using the SunPower Design Tool. If a designer decides to instead use the component capacities listed in this document to design a system, note that the capacities shown are Load and Resistance Factor Design(LRFD) design loads,and are NOT to be used for Allowable Stress Design (ASD)calculations; and that a licensed Professional Engineer(PE)must then stamp all calculations. Should you have any questions please contact-SunPower Technical Support at 1-800-SUNPOWER(1-800-786-7693). sunpower.com ©2017 SunPower Corporation.All Rights Reserved.SUNPOWER,the SUPIPOWER logo,EQUINOX,and INVISIMOUN t are trademarks or registered trademarks of SunPower Corporation. 509506 RevE All other trademarks are the property of their respective owners.Specifications included in this datasheet are subject to change without notice. D. UN PO E R W I POWERWALL mp y t g rated AC battery system foi `Tesla Powerwall is a full -in e r residential or light commercial use. Its rechargeable lithium-ion battery pack provides energy storage for solar self-consumption time-based control and backup. Powerwall s electrical interface provides a simple connection to any home or building. Its revolutionary compact design \ F.. achieves market-leadingenergy density gy y and is easy to install enabling \`, owners to quickly realize the benefits of reliable, clean power. ' + , V\�.'.'�\ `� `•.;\'fi`x•`?...3.."EEC'`'�•; `',•�••b..��\: .:� .� °...`'�' �:+:.- - PERFORMANCE SPECIFICATIONS MECHANICAL SPECIFICATIONS AC Voltage(Nominal) 120/240 V Dimensions' 1150 mm x 755 mm x 147 mm -- -�- 5.3mx29.6mx5.75in) Feed-In Type Split Phase ------ -- - ---------- -- ----------------------- -- Weight' 114 kg (251.3 Ibs) Grid Frequency 60 Hz - - - -- - - - - - --- Mounting options Floor or wall mount Total Energy 14 kWh ---- - - --- - - - -- - - - - -- - - - --- - ---- --- - -- - - --- -- 'Dimensions and weight differ slightly if rnanufactured before March 2019. Usable Energy 13.5 kWh Contact Tesla for additional information. —-- - - - - - -- -- --- -- - - ----- - 753 mm 147 mm Real Power, max continuous 5 kW (charge and discharge) (29.6 in) (5.75 in) Real Power, peak(10s,off-grid/backup) 7 kW(charge and discharge) "> Apparent Power, max continuous 5.8 kVA (charge and discharge) Apparent Power, peak(10s,off-grid/backup) 7.2 kVA (charge and discharge) T o M L R I Maximum Supply Fault Current 10 kA _ i K'1 Maximum Output Fault Current 32 A 1150 mm Overcurrent Protection Device 30 A (45.3 in) ------- - -- -- - - i i Imbalance for Split-Phase Loads 100% , -- - --- - 4 Power Factor Output Range +/-1.0 adjustable I i Power Factor Range(full-rated power) +/- 0.85 i Internal Battery DC Voltage 50 V . Round Trip Efficiency'-' 90% rw.J Warranty 10years ENVIRONMENTAL SPECIFICATIONS 'Values provided for 25°C(77°F),3.3.kW-charge/discharge power. -- - -- -- - - - - "-- - ---- - - 21n Backup mode, grid charge power is limited to 3.3 kW. Operating Temperature -20oC to 50°C (-4oF to 122°F) 3AC to battery to AC,at beginning of life. Recommended Temperature 0°C to 300C (32oF to 86°F) Operating Humidity(RH) Up to 100%, condensing COMPLIANCE INFORMATION -- - - - — -- - -- - - Storage Conditions -201�to 30oC(-4°F to 86°F) Certifications UL 1642, UL 1741, UL 1973, Up to 95% RH, non-condensing UL 9540, IEEE 1547, UN 38.3 State of Energy (SoE): 25% initial Grid Connection Worldwide Compatibility Maximum Elevation 3000 m (9843 ft) Emissions FCC Part 15 Class B, ICES 003 Environment Indoor and outdoor rated Environmental PoHS Directive 2011/65/EU Enclosure Type NEMA 3R Seismic AC156, IEEE 693-2005 (high) Ingress Rating IP67 (Battery & Power Electronics) IP56 (Wiring Compartment) Wet Location Rating Yes Noise Level @ 1m < 40 dBA at 30°C(86°F) T = 5 L r=i TESLA.COM/ENERGY TYPICAL SYSTEM LAYOUTS WHOLE HOME BACKUP -------------------------- Optional: Solar Solar inverter ------------------------ Main panel Backup Gateway Utility meter Grid including service disconnect T = S L R l�0 Powerwall Whole home backup PARTIAL HOME BACKUP ---------------------- Optional � I / Solar F01ti o0 Solar inverter ---------------------- Sub panel Backup Gateway Main panel Utility meter Grid T S S L R Powerwall Backup loads Home loads T E 5 L- n NA - 2019-06-11 TESLA.COM/ENERGY �� gO .(SS W&tI0- W der, Grr-eeo loor� CSA GROUP CSA Laboratory Test Data - UL 9540A Checklist and Test Result GROUP'" ORIGINAL TEST DATA The results relate only to the items tested. This report shall not be reproduced, except in full, without the approval of CSA Group Testing& Certification Inc. Master Contract: 236698 Model: Powerwall 2-3012170-XX-Y I Page number 1 of 45 Project/Network: 80084072 Description: Li-Ion BESS,up to 15.3 kWh, 120/240V Standard(s): ANSI/CAN/UL 9540A:2019 Fourth Edition, Dated November 12,2019-Test Method for Evaluating Thermal Runaway Fire Propagation in Battery Energy Storage Systems Testing Laboratory Name: CSA Group Address: 8501 East Pleasant Valley Road, Independence, OH 44131 USA Testing Program: Custom Test: Cover Letter X❑ Testing Only J Note: Mark"X " in applicable test program block If tests were performed at another facility, then described below: Testing Laboratory Name: Right Testing Lab, LLC Address: 4767 Clark Howell Highway, Atlanta, Georgia 30349 USA Qualification: A2LA 17025 Certificate Number 6364.01 As above/or describe otherwise Customer: Tesla Address: 3500 Deer Creek, Palo Alto, California 94304 USA Tested By: Drew Mersereau, Right Testing Labs Name, Title N/A N/A Signature Date (YYYY-MM-DD) ❑ Reviewed by: Kim Sikorski, Certifier ® Witnessed by: Name, Title K Sk-&vim 2021-03-26 Signature Date YYYY-MM-DD Version4:0112512021 IA Al 19 9n9Q BUIITOWN OFSOI�tp UL 9540A Checklist and Test Result-Version4:0112512021 CSA GROUP CSA Laboratory Test Data - UL 9540A Checklist and Test Result GROUP'" ORIGINAL TEST DATA The results relate only to the items tested. This report shall not be reproduced, except in full, without the approval of CSA Group Testing&Certification Inc. Master Contract: 236698 Model: Powerwall 2-3012170-XX-Y Page number 2 of 45 Project/Network: 80084072 Description: Li-Ion BESS, up to 15.3 kWh, 120/240V Product Details Test Request: ❑ Cell Level Testing 1 ❑ Module Level Testing ® Unit Level Testing ❑ Installation Level Testing Manufacturer ❑ Cell: ❑ Module: ® Unit: Tesla Brand name/Trademark ❑ Cell: ❑ Module: ® Unit: Tesla Model Number ❑ Cell: ❑ Module: - ® Unit: 3012170-XX-Y (used in Powerwall + 1850000- XX-Y) and 2012170-XX-Y (used in Powerwall + 1850000-XX-Y Date of receipt of test sample(s) 2021-02-10 thru 2021-03-22 (YYYY-MM-DD) Cell/Battery Type Li-Ion Approximate Dimension (mm) ❑ Cell: (H x W X D) ❑ Module: ® Unit: 1150 x 753 x 147 Mass (kg) ❑ Cell: ❑ Module: ® Unit: 114 DUT Sample/Serial Number ❑ Cell: ❑ Module: ® Unit: DUT1, DUT2, DUT3 DUT Nominal Voltage Rating (V) ❑ Cell: ❑ Module: ® Unit: 100/120/200/208/220/230/240 DUT Nominal Charge Capacity Rating (Ah) ❑ Cell: ❑ Module: ® Unit: 404.8 Fire Mitigation Strategies: ❑ Water: (For installation level testing) ❑ Other(Specify): ® N/A Additional Information Powerwall + part number 1850000-XX-Y is an integrated product offering containing Powerwall 2 and a PV inverter. UL 9540A Checklist and Test Result-Version4:0112512021 CSA GROUP CSA Laboratory Test Data - UL 9540A Checklist and Test Result GROUP" ORIGINAL TEST DATA The results relate only to the items tested. This report shall not be reproduced, except in full, without the approval of CSA Group Testing& Certification Inc. Master Contract: 236698 Model: Powerwall 2-3012170-XX-Y I Page number 3 of 45 Project/Network: 80084072 Description: Li-Ion BESS, up to 15.3 kWh, 120/240V Summary of Results Indoor/Outdoor Indoor Outdoor Ground Mounted Wall Mounted Wall Mounted Residential Residential Residential Mfg. Name and Model number Tesla Powerwall 2 (3012170-XX-Y) -7 -T Number of modules in initiating 1 1 1 BESS Construction of initiating BESS per Metallic enclosure, 1150mm x 753mm x 147mm, UL9540 5.3 Compliant, UL 1973 Compliant, Internal PCS Fire protection features N/A Module voltage corresponding to 49.8 49.8 49.8 tested SOC Thermal Runaway Initiation Method Cartridge Heaters CoolantSystem I ,_ 17--�i Power Electronics ,.Sw�. �=--•^�4.t:•�✓'-fit.,{ Location of module within unit El BatteryModule i `i Observation of flaming outside unit Cheese cloth did not char or ignite as a result HRR vs Time Heat Release Data Heat Release Data Heat Release Data Separation Distances from Initiating 6" side Less than an inch Less than an inch Unit to Target Walls Less than an inch Separation Distances from Initiating 6" side unit 6" side unit 6" side unit Unit to Target Units 1" stacked unit 1" stacked unit 1" stacked unit Maximum wall surface temperatures 33.9C 29.5C 47.6C Maximum target BESS temperatures 72.9C 28.6C 30.7 Maximum ceiling/soffit surface 21.1 C 35.6C 20.5 temperatures Maximum incident heat flux on target Below detectable Below detectable Below detectable wall surfaces and target BESS units limits limits limits UL 9540A Checklist and Test Result-Version4:0112512021 CSA GROUP CSA Laboratory Test Data - UL 9540A Checklist and Test Result GROUP- ORIGINAL TEST DATA The results relate only to the items tested. This report shall not be reproduced, except in full, without the approval of CSA Group Testing& Certification Inc. Master Contract: 236698 Model: Powerwall 2-3012170-XX-Y