Loading...
HomeMy WebLinkAbout51048-Z TOWN OF SOUTHOLD w� BUILDING DEPARTMENT w TOWN CLERK'S OFFICE SOUTHOLD, NY BUILDING PERMIT (THIS PERMIT MUST BE KEPT ON THE PREMISES WITH ONE SET OF APPROVED PLANS AND SPECIFICATIONS UNTIL FULL COMPLETION OF THE WORK AUTHORIZED) Permit #: 51048 Date: 8/8/2024 Permission is hereby granted to:. Goodale, Gre o 103 Silver Beech Ln Calverton, NY 11933 To: demolish existing deck and to construct additions and alterations to existing single-family dwelling as applied for. At premises located at: 4225 Mill Ln Mattituck SCTM #473889 Sec/Block/Lot# 107.-4-2.6 Pursuant to application dated 6/3/2024 and approved by the Building Inspector. To expire on 2/7/2026. Fees: SINGLE FAMILY DWELLING-ADDITION OR ALTERATION $1,146.50 DEMOLITION $196.00 CERTIFICATE OF OCCUPANCY $100.00 Total; $1,442.50 Building Inspector TOWN OF SOUTHOLD-BUILDING DEPARTMENT Town Hall Annex 54375 Main Road P. O.Box 1179 Southold,NY 11971-0959 r Telephone(631)765-1802 Fax(631) 765-9502 htt s;l/www.sontholdtor n o^ je a keceiv d APPLICATION FOR BUILDING PERMIT r For Office Use Only d PERMIT NO. ,, Building P leis ertrac_ JUN 2024Applications and forms must be filled out in their entirety.Incomplete applications will not be accepted Where the Applicant is not the owner,an ^6 Ownerfs Authorhation arq (Pip 2)shall be completed. .. Date: dtl OWNER(S)OF PROPERTY: Name:Greg Goodale SCTM#1000- 107-04-2.6 Project Address: y 1 Z 5 M'1\\ Lokn-e Phone#: �03,- ALA - 'A0,Q TEail: O�O���.@ 1 V's -COC\1 Mailing Address. 2C4�) W-4'%o C.IX (1 CowQY�OYI l ��C��J� CONTACT PERSON: Name: ,. Mailing Address: Phone#: — � '` Email: DESIGN PROFESSIONAL INFORMATION: Name:Andrew Pollock,AIA Mailing Address:56 S. Oxford Street, Brooklyn NY 11217 Phone#:212.620.0044 Email:andrew@cityarchitect.com CONTRACIrOR INFMMATM. Name: s t Mailing Address: Phone#: Email: DESCRIPTION OF PROPOSED CONSTRUCTION ❑New Structure ❑Addition RAlteration ORepair ❑Demolition Estimated Cost of Project: ClOther $75,000 Will the lot be re-graded? ❑Yes MNo Will excess fill be removed from premises? ❑Yes RNo 1 PROPERTY INFORMATION Existing use of property: Residential Intended use of property: Residential Zone or use district in which premises is situated: Are there any covenants and restrictions with respect to this property? ❑Yes ®No IF YES, PROVIDE A COPY. IN Check Box After Reading: The owner/contractor/design professional is responsible for all drainage and storm water issues as provided by Chapter 236 of the Town Code.APPUCAT10N IS HEREBY MADE to the Building Department for the Issuance of a Building Permit pursuant to the Building Zone Ordinance of the Town of Southold,Suffolk,County,New York and other applicable taws,Ordinances or Regulations,for the construction of buildings, additions,alterations or for removal or demolition as herein described.The applicant agrees to comply with all applicable laws,ordinances,building code, housing code and regulations and to admit authorized inspectors on premises and In building(s)for necessary inspections.False statements made herein are punishable as a Class A misdemeanor pursuant to Section 210.45 of the New York State Penal law. Application Submitted R n me): �C�� G�ac�Ia�v ❑Authorized Agent 4tbwner Signature of Applicant: Date: l �`Z4 STATE OF NEW YORK) SS: COUNTY OF L 'e being duly sworn,deposes and says that(s)he is the applicant (Name of ihd' dual signing contract) above named, (S)he is the (Contractor,Agent, Corporate Officer,etc.) of said owner or owners, and is duly authorized to perform or have performed the said work and to make and file this application;that all statements contained in this application are true to the best of his/her knowledge and belief;and that the work will be performed in the manner set forth in the application file therewith. Sworn before me this day of 20 Notary Public rWr�www EMIN E.Ilt?Q0 Notary Public-State of New YorkPROPERTY OWNER AUTHOR] T , b No.02AR8445418 - Qualified in Suffolk County (Where the applicant is not the own e ' MyComm.Expires Dec.19,2028 1, residing at do hereby authorize to apply on my behalf to the Town of Southold Building Department for approval as described herein, Owner's Signature Date Print Owner's Name 2 DRAWING INDEX A.00 Cover Sheet Greg & JacquiA.01 Surve Notes A.02 Schedules Goodale ry�;Yh A.10 ExistingBasement Plan-No work OS A.11 Existin / Demo Ground Flo ridence o PlanAUG - 2 024 A.12 Existin / Demo Second floor Plan A.13 ExistingRoof Plan-No Work wrerng mint Town of Sou Imd A.21 Proposed Ground Floor Plan l ��,.. `-`.:..,ry �1 '' r I'� •�I ate'""' J _ ------ 1 -= 4225 Mill Lane M t i A.22 Proposed a t•tUCk Second FloorP Ian NY 11952 A.25 Proposed Ground Floor RCP-Electric Plan A.26 ProposedCP-Electric Plan 10 / ) Second Floor R A.30 North Elevation-Existing / Proposed Owner A.31 East Elevation-Existln Proposed A.32 South Elevation-Existing / Proposed Gre & Jac ui Goodale ` `' •� ' i � � ` �=•' evation-Existin_ 'j� �q 1" ��! � R..,,,�,. I i I' '1f(f l.����'t:. +iti r'ii'-`'.•r (!a "1 � 1 f I _ m. "' . s�•.•" • A.33 West Elevation-Existing / Pro osed u`•� . .°' ' ' t tf —,,`�� ,,, ." j , 4225 Mill Lane Mattituck NY 11952 A.40 Sections r ' 1 Architect Aj ,1'- Andrew Pollock Architect, PC `•a � J `� 3 •_,, � ,�=�. a�c ,[ _ 56 South Oxford Street Brooklyn, NY 11217 Tel: 212.620.0044 j Email: andrew@cityarchitect.com r"' www.cityarchitect.com `.• q = Square Footage Take Off Existina Square Footage take off _ Heated space (Ground floor and Second floor) 3703 SF ,, .�, Attached Garage 536 SF , :. �'"' -t " Wood Decking (including area under porch) 701 SF C 9 Proposed Square Footage take off Heated space(Ground floor and Second floor) 3746 SF (43SF converted attic) Attached Garage 536 SF Wood Decking (including area under porch) 701 SF I /� ` .