Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
TR-10592
Glenn Goldsmith, President QF S®�� Town Hall Annex 54375 Route 25 A. Nicholas Krupski,Vice President ®� ®�® P.O. BOX 1179 Eric Sepenoski l�i li Southold, New York 11971 Liz Gillooly Telephone (631) 765-1892 Elizabeth Peeples � a� Fax(631) 765-6641 com BOARD OF TOWN TRUSTEES TOWN OF SOUTHOLD CERTIFICATE OF COMPLIANCE #2252 C Date: June 10, 2025 THIS CERTIFIES that the demolition(per Town Code Definition),reconstruction in-place and raised to FEMA compliant elevation of the existing one-story dwelling with new front porch and new attached seaward side deck; installation of stormwater drainage system; and installation of an I/A sanitary system; reestablishment of existing 20'non-turf buffer, At 980 Oak Avenue, Southold Suffolk County Tax Map#1000-77-1-6 Conforms to the application for a Trustees Permit heretofore filed in this office Dated March 28, 2024 pursuant to which Trustees Wetland Permit#10592 Dated June 12,2024,was issued and conforms to all of the requirements and conditions of the applicable provisions of law. The project for which this certificate is being issued is for the demolition(per Town Code Definition), reconstruction in place and raised to FEMA compliant elevation of the existing one-story dwelling with new front porch and new attached seaward side deck; installation of stonnwater drainage system; and installation of an I/A sanitM system; reestablishment of existing 20' non-turf buffer. The certificate is issued to BRIAN&LAURA FLANAGAN owners of the aforesaid property. Authorized Signature Glenn Goldsmith,President O S® Town Hall Annex A. Nicholas Krupski,Vice President ® ® 54375 Route 25 P.O. Box 1179 Eric Sepenoski Southold,New York 11971 Liz Gillooly � Telephone(631) 765-1892 Elizabeth Peeples <t' ® a® Fax(631) 765-6641 BOARD OF TOWN TRUSTEES TOWN OF SOUTHOLD DATE OF INSPECTION: INSPECTED BY: Ch. 275 Ch. 111 INSPECTION SCHEDULE Pre-construction, haybale line/silt boom/silt curtain 1st day of construction 1/2 constructed . Project complete, compliance inspection COMMENTS: Pro;c�� is umplikV4- wii-I 2UVA _ A-IoS92 . 1okay b issue CcAiRca�r 1)� CoyAnllav\ct CERTIFICATE OF COMPLIANCE: Town Hall Annex ®� Glenn Goldsmith,President ���� � A 54375 Route 25 A. Nicholas Krupski,Vice President P.O. Box 1179 Eric Sepenoski Southold, New York 11971 Liz Gillooly Telephone(631) 765-1892 Elizabeth Peeples ® �® Fax(631) 765-6641 UNV BOARD OF TOWN TRUSTEES TOWN OF SOUTHOLD SOUTHOLD TOWN BOARD OF TRUSTEES YOU ARE REQUIRED TO CONTACT THE OFFICE OF THE BOARD OF TRUSTEES 72 HOURS PRIOR TO COMMENCEMENT OF THE ACTIVITIES CHECKED OFF BELOW INSPECTION SCHEDULE Pre-construction, hay bale line/silt boom/silt curtain 1st day of construction 1/2 constructed When project complete, call for compliance inspection; Glenn Goldsmith, President ®� s®(/�� Town Hall Annex A. Nicholas Krupski,Vice President ®� ®�® 54375 Route 25 P.O. Box 1179 Eric Sepenoski !I J Southold, New York 11971 Liz Gillooly CAM Telephone(631) 765-1892 Elizabeth Peeples Fax(631) 765-6641 BOARD OF TOWN TRUSTEES TOWN OF SOUTHOLD June 14, 2024 Robert E. Herrmann En-Consultants 1319 North Sea Road Southampton, NY 11968 RE: BRIAN & LAURA FLANAGAN 980 OAK AVENUE, SOUTHOLD SCTM# 1000-77-1-6 Dear Mr. Herrmann: The Board of Town Trustees took the following action during its regular meeting held on Wednesday, June 12, 2024 regarding the above matter: WHEREAS, En-Consultants on behalf of BRIAN & LAURA FLANAGAN applied to the Southold Town Trustees for a permit under the provisions of Chapter 275 of the Southold Town Code, the Wetland Ordinance of the Town of Southold, application dated March 28, 2024, and, WHEREAS, said application was referred to the Southold Town Conservation Advisory Council and to the Local Waterfront Revitalization Program Coordinator for their findings and recommendations, and, WHEREAS, the LWRP Coordinator issued a recommendation that the application be found Consistent with the Local Waterfront Revitalization Program policy standards, and, WHEREAS, a Public Hearing was held by the Town Trustees with respect to said application on June 12, 2024, at which time all interested persons were given"an opportunity to be heard, and, WHEREAS, the Board members have personally viewed and are familiar with the premises in question and the surrounding area, and, WHEREAS, the Board has considered all the testimony and documentation submitted concerning this application, and, WHEREAS, the structure complies with the standards set forth in Chapter 275 of the Southold Town Code, 2 WHEREAS, the Board has determined that the project as proposed will not affect the health, safety and general welfare of the people of the town, NOW THEREFORE BE IT, RESOLVED, that the Board of Trustees have found the application to be Consistent with the Local Waterfront Revitalization Program, and, RESOLVED, that the Board of Trustees APPROVE the application of BRIAN & LAURA FLANAGAN to demolish (per Town Code Definition), reconstruct in-place and raised to FEMA compliant elevation the existing one-story dwelling with new front porch and new attached seaward side deck; install stormwater drainage system; and install a new I/A sanitary system; with the condition to reestablish existing 20' non-turf buffer; any tree removed to be replaced on a one-to-one ratio with at least 2-3 inch caliper; all as depicted on the revised site plan prepared by En-Consultants, received on January 31, 2024, and stamped approved on June 12, 2024. Permit to construct and complete project will expire three years from the date the permit is signed. Fees must be paid, if applicable, and permit issued within six months of the date of this notification. Very truly ours, Glenn oldsmith President, Board of Trustees GG/ec •'�4•1�P'a''y�„� � �:a �g,!',r �.i�' `ur .< a"�� ..�.." 'Yf A ,cs'�°� •'7 .•4°�4 ,y,.. i'�'�� { _r," . 4 tiT4 f,'"r,7. d•R, 10i' e r ty�y e .1 � �a�dt7.k 'ti;4";:'�'6�o�'Xd7��A;:IL�'�°+r ',?X.'P.:J.:�PaY'RT,'W2v�+' J7�ICINYKSL�'.. 7T..{: •'.9{•.::.;1:7y".65.Y�:«'1'4&L"Yi'sSSTd2''n'�i:3Y.M.�,s' rdunivf.�'Y` -'�'�S'riA ��+'M•C�,J BOARD OF SOUTHOLD TOWN TRUSTEES SOUTHOLD,NEW YORK r , }' j PERMIT NO. 10592 DATE: JUNE 12, 2024 ' ISSUED TO: BRIAN & LAURA FLANAGAN PROPERTY ADDRESS: 980 OAK AVENUE, SOUTHOLD j= r' SCTM# 1000-77-1-6 y' { AUTHORIZATION G 4- Pursuant to the provisions of Chapter 275 of the Town Code of the Town of Southold and in f"x accordance with the Resolution of the Board of Trustees adopted at the meeting held on June 12,2024, and in •=' ' consideration of application fee in the sum of 1 250.00 aid b Brian&Laura Flanagan and subject to the PP � � P Y ii J Terms and Conditions as stated in the Resolution,the Southold Town Board of Trustees authorizes and permits the following: ,.; Wetland Permit to demolish (per Town Code Definition), reconstruct in-place and r "trr raised to FEMA compliant elevation the existing one dwelling with new front .a { p g I'Y g � porch and new attached seaward side deck; install stormwater drainage system; and . install a new I/A sanitary system; with the condition to reestablish existing 20' non-turf buffer; any tree removed to be replaced on a one-to-one ratio with at least 2-3 inch `eR ►' caliper; all as depicted on the revised site plan prepared by En-Consultants, received on ` January 31,2024, and stamped approved on June 12, 2024. IN WITNESS WHEREOF,the said Board of Trustees hereby causes its Corporate Seal to be affixed, and these presents to be subscribed by a majority of the said Board as of the day and year written above. .' �► p F Gy — — ,,�, o - Y1 �• '� �� Cv.:�, "'+iiA4"C,+T-��>,Y�"uu7A:,�Y2:u`.5,."G+3Gai•3c'F�::���.:�:`b�:�Z�.3S3i"a'6�'35z4•:.d�3hlLt;:.;.3YD.F.+iv�isnY3d�'u27¢^n7p,;5�i:*.S�aiS'Y�'xt'�5u+"S1i'��2�'nSYR.+.a��i9la?iXr77�'22�.'GA'�;%'D��69�45S.Sifa4.'t n:, �1.4 �•ice+"�' d.'' �'e� !.{�.vi, •� 'l }`n. ''�..9A.>e.�. '�tL'iN' 'a'• '�h,' b `b +e A.,_ :Si9: TERMS AND CONDITIONS The Permittee Brian &Laura Flanagan 980 Oak Avenue, Southold,New York as part of the consideration for the issuance of the Permit does understand and prescribe to the following: 1. That the said Board of Trustees and the Town of Southold are released from any and all damages,or claims for damages, of suits arising directly or indirectly as a result of any operation performed pursuant to this permit, and the said Permittee will,at his or her own expense, defend any and all such suits initiated by third parties, and the said Permittee assumes full liability with respect thereto,to the complete exclusion of the Board of Trustees of the Town of Southold. 2. That this Permit is valid for a period of 36 months,which is considered to be the estimated time required to complete the work involved,but should circumstances warrant,request for an extension may be made to the Board at a later date. 3. That this Permit should be retained indefinitely, or as long as the said Permittee wishes to maintain the structure or project involved,to provide evidence to anyone concerned that authorization was originally obtained. 4. That the work involved will be subject to the inspection and approval of the Board or its agents, and non-compliance with the provisions of the originating application may be cause for revocation of this Permit by resolution of the said Board. 5. That there will be no unreasonable interference with navigation as a result of the work herein authorized. 6. That there shall be no interference with the right of the public to pass and repass along the beach between high and low water marks. 7. That if future operations of the Town of Southold require the removal and/or alterations in the location of the work herein authorized, or if, in the opinion of the Board of Trustees,the work shall cause unreasonable obstruction to free navigation,the said Permittee will be required, upon due notice,to remove or alter this work project herein stated without expenses to the Town of Southold. 8. The Permittee is required to provide evidence that a copy of this Trustee permit has been recorded with the Suffolk County Clerk's Office as a notice covenant and deed restriction to the deed of the subject parcel. Such evidence shall be provided within ninety(90)calendar days of issuance of this permit. 9. That the said Board will be notified by the Permittee of the completion of the work authorized. 10. That the Permittee will obtain all other permits and consents that may be required supplemental to this permit,which may be subject to revoke upon failure to obtain same. 11. No right to trespass or interfere with riparian rights. This permit does not convey to the permittee any right to trespass upon the lands or interfere with the riparian rights of others in order to perform the permitted work nor does it authorize the impairment of any rights,title, or interest in real or personal property held or vested in a person not a party to the permit. NORWECO I/A OWTS w/ PSD HD PERMIT R=20-1213 z . PROPERTY OF BRIAN AND LAURA FLANAGAN �oJPo���°ti�-1b DATED 11-24-2020 w a 980 OAK AVE SOUTHOLD, NY °5°gee 5`° z Z w SCTM # 1000-77-01-06 ��P�PP�°�P�� EXISTING 20'± COVENANTED NON—TURF / 0 F ¢w TOTAL LOT AREA = 9,800sf ���yaP�SJ� , BUFFER (LIBER D00013070, PAGE 366) / W �D<F GROUNDWATER MANAGEMENT ZONE IV; z W TOTAL ALLOWABLE SANITARY FLOW = 300 GPD p a PROJECT LIMITING FENCE / U ALONG CONCRETE TROUGH rn PROPOSED; RENOVATE EXISTING 2 BEDROOM DWELLING sl AT EACH SIDE AND WOOD 'S^\ w a3. -- Q EDGING ADJACENT TO �g ALL NEIGHBORING PROPERTIES WITHIN 150' VACANT OR SERVICED O NON-TURF BUFFER AT WATER BY PRIVATE ON SITE SANITARY DISPOSAL FACILITIES O O SIDE // \ flNt�p4• S- Ea,S WC- STEPS // \ \ A AND PUBLIC WATER SUPPLY (SCWA). THERE IS NO PUBLIC SEWER DISTRICT 1 ; TO qF RFI OVFF �/// PUBLIC WATER THAT SERVE THIS AREA. �8 �' ROOF AREA 2 > r NO UNDERGROUND UTILITIES OTHER THAN THOSE SHOWN A° �g �' FF 3e f± To c REMOVE EXISTING SEPTIC ROOF STORMWATER INSTALL NEW WATER SERVICE LINE FROM MAIN � o°e Y� Dc s- �e , / \ (6) INFILTRATOR / �� sxctNcb G\�� 0� `CHAMBERS / SANITARY DESIGN; P �` ��? / \ / EXISTING HOUSE �\ S• y TO BE DEMOLISHED < z 2 BEDROOM DWELLING 6 S. �s�2 .' / \v/ (PER TOWN CODE \, 3 BEDROOM MINIMUM DESIGN; 330gpd DESIGN FLOW e s ,ti" �P�, / 5 1 DEFINITION) AND � o RECONSTRUCTED (IN-PLACE) c Sa! APPROX. 2' HIGHER zz PROVIDE (1) NORWECO 500gpd I/A OWTS .1 /- T k (FF EL. 9') I=3N EXCAVATE TO GREATER OF SP OR SW SOILS OR 4' BELOW PSD A° °9� �s oe . ti . ' ,' o � 2�F a oe /; e,P{, , ..� ? 2 PROP. 50sf BACKFILL WITH ASTM C33 SAND S- �'. �2 `� e ' % �� x ° o PORCH & STEPS ROOF AREA 1 y gyp} �Fy� P,yoy�, is- v'� H N NooN5 TABLE 13 APPLICATION RATE: 3gpd/sf Osf± �� 9 +��+� ��' O' mZo,3z 54 �5 0 of ` O o z o 9P / 9P / — CON( e O xo �F 330 d 3.0 d sf— 110sf BOTTOM AREA OF TRENCH RQD r.sndc --------____- G ice SE ES P"D TO �,<r�x. 7� � 'W �,�} P i OOP �rcOw 39' OF 34' WIDE TRENCH REQUIRED — PROVIDE (10) INFILTRATOR CHAMBERS Sc RFMOVED ;x / , ROOF STORMWATER ' �' 'x x'. SLOPE MANIFOLD PIPING AND TEE TOWARD PSD (10) INFILTRATOR 'x ., ��� 0 50% EXP DWELLING CHAMBERS y�; <\ J• s y�P PUBLIC WATER o INSTALL INSPECTION PORT AT DISTAL END OF EACH PSD x 9 AREA N ro Ua 5—FOOT DISTAL HEAD AT END OF EACH PSD LATERAL - °o J. \ N • W A ����"�� �� N CONTROL PANELS s o APPROVED / �Y �' CP , � ° (2) 20' QUICK4 PSD �+.� `� VENT THROUGH HOUSE o DOSING RATE: PLUMBING STACK „ �9 ' yT� z El z ED o PUMP STATION VOLUME 1.88 GAL/INCH BOARD OF TRUSTEES E is u; .`` NEW WATER SERVICE £ a w_ 18" RISE PER CYCLE = 34 GAL/DOSE Tu BE RL-.cvEG a 330GPD=9 DOSES PER DAY TOWN OF SOUTHOLD U U w rrsT lr- s noF 1F's- v /� 34 GAL/DOSE @ 1 10SF=0.31 GAL/SF/DOSE G r RE4°0 /i6 \ - -- - i W m m U U ' � � " � -EX�STiNC ASPHRLi DATE ^1 TRENCH DRAIN INTO �\ \� ERNE TO SE REMOVED O U U W SITE PLAN BASED ON SURVEY BY 12 p`oa� / RIVEWAY STORMWATER \ J V U �n rn Z NATHAN TAFT CORWIN IIIe- / 8'0x2' DRYWELL ^ \�� O m /Pa NORWECO lc':'a. m / DWELLING T�+ IA OWTS w N N DATED 5.15.13 -�, -� �`i \ PUBLIC / \ ; � e. . N o LAST REVISED 8.3.16 / WATER / \ �;' j.