Loading...
HomeMy WebLinkAbout49705-Z a�ta TOWN OF SOUTHOLD xt BUILDING DEPARTMENT '4 TOWN CLERK'S OFFICE " r SOUTHOLD, NY BUILDING PERMIT (THIS PERMIT MUST BE KEPT ON THE PREMISES WITH ONE SET OF APPROVED PLANS AND SPECIFICATIONS UNTIL FULL COMPLETION OF THE WORK AUTHORIZED) Permit#: 49705 Date: 9/18/2023 Permission is hereby granted to: Divine , Daniel 400 Ba Rd Green ort, NY 11944 To: demolish existing dwelling and shed and construct a new single-family dwelling as applied for per DEC, Trustees, ZBA & SCHD approvals with flood permit. At premises located at: 400 Ba Rd, Green ort SCTM # 473889 Sec/Block/Lot# 43.-5-8 Pursuant to application dated 7/27/2023 and approved by the Building Inspector. To expire on 3/19/2025. Fees: SINGLE FAMILY DWELLING-ADDITION OR ALTERATION $1,994.00 CO-NEW DWELLING $50.00 DEMOLITION $524.80 Flood Permit $100.00 Total: $2,668.80 Building Inspector TOWN OF SOUTHOLD—BUILDING DEPARTMENT Town Hall Annex 54375 Main Road P. 0. Box 1179 Southold,NY 11971-0959 '`. Telephone(631) 765-1802 Fax(631)765-9502 htt :""%rAw. oulhuldto-w.n.j�i . �u Date Received APPLICATION FOR BUILDING PERMIT For Office Use Only n i PERMIT NO, Building lnspector: JUL 2 7 2023 Applications and forms must be filled out in their entirety. Incomplete applications will not be accepted. Where the Applicant Is not the owner,an 1.J .� 1N Oii '"� Owners Authorization form(Page 2)shall be completed. ¢ p' I ;` Date:6/21/2023 OWNER(S)OF PROPERTY: Name: DAN & SUE DIVINEY SCTM#1000-43.-5-8 Project Address:400 BAY ROAD, GREENPORT, NY Phone#:Sue: 516-384-0456 Dan: 516-456-0866 Email:SUEDIV@HOTMAIL.COM Mailing Address: I CONTACT PERSON: Name:KAREN SZCZOTKA, AGENT Mailing Address:205 BAY AVE., GREENPORT, NY 11944 Phone#:631-477-9752 Email:KAREN@RI BROWNARCH ITECT.COM DESIGN PROFESSIONAL INFORMATION: Name:ROBERT I. BROWN A.I.A. Mailing Address:205 BAY AVE., GREEN PORT, NY 11944 Phone#:631-477-9752 Email:ROB@RIBROWNARCH ITECT.COM CONTRACTOR INFORMATION: Name: TBD Mailing Address:. Phone#: Email: DESCRIPTION OF PROPOSED CONSTRUCTION 71W New Structure ❑Addition ❑Alteration ❑Repair ❑Demolition Estimated Cost of Project: ❑Other 1,900,000.00 Will the lot be re-graded? Dyes El No Will excess fill be removed from premises? ❑Yes El No 1 PROPERTY INFORMATION Existing use of property: ,; Intended use of property: � � Zone or use district in which premise is situat d: Are there any covenants and restrictions with respat to �/f this property? ❑YesZNo IF YES, PROVIDE A COPY. V �"Ae�°k Box After�Reaading: The owner/contractor/design professional is responsible for all drainage and storm water issues as provided by Chapter 236 of the Town Code. APPLICATION IS HEREBY MADE to the Building Department for the issuance of a Building Permit pursuant to the Building Zone Ordinance of the Town of Southold,Suffolk,County,New York and other applicable Laws,Ordinances or Regulations,for the construction of buildings, additions,alterations or for removal or demolition as herein described.The applicant agrees to comply with all applicable laws,ordinances,building code, housing code and regulations and to admit authorized inspectors on premises and in building(s)for necessary inspections.False statements made herein aro punishable as a Class A misdemeanor pursuant to Section 210AS of the New York state Penal Law. Application Submitted By(print name): C �by Authorized Agent ❑Owner Signature of Applicant: Date: STATE OF NEW YORK) SS: COUNTY QF� Z&� Z- — ) L being duly sworn, deposes and says that(s)he is the applicant (Name of individual signing contract)above named, r� . m u (S)he is the , owners and Is dui authorized to Agent, orm or have performed the (Contrac ent, orporate'Officer, etc. of said owner or y p p said work and to make and file this application;that all statements contained in this application are true to the best of his/her knowledge and belief; and that the work will be performed in the manner set forth in the application file therewith. Sworn before me this day of 20 