Loading...
HomeMy WebLinkAbout48598-Z S1IFFOLf. 0�0 CpG�azl- Town of Southold 1/11/2024 P.O.Box 1179 y x_ 53095 Main Rd Southold,New York 11971 CERTIFICATE OF OCCUPANCY No: 44859 Date: 1/11/2024 THIS CERTIFIES that the building SOLAR PANEL Location of Property: 505 Kayleighs Ct, East Marion SCTM#: 473889 Sec/Block/Lot: 31.4-16.9 Subdivision: Filed Map No. Lot No. conforms substantially to the Application for Building Permit heretofore filed in this office dated 10/14/2022 pursuant to which Building Permit No. 48598 dated 12/14/2022 was issued, and conforms to all of the requirements of the applicable provisions of the law. The occupancy for which this certificate is issued is: roof-mounted solar panels to existing single-family dwelling as applied for. The certificate is issued to McGrann,Karen of the aforesaid building. SUFFOLK COUNTY DEPARTMENT OF HEALTH APPROVAL ELECTRICAL CERTIFICATE NO. 48598 11/21/2023 PLUMBERS CERTIFICATION DATED uth rize 'gnature ��o�syF BUILDING DEPARTMENT TOWN CLERK'S OFFICE ''o • Vol SOUTHOLD, NY BUILDING PERMIT (THIS PERMIT MUST BE KEPT ON THE PREMISES WITH ONE SET OF APPROVED PLANS AND SPECIFICATIONS UNTIL FULL COMPLETION OF THE WORK AUTHORIZED) Permit#: 48598 Date: 12/14/2022 Permission is hereby granted to: McGrann, Karen 505 Kayleighs Ct East Marion, NY 11939 To: install roof-mounted solar panels to existing single-family dwelling as applied for. At premises located at: 505 Kayleighs Ct, East Marion SCTM # 473889 Sec/Block/Lot# 31.-4-16.9 Pursuant to application dated 10/14/2022 and approved by the Building Inspector. To expire on 6/14/2024. Fees: SOLAR PANELS $50.00 ELECTRIC $100.00 CO-ALTERATION TO DWELLING $50.00 Total: $200.00 Building Inspector of so�ryol � o Town Hall Annex Telephone(631)765-1802 54375 Main Road P.O.Box 1179 G Q Southold,NY 11971-0959 �p • �o Jamesh southoldtownny.gov BUILDING DEPARTMENT TOWN OF SOUTHOLD CERTIFICATE OF ELECTRICAL COMPLIANCE SITE LOCATION Issued To: Jeff & Karen McGrann Address: 505 Kayleighs Court city:East Marion st: New York zip: 11939 Building Permit#: 48598 Section: 31 Block: 4 Lot: 16.9 WAS EXAMINED AND FOUND TO BE IN COMPLIANCE WITH THE NATIONAL ELECTRIC CODE Contractor: NY Solar Solutions Electrician: Stephen Baader License No: ME-40151 SITE DETAILS Office Use Only Residential X Indoor X Basement Service Commerical Outdoor X 1st Floor Pool New X Renovation 2nd Floor Hot Tub Addition Survey Attic Garage INVENTORY Service 1 ph Heat Duplec Recpt Ceiling Fixtures Bath Exhaust Fan Service 3 ph Hot Water GFCI Recpt Wall Fixtures Smoke Detectors Main Panel 1 A/C Condenser Single Recpt Recessed Fixtures CO2 Detectors Sub Panel A/C Blower Range Recpt Ceiling Fan Combo Smoke/CO Transfer Switch UC Lights Dryer Recpt Emergency Strobe Heat Detectors Disconnect 2 Switches 4'LED Exit Fixtures 11 Sump Pump Other Equipment: 16.15 DCKW Roof Mounted Solar Energy System with 38 panels 38 LG Electronics {425}W Solar Moduels, 38 EnphaselQ8M 72-2-US Microinverters,1 IQ AC Combin Notes: Panel, 1 80amp disconnect, 1 100amp disconect SOLAR ENERGY SYSTEM Inspector Signature: V'W Date: November 21, 2023 P 9 505 kayleighs ct g �0 !�► k;5C ! OF 50UlyO �� 0, Kay - ' # TOWN OF SOUTHOLD BUILDING DEPT. courmN�' 631-765-1802 INSPECTION [ ] FOUNDATION 1ST [ ] ROUGH PLBG. [ ] FOUNDATION 2ND [ ] INSULATION/CAULKING [ ] FRAMING /STRAPPING [ ] FINAL [ ] FIREPLACE & CHIMNEY [ ] FIRE SAFETY INSPECTION [ ] .FIRE RESISTANT CONSTRUCTION [ ] FIRE RESISTANT PENETRATION [ ] ELECTRICAL (ROUGH) ELECTRICAL (FINAL) [ ] CODE VIOLATION / [ ] PRE C/O [ ] RENTAL REMARKS: /Q� DATE ` 6 a3 INSPECTOR j e �91FNPHASE y t I !l 4 t � 1 Fiber Glass M i -.r Y J r 1 -Aw-mmmwil� I�� • b .ILI 4 1 ago I - t ,jj L i� J � 1 � r •� ,r • .yr � f pip u {triii �'•� e JJaR y y� •• y 1 � •Krg�: i•ji E • 1 I t s 1 to - •tom r • A� 1 V V 4 a. s 1000 ti 0 `raw t aril .�..:�■wr-'� OlMet r � - � ;e ego s ti t a .r ti oil p :! IT r Mm jr 1p a � � ', � ± ►Hs ti k 14 fM ; 75 ,. r r a T w � Y :pie==aiYi: E_..gg::iMoiERBB �eeuesE6 'se;g:3eee ...e i I � 1 `` "IELD INSPECTION REPORT DATE COMMENTS -4� FOUNDATION (1ST) OQ y ------------------------------------ O C FOUNDATION (2ND) Vlo D ROUGH FRAMING& PLUMBING 1 1 � 1 INSULATION PER N.Y-. STATE ENERGY CODE 04. - FINAL I ADDITIONAL COMMENTS (Z O e r' � o z �y x d b y �� nt TOWN OF SOUTHOLD—BUILDING DEPARTMENT Town Hall Annex 54375 Main Road P. 0. Box 1179 Southold,NY 11971-0959 oy • c� Telephone(631) 765-1802 Fax (631) 765-9502 https://www.southoldtownny.izov Date Received APPLICATION FOR BUILDING PERMIT For Office Use Only D D� PERMIT NO. Building Inspector: p 0 Kq - OCT 1 4 2022 Applications and forms must be filled out in their entirety.Incomplete applications will not be accepted. Where the Applicant is not the owner,an � �� • Owner's Authorization form(Page 2)shall be completed. TOWDi OF SOUTHOLD Date:8/14/22 OWNER(S)OF PROPERTY: Name:Jeff McGrann scTM#1000-31-04-16.9 Project Address:505 Kayleighs Court East Marion, NY 11939 Phone#:631-903-7784 Email:jeffmc45@yahoo.com Mailing Address:505 Kayleighs Court East Marion, NY 11939 CONTACT PERSON: Name:Louis Boccio / New York Solar Solutions Mailing Address:PO„Box 1014 Miller Place, NY 11764 Phone#:516-446-0093 _ Email:lou@newyorksolarsolutions.com _ DESIGN PROFESSIONAL INFORMATION: Name: �J Mailing Address: Phone#: 3 r� Email CONTRACTOR INFORMATION: Name:New York Solar Solutions Mailing Address:PO Box 1014 Miller Place NY 11764 Phone#:516-446-0093 Email:.lou@newyorksolarsolutions com DESCRIPTION OF PROPOSED CONSTRUCTION ❑New Structure ❑Addition ❑Alteration ❑Repair ❑Demolition Estimated Cost of Project: (]Other roof mounted solar $52,500 Will the lot be re-graded? ❑Yes ®No Will excess fill be removed from premises? ❑Yes IgNo 1 PROPERTY INFORMATION Existing use of property:residential Intended use of property:residential Zone or use district in which premises