Loading...
HomeMy WebLinkAbout49579-Z ��OS�FPOt�'�oG, Town of Southold 2/10/2024 a� y� P.O.Box 1179 o ` 53095 Main Rd Southold,New York 11971 CERTIFICATE OF OCCUPANCY No: 44981 Date: 2/10/2024 THIS CERTIFIES that the building SOLAR PANEL Location of Property: 260 Huckleberry Hill Rd,East Marion SCTM#: 473889 Sec/Block/Lot: 31.-16-5 Subdivision: Filed Map No. Lot No. conforms substantially to the Application for Building Permit heretofore filed in this office dated 5/25/2023 pursuant to which Building Permit No. 49579 dated 8/15/2023 was issued, and conforms to all of the requirements of the applicable provisions of the law. The occupancy for which this certificate is issued is: roof mounted solar panels with battery power wall to an existing single family as for. The certificate is issued to Kovatch,Patricia&Harrison,Robert of the aforesaid building. SUFFOLK COUNTY DEPARTMENT OF HEALTH APPROVAL ELECTRICAL CERTIFICATE NO. 49579 10/3/2023 PLUMBERS CERTIFICATION DATED A hori e SignaturcV SpFFQI,��, TOWN OF SOUTHOLD �ao� gay BUILDING DEPARTMENT TOWN CLERK'S OFFICE y • ��� SOUTHOLD, NY o . BUILDING PERMIT (THIS PERMIT MUST BE KEPT ON THE PREMISES WITH ONE SET OF APPROVED PLANS AND SPECIFICATIONS UNTIL FULL COMPLETION OF THE WORK AUTHORIZED) Permit#: 49579 Date: 8/15/2023 Permission is hereby granted to: Kovatch, Patricia 260 Huckleberry Hill Rd East Marion, NY 11939 To: Install roof mounted solar panels to an existing single family as applied for per manufacturers specifications. At premises located at: 260 Huckleberry Hill Rd, East Marion SCTM # 473889 Sec/Block/Lot# 31.-16-5 Pursuant to application dated 6/25/2023 and approved by the Building Inspector. To expire on 2/13/2025. Fees: SOLAR PANELS $50.00 ELECTRIC $100.00 CO-RESIDENTIAL $50.00 Total: $200.00 �I�� ` Building Inspector Gregory Sachs, PE 4589 Austin Blvd., (516)-544-4592 Island Park, NY 11558 permitting@empower-solar.com November 13th, 2023 Town of Southold Building Department 54375 Route 25 Southold, NY 11971 Permit#:49579 260 Huckleberry Hill Road East Marion, NY 11939 Section: 031.00 Block: 16.00 Lot: 005.000 To Whom It May Concern: The Solar Electric installation at 260 Huckleberry Hill Road, East Marion, NY 11939 (Harrison/ Kovatch Residence) has been inspected and meets the New York State Building Code standards for construction and the provisions of ASCE 7.The solar panels have been secured to the roof and the Tesla Power Wall Units have been wall mounted as per the manufacturer's attachment detail shown on the approved drawings, and are in compliance with the structural engineer's requirements.The project is consistent with the specifications set forth in the permit application. Sincerely, io k . ?�o snEC El VE c d� o DEC 2 1 2023 /CFNSED F�OF�c I3i�9f�'�r�q!�a���a-p;rttag3$ biGJir .:0ierC71L� Gregory Sachs, PE pF SO�r�,Ql 0 Town Hall Annex Telephone(631)765-1802 54375 Main Road P.O.Box 1179 �Q Jamesh -southoldtownny.gov Southold,NY 11971-0959 Q�yCOiJNTI,�� BUILDING DEPARTMENT TOWN OF SOUTHOLD CERTIFICATE OF ELECTRICAL COMPLIANCE SITE LOCATION Issued To: Robert Harrison Address: 260 Huckleberry Hill Road city:East Marion st: New York zip: 11939 Building Permit#: 49579 Section: 31 Block: 16 Lot: 5 WAS EXAMINED AND FOUND TO BE IN COMPLIANCE WITH THE NATIONAL ELECTRIC CODE Contractor: EMPOwer CES LLC Electrician: Timothy Crotty License No: ME-65990 SITE DETAILS Office Use Only Residential X Indoor X Basement Service Commerical Outdoor X 1st Floor Pool New X Renovation 2nd Floor Hot Tub Addition Survey Attic Garage INVENTORY Service 1 ph X Heat Duplec Recpt Ceiling Fixtures Bath Exhaust Fan Service 3 ph Hot Water GFCI Recpt Wall Fixtures Smoke Detectors Main Panel X A/C Condenser Single Recpt Recessed Fixtures CO2 Detectors Sub Panel X A/C Blower Range Recpt Ceiling Fan Combo Smoke/CO Transfer Switch UC Lights Dryer Recpt Emergency Strobe Heat Detectors Disconnect Switches 4'LED Exit Fixtures Sump Pump Other Equipment: 6.64kw roof mounted pv solar system with 16 panels, 1 GW 200 amp panel, 2 Tesla Power wall energy storage power 10.0 kwac, energy 27.0 kwh Notes: 16 Panels SPR-415W ACPV SOLAR ENERGY SYSTEM Inspector Signature: Date: October 3, 2023 260 huckleberry hill rd os�s�. �1� �7 q 060 R uckle be r� 4J( eA � . f � TOWN OF SOUTNOLD BUILDING DEFT. 'rowm , 637.765.1802 INSPECTION . [ ] FOUNDATION 1ST [ ] ROUGH PLBG. [ ] FOUNDATION 2ND [ ] INSULATION/CAULKING [ ] FRAMING/STRAPPING [ ] FINAL [ ] FIREPLACE & CHIMNEY [ ] FIRE SAFETY INSPECTION [ ] FIRE RESISTANT CONSTRUCTION [ ] FIRE RESISTANT PENETRATION [ ] ELECTRICAL (ROUGH) ELECTRICAL (FINAL) [ ] CODE VIOLATION [ ] PRE C/O [ ] RENTAL REMARKS: �o lQ..� . Jo re �11j as ner plans A DATE �'d�'fJ.7 INSPECTOR ' �oF soil . q q5,7q ( r 0 w-uck (4erq 41r(� P. * # TOWN OF SOUTHOLD BUILDING DEPT. cou 631-765-1802 INSPECTION [ ] FOUNDATION 1ST [ ] ROUGH PLBG. [ ] FOUNDATION 2ND [ ] INSULATION/CAULKING [ ] FRAMING/STRAPPING [ ] FINAL [ ] FIREPLACE & CHIMNEY [ ] FIRE SAFETY INSPECTION [ ] FIRE RESISTANT CONSTRUCTION [ ] FIRE RESISTANT PENETRATION [ ] ELECTRICAL (ROUGH) ] ELECTRICAL (FINAL) [ ] CODE VIOLATION P [ ] PRE C/O [ ] RENTAL -REMARKS: a DATE INSPECTOR ' 31 (6-2 7 - f6lG *OF SOGIyOlo TOWN OF SOUTHOLD BUILDING DEPT. courm N�' 631-765-1802 INSPECTION [ ] FOUNDATION 1ST [ ] ROUGH PLBG. [ ] FOUNDATION 2ND [ ] INSULATION/CAULKING [ ] FRAMING /STRAPPING [✓,'FINAL v,,pwg-w/ [ ] FIREPLACE & CHIMNEY [ ] FIRE SAFETY INSPECTION [ ] FIRE RESISTANT CONSTRUCTION . [ ] FIRE RESISTANT PENETRATION [ ] ELECTRICAL (ROUGH) [ ] ELECTRICAL (FINAL) [ ] CODE VIOLATION [ ] PRE C/O [ ] RENTAL REMARKS: SIA-ti C�(�{-��i c i ( r✓e.� Ae C � DATE A-2,213 INSPECTOR ?IELD INSPECTION REPORT DATE COMMENTS b FOUNDATION(IST) ------------------------------------ l� C FOUNDATION (2ND) �O Q' cn t " ROUGH FRAMING& PLUMBING t INSULATION PER N.Y. STATE ENERGY CODE o FINAL ADDITIONAL COMMENTS S 3 � - Lk• `�. \ tC C2 s rn v\ C z x �y x d b H j�o�SUFFat t��a TOWN OF SOUTHOLD—BUILDING DEPARTMENT H Town Hall Annex 54375 Main Road P. O. Box 1179 Southold,NY 11971-0959 Telephone(631) 765-1802 Fax(631) 765-9502 hops://www.southoldtow=.gov Date Received APPLICATION FOR BUILDING PERMIT For Office Use Only "•' , :' ` . J PERMIT NO. 4 1q 5'7 1q Building Inspector: J MAY ? ' 2023 Applications and forms must be filled out in their entirety. Incomplete applications will not be accepted. Where the Applicant is not the owner,an h"s; Owner's Authorization form(Page 2)shall be completed. Date: 5/23/2023 OWNERS)OF PROPERTY: Name: Robert Harrison oyu,-f • SCTM #1000-031.00-16.00-005.000 Project Address: 260 H ckleberry Hill Rd, East Marion, NY 11939 Phone#: (865)274-8544 Email: rjharrison@gmail.com l Mailing Address: 260 Huckleberry Hill Rd, East Marion, NY 11939 CONTACT PERSON: Name: Florence Trudel Mailing Address: 4589 Austin Blvd, Island Park, NY 11558 Phone#: 516-544-4592 Email: permitting@empower-solar.com DESIGN PROFESSIONAL INFORMATION: Name: Gregory Sachs Mailing Address: 4589.Austin Blvd, Island Park, NY 11558 Phone#: 516-544-4592 Email: permitting@empower-solar.com CONTRACTOR INFORMATION: Name: EmPower CES LLC Mailing Address: 4589 Austin Blvd, Island Park, NY 11558 Phone#: 516-544-4592 Email:permitting@empower-solar.com DESCRIPTION OF PROPOSED CONSTRUCTION ❑New Structure ❑Addition ❑Alteration ❑Repair ❑Demolition Estimated Cost of Project: ROther Installation of(16)SPR-415W roof mounted solar and 2 Tesla Powerwalls, $ 5j I•ib. \$$ :• Will the lot be re-graded? ❑Yes&No Will excess fill be removed from premises? ❑Yes &No . 1 PROPERTY INFORMATION Existing use of property: Residential 1 Family Intended use of property: Residential 1 Family Zone or use district in which premises is situated: Are there any covenants and restrictions with respect to this property? Dyes fRNo IF YES, PROVIDE A COPY. -Check box After Reading: The owner/contractor/design professional is responsible for all'drainage and storm water issues as provided by Chapter 236 of the.Town Code.APPLICATION IS HEREBY MADE to the Building,Department for the issuance of a`Building Permit pursuant tothe,Building Zone Ordinance of the Town-of Southold,Suffolk,County,New York and other applicable Laws,Ordinances or Regulations,for the construction of buildings, additions;alterations or for removal or demolition as Herein described.The applicant agrees to comply with all:applicable'laws,ordinances,building code, housing code,and regulations and to admit authorized,inspectors on premises,and in building(s,),for,necessary inspections.False statements made herein,are punishable as a Class-A•misdemeanor pursuant to'Section 2i0.45 of the,New York State-Penal Law. Application'5ubmitted By(print name): Florence Trudel gAuthorized Agent ❑Owner, Signature of Applicant: Date: 5/23/2023 STATE OF NEW YORK) SS: COUNTY OF Suffolk ) Florence Trudel being-duly sworn,•deposes and-says that is the applicant (Name of individual signing contract)above named, (S)he is the Agent (Contractor,Agent,Corporate Officer,etc.) of said owner or owners,and-is duly authorized to perform or have performed the said work and to make and file this application;that all statements contained.in this application are true to the best of his/her knowledge and belief;and that the work will be performed in the manner set forth in the application file therewith. Sworn before me this Ryan M.Moser NOTARY PUBLIC NEW YORK Z3 day of M 01�I ,20 _ Registrati 12506 kn w y Commission a r 28,2024 PROPERTY OWNER AUTHORIZATION (Where the applicant is not the owner) I� Robert Harrison residing at 260 Huckleberry Hill Rd, East Marion, NY 11939 do hereby authorize Florence Trudel to apply on my behalf to the Town of Southold,Building Department for approval as described herein. I f � �ii�LGILeM`' 5/23/2023 Owner's Signature Date Robert Harrison, Print Owner's Name 2 BUILDING DEPARTMENT- Electrical Inspector TOWN OF SOUTHOLD Town Hall Annex- 54375 Main Road - PO Box 1179 Southold, New'York 11971-0959 Telephone (631) 765-1802 - FAX (631) 765-9502 ;R rogerr -southoldtownny.,gov-seandO-southoldto-wnny.gov-, AP'PL[C- TI:ON FOR ELECTRICAL INSPECTION": , ELECTRICIAN INFORMATION (Ali information Required) Date.: 05/23/2023 Company Name:,_ Empower CES, LLC.. - -—=— Name: -.Timothy Crotty.. _. License No.: ME-65990 email: p ermittin em ower-solar.com Address: 4589 Austin _Blvd., Island Park, NY 11558 - - k. Phone No.: 516 -544-4592 JOB SITE INFORMATION (All Information Required) - i Name:_ Robert-Harrison Address: 260 Huckleber Hill Rd, East Marion,-NY 11939 Cross Street: 7 Phone No.:..(865).274-8544 BIdg.Permit#: y-q_5'7� -- _ -- - ---email: rjharrison@gmail.com Tax 100 _ Lot__ 005.000_Map District:, _ BRIEF DESCRIPTION OF WORK (Please Print Clearly) _ Installation of roof mounted solar panels N 6) SPR-415W ACPV modules 6.64 kW total system size & (2) Tesla Battery Pack Circle All That Apply: ' Is job ready for inspection?: YES / NO Rough In Final Do you need a Temp Certificate?: YES / NO Issued On Temp Information: (All information required) Service Size 1 Ph 3 Ph Size: _ -A # Meters Old Meter# . _ New Service - Fire Reconnect- Flood Reconnect-.Service Reconnected - Underground - Overhead #Underground Laterals 1 2 H Frame Pole Work done on Service? Y N Additional Information':; - -PA YMENT_DUE WITH-APPLICATION Request for Inspection FormAs BUILDING DEPARTMENT- Electrical Inspector r dGM''L, TOWN OF SOUTHOLD Town Hall Annex - 54375 Main Road - PO Box 1179 z iya Southold, New York 11971-0959 Telephone (631) 765-1802 - FAX (631) 765-9502 rogerr(a�southoldtownny.gov seand a17southoldtownny.gov APPLICATION FOR ELECTRICAL INSPECTION ELECTRICIAN INFORMATION (All Information Required) Date: 05/23/2023 Company Name: EmPower CES, LLC. Name*"- ame TimothV Crott License No.: ME-65990 email: permitting em ower-solar.com Address: 4589 Austin Blvd., Island Park, NY 11558 Phone No.: 516 -544-4592 JOB SITE INFORMATION (All Information.Required) Name: Robert Harrison Address: 260 Huckleberry Hill Rd, East Marion, NY 11939 Cross Street: Phone No.: (865) 274-8544 Bldg.Permit#: =� 5` email: rjharrison@gmail.com Tax Map District: 1000 Section: 031.00 Block: 16.00 Lot: 005.000 BRIEF DESCRIPTION OF WORK (Please Print Clearly) Installation of roof mounted solar panels (16) SPR-415W ACPV modules 6.64 kW total system size & (2) Tesla Battery Pack Circle All That Apply: Is job ready for inspection?: YES / NO Rough In Final Do you need a Temp Certificate?: YES / NO Issued On Temp Information: (All information required) Service Size 1 Ph 3 Ph Size: A / # Meters Old Meter# New Service - Fire Reconnect- Flood Reconnect- Service Reconnected - Underground - Overhead #Underground Laterals 1 2 H Frame Pole Work done on Service? Y N Additional Information: PAYMENT.DUE WITH APPLICATION Request for Inspection Form.kis SURVEY Of PROPERTY_._... SITUATE: EAST MARON TOWN: SOUTHOLD u %" W - s SUFFOLK COUNTY, NY N8912'0 'E s�53 5UKVEYMD f0-10-20176p"E 34.38' 36-5 0"�- j' - SUFFOLK COUN rY TAX 1000-31 -16-5 CERTIFIED TO: DAVID JANNUZZI co x `OLAND :>i� e� ``z'„• *, 11 I J011N C. EHLER5 LAND SURVEYOR' G EA5T MAIN 5TREE'T II.Y.5.LIC.NO.50202 i NE A'. —30.1125q.ft. IRRNEAD.N.Y.N fax 3G.Y. 11901 3G5-6286 f9-626v j L-'s}' �hI yp• �, r AVAGMf:.C a •_ J-11ayf-tlp[mhnc,net NYSIF PO Box 66699,Albany,NY 12206 New York State Insurance Fund nysif.com CERTIFICATE OF WORKERS' COMPENSATION INSURANCE A A A A A 522407627 AMWINS BROKERAGE OF NEW YORK 200 ELWOOD DAVIS ROAD SUITE 200 � LIVERPOOL NY 13088 91. im SCAN TO VALIDATE AND SUBSCRIBE POLICYHOLDER CERTIFICATE HOLDER EMPOWER CES LLC TOWN OF SOUTHOLD 4589 AUSTIN BLVD 54375 ROUTE 25 ISLAND PARK NY 11558 SOUTHOLD NY 11971 POLICY NUMBER CERTIFICATE NUMBER POLICY PERIOD DATE Z 2546 624-4 256986 05/01/2023 TO 05/01/2024 04/25/2023 THIS IS TO CERTIFY THAT THE POLICYHOLDER NAMED ABOVE IS INSURED WITH THE NEW YORK STATE INSURANCE FUND UNDER POLICY NO. 2546 624-4, COVERING THE ENTIRE OBLIGATION OF THIS POLICYHOLDER FOR WORKERS' COMPENSATION UNDER THE NEW YORK WORKERS' COMPENSATION LAW WITH RESPECT TO ALL OPERATIONS IN THE STATE OF NEW YORK, EXCEPT AS INDICATED BELOW. IF YOU WISH TO RECEIVE NOTIFICATIONS REGARDING SAID POLICY, INCLUDING ANY NOTIFICATION OF CANCELLATIONS, OR TO VALIDATE THIS CERTIFICATE, VISIT OUR WEBSITE AT HTTPS://WWW.NYSIF.COM/CERT/ CERTVAL.ASP.THE NEW YORK STATE INSURANCE FUND IS NOT LIABLE IN THE EVENT OF FAILURE TO GIVE SUCH NOTIFICATIONS. THIS POLICY AFFORDS COVERAGE TO THE SOLE PROPRIETOR, PARTNERS AND/OR MEMBERS OF A LIMITED LIABILITY COMPANY. DAVID SCHIEREN GREG SACHS EMPOWER CES LLC r THE POLICY INCLUDES A WAIVER OF SUBROGATION ENDORSEMENT UNDER WHICH NYSIF AGREES TO WAIVE ITS RIGHT OF SUBROGATION TO BRING AN ACTION AGAINST THE CERTIFICATE HOLDER TO RECOVER AMOUNTS WE PAID IN WORKERS' COMPENSATION AND/OR MEDICAL BENEFITS TO OR ON BEHALF OF AN EMPLOYEE OF OUR INSURED IN THE EVENT THAT, PRIOR TO THE DATEJOF THE ACCIDENT, THE CERTIFICATE HOLDER HAS ENTERED INTO A WRITTEN --- CONTRACT WITH-OUR INSURED THAT REQUIRES THAT SUCH RIGHT OF SUBROGATION BE WAIVED. THIS CERTIFICATE IS ISSUED AS'A•MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS' NOR INSURANCE COVERAGE UPON THE CERTIFICATE HOLDER. THIS CERTIFICATE DOES NOT AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICY. NEW YORK STATE INSURANCE FUND DIRECTOR,I SURANCE FUND UNDERWRITING VALIDATION NUMBER: 1057999100 1111111111111111111 IIIIIIIIIIIIIII Imm�mmm�nil punml BID Bill inn mHiml Mill Ilm Mill ll II IIIII llll 00000000000114835691 Form WC-CERT-NOPRINT Version 3(08/29/2019)[WC Policy-25466244] U-26.3 69 r00000000000114835691110001-00002546624411##Z1116124-211rCertNoP-CERT_11f01-000011 l i Suffolk County Dept.of Labor,Licensing&Consumer•Affairs �I •HOME IMPROVEMENT LICENSE Name GREGORY SACHS Business Name >certifies that the ireris,dulylicensed EMPOWER CESILC DBA hO Courty of suffolk License Number:H-50211 Rosalie orago Issued: 05/30/2012 Commissioner Expires: 51172024 Suffolk County Dept of.__ I Labor,. &Consumer Affairs MASTER ELECTRICAL LICENSE Name { TIMOTHY M GROTTY• - ' Business Name' - JI This certifies that the' Empower CES LLC DBA *aieris duty licensed, -3y the County-of suffolk License Number:ME$5990. Rosalie Drago Issued: 11112/2021 Commissioner Expires; 11/01/2023 ---------------- - i l I ` 4 yl 1 EMPOCES-01 TKARUNA ACORO® J CERTIFICATE OF LIABILITY INSURANCE DATE(MM/DD/YYYY)F5/8/2023 THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER.THIS CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES" BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S),AUTHORIZED REPRESENTATIVE OR PRODUCER,AND THE CERTIFICATE HOLDER. IMPORTANT: If the certificate holder is an ADDITIONAL INSURED,the policy(ies)must have ADDITIONAL INSURED provisions or be endorsed. If SUBROGATION IS WAIVED, subject to the terms and conditions of the policy,certain policies may require an endorsement. A statement on this certificate does not confer rights to the certificate holder in lieu of such endorsement(s). PRODUCER License#0757776 CONTACT Ana Bello NAME: HUB international Insurance Services Inc. PHONE FAX A/C,No,EXt:(310)568-5977 A/c,No SuiteCorporate Pointe E-MAIL ana.bello@hubinternational.com Suite 600 ADDRESS: Culver City,CA 90230 INSURERS AFFORDING COVERAGE NAIC INSURER A:Southwest Marine 8r General Insurance Company 12294 INSURED INSURER B:James River Insurance Company 12203 EmPower CES LLC INSURER C: 4589 Austin Boulevard INSURER D: Island Park,NY 11558 INSURER E INSURER F: COVERAGES CERTIFICATE NUMBER: REVISION NUMBER: THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES.LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. INSR TYPE OF INSURANCE ADDL SUBRLTR POLICY NUMBER POLICY EFF POLICY EXP IYYYYI LIMITS A X COMMERCIAL GENERAL LIABILITY EACH OCCURRENCE $ 1,000,000 CLAIMS-MADE X OCCUR PK202300006109 5/4/2023 5/4/2024 DAMAGE TO RENTED 500,000 X PREMISE Ea occurrence $ 10,000 MED EXP(Any oneperson) $ PERSONAL&ADV INJURY $ 1,000,000 GEN'L AGGREGATE LIMIT APPLIES PER: GENERAL AGGREGATE $ 2,000,000 POLICY 1XI JE LOC PRODUCTS-COMP/OP AGG $ 2,000,000 OTHER: PER PROJECT AGG $ 5,000,000 AUTOMOBILE LIABILITY EOMBIINEeD SINGLE LIMIT $ ANY AUTO BODILY INJURY Perperson) $ OWNED SCHEDULED AUTOS ONLY AUTOS BODILY INJURY Per accident $ AUTOS ONLY AUTOS ONLY Per acc dent AMAGE $ B UMBRELLA LIAB OCCUR EACH OCCURRENCE $ 5,000,000 X EXCESS LIAB X CLAIMS-MADE 001306871 5/4/2023 5/4/2024 AGGREGATE $ 5,000,000 DED I I RETENTION$ WORKERS COMPENSATION AND EMPLOYERS'LIABILITY Y/N PTA UTE ORH ANY PROPRIETOR/PARTNER/EXECUTIVE ❑ E.L.EACH ACCIDENT $ FFICER/MEMBER EXCLUDED? N/A Mandatory in NH) E.L.DISEASE-EA EMPLOYE $ If yes,describe under DESCRIPTION OF OPERATIONS below E.L.DISEASE-POLICY LIMIT i DESCRIPTION OF OPERATIONS/LOCATIONS I VEHICLES (ACORD 101,Additional Remarks Schedule,may be attached if more space Is required) The certificate holder is listed as additional insured per attached endorsements#G20100413$#CG20370413 CERTIFICATE HOLDER CANCELLATION SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE Town of Southold THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IIN ACCORDANCE WITH THE POLICY PROVISIONS. 