Loading...
HomeMy WebLinkAboutCoonan, Sally S�FFO(,��° Michael J.Domh 'esident O�Q C�� M1 . Town Hall Annex John M. Bredemeyer IIi, vice-President �� yJ,�?j 54375 Route 25 Glenn Goldsmith y a P.O.Box 1179 A.Nicholas Krupski ' _rft Southold,NY 11971 Greg Williams A Telephone(631)765-1892 Fax(631)765-6641 BOARD OF TOWN TRUSTEES TOWN OF SOUTHOLD Date/Time: Completed in field by: Cole Environmental Services, Inc. on behalf of SALLY COONAN requests a Wetland Permit to construct a 4' high by 15' long timber retaining wall with a 10' easterly return and a 12' westerly return; the top or filled area of the retaining wall to be vegetated with native beach grass and other salt tolerant coastal plant species; create a 6" earthen berm along the landward edge of the property scarp; add two (2) 4' wide by 6' deep dry wells to collect surface and roof runoff from dwelling and patio interconnected to a 4'x24' French Drain; add two (2) 8'x12' deep storm drains in the middle of the property to contain runoff emanating from adjacent properties; install 6" to 8" earthen berm within property lines and install three (3) 8'x12' interconnected storm drains with drains to be installed slightly below grade; and install a 2'x16' trench drain at the entry point of storm water coming from the road and surrounding properties. Located: 2662 Paradise Shores Road, Southold. SCTM# 1000-80-1-4 CH. 275-3 - SETBACKS WETLAND BOUNDARY: Actual Footage or OK=q Setback Waiver Required 1. Residence: 100 feet 2.. Driveway: 50 feet 3. Sanitary Leaching Pool (cesspool): 100 feet 4. Septic Tank: 75 feet 5. Swimming Pool and related structures: 50 feet 6. Landscaping or gardening: 50 feet 7. Placement of C&D material: 100 feet TOP OF BLUFF: 1. Residence: 100 feet 2. Driveway: 100 feet 3. Sanitary leaching pool (cesspool) 100 feet: 4. Swimming pool and related structures: 100 feet Public Notice of Hearing Card Posted: Y / N Ch. 275 Ch. 111 SEQRA Type: 1 II Unlisted Action Type of Application: Pre-Submission Administrative Amendment Wetland Coastal Erosion Emergency Violation Non-Jurisdiction Survey <_ 5 years: Y/N Wetland Line by: C.E.H.A. Line Additional information/suggested modifications/conditions/need for outside review/consultant/application completeness/comments/standards: I have read & acknowledged the foregoing Trustees comments: Agent/Owner: Present were: J. Bredemeyer M. Domino G. Goldsmith N. Krupski G. Williams Other STAGGER JOINTS 3.5' MIN RETAINING WALL FRONT VIEW 13.5► 0 v 18.01 STAGGER DEAD MEN BERM EL 14 BETWEEN COURSES NOTE PROPOSED RETAINING WALL \r T `�/-(/ `� y 611X 6" PRESSURE TREATED r JUTE NETTING WITH BEACH GRASS NVNv^NN•JJNYNNMYiTnN n `I `I Wv+Nv^.YNv^NNv^Nv^v^v^+/+rNv^^ aJY� w Y �.w�nrr�r�rr�rrr.k- LANTINGS SEED AREA Nv^vRNN NY-NNNJ.IN.nv^ +.^NNYv^v^W NHY+v^M1.lcIN.PY'NNN.^•..v w WITH SALT TOLERANT SEED MIX NOTE RETAINING WALL 6"X6" PRESSURE TREATED AUG6 2018 i� EXISTING 8DECK 48.0H LDEAD MEN TIE BACKS y Southold Tillow0 RETAINING WALL CROSS SECTION NTS Board of Trustees ao AHW BEACH DRAWN BY:DENNIS COLE -,a DATE:07.07.18 FILE NAME:SALLY COONAN Ott SITE ADDR:2662 PARADISE SHORES ROAD C�"�a1 �0C01Q �'� SOUTHOLD,NY 631-369-9445 7M140.:1000-8-1-4 . SURVEY of PROPERTY W. ' SITUATE x/Nu LAND 5SOUTHOLD, TOWN O FSOUTHOLD SUFFOLK COUNTY, NEWYORK m7Suffolk Tax Map No.:.1006-80-01-4 FPT:631-957-2400 SOUTH 4th STREET DATE SURVEYED:,7)6Jaoi5 enhurst, New York e®mjslandsurvey.com SCALE:1"=36' F:631-226-2400 SURVEYEDBY:R.B. JOB NO.S15- 4�6�0454 bRAWNBV_D.D. $' k$4 Cp �l Guaranteed to: 4' C The judicial Title Insurance Agency LLC ` 6-6 � 3Q Q�� First American Title Insurance Company , 0 : , Sully Coonan Guaranteed Rate,Inc.,its successors and/or assigns ` ti O; � '- •. 00 USE ® �$ INLET 1 INLET „. .�:.' 12,9' 1--- 1 nt ; \� C\j " INLET 1.7 1 COTE Ot ENCLOSm SHOWER T® M-77: INLE 1� 1 � 1 y I� 2.1' �l t UN OL POLE l 2.6' 2.2' l rpt CURB ONLINE "�1 1 T w � Ory co Q 1 � Q4I, QIL1 Cu y 1 t�i°a�. 1QQ:O D'............... ST RLE LML U_RE CA Aspf* �j n �r,I�I V '_ C h « tr r� R. +✓. ►/ , 1V 59048 '40'' I 'WEST'`�HORE 44. 95' DRI VE C� 9 AUG - 6 2018 Southold Town Board of TrusteesFR—UIS—IONS N UPDATES •— ADDITIONS DATE: DESCRIPTION: CHECKED BY: ���0 LAND S 2 (t) UNAUtHOR12ED ALTERATION OR AODRION 10 11•115 SURVEY MAP 56NPING A LICENSED LAND SURVEYOR'S SEAL 15 A VTOLATIOtl Or SECTION 7209. SUE-01VtS1UN 2; OF NEW YOR>r STAY£ EOUCA11ON LAV, (2) 040' BOUNOMY SURVEY MAPS WITH 1HE 5UI"V OR'5'EMSOSSET ,• SEAL ARE GENL9NE %RUE AND CORRECT COPIES OF THE SURVEYOR'S ORICINAL WORK AND OPINION, i3) CERRACAIMNS ON THIS BOUNDARY SURVEY AWP SIGNIFY THAT THE MAP WAS PREPARED IN ACCORDANCE WITH DIE CURRENT EX15TL':G CURE Of PRACRCE FOR LAND SURVEYSaI1L+aTED 13V THE NEW YORK STATE ASSOCIAtION Or PROFESSIONAL LAND SURVEYORS, INC. THE CERTIFII:AtION IS 0.411EO t0 PERSONS FOR 'WHOM THE 90UNDARY SURVEY MAP IS PREPARED, to THE TtTLE COMPANY, to rHE'TTOVERNAIEIVIAL AGENCY, AND TO THE F- L EN D ' KG INy7Fi UTION LISTED ON THIS 000NDARY SUP.Vei NAP..(4) THE Cr.RiIFCA1LON5 HEREIN ARE NOT TRAN5FERABLE. (5) THE LOCATION OF UNDERGROUND IMPROVEMENTS OR FNCROACHIAENTS ARE NOT ALWAYS KNOWN AND O:EN MUST BE ESTIMATED. -IF MY 7 UMOEPMUND IMPROVEMENTS OR ENCROACHMEN"IS EXIST OR ARE SI4l1WN,THE IMPROVEMENTS OR ENCROACHMENTS ARE NOT COVERED BY THIS SURVEY, (E) THE OFFSET (OR DIIAENSiONS) SHOWN HEREON :ROM 7HE SIR4JCIURES TO THE PROPERTY LINES ARE FOR A SPECIFIC PURPOSE AND USE AND THEREFORE ARE NO, INTENDED TO GRUIDE THE ERECITON OF FENCES, RETAINING WALLS, POOLS. PAuO> PLAt:TING AREAS, ADDITIONS TO BUILDINGS, AND ANY OTIIFR TYPE OI!'COT{STRUCTION. (7) PROPERTY CORNLR MONUMENTS WERE NOT SET A5 Pi\RT OF THIS SURVEY. (B) THIS 5URVE'e WAS -ERF'ORMEi1 WITH A SPEC.tRA FOCUS 30 ROBOTIC tO1AL 57ATi0N• Site Plan ft ��ExISTiN BULKHEAD EXISTING STAIRS 4 AND PLATFORM RESEED AND/ R'.': - ._ 2 EXISTING BULKHEAD PLANT WITH _ �-' _ _�LPROPOSED BEACH-GRASS 4`RETAINING WALL \rte —ANMRETUR( GRANULAR NON-FUNCTIO A;.. y -". � ��FILL DRAIN(REMOVTOPPLED-WITH � CtEAN-SAND 4°~ k-ND-P EATI ISH _' . tt BEACH GRASS '"s°'Ea�irH eERM` 'r'. ON JUTE MESH ON-FUNCTIONA owe DW2 `DRAIN(OFF-SITE) 14 ft 4'X24'FRENCH DRAT GUTTERS AND LEANDER EXISTING STONE �— TO DRY WELLS _► PATIO NOWFUNCTIONA -sT`v House DRAIN(OFF SITE) i 11n STY HOUSE i a3ibM PvI Notes: DW1,DW2-4'x 6'Precast Dry Wells — �- — DW3-DW7 8'x 12'Precast Stormwater i 1 Leaching Rings Trench and French Drains VA 24 and 2'x 16' (`Jl 2 err House STORM WATER r- FLOW► 3 DW3 f �1 �f I DW4 STORMWATER F40W /�6 St I H B �g�n9 N°ase Dw5' Are graded So drare 1 STALL STOMWATER CATCH BASIN int\` D 3 8'WIDE BY 12'DEEP STORMWATER 16 Dws R CHARGE UNITS. DW7 �:,ig\Lt�A, c�•��N � X114 6 Q Peed w Rped � I LU 296' (� pp �� I1 �rl IJ a AUG ` 6 2018 z2 Southold Town 22 ft Board of Trustees DRAWN BY:DENNIS COLE PLOT PLAN BASED ON SURVEY PREPARED BY: j;,,,; DATE: 07.07.18 MICHAELJ.SCALICE ,'�! FILE NAME:SALLY COONAN DATED:07.06.15 SITE ADDR:2662 PARADISE SHORES ROAD w "From Conndtation.to Comytetion" SOUTHOLD,NY ELEVATION DATE SUFFOLK COUNTY 2'CONTOURS NAD 88 631-369-9445 SCTM NO.:1000-8-1-4 STRUCTURES AND ROAD SURFACES S FROM SCGIS 2016 AERIAL PHOTOGRAPHY 1 inch - 20 feet Michael J.Domino,President O��OF SUUj�ol Town Hall Annex John M.Bredemeyer III,Vice-President ~ 54375 Route 25 P.O.Box 1179 Glenn Goldsmith Southold,New York 11971 igs A.Nicholas Krupski741% �pQ Telephone(631) 765-1892 Greg Williams `,oU '� Fax(631) 765-6641 BOARD OF TOWN TRUSTEES TOWN OF SOUTHOLD October 18, 2018 Dennis Cole Cole Environmental Services, Inc. P.O. Box 471 Manorville, NY 11949 RE: ENVIRONMENTAL DECLARATION OF SIGNIFICANCE PURSUANT TO NEW YORK STATE ENVIRONMENTAL QUALITY REVIEW ACT NYCCR PART 617 SALLY COONAN 2662 PARADISE SHORE ROAD, SOUTHOLD SCTM# 1000-80-1-4 Dear Mr. Cole: The Southold Town Board of Trustees adopted the following Resolution at a meeting held on Wednesday, October 17, 2018: DESCRIPTION OF ACTION: Cole Environmental Services, Inc. on behalf of SALLY COONAN requests a Wetland Permit to construct a 4' high by 15' long timber retaining wall with a 10' easterly return and a 12' westerly return; the top or filled area of the retaining wall to be vegetated with native beach grass and other salt tolerant coastal plant species; create a 6" earthen berm along the landward edge of the property scarp; add two (2) 4' wide by 6' deep dry wells to collect surface and roof runoff from dwelling and patio interconnected to a 4'x24' French Drain; add two (2) 8'x12' deep storm drains in the middle of the property to contain runoff emanating from adjacent properties; install 6" to 8" earthen berm within property lines and install three (3) 8'x12' interconnected storm drains with drains to be installed slightly below grade; and install a 2'x16' trench drain at the entry point of storm water coming from the road and surrounding properties. Located: 2662 Paradise Shores Road, Southold. SCTM# 1000-80-1-4 S.E.Q.R.A. NEGATIVE DECLARATION OF ENVIRONMENTAL SIGNIFICANCE: WHEREAS, on October 15, 2018 the Southold Town Board of Trustees found the application of SALLY COONAN to be classified as an Unlisted Action Negative Decision pursuant to SEQRA Rules and Regulations. A Short Environmental Assessment Form and a field inspection have been completed by the Board of Trustees Page 1 of 2 and it is here etermined that it will not have a "hificant effect on the environment, Y and; WHEREAS, the Southold Town Board of Trustees are familiar with this project having visited the site on September 12, 2018, and having considered Cole Environmental Services, Inc. plans for this project dated July 7, 2018, and a Michael J. Scalice Land Surveying survey dated July 6, 2015, it has been determined by the Southold Town Board of Trustees that all potentially significant environmental concerns have been addressed as noted herein: • No existing rocks or boulders are to be utilized, moved, or relocated on the beach. • Access to the site will be landward of the existing bulkhead. • Vegetative, non-structural measures capable of stabilizing the bluff without storm water mitigation is insufficient to control erosion. • A September 18, 2018 review of the drainage plans prepared by Cole Environmental Services, Inc. dated July 7, 2018 conducted by the Southold Town Office of the Engineer suggests that the proposed French drains and berms may create the potential for increased erosion but recognizes the need for an engineered bluff stabilization/erosion control plan. THEREFORE, on account of the foregoing, the Southold Town Board of Trustees Approve and Authorize the preparation of a Notice of Negative Declaration pursuant to SEQRA for the aforementioned project. If you have any questions regarding the above, please contact this office. Very truly yours, _)TLA� / - Michael J. Domino, President Board of Trustees Page 2 of 2 SUFFoc�- Michael J.Domino,President O�Q CSG Town Hall Annex John M.Bredemeyer III,Vice-President �� �� � 54375 Route 25 Glenn Goldsmith y x P.O.Box 1179 A.Nicholas Krupski -rill Southold,NY 11971 Greg Williams y ® p! Telephone(631)765-1892 Fax(631)765-6641 BOARD OF TOWN TRUSTEES TOWN OF SOUTHOLD TO: Jamie Richter & Michael Collins Town Engineers FROM: Michael Domino, President Board of Trustees DATE: September 18, 2018 RE: SALLY COONAN 2662 PARADISE SHORES ROAD, SOUTHOLD SCTM#: 1000-80-1-4 The Board of Trustees are in the process of reviewing an application for the above referenced property to install a small retaining wall with two returns on the embankment, and creating berms, installing drywells, French drains, and a trench drain throughout the property (project description attached). The Board have concerns regarding the proposed drainage for stormwater runoff throughout the property as submitted. The Board of Trustees are requesting that the Town's Engineering Department review the attached project and drainage plans prepared by Cole Environmental Services, dated July 7, 2018 and respond at your earliest convenience. If you require any additional information, please don't hesitate to ask. Attachments Michael J. Domti 'resident o��SOF0Q Town Hall Annex John M. Bredemeyer l.i`'i; vice-President 54375 Route 25 Glenn Goldsmith N a P.O.Box 1179 A.Nicholas Krupski • Southold,NY 11971 Greg Williams p! Telephone(631)765-1892 Fax(631)765-6641 BOARD OF TOWN TRUSTEES �i TOWN OF SOUTHOLD Date/Time:__1L JJ0 Completed in field by: Cole Environmental Services, Inc. on behalf of SALLY COONAN requests a Wetland Permit to construct a 4' high by 15' long timber retaining wall with a 10' easterly return and a 12' westerly return; the top or filled area of the retaining wall to be vegetated with native beach grass and other salt tolerant coastal plant species; create a 6" earthen berm along the landward edge of the property scarp; add two (2) 4' wide by 6' deep dry wells to collect surface and roof runoff from dwelling and, patio interconnected to a 4'x24' French Drain; add two (2) 8'x12' deep storm drains in the middle of the property to contain runoff emanating from adjacent properties; install 6" to 8" earthen berm within property lines and install three (3) 8'x12' interconnected storm drains with drains to be installed slightly below grade; and install a 2'x16' trench drain at the entry point of storm water coming from the road and surrounding properties. Located: 2662 Paradise Shores Road, Southold. SCTM# 1000-80- 1-4 CH. 275-3 - SETBACKS WETLAND BOUNDARY: Actual Footage or OK=4 Setback Waiver Required 1. Residence: 100 feet 2. Driveway: 50 feet 3. Sanitary Leaching Pool (cesspool): 100 feet 4. Septic Tank: 75 feet 5. Swimming Pool and related structures: 50 feet 6. Landscaping or gardening: 50 feet 7. Placement of C&D material: 100 feet TOP OF BLUFF: 1. Residence: 100 feet 2. Driveway: 100 feet 3. Sanitary leaching pool (cesspool) 100 feet: 4. Swimming pool and related structures: 100 feet Public Notice of Hearing Card Posted: Y / N Ch. 275 Ch. 111 SEQRA Type: 1 II Unlisted Action Type of Application: Pre-Submission Administrative Amendment Wetland Coastal Erosion Emergency Violation Non-Jurisdiction Survey <_ 5 years: Y/N Wetland Line by: C.E.H.A. Line Additional information/suggested modifications/conditions/need for outside review/consultant/application completeness/comments/standards: 1 have read & acknowledged the foregoing Trustees comments: Agent/Owner: Present were: J. Bredemeyer vfA. Domino G. Goldsmith N. Krupski -/_G. Williams Other Z. lip .......... ova NO .w ;' -2:/-2 018, 11 '1'9 '�•: _may• .11� �•.�'•+'. ��!.!• '� � � ; !'