is situated: Are there any covenants and restrictions with respect to this property? ❑Yes ®No IF YES, PROVIDE A COPY. 8 Check Box After Reading: The owner/contractor/design professional is responsible for all drainage and storm water issues as provided by Chapter 236 of the Town Code. APPLICATION IS HEREBY MADE to the Building Department for the issuance of a Building Permit pursuant to the Building Zone Ordinance of the Town of Southold,Suffolk,County,New York and other applicable Laws,Ordinances or Regulations,for the construction of buildings, additions,alterations or for removal or demolition as herein described.The applicant agrees to comply with all applicable laws,ordinances,building code, housing code and regulations and to admit authorized inspectors on premises and in building(s)for necessary inspections.False statements made herein.are punishable as a Class A misdemeanor pursuant to Section 210AS of the New York State Penal Law. Application Submitted By(print name):LOUIS Boccio BAuthorized Agent ❑Owner Signature of Applicant: Date: 8/14/22 STATE OF NEW YORK) SS: COUNTY OF ) LOUIS Boccio being duly sworn, deposes and says that(s)he is the applicant (Name of individual signing contract)above named, (S)he is the Contractor (Contractor,Agent,Corporate Officer,etc.) of said owner or owners, and is duly authorized to perform or have performed the said work and to make and file this application;that all statements contained in this application are true to the best of his/her knowledge and belief;and that the work will be performed in the manner set forth in the application file therewith. DEVIN A GRECO Sworn before me this NOTARY PUBLIC-STATE OF NEW YORK No.01 GR6434884 JLWdayof ,20 U.-j") Ougleflad'n Suffolk County IT My COMNOMgnll9*licss 06-13-2026 PROPERTY OWNER AUTHORIZATION (Where the applicant is not the owner) I, Jeff McGrann residing at 505 Kayleighs Court East Marion, NY 11939 do hereby authorize LOUIS Boccio to apply on my h to the Town of Southold Building Department for approval as described herein. mr/owner's Signature Date Jeff McGrann Print Owner's Name 2 �o�oS�g�p;f,�co BUILDING DEPARTMENT- Electrical Inspector ¢yam TOWN OF SOUTHOLD y = Town Hall Annex- 54375 Main Road - PO Box 1179 o Southold, New York 11971-0959 y app Telephone (631) 765-1802 - FAX (631) 765-9502 rogerr(aDsoutholdtownny gov— seand(@-southoldtownny.aov APPLICATION FOR ELECTRICAL INSPECTION ELECTRICIAN INFORMATION (All Information Required) Date: Revised 11/3/22 Company Name: New York Solar Solutions/Integrated Electrical Solutions Inc. Electrician's Name: Stephen Baader - License No.: ME-40151 Elec. email:lou@newyorksolarsolutions.com;steve@newyorksolarsolutions.co Elec. Phone No: 631-903-7784 [D I request an email copy of Certificate of Compliance Elec. Address.: PO Box 1014 Miller Place NY 11764 JOB SITE INFORMATION (All Information Required) Name: Jeff&Karen McGrann Address: 505 Kayleighs Ct.East Marion,NY Cross Street: Main Rd. Phone No.: 631-903-7784 Bldg.Permlt#: in process email: jeffmc45@yahoo.com Tax Map District: 1000 Section: 31 Block: 4 Lot: 16.9 BRIEF DESCRIPTION OF WORK, INCLUDE SQUARE FOOTAGE (Please Print Clearly): - Roof Mounted Solar System consisting of:(38)LG 425watt Solar Panels and(38)Enphase IQ8M microinverters. Total System Size=16.15kw DC Nameplate Rating. Square Footage: Circle All That Apply: Is job ready for inspection?: ❑ YES 0 NO ❑Rough In ❑ Final Do you need a Temp Certificate?: x YES ❑ NO Issued On Te nformation: (All information required) Service Size❑1 Ph❑3 Ph Size: 200 A # Meters 1 Old Meter# New Service❑Fire Reconnect[]Flood Reconnect❑Service ReconnectOUnderground❑Overhea Underground LateralsEl 1 2 H Frame M Pole Work done on Service? M Y x N A tionallnformation: 4— PAYMENT DUE WITH APPLICATION PERMIT # Address: Switches Outlets G FI's Surface Sconces H H's UC Lts Fans Fridge HW Exhaust Oven W/D Smokes DW Mini Carbon Micro Generator Combo Cooktop Transfer AC AH Hood Service Amps Have Used Special: Comments (,�W WM1KROD 4v�w"�"oq aLi m M RFtf1 M4i�➢6 LMY S��vD O�la owr m nae t�mtTmnae.�wimau�iru�,uo,nac.mu,w wno,w�oa.u."�ro+�amoas v��iamc wmrom[ur+uvawi 1 m muvm.sc ro mna.a.sv°�rv+mnom�lao,r o�iwuvc IS)o°�iwroi�0fv.mow(+a®ol"Ot w,�n(��aavau fv)v°�0wr'"ran,u�[m,we®civ ma uo m d muao Jm onoa� 400 Ontroder Avenue,WorftO04 N"York 11901 W.691.7772909 fox.691.117,01'" admbryolrrgerglroerlrlg�em Honed W.Young Lod SU veyor �' 7lnma�G.WolF+ert,Proleenlenol Cagiroer p I Douylo°E,Aoom�,i}ofeselonal FsghorX Robert 0.Tont,A-Wh..t § 1 t E Robert Stram°kl,Arehitect 6 1 Lo �2JI $ 1 1100 SITE 1 nN}ghPoint Zg4.37 SITE'"DATA x 2 1� N -,v s AREA=aa,say sa.F=r. •SUSDMSION- 6IPOINT W00D3'FILED IN THE OFFICE OF TIE g ;� O r CLERK OF 'HISUFFOLK COUNTY ON.ULY D,1997 AS FILE NO.10035. E rn G Lot 3 � eat a 5 o Z S�bdivisiowOods a �_- (n � o HighP°int "r''ac« .. . o�� � SURVEYDR'SGERTiFIGATION Y 3 �y,NpLT 1 KASPREPARE-PIEHEREBYcCRTIFYTOJEFF MOM RANN SURVEY � � rVTHAT (9 N �B .1�- e� ,N'• ! WA9 PREPARED 1N ACCORDANCE YUTH TIE CODE OFPRAGTIGf FOR LAND SURVEYS ADOPTED BY TFE NFYI YORK �+ p -" /'" q 311 O ASSOCIATION OP PROFESSIONAL LAID SLA FRIME I. ATI 0 %.:� 9,0 ,�� tt550 n HOWARD w YOUNG,KYS.T S,.NO.45543\ - O W N 5?8'09 40 W Lot 2 S�bdlvi t woods z SURVEY FOR a }�I "HighP°int o JEFF Mc6RANN 1 0 LOT 3"HIGHPOINT WOODS" at East Marlon,Town of Southold 1U N Suffolk Govnty,New York "o+ GERTIP m SURVEY p�� D County TOE CO XTEI 1000 s.,,m 91 am 04 t. 1016 D }��r�7J' 1 R PE1D SURVEY WIpLEfID PUG.90,7016 1 t { Z HAi'PREPARED NJfi.81,NJID U �� Rocord oP Revisions J J RECORD OF REVISIONS DATE FOINDATON LOGATON SURVEY 0:0 OCT 14 2022 MAINROAD 90 O D 5.0 100 NO.201a.0166 TOWN QF'SO T�'�OLD (N.Y.S. RTE. 25) Scale.r- 9,, m DWG.99091T30I8AI68JouMotbn_loc � OP I O=MOWlENT SET ■=MOMIIENT FOUND Q^STAKE SET •STAKE F owo --------------- o�gUFFO1,�coG BUILDING