54375 Route 25 f Southold,NY 11971 AUTHORIZED REPRESENTATIVE ACORD 25(2016103) ©1988-2015 ACORD CORPORATION. All rights reserved. The ACORD name and logo are registered marks of ACORD YEW Workers' CERTIFICATE OF INSURANCE COVERAGE ST ATE Compensation _ Board NYS DISABILITY AND PAID FAMILY LEAVE BENEFITS LAW PART 1.To be completed by NYS disability and Paid Family Leave benefits carrier or licensed insurance agent of that carrier 1 a.Legal Name&Address of Insured(use street address only) 1 b.Business Telephone Number of Insured EMPOWER CES LLC DBA EMPOWER SOLAR 310-534-7994 4589 AUSTIN BOULEVARD ISLAND PARK,NY 11558 1c.Federal Employer Identification Number of Insured or Social Security Number Work Location of Insured(Only►equ/red if coverage is specifically limited to ce►tath locations in New York State,Le.,Wrap-Up Policy) 522407627 2.Name and Address of Entity Requesting Proof of Coverage 3a.Name of Insurance Carrier (Entity Being Listed as the Certificate Holder) ShelterPoint Life Insurance Company TOWN OF SOUTHOLD 54375 ROUTE 25 3b.Policy Number of Entity Listed 1n Box"l a" l SOUTHOLD, NY 11971 ; DBL252634 3c.Policy effective period 05/10/2023 to 05/09/2024 4. Policy provides the following benefits: © A.Both disability and paid family leave benefits. B.Disability benefits only. . Q C.Paid family leave benefits only. 5. Policy covers: © A.All of the employer's employees eligible under the NYS Disability and Paid Family Leave Benefits Law. ) B.Only thefollowing class or classes of employer's employees: ' f i Under penalty of perjury,I certify that I am an authorized representative or licensed agent of the insurance carrier referenced above and that the named insured has NYS Disability.and/or Paid Family Leave Benefits insurance coverage as described above. Date Sighed 5/12/2023 B 9 .y (Signature of Insurance carrier's authorized representative or NYS Licensed Insurance Agent of that Insurance carrier) Telephone Number 516-829-8100 Name and Title Richard White, Chief Executive Officer IMPORTANT: 'If Boxes 4A and 5A are checked,and this form is signed by the insurance carrier's authorized representative or NYS Licensed Insurance Agent of that carrier;this certificate is COMPLETE.Mail it directly to the certificate holder. If Box 413;4C or 5B is checked,-this-'certificate is NOT COMPLETE for purposes of Section 220,Subd.8 of the NYS Disability and Paid Family Leave Benefits Law. It must be ema(led to PAU@wcb.ny.gov or it can be mailed for completion to the Workers'Compensation Board, Plans Acceptance Unit,PO Box 5200, Binghamton,NY 13902-5200. PART 2.To be completed by the NYS Workers'Compensation Board(only If Box 4B,4C or SB have been checked) - _ -- — State of New York Workers' Compensation Board According to information maintained by the NYS Workers'Compensation Board,the above-named employer has complied with the NYS Disability and Paid Family Leave Benefits Law(Article 9 of the Workers'Compensation Law)with respect to all of their employees. { Date Signed By (Signature of Authorized NYS Workers'Compensation Board Employee) Telephone Number -• Name and Title Please Note.Only insurance carriers licensed to write NYS disability and paid family leave benefits insurance policies and NYS licensed insurance agents of those insurance carriers are authorized to issue Form DB-120.1.Insurance brokers are NOT authorized to Issue this form. D13-120.1 (12-21) �11111�ioiie1�2ii0iiii1iiii(i1i2ioi2�1)ii�l0 Additional Instructions for. form D13-1204 By signing this form,the insurance carrier identifi d in Box 3 on this formis certifying that it is insuring the business referenced in Box lei for disability and/or Paid Family Leave benefits under.the NYS Disability and Paid Family Leave Benefits Law,.The insurance carrier or its licensed agent will send this Certificate of Insurance Coverage(Certificate)to the entity listed as the certificate holder in Box 2. The insurance carrier must notify the above certificate holder and the Workers'Compensation Board within 10 days IF a policy is cancelled due to nonpayment of premiums or within 30 days IF there are reasons other than nonpayment of premiums that cancel the policy or eliminate the'nsured from coverage indicated on this Certificate. (These notices may be sent by regular mail.)Otherwise,this Certificate is valid for one year after this form is approved by the insurance carrier or its licensed agent, or until the policy expiratior date,listed in Box 3c,whichever is earlier. This Certificate is issued as a matter of information only and confers no rights upon the certificate holder.This Certificate does not amend; extend or alter the coverage afforded by the-policy listed, nor does it confer any rights or responsibilities beyond those contained in the referenced policy. i This Certificate may be used as evidence of a NYS disability and/or Paid Family Leave benefits contract of insurance only while the underlying policy is in effect. Please Note: Upon the cancellation of the disability and/or Paid Family Leave benefits policy Indicated on this form, if the business continues to be named n a permit, license or contract issued by a certificate holder,the =____business-must_provide_that_certificate-holder with a new Certificate,of Insurance Coverage for NYS disability and/ _of Paid Family-Leave Benefits o�.other autho sized proof that the business is complying with the mandatoy coverage requirements.of the NYS Disability nd Paid Family Leave Benefits Law. NYS-DISABILITY AND PAID FAMILY LEAVE BENEFITS LAW §220. Subd. 8 (a) The head of a state or municipal department board;-commission or office authorized or required by law to issue any permit_for-or in_connection.with_any work involving-the employment of`employees in employment as defined in this article, and-not withstanding any general.or special statrjte.requiring or authorizing the issue of such permits,shall not issue such permit unless proof duly subscribed by an insura�ce_carrier is produced in a form satisfactory to the chair,that the payment of disability benefits and after January''rst,two-thousand and twenty-one,the payment)of family leave benefits for all employees has been secured as provided by this article. Nothing herein, however, shall be construed as creating any liability on the part of such state or municipa department, board, commission or office to pay any disability benefits to any such employee if so employed. : (b)The head of a state or municipal department, board; commission or office authorized or required by law to enter into any-contract.for-or in connection with any work ir volving-the employment of employees in employment as defined in this -article and notwithstanding any general or'speck I statute requiring or authorizing any such contract, shall,not enter into any such contract unless proof duly subscribed t y an insurance carrier is produced in a form satisfactory to the chair,that the payment of disability benefits and after January first,two thousand eighteen, the payment of family leave benefits for all employees has been secured as provided by his article. D13-120.1 (12.21)Reverse APPROVED AS NOTED COMPLY WITH ALL CODES OF DATE —IS—�3 �< B.P.# NEW YORK STATE &TOWN CODES FEE 00.00 BX AS REQUIRED AND CONDITIONS OF >4- ° NOTIFY BUILDING DEPARTMENT AT 802 8 AM TO 4 P TOWN A rear.!5,;94'}iiti { ,if:iN`aii; �,�K71�:,�.xY:;�=;�,►: �:�x� 7G5-1 M FOR THE' SOUTHOLDTO ZB fD v;r.,�t�'�t;,;,:,a;,rt�r�:�:: FOLLOWING INSPECTIONS: 1. FOUNDATION-TWO REQUIRED SOUTHOLD TOWN FANNING BOARD ", FOR POURED CONCRETE 2. ROUGH-FRAMING,PLUMBING, SOUTHOLD TOWN TRUSTEES '`} STRAPPING, ELECTRICAL&CAULKING 3. INSULATION N.YS.DEC ,s 4. FINAL-CONSTRUCTION&ELECTRICAL } MUST BE COMPLETE FOR ALL CONSTRUCTION SHALL MEET THE REQUIREMENTS OF THE CODES OF NEW YORK STATE. NOT RESPONSIBLE FOR DESIGN OR CONSTRUCTION ERRORS. ELECTRICAL INSPECTION REQUIRED - iscomcc+ ry)v!5+ bc, locct+rd ota+5i GcC�s�S 0, CI- Additional a,lrxled a�n�l reach• L Addi i onal Certification May Be Required. = 1 2 3 4 5 6 7 8 9 10 11 12 13 EMPOWER SOLAR I 4589 AUSTIN BLVD ISLAND PARK,NY 11558 TEL: 516-837-3459 FAX: 516-706-1789 RESIDENTIAL www.empower-soIar.com SOLAR P R O V E//�'T THE INFORMATION DISCLOSED HEREIN IS THE SOLE H ■`/• H PROPERTY OF EMPOWER CES,LLC.UNAUTHORIZED REPRODUCTION OR DISTRIBUTION OF THIS PROJECT TEAM. MATERIAL IS STRICTLY PROHIBITED WITHOUT PRIOR SPECIFIC WRITTEN PERMISSION PROFESSIONAL SEAL OWNER: Robert Harrison and Patricia Kov G G of NE.jVyo: P kY �. CO CMG PHONE: (865)274-8544 - ENGINEER OF RECORD: ' ' N w n F SOLAR INSTALLER: GREGORY SACHS, PE F EMPOWER SOLAR 4589 AUSTIN BLVD 4589 AUSTIN BLVD ISLAND PARK, NY 11558 � OFESSIG ISLAND PARK, NY 11558 PHONE: 516-837-3459 PHONE: 516-837-3459 E E ; D REV: DESCRIPTION: DATE: PROJECT LOCATION DATA: SHEET INDEX: PROJECT NAME: ST-01 COVER SHEET Robert Harrison and Patricia ADDRESS: 260 Huckleberry Hill Rd, East S-01 EQUIPMENT LOCATIONS S-02 STRUCTURAL PROJECT LOCATION: z Marion, NY 11939 260 Huckleberry Hill Rd, f? S-03 ESS SPECIFICATIONS c East Marion, NY 11939 SE-01 ELECTRICAL PROJECT#: SCTM: 1000-031.00-16.00-005.000 PROJ.PHASE: PERMIT 1 , © DATE: 5/19/2023 B B DESIGNED BY: ED CHECKED BY: GS SCALE: NTS MAP TITLE: COVER SHEET A A SHEET: ST-01 2 13 4 5 6 7 8 9 10 11 1 1 2 3 4 5 6 7 8 9 10 11 12 13 6 EMPOWER S 0 L A R 4 4589 AUSTIN BLVD ISLAND PARK,NY 11558 0 5 TEL: 516-837-3459 FAX: 516-706-1789 www.empower-solar.com SOUTH-1 ROOF SEGMENT 4 3 6 . POWE=R 15W ACPV PANELS THE INFORMATION DISCLOSED HEREIN IS THE SOLE H H PROPERTY OF EMPOWER CES•L-C.UNAUTHORIZED TO AL O ER: 2.49 kW REPRODUCTION OR DISTRIBUTION OF THIS MATERIAL IS STRICTLY PROHIBITED WITHOUT ORIENTATION: 1970" PITCH: 34' PRIOR SPECIFIC WRITTEN PERMISSION TYPE 1: FLASHLOC DUO PROFESSIONAL SEAL ❑ SOLAR ACCESS: 71°/D ' TSRF: 70% G G OF NEI,/ �P CRY O. O 2 r � >_ F F fn � N SETBACK LEGEND EAST-1_ROOF(SEGMENT 3): �GA� 08453'1 <? ❑ 3 SUNPOWE--R 15W-ACPV PANELS O�ESSIONP 36"CLEAR PATH 0 L POWER: 2.905 kW E ORIENTATION: 107°; PITCH: 34' E r TYPE 1: FLASHLOC DUO ® 18" RIDGE SETBACK SOLAR ACCESS: 69°/D J TSRF:60% T� i ACCESS ROOF EAST-2 ROOD(SEGMENT 1): D REV: DESCRIPTION, DATE: 3 3 SUNPOWE=R 415W ACPV PANELS OTAL POWER: 1.245 kW PROJECT NAME: ORIENTATION: 107'; PITCH: 34° EQUIPMENT LEGEND: <x TYPE 1: FLASHLOC DUO HARRISON RESIDENCE SOLAR ACCESS: 69°/D MODULES TSRF: 60% PROJECT LOCATION: C <X /1/\ C 260 HUCKLEBERRY HILL ROAD W EAST MARION,NY 11939 UTILITY METER J PROJECT#: PROJ.PHASE: PERMIT 3❑ INVERTERS x DATE: 05/19/2023 B B DESIGNED BY: ED DRIVEWAY U CHECKED BY: GS 4❑ SOLAR DISCONNECT SCALE: NTs TITLE: a MAIN SERVICE PANEL EQUIPMENT LOCATIONS ROOF LAYOUT A A NOT TO SCALE SHEET: QOWERiV,VA1LL S_O 1 1 2 3 4 5 6 7 8 9 10 11 12 13 1 2 3 4 5 6 7 B 9 10 1 11 1 12 13 EMPOWER MAXIMUM ESS RATING BASED ON LOCATION (R327.5) S O L A R I < I B B B INDIVIDUAL ESS UNIT RATING AGGREGATE ESS RATING 4589AUSTIN BLVD s �o ISLAND PARK,NY 11558 0 20 kWh 80 kWh TEL: 516-837-3459 FAX: 516-706-1789 www.empower-soiar.com THE INFORMATION DISCLOSED HEREIN IS THE SOLE H TESLA POWERWALL SPECS PROPERTY OF EMPOWER CES,L-C.UNAUTHORIZED REPRODUCTION OR DISTRIBUTION OF THIS MATERIAL IS STRICTLY PROHIBITED WITHOUT INDIVIDUAL ESS UNIT RATING QTY. AGGREGATE ESS RATING PRIOR SPECIFIC WRITTEN PERMISSION '-� 14 kWh 2 28 kWh PROFESSIONAL SEAL _J ' G ❑ G pF NEFty x TESLA POWERWALL SPACE REQUIREMENTS(R327.3.1) �P� 0FtY D. �O LU Go MINIMUM LATERAL WALL SPACE 38" ��� r 9 � J MINIMUM CLEARANCE FROM LEFT SIDE 2" Y a� b = U) . j MINIMUM CLEARANCE FROM RIGHT SIDE F DRIVEWAY 6 t y � w F�i� t --•—�_ = MINIMUM CLEARANCE ABOVE SINGLE POWERWALL 2" MINIMUM CLEARANCE ABOVE SIDE-BY-SIDE POWERWALLS 12" MINIMUM CLEARANCE BETWEEN SIDE-BY-SIDE POWERWALLS 10" _SS10NP�, MAXIMUM HEIGHT ABOVE GROUND 5' E E ROOFLAYOUT NOT TO SCALE D BASEMENT LEGEND. p REV: DESCRIPTION: DATE: 4❑ SERVICE DISCONNECT 8❑ PV MONITORING PROJECT NAME: HARRISON RESIDENCE NOTES: EXISTING MAIN SERVICE PANEL 2❑ UTILITY METER 1. ENERGY STORAGE SYSTEMS (ESS) TO BE INSTALLED WITH CONFORMANCE TO APPLICABLE PROJECT LOCATION: SECTIONS OF R327 AS PER 2020 RESIDENTIAL CODE OF NEW YORK STATE. C 2. ESS LISTED AND LABELED FOR RESIDENTIAL USE IN ACCORDANCE WITH UL 9540. C 260 HUCKLEBERRY HILL ROAD TESLA GATEWAY 9❑ TESLA POWERWALL (EXTERIOR, 3. ESS TO BE INSTALLED IN ACCORDANCE WITH THE MANUFACTURER'S INSTRUCTIONS AND EAST MARION,NY 11939 MOUNTED ON NORTH-EXTERIOR WALL) THEIR LISTING. INDIVIDUAL UNITS MAY HAVE A SEPARATION DIFFERENCE LESS THAN 3' AS PER R327.3.1. PROJECT#: 7❑ PV&ESS DISCONNECT 10 PATH.OF TRAVEL TO DISCONNECT FROM 4. ESS TO BE INSTALLED IN STORAGE OR UTILITY SPACE AS PER R327.4. PROJ.PHASE: PERMIT HUCKLEBERRY HILL RD 5. MAXIMUM INDIVIDUAL ESS UNIT RATING AND AGGREGATE ESS RATING SHALL COMPLY WITH DATE: 05/19/2023 B REQUIREMENTS OF R327.5. B DESIGNED BY: IV 6. ESS SHALL BE INSTALLED IN ACCORDANCE WITH LISTING AND LABELING REQUIREMENTS AS CHECKED BY: GS PER R327.6. SCALE: NTS 7. ROOMS AND AREAS IN WHICH ESS ARE INSTALLED SHALL BE PROTECTED BY TITLE: INTERCONNECTED SMOKE ALARMS IN ACCORDANCE WITH SECTION R-314 AS OUTLINED ENERGY STORAGE IN R327,7. I SYSTEM SPECIFICATIONS A 8. ROOMS AND AREAS CONTAINING ESS SHALL BE PROTECTED ON THE SYSTEM SIDE BY A 5/8-INCH TYPE X GYPSUM IN ACCORDANCE WITH SECTION R327.8 AND R302. SHEET: 9. ESS INSTALLED IN A LOCATION SUBJECT TO VEHICLE DAMAGE SHALL BE PROTECTED BY APPROVED BARRIERS. S-03 1 2 3 4 1 5 6 7 8 9 10 11 12 13 1 2 3 4 5 6 7 8 9 10 11 12 13 EMPOWER S O LA R I 4589 AUSTIN BLVD SUNPOWER MODULES ISLAND PARK,NY 11558 o ON INVISIMOUNT RACKING TEL: 516-837-3459 FAX: 516-706-1789 SHINGLES www.empower-solar.com THE INFORMATION DISCLOSED HEREIN IS THE SOLE H PROPERTY OF EMPOWER CES,L-C.UNAUTHORIZED H REPRODUCTION OR DISTRIBUTION OF THIS RAFTERS MATERIAL IS STRICTLY PROHIBITED WITHOUT PRIOR SPECIFIC WRITTEN PERMISSION PROFESSIONAL SEAL G G �OF NE14, Ir � . lam' a a_0- F LU F TYPICAL ROOF SECTION ,� �. NOT TO SCALE .D'1=ESS1 P� SUNPOWER PANEL SPECS E MODULE POWER(Wdc) QTY MODEL# LENGTH WIDTH DEPTH WEIGHT TABLE S-1.1: MAX.ATTACHMENT SPACING E SPR-415 16 SPR-M-SERIES-AC 73.7" 40.6" 1.57" 48.0 LB PORTRAIT: 5'-4" LANDSCAPE: 8'-0" SPR-A-SERIES-AC 72.2" 40.0" 1.57" 46.5 LB SPR-E/X=SERIES-AC 61.4" 41.2" 1.81" 42.9 LB NOTES: D 1. TOTAL SYSTEM DC POWER:6.64 kW p REV: DESCRIPTION: DATE: 2. RACKING SYSTEM INSTALLED IN ACCORDANCE WITH CODE-COMPLIANT INSTALLATION PROJECT NAME: MANUAL , 3.ATTACHMENTS TO BE SECURED TO ROOF ASSEMBLY USING 5 mm STAINLESS STEEL SCREWS Robert Harrison and Patricia AND/OR 5/16 STAINLESS STEEL LAG BOLTS SPACED ACCORDING TO TABLE S-1.1 PROJECT LOCATION: 4. ALL ATTACHMENTS TO ROOF, MOUNTING BRACKETS & HARDWARE MEET OR EXCEED NYS 260 Huckleberry Hill Rd, C CODE REQUIREMENTS C East Marion, NY 11939 5. INSTALLATION TYPICALLY MAINTAINS 7/8 INCH SPACING BETWEEN MODULES 6. SIZES OF STRUCTURAL MEMBERS THAT WERE NOT ACCESSIBLE FOR DIRECT MEASUREMENT ARE BASED ON OBSERVATIONS OF ACCESSIBLE MEMBERS, CONSTRUCTION DEPTH OR PROJECTM BOTH IN ADDITION TO KNOWLEDGE OF STANDARD CONSTRUCTION PRACTICES AT THE PROJ.PHASE: PERMIT TIME OF CONSTRUCTION DATE: 5/19/2023 7. THIS DOCUMENT CERTIFIES THAT THE ROOF STRUCTURE HAS BEEN CHECKED FOR WIND, B DESIGNED BY: ED B SNOW, UNBALANCED SNOW, LIVE AND DEAD LOADS BASED ON ASCE 7-10 CHAPTER 30 - CHECKED BY: Gs WIND LOADS - COMPONENTS AND CLADDING (C&C) AND FOR CONFORMANCE WITH THE SCALE: NTS 2020 RESIDENTIAL CODE OF NEW YORK STATE. THIS CERTIFICATION DOES NOT APPLY TO TITLE: ANY ADDITIONAL ROOF ALTERATIONS AFTER THE DESCRIBED INSTALLATION 8. THIS ROOF STRUCTURE AS SHOWN IS ADEQUATE TO SUPPORT THE PROPOSED LOADS srRucruRAL 9. REFER TO STRUCTURAL LETTER FOR SITE SPECIFIC AND ROOF SURFACE DATA A 10. ENERGY STORAGE SYSTEM INSTALLATION TO CONFORM WITH THE REQUIREMENTS OF THE A SHEET: 2020 RESIDENTIAL CODE OF NEW YORK STATE S-02 1 2 3 4 5 6 7 8 9 10 11 12 13 4 1 2 3 4 5 6 7 8 9 10 11 12 13 EMPOWER NOTES: , S O L A R 4589 AUSTIN BLVD ISLAND PARK,NY 11558 0 1. NEUTRAL&GROUND ARE BONDED TOGETHER(ORIGIN OF GEC FOR SOLAR TEL: 516-837-3459 ELECTRIC SYSTEM) FAX: 516-706-1789 2. GEC FROM SOLAR ELECTRIC SYSTEM BONDED TO EXISTING GEC IN THE MAIN www.empower-solar.com STANDARD INVERTER ASSEMBLY: SERVICE PANEL USING 'SPLIT-BOLT CONNECTOR' THE INFORMATION DISCLOSED HEREIN IS THE SOLE H 3. IN SOME CASES POWER FOR DATA MONITORING ENCLOSURE MAYBE H PROPERTY OF EMPOWER CES,LLC.UNAUTHORIZED REPRODUCTION OR DISTRIBUTION OF THIS DERIVED FROM MAIN SERVICE PANEL MATERIAL IS STRICTLY PROHIBITED WITHOUT - PRIOR SPECIFIC WRITTEN PERMISSION 4. CONNECT UTILITY SIDE TO PANEL LUGS PROFESSIONAL SEAL 5. USE TAP RULES FOR SIZING TAP CONDUCTORS(NEC 240.21) 6. SIZE GEC AND.EGC AS PER NEC 250.66, NEC 250.122 RESPECTIVELY 7. PROTECT GEC AND EGC SUBJECT TO PHYSICAL,DAMAGE AS PER NEC G SOLAR 250.64(B), NEC 250.120(C) G ARRAY 1 8. FINAL SCHEMATIC SPECIFIC TO THIS INSTALLATION AVAILABLE UPON �OF NFL REQUEST pRY 0'`��"0 -0 INVERTER(S) AC r 6 DISCONNECT 0 a _ m I C!3 F � Z LU F O�CSSIO �" E E I STANDARD EXTERIOR INTERCONNECTION: STANDARD INTERIOR INTERCONNECTION: D REV: DESCRIPTION: DATE: D ' PROJECT NAME: INTERIOR EXTERIOR INTERIOR EXTERIOR Robert Harrison and Patricia PROJECT LOCATION: 260 Huckleberry Hill Rd, c MAIN' TAP - BREAKER MAIN East Marion, NY 11939 SERVICE ENCLOSURE M 1 PANELETTE SERVICE O O PANEL _ PANEL PROJECT#: UTILITY UTILITY PROJ.PHASE: PERMIT METER METER DATE: 5/19/2023 B DESIGNED BY: ED B CHECKED BY: GS 1 SCALE: NTS TITLE: ELECTRICAL A A SHEET: S E-01 1 2 3 4 5 6 7 8 9 10 11 12 13 1 2 3 4 5 6 7 8 9 10 11 12 13 EMPOWER TO UTILITY GRID , S O L A R 4589 AUSTIN BLVD BRANCH B BRANCH A ISLAND PARK,NY 11558 o (8)SPR-415W MODULES (8)SPR-415W MODULES TEL: 516-837-3459 TOTAL DC STC POWER:3.32 kW TOTAL DC STC POWER:3.32 kW (8)ENPHASE IQ7HS MICRO INV (8)ENPHASE IQ7HS MICRO INV NET O FAX: 6-1789 W. p TOTAL AC POWER:3.072 kW TOTAL AC POWER:3.072 kW METER M ww o w e r-solar.com CONTINUE AS CONTINUE AS THE INFORMATION DISCLOSED HEREIN IS THE SOLE H REQUIRED FOR INV.... REQUIRED FOR INV.... H PROPERTY OF EMPOWER CES.LLC.UNAUTHORIZED REPRODUCTION OR DISTRIBUTION OF THIS SPECIFIED STRINGING SPECIFIED STRINGING MATERIAL IS STRICTLY PROHIBITED WITHOUT MSD 200A, PRIOR SPECIFIC WRITTEN PERMISSION AC1 AC1 AC2 c 120/240V PROFESSIONAL SEAL 200A CB (1)SPR-415W MODULE INV.2 (1)SPR-415W MODULE INV.2 NOTES:1,2 (1)ENPHASE MICRO INV. (1)ENPHASE MICRO INV. G G Ar AC1 AC1 P��O IV�14 �y /1 GW 200A, GO_ U (1)SPR-415W MODULE (1)SPR-415W MODULE AC2 1 -+ 120/240V F a"� (1)ENPHASE MICRO INV. INV.1 (1)ENPHASE MICRO INV. INV.1 2OOA CB m C' 'I - M cnl ~ W AC2 O j 2OA �p 8 20A TESLA 'Oc`SSIOt1 30A POWERWALL AC2 TESLA — E E 30A POWERWALL c —v v- -v v— GEN. PANEL ILL/ NBS PANEL 4 200A, 120/240V 125A, 120/240V D `� 200A CB MSP 200A, 100A CB D REV: DESCRIPTION: DATE: 120/240V PROJECT NAME: ��•, 200A CB ENERGY STORAGE CAPACITY: 2 TPW HARRISON,ROBERT&KOVATCH, - PATRICIA RESIDENCE POWER 10.0 kWAC PROJECT LOCATION: LABEL DESCRIPTION LABEL DESCRIPTION ENERGY 27.0 kWh C 260 HUCKLEBERRY HILL RD, C AC1 SPR�AC CABLE AC2 2"PVC (2)#12 AWG (3)#2/0 AWG EAST MARION,NY 11939 (1)#6 AWG,EGC _ PROJECT#: PROJ.PHASE: PERMIT DATE: 03/03/2023 B ti B DESIGNED BY: FK L CHECKED BY: XX NOTES: SCALE: NTS 1. MSD IS THE EXPECTED LOCATION OF THE MAIN BONDING JUMPER. TITLE: ENGINEERING SUPERVISION REQUIRED TO RELOCATE THREE LINE 2. PARALLEL CONDUCTORS TO BE INSTALLED AS PER FEEDER TAP RULES. IDEAL ELECTRICAL SCHEMATIC CONNECTION WILL BE AT DOUBLE LUGS LOCATED AT DEVICE OCPD, HOWEVER, ILL/NBS TOTAL SYSTEM SIZE: 6.64kW A A PANEL CONDUCTORS MAYBE TAPPED ONTO CONTINUOUS FEEDER CONDUCTORS FOR GW (16) SPR-415W MODULES SHEET: UTILIZING INSULATION PIERCING TAP CONNECTORS (B-TAPS) (NOTE GW FEEDERS MUST (16) ENPHASE IQ7HS MICRO-INV. SE-02.00 BE CONTINUOUS) 1 2 3 4 5 6 7 8 9 10 11 12 13 It • © • • • . • i i I Simple and Fast Installation Integrated module-to-rail grounding °W Pre-assembled mid and end clamps ;;v !I Levitating mid clamp for easy placement 4 ! Mid clamp width facilitates consistent,even module spacing i UL 2703 Listed integrated grounding I Flexible Design I - Addresses sloped and low-sloped residential ( ! roofs I Design in landscape and portrait with up to 8' rail span Pre-drilled rails and rail splice - I Rails enable easy obstacle management i Elegant Simplicity � j Customer-Preferred Aesthetics j I SunPower° InvisiMountTm is a SunPower-designed Best-in-class system aesthetics i Black anodized components rail-based mounting system.The InvisiMount system Low profile mid clamps and capped,flush addresses residential sloped roofs and combines faster end clamps j I installation time, design flexibility, and superior aesthetics. Part of Superior System " Classic InvisiMount is specifically envisioned and engineered Best-in-class system reliability and aesthetics I to pair with SunPower modules; Universal InvisiMount is Optional rooftop transition flashing,rail- mounted J-box,and wire management rail clips compatible with a wide range of modules. The resulting Combine with SunPower modules and system-level approach amplifies the installation and mySunPower,°'monitoring app aesthetic benefits—for homeowners and for installers. �►11 (�ui:�b - sunpower.com Datasheetit J • • © InvisiMountTIVIResidential . Mounting • • InvisiMount.ccpponents • • 1111 •1 Zvi Mid Clamp Ground Lug Assembly Universal Mid Clamp Ground Lug Assembly Rail and Rail Splice Rail and Rail Splice i Row-to-Row-Spacer Row-to-Row Grounding Clip ,End Clamp Row-to-row Grounding jumper Universal End Clamp (DynoBond) InvisiMount • •• - Details InvisiMountOperating Conditions Classic mid clamp Black oxide stainless steel 300 series 63 g(2.2 oz) Temperature —40'C to 90°C(-40°F to 194°F) Universal mid clamp Black anodized aluminum 6000 series 60 g(2.1 oz) Classic end clamp Black anodized aluminum 6000 series" 110 g(3.88-oz) Roof' Universal end clamp Black anodized aluminum 6000 series 103 g(3.63 oz) Refer to roof attachment hardware manufacturer's Rail Black anodized aluminum 6000 series 830 g/m(9 oz/ft) documentation. Rail splice Aluminum alloy 6000 series 830 g/m(9 oz/ft) Rail bolt M 10-1.5 x 25 mm;custom T-head 55304 8 g(0.63 oz) InvisiMount • •• '•' Rail nut M10-1.5;DIN 6923 SS304 nominal Classic Uplift 6641bf Ground lug assembly SS304;A2-70 bolt;tin-plated copper lug 106.5 g(3.75 oz) Mid clamp Shear 540 Ibf Row-to-row grounding clip SS 301 with SS 304 M6 bolts 75 g(2.6 oz) Universal Uplift 962 Ib Row-to-row grounding jumper Stainless steel 300 series 10 g(0.35 oz) Mid clamp Shear 4371b Row-to-row spacer Black POM-grade plastic 5 g(0.18 oz) Classic Uplift 899 Iblf Roof At(achment BOM End clamp Shear 220 Ibf InvisiMount Comp Shingle Attachment with Pegasus Universal Uplift 605 Ib InvisiMount Flat Tile Replacement Attachment with Pegasus- End clamp Shear 242 Ib InvisiMount S-Tile Replacement Attachment with Pegasus InvisiMount W-Tile Replacement Attachment with Pegasus Moment:upward 548 Ibf-ft Rail Moment:downward 580 Ibf-ft InvisiMount - • Certifications � Moment:upward 548 Ibf-ft 25-year product warranty Rail splice Warranties 5-year finish warranty Moment:downward 580 Ibf-ft Certifications UL 2703 Listed L-foot Uplift 1000 Ibf Class A Fire Rated Shear 390 Ibf With Classic InvisiMount,a module frame that is compatible with the InvISIMount system Is required for hardware interoperability;modules without this frame may be used with Universal InvislMount. ]SunPower recommends that all Equinox"",InvisiMount',and AC module systems always be designed using the InvisiMount Span Tables#524734.If a designer decides to instead use the component capacities listed in this document to design a system,note that the capacities shown are Load and Resistance Factor Design(LRFD)design loads,and are NOT to be used for Allowable Stress Design(ASD)calculations;and that a licensed Professional Engineer(PE)must then stamp all calculations.If you have any questions please contact SunPower Technical Support at 1-855-977-7867. sunpower.Com Q 2022 SunPower Corporation.All Rights Reserved.SUNPOWER,the SUNPOWER logo,EQUINOX,and INVISIMOUNT are trademarks or registered trademarks of SunPower Corporation. 509506 RevG All other trademarks are the property of their respective owners.Specifications included In this datasheet are subject to change without notice. nn SUNPOWER° 425-410 W Residential Black AC Module SunPower•Maxeon Technology Built specifically for use with the SunPower Equinox®system,the only fully integrated solution designed, engineered,and warranted byone company. Highest Power Density Available y The patented,solid-copper foundation Maxeon Gen-6 cell is over 5% larger thari'prior generations, delivering the highest-efficiency all-black AC solar module available? Part of the SunPower Equinox*Solar System E % •Seamless aesthetics m Ln 1.0 •Compatible with mySunPower monitoring �i, Highest Lifetime Energy and Savings '` >t L ,r Designed to deliver 60% more energy over 25 years in real-world conditions like partial shade and high temperatures.2 i 150%14096 i Factory-i nteg rated 130% Microinverter '-°°� P u to a, 110% 60% -�100% More • Highest-power integrated c o°% Lifetime AC module in solar w 40% Energy A 70% Conventional Panel • Engineered and calibrated Ln�60% by SunPower for SunPower 0 5 10 15 20 25 Years of Operation AC modules _ =_ Best Reliability,Best Warranty a With more than 42.6 million and 15 GW of modules deployed around the world, SunPower technology is proven to last.That's why we stand behind our module and microinverter with the industry's best 25-year Combined Power and Product Warranty, including the highest Power Warranty in solar. M425=BLK I M415-BLK M410-BLK SunPower Residential Black AC Module AC Electrical Data Inverter Model:Type H(Enphase IQ7HS)' @240 VAC @208 VAC Max.Continuous Output Power(VA) 384- 369 Nom.