Notary Public W (Where the applicant isnot the owner) r - w 6 I, .a... "l � residing at ^N m Ado 4reby authorize � �°� 'mo '� to apply on m t Town of Southold Bulldi Depa ent for royal as descrie �-A y be I p pp bed her in. Owber' Ig ure Date Print Owner4 Name 2 i n 71 I BOARD OF SOUTHOLD TOWN TRUSTEES SOUTHOLD, NEW YORK I PERMIT NO. 10258 DATE: NOVEMBER 16 2022 ISSUED TO: DANIEL & SUZANNE DIVINEY PROPERTY ADDRESS: 400 BAY ROAD GREENPORT SCTM# 1000-43-5-8 AUTHORIZATION Pursuant to the provisions of Chapter 275 of the Town Code of the TOWD of Southold and in accordance with the Resolution of the Board of Trustees adopted at the meeting held on November 16 , p , and in consideration of application fee in the sum of E250.0tl ,paid by Daniel& 5gaLp3g,'l iviney and subject to the Terms and Conditions as stated in the Resolution, the Southold Town Board of Trustees authorizes and ° permits the following: Wetland Permit to demolish and remove existing 1,345sq.ft. two-story dwelling with attached deck and remove existing ►'Y g Y g shed; construct a new two-sto single family dwelling with a 1,516sq.ft. footprint and 341sq.ft. attached garage with 39sq.ft. concrete apron, stoop and steps beneath 92sq.ft. front roof overhang,410sq.ft. deck(with balcony above),and 4'x4.25' steps, 123sq.ft, screened porch (with balcony above),and 4'x4.25' steps, and 112sq.ft. second-story deck/balcony; install 112sq.ft. pavers-in-sand patio,41x4' outdoor shower enclosure over gravel (piped to proposed drainage system),HVAC, and buried utilities, replace existing concrete driveway with pervious gravel driveway; remove existing septic system and install new I/A OWTS sanitary system; install a stormwater drainage system; establish and perpetually maintain a non-disturbance buffer between the tidal wetlands boundary and the existing edge of lawn; and establish and maintain a 10-foot wide, approximately 800 sf non-turf buffer landward of the existing edge of lawn,and as depicted on the site plan prepared by Robert I. Brown Architect,P.C., last dated November 16,2022; and stamped approved November 16, 2022. 1N WITNESS WHEREOF, the said Board of Trustees hereby causes its Corporate Seal to be affixed, and these presents to be subscribed by a majority of the said Board as of the day and year first above written. _� r �µ xewq :�rn�- "n �µyyw✓ m r TERMS AND CONDITIONS The Permittee Daniel , Suzanne Divincy,.r siding at 400 Bay goad. Cjrcen qjg New"fork as part of the consideration for the issuance of the Perm it does understand and prescribe to the following: I. That the said Board of Trustees and the Town of Southold are released from any and all damages, or claims for damages, of suits arising directly or indirectly as a result of any operation performed pursuant to this permit, and the said Permittee will, at his or her own expense, defend any and all such suits initiated by third parties, and the said Permittee assumes full liability with respect thereto, to the complete exclusion of the Board of Trustees of the Town of Southold. 2. That this Permit is valid for a period of 24 months, which is considered to be the estimated time required to complete the work involved, but should circumstances warrant, request for an extension may be made to the Board at a later date. 1 That this Permit should be retained indefinitely, or as long as the said Permittee wishes to maintain the structure or project involved,to provide evidence to anyone concerned that authorization was originally obtained. 4. That the work involved will be subject to the inspection and approval of the Board or its agents, and non-compliance with the provisions of the originating application may be cause for revocation of this Permit by resolution of the said Board. 5., That there will be no unreasonable interference with navigation as a result of the work herein authorized. 6. That there shall be no interference with the right of the public to pass and repass along the beach between high and low water marks. 