DEPARTMENT-Electrical Inspector C„ x TOWN OF SOUTHOLD O #_" Town Hall Annex-54375 Main Road-PO Box 1179-Southold, NY 11971-0959 y'�41 Telephone �•(63 802 Temporary Certificate # I c� J Date 2022 Customer Name e s t Electr clan Nkae Address 0 L �d s �. Ltx o Phone �43 4 e-mail ' e-mail serve"'"� c .C W a✓ o� lar VII c Phone License# - 01 Size A Phase 1 Ove head ndergrou d #of Meters i Remarks_ NNII _N1 #of Underground La als 1 New "H" Frame or Po H P Fire Reconnect Was work done on Service? Flood Reconnect Old Meter#F Service Reconnected Application for electrical service equipment is on file with the town of Southold.On the applicant's notification that this installation is complete,the town will conduct a premises inspection of the service equipment. This verification is vali4forlys Afrh,,_date above. , Authorized by ----------------------------------------------- BUILDING ---BUILDING DEPARTMENT-Electrical Inspector C, r TOWN OF SOUTHOLD oy �� Town Hall Annex-54375 Main Road-PO Box 1179-Southol;d, NY 11971-0959 1 � Telephone (631) 765-1802 Temporary Certifjcate-#----�-�_ Date 2022 Customer Name Q y Electrician Name Address,, / ,i Ph 31 03 P, e-mail S Gino - _o.v► -mail tt :e- Phone 631 cj03 •�� 'cense —_ ISI Size OO A Phase Ov �ed. der and #of Meters 1 Remarks #of Undr ground Laterals 2 New " Frame or P H P F' annect Was work one on Service? Y N' ood Reconnect Old Me r# Service Reconnected Application for el rical servic equipment is on file wit n of Southold.On the applicant's notification that this installation comple the to WMtAg5oddtra premises inspection of the service equipment. This verification i 90 s the date Authorized by ��g�FFpL��o BUILDING DEPARTMENT- Electrical Inspector ��O Gyr► TOWN OF SOUTHOLD o =` Town Hall Annex- 54375 Main Road - PO Box 1179 Southold, New York 11971-0959 Telephone (631) 765 802 - FAX (631) 765-9502 ro err southoldtownn ov _ seand southoldtownn ov APPLICATION FOR ELECTR AL INSPECTION ELECTRICIAN INFORMATION (All Information /grated ed) Date: 9/26/22 Company Name: New York Solar Solutions LLC/InElectrical Electrical Solutions Inc. Name: X12. i License No.: ME-40151 mail: jeffmc45@yahoo.com Phone No: 631-903-7784 2,(/request an email copy of Certificate of Compliance Address.: 505 Kayleighs Court East arion, NY 11939 JOB SITE INFORMATION (All Info ation Required) Name: Jeffrey McGrann Address: 505 Kayleighs CoA East Marion, NY 11939 Cross Street: Main Rd. Phone No.: 631-903-7784 Bldg.Permit#: email: jeffmc45@yahoo.com Tax Map District: 1000 Section: 31 Block: 4 Lot: 16.9 BRIEF DESCRIPTION O/nsisting ORK (Please Print Clearly) Roof Mounted Solar System c of: (38) LG 425watt Solar Panels and (38) Enphase IQ8M microinverters. Total System Size= 16.15k DC Nameplate Rating Check All That Apply- Is job ready for inspe tion?: ❑YES ❑✓ NO ❑Rough In ❑Final Do you need a Tem Certificate?: [7]YES ❑NO Issued On Temp Informatio : (All information required) Service Size 01 Ph ❑3 Ph Size: 200 A #Meters 1 Old Meter# ❑Mdv Rdcp ❑ RdcpHDd Qdbnnudbs ❑Trr+cdcf cit rr+c ❑Nudcgd' c # Underground aterals ❑1 ❑2 ❑H,Frame❑Pole Work done on Service? ❑Y [Z]NI Additional rmation: PAYMENT DUE WITH APPLICATION Electrical Inspection Form 2020.xlsx .---ss:s:::s_ �Z FO(�� ��A 1; BUILDING DEPARTMENT-Electrical Inspector ® y TOWN OF SOUTHOLD %;55 Town Hall Annex-54375 Main Road-PO Box 1179-Southol;d, NY 1197 959 Telephone (631) 765-1802 Temporary Certificate # S Date 1 2022 Customer Name Electrician Name 34GeM4'ro-viyi AddressS-6)q Phone ( Cjo3 --� 8 e-mail e-mail )e �nc4�PYalub. Wen Phone LicensCOI F Size UO A Phase_� Overhead Underground #of Meters 1 Remarks #of Underground Laterals 1 2New "H" Frame or Pole H P Fir Reconnect Was work done on Service? Y N ood Reconnect Old Meter# Service Reconnected Application for electrical service equipment is on file with the town of Sou old.On the applicant's notification that this installation is complete,the town will conduct a premises i pe ton of the service equipment. This verification i 90 s the date e. Authorized by I I 3` 2 2 G vV.a„�.� ed vk C, C 2`�C&Cam J C oma, V,eVjiolekso(a�r�Sobv\5 . ;^A 1%A 0 Horton, LisaMarie From: Lou Boccio <lou@newyorksolarsolutions.com> Sent: Tuesday, November 29, 2022 8:38 PM To: Horton, LisaMarie Subject: RE: McGrann -Temp#1345 Hi Lisa, Please Mail to: New York Solar Solutions Box 1014 Mi ✓ ""` Miller Place, NY 11764 Thanks, Lou F— NYSOLAR SOLUTIONSLouis Boccio President 1-516-446-0093 direct 1-888-350-SOLAR office www.newvorksolarsolutions.com From: Horton, LisaMarie<lisamarieh@southoldtownny.gov> Sent:Tuesday, November 29, 2022 12:13 PM To: Lou Boccio<lou@newyorksolarsolutions.com> Subject: RE: McGrann -Temp#1345 Hello Lou, When the Building Permit is approved and written it can be mailed or picked up. Please let me know what you would prefer. Thank you, Lisa From: Lou Boccio<lou@newyorksolarsolutions.com> Sent: Monday, November 28, 2022 11:42 AM To: Horton, LisaMarie<lisamarieh@southoldtownny.gov> Subject: RE: McGrann -Temp#1345 Hi Lisa, 1 - S FI:Of� A BUILDING DEPARTMENT-Electrical Inspector CIO TOWN OF SOUTHOLD ® b' Town Hall Annex-54375 Main Road-PO Box 1179-Southol;d, NY 11971-0959 4% Telephone (631) 765-1802 Temp ary Certificate # Date 2022 Customer Name e sJeU INNC a A VN Electrician Name Address C f is s �. &A « Y Phone 65 Ci b::!!�> . j+ { e-mail ' e-mail si�v2(u?"e WlG C t1/0 Old '1n� Q� Iu 0CGS lcar5zltt' 1 Phone (�a,i . d 3.