Page number 4 of 45 Project/Network: 80084072 Description: Li-Ion BESS,up to 15.3 kWh, 120/240V Indoor/Outdoor Indoor Outdoor Ground Mounted Wall Mounted Wall Mounted Maximum incident heat flux on target Below detectable Below detectable ceiling/soffit surfaces (wall mounted --- limits limits only) Gas generation and composition Gas Comp and Gas Comp and Gas Comp and Generation Generation Generation Peak smoke release rate 0.03m2/sec 0.05 m2/sec 0.07 m2/sec Indication of the activation of integral N/A fire protection systems Observation of flying debris and/or None Glowing particles Glowing particles explosive gases observed observed Observation of a re-ignition from None thermal runaway events Observation of sparks, electrical arcs None or other electrical events Observations of damage to initiating BESS, Target BESS, and adjacent No visible damage No visible damage No visible damage walls, ceilings/soffits Performance Criteria Flaming outside the initiating BESS unit is not observed Cheesecloth did not as demonstrated by no flaming or charring of the ignite or char cheesecloth indicator; Surface temperatures of modules within the target BESS units adjacent to the initiating BESS unit do not exceed Conformed the temperature at which thermally initiated cell venting ` Indoor Floor occurs, as determined in 7.3.1.8; Mounted For BESS units intended for installation in locations with (residential) combustible construction, surface temperature measurements on wall surfaces do not exceed 970C Conformed (175°F) of temperature rise above ambient per 9.2.15; Explosion hazards are not observed, including deflagration, detonation or accumulation (to within the Conformed flammability limits in an amount that can cause a deflagration)of battery vent gases; and UL 9540A Checklist and Test Result-Version4:0112512021 CSA GROUP CSA Laboratory Test Data - UL 9540A Checklist and Test Result GROUP'" ORIGINAL TEST DATA The results relate only to the items tested. This report shall not be reproduced, except in full, without the approval of CSA Group Testing& Certification Inc. Master Contract: 236698 Model: Powerwall 2-3012170-XX-Y Page number 5 of 45 Project/Network: 80084072 Description: Li-Ion BESS, up to 15.3 kWh, 120/240V The concentration of flammable gas does not exceed 25% LFL in air for the smallest specified room installation Conformed size. If flaming outside the unit is observed, separation distances to exposures shall be determined by greatest Conformed flame extension observed during test. Surface temperatures of modules within the target BESS units adjacent to the initiating BESS unit do not Conformed exceed the temperature at which thermally initiated cell venting occurs, as determined in 7.3.1.8; Outdoor Ground For BESS units intended for near exposures, surface temperature measurements on wall surfaces do not Mounted Conformed (residential) exceed 970C (1750F)of temperature rise above ambient per 9.2.15; Explosion hazards are not observed, including deflagration, detonation or accumulation (to within the Conformed flammability limits in an amount that can cause a deflagration)of battery vent gases; and Heat flux in the center of the accessible means of egress2)shall not exceed 1.3 kW/m2. Conformed Flaming outside the initiating BESS unit is not observed Cheesecloth did not as demonstrated by no flaming or charring of the char or ignite cheesecloth indicator; Surface temperatures of modules within the target BESS units adjacent to the initiating BESS unit do not exceed Conformed the temperature at which thermally initiated cell venting occurs, as determined in 7.3.1.8; Indoor Wall Mounted For BESS units intended for installation in locations with (residential) combustible construction, surface temperature Conformed measurements on wall surfaces do not exceed 97°C (1750F)of temperature rise above ambient per 9.2.15; Explosion hazards are not observed, including deflagration, detonation or accumulation (to within the Conformed flammability limits in an amount that can cause a deflagration)of battery vent gases; and UL 9540A Checklist and Test Result-Version4:01/25/2021 CSA GROUP CSA Laboratory Test Data - UL 9540A Checklist and Test Result GROUP" ORIGINAL TEST DATA The results relate only to the items tested. This report shall not be reproduced, except in full, without the approval of CSA Group Testing& Certification Inc. Master Contract: 236698 Model: Powerwall 2-3012170-XX-Y Page number 6 of 45 Project/Network: 80084072 Description: Li-Ion BESS, up to 15.3 kWh, 120/240V The concentration of flammable gas does not exceed 25% LFL in air for the smallest specified room installation Conformed size. Flaming outside the initiating BESS unit is not observed Cheesecloth did not as demonstrated by no flaming or charring of the char or ignite cheesecloth indicator; Surface temperatures of modules within the target BESS units adjacent to the initiating BESS unit do not Conformed exceed the temperature at which thermally initiated cell Outdoor Wall venting occurs, as determined in 7.3.1.8; Mounted For BESS units intended for installation in locations with - (residential) combustible construction, surface temperature Conformed measurements on wall surfaces do not exceed 970C (175°F)of temperature rise above ambient per 9.2.15; - Explosion hazards are not observed, including deflagration, detonation or accumulation (to within the Conformed flammability limits in an amount that can cause a deflagration)of battery vent gases. UL 9540A Checklist and Test Result-Version4:0112512021 CSA GROUP CSA Laboratory Test Data - UL 9540A Checklist and Test Result GROUP' ORIGINAL TEST DATA The results relate only to the items tested. This report shall not be reproduced, except in full, without the approval of CSA Group Testing& Certification Inc. Master Contract: 236698 Model: Powerwall 2-3012170-XX-Y Page number 7 of 45 Project/Network: 80084072 Description: Li-Ion BESS, up to 15.3 kWh, 1201240V ANSI/CAN/UL 9540A:2019 Fourth Edition, Dated November 12, 2019 -Test Method for Evaluatinq Thermal Runaway Fire Propagation in Battery Energy Storage Systems Section Requirement Test(T)./ Comments Waive (W) Not App. N/A 5 General 5.1 Cell N/A Cell testing not requested by manufacturer 5.1.1 The cells associated with the --- Cell testing not requested by manufacturer BESS were tested. Cell Thermal runaway methodology: Film Heater Cell Surface temperature at gas venting (°C): 176.4 Cell Surface temperature at thermal runaway(°C): 185.8 Gas Composition: Gas Component Volume Released (After thermal runaway) Methane 2.462291 C2 as Ethane 0.171503 C3 as Propane 0.01715 C4 as n-Butane 0.017254 C5 as n-Pentane 0.066551 C6 as n-Hexane 0.579244 C6+ as n-Hexane 0.308108 Propene 0.28346 Ethene 1.84865 Ethanol 0.093665 Benzene 0.184865 Toluene 0.014789 Styrene 0.005299 Carbon Dioxide 26.86704 Carbon Monoxide 41.16327 Hydrogen 25.51137 UL 9540A Checklist and Test Result-Version4:0112512021 CSA GROUP CSA Laboratory Test Data - UL 9540A Checklist and Test Result GROUP' ORIGINAL TEST DATA The results relate only to the items tested. This report shall not be reproduced, except in full, without the approval of CSA Group Testing& Certification Inc. Master Contract: 236698 Model: Powerwall 2-3012170-XX-Y I Page number 8 of 45 Project/Network: 80084072 Description: Li-Ion BESS,up to 15.3 kWh, 120/240V Section Requirement Test(T)/ Comments Waive (W)/ Not App.' N/A Total 100 LFL @ ambient: 9.55% LFL @ vent temp.: T.95% Gas Burn Velocity: 93.7 cm/sec Pmax: 775 kPa 5.1.2 Cells associated with the --- Cell testing done to UL 1973 Appendix E BESS comply with UL 1973 ` See project 80054564, Cells are compliant to UL 1642 5.1.3 Cell level test report --- See 80053757 for Cell Level testing data 5.2 Module N/A See 80059532 for representative worst case Module Level testing data (1609170) 5.2.1 The module associated with --- Cell Thermal.runaway methodology: Film Heater the BESS were tested. Cell Surface temperature at gas venting (IC): 176.4 Cell Surface temperature at thermal runaway(°C): 185.8 Module Heat Release Rate (kW/m2): 0.78 (peak release rate) Gas Generation was below detectable limits during module level testing. Module External Flaming and Flying Debris Hazard: Yes See 80059532 for representative worst case Module Level testing data (1609170) Modules 1609170 and 1624811 differ only in connection and number of cells. The tested module (1609170)contains a larger quantity of cells. 