7. That if future operations of the Town of Southold require the removal and/or alterations in the location of the work herein authorized, or if, in the opinion of the Board of Trustees,the work shall cause unreasonable obstruction to free navigation,the said Permittee will be required, upon due notice, to remove or alter this work project herein stated without expenses to the Town of Southold. & The Permittee is required to provide evidence that a copy of this Trustee permit has been recorded with the Suffolk County Clerk's Office as a notice covenant and deed restriction to the deed of the subject parcel. Such evidence shall be provided within ninety(90)calendar days of issuance of this permit. 9, That the said Board will be notified by the Permittee of the completion of the work authorized. 10. That the Permittee will obtain all other permits and consents that may be required supplemental to this permit, which maybe subject to revoke upon failure to obtain same. 11. No right to trespass or interfere with riparian rights. This permit does not convey to the permittee any right to trespass upon the lands or interfere with the riparian rights of others in order to perform the permitted work nor does it authorize the impairment of any rights,title, or interest in real or personal property held or vested in a person not a party to the permit. 3 63 7" Pa /.,,F DWEL AND SUZANNE DiVNlY W D-_ I-A 0.5-23 @asp, e __T A 6q & -9 � � `������ _ `-' .,"`� ��+`���,E+rr Fn ( � ztrnT ohs Aa,a,:ch-T >; _4 YTA­ _V, mm­ —A Robert I.Brown A E Architect,P.C. tD T—L -4 6 IM Y-477-97P J/ YTY NYSDEC PROMSED LCT COIVTRACE. -21f h 71� I M6 affW M if 7�7,i7 f N J12 -C DRAINAGE CALCUIATK)NS DANIEL&SUZANNE UTIL DrVINEY SAY ROAD BAY ROAD W NES'UISIDENCE -C-ER IN SMEET 0 75' W 50- 50'LS EXISTING VS.PR 0 POSED SITE PLAN PROPOSED BASED 0'SURVEY BY PECONIC SURVEYORS WE PLAN ME PLAN 30' (JOHN METZGER) GENERALNOTES _i LAST DATED OCTODER.9,aoav SCTM BASED ON SURVEY BY PECONIC SURVEYORS 'E"_ Y IFI.TIELINES ;WEBS (JOHN METDBER) LASTDATEDOMBER,,­ SCTM N. 2't mftfm 14,�,m- v8,"e,.TIELINES A NEW YORK STATE DEPARTMENT OF ENVIRONMENTAL CONSERVATION Division of Environmental Permits,Region 1 SUNY Cit Stony Brook,50 Circle Road,Stony Brook,NY 11790 P:(631)444-0365 1 F:(631)444-0369 wymdec.ny,9ov August 15, 2022 Suzanne and Daniel Diviney 400 Bay Rd. Greenport, NY 11944 RE: Permit #1-4738-04893/00001 Dear Permittee: In conformance with the requirements of the State Uniform Procedures Act (Article 70, ECL) and its implementing regulations (6NYCRR, Part 621 ) we are enclosing your permit for the referenced activity. Please carefully read all permit conditions and special permit conditions contained in the permit to ensure compliance during the term of the permit. If you are unable to comply with any conditions, please contact us at the above address. Enclosed is a permit sign which is to be conspicuously posted at the project site and protected from the weather and a Notice of Commencement/Completion of Construction. Very truly yours, Sherri Aicher Deputy Permit Administrator Enclosure raswY ft DaPartarnantr'i r" s'MMrrw rNvironM nta, Conservation NEW YORK STATE DEPARTMENT OF ENVIRONMENTAL CONSERVATION Facility UEC 1D 1-4738-04893 PERMIT Under the Environmental Conservation Law JCL Permittee and Facility Information ............ _.__.. .. . _ W_ _... �........_ Permit Issued To: Facility: SUZANNE DIVINEY DIVINEY PROPERTY 400 BAY RD 400 BAY RDISCTM# 1000-43-5-8 GREENPORT,NY 11944 GREENPORT, NY 11944 DANIEL DIVINEY 400 BAY RD GREENPORT, NY 11944 Facility Application Contact: EN-CONSULTANTS 1319 N SEA RD SOUTHAMPTON,NY 11968 Facility Location: in SOUTHOLD in SUFFOLK COUNTY Facility Principal Reference Point: NYTM-E: 722,41 NYTM-N: 4554.144 Latitude: 41°06'29.3" Longitude: 72°21'04.5" Authorized Activity: Remove existing dwelling and associated structures. Construct new single family dwelling, decks, attached garage, and gravel driveway. Install Innovative/Alternative Onsite Wastewater