�t-7 4} License# ©19 1 Size A Phase l Overhead derground #of Meters i Remarks #of Underground Laterals 1 2 Ne "H" Frame or Pole H P Fire Re nnect ; Was work done on Service? N Flood Rec nect Old Meter# Service Recon ected Application for electrical service equipment is on file with the town of Southold.On the applicant's no 'cation that th ' lation is complete,the town will conduct a premises inspection of the service equipmen This verification is valid for ys fr date above. Authorized by 11�3� SoQCSotur�I'twts . C0VV-N SA V e V\ie w0V, kSolu V,So � L+i c R ivl C � o-k,0o. c_o v\ � J � N YS I F New York State Insurance Fund PO Box 66699,Albany,NY 12206 1 nysif.com CERTIFICATE OF WORKERS' COMPENSATION INSURANCE 0 0 A A A A A A 262092321 ARTHUR J GALLAGHER RISK MANAGEMENT SERVICES INC 30 CENTURY HILL DR STE 200 ' LATHAM NY 12110 SCAN TO VALIDATE AND SUBSCRIBE POLICYHOLDER CERTIFICATE HOLDER NEW YORK SOLAR SOLUTIONS, LLC TOWN OF SOUTHOLD 25 HEATHER LANE 54375 MAIN ROAD MILLER PLACE NY 11764 SOUTHOLD NY 11971 POLICY NUMBER CERTIFICATE NUMBER POLICY PERIOD DATE 12472513-7 393965 05/02/2022 TO 05/02/2023 10/14/2022 THIS IS TO CERTIFY THAT THE POLICYHOLDER NAMED ABOVE IS INSURED WITH THE NEW YORK STATE INSURANCE FUND UNDER POLICY NO. 2472 513-7, COVERING THE ENTIRE OBLIGATION OF THIS POLICYHOLDER FOR WORKERS' COMPENSATION UNDER THE NEW YORK WORKERS' COMPENSATION LAW WITH RESPECT TO ALL OPERATIONS IN THE STATE OF NEW YORK, EXCEPT AS INDICATED BELOW, AND, WITH RESPECT TO OPERATIONS OUTSIDE OF NEW YORK, TO THE POLICYHOLDER'S REGULAR NEW YORK STATE EMPLOYEES ONLY: IF YOU WISH TO RECEIVE NOTIFICATIONS REGARDING SAID POLICY,INCLUDING ANY NOTIFICATION OF CANCELLATIONS, OR TO VALIDATE THIS CERTIFICATE,VISIT OUR WEBSITE AT HTTPS://WWW.NYSIF.COM/CERT/CERTVAL.ASP.THE NEW YORK STATE INSURANCE FUND IS NOT LIABLE IN THE EVENT OF FAILURE TO GIVE SUCH NOTIFICATIONS. THIS POLICY AFFORDS COVERAGE TO THE SOLE PROPRIETOR,PARTNERS AND/OR MEMBERS OF A LIMITED LIABILITY COMPANY. LOUIS BOCCIO OWNER THE POLICY INCLUDES A WAIVER OF SUBROGATION ENDORSEMENT UNDER WHICH NYSIF AGREES TO WAIVE ITS RIGHT OF SUBROGATION TO BRING AN ACTION AGAINST THE CERTIFICATE HOLDER TO RECOVER AMOUNTS WE PAID IN WORKERS'COMPENSATION AND/OR MEDICAL BENEFITS TO OR ON BEHALF OF AN EMPLOYEE OF OUR INSURED IN THE EVENT THAT, PRIOR TO THE DATE OF THE ACCIDENT, THE CERTIFICATE HOLDER HAS ENTERED INTO A WRITTEN CONTRACT WITH OUR INSURED THAT REQUIRES THAT SUCH RIGHT OF SUBROGATION BE WAIVED. THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS NOR INSURANCE COVERAGE UPON THE CERTIFICATE HOLDER. THIS CERTIFICATE DOES NOT AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICY. NEW YORK STAT SUR NCE FUND 4 �/ DI RECTOR,INSU RANCE FUND UNDERWRITING VALIDATION NUMBER:811667993 U-26.3 YTEW Workers' ATE Compensation CERTIFICATE OF INSURANCE COVERAGE ST Board NYS DISABILITY AND PAID FAMILY LEAVE BENEFITS LAW PART 1.To be completed by NYS disability and Paid Family Leave benefits carrier or licensed insurance agent of that carrie 1a.Legal Name&Address of Insured(use street address only) 1b.Business Telephone Number of Insured NEW YORK SOLAR SOLUTIONS,LLC 516-446-0093 ATTN: LOUIS BOCCIO 25 HEATHER LANE MILLER PLACE,NY 11764 1c.Federal Employer Identification Number of Insured Work Location of Insured(Only required if coverage is specifically limited to or Social Security Number certain locations in New York State,i.e.,Wrap-Up Policy) 262092321 2.Name and Address of Entity Requesting Proof of Coverage 3a. Name of Insurance Carrier (Entity Being Listed as the Certificate Holder) ShelterPoint Life Insurance Company Town of Southold 54375 Main Rd. 3b. Policy Number of Entity Listed in Box"1a" PO Box 1179 DBL594547 Southold, NY 11971 3c.Policy effective period 01/01/2022 to 12/31/2023 4. Policy provides the following benefits: © A.Both disability and paid family leave benefits. ❑ B.Disability benefits only. E] C.Paid family leave benefits only. 5. Policy covers: © A.All of the employer's employees eligible under the NYS Disability and Paid Family Leave Benefits Law. B.Only the following class or classes of employer's employees: Under penalty of perjury,I certify that I am an authorized representative or licensed agent of the insurance carrier referenced above and that the named insured has NYS Disability and/or Paid Family Leave Benefits insurance coverage as described above. Date Signed 10/14/2022 By wig 4f (Signature of insurance carrier's authorized representative or NYS Licensed Insurance Agent of that insurance carrier) Telephone Number 516-829-8100 Name and Title Richard White, Chief Executive Officer IMPORTANT: If Boxes 4A and 5A are checked, and this form is signed by the insurance carrier's authorized representative or NYS Licensed Insurance Agent of that carrier,this certificate is COMPLETE. Mail it directly to the certificate holder. If Box 4B,4C or 513 is checked,this certificate is NOT COMPLETE for purposes of Section 220, Subd.8 of the NYS Disability and Paid Family Leave Benefits Law.It must be emailed to PAU@wcb.ny.gov or it can be mailed for completion to the Workers'Compensation Board, Plans Acceptance Unit, PO Box 5200,Binghamton, NY 13902-5200. PART 2.To be completed by the NYS Workers'Compensation Board (Only if Box 46,4C or 513 have been checked) State of New York Workers' Compensation Board According to information maintained by the NYS Workers'Compensation Board,the above-named employer has complied with the NYS Disability and Paid Family Leave Benefits Law(Article 9 of the Workers'Compensation Law)with respect to all of their employees. Date Signed By (Signature of Authorized NYS Workers'Compensation Board Employee) Telephone Number Name and Title Please Note:Only insurance carriers licensed to write NYS disability and paid family leave benefits insurance policies and NYS licensed insurance agents of those insurance carriers are authorized to issue Form DB-120.1.Insurance brokers are NOT authorized to Issue this form. DB-120.1 (12-21) �JIII 1liiiiiuiiiiuiiiuiii�iii�iiiiiiiiii�iiiii111111 ® DATE(MMDD/YYYY) AC® �� CERTIFICATE OF LIABILITY INSURANCE 10/14/2022 THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER($), AUTHORIZED REPRESENTATIVE OR PRODUCER,AND THE CERTIFICATE HOLDER. IMPORTANT: If the certificate holder Is