(L-Q Voltage/Range'M 240/211-264 208/183-229 Max.Continuous Output Current(A) 1.60 1.77 Max.Units per 20 A(L-Q Branch Circuit° 10 - 9 CEC Weighted Efficiency 97.0% 96.5% Nom.Frequency 60 Hz 60 Hz Extended Frequency Range 47-68 Hz 47-68 Hz AC Short Circuit Fault Current Over 3 Cycles 4.82 A 4.82 A Overvoltage Class AC Port III III AC Port Backfeed Current 18 mA 18 mA Power Factor Setting 1.0 1.0 Power Factor(adjustable) 0.85(inductive)/0.85(capacitive) 0.85(inductive)/0.85(capacitive) DC Power Data Warranties,Certifications,and Compliance SPR-M425-BLK-H-AC SPR-M415-BLK-H-AC SPR-M410-BLK-H-AC Warranties '25-year limited power warranty Nom.Powerb(Pnom)W 425 415 410 25-year limited product warranty Power Tolerance +5/-0% +5/-0% +5/-0% UL 1741/IEEE-1547 UL 1741 AC Module Module Efficiency 22.0% 21.5% 21.2% UL 61730(Type 2 fire rated) Temp.Coef.(Power) -0.29%/°C -0.29%/°C -0.29%/°C UL 62109-1/IEC 62109-2 FCC Part 15 Class B Shade Tolerance Integrated module-level max.power point tracking ICES-0003 Class B CAN/CSA-C22.2 NO.107.1-01 CA Rule 21(UL 1741 SA)' Tested Operating Conditions Certifications (includes Volt/Var and Reactive Power Priority) and UL Listed PV Rapid Shutdown EgUipment7 Operating Temp. -40°F to+185°F(-40°C to+85°C) Compliance Enables installation in accordance with: Max.Ambient Temp. 122°F(50°C) NEC 690.6(AC module) Max.Test Loads Wind:125 psf,6000 Pa,611 kg/m2 back NEC 690.12 Rapid Shutdown(inside and outside the Snow:187 psf,9000 Pa,917 kg/m2 front array) Wind:75 psf,3600 Pa,367 kg/m2 back NEC 690.15 AC Connectors,690.33(A)-(E)(1) Max.Design Load Snow:125 psf,5400 Pa,550 kg/m2 front when used with AC module Q Cables and accessories Impact Resistance 1 inch(25 mm)diameter hail at 52 mph(23 m/s) (UL 6703 and UL 2238)7 •Rated for load break disconnect Mechanical Data,--- PID Test 1000 V:IEC 52804 Solar Cells- 66 Maxeon Gen 6 Front Glass High-transmission tempered glass with anti-reflective coating l Packaging Configuration Environmental Rating Outdoor rated Modules per pallet 25 Frame Class 1 black anodized(highest AAMA rating) Packaging box dimensions 75.4 x 42.2 x 48.0 in.(1915 x 1072 x 1220 mm) Weight 48 Ibs(21.8 kg) Pallet gross weight 1300 lb(590 kg) Recommended Max: 1.3 in.(33 mm) Pallets per container 32 Module Spacing Net weight per container 18,880 kg 73.7 In 1 Based on datasheet review of websites of top 20 manufacturers per IHS,as of July 2021. I [1872 mm] ~I FRAME PROFILE 2 Maxeon 435 W,22.5%efficient,compared to a Conventional Panel on same-sized arrays(300 W,19%efficient, ] approx.1.6 m2),7.9%more energy per watt(based on PVSyst pan files for avg.US climate),0.5%/yr slower degradation rate gordan,et.al."Robust PV Degradation Methodology and Application'PVSC 2018). T Grounding Holes 3 Based on search of datasheet values from websites of top 10 manufacturers per IHS,as of June 2021. 4 Limits may vary.Refer to local requirements to define the number of microinverters per branch in your area. E • ❑ A 5 Factoryset to IEEE 1547a-2014 default settings.CA Rule 21 default settings profile set during commissioning. N � - 6 Standard Test Conditions(1000 W/mz irradiance,AM 1.5,25°Q.All DC voltage is fully contained within the module. oIca= (A)Lon Side:1.3 in(32 mm) 7 UL Listed as PVRSE and conforms with NEC 2014 and NEC 2017 690.12;and C22.1-2015 Rule 64-218 Rapid g Shutdown of PV Systems,for AC and DC conductors;when installed according to manufacturer's instructions. Short Side:0.9 in(24 mm) 8 Please read the safety and installation instructions for more information regarding load ratings and mounting configurations. See www.sunpower.com/company for more reference information. Please read the safety and Installation instructions for details. For more details,see extended datasheet:www.sunpower.com/solar-resources. Specifications included in this datasheet are subject to change without notice. '' K 02022 SunPower Corporation.Al rights reserved.SUNPOWER,the SUNPOWER logo and EQUINOX are UL wrtcncme registered trademarks of SunPower Corporation in the U.S.MAXEON is a registered trademark of Maxeon Solar LISTED FA78s�s 544400 ReVA Technologies,Ltd.For more information visitwww.maxeon.com/legal. Md°la Fir.hrfw °­Typc,2 - January2022 J Data Sheet Enphase Microinvefters Region:AMERICAS, I Enphase IQ7HS The high-powered smart grid-ready Microinverter Enphase IQ7HS Microinverter'M with integrated MC4 connectors dramatically simplify the installation, process while achieving the highest system . efficiency. The IQ Series Microinverters extend the reliability standards set forth by previous generations and undergo over a million hours of power-on testing, enabling Enphase to�provide an industry-leading warranty of up to 25 years. Easy,to Install • Lightweight and simple • Faster installation with improved,lighter two-wire cabling Built-in rapid shutdown compliant-(NEC 2014,2017.&2020) Efficient and Reliable • Optimized for high powered 66-cell*modules • Highest CEC efficiency of 97.0% • More than a million hours of testing ENPHASE m Class II double-insulated enclosure • UL listed Smart Grid Ready, • Complies with advanced grid support,voltage and frequency \ ride-through requirements • Remotely updates to respond to changing grid requirements F Configurable for varying grid profiles ' Meets CA Rule 21 (UL 1741-SA) *The IQ7HS is required to support 66-cell modules. To learn more about Enphase offerings,visit enphase.com v EN PHAS E. Enphase IQ7HS Microinverter INPUT DATA(DC) IQ7HS-66-M-US Commonly used module pairings' 320 W-460 W+ Module compatibility 66-cell PV modules Maximum input DGvoltage 59 V Peak power tracking voltage 38 V-43 V Operating.range 20 V-59 V Min/Max start voltage 30 V/59 V Max DC short circuit current(module Isc) 15 A Overvoltage class DC port II DC port backfeed current 0 A PV array configuration 1 x 1 ungrounded array;No additional DC side protection required; AC side protection requires max 20A per branch circuit OUTPUT DATA(AC) @240 VAC @208 VAC j Peak output power 384 VA 369 VA Maximum continuous output power 384 VA 369 VA Nominal(L-L)voltage/rang6z 240 V/211-264 V 208 V/183-229 V Maximum continuous output current 1.60 A(240V) 1.77 A(208V) Nominal frequency 60 Hz 60 Hz Extended frequency range 47 to 68 Hz 47 to 68 Hz AC short circuit fault current over 3 cycles 4.82 A 4.82 A Maximum units per 20 A(L-L)branch circuit3 10 9 Overvoltage class AC port III III AC port backfeed current 18 mA 18 mA Power factor setting 1.0 1.0 Power factor.(adjustable) 0.85 leading...0.85 lagging 0.85 leading...0.85 lagging EFFICIENCY @240 V @208 V J CEC weighted efficiency 97.0°i 96.5% I MECHANICAL DATA �Ambient temperature range -400C to+60°C Relative humidity range 4°i to 100%(condensing) FConnectortype Staubli made MC4 Dimensions(WxHxD) 212 mm x 175 mm x 30.2 mm(without bracket) Weight 1.08 kg(2.38 Ibs) Cooling Natural convection-No fans - Approved for wet locations Yes Pollution degree PD3 Enclosure Class II,corrosion resistant polymeric enclosure Environmental category/UV exposure rating NEMA type 6/outdoor Altitude 2000m FEATURES Communication Power Line Communication(PLC) - Disconnecting means The AC and DC connectors have been evaluated and approved by UL for use as the load-break disconnect means required by NEC 690 and C22.1-2018 Rule 64-220. Compliance CA Rule 21 (UL 1741-SA),HECO v1.1 UL 62109-1,UL1741/IEEE1547,FCC Part 15 Class B, ICES-0003 Class B, l CAN/CSA-C22.2 NO.107.1-01 This product is UL Listed as PV Rapid Shut Down Equipment and conforms with NEC-2014,NEC- 2017 section 690.12,NEC 2020 and C22.1-2015 Rule 64-218 Rapid Shutdown of PV Systems,for AC and DC conductors,when installed according to manufacturer's instructions. 1.No enforced DC/AC ratio.See the compatibility calculator at htt s:Henphase.com/en-us/support/module-com atin 'bility. 2.Nominal voltage range can be extended beyond nominal if required by the utility. 3.Limits may vary.Refer to local requirements to define the number of microinverters per branch in your area. To learn more about Enphase offerings,visit enphasexom ©2022 Enphase Energy.All rights reserved.All tra.'demarks or brands used are the property of Enphase Energy,Inc. E N P H A S E, 10-18-2022 `/ i Gregory Sachs, PE 4589 Austin Blvd, (516)-544-4115 Island Park, NY 11558 permitting@empower-solar.com May 19,2023 To Whom It May Concern:. The purpose of this letter is to certify that the existing roof structure located at: 260 Huckleberry Hill Rd, East Marion,NY 11939 can support the additional load of the solar energy system, in addition to wind,snow and gravity. Portions of roof structure covered and not covered with photovoltaic panels are in compliance with R324.4.1.1. Furthermore, it has been determined that the structure complies with the 2020 Residential Code of New York State including the ASCE 7. Please see Table 1 below -- - ---for-specific data relating to the calculations for each roof structure involved in the solar energy system installation. Table 1 Rafter Snow Wind Max Span Layers of ' Roof Surface spacing Cross Section Load Speed Kneewall Collar Ties M (in) (psf) (mph) Shingles South 1 8.58 16 Nominal 2x8 20 135 No No 1 East 1 9.58 16 Nominal 2x8 20 1 135 No No 1 East 2 8.17 16 Nominal 2x8 20 135 No No 1 Sincerely, Gregory Sachs, PE r' OF NE W co zjj: € : 2s osa53 FO'°ROFESS�p�P f -- l � J r l5 Q U L5 POWERWALL DEC 2 7 2023 Tesla Powerwall is a fully-integrated AC battery system for -.��Z, residential or light commercial use. Its rechargeable IithiurOul d n ep L n y pack provides energy storage for solar self- Town of Southold Jon batter ,w V. J, b �. consumption, time-based control, and backup. ' PowerVvall's electrical interface provides a simple • �:�.Y�fr, ., ;���,, connection to any home or building. Its revolutionary ., =°a compact design achieves market-leading energy density and-is easyto install, enabling owners to uickl realize the ` g quickly benefits of reliable, clean power. J PERFORMANCE SPECIFICATIONS MECHANICAL SPECIFICATIONS AC Voltage'(Nom Ina 1) 120/240 V Dimensions' 1150 mm x 753 mm x 147 mm Feed-In Type Split Phase __ _,____ (45.3 in x 29.6 in x 5.75 in) Welght3 114 ka(251.3 Ibs) Grid Frequency 60 Hz Mounting options Floor or wall mount Total Energy' 14 kWh =Dimensions and weight differslightly if manufactured before March 2019. Usable Energy' 13.5 k1Nh Contact Tesla for additional information. Real Power,max continuous 5 kW(charge and discharge) 753 mm 147 nim (29.6 m) (5.75 in Real Power,peak(10s,off-grid/backup) 7 kW(charge and discharge) I Apparent Power,max continuous 5.8 kVA(charge and discharge) Apparent Power,peak(10 s,off-grid/backup)7.2 kVA(charge and discharge) T v S L w Maximum Supply Fault Current 10 kA Maximum Output Fault Current 32 A 1150 mm Overcurrent Protection Device 30 A (45.3 in) Imbalance for Split-Phase Loads 100% Power Factor Output Range +/-1.0 adjustable Power Factor Range(full-rated power) +/-0,851 Internal Battery DC Voltage 50 v 1 Round Trip Efficiencyt1 90% Warranty 10 years ENVIRONMENTAL SPECIFICATIONS 'values provided for 250C(771F),3Z kW charge/discharge power. '-AC to battery to AC,at beginning of life. Operating Temperature -200C to 500C(-4°F to l22°F) Recommended Temperature 0°C to 300C(320F to 86017) COMPLIANCE INFORMATION Operating Humidity(RH) Up to 100%,condensing Storage Conditions -200C to 300C(-40F to 860F) Certifications UL 1642,UL 1741,UL 1973, Up to 9S%RH,non-condensing UL 9540,IEEE 1547.UN 38.3 State of Energy(SoE):25%initial Grid Connection Worldwide Compatibility Maximum Elevation 3000 m(9843 ft) Emissions FCC Part 15 Class B,ICES 003 Environment Indoor and outd:or rated Environmental RoHS Directive 2011/GS/EU Enclosure Type NEMA 3R Seismic AC156,IEEE 693-2005(high) Ingress Rating IP67(Battery&Power Electronics) P56(Wiring Compartment) Wet Location Rating Yes Noise Level @ 1 m < 40 dBA at 300C(86°F) 7 =_ 5 L n TESLA.COM/ENERGY TYPICAL SYSTEM LAYOUTS WHOLE HOME BACKUP --------------- dptionel; Solar I i o FO 0 --Solar inverter i Main panel Backup Gateway Utility meter Grid including service disconnect T H 9 L.7 0 Powerwall Whole home. backup PARTIAL HOME BACKUP --------------------------- Optional: Solar \I o0 0 0 , o Solar inverter '•------------------------ Sub panel Backup Gateway Main panel Utility meter Grid T■■L R Powerwall Backup loads Home loads T a M L n NA-BACKUP-2019-06-11 TESLA.COM/ENERGY UNIT LEVEL TEST - OUTDOOR WALL MOUNTED The outdoor wall mounted test was performed in accordance with Section 9.2 except as modified by Section 9.5, which again adds the 1-ftwide soffit and associated instrumentation. Pages 20 through 22 verify that the test layout,wall constructions, placemegt of the cheesecloth indicator and instrumentation fully conformed to the test standard methodology. 6 in.spacing 6 in.spacing between unit and between units target wail Figure 5- Outdoor Wall Mount Dimensions UNIT LEVEL TEST - REPORT DETAILS Beginning on page 22: an overview table of each test is provided including a timestamped outline of observations noted. The data provided in the graphs in this section is intended to be used as a means of characterizing and comparing different ESS products in a standardized way. Another use is for evaluating non-residential installations, or ESS that exceed the aggregate quantities established in codes. The design of room construction and/or fire suppression for those systems based on this data is beyond the scope of this guidance document. �,�1,3•,.i.1-drl liL.-to nr any qu—e,inns yn,i S,ax,a Plaaca fQP1 free to ornaii rnrior.mmnlianra;7te sl a.com. cr ENS AUG - 3 2023 -Punge;G DEPT. �i��T T = 5 L n I L - T = 5 n I I Powerwall 2 AC ,Installation Manual with Backup Gateway 2 For the latest Powerwall installation documents in all'supported languages,visit: www.tesla.com/support/po werwall. I To secure the full 10-year product.warranty, Powerwall must be registered by completing the commissioning process and sending system information to Tesla. i i Product Specifications All specifications and descriptions contained in this document are verified to be accurate at the time of printing. However, because continuous improvement is a goal at Tesla, we reserve the right to make product modifications at any time. i The images provided in this document are for demonstration purposes only. Depending on product version and market region, details may appear slightly different. i Errors or Omissions I To communicate any inaccuracies or omissions in this manual, send an email to: energy-pubs@tesla.com. I 3 ©2020 TESLA, INC. All rights reserved. � All information in this document is subject to copyright and other intellectual property rights of Tesla, Inc. and its licensors. This material may not be modified, reproduced or copied, in whole or in part, without the prior written permission of Tesla, Inc. and its licensors. Additional information is available upon request. The;! following are trademarks or registered trademarks of Tesla, Inc. in th'e United States and other countries: I I-T T = 5 L n T Tesla Tesla Motors Powerwall All other trademarks contained in this document are the property of their respective owners and their use herein does not imply sponsorship or endorsement of their products or services. The unauthorized use of any trademark displayed in this document or on the product is strictly prohibited. i Electronic Device: Do Not Throw Away Proper disposal of batteries is required. Refer to local codes for disposal requirements. For Private Households: Information on Disposal for Users of WEEE This symbol on the product(s) and/or accompanying documents means that used electrical and electronic equipment (WEEE) should not be mixed with general household waste. For proper treatment, +recovery and recycling, please take this product(s) to designated collection points where it will be accepted free of charge.Alternatively, in some countries, you may be able to return your products to your local retailer upon purchase of an equivalent new product. Disposing of this product correctly will help save valuable resources and prevent any potential negative effects on human health and the environment, which could otherwise arise from inappropriate waste handling. Please contact your local authority for further details of your nearest designated collection point. Penalties may be applicable for incorrect disposal of this waste, in accordance with you national legislation. For Professional Users in the European Union If you wish to discard electrical and electronic equipment(EEE), please contact your dealer or supplier for further information. For Disposal in Countries Outside of the European Union This symbol is only valid in the European Union (EU). If you wish to discard this product please contact your local authorities or dealer and ask for the correct method of disposal. n L CONTENTS General Warnings and Information.................3 Make AC Power Connections to Supply and Load Panels................................................................'.......................25 Specifications..........................................................5 Install Optional Internal Panelboard in the Backup Powerwall Specifications.....................................................5 Gateway...................................................................................27 Backup Gateway 2 Specifications...................................7 STEP 5: Make Communications Connections RegisteringPowerwall......................................... 8 ...................................:................................................29 Connect Powerwall to'the Backup Gateway.............29 Site Requirements and Pre-Installation Install Optional Remote Disable Switch......................32 Guidance...................................................................9 Powerwall and Backup Gateway 2 Installation STEP 6: Install Energy Metering for the Requirements...........................................................................9 System.....................................................................34 Powerwall Physical Requirements........................ ...10 About Energy Metering.....................................................34 Powerwall Identification......................................................11 Site and Solar Metering for Backup Gateway 2.......34 Powerwall Optimum Temperature Range....................11 Install Tesla 100 A CTs......................................................35 Preparing for Installation...................................12 STEP 7: Complete the Installation................ 36 In the Powerwall Box.......................... ....12 Plan Internet Connection for the Backup Gateway 2 In the Powerwall Accessory Bag 12 . ....................................................................................................36 In the Backup Gateway 2 Box..........................................13 Close the Wiring Compartments and Turn the SystemOn ...................................................36 In the BackupGateway2 AccessoryBag13 Y """""""""""""' RequiredTools.......................................................................14 STEP 8: Commission the System...................38 RequiredSupplies................................................................14 Optional Accessory Kits and Orderable Parts...........14 Commission the System....................................................38 Finish and Demonstrate the Installation....................40 STEP 1: Plan the Installation Site......................16 Troubleshooting...................................................................40 Choose a Location...............................................................16 Technical Support...............................................................40 Choose Powerwall Cable Entry 16 Maintenance..........................................................................40 Choose Backup Gateway Cable Entry..........................16 Plan the Electrical Service Connection to Backup Appendix A: Powerwall Mounting Details...... Gateway ...............................16 .....................................................................................41 Plan Amount and Size of Conduit or Raceway.........16 Powerwall Space Requirements......................................41 Plan Distance Between Components............................17 Mounting Bracket Anchoring Details...........................42 STEP 2: Mount Powerwall and the Backup Appendix B: Wiring Reference...................... 45 Gateway...................................................................18 Powerwall Wiring.................................................................45 Anchor the Powerwall Mounting Bracket....................18 Backup Gateway 2 Wiring................................................46 Mount Powerwall on the Bracket.....................................19 Backup Gateway 2 Communication Wiring...............47 Mount the Backup Gateway 22 Eaton Breakers.............................................................:.......48 STEP 3: Configure the Backup Gateway for Appendix C: System Wiring,Diagrams........49 . Wiring......................................................................24 Overview.................................................................................49 Remove Neutral-Ground Bonding Strap from Whole-Home Backup.........................................................49 Backup Gateway if Not Installed as Service Partial-Home Backup.........................................................52 Equipment..............................................................................24 Appendix D: Configure Energy Metering........ STEP 4: Make AC Power Connections.........25 Install Main Breaker in Backup Gateway.....................25 CONTENTS. Appendix E: Installing a Neurio Energy Meter........................................................................ 