Treatment System (I/A OWTS), Establish I O' wide vegetated no-disturbance buffer along tidal wetland boundary, and establish 4' wide path through buffer. All work must be clone in strict accordance with the attached plans stumped "NYSDEC Approved" on 8/15/2022. _-Permit Authorizations Tidal Wetlands - Under Article 25 Permit ID 1-4738-04893/00001 New Permit Effective Date: 8/15/2022 Expiration Date: 8/15/2027 Page I of 7 Am Iowa NEW YORK STATE DEPARTMENT OF ENVIRONMENTAL CONSERVATION Facility DEC-ID 1-4738-04893 NYSDEC Approval By acceptance of this permit, the permittee agrees that the permit is contingent upon strict compliance with the ECL, all applicable regulations, and all conditions included as part of this permit. Permit Administrator: SHERRI L AICHER, Deputy Permit Administrator Address: NYSDEC Region 1 Headquarters SUNY @ Stony BrookJ50 Circle Rd Stony '13 :role,NY 11790 -3409 Authorized Signature: w _ _ Date Distribution List EN-CONSULTANTS Bureau of Marine Habitat Protection Permit Components NATURAL RFSOURCE PERMIT CONDITIONS GENERAL CONDITIONS, APPLY TO ALL AUTHORIZED PERMITS NOTIFICATION OF OTHER PERMITTEE OBLIGATIONS NATURAL RESOURCE PERMIT CONDITIONS Apply to the Following Permits: TIDAL WETLANDS I. Notice of Commencement At least 48 hour's prior to commencement of the project, the permittee and contractor shall sign and return the lop portion of the enclosed notification form certifying that they are fully aware of and understand all terms and conditions of this permit. Within 30 days of completion of project, the bottom portion of the form must also be signed and returned, along with photographs of the completed work. 2. Conformance With Plans All activities authorized by this permit must be in strict conformance with the approved plans subs-pitted by the applicant or applicant's agent as part of the permit application.. Such approved plans were prepared by Robert I Brown last revised 6/2/2022 and with the Sanitary System plan prepared by Nicholas J. Mazzarerro last revised 2/l/2022. Both plans were stamped "NYSDEC Approved" on 8/15/2022, 3. Post Permit Sign The-permit sign enclosed with this permit shall be posted in a conspicuous location on the worksite and adequately protected from the weather, Page 2 of 7 Am NEW YORK STATE DEPARTMILM OF ENV1t2ONMENTAL CONSERVATION Facility DEC ID I-4738-04893 4. Tidal Wetland Covenant The permittee shell incorporate the attached Covenant (or similar Dep artment-approved language)to the deed for the property where the project will be conducted and file it with the Clerk of SUFFOLK County within 30 days of the effective date of this permit. 'Phis deed covenant shall run with the land into perpetuity. A copy of the covenanted deed or other acceptable proof of record, along with the,number assigned to this permit, shall be submitted within 90 days of the ef=fective date of this permit to Marine Habitat Pcotection NYSDEC Region 1 Headquarters SUNY , Stony BrookJ50 Circle Rd Stony Brook,NY 11790 -3409 Attn: Compliance 5. Prohibition Period for Nesting Birds To protect nesting shorebirds, including threatened and/or endangered species, no regulated activities may occur between April I and August 31, inclusive, of any calendar year. 6. Concrete Leachate During construction, no wet or fresh concrete or leachate shall be allowed to escape into any wetlands or waters of New York State, nor shall washings from ready-mixed concrete trucks, mixers, or other devices be allowed to enter any wethuld or waters. Only watertight or waterproof forms shall be used, Wet concrete shall not be poured to displace water within the forms. 7. Materials Disposed at Upland Site Any demolition debris, excess construction materials, and/or excess excavated materials shall be immediately and completely disposed of in an authorized solid waste management Facility. These materials shall be suitably stabilized as not to re-enter any water body, wetland or wetland adjacent area. 8. No Disturbance to Vegetated Tidal Wetlands There shall be no disturbance to vegetated tidal wetlands or protected buffer areas as a result of the permitted activities. 