Loading...
HomeMy WebLinkAbout50781-Z v SS��S v� n I 0 68 Road,Austin, 68 5101 �` ow 8725 P 650 681 5100 F 650 681 5101 Version#97.5-1 'WS(4) PIL NAS January 10,2024 Certification Letter /� Project/Job#1193042 A r d 1�/� � ® E N T Project Address: Campisi Residence 455 Grove Dr Southold,NY 11971 AHJ Southold Town Tesla Operations Center Bethpage Design Criteria: Applicable Codes=Structure:2020 EBCNYS;PV:2020 RCNYS/BCNYS with 2020 NYSUCS,ASCE 7-16,and 2018 NDS Risk Category=II Wind Speed=130 mph(3-s Gust-Vult),Exposure Category C,Partially/Fully Enclosed Method -Ground Snow Load=30 psf MP2:Roof DL=10 psf,Roof LUSL=20.8 psf(Non-PV),Roof LUSL=11.5 psf(PV) MP1:Roof DL=10 psf,Roof LUSL=20.8 psf(Non-PV),Roof LUSL=11.5 psf(PV) Note: Per IBC 1613.1; Seismic check is not required because Ss=0.177<0.4g and Seismic Design Category(SDC)=B<D To Whom It May Concern, A structural evaluation of loading was conducted for the above address based on the design criteria listed above. Based on this evaluation, I certify that the alteration to the existing structure by installation of the PV system meets the prescriptive compliance requirements of the applicable existing building and/or new building provisions adopted/referenced above. Additionally, I certify that the PV module assembly including all standoffs supporting it have been reviewed to be in accordance with the manufacturer's specifications and to meet and/or exceed all requirements set forth by the referenced codes for loading. The PV assembly hardware specifications are contained in the plans/docs submitted for approval. Installer shall verify existing roof framing is in suitable condition and does not exhibit any signs of structural damage which may diminish the capacity of its members or connections prior to commencement of PV installation.Installer verification of the mounting planes noted above is required because some or all of the framing was not observed prior to the structural evaluation performed for this report. )F NEW), �P0 310 U., 2 105EI00 A'��FES1.311 STRUCTURAL EVALUATION&HARDWARE DESIGN RESULTS SUMMARY TABLES Design Standard ASCE 7-16 Risk Category T` _Yq _ _ Table 26 9 1 Ultimate end Speed V-Ult _ 130 mph Fig.26 5-1 B "�� E�osure Category� �µ C �_ _ _ Section 26.7 Ground Snow Load _ a pgY 3 0.0 psf Table 7-1 MP Name MP2 MP1 Roofing Comp Roof Comp Roof w 5 ZS Comp V4 with ZS Comp V4 with Standoff Flashing Insert Flashing Insert N of c Pitch 37° 37° SURLL:PV 11.6 psf 11.5 psf SURLL:•Non-PV 20.8 psf 20.8 Of, Edge Zone Width 3.0 ft 3.0 ft Standoff •. • • o MP Name MP2 MP1 plied Wind Zone WZ1,2e,21r WZ1,2e,2r Wind Pressure -19.6 psf -19.6 psf ® X-Spacing64" 64" ,tea X-Cantilever 24" 24" YS acin 41" 