57 Neurio Energy Meter Overview......................................57 Wireless Communication.to the Backup Gateway....... ........................................................ .......................................57 Wired Communication to the Backup Gateway...,..57 Meter Voltage Taps............................................................59 Current Transformer Placement.....................................59 Voltage Tap and Current Transformer Connections.... .....................................................................................................59 Meter Placement and CT Wire Lengths......................60 Current Transformer Orientation...................................60 Current Transformer Capacity........................................60 Metering Split-phase Solar with a Single CT.............62 Installing the Meter.............................................................62 Appendix F: Feature Notes............................. 63 Configuring Site Limits......................................................63 Configuring Conductor Export Limits.........................63 LoadShedding.....................................................................63 Appendix G: Installation Troubleshooting...... �...................................................................................65 Accessing the Powerwall User Interface.....................65 Updating Firmware.............................................................65 . Configuring Energy Meters..............................................65 Reset the Backup Gateway..............................................67 Power Cycle the System...................................................67 Appendix H: Multi Powerwall Installations..... ....................................................................................68 Electrical Equipment Sizing and Overcurrent Protection...............................................................................68 Multi-Powerwall Installations with the Stack Kit......73 In the Powerwall Stack Kit..............................................73 RequiredTools..;..................................................................73 Site Requirements..............................................................74 Installation Instructions....................................................74 Step 1: Prepare for Installation.....................................75 Step 2: Choose a Wiring Option.................................76 Step 3: Prepare for Concealed Wiring......................76 Step 4:Join the Powerwall Units................................79 Step 5: Wire the Powerwall Units...............................83 Step 6: Close the Wiring Compartments and Replace the Covers..........................................................84 Step 7: Turn On and Commission the System.......86 Appendix I: Revision Log..................................87 GENERAL WARNINGS AND INFORMATION ATTENTION: Read this entire document before installing or using Powerwall. Failure to do so or to follow any of the instructions or warnings in this document can result in electrical shock,serious injury, or death, or can damage Powerwall, potentially rendering it inoperable. Important Safety Instructions This manual contains important instructions for the Tesla Powerwall 2 AC and Backup Gateway that must be followed during installation and maintenance of the system. Symbols Used CAUTION: indicates a hazardous situation i [RISK OF ELECTRIC SHOCK: indicates 3 which, if not avoided, could result in minor !components that present risk of i injury or damage to the equipment. s electrical shock. WARNING: indicates a hazardous situation CAUTION, RISK OF ELECTRIC SHOCK, I ®� g which, if not avoided, could result in injury or ; 5 minutes I ENERGY STORAGE TIMED � I death. DISCHARGE. Discharge time is 5 g minutes from de-energization. NOTE: indicates an important step or tip that ! BIDIRECTIONAL TERMINAL: Indicates leads to best results, but is not safety or location of combined input/output ; damage related. connector on the equipment. - 1 REFER TO OPERATING INSTRUCTIONS: PROTECTIVE CONDUCTOR indicates that user should refer to operating — TERMINAL: Indicates location of j i or installation instructions before proceeding. i grounding connection on the equipment. General Information WARNING: Read this entire document before installing or using Powerwall. Failure to do so or to follow any of the instructions or warnings in this document can result in electrical shock,serious injury, or death, or may damage Powerwall, potentially rendering it inoperable. WARNING:A battery can present a risk of electrical shock,fire, or explosion from vented gases. Observe proper precautions. A WARNING: Powerwall installation must be carried out only by a competent electrician who is certified by Tesla and who has been trained in dealing with low voltage electricity_. , . WARNING: Powerwall is heavy. Use of lift equipment is recommended. WARNING: Use Powerwall only as directed. A WARNING: Do not use Powerwall if it is defective, appears cracked, broken, or otherwise damaged, or fails to operate. A WARNING: Before beginning the wiring portion of the installation, ensure that Powerwall is switched off, and lock out any associated circuit breakers and disconnect switches (if applicable for the installation). Powerwall 2 AC Installation Manual 3 GENERAL WARNINGS AND INFORMATION A WARNING: Do not attempt to open, disassemble, repair, tamper with, or modify Powerwall. Powerwall and its components are not user serviceable. Batteries in Powerwall are not replaceable. Contact Tesla Support for guidance on repairs. A WARNING: To protect Powerwall and its components from damage when transporting, handle with care. Do not impact, pull, drag, or step on Powerwall. Do not subject Powerwall to any strong force. To help prevent damage, leave Powerwall in its shipping packaging until it is ready to be Installed. ' A WARNING: Do not insert foreign objects into any part of Powerwall. A WARNING: Do not expose Powerwall or its components to direct flame. A WARNING: Do not install Powerwall near heating equipment. A WARNING: Do not immerse Powerwall or its components in water or,other fluids. A WARNING: Install Powerwall and Backup Gateway in a location that prevents damage from flooding. A WARNING: Operating or storing Powerwall in temperatures outside its specified range might cause damage to Powerwall. A WARNING: Do not expose Powerwall to ambient temperatures above 600C (140°F) or below -30°C (-22°F). CAUTION: Do not use solvents to clean Powerwall, or expose Powerwall to flammable or harsh chemicals or vapors. CAUTION: Do not use fluids, parts, or accessories other than those specified in this manual, including use of non-genuine Tesla parts or accessories, or parts or accessories not purchased directly from Tesla or a Tesla-certified party. CAUTION: Do not place Powerwall in a storage condition for more than one (1) month, or permit the electrical feed on the Powerwall to be severed for more than one (1) month,without placing Powerwall into a storage condition in accordance with Tesla's storage specifications. CAUTION: Do not paint any part of Powerwall, including,,any internal or external components such as the exterior shell or casing. CAUTION: Do not connect Powerwall directly to photovoltaic (PV) solar wiring. CAUTION: When installing Powerwall in a garage or near vehicles, keep it out of the driving path. If possible, install Powerwall on a side wall and/or above the height of vehicle bumpers. CAUTION: Avoid installing Powerwall and Backup Gateway in direct sunlight. CAUTION: Ensure that no water sources are above or near Powerwall or Backup Gateway, including downspouts, sprinklers, or faucets. i A CAUTION: Ensure that snow does not accumulate around Powerwall or Backup Gateway. A CAUTION: Avoid installing the Powerwall and Backup Gateway where it will be exposed to direct sunlight or ambient temperatures greater than 35'C. J Powerwall 2 AC Installation Manual 1 4 SPECIFICATIONS Powerwall Specifications Performance Specifications AC Voltage (Nominal) __ 120/240 V Feed-In Type Split Phase Grid Frequency i 60 Hz _ Total Energyl 14 kWh Usable Energyl 13.5 kWh Real Power, max continuous - 5 kW (charge and discharge) Read I Power, peak(10s, off-grid/backup) 7 kW (charge and discharge) i Apparent Power, max continuous 15.8 kVA (charge and discharge) ~� Apparent Power, peak(10s, off-grid/backup)- 17.2 kVA (charge and discharge) Maximum Supply Fault Current 10 kA Maximum Output Fault Current 32 A Overcurrent Protection Device 30 A ---------------- Imbalance for Split-Phase Loads _ 100% Power Factor Output Range +/-1.0 adjustable Power Factor Range (full-rated power) +/- 0.85 } I Internal Battery DC Voltage � 1 50 V Round Trip Efficiencyl,2 0 _ 90/ Values provided for 25°C (770F), 3.3 kW charge/discharge power. 2AC to battery to AC, at beginning of life. Mechanical Specifications Dimensions3 1150 mm x 753 mm x 147 mm (45.3 in x 29.6 in x 5.75 in) P Weight3 €114 kg (251.3 Ibs) Mounting' Floor or wall mount 3Dimensions and weight differ slightly if manufactured before March 2019. Contact Tesla for additional information. - Powerwall 2 AC Installation Manual 5 SPECIFICATIONS Environmental Specifications Operating Temperature 1-200C to 50°C (-4°F to 122°F) Recommended Temperature O°C to 300C (320F to 86°F) f Operating Humidity (RH) Up to 100%, condensing Storage Conditions 200C to 300C (-4°F to 86°F) Up to 95% RH, non-condensing State of Energy (SoE): 25% initial I Maximum Elevation _ 3000 m (9843 ft) Environment Indoor and outdoor rated �~ Enclosure Type I NEI MA 3R Ingress Rating IP67 (Battery& Power Electronics) IP56 (Wiring Compartment) Wet Location Rating Yes Noise Level @ 1m < 40 dBA at 300C (86°F) J r l i I 1 Powerwall 2 AC Installation Manual 6 SPECIFICATIONS Backup Gateway 2 Specifications Performance Specifications AC Voltage (Nominal) -� 120/240 V Feed-In Type ;Split Phase Grid Frequency 60 Hz Current Rating 1 200 A Maximum Input Short Circuit Current 10 kAl Overcurrent Protection Device 100-20OA; Service Entrance Ratedl Overvoltage Category �-Category IV � AC Meter Revenue accurate (+/- 0.2 %) When protected by Class J fuses, Backup Gateway 2 is suitable for use in circuits capable of delivering not more than 22kA symmetrical amperes. Mechanical Specifications Dimensions 1660 mm x 411 mm x 149 mm (26 in x 16 in x 6 in) j Weight 120.4 kg (45 lb) s Mounting Wall mount, Semi-flush mount Environmental Specifications Operating Temperature i-20°C to 500C (-4°F to 122°F) Operating Humidity (RH) I Up to 100%, condensing Maximum Elevation 13000 m (9843 ft) 1 Environment , Indoor and outdoor rated Enclosure Type _ NEMA 3R J Powerwatl 2 AC Installation Manual 7 REGISTERING POWERWALL Tesla Powerwall comes with a warranty whose term depends on the connection of Powerwall to the Internet. To secure the full 10-year warranty for Powerwall, it must be reliably connected to the Internet to allow remote firmware upgrades from Tesla. If an Internet connection is not established or is interrupted for an extended period, and Tesla is unable to contact the owner, the warranty may be limited to 4 years. To ensure that the owner can receive the full 10-year warranty, be sure to complete the commissioning process so that registration information is sent to Tesla. For more information, refer to the"Powerwall Warranty for your region at www.tesla.com. r Powerwall 2 AC Installation Manual r 8 SITE REQUIREMENTS AND PRE-INSTALLATION GUIDANCE Powerwall and Backup Gateway 2 Installation Requirements Powerwall comes with a separate Backup Gateway to enable integration with the electrical grid and generation like solar systems (refer to Compatibility Matrix for information on what can be connected with Powerwall). The Backup Gateway communicates with the system by means of wireless and wired connections. Wiring and conduit (where required) must be provided by the installer and installed to comply with local codes. J c AC isolation and interconnection requirements between the Powerwall system and the electrical panel are subject to local codes. Ensure that the installation meets local isolation and interconnection requirements. All U.S.and Canada electrical installations must be done'in accordance with local codes and the National Electric Code (NEC) ANSI/NFPA 70`or the Canadian Electrical Code CSA C22.1. A WARNING: All Powerwalls in the system must be installed on the `Backup' side of the Backup Gateway's relay. A WARNING: When Powerwall is installed in a dwelling unit, fire detection and protection equipment should be installed in accordance with local building and fire codes. A WARNING: Do not connect the Backup Gateway in any way that bypasses or short-circuits its relay. A WARNING: Do not connect the Backup Gateway to the source side only or to the load side only. The Backup Gateway must have both source and load connections, and must be wired in compliance with local codes. CAUTION: The Backup Gateway 2 is rated for 10 kA maximum supply fault current. Where local regulation requires a 10 kA rating, all breakers employed in circuit with the Backup Gateway 2 should also be rated to 10 kA. ' CAUTION: The Manual Override switch inside of the product must not be used to simulate a grid outage or take home off-grid. A main isolation switch should be installed upstream of the Backup Gateway for testing the system and for service purposes. CAUTION: Before installing, disconnecting, and/or adjusting current transformers for metering, ensure the circuits being measured are not energized and the system is completely powered down. Failure to de-energize the system may compromise operator and equipment safety. NOTE: All installations must conform to the laws, regulations, codes, and standards applicable in the jurisdiction of installation. The Backup Gateway must be wall-mounted and can be configured for cable entry at the top, bottom, rear, or sides of the enclosure. It requires adequate clearance for installation and cabling or conduit. Wiring and conduit (where required) must be provided by the installer and the installation must comply with local codes and UL514B requirements. ' l Powerwall 2 AC Installation Manual 9 SITE REQUIREMENTS AND PRE-INSTALLATION GUIDANCE Figure 1. Powerwall 2,AC and Backup Gateway 2 Dimensions 753 mm 147 mm (29.6 in) (5.8 in) r� Y m E L F i 411 mm 149 mm 1150 mm (16 in) (6 in) (45.3 in) j I I I III T0f!L W 660 mm (26 in) Ll Powerwall Physical Requirements Powerwall can be mounted on a floor or wall, and includes a mounting bracket to support either configuration. Mounting Powerwall must follow the guidance outlined in this document. Mounting requirements based on wall type are provided in Appendix A:Powerwall Mounting Details on page 41. Powerwall requires adequate clearance for installation, cabling, and airflow. Do not install anything above Powerwall that limits access to the unit or that might fall and damage the unit. Do not mount Powerwall horizontally or upside down. NOTE: Powerwall has a pump and fan that produce a gentle hum during operation, comparable to a typical refrigerator. The noise level depends on the ambient temperature and the power level of operation. Consider these noise levels when choosing where to install Powerwall. _ l r Powerwall 2 AC Installation Manual 10 SITE REQUIREMENTS AND PRE-INSTALLATION GUIDANCE Powerwall Identification Newer Powerwalls have slightly different dimensions for mounting-bracket height. Powerwalls may be easily identified by part number and by comparing the back of the Powerwall. Figure 2. Powerwall 2 Identification by Mounting Bracket Height 1092170-XX-H and lower 1092170-XX-J and higher 2012170-XX-8 and lower 2012170-XX-C and higher i 755 mm(29.7 in) 753 mm(29.6 in) 395 mm -° °—°—°—° °—° o 0 0. _ .. o (15.6 in) 1 °\� ° o, I ' 000 �•� o000 �� 0 0 1. 01 u ° 1150 mm 0 0 p O i (45.3 in) ❑ II ❑ 1 ° 711 mm 0 o o Ib o ogee OO o000 ° 11 _ J ;� 292 mm I° (11.5 in) ` ° 248 mrr 40 (9.76 in o _ o on_o_o_.o_o c ofr r 0 mm J 1 63 min 623 mm (0.79 in) (2.48 in) (24.54 in) Powerwall Optimum Temperature Range Powerwall is rated to operate in temperatures from -4°F to 122°F (-20°C to 500C). However,.for best performance Tesla recommends installing Powerwall in locations-with ambient temperature between 32°F to 86°F (0°C to 30°C) year round. When outside this optimum temperature range, charge/discharge power may be reduced and Powerwall will utilize its thermal control system more frequently to maintain battery cell temperature which will reduce the energy efficiency of the system. Systems operating off-grid for long periods (>4 hours) in cold weather may need to curtail PV, and reduce energy used for pre-conditioning. • For cold climates Tesla strongly recommends installing Powerwall indoors when possible (particularly when long outages are expected). • For hot climates Tesla recommends keeping Powerwall out of direct sunlight. Installation in full sun raises the temperature inside the enclosure above ambient temperature. This temperature rise is not a safety risk, but may impact battery performance. Additionally, if stored in a cold environment (e.g. below 0°C) before installation, it may take several hours for Powerwall to raise its internal temperature using pre-conditioning..Tesia recommends storing Powerwalls in a warm location prior to installation to help efficiently commission and test the system. - Powerwall 2 AC Installation Manual 11 PREPARING FOR INSTALLATION In the Powerwall Box I T 9 L 1 I ' I a i In the Powerwall Accessory Bag - Powerwall Accessory Bag: Tesla P/N 1104517-00-x --i'l-=t'm i 0 0 0 1 2 3 4 5��� Wiring compartment (1) AC power (3) Wago 2- (1) 4-pin terminal (1) 4-pin terminal cover with (4) screws harness position lever nuts block connector block,connector with 120-Ohm terminating resistor 6 7 8 9 (1) 32-mm reducing (2) 25-mm (1) 35-mm rubber (1) drillable washer reducing grommet threaded cable washers gland Powerwall 2 AC Installation Manual 12 PREPARING FOR INSTALLATION In the Backup Gateway 2 Box T S L n V N 5 In the Backup Gateway 2 Accessory Bag I ' 0, .�. . . i iSCONNECT iMAIN + ISCONNECT 6— cr - G01N[kM'Atl2AC -CIL i-, 1 2 3 (1) Main circuit breaker adhesive label (1) Tesla 100 A CT (4) Sealing washers 4 ; 5 (1) Tesla CT extension cable harness [10 ft/3 m] (1) Owner's Guide ^� Powerwall 2 AC Installation Manual 13 PREPARING FOR INSTALLATION Required Tools • Personal protective equipment (safety glasses, gloves, protective footwear) • Drill and drill bit for drilling pilot holes in mounting surface • Torque screwdriver with 1/4-inch bit holder and Torx T20 bit • Large (5 mm) flathead driver bit (for Powerwall Earth terminal) • Small (2 mm) flathead screwdriver(for wiring connector spring terminals) • Torque wrench with 1/4-, 3/8-, and 5/16-inch Allen bit (for Backup Gateway power connections) i • Socket wrench with 8 mm hex socket • Wire strippers/cutters for 24 AWG to 250 kcmil (0.2 mm2 to 120 mm2) wires • Installation tools (level, stud.sensor, tape measure, pencil, painter's tape, flashlight) • Multimeter and Loop Impedance Tester • Lift equipment capable of lifting and supporting 125 kg up to 1.5 m • Ratcheting strap to secure Powerwall to lift equipment • Digital camera or smartphone for documenting the installation A WARNING: Powerwall is heavy. Wear appropriate personal protective equipment (such as gloves and protective footwear) when handling the unit. Only a sufficient number of trained movers should lift Powerwall. Use of lift equipment is recommended. Required Supplies • Powerwall mounting bracket hardware(see Appendix A:Powerwall Mounting Details on page 41) • Backup Gateway mounting hardware • Conduit or raceway (depending on local electrical requirements) • Conduit adapters (necessary for cable entry into Powerwall wiring compartment and Backup Gateway) • Minimum 600 V rated 4-conductor(twisted pair optional) or double-insulated (with one twisted pair) shielded copper (Cu) cable (for communication connection between Powerwall and the Backup Gateway) • Minimum,600 V rated copper (Cu) cable (for power connections to Powerwall and the Backup Gateway) Optional Accessory Kits and Orderable Parts Part Number Name Description _ v - 1467316-00-x Tesla 100 A CT Additional Tesla 100 A CT (1 count) 1467274-00-x Tesla 100 A CT Extension Tesla 100 A CT Extension (10,ft/3 m) 1529623-00-x Internal Panelboard Kit Optional internal'panelboard kit with wire jumpers and breaker hold-down bar 1549184-00-x 2" Conduit Hub Kit 2" conduit hub and bolts 1549184-01-x 1.25" Conduit Hub Kit 1.25" conduit hub and bolts 1112484-02-xNeurio Meter Kit with 200 A Neurio Meter Kit with (2) Neurio 200 A CTs CTs 1112477-00-x Neurio Additional 200 A CTs Additional Neurio 200 A CTs (2 count) 1125547-03-x _ Neurio CT Extension Wires Neurio CT Extension Wires W Powerwall 2 AC Installation Manual 14 PREPARING FOR INSTALLATION Part Number Name y Description 1447689-00-x Neurio 800 A CTsNeurio 800 A CTs (2 count) 1 1129625-00-x Neurio CT Y Splitter Neurio CT Y-Splitter to allow for paralleling CTY- V�Y� i connections I 1133339-00-x _� Neurio RS-485 meter Neurio R5-485 cables that connect from meter to communication harness i Gateway to ensure a hardwired connection EP-PW-BUNDLE-1 Bundle 1 Two Neurio 200 A CTs, two Neurio CT Extension Wires, one Neurio CT Y-Splitter EP-PW-BUNDLE-2 Bundle 2 One Neurio Meter Kit with two Neurio 200 A CTs, two additional Neurio 200 A CTs, four Neurio CT d Extension Wires, two Neurio CT Y-Splitters, one Neurio IRS 485 cable 1107999-00-x Powerwall 2 Mounting Bracket ;Additional Powerwall Wall Mounting Bracket (1 bracket is included with every Powerwall) 1104517-00-x Powerwall 2 Accessory.Bag Additional Powerwall 2 accessory bag for North (North America) &American market (1 accessory bag is included with every Powerwall) 1112154-00-x Powerwall 2 Stack Kit Powerwall 2 Stack Kit for stacked Powerwall installs Figure 3. Optional Internal Panelboard Kit �4 i s Figure 4. Conduit Hub