an ADDITIONAL INSURED,the policy(les)must have ADDITIONAL INSURED provisions or be endorsed. If SUBROGATION IS WAIVED,subject to the terms and conditions of the policy,certain policies may require an endorsement. A statement on this certificate does not confer rights to the certificate holder in lieu of such endorsement(s). PRODUCER CONTACT NAME: Jill T Bowen,CISR Elite,AINS Arthur J.Gallagher Risk Management Services, Inc. PHONE 518-824-2010 Fvc Nv:51&783 8754 2 Country Club Road,Suite 1 AMAIL Queensbury NY 12804 ADDREss: Jill Bowen a' .com INSURER(S)AFFORDING COVERAGE NAIC f1 INSURERA:Ohio Security Insurance Company 24082 INSURED INSURER 13:Ohio Casualty Insurance Company 24074 New York Solar Solutions,LLC INSURER C 25 Heather Lane Miller Place NY 11764 INSURER D: INSURER E: INSURER F: COVERAGES CERTIFICATE NUMBER:1519434579 REVISION NUMBER: THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN ISiSUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES.LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. ILTR TYPE OF INSURANCE DL SUBR POLICY NUMBER POLICY EFF MM DD YY LIMITS A X COMMERCIAL GENERAL LIABILITY BKS59089913 12/11/2021 12/11/2022 EACH OCCURRENCE $1,000,000 �OCCUR DAMAGE T RENTED- CLAIMS-MADE PREMISES Ea occurrence) 16 300,000 MED EXP(Any one person) $15,000 PERSONAL$ADV INJURY $1,000,000 GEN'L AGGREGATE LIMIT APPLIES PER: GENERAL AGGREGATE 3 2,000,000 HPOLICY Z JECT LOC PRODUCTS-COMP/OP AGG 16 2,000,000 OTHER: 3 B AUTOMOBILE LIABILITY BA059089913 12111/2021 12/11/2022 CEOMBINccideEDSINGLEnt LMIT 161,000,000 a a X ANY AUTO BODILY INJURY(Per person) $ OWNED SCHEDULED BODILY INJURY(Per accident) $ AUTOS ONLY AUTOS X HIREDX NON-OWNED PROPERTY DAMAGE AUTOS ONLY AUTOS ONLY Per accident 16 B X UMBRELLA LIAB X OCCUR US059089913 12/11/2021 12/11/2022 EACH OCCURRENCE $1,000,000 EXCESS LIAS CLAIMS-MADE AGGREGATE 161,000,000 DED I X I RETENTION $ WORKERS COMPENSATION STATUTE ETH Issued b carrier AND EMPLOYERS'LIABILITY Y/N ANYPROPRIETOR/PARTNER/EXECUTIVE ❑ N/A E.L.EACH ACCIDENT 16 OFFIC ER/MEMBER EXCLUDED? (Mandatory In NH) E.L.DISEASE-EA EMPLOYEE If yes,describe under DESCRIPTION OF OPERATIONS below E.L.DISEASE_-POLICY LIMIT $ DESCRIPTION OF OPERATIONS I LOCATIONS/VEHICLES(ACORD 101,Additional Remarks Schedule,may be attached if more space is required) CERTIFICATE HOLDER CANCELLATION SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN Town of Southold ACCORDANCE WITH THE POLICY PROVISIONS. 54375 Main Rd PO Box 1179 AUTHORIZED REPRESENTATIVE ,Southold NY 11971 ©1988-201155 ACORD CORPORATION. All rights reserved. ACORD 25(2016/03) The ACORD name and logo are registered marks of ACORD Building Department Application AUTHORIZATION (Where the Applicant is not the Owner) 1� Jeff McGrann residing at 505 Kayleighs Court East Marion,NY 11939 (Print property owner's name) (Mailing Address) do hereby authorize Louis Boccio/New York Solar Solutions LLC (Agent) to apply on my behalf to the Southold Building Department. e s Signature) (Date) (Pri t Owner's Name) JAMES J. S TOUT A R C H I T E C T & Assoc . 2 G REG L ANE E AST NORTHP0RTN. Y. 631 - 8 58 9388 oa Letter of Certification FD E � D October 12, 2022 RE: McGrann Residence OCT 1 4 2022 505 Kalieghs Court East Marion, NY 11939 � ,�;�T � , TO WN OF SO UT11C)LIDO To whom it may concern: I, James J. Stout, registered architect NYS license number 021633 would like to submit the following. I have inspected and analyzed the roof structure at the above listed address and have determined the structure and the attachment to be adequate to support the new additional load imposed by the proposed solar system and complies with the 140-mph wind design load as per 2020 Residential code of NYS (RCNYS), 2020 Energy conservation construction code of NYS (ECCCNYS), and the ASCE 7-16. The 2"x 8" @ 16"o.c roof rafters will provide the required support. The existing roof has 1 layer of shingles on 15#building paper on 12"plywood sheathing. James J.Stout Architect ED ARc C7\y J S T y/jam 1 ►i 021633 - Oo OF N E`N S ITE PLANGENERAL NOTES JOBNO. 2022-S06079 1. SOLAR PANELS WILL BE (38) LG 425 WATT SOLAR PV MODULES, AND (38) IQ8M MICRO-INVERTERS 2. ALL WIRING TO MEET THE NATIONAL ELECTRICAL CODE. V 3. THE RAFTERS AS INDICATED HAVE BEEN ANALYZED AND DEEMED SUFFICIENT O 0 `J��// Or1VILI { n P�` i OR TO SUPPORT THE ADDED LOAD OF THE SOLAR PANELS AND CONNECTORS. Z 4. THE SOLAR PANELS MAY NOT BE INSTALLED ON AN EXISTING ROOF THAT O U�\C �� � A/Ct i HAS MORE THAN 1 LAYERS OF ROOF IS CEDAR SHINGLES, UNLESS ADEQUATE Z J C V Y r V MEANS OF SUPPORT ARE PROVIDED AS PER THESE DRAWINGS. W C3 WITHOUT r�f IT�„�ry� , �TI[�� THE MAXIMUM SPACING BETWEEN THE STANDOFFS SHALL BE 80' O.C. � a OF , f�{j i II 1�1�1 1 6. THE SOLAR PANEL MOUNTING SYSTEM WILL BE WITH IRON RIDGE XR100 OCCUFRACKING. AND UNIRAC TILT-UP LEGS (v J Q W ZONING INFORMATION O0) 1 p rU, f STREET ADDRESS: �T MARIO505 IN. NYGHS T11939 \ z w D 00 .' SECTION: 31 BLOCK: 4 LOT ( S ): 16.9 r-- cn LJLI < '.-.w LINE DIAGRAM u; Z r� rr Y Q m00 a ( 00 W) F- p U ,r Z U x o �► +Ii V) z CIRCUIT 1 CONNECTED TO PV MODULES I J W " CIRCUIT 2 CONNECTED TO PV MODULES U) O W � Z Z E~ CIRCUIT 3 CONNECTED TO PV MODULES Z LiJ p J _0 Z x CIRCUIT 4 CONNECTED TO PV MODULES Q Q z t �. �- - C�r 80 AMP Z a- Ctf Lo LL E•—I Z t EXISTING EXISTING COMBINER Q AC O !�, U) O cn UTILITY PANEL IN Cv Lo Q O r METER LQ HOUSE 2 2 POLE p (1 L W 20 AMP w • �' BREAKER ►� 2 itr Q TOTAL SYSTEM SIZE: 16.15 kW U cc Q W _^ APPROVED AS NOTED Q g N > '- Z w D 0 DATE: P.# S 8 LU O ZLo w FEE: Q a N In � cl COMPV BY: LY WITH ALL CODES ::1F ATTACHMENT DETAIL z Z � w �/gQd�r NOTIFY BUILDING DEPARTMENT A W YORK STATE & TOWN C'-'DE- a D 765-1802 8AM TO 4P FOR THEAS REQUIRED AND CONDITIG vl00 uj OJ 00 t5 V l5 D OLLOWING INSPECTIONS: SOLAR PANEL MODULE � N 00 � J FOUNDATION _ 0. E TU'>✓0 REQUIRED ��-IT}}eI n rnl •L^� OCT 1 4 2022 FOR POURED CONCRETE � 2. ROUGH - FRAMING & PLUMBING ROAR[ � ALUMINUM ALLOY L-FOOT ALUMINUM XR700 3. INSULATION S015_H d RUS 1 ELS RAIL BY IRON RIDGE \ i. it ASPHALT 4. FINAL - T r w FLASHING "�r ROOF SHINGLE `\ .