5.2.2 Modules associated with the --- Module is a component of UL 1973 and UL 9540 BESS comply with UL 1973 listed BESS, PowerWall 2 See Attachment 4 for certificate 5.2.3 Module level test report --- See 80059532 for representative worst case Module Level testing data (1609170) 5.3 Battery energy storage T Test Conducted system unit UL 9540A Checklist and Test Result-Version4:0112512021 CSA GROUP CSA Laboratory Test Data - UL 9540A Checklist and Test Result GROUP` ORIGINAL TEST DATA The results relate only to the items tested. This report shall not be reproduced, except in full, without the approval of CSA Group Testing& Certification Inc. Master Contract: 236698 Model: Powerwall 2-3012170-XX-Y Page number 9 of 45 Project/Network: 80084072 Description: Li-Ion BESS, up to 15.3 kWh, 120/240V Section Requirement Test(T)/ Comments Waive (W)/ Not App. N/A 5.3.1 BESS were tested. --- Manufacturer Name:Tesla Model: Powerwall 2—3012170-XX-Y(used in Powerwall + 1850000-XX-Y)Nominal Voltage: 240V (applied during testing) BESS Capacity(Ahr): 404.8 BESS Energy(kWhr): 15.3 5.3.2 BESS comply with UL 9540 --- Battery system complies with UL 1973 and UL 9540, See Attachment 4 for battery system certificate complying UL 1973 provided by manufacturer 5.3.3 Fire detection and -- BESS do,not have fire detection and suppression suppression systems system 5.3.4 BESS test report -- See Unit level test section below 5.4 Flow Batteries N/A EUT is not flow battery 5.4.1 --- EUT is not flow battery 5.4.2 Flow battery comply with UL -- EUT is not flow battery 1973 5.4.3 Flow battery thermal runaway --- EUT is not flow battery determination level test report Attachments No. Name Nm of Page(s) 1 Indoor/Outdoor Ground Mounted Test Video --- 2 Indoor Wall Mounted Test Video --- 3 Outdoor Wall Mounted Test Video --- 4 UL 1973 Certificate 1 5 UL 9540 Certificate 4 5 Images 14 i UL 9540A Checklist and Test Result-Version4:0112512021 CSA GROUP CSA Laboratory Test Data - UL 9540A Checklist and Test Result GROUP" ORIGINAL TEST DATA The results relate only to the items tested. This report shall not be reproduced, except in full, without the approval of CSA Group Testing& Certification Inc. Master Contract: 236698 Model: Powerwall 2-3012170-XX-Y Page number 10 of 45 Project/Network: 80084072 Description: Li-Ion BESS, up to 15.3 kWh, 120/240V ANSUCANWL 9540A:2019 Fourth Edition, Dated November 12, 2019 -Section 9 Unit Level Testing Section Requirement Comments 9 Unit Level Testing 9.1 Sample and test configuration The unit level test conducted with BESS units Test Configuration: installed as described in the manufacturer's instructions and this section. Indoor floor mounted residential use BESS Outdoor ground mounted residential use BESS Indoor wall mounted residential use BESS Outdoor wall mounted residential use BESS Unit level test required one initiating BESS unit ® Conformed in which an internal fire condition in accordance with the module level test is initiated and target adjacent BESS units representative of installation. Test conducted for indoor floor mounted ® Conformed installations with fire propagation hazards and separation distances between initiating and target units representative of the installation. Depending upon the configuration and design BESS is self-contained, all components are within of the BESS (e.g. the BESS is composed of the single enclosure. multiple separate parts within separate enclosures), this testing to determine fire characterization can be done at the battery system level. Note: The suitability of this approach shall be determined based upon the overall design of the BESS and an analysis of the battery system as representative of the overall BESS for fire characterization concerns. The initiating BESS unit shall contain ® Conformed components representative of a BESS unit in a complete installation. Target BESS units shall include ® Conformed - the outer cabinet(if part of the design), racking, - module enclosures, and - components that retain cells components. UL 9540A Checklist and Test Result-Version4:0112512021 CSA GROUP CSA Laboratory Test Data - UL 9540A Checklist and Test Result GROUP" ORIGINAL TEST DATA The results relate only to the items tested. This report shall not be reproduced, except in full, without the approval of CSA Group Testing& Certification Inc. Master Contract: 236698 1 Model: Powerwall 2-3012170-XX-Y Page number 11 of 45 Project/Network: 80084072 Description: Li-Ion BESS,up to 15.3 kWh, 120/240V Section Requirement Comments Initiating BESS sample tested within 8 hrs. ® Conformed after charging BESS as per manufacturer specification to obtain maximum operating Charging Procedure: CC-CV state of charge. Charging Voltage (V): 49.8 Charging Current(A): 40 Charging End Condition (A): 10 Sample Test Final charge Test Start Number Configuration end time time (Date and (Date and Time) Time) DUT1 Indoor/Outd 2021-03-19 2021-03-19 oor ground 12:16:37 16:08:00 mounted DUT 2 Indoor wall 2021-03-22 2021-03-22 mounted 11:37:11 15:12:00 DUT3 Outdoor wall 2021-03-23 2021-03-23 mounted 10:10:53 13:05:00 BESS unit includes an integral fire suppression Integral fire suppression system system. ❑ Optional ❑ Part of BESS Evaluation ❑ DUT tested with Integral fire suppression system ® DUT tested without Integral fire suppression system Electronics and software controls such as the ® Conformed battery management system (BMS) in the BESS are not relied upon for this testing. 9.2 Test method— Indoor floor mounted BESS units During the test, the test room environment Temperature ff): 72 to 74 shall be controlled to prevent drafts that may Humidity(% RH): 40 to 48 affect test results. Any access door(s) or panels on the initiating ® Conformed BESS unit and adjacent target BESS units closed, latched and locked at the beginning and duration of the test. UL 9540A Checklist and Test Result-Version4:0112512021 CSA GROUP CSA Laboratory Test Data - UL 9540A Checklist and Test Result GROUP' ORIGINAL TEST DATA The results relate only to the items tested. This report shall not be reproduced, except in full, without the approval of CSA Group Testing& Certification Inc. Master Contract: 236698 Model: Powerwall 2-3012170-XX-Y Page number 12 of 45 Project/Network: 80084072 Description: Li-Ion BESS, up to 15.3 kWh, 120/240V Section Requirement ' Comments The initiating BESS unit positioned adjacent to ® Conformed two instrumented wall sections. Instrumented wall sections extend not less ® Conformed than 1.6 ft. (0.49 m) horizontally beyond the exterior of the target BESS units. Instrumented wall sections was at least 0.61-m ® Conformed (2-ft)taller than the BESS unit height, but not less than 3.66 m (12 ft) in height above the bottom surface of the unit The surface of the instrumented wall sections ® Conformed were covered with 5/8-in (16-mm) gypsum wall board and painted flat black. The initiating BESS unit was centred ® Conformed underneath an appropriately sized smoke collection hood of an oxygen consumption calorimeter The light transmission measured in the ® Conformed calorimeter's exhaust duct of the heat release ' rate calorimeter. The smoke release rate calculated. ® Conformed The chemical and convective heat release ® Conformed rates shall be measured for the duration of the test The heat release rate measurement system ® Conformed was calibrated using an atomized heptane diffusion burner. The convective heat release rate shall be ® Conformed measured using 1. Thermopile, 2. Velocity probe, and 3. Type K thermocouple, located in the exhaust system of the exhaust duct Following test configuration used for testing. Installation of BESS unit with two or Two rows with initiator surrounded by two more rows instrumented walls and two target units for the indoor ground mounted test. UL 9540A Checklist and Test Result-Version4:0112512021 CSA GROUP CSA Laboratory Test Data - UL 9540A Checklist and Test Result GROUP" ORIGINAL TEST DATA The results relate only to the items tested. This report shall not be reproduced, except in full, without the approval of CSA Group Testing& Certification Inc. Master Contract: 236698 Model: Powerwall 2-3012170-XX-Y I Page number 13 of 45 Project/Network: 80084072 Description: I-i-Ion BESS,up to 15.3 kWh, 120/240V Section Requirement Comments 1 Installation of BESS units with a single --- row Figure 8.1 Examples of potential SBA test arrangements Instrumented Instrumented Wall Section Wall Section ¢ m ¢ m Initiating BESS 0 Target BESS Initiating BESS p Target BESS C Unit Unit Unit Unit 2i0 0 CD E M. m�c c 0.2 N U W LL W LL ECr) 2— N j C Instrumented Wall Section G Target BESS H TarjUnit Unit Note: This image is not representative of the test set-up UL 9540A Checklist and Test Result-Version4:0112512021 CSA GROUP CSA Laboratory Test Data - UL 9540A Checklist and Test Result GROUP' ORIGINAL TEST DATA The results relate only to the items tested. This report shall not be reproduced, except in full, without the approval of CSA Group Testing& Certification Inc. Master Contract: 236698 Model: Powerwall 2-3012170-XX-Y I Page number 14 of 45 Project/Network: 80084072 Description: Li-Ion BESS,up to 15.3 kWh, 120/240V Section Requirement Comments ID Location Required Measured Value (in) Value (in) A Separation distance between the initiating BESS unit and 1 1 instrumented wall section behind initiating BESS unit. B Separation distance between the target BESS unit and 1 1 instrumented wall section behind the target BESS unit. C Separation distance between the initiating BESS unit and 6 6 instrumented wall section to the side of the initiating BESS unit. D Separation distance between initiating BESS unit and target BESS 6 6 unit. E Separation distance between initiating BESS unit and target BESS 1 1 unit or instrumented wall section. F Separation distance between target BESS unit and target BESS --- --- unit or instrumented wall section. G Separation distance between target BESS unit and instrumented 6 6 wall section. H _ Separation distance between target BESS units. ---- --- Note: The physical spacing between BESS units (both initiating and target) and adjacent walls shall be representative of the intended installation. For example, the left side of Figure 9.1 shows a