�5G C, M m ELEVATIONS BASED ON 1988 NAVD // \ // \ �; 5�`� O DWELLING o APPROX LOC „' � PUBLIC WATER a N M < WETLANDS WITHIN 300' OF PROPERTY AS SHOWN ExlsTwG SEPTIC c To BE ABANDONED PROPOSED STORMWATER COLLECTION/CONTROL AS SHOWN J / NEW DRIVEWAY /"" DWELLING 546sf PUBLIC WATER N TEST HOLE z Q McDonald Geoscience m J April 10, 2015 STORMWATER CALCULATIONS E F N ro zw>- EL 8.0, D. ROOF AREA I = 530sf TOWN ZONE R-40 SITE PLAN 1�asy � QQz DARK BROWN LOAM OL RAINFALL FROM 2" STORM LOT COVERAGE 20% MAX S 0 C) SCALE 1: 30 QYJ z —0.5' C=1*A= 2"/12*530sf=88cf SETBACKS 35' FRONT & REAR Qp a BROWN CLAYEY SAND sc ARC 36 LEACHING CHAMBER = 10.7cf 10' SIDE 1, 15' SIDE 2 ZO=td o 9 CHAMBERS REQUIRED; 10 PROVIDED HEIGHT 35' MAX to Q ~ SKYPLANE 10'h AVE, 45' PYRAMID ��Fo �835S" ��'� a- JDDo0 a LWATER -54 WATER IN BROWN sc ROOF AREA 2 = 360sf GFA 2,100sf MAX. AR�FESSIONP� ��� a CLAYEY SAND RAINFALL FROM 2" STORM 950sf EXISTING & PROPOSED — LEGEND C=1*A= 2"/12*360sf=60cf 0- ARC 36 LEACHING CHAMBER = 10.7cf COVERAGE CACLS °o IA UNT z -14' 6 CHAMBERS REQUIRED; 6 PROVIDED SITE 9,800sf (0.225ac) O° PROPOSED HOUSE 950sf 9.7% O PSD PUMP WATER IN PALE BROWN sP DRIVEWAY = 546sf PROPOSED PORCH 50sf 0.5% FINE SAND 2�24 40 IA PSD CHAMBER RAINFALL FROM 2" STORM PROPOSED DECK 392sf 4% MAR 2 m —20' C=1*A= 2"/12*546sf=91cf REQUIRED TOTAL 1,392sf 14.2% i,DVVj STORMWATER DRYWELL N Z Z TEST H OLE 8'�x2' DEEP DW = 84cf PROVIDED STORMWATER CHAMBER W < < U" Southold Town SCALE NTS (DEPTH TO GROUNDWATER PROHIBITS MORE CAPACITY) y Board of Trustees --- EXISTING TO BE REMOVED o im V) M -us �01 UiTIH.O-LD T T::EE . No. 1 o S41 011--* 1 Issued, To �� G� + 1..�►u ���\4�a��Date Aaares� � to . Oars averukt , SoN`rt�o1 1 ' THIS.,NOTICE MUST BE DIS UYED DURING CONSTRUCTION TOWN TRUSTEES OFFICE.TOYYN OF SOUTHOLD SOUTHOLDB N.Y. 11971 TEL.: 765.9892 , Glenn Goldsmith,Presid ht �o�OSUFFO�,�coGy f Town Hall Annex A.Nicholas Krupski,Vice President c < 54375 Route 25 Eric Sepenoski P.O.Box 1179 Liz Gillooly �y �' p!� Southold,NY 11971 Elizabeth Peeples � �a Telephone(631)765-1892 Fax(631)765-6641 Southold Town Board of Trustees Field Inspection Report Date/Time:dunee 4-ZD2 Completed in field by: EItuc c4 W-eDkeS En-Consultants on behalf of BRIAN & LAURA FLANAGAN requests a Wetland Permit to demolish (per Town Code Definition), reconstruct in-place and raised to FEMA compliant elevation the existing one-story dwelling with new front porch and new attached seaward side deck; install stormwater drainage system; and install a new I/A sanitary system., Located: 980 Oak Avenue, Southold. SCTM# 1000-77-1-6 Type of area to be impacted: Saltwater Wetland Freshwater Wetland Sound Bay Part of Town Code proposed work falls under:. Chapt. 275 Chapt. 111 other Type of Application: Wetland Coastal Erosion Amendment Administrative Emergency Pre-Submission Violation Notice of Hearing card posted on property: Yes No Not Applicable Info needed/Modifications/Conditions/Etc.: Si ra1QWWWW0'VA. :u Present Were: V/'G. Goldsmith ✓ N. Krupski ✓ E. Sepenoski ��L. Gillooly E. Peeples ' � r ' RECORDED This document will be public record.Please remove all Social Security Numbers prior to recording. Deed/Mortgage Instrument Deed Mortgage Tax Stamp Recording Filing Stamps FEES Page/Filing Fee Mortgage Amt. TP-584 Sub Total Notation Spec./Assit. or EA-52 17(County) Sub Total Spec./Add. EA-5217(State) TOT.MTG.TAX R.P.T.S.A. Dual Town — Dual County %-01 -- Held for Appointment Comm.of Ed. 5. 00 Transfer Tax Affidavit Mansion Tax Certified Copy The property covered by this mortgage is or will be improved by a one or two Other YES or NO Grand TotaI(—,)C\-A-J If NO, see appropriate tax clause on page# this instrument. 4 1 Dist. 10( p T S 5 Community Preservation Fund Real Property R SMI A Consideration Amount $ Tax Service 02-SEP-20 Agency CPF Tax Due $ Verification 6 Satisfactions/Discharges/Releases List Property Owners Mailin-g Address Improved RECORD&RETURN TO: Vacant Land TD 1319 North Sea Road TD TD Mail to:Judith A. Pascale,Suffolk County Clerk 7 Title Company Information 310 Center Drive, Riverhead, NY 1-iguil Co.Name www.suffolkcountyny.gov/clerk Title 8 Suffolk County Recording & Endorsement Page This page forms part of the attached Z>n:iaz»douofCovenants made by: (SPE[|FYTYPffnFINSTRUMENT) The premises herein is situated in 5UFFOLK COUNTY,NEW YURK. TO ' |n the TOWN of myn of Southold |n the VILLAGE Roard of Trustees mr HAMLET of—Southold BOXES 6 THRU 8 MUST BE TYPED OR PRINTED IN BLACK INK ONLY PRIOR TO RECORDING OR FILING. I IIIIIII IIII IIIII IIIII IIIII IIIII IIIII IIIII IIIII IIII IIII III IIII IIIII IIIII IIII IIII SUFFOLK COUNTY CLERK RECORDS OFFICE RECORDING PAGE Type of Instrument: DECLARATION Recorded: 09/09/2020 Number of Pages : 17 At: 12 : 55 : 08 PM Receipt Number : 20-0138698 LIFER: D00013070 PAGE : 366 District: Section: Block: Lot: 1000 077 . 00 01 . 00 006 . 000 EXAMINED AND CHARGED AS FOLLOWS Received the Following Fees For Above Instrument Exempt Exempt Page/Filing $85 . 00 NO Handling $20 . 00 NO COE $5 . 00 NO NYS SRCHG $15 . 00 NO TP-584 $0 . 00 NO Notation $0 . 00 NO Cert.Copies $0 . 00 NO RPT $200 . 00 NO Fees Paid $325 . 00 THIS PAGE IS A PART OF THE INSTRUMENT THIS IS NOT A BILL JUDITH A. PASCALE County Clerk, Suffolk County DECLARATION OF COVENANTS THIS DECLARATION made this 13 day of - bk.. &L-1 2020,byTEAMC99A Properties LLC,whose mailing address is c/o Christopher Joseph,Member,24 Jaynes Way,Wading River, NY 11792,hereinafter referred to as"DECLARANT": WITNESSETH : WHEREAS,DECLARANT is the owner of certain real property located at 980 Oak Avenue, Town of Southold, County of Suffolk, State of New York, described in the Suffolk County Tax Map.as District 1000, Section 77,Block 1, Lot 6,which is more particularly bounded and described as set forth in Schedule"A" annexed hereto, hereinafter referred to as the Property; and WHEREAS, the Property is situated on lands within the jurisdiction of the Board of Trustees of the Town of Southold(hereinafter the"Trustees")pursuant to Chapter 275 of the Town Code of the Town of Southold or its successor, and various activities conducted upon the property may thus be subject to the regulation and approval of the Trustees prior to being conducted; and WHEREAS,the DECLARANT therefore made application to the Trustees for a permit pursuant to the Wetlands Law of the Town of Southold to undertake certain regulated activities; and WHEREAS,on February 12, 2020,the Trustees approved the application and issued a permit with terms and conditions; and WHEREAS,the issued permit,terms and conditions of the permit,as well as the site plan prepared by Sherman Engineering&Consulting,P.A. , last dated February 7,2020,and stamped approved on February 12,2020 upon which the permit is based,are annexed hereto as Schedule`B;"and WHEREAS, as a condition of the granting of a Wetlands Permit to undertake such regulated activities, the Trustees required that the existing, approximately twenty-foot wide"non-turf buffer"be perpetually maintained adjacent to the bulkhead, as depicted on the site plan prepared by Sherman Engineering&Consulting,P.A. , last dated February 7,2020, and stamped approved on February 12,2020; and WHEREAS, the DECLARANT has considered the foregoing and have determined that the same will be for the best interests of the DECLARANT and subsequent owners of the Property, NOW, THEREFORE, the DECLARANT does hereby covenant and agree as follows: 1) Upon the substantial completion of the aforementioned permitted activities, the existing, approximately twenty-foot wide"non-turf buffer, as defined by Chapter 275 of the Town Code,"will be perpetually maintained adjacent to the bulkhead as depicted on the site plan prepared by Sherman Engineering&Consulting,P.A., last dated February 7,2020, and stamped approved on February 12,2020, 2) The DECLARANT shall at all times comply with the Terms and Conditions of the permit, a copy of which is attached hereto in Schedule"B"annexed hereto. 3) These covenants shall run with the land and shall be binding on the DECLARANT, their heirs, assigns,purchasers,or successors in interest and may be modified only upon resolution of the Board of Trustees. (THIS SPACE LEFT BLANK INTENTIONALY) 2 IN WITNESS WHEREOF, the owner has duly executed this instrument this day of /46 4— 2020. TeamC99A Properties LLC By: Christopher Joseph,Member STATE OF YO ; ss: COUNTY OF 5�- On the day of A- , in the year 2020, before me the undersigned, a Notary Public in and for said State,personally appeared C-hristopher.Joseph personally known to me or proved to me on the basis of satisfactory evidence to be the individual whose name is subscribed to the within instrument and acknowledged to me that he executed the same in his capacity, and that by his signature on the instrument, the individual or the person on behalf of which the individual ac executed the instrumen No Public Kristopher Hodells Notary Public,State of New*Pork No.021106147106 Qualified in Suffolk Coun comm Expires 05130/20 3 SCHEDULE A ALL that certain plot,piece or parcel of land, situate, lying and being in the Town of Southold, County of Suffolk and State of New York, known and designated as and by the southwesterly half of Lot 297, Lot Nos. 298, 299 and 300 on a certain map entitled, "Map of Goose Bay Estates", in the Town of Southold, Suffolk County,New York, said map being made by Lewis N. Waters, L.S. of Oyster Bay, L.I., New York, dated September 12, 1934, and filed in the Office of the Clerk of the County of Suffolk on the 13t" day of November, 1934, as and by the Map No. 1176, said lots and part of lot when taken together being bounded and described as follows: BEGINNING at a point on the northwesterly side of Oak Avenue distant 399.68 feet southwesterly as measured along the northwesterly side of Oak Avenue from the corner formed by the intersection of the northwesterly side of Oak Avenue and the southwesterly side of Cedar Avenue; RUNNING THENCE along the northwesterly side of Oak Avenue, South 45 degrees 24 minutes 40 seconds West, 70.00 feet to a concrete monument and the division line between Lot 300 and Lo t 301 on the above mentioned map and being and now or formerly of Dominick Basile and Donna C. Basile; THENCE along the last mentioned division line,North 44 degrees 35 minutes 20 seconds West, 140.00 feet to an unnamed street as shown on the above mentioned filed map; THENCE along the unnamed street, North 45 degrees 24 minutes 40 seconds East, 70.00 feet to land now or formerly of Alexander R. LeDonne and Pauline LeDonne; THENCE through Lot No. 297 and along the last mentioned land, South 44 degrees 35 minutes 20 seconds East, 140.00 feet to the northwesterly side of Oak Street, the point or place of BEGINNING. 4 SCHEDULE B �N 1 Y,!22�WK r BOARD OF SOUTHOLD TOWN TRUSTEES SOUTHOLD,NEW YORK PERMIT NO. 9642 DATE: FEY3ItUARY 12,2020 ISSUED TO: TEAMC99A PROPERTIES,1,LC c/o CMUSTOPHER JOSEPii,MEMBER PROPERTY ADDRESS: 980 OAK AVENUE, SOUTHOLD SCTM9 1000-77-1-6 AUTHORIZATION Pursuant to the provisions of Chapter 275 of the Town Code of the Town of Southold and in accordance with the Resolution of the Board of Trustees adopted at the meeting held on February 12,2020,and in consideration of application fee in the sum of$250.00 paid by Team C99A Propertigs, ILC and subject to the Terms and Conditions as stated in the Resolution, the Southold Town Board of Trustees authorizes and permits the following: Wetland Permit to demolish and remove existing dwelling,and construct new two-s tory approximately 1,289 A single-family dwelling with approximately 307 sf waterside deck with +4'wide steps,89 sf side deck,and 90 sf front entry deck with 63 sf stairway; install drainage System consisting of drywells and infiltrator chambers; raise existing grade with approx imately 75 Cy of clean sand fill to be trucked in from an approved upland source(approximately 14 cy to be placed within Chapter 275 jurisdiction); construct 6"wide x 12" high (max.) x+32' long easterly retaining wall and 6" wide x 18" high (max.)x+34' long westerly retaining wall; truck i in an additional 30 cy of ASTM C33 sand to replace existing subsoil to be removed for Qk installation of proposed I/A sanitary system (located more than 100 feet from wetlands); and maintain existing,approximately 201 wide non-turf buffer adjacent to bulkhead. (Proposed pervious gravel parking area to be located more than 100 feet from wetlands); all as depicted on the site plan prepared by Sherman Engineering& Consulting P.A.,last dated February 7, 1 2020; and stamped approved on February 12,2020. IN WITNESS WHEREOF,the said Board of Trustees hereby causes its Corporate Seal to be affixed, and these presents to be subscribed by a majority of the said Board as Of the 12th day of February,2020, own fee* ,%Al M 2 TERMS AND CONDITIONS The Permittee TeamC99A Properties, LLC 98Q Oak Avenue Southold New York as part of the consideration for the issuance of the Permit does understand and prescribe to the following: l. That the said Board of Trustees and the Town of Southold are released from any and all damages, or claims for damages,of suits arising directly or indirectly as a result of any operation performed pursuant to this permit, and the said Permittee will, at his or her own expense, defend any and all such suits initiated by third parties, and the said Permittee assumes full liability with respect thereto,to the complete exclusion of the Board of Trustees of the Town of Southold. 2. That this Permit is valid for a period of 24 months, which is considered to be the estimated time required to complete the work involved, but should circumstances wan•ant, request for an extension may be made to the Board at a later date. 3. That this Permit should be retained indefinitely, or as long as the said Permittee wishes to maintain the structure or project involved, to provide evidence to anyone concerned that authorization was originally obtained. 4. That the work involved will be subject to the inspection and approval of the Board or its agents, and non-compliance with the provisions of the originating application may be cause for revocation of this Permit by resolution of the said Board. S. That there will be no unreasonable interference with navigation as a result of the work herein authorized. 6. That there shall be no interference with the right of the public to pass and repass along the beach between high and low water marks. 