�cyOl��' BUILDING DEPT. CONS I RG.,TION MUST n J �y TOWN OF SOUTHOLD BE COMPLETE FOR C.O. — __ ` F,. ALL CONSTRUCTION SHALL MEET THE EXISTING ROOF '":C: `0 LUZ a= i-� N.Z REQUIREMENTS OF THE CODES OF NEW ELECTRICAL SHEATHING �W.N K O -O� YORK STATE. NOT RESPONSIBLE FOR INSPECTION REQUIRED LAG 13 X 4 INTO STAINLESS STEEL ,d: EXISTING ROOF RAFTER LAG BOLTS IMU CENTER OF ROOF DESIGN OR CONSTRUCTION ERRORS. Rpt, MINIMUM 3' EMBEDMENT. jam 6 s P �\ ''��v/j/11111111N PRIOR TO CUTTING, OR ORDERING OF MATERIAL JOB NO. OR PLACEMENT OF THE L-FOOT ATTACHMENT, 2022—S06079 FIELD-VERIFICATION OF EXACT RAFTER 36" GROUND LOCATIONS ARE REQUIRE TO COMPENSATE FOR � I AccEss AREA PREEXISTING RAFTER IRREGULARITY THAT MAY EXIST. I � � O THESE DRAWINGS COMPLY WITH THE I I OUTLINE OF ROOF p O N 2018 IRC AND 2020 NEW YORK 1 I I w STATE RESIDENTIAL BUILDING CODE. I I cD fl � a Q NOTE: ALL ROOF MOUNTING I FRONT BRACKETS SHALL BE PROPERLY W I N D I I HousE N -� SECURED TO A ROOF RAFTER. I N _1 F.., �-- 0 V THIS PROPERTY PRODUCESLTHE I I U z _O w REQUIRED GROUND ACCESE 36" ROOF \ v — 00 ROOF ACCESS PATHWAYS AN. ACCESS AREA \ f = 0 00 Lli 0) 00 00 THESE DRAWING COMPLY WITH THE _ _ _ __ \ o Q LLJ _ 2018 IBC CODE & 2020 NEW YORK \ Q U U x STATE SUPPLEMENTAL CODE. \ Y 2 Z (n Q� W O o GROUND ACCESS POINTS ARE NON-OBSTRUCTED - _J = z w PER 2018 IRC AND 2020 NEW YORK STATE U RESIDENTIAL BUILDING CODE. (n �O W U Z z Z J O Z �" >_ — Q �:) o HATCHED AREA W Z Q J INDICATES LOCATION (n z Y QE-- OF SOLAR PANELS O Q O wO 2" X 10" RIDGE FRONT co Z n- Q� L LL z LUMINUM SUPPORT 3 GARAGE Q O U InQ Q RAIL BY IRON RIDGE Q W o LL :2 W � w ALUMINUM STANDOFF AND L-FOOT z CLIP LAG BOLTED TO RAFTER LL � (n O Z � _' cn w MODULES � N � W ATTIC LG 425W SOLAR 1. a I Q Lu Oz O z EXISTING ASPHALT ROOF SHINGLES BUILDING 2" X 8" ROOF RAFTERS a (n Q Lu Lo O O U (MAX 1 PAPERLAYER)ONN1/2- PLYWOOD o 1s" O.C. ROOF PLAN/PANEL LOCATION _ SHEATHING 2 >_ I� W a SCALE 1/16"=1'-0" o 00 nuwj -- o (n 00 THE ACTUAL IN-FIELD ATTACHMENT TO THE ROOF WILL MEET OR EXCEED NYS RESIDENTIAL CODE REQUIREMENTS •.. '�• . J� %7-S S THESE DRAWINGS HAVE BEEN DESIGNED IN 'Q: ��:w= ACCORDANCE WITH THE (AF & PA) WOOD E0: " o Sm FRAME CONST. MANUAL FOR ONE AND TWO IN. : ROOF CROSS SECTION FAMILY DWELLINGS. '�'' SCALE 1/4"=1'-0" '���'.�����•.....••• Q.`,�: THESE DRAWING COMPLY WITH THEJOB NO. 2018 IBC CODE & 2020 NEW YORK 2022—SO6079 STATE SUPPLEMENTAL CODE. SYSTEM LENGTH = 34'-4 1/4" 1 6'-8- 6'-8- 6'-8- 6'--8- e_ 6'-8- RIDGE LINE LL - - - - -- - - - -- - -- - - - - - - - - - - - - -- - L-7 18" MINIMUM z - — - -- ---- -- - - - —— ——— — — - — — —— — — — 0 7 VENT AREA Lu uj 2 1/2- ALUMINUM cc < SUPPORT BEAM 04 04 < ALUMINUM STANDOFF 7 LU Ml-2 1 S 2 SUPPORT P C N U M STANDOFF LAG BOLTED TO RAFTER 0 z w 00 0 00 cl) OUTLINE 0 OUTLINE OF ROOFLi 00 z u CI) 00 1.2 LG 425W SOLAR O < U Z C) ct� LLI 0 z H LLJ Cf) LIJ Z :D z of L.LJ 0 0 NOTE: THIS ROOF WILL HAVE (20) LG 425 WATT PV bi z �D < < co z MODULE PANELS WITH A KW OUTPUT OF ( 8.5 KW AND 0 < 0 (20) ENPHASE IQ8M MICRO—INVERTERS m CL cr _j z 0 0 C) z< SOLAR PANEL LAYOUT ROOF # 1 It C) Lr) < SCALE 3/16"=I'-0- 5'-4- 5'-4- CL < 4'-0' 4'-0' RIDGE LINE UJ LL 18" MINIMUM c) z VENT AREA (f) Ld >- > Oz u :t 't Z r- Li cc cn C) Lr) OAU 0 04 Q. X 0 0 ziz:5 2 1/2" ALUMINUM (D Ld CL b _c_j SUPPORT BEAM z Z _j 00 0 00 ui cn 00 lo- _j OUTLINE OF ROOF -i rc /91 ALUMINUM STANDOFF NLAG BOLTED TO RAFTER --LG 425W SOLAR t MODULES %0 o SOLAR PANEL LAYOUT ROOF gr:C0 8.Lu Z 2 6 8" 6'-8- -8- 6' 4'-0" -=o: :zz ,: z SCALE 3/16"=1'-0fv SYSTEM LENGTH = 25'-1 1/2* 'j- NOTE: THIS ROOF WILL HAVE (9) LG 425 WATT PV MODULE PANELS WITH A KW OUTPUT OF ( 3.825 KW ) AND (9) ENPHASE IQ8M MICRO—INVERTERS JOB NO. 35'-0' 2022—SO6079 SYSTEM LENGTH = 30'-11' 6'-8' 6'-8' 5'-4• 4'-0• RIDGE LINE � 2 O i' - - - - - - - — _ rT� _ _ _ - LL 2 1/2" ALUMINUM Z O SUPPORT BEAM Z LG 425W SOLAR 5 MODULES W a Q ALUMINUM STANDOFF cc LAG BOLTED TO RAFTER N � FFw OUTLINE OF ROOF \ z W O 00 M J m NOTE: THIS ROOF WILL HAVE (9) LG 425 WATT PV MODULE u Zco 00 PANELS WITH A KW OUTPUT OF ( 3.825 KW ) AND (9) o < cow ENPHASE IQ8M MICRO—INVERTERS zUJ U � 0 (n z o SOLAR PANEL LAYOUT GARAGE ROOF # 3p W T_ w z SCALE 3/16"=1'-0" Z O J O O --� WZQQ Q (/) z _] �- m O Q Y J O ° CL 0� Lo LIJZ cc � U � Q � w ►—j z OO U j t\ O z .— w CC J Co w } W W O z O Q Z N LAJ CCC) O 0c) co USC 3 z0 ^ w THESE DRAWING COMPLY WITH THE N 00 t, w 2018 IBC CODE & 2020 NEW YORK STATE SUPPLEMENTAL CODE. i �•� 'moi ED:— C) �W�tA �i�t� C( . �JOB NO. 2022—SO6079 r- O 521TPANEL - AC SUBPANEL PHOTOVOLTAIC POINT OF Z PHOTOVOLTAIC SYSTEM INVER'1 ER OUTPUT CONNECT ION DO NOT A o o O EQUIPPED WITH ADD LOADS TO THIS SWITCHBOARD INTERCO w O Lu RAPID SHUTDOWN DO NOT RELOCATE THIS OCPD LINE SIDE TAP INSIDE APV GENERATOR ACA MST SERVICE PANEL N REFLECTIVE LABEL(S) SHALL BE DISCONNECT SWITCHPOWER \ Q LOCATED SOURCE. o u MAIN SERVICE PANEL OR LOCATION OF MAX AC OPERATING CURRENT: 2oA POWER UTILITY AND SOLAR \ Z w 00POINTOF INTERCONNECTION-SOLARA/C ELECTRIC SYSTEM 40V o m DISCONNECT NOMINAL OPERATING VOI:TAGE: 2 AC , .ERATING CURRENT: AJ [-'-' --- ------ ---- -- W Go -- - • • • 00 • YAO o Q W M M WARNING: PHOTOVOLTAIC - -- - - - _ --- _ Q WARNIN POWER SOURCE ELECTRIC SHOCK HAZARD D PRIOR w o PHOTOVOLTAICTURN OFF WORKING PANEL = Z 3 REFLECTIVE LABEL(S) SHALL BE LOCATED: DUAL POWER SOURCEo V) EVERY 1 OFT OF EACH AC/DC RACEWAY. DO NOT TOUCH TERMINALS z J Ld o TERMINALS ON BOTH LINE AND LABEL SHALL BE LOCATED: ON 0 Z Q Q o SHOCKELECTRIC HAZARD LOAD SIDES MAY BE ENERGIZED ; O Q Y z 0 0 SERVICE PANEL ORPOIIVTOF m Q- z z • • • IN THE OPEN POSITION E\71 RCONNECIION o d o CE TERMINALS • • • --- 110LnQ Q