Kit Powerwall 2 AC Installation Manual 15 STEP 1: PLAN THE INSTALLATION SITE Choose a Location Choose a wall capable of supporting the full weight of Powerwall, with one of the following characteristics: • Wood studs at regular intervals • Plywood sheeting of sufficient thickness • Solid concrete or masonry • Metal studs of sufficient gauge If floor-mounting Powerwall, choose a level surface adjacent to a wall space that meets the above requirements. Make sure the area is isolated from hazards that could damage Powerwall, such as vehicle traffic or flooding. Consider the spacing requirements for Powerwall (see Appendix A:Powerwall Mounting Details on page 41). Choose Powerwall Cable Entry Determine whether cables will be routed into Powerwall from the side or the back of the unit. • For side cable entry, a conduit fitting or cable gland must be used to seal the entry into the wiring compartment. • For back cable entry, a rubber grommet or cable gland is used to seal the entry into the wiring compartment. NOTE: If Powerwall is mounted on a wall with studs spaced 24 inches apart, cable entry from the back of Powerwall may be blocked. Choose.Backup Gateway Cable Entry 1 Determine whether cables will be routed into the Backup Gateway from the top, bottom, sides, or rear of the enclosure. NOTE: For cable entry at the top of the Backup Gateway enclosure, a Tesla Top Hub must be used in order to maintain enclosure ingress protection. Plan the Electrical Service Connection to Backup `Gateway The Backup Gateway is service entrance rated. When installed at the service entrance, appropriate overcurrent protection must be installed in.the Backup Gateway. The Backup Gateway can accommodate a main circuit breaker between 100 and 200 A. Breaker sizing and installation must comply with the National Electric Code. Plan Amount and Size of Conduit or Raceway Calculate the amount and size of conduit or raceway needed for the installation, based on fill limits and local code requirements. An adapter may be required between the entry into the Powerwall wiring compartment and the conduit. J 1 Powerwall 2 AC Installation Manual 16 STEP 1: PLAN THE INSTALLATION SITE Plan Distance Between Components Follow the table below for maximum distances between system components. Wire gauge must meet local codes and in some circumstances wire gauge requirements change based on distance. Refer to Appendix B on page 45 for wire gauge requirements. Maximum Cable Length , Backup Gateway to Powerwall(s)* 150 ft (45 m) Neurio Energy Meter to Backup Gateway (RS485 wired connection) ;164 ft (50 m) x Backup Gateway to Internet router (wired Ethernet connection), 1328 ft (100 m) *Total length.of communications cable, including daisy-chained connections, through last Powerwall in chain CAUTION: Failure to follow minimum cable size and length requirements may result in intermittent or unreliable operation of the Powerwall system. In systems that do not meet these minimum requirements, performance issues may arise even after successful commissioning. Maximum CT Extension Tesla 100 A CTs Maximum Extension Length V Using 20 AWG (0.5 mm2) or larger twisted pair conductors Up to 330 ft (100 m) Using Tesla 100 A CT Extension (10 ft/3 m) (Testa P/N 1467274-00-x) �Up to 330 ft (100 m) Neurio 200 A CTs (Remote Metering) Maximum Extension Length ; Using Neurio CT extension harness (Tesla P/N 1125547-03-x) Up to 15 ft (4.5 m) Using 24-18 AWG (0.2-1.5 mm2) shielded twisted pair with drain wire !-Up to 50 ft (15 m) R Powerwall 2 AC Installation Manual 17 STEP 2: MOUNT POWERWALL AND THE BACKUP GATEWAY Anchor the Powerwall Mounting Bracket NOTE: For detailed instructions on mounting Powerwall, including minimum spacing requirements, refer to Appendix A:Powerwall Mounting Details on page 41. 1. Using a drill and level, mount the bracket.to the selected wall. See Mounting Bracket Anchoring Details h on page 42 for additional details on the type and number of fasteners to use. Figure 5. Mounting Bracket Dimensions 1 659 mm(26 in) { 610 mm(24 In) 508 rrim(20 in) 406 mm(16 In) 305 mm(12 in) O O O O 582 mm O 463 mm (23In) (18.2 in) O O O o 0 O O O O O Q OCD1 � Li ED 640 riim(25.2 in) r 1 • Powerwall 2 AC Installation Manual 18 STEP 2: MOUNT POWERWALL AND THE BACKUP GATEWAY 2. For back cable entry installations, drill a hole in the wall corresponding to the back cable entry port. Table 1. Location of Back Cable Entry Port,.!n Re lation to Brack t 14 mm (0.5 in)-,-- 14 mm (0.55 in) ----------- ----------- ------- ------------------------------ ---------------------------- 035 mm I (1.375 in) -- 035 mm --- ------------- (1.375 in) 24 MM (0.95 i :::. I 1 I (2.7 in)68 mm - --------------------- It CD4=- ----- 1092170-XX-H and lower 1092170-XX-J and higher 2012070-XX-B and lower 2012070-XX-C and higher Mount Powerwall on the Bracket 1. Switch off Powerwall. AWARNING: Switching off will ensure Powerwall does not grid form. However, AC voltage may still be,present from the grid. Ensure all equipment is safely de-energized before working. O Powerwall 2 AC Installation Manual 19 STEP .2: MOUNT POWERWALL AND THE BACKUP GATEWAY 2. Remove the left side cover from Powerwall. m� C - I' 3. Prepare Powerwall for side or back cable entry: a. For side cable entry installations, remove the side cable entry door from the left side cover. I � I i b. For back cable entry installations, remove the plug from the back cable entry port and place it in the side cable entry port. 1 NOTE:The plug must always be placed in either the back or side cable entry port. S a a a 0 as � I a I - I e � � Powerwall 2 AC Installation Manual 20 STEP 2: MOUNT POWERWALL AND THE BACKUP GATEWAY r 4. Using lift equipment, position Powerwall close to the wall and adjust the height of Powerwall until its mounting cleats are just above the flanges on the bracket. 5. Lower Powerwall until the top cleat engages the top flange on the bracket and the bottom cleat aligns with the bottom flange. 6. With both cleats engaged, lower Powerwall onto the bracket. An audible click will be heard when the cleats are seated in the bracket and the locking mechanism at the center of the top flange clicks into place. NOTE: To remove Powerwall from the mounting bracket, place a thin piece of sheet metal between the Powerwall unit and the-bracket to compress the locking mechanism, and lift the Powerwall straight up. Figure 6. Mounting Powerwall on the Bracket 00 4 CLICK ®O o O O b O 0 7. If floor-mounting Powerwall, use shims to ensure-that Powerwall is level. The unit should be level within +/- 2 degrees side-to-side and within +/- 5 degrees front-to-back. 8. If wall-mounting Powerwall, remove the feet from the unit. NOTE: Step 8 applies only to updated versions of Powerwall, see Powerwa//2 Identification by Mounting Bracket Height on page,11. v i a Powerwall 2 AC Installation Manual 21 STEP 2: MOUNT POWERWALL AND THE BACKUP GATEWAY Mount the Backup Gateway 1. Using a hole saw, drill out the necessary cable access holes from the Backup Gateway. All cable knockouts are 3/a" in diameter but can be expanded to 2". Figure 7. Cable Access Drill Guides i Or ` v 2. If using top cable entry, remove the Top Hub Cap from the enclosure and install the Tesla Top Hub (Testa P/N 1549184-00-A (2-inch kit) or Tesla P/N 1549184-01-A (1.25-inch kit)). 0 0 O O I I I I I I I I ® I V I 0 0 0 0 � Q I ` I 1 Powerwall 2 AC Installation Manual 22 STEP 2: MOUNT POWERWALL AND THE BACKUP GATEWAY 3. Using a drill and level and A"screws, mount the Backup Gateway enclosure. The provided sealing washers must be used when mounting the Backup Gateway. NOTE: Mount the Backup Gateway vertically, in the orientation shown in Backup Gateway Enc%sure Mounting Holes on page 23. Do not mount the Backup Gateway enclosure horizontally or upside down. Figure 8.,Backup Gateway Enclosure Mounting Holes 388 mm (15.3 in) 31mm� - (1.2 in) 519 mm g" Dial . 642 mm ° (25.3 in) ®° po 4. Locate the Backup Gateway serial number on the label on the dead front cover. Record the serial number for reference. l Powerwall 2 AC Installation Manual 23 STEP 3: CONFIGURE THE BACKUP GATEWAY FOR WIRING Remove Neutral-Ground Bonding Strap from Backup Gateway if Not Installed as Service Equipment Proper earth connection and Neutral-to-Ground bonding is required for safe operation of the Powerwall system and for compliance with local code requirements. When installed as Service Equipment, the factory-installed Neutral-Ground Bonding Strap bonds neutral to ground, as shown in Figure 8. The Neutral-Ground Bonding Strap must only be removed if not installed as Service Equipment, or for test purposes. Use a 7/16-inch socket to remove the two nuts/attaching the Neutral-Ground Bonding Strap. If replacing the Neutral-Ground Bonding Strap, torque nuts to 65 in-lbs (7.4 N-m). Figure 9. Neutral-Ground Bonding Strap Location o ,o ° II 0 grip 0 O Q _ o al o 0 4 ° 4 o 'aO �MIPP6rl 0 ©�°® O A WARNING: To ensure-safe operation in Backup Mode, a local earth connection must.be present on the site such as by earth rod.or ground electrode. Connection of earth rod must comply with local codes. Powerwall 2 AC Installation Manual 24 STEP 4: MAKE AC,POWER CONNECTIONS Install Main Breaker in Backup Gateway When installed as Service Equipment, a main breaker must be installed. Eaton CSR or BW type breakers may be used; see Eaton Breakers on page 48 for compatible breakers. 1. Remove the S1 and S2 supply lugs using a 7/16-inch hex socket. 2. Install the main breaker, torqueing the two S1 and S2 nuts to 65 in-lbs (7.4 N-m) using a 7/16-inch hex socket. NOTE: Main breaker wire lug cover caps are recommended any time a main breaker is installed in the Backup Gateway Figure 10. Removing the S1 and S2 Supply Lugs to Install a Main Breaker Al 11117^� o c�i � I � I U O ° o OCR 00 o' O p p sdppan o' 'OO O O Oo Make-AC Power Connections to Supply and Load Panels In each of the following steps: • Strip the ends of the wires and insert into the corresponding Backup Gateway terminal lugs. • Using an appropriate torque tool, tighten the lugs according to the table on the following page. • Use copper or aluminum wire only. `1. Connect the supply conductors to the Backup Gateway Supply terminals according to Conductor Connections on page 26 and the accompanying table. 2. Connect the home load panel conductors to the Backup Gateway Backup terminals according to Conductor Connections on page 26 and the accompanying table. 3. For partial home backup with Non-Backup loads under 100 A, a Non-Backup panel can be connected. Connect the conductors (L1, L2, Neutral, and Ground) from the Non-Backup panel to the Backup Gateway's Non-Backup terminals according to Conductor Connections on page 26 and the accompanying table. Powerwall 2 AC Installation Manual 25 STEP 4: MAKE AC POWER CONNECTIONS Any circuits connected here will not be powered when disconnected from the grid. During on-grid operation, these circuits are still metered by the internal site metering with no additional metering hardware required. A WARNING: Always ensure all equipment is safely de-energized and locked out prior to working, to prevent risk of electric shock. To avoid shock hazard, never power on the system without a connection to Earth at the Gateway. A WARNING: Incorrect wiring of AC conductors presents a risk of electrical shock or damage to equipment. Before energizing the system, ensure all connections are made correctly according to the instructions in this document and in accordance with local wiring codes and regulations. Refer to Appendix B. Wiring Reference on page 45 for all wiring requirements and recommendations, including wire colors and gauges. 'Refer to Appendix C'System Wiring Diagrams on page 49 for example system wiring diagrams. _ Table 2. Conductor Connections _ Supply Connections Horne Load and Backup Connections. Non-Backup Connections ° e --I 0 QUO)) i �a.o,, ��•�•,�' man,, eo_ -_ 'I � oo__ i u _ I ° d av o �e ° admwav o ° �' 6MPPatl ® 1 •o off ' Terminal 'Wire Gauge Tool Size Strip Length Torque Supply Lugs (S1, S2) 6 AWG - 250 kcmil Is/16-in hex I—'�1.25 in (32 mm) 275 in-Ibs (31 N-m) Non-Backup Lugs (L1, L2) 14 - 2 AWG 3/16-in hex 13/4 in (20 mm) 120 in-Ibs (14 N-m)� Backup Lugs (LI, L2) 6 AWG- 250 kcmil 5/16-in hex 1.25 in (32 mm) 275 in-Ibs (31 N-m) Large Neutral Lugs 6 AWG- 250 kcmil 5/16-in hex 1.25 in (32 mm) 275 in-Ibs (31 N-mm) Large Earth Lugs 14 AWG - 2/0 3/16-in hex 3/4 in (20 mm) 120 in-Ibs (14 N-m) Design Considerations Refer to Appendix F. Feature Notes on page 63 for information on the Backup Gateway load shedding feature, which can be used to interrupt any 60 V circuit when operating off-grid. Powerwall 2 AC Installation Manual 26 STEP 4: MAKE AC POWER CONNECTIONS Install Optional Internal Panelboard in the Backup Gateway The Internal Panelboard kit (Testa P/N 1529623-00-x) may be installed in the Backup Gateway 2 and connected to either the Backup or the Non-Backup terminals by feeding a two pole breaker on the bussing. 1. Mount the Internal Panelboard into the Backup Gateway using the provided mounting screws (M5x12 hex bolts). d ® -------- ------- -- -o 0 ® O � ° i 2. Connect the internal panelboard to either the backup (2a).or non-backup (2b) lugs: a. Connect the L1 and L2 lugs on the bottom of the Internal Panelboard to the Backup lugs via the provided 105'C-rated CU wire jumpers. o � o m - o , ® O O ®0 0® 03.0 ® ® o O O 0 �NJI?I?dSl ° n ' a Powerwall 2 AC Installation Manual 27 J 1 STEP 4: MAKE AC POWER CONNECTIONS b. Connect the Non-Backup Lugs to an Eaton BR breaker on the bussing (up to 100 A). o e 0 [ Q oo e • o ® o O � 0 —k ©° Q° O o O O r ®0 00 ® e oa oa ® 0 4 � o � O O O O P s3�pparr � NOTE: The Eaton BR breakers are required when connecting the internal panelboard to the Non-Backup lugs to accommodate for wire gauge difference (see Backup Gateway Wiring.on page 46 for wire gauge ranges). 3. Once all breakers have been installed, install the breaker hold-down if installing any back-fed or generation breakers on the bussing. Mount the hold-down bracket using the provided (2) M5-0.8x12_ Philips head screws. ° ° ® ® o Co o 0 � 0 4. Place the adhesive circuit label on the deadfront to label circuits. Design Considerations The Internal Panelboard is 200 A-rated and supports 6x 1" breaker spaces (12 circuits) using Eaton BR branch circuit breakers up to 125 A maximum. The Powerwall connection to the,Backup Gateway always requires a 30 A circuit breaker. This breaker serves as circuit'protection for the Powerwall. Breaker sizing and installation must comply with the National Electric Code. Powerwall 2 AC Installation Manual 28 STEP 5: MAKE COMMUNICATIONS CONNECTIONS Connect Powerwall to the Backup Gateway NOTE: Refer to Appendix B. Wiring Reference on page 45 for wiring specifications. Depending on local requirements, Powerwall wiring can be installed through conduit or through a cable gland. Refer to local codes to determine wiring requirements. 1. (Conduit installations only) Run conduit as needed and attach the conduit fitting to the inlet of-the wiring compartment. The wiring compartment inlet accepts a standard 1-inch conduit fitting: 2. (Conduit installations only) If the conduit connector does not have an integrated bushing, affix the provided insulation bushing to the conduit opening on the inside of the wiring compartment. NOTE: Ensure that all conduit joints and outlets have smooth edges so that wiring is not damaged as it is run through the conduit. 3. Run the 4-conductor communication cable, the AC power conductors, and equipment grounding conductor from the Backup Gateway through the conduit or cable gland and pull them into the Powerwall wiring compartment. 4. At the Powerwall, strip the ends of the AC conductors and attach them to the corresponding leads on the AC power harness. 5. Plug the AC power harness into the AC.connector in the Powerwall wiring compartment. Ensure that the connector clicks into place. Figure 11. Powerwall 2 AC Power Harness Connection 0000OUT i 0 0000 o� L2NM ! °® CD Ll N _ Q L2 j Powerwall 2 AC Installation Manual 29 1 STEP 5: MAKE COMMUNICATIONS CONNECTIONS 6. On each end of the 4-conductor communication cable, strip'and insert the wires into the provided 4-pin connectors. On the Powerwall side, use the black connector provided in the accessory.bag. On the Backup Gateway side, use the connector that came plugged into the corresponding connector socket in the Backup Gateway. Figure 12. Communication Connector Wiring 7. On the Backup Gateway side of the 4-conductor communication cable, cut back the drain wire. The drain wire should be terminated at the Powerwall chassis Earth terminal only. 8. On the Backup Gateway side, plug the 4-pin connector into the 4-pin socket labelled "Powerwall". Tighten screws on the connector. NOTE: See Backup Gateway Communication Wiring on page 47 for diagrams and wiring specifications. 9. On the Powerwall side, plug the 4-pin connector into the bottom 4-pin socket (labeled "IN") in the Powerwall wiring compartment. . 10. Plug the provided 4-pin connector with the terminating 120-Ohm resistor into the top 4-pin socket (labeled "OUT") in the Powerwall wiring compartment. (In multi-Powerwall installations, use this connector only in the last Powerwall in the chain.) 11. On the Powerwall side, strip the end of the equipment grounding conductor and wrap the communication cable drain wire around the grounding conductor lead. Powerwall 2 AC Installation Manual 30 STEP 5: MAKE COMMUNICATIONS CONNECTIONS 12. Insert the grounding conductor and drain wire in the Powerwall chassis Earth terminal. The Earth terminal is identified with the following symbol:Q Tighten the screw in the Earth terminal to 4.5 Nm. Figure 13. Powerwall Earth/Ground and Communication Connections with'a Terminating Resistor Q� O a a a OUT I R�m 0 a 0 a O" LS� IIVL�� I i� O® CD 1. 1 7 � 12V+ GND CN + — Drain •----------------------------� Ground NOTE:The Tesla Powerwall system supports,ESS Operating Mode.of Import Only, where it will not export active power from the battery to the Area EPS.The installer and the customer can select three standard modes of operation for the Powerwall: Backup, Solar Self-Powered, and Time of Use.All three of the modes of operations'operate within the constraint of the Import Only ESS Operating Mode. NOTE:This system is equipped with a power control system (PCS)which is suitably rated to provide branch circuit overcurrent protection. The controlled current setting shall not exceed the rating of any controlled busbars or conductor ampacity. NOTE:The PCS controlled current setting for each PCS controlled conductor or bus bar shall be indicated with a field applied marking label on the conductor or in close proximity to the busbar. Figure 14. PCS Field Marking Label PCS Controlled Current The maximum output current from this system towards the main panel is controlled electronically.Refer to the m anufacturer's instructions for more information. ,A; WARNING: Only qualified personnel shall be permitted to set or change the setting of the maximum operating current of the PCS. The maximum PCS operating current setting shall not exceed the busbar rating or conductor ampacity of any PCS controlled busbar or conductor. WARNING: Configuration of power control settings system or changes to settings shall be made by qualified personnel only. Incorrect configuration or setting of the power control settings may result in unsafe conditions. NOTE:The maximum operating currents in controlled busbars or conductors are limited by the settings i of the power control system (PCS) and may be lower than the sum of the currents of the connected controlled power sources. The settings of the PCS controlled currents may be used for calculation of the design currents used in the relevant sections of NEC Article 690 and 705. NOTE: Maximum PCS Controlled Current setting: 200 A. Powerwall 2 AC Installation Manual 31 STEP 5: MAKE COMMUNICATIONS CONNECTIONS Install Optional Remote Disable Switch NOTE: This section provides guidelines on a system functionality. Please consult your local AHJ or Utility before use. The Backup Gateway 2 can be wired to include an external Remote Disable switch that simultaneously commands all Powerwalls to become idle and enter a safe mode. Installation Instructions The Remote Disable switch is wired through a low voltage, 12 V DC, control circuit connected to the Gateway AUX port. Figure 15. Wiring a Remote Disable Switch to the Backup Gateway AUX Port 1 2345 °r���•�= a -- �i�l�@, ie�e I 12 - OOo ® I ® • Oo Qo ! io B 1. Remove the factory-installed jumper from pins 1 and 2 of the 5-position "AUX" connector inside the Gateway 2. See Appendix B. Wiring Reference on page 45 for a diagram of the connector location. Powerwall 2 AC Installation Manual 32 STEP 5: MAKE COMMUNICATIONS CONNECTIONS 2. Using minimum 24 AWG conductors (maximum 16 AWG), with wiring methods according to code, connect pins 1 and 2 (labelled "SDO" and "SDI") to a suitable disconnect switch. 