�`��nCC '{�,,,f� • 't 1 ��1 T. - ^ � Cit. �1,� i f• ! lot- %J/ 12 /2018 ot-9/ 12 /2018 11 '..19 J • • News Government Police Education Sports Opinion Community Obituaries News Quick-moving storm dumps more than 4 inches of rain in Mattituck by Tim Gannon 1 08/23/2017 3:16 PM I YI Around noon Friday,the skies opened up for about 90 minutes,parking lots and basements flooded,lawns in the middle of a business district had"high tide marks"and a car even floated away. Some roads that have had flooding problems in the past,like Old Sound and Bray avenues in Mattituck,had really big problems Friday. Observer stations that report to the National Weather Service reported 4.07 inches in Mattituck,3.79 inches in Riverhead,3.44 inches in Baiting Hollow,3.96 inches at the Cornell Cooperative Extension on Sound Avenue and 1.30 inches at Orient Beach State Park "Mattituck really got the brunt of the storm," said Southold Town Highway Superintendent Vincent Orlando. Mr.Orlando said he was checking up on the some of the hardest hit areas Friday when he came upon a truck floating in the recharge basin off Bray Avenue. He said he helped the driver out of the vehicle and drove him home. "The water was like a river going down there,"Mr.Orlando said."He tried to go through it and the water just lifted up his truck and floated him into the recharge basin." The parking lot at the Mattituck Plaza shopping center also flooded with several inches of water and flooding in front of Handy Pantry left the roadway"almost impassable,it was so flooded,"Mr.Orlando said,adding that he'd never seen that section of Main Road so flooded before. The businesses on the north side of Main Road,opposite Handy Pantry,still had"high tide marks"on their lawns several days later, Ms.Long got a double dose of flooding,since she lives on Bray Avenue. "For years it's flooded there,"she said of the recharge basin."We call it Lake Bray." While she's never seen a car float away before,she said people constantly try to drive through the street while it's flooded and end up losing bumpers and parts of their cars. Riverhead Town also saw lots of floods. "It was flooded all over,"Highway Superintendent George Woodson said. "About four inches in an hour.But once it stopped,all the flooding kind of subsided within a half-hour to 45 minutes." He said water needs time to drain naturally, and this storm happened too quickly for that to happen. Farm roads like Reeves Avenue,Sound Avenue,Church Lane and Roanoke Avenue were among the most flooded areas in town, he said. Mr.Woodson said he's been speaking with county Legislator Al Krupski(D-Cutchogue) about developing ways to contain water on farms. But with a storm like Friday's,he added, "there's no way any drain can handle that much rain at once.It's just Mother Nature's wrath." ,r • t q^� r he said,referring to debris that was washed up by the storm. For Doug Bogovich,who lives at the bottom of Old Sound Avenue in Mattituck,it was a familiar story. A drain in front of his property catches most of the runoff from Old Sound Avenue.But on Friday,his driveway looked like a river and his house and garage were flooded.He said the town had just resurfaced the road a few days earlier. "I've been here 40 years,and guaranteed, two to three times a year,this happens,"he said Friday."All of the water from the entire road and the side roads dump into here.This is the only drain on Old Sound Avenue.It's insufficient drainage." "It was all the way up to the loading dock,the whole basement was flooded out,"said Jennifer Long of Dame Construction,across the street from Mr.Bogovich. Mr.Orlando said his department recently installed new drainage on Old Sound Avenue, but the amount of rain that fell Friday was"a little extreme." "No drain in town was able to keep up with that,"he said."We measured 3.9 inches in about 90 minutes." The recent roadwork included installing larger pipes and connecting them to a drainage system on Lipco Road,Mr.Orlando said.Because Lipco Road is uphill from Mr. Bogovich's property,the pipe was dug down 6.5 feet by the time it reached Lipco. He said additional work on Old Sound Avenue is planned. Photo Shf PHOTOS JUNEI 010 SALLY COONAN 2662 PARADISE SHORES ROAD SOUTHOLD, NY 01 Y., .._ FACING SOUTH-SHOWS PERMITTED WOOD DECK AND STAIRS AND WASHOUT AREA a i ■% i 7 t it at at uW. ANOWf FACING SOUTH SHOWS ERODED AREA WHERE RETAINING WALL, DRY WELLS ON THE TOP, AREA IS TO BE REVEGETATED. oto Sheet • PF )S JUNE 2010 SALLY COONAN 2662 PARADISE SHORES ROAD SOUTHOLD, NY i' w :F'� # ��rx',�'� +r.f,`::•it, ' _a,;.' i. .p ,art` �'! iC SOUTH SIDE OF PROPERTY WHERE STORM WATER RECHARGE UNITS ARE PROPOSED ti — , K S — a;. Y � ,r •rs R k,.s AREA BETWEEN BOTH RESIDENCES-THE CURRENT DRAINAGE PATH FOR STORMWATER Photo Sh PHOTOS JUNE X010 SALLY COONAN 2662 PARADISE SHORES ROAD SOUTHOLD, NY r w ooNON■ I i• r FACING SOUTH—SHOWS PERMITTED WOOD DECK AND STAIRS AND WASHOUT AREA * _ jwwli�p�lr FACING SOUTH SHOWS ERODED AREA WHERE RETAINING/f WALL, DRY WELLS ON THE TOP, AREA IS TO BE REVEGETATED. oto Sheet . .)h ►S JUNE 2010 SALLY COONAN 2662 PARADISE SHORES ROAD SOUTHOLD, NY r � ilk �'.Ste" •i. °'!. _ �� a '. �F�Xis.;$='• ,.� rbr...:. - ... ,: �e SOUTH SIDE OF PROPERTY WHERE STORM WATER RECHARGE UNITS ARE PROPOSED -�w . .t �4 r a. A ! AREA BETWEEN BOTH RESIDENCES-THE CURRENT DRAINAGE PATH FOR STORMWATER Lff W M From bulkhead facing house—shows eroded bank. Photos 8/21/17 r� _ � t 4 sit f `� v Photos show erosion along existing stairs and eroded hole along top of bank. Photos 8/21/17 •t t "R ' I a a 'r _ dei R twn .cwelion �. . S� o A w 1 is u...� x�.ttr �+►... —____"���..>r _ —,__i , -- — � ax.ac+crzry�x slzasxsxY I �`�--�� I p �e � S, � WO � ?ROPCRTY tA,iP J - \ z SEE SEC.N0.t31 14 �... a �...� __ p__ 2t.t t 13 • I �— J a____- ___ ______ w 1N '_- A ---�___ - --- ---------- ------- �w�wwr,+v A 1� - A11 A a - A __-______ -A _ A " Q -- (C)-2+-- �t a (E1 1P- to_ w A _ - __ to ___ -______ - 1] itY.1 10. __ A____ 20. LAKE 20 DR. a a 31 __4- 6 -A ---__--- tom.) (5p) 13 -- A 30.1 ' i -- la- --- -- -- A (G� 6 t A ° b ' - b.l _--__-_____ ____o____ aJ _ to r I ® d m GROVE A- q i 120 1 ;+ Ib, 2B NOTICE COUNTY OF SUFFOLK © E ott ,n ' '� atxrman sEcraNNo 2 Real Property Tax Service Agency r 80 ounlY unrr RNwnua,Nr ttpt M Oto rrr n a 121 wnw 12N a —___ era --n-- ora--lw-- A ' iwerw 1aM 1x1a1 —____ P PROPERTY aIAP Cantrell, Elizabeth From: Cole Environmental Services <cesenv@gmail.com> Sent: Tuesday, November 13, 2018 3:07 PM To: Cantrell, Elizabeth Subject: Re: Sally Coonan; SCTM# 1000-80-1-4 Hi Elizabeth, We are still waiting on plans to be amended. Please postpone the Coonan application until Dec 12. Thanks, Dennis & Chris Cole Cole Environmental Services, Inc. 425 Montauk Highway East Quogue,NY 11942 631-369-9445 CES Website LinkedIn Facebook On Tue,Nov 13, 2018 at 11:59 AM Cantrell, Elizabeth<elizabethc cr,town.southold.ny.us>wrote: Good Morning, Last month the Board of Trustees tabled your application so that someone could be present to represent the I property owner. The Board had submitted a review of your project to the Town's Engineer. Attached is his report. The Board has asked that I remind you that tomorrow night is the scheduled public hearing date for Ms. Coonan's application. If you cannot attend, please let us know so that we can postpone said application for our December 12th public hearing agenda. I 3 56�a &"Ae& 3� 7 i Senior Clerk Typist i Town of Southold i Board of Trustees i 631-765-1892 i i Y S ,��,, FFO SCOTT A. RUSSELL � , JAMES A. RICHTER, R.A. SUPERVISORF MICHAEL M. COLLINS, P.E. � a TOWN HALL - 53095 MAIN ROAD T Tel. (631)-765—1560 �� ® �� D F��. � )=9�jl MICHAEL.COLLINS�ic TOWN.SOUTHOLD.NY.US �0 �® JA HTERnTOWN.SOUT U SEP 1 9 2018 OFFICE OF THE ENGINEELSOutL9!d Tevm TOWN OF SOUTHOLD ®oar;Trustees Michael Domino - President September 18, 2018 Southold Town Board of Trustees 53095 Main Road Southold, New York 11971 Re: Sally Coonan Property, Drainage Review 2662 Paradise Shores Road, Southold SCTM #: 1000-80-01-04 Dear Mr. Domino: As per a request from your office I have reviewed the drainage plan for the above referenced property. The survey was prepared by the office of Michael J. Scalice, LS dated 7/6/15 and the drainage design was prepared by "CES", Cole Environmental Services dated 7/6/15. Please consider the following: 1. The drainage design does not provide calculations that would allow me to review how the drainage design was formulated. 2. Drywells # 5, 6 & 7 are noted with an earth berm surrounding the downhill side of the drainage. This berm should extend southerly on the easterly side until it re-connects with the shown 18' contour. The berm should also be established at or above the 18' contour height and be fully vegetated. 3. There is a proposed 6" Earth Berm seaward of a proposed French drain along with Drywells # 1 & 2 on the northerly side of the residence. The location of this berm is basically the Top of Bluff. This small berm will only serve to create an even greater potential for erosion failure due to the potential build-up of water that may over top and/or release at a single point. A 5' wide vegetated non-disturbance buffer would be more appropriate at this location. Elevated non-contiguous walking path stone or other permeable surface could be used to traverse the buffer area. 4. The face of slope between the top of berm and the existing bulkhead ranges from the 4' contour to the 14' contour within a horizontal distance of about 20' which would be a 50% slope. This slope should be engineered in more detail. Sand covered with peat moss and grass cannot support itself with this steep slope even with the utilization of Jute Mesh. If you have any questions concerning this matter, please coAct my office. Sin erely ames . 4er, .A SCOTT A. RUSSELL SS , , JAMES A. RICHTER, R.A. SUPERVISOR f` "? MICHAEL M. COLLINS, P.E. °,' : TOWN HALL - 53095 MAIN ROAD , t TO I�W O 1 1 Tel. (631)-765—1560 1 n 9( 5�� F ua ,, MICHAEL_COLLINS_ctTOWN_SOUTHOLD.NY,US. �r e JAMIE. C IERa,TOWN,SOUTHOLDNY[. § _ ...._.. ......... S EP 1 8 2018 OFFICE OF THE ENGINEER Southold Town TOWN OF SOUTHOLD ar o T e Michael Domino - President September 18, 2018 Southold Town Board of Trustees 53095 Main Road Southold, New York 11971 Re: Sally Coonan Property, Drainage Review 2662 Paradise Shores Road, Southold SCTM #: 1000-80-01-04 Dear Mr. Domino: As per a request from your office I have reviewed the drainage plan for the above referenced property. The survey was prepared by the office of Michael J. Scalice, LS dated 7/6/15 and the drainage design was prepared by "CES", Cole Environmental Services dated 7/6/15. Please consider the following: 1. The drainage design does not provide calculations that would allow me to review how the drainage design was formulated. 2. Drywells # 5, 6 & 7 are noted with an earth berm surrounding the downhill side of the drainage. This berm should extend southerly on the easterly side until it re-connects with the shown 18' contour. The berm should also be established at or above the 18' contour height and be fully vegetated. 3. There is a proposed 6" Earth Berm seaward of a proposed French drain along with Drywells # 1 & 2 on the northerly side of the residence. The location of this berm is basically the Top of Bluff. This small berm will only serve to create an even greater potential for erosion failure due to the potential build-up of water that may over top and/or release at a single point. A 5' wide vegetated non-disturbance buffer would be more appropriate at this location. Elevated non-contiguous walking path stone or other permeable surface could be used to traverse the buffer area. 4. The face of slope between the top of berm and the existing bulkhead ranges from the 4' contour to the 14' contour within a horizontal distance of about 20' which would be a 50% slope. This slope should be engineered in more detail. Sand covered with peat moss and grass cannot support itself with this steep slope even with the utilization of Jute Mesh. If you have any questions concerning this matter, please contact my office. Sincerely, James A. Richter, R.A OFFICE LOCATION: O��QF SU(/r�Ol MAILING ADDRESS: Town Hall Annex P.O.Box 1179 54375 State Route 25 Southold, NY 11971 (cor.Main Rd. &Youngs Ave.) Southold, NY 11971 p@ Telephone: 631 765-1938 Fax: 631 765-3136 COUNTY LOCAL WATERFRONT REVITALIZATION PROGRAM TOWN OF SOUTHOLD MEMORANDUM To: Michael Domino, President Town of Southold Board of Trustees From: Mark Terry, AICP LWRP Coordinator Assistant Town Planning Director Date: September 13, 2018 Re: LWRP Coastal Consistency Review for SALLY COONAN SCTM# 1000-80-1-4 Note, that water entering the subject property may be in violation of Chapter 236 Stormwater Management of the Southold Town Code. Cole Environmental Services, Inc. on behalf of SALLY COONAN requests a Wetland Permit to construct a 4' high by 15' long timber retaining wall with a 10' easterly return and a 12' westerly return; the top or filled area of the retaining wall to be vegetated with native beach grass and other salt tolerant coastal plant species; create a 6" earthen berm along the landward edge of the property scarp; add two (2) 4' wide by 6' deep dry wells to collect surface and roof runoff from dwelling and patio interconnected to a 4'x24' French Drain; add two.