HomeMy WebLinkAboutHPC 585 Orchard - IVNN-Snowdon- dated 11-14-2023W18W18
D6D6
D2D2W9W9
W1W1
D12D12
D1D1
UP
UP
2'-11 1/2"
28'-2"15'-3 1/2"10"
44'-3 1/2"
22'-3 3/4"
4'-0 1/2"
2'-11 1/2"
3'-7 1/2"
25'-8 1/4"
29'-3 3/4"
16'-0 1/4"28'-3 1/4"
44'-3 1/2"
17'-7"1'-8 1/2"2'1'-7 1/2"5'-3"6'-7 3/4"2'3'-3 1/2"2'-6"1'-8 1/4"
14'-8" X 6'-0"
109 SQ FT
43'-0" X 21'-0"
929 SQ FT
FINISHED BASEMENT AREA
NEW FOUNDATION &
FOOTINGSCEILING HEIGHT 8'
FOUNDATION 16" WIDE 18" HIGH.
TWO X #4 REBAR IN FOOTING ALONG LENGTH OF THE FOOTING.
WALLS POURED CONCRETE 8" THICK. #4 REBAR 3' ON CENTER
BOTH DIRECTION. ALL TIED TOGETHER WITH FOOTING.
ANCHOR BOLT 5/8" SET AT 48" ON CENTER AT 7" DEPTH MIN' WITH
SQUARE WASHER.
EXISTING DECK
FOOTINGS
NEW WINDOW
NEW WINDOW
Fire Rated Stud
Partition Wall
and Door
MECHANICAL ROOM
EGRESS
Proposed Basement Plan View - New1/4 in = 1 ftProposed Basement Plan View - New1/4 in = 1 ft
DN
W14W14W7W7
W12W12 W8W8 W8W8
W13W13
W12W12
W12W12
2668
D4D4D9D9
21068
2068
2668
W11W11
W17W17
2668
D9D9
D11D11
D8D8
D12D12
D7D7
D6D6
D5D5 D10D10
D2D2
D8D8
D3D3
D7D7
W17W17
W10W10
W6W6
UP
8'-2 3/4"2'-8"2'-2"
8 1/2"2'-8"9'-3 3/4"5'-4 1/2"2'-8"3'-2 1/2"2'-7 1/4"2'-8"
9'-6"11'-3"7'-11 3/4"2'-10 1/2"12'-8 1/4"
44'-3 1/2"
1'
4'
6 1/2"
3'-11 3/4"
6'
4'-4"
5'-10"
8"
5'-6 1/2"
14'-3 3/4"
5'-10"
26'-4 1/4"
5'-5 3/4"2'-8"3'-11 1/2"1'-5 1/4"2'-8"5'-2 1/2"2'-8"6"
3'-11"12'-1 1/4"12'-5 3/4"2'-8 3/4"13'-0 3/4"
44'-3 1/2"
3'-9 3/4"
2'-8"
3'-4"
2'-8"
9"
2'-7 1/4"
2'-8"
3'-9 3/4"
13'-2 3/4"
9'-1"
22'-3 3/4"
4'-0 1/2"
4'-0 1/2"
12'-6" X 12'-3"172 SQ FT
2'-1" X 2'-6"7 SQ FT
5'-11" X 1'-10"14 SQ FT
16'-1" X 9'-5"174 SQ FT
9'-0" X 8'-7"
90 SQ FT
7'-10" X 3'-1"28 SQ FT
11'-6" X 13'-11"195 SQ FT
10'-6" X 5'-8"67 SQ FT
16'-2" X 9'-3"97 SQ FT
2'-1" X 4'-10"14 SQ FT
5'-6" X 1'-10"13 SQ FT
BEDROOM 3 CLOSET
BEDROOM 4
HALLWAY
FAMILY BATHOPEN BELOW
CLOSET
GARDEN BEDROOM
LINEN CLOSET CLOSET
GROSS SQUARE
FOOTAGE:
1053 SQ. FT.SUNSET BEDROOM
CEILING HEIGHT 7' 7"
11
CEILINGHEIGHT 7' 7"
CEILING HEIGHT 7' 7"
Proposed Second Floor Plan View - New1/4 in = 1 ftProposed Second Floor Plan View - New1/4 in = 1 ft
DN
W16W16 W15W15
28'-8 3/4"
6'-2"
1'-8"
6'-6 1/2"
4'-2"
14'-4 1/2"
3'-9 1/4"