layout of BESS units of two or more rows. The right side of Figure 9.1 shows a layout of BESS units of a single row, with an instrumented wall taking place of the target BESS units as the nearest potential item exposed to thermal energy from the initiating BESS unit in thermal runaway Wall surface temperature measurements ® Conformed collected for BESS intended for installation in locations with combustible construction. Wall surface temperatures measured in ® Conformed vertical array(s) at 152-mm (6-in) intervals for the full height of the instrumented wall sections using - No. 24-gauge or smaller, - Type-K exposed junction thermocouples. Thermocouples shall be secured to gypsum ® Conformed surfaces Heat flux measured with at least two water- ® Conformed cooled Schmidt- Boelter gauges at the surface of each instrumented wall: UL 9540A Checklist and Test Result-Version4:0112512021 CSA GROUP CSA Laboratory Test Data - UL 9540A Checklist and Test Result GROUP' ORIGINAL TEST DATA The results relate only to the items tested. This report shall not be reproduced, except in full, without the approval of CSA Group Testing& Certification Inc. Master Contract: 236698 Model: Powerwall 2-3012170-XX-Y Page number 15 of 45 Project/Network: 80084072 Description: Li-Ion BESS,up to 15.3 kWh, 120/240V Section Requirement Comments a) Both are collinear with the vertical Conformed, HFG are vertically collinear with TC thermocouple array; array b) One is positioned at the elevation estimated Conformed, HFG placed at approx. 6 inches above to receive the greatest heat flux due to the intiating unit thermal runaway of the initiating'module; and c) One is positioned at the elevation estimated Conformed, HFG was positioned in the side of to receive the greatest heat flux during target unit facing the initiating unit potential propagation of thermal runaway within the initiating BESS unit. Heat flux measured with at least two water- ® Conformed cooled Schmidt-Boelter gauges at the surface of each adjacent target BESS unit that faces the initiating BESS unit: a) One is positioned at the elevation estimated Conformed, HFG was positioned in the side of to receive the greatest heat flux due to the target unit facing the initiating unit thermal runaway of the initiating module within the initiating BESS; and b) One is positioned at the elevation estimated Conformed, HFG was positioned in approx. 3 ft to receive the greatest surface heat flux due to from the front of the target unit the thermal runaway of the initiating BESS. For non-residential use BESS, heat flux ® Conformed measured with at least one water-cooled Schmidt-Boelter gauge positioned at the mid height of the initiating unit in the center of the accessible means of egress. No. 24-gauge or smaller, Type-K exposed ® Conformed junction thermocouples installed to measure the temperature of the surface proximate to the- cells and between the cells and exposed face of the initiating module. Each non-initiating module enclosure within the initiating BESS unit instrumented with at least one No. 24-gauge or smaller Type-K thermocouple(s)to provide data to monitor the thermal conditions within non-initiating modules. Additional thermocouples placed to account for convoluted enclosure interior geometries. UL 9540A Checklist and Test Result-Version4:0112512021 CSA GROUP CSA Laboratory Test Data - UL 9540A Checklist and Test Result GROUP`" ORIGINAL TEST DATA The results relate only to the items tested. This report shall not be reproduced, except in full, without the approval of CSA Group Testing& Certification Inc. Master Contract: 236698 Model: Powerwall 2-3012170-XX-Y Page number 16 of 45 Project/Network: 80084072 1 Description: Li-Ion BESS,up to 15.3 kWh, 120/240V Section Requirement Comments For residential use BESS, the DUT covered ® Conformed with a single layer of cheese cloth ignition indicator. An internal fire condition in accordance with ® Conformed the module level test created within a single module in the initiating BESS unit: a)The position of the module selected to Single module unit, placement inside the module present the greatest thermal exposure to was selected to present greatest thermal exposure adjacent modules (e.g. above, below, to surround cells. laterally), based on the results from the module level test; and b)The setup (i.e. type, quantity and ® Conformed positioning) of equipment for initiating thermal runaway in the module is same as that used to initiate and propagate thermal runaway within the module level test (Section 8). The composition, velocity and temperature of ® Conformed the initiating BESS unit vent gases measured within the calorimeter's exhaust duct. Gas composition measured using a Fourier- ® Conformed Transform Infrared Spectrometer with a minimum resolution of 1 cm-1 and a path HFID was used. length of at least 2.0 m (6.6 ft), or equivalent gas analyzer. The hydrocarbon content of the vent gas shall ® Conformed be measured using flame ionization detection. Hydrogen gas measured with a palladium- ® Conformed nickel thin-film solid state sensor. The test shall be terminated if: a)Temperatures measured inside each ® Conformed module within the initiating BESS unit return to ambient temperature; b) The fire propagates to adjacent units or to There was no fire propagation to adjacent units or adjacent walls; or walls c)A condition hazardous to test staff or the A hazardous condition was not created, such that test facility requires mitigation. staff or facilities were at risk For residential use systems, the gas collection ® Conformed data gathered in 9.2 shall be compared to the smallest room installation specified by the UL 9540A Checklist and Test Result-Version4:0112512021 CSA GROUP CSA Laboratory Test Data - UL 9540A Checklist and Test Result GROUP' ORIGINAL TEST DATA The results relate only to the items tested. This report shall not be reproduced, except in full, without the approval of CSA Group Testing& Certification Inc. Master Contract: 236698 Model: Potberwali 2-3012170-XX-Y Page number 17 of 45 Project/Network: 80084072 Description: Li-Ion BESS, up to 15.3 kWh, 120/240V Section Requirement ' Comments manufacturerito determine if the flammable gas collected exceeds 25% LFL in air. 9.3 Test method—Outdoor ground mounted units Outdoor ground mounted non-residential use ® Conformed BESS being evaluated for installation in close proximity to buildings and structures shall use the test method described in Section 9.2. If intended for outdoor use only installations, following measurement are not needed. - the smoke release rate, - the convective and chemical heat release rate and content, - velocity - temperature of the released vent gases Outdoor ground mounted residential use BESS ® Yes, requirement from test method described in being evaluated for installation in close Section 9.2 of UL 9540A except as noted in 9.3.3 proximity to buildings and structures. and 9.3.4 considered during testing. ❑ No Heat flux measurements for the accessible ® Heatflux measured means of egress. ❑ No accessible egress path Test samples installed as shown in Figure 9.2 ® Conformed in proximity to an instrumented wall section that is 3.66-m (12-ft)tall with a 0.3-m (1-ft) D— Distance of BESS from external wall wide horizontal soffit(undersurface of the eave shown in Figure 9.2). Required by manufacturer(in.): 1 The sample mounted on a support substrate Measured during testing (in.): 1 and spaced from the wall in accordance with the minimum separation distances specified by Sample was flush to posterior wall, using the the manufacturer. manufacturer's bracket to anchor it. No substrate was used. UL 9540A Checklist and Test Result-Version4:0112512021 CSA GROUP CSA Laboratory Test Data - UL 9540A Checklist and Test Result GROUP'" ORIGINAL TEST DATA The results relate only to the items tested. This report shall not be reproduced, except in full, without the approval of CSA Group Testing& Certification Inc. Master Contract: 236698 Model: Powerwall 2-3012170-XX-Y Page number 18 of 45 Project/Network: 80084072 Description: Li-Ion BESS, up to 15.3 kWh, 120/240V Section Requirement Comments Exception: If the manufacturer requires ❑ Test perfomed with manufacturer installation against non-flammable material recommended backing material ® Test perfomed without manufacturer recommended backing material Figure 9.2 Example of Outdoor Ground Mounted Residential Use BESS Test Arrangement Eave X X X X X X X X Wall X X BESS D Installation x substrate X SIDE VIEW sa3474a X— Denotes typical thermocouple locations, specific positions dependent on installation details. D— Distance of ESS from external wall. Note: This is not representative of the test set-up used. Target BESS installed on each side of the ® Conformed initiating BESS in accordance with the manufacturer's installation specifications. 