(2) 8'x12' deep storm drains in the middle of the property to contain'runoff emanating from adjacent properties; install 6" to 8" earthen berm within property lines and install three (3) 8'x12' interconnected storm drains with drains to be installed slightly below grade; and install a 2'x16' trench drain at the entry point of storm water coming from the,road and surrounding properties. Located: 2662 Paradise Shores Road, Southold: SCTM# 1000-80-1-4 The proposed action ' has been reviewed to Chapter 268, Waterfront Consistency Review of the Town of Southold Town Code and the Local Waterfront Revitalization Program (LWRP) Policy Standards. Based upon the information provided on the LWRP Consistency Assessment Form submitted to this department, as well as the records available to me, it is my recommendation that the proposed action is CONSISTENT with the LWRP policies and therefore CONSISTENT with the LWRP. Pursuant to Chapter 268, the Board of Trustees shall consider this recommendation in preparing its written determination regarding the consistency of the proposed action. Cc: Damon Hagan, Assistant Town Attorney Y - ���ggFFO(kEe� _ Peter Young,Chairman y Town Hall,53095 Main Rd. Lauren Standish,Secretary P.O.Box 1179 `F Southold,NY 11971 Telephone(631)765-1889 Fax(631)765-1823 Conservation Advisory Council Town of Southold At the meeting of the Southold Town Conservation Advisory Council held Wed., September 12, 2018 the following recommendation was made: Moved by John Stein, seconded by Peter Meeker, it was RESOLVED to SUPPORT the application of SALLY COONAN for a bluff retaining wall and stormwater containment system consisting of a low berm at top of scarp slope; French drain leading to drywells landward of the scarp (drywells to contain roof and patio run-off), mid-property drywells to contain neighbor stormwater run-off and on-site surface stormwater run-off and trench drain leading to a series of drywells to contain run-off from adjacent properties and local access road/driveway. Located: 2662 Paradise Shore Road, Southold. SCTM#80-1-4 Inspected by: John Stein, Peter Meeker Vote of Council: Ayes: All Motion Carried i James F.King,President ��Ur SOy� Town Hall Annex Bob Ghosio,Jr.,Vice-President ,`4 01 0 54375 Main Road P.O.Box 1179 Dave Bergen Southold,New York 11971-0959 John Bredemeyer Michael J.Domino �Q Telephone(631)765-1892 Fax(631) 765-6641 BOARD OF TOWN TRUSTEES TOWN OF SOUTHOLD Office Use Only D' E E 8N E. oastal Erosion Permit Application ! E./as Permit A.ppIication - Administrative Permit ion A��i 6 2018 _Amendment/Trans / x - X eceived Application: -- �1// eceived Fee:$ Z Completed Application s t Southold.Tb 6i es Incomplete J s _SEQRA Classifica ' n: ►�I'��� ri- a Type l=_-Type IIUnlisted , Coordination:(date sent) LWRP Consistency Assess, }ent ortn d DAC Referral Semi g,Z � ': , ate of Inspection: Receipt of CAC Report:- - Lead Agency Determination: Technical Public Heazing Resolution: Name of Applicant Sally Coonan Mailing Address 12 Hughes Place Summit NJ 07901 Phone Number:( ) 1-917-620-1341-• ' Suffolk County Tax Map Number: 1000- 80 Property Location z66u Paradise Shore Road M Southold © NY 11971 (provide LILCO Pole#, distance to cross streets,and location) AGENT: Cole Environmental Services; Inc. Dennis W. Cole (If applicable) Address: PO Box 471 Manorville NY 11949 Phone: 63.1;..369-9445, PO Box 471 Manorville,NY 11949 cesenv@Lrmail.com Tel.No. (631)996-4527 March 15, 2017 Town of Southold Board of Trustees �� I 53095 Route 25 PO Box 1179 SotitholdNY 11,971,' P Fect Name: Sally Coonan thold Town 262 Paradise Shores Road, Southold,NY f Trus e SCTM'No: 1'.000-K-1-4 Last August,-a"torreri ial rainfall event occurred on or about August 23, 2017. More than four inches or rain.poured down creating essentially a river through Ms. Coonan's property. A review of topographic information reveals that Ms. Coonan's property is at a low point within a drainage basin of considerable size. Review of Paradise Shores Road and the surround community found that there are virtually no provisions within this community to address stormwater runoff. Additionally, I observed many of the homes in the area without adequate dry wells. Their gutters and leaders empty on the ground surface adding to a storm water runoff problem for Ms. Coonan. In light of the aforementioned information,Ms. Coonan seeks to make repairs to her property landward of the existing bulkhead by doing the following: 1. Constructing a timber retaining wall on the east side of the stairs consisting of a 15' Wall with returns of 12' and 10'. The top or filled area of the retaining wall will be vegetated with indigenous beach grass and other salt tolerant coastal plant species. 2. Create a 6" earthen berm along the landward edge of the property scarp. 3. Add two four foot wide by six foot deep dry wells to collect surface and roof runoff from Ms. Coonan's house and patio interconnected to a 4' x 24' French Drain. 4. Add two 8' x 12' deep storm drains in the middle of the property to contain runoff emanating from the properties immediately east and west of Ms. Coonan's property 5. Install 6"—8"earthen berm within the Ms. Coonan's property lines and install three 8' x 12' interconnected storm drains. Drains to be installed slightly below grade so storm water will enter them. 6. Install a 2' x 16' trench drain at the entry point of storm water coming from the Paradise Shores Road and surrounding properties that are higher in elevation. Board of Trustees Appl, :,tion GENERAL DATA. , Land.Area(in square feet): 11;979 sf , R-40 Area Zoning: Previous use of property: Residential Intended use ofproperty: Residential Coveants and.Restrictions ori poperty? Yes No If"Yes'?,please provide a copy. f SINc� �El �: E Will,this project require aBuilding ermit as per Town Code? Yes ELNo If"Yes",be advised phis appIicahon will be reviewed-by the Building Dept.prior'to aboard;of Trustee reviiew` and elevation Plans'will-be required " Does this project require a variance from the Zoning Board of Appeals? Yes No If"Yes",please provide copy of decision. W' 's project require any demolition as per Town Code or as determined by the Building Dept.? Yes ✓ No Does the structure(s)on property have a valid Certificate of Occupancy? WI.Yes 0No`' Prior permits/approvals for site improvements: - ------- - ---------------- -------------- Agency Date F Trustee 4/19/17 Building #41485 04/4/1.7 No prior permits/approvals for site improvements. Has any permit/approval ever been revoked or suspended by a governmental agency?W] No EvYes If yes,provide explanation: Project Description(use attachments if necessary): Folowing an intense rain-storm event in the,summer of 2017 Ms. Coonan is seeking Southold Trustee approval for bluff retainirig'wall and storm water containment system consisting of low berm at top of scarp slope,French Drain leading to dry wells landward of the scarp (dry wells to contain roof and patio;runof), mid- property dry wells to contain-neighbor stormwater runoff anon-site sur ace stormwater runoff and trench drain leading to a series of dry wells to contain runoff from adjacent properties and locdlaccess road7driveway. a in en is o con air all runoff streaming through Ms. Coonan's property prior to reaching Peconic Bay. Board-of Truatees •Applir-tion . WETLAND/TRUSTEE LANDS APPLICATION DATA Purpose of the proposed operations:. To make repairs to the existing 1.storm-dam by constructing a retaining wall with return along the property line,and to create_an_on:sife storm water containm6nt system to prevent future overspills into Peconic Bay from future,rainstorm events. 0 Area of wetlands on lot: square feet . y 8.7 Percent coverage of lot: % Closest distance between nearest existing structure and upland 2 edge of wetlands. feet Closest distance between nearest proposed structure and upland', edge of wetlands: 25 feet Does the project involve excavation or filling? No Yes If yes,how much material will be excavated? .5 cubic yards How much materialNwill;be-filled?.,0 -'i -11, icobiay.ards(It, "NEAR �:l i?::Ci' :..t L.:A::.� �.'�5 :a,':';. '� -•i NEAR BLUF'i t Depth of wliicli'material:will bexemoved;or;deposited: .: : 33%BLUFF AREA Proposed slope th oaghout"the area�of operations: r Manner in which material;will:be removed-or.deposite3:; +_;r'i:> tr i it,' Jar r >r; i, , Work to be done by small machine. -All excess, fill material to be removed from-site. _ __.... . _. .. _.. . ._. _ _..... . _ Statement of the effect,if any, on the wetlands and tidal waters of the town that may result by reason of such proposed operations(use attachments if appropriate): No impact to tidal wetlands as all work to take place landward of the exiting bulkhead. Stormwater containment will aid in preventing overwash of stormwater and sediments into bay. Board of Trustees Appli' tion COASTAL EROSION APPLICATION DATA . retaining wall landward of existing Purposes:of proposed activity; M bulkhead. Stormwater containment system to be installed = Are wetlands present within 100 feet of the proposed activity? ❑ No F7 Yes Does the project involve excavation or filling? ; ❑ No W1 Yes f' . If Yes,how much material will be excavated? 80 (cubic yards) How much material will be filled? 1.2' + (eubic,yards) Manner in which material will be removed or deposited: 7rr Backhoe and small excavator for near shore work Describe the nature and extent of the environmental impacts to the subject property:ory. neighboring properties reasonably anticipated resulting from implementation of the project as --proposeatn���udmg-erosro�rmcrease-or-aayerse-errects�ri-matural<:proteecivc eri�i;res:-�J�e� , . -- -. . - ------------ attachments if necessary) No impacts to tidal wetlands are-anticipated as all.work to.occur landward:of the existing bulkhead. Stormwater containment system should aid in abatingw stormwater from overashing.and-eroding the bank as=the•stormwate'r enters - = Peconic Bay. 617.20 Appendix B Short.,nvironmentat AssesnFnent Form Instructions far.Compietinl�• . Part I -Project information. The applicant or project sponsor is responsible for the completion of Part 1. Responses bccoine part of the application for approval or funding,are subject to public review,and may be subject to further verification, Complete Part l based an information currently'available. ifudditional research or investigation woutd be needed.tq forty respond,to any item,please answer as thoroughly as possible based on current information. Complete all.items in Part L You may also provide any additional information which"you believe will be needed by or useful to the lead agency;attach additional pages as necessary to supplement any item. Part 1.-Project and Sponsor Information Sally Coonan Name of Action or Project: - Sally Coonan Project Location(describe,and"attach a location map): 26,62. Paradise Shore Road Southold:; Brief Description of Proposed Action:: Folbwing an'interise`rain-stone event in the summer of 2017 Ms.Coonan is Seeking Southold Trustee approval for bluff retaining wall and,storm water containment system consisting of low berm at lop of scarp slope,French Drain leading to dry wells landward of the scarp(dry wells to contain roof and patio runoff), mid-property drywells to contain neighbor.•stormwater runoff and on-site surface stormwater runoff and trench drain.leading to a series,of dry wells to con_lain ru2off from adjacent properties and local access road/drivewa . The intent is to contain all runoff streamin throw h Ms.Coonan's ro e y g g p p rty prior to reaching Peconic Bay. Natrie_ofA''' licant or 5'oiisor - '"` I' Telephone.' i 1-917-620-1341 _ Sally' Coonan E,-K4 r- Sally,.Coonan@gmail.com, ;.i . .. .. . - Addr,ts: r .; 12,Mughes,Plce 'City(PO ; ., . _ Zi-..Cade: Summit,_ NJ.. 07901 _1 L'U164s"thb-196 ased action and revolve tlic le"'slative`a$o"tion ofd' pati"local law`ordirianae" "' lrp"' �`YES•- ` P P Y�� � P p administrative rule,or regulation?- If Ycs,�attach a narrative description of the,intent ofthe proposed action and the environmental resources that may be affected in the;niunicipalify"and�peo_ce to;ft 2,'t ,n0,cgntiriiteto.questioq. 2. Does the proposed actionircr;u ire&pdrmii,approval;or•funding from anyother governmental Agency? M If Yes,Iist agency(s)name mid permit ar approval: t._ '�r Y..f, i.l',r.... J1'd .I: rr I•, .. t: ',.. .t , .,.:..1.r 17.i' + ❑ !®E '3 \ .:` .1'.,.. .. 3a Total:acreage ofthe site ofthe proposed action? aar'es b:?otal aoreage-to-be-physically-disturbed? acres C.Total,acreage(project site and any contiguous properties)owned' or pontrolled by the applicant or project spoiisor? 11,979 sf acres 4. Chepk,all land uses that occur on,adjoining and near the proposed action ]Urban ERuralI non-agrieultitre) ❑Industrial ' ' omtherdial-residential(suburban) ❑Fdi•:est . Dgriculturequaticpther(specify): _ ❑Parkland r 5.. is the"proposed action, i -N0 YES 11 N/A ' a:.A permitted use under the zoning:regulations?. �--� ;�--� b.Consistent with the adopted comprehensive plan? ✓ i 6.'is the proposed actiorrconsistent.with.the predominant character ofthe'ex isting':built.or:'nafurar' ":146 landscape? . i T:"10) 1110 s`the site df the'proposed`action located m;or does rt adjoin,a state lrsted'CnticaF6Vk6tlmenta'1`Area? :'N6:--' If Yes;rdentlf}i:,.-.:_..� -—•-' - _ - - r' -- . • ;a.Will:the.proposed:aetionresuhan-asubstantial:inciease;in;tiaffc;above:presentaevels7 . ;'. O..' FYiES:' -b,.Are public transportation•service(s);available:at or near the site of:the proposed'action? c:Are any:pedestrian_accommodations.orbicycleroutes.availalile:on:orneacsite:ofthe:proposedaction? . ✓ ' 9.,Does ttie:proposed action meef or exceed:the'sfate energy,c'ode,-requirements?' =filo:"` f yES' Ifthe..roposed.act'ion•will exceed regyirements,describe desigrt'.features.and,,teciinologies:; if .. .._........._.... _ .... ............. ....... �" 1, - i 1:0. Will-the proposed-actionconnectfo an exisfing priblic/private:vvafer.::supply?. ::E. NO, ±:Ya✓ ` If:No;descrrbe:method:.for.providipg:potabfewater.;.. -Y ,LP ,.11:.Will,'the?'proposed action connect to bWtingwastewaterutilifies7' If No,describe method for providing wastewaterfreatment:.On-site septic system l 1:2. a.0M.-thesite'coritain.,a structuie'.that iS°listed on dither the:Stafeor:National Register'of'Historic; r;l!IQ b:14#lie'propgsed; ction'=iobate8'iri airarclieologieal sensitive area?: ✓ 1'3.'a:Does any portion ofthe'site'of ftie proposed action;or lands'ai�joiriEi galie'propo'sed action;:coiitaiii YES; ----------____-_��vetlat ds_oLntherwmterboclids ggirlated by sr federal tatty or local ency7 ---- b,13!'guld.thepr!or.osed aetion..physieally'alter,or.encroach.:into;any ex6ting'wet1,, Qr_wnte l%ody;,. . i if Yes identify-the wetland or waterbody and eztgnt of:altSrafians>in;square feetior:acres ✓ i.,..,..:... t 14: Identify th'e'typical habitat types that occ' n;o.are likely to b ;found onaHe'"rbject$ie: Check ill"ftiafpply, y...:.:. horeline MFbrest;'• gricultiirallgrasslands ty mrcl=successional f Q Wetland Dlrban ✓ Suburban '- ! 66e.tlhe's'ite of the proposed acfion'conta n any species of animal,or.associated Habitats;listed i NO 'j'j YES i �4y,ihe_State,or-Federal-•governtneirit'as threatened or-endangere87 `16.is the project-site located'in th'elT0e_'ar'flood plain?- NO"' ;;'YES'' M.W'ill:the'proposed-action.create storm water.discharge;either:from:'point or'non-poiiit:sources7' r!f Yes;. - a Will storm:w,ater,.discharges.,flovV to edjacent propeities7. �✓�NO;.-.:QYES �;� ' b.WiII storm'.water:discharges be-diredted toe§tablished'conveyarice:systems. runoff arid':s'thr'fv-di-aini)? 1 if Yes,briefly describe: NO ✓ ES ; F rid currently.transverses the owners propeft.eventually spilling into Peconic Bay. Page 2 of 4 18:Does:the-proposed action include construction or other activities that result in the impoundment of NO YES , Water,or:other.tigtiids(e.g.retention pond,waste lagoon,dam)? If Y,es;.explain;purpose and sizer 19.Hasahe site.gfthe proposed action:oran,adjoining:prpperty,been.th.e.,locatio,.of an active or closed { NO, •.YES solid waste management facility? If Yes Aescribe: _..... ._.. _::....._.. T . _._._...._..:. jTFM 77 -_ -- -- r- 20:•l9as the ite:offhe.prgposed action or aa.adjoining:propeity_been thesubject o€.camediation;(ongoing.or ,-'completed):forhazaidous:waste?, If Xes; 1 AFFIRM THAT`'I`HE'INFORMATION'P:ROVIDED'ABOVEINIkUE.AIV..D ACCURATE T6T11I9 T OF W, KNOWLEDGE Applicant/sponsor n Den is Cole Date:,. . .. ....