7. That if future operations of the Town of Southold require the removal and/or alterations in the location of the work herein authorized, or if, in the opinion of the Board of Trustees, the work shall cause unreasonable obstruction to free navigation,the said Permittee will be required, upon due notice, to remove or alter this work project herein stated without expenses to the Town of Southold. 8. The Permittee is required to provide evidence that a copy of this Trustee permit has been recorded with the Suffolk County Clerk's Office as a notice covenant and deed restriction to the deed of the subject parcel. Such evidence shall be provided within ninety(90)calendar days of issuance of this permit. 9. That the said Board will be notified by the Permittee of the completion of the work authorized. 10. That the Permittee will obtain all other permits and consents that may be required supplemental to this permit, which may be subject to revoke upon failure to obtain same. 11. No right to trespass or interfere with riparian rights. This permit does not convey to the permittee any right to trespass upon the lands or interfere with the riparian rights of others in order to perform the permitted work nor does it authorize the impairment of any rights, title, or interest in real or personal property held or vested in a person not a party to the permit. O Q. O O 'ING ROOF AREAS 11 & III 760sf rblo, .4. -ROM 2" STORM 00 '/12*760sf=127cf o -.LL = 42.2cf/ft r4 C,4 - 8'0 DRYWELL REQUIRED �rrZ clq (2) 8'4x2' DEEP DRYWELL 0 7.5' GRADE oo c� cl) �D 00 z r-q4-4 cv) 0 - R DRYWELL u PROP LINE C8 'AVE INLET .4G AREA 10 Yj—rtNG GRADE 8 iv. ,J6 ' ' 4' 0, AREA 672sf FROM 2" STORM = 0.9*2"/12*672sf=101cf -EACHING CHAMBER = 10.7cf 3ERS REQUIRED .9 1d1 G Ilk' 10' 8' 6EXISTIN GRADE ' 4' JAL GROUNDWATEP EL.. 2.6' 2' 0 _A I = 580sf FROM 2" STORM n0 -- "'/l 2*580sf=96cf U) U-1 -EACHING CHAMBER = 10.7cf E-'RS REQUIRED m co n 10, Ld z < Lli 6' ir- EXIST—ING C)—GRADE I 7 4' GROUNDWATER EL. 2.6' 2' 0, 244sf 4 2" STORM *244sf=41 cf iING CHAMBER = 10.7cf REQUIRED rr) rn m m 1 r ----- ' C X' C r Q o m g i> !+ Cl2 m r r� vas A 0 � m ff ER PROPERTY UNE JOB#: JOH1801 PROPOSED SITE PLAN REV DATE COMMENT 1 4 . 25 . 19 EN-CON COMMENT. DATE: 02.12.19 2 6 . 2 4 . 19 EN-CON COMMENT: SCALE: AS DOTED 980 OAK AVE I� 3 9 . 19 . 19 EN-CON COMMENT. 4 9 . 25 . 19 EN-CON COMMENT; DRAWING NUMBER S O U TH O L D NY* 5 11 . 7 , 19 TOWN COMMENTS 6 01 . 13 , 20 TOWN COMMENTS 7 02 . 7 . 20 TOWN COMMENTS DRAWING: PERMIT DRAWING 1 OF 1 Wd lFLEZLOZOZ/L/94Ud'OZ-ZL-ZueidndidysaalmilOS-L-(L'Z) 4' O O. O O BACKFILL WITH COARSE SAND AND GRAVEL GRADE EL. 7.5'± AREA COVERAGE CONTRIBU 763sf 8% RAINFALL c;;,= I = z C=I*A= 2 187sf 2% 7 8'0 DRYW 17sf NA 114 MIN. 3' C 950sf 10% PROVIDE 967of w/ STAIRS EL. 4.6' AREA COVERAGE 1 ,384sf 14% 04 iNTILEVERED UPPER FLOOR) HIGH SEASONAL V 486sf 5% GROUNDWATER EL 2.6' ------23sf NA ROOF AREA H & III STORM WAT 1 ,871 sf 19% NTS 1,9919f W/ STAIRS 18x3O CON PROPOSED GP.ADE PARK. ' n-y?WM NG RA M ul Ilk al 1KpPDX EXISTING DE ARC 36 INFILTRATORS HIGH "SEASONALGROUNDWATER 'EL, 2 OR EQUIV. PARKING PARKING AREA STORMWATER CONTROL RAINFALL NTS C=0.9*1*, ARC 36 10 CHAM -Ap PROX-, ...PROPOSED- --GRADE - 00 M a Ritf,umpLLqm!mmlp-LVqu 'HIGFF'SEASi ARC 36 INFILTRATORS OR EQUIV. ROOF Af RAINFALI C=I*A= ROOF AREA I STORMWATER CONTROL ARC 3 6 NTS 9 CHAM APPROX. PROPOSED 'GRADE FIIGH SEASON, ARC 36 INFILTRATORS OR EQUIV. ROOF AREA RAINFALL FR, C=I*A= LEA, ROOF AREA IV STORMWATER.... CONTROL ARC 36 NTS 4 CHAMBERS OunnvuLh 1i (UUN ' T) EXISTING DRAINAGE ti TROUGH a EXISTING .GRADE EL. 7.5'± SHALLOW PRESSUR128b 'DRAINFIELD O _ _SEASONAL• IA OWTS INDWATER EL. -- N O SANITARY DISPOSAL PROFILE �ME GROUNDVIAtER 500 RW RATED CAPACfTY DESIGN FOR 360d NORYdEGO SINGULAIR 610-KINETIC WASTEWATER N TS EMPTY W WaYAME m j;: uPuFr TREATMENT SYSTEM C'o '�EQutRED - t=" 11,4001ba DRY WEIGHT CDNo 0 9IIt /Cf — PRbV10E B'x6'x24° coNc PAD BALLAST FROV4DED R 12,OOUtbs ffT off-E—i ❑ i 0 mum I LL_=I:z _-_7.3 __., ------ P440POSED GRADE'__ 3 f _ ---- _. __.... -EXISTINGGRAD€ - ------- _- -- ROADSIDE ELEVATION NTS UNA UTILORIZED ALTERATION OR ADDITION TO STAMPEL AND RELATED DOCUMENTS IS A VIOLA770N OF SE 720{ 0 c m D • a v N O N N APPROXIMATELY 100cy OF SOIL TO BE REMOVED FOR INSTALLATION OF PROPOSED FOUNDATION BUILDABLE LAND = 9,800sf w AND STORMWATER CONTROL APPROXIMATELY 30cy OF SOIL TO BE REMOVED EXISTING TOWN SITE COVER-AGECOMPONENTFOR INSTALLATION OF IA OWTS AND PSD LEACHING FIELD TO BE HOUSE REPLABY SCDHSCED REGUITH LATIONS OF ASTM C33 SAND AS REQUIRED ENCLOSED PORCH APPROXIMATELY 75cy OF CLEAN FILL FOR REGRADING TO STEPS BE TRUCKED IN FROM AN APPROVED UPLAND SOURCE. TOTAL APPROXIMATELY 14cy OF THAT FILL TO BE WITHIN 100' OF REGULATED WETLANDS BOUNDARY. PROPOSED TOWN SITE COVERAGE COMPONENT HOUSE DECKS (1'289sf HOUSE FOOTPRINT, 95sf CA STAIRS TOTAL �CK 307sf• 7sr - R EA TRATOR RS TING HOUSE \ ECK TO F � �C� ' 1NETLANDS SETBACK ' �1 �/-- SIDE DECK 89s-i IA CONTROL PANEL EN1- RY DECK 90sf EN l RY STAIR 63sf f / '/ �°;•/ / 6 " WIDE, 3 2 ' ± LONG 9/1 R E_ rAiNING WALL N ;' i ' MAX HEIGHT 8 LU PARKING AREA f w ( "I C}) IN F-I (_T-RATOR W _. _. 10, �c INLET 8 G N v N f, f 4' o HIGI-P -2r----- _.GRO � N O��\� ✓" �y of. /lb C1 SANITARY SYSTEM 8.5 0_._-- PARKING AREA ( 672sf) � EXISTING 6 -SCWA MAIN / f g.8• .,� f va 41 FlN.151Fl.00fl RET WALL PROP:- _- --- 8' LIME TOW 7' ~- BOW 6'±_.... q' _ __. 2 9 A O C A D V N 0 N l.OJ O N PROPERTY, CIF TEAMC99A PROPERTIES, LLC 980 OAK AVE SOUTHOLD, NY SCTM# 1000-77—•01-06 9,800 SF GROUNDWATER-MRNAGMENT.ZONE IV DENSItY _ 3.00GF?D%AC (PRIVATE WELL AND SANITARY DISPOSAL) PROPOSED..SEP110:SYSTEM: ALTERNATIVE SYSTEM FOR HIGH GROUNDWATER ONE (9.) :500GPQ. IdOi#1NEGO 4A:OWTS TWO (2).23'•.SGONG. PRESSURIZED SHALLOW DRAINFIELDS PARCEL. CURRENTLY SERVED BY SCWA NEIGHBORING .DWELLINGS CONNECTED TO SCWA SITE PLAN BASED ON SURVEY BY NATHAN TAFT .CORWIN III DATER E ISED 15-.13 LAST REVISED 8.3.16 ELEVATIONS"BASED ON 1988 NAVD PROJECT LIMITING FENCE ALONG CONCRETE TROUGH AT EACH SIDE AN �D WOOD EDGING ADJACENT TO NON -TURF BUFFER AT WATER DE REAR DE STAIR 5' 7DO ROOF A (9) INFIL CHAMBE \� 81 '-4" EXIS C 7' 1 . ti G- BE F 67'-4„ 4.8 �� / 10 TZ Ix qTQ RY 41 8.5 ISTING SEPTIC o;n tx CONNECT 'TO EXISTING ASPHALT, DRIVE AND CURBING ! 0 BE REMOVED- ' / SUHEDULE B (CON' T) 11 0 � C fD D a v v N ti N O 'O O N O N O N < C 9,_ 7�, 55'-1 14 ---3 r' `i 12 ROOF AREA IV 14.) INFILTRATOR CHAMBERS O SECOND FLOOR FOOTPRINT 95s-lc NO FIRST FLOOR OR PATIO/DECK BELOW FIRST FLOOR BUILDING ' FOOTPRINT 6 WIDE, 3 4' ± LONG RETAINING WALL ZONE 1 . 5 ' MAX HEIGHT ROOF AREAS 8'Ox4' STORI'v DF N E EX TO B SITE PLAN- SCALE 1 : 10 4 BRIAN ANL z.,AURA FLANAGAN,980 OAK AVENLL,SOUTHOLD Jv loe- 2> • • Figure 1. Aerial view of subject parcel and developed properties to north and.south in.t pril 2021. Image by Google Earth. p 11 wl � lisp Figure 2. Looking south from Goose Creek toward existing dwelling to be demolished(per Town code)and reconstructed(in-place) at raised, FEMA-compliant elevation(center);and at adjacent homes to north (left)and south (right). e BRIAN AN] 1URA FLANAGAN,980 OAK AVENLr,.SOUTHOLD J . Figure 3. Looking northwest from Oak Avenue over location of proposed sanitary system and toward dwelling to be demolished(per Town code)and reconstructed(in place)at raised, FEMA-compliant elevation. ecmm os-a,s N 6, sYq rx {. ,1Nq � a 3 u 6 O - - � m u 4 ; 6 b 2,W1 , Rxxoar AwW. urr �� --•-- ,,,,,� noncE COUNTY OF SUFFOLK © K '* ,. souTHoD s¢cran ra R 1 O F --�-- ` PReal Property Tax Service Agency v r a..m on pw.,. a- r_a,x1 v six ___ � _—.-- e.�--�_— �h• � A x,xp, - '•r • -'KS 1000 PROPERTY WP OFFICE LOCATION: MAILING ADDRESS: Town Hall Annex P.O. Box 1179 54375 State Route 25 Southold,NY 11971 (cor. Main Rd. &Youngs Ave.) Telephone: 631 765-1938 Southold, NY 11971 LOCAL WATERFRONT REVITALIZATION PROGRAM TOWN OF SOUTHOLD To: Glenn Goldsmith, President Town of Southold Board of Trustees From: Mark Terry, AICP LWRP Coordinator Date: June 12, 2024 Re: LWRP Coastal Consistency Review for BRIAN & LAURA FLANAGAN SCTM# 100-77-1-6 En-Consultants on behalf of BRIAN & LAURA FLANAGAN requests a Wetland Permit to demolish (per Town Code Definition), reconstruct in-place and raised to FEMA compliant elevation the existing one-story dwelling with new front porch and new attached seaward side deck; install stormwater drainage system;. and install a new I/A sanitary system. Located: 980 Oak Avenue, Southold. SCTM# 1000-77-1-6 The proposed action has been reviewed to Chapter 268, Waterfront Consistency Review of the Town of Southold Town Code and the Local Waterfront Revitalization Program (LWRP) Policy Standards. Based upon the information provided on the LWRP Consistency Assessment Form submitted to this department, as well as the records available to me, it is my recommendation that the action is CONSISTENT with the LWRP Policies 4 and 6. This recommendation considered the following: 1. The residential structure is proposed to meet FEMA standards. No expansion of the structure is proposed. 2. Note that the depth of groundwater is expected to be seasonally high. Pursuant to Chapter 268, the Board of Trustees shall consider this recommendation in preparing its written determination regarding the consistency of the proposed action. Cc: Honorable Lori Hulse, Attorney NORWECO I/A OWTS w/ PSD lb HD PERMIT R-20-1213 p PROPERTY OF BRIAN AND LAURA FLANAGAN <eP�.�� ti� DATED 11-24-2020 w °� N 980 OAK AVE SOUTHOLD, NY o5 0"� `o z z W a n SCTM # 1000-77-01-06 �P�o�P�� EXISTING 20't COVENANTED NON-TURF TOTAL LOT AREA = 9,800sf ����PPSy� ti BUFFER (LIBER D00013070, PAGE 366) / z P �y P�O� 0 0.� / GROUNDWATER MANAGEMENT ZONE IV; �.o�P��p � z m w „ TOTAL ALLOWABLE SANITARY FLOW = 300 GPD ��o���a // d p ? `° py PROJECT LIMITING FENCE / U ALONG CONCRETE TROUGH PROPOSED; RENOVATE EXISTING 2 BEDROOM DWELLING s AT EACH SIDE AND WOOD 'S^\ W 4 ALL NEIGHBORING PROPERTIES WITHIN 150' VACANT OR SERVICED Tl EDGING ADJACENT TO NON—TURF BUFFER AT WATER n-j x 0 / \ ` � BY PRIVATE ON SITE SANITARY DISPOSAL FACILITIES O SIDE 0Nig? AND PUBLIC WATER SUPPLY SCWA . THERE IS NO PUBLIC SEWER DISTRICT 10 s' EX'ST R UOVE /// DWELLING THAT SERVE THIS AREA. \ O QA� (��� PUBLIC WATER ROOF REA 2 � o e � � � / 8 � NO UNDERGROUND UTILITIES OTHER THAN THOSE SHOWN �� �� FF i 36 5ff / a REMOVE EXISTING SEPTIC ROOF STORMWATER / � 6 INFILTRATOR / 64 INSTALL NEW WATER SERVICE LINE FROM MAIN 101 T�° / `CHAMBERS / sxC.1 , s / / SANITARY DESIGN: �� �F my \ / EXISTING HOUSE �\ S- 90 / TO BE DEMOLISHED C ` z 2 BEDROOM DWELLING ss• ti'2 / \ / (PER TOWN CODE \, o 3 BEDROOM MINIMUM DESIGN; 330gpd DESIGN FLOW s c }ti' �P��i / h n� DEFINITION) AND �Zo S cy e• ,' ` RECONSTRUCTED (IN—PLACE) oaSrn PROVIDE (1) NORWECO 500gpd I/A OWTS T° 9 yY o�5 # APPROX. 2' HIGHER zzaZ F�O'y ,°� �9ti O k� / 6Q '� (FF EL. 9') 3 yr w EXCAVATE TO GREATER OF SP OR SW SOILS OR 4' BELOW PSD A° o9�s r �s, oQ; �� / -' ti ;`, '24� _� PROP. 50sf � � BACKFILL WITH ASTM C33 SAND ems. 2 F�, °o , a? �.q� e. Pe�y� '�� a ,�o o PORCH & STEPS ROOF AREA 105 ,'s" v W�c�,o5 TABLE 13 APPLICATION RATE: 3gpd/sf sff �� �,a+o ^'. ozonz �' 0 - srnc covc------------- -- - "9'G J� �� ��P y� 0 Dc00 �ER�� 330gpd/3.Ogpd/sf- 110sf BOTTOM AREA OF TRENCH RQD rxI 39' OF 34" WIDE TRENCH REQUIRED - PROVIDE (10) INFILTRATOR CHAMBERS BE ,<_. <ovto y„XD TO / �O' -arcLIE ROOF STORMWATER ' 'X SLOPE MANIFOLD PIPING AND TEE TOWARD PSD (10) INFILTRATOR XX., ��� c 50% EXP DWELLING INSTALL INSPECTION PORT AT DISTAL END OF EACH PSD LATERAL CHAMBERS Y�,;.,X a <, ° .bow �� i $ �P AREA PUBLIC WATER N r- U 5-FOOT DISTAL HEAD AT END OF EACH PSD LATERAL IA CONTROL PANELS �' " ° J \ N N W / Y CP , (2) 20' QUICK4 PSD m �' VENT THROUGH HOUSE � DOSING RATE: PLUMBING STACK /� " 59 � ° ' w v H F m PUMP STATION VOLUME 1.88 GAL/INCH '� ' rF z z z c 18" RISE PER CYCLE = 34 GAL DOSE Exlsrl" ; "` w w w / u E RE cvEo \yam ^ Vr \ .'' \\ � NEW WATER SERVICE w 330GPD=9 DOSES PER DAY :X,ST'N0 SIR,oF,,E SIFPS- F U ° ca 34 GAL/DOSE @ 11 OSF=0.31 GAL/SF/DOSE To H ,Ee;ow r 6 /�/ W U TRENCH DRAIN INTO �� r , �� � '-RIVETINC ASPHALT R MOYEO £ C] SITE PLAN BASED ON SURVEY BY / DRIVEWAY STORMWATER \ J% U cn m n4 NATHAN TAFT CORWIN III / \ B'0x2' DRYWELL \ 0 DATED 5.15.13 / DWELLING /^ T� �O 3 �.� IA W OWTS C, N QQ�� N C' � / PUBLIC \ y'O� p� �P P IA OWTS w N m f LAST REVISED 8.3.16 / \ / \ F " N o WATER �'' ' j� `' 4 r� •N r ELEVATIONS BASED ON 1988 NAVD // \ // \ Gj h O , � DWELLING O) 0 rh / APPROX LOC � PUBLIC WATER wa N M of WETLANDS WITHIN 300' OF PROPERTY AS SHOWN EXISTING SEPTIC / o PROPOSED STORMWATER COLLECTION/CONTROL AS SHOWN TO BE ABANDONED NEW DRIVEWAY /+ DWELLING 546sf PUBLIC WATER N TEST HOLE z McDonald Geoscience Q Ap�" 2015 STORMWATER CALCULATIONS E F N/� yo w z>z EL 8.0, 0' ROOF AREA I = 530sf TOWN ZONE R-40 SITE PLAN s I-- QQ DARK BROWN LOAM OL RAINFALL FROM 2" STORM LOT COVERAGE 20% MAX s y (� 0 -0.5' C=1*A= 2"/12*530sf=88cf SETBACKS 35' FRONT & REAR SCALE 1: 30 YJ BROWN CLAYEY SAND Sc ARC 36 LEACHING CHAMBER = 10.7cf 10' SIDE 1, 15' SIDE 2 `" 0 ZCkf O= 9 CHAMBERS REQUIRED; 10 PROVIDED HEIGHT 35' MAX (/) Q0Ii � EL. 26' SKYPLANE 10'h AVE, 45' PYRAMID CFO 083534 F 0 ---1000 a WATER -5 4' WATER IN BROWN sc ROOF AREA 2 = 360sf GFA 2,100sf MAX. °RpF r1P 0 LL_rn V) a- CLAYEY SAND RAINFALL FROM 2" STORM 950sf EXISTING & PROPOSED - LEGEND ESS10 o C=1*A= 2"/12*360sf=60cf In COVERAGE CACLS a_ In ARC 36 LEACHING CHAMBER = 10.7cf ��] 0 O —14' 6 CHAMBERS REQUIRED; 6 PROVIDED SITE 9,800sf (0.225ac) y °o IA UNT Q PROPOSED HOUSE 950sf 9.7% PSD PUMP WATER IN PALE BROWN SP DRIVEWAY = 546sf PROPOSED PORCH 50sf 0.5% FINE SAND RAINFALL FROM 2" STORM PROPOSED DECK 392sf 4% MAR 2 2OZ4 ;O IA PSD CHAMBER m -20 C=1*A= 2"/12*546sf=91 cf REQUIRED TOTAL 1,392sf 14.2% %DVV} STORMWATER DRYWELL m z n TEST HOLE 8'Ox2' DEEP DW = 84cf PROVIDED o " < SCALE NTS (DEPTH TO GROUNDWATER PROHIBITS MORE CAPACITY) Southold Town STORMWATER CHAMBER m a Uo Board of Trustees --- EXISTING TO BE REMOVED LN 1 i (6 i t S CZ F. W WO RECEIVED H w •-- w" � � - .IAN 2 6 2024 N m m �f i ® = ZONING BOARD OF APPEALS EMS.-_- i _ _ iGn9.0 o CRAW.— PROPOSED SOUTH ELEVATION x¢z Z a SCALE: 1/8" = 1'-0" ¢o < o a00 � - w o 0 - m mgg MAR 2 8 2024 m gI-SO 1 - - V Southold Town Board of Trustees U i FINALAP F�n 6.96 R�6g6 B n z 3 —.