9. Storage of Equipment, Materials The storage of construction equipment and materials shall be confined within the project work area and/or upland areas greater than 75 linear feet from the tidal wetland boundary. Io. Seeding Disturbed Areas All areas of soil disturbance resulting from the approved project shall be stabilized with appropriate vegetation(grasses, etc.) immediately following project completion or prior to permit expiration, whichever comes First, If the project site remains inactive for more than 48 hours or planting is impractical due to the season, then the area shall be stabilized with straw or hay mulch or jute matting until weather conditions favor germination. II. No Unauthorized Fill No till or backfill is authorized by this permit without further written approval from the department (permit, modification, amendment). 12. Establish Vegetated Buffer To protect the values of the tidal wetlands; a permanent vegetated buffer zone shall be established. There shall be no disturbance to the natural vegetation or topography within an area extending IQ linear feet landward of the tidal wetland boundary. Page 3 of 7 NEW YORK STATE DEPARTMENT OF ENVIRONMENTAL CONSERVATION Now Facility DEC ID 1-4738-04893 13, Install, Maintain Erosion Controls Necessary erosion control measures, i.e., straw bales, silt fencing, etc,, are to'be placed on the downslope edge of any disturbed area. This sediment barrier is to be put in place before any disturbance of the ground occurs and is to be maintained in good and, functional condition until thick vegetative cover is established. 14. Runoff Directed to Upland Drywells hoof runoff shall be directed to diywelIs for immediate on- site recharge as per plans by Robert Brown.Architect, P,C. dated 6/2/2022 stamped "NYSDEC Approved" on 8/15/2022. 1S. Driveway/lancing Area of Pervious Material Driveway and parking areas shall be constructed of NYSDIC-approved pervious materials. 16. Authorized Innovative/Alternative Onsite %stewater'I'reatment Systems (I/A OWTS) Septic Systems This permit authorizes the installation of any models of I/A OWTS septic system which have received the approval of the Suffolk County Department of Health Services (SCDHS), 1 C SCDHS rescinds its approval of one or more of these models during the term of this permit, DEC will no longer approve new installations of that model. The list of I/A OWTS systems which have received approval by SCD171S are found on the Suffolk County Website under the Reclaim Our Water- Homeowner section at: Overview of Provisionally Approved Technologies, 17. Maintenance of Installed Innovative/Alternative Onsite Wastewater Treatment Systems (1/A OWTS) The permittee must maintain, service and repair the installed I/A OWTS in accordance with the maintenance schedule set forth in the Suffolk County Department of Health Services (SCDHS) permit issued for the system. 18. Contain Exposed, Stockpiled Soils All disturbed areas where soil will be temporarily exposed or stockpiled for longer than 48 hours shall be contained by a continuous line of staked haybales / silt curtains (or other NYSDEC approved devices) placed on the seaward side between the ti I and the wetland or protected buffer area. `rarps are authorized to supplement these approved methods. 19. Maintain Erosion Controls All erosion coritrol devices shall be maintained in good and functional condition until the project has been completed and the area has been stabilized. 