__».,,.�'+.a.-'yr,,,y,a ihr•.;w.Y."av:..l]1uk.�p». _ _. r`"@ aF.' - 1/ ��`` �;� ', . f � � � I � •ia ea�76v'�ec, F`,, �tt-w il+�eai 11Y�,.:;,�' ..r'Yaiar gmvan'le:..•s., @ Yf�:r ;, ��, � � "!tl '• !• '� ��V 1 \\� _ . I' � " !: :� i , ; it 1 k 'r �r ' f M.•.-,.. A' _ . - _ �i`_'^'+++M^°I-.a-t^n.,..n t i�, p .' I t ? ZZ- zzz- Revisions # Date Notes ► A 5/17/24 Issued for Permit B 7/10/24 Design Revisions . -.I j�; J,' :•ems ' 1�! Jl 11 G;����i '^�~: - •• . � '� l( � - , `` ) �t {_ C r .� ; '�~'.� '�.l — -� ..t_s i - �`' ,'' 1( ate. ` .. ,' �` -J , _ t.. •..._... 6 gR, . W. C 7/30/24 Revisions to f t� r � Permit t Set •fy ;i�'''"'�•., •��•!rii,rt�•�1' r,' I C;'1� t'� J J 'J` f! ,.�q� `.. - L..`,.,,,.., w � 1 t S' ,� .. .'�J - }• '�i �j Z`iti t I •...;ri;-_•,a,; .(„rya t ,rl '''*,.` ! � I � 1 -°�'�"'� r ,' �(f i�& S f`-a 1�,,� t '�l ✓ i�!'�ir:,;ar.',:1��;,',:r�f'ii# 'y ()"I `""`�'� J l J � 'N_,� } � i '/ � -+�...., / e,,;i•.k r• a�e���r„�� _ /I _ ,/ ;,'���, +! � j ,,.�, i A.,.. , ,t,,,r` r „�,# �^� ---- c't 1!r� �°�', •1r,►�.rs i�i.w�.•..�, =lj�, J �, � i, /',�.` 1 j s;� ._� ,:� (, � 5 �" •w'• ,,.,, roa.-:,� ICS •iil!=•ir'Ainri e° a • %;j �l 1/ ,' J,�� f i I ..l ` ^„, ..�„,�^ .y .,:...,. ! { 3 �'_'+�i.. � '"�,"' / ,4-, � • ry 1 , ' ',:'&, s��•1 T � �, / l I f 1 7Tr.',c�;+*.�'t` i ".:.:•;� y � I r'' �'-r'�,�+, ` ,-.� � �y i c i' � _ W,... 1 ... / ""°'CAM ti-' J i s�� -�A _ - - ..'^° "'•°_uA "_...,w r y?' '$ €''M .�i, •sw....,.ce,.. _.... 1«+. $....u..jw..,,,., i' ��!►r.. a - /I / .31 '",g,.•.. '! �r^�e'-'� � „"�:.. R r d' ! f r t.s,,�x," '�" � - .4 � „ Scale: 1/4 -1 -0 or as noted ' ``'•.,.,>>y 'J�Y'I� "-.,�„`�4 � j .. - .,.,.,,. ,1 ,!, t '. ` 17F .k'.•k� .I d - y.°"�.^nri^'+wre�I' .'R',J,,A,�6 . "^G y�,"�,,,,�'g. .��' i„..�"+_` �MMI r � / ..�� � {i` � _ a E �i�s � t r ,"�� r... "T';?''j "`"'•+�+✓ SY p � � .'fit ,. July 30, 2024 g . ` ; ` !� S Cover Sheet 14 4 h , r. 3' y s SURVEY OF Greg Jacqui& LOT f t 1/4" 1 V Y „/4• t t/4• 1 a /a" t va• FjMAP OF W Lav Lav WCs'rn GoodaIe WOLF PIT POND ESTATES Tub o nEloOL 2` 3' t 11114 " 3' r Y FILE No. 8963 FILED JUNE 21, 1990 114� SITUATE c.o. Residence 3 MATTITUCK 3 TOWN OF SOUTHOLD SUFFOLK COUNTY NEW YORK LOTO N•s' '>9rS.' �- p+`.' t�s t 1 1/4• ' " ' ',ad cfl /4' 112' 11/4' 11/4' q " 15/4' S.C. TAX No. 1000-107-04-2.6 SCALE 1"=40' L,d WC Sink 7W wM DECEMBER 6, 2023 FAL. Shows Tub r.mood Floor pa 2" 2• • r r e t'•... C.O. C o. ILL, 4225 Mill Lane Mattituck AREA = 217,999.5 sq. ft. 3• 3• 3 5.001 a�. NY 11952 Existing Wood Deck ` to be removed N .� Slope 1/4 per Foot.Pitch to Omin C 5�j 4. l • '- 44•C.I.House Trap tl, �" Basement_ �•, LOT 7O v (D_EX_is1,n f�umbin Riser Dia ram Owner ale: 1/8" 1 -0" °F LOTO Greg & Jacqui Goodale 41 4225 Mill Lane Mattituck NY 11952 YAP OF HEHRY I DRUM TEST TRUST N�� `\, a t 3• SCUA E PROPERTY TRUST A G (CO UIFIY OF SUFFOLK DEPELOP1rENT RIGHTS) `\ �• 11/2' ,tl4' t 1/4• 11/4•WM 1114" 112 av,r 114" Lavt 114" Lav1,1/4' 111r Architect 11/4' NO W W v w �Db BhDwer Andrew Pollock Architect PC O,11 Shows S� 3 1 4° Y 1/4" 1 s2. tie 2• 3" 1 11/4' 11f4' 3• r Y C.O. C.O. Y� NOTE LOCATONS AND EXISTENCE OF ANY 3. $UaSURFACE UTILITIES AND/oR STRUCTURES 56 South Oxford Street NOT READILY 95IBLE.ARE NOT CERTIFIED. C.O.O. 3' 3" Brooklyn, NY 11217 ti METES AND BOUNDS SURVEYING 4Z`„°E „.IR`aCE°" 53 PROBST DRIVE vR.uw II-IN o.womoR To. SHIRLEY, NY 11967 smssvwoeum'w""`E"E° °"19P•' PHONE(516)972-5812 T „ u•°'� Tel: 212.620.0044 surveyduderheil®gmail.com `come°from the onq°mor or thu.°we mop 11/4" ^ot mo11 .nh o^ ,rh,,or the Iooe 1 1/4• 1 1/2• 1 1/4' 1 1/2" 1,/4' �•ro•Mtro°° °o ro rou .I Email: andrew@cityarchitect.com LOTS: 2 6 BLOCK: 04 SECTION: 107 DISTRICT:1000 °nmi m e° n.�a° .1 h, or.' Sink ''certn°orp^ma,°° h°reoe�o^nr w°t we W MAP OF: NORTHVILLE m.oiei y cod a°1 I�.roria�a•s�ry.>° �LaW �Lav;T DW a ted by the New Yoh sI-Asa«tattoo or F.A.L.°v ..-Em,a sv�e��. SoIE Shower-° SITUATED AT: MATTITUCK certlnwZ.. ' o it 10 th.�Rp^ -- a TOWN OF SOUTHOLD, SUFFOLK CO..N.Y. tenon°`"m..v,ve>ehm.pr°vor.a, a LEGEND: " �° q°°° °^t°' ,va 3 r 3 va r wm.cityarchitect.com NORTHVILLE s°^Cr o^a bndnn,o.mm�oo. ceunlc°h°^e are of n°^°r°,ohl.to C.O. UTIUTr ROLE NORTHVILLE o..°h:.q O.O C.O. • WELL CERTIFIED NORTHVILLE TO NORTHVILLE JOB NO.: 23-299 3' 3" 3' DATE: DECEMBER 6, 2023 Note: Survey for information only. See Metes and Bounds Surveying's documnets for building survey Slope 1/4 per toot.Pitch to Drain 4" lij 7 .I.House Trap Basement Site Plan & SurveyoPlumbin Riser Dia ram 1 Scale: 1" = 100'-0" O_Z_IM/SP��- 1'-0" General Conditions Framing Insulation Painting ALLOWANCE Plumbing 1. All debris is to be removed daily to site dumpster. Individual work areas are to be 1. Install sill sealer,coppertex, sill plates and straps 24"OC under plates. 1. Floors 1. Exterior Trim 1. Provide tie-in to Septic System. in left in a broom clean manner daily. Recyclable debris is to be removed by installing contractor. 2. Floors: a. 2" Spray Foam as vapor barrier a. Exterior trim surfaces to receive stain (TBD). 