__ .._ Signature: Part 2-Impact Assessment:.The.Lead Agency is'responsible for the completion of Part'!. Answer all,of the,following questions in Part 2 using the information contained in Part 1 and other materials submitted by.the.project sponsor.or otherwise:available to.the reviewer. When answering the questions the reviewer should be.guided.by the concept"Haye.my responses been reasonable considering the scale and context of the proposed action? No or Mo-7c erste `small_ to-large. . impact impact may may occur. _. occur .l`, Will the proposed66.n:create a material conflict with a"n.'adopted land use plan:or Toning regulations? !2.; Will the proposed action result iiia change in-the.use or.intensity.of use-of land? La -01 3' Wtll the proposed action impair the character.or qualify-of the existing community? V. 4. Will:the.proposed:action.have an.impact on the environmental characteristics that caused the establishment of a Critical Environmental Area(CEA)7 S; :W:ilt'I e-praose& cresltin;aaadvsechangenie:eisiipgslevelof taor., affect existing infrastructure for-mass transit;-biking orrwatkway?: . 6. Wiftthe.proposed;action cause.an.increase.in tlie_use;of energy„and,itfailsao;ipcorporate r' reasonabl available ene-r conservation-oc ret'OWW.e.ener` o ortun ties? ` ' 7. Will the proposed action impact existing: a,public/private.water.supplies? r,R•, ,i y • b.,.public/private wastewater treatment utilities? E 8. Will.the-proposed..Acti ri:impMrthe.character or-quality-of impottant:historic;arohaeological,. architectural_or aes hette resources.., 9. Will-the proposed•action:result inan•adverse.change-to.natural.resources-(e.g.,..wetlands, wateebodies;groundwater;air quality;flora`and fauna)7 Pagel of 4 No,or 1Vlociersite' 1 small to'large impact- impact j,Mny may occur occur I0. WilI tie proposed:action "result irr an'inccea§e in'ttie potential for e'ro'sion,.flooding ordrain"age 1 problems? i i 1. Will-the proposed aciion'create a hazard to environmental resources or human health?. Part 1-Determination..ofsignificance-. The,Lead::A;g6ncy is-r.esponsible:forfhe.completion of Far-t-.1-.-For every r:. question,in Part 2 that.Was'answered-m. o' erate td,large impact may occur",ai rf there:is a need to ezpla i.why.a:particular element.of the proposed:action may or.will not iesulE in a`significant'adverse environmental mpactrpleasecornplete<Part;3. Part-3 should,.insufficient',detail;;identify;.the;imPaot;;including_any.measures;or,:design eiementsaiiat.have.been:included by' ilia'project-sponsor.toavoid.ot.(educeimpacts, Paq,3:should,also,explairi;hold.t4e.104agepcy,determined,.that the impact may or will riot be significant.Each,potential.impaet;shoul.¢be assessed considering;its setting,probability o f occurring, duration, irreversitiility;:geograpliic sq'&i-nd:`magriitude Aiso:consider the•potential.for sfior<-fe"rm;tlong-tern Arid ; cumulative impacts. s•• Ch k s ox fy u,have determinedbasedoitahe':infotmatio'n;,and;analysis:above:and�anysuppoctng:documentation,. that the', proposed, acti on. may result in one or more;pp4cntiallyaarge_or significant:adverse,impacts.:and an: ; ...epyironmen;tal'impact stateipent,is required. Check,Ahis-box ifyou'.have"determihe'd liased,on thenfo.rmdtidii.ariif analysis a�ova .and a•ny supportir-g'ldoctimentatiori„ ;that the proposad,actiorrwill riot result,in any 5ignifcarit`adVerse'•eniirorimenfal im cfs: Town,bi..8outhold°--Board of Trustees �' /4 d ''Name of Lead Agency-... . ----------Mir . ]._J, Domino Fiesldent -_ - - - - - - .._ -a....,.., .. ._. -� _ Prir t.or Type Name. Respo ble icer in Lead`Agency. Title of•Responsible O:ffcer `:Signature,:of'Respons.ibl O icer--Lead Agency Sigriature.:of:Preparer.0 different fiom'Respons bleZfficer) PRINT Oage'4 of 4 PROJECT 1D NUMBER 61 SEAR APPENDIX C STATE ENVIRONMENTAL QUALITY REVIEW SHORT ENVIRONMENTAL ASSESSMENT FORM for UNLISTED ACTIONS Only PART 7 -PROJECT INFORMATION (To be completed by A 3plicant or Project Sponsor) 1.APPLICANT/SPONSOR 2.PROJECT NAME Sally Coonan Coonan Property &PROJECT LOCATION: Southold Suffolk Municipality County 4.PRECISE LOCATION: Street Addess and Road Intersections. Prominent landmarks etc -or provide map 2662 Paradise Shore Southold NY 11971 5.IS PROPOSED ACTION: 1:1 New Expansion El Modification/alteration 6.DESCRIBE PROJECT BRIEFLY: Folowing an inten§e-rain-storm event in the summer of 2017 Ms.Coonan is Seeking Southold Trustee approval for bluff retaining wall and storm water containment system consisting of low berm at top of scarp slope,French Drain leading to dry wells landward of the scarp(dry wells to contain roof and patio runoff), mid-property dry wells to contain neighbor stormwater runoff and on-site surface stormwater runoff and trench drain leading to a series of dry wells to contain runoff from adjacent properties and local access road/driveway. The intent is to contain all runoff streaming through Ms.Coonan's property prior to reaching Peconic Bay. 7.AMOUNT OF LAND AFFECTED: .010 Initially acres Ultimately acres 8.WILL PROPOSED ACTION COMPLY WITH EXISTING ZONING OR OTHER RESTRICTIONS? Oyes Q No If no,describe briefly: 9.WHAT IS PRESENT LAND USE IN VICINITY OF PROJECT? (Choose as many as apply.) LZIResidenfial 71 Industrial Commercial Dgdculture 11 Park/Forest/Open Space Mother (describe) 10. DOES ACTION INVOLVE A PERMIT APPROVAL, OR FUNDING, NOW OR ULTIMATELY FROM ANY OTHER GOVERNMENTAL AGENCY (Federal, State or Local) Yes r7No if yes, list agency name and permit / approval: 11.DOES ANY ASPECT OF THE ACTION HAVE A CURRENTLY VALID PERMIT OR APPROVAL? 0Yes r—po If yes, list agency name and permit / approval: S A MULT OF PROPOSED ACTION WILL EXISTING PERMIT/ APPROVAL REQUIRE MODIFICATION? es I V/ No I CERTIFY THAT THE: INFORMATION PROVIDED s�ABOVE IS TRUE TO THE BEST OF MY KNOWLEDGE Applicant / Sponsor Name �2 Yx `" S c0 t-� / A- `�A"` r Date: ?/S/1�_ Signature M 6W/ l If the action is a Costal Area,and you are a state agency, complete the Coastal Assessment Form before proceeding with this assessment APPLICANT/AGENTMPRESENTATIW TRANSACTIONAL DISCLOSURE FORM 71 ToMno uthold s Code of Ethics nmhibits connictc of ince gn t�.,hci+ a of town ofTiazrs nod am►�lovecs The tum ae of �a this iorm Is toymvI&r o riprAn ehich inn a!e�t ttt,roti cif nKmtbk conflicts orkUM a„d allow it 10tekc whatevsr W M -is n%nry to avoid same. YOUR NAME: �>A'L L C,©C) /0 n (Lest name,fiist namc,.gdddle Initial,unless you are applying in the frame of someone else or other entfty,such as a company.If So,indicate.thb other person's or company's name.) NAME OF APPUCATiON: (Check all that apply.) Tax gricvartct Bulb Variance �— Trustee Change of Zone Coastal Erosion Approval of plat Mooring Exemption frorn plat orofffcw map Planning Otho (ir"Otheel,name the activity.) Do you persanaily(or through your company,spouse,dbltttg,patent..or ddkO flew a rr lationft with any officer or.employoe. orlhe Town of Southold? "Relatio;Wdpr Includes by blood,,attirringc,or business Interest"Business IntemsO means a business, including a partnership,in which the town officer or employce.bas evert u partial owmpsltip of(or employment by)'a corporation in which the town officer or etnployeb owns mono than 51%of/the shams. YES NO lfyou mmvertd"YHS",compfeto the balm=of ddb form and date and sign where Inde* Name of person employed by the Town of Southold Tide or position of that person Describe the relationship between yourself(ft appl'reWW*nthapresentative)and the town off ocr or en.Vloyee.Either check the appropriate line A)through D)andlor describe in.the space pio%H*& The town offrar or employto or his or her spouse,wVftag,pavept,or child Is.(dw*all dist apply): die owner 9i'gveator than A of the shaves of the 600130MO.block of the applicant (what the applitxutt is a aprporat16u); = B)the W orbeneficial owner of any.i In a non-cotpotnbo entity(when the appikant,b not p c Wratlon); C)an offtoer,director,partner,or employee of the applicant;or D)the actual applicant. DESCRIPTION OF RELATIONSHIP Submitted Wis�any of Y 20V Signature PdaName f SA.1-1-Yf C'r o/--1 A ^3 Form TS l s Board of Trustees Application ,AFFIDAVIT A LL `1 CO 0N R tk) BEING DULY.SWORN DEPOSES AND AFFIRMS THAT HE/SHE IS THE APPLICANT FOR THE ABOVE DESCRIBED PERMIT($)AND THAT ALL STATEMENTS CONTAINED HEREIN ARE TRUE TO THE BEST OF.HIS/HER KNOWLEDGE AND BELIEF,AND THAT ALL WORK WILL BE DONE IN THE MANNER.SET FORTH IN THIS APPLICATION AND AS MAY BE APPROVED BY THE SOUTHOLD TOWN BOARD OF TRUSTEES. THE APPLICANT AGREES TO HOLD THE TOWN OF SOUTHOLD AND THE BOARD OF TRUSTEES HARMLESS AND FREE FROM ANY.AND ALL DAMAGES AND CLAIMS ARISING UNDER OR BY VIRTUE OF SAID PERMIT(S� IF GRANTED. IN COMPLETING THIS APPLICATION,I HEREBY AUTHORIZE THE TRUSTEES,THEIR AGENTS)OR,REPRESENTATIVES,INCLUDING THE CONSERVATION ADVISORY COUNCIL,TO ENTER ONTO MY PROPERTY TO INSPECT:THE PREMISES IN CONJUNCTION WITH THIS APPLICATION, INCLUDING A FINAL INSPECTION. I FURTHER AUTHORIZE THE BOARD OF TRUSTEES TO ENTER ONTO MY PROPERTY AND AS REQUIRED TO INSURE COMPLIANCE.WITH ANY CONDITION OF ANY'WETLAND OR COASTAL EROSION PERMIT ISSUED BY THE BOARD OF TRUSTEES DURING THE TERM OF THE PERMIT. Signature of Property Owner Signature of Property Owner SWORN TO BEFORE ME THIS 3 DAY OF ,20 1 Notary Public OSAMA M ABDALLA NOTARY PUBLIC-STATE OF NEW YORK No.01AB6353282 Qualified in New York County D✓iy Commission Expires 01-17-2021 Board of Trustees ]lppLlcation AUTHORIZATION (Where the applicant is not the owner) 1/We, A L L`f Co O t,3 A.IJ owners of the property identified as SCTM# 1000.06-01.4 in the town of SO L4 T N o L 10 ,New York,hereby authorizes w w✓5 L' 2 to act as my agent and handle all necessary work involved with the application process for permit(s)from the Southold Town Board of Trustees.for this property. r Property Owner's Signature Property Owner's Signature . SWORN TO BEFORE ME THIS. 23 DAY OF 2AM 2.0 OS `� Notary Public OGAMA M ABDALLA NOTARY PUBLIC-STATE OF NEW YORK No,01ABS353282 Go0fied In New York County My Commission Expires of-17-2021 APPLICANAGENT RESENTATIVE TRANSACTI ISCLOSURE FORM ne TOME of aputhold'se of Ethics prohibitscofl i qk o f inter n the in 9 o town 6f F1 cc ri and a m P-1o e munng o this form igto trrovide inforination which can alert the town of 129ssible_conflicts of interest and allow it to take whatever action is nMssary to avoid same. - - YOURNAME: Dennis Cole (Last name,fiist name,.r}iiddle initial,unless you are applying i—the name of someone else or other entity,such as a company.If so,indicatq thc.other person's or company's name.) NAME OF APPLICATION: (Check all that.apply.) 'Tax grievance Building Variance Trustee AA Change of Zone Coastal Erosion Approval of plat Mooring Exemption from plat or official map Planning OtherStormwater containment (If"Other,name the activity.) Do you personally(or through your company,spouse,sibling,parent;or child)have a relationship with any officer or employee of the Town of Southold? "Relationship"includes by blood,rgarriage,or business ihterest."Business interest"means a business, including a partnership,in which the town officer or employee has even a partial ownership of(or employment by)a corporation in which the town officer or employee owns more than 5%of the shares. YES NO XX Ifydu answered"YES",complete the balance of this form and date and sign where indicated. Name of person employed by the Town of Southold Title or position of that person Describe the relationship between yourself(the applicant(agent/representative)and the town officer or employee.Either check the appropriate line A)through D)and/or describe in the space provided The town officer or employee or his or her spouse,sibling,parent,o'r child is(check all that apply): A)the owner of greater than 5%of the shares of the corporate stock of the applicant . (when the applicant is a corporation); B)the legal orbeneficial owner of any interest in a non-corporate entity(when the, applicant is not a corporation); C)an officer,director,partner or employee of the applicant;dr D)the actual applicant. a /V NALD REBALDO . DESCRIPTION OF RELATIONSHIP Notary Public-State of Newyork No. 01 RE6101557 Qualified Irl Suffolk County My Commission Expires Submitted Z day of_A. " - 2006— Signature• (,[� Print Name QP.hmtz, W, e6fe Form TS I PROOF OF MAILING OF NOTICE ATTACH CERTIFIED MAIL RECEIPTS Ang Name: STATE OF NEW YORK COUNTY OF SUFFOLK V-01+96 residing at 5 tot S Q U 691 U Q�lV I 1 c14 2 ,being duly sworn,deposes and says that on the S"h ay of �t 20 M, deponent mailed a true copy of the Notice set forth in the Board of Trustees Application, directed to each of the above named persons at the addresses set opposite there respective names; that the addresses set opposite the names of said persons are the address of said persons as shown on the current assessment roll of the Town of Southold; that said Notices were mailed at the United States Post Office at-EAS+ © Ul 0 _ U G ,that said Notices were mailed to each of said persons by CERTIFIED MA JR TURN RECEIPT. Sworn to before a dais Day of 20 1 Notary ublic ANGEL R MACEID11Notary Public-State oN0. 01 MA6254Qualified in SuffolkMy Commission Expir;s Michael J.Domino,President o� oaaFF01,rre, � Town Hall Annex John M.Bredemeyer III,Vice-President �� GyJ, 54375 Route 25 Glenn Goldsmith x P.O.Box 1179 A.Nicholas Krupski 1�6 �:, Southold,NY 11971 Greg Williams 'b p! Telephone(631)765-1892 Fax(631)765-6641 BOARD OF TOWN TRUSTEES TOWN OF SOUTHOLD BOARD OF TRUSTEES: TOWN OF SOUTHOLD -------------------------------------------------------------- In the Matter of the Application of SALLY COONAN COUNTY OF SUFFOLK STATE OF NEW YORK AFFIDAVIT OF POSTING TO BE COMPLETED AFTER POSTING REMAINS IN PLACE FOR AT LEAST SEVEN DAYS PRIOR TO THE PUBLIC HEARING DATE I, Ko MQ �U mm P` , residing at/dba S W QGi!l Q W 00d D 1'1 Ve Zr-v;k QvAogM, Nva 11nL42 being duly sworn, depose and say: That on the II- �y of�e?+Q m 6ev, 20 IS , I personally posted the property known as Z(0(02 Vn<r,qCly:Sa 4ILoresVcl, Co V-�tqQId ,N by placing the Board of Trustees official poster where it can easily be seen, and that I have checked to be sure the poster has remained in place for eight days prior to the date of the public hearing. Date of hearing noted thereon to be held Wednesday,September 19,2018. Dated: `'l (signature) Sworn to before me this q day ofStp 6 I g Nota P iUbli:%', E%'E L.GATZ-SCHWAMBORN NOTARY PUBLIC.STATE OF NEW YORK Registration No.OIGA6274028 Qualified in Suffolk County Commission Expires Dec.24,20-2-D i i COMPLETE • ON DELIVERY COMPLETE • ■ Complete items 1,2,and�. A Si nawre y X V f .