22'-3 3/4"
28'-8 3/4"
4'-10 1/2"
5'
4'-6"
3'-9 1/4"
14'-4 1/2"
4'-2"
22'-3 3/4"
15'-0 1/2"12'-5 3/4"
27'-9 3/4"
14'-1"
27'-9" X 2'-11"
100 SQ FT
27'-9" X 3'-7"119 SQ FT
ATTIC
ATTIC
Proposed Attic Plan View - New1/4 in = 1 ftProposed Attic Plan View - New1/4 in = 1 ft
DN
W5W5
W4W4
W4W4
6080
TYPE M
W3W3
21068
TYPE L
W5W5
W5W5
D1D1 D5D5
1968
W5W5 W5W5 W5W5
W3W3
W4W4
W4W4
W2W2W3W3W3W3
UP
2'-11 3/4"2'-8"4'-4 3/4"2'-8"2'-4"5'-8 1/4"2'-8"9'-8 3/4"10"2'-8"8 1/2"
18'-1"4'-2 1/2"3'2'-8"9"6 1/2"15'-0 1/2"
44'-3 1/2"
9'-6 1/4"
6'
10'-2"
3'
8"
25'-8 1/4"
26'-4 1/4"
1'-5 1/4"2'-8"5'-2 1/2"2'-8"3'-10 1/2"2'-8"4'-11"2'-8"2'-2"
16'-0 1/4"28'-3 1/4"
44'-3 1/2"
3'-9 3/4"
2'-8"
3'-5 3/4"
2'-8"
3'-2 3/4"
1'-2 1/2"
2'-10"
2'-5"
15'-10 1/4"
6'-5 1/2"
22'-3 3/4"
4'-0 1/2"
43'-4" X 18'-2"973 SQ FT
6'-7" X 5'-11"
46 SQ FT7'-2" X 2'-9"
24 SQ FT
6'-10" X 28'-6"390 SQ FT
KITCHEN
BATHROOM
DECK
BUILD SOFFIT FOR CHIMNEY 6" INSULATED CHIMNEY
DECK
DECK
EXISTING WINDOWS TO BE REPLACED
WITH HPC APPROVED WINDOWS
EXISTING WINDOWS TO BE REPLACED
WITH HPC APPROVED WINDOWS
NEW WALLS TO
MATCH EXISTING
GROSS SQUARE
FOOTAGE:
1040 SQ. FT.
11
STAIRWELL
Proposed First Floor Plan View - New1/4 in = 1 ftProposed First Floor Plan View - New1/4 in = 1 ft
PLAN NOTES, FLOOR 2#NOTE
NEW EXTERIOR WALLS ARE MIN R-281111
SCALE: 1/4" = 1'-0"
ATTICSECOND FLOOR
BASEMENT FIRST FLOOR
HPC EDITION
ISSUED:
Consulting Architect/Designer
85 Willow Street #71
Orient, NY 11957
DAVID SNOWDON-JONES
(T) 212 518 1818
(E)dsj@snowdon.us
SNOWDON II LTD
Engineer
Address
585 Orchard Street
Orient, NY
11957
Description
HOME REMODEL
DATE: 11/14/2023
DRAWING BY: SS
PROJECT NO:
CHECKED BY: DSJ
SCALE:AS NOTED
BSCAN STICKER
DOB APPROVAL: STAMP
Floor Plans Proposed
2023-07-27
Nick Mazzaferro P. E.
PO Box 57, Greenport, NY 11944
(T) 516 457 5596
(E) nickmazzaferro@verizon.net
Sheet Number A-1.2 of 19
S1 Cross Section 1
Scale 1/4 in = 1 ftS1Cross Section 1
Scale 1/4 in = 1 ft
S3 Cross Section 3
1/4 in = 1 ftS3Cross Section 3
1/4 in = 1 ft
FOUNDATION 16" WIDE 18" HIGH.
TWO X #4 REBAR IN FOOTING ALONG LENGTH OF THE FOOTING.
WALLS POURED CONCRETE 8" THICK. #4 REBAR 3' ON CENTER
BOTH DIRECTION. ALL TIED TOGETHER WITH FOOTING.