2. Install new waste lines of cast iron when over living spaces. Extend waste to 10, Dumpsters are for non-recyclable debris only. Dumpster is to be kept covered when not in use. a. 1 st Floor b. Fiberglass insulation b. Windows are Anderson E seriee or equal in anodized Aluminum from 2. Site sanitation facilities are provided. No residential sanitation facilities are to be i. Install traditional floor frame of 12"TJI 560 with 1" Sturdi 2. Exterior Walls: 2. Siding building used. Floor a. 2"Spray foam as vapor barrier a. Stain Color TBD. for connection to septic system 3. There will be regularly scheduled site meetings to review schedule, decisions, subfloor b. Fiberglass insulation 3. Interior: 3. Provide supply and waste for: and changes. Attendance is mandatory when contractor's work is upcoming or current. C. Spray foam all window openings and penetrations a. All new interior walls to receive (1)coat vinyl, latex primer and (2) a. (2) Bathrooms 4. Jobsite safety is the responsibility of each trade and its employees. All OSHA 3. Frame Exterior Walls: 3. Roofs: b. (1) Master Bath and NYS safety protocols will be enforced. erf system) mahogany decking. a. 2" Spray foam as vapor barrier coats flat latex paint C. Laundry Rm Soffits and Fascia b. Fiberglass insulation b. All interior trim, millwork, built-in cabinetry, and doors to have clear finish, d. Powder Rm Site Work 1. Soffits C. Seal all panel connections e. Kitchen 1. Site Preparation a. 2xl2 on edge of panel edge (from framing) 4. Install Roxul insulation for sound: latex based polyurethane, 3 coats. 4. All hot and cold water lines are to be PEX. a. Remove trees and stumps as indicated- NIC b. Install 1x2 Select Cedar at bottom of 2xXX a. 3 1/2"at all interior walls for sound attenuation. 4. Painter is to inspect all surfaces prior to start to verify the work is ready. a. Supplies 3/"diameter PEX i. Remove from site the wood and stumps 2. Fascia 5. The following steps are to be included for all new work: 5. Colors to be selected by Owner. b. All supplies, hot and cold, to be insulated. ii. Provide protection for plantings and trees identified as to be saved. a. Install 1 x 10 Select Cedar Fascia a. Foam insulate all electrical penetrations. 5. Provide allowance to supply fixtures of per schedule for all fixtures and fittings. b. Install double silt fencing with hay bales to prevent silting and run-off b. Install 1x2 Ce Roofing b. Foam/caulk the sill plate of wall framing and plywood decking. Appliances 6. Shower stalls to have mud base and Schluter System by the installer. where 1. Roofs C. Ensure that fiberglass insulation is tight to top and bottom plates prior to 1. Install new stove, range hood, refrigerators, dishwasher, and washer/dryer as 7. Provide hookups for all appliances. identified on site plan and per Town of East Hampton Permit. a. Install Standing seam LCC roofing on water and Ice membrane on upper drywall supplied by Owner a. Dishwasher 2. Strip topsoil and stockpile. Stabilize to prevent run-off. roof Drywall b. Refrigerator Ice Maker Revisions 3. Driveway b. Install Standing seam LCC roofing on water and Ice membrane tapered 1. Install 5/8" Drywall on all walls, ceilings, including garages. C. Washer and Dryer install Laundry box. a. Strip area of new driveway and parking area to a depth of 8" insulation board. 2. All areas to receive the are to have Wonderboard or Schluter System substrate. HVAC d. Provide (4)sill cocks: b. Install bank run gravel base. C. Provide LCC gutters and downspouts to match roof at all 12/12 pitch 3. Finish tape and spackle all new drywall. 1. Design-build HVAC system to include: 8. Provide option for Re-circ line on motion detectors. 4. Excavate for new foundation: roofs. 4. Finish of walls to be skim coated and to be suitable for eggshell paint. a. Manuals J, S, & D ,Walls R-24 Roofs/Attic R-36, Windows have Ufactor 9. Provide filtered drinking water system at kitchen sink # Date Notes a. Excavate area to depth required: Walls are to be inspected after prime paint and touched up as needed. of.25 to .28. 10. Provide instant Hot water at Kitchen sink. i. Main House 10'foundation walls final grade is established. Windows and Exterior Doors Finish Carpentry Manual J to follow shortly From NYBTG. A 5/17/24 Issued for Permit 6. Provide trenching for new: 1. Provide and install new windows 1. Install new flush solid core Birch Interior Doors and Hardware. b. Design two HVAC systems for pricing and evaluation with Architect and Electric a. Waterline 2. Exterior Finish. a. Jambs to be 5/4 Pine or Poplar(no fingerjoint material). home owner. 1. Determine load and install appropriate rated electrical system. b. Electric& CATV service 3. Paint grade interior. Less than .3 U-value, Low E double pane glass.. b. Hinges (3)per leaf to be stainless steel. i, System 1-VRF High Efficiency system with (2)wall mounted a. Provide new 400 amp service B 7/10/24 Design Revisions 7. Septic System a. All windows to have screens to match window color selected. C. Install Baldwin hardware as specified. Allowance of$140.00 condensers 2. Provide new underground service a. Install new I/A OWTS SCHD approved septic system b. Jamb size to be for 2x6 wall with 5/8"sheathing and 5/8"drywall interior 2. Cabinetry: (Mitsubishi MXZ or equal )Hydronic heating system w/gas boiler 3. Install all new circuit wiring. 7/30/24 Revisions to b. Pick up waste line 10'from building. (6 7/8"). a. Kitchen cabinetry: for hot a. Minimum#12 wire C C. Provide all necessary SCHD inspections and documentation. C. Wrap all window openings with flexible adhesive window opening i. Boxes to be pre-lacquered birch plywood. water and 2nd stage heating. b. 4 fewer devices per circuit than required by code Permit Set 8. Drainage material. ii. Doors to be full overlay frame ii, System 2-closed loop 2 stage Geothermal sized forA//C and 4. Install all devices. a. Install (4)drywells piped to roof drains with solid green pipe. Wrapped opening to be on top of window pan. iii. 1x 5 1/2 Poplar or Pine suitable for painting first stage a. Switches are to be"silent type" (but not quiet). 9. Spread stockpiled topsoil at completion of construction. 4. Provide and install new Patio and Entry Doors. 