—.— _ — — VIA -D BY .Ya wAaenss EXISTING SOUTH ELEVATION ` sDEC1s10« w- SCALE: 1/8" = 1'-0" �I�.��`�D: . :.� 6AA0.Y8 M117hS" KALE: 1o7i k �nvm7a SNkE7 h'UMdkP' A-1 1 _ 2 } r t I z o Hw aSCEIVED v' JA% 2 6 2a2 H z > -- w f ZONING BOARD OF APPEAL'' � w i A < ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ _if CL 9-C_ - _._.__ - fill I I 1 11 1- �z zac PROPOSED EAST ELEVATION Q o x zoH SCALE: 1/8" = "1'-0" 0 0 E • p= g au ® a � yea OF ❑Nw :_ x• MAP d ® JB r ` ELISION# `7 � �rey O FC n6.96_. EXISTING EAST ELEVATION SCALE: 1/8" = 1'-0" MAR 2 8 2024 DRAWN;mIf?NU WALL mA Southold Town Board of Trustees A-2 ya l 1 � _ - — — — -- _.—_—. RECEIVED w o JAN 2 6 2024 111 z / w ZONING BOARD OF APPEALS q ! 11A a a ' I _ bl x�z PROPOSED NORTH ELEVATION SCALE: 1/8" = V-0" Q o x ZD w o 0 u mo'9 �°3r p o •a uu Z IL V Y m 0� � g9 r — MAR 2 8 2024 a U Southod Town I= m Board oflT ust es a I � 3 Y- `�`°� NAL MAP EXISTING NORTH ELEVATION .EVIEVED BY ZBA SCALE: 1/8" = Y-0" =C 51 !# �.,VMAU IW SCAM 77 �J XHa. L�L.E . .i../� 7AL7871 SNGET NUb]HER: A-3 f V] ' z 0 wo ax RECEIVED JAN 2 6 20?411 IF A _ A IIIIIIIIIIIIIIII 1 , t BONING BOARD OF APPEALS. 1Li , i Hill lililwj -FF1L94_ - _ FFSL.4_ W 0 x ww �z ¢tea PROPOSED WEST ELEVATION ¢ox zoH SCALE: 1/8" = 1'-0" 00 o 4 5 u m� mod a LL p H C VETown m tm Q W 3 L - a MAR C� o SoutBoard H t a 3 muocnu SL EXISTING WEST ELEVATION ±NAB. MAP x SCALE: 1/8" = 1'-0" VIEV BY ZBA "ELISION# -R l mam )ATE^ : 'sc=aIrWs �p Am �. u:vmu - IItEt NUFE EA A-4 P 1 • I . -. " ..... RECEIVE. . , ( z 2.6...?�? 1 ........ ..........,..... ...._._... ................-. cn AAN .. ..........:.. w o ..................__._...._...-- -.._............__......._.......:...._.._....---..._..__.._..... r— 31'40W EAL, H I � z > El-------®-------� _........................ I o w ; I PROPOSED DLC R I ,�� i i1es,: o ok ............. - 12",------------- -- - ................................................. - Qz----------------------------------- . ._..-- --------- -- •------- -- oa rmnr:taAlvl ErxcToerRnD¢T Q u,,..� fspp; 10 SS nalalcrtr7ouurcuaaortPmcoo; dr,�O q C�3 •lAAl1TRDGiDRl 70 z C F' . b8C �po� � AWMtO MCA TO PERMlTEYRA!IERO% ��Q EE CloV] A71IW1D=ERIOLAT= YER1ry GWCR lOCA7R7N• l�lr,.ti�,•�,.•�•r�— '��1 •mil—.��•�.���.o• i ,I�ID C=RtOGI� 4. ❑ ❑ ilm7seTrigtRf°:-•! - rETuaantaEi f+3.tnmrmnalvD '. IIFM.DI'P — ODDW4; d u. _ gg c,auNEr• oo ,E cnMr -•rxas� ADamrn! �• li r !EDGER ROARDTOREFA DM ' 1'• I - TO9UI1DINGVNi11TWM1OK. ,D tg ;:' 9Y0{YMYINC MAWEIUiACiUWE1G '—" -- VOST70AWOKO Ir scREW30 Er D.G.) \\\U Q Town6torccntR�JSl7LE�iG4sBQ�_� lew.rmrowTSADI ! H Q EXISTING CRAWL_ SPACE —` PROJECT NORTH (PROJECT NORTH C ACTUAL NORTH ..................... ........: SCALE: 1 l/8" = V-0" ® .........................: ACTUAL NORTH PROPOSED CRAWLSPACE pi FINAL MAP REVIEWED BY ZBA [ETAWN.FIII! MAR 2 8 20240 1 DF:c1si0 I urvmm SH TNOMDER DATED: A-5 Southold Town (I 0 -` Hx OPRU c.t' d ZO zo w r--n _ ]]G R4 rzV•O[ � L FITTINGROOM]AARRMCOCA - -- -s - - - -rAWW2 c=Y F--------------- - _ D 7 O ® WING/DINING �'• •:r E 9r cEuwa srt. S THE ••= :IlU1t G RC!'bTn i� 7a•cmMowlt 7 ODIIDWALLupw RATTERS CC TD RWIM RAFTEW AND 66 - � T¢IN,SRATCf,ADD Af REO II � d�0 W' - • - ` - C BU=WALLUATOAAFTM Sr.-� rb• GcTo Rrlfw Lv=AND ••• m ••• - - --- - _ _ TIF3N.FRWCUADDA5REo. pv F wm BEDROOM No.1 UTILITY ROOM - i! 71 :. 7 �- - �w•cFluuc Nr. G 1 �� y�.d 9r couNc sR. .s KITCHEN1 CwS�v BAH I! BED 9rc BATH (2j iA FLUSH• - SAT _ , 'y _ LNS _ 9rcnuNCHr_ veal 1f I: TANK x pitBy E -- ------ ----- — 6j— ---- ------ 2 - 3 Tucwc -E III ® a r - - _ - -- - - - - - - - - - - - - - -TWJDS62- - RODP I Q PAOpOSPD POACH o U 1DCOLD/6 6G '- wtOXbACpPOSTtT - _ EXISTING FLOOR PLAN PROJECT NORTH ) F PROJECT NORTH 0.0 SCALE: 1 8" = V-0" ACTUAL NORTH AP y Mir REVIEWED BY ZBA WALL LEGEND 1y41 perm Y/ �ry\� ✓'/� ^/E F ••�•••--••••••�I WALLTODERSMOVED D l.�CIS 1O 1'Q# 1 R6����J E%I7TING WALL n DATED: ��]/qy 6.r�) ff(�LLfl(f(lff.V NEW wALL ti/A TE D• ! J. NOTD _ _ ^ - -- MAWN,ISM MR ^ DIMENfroNSOF VlSFWG WAILI MEIROMFINISHED WAI PROPOSED FLOOR PLA ' I1l�-7, '(1.1 ]INTm2RR=a '2Y6-&w-m.12RA.<',2%6.6•I II�• 1I1ST 7/( `I`" ' T171 1I1SII�� EO11 t. DWEHSIDMWNEw'WALLSARFFF0.S DS SCALE: 1�Q 11 11-01► V L� ImRAl� I EZT-/DTE.'2RA.2 U2'.]RA.S-IR•] I SIICRi Ni3RTDER. MAR 2 R PngA A-6 Southold Town Board of Trustees SURVEY OF P/0 LOT 297 & LOTS 203 , 299 & 300 MAP OF GOOSE BAY ESTATES FILE No. 1176 FILED NOVEMBER 13, 1934 SITUATE � 0J SOUTHOLD �1v�9 G� �� s .\ TOWN OF SOUTHOLD o� oaOJ o '\Q�o 9 SUFFOLK COUNTY, NEW YORK °', �o� 9 S.C. TAX No. 1000-77-01 —06 O,, ' 9��fd�, p �+ SCALE 1 "=30' a� \`�' \F \ ��� MAY 15, 2013 ,f,Oy ° 3 p� \ . \�✓ ' 1P AUGUST 3, 2016 UPDATE SURVEY +' ��� AREA = 9,800 sq. ff. a \ 0.225 cc. c9�s s'o p�U�pp 4.1 � `�� 4.3/ /_� L1z>;UCiCVC o �c h O V 4_1 � `o��Jy�,��. �� , `\ �6� CERTIFIED TO: fi2o TEAMC99A PROPERTIES, LLC X�w NOTES:Q Fu /s.t �co // ` y 1. ELEVATIONS ARE REFERENCED TO N.A.V.D. 1988 DATUM EXISTING ELEVATIONS ARE SHOWN THUS:5.o �vO pj�0 F.FL - FIRST FLOOR p \ C Op J4 0� G.FL. - GARAGE FLOOR 2 P TB - TOP OF BULKHEAD ZQ AE(E�)y� / '\x� OGiI,C °Fe �OP �A�> BB - BOTTOM OF BULKHEAD 2. FLOOD ZONE INFORMATION TAKEN FROM: ,e6 v'p \�q�✓ `� / FLOOD INSURANCE RATE MAP No. 36103CO166H ZONE AE: BASE FLOOD ELEVATIONS DETERMINED ZONE X*: AREAS OF 0.2% ANNUAL CHANCE FLOOD; AREAS OF 1% ANNUAL 00. a �,D` CHANCE FLOOD WITH AVERAGE DEPTHS OF LESS THAN 1 FOOT ' / �`: 4j OR WITH DRAINAGE AREAS LESS THAN 1 SQUARE MILE; AND AREAS PROTECTED BY LEVEES FROM 1% ANNUAL CHANCE FLOOD. � O G UNAUTHORIZED ALTERATION ADDITION PREPARED IN ACCORDANCE WITH THE MINIMUM Nathan Taft Corwin TO THIS SURVEY IS A VIOLATITI ON OF STANDARDS FOR TITLE SURVEYS AS ESTABLISHED SECTION 7209 OF THE NEW YORK STATE BY THE L.I.A.L.S. AND APPROVED AND ADOPTED EDUCATION LAW. FOR SUCH USE BY THEN WZK STATE LAND TITLE ASSOCIATION. e� Land Surveyor COPIES OF THIS SURVEY MAP NOT BEARING IS �OF THE LAND SURVEYORS INKED SEAL OR EMBOSSED SEAL SHALL NOT BE CONSIDERED GAF TO BE A VALID TRUE COPY. CERTIFICATIONS INDICATED HEREON SHALL RUN �' }` Successor To: Stanley J. Isaksen, Jr. L.S. ONLY TO THE PERSON FOR WHOM THE SURVEY' Joseph A. Ingegno L.S. IS PREPARED, AND ON HIS BEHALF TO THE ';;,, , TITLE COMPANY, GOVERNMENTAL AGENCY AND {,ytL' _ Title Surveys — Subdivisions — Site Plans — Construction Layout LENDING INSTITUTION LISTED HEREON, AND TO THE ASSIGNEES OF THE LENDING INSTI- TUTION. PHONE (631)727-2090 Fax (631)727-1727 CERTIFICATIONS ARE NOT TRANSFER ABLE.. �r � , THE EXISTENCE OF RIGHT OF WAYS ,_ �Q467 OFFICES LOCATED AT MAILING ADDRESS AND/OR EASEMENTS OF RECORD, IF °. 1586 Main Road P.O. Box 16 ANY, NOT SHOWN ARE NOT GUARANTEED. Y.S. Lic. No. 50467 Jamesport, New York 11947 Jamesport, New York 11947 38-292 FO4co �� as Caroline Burghardt,Chairperson y Town Hall,53095Main Rd. Lauren Standish,Secretary -0 P.O.Box 1179 • `F Southold,NY 11971 y'flpl �•aO!' Telephone(631)765-1889 Conservation Advisory Council Town of Southold - At the meeting of the Southold Town Conservation Advisory Council held on Wed., June 5, 2024, the following recommendation was made: Moved by Inga Van Eysden, seconded by Nancy May, it was RESOLVED to SUPPORT the application of BRIAN & LAURA FLANAGAN to demolish (per Town Code definition) and reconstruct (in-place and raised approx. 2' higher to FEMA compliant elevation) existing 950 sf. one-story dwelling with new 50 sf. front porch, 392 sf. attached waterside deck, and associated steps; install stormwater drainage system; and install a new I/A sanitary system in place of existing septic system, more than 100' from wetlands. Located: 980 Oak Ave., Southold. SCTM#77-1-6 Inspected by: Inga Van Eysden, Nancy May The CAC Supports the application and recommends the removal of the drains leading from the street to the Bay. Vote of Council: Ayes: All Motion Carried ^. BOARD MEMBERS �0iF S®UryO - Southold Town Hall Leslie Kanes Weisman, Chairperson ,`O �� 53095 Main Road-P.O.Box 1179 Southold,NY 11971-0959 Patricia Acampora Office Location: Eric Dantes �Q Town Annex/First Floor, Robert Lehnert,Jr. 54375 Main Road(at Youngs Avenue) ��,0 Nicholas Planamento U1 , Southold,NY 11971 RECEIVED http://southoldtownny.gov f q Ip DA 0►*4-A ZONING BOARD OF APPEALS F EB 2 0 2024 TOWN OF SOUTH OLD Tel. (631)765-1809 �W_ xne2�� Southold Town Clerk FINDINGS, DELIBERATIONS AND DETERMINATION MEETING OF FEBRUARY 15,2024 ZBA FILE: #7874 NAME OF APPLICANT: Brian W. Flanagan and Laura K. Flanagan PROPERTY LOCATION: 980 Oak Avenue, Southold,NY SCTM No. 1000-77-1-6 SEORA DETERMINATION: The Zoning Board of Appeals has visited the property under consideration in this application and determines that this review falls under the Type 1I category of the State's List of Actions,without further steps under SEQRA. SUFFOLK COUNTY ADMINISTRATIVE CODE: This application was referred as required under the Suffolk County Administrative Code Sections A 14-14 to 23, and the Suffolk County Department of Planning issued its reply,dated December 22,2023,stating that this application is considered a matter for local determination as there appears to'be no significant county-wide or inter-community impact. LWRP DETERMINATION: This application was referred for review under Chapter 268, Waterfront Consistency review of the Town of Southold Town Code and the Local Waterfront Revitalization Program (LWRP) Policy Standards.The LWRP Coordinator issued a recommendation dated January 25,2024. Based upon the information provided on the LWRP Consistency Assessment Form submitted to this department, as well as the records available, it is recommended that the proposed action is EXEMPT from LWRP Review since the building is proposed to be raised/elevated to mitigate flooding. PROPERTY FACTS/DESCRIPTION: The subject property is a 9,800-sq. ft. non-conforming parcel in an R-40 Zoning District. The front yard property line measures 70.00 feet along Oak Avenue, the westerly property line measures 140.00 feet, the northerly property line, landward of a wood bulkhead, measures 70.00 feet and the easterly property line measures 140.00 feet. The property is improved with a one-story frame house with an attached enclosed porch, as shown on a survey prepared by Nathan Taft Corwin,III, L.S., dated May 15,2013. BASIS OF APPLICATION: Request for Variances from Article XXIII, Section 280-124; Article XXXVI, Section-280-208A; and.the Building Inspector's October 16, 2023 Notice of Disapproval based on an application for a permit to demolish(as per Town Code definition)and reconstruct a single family dwelling; at; 1)located less than the minimum required side yard setback of 10 feet; 2) the construction exceeds the permitted sky plane as defined in Article I, Section 280-4 of the Town Code; located at: 980 Oak Avenue;Southold,NY. SCTM# 1000 77-1-6. RELIEF REQUESTED: The applicant requests variances to partially demolish and elevate the single-family dwelling and add a rear deck and a front porch. The rear deck will have a 5.5 feet side yard setback, equal to the P Page 2,February 15,2024 #7874,Flanagan SCTM No. 1000-77-1-6 existing framed dwelling,and after elevating the dwelling,the proposed construction will result in approximately 3 sq. ft of the roof exceeding the sky plane as defined in the Town Code. ADDITIONAL INFORMATION: The existing dwelling was built within the pier line of property in close proximity to Goose Creek. The applicant agreed that the septic system will be upgraded to an Innovative Advanced (I/A)Waste Water Treatment System. According to the applicant's representative, a pre-submission meeting was conducted with the Southold Town Board of Trustees, which resulted in that Board advising the applicant not to move the house. Thirteen letters of support were received from neighbors. FINDINGS OF FACT/REASONS FOR BOARD ACTION: The Zoning Board of Appeals held a public hearing on this application on February 1,2024, at which time written and oral evidence were presented. Based upon all testimony, documentation, personal inspection of the property and surrounding neighborhood, and other evidence,the Zoning Board finds the following facts to be true and relevant and makes the following findings: 1. Town Law 4267-b(3)(b)(1). Grant of the variances will not produce an undesirable change in the character of the neighborhood or a detriment to nearby properties. The dwelling is currently in significant disrepair and will require aesthetic and structural improvements as it is being elevated to conform to FEMA regulations because the subject neighborhood and lot are very vulnerable to significant flooding. The homes on either side of the subject residence are both two-story and much larger than the proposed elevated one-story dwelling. Additionally, many other dwellings in the neighborhood have been updated and enlarged over time. 2. Town Law 4267-b(3)(b)(2). The benefit sought by the applicant cannot be achieved by some method, feasible for the applicant to pursue, other than an area variance. The subject dwelling already has a non- conforming side yard setback which is being maintained because the Trustees have informed the applicant that they do not support moving the footprint of the reconstructed dwelling to a more conforming location due to land disturbance. However, in order to elevate the renovated home to conform to FEMA regulations, which is required because the construction is deemed a demolition per Town Code, while also meeting the Trustees request to maintain the existing footprint,the construction must exceed the sky pane limitations 3. Town Law 4267-b(3)(b)(3). The variance granted herein for the side yard setback is mathematically substantial, representing 45%, relief from the code, while the portion of the dwelling located within the sky plane represents 100% relief from the code. However, the proposed partial demolition and elevation is required to mitigate any potential flood damage per FEMA requirements, and the sky plane violation is exceeded by only 3 square feet of the corner of the proposed roof,which is de minimus. 4. Town Law 4267-b(3)(b)(4). No evidence has been submitted to suggest that a variance in this residential community will have an adverse impact on the physical or environmental conditions in the neighborhood. The applicant must comply with Chapter 236 of the Town's Storm Water Management Code, and apply to the Southold Board of Trustees, if required. 