�v ❑Agent • ■ Print our name and address on the reverse ,N`t ❑Addressee so that we can return-the card to you. ■ Attach this card to the back of the mailpiece, B• eceived by(Printed Name) C. Date of Delivery or on the front if space permits. v l 1. Article Addressed to: D. Is delivery address different item 1? ❑Yes - if YES,enter delivery address below: ❑No CALLISTA TULLY ; R 295 GROVE DRIVE SOUTHOLD, NY 11971 IIIIIIIIIII II III III III Signature El pressO 11 dultIITM ❑Adult SiII II II III I I I I III II I gnature Restricted Delivery ❑Registered Mall RestrieWl nertified Mail® Delivery, 9590 9402 2999 7124 2948 55 Certified Mall Restricted Delivery -.0 Retum Receiptfor ❑Collect on Delivery Merchandise 2. Article Number(Transfer from service label ❑.Collect on Delivery Restricted Delivery' Conflnnatiod"" . .. .. .• )._._._. n•� sured Mail::: :i .M�SighatureConfirmaWn �isured Mall Restricted D'elixery i Re`Strioted Delivery 7 015 3010 ?�O Q 1 1:0 7`8 wer$soo) :{ ...; PS Form.3811,July 2015 PSN 7530-02-000-9053 porres90,Rdtum_kegeipt 1 -- postal1 Postal i CERTIFIED p RECEIPT CERTIFIED k RECEIPT = oomestic mailOnly flJoomestic ^ I�.J rs f< • 5pUTHOLf}'9 �6 SpUTH,IJL{j 94=' Certified Mail Fee Ln Certified Mail Fee $3.45 $ ate) —0 $ t#.7 'r• {5 jr Extra Services&Fees(check box,add tee rj prgp ...0 ate ❑Return Receipt(hardcopy) $—�-`� Q+ Extra Services&Fees(check box,add ) Postmark ❑Return Receipt(hardcopy) 'P�, rl ❑Return Receipt(electronic) $ F s I I,111 I Postmar ®t. Certified Mail Restricted Delivery $ i l_ ( ISI I HBfO Return Receipt(electronic) $ (�6 .=k f� � t•fl I`t t 1 0 ❑Certified Mail Restricted Delivery $1i l UU 11 0 ❑Adult Signature Required 0 ❑Adult Signature Required $ k t— -lrt-Q.,-.:'— ///�// 1:3 ❑Adult Signature Restricted Delivery$ 0 nAduAdult Restricted Delivery$ y V 0 Postage #171.5[{ - g CQy C3 �gm,. Posta a �j{• ({ �! m m PARADISE MRES INC C/O GINA RUSCH SZNNT&SKI A&P RVCTRT Ln 285 RIVERSIDE DRIVE Ul PO BOX 1315 ----- p ----------------- r- SOUTHOLD,NY 11971 SOUTHOLD, NY 11971 ---------------- , Postal o ' e RECEIPT' nly r •' c Mail e CERTIFIED rl Domestic 'H LP NY C3 1:1 !71 • :; } ii i! ...,, .,w . Z Ie • :> t: rl SpUTHpLQ-r� i�`��I�' Jf: kl Ln Certified Mail Fee y7 4� QGU E N e Ln 7� -� $ t.5.omP-are) J J Certified Mail Fee $3�4,, G Q Extra Services&Fees(cneck box,add tee p ❑Return Recoil pt(he rdcopy) $ YT— inner %0Post r•+ Extra Services&Fees(check box.ad$d tee VIPM t [I Return Receipt(electronic) $ C]Return Receipt(hardcopy) �a�'�1{ o Certified Mail Restricted Delivery $ PJ $ $ Return Receipt(electronic) _ -- Adult Signature Required - Certified Mail Restricted Delivery $ *t ty^{T� Aj � (3 Adult Signature Restricted Deliveryf-j $ E_ 0AdultSignatureRequired :'_ Postage •$0.5 I - Adult Signature Restricted Delivery$— C. C3 - -9/L }7 O Postage �; Ln JALLISTA TULLY C3 1 kATALEN D.COUDEN .----- 9 295 GROVE DRIVE m POBOX96 �.. SOUTHOLD,'NY 11,971 rq , C3 SOUTHOLD,NY 11971 I ---- - :r. - - -1 �� ori•�• i postal CERTIFIED MAILP RECEIPT u1 Domestic Mail • nly cc I •w fj i{9� ll) Certified Mail Fee $3.45 '-� $ i ate) Q �fi V �e A Q- Extra Services&Fees(check box,add fee pp ❑Return Receipt(hardcopy) y Postmar fv Return Receipt(electronic) Here �� Q �certified Mail Restricted Delivery $ i C:3 []Adult Signature Required $ lisps ' p e S 0 Adult Signature Restricted Delivery$ V 7 Postage $0.50 t19/03/2011 'm 96SNAARY HALLIGAN Ln PO BOX 96 a � C3 SOUTHOLD.,NY 21971 I r- PROOF OF MAILING OF NOTICE ATTACH CERTIFIED MAIL RECEIPTS Name: J 1 /� ra 1r•4 STATE OF NEW YORK COUNTY OF'SUFFOLK residing at being duly sworn, deposes and says that on the day of , 20 , deponent mailed a-true copy of the Notice set forth in the Board of Trustees Application, directed to each of the above named persons at the addresses set opposite there respective names; that the addresses set opposite the names of said persons are the address of said persons as shown on the current assessment roll of the Town of Southold; that said Notices were mailed at the United States Post Office at , that said Notices were mailed to each of said persons by CERTIFIED MAIL/RETURN RECEIPT. Sworn to before me this Day of , 20 I Notary Public , NUTILL Ulm H i t I AI< ING NOTICE IS HEREBY GIVEN that a Public Hearing will be held by the Southold Town Board of Trustees at the Town Hall, 53095 Main Road, Southold, New York, concerning this property. OWNER(S) OF RECORD: SALLY COONAN SU BJ ECT OF PU BLIC H EARI NG : For a Wetland Permit to construct a 4' high by 15' long timber retaining wall with a 10' easterly return and a 12' westerly return; the top or filled area of the retaining wall to be vegetated with native beach grass and other salt tolerant coastal plant species; create a 6" earthen berm along the landward edge of the property scarp; add two (2) 4' wide by 6' deep dry wells to collect surface and roof runoff from dwelling and patio interconnected to a 4'x24' French Drain; add two (2) 8'x12' deep storm drains in the middle of the property to contain runoff emanating from adjacent properties; install 6" to 8" earthen berm within property lines and install three (3) 8'x12' interconnected storm drains with drains to be installed slightly below grade; and install a 2'x16' trench drain at the entry point of storm water coming from the road and surrounding properties. Located: 2662 Paradise Shores Road, Southold. SCTM# 1000-80-1 -4 TIME & DATE OF PUBLIC HEARING : Wednesday, September 19, 2018 — at or about 5 :30P. M . If you have an interest in this project, you are invited to view the Town file(s) which are available for inspection prior to the day of the hearing during normal business days between the hours of 8 a.m. and 4 p.m. BOARD OF TRUSTEES * TOWN OF SOUTHOLD * (631) 765-1892 Town of Southold LWRP CONSISTENCY ASSESSMENT FORM A. INSTRUCTIONS i 1. All applicants for permits* including Town of Southold agencies, shall complete this CCAF for proposed actions that are subject to the Town of Southold Waterfront_.Consistency Review Law.,This assessment is intended to supplement other information used by a Town of Southold agency in making;a determination:of gonsistency., *Except{minor;axempt actions:including'Building,Permits and other ministerial permits not located within the Coastal Erosion.Hazard Area.. 2. Before answering the questions in Section C, the preparer of:this)form.;shoutd review:the exempt minor action list,policies and explanations of each policy contained in the Town of Southold Local Waterfront Revitalization!Trogram'.+ A proposed action will be cyst uated._as.,•toJts:�significant beneficial'and adverse effects upon the coastal area fwhich'includes allof Southold Town 3: If any question in Section C on flus form is answered"yes"_or nd , then the proposed action will affect the achievement of the LWRP policystandards and conditions.contained.in, et;consisteney review law. Thus, each answer must be explained'in detail, listing both supporting and non- supporting facts. If an action cannot be certified as consistent with;the LWRP policy,pton and conditions,it shall not be undertaken. ' "? ... ;: -. �:;.-tG i '�" ,.tG"' ;i{:'. a? .<i.`,i}i . .. .. ,'})tli, i.;:.`•:'s7• t,•{ .,. . ::: 5i{1 . . 1 A copy of the LWRP is available in the following places: online at the Town of Southo_ld's " website(sput4gldlpwn.northfork.liet),,,thq,B6ard of Trusteesi.Qffce;the.Planrag Ddpartment;'all local libraries and the Town Clerk's office. B: y i�ESGRIP'TIsUN�F STTEt AND,PROPQSEDACTION, L t 4 s As,e.: ... }. .'�:'�iys ....i.J.. 1' @}i. .i4. ....,yd �,`} ., p( S:Y. - i. .•,ti ems. FA tt R .'':Yi .,, ' SCTIVI# 1000 _ 80 _ 1. 44yy •t D { ... .. �: : .J.. .. 44., .1I. iiry `hs![4 b:4a a3.W `N i. irt• :.�i'�Y !:b °i;t ,t ..tft�i ..`g:G ' f PROJECT NAME Coonan Property 1 The Applic�hon,has been submtted$o,(check appropate response)• t•I , z is Rt. ..ii L Offi.: :°9$:.';tx {'� f,n. 5. - Ba,'�,(i,c'; ..,51''.r .x V­­ 4, i .,..wU j"t ift:°ii' is ;> 'y '_;..' y t.,u•ly.,.9 _t..S.p:S•1' 4r °�4 r.. to ,af dF '^;'2�•7.;. .;.t1,�� ., .. {;' ° ,.. 'a ren,: �. Town Bbar , Pl r.: u ` y lam. n x { ' anriing$oacil BuiIdin De : �•� Board of Trustees. ��4•i Llt`.'�`�i'i�'D >r. :.�p2. .. � tll i§�j'.�'t:p. �S'i.t dc.`ri.I F'..`1, 1. Category of Town of Southold agency action(c.heck aPProPriate' Ponse : (a) Action undertaken directly by Town agency(e,g.capital - '- constnzctioplanning-acti .• a enc.-re ation,-land-transaction n, �agency ) - .(b).. -Financial amistance'(e.g� t;lo`loan, _ - (c) Peiwit,approval,license;-certification: Nature and extent of action: Folqwing,an intense raiq storm-event in..the summer of 201.7tMs.Coonan•is,Seehin S,outhold.Trustee a roval:for bluff' retainmg w and storm water containment.system consisting of tow:"erm.at,top o fscarp,s ope,French Drain,leading to dry wells landward of the scarp(dry wellg'to'contain roof'ahid patio runoff;`mid-property dry'wells to contain n ells-to contain runoff from adjacent properties and local access road/driveway. The intent &to contain all rundff:streaming,. through Ms.Coonan's property prior to reaching Peconic Bay. Location of action: 2662 Paradise Shore Road,Southold Site acreage: .286 Present land use: Residential Present zoning classificatio&R-40: i 2. If an applicativii.for the proposed 46tion-"liar%been filed with the Town-of Southold-agency, the following information shall lie provided: " . i (a) Name of�apphcant:Sally Coonan � ..� .12'Hu hes,Place (b).:Mailing address: g Summit NJ 07901 ' (c)"`Telephorie�iiuiriber:Area Code-,( :)-;1-917=620,13`4`1',, (d)"`EipPlicatian number;if any:" :rs Will the action be directly undertaken,require funding,or approval by a state or federal agency? Yes . _.No If yes,which state or federal'agency? C. Evaluate the project to the following policies'by'analyzing`how°the-'project wilI'furtlrei support`or not support the policies. Provide all proposed Best Management Practices that will further each policy. -__in omplete-ansv►�ers DEVELOPED"COAST POLICY Policy 1. Foster a pattern of development ini`•the Town of'Southold"that enhances comnunity'character; preserves open space, makes efficient use of infrastructare,makes beneficial use of a coastal location,,and minimizes adverse effects of developitient."See LVVRP Section III'—Policies;Page'2 for`evi luatian ; criteria. ®Yes ® No 0=Not Applicable r . Attach additional sheets if necessary Policy 2. Protect and.prcservthistoiic and archaeological"resources_ of.the Town of.Southold." See LVW Section III-L Policies Pages 3 throu h 6 for evaluation criteria; 0 Yes.0 NoM Not Applicable f Attach additional sheets if necessary' Policy 3. Enhance visual quality and protect scenic resources throughout the Town of Southold. See LWRP Section III—Policies Pages 6 through 7 for evaluation criteria �✓ Yes ® No rl Not Applicable Areas,landward of the bulkhead and-retaining wall will.he estahlished•with•nate iral•.veagtation thereby reestablishing areas with nahiralyPaPtation that erP''c 1 , „,. _ � ever�.erede�l-bTSl,mr�gr 20.17 rain event Attach additional sheets if necessary Policy.4._Minimize loss of life, structures, and natural resources from flooding and erosion. See LWR__P " Section III—Policies Pages 8 through 16 for evaluation criteria ��::lY��.��No}��`Not.Applicable .� �a A' .r �9"•.;�:�` :� -..,,;s,,r��A. . ;�,, ' b � .� tl`; ,� ':. . . I The propose„d:.stormwater;contanment/abatemen�:system pis;being�installpd on this,;homeo.,wnert s; property while k - the contribution areas (drainage basin) is far outside the subject prop:':Her�proVis..tlelow�i....... point in which the waters converge and flow downward toward Peconir. Ray_ Tnatallatinn of thPRP j stormwater leaching basi> � cwe 1S and retaining wall �arill girl in nreyPntinaa filtube �J _._ _._. _ m rain/ storm vents from rnntrihti a to ctnrmwatPr a Into Pgconir fla _.._- -- _... -. y Policy--& Protect-and improve,water quality andsupply,in-theTown-of-Southold-See-LWRP"SectionIII-- Policies Pages 16 through 21 for evaluation criteria ® Yes ® No RI Not Applicable The�proliiised storrriWater:eorirt� lll[l"PT1t�a1��tP.1T1PTlt CVCCPt11 w;11}nrn'vir�a fprhgSt t� �ag•� f siirroimrling properties that do not hw-re hayo dr-y weRs ani-iA.,hGF2 eii-6@f and dfkeeway .r.this pr-ejeetshatild aid inlTepft the waters in '9. Consequendy rOLLr Attach additional sheets if necessary Policy'& protect and"restorethe•quality and function of the Town of Sodthold-ecosystems 'incliidiug " Significant Coastal Fish and Wildlife IHabitats Arid-wetlands. 'See LWRP Section III—Micics;^Pkgo 22 through 32 for evaluation criteria. _ Yes No Not Applicable Attach additional sheets if necessary Policy 7. -Proteet`andimprove.:Air-4u'ali#y'•in-`tlie Town of Southold. See LWRP Section_III" Policies, Pages 32 through 34 for evaluation criterim 2 ® Yes' ®-No Not Applicable Attach additional sheets if necessary Policy 8. Minimize environmental degradation in Town of Southold;fromi solid: WORKING COAST POLICIES Policy 10. Protect Southold's water-dependent uses and promote siting of new water-dependent uses in suitable locations. See LWRP Section III—Policies;Pages 47 through 56 for evaluation criteria. Yes NoNot Applicable - I I . I 4 i ,r t r s" Attach additional sheets if necessary Policy 11. Promote'sustainable,{use of living'marine. resources-M` Lang Island' S'ouod, the Peconic Estuary and Town waters.See;LNMP Section.III-Policies; Pages;57.throu&62 Sor evaluation criteria. El Yes U No M Not Applicable .. i Attach additional sheets,if.necessary s Policy 12. Protect agricultural.lands-in the Town of Southold. See LWRP Section III�Policies; Pages 62 through 65 forevaluation criteria. . Yes ® No` NotApgGcaii�e Attach additional sheets if necessary Policy 13. Promote` appropriate"use and'development 6f`energy,;and mineral,resources. See LWRP Section III--Policies;Pages'65,thro�gli�'for`evaluation criteria. .. : Yes No ✓� /Not Applicable :> PREPARED BY Dennis W.Cole TITLE Agent DATE 07.08.18 � � I 1 PO Box 471 Manorville,NY 11949 cesenv&mail.com Tel.No.