HomeMy WebLinkAbout1000-87.-5-21.7, 21.9, 21.10, 21.11, 21.12, 21.13 Short Environmental Assessment Form
Part I -Project Information
Instructions for Conipleflu
Part I—Project Information. The applicant or project sponsor is responsible for the completion of Part 1. Responses become part of the
application for approval or funding,are subject to public review,and may be subject to fiirther verification. Complete Part 1 based on
information currently available. If additional research or investigation would be needed to fully respond to any item,please answer as
thoroughly as possible based on current information.
Complete all items in Part 1.You may also provide any additional information which you believe will be needed by or useful to the
lead agency;attach additional pages as necessary to supplement any item.
__.......w_._......... -mm..._.. .. _ _........w�...w...............................ww ..... ......................w�w�w�ww���w_._._..� .�
Part 1-Project and
w�Sponsor Information
Name of Ac ...mm...............__.w....................1-1-11,11,111,11--..",",-.-...-.............- ......... _,,,,_ _w_w_..__..._...._.............._.... .._.__.._......w............. M.............w..............._.........._...w......_........_m
tion or Project:
Southview Custom Homes Two,Inc.
Project Location(describe,and attach...a..M ......
location"map)._...___..____..._.w—.........._. ._........... ._.www.__._.....w...... ..._.... ._.................._._...�_M..m_m..._w__—._w.....____.
SCTM#1000-87.-5-21.7 and 87.-5-21.9.21.10.21.11.21.12.21.13. 9230,9293 and No Number Main Bayview Road,Southold.
-Brief Description of Prop—os ed....Action:...._._...._..-.......
........................... ................._............................... _.w........_ �........._..._ _ ._. w _...
Town of Southold to acquire fee titel to the entire combined property,totaling approximately 14,54 acres,for open space preservation.
.Name of Applicant or�Sponsor: . ....._............w._._.....................................................
._...
........
. _...................�..�............ .._w. ..�...................
....._w_....�......................
Tel _.
ephone: (631)765-1800
Southold Town Board E-Mail: melissa.spiro@town.southold.ny.us
A�......._._m_":"� �w_.............vww_...........................__........�........-..�.�.�.�._._��_�.�.�.._........wwvwvw�_._._._.........�__� ��............ ........_._.._........................-. . � ��_.....M......._..�.�..._.........�.....
dress:
Southold Town Hall 53095 Main Road
SouthodO: Il
....w_..._.................�,�......"...v..w_.vw_._.vw_._.. ..._. ..—._..______....._..............w._..w .._._._....................................—..._..........._.....NY µ9 1Code:..._...... ..w.w.......
ity/p
Stater Zi
1. Does the..p_...........__�,.....v .www_..e the..��....islative ado tion.�...�a...�.�.-m�.......local law,ordiww�a �w�w�w�wwww......w E
roposed a tion only in olv g p f plan, n ce, NO YES
administrative rule,or regulation?
If Yes,attach a narrative description of the intent of the proposed action and the environmental resources that � I""l
may be affected in the municipality and proceed to Part 2. If no, continue to question 2. IJJ L�
2. Does the proposed action requirema permit,µapproval or funding from any other government Agency? NO YES
ww.... _...._ ............
If Yes,list agency(s)name and permit or approval: � Dg proposed action? .._ ....�.�.�.�.�.�_....-..._��w_.v_.__......._.w................_...--.w�_..._....
a.Total acreage of the site of the p op_._..��....._osed actio ._.._�.._�_�_�_................._...._ �.............? 1 4.5.acres
b.Total acreage to be physically disturbed? o acres
c. Total acreage(project site and any contiguous properties)owned
14.54
or controlled by the applicant or project sponsor? _. ............_ acres
4, Check all land uses that occur on, are adjoining or near the proposed action:
❑Urban ❑✓ Rural(non-agriculture) ❑ Industrial ❑ Commercial ❑✓ Residential(suburban)
❑✓ Forest Agriculture ❑ Aquatic ❑ Other(Specify):
❑✓ Parkland
Page 1. of 3 SEAF 2019
6.,.... Is the proposed action, �� �......._ .......ww__.......ww..__......_.��m�..._ .�.�w.w...................._. w�w�w�ww __....... ............_.._
._........w.............. ......,.,�._.m_....._ww�.w...._........_......._............._ NO YES N/A
m�......�. M.� ..............�
a. A permitted use under the zoning regulations?
b. Consistent with the adopted comprehensive plan? _Y 1
_...�....W..W................wwww_w_............www._.�.�.............._..w_._................. � _....,�....w�..._._ �_�.,,,,,,._��..F............�........
..._.._.............._..........,............_.. � NO YES
6. Is the proposed action consistent with the predominant character of the existing built or natural landscape? .................
7.._- Is the site ofthe,,,.�_._.. .... .w_...................._.,,,,_ _.. .w_ .........._... _.....,w..w._ ..�........,...�........... �..__W_...................
._�J
proposed action located in,or does it adjoin,a state listed Critical Environmental Area? NO YES
If Yes,identify:
........_.....w_._ ............ _..ww.......... ..._.................................. ...,..,
NO YES
8. a. Will the proposed action result in a substantial increase in traffic above present levels? w
b. Are public transportation services available at or near the site of the proposed action? R1 Elw
c. Are any pedestrian accommodations or bicycle routes available on or near the site of the proposed FM
action?
