Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
1000-83.-2-17.1
Short Environmental Assessment Form Part I -Project Information Ittstructiotts for Comlj!tfinL Part 1—Project Information. The applicant or project sponsor is responsible for the completion of Part 1. Responses become part of the application for approval or funding,are subject to public review, and may be subject to further verification. Complete Part 1 based on information currently available. If additional research or investigation would be needed to fully respond to any item,please answer as thoroughly as possible based on current information. Complete all items in Part 1.You may also provide any additional information which you believe will be needed by or useful to the lead agency;attach additional pages as necessary to supplement any item. Part 1-Project and Sponsor Information.......... ......m..........�...-._.....__.......-...........�........._�..,.m...__.._ti,_.._......�� _-..__.mm.. ._.......W................. .. Name of Action or Project,....... -_.. .�,.._.________..m..._..-... .__..............,.._._............._...._........_,...........__..w_w_._.............�._.._.............w._._......... E&C Property Holdings.II,Inc.,Town Purchase of a Development Rights Easement Project Location(describe,and attach a location map):M.M............................�...._......................._.__ .w_ .. _..mm.w.w.w.. ..-. ............. ._.....-_ �.�...._.w................e....._�.�.�.... .�........ 10475 Oregon Road,Cutchogue;SCTM#1000-83.-2-17.1 Brief Description of Proposed....�__.w..............ww .....�.�.�.�.�.�.�.w__...... _....� _................-...w__...........__.........._._.-......_...... �_�_�_�...�...................-._........_......�.� p Action: Town purchase of a development rights easement on 25.7+/-acres of the 28.7+/-acre property. .................._ ......v_.... Name of Applicant or Sponsor:......__m...._w.www.w__ Telephone: ....... ..m .a....................ww_ ...w.... ......p_._._hone: (63 �..-__..w_�_....1).7_...., 65-5711 Southold Town Board E-Mail: melissa.spiro@town.southold.ny.us -Address _ _-.._...www._...........M..._........................W.w . ,..w................ 54375 Route 25,P.O.Box 1179 4 City/PO:www__ _.. ...._.._._.................................w._...............__ m__._....�_........... State:.......... 1Zip Code....._wu Southold � 71 1. Does thlegislative adoption of a plan,local law,ordinance, g NO YES e proposed action only involve the le administrative rule,or regulation? If Yes,attach a narrative description of the intent of the proposed action and the environmental resources that ✓ El may be affected in the municipality and proceed to Part 2. If no,continue to question 2. p approval g __..y.wther.government Agency? NO w ............. _w_r funding from an other�.. _. g. -vwv_._._._.......�.�.�_.�_..... 2. Does the proposedWaction require a ermit a royal o..._.. ___ YES If Yes,list agency(s)name and permit or approval: W M a....Totalacreag.�.�.�_.fth-Tot ..w....._-pr.�.�.�..o-s,'�e'-d.a,-c._..w_'? 25.7+/-acres � _._..._._.w_�_.....�.. .r.�_�w..�......... .... _..._m�.� 3. e of the site of the ro sed action b.Total acreage to be physically disturbed? 0 acres c.Total acreage(project site and any contiguous properties)owned or controlled by the applicant or project sponsor? 28.7 acres 4. Check all land uses that occur on,are adjoining or near the proposed action: ❑Urban ❑✓ Rural(non-agriculture) ❑✓ Industrial ❑ Commercial ❑✓ Residential(suburban) ❑ Forest ❑✓ Agriculture ❑ Aquatic ❑ Other(Specify): ❑Parkland Page 1 of 3 SEAF 2019 5. Is the proposed action...._............wwww_ _......w. ..w......�...............MM....................__._._...ww.www_. .............._....._._.._._ _...._.._..www._.w........................... ......._.v NO YES N/A a. A permitted use under the zoning regulations? F-1 � El P P plan? ...__..✓ ,........w_................. .� b. Consistent with the adopted comprehensive lan. El .............. ... ..w_..w_.w__w....ww__ �ww... ._ w . _ ..... ........,._v_.�. _....__. _. NO YES 6. Is the proposed action consistent with the predominant character of the existing built or natural landscape? •- .-w El Fv-1 7. Is the site of the proposed action located in,or does it adjoin, a state listed Critical Environmental Area? NO YES If Yes,identify: 0 �_.�.�.�.......,�......._........