(631)996-4527 March 15, 2017 _ Town of Southold Board of Trustees D r T i jl l I 53095 Route 25 E- PO Box 1179 Southold,NY 11971 AUG — 6 ?018 Project Name: Sally Coonan outho!d?own 2262 Paradise Shores Road, Southold,NY Bof?us e SCTM No. 100041-4 Last August, a torrential rainfall event occurred on or about August 23, 2017. More than four inches or rain poured down creating essentially a river through Ms. Coonan's property. A review of topographic information reveals that Ms. Coonan's property is at a low point within a drainage basin of considerable size. Review of Paradise Shores Road and the surround community found that there are virtually no provisions within this community to address stormwater runoff. Additionally, I observed many of the homes in the area without adequate dry wells. Their gutters and leaders empty on the ground surface adding to a storm water runoff problem for Ms. Coonan. In light of the aforementioned information,Ms. Coonan seeks to make repairs to her property landward of the existing bulkhead by doing the following: 1. Constructing a timber retaining wall on the east side of the stairs consisting of a 15' Wall with returns of 12' and 10'. The top or filled area of the retaining wall will be vegetated with indigenous beach grass and other salt tolerant coastal plant species. 2. Create a 6" earthen berm along the landward edge of the property scarp. 3. Add two four foot wide by six foot deep dry wells to collect surface and roof runoff from Ms. Coonan's house and patio interconnected to a 4' x 24' French Drain. 4. Add two 8' x 12' deep storm drains in the middle of the property to contain runoff emanating from the properties immediately east and west of Ms. Coonan's property 5. Install 6"—8"earthen berm within the Ms. Coonan's property lines and install three 8' x 12' interconnected storm drains. Drains to be installed slightly below grade so storm water will enter them. 6. Install a 2' x 16' trench drain at the entry point of storm water coming from the Paradise Shores Road and surrounding properties that are higher in elevation. All Enclosed are the following: 1. Short Environmental Assessment Form 2. Authorization form 3. Agent Authorization form 4. Applicant Transactional Disclosure form 5. Agent Transactional Disclosure form 6. LWRP Consistency Assessment Form 7. Survey 8. Plot/Site Plan -, 9: Photograph-S7 10. Application`Fee should yoVIve any questions,please feel free to contact me at the above address,by phone or by email cesenv@gmal.com. --- •.> .utir.��-^.._.._.._...r.�._a Sincerely, Dennis W. Cole,Agent Enclosed are the following: 1. Short Environmental Assessment Form 2. Authorization form 3. Agent Authorization form, 4. Applicant Transactional Disclosure form 5. Agent Transactional Disclosure form 6. LWRP Consistency Assessment Form 7. Survey 8. Plot/Site Plan 9. Photographs 10. Application Fee Should you have any questions,please feel free to contact me at the above address,by phone or by email cesenv@gmail.com. Sincerely, Dennis W. Cole,Agent 0 0 425 Montauk Highway East Quogue,NY 11942 cesenv @ gmail.com (631) 996-4527 August 6, 2018 Town of Southold Board of Trustees 53095 Route 25 PO Box 1179 Southold, NY 11971 Attn: Elizabeth Cantrell Project Name: Sally Coonan, 2662 Paradise Shores Road, Southold, NY SCTM No. 1000-9-1-4 Elizabeth, I apologize for the incomplete application. Thank you for bringing that to our attention. Enclosed please find copies of each of the following: 1. Application 2. Short Environmental Assessment Form 3. Authorization form 4. Agent Authorization form 5. Applicant Transactional Disclosure form 6. Agent Transactional Disclosure form 7. LWRP Consistency Assessment Form 8. Survey 9. Plot/Site Plan 10. Retaining Wall Cross Section 11. Photographs 12. Application Fee If you have any questions, please feel free to contact us. Sincerely, I Kate Rummel Office Manager �, James F.King,President ��0�Sy� Town Hall Annex Bob Ghosio,Jr.,Vice-President 54375 Main Road P.O.Box 1179 Dave Bergen Southold,New York 11971.0959 John Bredemeyer Michael J.Domino �Q Telephone(631)765-1892 `,oU ' Fax(631) 765-6641 BOARD OF TOWN TRUSTEES TOWN OF SOUTHOLD Office Use Only f]D E 0 E(( V /101and stalErosion Penmit Application Permit Application Administrative Permit / _Amendment/Trans f x ion AUG — 6 2018 V//Received Application: 'Tr eceived Fee:$ ZS . Southold Town Completed Application ZX Board us e os Tincomplete _SEQRA Classification: Type I Type II Unlisted �Coordination:(date sent) LWRP Consistency Assessent orm d AC Referral Sent: ga�T�c Date of Inspection: ®a_ _Receipt of CAC Report: Lead Agency Determination: , r Technical Review: c ,�'1lJ Public Hearing Held: , Resolution: Name of Applicant Sally Coonan Mailing Address 12 Hughes Place Summit NJ 07901 Phone Number:( ) 1-917-620-1341 Suffolk County Tax Map Number: 1000- 80 1 4 Property Location: Paradise Shore Road p Southold © NY 11971 (provide LILCO Pole#, distance to cross streets,and location) AGENT: Cole Environmental Services, Inc. Dennis W. Cole (If applicable) Address: PO Box 471 Manorville NY 11949 Phone: 631-369-9445 Hoard of Trustees Application GENERAL DATA Land Area(in square feet): 11,979 sf Area Zoning: R-40 Previous use ofY�ro Residential p I� Intended use ofp�Y�ro Residential p XX Covenants and Restrictions on property? Yes No If"Yes",please provide a copy. N�f�•� � :.;. �i 1 t i Will this projbct'require"a Building Permit as per Town Code? Yes ELNO If"Yes",,be advised this application'will be reviewed.by the Building Dept.prior to a Board of Trustee review and Elevation Plans will be required. Does this project require a variance from the Zoning Board of Appeals? El Yes =No If"Yes",please provide copy of decision. W' 's project require any demolition as per Town Code or as determined by the Building Dept.? —LiYes 4;71-&o Does the structure(s)on property have a valid Certificate of Occupancy? Yes No Prior permits/approvals for site improvements: Agency Date Trustee 4/19/17 Building #41485 04/4/17 No prior permits/approvals for site improvements. Has any permit/approval ever been revoked or suspended by a governmental agency?W1 No D Yes If yes,provide explanation: Project Description(use attachments if necessary): Folowing an intense rain-storm event in the summer of 2017 Ms. Coonan is seeking Southold Trustee approval for bluff retaining wall and storm water containment system consisting of low berm at top of scarp slope,French Drain leading to dry wells landward of the scarp (dry wells to contain roof and patio runoffl, mid- property dry wells to contain neighbor stormwater runoff and on-site surface stormwater runoff and trench drain leading to a series of dry wells to contain runoff omadjacent properties and locN[access road7dnveway. IRE intent is to contain all runoff streaming through Ms. Coonan's property prior to reaching Peconic Bay. Board of Trustees Application WETLAND/TRUSTEE LANDS APPLICATION DATA Purpose of the proposed operations: To make repairs to the existing storm-damn by constructing a retaining wall with return along the property line,and to create an on-site storm water containment system to prevent future overspills into Peconic BE from future,rain/storm events. Area of wetlands on lot: 0 square feet 8.7 Percent coverage of lot: % Closest distance between nearest existing structure and upland edge of wetlands: 25 feet Closest distance between nearest proposed structure and upland edge of wetlands: 25 feet Does the project involve excavation or filling? No Yes If yes,how much material will be excavated? .5 cubic yards L How much material will be filled? 0 cubic yards 2'NEAR BLUF Depth of which material will be removed or deposited: p feet 6' FOR DRY WELLS 33%BLUFF AREA Proposed slope throughout the area of operations: v Manner in which material will be removed or deposited: Work to be done by small machine. All excess fill material to be removed from site. Statement of the effect,if any, on the wetlands and tidal waters of the town that may result by reason of such proposed operations(use attachments if appropriate): No impact to tidal wetlands as all work to take place landward of the exiting bulkhead. Stormwater containment will aid in preventing overwash of stormwater and sediments into bay. Board of Trustees Application COASTAL EROSION APPLICATION DATA retaining wall landward of existing Purposes of proposed activity: bulkhead. Stormwater containment system to be installed Are wetlands present within 100 feet of the proposed activity? ❑ No ❑� Yes Does the project involve excavation or filling? No ❑� Yes If Yes,how much material will be excavated? 80 (cubic yards) How much material will be filled? 1.2 (cubic yards) Manner in which material will be removed or deposited: Backhoe and small excavator for near shore work Describe the nature and extent of the environmental impacts to the subject property or neighboring properties reasonably anticipated resulting from implementation of the project as proposed,including erosion increase or adverse effects on natural protective features. (Use attachments if necessary) No impacts to tidal wetlands are anticipated as all work to occur landward of the existing bulkhead. Stormwater containment system should aid in abating stormwater from overwashing and eroding the bank as the stormwater enters Peconic Bad s 617.20 Appendix B Short Environmental Assessment Form Instructions for Comoletin Part I -Project Information. The applicant or project sponsor is responsible for the completion of Dart 1. Responses become part of the application for approval or funding,are subject to public review,and may be subject to further verification. Complete Pan I based on information currently available. If additional research or investigation would be needed to fully respond to any item,please answer as thoroughly as possible based on current information. Complete all items In Part 1. You may also provide any additional information which you believe wil I be needed by or useful to the lead agency;attach additional pages as necessary to supplement any item. Part l-Project and Sponsor Information Sally Coonan Name of Action or Project: - — Sally Coonan Project Location(describe,and attach a location map): 2662 Paradise Shore Road Southold NY 11971 Brief Description of Proposed Action:: Folowing an intense rain-stone event in the summer of 2017 Ms.Coonan is Seeking Southold Trustee approval for bluff retaining wall and storm water containment system consisting of low berm at top of scarp slope,French Drain leading to dry wells landward of the scarp(dry wells to contain roof and patio runoff), mid-property dry wells to contain neighbor stonnwater runoff and on-site surface stonnwater runoff and trench drain leading to a series of dry wells to contain runoff from adjacent properties and local access road/driveway. The intent is to contain all runoff streaming through Ms.Coonan's property prior to reaching Peconic Bay. Name ofApplicant or Sponsor. Telephone: 1-917-620-1341 Sally Coonan iSallyCoonan@gmail.com Address: 12 Hughes Place City/PO N� Zi Cade: Summit 1. 07901 1,Does the proposed action only invalve•the legislative adaption of a plan,local law,ordinance, NO 'YM administrative rule,or regulation? If Yes,attach a narrative description of the intent of the proposed action and the environmental resources that D LJ may be affected in the municipality and proceed to Part 2. ]foo,continue to question 2. 2, Does the proposed action require a permit,approval or funding from any other governmental Agency? NO YES If Yes,list agency(s)name and permit or approval: 3.a.Total acreage ofthe site of the proposed action? _ •286 acres b.Total acreage to be physically disturbed? —acres c.Total acreage(project site and any contiguous properties)owned or controlled by the;applicant or project sponsor? 11,979 sf acres 4. Check all land uses that occur on,adjoining and near the proposed action. J Urban DRural(non-agriculture) ❑Industrial orn nieroial �esidantial(suburban) Elpormt Dgriculture [Dkquatic LJOther(specify): }]Parkland Page 1 of 4 p p -- - - - YES N/A'f 'S:� is the-- ro- osed action, a..A.permitted,use under.the zoning regulations? it ! b.Consistent with the.adopted compreliensive,plan. ✓ f P p. - 1. .0�.. Is the.ro osed actiorrconsistent wtthahe predominant charaoter.ofthe existing built.or'natural NO :`YES,' I ' dscape?' .-Is the site of the pro*' sed:_action located'in;or does it-djoin,a stafe listed Critical EnV.ironmental:Area?' N6_ YES If Yes;identify 4- a: Will,the-proposed action result.in a'substantial increase in traffic above'presentlevels? i,NO `YES. 211- b:Are _J b:.Are publicAransportationservice(s)available for near the site of.the proposed action?: r c..Are any.pedestrian.accommodations.or,:bicycle.routes,available,.on or near site:ofthe,proposed action? i ✓ ;; `9.Does the proposed:action meet or exceed the state en ergy;code;requirements.? NO.` `YES. If.the proposed.action.will exceed.requirements,describe,design,features.and technologies.'; : 1.0. Will.the'proposed'action,co-'ne-ct to an"existing_public/priviate.water-:supply? :.N YES; i If No,describe,method'for providing potable water:_..._ ---- ---------- IT. ---- --IT.Will.the proposed;action,connect to existing wastewater utilities? _NO=: YES.': If No,describe method for providing wastewater treatment:,On-site septic system s 12. a.Does the site contain a structure that-is listed on either the State or National Register of.Historic. NO YES', Places? b.Is the`proposed action located in an archeological sensitive area? 13.'a.Does anyportion of-the site of the proposed action;or lands adjoining tkprop-osed action,'contain NO - YES wetlands:or other waterbodies regulated by a federal,:state or:local agency? b.Would the proposed action,physically alter,orencroach:into,any existing Wetland..or waterbody? ! ✓ ; z If Yes;identify the wetland or waterbody and:extent of alterations in square feet or acres' : i 14. Identify the typical habitat types that occ : n,o.r are:likely to be.found on the roject'site; Check`all that apply, ,i, Shoreline Forest gricultural/grasslands Earlymid-successional Wetland arban ✓ Suburban 15.'Does the site of the ro osed.action contain an species of animal,or associated habitats,listed NO by the State or Federal government as threatened or endangered? ® ®` I.&Is th:e,project site located in the'100 year flood plain? NO YES i I.7.Will the proposed action create:storm waterd.ischarge;either.from point or non-point sources? :N.O_ ;..Y.ES:! .If Yes; n a.Will storm w.ater.dischargesflow to adjacent properties?. ONO. YES I b.Will storm water discharges.be directed to established conveyance systems. runoff and storm drains)? If Yes,briefly describer LJNO'• R 'PS and current) ..transverses the-owners propeity. eventually s illin _into -- Peconic Bay. 'Pagel of 4 n-inc _h .......... _- 18 Does the pro'Posed1',adt10 I ludeconstruction.drot other adtiv=_Iifie�'thiit,�6su fin-the impoundmento-f NO YES water or other (e.g.,retention pond,waste-lagoon,dam)? If Yes,.cxp)Ain purpose and sizd: ....... Lj 19.Has,the Site of the proposed:action Tor.an adj-o.ini ng property-bee n the locatio n of a act'i v'e'or' dos'eid .1 '.NO _YES solid waste:management facility? -IT If Yes,ddScribe-.