41" Y-Cantilever NA NA Uplift DCR 72.8% 72.8% X-Spacing 16" 18" X-Cantilever 8" 8" Y-S acin 74" 74" a. Y-Cantilever NA NA U IIft DCR 32.9% 32.9% La out Staggered Staggered A plied Wlnd Zone WZ2n,.3r'- W22n,3r Wind Pressure -23.2 psf -23.2 psf m _ X-Spacing 64" 64" cc X-Cantilever 24" 24" YS acin 41" 41"' m Y•Cantilever NA NA U lift DCR` 87.5% 87.5% XS acin 16" 16" x X•Cantilever, 8" W" YS acin 74" 7V' a° Y-Cantilever NA NA Uplift DCR 39.5% 39.5% Layout StaggBred Staggered Applied Wind Zone WZ3e WZ3e Wind Pressure -28.7 psf -28.7 psf m XSpaciri 48" 48" m X-Cantilever 19" 19" w Y-Spacing 41" 41' v Y•Cantilever NA NA Uplift DCR._ 82.2% 82.2% XS acin 18" 16" X-Cantilever V. W Y-Spacing 74" 74" ILY-Cantilever NA NA Uplift DCR 49.5% 49.5% Layout Sta ered Ste ered 1.X and Y are maramums that are always relative to the structure framing that supports the PV. X is across framing members and Y is along framing mem ers. 2.Where present,the green and red hatching in Applied Wind Zone rows corresponds to hatching on the Site Plan eage of the plan set. MP Name MP2 MP1 Member Member Impact Member Impact Evaluation Check OK Check OK Results ABBREVIATIONS ELECTRICAL NOTES JURISDICTION NOTES A AMPERE AC ALTERNATING CURRENT BLDG 1. THIS SYSTEM IS GRID-INTERTIED VIA A UL-LISTED BUILDING CONC CONCRETE DC DIRECT CURRENT POWER-CONDITIONING INVERTER. EGC EQUIPMENT GROUNDING CONDUCTOR (E) 2. A NATIONALLY - RECOGNIZED TESTING ALL WORK TO COMPLY WITH SECTION R327 OF THE 2020 RESIDENTIAL CODE OF NYS. EXISTING EMT ELECTRICAL METALLIC TUBING FSB LABORATORY SHALL LIST ALL EQUIPMENT IN FIRE SET-BACK GALV GALVANIZED GEC GROUNDING COMPLIANCE WITH ART. 110.3. ELECTRODE CONDUCTOR GND GROUND HDG HOT 3. WHERE ALL TERMINALS OF THE DISCONNECTING DIPPED GALVANIZED I CURRENT Imp CURRENT AT MEANS MAY BE ENERGIZED IN THE OPEN POSITION, MAX POWER Isc SHORT CIRCUIT CURRENT kVA A SIGN WILL BE PROVIDED WARNING OF THE KILOVOLT AMPERE kW KILOWATT LBW LOAD HAZARDS PER ART. 690.17. BEARING WALL MIN MINIMUM (N) NEW NEUT 4. EACH UNGROUNDED CONDUCTOR OF THE NEUTRAL NTS NOT TO SCALE OC ON CENTER PL MULTIIMRE BRANCH CIRCUIT WILL BE IDENTIFIED BY PROPERTY LINE POI POINT OF INTERCONNECTION PHASE AND SYSTEM PER ART. 210.5. PV PHOTOVOLTAIC SCH SCHEDULE S STAINLESS 5. CIRCUITS OVER 250V TO GROUND SHALL COMPLY STEEL STC STANDARD TESTING CONDITIONS TYP WITH ART. 250.97, 250.92(B). TYPICAL UPS UNINTERRUPTIBLE POWER SUPPLY V 6. DC CONDUCTORS EITHER DO NOT ENTER BUILDING VOLT Vmp VOLTAGE AT MAX POWER Voc VOLTAGE OR ARE RUN IN METALLIC RACEWAYS OR AT OPEN CIRCUIT W WATT 3R NEMA A RAINTIGHT ENCLOSURES TO THE FIRST ACCESSIBLE DC DISCONNECTING MEANS PER ART. 690.31(E). 