20. Cover Material For Footpath Cover material used for footpaths is limited to natural wood/bark chips, stone, gravel or sand. 21. State Not Liable for Damage The State of New York shall in no case be liable for any damage or injury to tine structUre or work herein authorized which may be caused by or result Groin future operations undertaken by the State for the conservation or improvement of navigation, or for other purposes, and no claim or right to compensation shall accrue from any such damage, 22. State May Order Removal or Alteration of Work If future operations by the State of New York require an alteration in the position of the structure or work herein authorized, or if, in the opinion of the Department of Environmental Conservation it shall cause unrerisonable obstruction to the free navigation of"said waters or flood flows or endanger the health, safety or welfare of the people of the State, or cause loss or destruction of the natural resources of the State, the owner may be ordered by the Department to remove or alter the structural work, obstructions, or hazards caused thereby without expense to the State, and if, upon the expiration or revocation of this permit, the structure, Gill, excavation, or other modification of tile, watercourse hereby authorized shall not be completed, the owners, shall, without Page 4 of 7 NEW YORK STATE DEPARTMENT OF ENVIRONMENTAL CONSERVATION Facility DEC 1u 1-4738-04893 expense to the State, and to such extent and in such time and manner as the Department of, Environmental Conservation may require, remove all or any portion of the uncompleted structure or fall and restore to its former condition the navigable and:flood capacity of the watercourse. No claim shall be made against the State ol'New York on account of any such removal or alteration. 23. State May Require Site Restoration If upon the expiration or revocation of this permit, the project hereby authorized has not been completed, the applicant shall, without expense to the State, and to such extent and in such time and manner as the Department of Environmental Conservation may lawfully require, remove all or any portions of the uncompleted structure or fill and restore the site to its former condition. No claim shall be made against the State of New York on account of any such removal or alteration. 24. Precautions Against Contamination of Waters All necessary precautions shall be taken to preclude contamination of any wetland or waterway by suspended solids, sediments, fuels, solvents, lubricants, epoxy coatings, paints, concrete, leachate or any other environmentally deleterious materials associated with the project. GENERAL CONDITIONS - Apply to ALL Authorized Permits: t. Facility Inspection by The Department The permitted site or facility, including relevant records, is subject to inspection at reasonable hours and intervals by an authorized representative of the Department of Environmental Conservation'('the Department) to determine whether the permittee is complying with this permit and the ECL. Such representative may order the work suspended pursuant to ECL 71-0301 and SADA 401(3). The permittee shall provide a person to accompany the Departnent's representative during an inspection to the permit area when requested by the Department. A copy of this permit, including all referenced maps, drawings and special conditions, must be available 11or inspection by the Department at all times at the project site or facility. failure to produce a copy of the permit upon request by a Department representative is a violation of this permit. 2. Relationship of this Permit to Other Department Orders and Determinations Unless expressly provided for by the Department, issuance of this permit does not iriodify, supersede or rescind vty order or determination previously issued by the Department or any of the terms, conditions or requirements contained in such order or determination. Page 5 of 7 NEW YORK s`rATE DEPARTMENT OF ENVIRONMENTAL CONSVIVA` ION NOW Facility DEC ID 1-4738-04893 3, Applications For Permit Renewals, Modifications or Transfers The permittee must submit a separate written application to the Department for permit renewal, modification or transfer of this permit. Such application must include any forms or supplemental information the Department requires, Any renewal; modification or transfer granted by the Department