____ -A d bj'ec_t_6G6rnediae1_- or T 20.Has the site of t e propose action orman adjoining property been the subject on ongoinTV' YES", c6ffioleted),for hazardous'waste? If Yes,describe- 1 A b,0OVE IS t AFFIRM THAT THE INFORMATION PROVIDE Itut AND ACCURATE TO THE BEST OF MY KNOWLEDGE. ApplicanlJsporisor,nani� -.--.--.--.-.,.,------- Denis\41. Date,:., D 2ole-- J'Signature:, Part I Impact Assessment.The Lead'Agency,is responsible for the completionof Part 2. Answer all of tkfibl[owing questions in Part Zusing the information contained in Part I and other materials submitted by the project sponsoror otherwise available to the reviewer. When answering the questions the reviewer should be.guided by the concept"Havemy responsesbeen reasonab ie.cons ideri n I g the scale-and context of the propose.d a.ction?" _ No,';6t Mod6ke Small, to large, impact impact may may occur occur I*i Will the proposed action.create a material.conflict with�an'adopted land dsi6 pi 4_h­ p .or.zoning regulations? ,2. Will the.proposed action result in a change in'the,use or-intensity.of use of land? 3. Will the proposed action impair the-character or quality of the existing community? Will the proposed action have an impact on the environmental characteristics.that caused the establishment.of a-Critical Environ mental:Area(CEA)? .:5 Will the proposed.action,result in.an,adverse change in the-existing:level'of traffic-or affeaexisiing-infrakruciure ior mass transit�biking or walkway? �.6: Will the proposed action cause an increase in the use of energy,and it NIS to incorporate reasonably available:endrgy conservation or renewable energy opportunities?' 7., Will,the proposed action impact existing: A.,public/private water supplies? b.;public/private wastewater treatment utilities? Ii. W ill the proposed,action impair-the.character or quality of important histbrici arch ado logical; architectural o-radsithetic,resources?. 9. Will the,proposed,action. result in an adv&rsechingeto:hattiral resources(e.g.,wetlands, wateib6dies,gro6ridwater,Air quality,flora-andTfaura)? Pa&3 of 4 No,or Moderate small to large t impact impact may may occur occur I;! 10. Will;the.proposed'action,;result in:an increase in the-potential for erosion,flooding or•drainage j problems?: t� '11 W.ill.the proposed action'create.a hazard to environmental resources.or human health? Part 3-Determination of significance. The lead Agency is responsible-for.the:completion of PA rt 3. Forevery, ,question in_Part 2 that was answereii"moderate to large impactmay:occur'',or'if there-is a need-to explain.why a particular element-ofthe_proposed-action may or will not•resul'in a`significant adverse environmental impact;please.corrmplete Part3. Part3 should,in sufficient detail,identifythe impact, including.any measures or design.elements that have been includedby the projectsponsor.to avoid.or reduce impacts, :Part.3 should:also expl6in.how -agency determined.that.the impact. may.or:will not be,significant.Each-potential_impact should- assessed-considering its setting;probability of occurring, duration,irreversibiIity,.geograohic scope,and'mag'itude...Also consider the poteritial for short-term;long-term and cumulative impacts: Check=this box-if you have determined,-based_onIhe ihformatlomand-anal-sis above; � y - - ` `-'�-�---- y�'- "and'any supporfng.dociimentation,'` that the. proposed action may result in one or more.potentially large or significant adverse;impacts.and an ? ___-- environmental impact statement is required. Check,this box ifyou;have determined,.based;on the i,,nformation and analysis above;and any supporting documentation, " 'that the proposed acdoii;will not,result in any signifcanfidverse_env ironmental impacts: Town of Southold-Board of Trustees Name.of Lead;4gency: Date_:... ..._. _._. - "President. Print or Type Name.of Responsible Officer'ii%I ead Agency. V Tiff 0 Responsible Officer Signature of Responsible Officer in Lead:Agency. Signature of Prepares(if different from Responsible Officer) --PRINT __ Page 4 of 4 PROJECT ID NUMBER 617.20 SEAR APPENDIX C STATE ENVIRONMENTAL QUALITY REVIEW SHORT ENVIRONMENTAL ASSESSMENT FORM for UNLISTED ACTIONS Only PART 7 -PROJECT INFORMATION (To be completed by A)plicant or Project Sponsor) 1.APPLICANT/SPONSOR 2.PROJECT NAME Sally Coonan Coonan Property &PROJECT LOCATION: Southold Suffolk Municipality County 4.PRECISE LOCATION: Street Addess and Road Intersections. Prominent landmarks etc -or provide map 2662 Paradise Shore © Southold NY 11971 5.IS PROPOSED ACTION: El New El Expansion ❑Modification/alteration 6.DESCRIBE PROJECT BRIEFLY: Folowing an intense rain-storm event in the summer of 2017 Ms.Coonan is Seeking Southold Trustee approval for bluff retaining wall and storm water containment system consisting of low berm at top of scarp slope,French Drain leading to dry wells landward of the scarp(dry wells to contain roof and patio runoff), mid-property dry wells to contain neighbor stormwater runoff and on-site surface stormwater runoff and trench drain leading to a series of dry wells to contain runoff from adjacent properties and local access road/driveway. The intent is to contain all runoff streaming through Ms.Coonan's property prior to reaching Peconic Bay. 7.AMOUNT OF-LAND AFFECTED: .010 Initially acres Ultimately acres 8.WILL PROPOSED ACTION COMPLY WITH EXISTING ZONING OR OTHER RESTRICTIONS? ❑✓ Yes 0 No If no,describe briefly: 9.WHAT IS PRESENT LAND USE IN VICINITY OF PROJECT? (Choose as many as apply.) M Residenfial ri Industrial 11 Commercial 04riculture 11 Park/Forest/Open Space Other (describe) 10. DOES ACTION INVOLVE A PERMIT APPROVAL, OR FUNDING, NOW OR ULTIMATELY FROM ANY OTHER GOVERNMENTAL AGENCY (Federal, State or Local) Yes MNo If yes, list'agency name and permit / approval: 11.DOES ANY ASPECT OF THE ACTION HAVE A CURRENTLY VALID PERMIT OR APPROVAL? EYes o If yes, list agency name and permit / approval: 12,—AS A SULT OF PROPOSED ACTION WILL EXISTING PERMIT/ APPROVAL REQUIRE MODIFICATION? es I /INo I CERTIFY THAT THE INFORMATION PROVIDED ABOVE IS TRUE TO THE BEST OF MY KNOWLEDGE Applicant / Sponsor Name �R-N pt S �r0(-�/ / A, -7 Date: SignatureL ( / If the action is a Costal Area,and you are a state agency, complete the Coastal Assessment Form before proceeding with this assessment .r APPLICANT/AGENT/REPRESENTA.TI VE TRANSACTIONAL DISCLOSURE FORM Z1ic Town of Soulhold's Code of Ethics pmhibiis conflicts of interest n the pirt of town-ofliccrs and employecs.'1710 putliose of Iliis Court is.lb gmvide information whish can alert the town. blc of nossiconflicts of mten t and allow it to taRe.wh:ucver action.is niecnssaiy to avoid sa e: YOUR NAME:._ n`L G y' ©C? � n (Last name,fust name,griddle initial,unless you are applying nt the name of someone else or other entity,such as a company.If so,indicate the other person's or company's name.) NAME OF APPLICATION: (Check all that apply.) Tax grievance Building Variance TrusteeChange of Zone Coastal Erosion Approval ofplat Mooring Exemption from plat or oMciai map Planning Other (If"Oftel,name the activity.) Do you personally(or throughyour comp<viy,spotisc,sibling,parent,,or child)have a rctutionship with any OR=or employee of the Town of Sctiilhold? "Rcliitianship"includes by blood,,alarringc,or business interest"flusiriccs intcrcsl'•nicans a husinoss, inciddiiig a paitnersldli;in which die town officeror employee Lias even a partial owncrshipor(or employment by)a.corporation in which the low,,ofricer or employee owns more tham5%'of the shares. YES NO V If ydu answered"YES",completo the balance of this form and date and sign where indicated. Name of person employed by the Town of Southold Title or position of that person Describe the relationship between yourself(the;applicant/agcnunepn:sentative)and the town officer or employee.Either check the appropriatc.line A)through D)and/or describe in the space provided. The town officer or employee or his or her spouse,sibling,parent,oY child is(check 211 that apply): A)the owner of greater•than.5%of the shares of the corporate stock of the applicant (when the applicant is a corporation); B)the legal or beneficial owner of any interest in a non-corporate entity(when the applicant is not a corporation); C)an officer,director,partner,or employee of the applicant;or D)the actual applicant. DESCRIPTION OF RELATIONSHIP Submitted this ZD day of /`�i� y 20V Signature Print Name s5L/9 L G y C o Form TS 1 f Board of. Trustees Application AFFIDAVIT. 'jq Ll- `1/ CO O N A('\J BEING DULY SWORN DEPOSES AND AFFIRMS THAT HE/SHE IS THE APPLICANT FOR THE ABOVE DESCRIBED PERMIT(S)AND THAT ALL STATEMENTS CONTAINED HEREIN ARE TRUE TO THE BEST OF HIS/HER KNOWLEDGE AND BELIEF,AND THAT ALL WORK WILL BE DONE IN THE MANNER SET FORTH IN THIS APPLICATION AND AS MAY BE APPROVED BY THE SOUTHOLD TOWN BOARD OF TRUSTEES. THE APPLICANT AGREES TO HOLD THE TOWN OF SOUTHOLD.AND THE BOARD OF TRUSTEES HARMLESS AND FREE FROM ANY.AND ALL DAMAGES AND CLAIMS ARISING UNDER OR BY VIRTUE OF SAID PERMIT(S),IF GRANTED. IN COMPLETING THIS APPLICATION,I HEREBY AUTHORIZE THE TRUSTEES,THEIR AGENTS)OR REPRESENTATIVES,INCLUDING THE - CONSERVATION.ADVISORY COUNCIL,TO ENTER ONTO MY.PROPERTY TO INSPECT.THE.PREMISES IN CONJUNCTION WITH THIS APPLICATION, INCLUDING A FINAL INSPECTION. I FURTHER AUTHORIZE THE BOARD OF TRUSTEES TO ENTER ONTO MY PROPERTY AND AS REQUIRED TO INSURE COMPLIANCE WITH ANY CONDITION OF ANY WETLAND OR COASTAL EROSION PERMIT ISSUED BY THE BOARD OF TRUSTEES DURING THE TERM OF THE PERMIT. Signature of Property Owner Signature of Property Owner SWORN TO BEFORE ME THIS Z 3 DAY OF - f J Notary Public OSAMA M ABDALLA NOTARY PUBLIC-STATE OF NEW YORK No.01AB6353282 Qualified in New York County Nliy Commission Expires 01-17-2021 Hoard of Trustees Application AUTHORIZATION (Where the applicant is not the owner) I/We,. 'S A L 4- Co owners of the property identified as SCTM# 1000-0x-01,4 .in the town of S O u T H .o i ,10- .New York,hereby authorizes --'-S C J t-2 to act as my agent and handle all necessary work involved with the application process for pennit(s)from the Southold Town Board of Trustees for this property. Property Owner's Signature Property Owner's Signature SWORN TO BEFORE ME THIS 2 3 . DAY OF120 . I �SAdIZI"-VL- Notary Public ©SAMA-M ABDALLA. NOTARY PUALIC•STATE OF NEW YORK NO,V AHIM282 0ijolifif-W In New York County MV Uff rmissi.on Expires 01-17-2021 AFPLICAGENT RESENTATPVE TR.ANSACTI ISCLOSURE FORM The Town of Southold's Code of Ethics nrohibjts conflicts of interest on the Hart of tows officers and emplo ms The p-in a of this form is to g+Lvide inforination which can alert the town of nossible conflicotts„of interest and allow it to take whatever action is uaWssary to avoid same. - - YOURNAME: Dennis Cole (Last name,Hist name,.gdddle initial,unless you are applying in the name of someone else or other entity,such as a company.If so,indicatq•thb.other person's or company's name.) NAME OF APPLICATION: (Check all that.apply.) 'Tax grievance Building Variance Trustee Change of Zone Coastal Erosion Approval of plat Mooring Exemption from plat or official map Planning Other (If"Other,nwe the activity.) Stormwater containment Do you personally(or through your company,spouse,sibling,parent,or child)have a relationship with any officer or employee of the Town of Southold? "Relationship"includes by blood,marriage,or business interest.`Business interest"means a business, including a partnership,in which the town officer or employee has even a partial ownership of(or employment by)a corporation in which the town officer or employee owns more than 5%of the shares. YES NO XX lfyou answered"YES",complete the balance of this form and date and sign where indicated. Name of person employed by the Town of Southold Title or position of that person Describe the relationship between yourself(the applicant(agent/representative)and the town officer or employee.Either check the appropriate line A)through D)and/or describe in the space provided The town officer or employee or his or her spouse,sibling,parent,or child is(check all that apply): A)the owner of greater than 5%of the shares of the corporate stock of the applicaat (when the applicant is a corporation); B)the legal or beneficial owner of any interest in a non-corporate entity(wheel the' applicant is not a corporation); C)an officer,director,partnei or employee of the applicant;or D)the actual applicant. NALD REBALDO . DESCRIPTION OF RELATIONSHIP Notary Public-State of Newyork No. 01 RE6101557 Qualified In Suffolk County �My Commission Expires Submitted this Z day ofA e, 20010 Srgnature- C-�U2 - Print Name lv)me n., W, eof Form TS 1 Town of Southold LWRP CONSISTENCY ASSESSMENT FORM I A. INSTRUCTIONS j 1. All applicants for permits* including Town of Southold agencies, shall complete this CCAF for proposed actions that are subject to the Town of Southold Waterfront Consistency Review Law. This assessment is intended to supplement other information used by a Town of Southold agency in making a.determination of consistency. *Except minor exempt actions including Building Permits and other ministerial permits not located within the Coastal Erosion Hazard Area. 2. Before answering the questions in Sectiod. C, the preparer of this form.should review the exempt minor action list,policies and explanations of each policy contained in the Town of Southold Local Waterfront Revitalization Program. A proposed action will be evaluated. as to its significant beneficial and adverse effects upon the coastal area(which includes all of Southold Town 3. If any question in Section C on this form is answered "yes" or"no",then the proposed action will affect the achievement of the LWRP policy standards and conditions contained in the consistency review law. Thus, each answer must be explained in detail. listins both supporting and non- supporting facts. If an action cannot be certified as consistent with the LWRP policy standards and conditions,it shall not be undertaken. A copy of the LWRP is available in the following places: online at the Town of Southold's website(southoldtown.northfork.net), the Board of Trustees Office, the Planning Department, all local libraries and the Town Clerk's office. B. DESCRIPTION OF SITE AND PROPOSED ACTION SCTM# 1000 _ 80 1 4 PROJECT NAME Coonan Property i The Application has been submitted to(check appropriate response): Town Board M Planning Board Building Dept. ® Board of Trustees # 1. Category of Town of Southold agency action(check appropriate'response): F , 3 (a) Action undertaken directly by Town agency(e-g.capital construction,planning activity,agency regulation,land transaction) .