3. Confirm that all Powerwalls cease operation when the switch is open. Operation Initiate Remote Turn the switch to the OFF (open) position Disable ------! All Powerwalls will go to idle. This behavior is the same wither the AC utility grid is I I present or not. j Resume Powerwall Turn the Switch to the ON (closed) position Operation AC Grid Present AC grid not present (Off-grid or AC grid is' down) Normal system operation will Powerwall operation will only resume when the resume shortly grid'is back or a 12V jump start is provided to L the Gateway Guidelines for Remote Disable Switch Selection and Installation • Must be Listed or Recognized as "Emergency Stop Button", "Emergency Stop Device", "Emergency Stop Unit" • Must be Lockable on ON/OFF position • Must have a clear indication of ON/OFF position • Must be outdoor rated (NEMA 3R or higher) • Should be Installed externally in a readily accessible location preferably by utility meter • The maximum low voltage wire run from switch to Gateway should not exceed 150 feet (45 m) • Should observe 12V, 0.1 A ratings Powerwall 2 AC Installation Manual 33 STEP 6: INSTALL ENERGY METERING FOR THE SYSTEM About Energy Metering Visibility on power and energy data is needed for the Powerwall system to operate properly. An energy meter accomplishes this by measuring voltage'(by voltage tap) and current (by Current Transformer, CT) at certain points in the system. There are many possible configurations for installing metering depending on system design. However, there are two goals: • Metering the Site- Site meters show the overall power flow to/from a site from the Grid's perspective. Thus, Site meter(s) must be installed upstream of all solar production, Powerwalls, and loads. Multiple physical Site meters can be installed together where needed, but their sum should capture all of the power flows from load, solar, and Powerwall(s). • Metering all Solar- Solar meters capture-production from PV inverter(s). There must not be any loads or Powerwalls behind the Solar CTs. This would result in under- or over-estimation of solar production. Site and Solar Metering for Backup Gateway 2 Backup Gateway 2 makes metering simple with built-in options for Site and Solar metering: • Internal Primary Meter(Meter X) - This Site meter may be used when the Grid connection is at the Supply terminals. No additional steps are needed during install. If there are any loads or solar upstream of the Supply terminals, a Remote Meter must be used to meter the Grid connection point. • Internal Auxiliary Meter (Meter Y) - Metering solar circuits inside the Gateway or in adjacent switchboards is simple with the three (3) internal CT connections for use with Tesla 100 A CTs (one included in the Accessory Kit). Additional Tesla 100 A CTs (Testa P/N 1467316-00-x) may be ordered individually. The Tesla 100 A CTs may be extended a max distance of 330 ft (100 m) by splicing twisted pair or using the Tesla 100A CT Extension (10 ft/3 m) (Tesla P/N 1467274-00-x). Use 20 AWG (0.5 mm2) conductors or larger to extend CTs up to 330 ft (100 m). Voltage rating of the extension wire must be equal to or greater than all other adjacent circuits. Depending on site layout it may not be possible to use internal Gateway 2 meters, and Remote Energy Meters will be required. • See Appendix D: Configure Energy Metering on page 56 for further guidance-on metering. • See Appendix E.-Installing a Neurio Energy Meter on page 57 for Remote Neurio Meter installation instructions. Powerwall 2 AC Installation Manual '34 1 - STEP 6: INSTALL ENERGY METERING FOR THE SYSTEM Install Tesla 100 A CTs J A WARNING: Before installing, disconnecting, and/or adjusting CTs, ensure the circuits being measured are not energized and the system is completely powered down. Failure to de-energize the system may compromise operator and equipment safety. 1. Plug the Tesla 100 A CT into the terminal in the Backup Gateway. Ensure the connector is fully seated in the terminal. 2. Clamp the CT around the conductor to be measured. Figure 16. Embedded Site CTs and Solar CT Connectors 0 0 -- 0 $ ° o @ �FY iQ� �® o) � �i o0 ® o • f 0 i 0 p ®� © o O O ® 0 4• Tips • See Appendix D: Configure Energy Metering on page 56 for additional diagrams on configuring energy metering. • When metering split-phase 240 V solar inverters, a single CT on L1 or L2 can be used to meter production. • The CT1 and CT2 terminals have voltage references to Ll and L2 respectively and cannot be reconfigured. The CT3 terminal has a default voltage reference to Ll but can be configured as L2 in the Commissioning Wizard. • Ensure CTs are facing the proper direction as indicated on the label. A CT will show negative current if installed backwards. • When upgrading a Gateway 1 system, the existing Remote(Neurio) Energy Meter(s) may be left in place and re-paired with the new Gateway. The Remote Meter must be power cycled within one minute prior to re-pairing. If metering Site power with the Remote Meter, ensure the Backup Gateway 2 internal site meter is de-selected in Commissioning. • See Appendix G.Installation Troubleshooting on page 65,for CT configuration troubleshooting tips. • The Powerwall installer has the option to set a Conductor Export Limit, or a Site Charge Limit. When used, the Powerwall will dynamically curtail to meet these site-specific programmed thresholds. See Appendix F.- Feature Notes on page 63 for more information. Powerwall 2 AC Installation Manual 35 STEP 7: COMPLETE THE INSTALLATION Plan Internet Connection for the Backup Gateway 2 Internet connectivity is required to receive the full 10-year Powerwall warranty, and for the customer to see their system in the Tesla App. For best performance, ensure Ethernet and Wi-Fi connections are both configured during commissioning. The Gateway will automatically select the network option with best connection. I Cellular is available only as a backup connection when Wi-Fi and Ethernet connections are lost. Cellular should not be relied•on as the default connection method. Install Ethernet Connection • Ethernet cable must be CAT5 (24 AWG) cable at minimum. • If not possible to run an Ethernet cable directly to the customer's network router, Powerline Ethernet socket adapters may be used. • See Appendix B: Wiring Reference on page 45 for the position of the Ethernet port. Close the Wiring Compartments and Turn the System On 1. Before closing any installed hardware, take photos of the completed wiring in the Powerwall, Backup Gateway, and main distribution board. 2. Ensure that all conduit junctions and cable entry points are secure and properly sealed. 3. Arrange the communication and AC power wires neatly inside the Powerwall wiring compartment. 4. Replace the cover on the Powerwall wiring compartment. Ensure that the cover seats properly on the gasket so that the compartment is sealed. Using a Torx T20 bit,tighten the fasteners to 1.5 Nm. 5. Replace the left side cover on Powerwall by pushing the top into place and working toward the bottom to reattach it to the clips along the length of the unit. 6. Install the Backup Gateway dead front panel and secure it firmly with the original screw. Mount the Backup Gateway door, and latch it shut. Figure 17. Install the Dead Front Cover and Glass Door _ -- � o ® o o - n Powerwall 2 AC Installation Manual 36 STEP 7: COMPLETE THE INSTALLATION 7. Use the provided breaker label sheet to clearly label the circuit breakers. NOTE: If the Backup Gateway is installed outdoors or in a high-traffic area, the latch can be locked shut. 8. Switch on the AC circuit breakers for the Backup Gateway and Powerwall. 9. Switch on Powerwall by moving the switch on the right side of the unit to the ON position. When Powerwall establishes communication with the Backup Gateway, the LED on the right side of Powerwall illuminates. A CAUTION: Always leave site with Powerwall breaker closed for battery to maintain a base level of charge..Leaving the Powerwall disconnected from AC for extended periods increases risk of damage. J Powerwall 2 AC Installation Manual 37 STEP & COMMISSION THE SYSTEM Commission the System V Locate the label on the Backup Gateway deadfront. Using a smartphone, scan the QR code on the label to establish Wi-Fi connection with the Backup Gateway. e WKTPN:1232100-XX-X TSN:TGYYYYYYYYYQY Password:ZZZZZZZZZZ '^ Join TEG- YY Wi-Fi NOTE: To connect to the Backup Gateway via Ethernet, connect-a computer to the Ethernet port of the Backup Gateway with a standard CAT5 Ethernet cable. 2. Open a browser and navigate to http://TEG-YYY where YYY are the last 3 digits of the Backup Gateway serial number. TPN:1232100-XX-X TSN:TGYYYYYYYYY Y Password:ZZZZZZZZZZ fad^ 9:41AM 6 C*100%Wf ~http://TEG YYY NOTE: If the Backup Gateway Wi-Fi network doesn't appear or the connection to the Backup Gateway fails, power cycle the Backup Gateway using the Reset button, wait 2 minutes, and try connecting again. Powerwall 2 AC Installation Manual 38 STEP 8: COMMISSION THE SYSTEM 3. Once communication is established, the browser may show a Security Warning page. This is normal. To enter the Commissioning Wizard, click Advanced and then Proceed. The browser should then show the login page to the Commissioning Wizard. 4. Log into the Commissioning Wizard: o Username: Enter the e-mail address of the installer who is carrying.out the work o Password: Enter the password on the deadfront label o Click Continue .114 9:41 N+ L 0:100%AM-. TEG-YW G LANGUAGE. English EMAIL instal ler@corripany.com % TPN:1232100-XX-X TSN:TGYYYYYYYYYYYY FAssvros:o Password:ZZZZZZZZZZ ^ZZZZZZZZZZ I]Show password NOTE: For systems with firmware version 1.48+,,the 'password will only be required the first time the installer logs into commission the system. Once the system has been commissioned, the Commissioning Wizard will prompt the installer to log in by toggling the On/Off switch on one,connected Powerwall. If the Powerwall(s) are unable to communicate with the gateway, the password will be available as an alternative login. 5. Connect the Backup Gateway to the Internet by the following means: NOTE: Either an Ethernet or a Wi-Fi connection must be connected. For best reliability, ensure Wi-Fi and Ethernet options are both configured. Wi-Fi (2.4 or 5 GHz) _ Ethernet o In the Commissioning Wizard, click the arrow for o In the Commissioning Wizard,-click the arrow j Wi-Fi for Ethernet I o Scan and locate the home Wi-Fi network name o Choose DHCP (most common) or Static (only 1 (SSID) if necessary and you know the Network o Enter the homeowner's network password settings) € go Click the blue arrow o Click Connect NOTE: Cellular connection must only be relied on as fallback connection if Wi-Fi and/or Ethernet is lost. 6. Click Check Connection to verify that the Internet connection is working. Click Continue. NOTE: See Appendix G.Installation Troubleshooting on page 65 for troubleshooting stepson accessing the Commissioning Wizard. Powerwall 2 AC Installation Manual 39 STEP 8: COMMISSION THE SYSTEM 7. Click Check for Update to apply any firmware updates to the Backup Gateway and Powerwall. After the update is staged, click Update.After the update is complete, re-establish connection to the Backup Gateway and the Internet, starting with procedure #1 above. -A WARNING: Software updates may take several minutes, especially for installations with multiple Powerwalls. Never power down during an update, as it may result in damage to the system. 8. Follow the Commissioning Wizard steps to complete the commissioning process. Finish and Demonstrate the Installation 1. After installation is complete, remove the protective film from Powerwall. - 2. Remove the plastic straps from the left and right side covers by cutting them and carefully pulling them through the slots in the covers. 3. Ask the homeowner to download and install the Tesla mobile app and connect to the system. i 4. Demonstrate the capabilities of the Tesla mobile app, such as how to change the operation mode. 5. Simulate an outage.by opening the main breaker and show that Powerwall is powering backup loads. 6. Leave the Powerwaii Owner's Manual with the owner of the newly installed system. 7. Archive the photos from the installation. ; Troubleshooting See Appendix G.installation Troubleshooting on page 65 for common installation troubleshooting steps. Technical Support Resources for Certified Installers, including service request forms and the latest versions of installation manuals, are available within the Tesla Partner Portal: https.Ilpartners.testa.com Maintenance Powerwall does not require pre-scheduled preventative maintenance. The only maintenance required by an owner is to keep the unit connected to the internet and free and clear of debris, especially around the air intake and exhaust. To clean Powerwall, use a soft, lint-free cloth. If needed, the cloth can be dampened with mild soap and water only. Do not use cleaning solvents to clean Powerwall, or expose Powerwall to flammable or harsh chemicals or vapors. 1 i 5 � . I Powerwall 2 AC Installation Manual 40 APPENDIX A: POWERWALL MOUNTING DETAILS Powerwall Space Requirements Figure 18. Powerwall 2 Mounting Bracket Dimensions and Space Requirements 659 mm(26 In) 610 mm(241n) 50 m m 508 mm 20 in) (2 in) 406 mm(161n) 305 mm(12 in) I O T = 5 L. Pi 0 ❑ 50 mm 150 mm ❑ 463mm (2 in) (6 in) 582 mm (231n) (182 In) ❑ l J ❑ O O O O O ❑ �_j — — p . 640 mm(252 In) f .Minimum lateral wall space 38 in (960 mm) i Minimum clearance from left side (air intake)_ 2 in (50 mm) rMinimum clearance from-right side (air exhaust) 6 in (150 mm) Minimum clearance above single Powerwall 2 in (50 mm) Minimum clearance above side-by-side Powerwalls 12 in (300 mm) Minimum clearance between side-by-side Powerwalls 10 in (250 mm) Maximum height above ground _ 39.5 in (1 m) to bottom of unit Maximum slope +/- 2° side-to-side I +/- 50 front-to-back NOTE: Powerwall has a pump and fan that produce a gentle hum during operation, comparable to a typical refrigerator. The noise level depends on the ambient temperature and the power level of operation. Consider these noise levels when choosing where to install Powerwall. Powerwall 2 AC Installation Manual 41 APPENDIX A: POWERWALL MOUNTING DETAILS Mounting Bracket Anchoring Details NOTE:The details below are minimum guidelines and are not guaranteed to be applicable. Refer to local building codes to ensure the use of appropriate fasteners. Refer to Powerwall 2 Anchorage Details for complete mounting information. Wood Studs (spaced at 12,16, 20 or 24 inches) I , If anchoring directly into wood studs, use at least four (one in o o a o o G$D each corner) 1/4-inch wood screws with washers, of sufficient j ! length for at least 2.5 in embedment into the studs. 1 I I 0 I I I I I I I I 1• I I i 1 1 I I o4Doo § I I I I � Wood Studs (spaced at 12,16, 20 or 24 inches) dp 0 0 If anchoring to blocking between wood studs, use minimum 2 -- -- - x 4 in blocks, end-nailed into studs with two 16d'nails or toe- nailed into studs with four 8d nails. Use at least four (one in o ! each corner) 1/4-inch'wood screws with washers, of sufficient 0 ? I 1 I 1 length for at !east 2.5 in embedment into the blocking. ED _ I 1 ❑ I 1 I I I 1 I 1 I 1 f I I ❑ I 1 1 1 I I 1 II -___________ y111 I h- ( § I I I I I I 1 t ! I I I 1 I I I I Powerwall 2 AC Installation Manual 42 APPENDIX A: POWERWALL MOUNTING DETAILS Plywood 06D C= C: G;D C=C? If anchoring to plywood wall material, the plywood must be minimum 1/2-inch thick. Use at least four (one in each corner) 1/4-inch wood screws with washers, of sufficient length to penetrate at least 1/4 inch beyond the backside of the plywood. Metal Studs (spaced at 12,16, 20 or 24 inches) If anchoring directly to metal studs, studs must be minimum CD G$Do o G$D o CD 18 gauge. Use at least four (one in each corner) #14 sheet metal screws with washers, of sufficient length to penetrate at EIQ least 3 threads beyond the stud. 0 Li El 0 Metal Studs (spaced at 12,16, 20 or 24 inches) Cl o Goo If anchoring to backing between metal studs, studs must be :1 CD —'] f 7- W minimum 2!E gauge, and backing must be minimum 22 gauge. j, Use at least eight (two in each corner) #14 sheet metal screws i i 0 with washers, of sufficient length to penetrate at least 3 threads beyond the backing. i i I Powerwall 2 AC Installation Manual 43 APPENDIX A: POWERWALL MOUNTING DETAILS Metal Studs (spaced at 12, 16, 20 or 24 inches) I I oG*D4DCOD COD(#D GODo. If anchoring to backing between metal studs in an outdoor high wind area, studs must be minimum 25 gauge, and backing must be minimum 22 gauge. Use at least twelve (three in each corner) #14 sheet metal screws with washers, of sufficient length to-penetrate at least 3 threads beyond the backing. i i I I I I I Concrete or Masonry Minimum strength must be 2500 PSI (concrete) or 1500 PSI (masonry). o I. I Use at least four (one in each corner, in any available anchor — slot) 1/4-inch fasteners with washers, of sufficient length for f ❑ at least 1.5 in (38 mm) embedment into the material. Ensure I ❑ that all fasteners are at least 1.5 in (38 mm) away from the edges of masonry blocks or bricks. �{ Channel'Strut (Unistrut) Struts must be minimum 1-5/8 in x 1-5/8 in, 12 gauge. a I If mounting on wood studs, attach the strut to at least three ' studs, using at least one 1/4-inch wood screw with washer per stud, of sufficient length for at least 2.5 in embedment into the studs. If mounting on,metal studs, attach the strut to at least three E3 , studs, using at least two#14 sheet metal screws with washers ° per stud, of sufficient length to penetrate at least 3 threads beyond the studs. To attach the bracket to the struts, use at least four (one in each corner) 1/4-inch hex head screws with washers and strut nuts. I S I , I Powerwall 2 AC Installation Manual 44 APPENDIX B: WIRING REFERENCE Powerwall Wiring 1234 --5-6-7 000 O o00o pb 2IMM O O® CD 8 _ Table 3. Powerwall Wiring: Communication Powerwall Terminal Recommended Wire Color `;Wire Gauge 1 112V + (Logic+) Brown 18 -16 AWG (0.8 -1.5e mm2) 2 GND (Earth) i White 18 -16 AWG (0.8 -1.5 mm2) 3 CN + (CAN HI) Blue 24 -16 AWG (0.2 -1.5 mm2) 41 CN - (CAN LO) Yellow J. 24 -16 AWG (0.2 -1.5 mm2) Cable Shield/Drain Wire (Terminate at Powerwall chassis ground lug only) Table_4. Powerwall Wiring: Power 'Powerwall Terminal Recommended Wire Color i Wire Gauge. — -� 5 L2 (Line 2) - to Neutral Red 2 10- B AWG (6 -10mm ) 6 N (Neutral) White 10 - 8 AWG(6 - 10 mm2) 7 L1 (Line 1) Black' 10 -'8 AWG (6 -10 mm2) 8 Chassis Ground Lug' Green/Yellow 10 - 8 AWG (6 -10 mm2) i * Depending on local code for installation methods and cable sizing calculations. NOTE: Refer to local codes and standards for correct wiring practices and wire colors. (3)Wago lever nuts are provided for use with up to 10 AWG(6 mm2) cable. If 8 AWG (10 mm2) cables are required per wiring methods, other appropriate connectors may be used, or a junction box near the Powerwall can be used to convert from 10 to 8 AWG (10 to 6 mm2) cables. Follow all code wiring requirements. NOTE:Suitable wire ferrules may be used with Wago connectors, but are not required. Powerwall 2 AC Installation Manual 45 1 APPENDIX B: WIRING REFERENCE Backup'Gateway 2 Wiring 0 Fj oqg o no ,� ° 0 0 O ° ® _ O G ° If 0 - � @ o Oo Oo Oo 00 �° �drPpav � ® a o®� a Without Internal Panelboard With Internal Panelboard Table 5. Backup Gateway 2 Wiring: Power Component L Recommended Wire Color Wire Gauge A Ethernet Terminal - 24 AWG CATS or better B Main Ground Terminals Green or Bare 6 AWG - 2/0 C Load/Generation Ground Terminals Green or Bare\ 14-4 AWG - ' D Supply Terminals (L1, L2) Black, Red 6 AWG - 250 kcmil E Backup Loads and Generation (L1, L2) Black, Red 6 AWG - 250 kcmil j F Main Neutral Terminals White 6 AWG - 250 kcmil G Load/Generation Neutral Terminals i White 14- 6 AWG, 14 AWG - 1/0 H Neutral-Ground Bonding Strap - - I Non-Backup Loads (L1, L2) Black, Red 14 - 2 AWG J RESET button - - K Optional Internal Panelbard Terminals Black, Red 300 kcmil -1 AWG * Use copper or aluminum conductors. Powerwall 2 AC Installation Manual 46 f APPENDIX B: WIRING REFERENCE Backup Gateway 2 Communication Wiring 1 o PbVvLarwAll Ole 1234 Aux o 0 0 0 0 0 0 1.2345 ° i0lol0 4°Q COMn1$. 0 000000 � °°'®°ate " 1234-56 Oo O (U 0.9. 12 Table 6. Backup Gateway Communication Wiring � 'Terminal Name ~ 'Recommended Wire Color !Wire Gauge 1 12V+ (Logic +) Brown 18 -16 AWG (0.8 - 1.5 mm2) _ 2. GND (Earth) White 18 - 16 AWG (0.8 -1.5 mm2) 3 CN + (CAN HI) Blue 24 -16 AWG (0.2 -1.5 mm2) 4 I CN - (CAN LO) Yellow 24 -16 AWG (0.2 - 1.5 mm2) Table 7. Aux Wiring____ 11 Terminal Name M ;Recommended Wire Color ;Wire Gauge 1 Remote Disable (OUT) - 24 -16 AWG (0.2 -1.5 mm2) 2 Remote Disable (IN) - 24 -16 AWG (0.2 - 1.5 mm2) 3 Generator/Load Control (+) Red 18 - 16 AWG (0.8 -1.5 mm2) 4 Generator/ Load Control (-) Black 18 -16 AWG (0.8 -1.5 mm2) 5 Interlock pin - 24 --16 AWG (0.2 -1.5 mm2) Table 8. External Meter Communication Wiring Terminal Name Recommended Wire Color Wire Gauge 1 GND (Earth)/Shield - 24 -16 AWG (0.2 - 1.5 mm2) 2 RS485 HI #1 Red - 24 -16 AWG (0.2 - 1.5 mm2) 3 RS485 LO #1 Black 24 - 16 AWG (0.2 -1.5 mm2) 4 GND (Earth)/Shield - E 24 - 16 AWG (0.2 - 1.5 mm2) 5 RS485 HI #2 Red 24 -16 AWG (0.2 - 1.5 mm2)'J-� 6 RS485 LO #2 Black 24 -16 AWG (0.2 - 1.5 mm2) ; Powerwall 2 AC Installation Manual 47 APPENDIX. B: WIRING REFERENCE Eaton Breakers Eaton CSR 25 kAIC Breakers Amps ', Part Number Description 100 CSR2100 Eaton # CSR2100N: 100A Me; 2- Pole, 240V, 25kAIC, For Convertible Load Centers 125 CSR2125N Eaton # CSR2125N:125A MB; 2-Pole, 240V, 25kAIC, For Convertible Load Centers i 150 CSR2150N -E-a-ttoon ## CSR2150N: Breaker, 150A, 2P, 120/240V, 25 kAIC, Type CSR 175 CSR2175N Eaton # CSR2175N: 175A MB• 2-Pole 240V 25kAIC For Convertible Load Centers 200 CSR2200N I Eaton # CSR2200N: 200A MB ONLY; 2-Pole, 120V/240V, 25kAIC, Bolt On Eaton BW 10 kAIC Breakers Amps ,Part Number Description 100 BW2100 _ Eaton # BW2100: 100A Main Circuit Breaker; 2-Pole, 240V,10kAIC 150 BW2150 Eaton # BW2150: Circuit Breaker; 150A/240V/2P 175 BW2175 Eaton # BW2175: Circuit Breaker; 175A/240V/2P 200 BW2200 'Eaton # BW2200: 200A Main Circuit Breaker; 2-Pole, 240V, 10kAIC Eaton BWH 25 kAIC Breakers jAmps !Part Number I Description 100 BWH2100 Eaton # BWH2100: 100A Circuit Breaker; 2-Pole,120V/24OV, 25kAIC, Bolt On 125 BWH2125 Eaton # BWH2125: 125A Circuit Breaker; 2-Pole, 120V/240V, 25kAIC, Bolt On 150 BWH2150 Eaton # BWH2150: 150A MB; 2-Pole,120V/240V, 25kAIC, Bolt On. , 175 BWH2175 Eaton # BWH2175: 175A MB; 2-Pole, 120V/,240V, 25kAIC, Bolt On 200 BWH2200 Eaton # BWH2200: 200A MB; 2-Pole, 120V/240V, 25kAIC, Bolt On l I - Powerwall 2 AC Installation Manual 48 APPENDIX C: SYSTEM WIRING DIAGRAMS Overview . The following diagrams are intended for illustration purposes only. Drawings represent sample site layouts to show example system layout and metering. These diagrams should not be considered complete plan sets. The Wiring Key below illustrates how the lugs in the Backup Gateway are connected. Figure 19. Backup Gateway 2 Wiring Key Optlonal Internal Panelboard Non-Backup lugs • • LlU= = L2® 0 o Neutral lugs ® �, �:: N L1 L2 N supply connections(2o) Backup lugs Main lugs or main breaker— Whole-Home Backup • All loads and generation are downstream of the Backup Gateway contactor. • Site-level metering by integrated Site CTs. • Internal panelboard kit may be used for Generation breakers. Neutral-Ground Bonding Strap installed only if Gateway is main service equipment. Powerwall 2 AC Installation Manual 49 APPENDIX C: SYSTEM WIRING DIAGRAMS Figure 20. Whole-Home Backup with Standalone Meter Utility Meter Solar Inverter I 1 ! Backup Gateway 2 Ll L2 Solar CT I) (connected to Internal ( ° ° Auxiliary Meter) o m�bo a@' i a'!i � PCs �- -Controlled Conductors Toy- Internal o © "� ° Primary N-GND li -r Meter =bonding st p 0® ® ® Main Breaker d O ff 0 0 II� IN UUaILI j 1 a' 0 0O Oo a PP ill 00 CD II' II it ®© op 1 Powerwall ' LGND F ` n Ll L2 GND e s Li 9 ® ® e ® e .N e ® ® e GND— e ® ® e e e e ® ® e e e i e e i e1 e ® ® e Backed-up EEO 9D Home Loads e 6 6 Main Panel J Powerwall 2•AC Installation Manual - so APPENDIX C: SYSTEM WIRING DIAGRAMS Figure 21. Whole Home Backup with Meter Load Center Utility Meter Main Breaker Solar Inverter Backup Gateway 2 9G!NrD- L2 Solar CT, N (connected to Internal o o Auxiliary Meter) _ a ® i k _nin -�� ! Internal o Primary � Removed --� - -� o ®I Meter Neutral-Gro d • • - e o o� Bonding St r i ® _ i ° po 0O o a@�� _ _ o Powerwall GND .