7. ALL WIRES SHALL BE PROVIDED WITH STRAIN RELIEF.AT ALL ENTRY INTO BOXES AS REQUIRED BY UL LISTING. <<c-Of NEW 8. MODULE FRAMES SHALL BE GROUNDED AT THE UL ' W y - LISTED LOCATION PROVIDED BY THE c�'�P�pOJIAN �'p� MANUFACTURER USING UL LISTED GROUNDING HARDWARE. A 9. MODULE FRAMES, RAIL, AND POSTS SHALL BE BONDED WITH EQUIPMENT GROUND CONDUCTORS. 10580- - ------ ------ --- - VICINITY MAP _ - INDEX Sheet 1 COVER SHEET Sheet 2 SITE PLAN `T Sheet 3 THREE LINE DIAGRAM Sheet 4 PW MOUNTING DETAIL Sheet 5 BOS LOCATION LICENSE GENERAL NOTES Cutsheets Attached 1. ALL WORK SHALL COMPLY NTH THE 2020 NYS ' UNIFORM CODE. 2. ALL ELECTRICAL WORK SHALL COMPLY WITH THE 2017 NATIONAL ELECTRIC CODE. 3. ALL WORK SHALL COMPLY WITH THE 2020 NYS FIRE CODE. MODULE GROUNDING METHOD: WEEB 4. ALL WORK SHALL COMPLY WITH THE 2020 AHJ: Southold Town BUILDING CODE OF NYS. REV BY DATE COMMENTS 5. ALL WORK SHALL COMPLY WITH THE 2020 REVA NAME DATE COMMENTS RESIDENTIAL CODE OF NYS. k 6. ALL WORK SHALL COMPLY WITH THE 2020 UTILITY. PSE&G-Long Island EXISTING BUILDING CODE OF NYS. , CONFIDENTIAL- 1HE INFORMATION HEREIN m mum J g-1193071 00- DEMM DEW, CONTAINED MALL NOT BE USED FOR THE Matthew Campisi 40.5 KWH ENERGY STORAGE SYSTEM LUIS CODINA TB � �i �I NOR NWMO�� T — S L SHALLI E DISCLOSED OR IN 1"1 455 Grove Dr PART un OUTSIDE THE RECIPIENTS Moms: Southold, NY 11971 THE SALE AND USE OF 1HE RESPECDIE TESLA EWPMENT,WITHOUT THE WRITTEN BIMRIER: PAGE NAYS SHEET: REV: DAM PMSSIONI OF�SIA INC. 6319885334 COVER SHEET 1 1 4/5/2024 OF NEW,,, �ppJIAN r 1 800 EXTERNAL 2rESS DISCONNECT SWITCH BYO LEGEND Q © Oar 0 (E) UTILITY METER & WARNING LABEL O Inv INVERTER W/ INTEGRATED DC DISCO & WARNING LABELS poyl Q Front Of House AUTOMATIC RELAY ® DC DISCONNECT & WARNING LABELS DES AC DISCONNECT & WARNING LABELS Q DC JUNCTION/COMBINER BOX & LABELS O ENERGY STORAGE SYSTEM FOR STAND ALONE OPERATION g Q DISTRIBUTION PANEL & LABELS (E)DRNEVdAY O LOAD CENTER. & WARNING LABELS O DEDICATED PV SYSTEM METER Q RAPID SHUTDOWN 0 STANDOFF LOCATIONS -- CONDUIT RUN ON EXTERIOR CONDUIT RUN ON INTERIOR GATE/FENCE 0 HEAT PRODUCING VENTS ARE RED r,---i It +r INTERIOR EQUIPMENT IS DASHED L-"J SITE PLAN N Scale:1/16" = 1' W E 01, 16' 32' S CONFIDENTIAL-THE INFORMATION HEREIN JOB J B-119 3 0 71 00 a,sraM o�naW CONTAINED SHALL NOT BE USED FOR THE Matthew Campisi 40.5 KWH ENERGY STORAGE SYSTEM LUIS CODINA BENEFIT —r- S L I"1 OF ANYONE EXCPT TESLA INC.,NOR MUTING G SHALL IT BE DISCLOSED IN WHOLE OR IN 455 Grove Dr PART TO OTHERS OUTSIDE THE RECIPIENTS ORGANIZATION, EXCEPT IN CONNECTION WITH MODULE- Southold, NY 11971 THE SALE AND USE OF THE RESPECTIVE �+I� E" WITHOUT THE OTTEN 6319885334 PAGE� 2 04 5 2024 SITE PLAN / / PITCH:370(9:12) ARRAY PITCH:370(9:12) • HATCHING INDICATES WIND PRESSURE MP1 AZIMUTH:193 ARRAY AZIMUTH:193 ZONES. SEE THE STANDOFF SPACING MATERIAL:Comp Shingle STORY: 1 Story AND LAYOUT TABLE FOR MORE PITCH:370(9:12) ARRAY PITCH:370(9:12) INFORMATION. MP2 AZIMUTH:13 ARRAY AZIMUTH:13 MATERIAL:Comp Shingle STORY: 1 Story V NEW �POSIAN 0 - n W `!'