__._._ ._.��_�_._.............._..ww�_.................w�..............�...._.w._...�.�..... ..�._.w.�_......._.�,.�,.w....�.....wwwwwwww..w�..�.�.._�_.......... 'LI_._ .......... ................................,... NO YES 8. a. Will the proposed action result in a substantial increase in traffic above present levels? ....__ b. Are public transportation services available at or near the site of the proposed action? C. Are any pedestrian accommodations or bicycle routes available on or near the site of the proposed m El (v action? _ �l �J .l.��.p ro.._osed action meet exceed the state energy code....requirements? _.._....._ .._w..W. _.�_..........._. ����wwww._�..............._�_ _.......NO .�..�.�....._. 9. Does th e re ...� � . _.. YES P P gY q ..M If the proposed action will exceed requirements,describe design features and technologies; _M.M......___. _......_................................wM....................... .................................... ._.............. 1I L. ! 10. lf the proposed action connect to an existing public/private water..supe"y.............._----- --------------------- .........�_�.�_....... .......�_�w...._.._ �.._w....,N�• Y .��.�_.. If No,describe method for providing potable water: NA vi 1 p action connect to ............... ,.,,,._�_�.�. �w� _,.w�__.w.M...._w...._....wwww_w_...........�.�.�...,ww,..�....,,,Y.�_.._. �....I......Will the proposed acts _w_..............o existing wastewater utilities ������ g N ES If No,describe method for providing wastewater treatment: N w.w_...�....w..........................._., _.........................._........,_.. �_ w... _www_........;...,, '..e._.or district........ .w... ................... ................._. __......w _.__...s the p project sit._.m..w__._...w._w.... Y g g g —N-0--...... _......ES 12. a. Does the ro ect site contain,or is it substantially contiguous to a building,archaeological site, Ym which is listed on the National or State Register of Historic Places,or that has been determined by the Commissioner of the NYS Office of Parks,Recreation and Historic Preservation to be eligible for listing on the R1 F-1 State Register of Historic Places? b.Is the project site,or any portion of it, located in or adjacent to an area designated as sensitive for F1 archaeological sites on the NY State Historic Preservation Office(SHPO)archaeological site inventory? ...w_............ .... _w.__....._... . ......._ _______.ww_........ ...� . _�...�... —..............._._. ............. ....... �_.._ __ .._.... ~w.....m_..... 13. a. Does any portion of the site of the proposed action or lands adjoining the proposed action,contain N M._w_ O YES wetlands or other waterbodies regulated by a federal,state or local agency? El b. Would the proposed action physically alter,or encroach into,any existing wetland or waterbody? .w If Yes,identify the wetland or waterbody and extent of alterations in square feet or acres: ww..........w ................ ....... _...... .......w..._w� .m._.� . Page, 2 of 3 14. Idenffy the typical habitat types that occur on,µor are likely to be found on the project site. Check all that apply: _......._............. ❑Shoreline ❑ Forest ✓❑Agricultural/grasslands ❑ Early mid-successional ❑Wetland ❑ Urban ❑ Suburban 15. Does th_.._�mw___ .._._......... ._.........._....._...www._._ mm.H�contain any species animal,or associated__.....w__,w..... listed _.._-.... .._-__._..............w. .�..._w�.__ .....�....... e site of the proposed action co p habitats, li d by the State or NO YES Federal government as threatened or endangered? .�16. Is the project site located in the 100-year flood plan?.___w�._�_........_�_.�...._���_........__._._....... ._...._.�.........._._.�.�.�...�.�.�.._.............w_.......� w N0 YE.�._. _ p ro�ec_ ....S w_.. ..................... ✓ YES 17. Will the proposed action create storm water discharge,either from point or non-point sources? � F If Yes, a. Will storm water discharges flow to adjacent properties? _w.R] ... b. Will storm water discharges be directed to established conveyance systems(runoff and storm drains)? ✓ If Yes,briefly describe: .......... w.w.ww�_._....�_,�.._........... .w_......_�_....._._ w �_. �..�.�............w._........... _m.w_..w�.�.�.M � �- ����....................����������-..�.�_a ti n include�construction or other activities that would result in the impoundment�of�water NO � YES 18. Does the proposed c o _...