®�I N L1 L2 GND , e \ Ll Q➢ M e L2 e N_` -e131a GND s e e e � e e e ® ID e e e Backed-up e ® OD e Home Loads a ® e e a Main Panel Powerwall 2 AC Installation Manual 51 APPENDIX C: SYSTEM WIRING DIAGRAMS Partial-Home Backup • Non-Backup loads (refer to design guidance for information on selecting circuits to back up) • If Non-backup loads connected to Non-Backup Lugs, site-level metering by integrated Site CTs. • If Non-backup loads are upstream of Gateway, site-level metering by integrated Site CTs plus additional 100 A CTs on 1-1/1-2 of non-backup circuit, or by remote meters at point of interconnection. • Internal panelboard kit may be used for Generation breakers or Non-Backup loads. • Neutral-Ground Bonding Strap installed only if Gateway is main service equipment. Powerwall 2 AC Installation Manual 52 APPENDIX C: SYSTEM WIRING DIAGRAMS Figure 22. Partial Home Backup with,Standalone Meter Utility Meter 0 Backup Gateway 2 L1 1771 L2 o e o PCs Controlled Conductors L � fNon Backed-up I - Internal Loads o © � ,o Primary Meter Main N-GND m o Breaker bonding strap II ff! h C � • e Solar CT N L7 L2 GND (connected to Internal o g Auxiliary Meter) O Solar Inverter El N�GND� e o L e e -L7- +- e ® ® e e ® ® e • e ® ® e e ® ® e Powerwall e ® ® e Backed-upad ® ® e Home Loads .CUM o oQ c' IN Lg N U EH 9D OO e •GND� I ® ® a Ll �Ii + I C Il - -- -e e �—=N �__LGND Main Panel Powerwall 2 AC Installation Manual 53 APPENDIX C: SYSTEM WIRING DIAGRAMS Figure 23. Partial Home Backup with Standalone Meter - Option Using Secondary Load Lugs Utility Meter 0 I ' Backup Gateway 2 Ll L2 N ---- Non Backed-up C 1 A��I Internal Loads Primary Meter ® ° Main N-GND Breaker ° • • bonding strap i 00 ©o ° - L II Y Solar CT u (connected to Internal N L1 L2 GND 0 L7 L2 GN'D Auxiliary Meter) Solar Inverter n a a („+ LGND— e e a e N e e e e L1 e e e ® ® a ® 0D e 1 a ® ® e e ® ® 6 f e e 9 ® ® 6 i e CID ®_ e e ® e Powerwall Backed-up �---e r®-� ® a e � ® 8 Home Loads FU EH°° ° Y O Q i 107 °° IN L20i ® ® e ' 00 O I •I e a ® ® s .GND I;! ^ �] e e L1 M e e 110 IO L2 —e e a e I, --------- -----------------�r GND Generation Panel Subpanel •Powerwall 2 AC Installation Manual 54 APPENDIX C: SYSTEM WIRING DIAGRAMS Figure 24. Partial Home Backup with Meter Load Center Utility Meter Main Breaker Non-backup loads e e - Solar Inverter e Backup Gateway 2 u GND L2 Solar CT N (connected to Internal Auxiliary Meter) Site Us Q (connected to Internal Auxiliary I-,Ill I Meter) I*�* { Removed Neutral-Grou - 0_ Bonding St a, I ® I� ® Internal Primary Meter oCD 0 - CM 0 i0 o a PowerwallEGND_ II N� Ll L2 GND I n 1 l - e Y. a u m I IILI e N�— e e GND— a Fn ® e e e ° Ea ® ° e En e a ® ULI7 e e ® ® e e ® ® e Backed-up e e Home Loads e e e Main Panel Powerwall'2 AC Installation Manual 55 APPENDIX D: CONFIGURE ENERGY METERING Solar Metering F Install the"solar CT on the solar wire .START Inside Backup Gateway' I Install an Install the solar CT Is there solar Where is the \ Greater than 100m- on the solar wire Yes. —►• external —► on site? solar located? from Backup.Gafway and connect the CT Neurlo meter to the Neurlo No Within 1oO,m of.'Backup Gateway 1 i Extend the solar CT No action needed lead and Install the CT on the solar wire S•it.e'Re-teri-n•g START Can the upstream Are.there any loads loads be connected to upstream of the Backup Yes, _ the Backup Gateway No,—►� Install an external Gateway supply terminals? non-backup f Neurlo meter terminals? •No' ' --_ • Yes; Use the Backup FInttal site CTs on the Gateway Internal site meter I ires and connect e Neurlo meter Powerwall 2 AC Installation Manual 56 APPENDIX E: INSTALLING A NEURIO ENERGY METER Neurio Energy Meter Overview If energy metering in addition to the built-in Site and Solar metering is required, remote Neurio Energy Meter(s) may be paired with Backup Gateway. The Neurio Energy Meter(s) connect to Backup Gateway 2 by wireless connection, or wired communication between the meter and the Backup Gateway using an optional 2-conductor RS485 meter communication harness (Testa P/N 1133339-00-x). The Backup Gateway can support wired communication for up to two meters. NOTE: When upgrading a Gateway 1 system with Gateway 2, the existing Neurio Energy.Meter(s) may be left in place in.the main distribution board and re-paired. The Neurio Meter must be power cycled within one minute prior to re-pairing. If metering,Site power with the Neurio Meter, ensure the Gateway 2's internal site meter is deselected in Commissioning. Wireless Communication to the Backup Gateway The Neurio Energy Meter (Testa P/N 1112484-00-x) may be wirelessly paired with Backup Gateway as part of the normal Powerwall commissioning process within the Commissioning Wizard. Wired Communication to the Backup Gateway As an alternative to wireless communication, it is possible to establish wired communication between the meter and the Gateway using an optional 2-conductor meter communication harness (Testa P/N 1133339-00- x). Up to two meters can be wired directly to the Gateway. If the meter is located outside the Gateway, the harness leads can be extended by splicing additional wire to the harness. See Maximum CT Extension on page 17. The meter antenna is always required, even if the-meter is located inside the Backup Gateway enclosure or connected to the Gateway using the optional wired communication harness. NOTE: Tesla recommends connecting the meter via wireless Wi-Fi rather than using a wired connection. This is because the meter receives firmware updates with new features and improvements, but only if the meter is communicating to the Gateway via Wi-Fi. Firmware updates are not possible when the meter is using wired communication. If you must_use wired communication, connect the meter to the gateway wirelessly first to update the meter firmware, then transition to wired communication. 1. Plug the 2-conductor harness into the port on the top of the meter. 2. Connect the harness leads to the Backup Gateway Meter Communication ports by inserting them into the corresponding connector, according to the following table and diagram. Powerwall 2 AC Installation Manual 57 APPENDIX E: INSTALLING A NEURIO ENERGY METER Figure 25. Meter Communication Wiring / 1 2 3 #2 ❑❑❑ 0 ❑❑a 456 � 1 1 1 1 . 1 1 1 2 3 #1 1 ER 1 °°❑oo °O 456 � 1 1 1 1 1 1 1 1 COM S I o 123456 ° 0 - O @ e Meter#1 Communication' ' Meter Terminal Backup Gateway Meter Wire Gauge Port Pin Communication Pin I 3 RS485 LO 3 24-16 AWG (0.2-1.5 mm2) or CATS (24 AWG) 6 RS485 HI 2 24-16 AWG (0.2-1.5 mm2) or CAT- m 5 I (24 AWG) (Harness shield) (Earth/Shield) 1 24-16 AWG (0.2-1.5 mm2) or CAT5 (24 AWG) Meter#2 Communication Meter Terminal Backup Gateway Meter Wire Gauge Port Pin Communication Pin I 3 RS485 LO 6 244 AWG (0.2-1.5 mm2) or CAT5 f (24 AWG) P 6 RS485 HI 5 24-16 AWG (0.2-1.5 mm2) or CATS (24 AWG) I (Harness shield) (Earth/Shield) 4 24-16 AWG (0.2-1.5 mm2) or CAT5 (24 AWG) f Powerwall 2 AC Installation Manual 58 APPENDIX E: INSTALLING A NEURIO ENERGY METER Meter Voltage Taps If the site has single-phase electrical service;before relocating the meter, modify the provided voltage line harness by combining the blue and red leads. Figure 26. Voltage Line Harness with Combined Leads Current Transformer Placement CT placement locations include the following: Site(Grid): A CT is placed between the utility meter and main switch to measure both load and generation. See Appendix F for information on implementing a Site Limit to curtail Powerwall charging from the grid. Solar: If the site includes solar equipment, a CT is placed after the solar inverter to measure the solar output. Load: Site and solar metering are preferred. However, in configurations where it is not possible to locate CTs between the utility meter and the main switch, load metering can substitute for site metering. Conductor: Where desired to curtail Powerwall discharge on a conductor, a dedicated Conductor Limit CT can be installed. This feature is optional for installations. See Appendix F. Feature Notes on page 63 for more information. See Appendix C on page 49 for system wiring diagrams depicting CT placement for various wiring configurations. Voltage Tap and Current Transformer Connections Voltage taps and current transformers must be connected so they are measuring the same phase. They must correspond according to the following table and diagram: Figure 27. Voltage Tap Port (left).and Four CT Ports (right)on Bottom of Meter AB oo ® ® N C A B C A 0® - ■ I p ■ { Phase Meter Voltage Tap PortA� Meter CT Port _ _ Site L1' _I A _ 1/A. Site L2 - B/C* 2/13 Solari-1 _ � 4/A Solar L2 3/C Powerwall 2 AC Installation Manual 59 APPENDIX E: INSTALLING A NEURIO ENERGY METER Meter Placement and CT Wire Lengths CT leads are 1.5 m long and can be extended to a maximum length of 50 ft (15 m), as follows: • For a total extended length of up to 15 ft(4.5 m): CT wiring can be extended with up to one Neurio CT Extension (10 ft/3 m) (Tesla P/N 1125547-037 x) • For a total extended length of up to 50 ft(15 m): CT wiring can be extended by using wire with the following properties: • Shielded,twisted pair with drain wire o Wire gauge of 24-18 AWG (0.2-1.5 mm2) o Voltage rating equal.to or greater than all other circuits in shared enclosures or raceways • If the distance between the meter and the CT is greater than 50 ft (15 m), the meter can be relocated, or a second meter can be used. When the meter is relocated into the main distribution board, use the antenna extension to place the antenna on the outside of the distribution'board. Current Transformer Orientation CTs must be installed with the label on the CT housing pointing toward the power source, according to the following table and diagram. Always verify CTs are in the correct orientation by observing power flow in the Commissioning Wizard. Figure 28. CT Orientation in Relation to Power Flow � a CT Usage CT Orientation Site CTs CT label facing toward the service entrance/grid Solar CTs ' CT label facing toward the solar inverter Load CTs I CT label facing away from the loads Current Transformer Capacity Standard Neurio CTs have a capacity of 200 A. If the wiring configuration allows, it is possible to pass multiple conductors of the same type through a single CT, provided the sum of the conductor's current ratings does not exceed the CT current handling capacity. This is especially useful for systems with multiple solar inverters. NOTE: Multiple conductors through a single CT is only possible if all conductors are on the same phase. i l Powerwall 2 AC Installation Manual 60 c APPENDIX E: INSTALLING A NEURIO ENERGY METER Figure 29. Multiple Conductors Passing Through Single CTs 00 Ma e e e e 1 e If a site has multiple solar inverters spaced far apart, or if a main panel has two main breakers (for example, 400 A service with two 200 A breakers), a Y-splitter cable(Testa P/N 1129625-00-x) can be used to connect two CTs on the same phase to a single meter port. Figure 30.Y Cables Connecting CTs on the Same Phase e e e e 1 800 A CTs are also available for larger service sizes (Tesla P/N 1447689-00-x). The 800 A CTs can be used with the standard Neurio Energy meter, but the 800 A CT option must be selected in the Commissioning Wizard drop down menu on the CT page. If using a Y splitter with 800 A CTs, total current should not exceed 800 A. Powerwall 2 AC Installation Manual 61 APPENDIX E: INSTALLING A NEURIO ENERGY METER Metering Split-phase Solar with a Single CT Metering a split-phase solar inverter with one Current Transformer(CT) is supported with firmware version 1.37 and later. In this configuration, connecting a single CT to one of the two PV inverter output phases allows total power output to be calculated by software. The single CT must be installed on the phase that corresponds to the same CT port on the meter (phase A or B). It is possible to meter multiple split-phase solar inverters with one CT, if the solar inverter circuits are physically near each other: 1 1. Install both solar inverters with the same phasing 2. Group all conductors of the same phase together to pass through a single CT i 3. As with a single inverter, it is important that the phase of this CT matches the phase of the voltage reference on the meter Installing the Meter Using the self-drilling screws provided in-the meter kit, attach the meter to the inside of the main distribution board or to another surface. Choose a location that takes into account the voltage line harness and CT cable lengths. To wire the voltage taps: 1. Plug the voltage line harness into the meter in its new location. 2. Connect-, he voltage line harness leads to a dedicated circuit breaker (not exceeding 16 A) of corresponding phase inside the distribution board: Voltage Harness Port/Wire Color Distribution Board Connection A/ Black Ll breaker terminal B/Red L2 breaker terminal C/Blue L3 breaker terminal or spliced with the Red B wire N/White` Neutral bus bar To locate the CTs: • Place a CT on the corresponding power wire in the main distribution board, after the utility meter and ahead of any loads. • If the site includes solar equipment, place an additional CT on the solar wire in the main distribution board. l Powerwall 2 AC Installation Manual 62 APPENDIX F: FEATURE NOTES Configuring Site Limits The Backup Gateway can be configured to limit Powerwall charge power from the grid. When Site Limits are programmed by the installer during commissioning, the Powerwall charge power is dynamically adjusted based on the net measured site power and the programmed site limit threshold. 1 Site Limits are configured in the Commissioning Wizard; select Site Import Limit from the Settings page. At the conclusion of the commissioning process, a summary of the settings will be displayed. The net site power measurement can be a virtual aggregated meter; therefore, abide by all prior guidance on meters and CTs. ` Configuring Conductor Export Limits Overview J The Powerwall system can be configured to limit Powerwall discharge power. When Conductor Export Limits are programmed, the Powerwall discharge power is dynamically adjusted based on the amperage measured by designated current transformers (CTs) and the programmed Conductor Limit amperage threshold. Set Conductor Export Limits Install CTs _ • Conductor CTs must be installed on conductors that are: o Between the grid connection and the Powerwalls. • At a location where the Powerwalls have control over current. • CTs should\be oriented such that the label faces toward the grid. Complete Commissioning 1. In the Commissioning Wizard, assign the correct CTs to Conductor. NOTE: CTs can only be assigned one designation, meaning a CT cannot be both a Site and a Conductor CT. _ 2. Enter the amperage for the Conductor Limit on the Settings page. At the conclusion of the commissioning process, a summary of the settings will be displayed. Load Shedding Overview The Backup Gateway allows for load shedding, meaning a low voltage control circuit can be wired to control a specific load. For instance, an air conditioning load controlled by a thermostat can be wired to the low voltage control circuit in the Backup Gateway,so that the load can be shed when Powerwall is off-grid. .When commissioned for load shedding and the Powerwall system is on-grid, the low voltage control circuit is closed and the load is powered. When commissioned for load shedding and the system is operating off- grid, the low voltage control circuit is open and the load is OFF. Powerwall 2 AC Installation Manual 63 APPENDIX F: FEATURE NOTES When the system is wired for load shedding, the controlled load breaker can remain on the backup loads panel. Gateway Air Handler Unit ram,_ 'I�.. CFO ° Thermostat 1 0 Ii1� 0 — - � 1�I ❑p I 24 V Control Circuit 04llV'0'LT O O O Wire Splice O �Condensor NOTE: The load shedding feature is not applicable to permanently off-grid Powerwall systems. Permanently off-grid systems use the Backup Gateway Aux terminals for generator control rather than for load shedding. NOTE: To activate this feature in the Commissioning Wizard, check the Open Relay when Off-Grid box under "Gateway Low Voltage Relay" on the Installation page. This feature can be activated in firmware version 1.47 or later. 11 NOTE: Seethe Load Shedding with the Backup Gateway application note for an example installation which uses the load shedding feature to control a condenser for a central air conditioning system. NOTE: The low voltage control circuit will be opened briefly during firmware updates and under abnormal fault conditions. ' NOTE: The load shed relay is rated up to 60 V (DC or AC) and 2 A. f Powerwall 2 AC Installation Manual 64 APPENDIX G: INSTALLATION TROUBLESHOOTING Accessing the Powerwall User Interface Use Chrome: Incognito mode or Safari. Private Browsing mode �J- Work in one browser tab only. P For security message Your connection is not private. select Advanced and Proceed to 192.168.xx.x (unsafe). For Error.•Bad Credentials, select FORGOT PASSWORD to reset password. For Error.•Login Error(Cannot Start Wizard), select Click for\More and tick the Force Launch Wizard option. Try again. If experiencing other issues in the Commissioning Wizard, refresh the web page. If issues persist, reboot Gateway using RESET button. Updating Firmware CHECK INTERNET CONNECTION to verify Gateway network connection - Check for Update to verify you are on the latest firmware. Factory firmware ending in GF must be updated. Never power down or modify wiring during an update. During the update, the Gateway will reboot which will cause the "TEG-xxx" Wi-Fi to disconnect. When — reconnected, refresh the web page. - 6 Configuring Energy Meters ` Conduct all CT tests with at least 1 kW of power flowing. i I Ensure all solar inverters are monitored with CTs. I When using only 1 CT for solar, select Solar(1CT x2) on the Current Transformers screen in the Commissioning Wizard. For each CT, select the applicable function on the Current Transformers screen and perform the following steps to ensure it is in the correct location and orientation: I • Adjust the Amps/kW slider to see what the CTs are readings • Verify the on-screen values for the CT against the applicable meter (such as the solar inverter meter or j utility meter). • Ensure that: o Site CTs are positive for import, negative for export. I o Solar CTs are positive when the PV array is producing power (Solar is NEVER negative during daytime). I Negative power flow may indicate CT is installed on the wrong phase! • If the "toward source" CT label is correctly facing the solar inverter but power flow is negative, a voltage- current mismatch is likely. i • Physically move the CT to the correct phase with the label facing the correct direction. Do not use the II Flip checkbox in this case. } !I Powerwall 2 AC Installation.Manual 65 APPENDIX G: INSTALLATION TROUBLESHOOTING Solar CTs should only meter generation sources. It is never recommended to meter both generation and loads using the Solar (1 CT x2) option. If it is absolutely necessary to install solar and a small amount of loads together without independent metering, you must install the solar CT on the phase without any downstream loads., i Use a handheld clamp or fork meter to verify CT readings. 1 Powerwall 2 AC Installation Manual 66 APPENDIX G: INSTALLATION TROUBLESHOOTING .1 Reset the Backup Gateway If experiencing issues with the Backup Gateway, reboot the Gateway using the RESET button (1 below). ri Power Cycle the System If resetting the Backup Gateway does not resolve issues, power cycle the system as follows. J _ To power the system off 1. Turn off solar equipment. 2. Turn off all Powerwalls. 3. Open breakers feeding Powerwall and solar. 4. Open breaker feeding Gateway. 