9. Does the proposed action meet or exceed the state energy code requi ? _..,.,.. w ------...
w ....................., .. __....ww .._...w_....._.�..... .�......._w_w........_........._.,..,_. v�...w rements_....._...............ww.. mN0 YES
If the proposed action will exceed requirements,describe design features and technologiesW
_.�ww.. __...................... ._w......_. _._.._.._.._.._.._.........ww ._.. _ _._.. ..._w .,......._..w_.........................____._.w_ .. .w_.._...... w .. .......... Z
10. Will the_ro �osed action connect to a...........,M�... public/private wwww.www.._ _..�......w..m. supply?
....,........ .�.........w.. ......�.� .�..�.�w......., � ..wwwww_.�_,,, .w N.�.�.�. ........._..._�u_
„ o an existing y�
p p water su 1 YES
If No,describe method for providing potable water:
w_.._..�_... _....w�._v ._..�.�.�.. ��.....w................ ........._.w.w_ ,.
11. Will the proposed action connect to existing wastewater utilities � ��__.._...................w_.,,., NO.. ......YES
If No,describe method for providing wastewater treatment:„ ,...._ ww _,. _w w _ Fv_1 D
_�. .,... _. .- .
._ w_..................
....w
a.Does the project site contain,or is rt substantially contiguous to a building,archaeological site,or district.. Hw_.
NO YES
which is listed on the National or State Register of Historic Places,or that has been determined by the ..
Commissioner of the NYS Office of Parks,Recreation and Historic Preservation to be eligible for listing on the
State Register of Historic Places?
b.Is the project site,or any portion of it,located in or adjacent to an area designated as sensitive for Fv_1 El
archaeological sites on the NY State Historic Preservation Office(SHPO)archaeological site inventory?
i_3_.._.a,...........
Does an portion of the site of the pro...._......_._��.........._w....._. ................ ww. ._M..p_.,...w....osed_a .�. ........_....�.�....w__�_�_� ._....._....... .N ........._.� ,.
proposed action,or lands adjoining the proposed y p p tion contain YES
wetlands or other waterbodies regulated by a federal,state or local agency?
b.Would the proposed action physically alter,or encroach into,any existing wetland or waterbody?
If Yes,identify the wetland or waterbody and extent of alterations in square feet or acres: m.
Corey Creek
,. .....�.._..�.�._..�.�_�.�........._..............�..�.,� w_.......�........_,�,...w_.�...._..._..._.....�.�.�.�_�_.,w.,...www.w.ww�...�...._�..�.�.�.�..._._,.w................,..._.........._..�_.,.__�......_......�.�.__.....w......,w.,.�.._......w...........w_, �R
.....�.�.�.�....�.._.......,,,.._�w�w_..n... .._.... ......_.......... ....._._.................... ..�w�_.._w..v_..... . .. .. ........ . . w.� _m__._. � V w.w.........., ........n..w_.�..._
14. Identify the typical habitat types that occur on,or are likely to be found on the project site. Check all that apply:
OShoreline ❑ Forest ❑Agricultural/grasslands 0 Early mid-successional
❑✓ Wetland ❑ Urban ❑ Suburban
15. Does the site o w_..�.�.�_p.._p..____...� ....ww�.__._�......._�.. .................... a.._._.._;mal.�. _...._. ......___-----_.............._M. w_._._._.....�.w....�w.� State��....._......_.....�...�.._�.�.�.� ....
ro osed action contain an species of am or associated habitats,listed b the r NO
www..ww.f theYES
Federal government as threatened or endangered? _
Z 11
the project site...located in
the.....1..00-year..flood plan? .�.�_�.�.�_�.�........M.�.. _..� ..ww�.�.�.�...._..........._w�....... N Y.ES......
_ _ _ _ _._NO YES. _.._www...
w_�_... .w..._...__....__..wwww _......_www.w��_w_--w-_-w_w��.�._.._......M.�_,._..M.M..w�w�._......_____.ww..__. _._........._m_._�._._.. ... ...........w_..�__.._..��m.w�__... NO....... YE ._
17. Will the proposed action create storm water discharge,either from oint or n
p on-point sources?.............. .......__._.. .. _w. ..._._O w S
If Yes, Z✓ D
a. Will storm water discharges flow to adjacent properties? El El
b. Will storm water discharges be directed to established conveyance systems(runoff and storm drains)? 11 0
If Yes,briefly describe:
18. Does the proposed action include construction or otherwould result in the impoundment of water_ NO �,... .._�ES
activities that w............� .. ..�
or other liquids(e.g.,retention pond,waste lagoon,dam)?
If Yes,explain the purpose and size of the impoundment:__ ........ _�. _...wwwwww._................... .................__..._mmmmm_.v...__...._.�w...........__�.
El
19. Has the site of the a.._.,._._._._ _-......... prop ............_ _..._.......�ation of an actio.�.�.�_M.. .._www_..w....,_..�a.......... ..._w._.. ............._.......�....__m...._.
e site .... action or an adjoining property been the location e or closed sol'
... proposed g �_�
waste NO ' YES
management facility?
IfYes,describe: _,.�.. ...w.�......M_m_ ......_ ..�.�.�.�....................ww_. M.._...........�w R F]
20.Has the site of the proposed action or an adjoining property been the subject of remediation(ongoing or NO YES
completed) for hazardous waste?
IfYes,describe: ...ww..................... ...mmm .... _......................._ ..................ww_ _..........................w__ _..__..._._._._._. .........�.�.�.�.��aw�.w.......... El
I CERTIFY THAT THE INFORMATION PROVIDED ABOVE IS TRUE AND ACCURATE TO THE BEST OF ��
MY KNOWLEDGE
+ pplicant/ ponsor/naniee Southold To n.11 Bo11 ard11 Date:2/15/2023
Signature: Title:
_w._...................... __...��.....�_�_�.�.�.�. _...................... .�.ww�........�.�_. Land Preservation
..,Consultant
.�..M._mM._.�_._.�..........ww,ww�.._.._
PRINT FORM Paue 3 of