Loading...
HomeMy WebLinkAboutPBA-10/06/2003 WORK SESSION AGENDA SOUTHOLD TOWN PLANNING BOARD October 6, 2003 at 4:30 pm SITE PLANS Greenport Heights Main Road Greenporr, t'~ SCTM: 1000-45-4-3.1 Zone: B RE: I)Tiffs work session is a pre-submission conference for the concept proposed. Tiffs stte plan application is for a new 2,400 square foot retail building on a 1.521 acres parcel ia the B Zone(s) located in Grecnport. Requires a revised site plan see letter attached.. Saint Peters Church Mai~.Road Greenpo~t, NY SCTIg[: 1000-45-2-7.1 Zone: LB RE: t) New revised site plan and letter from Warren Sambach, see the attached letter. Amerata Hess Main Road Martituck, NY SCTM: 1000-122-3-10 Zone: MI RE:-i)New plan and correspondence received from Eugene DeNicola~ See attached information. CF Van Duzer CR48 Souttiold, NY 11971 SCTM: 1000-55-2-24.4 Zone: B RE: 1) Resolution for public meeting on 10/13/03. ( see attached) Albertson Marine, 37645 Main Road Southold, N.Y. SCTM: 1000-56-3-15 Zone: MII RE: 1) October 1, 2003 request from the ZBA Chairwoman for comments on the site plan. ( See attached memo~ Tiffs site plan is for a new 12,000 sq. ft. building with 6,500 sq. ft. of warehouse and 5,000 sq. ft. of showroom space on 1.089 acres parcel in the MI[ Zoners) located ar approximately 918' from Bay Home Road on the north side of Main Road iI~ Southold. WORK SESSION AGENDA Page two Orient Fire Deparrmem-Communication tower Ivlain Road Orient, NY 11957 SCTM: I000-18~5-13.8 Zone: R-40 RE: 1) October 1, 2003 request from the ZBA Chairwoman for commems on the site plan. ( See attached memo). Proposed 120' communication tower. LOT LINE APPLICATION Petrolino & Graseck 435 North Bayville Road ext & 1580 Cedar Drive Southold, NY 11971 SCTM# 1000-78-8-16.2 & 17.2 Zone: R-40 Representative: Thomas McCarthy RE: 1) Place on October 13, 2003 for sketcli plan approval of survey revised 9/25/03 and set the public hearing date for November meeting. SET OFF APPLICATIONS Mr. Mendoza Main Road Orient, NY 11957 SCTM: 15-2-15.1 Zone: R-80 Representation: Mr. Brace Andersen( Suffolk Enviromnental Consulting, Inc.) RE: 1) Setoff application may require a waiver from Moratorium. Total parcel 26:690 acres divided into Lot A 7.044 acres and Lot B 19.645 acres. Details a 25' ROW. Miscellaneous Church Lane Change of Zone bs 10/2/03