(b).. Financial assistance(e.g.grant,loan,subsidy) E (c) Permit,approval,license,certification: Nature and extent of action: Folowing an intense rain-storm event in the summer of 2017 Ms.Coonan is Seeking Southold Trustee approval for bluff - retaining wall and storm water containment.system consisting o ow erm at top of scarp slope,French Drain leading to dry wells landward of the scarp(dry wells to contain roof and patio runof fl, mid-property dry wells to contain n ells to contain runoff from adjacent properties and local access road/driveway. The intent is to contain all runoff streaming through Ms.Coonan's property prior to reaching Peconic Bay. Location of action: 2662 Paradise Shore Road,Southold Site acreage: .286 Present land use: Residential Present zoning classification: R-40 r 2.' If an application.for the proposed action has been filed with the Town of Southold agency, the following j information shall be provided: (a) Name of applicant:Sally Coonan I (b) Mailing address: 12 Hughes Place i Summit NJ 07901 i (c) Telephone number:Area Code( ) 1-917-620-1341 (d) Application number,if any: �• Will the action be directly undertaken,require funding,or approval by a state or federal agency? i Yes 13 No If yes,which state or federal agency? C. Evaluate the pxoject to the following policies by analyzing how the project will further support or not support the policies. Provide all proposed Best Management Practices that will further each policy. Incomplete answers will require that the form be returned for completion. DEVELOPED COAST POLICY . I. r i Policy 1. Foster a pattern of development in the Town of Southold that enhances community character, preserves open space,makes efficient use of infrastructure,makes beneficial use of a coastal location,and minimizes adverse effects of development. See LMW Section III--Policies;Page 2 for evaluation criteria. i E]Yes ® No EJ Not Applicable Attach additional sheets if necessary Policy 2. Protect and preserve historic and archaeological resources of the Town of Southold. See LNW Section III=Policies Pages 3 through 6 for evaluation criteria ® Yes No 0 Not Applicable f r � I i Attach additional sheets if necessary I. Policy 3. Enhance visual quality and protect scenic resources throughout the Town of Southold. See LWRP Section III--Policies Pages 6 through 7 for evaluation criteria �✓ Yes ® No [j Not Applicable Areas landward of the bulkhead and retaining wall will he Pstahlished with naturalvegetation thereby reestablishing areas mdth natural vP¢Ptation that were seve l.,eroded by Sum-m-Pr 2917 rain event Attach additional sheets if necessary �. NATURAL COAST POLICIES Policy 4. Minimize loss of life, structures, and natural resources from flooding and erosion. See LWRP Section III-Policies Pages 8 through 16 for evaluation criteria Yes ® No El Not Applicable The proposed stormwater containment/abatement system is being installed on this'homeowner's property while e contribution areas (drainage basin) is far outside the subject property. Her property is the low point in which the waters converge and flow downward toward Peconir- Ray_ Tnstallatinn of these j stormwater leaching basins- dry wells and retaining wall will aid in preventing future major rain/ st&m events from rnntrihiitina to stnrmwa'Pr entry into Reconi�Bay, Attach additional sheets if necessary Policy 5. Protect and improve water quality and supply in the Town of Southold.See LWRP Section III =Policies Pages 16 through 21 for evaluation criteria ® Yes ® No V1 Not Applicable The proposed stormwater containment/ahatement systi m wili provide for the storage of siirrniinding properties that d anlo-thave,I-}gaue d}-wells and—x6$h8i;eby their-r-e of and dFiveway vinaff cross th@kt property lines uftimately in stafm evefAs effter-ing 4te subjeet property. Attach additional sheets if necessary Policy 6. Protect and restore the quality and function of the Town of Southold ecosystems including Significant Coastal Fish and Wildlife Habitats and wetlands. See LWRP Section III-Policies; Pages 22 through 32 for evaluation criteria. Yes No Not Applicable I I I i Attach additional sheets if necessary i Policy 7. Protect and improve air quality in the Town of Southold. See LWRP Section III — Policies Pages 32 through 34 for evaluation criteria. ® Yes ® No21 Not Applicable I Attach additional sheets if necessary Policy 8. Minimize environmental degradation in Town of Southold from solid waste and hazardous substances and wastes. See LWRP Section III—Policies; Pages 34 through 38 for evaluation criteria.. Yes No Not Applicable 1 I PUBLIC COAST POLICIES Policy 9. Provide for public access to, and recreational use of, coastal waters, public lands, and public resources of the Town of Southold. See LWRP Section III;Policies; Pages 38 through 46 for evaluation criteria. YZ No Not Applicable Attach additional sheets if necessary WORKING COAST POLICIES Policy 10. Protect Southold's water-dependent uses and promote siting of new water-dependent uses in suitable locations. See LWRP Section III Policies;Pages 47 through 56 for evaluation criteria. Yes Ej No 21 Not Applicable - t I r . I Attach additional sheets if necessary Policy 11. Promote sustainable use of living marine resources in Long Island Sound, the Peconic Estuary and Town waters. See LWRP Section III-Policies;Pages 57 through 62 for evaluation criteria. El Yes ® No Not Applicable ` 1 Attach additional sheets if necessary Policy 12. Protect agricultural.Iands-in the Town of Southold. See LWRP Section III Policies; Pages 62 through 65 for evaluation criteria. Yes ® No Not Applicable Attach additional sheets if necessary Policy 13. Promote appropriate use and development of energy.and mineral resources. See LWRP Section III—Policies;Pages 65 through 68 for evaluation criteria. Yes No Not Applicable PREPARED BY Dennis W.Cole TITLE Agent DATE 07.08.1 s I Chapter 55 i. PUBLIC HEARINGS, NOTICE OF I I §55-1.Providing notice of public hearings. VMTORY: Adopted by the Town Board of the Town of Southold 12-27-1995 by L.L. No.25-1995.Amendments noted where applicable.] I § 55-1. Providing notice of public hearings. [Amended 6-3-2003 by L.L.No. 12-20031 Whenever the Code calls for a public hearing this section shall apply. Upon determining that 1 an application or petition is complete, the board or commission reviewing the same shall fix a I i time and place for a public hearing thereon. Notice relating to a public hearing on an application or petition shall be provided as follows: 'I I A. Town responsibility for publication of notice. The reviewing board or commission shall cause a notice giving the time, date, place and nature of the hearing to be published in the official newspaper within the period prescribed by law. B. Applicant or petitioner responsibility for posting and mailing notice. An application or I' petition, initiated,proposed or requested by an applicant or petitioner,other than a Town board or commission, shall also be subject to additional notice requirements set forth 3 .- .� below: (1) The applicant or petitioner is required to erect the sign provided by the Town, which shall be prominently displayed on the premises facing each public or private street which the property involved in the application or petition abuts, giving notice of the application or petition, the nature of the approval sought thereby and the time and place of the public hearing thereon. The sign shall be set back not more than 10 feet from the property line. The sign shall be displayed for a period of not less than seven days immediately preceding the date of the public hearing. I ' The applicant, petitioner or his/her agent shall file an affidavit that s/he has complied with this provision prior to commencement of the public hearing. (2) The applicant or petitioner is required to send notice to the owners of record of every property which abuts and every property which is across from any public or private street from the property included in the.application or petition. Such notice shall be made by certified mail, return receipt requested,posted at Ieast seven days prior to the date of the initial public hearing on the application or petition and addressed to the owners at the addresses listed for them on the local assessment roll. The notice shall include description of the street location and area of the subject property, nature of relief or approval involved, and date, time and place of hearing. The applicant, petitioner or agent shall file an affidavit that s/he has complied with this provision prior to commencement of the public hearing. 55:1 05-01-2m i I f . I _ r 'l S r1: Ii i. i OTHER POSSIBLE AGENCIES YOU MIGHT HAVE TO APPLY TO N.Y.S. Dept. of Environmental Conservation (DEC) SUNY, Bldg. 40 Stony Brook, NY 11790-2356 (6.31)444-0355 �= Mon., Wed., Fri., 8:00 AM-3:00 PM Suffolk County Dept. of Health Services 360 Yaphank Ave., Suite C Yaphank, NY 11980 852-5700 U.S. Army Corp. of Engineers New York District 26 Federal Plaza 'New York, NY 10278 917-790-8007 N.Y.S. Dept. of State Coastal Management 99 Washington Ave. Albany, NY 12231 518-474-6000 I-. Nit PO Box 471 Manorville,NY 11949 Ys� v_K Qr� •� POSTAGE MANORVILLE, NY 5, 11902 18 Y• AUAy�MOUNTAA UNITE $ ■47 it mum-Ep � G �-■■ 1000 11971 R2305K135407.01 , l ovv', Of Southold Trustees _- Town Hall 4nnkx K. 54375 Roue 25 _> _ ' PO Box `l;"9 {� A y I SURVEY PROPERTY jSITUATE p�tt;'.lLic LAND5UPV1r-Y1NG Y;�C.+. . SOUTHOLD, TOWN OFSOUTHOLD SUFFOLK COUNTY, NEW YORK Suffolk Tax Map No.: 1000-86-01-4 110 SOUTH 4th STREET DATE SURVEYED:7/6/-o1S Lindenhurst, New York MJScaiice®mjslandsurvey.eom SCALE:i"=3o' P:631-057-2400 F:631-226-2400 SURVEYED BV:R.B. JOB NO.S1 0 bRAWNBV:D.D. S' 454 �O -tel Guaranteed to: S A 0 The Judicial Title insurance Agency LLC �i7 Q - O mrst American Title insurance Company .� O Sally Coonan 0 $ Guaranteed Rate,Inc„its successors anti/or assigns { i eu 1 o� ® 1 INLET 1 co INM m .•,•rw24,6" ' 12.s' ENS PUMP PIMP � A�tv � � INLET 194:� 1 1.7' 1 0 3RE � � ENCLOSED C SHOWER 1� INIEt�i. I r A.C. "W ' U POLE , CI Ij ED y U .f v1S qr 2.2' of G CURB ONUNE "�1 1 O 1 ill co n ti 0 1 t& � O. �1 { R Biu .........................foo: . . 1 . cA _ -- -- -- ALL. URL RE n n DRI V �- LEo I 1 �As ST f- 6 ( (20 LZ. *✓: Ty� N 59og8 '��i� I Tjfj �` 'OLL.L' 0 NE%/44.95 -RIV � ,AU018 Y T � s 50uttTo!?TO" REVISIONS — UPDATES ADDITIONS elf fin. 05G$$� DATE: DESCRIPTION: CHECKED BY: 1 --- — --- D 2 (T) UNAUTHORIZED ALTERATION ORAODITION TO THIS SURVEY MAP SEARING A LICENSED LAND SI/RVEYOR'S SEAL 15 A V;OLA•IMI OI' SECTION 7205, StlE-01VISION 2,'OF NEW YORE. STATE EDUCATION LATS. (2) ONLY BOUNDARY SURVEY !AAPS Willi THE SUROCiOR'S EME05SEc SEAL ARE GENUINE TRUE AND CORRECT COPIES OF TH[ SURVEYOR'S ORIGINAL WORK AND OPINION. (3) CERTIPICATIO45 ON-n'!S GOUNDARY SURVE•r MAP SIGNIFY T14AT THE MAP WAS PREPARED IN ACCORDANCE WITH THE CURRENT EXISTING CNOE OF PRACTICE FOR. LAND w SURVEYS ADOPTED BY THE NEW PORI{ STATE ASSOCIATION OF PROFESSIONAL LAND_SURVEYORS, INC: THE C-R1IFII;A7ION IS I-IMIM) t0 PERSON: +OR WHOM THE.90UNDARY SURVE-Y MAP IS PREPARED, to THE TITLE COMPAlrY, t0 rHF'l;OVERNI.Ii-.i4L AOF.NCY, AND TO THE I— LE.11DING INSTITUTION LISTED ON THIS BOUNDAfr( SURVEY MAP. (A) THE CERTIRCATIONS HEREIN ARE NUr TRANSFERAELE. (5) THE LOCATION OF UNDERGROUND IMPROVEMENTS OR ENCROACHMENTS ARE NO`e A.WAYS KNOWN AND OFTEN MUST BE ESi,MATED, IF ANY cJl UNDEFY;ROUND IMPROVEMENTS OR EUCROACHMENTS EXIST OR ARE SHOWN, THE fMPROVCAIEMS OR FNCROACHMENTS ARE NOT COVERED BY THIS SURVEY. (G) Tr+E OFFSET (Or, GIMENSONS) SHUw,N HEREONFROM THE STRuCTURcS TO THE PROPERv LINES ARE FOR A tl SPECIr!C PURPOSE AND USE AND THEREFORE ARE NOT INTEN0.D TO GUIDE 1Ht ERECTION OF IENCfS, RETMNING WALLS, POOLS, PATIOS PLAtiTING AREAS, ADDITIONS TO BU+LDWGS, AND ANY OTHcR TYPE OF CONSTRUCTION_ (7) mROPERTT COPNER MONL'MENTS WERE NOT SET AS PART Or THIS SURVCt. (B) THIS SURVEY WAS PrRFORMEO WITH A SPECTRA I'MOS 30 ROBOTIC TOTAL STAMM SURVEY of PROPERTY LAM) t _ �~ SITUATE . �,��,�,�,�c�... . �.. r t!r:YIN :i ��. SOUTHOLD, TOWN OFSOUTHOLD SUFFOLK COUNTY, NEW YORK Suffolk Tax Map No.: i000-8o-01-4 110 7SOUTH 4th STREET DATE SURVEYED:7/6/2015 Lindenhurst, New York MJScalice®mjslandsurvey.com SCALE: I"=30' P:631-957-2400 F:631-226-2400 SURVEYEDBY:R.[i. JOB NO.S7 4 DRAWWBV:D.O. S' 454 cv CQ �1 Guaranteed to: C The Judicial Title Insurance Agency.LLC ITirst Anurican'1'itle lnsurance.Company �Q'' Sally Coonan QQ ' Guaranteed Rate,Inc.,its successors and/or assigns Cow O) 1 �°pD euk�j, CNI y 05E ® INLET 04 INLET m g22r4.6' PTA�NK EINLET ' A\N � n 1.7' 44.6' t OTE - - olENCLOSED ��j� ) COYER SHD'NER INLET®I �tl 1 A 2.1A.C. LIN z 5 C) Poi U'2.6' 2.2' - � CURB . r, '- ONLINE r ` ` ^til co ` A O O U 1 0.2 Bi ......................100, • I u. -. nil r, (//�� �� Cr/7 i —1RgN.p�j UTIL cm, fC HOR �6 BEST ,�o ° RI V. N 5 � „ , s - R. 0. W. 9 98 4Q IV HORSw AUG 6 2018 49. 95 RI VE Southold Town Boar of Tr tees r ylr a REVISIONS UPDATES ADDITIONS t il,c` 05�P'�b�` �•ti '� DATE: DESCRIPTION: ICHECKED BY: A f0 2 (1) UNAJIMORIZED ALTERATION OR ADDITIDN III 1-115 SUR`!EY MAP :3EARINO A LICENSED LAND 50I?VEYOft'S SEAL IS A VIOLATIOU GI.3EO7I0N %a(i9, S:)D-D1V15:ON2, OF NEV YORM S'fATE EDU(-J.lou V.R'. (2) OKL%- 80UNDAhY SUr e-r mApi W:Tn ME 3Lr.WL-I0R'5 tM80<5C� SEAL ARE CENUINC 'ROE AND CORRECT COPIES OF THE SURVEYOR'S DRIr,04L WORK AND OPINION. (3) CERTIFICATIONS ON THIS BOUNDARY SURVITY MAP SICNIFY THAT THE MAP 'NAS PREPARED IN ACCORDANCE WITH THE CURRENT EXISTING CODE Df PRACTICE FOR L1N:: NI SURVEYS ADOPTF.J BY THE KIN YORK STATE ASSO'I:IATION' OF FROFESSIDNAL ILND SURVR'URS, INC. THE CERNFII:AHON IS LIMIT") TO PERSONS FOR 'WHOM THE BOUNDA:iY SI'RVF% MAP i$ PREPARED,TO'T14F 'IIfLE COMPANY, TO fHI' G^YERNMf:IJ1Ai AGF.14CY, AND 10 ThE LEAIDINC MSTITUTION LISTED ON THIS BOUNDARY SURVEY MAP. (4)THE Ci-9TIFICAT10NS HEREIN ARE NOT TRANSFERABLE. (5) THE LOCATION OF ONDFRGROUND IMPROVEMENTS OR FNCRDA(.'HIAENT4 ARE NOT ALWAS'S KNOWN AND OFTEN MUST BE ESTIMATE,). IF A+!? UNO[R(:RCITNO IMPROVEMENT$ Qn^ EI1I:RGACHMENTv EXIST iIR ARE SHGwni, THE f6}aRC-)VF_MF,NTS f7R F.NCRGACHMENTS ARE NOT Ci.>tERF,O Hr THLS SURVEY, (R) THE OFFSET %O? DIMENSIONS) SHGvYN HEREON FROM THE STRUCTURES i0 THE PROPERTY !INES ARE FOR A SPECIFIC PURPOSE AND LSE AND THEREFORE ARE NOT IHTENOED TG GUIDE THE ERECTION OF TINCES, RETAINING WALLS. POOLS, PA:IOS PI-0.TINC AREAS, ADDITIONS TO BUILDINGS, AND ANY OTHER TYPE Of CONSTRUCTION. (7) PrOPERT.Y CORNER MONUMENTS WERE NOT SET AS PARI Of' THIS SURVEY. (B) 'MIS 5URVFI WAS PERFORMED WITH A SPECTRA FOCUS 60 ROBOTIC TOTAL STATION.