w LOAD • BE - LABEL SHALL BE LOCATED: o 0- :E w 3 IN THE OPEN ' • • ON A/C COMBINER/ SOLAR DISCONNECT - -- rz gUJ WARN=' Qo z DUAL POWER SOURCE SECOND SOURCE Q J j� > ,t z W N IS PV SYSTEM I .A WARNING DUAL POWER SOURCE ui O Z O o w LABEL SHALL BE LOCATED: METERPAN SECOND SOURCE IS PHOTOVOLTAIC SYSTEM M Ua NEC 705.12 (B)(3-4) & 690.59 z JO o� U) � uwjJ o 05 ` 1/1 nnrrlllli Ik. i co L'S call ' 1///IIIIIINNI� SYSTEM LENGTH = 34'-4' RIDGE LINE '}— -- 18" MINIMUM I VENT AREA OF 2 1/2" ALUMINUM } / SUPPORT BEAM V n 1 N � NUM STANDOFF LAG BOLTED 0 RAFTER — _— / —� C. / OUTLINE OF ROOF LG 425W SOLAR �y► MODULES LL. Z Q 0 l RIDGE UNE 18' MINIMUM INSTALLER VENT AREA NY SOLAR SOLUTIONS 47 ECHO AVE. #1014 _ = 2 1/2• ALUMINUM MILLER PLACE, NY 11764 a _ �. s SUPPORT BEAM 1-888-350—SOLAR OUTLINE OF ROOF PROJECT ADDRESS ALUMINUM STANDOFF MCGRANN RESIDENCE M LG 2LAG BOLTED TO RAFTER MODULES 505 KAYLEIGHS CT. EAST MARION, NY 11939 SYS" LENGTH - 25'-2' NOTE: THIS ROOF WILL HAVE (9) LG 425 WATT PV MODULE PANELS WITH A KW OUTPUT OF ( 3.825 KW ) AND (9) SYSTEM DETAILS ENPHASE IQ8+ MICRO—INVERTERS ROOF #1 8.5 KW PV SYSTEM ROOF #2 3.825 KW PV SYSTEM ROOF #3 3.825 KW PV SYSTEM PORTRAI LANDSCAPE �SYSfEM LENGTH = 30'-11LINM - a0'-1i' LG 425 DETAILS: LG 425 DETAILS: RIDGE LINE ROOF #1(20) LG 425W '� •I r ROOF #1(09) LG 425W �k m 75.2' 40 t r � 2 1/2"ALUMINUM ROOF #1(09) LG 425W ,k SUPPORT BEAM C LG 425N SOLAR 0 MODULES N D � ALUMINUM STANDOFF O LAG BOLTED TO RAFTER d C OURJNE OF ROOF (38) ENPHASE IQ8M MICRO—INVERTERS 41.0 IRONRIDGE RACKING CAMPING RANGE: CLAMPING RANGE: A = 9.8" DATE SHEET B = 15.7 C = O" D = 11.8" 10i9/22 � � • 425W ( 420W 415W 141 OW The LG NeON®2 is LG's best selling solar module,and is one of the most power- ful and versatile modules on the market today.Featuring LG's Cello Technology, the LG NeON® 2 increases power output. New updates include an extended performance warranty to 90.08%to give customers a greater sense of reliabil- ity and peace of mind. DVE C VL U$ C� In Progress Feature Enhanced Performance Warranty Enhanced Product warranty zsY LG NeON® 2 has an enhanced performance LG has extended the warranty of the NeON®2 warranty. After 25 years,LG NeONO 2 is guar- to 25 years,which is among the top of industry anteed to perform at minimum 90.08%of ini- standards. tial performance. Better Performance on a Sunny Day BOS(Balance Of System)Saving LG NeON®2 now performs better on sunny m LG NeON®2 can reduce the total number days,thanks to its improved temperature of strings due to its high module efficiency coefficient. resulting in a more cost effective and efficient solar power system. About LG Electronics LG Electronics is a global big player,committed to expanding its operations with the solar market.The company first embarked on a solar energy source research program LG in 1985,supported by LG Groups vast experience in the semi-conductor,LCD,chemistry and materials industries.In 2010,LG Solar successfully released its first Mondf0 series to the market,which is now available in 32 countries.The NeONO(previous.MonoX8 NeON),Ne0NO2,NeONe2 BiFacial won the"Intersolar AWARD"in 2013,2015 and 2016,which demonstrates LG Solar's lead,innovation and commitment to the industry. LG NeONe2, LG425N2W-V5 1 LG420N2W-V5 LG415N2W-V5 LG410N2W45 General Data Electrical Properties(STC*) Cell Properbes(Matenal/Type) Monocrystalline/N-type Model LG425N2W45 L6420N2WVS LG41Stl2%V5 LW10112W45 Cell Maker LG Maximum Power(Pmax) [W] 425 420 415 410 Cell Configuration 72 Cells(6 x 12) MPP Voltage(Vmpp) [V] 42.5 42.1 41.8 41.4 Number of Busbars 12EA MPP Current(ImpP) [A] 10.01 9.98 9.94 9.91 Module Dimensions(L x W x H) 2,024mm x 1,024mm x 40 mm _Open Circuit Voltage(voc,S5%) [V] 49.8 49.7 49.6 49.5 -- - -- _ -------- -------.. Weight 203 kg -short Circuit Current(i:<,xs1s) [AJ 10,67 10.63 10.59 10.55 Glass(Matenal) Tempered Glass with AR Coating Module Efficiency [%] 20.5 20.3 20.0 19.8 Backsheet(Color) White Power Tolerance [%] 0-3 Frame(Materian Anodized Aluminium 'STC(Standard Test Condition):Irradiance 1000 W/m',Ce0 temperature 25'C,AM 1.5 Junction Box(Prvtection Degree) IP 68 '•Measure Tolerance of Pmax:0% Cables(Length)' 1,200 mm x 2EA Operating Conditions_- Connector(Type/Maker) MC4 Compatible .Operating Temperature [•C] -40--90 =Gdudin connector__ _. -._ 9 Maximum System Voltage [V] 1,500(UL),1000(IEC) Maximum Series Fuse Rating [A] 20 Certifications and Warranty Mechanical Test Load(Front) [Pa/psf] 5,400/113 IEC 61215-1/-1-1/2:2016,IEC 61730- MechanicalTest Load(Rear)_ [Pa/psf] 3,000/63 1/2:2016,UL 1703 %Mechanical Test Load 5,400Pa/3,OOOPa based on IEC 61215-2:2016 Certifications -. - -I50 9001,150 14001,ISO 50001 (Test Load-Design Load x Safety Factor(1.5)) OHSA518001 Packaging Configuration Salt Mist Corrosion Test IEC 61701:2012 Severity 6 Number of Modules per Pallet [EAJ 25 Ammonia Corrosion Test IEC 62716:2013 Number of Modules per 40ft HQ Container [EA) 550 Module Fire Performance Type 1(UL 1703) Packaging Box Dimensions(Lx W x_-H)_ [mm] 2,080 x 1,120 x 1 226 Fire Rating Class C(UL 790,ULC/ORD C 1703) Packaging Box Gross Weigh -[kg] 551 Solar Module Product Warranty 25 Years Solar Module output Warranty Unear Warranty -_-- Dimensions(mm/inch) ------------------------------------- •1)First year:98%2)After 1 st year:0.33%annual degradation 3)90.08%for 25 yews •ne..o2aaww.o�n sit Temperature Characteristics NMor [ •C] 42:0 pnm [%/-C] -036 _ ..----------- - [%/°C] -0.26 Nx [%/°C] 0.03 •NMOr(Nominal Module Operating Temperature):Irradiance 800 W/m2,Ambient temperature 20°C, Wind speed 1 m/s,Spectrum AM 1.5 Electrical Properties(NMOT) Model LW25N2W-VS IG420N2NFK L6415NN1145 W41011112VRV5 "'°-""'-' Maximum Power(Pmax) [WJ 319 315 311 307 MPP Voltage(Vmpp) [v] 39.9 39.6 393 3_8.9 MPP Current(Impp) [A] 797-- - 7.95_ 7.92----------_7.89 Open Circuit Voltage(Voc) [V] 47.0 46.9 468 467 Short Circuit Current(Ise) [Al 8.58 8.55 852 8.48 IN Curves I 000w q 800W ? e00W _ m 3 G-o - 400W _ r 200w t� �0.0 - 20.0 _r.