4. Closet Shelves: heat. Proved gas boiler for hot water and second stage heating. b. Devices are to be selected by architect/owner. 10. Install crushed bluestone driveway(permeable). a. Exterior Doors by Anderson E series or equal a. Shelves to have poplar or pine cleat on wall. C. Submitted shop drawings for duct size and locations with distribution. C. Switches are to be selected by architect/owner. 11. Landscaping - NIC: b. Anodized Finish Exterior. Paint grade interior. b. Shelves to be birch plywood with pine or poplar band. Architect to review proposed system. d. Install GFI receptacles as indicated. C. Less than .3 U-value, Low E triple pane glass C. Install wood closet rod. 2. System to have zones as follows (unless otherwise noted, each zone to have 5. Provide hookups for: Foundation & Concrete Floor d. All doors to have screens to match window color selected. separate a. Appliances 1. Install Cast In Place wall foundation at House. e. Provide extension jambs to match wall thickness of location (6 7/8"). 5. Provide Shop drawings and finish sample for all cabinetry air handler): b. Equipment a. Basement walls to be minium 4'-0"below grade and 6"above grade. f. Wrap all openings with flexible adhesive window opening material. a. Zone : 1 First Floor"public spaces" 6. Contractor is to supply and install all recessed fixtures. Typical Wrapped opening to be on top of pan. Wood Flooring b. Zone 2: First Floor Den and bedroom# 7. Supply and install all bath fans. Fans are to be remotely located. Fans and wiring foundation walls are 10'-0" 1. Install and finish new flooring: C. Zone 3: Second floor Bedroom# to be part of b. Walls to be 10"thick with (1)#5 rebar located 12"from corner and 48" Porches and Decks a. Select Rift White Oak 1 x6. d. Zone 4: Second Floor hall and Bedroom# this Scope of Work and all ducting is to be part of the HVAC Scope. OC. 1. Porch floor under framing scope of work. b. Finish is Bona Traffic- Natural. e. Zone 5: Second floor master suite. 8. Prewire for all CATV and communications. C. Provide 12"Wing Wall foundations, 6"below TOF. 2. Front and Back Decks 2. Prep areas so tile and wood floor intersections are flush w/st.stl divider f. Zone 6 Basement East 9. Provide all permits and inspections associated with this Scope. d. Provide all pockets for structural beams. a. Install 5/4x4 1pe Decking with concealed fasteners. strip g. Zone 7 Basement West 10. Provide Gas powered electric generator back-up for HVAC system, refrigerators/ Scale, 1/4 =1'-On or as noted e. Walls to have 5/8" anchor bolts approx. 32" OC with (2)at each corner. b. Floor to have 5/4x6 border and 3. Grills to be linear metal flobar type register on second floor and wood grill in floor freezers, 2. Provide option for Superior Wall Foundation system. In both 4'and 10" Depth Tile & Stone -ALLOWANCE on essential systems and emergency lighting. 3. Dampproof foundation with asphaltic coating from top of footing to 6" below Siding & Exterior Trim 1. Install tile floors in Baths. first floor grade. 1. Exterior Trim 2. Install wall tile in showers and tubs all approved by Architect. A-V-NIC a. All exterior siding to be 1 x6 Select clear cedar shiplap siding with 3/16 3. Tile to be on wonderboard or mudset substrate with Schluter system in wet 4. Provide all ducting sealed and to be pressure tested. Structural Steel reveal. Cedar will be bleached and stained. 3 sample boards, 48"x48" areas. 5. Provide ERV. Security- July 30, 2024 1. Supply and install basement steel I-beam with posts: will be 4. All doors of tiled areas to have saddles per schedule. 6. Provide NEST, or equal programmable thermostats. 1. Allowance for security system prepared outside on the site to arrive at final stain preparation. 7. Provide all ducting for: 2. System to include motion detectors, glass break, hi-low temp alarm,water b. Install all trim blocking as required. Countertops-ALLOWANCE a. Cloths dryers. sensing alarm. Survey Notes c. All exterior trim to be 5/4 clear cedar stained to match exterior siding. 1. Provide polished Quartz countertops for: b. Range hoods. Trim is to have nails set and is to return onto itself. a. Kitchen C. Bath Fans and ducting in all baths. Utilities 2. All walls to be covered by Blueskin prior to of trim or siding. b. Baths 1. Provide new services: 3• Install Benjamin Obdyk Home Slicker or equal for drainage plane at cedar sided 2. All sinks to be set with anchors. a. Electric and CAN areas. b. Allowance for Well. Bath Accessories 2. Water 1. Allowance to install 3 shower doors. a. Provide new well. a. Complete wall at"Roll-in Shower" (2) b. Provide all tanks and controls. b. Panel/Door in Bath 3 2. Install Bath Accessories as Selected by Owner: General Notes 3. Install mirrored medicine cabinets in all bathrooms. 4 Scale: Actual Size Amu Interior Existing Door Schedule Door Legend Per Schedules Greg & Jacqui ID Location Width Height Thick Type Slab Style RO Width RO Height Mfr Finish Comments D-11 BEDROOM 1 2'8" 6'8" 1 1/2" Swing Simple Panel 19 1/2" 6'9" Goodale D-14 UNDER STAIRS 2'8" 6'8" 1 1/2" SwingSimple Panel 2'9 1/2" 6'9" 2'-9 1/2" 6-5 1/2" 4'-1 1/2" 2'-9 1/2" 21-8" 21-811 2'-8" D-17 MUD ROOM 4'0" 6'8" 1 1/2" Slider Panel 4'1 1/2" 6'8 3/4" D-18 MUD ROOM 2'8" 6'8" 1 1/2" Swing Simple Panel 2'9 1/2" 6'9" _ I I r__ I , D-31 LIBRARY HALL 2'8" 7'0" 1 1/2" SwingSimple Panel 2'8" 7'0" � ; , , , � � � , I , � i ; T T , I D-32 LIBRARY HALL 2'8" 7'0" 1 1/2" Swing Simple Panel 2'8" 7'0" Residence 0" _, r_; _ r_; _ r_ D-33 LIBRARY HALL 3'0" 7'0" 1 1/2" Cased Opening Panel 3'0" 7'0" D-34 LIBRARY HALL 2'8" 7'0" 1 1/2"1 Swing Simple Panel 2'8" 7'0" co 00 00 00 00 ; ' ; co i ' 00 ' D-36 STORAGE 2'6" 4'6" 1 1/2" Swing Simple Panel 2'7 1/2" 4'6 3/4" 1 1111 1 i-I !