ANCHOR BOLT 5/8" SET AT 48" ON CENTER AT 7" DEPTH MIN' WITH
SQUARE WASHER.
NOTES:
SITE PROTECTION: FURNISH AND INSTALL PROTECTION AT ALLPROPERTY LINES. CONTRACTOR TO INSTALL FENCE WHERE
APPLICABLE AND MAINTAIN WORK WITH JOB ENVELOPE.
HOUSE LIFT: ALL UTILITIES (WATER, GAS, ELECTRIC) ARE TO BE
DISCONNECTED BY THE APPROPRIATE ENTITIES PRIOR TO
MOBILIZATION TO THE SITE.
FOUNDATION: 18" X 16" FOOTINGS WITH (2) #4 REBAR
CONNECTED THROUGHOUT. FORM & POUR 8" THICK POURED
CONCRETE WALLS AT 8' HIGH. KAMACK WATERPROOFING WITH
RIGID INSULATION PROTECTION BOARD
4" POURED BASEMENT SLAB, WITH WELD WIRE
REINFORCEMENTS, TROWEL FINISH.
NOTES: ELEVATE THE EXISTING HOME AND PREPARE IT FOR A
FINAL EXCAVATION BENEATH
• EXCAVATE ALL BASES OF OUR CRIBBING TOWERS DOWN
TO THE PROPOSED FOOTING ELEVATION AS PER PLANS
PROVIDED
• STRUCTURE TO BE LIFTED OFF ITS EXISTING FLOOR
SYSTEM BY A PROFESSIONAL HOME LIFTING COMPANY. INSTALL
A GRID OF STEEL THROUGH THE WALLS AND BOLT LEDGERS TO
THE STUD OF THE HOUSE
• ELEVATE THE HOUSE APPROXIMATELY 6". THE
CONTRACTOR WILL REMOVE THE EXISTING FLOOR, THEN THE
HOUSE WILL BE LIFTED AN ADDITIONAL 3'
• UPON COMPLETION OF NEW FOUNDATION AND FLOOR
SYSTEM, SET THE BUILDING DOWN AND REMOVE ALL EQUIPMENT
FROM SITE
NOTES: NEW FOUNDATION REPLACED-IN-PLACE
OF EXISTING FOUNDATION.
NO CHANGE TO LOCATION OR DIMENSION
NO CHANGE TO HEIGHT OF THE HOME, DOES
NOT CHANGE SKYPLANEEXISTING HOME WILL LOOK LIKE IT CURRENTLY
LOOKS, IN ITS CURRENT LOCATION
S2 Cross Section 2
1/4 in = 1 ftS2Cross Section 2
1/4 in = 1 ft
2x TOP PLATE
2x WALL STUDS
SPRAY FOAM INSULATION MIN R-28 VAPOR BARRIERVAPOR BARRIER
DRYWALL
2x TREATED BOTTOM PLATE
CONCRETE SLABREINFORCING STEEL AS REQUIRED
VAPOR BARRIER
4" GRAVEL BASE
2x TREATED MUDSILL
CAST-IN-PLACE ANCHOR
BOLT SQUARE WASHER
SILL SEAL
CONCRETE FOUNDATION WALL
CONCRETE FOOTINGREINFORCING STEEL AS REQUIRED
Basement Foundation
(print at 1"=1')
DRAINAGE SYSTEM
KAMACK INSULATION +
RIGID BOARD PROTECTION
HPC EDITION
ISSUED:
Consulting Architect/Designer
85 Willow Street #71
Orient, NY 11957
DAVID SNOWDON-JONES
(T) 212 518 1818
(E)dsj@snowdon.us
SNOWDON II LTD
Engineer
Address
585 Orchard Street
Orient, NY
11957
Description
HOME REMODEL
DATE: 11/14/2023
DRAWING BY: SS
PROJECT NO:
CHECKED BY: DSJ
SCALE:AS NOTED
BSCAN STICKER
DOB APPROVAL: STAMP
Proposed Section Views
2023-07-27
Nick Mazzaferro P. E.
PO Box 57, Greenport, NY 11944
(T) 516 457 5596
(E) nickmazzaferro@verizon.net
Sheet Number A-2.4 of 19
SCALE: 1/4" = 1'-0"