5. Disconnect communication wiring. Reverse steps to power the system on. Kl .Powerwall 2 AC Installation Manual 67 APPENDIX H: MULTI-POWERWALL INSTALLATIONS� Electrical Equipment Sizing and Overcurrent-Protection; Overview This section describes the requirements for installation of multiple Powerwall units with a Backup Gateway in North America. l Pre-Requisites for Design Before designing a Powerwall system with more than four Powerwall units: • AC line impedance must be measured at the installation site to ensure the utility grid connection is able to support the desired quantity of Powerwalls. If the required grid impedance is too high, the Powerwalls may not connect to the grid, resulting in undesirable operation. See Table 1 in this app note for required minimum impedance values. • Minimize Impedance: o Install the Powerwalls as close as possible to the point of interconnection with the grid. The recommended maximum wire length is 33 ft (10 m). o Install wires larger than required by code between the Powerwall generation panel and the point of interconnection with the grid. Example, if the design requires 3/0 AWG wire, use 4/0 AWG wire. • Tesla Certified Installers should submit their multiple Powerwall system designs and measured impedance values to Tesla for review by sending design documents to powerwalldesignreview@tesla.com. Copy your Tesla account manager on all submissions. • Designers must properly size overcurrent protection and loads to account for the full power potential of multiple Powerwalls. For example, a 10-Powerwall system is capable of discharging up to 50 kW of power. See design examples in Panel Configuration and Breaker Sizing. • Multi-Powerwall installations may require larger Powerwall communication wire between the Backup Gateway and the Powerwall units. Please refer to the Powerwall 2 AC/Gateway Communication Wiring application note on communication cable requirements, as your install may require up to #16 AWG or 1.3 mm2 wire. • For systems between 11 to 20 Powerwalls, multiple Backup Gateways are required, as each Gateway can only control up to 10 Powerwall units. Please refer to the Multiple Gateways on a Single Site application note on the Partner Portal. • Grid impedance does not need to be measured for off-grid systems as there is no grid impedance to measure. Pre-Requisites for Installation Before installing and commissioning a multi-Powerwall system: • Plan for the commissioning process to take longer than a typical installation. It can take up to 3 minutes to complete the commissioning scan and verify process for each Powerwall, so a 10-Powerwall system can take up to 45 minutes during this stage of commissioning. NOTE: Do not interrupt a commissioning step, turn off the system, or unplug the communication wiring at any time during the,commissioning process. J Powerwall 2 AC Installation Manual 68 APPENDIX H: MULTI-POWERWALL INSTALLATIONS Service Type and Capacity Requirements The Backup Gateway supports systems of up to 10 Powerwall units, but the maximum number of Powerwalls may be limited by the site electrical service, utility grid infrastructure, or local requirements; therefore an impedance test is required to confirm. . Line Impedance Requirements The sensitivity of the system to line impedance increases with the number of Powerwalls in the system. (See Impedance Requirements for Multi-Powerwa//Systems on page 70 for the maximum allowable impedance as it relates to number of Powerwalls.) If grid impedance at a site exceeds the maximum allowable value, do either of the following: J • Decrease the impedance of the site grid connection. This may require coordinating with-the local electrical utility. See "Minimize Impedance" in the Pre-Requisites for Design for suggestions. • Reduce the quantity of Powerwalls installed at the site to meet the maximum allowable impedance value. If impedance values exceed the requirement for the installed number of Powerwalls, the system may not function properly. Measuring Line Impedance To.determine the line impedance at a site, measure between Line and Neutral where the Powerwalls will be interconnected to the site electrical system with testing equipment such as the following: • Fluke,1660 Series Installation Tester (1662, 1663, or 1664) • Metrel-M13000 Multifunction Tester • Megger LTW315 Loop Impedance Tester Example Line Impedance Test Instructions For details on line impedance testing, refer to the test equipment manufacturer's instructions. The steps below are.general guidelines only. WARNING: Impedance tests must be performed on an energized electrical system. Impedance tests should be carried out only by trained electricians using appropriate safety equipment and safety practices. 1. Follow manufacturer instructions to calibrate and zero the impedance tester before taking measurements. 2. Complete the test on Ll first, then move to L2. 3. Connect all three voltage test leads - Line, Neutral, and Ground 4. Follow manufacturer instructions to verify that the correct voltage is present. Switch the tester to a voltage measurement mode and check Line-to-Neutral and Line-to-Ground voltages. 5. Follow manufacturer instructions and take an impedance measurement where the Powerwalls will be interconnected to the site electrical system. Switch the tester to the appropriate impedance measurement mode and take the following readings: o Line-Neutral o Line-Ground NOTE: The Line-Neutral impedance measurement is the value referenced in Impedance Requirements for Multi-Powerwall Systems on page 70. Powerwall 2 AC Installation Manual 69 APPENDIX H: MULTI-POWERWALL INSTALLATIONS 6. Record the impedance measurements. 7. Repeat steps 3-6 for L2. Recommended Interconnection Point for Large Multiple Powerwall Systems __ _ - �1 Service Entrance O L---- 2 Meter 3 Main Panel © o I B l ll�+il 1 NOTE: Impedance should always be measured at the point of Powerwall interconnection. Table 9. Impedance Requirements for Multi-Powerwall Systems # of Powerwalls per site T Maximum Grid Impedance, Line - Neutral 1 0.80 Ohms 2 0.40 Ohrns 3 0.27 Ohms i 4 0.20 Ohms 5 0.16 Ohms 6 0.13 Ohms 7 0.11 Ohms 8 0.10 Ohms 9 0.09 Ohms 10 * 0.08 Ohms 11 to 12 ** 0.07 Ohms 13 to 14 ** 0.06 Ohms 15 to 17 ** 0.05.Ohms 18 to 20 ** 0.04 Ohms *Maximum number of Powerwalls supported for a single Gateway **11 to 20 Powerwalls require multiple Gateways Powerwall 2 AC Installation Manual 70 APPENDIX H: MULTI-POWERWALL INSTALLATIONS Panel Configuration and Breaker Sizing The Backup Gateway has a maximum continuous current rating of 200 A. In systems with 7 or more Powerwall units, to ensure sufficient ampacity while keeping total charge/discharge current within the 200 A capacity of the Backup Gateway, a separate generation panel (400 A minimum) with a 200 A main breaker is recommended. The example below shows the following: • 400 A main panel with a 200 A main breaker in the panel or in the Backup Gateway • 400 A generation panel with 200 A main breaker • Load panel w/200 A main breaker Example 400 A Service with Separate Generation and Load Panels 11 400 A Service 0 12 200 A Breaker in Backup Gateway ~ 3 200 A Breaker (max) in-200 A Panel Q 4 Loads © 5 200 A Breaker (max) in 400 A Panel 6 Solar 7 7 or more Powerwalls f © © i 0 When wiring the load panel, ensure that combined loads do not exceed main breaker continuous or peak current ratings, whether the system is on-grid or off-grid. When the grid is operational, power can flow from both the grid and the generation panel to the load panel. I Power Flow from Grid and Generation Panel when On-Grid J Powerwall 2 AC Installation Manual 71 APPENDIX H: MULTI-POWERWALL INSTALLATIONS �1 400 A Service ❑ 2 1 200.A Breaker in Backup Gateway 1 3 200 A Breaker (max) in 200 A Panel 0 4 Loads © 5 200 A Breaker (max) in 400 A Panel 6 Solar �7 7 or more Powerwalls V © . © O I I O ' I When there is a grid outage, power can flow from the generation panel to the load panel. Power Flow from Grid and Generation Panel when On-Grid 1 1 400 A Service i 0 2 200 A Breaker in Backup Gateway 3 1200 A Breaker (max) in 200 A Panel 0 4 Loads © 5 200 A Breaker (max) in 400 A Panel ---; 6 Solar 7 7 or more Powerwalls O © © O I i I " Powerwall 2 AC Installation Manual 72 APPENDIX H: MULTI-POWERWALL INSTALLATIONS Multi-Powerwall Installations with the Stack Kit In the Powerwall Stack Kit Powerwall Stack Kit: Tesla P/N 1112154-00-x O 0 o U —.LM 001 m o� 2 3 4 (2) Side clips (1) Top cover I (1) Conduit nipple � � (2) Conduit insulation � i ��__bushings f 5 6 I 7 8 t (2) Conduit sealing O- (1) Bridge piece (1) 5-conductor communication i (1) Wiring interface WI rings cable cover- 9 10 -ems 11 -_j N 12 (2) Shims (4) Magnetic camshaft a (1) 6 mm Allen j (1) Drill guide (two pieces) caps j wrench Required Tools i • Personal protective equipment (safety glasses, gloves, protective footwear) • Drill and 6 mm (1/4-inch) drill bit (for drilling pilot hole in Powerwall chassis) • 35 mm (1-3/8 inch) hole saw (for drilling conduit hole in Powerwall chassis) • Small metal file (for removing burrs from Powerwall chassis sheet metal) • Rubber mallet or small hammer and wood block (for seating side clips in Powerwall) • Wire strippers/cutters for 24 to 8 AWG (1.5 to 8 mm2) wires • Small grease applicator (wooden craft stick or cotton swab) Powerwall 2 AC Installation Manual 73 APPENDIX H: MULTI-POWERWALL INSTALLATIONS • Water-resistant heavy-duty grease (Dow Corning Molykote BR-2 Plus High Performance Grease or equivalent, for preventing corrosion on side clips) • Installation tools (level, tape measure, pencil, flashlight) Site Requirements Stacked multi-Powerwall systems must be floor-mounted and must be anchored to an adjacent wall. The wall must be capable of supporting the lateral load of the Powerwall stack. A maximum number of 3 floor-mounted Powerwall units may be joined together with two Powerwall Stack Kits. For systems with more than 3 Powerwalls, separate groups of 3.units should be assembled, with each group of 3 attached to a wall. For complete Powerwall Mechanical Specifications and Site Requirements;see Site Requirements and Pre- Installation Guidance on page 9. Figure 31. Dimensions for 2-unit and 3-unit Powerwall Stacks 1 312 mm 476 mm 753 mm(29.6 in) (12.3 in) (18.7 in) O O O 439 mm (17.3 in) o00 0000 0 ❑ 1150 mm ❑ (45.3 in) 0 000 0000 248 mm (9.75 in) O O O Installation Instructions These instructions assume that at least one Powerwall has been installed and additional Powerwall units are being installed using the Powerwall 2 Stack Kit (Testa P/N 11121S4-00-x). See STEP 1:Plan the Installation Site ' on page 16 for complete installation instructions. Powerwall 2 AC Installation Manual 74 APPENDIX H: MULTI-POWERWALL INSTALLATIIONS' Step 1:Prepare for Installation 1. Turn off the first (previously installed) Powerwall by setting its On/Off switch to the OFF position. o i I O I 2. Turn off the AC circuit breaker for the Powerwall. 3. Ensure that the second Powerwall is turned off by verifying that its On/Off switch is set to the OFF position. 4. Remove both side covers from each Powerwall to be joined. NOTE: On the first (previously installed) Powerwall, it may be necessary to remove the small plastic insert at the bottom of the covers to help with removal. For the right (LED) side covers, do not disconnect the switch and LED leads. Turn the cover to one side and rest it against the Powerwall chassis. ,III I III ®w { i � 9WAS Powerwall 2 AC Installation Manual 75 APPENDIX H: MULTI-POWERWALL INSTALLATIONS . 5. Using a T20 Torx bit, remove the wiring compartment covers from the previously installed Powerwall. To rJ role Step 2: Choose a Wiring Option In multi-Powerwall,systems, communication wiring is daisy-chained between Powerwall units. Power wiring is direct (home run) from each Powerwall to a dedicated circuit breaker in the electrical panel. Wiring between Powerwalls can be concealed, or run externally. Concealed Wiring For concealed wiring, a hole is drilled from the front of the first Powerwall into its wiring compartment and wires are run directly into it from the back port of the second Powerwall. To use this wiring method, proceed to Step 3;,°'Prepare for Concealed Wiring." External Wiring For external wiring, wires are run through conduit or raceway that spans the wiring compartment ports on the side of each Powerwall. To use this wiring method, skip to Step 4, "Join the Powerwall Units." Step 3.•Prepare for Concealed Wiring 1. Disconnect all wiring from the wiring compartment of the first Powerwall. 1 Powerwall 2 AC Installation Manual 76 APPENDIX H: MULTI-POWERWALL INSTALLATIONS 2. Locate the wiring interface cover and peel back the film to expose the adhesive on the cover gasket. With the gasket facing inward, place the cover over the interface board at the back of the wiring compartment. The cover is intended to protect the circuit board and its components from metal shavings while drilling into,the wiring compartment. o „ 3. Attach the included drill guide to the front of the first Powerwall by bracing the inside half of the guide against the bottom of its wiring compartment. P a . 4 9 i o 0 0 0 0 4. Clip the outside half of the drill guide to the inside half so that the guide engages the hem of the Powerwall enclosure. III I II j I I C o III � Powerwall 2 AC Installation Manual 77 APPENDIX H: MULTI-POWERWALL INSTALLATIONS 5. While holding the drill guide to make sure it conforms to the edge of the Powerwall chassis, drill a 1/4- inch (6 mm) pilot hole using the small hole in the drill guide. u rul 6. Remove the drill guide. 7. Drill the-full-size 1-3/8 in (35 mm) hole with a hole saw, using the pilot hole as a guide. O — --'a - � o 8. File the edges of the hole to remove any burrs. 9. Clear the wiring compartment of all metal shavings and debris. 10. Remove the protective cover from the wiring compartment. i 11. If the first Powerwall still has its protective film, remove the film. 12. Peel back the*protective film from the feet of the second Powerwall before moving it into place. 13. Remove the plug from the back cable entry port of the second Powerwall and place it in the side cable entry port of the same Powerwall. RIIII IIII IIIII U � a 0 0) a Powerwall 2 AC Installation Manual 78 APPENDIX H: MULTI-POWERWALL INSTALLATIONS Step 4:Join the Powerwall Units 1. Orient the second Powerwall about 1 in (2 cm) in front of the first, with its back cable entry port facing the hole you drilled in the front of the first Powerwall. 2. (Concealed wiring installations only) Do the following to bridge the gap between the Powerwall wiring compartments: o Locate the bridge piece, conduit nipple, two O-rings, and two insulation bushings. O O o Assemble the conduit nipple, bridge piece and O-rings. Center the bridge and O-rings on the nipple. NOTE: Orient the O-rings so that the sides with greater surface area (marked `Box Side") point to the outside, toward the Powerwall chassis. o Install the assembly between the two Powerwalls so it spans the two wiring compartments. O ° O o Thread an insulation bushing onto each end of the conduit nipple, but do not fully tighten the bushings. 0 ' Powerwall 2 AC Installation Manual 79 . APPENDIX, H: MULTI-POWERWALL INSTALLATIONS 3. (All installations) Locate a side clip, making sure the flange (with magnet) is positioned at the top and that the cams are rotated vertically in relation to the clip. i 4. Slide the side clip into the gap between the two Powerwalls so that its flanges engage the side hem of each enclosure. �© o II F 0 I NOTE: The Powerw all enclosure hems have cutouts that mate with tabs in the clip. Powerwall 2 AC Installation Manual ' 80 APPENDIX H: MULTI—POWERWALL INSTALLATIONS orb A 5. Press the clip until it is flush with the sides of the Powerwalls. 6. Using the provided 6 mm Allen hex wrench, do the following: o Turn the top cam 90 degrees clockwise until it clicks into place and stops rotating. l o Turn the bottom cam toward the wall (toward the first Powerwall) so that the cam indicator notch on the hex camshaft head points toward the wall, until the cam clicks into place. Powerwall 2 AC Installation Manual 81 APPENDIX H: MULTI-POWERWALL INSTALLATIONS NOTE: The top cam is symmetrical and can be rotated in either direction to secure the side clip. The bottom cam must be rotated toward the first Powerwall so that its stepped side (indicated by the notch on the hex camshaft head) engages the housing of one of the Powerwalls. 7. Repeat steps 3-6 to install a side clip on the other side of the Powerwalls. NOTE: If necessary, use a small rubber mallet or a hammer and wood block to gently tap the side clips so that they are fully seated in the hem of the Powerwall. 1 8. Position the top cover across the gap between the 9owerwalls so that its flanges engage the tops of each side clip. The cover is held in place by the magnets on the tops of the side clips. 0 0 9. (Concealed wiring installations only) Tighten the insulation bushing on each side of the conduit nipple to' secure the bridge between the two Powerwall wiring compartments. J Powerwall 2 AC Installation Manual 82 APPENDIX H: MULTI-POWERWALL INSTALLATIONS 10. Use the provided shims to ensure that the Powerwalls are level. i NOTE: When joined, the units should be level within +/-2 degrees side-to-side and within +/- 5 degrees front-to-back. Step 5: Wire the Powerwall Units 1. Connect the communication ports of the two Powerwalls by doing the following: ` o Run the 4-conductor communication cable between the Powerwall wiring compartments. At the first Powerwall, cut back the drain wire; the drain wire should be.terminated only at the second Powerwall. o Attach the provided Phoenix connector to one end of the cable, and attach the extra Phoenix connector that came with the Powerwall to the other end of the cable. See Appendix B. Wiring Reference on page 45 for additional wiring information. 1 Powerwall 2 AC Installation Manual 83 APPENDIX H: MULTI-POWERWALL INSTALLATIONS r ■ Connect the communication OUT connector of the first Powerwall to the communication IN connector of the second Powerwall. ■ To ground the drain wire: ■ Strip the end of the equipment grounding conductor and wrap the communication drain wire around the grounding conductor lead. ■ Insert the drain wire and grounding conductor lead into the second Powerwall chassis ground lug. The ground lug is identified with the following symbol:O ■ Tighten,-the screw in the ground lug to 4.5 Nm (40 lb-in). NOTE:There will be a drain wire grounded in each Powerwall in the chain. For each pair of components (Gateway and first Powerwall, first Powerwall and second Powerwall, etc.), the drain wire is cut at the first component and grounded at the second. Figure 32. Connecting Powerwall Communication Ports OUT o aoo On1 ij '� ooao 1 0 00 O } ji 00 O j L_ oIL _-J 1 GND LCN- --------CN+ Drain Wire ,_________________________� r Equipment Ground o In the last Powerwall in the communication chain, plug the 4-pin Phoenix connector with the terminating 120-Ohm resistor into the top 4-pin socket(labeled "OUT"). 2. Connect each AC Powerwall to the main or sub electrical panel of the installation (depending on the system configuration) according to the electrical service type. 3. On the Powerwall side, strip the ends of the wires and attach them to the corresponding leads on the 3- pin AC power harness. 4. Plug the AC power harness into the AC connector in the Powerwall wiring compartment. Ensure that the connector clicks into place. NOTE: Each Powerwall connection to the main electrical panel requires an independent 30 A circuit breaker. This breaker serves as the disconnect for the Powerwall, and must be wired in accordance with local wiring codes and regulations. 5. Reconnect the power and communications leads that were disconnected from the first Powerwall at the beginning of the installation'. 1 Step 6; Close the Wiring Compartments and Replace the Covers 1. Arrange the communication and AC power wires inside the Powerwall wiring compartments. 2. Ensure that all conduit junctions and cable entry points are secure and properly sealed. 3. Replace the wiring compartment cover on each Powerwall. Ensure that the cover seats properly on the gasket so that the compartment is sealed. Tighten the fasteners using a Torx T20 bit: Torque to 1.5 Nm. 4. Replace each of the side covers on the Powerwalls by pushing the top.into place and working toward' the bottom to reattach it to the clips along the length of the unit. Powerwall 2 AC Installation Manual 84 APPENDIX H: MULTI-POWERWALL INSTALLATIONS 5. (Optional) In humid or rainy climates, or in locations where'the installation may be exposeclAo salt, fog, or other corrosive elements use a small applicator (such as a wooden craft stick or cotton swab) to apply a generous bead of heavy duty water-resistant grease around the outside edge of each camshaft head where it contacts the side clip. J 6. Place a magnetic camshaft cap on each of the four hex camshaft heads i ;1,C1�111t�11�711 11AVI INAA�l lilt;. ' i!il{i''!"tc''`I'{•- !;�� �i�,Ili Itl i�f�l l I'li'll i'lli)'II'l i F,,, t 11�;1 ,• „ I •tar,+I•{:�-t I'�Nlt i'4; �t, +tiER1'uC{Ib l;ltiitli'tli�t(Jl1" liiii�' uI 9�lki hilti`tFt}{{j�j� - tt ,I.V w p!s{elil'R t , III"rt�(�IIT'tIN "� �':t"t' •I III' tl. �I�i}" pi{il�iv dl``E'I j I i.iit+dd IIjUli i�({1IItjliil(;•lM iHi llJI' " INi ' �+j.fit i�•l tl,i I J I+ i�.: I;`tla;'44?�'Cd�I j IFt((f�'llj•E;� (Ifl ii;d i II i(,IIIj t"�Itj''.i I Ija"tj RE n �@Iti;1'!�'.jta!ir > ill,�tltyillj''li ,!�111��1f11'.4 ,lYl° f't"'�;°l•I'I gill 'ili�ii"14'14 IIIEf!�I jle�,1�f,' I / :liEf4 I"at�tnailt Fi,;jji9? I i1ti"f'iilli[lip il ll Il l "i(jlti; , !+I1i,,�tt„,rtt«tn1t:;h�� �11t a.lt(�ItI;�;1�7 I'!(j+y+4}illttt�lCi 'If�iicf.;it Ik!il`i�l E}lifijflft�li I!j�yl tlj ,Ii,ll.ilih(i ij !`I�1111 11t r.tlllmujil;i O Powerwall 2 AC Installation Manual 85 APPENDIX H: MULTI-POWERWALL INSTALLATIONS Step 7. Turn On and Commission the System 1. Switch on the AC circuit breakers for the Gateway and each Powerwall. 2. Switch on each Powerwall by moving the switch on the right (LED) side of the unit to the ON position. When each Powerwall establishes communication with the Gateway, the LED on the right side of Powerwall illuminates. 3. See Commission the System on page 38 for instructions on updating system firmware and commissioning the system. NOTE: During commissioning, ensure that when scanning for Powerwalls, the Commissioning Wizard shows all Powerwalls in the system. 4. After installation is complete, remove the protective film from the second Powerwall. Powerwall 2 AC Installation Manual 86 APPENDIX I: REVISION LOG Revision; Date Description 1.0_ 2020-05-23 Initial release 1.1 2020-06-26 i• Added Powerwall and Backup Gateway 2 specifications 1 - Updated multi-Powerwall communication wiring'instructions for clarity 1.2 2020-08-10 - Noted breaker requirement when wiring Optional Internal Panelboard to Non- I Backup lugs (see Install Optional Internal Panelboard in the Backup Gateway on page 27) i - Added Optional Internal Panelboard terminal wire gauges to Wire Reference ! i 1.3 2020-09-30 - Corrected stack kit dimensions ' S r Powerwall 2 AC Installation Manual 87 ' J T = 5Ln Published September 2020 \ Revision 1.3 l