�`� 105800 OEXIMAI.DI.ONNEYI SMITH P ® � LEGEND `I ® t um Q (E) UTILITY METER & WARNING LABEL o INVERTER W/ INTEGRATED DC DISCO �� & WARNING LABELS Q ., Foil _==_ ©_ AUTOMATIC RELAY Q .. 1p DC DISCONNECT & WARNING LABELS SV PI AC DISCONNECT & WARNING LABELS Front Of House �- QB DC JUNCTION/COMBINER BOX & LABELS ACCESS Lem O ENERGY STORAGE SYSTEM FOR STAND ALONE OPERATION Q DISTRIBUTION PANEL & LABELS LOAD CENTER & WARNING LABELS M MMMAY g O DEDICATED PV SYSTEM METER Q RAPID SHUTDOWN Q STANDOFF LOCATIONS CONDUIT RUN ON EXTERIOR CONDUIT RUN ON INTERIOR GATE/FENCE O HEAT PRODUCING VENTS ARE RED INTERIOR EQUIPMENT IS DASHED L="J SITE PLAN N TOTAL ARRAY AREA (SF): 260 TOTAL ROOF AREA (SF): 1454 Scale:l/1' = 1' W E TOTAL ARRAY AREA IS m 17.9 oi' 16 32' PERCENT OF TOTAL ROOF AREA s CONFIDENTIAL'- 1HE INFUiiIAATION HEREIN JOB NOT m J B-1193042 00 CUSUM DESCIr . CONTAINED sHAU NOT BE USED FOR THE Matthew Campisi 4.86 KW PV ARRAY Nicola Mastrangelo T S L 1"1 SHALL IT BE ANYONE Os�wHaE OR INC.NOR 101 m'°� 455 Grove Dr 27 KWH ENERGY STORAGE SYSTEM PART TO ONM OUTSIDE THE RECIPIENT'S ZS Comp V4 W Flashing-Insert ORGANIZATION,EXCEPT IN CONNECTION wTH ►10 Southold, NY 11971 THE SALE AND USE OF THE RESPECTIVE 12 Hanwha # Q.PEAK DUO BLK ML—G10+ TS 405 PAGE NAYS: SNEER REV: DAIS: TESLA EQUMENT,IYTHOUT THE VR TEN INVeEIM. PEINSSION OF MLA INC. 3.8 kW Tesla Inc 1538000-45-A 240V 6319885334 SITE PLAN 2 1/10/2024 POWERWALL FASTENER SCHEDULE' POWERWALL INSTALLATION INFORMATION: WALL TYPE MODEL DIAMETER EMBEDMENT FASTENERS PER ESR/ UNISTRUT REQUIRED? CORNER ,-- WOOD smo wood 4 n W. x o 2ss' �� tw rs ❑ Ho H � 1. POWERWALLS TO BE INSTALLED PER FASTENER SCHEDULE BASED ON WALL TYPENCO ''� — AND SITE SPECIFIC CONDITIONS. at Cm �� � 2. DO NOT MOUNT BELOW OR ABOVE WINDOWS OF THE SAME STORY. •HO*i-EZ �• ��• � �� �, 3. IF LOCATION NEEDS TO BE CHANGED, PLEASE CONTACT DESIGN TEAM. EIRIM Hm mw C"i xti Or I NA ►� 4. ANY UNUSUAL FRAMING NEAR THE POWERWALL THAT MAY COMPROMISE THE WALL s ><tiI• —��,� , STRUCTURAL INTEGRITY SHALL BE RELAYED TO THE DESIGN TEAM PRIOR TO INSTALL. s� '�" '�' ' ' ❑ 0 5. WHEN INSTALLING POWERWALL+ THE INVERTER IS A SINGLE UNIT AND CANNOT BE 1. INSTALLER TO CHOOSE FASTENER BASED ON FIELD CONDITIONS, WALL TYPE, AND EASE OF INSTALL 2. 1 CONCRETE & CMU NON—ESR FASTENER CAN BE USED WHEN UNITS) ARE MOUNTED ON THE GROUND AND SEISMIC Ss (SPA ONLY ONE POWERWALL+ AND AT SHORT PERIOD) IS AT OR BELOW Sa m 1.25. STACKED. WHEN INSTALLING A STACKED ARRANGMENT, 3. 