5. Town Law 4267-b(3)(b)(5). The difficulty has been self-created. The applicant purchased the parcel after the Zoning Code was in effect and it is presumed that the applicant had actual or constructive knowledge of the limitations on the use of the parcel under the Zoning Code in effect prior to or at the time of purchase. Page 3,February 15,2024 97874,Flanagan SCTM No. I000-77-1-6 6. Town Law 4267-b. Grant of the relief is the minimum action necessary and adequate to enable the applicant to enjoy the benefit of a single-family dwelling elevated to FEMA requirements while preserving and protecting the character of the neighborhood and the health, safety and welfare of the community. RESOLUTION OF THE BOARD: In considering all of the above factors and applying the balancing test under New York Town Law 267-13,motion was offered by Member Acampora, seconded by Member Lehnert,and duly carried,to GRANT the variances as applied for, and shown on the Site Plan and Architectural Plans(Sheets S-1, S-2, Al2 thru A-6)prepared by Mark Kevin Schwartz,Architect, dated January 22,2024. SUBJECT TO THE FOLLOWING CONDITION: I. The applicant shall install an Innovative Advanced septic system (I/A) on the subject property approved by the Suffolk County Department of Health Services This approval shall not be deemed effective until the required conditions have been met.At the discretion of the Board of Appeals,failure to comply with the above conditions may render this decision null and void That the above conditions be written into the Building Inspector's Certificate of Occupancy, when issued The Board reserves the right to substitute a similar design that is de minimis in nature for an alteration that does not increase the degree of nonconformity. IMPORTANT LIMITS ON THE APPROVALS) GRANTED HEREIN Please Read Carefully Any deviation from the survey,site plan and/or architectural drawings cited in this decision, or work exceeding the scope of the relief granted herein, will result in delays and/or a possible denial by the Building Department of a building permit and/or the issuance of a Stop Work Order, and may require a new application and public hearing before the Zoning Board of Appeals. Any deviation from the variances) granted herein as shown on the architectural drawings, site plan and/or survey cited above,such as alterations,extensions,demolitions, or demolitions exceeding the scope of the relief granted herein, are not authorized under this application when involving nonconformides under the zoning code. This action does not authorize or condone any current or future use, setback or other feature of tite subject property that may violate the Zoning Code, other than such uses, setbacks and other features as are expressly addressed in this action. TIME LIMITS ON THIS APPROVAL: Pursuant to Chapter 280-146(B) of the Code of the Town of Southold any variance granted by the Board of Appeals shall become null and void where a Certificate of Occupancy has not been procured, and/or a subdivision map has not been filed with the Suffolk County Clerk,within three(3)years from the date such variance was Page 4,February 15,2024 #7874,Flanagan SCTM No. 1000-77-1-6 granted. The Board of Appeals may, upon written request prior to the date of expiration,grant an extension not to exceed three (3) consecutive one (1) year terms. IT IS THE PROPERTY OWNER'S RESPONSIBILITY TO ENSURE COMPLIANCE WITH THE CODE REQUIRED TIME FRAME DESCRIBED HEREIN.Failure to comply in a timely manner may result in the denial by the Building Department of a Certificate of Occupancy, nullify the approved variance relief, and require a new variance application with public hearing before the Board of Appeals Vote of the Board: Ayes: Members Weisman(Chairperson), Dantes, Planamento,Acampora, and Lehnert. (5-0) 4eshe s Weisman, ehairperson Approved for filing, 114 /2024 l Fo�,�co John M. Bredemeyer III, President 3 d� Town Hall Annex Michael J.Domino,Vice-President 54375 Main Road ti P.O. Box 1179 James F. King, Trustee D Southold,New York 11971-0959 Dave Bergen,Trustee y'1%1 0�` Telephone(631) 765-1892 Charles J. Sanders, Trustee Fax(631)765-6641 BOARD OF TOWN TRUSTEES ��7 TOWN OF SOUTHOLD ® EC E 0 V E Office Use Only LIAR 2 8 2024 Coastal Erosion Permit Application Wetland Permit Application Administrative Permit _Amendment/Transfer/Extension Southold Town Received Application: Board of Trustees 7Received Fee: $ � Completed Application S1 Offr Incomplete _SEQRA Classification: Type I Type II Unlisted _Coordination: (date sent) YLWRP Consistency Assessment Form "-CAC Referral Sent: 5/Z1,41- `/Date of Inspection: (o JJ4K _Receipt of CAC Report: _Lead Agency Determination: _Technical Review: - ✓Public Hearing Held: (a (Z 311 Resolution: Name of Applicant Brian and Laura Flanagan 55 Saint Andrews Drive Address Huntington,NY 11743 Phone Number: 51 589-0725 Suffolk County Tax Map Number: 1000 - 77- 1 -6 Property Location: 980 Oak Avenue, Southold (property is located on west side of Oak Avenue,60'north of Hickory Avenue)) (provide LILCO Pole #, distance to cross streets, and location) AGENT: En-Consultants (If applicable) Address: 1319 North Sea Road, Southampton,NY 11968 Phone:631-283-6360 C'� S� 5131��y I Board of Trustees ApplicE bri GENERAL DATA Land Area(in square feet): 9,800 sf Area Zoning: R-40 Previous use of property: Residential,one-story,single-family dwelling Intended use of property: Same,with renovated dwelling at FEMA-compliant elevation Covenants and Restrictions: X Yes No If"Yes", please provide copy.Liber 13070 Page 366 recorded September 19, 2020'(copy provided) Will this project require a Building Permit as per Town Code? X yes No If"Yes", be advised this application will be reviewed by the Building Dept. prior to a Board of Trustee review and Elevation Plans will be required. Does this project require a variance from the Zoning Board of Appeals X Yes No If"Yes",please provide copy of decision. Will this project require any demolition as per Town Code or as determined by Building Dept. X Yes No Does the structure(s)on property have a valid Certificate of Occupancy X Yes No Prior permits/approvals for site improvements: Agency Date Southold Wetlands#5692(bulkhead) 1-22-03,transferred 9-13-23 8-19-15;extended 8-16-17;transferred Southold Wetlands#8664(dwelling) 10-18-17 Southold Wetlands#9376(dock) 12-12-18;transferred 9-13-23 Southold Wetlands#9642(dwelling) 2-12-20;amended 3-22-21&extended 11-17-21 No prior permits/approvals for site improvements. Has any permit/approval ever been revoked or suspended by a governmental agency? X No Yes If yes, provide explanation: Project Description (use attachments if necessary): Demolish(per Town code definition)and reconstruct(in-place and raised approximately 2 feet higher to FEMA-compliant elevation) existing 950 sf, 1-sty dwelling,with new 50 sf front porch,392 sf attached waterside deck,and associated steps;install stonnwater drainage system;and install new UA sanitary system in place of existing septic system,more than 100 feet from wetlands,all as depicted on the site plan prepared by Sherman Engineering&Consulting P.A., last dated March 20,2024. lard of Trustees Applicatic WETLAND/TRUSTEE LANDS APPLICATION DATA Purpose of the proposed operations: To replace an aging dwelling and conventional septic system with a new/renovated,FEMA-compliant dwelling and new I/A sanitary system. Area of wetlands on lot: 0 square feet Percent coverage of lot: 0 °% Closest distance between nearest existing structure and upland edge of wetlands: 67.5 feet (dwelling) Closest distance between nearest proposed structure and upland edge of wetlands: 63.5 feet (deck) Does the project involve excavation or filling? No X Yes (installation of new foundation;and drainage and sanitary If yes, how much material will be excavated? TBD cubic yards systems) How much material will be filled? N/A cubic yards Depth of which material will be removed or deposited: +/-4 feet Proposed slope throughout the area of operations: Manner in which material will be removed or deposited: Standard construction practices. Statement of the effect, if any, on the wetlands and tidal waters of the town that may result by reason of such proposed operations (use attachments if appropriate): The site is presently characterized by a 1-sty single family dwelling,which is to be demolished(pursuant to the Town code definition),reconstructed in-place,and raised approximately 2 feet to a FEMA-compliant elevation,with a new porch and deck.The existing dwelling was previously permitted to be replaced with a larger 2-sty dwelling(1,384 sf vs. 950 sf),greater Town-defined lot coverage(19%vs. 14.2%),and increased grades achieved with placement of fill and retaining walls(see Wetlands Permit No. 9642).In contrast,the current proposal maintains a 1-sty dwelling in the same footprint with a similarly sized deck,and requires no imported fill or retaining walls.A zoning variance was issued to maintain the existing side yard setback,based in part on the Board of Trustees'pre-application recommendation that the current dwelling location be maintained.To mitigate potential project impacts and in fact improve the environmental condition of the property,a stormwater drainage system will be installed to collect and recharge roof runoff;a new I/A sanitary system located more than 100 feet from wetlands will be installed in place of an existing conventional septic system;and the existing,covenanted 20-foot wide non-turf buffer adjacent to the bulkhead will be maintained.Therefore, the proposed project design and its incorporated mitigation measures will protect groundwater quality and supply and will not adversely impact the quality or function of the surrounding surface waters of Goose Creek or associated tidal wetland ecosystem. 617.20 Appendix B Short Environmental Assessment Form Instructions for Completing Part I-Project Information.The applicant or project sponsor is responsible for the completion of Part 1.Responses become part of the application for approval or funding,are subject to public review,and may be subject to further verification. Complete Part I based on information currently available. If additional research or investigation would be needed to fully respond to any item,please answer as thoroughly as possible based on current information. Complete all items in Part 1.You may also provide any additional information which you believe will be needed by or useful to the lead agency;attach additional pages as necessary to supplement any item. Part I-Project and Sponsor Information Name of Action or Project: Flanagan Residence Project Location(describe,and attach a location map): 980 Oak Avenue, Southold, Suffolk County; SCTM#1000-77-1-6,property is located on west side of Oak Avenue,60' north of Hickory Avenue,refer to provided maps. Brief Description of Proposed Action: Demolish(per Town code definition)and reconstruct(in-place and raised approximately 2 feet higher to FEMA-compliant elevation)existing 950 sf, 1-sty dwelling,with new 50 sf front porch,392 sf attached waterside deck, and associated steps;install stormwater drainage system;and install new I/A sanitary system in place of existing septic system,more than 100 feet from wetlands,all as depicted on the site plan prepared by Sherman Engineering& Consulting P.A.,last dated March 20,2024. Name of Applicant or Sponsor: Telephone: 516-589-0725 Brian&Laura Flanagan E-Mail: bflano@aol.com Address: 55 Saint Andrews Drive City/PO: State: Zip Code: Huntington NY 11743 1.Does the proposed action only involve the legislative adoption of a plan, local law,ordinance, NO YES administrative rule, or regulation? If Yes,attach a narrative description of the intent of the proposed action and the environmental resources that may be affected in the municipality and proceed to Part 2.If no, continue to question 2. X 2. Does the proposed action require a permit,approval or funding from any other governmental Agency? NO YES If Yes, list agency(s)name and permit or approval: Suffolk County.Department of Health Services X 3.a.Total acreage of the site of the proposed action? 9,800 sf b.Total acreage to be physically disturbed? <9,000 sf c.Total acreage(project site and any contiguous properties)owned or controlled by the applicant or project sponsor? 9,800 sf 4. Check all land uses that occur on,adjoining and near the proposed action. ❑ Urban ❑Rural(non-agriculture) ❑Industrial ❑Commercial ®Residential(suburban) ❑Forest ❑Agriculture N Aquatic ❑ Other(specify): ❑Parkland Page 1 of 4 5. Is the proposed action, NO YES N/A a.A permitted use under the zoning regulations? X b. Consistent with the adopted comprehensive plan? X 6. Is the proposed action consistent with the predominant character of the existing built or natural NO YES landscape? X 7. Is the site of the proposed action located in,or does it adjoin, a state listed Critical Environmental Area? NO YES If Yes,identify: Name:Goose Creek,Peconic Bay&Environs,Reason:Significant coastal fish&wildlife habitat, Protect public helath,water,vegetation&scenic beauty,Agency:Southold,Suffolk County,Date:3-9-90,7-12-88 X 8. a. Will the proposed action result in a substantial increase in traffic above present levels? NO YES X b.Are public transportation service(s)available at or near the site of the proposed action? X c.Are any pedestrian accommodations or bicycle routes available on or near site of the proposed action? X 9.Does the proposed action meet or exceed the state energy code requirements? NO YES If the proposed action will exceed requirements,describe design features and technologies: X 10. Will the proposed action connect to an existing public/private water supply? NO YES If No, describe method for providing potable water: X 11. Will the proposed action connect to existing wastewater utilities? NO YES If No,describe method for providing wastewater treatment: A new,upgraded on-site sanitary X system is proposed. 