- 1 1 ' !- ! ' CO CO CO C4 Cfl I �-1 r-1I CO I �-� r-jl CD II-� r-il I I I I I I I I I 1 I : L I L_____J L_____J LL_____J D-01 D-02 D-02 D-03 D-04 D-05 D-07 4225 Mill Lane Mattituck Interior Door Schedule (New Doors) NY 11952 ID Location Width Height Thick Type Slab Style RO Width RO Height Mfr Finish Comments D-01 BATH 1 2'8" 6'8" 1 1/2" Swing Simple Panel 2'9 112" 6'9" D-02 BEDROOM 1 CLOSET 5'4" 6'8" 1 1/2" Swing Bi-part Panel 5'5 1/2" 67 1 2_ 9 1,211 3'-1 1/2" 2r -$" 2'-9 1/2" 4'-1 1/2" 2'-5 1/2" D-02 BEDROOM 1 CLOSET 4'0" 6'8" 1 1/2" Swing Bi-part Panel 4'1 1/2" 6'9" If�If D-03 BEDROOM 1 2'8" 6'8" 1 1/2" Cased Opening Panel 2'9 1/2" 6'9" P D-10 DEN 3'0" 6'8" 1 1/2" Pocket Simple Panel 3'1 1/2" 6'9" D-14 PANTRY 4'0" 6'8" 1 1/2" Pocket Bi- art Panel 4'1 1/2" 6'9" ; 1- r-1 ; r- r-a ; Owner A 1 1 I I I I I I I D-15 POWDER ROOM 2'4" 6'8" 1 1/2" Swing Simple Panel 2'5 1/2" 6'9" - - - P 00 00 II 00 D-20 BATH 2 2'4" 6'8" 1 1/2" Swing Simple Panel 2'5 1/2" 6'9" ' ; ; ; 1 ;zo CO _•' !- 1 -' !- 00 -i -1 1 [ D-21 LAUNDRY 3'0" 6'8" 1 1/2" SwingSimple Panel 3'1 1/2" 6'9" " ' r- ' ' '-� r- Greg & Jacqui Goodale A I I I I' , I I I I I I I 1 D-22 BEDROOM 2 2'4" 6'8" 1 1/2" Swing Simple le Panel 2'5 1/2" 6'9" 4225 Mill Lane D-23 BEDROOM 2 2'6" 6'8" 1 1/2" Swing Simple Panel 2'7 1/2" 6'8 3/4" ; '--� ; ;1 `-'-'-� II I `-'-•-J I D-24 BEDROOM 2 2'6" 6'8" 1 1/2" SwingSimple Panel 2'7 1/2" 6'8 3/4" ---- -----J L_____J Mattituck NY 11952 D-26 LANDING DEN 6'0" 810" 1 1/2" Cased Opening Panel 61 1/2" 811" D-08 D-09 D-10 D-13 D-14 D-14 D-15 D-27 LANDIING DEN 4'0" 811" 1 1/2" Cased Opening Panel 4'0" 8'1" D-28 BEDROOM 3 2'4" 6'8" 1 1/2" Swing Simple Panel 2'5 1/2" 6'9" D-29 BEDROOM 3 3'0" 6'8" 1 1/2" Swing Bi-part Panel 3'1 1/2" 67 D-30 BATH 3 2'4" 6'8" 1 1/2" Swing Simple Panel 2'5 1/2" 6'9" Architect D-37 STORAGE 2'6" 4'6" 1 1/2" SwingSimple Panel 2'71/2" 4'63/4" 4'-1 1/2" 2'-9 1/2" 2'-5 1/2" 3'-1 1/2" 2'-5 1/2" 2'-7 1/2" 7-7 1/2" I I I I Andrew Pollock Architect, PC 56 South Oxford Street co co co H 00 IF 00 11 Brooklyn, NY 11217 CD co CD CD zo Interior Demo Door Schedule Tel: 212.620.0044 ID Location Width Height Thick Type Slab Style RO Width RO Height Mfr Finish Comments Email: andrew@cityarchitect.com L —L D-04 Bath 1 2'8" 6'8" 1 1/2" Swing Simple Panel 2'8" 6'8 1/4" D-17 D-18 D-20 D-21 D-22 D-23 D-24 D-05 Den 2'8" 6'8" 1 1/2" Swing Simple Panel 2'8" 6'8 1/4" www.cityarchitect.com D-06 Bedroom 1 510" 6'8" 1 1/2" Swin Bi-part Panel 5'0" 6'8" D-07 Bedroom 1 2'8" 6'8" 1 1/2" Swing Simple Panel 2'8" 6'8 1/4" D-08 Bedroom 1 1'6" 6'8" 1 1/2" Swing Simple Panel 1'6" 6'8" D-09 Bedroom 1 2'8" 6'8" 1 1/2" Swing Simple Panel 2'9 1/2" 6'9" 2'-9 1/2" � r 2'-9 1/2" D-13 LivingRoom 2'8" 6'8" 1 1/2" SwingSimple Panel 2'8" 6'8 1/4" 6-1 1/ -0 3 2'-5 1/2" D-25 Bedroom 2 2'8" 6'8" 1 1/2" Swing Simple Panel 2'9 1/2" 6'9" D-30 Bedroom 3 2'8" 6'8" 1 1/2" Swing Simple le Panel 2'9 1/2" 6'9" D-32 Bath 3 2'8" 6'8" 1 1/2" Swing Simple Panel 2'9 1/2" 6'9" D-35 Master Bath 2'8" 6'8" 1 1/2" Swing Simple Panel 2'9 1/2" 6'9" _ D-40 Master Closet 4'6" 6'8" 1 1/2" Swing Bi-part Panel 471/2" 6'9" c0 { C) C 0o co co ; ' I ; 00 D-41 Master Closet 2'6' 6'8" 1 1/2" SwingSimple Panel 2'7 1/2" 6'9" zo -, r- op op 0p i_ r_i II CD D-44 Bedroom 3 4'6" 6'8" 1 1/2" Swing Bi-part Panel 4'7 1/2" 6'9" II I I I 1 II I' I 1 1 I 'I II II D-25 D-26 D-27 D-28 D-29 D-30 D-30 EXTERIOR DOOR SCHEDULE (NEW DOORS ONLY) ID Location Width Height Thick Type Slab Style RO Width RO Height Mfr Finish Comments D-34 LIVING ROOM 12'0" 8'0" 1 314" Bi-fold Bi-part Glass 12'1 1/2" 8'0 3/4" 2'-8" 2'-9 1/2" 2'-8" 31_0'1 2'-8" D-35 MASTER.BEDROOM 910" 810" 1 3/4" Slider Glass 9'1 1/2" 8'0 3/4" Meets egress requirements 9'9'-1 1/2" IF a ram—� 1 I 12'-1 1/2" EXTERIOR DOOR LEGENDT1- I L I L NOTE: All new doors to have 2-2x8 op - headers spaning rough opening. E I_' -I �, -1 o 00 UNO 12'-1 1/2" 9'-1 1/2" o0 - --- — -- - --- D-31 D-32 D-32 D-33 D-34 D-34 D-35 2'-9 1/2" 2'-7 1/2" 2'-7 1/2"'. 4'-7 1/2" 2'-7 1/2" 4'-7 1/2" co co O O __ - -_ � Revisions I I I I , r� � �� r; l; '� �� �� I'1 # Date Notes 00 � (0 I I I I I I I a-ohl I I zo III I , I ' I I I ICI L I I I I f I - I I r- I I I 1 - L, r_ ----_ _----- ---_' ti-1 r-iII d d Ii r illi r I, � ii-1 r-iII iI l r iIi r iII I I , ,, II I I I I ,, I , : I I I I I I , II A 5/17/24 Issued for Permit D-34 D-35 I' I I I .I I I I I ' III ; I I I I 'I I I I I I I ; II L_I_I_� II II �11J I L11- I, B 7/10/24 Design Revisions D-35 D-36 D-37 D-40 D-41 D-44 C 7/30/24 Revisions to WINDOW SCHEDULE (ONLY NEW WINDOWS) Permit Set ID Location Unit Width Unit Type RO Width RO Height Head Of Height Window W-01 FOYER, 2'0" 3'0" Fixed Glass 21111 311" 61811 W-02 FOYER, 210" 3'0" Fixed Glass 211" 31111 618" W-03 KITCHEN 31611 3'6" Awning 317" 31711 71011 W-04 BATH 2 31011 TO" Fixed Glass 31111 31111 61811 W-05 LAUNDRY 31011 4'0" Casement TV 41111 6111" W-06 LANDING/DEN 518" 4'0" Custom 519" 411" 618" W-07 LANDING/DEN 5'8" 27 Casement 57 211" 6'8" Scale: 1/4'1=1'-0" or as noted W-08 LIBRARY 3'0" 4'0" Casement 3'1" 411" 6111" July 30, 2024 WINDOW LEGEND 3'-0" 5'-8" 3'-0" Schedules 3'-6" 2'-0" 2'-0" 3'-0" i { E ' v W-01 W-02 W-03 W-04 W-05 W-06 W-07 W-08 GregJacqui& Goodale Residence 4225 Mill Lane Mattituck A NY 11952 A.40 Owner 0 T- Greg & Jacqui Goodale 4225 Mill Lane Mattituck NY 11952 C C A.40 A.40 Architect Andrew Pollock Architect, PC 56 South Oxford Street Brooklyn, NY 11217 Tel: 212.620.0044 Email: andrew@cityarchitect.com www.cityarchitect.com 0 B A.40 A.40 - E R Revisions UP # Date Notes A 5/17/24 Issued for Permit B 7/10/24 Design Revisions C 7/30/24 Revisions to Permit Set Existing Basement Plan-No Work- cale: 1 /4 - 1 -0 11 _. A.40 Scale: 1/4"=1'-0" or as noted