1 CONCREORT TE & CMUIS oR BE��C s.B AND REWHEN LUNrT( )SMED (3—�NON THE D GUST) ISGROUND AT AND BELOW 7oM�{PA AT ONE ADDITIONAL POWERWALL CAN BE INSTALLED. THE LARGEST STACKING 4. COLD FORMED STEEL MINIMUM 25 GAUGE REQUIRES 3 FASTENERS PER CORNER, BUT 1 FASTENER PER CORNER CAN BE USED CONFIGURATIONS ALLOWED BY THE MOUNTING BRACKETS ARE 3 POWERWALL UNITS WHEN STE& STUDS ARE 8 GAUGE OR THICKER OR 1 POWERWALL+ AND 1 POWERWALL UNIT WHEN BOX IS CHECKED DIVERSITECH PAD ACP24362 IS APPROVED FOR A SINGLE OUTDOOR POWERWALL GROUND MOUNT AND DIVERSffECH PAD ACP36362 IS APPROVED FOR UP TO 2 STACKED USING A POWERWALL+ AND A POWERWALL UNIT OR 2 POWERWALL UNITS REFER TO FASTENER SCHEDULE FOR MAM OF FASTENERS .� Of NEW y PER LOSER POWERWALL uwT �, r+V EXAMPLEEpp J IA N D�� ONE FASTENERIN ANY HOLE WALL ,k yf PER 0=0 r Lu EXAMPLE TWO FASMOtSIN MY HOLE opop FOA 105800 �� PER CORNER SIONP FASTENER To WALL 1 r + + PER FASTENER SCHEDULE POMFRMALL+ MPOWBLWAPOMLL UMT NOTT WALL 9RACKET SHOWN FOR CLARITY + + WALL ATTACHMENT: GROUND MOUNT SIDE VIEW TWO POWERWALL STACK NTS ATTACHMENT: FRONT VIEW POWERWALL Krs COAL— THE 1WONA70 HEREIN aoll NIL1�et J B-1193042 00 CUSTOMER: °�"� OEM _ CONTAINED SHALL NOT USED FOR THE Matthew Compisi 4.86 KW PV ARRAY Nicola Mastrangeto T _ 5 L n Bt9EE1T O OF ANYONE EX BECEPT MUINC..NOR YOl1NiING SYS1Elt � i SHALL IT DE I)MMOSED IN WHOLE OR IN ZS CompV4 w Flashing—insert 455 Grove Dr 27 KWH ENERGY STORAGE SYSTEM PART To OTHERS OUTSCE THE RECPENT'S THE SALES AND EXCEPT O IN RESPECTIVE VM N 12) Hanwha Q.PEAK DUO 8LX ML—G10+ S 405 Southold, NY 11971 TESLA EQUIPMENT. 111HOUT 1Fff WRITTEN W RIM PAGE HAIM SHEET. REY: DATE PERMHsgaN OF TESTA IN 3.8 kW Tesla Inc 1538000-45—A 240V 6319885334 POWERWALL MOUNTING DETAIL 3 1/10/2024 4 POWERWALL SCHEDUW ASTENER POWERWALL INSTALLATION INFORMATION: WAIL TYPE MODEL DIAMETER EMBEDMENTF FASTENERS PER ESR# UNISTRUT REQUIRED? CORNER wood srm w=OWN M• Zf - I m YLs❑ No 1: POWERWALLS TO BE INSTALLED PER FASTENER SCHEDULE BASED ON WALL TYPE com=w Esc► jef W 22 NA HA OR CM AND SITE SPECIFIC CONDITIONS. COMM OR cWSOLSPO Imm wo 2• 0 ESR1� ; 2. DO NOT MOUNT BELOW OR ABOVE WINDOWS OF THE SAME STORY. Ham,�-� wo 1W f cC T 3. IF LOCATION NEEDS TO BE CHANGED, PLEASE CONTACT DESIGN TEAM. em MM KW WINI x• ��- f NA HA 4. ANY UNUSUAL FRAMING NEAR THE POWERWALL THAT MAY COMPROMISE THE WALL a* NRm,sumw #'o ve I MI-4143(WOO �^ STRUCTURAL INTEGRITY SHALL BE RELAYED TO THE DESIGN TEAM PRIOR TO INSTALL. SwW"Scm wo W 36 m No 1. INSTALLER TO CHOOSE FASTENER BASED ON FIELD CONDITIONS, WALL TYPE, AND EASE OF INSTALL 5. WHEN INSTALLING POWERWALL+ THE INVERTER IS A SINGLE UNIT AND CANNOT BE 2. 