12.a.Does the site contain a structure that is listed on either the State or National Register of Historic NO YES Places? b.Is the proposed action located in an archeological sensitive area? X X 13.a.Does any portion of the site of the proposed action,or lands adjoining the proposed action, contain NO YES wetlands or other waterbodies regulated by a federal, state or local agency? X b.Would the proposed action physically alter,or encroach into,any existing wetland or waterbody? X If Yes, identify the wetland or waterbody and extent of alterations in square feet or acres: 14. Identify the typical habitat types that occur on,or are likely to be found on the project site. Check all that apply. ® Shoreline ❑Forest ❑Agricultural/grasslands ❑Early mid-successional ® Wetland ❑Urban ® Suburban 15. Does the site of the proposed action contain any species of animal,or associated habitats,listed NO YES by the State or Federal government as threatened or endangered? X 16. Is the project site located in the 100 year flood plain? NO YES X 17. Will the proposed action create storm water discharge,either from point or non-point sources? YES If Yes, a. Will storm water discharges flow to adjacent properties? ❑NO❑YES b. Will storm water discharges be directed to established conveyance systems(runoff and storm drains)? If Yes,briefly describe: ❑NO❑YES Page 2 of 4 18.Does the proposed action include construction or other activities that result in the impoundment of NO YES water or other liquids(e.g.retention pond,waste lagoon,dam)? If Yes,explain purpose and size: X 19.Has the site of the proposed action or an adjoining property been the location of an active or closed NO YES solid waste management facility? If Yes,describe: X 20.Has the site of the proposed action or an adjoining property been the subject of remediation(ongoing or NO YES completed)for hazardous waste? If Yes,describe: X I AFFIRM THAT THE INFORMATION PROVIDED ABOVE IS TRUE AND ACCURATE TO THE BEST OF MY KNOWLEDGE Applicant/sponsor name: Arrmarm,Coastal Mgmt. Specialist Date: March 27,2024 Signature: Part 2-Impact Assessment.The Lead Agency is responsible for the completion of Part 2.Answer all of the following questions in Part 2 using the information contained in Part I and other materials submitted by the project sponsor or otherwise available to the reviewer. When answering the questions the reviewer should be guided by the concept"Have my responses been reasonable considering the scale and context of the proposed action?" No,or Moderate small to large impact impact may may occur occur 1. Will the proposed action create a material conflict with an adopted land use plan or zoning regulations? 2. Will the proposed action result in a change in the use or intensity of use of land? 3. Will the proposed action impair the character or quality of the existing community? 4. Will the proposed action have an impact on the environmental characteristics that caused the establishment of a Critical Environmental Area(CEA)? 5. Will the proposed action result in an adverse change in the existing level of traffic or affect existing infrastructure for mass transit,biking or walkway? 6. Will the proposed action cause an increase in the use of energy and it fails to incorporate reasonably available energy conservation or renewable energy opportunities? 7. Will the proposed action impact existing: a.public/private water supplies? b.public/private wastewater treatment utilities? 8. Will the proposed,action impair the character or quality of important historic,archaeological, architectural or aesthetic resources? 9. Will the proposed action result in an adverse change to natural resources(e.g., wetlands, waterbodies,groundwater,air quality, flora and fauna)? Page 3 of 4 I , No,or Moderate small to large impact impact may may occur 10. Will the proposed action result in an increase in the potential for erosion,flooding or drainage problems? 11. Will the proposed action create a hazard to environmental resources or human health? Part 3-Determination of significance.The Lead Agency is responsible for the completion of Part 3.For every question in Part 2 that was answered"moderate to large impact may occur",or if there is a need to explain why a particular element of the proposed action may or will not result in a significant adverse environmental impact,please complete Part I Part 3 should, in sufficient detail,identify the impact,including any measures or design elements that have been included by the project sponsor to avoid or reduce impacts. Part 3 should also explain how the lead agency determined that the impact may or will not be significant. Each potential impact should be assessed considering its setting,probability of occurring, duration,irreversibility,geographic scope and magnitude.Also consider the potential for short-term, long-term and cumulative impacts. ❑ Check this box if you have determined,based on the information and analysis above,and any supporting documentation, that the proposed action may result in one or more potentially large or significant adverse impacts and an environmental impact statement is required. ❑ Check this box if you have determined,based on the information and analysis above,and any supporting documentation, that the proposed action will not result in any significant adverse environmental impacts. Name of Lead Agency Date Print or Type Name of Responsible Officer in Lead Agency Title of Responsible Officer Signature of Responsible Officer in Lead Agency Signature of Preparer(if different from Responsible Officer) Page 4 of 4 ao � Town of Southold Erosion, Sedimentation & Storm-Water Run-off ASSESSMENT FORM PROPERTY LOCATION: S.C.T.M.#: THE FOLLOWING ACTIONS MAY REQUIRE THE SUBMISSION OF A Qf 1000 77 1 6 STORM-WATER,GRADING,DRAINAGE AMP EROSION CONTROL PLAN rII s rt IEF Section Block Lot CERTIFIED BY A DESIGN PROFESSIONAL IN THE STATE OF NEW YORK. SCOPE OF WORK - PROPOSED CONSTRUCTION ITEM#/WORK ASSESSMENT Yes No a.What is the Total Area of the Project Parcels? 1 Will this Project Retain All Storm-Water Run-Off (include Total Area of all Parcels located within 9,800 sf Generated by a Two(2")Inch Rainfall on Site? Elthe Scope of work for Proposed Construction) (S.F./Acres)) (This item will include all run-off created by site b,What is the Total Area of Land Clearing clearing and/or construction activities as well as all and/or Ground Disturbance for the proposed <9,000 sf Site improvements and the permanent creation of construction activity? (S.F./Acres) impervious surfaces.) 2 Does the Site Plan and Survey Show All Proposed ❑ PROVIDE BRIEF PROJECT DESCRIPTION(Provide Additional Pages as Needed)) Drainage structures Indicating Size&Location?This item shall include all proposed Grade Changes and Demolish(per Town code definition)and reconstruct(in-place Slopes Controlling Surface Water Flow, and raised approximately 2 feet higher to FEMA-compliant 3 Does the Site Plan and/or Survey describe the erosion elevation)existing 950 sf, 1-sty dwelling,with new 50 sf front and sediment control practices that will be used to XF porch,392 sf attached waterside deck,and associated steps; control site erosion and storm water discharger.This install stormwater drainage system;and install new A sanitary Item must be maintained throughout the Entire system in place of existing septic system,more than 100 feet Construction Period. from wetlands,all as depicted on the site plan prepared by 4 Will this Project Require any Land Fillin ,Grading or ❑ Excavation where(here is a change to a Natura Sherman Engineering&Consulting P.A.,last dated March 20, Existing Grade involving more than 200 Cubic Yards 2024. of Material within any Parcel? 5 Will this Application Require Land Disturbing Activities Encompassing an Area in Excess of Five Thousand (5,000 S.F.)Square Feet of Ground Surface? 6 Is there a Natural Water Course Running through the Site?Is this Project within the Trustees jurisdiction General DEC SWPPP Requirements: or within One Hundred(100')feet of a Wetland or Submission of a SWPPP is required for all Construction activities involving soil Beach? disturbances of one(1)or more acres:including disturbances of less than one acre that 7 Will there be Site preparation on Existing Grade Slopes Elare part of a larger common plan that will ultimately disturb one or more acres of lands; which Exceed Fifteen(15)feet of Vertical Rise to Including Construction activities involving soil disturbances of less than one(1)acre where One Hundred(100')of Horizontal Distance? the DEC has determined that a SPDES permit is required for storm water discharges, p fSWPPP's shall meet the Minimum Requirements of the SPDES General Permit O Will Driveways,Parking Areas or other impervious for Storm Water Discharges from Construction activity-Permit No.GP-0-10-001.) Surfaces be Sloped to Direct Storm-Water Run-Off ❑ X 1.The SWPPP shall be prepared prior to the submittal of the NOI. The NOI shall be into and/or in the direction of a Town right-of-way? submitted to the Department prior to the commencement of construction activity. 2.The SWPPP shall describe the erosion and sediment control practices and where 9 Will this Project Require the Placement of Material, ❑ required,post-construction storm water management practices that will be used and/or Removal of Vegetation and/or the Construction of any constructed to reduce the pollutants in storm water discharges and to assure Item Within the Town Right-of-Way or Road Shoulder compliance with the terms and conditions of this permit. In addition,the SWPPP shall identify potential sources of pollution which may reasonably be expected to affect the Area?(This item will NOT include the installation of Driveway Aprons.) quality of storm water discharges. NOTE:If Any Answer to Questions One through Nine is Answered with a Check Mark 3.All SW PPPs that require the post-construction storm water management practice in a Box and the construction site disturbance is between 5,000 S.F.&1 Acre in area, component shall be prepared by a qualified Design Professional Licensed in New York a Storm-Water,Grading,Drainage&Erosion Control Plan is Required by the Town of that is knowledgeable in the principles and practices of Storm Water Management. Southold and Must be Submitted for Review Prior to Issuance of Any Building Permit. g P P P g (NOTE: A Check Mark(X)and/or Answer for each Question is R aired for a Completed Application). STATE OF NEW YORK,COUNTY OF Suffolk SS ---------------- That I, Robert E.Herrmann being duty sworn,deposes and says that he/she is the applicant for Permit, (Name of individual signing Document) And that he/she is the Agent__f_or__Own__e_r____ _______ ----------------------------------------------------------------------------------------------------- (Owner,Contractor,Agent,Corporate Officer,etc. Owner and/or representative of the Owner or Owners,and is duly authorized to perform or have performed the said work and to make and file this application;that all statements contained in this application are true toZthesis knowledge and belief;and that the work will be performed.in the manners set forth in the application filed herewith. Sworn to before me this; ------ 27th -da of March ---------------- -2024-- Notary Public " ---------- - -KIM H. STEPHEfApplicant) FORM - 06 10 Notary Public-State of New York No.01 ST5015931 Qualified in Suffolk County My Commission Expires August 02,20-2-5 UOMUDNur II CHAROonunv g ° D j '' - V O 1 CT ORi __ Sf• 'POR _ xx .r rCq 2 ° o Park pe '� I OF DR O° CR i pd WSY V I . LO G D I OLD^ ENNECOTt I O O - I p0\O�• MOCKINGBIRD o e Camp Ouimpe Y I wll1ow ar [Metho(list) 'eld �F l N A V ne °O /� Je nings Pt ' v_ r �, ^•.+ Ctf ROC POINT � o F t?t C 4$ I � __ ° aSwP r° Hfypndmm, oe°a o°F � Q•v�•.�.�°a° }� Southold o o° ryy Pone? as ° St sIEDON D IA -"— .ta• o I SoutholdA�e6%I' Founders Ede HS ' s ROM ° �( Landing '� a� Q� NE a � j Harper Pt I r, iY wa y 1 �`•`' �Qom. '; I JOCKEY CREEK DR _�\'�L / _i I °• �• Aw CemQ LA ��' COR y5 eo o 'R ro SoptholdYC i C ¢Da N.P So ry Custer, 0 9 ° g tdian Mud um Institute cLEARVIEw ' - I RA o ! _ nvw 3 SITS C ACCSSS via OAK AVM,wDpO "�H60N Dq w` ,Paradise I FD / -� ';�..._�: �' ANCyo DR O° c Sy�R i"Point ' VV i pQO G005 5IAN -- -- GtENN 17 �\��SK A n¢ RD Q O LAKE'DR 0 F.LENN j�L^tcy(i•:N o�..., '`,;... / ' � �1 I o Q� 0 GREAT HOG "� RIGGER LAE W �GeOVE tri o F<c i Rv� NECK � 1 ,S '• O W O C Hew su Mirk a�/ G i 5 BAYVIEVV 5 c C �r m p l o v T �gm's RD i 5 ¢y¢o¢ Ew EDS c, i r 0 go Ro f o 1 a 1 �[Suffolk Counb4 Hags+rom Map 44 meson RD�,9�iy 9G APE H 15 I'12000' 1 Park — a� ..�fR yLY�Py Sf '9r,'ti �t-J) $ s• r ¢ `.v,� `., I L ¢ w Cedar Beagh C DAR OARwouu f¢ �Coun Park � Cedar Beach •P..—' �•� ;` Point PL HU(_1 NECK - W` y _ W tJr'{Y I -� 4R..--- I 1 .�.f�•. 72'25.30• _.�/t3 '7q ,�''-�: ,:IY3 72"2i'00". - -4• ,•j• - '�0161S rye8p 52, ., ®Haptrmn Map Company.Inc Board of Trustees .Application' AUTHORIZATION. (Where the applicant is not the owner) Brian W. Flanagan owners of:the property identified as SCTM# 1000-_77-1-6. in-the town of Southold New York,hereby authorizes En-Consultants . :. to act as my agent.and.handle all .necessary work involved with the application process-for permit(s)from the Southold Town .Board of.Trustees.for.this property. • N/A. operty Owner's:Sig ature Property Owner's Signature Brian:W' Flanagan SWORN TO BEFORE ME THIS, DAY OF ;.20 0� _ Notary Public LAURIE TURNER NOTARY,PUBLIC'STATE.OF NEW YORK Registration No.01TU6362153 Qualified in Suffolk County Commission Expires July 24,2025 Board of Trustees Application' A . UTHORIZATION. -(Where the applicant is not the owner) I/We- Laura K. Flanagan owners of the property identified as S,CTM#:1000-177-1-6 in,the town of Southold New York, hereby authorizes En-Consultants to act as my agent.and handle all necessary work involved With the application process:for permit(s)from the Southold Town. Board of.Trustees for,this.property. N/A PropeK Owner's Signature . Property Owner's Signature Laura K. Flanagan. . SWORN TO BEFORE ME THIS_ DAYOF ; 20 Notary Public Fs uFaE JI='1�LFN �' E OF EW YORK TARUBLIC,STET. tration.No:O�TU6362153 'iv ierl in Sufro1KCo'9 2025l`_. ,on Cx! " . Y y ..