July 30, 2024 Existing Basement Plan GregJacqui& Goodale Residence 90'-11 1/2" i 62'-0" Remove existing deck an starirs� 4225 Mill Lane Mattituck NY 11952 i CONC. a PAD Owner ( �, __ ( � II Greg & Jacqui Goodale 4225 Mill Lane Mattituck NY 11952 0 mPORCH W - Architect lz - -- Itec , PC ---► �= Andrew Pollock Arch' t 56 South Oxford Street I - j� I GARAGE Brooklyn, NY 11217 TUB I. j EAKFAST w I NOOK o Tel: 212.620.0044 Close double hight opgning j Remove column androvide p ; v j ------------------__ Email: andrew@cityarchitect.com Options for stru;tlire ` ° N www.cityarchitect.com -------------------- PRIMARY' d _ MUD ROOM BATH _ Q ►- I. j ' PRIMARY BEDROOM J-IVING,ROOM Ir - 4 j Ij N SHWR i �; l� IL - I� SINK DW ;-- ' I KITCHEN STOVE _ W.I.C. ,---_ ---------------- -------------------- - , \ j _ -------- 13 D-09 ' PANTRY F �- w CLOSET AV a CONC. D-06 PAD D- 77 POWDER --" ROOM o r BEDROOM FOYER DINING co ROOM CLOSET Revisions UP # Date Notes I, _ _ A 5/17/24 Issued for Permit B 7/10/24 Design Revisions C 7/30/24 Revisions to Permit Set a CONC. n PAD 8'-0" 45-0" 9'-0" 28'-11 1/2" Scale: 1/4"=1'-0" or as noted 90'-11 1/2" Walls To Be Removed July 30, 2024 Existing Walls -_°__- __- Existing / Demo i Ground Floor Demo Plan To Remain� Ground Floor Scale. 1/4 Doors To Be Removed i i �/ Plan II � IL—� GregJacqui& Goodale Residence Remove existing deck and starirs ; 4225 Mill Lane Mattituck NY 11952 82'-11 1/2" 4'-6" 6'-0" 6-10" 10'-4" 6' 10" 6'-0" 4'-21/2" 9'-0" Owner Greg acu q I Goodale \1 4225 Mill Lane Mattituck NY 11952 L ` , 00 = x — — — — — --- , Architect Andrew Pollock Architect, PC j - LIVING ROOM 0 56 South Oxford Street Brooklyn, NY 11217 0o c _ - ; i Tel: 212.620.0044 r Email: andrew@cityarchitect.com _ BATH j ,I i,1 : -- -- i — f;,IIir1U�� H it IUIL✓killia'�kJll, �',` 11, 1 I,i --i;, 1 , i.. )1. T : -rl KITCHENETTE O O D-35 O ATTIC OPEN TO BELOW I I a HALL I , BEDROOM 2 — - -- BEDROOM ------- BATH Note: Remove all ' fixtures and replumb STORAGE \ ` - y for new bath design ` 0 00 Cl) N = ` I-- 1 ' !_ — �L I IJ i — ( ull I'• I'1:'', ' i NI U II' r111 1 11 I HALL` oho I - BEDROOM 1 OPEN TO BELOW L -5: Revisions ' LO- j - # Date Notes i, 1 —I,—; - - - - - - - A 5/17/24 Issued for Permit B 7/10/24 Design Revisions 4'-6" 6'-0" 6-10" 10'-4" 6'-10" 6'-0" 4'-6" C 7/30/24 Revisions to Permit Set 45'-0" Scale: 1/4"=1'-0" or as noted Le end Walls To Be Removed July 30, 2024 Existing Walls =_ _-__ _____ - Existing / Demo Second Floor Demo Plan To Remain - � Second Floor Scale: 1/4 Doors To Be Removed i i �/ Plan II i eN II ,� II , GregJacqui& Goodale Residence 4225 Mill Lane Mattituck NY 11952 Owner Greg & Jacqui Goodale 4225 Mill Lane Mattituck NY 11952 3.5:12 Architect Andrew Pollock Architect, PC = 56 South Oxford Street c� Brooklyn, NY 11217 J U) Tel: 212.620.0044 CN N N N N SKYLIGHT .1 ; Email: andrew@cityarchitect.com N <1 10:12 www.cityarchitect.com � f . 12:12 14:12 J t 12:12 12:12 SKYLIGHT i i i i 12:12 N N N N N Revisions N N N # Date Notes A 5117/24 Issued for Permit B 7/10/24 Design Revisions C 7/30/24 Revisions to Permit Set 4.5:12 Existing Roof Plan-No Work Scale: 1/4"=V-0" or as noted Scale. 1 /411 = 1 -0 11 July 30, 2024 Existing Roof Plan As GregJacqui& Goodale 90'-111/2" Residence 62'-0" 28'-11 112" A A.40 4225 Mill Lane Mattituck CONC. a NY 11952 PAD 4'-0" — - Owner ------------------- Greg & Jacqui Goodale A..40 4225 Mill Lane ' A.40 Mattituck NY 11952 O 1 i �� I I`y- 00 BREAKFAST NOOK ,, GARAGE w Architect I N U Andrew Pollock Architect, PC I I 1 `-------------------- 56 South Oxford Street 0 Brooklyn, NY 11217 BATH 1 _ -- ------------------ N - v 4'-1 3/4" 4'-2 1/4" 3'-0" 41_0" 21-0" MUD ROOM Tel: 212.620.0044 g DEN o W o Email: andrew@cityarchitect.com w r — I ww.cityarchitect.com B '+ N o D-01 LIVING ROOM B A.40Vo'iVVvNMNVT ' I� I _ D-02 N ------------------- o _ D- 22 - — � � I e CLOSET m o BAR o� � i� „lhl 11M (U - - 6� WIN I I D-1 EW 4'-2 1/2" 3 1/2" 3'-2 3/4" _ BEDROOM 1 ' a CONC. PAD �t o PANTRY o KITCHEN o 0 in EO - rq FOYER q \ m Existing windows provide 5.2 SF _ r.- of free egress and meet egress ' I code. ' _ - I o o >n POWDER = �, UP d ROOM I � I nr Aiv - Revisions 31 2" 8'-6" 015=74 0 # Date Notes to A 5/17/24 Issued for Permit B 7/10/24 Design Revisions C 7/30/24 Revisions to CONC. Permit Set D PAD A A.40 8'-0" 5'-0" 9'-0" 28'-11 1/2" 90'-11 1/2" Scale: 1/4"=1'-0" or as noted Proposed Ground Floor Plan New Windows and doors circled in red July 30, 2024 Scale: 1 /4 = 1 —O = NOTE: This alteration is not a full gut. Location of existing, deolished wallare noted Proposed in grey. Ground Floor Plan AM 'Aloft, As GregJacqui& Goodiale Residence A A.40 82'-11 1/2" 4'-6" 6'-0' 10" 10'-4" 6' 10" 6-0" 4'-2 1/2" 9'-3 1/2" 28'-11 1/2" 4225 Mill Lane Mattituck D-35 NY 11952 2-2x12 headers at new opening D-37 Owner co o C STORAGE MASTER BEDROOM STORAGE ciii A.40 A.40 ' Greg & Jacqui Goodale --—-— -----—-—---------—------.— 4225 Mill Lane r� Mattituck NY 11952 W-05 / W-07 W-08 , , VM ? _ I L------ --- --;;------LID � . i = Architect I I r , Area of new floor _� WIC ° ' ' ' construction - -- ` Andrew Pollock Architect, PC I J 1i, n u, ,,:.',' ,'',, _ I 56 South Oxford Street /-D t Brooklyn, NY 11217 LIBRARY HALL I D-33i O O , . LAUNDRY � � I � ' _-____ Tel: 212.620.0044 -I 1 o i LANDING DEN i ' ' Email: andrew@cityarchitect.com o [C�4 I I , `7 3'-41/2" - 10'-41/2" N i rn i i m B 'n BA 6'-11/2" 1'-8" 51/2" p I I Cal B ' /X! .