1 CONCRETE & CMU NON—ESR FASTENER CAN BE USED WHEN UNIT(S) ARE MOUNTED ON THE GROUND AND SEISMIC Ss (SRA SHORTSTACKED. WHEN INSTALLING A STACKED ARRANGMENT, ONLY ONE POWERWALL+ AND 3. 1TCON CONCRETE PERIOCMUSESR FASTENAT OR BELER CAN BE USED WHEN UNIT(S) ARE MOUNTED ON THE GROUND AND SEISMIC Ss (Sim AT SHORT PERIOD) IS AT OR BELOW Ss = 2.5 AND REGIONAL WIND SPEED (3-SECOND GUST) IS AT OR BELOW 17OMPH ONE ADDITIONAL POWERWALL CAN BE INSTALLED. THE LARGEST STACKING 4. COLD FORMED STEEL MINIMUM 25 GAUGE REQUIRES 3 FASTENERS PER CORNER, BUT 1 FASTENER PER CORNER CAN BE USED CONFIGURATIONS ALLOWED BY THE MOUNTING BRACKETS ARE 3 POWERWALL UNITS WHEN STEEL STUDS ARE 8 GAUGE OR THICKER . OR 1 POWERWALL+ AND 1 POWERWALL UNIT WHEN BOX IS CHECKED DIVERSTTECH PAD ACP24362 IS APPROVED FOR A SINGLE OUTDOOR POWERWALL GROUND MOUNT AND DNERSTTECH PAD ACP36362 IS APPROVED FOR UP TO 2 STACKED USING A POWERWALL+ AND A POWERWALL UNIT OR 2 POWERWALL UNITS -- - REFER TO FASTS O SWIMUUe - i - FOR MAW OF FASTENERS PER CORNER POWERWAM UNIT P,E O f NEW ,O ONE°�FASTENERMY ME o o a o WAII �'t ��ppJIAN,�, ,�� IN PMcma * * EXAMPLE TWO FASTENERS o p o p r IN ANY HOLE W PER CORNER 105800 FASTENER TO WNL FESSI + + PER FASEM SU DUIE s r �/`,' PO �PONEWW+ � T NOT WAM BAD MM Fit CLARITY + + WALL ATTACHMENT: GROUND MOUNT SIDE VIEW THREE POWERWALL STACK NTS ATTACHMENT: FRONT VIEW POWERWALL rfrs CONFIDENTIAL- THE INFORMATION HIREIN mmi DEMWTM- DM- CONTAINED SHALL NOT BE USED FOR THE IDe NUMBErI J B-119 3 0 71 00 Matthew t Campisi 40.5 KWH ENERGY STORAGE SYSTEM WIS CODINA T 5 n 04MT OF ANYONE EXCEPT TEU INC.,NOR TAUNTING SYBTEIk SHALL IT BE DISCLOSED IN WHOLE OR IN 455 Grove Dr PART TO OTHERS OUTSIDE THE RECIPIENTS ORGANIZATION,EXCEPT IN CONNECTION WITH MODULES Southold, NY 11971 THE SALE AND USE OF THE RESPECTIVE TESLA EQUIPMENT, WITHOUT THE WRITTEN INVERTM PAGE NAME SHEET. REV: DATE- PERMISSION OF TESLA INC. 6319885334 PW MOUNTING DETAIL 4 4/5/2024 S1 - � OFIAEWyO * y1r (N) PV MODULE 10580 (E) MOUNTING PLANE (MP) F°'�'�'oFEssioNP�' TYPICAL PV SIDE VIEW SV NTH PV MODULE 5/16"x1.5" BOLT WITH 5/16" FLAT-WASHER INSTALLATION ORDER ZEP ROCKIT OCATE FRAMING MEMBER, MAR ZEP LEVELING FOOT (1) HOLE LOCATION, AND DRILL ZEP ARRAY SKIRT PILOT HOLE. --------- --- -------- ZEP MOUNTING BLOCK (4) ATTACH FLASHING INSERT TO ZEP FLASHING INSERT — (3) (2) MOUNTING BLOCK AND ATTACH TO FRAMING MEMBER USING LA (E) COMP. SHINGLE SCREW. (1) 22"MIN. (E) ROOF DECKING (2) INJECT SEALANT INTO FLASHING (3) INSERT PORT, WHICH SPREADS 5/16" DIA STAINLESS LOWEST MODULE SUBSEQUENT MODULES SEALANT EVENLY OVER THE STEEL LAG SCREW ROOF PENETRATION. INSTALL LEVELING FOOT ON TOP (E) FRAMING MEMBER (4) OF MOUNTING