9.4 Test Method— Indoor wall mounted units Indoor wall mounted BESS tested in ® Conformed accordance with Section 9.2, except as modified in this section. UL 9540A Checklist and Test Result-Version4:0112512021 CSA GROUP CSA Laboratory Test Data - UL 9540A Checklist and Test Result GROUP' ORIGINAL TEST DATA The results relate only to the items tested. This report shall not be reproduced, except in full, without the approval of CSA Group Testing& Certification Inc. Master Contract: 236698 Model: Powerwall 2-3012170-XX-Y I Page number 19 of 45 Project/Network: 80084072 Description: Li-Ion BESS,up to 15.3 kWh, 120/240V Section Requirement Comments Figure 9.3 Example of Indoor Wall Mounted BESS Test Arrangement Ceiling X X X X X X X _ X X X BESS Wall Ventilation opening X X X SIDE VIEW X—Denotes typical thermocouple locations, specific positions dependent on installation details The test conducted in fire test room (as per ® Conformed standard NFPA 286), 3.66 x 2.44 x 2.44-m (12 x 8 x 8-ft) high, with a 0.76 x 2.13-m (2-1/2 x 7-ft) high opening. UL 9540A Checklist and Test Result-Version4:0112512021 CSA GROUP CSA Laboratory Test Data - UL 9540A Checklist and Test Result GROUP- ORIGINAL TEST DATA The results relate only to the items tested. This report shall not be reproduced, except in full, without the approval of CSA Group Testing& Certification Inc. Master Contract: 236698 Model: Powerwall 2-3012170-XX-Y I Page number 20 of 45 Project/Network: 80084072 Description: Li-Ion BESS, up to 15.3 kWh, 120/240V Section Requirement Comments f' T The initiating BESS unit positioned on the wall ® Conformed opposite of the door opening, with the center located 1.22-m (4-ft) above the floor, and halfway between adjacent walls. Target BESS installed on the wall on each side ® Conformed of the initiating BESS, The wall on which the initiating and target ® Conformed BESS units are mounted is instrumented in accordance with Section 9.2. The gas collection methods shall be in ® Conformed accordance with 9.2.. For residential use BESS, the DUT covered ® Conformed with a single layer of cheese cloth ignition indicator. 9.5 Test Method—Outdoor wall mounted units Outdoor wall mounted BESS tested in ® Conformed accordance with Section 9.2, except as modified in this section. � I UL 9540A Checklist and Test Result-Version4:0112512021 CSA GROUP CSA Laboratory Test Data - UL 9540A Checklist and Test Result GROUP'" ORIGINAL TEST DATA The results relate only to the items tested. This report shall not be reproduced, except in full, without the approval of CSA Group Testing& Certification Inc. Master Contract: 236698 Model: Powerwall 2-3012170-XX-Y Page number 21 of 45 Project/Network: 80084072 Description: Li-Ion BESS,up to 15.3 kWh, 120/240V Section Requirement Comments Figure 9.4 Example of Outdoor Wall Mounted BESS Test Arrangement Eave X X X X X X X Wall BESS X X Installation substrate X SIDE VIEW su347Sa X—Denotes typical thermocouple locations, specific positions dependent on installation details. If intended for outdoor use only wall mount installations, following measurement are not needed. - the smoke release rate, - the convective and chemical heat release rate and content, - velocity - temperature of the released vent gases Test samples mounted on an instrumented ® Conformed wall section that is 3.66-m 12-ft tall with a UL 9540A Checklist and Test Result-Version4:01/25/2021 CSA GROUP CSA Laboratory Test Data - UL 9540A Checklist and Test Result GROUP'" ORIGINAL TEST DATA The results relate only to the items tested. This report shall not be reproduced, except in full, without the approval of CSA Group Testing& Certification Inc. Master Contract: 236698 Model: Powerwall 2-3012170-XX-Y I Page number 22 of 45 Project/Network: 80084072 Description: Li-Ion BESS, up to 15.3 kWh, 120/240V Section Requirement Comments 0.3-m (1-ft)wide horizontal soffit(undersurface of the eave shown in Figure 9.4). The initiating BESS unit positioned on the ® Conformed instrumented wall, with its center located 1.22- m (4-ft) above the floor, and halfway between wall edges. Target BESS installed on the wall on each side ® Conformed of the initiating BESS, The wall on which the initiating and target ® Conformed BESS units are mounted is instrumented in accordance with Section 9.2. For residential use BESS, the DUT covered ® Conformed with a single layer of cheese cloth ignition indicator. 9.6 Rooftop and open garage installations Non-residential use-rooftop or open garage ' installations BESS tested be in accordance with 9.2. If intended for rooftop and open garage use only installations, folloing measurement are not needed. - the smoke release rate, - the convective and chemical heat release rate and content, - velocity - temperature of the•released vent gases Section 9 TABLE: Unit Level Test Sample No DUT 1 Type of Installation: Indoor Ground Mounted Residential Representative of Other Type of Installation" Outdoor Ground Mounted Residential Open Circuit Voltage of Initiating BESS Before Test(Vdc): 49.8 Open Circuit Voltage of Module 1 with BESS Before.Test (Vdc): 49.8 Thermal runaway initiation,Method: Cartridge Heaters UL 9540A Checklist and Test Result-Version4:0112512021 l CSA GROUP CSA Laboratory Test Data - UL 9540A Checklist and Test Result GROUP- ORIGINAL TEST DATA The results relate only to the items tested. This report shall not be reproduced, except in full, without the approval of CSA Group Testing&Certification Inc. Master Contract: 236698 Model: Powerwall 2-3012170-XX-Y Page number 23 of 45 Project/Network: 80084072 Description: Li-Ion BESS,up to 15.3 kWh, 120/240V -Section Re uirement Comments Coolant5ystem ElPower Electronics L'oCation of Initiating module within BESS:` ] Battery Module r Heat Release Rate' UL 9540A Checklist and Test Result-Version4:0112512021 CSA GROUP CSA Laboratory Test Data - UL 9540A Checklist and Test Result GROURO ORIGINAL TEST DATA The results relate only to the items tested. This report shall not be reproduced, except in full, without the approval of CSA Group Testing& Certification Inc. Master Contract: 236698 Model: Powerwall 2-3012170-XX-Y I Page number 24 of 45 Project/Network: 80084072 Description: Li-Ion BESS,up to 15.3 kWh, 120/240V Section Requirement Comments Heat Release Data I 3 1.00 I 0.90 2.5 0.80 0.70 2 I I !! Y 0.60 j v { l � 1.5 0.50� v 0.40 m 1 = o 1 I- 0.30 1 Chemcical Heat Release (kW) 0.20 0.5 Convective_Heat-teleas Rate(kW) � 0.10 I i I I j 0 v 0.00 0:00:00 0:14:24 0:28:48 0:43:12 0:57:36 1:12:00 1:26:24 1:40:48 1:55:12 2:09:36 2:24:00 Time(H:MM:SS) I Observations UL 9540A Checklist and Test Result-Version4:0112512021 CSA GROUP CSA Laboratory Test Data - UL 9540A Checklist and Test Result GROUP" ORIGINAL TEST DATA The results relate only to the items tested. This report shall not be reproduced, except in full, without the approval of CSA Group Testing& Certification Inc. Master Contract: 236698 Model: Powerwall 2-3012170-XX-Y I Page number 25 of 45 Project/Network: 80084072 Description: Li-Ion BESS,up to 15.3 kWh, 120/240V Section I Requirement Comments Time H•MM•.SS Observation 0:00:00 Test Start I Heater Activated 0:25:37 No Observations 0:25:35 Computer malfunction data and video affected 0:26:45 First full vent observed,cheesecloth displaced on right side of initiating unit,small amount of smoke observed from the top, right and left sides of initiating unit 0:27:46 Data acquisition system and video recording,back online 0:28:26 Flash flames extending from right side, mid-height of initiating unit,flames extended behind the ri ht-side target uni approximately 6 inches past the right side of the target 0:29:07 Flash flames self-extin uished and on no residual combustion observed. 0:29:52 Second vent event observed from the right side, middle of initiating unit,only smoke observed 0:30:43 Third vent event observed right side middle of initiating unit only smoke observed 0:31:42 Fourth vent,.event observed right side, middle of initiating unit,only smoke observed 0:33:26 The thermocouples_located in the initiating unit are logging erroneous data due exposure of thermocouple to-the D C ower of the unit'or the C power from the heaters 0:35:16 Small amount of smoke from the initiating unit, extending vertically up the back wall. 0:39:21 Fifth vent event observed,small amount of smoke from right side of initiating unit 0:43:50 Sixth vent event observed -small amount of smoke from right side of initiating unit 0:49:24 Seventh vent event observed, small amount of smoke from right side of initiating unit, thermocouples located in theInitiating unit continue to log erroneous data 0:50:00 Temperatures Dropping on all thermocouples 2:27:28 'End`ofTest Flammable Gas Generation and Composition Data UL 9540A Checklist and Test Result-Version4:0112512021 CSA GROUP CSA Laboratory Test Data - UL 9540A Checklist and Test Result GROUP`" ORIGINAL TEST DATA The results relate only to the items tested. This report shall not be reproduced, except in full, without the approval of CSA Group Testing& Certification Inc. Master Contract: 236698 Model: Powerwall 2-3012170-XX-Y Page number 26 of 45 Project/Network: 80084072 Description: Li-Ion BESS, up to 15.3 kWh, 120/240V Section Requirement I Comments Total Hydrocarbons 2.50 s S 2.00 ------ — -- --- -- —- — ----- 4 61 4 E o 1.50 3 6! n c -THC(Gtersiminute) 0 3 c`a a c 1MO Total I(Wrocarbons(liters)--- T � O rJ c 2 050 1 ' 0.00 0 0:00:00 0:28:48 0S7:36 1:26:24 1:55:12 2:24:00 Time(H:MM:SS) UL 9540A Checklist and Test Result-Version4:0112512021 CSA GROUP CSA Laboratory Test Data - UL 9540A Checklist and Test Result GROUP'" ORIGINAL TEST DATA The results relate only to the items tested. This report shall not be reproduced, except in full, without the approval of CSA Group Testing& Certification Inc. Master Contract: 236698 Model: Powerwall 2-3012170-XX-Y Page number 27 of 45 Project/Network: 80084072 Description: Li-Ion BESS,up to 15.3 kWh, 120/240V Section -Requirement I Comments Duct Gas Composition 180 -------- 160 —— - --------___—__ �_--. 