`� BEDROOM HALL ,' www.cityarchitect.com I 2- x10 headers at new opening � I — ` -- - _ j D-26 i 117- and - MASTER BATH Provide new R-20 Batt insulation in wallsNO �Spray foam Insulation m ceilings m =_ I � cv _________________________________ - I OPEN STORAGE IF) dormer area(R-46)that is to be I ° N D-29 I , Cn o converted to this bathroom space. BEDROOM 2 9 _ N m BATH 3 co N = D-30 i STAIR HALL Provide new R-20 Batt insulation in exterior walls and Spray foam Insulation (R-46)in ceilings in ceiling area that is to be converted to this Bedroom space. D-23 D_24 OPEN TO BELOW BEDROOM t= N 0 — _ i NOTE: This alteration is not a full gut. Location of existing, deolished wallare noted i in grey. ,�,- "j'�',i''i r� ✓.��+u)�IIL��u�ILll)������i��U:�l�U__ r(�I'I' 't= l '� Note: Existing _' Note: Existing ! =I window(6.2 SF _ window (6.2 SF _ o, LID _a free area) meets free area) meets I_ � _� egress egress i requirements requirements _ -�—i �Jll��l (r111bV1PlJ�`I I Ihr11'1JIU(vl(V�IIU1(lI �U( V(��� vll�� 11 " PI'rllli-' Revisions 4'-6" 6'-0' 6'-10" 10'-4" 6'-10" 6'-0" 4'-6" ,._.—'— — — --- — — — ----- ------- ------------- - --------- ----- ---•- -•--- - ---•- - --- — --- — — — — — — ----_ , # Date Notes 45'-0" / ILL _ _- _ _ �� / / Issued for Permit A ! — _-= ��__=�_ P61R,GFI =_ -- - -- - A4o _ _ .. B 7/10/24 Design Revisions _. �� -- i C 7/30/24 Revisions to iXSti ._.. _ y'' - — BREAKFAST Permit Set GARAGE t r*NOOK ti Proposed Second Floor Plan New 2x10 Floor joists o' w New Windows and doors circled in red Scale: 1 /4 1 -- �_ q - g p _— p_p• MUD ROOM — -- DEN BATH 3ia• a'-2 va• f a'-o• 18 BATH 1 LIVING ROOM �* --------------------- I _ 0.DI' — �!i{ L j o.� a'-z vz• 3 vz 3•-z 3ia• BEDROOM 1 — --- - .,. a� cone. ! Scale: 1/4"=1'-0" or as noted KITCHEN FOYER LGlOSET _--- -- I July 30, 2024 i IUP, -a i POWDER 4 �,j ROOM t `t' C St I � a S , (( ti ' x� y 1 Proposed Second Greg & Jacqui Goodale Residence CONC. PAD N New OUTLET 4225 Mill Lane Mattituck NY 11952 (P GFl New GFI OUTLET K (D 220 220 OUTLET WP WATERPROOF OUTLET 0 F FLOOR MOUNTED CONVIENIENCE OUTLET Owner O HALF SWITCHED/HALF HOT Ll Greg & Jacqui Goodale TELEVISION N _ 4225 Mill Lane RECESSED WALL FIXTURE MattltUCk NY 11952 BRE�FAST SMOKE DETECTOR/HARDWIRED �. j N - NOOK f',,. GARAGE WP N ,-. � I ❑ cn , OSD/CM SMOKE&CARBON MONO DETECTOR/HARDWIRED \ �) ` E-� N - o STRUCTURAL Architect \� COLUMN (� GD GARBAGE DISPOSAL WP LL r ' ow DISH WASHER BATH 1 , I W ) 1�3 1/2"X 14" BEAM _ _____ _____ Andrew Pollock Architect, PC = i MUD ROOM (EXISTING) 56 South Oxford Street su6 PANEL ( DEN 'V W Q I ° F I Brooklyn, NY 11217 MAIN PANEL = N z l / N -� 14jf) Tel: 212.620.0044 TELEPHONE SACK ---_ LIVING ROOM Email: andrew@cityarchitect.com D-01 N dIl� HEAT REGISTER CEIL FLR N - � - i I WALL CAB-CAB KICK SPACE � - - ' o Ise HOSE BIBB H HUM ` 0 1 - r�> �J, / 10;_ www.cltyarchltect.com —FIG FIXTURE GAS IN° `J L ------------------ DB DOOR BELL D-02 HEAT GAS HEATER — CLOSET N) N N s 0 I I e N Mo �� O SD/CM -- _ ❑ — — DV DIRECT VENT GAS HEATER } (� WALL SWITCH _ -- d 3 3 WAY FLOOR ABOVE `.1 4 BEDROOM 1 CONC. 4 WAY IPAD J N D D DIMMER SWITCH /N SWI C � � I � T TIMER SWITCH i KI,N C EN - (L>TRY N ��)1 SURFACE MOUNTED CEILING FIXTURE N OPEN TO 2ND FLOOR CEILING I O N N N CF COMPACT FLUORESCENT RECESSED FIXTURE FOYER / GFl N —( DIRECTIONAL SURFACE FIXTURE , N I' (p) PENDANT LIGHT UP � DER N � o N ROOM _ (D RECESSED LED FIXTURE L) WP RECESSED LED WATERPROOF FIXTURE 0 STEP LIGHTING PuPrH Revisions HEAT LAMP — - LOW VOLTAGE STRIP LIGHT # Date Notes RECESSED UP LIGHT A 5/17/24 Issued for Permit Q--Q SURFACE WALL FIXTURE = CONC. PAD B 7/10/24 Design Revisions IZ;7 WALL SCONCE C 7/30/24 Revisions to Permit Set 77 TRACK LIGHTING Proposed Ground Floor RCP-Electrical Plan- 11 tH2O FRIDGE WATER OUTLET Scale: 1 /4 - 1 -0 4- DOUBLE DIRECTIONAL FLOOD LIGHT UNDER ROOF OVERHANG a FAN VENT FLI FAN VENT& LIGHT Note: Varify all existing electrical outlets and light fixtures. Add required outlets to meet NYS Electrical code. Existing (S) SENSOR OPERATED outlets and swithes to remain where possible. All existing lights and switches to remain unless noted otherwise. Scale: 1/4"=V-0" or as noted July 30, 2024 Proposed Ground Floor RCP-Elec. P1 #1% P_ GregJacqui& Goodale Residence 4225 Mill Lane Mattituck (� New OUTLET I LD-35 NY 11952 GFI New GFI OUTLET i i i t ' !..1.. 11 i _ ` � 220 220 OUTLET � � D-37 _i D-36 CCL IC Can light IC Can ligh WP WATERPROOF OUTLET I ' Owner OF FLOOR MOUNTED CONVIENIENCE OUTLET STORAGE MASTER BEDROOM STORAGE !! O HALF SWITCHED/HALF HOT ' I ______ ! Greg & Jacqui Goodale a TELEVISION = I �� 4225 Mill Lane New Cathe ral Ceiling `.\ .' = Mattituck PJY 11952 RECESSED WALL FIXTURE q .......—Provide dresend ZX4 ---- �------ -------� 1 � SMOKE DETECTOR/HARDWIRED ( ;" N I OsDicM SMOKE&CARBON MONO DETECTOR/HARDWIRED 0 N Architect WIC (D �L IC C light IC Ca ligh �Q' GD GARBAGE DISPOSAL ;t El O J F i ; i i Dw DISH WASHER ----- - - ------ ------ - / 1 -- - --- - - -_ - - Andrew Pollock Architect, PC spa - -- � � I --' "' -' 56 South Oxford Street 0 SUB PANEL �' - - M LIBRARY HALL y _-. � � �_ Brooklyn, NY 11217 MAIN PANEL 220 �..-- - -- M ! 3 D-33 GR GFI ; - _ LAUNDRY; O O L wP l L j" / �) LANDING DEN L h i N TELEPHONE JACK o ) O �) N `�' L) �) m I m Tel: 212.6120.0044 o Email: andlrew cit architect.com - @ Y BAT 2 FLAT CEILING FLAT CEILING L FLAT CEILING � SD _ - N 10'-0"AFF --- \`. _ TII! HEAT REGISTER CEIL, FLR, 8'-0"AFF 8-0"AFF ' ' WWW.CIt al-chitect.com WALL, CAB=CAB KICK SPACE � c� BEDROOM HALL------ -- WALL, D-20 3 ------------- - �) Y - —MASTER BATH tH B HOSE BIBB � , < < - - ; _ _ ,,_ D 26' r-G FIXTURE GAS N "� DB DOOR BELL \�SD Q O SD/Cnn L -2 (� �4.