__w or other liquids(e.g.,retention pond,waste lagoon,dam)? If Yes,explain the purpose and size of the impoundment: _...._....u._w... ....�.�.........w .M........ ���� El .._._. ___....�.----- P — ..�.�.�.�.�_,.....�.._.ww.w.._..._... .�_.�_m.._.....���_..............._�..ww�.�....._�_.,�..,..,� .wwww._.......�_��_.._.,umm�__.�........�.�.�.,...,......ww. ������..w... YE.�... 19. Has the site of the ro i posed action or an adjoining property been the locaton of an ac trve or closed solid waste NO S management facility? If Yes,describe: _........._ a�._�....�.�.�.�.�.......wv_. .. .w�.�........_.�....,_ m remediation(ongoing or �� ...... �_....m.w_... 20.Has the site of the proposed action or an adjoining property been the subject ofr�......._��� -......_m.�..�.. or � YES completed) for hazardous waste? IfYes, describe: __...._.......�w�.ww�................... .ww.... ..m�.....�.�.. ...�w�w�w._......�, w_._w_..........._�.w_...�.�...�..._._._..... �_�_....�.�..w...._ . _......_.u._ _...�. .... z �"_`� I CERTIFY THAT THE INFORMATION PROVIDED ABOVE IS TRUE AND ACCURATE TO THE BEST OF MY KNOWLEDGE � l�cant/s onsor/na�trn.z ..�.�.�..�.w...._.... _..........�.�w..�w...w. ...._.. .. .w_.._......... ........ .�.._.._.._.....�..... . _.w Melissa Spiro Date:1/3/2023 A1ip p __.M.Mw.www . _..........w..M......,,,.. .. Signature: Title:Southold Land Preservation Coordinator PRINT FORM Page 3 of 3 A ency C'st(inly f ffAppltcablej Project: E&C Property Haart ing Btl„Vnc. mm�mmxmamwawxararttuwecci.nears Date: 1/26/2023 Full Environmental Assessment Form Part 3-Evaluation of the Magnitude and Importance of Project Impacts and Determination of Significance Part 3 provides the reasons in support of the determination of significance. The lead agency must complete Part 3 for every question in Part 2 where the impact has been identified as potentially moderate to large or where there is a need to explain why a particular element of the proposed action will not,or may,result in a significant adverse environmental impact. Based on the analysis in Part 3,the lead agency must decide whether to require an environmental impact statement to further assess the proposed action or whether available information is sufficient for the lead agency to conclude that the proposed action will not have a significant adverse environmental impact. By completing the certification on the next page,the lead agency can complete its determination of significance. Reasons Supporting This Determination: To complete this section: • Identify the impact based on the Part 2 responses and describe its magnitude. Magnitude considers factors such as severity, size or extent of an impact. • Assess the importance of the impact. Importance relates to the geographic scope,duration,probability of the impact occurring,number of people affected by the impact and any additional environmental consequences if the impact were to occur. • The assessment should take into consideration any design element or project changes. • Repeat this process for each Part 2 question where the impact has been identified as potentially moderate to large or where there is a need to explain why a particular element of the proposed action will not,or may,result in a significant adverse environmental impact. • Provide the reason(s)why the impact may,or will not,result in a significant adverse environmental impact • For Conditional Negative Declarations identify the specific condition(s)imposed that will modify the proposed action so that no significant adverse environmental impacts will result. • Attach additional sheets,as needed. See Short Environmental Assessment Form prepared by Southold Town Land Preservation Coordinator signed and dated 1/3/2023. Determination of Significance-Type 1 and Unlisted Actions SEQR Status: ❑ Type I © Unlisted Identify portions of EAF completed for this Project: ©Part 1 ❑Part 2 ©Part 3 Spiro, Melissa From: Spiro, Melissa r ..... W Sent: Wednesday, December 21, 2022 1:23 PM DEC 2 20? To: Terry, Mark '�own - Subject: E&C Holding 83.-2-17.1, SEAF and LWRP tiiof Planning Board On Jan. 3rd the Town Board will schedule the public hearing for Jan. 13th for the E&C Holding II, Inc. Town development right acquisition. Since we are all very busy, I'm sending the SEAF and LWRP to you ahead of time. I gave the paperwork to Jess. Thanks, Melissa i