- 40.0 500 Vokage[V] G LG Electronics Inc. Product specifications are subject to change without notice. QQ ® LSolar Business Division DS-VS-72-W-G-F-EN-90806 LG Twin Towers,128 Yeoui-daem,Yeongdeungpo-gu,Seoul .�-4�• 07336,Korea 0 2019 LG Electronics.All rights reserved. .t� Life's Good r LA-- wwwlg-solarcom ENPHASE Cm " i lam- 1 IQ8 and IQ8+ Microinverters Easy to install Our newest 108 Microinverters are the industry's first microgrid-forming,software- Lightweight and compact with defined microinverters with split-phase power conversion capability to convert DC plug-n-play connectors power to AC power efficiently.The brain of the semiconductor-based microinverter Power Line Communication is our proprietary application-specific integrated circuit(ASIC)which enables the (PLC)between components microinverter to operate in grid-tied or off-grid modes.This chip is built in advanced 55nm technology with high speed digital logic and has super-fast response times Faster installation with simple to changing loads and grid events,alleviating constraints on battery sizing for home two-wire cabling energy systems. High productivity and reliability Produce power even when the Whase grid is down* 25 More than one million cumulative hours of testing Year hinted Class II double-insulated Part of the Enphase Energy System,I08 Series IQ8 Series Microinverters redefine reliability enclosure Microinverters integrate with the Enphase IQ Battery, standards with more than one million cumulative Optimized for the latest high- Enphase IQ Gateway,and the Enphase App monitoring hours of power-on testing,enabling an industry- and analysis software. leading limited warranty of up to 25 years. powered PV modules Microgrid-forming Complies with the latest advanced grid support** CERTIFIED Remote automatic updates for SAFETY the latest grid requirements Connect PV modules quickly and easily to I08 Series I08 Series Microinverters are UL Listed as Configurable to support a wide Microinverters using the included Q-DCC-2 adapter PV Rapid Shut Down Equipment and conform with cable with plug-n-play MC4 connectors. various regulations,when installed according to range of grid profiles manufacturer's instructions. Meets CA Rule 21(UL 1741-SA) requirements ©2022 Enphase Energy.All rights reserved.Enphase.the Enphase logo,I08 Microinverters,and other Only when installed with IQ System Controller 2, names are trademarks of Enphase Energy,Inc.Data subject to change. meets UL 1741. "IQ8 and I08PIus supports split phase,240V I08SP-DS-0002-01-EN-US-2022-03-17 installations only, I08 and IQ8+ Microinverters INPUT DATA 10C) IQ8-60 2-US 108PLUS 72 2-US Commonly used module pairings' W 235-350 235-440 Module compatibility 60-cell/120 half-cell 60-cell/120 half-cell,66-oell/132 half-cell and 72-cell/144 half-cell MPPT voltage range V 27-37 29-45 Operating range V 25-48 25-58 Min/max start voltage V 30/48 30/58 Max input DC voltage v 50 60 Max DC current2[module Ise] A 15 Overvoltage class DC port II DC port backfeed current mA 0 PV array configuration 1x1 Ungrounded array;No additional DC side protection required;AC side protection requires max 20A per branch circuit OUTPUT DATA JAC] A' .1IQ8PLUS 72 2-US Peak output power VA 245 300 Max continuous output power VA 240 290 Nominal(L-L)voftage/range3 v 240/211-264 Max continuous output current A 1.0 1.21 Nominal frequency Hz 60 Extended frequency range Hz 50-68 AC short circuit fault current over 2 3 cycles Arms Max units per 20 A(L-L)branch circuit' 16 13 Total harmonic distortion <5% Overvoltage class AC port III AC port backfeed current mA 30 Power factor setting 1.0 Grid-tied power factor(adjustable) 0.85 leading-0.85 lagging Peak efficiency % 97.5 97.6 CEC weighted efficiency % 97 97 Night-time power consumption mW 60 Ambient temperature range -40°C to+60°C(-40°F to+140°F) Relative humidity range 4%to 100%(condensing) DC Connector type MC4 Dimensions(HxWxD) 212 mm(8.3")x 175 mm(6.9")x 30.2 mm(1.2") Weight 1.08 kg(2.38 lbs) Cooling Natural convection-no fans Approved for wet locations Yes Pollution degree PD3 Enclosure Class II double-Insulated,corrosion resistant polymeric enclosure Environ.category/UV exposure rating NEMA Type 6/outdoor ' CA Rule 21(UL 1741-SA),UL 62109-1,UL1741/IEEE1547,FCC Part 15 Class B,ICES-0003 Class B,CAN/CSA-C22.2 NO.107.1-01 Certifications This product is UL Listed as PV Rapid Shut Down Equipment and conforms with NEC 2014,NEC 2017,and NEC 2020 section 690.12 and C22.1-2018 Rule 64-218 Rapid Shutdown of PV Systems,for AC and DC conductors,when installed according to manufacturer's instructions. (1)No enforced DC/AC ratio.See the compatibility calculator at https://Iink.enphase.com/module-compatibility (2)Maximum continuous input DC current is 10.6A(3)Nominal voltage range can be extended beyond nominal if required by the utility.(4)Limits may vary.Refer to local requirements to define the number of microinverters per branch in your area. 1OBSP-DS-0002-01-EN-US-2022-03-17 -%l IRONRIDGE XR100 .Rail i' i See Descrytion / Length Rail Section Properties Property Value Total Cross-Sectional Area 0.582 int .66 Section Modulus (X-axis) 0.297 in' .46 Moment of Inertia (X-axis) 0.390 in -- - - - - Moment of Inertia (Y-axis) 0.085 in Torsional Constant 0.214 in' Polar Moment of Inertia 0.126 in° 1.99 APPROVED MATERIALS: 2.44 6005-T6, 6005A-T61, 6105-T5, 6N01-T6 2.34 (34,000 PSI YIELD STRENGTH MINIMUM) .58 r 1.25- Clear Part Black Part Description/Length Material Weight Number Number XR-100-132A XR-100-132B XR100, Rail 132"(11 Feet) 6000-Ser7.50 lbs. XR-100-168A XR-100-1688 XR100, Rail 168"(14 Feet) 9.55 lbs. XR-100-204A XR-100-2048 XR100, Rail 204"(17 Feet) Aluminum 11.60 lbs. V1.1