140 _�. ------ — -- ---- ----------- ----- --- 120 100 — --CO'(PPIn) 80 0 N —Hydrogen(pp-) n 60 —THC(ppm) 40 t 20 i 0 OM:00 0:14:24 0:28:48 0:43:12 O:S7:36 1,12:00 1:26:24 Time(H:MPd:SS) UL 9540A Checklist and Test Result-Version4:0112512021 CSA GROUP CSA Laboratory Test Data - UL 9540A Checklist and Test Result GROUP' ORIGINAL TEST DATA The results relate only to the items tested. This report shall not be reproduced, except in full, without the approval of CSA Group Testing& Certification Inc. Master Contract: 236698 Model: Powerwall 2-3012170-XX-Y Page number 28 of 45 Project/Network: 80084072 Description: Li-Ion BESS, up to 15.3 kWh, 120/240V Section Requirement I I Comments Duct Flow Volume vs. Hydrocarbons 10.00 - — — 60000 9.00 55000 8.00 - 7.00 - ----- 50000 N_ 6.00 —THC(liters/minute) �y u u � 5.00 — ---- -- __ 45000 2 � R o F~° 4.00 —Total Hydrocarbons(liters) < 40000 m 3.00 2.00 ---MASS Air Flow in Duct(Liters/min) 35000 1.00 0.00 30000 0:00:00 0:14:24 0:28:48 0:43:12 0:57,36 112:00 1:26:24 1:40:48 1:55:12 2:09:36, 2:24:00 Time(H:MM:SS) Activation of Integral Fire Protection System. N/A UL 9540A Checklist and Test Result-Version4:0112512021 CSA GROUP CSA Laboratory Test Data - UL 9540A Checklist and Test Result GROUP' ORIGINAL TEST DATA The results relate only to the items tested. This report shall not be reproduced, except in full, without the approval of CSA Group Testing& Certification Inc. Master Contract: 236698 Model: Powerwall 2-3012170-XX-Y I Page number 29 of 45 Project/Network: 80084072 Description: LHon BESS,up to 15.3 kWh, 120/240V Section Requirement Comments Smoke release rate 1.00 -- ----- ---- -- ---- 12 090 10 0.80 0.70 —_.— ry 8 -0.60 OSO — _._ _ __--_ — __-- — __ Y_—_— - 6 c ai —Rate of Smoke Release(m'/sec) a o � C x 0.40 -- — — —Total Smoke Released(m') 4 0.30 020 — -- — r2 0.10 0.00 0 0:00:00 0:14:24 0;28:48 0:43:12 0:57:36 1:12:00 1;26:24 1;40;48 1;55:12 2;09:36 2:24:00 Time(H:F411 WSS) Temperature Measurement Thermocouple Location Temperature Measured . Limit(0C) Maximum Temperature (°C) Ambient Temperature Before Test 25 +5 22.2 Max Wall Surface Temperature (6in.from ground behind unit 97 33.9 Maximum Target BESS Temperature (side adjacent target, 20in. 176.4 72.9 from bottom Maximum Surface Temperature of Module within Target BESS 176.4 71.7 side adjacent tar et, 40in. from bottom Maximum Ceiling or Soffit Surface,Temperatures (138in. from the 97 21.1 round UL 9540A Checklist and Test Result-Version4:0112512021 c CSA GROUP CSA Laboratory Test Data - UL 9540A Checklist and Test Result GROUP" ORIGINAL TEST DATA The results relate only to the items tested. This report shall not be reproduced, except in full, without the approval of CSA Group Testing& Certification inc. Master Contract: 236698 Model: Powerwall 2-3012170-XX-Y I Page number 30 of 45 Project/Network: 80084072 Description: Li-Ion BESS,up to 15.3 kWh, 120/240V Section Requirement Comments Heat Flux Measurement Heat flux readings were below detectable limits. Indoor/Outdoor Wall Mount Heat Flux (kW) 0.07000 — 0.06000 — — i 0.05000 0.04000 -- I _ 0.03000 x LL 41 v 0.02000 — — - — - 0.01000 0.00000 O e-i N M g in w n oo D1 O H N M :t Ln LD n oo a) O ei N rn of Ln w n oo D1 O a i N cn r to w r\ oo M O 0 0 0 0 2 0 0 0 0 0 e-r 7! ci e-i .7i i:i -! %I.t ri N N N N N N N N N N M M M M M m m M M m * O m O ui O m O iri O m co O Ln O to O m O m O m O vi O m O N O Ln O m O to O Ln O m O � O 0 0 a-i e-1 N N M M V il'1 Lrl 99 e-i a-i N N fY1 M N lf) O O ci .--i N N M fh C V tl'1 to O O c-1 ci N O O O O O O O O O O cc .--1 ci .--i a-j ei e-I .--I e-i i--I N N N N N N N " N N N " M M M M M Time(�t�ii:mm:sSI Wall Above Initiating 1 Wall Above Initiating 2 Ceiling Right Ceiling Left Target Right Target Left Whole Assembly 30 degree angle 36-inch Egress Initiating 72-inch Egress Initiating Supplementary information:N/A UL 9540A Checklist and Test Result-Version4:0112512021 CSA GROUP CSA Laboratory Test Data - UL 9540A Checklist and Test Result GROUP'" ORIGINAL TEST DATA The results relate only to the items tested. This report shall not be reproduced, except in full, without the approval of CSA Group Testing& Certification Inc. Master Contract: 236698 Model: Powerwall 2-3012170-XX-Y I Page number 31 of 45 Project/Network:. 80084072 Description: Li-Ion BESS, up to 15.3 kWh, 120/240V Section 9 TABLE: Unit Level Test Sample No DUT 2 Type of Installation: Indoor wall mounted residential/non- residential Representative of Other Type of•Installation: - --- Open-Circuit Voltage of'Initiating BESS:Before Test(Vdc): 49.8 -Thermal•runaway initiation Method: Cartridge Heaters Coolant System >, f Power Electronics Location of Initiatingmodule within BESS: �] Battery Module ,t ° Heat Release Rate UL 9540A Checklist and Test Result-Version4:0112512021 CSA GROUP CSA Laboratory Test Data - UL 9540A Checklist and Test Result CROUP`" - ORIGINAL TEST DATA The results relate only to the items tested. This report shall not be reproduced, except in full, without the approval of CSA Group Testing& Certification Inc. Master Contract: 236698 Model: Powerwall 2-3012170-XX-Y Page number 32 of 45 Project/Network: 80084072 Description: Li-Ion BESS, up to 15.3 kWh, 120/240V 40 5 35 0:20 30 ----------_--------------` --------------------- --- z T^� 015 SC .cN 20 c OSO 10 ------'-------- -'----------- =Ctmmac l Heat -------- -Comiective Heat Release Rate(kW) OA5 -Total Chemical Heat Release(wl) 0M:C0 0:14:24 0:28:48 0:43:12 O:S7:36 1:12:00 1:26:24 1:40:48 1:SSa2 2:0936 2:24:00 Time(H:MPA:SS) Observations UL 9540A Checklist and Test Result-Version4:0112512021 CSA GROUP CSA Laboratory Test Data - UL 9540A Checklist and Test Result GROUP" ORIGINAL TEST DATA The results relate only to the items tested. This report shall not be reproduced, except in full, without the approval of CSA Group Testing&Certification Inc. Master Contract: 236698 Model: Powerwall 2-3012170-XX-Y I Page number 33 of 45 Project/Network: 80084072 Description: Li-Ion BESS,up to 15.3 kWh, 120/240V Time H:MM:SS Observation 0:00:00 Test Start/Heater Activated 0:30:00 No Observations 0:32:23 First full vent observed cheesecloth displaced on right side of initiating unit 0:32:27 Small amount of smoke observed from the top center of Jnitiati,rid unit. The initiating unit's casing distorting or flexing a small amount. 0:32:43 Second vent event observed from the right side of initiating unit. 0:32:47 Small amount of smoke observed from the top center of initiating unit; 0:33:40 Third vent event observed right side and left side,,middle of initiating unit., 0:33:41 Very small flash flame and ejection of glowing debris from left side,middle of initiating unit. 0:33:45 Small amount of white smoke on left side of the left target unit and right side of right target unit. 0:33:59 Fourth vent event observed right side and left side. Ejection of glowing debris from left side,middle of initiating unit. 0:34:11 Fifth vent event observed right side and left side. The initiating unit's casing distorting or flexing a small amount. 0:34:30 Sixth vent event observed right side and left side: The initiating unies casing distorting or flexing a small amount. 0:34:35 Smoke increasing from the middle of initiating unit. A small chary mark has formed in the middle of th initiating unit's casing approximately 1 inch in diameter 0:35:30 Seventh vent event observed right side and left side. The initiating unies casing distorting or flexing a small amount. . 0:35:45 Charr mark on the middle of the initiating unit's casing has increased to approximately 1.5 inches in diameter-and extended vertically al5proximately.2 inches. 0:36:58 Eighth vent event observed right side and left side. The initiating unit's casing distorting or flexing a small amount. 0:38:45 Nmeth vent event observed right side and left side. The initiating unies casing distorting or flexing a small amount. 0:39:04 Tenth vent event observed right side'and left side. 3:21:00 End of Test Flammable Gas Generation and Composition Data UL 9540A Checklist and Test Result-Version4:01/25/2021 CSA GROUP CSA Laboratory Test Data - UL 9540A Checklist and Test Result GROUP" ORIGINAL TEST DATA The results relate only to the items tested. This report shall not be reproduced, except in full, without the approval of CSA Group Testing&Certification Inc. Master Contract: 236698 Model: Powerwall 2-3012170-XX-Y I Page number 34 of 45 Project/Network: 80084072 Description: Li-Ion BESS,up to 15.3 kWh, 120/240V Total Hydrocarbons 120 -- -- -- 8 7 1.00 0.80 ------—------ — --------------------— --------- - E 5 V C N _THC(titers/minute) p 0.60 - ----------- — ----__,— _ —_ —._.