� — OPEN STORAGE (VIF) �I P I c� WP i - D 9 - BEDROOM 2 JF o ' El : -vi N BATH 3 DO;0 NGAS HEATER D-30 ({ FLAT CEILING { DV DIRECT VENT GAS HEATER FLAT CEILING I- '._ t'- 10'-0"AFF WALL SWITCH 8'-0"AFF I _ STAIR HALL ) 3 3 WAY _ _ $4 4 WAY D DIMMER SWITCH �) Li (DT TIMER SWITCH - �) D-23 ' D-24 PEN TO BELOW BEDR \ SURFACE MOUNTED CEILING FIXTURE { --- ----------_____-___ JI 000MPACT FLUORESCENT RECESSED FIXTURE 1 �T = �- DIRECTIONAL SURFACE FIXTURE ' I -' i _ I �) PENDANT LIGHT N (� RECESSED LED FIXTURE ( - �) wP RECESSED LED WATERPROOF FIXTURE t� STEP LIGHTING Revisions FHJ HEAT LAMP — - LOW VOLTAGE STRIP LIGHT # Date Notes RECESSED UP LIGHT Proposed Second Floor RCP-Electrical Plan- A 5/17/24 Issued for Permit SURFACE WALL FIXTURE Scale: 1 /4 - V-011 B 7/10/24 Design Revisions C 7/30/24 Revisions to a WALL SCONCE Permit Set 77 TRACK LIGHTING tH20 FRIDGE WATER OUTLET DOUBLE DIRECTIONAL FLOOD LIGHT UNDER ROOF OVERHANG ❑F FAN VENT FAN VENT& LIGHT Note: Varify all existing electrical outlets and light fixtures. Add required outlets to meet NYS Electrical code. Existing (S) SENSOR OPERATED outlets and swithes to remain where possible. All existing lights and switches to remain unless noted otherwise. Scale: 1/4"=V-0" or as noted July 30, 2024 Prtoposed Second Floor RCP-Elec. Plan Greg & Jac( Goodale Residence 4225 Mill Lane Mattitu NY 11952 Owner Greg & Jacqui Goodal 4225 Mill Lane Mattituck NY 11952 Architect Andrew Pollock Architect, 56 South Oxford Street Brooklyn, NY 11217 Tel: 212.620.0044 Email: andrew@cityarchitect.cc www.cityarchitect.com i Existing North Elevtion Scale: 1/4" = V-0" Revisions # Date Notes A 5/17/24 Issued for 7/30/24 Revisions 1 C Permit Set - � - . I - - ► - [ - - 1 - Scale. 1/4 =1 -0 or as nc -- July 30, 2024 North Elevati Existing & Proposed North Elevation 2 1 4" = V- Proposed Scale: / 0 GregJacqui& Goodale E Residence f i I 4225 Mill Lane Mattituck `❑❑�____ f I NY 11952 . f I . I T ❑gin-� T_ ❑1 ❑- Greg & Jacqui Goodale Mill Lane Mattituck NY 11952 I - - - Architect I — J I I I ii — Andrew Pollock Architect, PC 56 South Oxford Street II Brooklyn, NY 11217 Tel: 212.620.0044 Email: andrew@cityarchitect.com - - - -- - - -- -- - - -- - ---- - --1- -- - - - - - r _ _ --_.�. www.cityar chitect.com rchitect.com 7 } Existing East Elevtion Scale: 1/4" = 1 '-0" Revisions - --- - -- # Date Notes — ----- -- - - A 5/17/24 Issued for Permit B 7/10/24 Design Revisions i 7/30/24 Revisions to Permit Set HI I ' II ❑❑ � I i Scale: 1/4"=1 '-0" or as noted 1J _ July 30, 2024 �j F 7 i, 7' WrIff I 41111C7 i . . . . ILL . East e vio n Proposed East Elevation Existing & 2 Scale: 1/4" = 1 '-0" Proposed GregJacqui& Goodale Residence 4225 Mill Lane Mattituck NY 11952 1#1 1 1 1 Owner Greg & Jacqui Goodale 4225 Mill Lane Mattituck NY 11952 Architect Andrew Pollock Architect, PC 56 South Oxford Street Brooklyn, NY 11217 Tel: 212.620.0044 Email: andrew@cityarchitect.com ' www.cityarchitect.com Existing South Elevtion Scale: 1/4" = 1 '-0" I i I 0 Revisions # Date Notes A 5/17/24 Issued for Permit B 7/10/24 Design Revisions -� F, 7/30/24 Revisions to Permit Set i --� - - 1_ . --- - Sole: 1/4"=1'-0" or as noted 00 00 0 0 0 0 July 30, 2024 ' 00 00 South Elevtion Existing & Proposed South Elevation Proposed 2 AM -_ Scale: 1/4" = 1 '-0" AQ Am % GregJacqui& Goodale Residence 4225 Mill Lane Mattituck I NY 11952 I I I I I j , Owner 1 I l� Greg & Jacqui Goodale : is 4225 Mill Lane Mattituck NY 11952 I i I � i � � - ' Architect Andrew Pollock Architect, PC I i t i r I 56 South Oxfo rd Stree j -- -- ---- - k i Brooklyn, NY 11217 Tel: 212.620.0044 t 11 Email• d ew ci r hi F t a c tec . I t com T f l I r - -- - - — C www ci y rchitect com , •t a --- , I , •I E. 171 "4 i'u m' b' 'J f J , 5 ' r , t i r� a r j. f •i i a• 5.M F e• i tt .l. Existing West Elevation Scale: 1/4" = 1 '-011 i Revisions # Date Notes A 5/17/24 Issued for Permit { B 7/10/24 Design Revisions 7/30/24 Revisions to C Permit Set E i G d. 11 P Scale. 1/4 =1t-011 or as noted i _ I IT I , I J u ly 30, 2024 k Fi is i4 } ; I f 7 I` 4 .Y .w n i r i West Elevtion ll t � F. ff i Y j i a r G , I i I. Existing & Proposed West Elevation Peoposed 2 Scale: 1/4" = 1 '-0" AN GregJacqui& Goodale 1 . I RE."Sidence f Provide new Spray foam insulation between all ceiling joists in order to achive R-49 insulation 422-5 Mill Lane Mattituck ib ceiling NY 11952 CV - W M O I O Stair Hall Landing Den Primary Bedroom Owner P I 00 id Greg & Jacqui Goodale ,,�� _ 4225 Mill Lane I I 2nd Floor T.O. F.F. 2nd Floor T.O. F.F. EI. +4 ' 1 2° Mattituck NY 11952 0 -8 / El. +66 -0 00 10 r Provide new R-19insulation between the garage and the - Primary bedroom N Architect 00 rn 1 Ent Hall Living Room - Andrew Pollock Architect, PC Entry g00 56 South Oxford Street Garage Brookh/n, NY 11217 Gr. Floor T.O. F.F. Gr. Floor T.O. F.F. El. +31 0 - Tel: 212.620.0044 Email: andrew@cityarchitect.com N Garage g 1 El. +31'-0" _ www.cityarchitect.com Unfinished Basement — ' 11 ' ' _ —I 11=IIII—IIII IIII—IIII—IIII IIII—IIII=IIII—IIII IIII=IIII IIII IIII IIII—IIII I' Section C Basement T.O. Footing El. +20'-10 _— I I I I— 3 Scale: 1/4" = 1 �-0'1 " -IIII — — - -IIII IIII—IIII IIII IIII—IIII=IIII—IIII—IIII=IIIIIIII—IIII IIII IIII IIII IIII—IIII IIII IIIIIIII—I ' 1 1 Section A Scale: 1/4" = 1 '-0" T - - Provide news pray foam insulation _ 1 L between all ceiling joists in order i ` to achive R-49 insulation in ceiling i Revisions # Date Notes o A o o Bath Laundry Landing Den Library Hall Primary Bedroom Hall Primary edroom A 5/117/24 Issued for Permit B 7/"'10/24 Design Revisions End Floor T.O. F.F. C 7/30/24 Revisions to Permit Set Li Provide new R-19insulation - between the garage and the - - Primary bedroom 00 61 Bath Den Living Room EIK Mud Room Garage c I I i Gr. Floor T.O. F.F. - - El. +31'-0" Scale: 1/4"=1 '-0" or as noted I - Li L { I - - - I - _ - - I— July 30, 2024 Unfinished Basement I I I I - Sections Basement T.O. Footrn-0- — Eq, Section B I I I I IIII 2 Scale: 1/4" = 1 '-0" A04