BLOCK & Si STANDOFF " - , SECURELY FASTEN WITH BOLT. 1 Scale: 1 1/2 - 1 CWDENTIAL- 1HE INFOI211ATION NEW aDe NUMtT� JB-1193042 00 cUsmmm DESCWIm- DEs+GI� CONTAINED ANYONE NDTCE USED FOR THE Matthew Campisi 4.86 KW PV ARRAY Nicola Mastrangelo T 5 L n BENEFIT OF ANYONE EXCEPT 11:SL.A fNC.,NOR MOUNTING SY51E1t SHALL IT BE MOSED IN WIOLE OR IN ZS CompV4 w Flashing-Insert 455 Grove Dr 27 KWH ENERGY STORAGE SYSTEM PART TO OTHERS OUTSIDE THE RECIRENTS Momm Southold NY 11971 VATH THE S E AND EXCEPT'ME IN CTIVE (12) Hanwha # Q.PEAK DUO BLK ML-G10+ S 405 TESLA EQUIPMENT,TNTMIT 111E HEDT 18, PAGE NAME %1M. ITEM DAZE: PERMISSION aF,EsIA INC. INVEF13.8 kW Tesla Inc 1538000-45-A 240V 6319885334 STRUCTURAL VIEWS 4 1/10/2024 i khaib Sp ft Dale mat LP*ft Do*ww"tim Dsdp Cade ASM 7-1E iP Name 1P1 I 1P2 Rdr Category 1 Tubb 1.5-1 Roolhg Cane 9*0 Cmrp swe USIM8 Wad%eW V-m 13D Po-law StadoN Zs Cmv►a! ZS Ev—catem C SedAn 20.7 pm 37 37 6loard Svw Load P9 30 ToWe 7-1 SL/RLL.PV 11.4 11.4 9./RU:Nm-pV 20.E 20.E Edpe Zane 1A& 3 R 3 R Arlmuth 193 13 Stela 1 1 Rafter SimA-bg 26 MC OC 2r6 MB'OC Cd Sm/*Cklg 20 Sir OC 216 NB'OC Stmdott 4a*q and Layout UP Name LP1 IP2 AMW Nnd Zeta, 1.246 2r 1,2%2r Nnd Presque -19.57 Lffdmxpo Of NEW yo X- 4 64 -Cm 24 a4 .j>t Landa"Y-spockg 41, 41 PaUaR X-Spatrq 16 16 r Portrait X-Cmtkm E E Cy Partrdt Y-*WN 74 74 FO P a 105800 �� LayaA sm v4d staggffw - -- --- A��FESSIONP� - - ....... ....... ..... -AppWd Nnd Zmesi::.....2a.s — 16<d Prt= -2124 -23.24 Lmdeove X-Spodng 64 64 X�Cani� 24 24 L-ASC a Y-spodng 41 41 Y - - Patma X-Spoft 16 16 Portrait X-CmtAwr a B Patron Y-*cilvg, 74 74 Parmoit Y-Cm9"X - - Applk vied zomh 3e b Nod Premn -2E,74 -2104 X-Spadag 46 48 �Q00�0 19 19 X-Cmflewr Ladaw Y-fig 41 41 Y - - PateR X-* q 16 16 Patron X-Cmaa,. a E Pabst Y-SPadV 74 74 Partrdt Y-Cmtl wr - - Layout 9aggrd Stagwod NOW 1.X and Y aro mmriarmu that-are dwp nklin to the sinroh" �a gg Brat Lppab the PY.X Y aaae ralmn and Y Is dmg 2 1 1mg io AWW IId Zora ron eoawpmds to hatding an SRe Am. CMDENTIAI_- THE INFORMATION HEREIN im NIom J B-1193042 00 CUSroYIR DESORPTION: DEM CONTAINED SHALL NOT BE USED FOR THEMatthew Cam isi 4.86 KW PV ARRAY Nicola Mastran elo '�" 5 L n BENMT OF ANYONE EXCEPT TESLA INC.NOR MDUNTDIG SYM- p g SHALL IT BE DISCLOSED IN WHOLE OR IN ZS Cbmp V4 w Flashing—insert 455 Grove Dr 27 KWH ENERGY STORAGE SYSTEM PART TO OTHERS OUTSIDE THE RECIPENT'S ORGANIZATION.EXCEPT IN CONNECTION WITH MOOM Southold, NY 11971 THE SALE AND USE OF THE RESPEC71YE 12 Hanwha # O PEAK DUO BLK ML—G10+ TS 405 TESLA EQUIPMENT,VATHOUT THE WPoTiEN INVERTER PAGE NAY- STEEL• REV: DATE RMI PESSION OF TESLA INC. 3.8 kW Tesla Inc 1538000-45—A 240v 6319885334 UPLIFT CALCULATIONS 5 1/10/2024