-------- 4 z o o � —Total Hydrocarbons(flters) = 3 0 F- 2 020 0.00 0 0:0D:00 0:28:48 0,57:36 1:26:24 1:55:12 2:24:00 2:S2:48 3:21:36 3:50:24 Time(H:MM:SS) UL 9540A Checklist and Test Result-Version4:0112512021 CSA GROUP CSA Laboratory Test Data - UL 9540A Checklist and Test Result GROUP` ORIGINAL TEST DATA The results relate only to the items tested. This report shall not be reproduced, except in full, without the approval of CSA Group Testing& Certification Inc. Master Contract: 236698 Model: Powerwall 2-3012170-XX-Y I Page number 35 of 45 Project/Network: 80084072 Description: Li-Ion BESS, up to 15.3 kWh, 120/240V Duct Gas Composition tan 90 -- 80 --- - 70 ---- ---------- ---- --------- ----- - ------- c n 60 - -- - - -- -- - -- 0 0 so a —Co(ppm) E 0 H 40 Horogen(Ppm) ra —THC(ppm) 30 20 ---- — --. - ---- - ----------- --- - -- --'----- `-— -- ------- '--- t 10 i 0 0:00:00 0:28:48 0:57:36 1:26:24 1:S5:12 2:24:00 2:52:48 3:21:36 3:50:24 Time(H:NIM:SS) UL 9540A Checklist and Test Result-Version4:0112512021 CSA GROUP CSA Laboratory Test Data - UL 9540A Checklist and Test Result GROUP'" ORIGINAL TEST DATA The results relate only to the items tested. This report shall not be reproduced, except in full, without the approval of CSA Group Testing& Certification Inc. Master Contract: 236698 Model: Powerwall 2-3012170-XX-Y Page number 36 of 45 Project/Network: 80084072 Description: Li-Ion BESS,up to 15.3 kWh, 120/240V Duct Flow Volume vs. Hydrocarbons 10.00 — - - -- 60000 9.00 SS000 8.00 -- - - - - - — 7.00 5�00 6.00 —THC(lit ers/minute) V V � 3 5.00 -- — ——— -- 45000 13 O 4.00 - -- --- `i —Total Hydrocarbons(liters) Q 40003 q 3.00 2.00 MASS Air Flowin Duct(Liters/min) a 35000 1.00 — 0.00 -------------- - 30000 0:00:00 0:14:24 0:28:48 0:43:12 0:57:36 112:00 1:26:24 1:40:48 1:5512 2:09:36 2:24:00 Time(H:mm:ss) Activation of,lnte ral Fire Protection System. N/A UL 9540A Checklist and Test Result-Version4:0112512021 CSA GROUP CSA Laboratory Test Data - UL 9540A Checklist and Test Result C'aROUP"m ORIGINAL TEST DATA The results relate only to the items tested. This report shall not be reproduced, except in full, without the approval of CSA Group Testing&Certification Inc. Master Coritract: 236698 Model: Powerwall 2-3012170-XX-Y Page number 37 of 45 Project/Network: 80084072 Description: LHon BESS, up to 15.3 kWh, 120/240V Smoke release rate 30 030GAO ZS i 030 20 n n F _u oko c`1 � u 050 15 7B -Rare or Smoke Release(m'/sec) s � o " c Y 0.40 o sH —Total Smoke Released(m') � 10 r 030 0.20 •----___ __.—_...__ __�—_T.._._—�_._.�_._._._._ _.—..M_..... _—..�__�__ A S 0.10 0.00 0 0:00:00 0:14:24 0:28:4S 0:43:12 0:S7:36 1:12:00 1:26:24 1:40:48 1:5s:12 2:09:26 2:24:00 Time(H:MM:SS) Temperature Measurement -Thermocouple,Location Temperature Measured Limit(°C) Maximum Temperature (°C) Ambient Temperature Before Test 25 + 5 20 Max Wall Surface Temperature (posterior wall, 54in. from the 97 29.5 round Maximum Target BESS Temperature(20in from bottom of right 176.4 28.6 target) Maximum Surface Temperature of Module within Target BESS 176.4 22.4 20in from bottom of left target) Maximum Ceiling or Soffit Surface Temperatures 18in from wall 97 35.6 UL 9540A Checklist and Test Result-Version4:01/25/2021 CSA GROUP CSA Laboratory Test Data - UL 9540A Checklist and Test Result GROUP' ORIGINAL TEST DATA The results relate only to the items tested. This report shall not be reproduced, except in full, without the approval of CSA Group Testing& Certification Inc. Master Contract: 236698 Model: Powerwall 2-3012170-XX-Y Page number 38 of 45 Project/Network: 80084072 Description: Li-Ion BESS,up to 15.3 kWh, 120/240V Heat Flux Measurement Heat flux was below detectable limits Indoor Wall Mount Heat Flux (kW) 0.10000 0.09000 i 0.08000 0.07000 -- ' 0.06000 —— — 0.05000 — Y 7 0.04000 - — — Li cu 0.030001 — — — - — — —p 9 j !7 0.02000 — If I 0.01000 i 0,00000 O a-i N M Ln LD t, 00 0) O ­1 N M a Ln LD 1, 00 0) O c-1 N M ct Ln LO 1, 00 M O a--1 N M Gt LO L0 1, 00 0) O 0 0 0 0 0 0 0 R R R ci ei a-i ci ci ci .--, a.i .71 ci N N N N N N N N N N M M M M M M M M M M V O Ln O Ln O Ln O Ln O N O Ln O Ln O Ln O Ln O Ln O Ln O Ln O N O to O to O Ln O u1 O Ln O u1 O Ln O O R 7! 7! N N m m of 5: Lq L9 0 0 7! N N N M M �t Ln Ln O O ei ei N N M M V a' Ln Ln 0 0 7! a-i N i 0 0 0 0 0 C 0 0 0 0 0 0 ­1 ri ei 'i _1 r ei ei ri N N N N N M M M M M I Time(� i:mi m:ss� N N N N N N N Wall Above Initiating 1 Wall Above Initiating 2 Ceiling Right j I Ceiling Left Target Right Target Left I I Whole Assembly 45 degree angle 36-inch Egress Initiating 72-inch Egress Initiating Supplementary information: --- Section 9 TABLE: Unit Level Test Sample No DUT 3 Type of Installation: Outdoor Wall Mounted Residential Representative of Other Type of Installation: --- Open Circuit Voltage of Initiating BESS Before Test(Vdc): 49.8 UL 9540A Checklist and Test Result-Version4:0112512021 CSA GROUP CSA Laboratory Test Data - UL 9540A Checklist and Test Result CaROUPm ORIGINAL TEST DATA The results relate only to the items tested. This report shall not be reproduced, except in full, without the approval of CSA Group Testing& Certification Inc. Master Contract: 236698 Model: Powerwall 2-3012170-XX-Y I Page number 39 of 45 Project/Network: 80084072 Description: Li-Ion BESS,up to 15.3 kWh, 120/240V Thermal runaway initiation Method: Cartridge heater Coolants stem Pnaior$lectiotilns 3, ,�`,�'` �'-x.Y�•'d'rl ,-Location of-initiating module within BESS: I•: •>; ._ °' BatieayModuie ✓b;'r.;i•�.p.':�:. y�, J S UL 9540A Checklist and Test Result-Version4:01/25/2021 CSA GROUP CSA Laboratory Test Data - UL 9540A Checklist and Test Result GROUP ORIGINAL TEST DATA The results relate only to the items tested. This report shall not be reproduced, except in full, without the approval of CSA Group Testing& Certification Inc. Master Contract: 236698 Model: Powerwall 2-3012170-XX-Y Page number 40 of 45 Project/Network: 80084072 Description: Li-Ion BESS, up to 15.3 kWh, 120/240V Heat Release Rate 35 2.00 I 25 I 150 a 20 c ra n 10 =Chema'�tTRc'ai'Rete`ase{kW)-- --Comrecti m Heat Release Rite(kW) O50 -Total Chemical Heat Release(PN) , J 1 � ono 0:C0:00 0:28:48 057:36 1:26:24 1S512 2:24;00 Time(H:MM:SS) Observations Time H:MM:SS Observation 0:00:00 Test Start/Heater Activated 0:24:22 First full vent observed cheesecloth displaced on right side of initiating unit and the top of the left side 0:25:55 Second full vent observed,flash flames and glowing debris observed extending from right side and left side to target units mid-height of initiating unit 0:26:14 Third full vent observed 0:26:28 Fourth full vent observed,one piece of glowing debris observed extending'from right side to target unit, mid-hei ht of initiating unit 0:26:37 Fifth full vent observed,flash flames and glowing debris observed extending from right side and left side to target units mid-height of initiating unit 0:26:51 Sixth full vent observed with a small amount of white smoke, e.initiating unies casing, _oke,thsing,distorting or g flexin a small amount. 0:33:12 Seventh full vent observed with a small amount of white smoke 0:33:16 The initiating unWs casing distorting or flexing a small amount."-- 0:37:37 Eighth full vent observed,the initiating`unit's casing distorting or flexing a small amount Charring starting to develop on the middle of the initiating units exterior casing. 0:37:45 A small amount of white smoke observed 0:44:33 Ninth vent event observed the initiating unWs casing distortin 'or fle)dhq a small amount. 2:27:28 End of Test UL 9540A Checklist and Test Result-Version4:0112512021 CSA GROUP CSA Laboratory Test Data - UL 9540A Checklist and Test Result GROUP- ORIGINAL TEST DATA The results relate only to the items tested. This report shall not be reproduced, except in full, without the approval of CSA Group Testing& Certification Inc. Master Contract: 236698 Model: Powerwall 2-3012170-XX-Y Page number 41 of 45 Project/Network: 80084072 Description: Li-Ion BESS, up to 15.3 kWh, 1201240V Flammable Gas Generation and Composition Data Total Hydrocarbons 120 -- — — ---� 4 4 1.00 3 0180 3 N_ � N C -THC(liter siminute) e 0.60 2 r`o a 2 t? z -Total Hydrocarbons(liters) 2 OAO 0.20 o 1 i 1 OAO L0 0:00:00 0:28:48 0:57:36 1:26:24 1:55.12 2:24:00 2:52:48 3:21:36 3:50:24 Time(I MM:SS) UL 9540A Checklist and Test Result-Version4:01/25/2021 CSA GROUP CSA Laboratory Test Data - UL 9540A Checklist and Test Result GROUP- 1 ORIGINAL TEST DATA The results relate only to the items tested. This report shall not be reproduced, except in full, without the approval of CSA Group Testing&Certification Inc. /Master Contract: 236698 Model: Powerwall 2-3012170-XX-Y I Page number 42 of 45 Project/Network: 80084072 Description: Li-Ion BESS, up to 15.3 kWh, 120/240V Duct Gas Composition 100 -- 90 80 70 C c 60 • c 0 50 (Pp") --Co(PPM) 0 y 40 C —THC(ppm) 30 _ 20 10 0 0:00:00 0:28:48 0:57,36 1:26:24 1:55:12 2:24:00 2:S2:48 3:21:36 3:50:24 Time(H:MPA:SS) r UL 9540A Checklist and Test Result-Version4:0112512021 CSA GROUP CSA Laboratory Test Data - UL 9540A Checklist and Test Result GROUP- ORIGINAL TEST DATA The results relate only to the items tested. This report shall not be reproduced, except in full, without the approval of CSA Group Testing& Certification Inc. Master Contract: 236698 Model: Powerwall 2-3012170-XX-Y Page number 43 of 45 Project/Network: 80084072 Description: Li-Ion BESS, up to 15.3 kWh, 120/240V Duct Flow Volume vs. Hydrocarbons 10.00 60000 9.00 - --- -- -- ----- -- __--.� 55000 0.00 7.00 --- --- ----- ---- -------- ------ _-_ -- 6.00 ---------- -- --- -_ __ - -_- ---- -THC(liters/minute) r`a 5.00 - --_—`- _ -- - --- ---------. 