•�� $oard::of-Trustees :Application AFFIDAVIT Brian W. Flanagan BEING DULY SWORN: - - - - . DEPOSES AND AFFIRMS THAT IS THE-APPLICANT•FOR"THE ABOVE 'DESCRIBED PERMIT(S)AND.THAT ALL STATEMENTS CONTAINED HEREIN. y ARE TRUE.TO THE BEST OF•HIS/HER KNOWLEDGE AND.BELIEF,.AND:THAT ' ALL WORK WILL BE DONE IN.THE MANNER SET-FORTH IN THIS APPLICATION 1 AND AS MAYBE APPROVED BY THE_SOUTHOLD TOWN BOARD OF TRUSTEES.- THE APPLICANT AGREES TO HOLD•THE TOWN OF SOUTHOLD AND THE .BOARD OF TRUSTEES HARMLESS AND FREE FROM ANY AND ALL DAMAGES � AND'CLAIMS•ARISING UNDER OR BY VIRTUE OF SAID PERMIT(S);IF GRANTED. •IN COMPLETING THIS APPLICATION,I HEREBY AUTHORIZE THE_ TRUSTEES;THEIR AGENT(S) OR REPRESENTATIVES,INCLUDING Tim : i. CONSERVATIONAADVISORY COUNCIL,TOENTER ONTO..MY PROPERTY TO INSPECT THE PREMISES IN.CONJUNCTION WITH.THIS APPLICATION')' - 'INCLUDING A FINAL INSPECTION. I FURTHER AUTHORIZE THE BOARD OF TRUSTEES TO ENTER ONTO'MY PROPERTY AND AS REQUIRED TO INSURE C.OMPLIANCE.WITH ANY CONDITION,OF.ANY.WETLAND OR.COASTAL:.. . EROSION PERMIT ISSUED BY THE BOARD OF TRUSTEES DURING THE TERM OF THE TERMIT. .. . . . . ... . . . . . .. .. .. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. N/A..,, Signature.of Property.Owner Signature of Property Owner . Brian.W. Flanagan SWORN TO BEFORE ME.THIS DAY.OF r 20 um- .. :. . . . . .Notary P blic 9ZOZ'tiZ rinf.. s�alcx3 uoiss!u4wo :. . . . . . . . . . . . . . . . .�(;unb0�Ilo�lnS u!pagi!enp ESbZ9£9f1160'�N uogehsi6al }R301.M3N d0 1d1S'�I 19f1d,Xjj- i0N j13N2�f11_.�I�dfldl ..,®1a. oard-:of Trustees Application AFFIDAVIT Laura K. Flana an g ..BEING DULY SWORN DEPOSES AND AFFIRMS THAT HE/SHE IS THE.APPLICANT-FOR THE ABOVE . DESCRIBED PERMIT(S)'AND.THAT:AILL STATEMENTS CONTAINED HEREIN. ARE TRUE.TO THE BEST OF HIS/HER KNOWLEDGE AND.BELIEF,.AND:THAT : ALL WORK WILL BE'DONE IN THE MANNER SET FORTH IN THIS APPLICATION' AND AS MAY BE APPROVED BYTHE SOUTHOLD TOWN BOARD OF TRUSTEES; y _ THE APPLICANT AGREES TO HOLD THE TOWN OF SOU.THOLD AND THE ..BOARD OF TRUSTEESMARMLESS AND FREE FROM ANY AND ALL DAMAGES AND CLAIMSARISING:UNDER OR,BY:VIRTUE,OF SAID•PERMIT(S);IV-' . GRANTED. IN COMPLETING THIS APPLICATION,I.HEREBY AUTHORIZE THE TRUSTEES,THEIR AGENTS) OR REPRESENTATIVES,.INCLUDING THE -CONSERVATIONADVISORY COUNCIL,TO ENTER ONTO:MY PROPERTY TO .. . ... . .. . ... . . . . . . . . . . . . . .. . . . . . . . . . . . INSPECT-THE PREMISES IN-CONJUNCTION WITH THIS APPLICATION' x INCLUDING.A FINAL,INSPECTION.. I FURTHER AUTHORIZE THE BOARD OF TRUSTEES TO ENTER ONTO MY PROPERTY AND AS REQUIRED.TO INSURE ' . .. COMPLIANCE.WITH ANY CONDITION.OF ANY WETLAND:OR COASTAL: EROSION PERMIT ISSUED BY THE BOARD OF TRUSTEES DURING THE TERM OF'THE.PERMIT. '. N/A:. $igna . Property Owner . Signature of Property.Owner 'Laura K. Flanagan SWORN TO-BEFORE ME.THIS :DAY OF ,:0.20 7-7.:Notary Publ LAURIE TURNER [NOTA,Ry PU'Lit STATE OF NEW YORK .. . ... .. . . . . . Registration.No:01 TU6362153 Qualified in Suffolk County n EVrires July:24,2025. issio -APPLICANT/AGENT/REPRESENTATIVE . TRANSACTIONAL DISCLOSURE FORM The Town of Southold's Code of Ethics prohibits•conflicts of interest on the part oftown officers and emolovees.The nurpose of :this form into provide information which can'alert,the town of possible conflicts of interest and allow it to take whatever action is necessary to avoid same.. YOUR NAME::Flanagan,;Brian W.- : . . . . . . . . (Last.name,first.name,.piddle initial,unless you are applying in the name of someone else orother entity,such as a company.If so,indicate-the other person's or company's name.) NAME OF APPLICATION: (Check-all-that apply.) Tax grievance Building Variance Trustee . . X Change of Zone Coastal Erosion Approval of plat: Mooring. Exemption from plat orofficial map Planning Other . (lf"Other,name the activity.) Do you personally Tor through your.company,spouse;sitiling;:parent;or child)have a:relatiooship with'any officer or employee. of the Town-of Southold? "Relationship"incWdes by blood;ntarriage,'or fius'A s interest:`Business interesf'means a business, including a-partnershipj,ii-which the town officer or employee has even.a-partial.ownership of(or employment-by).a corporation in which the town officer or employee.owns more than 5%ofthe shares.. � YES : . . . NO . . ' If you answered"YES",complete the balance of this form and date and sign where indicated. Name of person employed by the.Town of Southold . Title or position of that person Describe the relationship between yourself(the applicant/agent/representative)and the.town officer or employee.Either check., 1 the appropriate line A)through D)and/or describe in the space provided. The town officer or employee or his or her spouse,sibling, aren or child is check all'that a A)the owner of greater than S%of the shares of the cot poratc stock of the•applimt _n (when the applicant is a corporation); . . B)the legal or beneficial owner'of.any interest in a non-corporate entity.(when"the. applicant is not a corporation); C)an office dimctor partner,or employee of the applicant;or D)the actual applicant DESCRIPTION OF RELATIONSHIP p�yk� Submitted ibis / d o 20_( Signature . Print Name Brian W.Flanagan'' Forin TS 1 . LAURIE TUFcNER . N ARY PUBLIC,STATE OF NEW YORK Registration No.OITU6362153 Qualified in Suffolk County. Commission Expires July 24,2025 ti APPLICANUAGENUREPRESENTATIVE TRANSACTIONAL.DISCLOSURE FORM The Town of Southold's Code-of Ethics-prohibits conflicts'of interest on the nart of_town officers and emnlovees.The purpose of :this form is to provide information which can alert-the town of possible conflicts of interest and allow it to'-take whatever action is necessary to avoid same. YOUR NAME::Flanagan;Laura.K. . . . . . . . . ... (Last.name,first name,ipiddle initial;unlessyou are applyingirrthe name of someone else or other entity,such as a company.If so,indicate the other person'sor company.sname.) . NAME OF APPLICATION: (Check altthatapply.) Tax grievance Building Variance Trustee X - Change of Zone Coastal Erosion Approval ofplat.-. . Mooring Exemption from.plat or official map Planning Other . . (if"Other",name the activity.) Do-you personally'(or through your com an spouse:siblin arent or child have a Mationshi with ii officer or ere to ee P Y+ Po g,:P ) P Y. P Y of the Town'of Southold? "Relationship"includes by blood, 'marriage',or dusiness'inierest.`Business interest"means a business,. including a partnership,.in'which the town officer oremployce has•even a-partial.ownership of.(or employment by).a corporation in which the town officer or employee owns more than.S%of.the shares. YES.. . . . . . :- ,NO _ .. . . . If you answered"YES",complete the balance of this form and date and sign where indicated. Name of person employed by the Town of Southold Title or position of that person' Describe the relationship between yourself(the applicanttagent/representative)and the town officer or employee.Either check, r the appropriate line A).through D)and/or describe in the space provided. The.town officer or employee or his or her spouse,sibling;parent,or child is(check all that apply): nA)the owner of greater than'50/o of the shares of the corporatc.stock of the•applimt , (when the applicant is a corporation); B)the legal or beneficial owner of any interest in a non-corporate entity.(when-the. 2 applicant is not'a corporation);. C)an otFcer;director,partner,or employee of the applicant;or D)the actual.applicant. DESCRIPTION OF RELATIONSHIP . . . .. . . . . .. . . . .. Submitted th' day o,fe ` ZU�l Signature _ Print Name' Laura K.Flanagan . . .. . . . Form TS.1 LAURIE i IiRNEF2 NOTARY PUBLIC STATE®F NEW YORK . Registration No..09TU6362153• Qualified in Suffolk County Commission Expires. : July 24,2025 APPLICANT/OWNER TRANSACTIONAL DISCLOSURE FORM The Town of Southold's Code of Ethics prohibits conflicts of interest on the part of town officers and emplovees.The purpose of this form is to provide information which can alert the town of possible conflicts of interest and allow it to take whatever action is necessary to avoid same. YOUR NAME : Herrmann, Robert E. (Last name,first name,middle initial,unless you are applying in the name of someone else or other entity,such as a company.If so,indicate the other person's or company's name.) TYPE OF APPLICATION:(Check all that apply) Tag grievance Building Permit Variance Trustee Permit X X Change of Zone Coastal Erosion Approval of Plat Mooring Other(activity) Planning Do you personally(or through your company,spouse,sibling,parent,or child)have a relationship with any officer or employee of the Town of Southold?"Relationship"includes by blood,marriage,or business interest.`Business interest" means a business,including a partnership,in which the town officer or employee has even a partial ownership of(or employment by)a corporation in which the town officer or employee owns more than 5%of the shares. YES NO X If you answered"YES",complete the balance of this form and date and sign where indicated. Name of person employed by the Town of Southold Title or position of that person Describe the relationship between yourself(the applicant/agent/representative)and the town officer or employee.Either check the appropriate line A)through D)and/or describe in the space provided. The town officer or employee or his or her spouse,sibling,parent,or child is(check all that apply) A)the owner of greater that 5%of the shares of the corporate stock of the applicant(when the applicant is a corporation) B)the legal or beneficial owner of any interest in a non-corporate entity(when the applicant is not a corporation) Q an officer,director,partner,or employee of the applicant;or D)the actual applicant DESCRIPTION OF RELATIONSHIP Submitted this 27t Zay of M arch ,20 24 Signature Print Name Robert E. errm ann C NOTICE TO ADJACENT PROPERTY OWNER BOARD OF TRUSTEES, TOWN OF SOUTHOLD In the matter of applicant: Brian&Laura Flanagan S C T M#1000-77-1-6 YOU ARE HEREBY GIVEN NOTICE: 1. That it is the intention of the undersigned to request a Permit from the Board of Trustees to: Demolish(per Town code definition)and reconstruct(in-place and raised approximately 2 feet higher to FEMA-compliant elevation)existing 950 sf, 1-sty dwelling,with new 50 sf front porch,392 sf attached waterside deck,and associated steps;install stormwater drainage system;and install new I/A sanitary system in place of existing septic system,more than 100 feet from wetlands,all as depicted on the site plan prepared by Sherman Engineering&Consulting P.A.,last dated March 20,2024. 2. That the property which is the subject of Environmental Review is located adjacent to your property and is described as follows: 980 Oak Avenue, Southold 3. That the project which is subject to Environmental Review under Chapters 96,111 and/or 275 of the Town Code is open to public comment on: DATE: Wed,June 12,2024 @ 5:30 pm;Town Hall Meeting Room,53095 Main Rd,Southold You may contact the Trustees Office at 765-1892 or in writing. The above-referenced proposal is under review of the Board of Trustees of the Town of Southold and does not reference any other agency that might have to review same proposal. Brian&Laura Flanagan PROPERTY OWNERS NAME: 55 Saint Andrews Drive MAILING ADDRESS: Huntington,NY 11743 PHONE #: 516-589-0725 AGENT: En-Consultants MAILING ADDRESS: 1319 North Sea Road, Southampton,NY 11968 PHONE #: 631-283-6360 Enc: Copy of sketch or plan showing proposal for your convenience. " e00F OF MAILING OF NOTICE A:1-TACH CERTIFIED MAIL RECEIp'i'S Name: Address: SCTM#1000-77-1-5 2 Livery Lane Philip Mascia&Christina Hill-Mascia North Salem,NY 10560 SCTM#1000-77-1-7 P.O.Box 535 Daniel&Maria McGoey Southold,NY 11971 SCTM#1000-77-1-11 92 Lefferts Pl,Unit 2 Lance Soderstrom&Jill Barnhart Brooklyn,NY 11238 SCTM#1000-77-1-12 875 Deerfoot Path Joseph&Barbara West Cutchogue,NY 11935 STATE OF NEW YORK COUNTY OF SUFFOLK Robert E.Herrmann doing business at En-Consultants 1319 North Sea Road Southampton,NY 11968 , being duly sworn, deposes and says that on the 31st rya day of May ,20 24 , deponent mailed a true copy of the Notice set forth in the Board of Trustees Application, directed to each of the above named persons at the addresses set opposite their respective names; that the addresses set opposite the names of said persons are the address of said persons as shown on the current assessment roll of the Town of Southold; that said Notices were mailed at the United States Post Office at Southampton , that said Notices were Mailed to each of said persons by (certified)(ps mail. Robert E. errm Coastal Managment Specialist Sworn to before me this 31st day of May 2024 KIM H. STEPHENS Notary Public-State of New York No.01STS015931 Qualified in Suffolk County o tary Puvri6 My Commission Expires Aulust 02,20:I—v 'U.S..Po§tal Service".,- P CERTIFIE6 MAIIJ@ RECEIPT ost6l Service 'RECEIPT, D o mestic Mail Only CERTIFIED MAILT, M CO Domestic�Mail Only, Ln for delivery information,visit our Website Eit wt�w.usps.coma. M Ln Ln Off.W.M A.Trilm U.T.IMM WIM.U-1 I Certified Mail Feerir a. C3 C3 r-3 $ r C3 Certified Mail Fee M Extra Services&Fees(check box,add fee as TPP—ropriate),.?0 P M r-q ❑Return Receipt(hardcopy) $ Extra Services&Fees(check box,sea fee as awoioddta) ❑Return Receipt(electronic) $ MAY M Y .J S -ju P6 tffigrk,l r-q ❑Return Receipt(hardcopy) $ C3 El Certified Mall Restricted Delivery $ Here ❑Return Receipt(electronic) Postmark P— []Adult Signature Required $ C3 E]Certified Mail Restricted Delivery $ M [:]Adult Signature Restricted Delivery$ []Adult Signature Required $ MAY 3 1 Lj') Postage rU Ej Adult Signature Restricted Delivery$ Lri Postage C3 9 E3 $ Philip Mascia& 91 C3 Er Christina Hill-Mascia ----------------- Daniel &Maria McGoey CO ��l ------------------ Ln 2 Livry Lane Er I PO Box 535 --------------- CO [r C North Salem,NY 10560 Ln Southold,NY 11971 ------------------ Er - ---------------------- U Op ;I.S. Postal Servi U.S..,-Oostal Service'" CERTIFIED MAILO RECEIPT c3 CERTIFIEDWAIL@ RECEIPT- Domestic Mail Only Domestic Mail Only MM —----- Ln Ln For delivery information,visit our website at wwil�.U'Sps.6orn0l. Lrl E3 Lr) • (f C3 Certified Mall Fee Certified Mall Fee C3 C3 M Extra Services&Fees(check bogy add fee as Opp rn Extra Services&Fees(check box,& Return Receipt(hardcopy) $ vlel' ❑, Return Receipt(hardcopy) ❑Return Receipt(electronic) $ Postmark' Return Receipt(electronic) $ Vstmark E:3 ❑Certified Mall Restricted Delivery $ t ere C-3 0 Certified Mall Restricted Delivery $ Here []Adult Signature Required $ W $[:]Adult Signature Restricted Delivery []Adult Signature Required $ W E]Adult Signature Restricted Delivery$ U-) Postage it Lr) Postage C3 r-9 Total V, Total F C3 $ $ Sent: Lance Soderstrorn&Jill Barnhart C3 Sent I Joseph&Barbara West a- ----- ------------- Er ------------ iFj& 1:V 56ii6t CO Llre 92 Lefferts Pl,Unit 2 ------- Ln ------ 875 Deerfoot Path ------------ Brooklyn,NY 11238 Cutchogue,NY 11935 city, Ir Er fty-5 Glenn Goldsmith,President /'gvFFOtA, Town Hall Annex 1 O C r A.Nicholas Krupski,Vice President `��� OG��z 54375 Route 25 Eric Sepenoski % N # P.O. Box 1179 Liz Gillooly Southold,NY 11971 Elizabeth Peeples < `��p0� ��O.z�'�� Telephone(631)765-1892 Fax(631)765-6641 BOARD OF TOWN TRUSTEES TOWN OF SOUTHOLD BOARD OF TRUSTEES: TOWN OF SOUTHOLD --------------------------------------------------------------- In the Matter of the Application of BRIAN & LAURA FLANAGAN COUNTY OF SUFFOLK STATE OF NEW YORK AFFIDAVIT OF POSTING DO NOT COMPLETE THIS FORM UNTIL THE POSTING HAS REMAINED IN PLACE FOR AT LEAST SEVENDAYS PRIOR TO THE PUBLIC HEARING DATE- COMPLETE THIS FORM ON EIGHTH DAY OR LATER I, Robert E. Hernunn , residing at/dba En-Consultants 1319 NorthSea Road, Southmapton, NY 11968 being duly sworn, depose and say: That on the 4thday of June , 2024 , I personally posted the property known as 980.Oak Avenue, Southold; SLIM #1000-77-1-6 by placing the Board of Trustees official noticing poster where it can easily be seen from the street, and that I have checked to be sure the noticing poster has remained in place for a full seven days immediately preceding the date of the public hearing. Date of hearing noted thereon to be held Wednesday, June 12, 2024. Dated: (signature Sworn to before me this 12thday ofJune 20 24 KIM H. STEPHENS ,(1 Notary Public-State of New York No. 01 ST5015931 Notary bllc Qualified in Suffolk County . My Commission Expires August 02,20 �tl? ■ Complete items 1,2,and 3. TRecelvej ■ Print your name and address on the reverse Agent so that we can return the card to you. ❑Addressee ■ Attach this card to the back of the mailpiece, B. rinted Name) C. Date of Delivery or on the front if space permits. 1. Article Addressed to: D. Is delivery address different from item 1? ❑Yes If YES,enter delivery address below: ❑No Philip Mascia& Christina Hill-Mascia 3. Service Type ❑Priority Mail Express(D 2 hvey lane O Adult Signature ❑Registered MaiITM ❑Adult Signature Restricted Delivery ❑Registered Mail Restricted North Salem,NY 10560 21-0ertified Mail@ Delivery ❑Certified Mail Restricted Delivery ❑Signature ConfirmationTM ❑Collect on Delivery ❑Signature Confirmation "" in Delivery Restricted Delivery Restricted Delivery 9589 0710 5270 1300 0553 91 viail Rail Restricted Delivery over$500) PS Form 3311,July 2020 PSN 7530-02-000-9053 Domestic Return Receipt , NOTICE , OF HEARING. NOTICE IS HEREBY GIVEN that a Public Hearing will be held by the Southold Town Board of Trustees at the Town Hall, 53095 Main Road, Southold, New York, concerning this property. OWNER(S) OF RECORD: BRIAN & LAURA FLANAGAN SUBJECT OF PUBLIC HEARING: For a Wetland Permit to demolish (per Town Code Definition), reconstruct in-place and raised to FEMA compliant elevation the existing one-story dwelling with new front porch and new attached seaward side deck; install stormwater drainage system; and install a new I/A sanitary system. Located: 980 Oak Avenue, Southold, SCTM# 1000-77-1-6 TIME & DATE OF PUBLIC HEARING: Wednesday, June 12, 2024 — at or about 5:30P.M. If you have an interest in this project, you are invited to view the Town file(s) which are available online at www.southoldtownny.gov and/or in the Trustee Office until to the day of the hearing during normal business days between the hours of 8 a.m. and 4 p.m. BOARD OF TRUSTEES * TOWN OF SOUTHOLD * (631) 765-1892 Town of Southold t LWRP CONSISTENCY ASSESSMENT FORM A. INSTRUCTIONS l, All applicants for permits* including Town of Southold agencies, shall complete this CCAF for proposed actions that are subject to the Town of Southold Waterfront Consistency Review Law. This assessment is intended to supplement other information used by a Town of Southold agency in making a determination of consistency. *Except minor exempt actions including Building Permits and other ministerial permits not located within the Coastal Erosion Hazard Area. 2. Before answering the questions in Section C, the preparer of this form should review the exempt minor action list, policies and explanations of each policy contained in the Town of Southold Local Waterfront Revitalization Program. A proposed action will be evaluated as to its si nib beneficial and adverse effects upon the coastal area (which includes all of Southold Town). If any question in Section C on this form is answered "yes" or "no", then the proposed action will affect the achievement of the LWRP policy standards and conditions contained in the consistency review law. Thus, each answer must be explained in detail, listing both supporting and non- supporting facts. If an action cannot be certified as consistent with the LWRP policy standards and conditions, it shall not be undertaken. A copy of the LWRP is available in the following places: online at the Town of Southold's website (southoldtown.northfork.net), the Board of Trustees Office, the Planning Department, all local libraries and the Town Clerk's office. B. DESCRIPTION OF SITE AND PROPOSED ACTION SCTM# 77 - 1 6 PROJECT NAME Brian and Laura Flanagan The Application has been submitted to (check appropriate response): Town Board ❑ Planning Board❑ Building Dept. ❑ Board of Trustees Category of Town of Southold agency action (check appropriate response): (a) Action undertaken directly by Town agency (e.g. capital ❑ construction, planning activity, agency regulation, land transaction) (b) Financial assistance (e.g. grant, loan, subsidy) ❑ (c) Permit, approval, license, certification: Nature and extent of action: Demolish(per Town code definition)and reconstruct(in-place and raised approximately 2 feet higher to FEMA-compliant elevation) existing 950 sf, 1-sty dwelling,with new 50 sf front porch,392 sf attached waterside deck,and associated steps;install stormwater drainage system;and install new I/A sanitary system in place of existing septic system,more than 100 feet from wetlands,all as depicted on the site plan prepared by Sherman Engineering&Consulting P.A.,last dated March 20,2024. Location of action: 980 Oak Avenue, Southold Site acreage: 9,800 sf Present land use: Residential,single family dwelling Present zoning classification: R-40 2. If an application for the proposed action has been filed with the Town of Southold agency, the following information shall be provided: (a) Name of applicant: Brian and Laura Flanagan (b) Mailing address: 55 Saint Andrews Drive Huntington,NY 11743 (c) Telephone number: Area Code 516-589-0725 (d) Application number, if any: Will the action be directly undertaken, require funding, or approval by a state or federal agency? Yes ❑ No® If yes, which state or federal agency? C. Evaluate the project to the following policies by analyzing how the project will further support or not support the policies. Provide all proposed Best Management Practices that will further each policy. Incomplete answers will require that the form be returned for completion. DEVELOPED COAST POLICY Policy 1. Foster a pattern of development in the Town of Southold that enhances community character, preserves open space, makes efficient use of infrastructure, makes beneficial use of a coastal location, and minimizes adverse effects of development. See LWRP Section III - Policies; Page 2 for evaluation criteria. Yes 0 No ® Not Applicable Attach additional sheets if necessary Policy 2. Protect and preserve historic and archaeological resources of the Town of Southold. See LWRP Section III - Policies Pages 3 through 6 for evaluation criteria ❑ Yes ❑ No ® Not Applicable Attach additional sheets if necessary Policy 3. Enhance visual quality and protect scenic resources throughout the Town of Southold. See LWRP Section III - Policies Pages 6 through 7 for evaluation criteria ❑Yes ❑ No ® Not Applicable Attach additional sheets if necessary NATURAL COAST POLICIES Policy 4. Minimize loss of life, structures, and natural resources from flooding and erosion. See LWRP Section III - Policies Pages 8 through 16 for evaluation criteria ®Yes ❑ No ❑ Not Applicable The proposed/renovated dwelling will be raised approximately two feet in elevation to achieve FEMA compliance,thus making the dwelling and the surrounding developed environs better protected from potential flood and erosion damage. Attach additional sheets if necessary Policy 5. Protect and improve water quality and supply in the Town of Southold. See LWRP Section III - Policies Pages 16 through 21 for evaluation criteria ®Yes ❑ No ❑ Not Applicable The proposed dwelling will maintain the footprint of the existing dwelling and will be equipped with a new stormwater drainage system to collect and recharge roof runoff,and an upgraded I/A sanitary system in place of the existing conventional septic system,located outside Chapter 275 jurisdiction,more than 100 feet from wetlands and the surface waters of Goose Creek. And the existing, covenanted 20-ft wide non-turf buffer adajcent to the bulkhead will be maintained as a permanent sink and filter for potential upland contaminants before they can enter Goose Creek. Therefore,consistent with Policies 5 and 6,the proposed project and its incorporated mitigation measures will protect and improve groundwater quality and supply and will not adversely impact the quality or function of the surrounding surface waters of Goose Creek or associated tidal wetland ecosystem. Attach additional sheets if necessary Policy 6. Protect and restore the quality and function of the Town of Southold ecosystems including Significant Coastal Fish and Wildlife Habitats and wetlands. See LWRP Section III - Policies; Pages 22 through 32 for evaluation criteria. ®Yes ❑ No ❑ Not Applicable r t I The proposed dwelling will maintain the='_=s�rint of the existing dwelling and will be equil,Y;;;.with a new stormwater drainage system to collect and recharge roof runoff,and an upgraded I/A sanitary system in place of the existing conventional septic system,located outside Chapter 275 jurisdiction,more than 100 feet from wetlands and the surface waters of Goose Creek. And the existing, covenanted 20-ft wide non-turf buffer adajcent to the bulkhead will be maintained as a permanent sink and filter for potential upland contaminants before they can enter Goose Creek. Therefore,consistent with Policies 5 and 6,the proposed project and its incorporated mitigation measures will protect and improve groundwater quality and supply and will not adversely impact the quality or function of the surrounding surface waters of Goose Creek or associated tidal wetland ecosystem. Attach additional sheets if necessary Policy 7. Protect and improve air quality in the Town of Southold. See LWRP Section III — Policies Pages 32 through 34 for evaluation criteria. ❑ Yes ❑ No® Not Applicable Attach additional sheets if necessary Policy 8. Minimize environmental degradation in Town of Southold from solid waste and hazardous substances and wastes. See LWRP Section III - Policies; Pages 34 through 38 for evaluation criteria. ❑ Yes ❑ No ® Not Applicable PUBLIC COAST POLICIES Policy 9. Provide for public access to, and recreational use of, coastal waters, public lands, and public resources of the Town of Southold. See LWRP Section III - Policies; Pages 38 through 46 for evaluation criteria. ❑ Yes ❑ No® Not Applicable Attach additional sheets if necessary WORKING COAST POLICIES c Policy 10. Protect Southold's w.__.'r-de endent uses and promote siti,,-!J new water-dependent uses in suitable locations. See LWRP Section III - Policies; Pages 47 through 58 for evaluation criteria. ❑ Yes ❑ No ® Not Applicable Attach additional sheets if necessary Policy 11. Promote sustainable use of living marine resources in Long Island Sound, the Peconic Estuary and Town waters. See LWRP Section III - Policies; Pages 57 through 62 for evaluation criteria. ❑ Yes ❑ No® Not Applicable Attach additional sheets if necessary Policy 12. Protect agricultural lands in the Town of Southold. See LWRP Section III — Policies; Pages 62 through 65 for evaluation criteria. ElYes ElNo ® Not Applicable Attach additional sheets if necessary Policy 13. Promote appropriate use and development of energy and mineral resources. See LWRP Section III - Policies; Pages 65 through 68 for evaluation criteria. ❑ Yes ❑ No ® Not Applicable PREPARED BY TITLECoastal Management Specialist DATEMarch 27,2024 Robert E. n Amended on 811105 { !I - T EN-CONSULTANTS March 27,2024 Town of Southold Board of Trustees LIAR 2 8 2024 54375 Main Road Post Office Box 1179 Southold,New York 11971 Southold Town Board of Trustees Re: Brian&Laura Flanagan - 980 Oak Avenue, Southold SCTM#1000-77-1-6 Dear Board of Trustees: In regard to the above referenced property, enclosed are the following for the Board of Trustees review: 1. Four(4)Wetland Permit Applications including: a) Short Environmental Assessment Form; b) Authorization&Disclosure Forms; c) Site plan prepared by Sherman Engineering&Consulting P.A., last dated March 20,2024; d) Survey prepared by Nathan Taft Corwin III Land Surveyor, last dated August 3, 2016; and e) LWRP Consistency Assessment Forms. 2. One(1)set of site photographs. 3. One(1)copy of ZBA File#7874 Findings, Deliberations&Determination, date February 15, 2024. 4. One(1)copy of covenant recorded September 19,2020 as Liber 13070 Page 366. 5. Application fee of$1,250.00. I trust this information shall allow you to process our permit request. Should any additional information be required, please do not hesitate to contact our office. Sin cer Robert E� rrmann Coastal Management Specialist /khs Enc. 1319 North Sea Road Southampton,New York 11968 p 631.283.6360 f 631.283.6136 www.enconsultants.com environmental consulting