45000 7 b 0 4.00 -- - - i— —Total Hydrocarbons(liters) Q 40000 2.00 -- - - - - - - —MASS Air Hove in Duct(Liters/min) 0.00 — 30000 0:00:00 0:28:48 0:57:36 1:26,24 1:55:12 2:24:00 2:52:48 3:21:3G 3:50:24 Time(H:MIy1:SS) 1 UL 9540A Checklist and Test Result-Version4:0112512021 CSA GROUP CSA Laboratory Test Data - UL 9540A Checklist and Test Result GROUP' ORIGINAL TEST DATA The results relate only to the items tested. This report shall not be reproduced, except in full, without the approval of CSA Group Testing&Certification Inc. Master Contract: 236698 Model: Powerwall 2-3012170-XX-Y Page number 44 of 45 Project/Network: 80084072 Description: Li-Ion BESS,up to 15.3 kWh, 120/240V Activation of Integral Fire Protection System. N/A Smoke release rate L00 -- ---- — 20 090 --- -- 18 0.80 16 0.70 14 N N E 0.60 12 a A � � m $ oso ------ ------------- — ---- 10 u —Rate of Smoke Release W/sec) Y 0 z E Y 0.40 8 H E —Total Smoke Released(ml) S 030 6 0.20 4 0.10 -- — — ---- -------- 2 0.00 Ito 0 0:00:00 0:28:48 0:57:36 1:26:24 2:55:12 2:24:00 252:48 3:21:36 3:50:24 Time(H:MM:SS) Tem eratuee Measurement Thermocouple Location Temperature Measured Limit(°C) Maximum Temperature (OC) Ambient Temperature Before Test 25 + 5 20 Max Wall Surface Temperature Wall, 54in from round 97 30.7 Maximum Target BESS Temperature(Left Target, 4.5in.from 176.4 47.6 bottom Maximum Surface Temperature of Module within Target BESS 176.4 33.5 (Right Target, 20in from bottom Maximum Ceiling or Soffit Surface Temperatures (entire soffit, 1 in, 97 20.5 61n, and 12in from wall UL 9540A Checklist and Test Result-Version4:0112512021 CSA GROUP CSA Laboratory Test Data - UL 9540A Checklist and Test Result GROUP'" ORIGINAL TEST DATA The results relate only to the items tested. This report shall not be reproduced, except in full, without the approval of CSA Group Testing& Certification Inc. Master Contract: 236698 Model: Powerwall 2-3012170-XX-Y I Page number 45 of 45 Project/Network: 80084072 Description: Li-Ion BESS, up to 15.3 kWh, 120/240V Heat Flux Measurement Heat flux reading were below detectable limits f Outdoor Wall Mount Heat Flux (kW) 0.10000 - 0.09000 i 0.08000 I 0.07000 --- 0.06000 - +' I j 0.05000 -- II x 0.04000 — , 10.03000 — - - - - - - I 0.02000 0.01000 I 0.00000 j 1 O ci N M V Ln W r\ 00 0) O ci N M C' Ln w r\ oo cl O .-i N M d' Ln w n 00 a) O .-i N M I Ln w n oo M O O O O O O O O O O O 7i ci ci 7, 7, ci a-i a-i ci .-i N N N N N N N N N N M M M m M M M M In m !t O In O Ln O Ln O Ln 6 m O Ln O m O m O Ln O Ln O Ln O Ln O Ln O Ln O Ln O N O Ln O Ln O VI O Ln O .1 N N M M Ln to O O ci ci N N M M cy 7r Ln Ln O O 'i 7! N N M M Clz� Ln Ln O O .-i -.A N O O O O O O O O O O 00 e-I ­1 r1 � i r-I ci e c-1 .-i N N N N N N CON N N N N N M M M M Time mm:sS Wall Above Initiating 1 Wall Above Initiating 2 Ceiling Right Ceiling Left Target Right Target Left Whole Assembly 45 degree angle 36-inch Egress Initiating 72-inch Egress Initiating I Supplementary information: --- End of Report... UL 9540A Checklist and Test Result-Version4:0112512021 X SUNPOWER® SunPower®X-Series: X22-370 I X22-360 SunPowero Residential AC Module Built specifically for use with the SunPower Equinoklm system,the only fully integrated solution designed,engineered,and warranted by one manufacturer. " Maximum Power. Minimalist Design. i �N Industry-leading efficiency means more power and savings AWN-C per available space.With fewer modules required and hidden microinverters,less is truly more. Highest Lifetime Energy and Savings. Designed to deliver 60%more energy over 25 years in real-world conditions like partial shade and high temperatures., 150% r---------------------------------- 140% -------------- •Fundamentally Different. a 130% And Better. v ,2°% Sun up to >, 110% 60% 100% more d r- c 90% ?= lifetime aso% energy a, 70% ry 60% 0 5 10 15 20 25 The SunPower-'Maxeon®Solar Cell Years of operation • Enables highest-efficiency modules available 2 • Unmatched reliability • Patented solid metal foundation Best Reliability. Best Warranty. prevents breakage and corrosion ® With more than 25 million modules deployed around the world,SunPower technology is proven to last.That's 1 why we stand behind our module and microinverter . �" with the industrys best 25-year Combined Power and ' X-Series:X22-370 I X22-360 SunPower°Residential AC Module AC Electrical Data Inverter Model:Enphase IQ 7XS(IQ7)(S-96-ACM-US) @240 VAC @208 VAC Peak Output Power 320 VA 320 VA Max.Continuous Output Power 315 VA 315 VA Nom.(L-L)Voltage/Range2 M 240/211-264 208/183-229 Max.Continuous Output Current(A) 1.31 1.51 Max.Units per 20 A(LL)Branch Circuit3 12(single phase) 10(two pole)wye CEC Weighted Efficiency 97.5% 97.0% Nom.Frequency 60 Hz Extended Frequency Range 47-68 Hz AC Short Circuit Fault Current Over 3 Cycles 5.8 A rms Overvoltage Class AC Port III AC Port Backfeed Current 18 mA Power Factor Setting 1.0 Power Factor(adjustable) 0.7 lead./ 0.7 lag. No active phase balancing for three-phase installations DC Power Data Warranties, Certifications, and Compliance SPR-X22-370-E-AC SPR-X22-360-E-AC Warranties 25-year limited power warranty Nominal Power I(Pnom) 370 W 360 W 25-year limited product warranty Power Tolerance +5/-0% +5/-0% UL 1703 •UL 1741/IEEE-1547 Module Efficiency s 22.7% 221% nedrtifications .UL 1741 AC.Module(Type 2 fire rated) Temp.Coef.(Power) -0.29%/°C -0.29%/"C UL 62109-1/IEC 62109-2 Compliance .FCC Part 15 Class B •Three bypass diodes ICES-0003 Class B Shade Tolerance •Integrated module-level maximum CAN/CSA-C22.2 NO.107.1-01 power point tracking CA Rule 21(UL 1741 SA)° -• • Conditions (includes Volt/Var and Reactive Power Priority) TestUL Listed PV Rapid Shutdown Equipment6 Operating Temp. -40°F to+140°F(-40°C to+60°C) Max.Ambient Temp. 122°F(50°C) Enables installation in accordance with: NEC 690.6(AC module) Max.Load Wind:62 psf,3000 Pa,305 kg/m2 front&back NEC 690.12 Rapid Shutdown(inside and outside the array) Snow:125 psf,6000 Pa,611 kg/m2 front NEC 690.15 AC Connectors,690.33(A)-(E)(1) Impact Resistance 1 inch(25 mm)diameter hail at 52 mph(23 m/s) When used with InvisiMount racking and InvisiMount accessories Mechanical . (UL 2703): Solar Cells 96 Monocrystalline Maxeon Gen III Module grounding and bonding through InvisiMount Class A fire rated Front Glass High-transmission tempered glass with When used with AC module Q Cables and accessories(UL 6703 and anti-reflective coating UL 2238)6: Environmental Rating Module:Outdoor rated •Rated for load break disconnect Inverter:NEMAType 6 Class II PID Test Potential-induced degradation free Frame Class 1 black anodized(highest AAMA rating) Weight 42.9 Ib(19.5 kg) Recommended Max. 1.3 in.(33 mm) I Module Spacing 46 mm 1 SunPower 360 W compared to a conventional module on same-sized arrays(260 W,16% � lt.B1n.) efficient,a.pprox.1.6 m2),4%more energy per watt(based on third-party module i�r,i 'rc�. , ...ak�,y,a„k°`ak?^'Y4w.,. •µ a#�1 '� eSd!' x. S,Y� _,:R��w� yr 'Y`X* 1• '�. _ d'f R<>yi':,t ;' ,a,.Rr» ,x;�° %�' ..i f 01 '.�7. i 'fPF�j•[/ #" Simple and Fast Installation Integrated module-to-rail grounding • Pre-assembled mid and end clamps Levitating mid clamp for easy placement • Mid clamp width facilitates consistent,even �. module spacing UL 2703 Listed integrated grounding = Flexible Design _ : • Addresses nearly all sloped residential roofs —r-- • Design in landscape and portrait with up to 8' '« rail span Pre-drilled rails and rail splice Rails enable easy obstacle management Customer-Preferred Aesthetics • #1 module and#1 mounting aesthetics Elegant Simplicity Best-in-class system aesthetics Premium,low-profile design SunPower° InvisiMountlm is a SunPower-designed Black anodized components rail-based mounting system.The InvisiMount system Hidden mid clamps and new capped,flush addresses residential sloped roofs and combines faster end clamps installation time, design flexibility, and superior aesthetics. Part of Superior System The InvisiMount product was specifically envisioned and • Built for use with SunPower DC and AC modules engineered to pair with SunPower modules. The resulting • Best-in-class system reliability and aesthetics • New optional rooftop transition flashing,rail- system-level approach amplifies the aesthetic and mounted]-box,and wire management rail clips installation benefits—for homeowners and for installers. Combine with SunPower modules and • InvisiMount Components Module'/Mid Clamp and Rail Module'/End Clamp and Rail Mid Clamp End Clamp Rail&Rail Splice Ground Lug Assembly(for DC systems only) lnv�siMount ComoonentD- • !•- onditions Mid Clamp Black oxide stainless steel 300 series 63 g(2.2 oz) Temperature -40°C to 90°C(-40°F to 194°F) End Clamp Black anodized aluminum 6000 series 110.g(3.88 oz) 3000 Pa uplift Max.Load(LRFD) 6000 Pa downforce Rail Black anodized aluminum 6000 series 830 g/m(9 oz/ft) Rail Splice Aluminum alloy 6000 series 830 g/m(9 oz/ft) Ground Lug 304 stainless steel :Roof Atiachment Hardware ••• • by •• Assembly106.5 g/m(3.75 oz) (A2-70 bolt;tin-plated copper lug) Composition Shingle Rafter Attachment Application Composition Shingle Roof Decking Attachment Curved and Flat Tile Roof Attachment InvisiM•u'rit Component L• ,•. Universal interface for other roof attachments Uplift 664 Ibf Mid Clamp Shear 5401bf • Warranties Certifl-cations Uplift 899 Ibf 25-year product warranty End Clamp Warranties Shear 220 Ibf 5-year finish warranty Rail Moment:upward 548 Ibf-ft UL 2703 Listed Moment:downward 580 Ibf-ft Certifications - Class A Fire Rated Moment:upward 548 Ibf-ft Rail Splice Moment:downward 580 Ibf-ft