nust be in writing. Submission of applications for permit renewal, modification or transfer are to be submitted to: Regional Permit Administrator NYSDEC Region 1 Headquarters SUNY (cam Stony Brook150 Circle Cid Stony Brook, NY 11790 -3409 4. Submission of Renewal Application 'rhe pelnnittee must submit a renewal application at least 30 clays before permit expiration for the following permit authorizations: Tidal Wetlands. s. Permit Modifications, Suspensions and Revocations by the Department The Department reserves the right to exercise all available authority to modify, suspend or revoke this permit. 'rile grounds for modification, suspension or revocation include: a. materially false or inaccurate statements in the permit application or supporting papers; b. failure by the permittee to comply with any terms or conditions of the permit; c. exceeding the scope of the project as described in the permit application; d, newly discovered material information ora material change in environmental conditions, relevant technology or applicable law or regulations since the issuance orthe existing permit; e. noncompliance with previously issued permit conditions, orders of the commissioner, any provisions of the Environmental Conservation Law or regulations of the Department related to the permitted activity. G. Permit Transfer Permits are transferrable unless specifically prohibited by statute, regulation or another permit condition, Applications for permit transfer should be submitted prior to actual transfer of ownership. Page 6 of 7 NEW YORK STATE DEPARTMENT Of ENVIRONMENTAL CONSERVATION Facility DEC 11) I-4738-04893 NOTIFICATION IFICATION OF OTHER PERMITTEE OBLIGATIONS Item A: Permittee Accepts Legal Responsibility and Agrees to Indemnification The permittee, excepting state or federal agencies, expressly agrees to indemnify and hold harmless the Department of Environmental Conservation of the State of New York, its representatives, employees, and agents ("DEC:") for all claims, suits, actions, a d damages, to the extent attributable to the permittee's acts or omissions in connection with the permittee's undertaking of activities in connection with, or operation and maintenance of, the facility or facilities authorized by the permit whether in compliance or not in compliance.with the terms and conditions of the permit. This indemnification does not extend to any claims., suits, actions, or damages to the extent attributable to DEC's own negligent or intentional acts or omissions, or to any claims, suits, or actions naming the DEC and arising under Article 78 of the New York Civil Practice Laws and Rules or any citizen suit or civil rights provision under federal or state laws. Item B: Permittee's Contractors to Comply with Permit The permittee i_s responsible for informing its independent contractors, employees, agents and assigns of their responsibility to comply with this permit, including all special conditions while acting as the permittee's agent with respect to the permitted activities, and such persons shall be subject to the same sanctions 176r violations of the Environmental Conservation Law as those prescribed for the permittee. Item C; Permittee Responsible for Obtaining Other Required Permits The permittee is responsible for obtaining any other permits, approvals, lands, easements and rights-of- way that may he required to carry out the activities that are authorized by this permit. Item D: No Right to Trespass or Interfere with Riparian Rights This permit does not convey to the permittee any right to trespass upon the, lands or interfere with the riparian rights of others in order to perform the permitted work nor does it authorize the impairment of any rights, title, or interest in real or personal property held or vested in a person not a party to the permit. Page 7 of 7 (700 GAL..) 9J..II01AN :JNG COVERS mcr�,'a APPROMInnATF r u IT�, rrr l +,.row�l. .._ u _DIA "MING CJ(P)LEA,— nGJesY P`ntlatl.. rl.. .0 ° F RIA oiWxEAPPRJVFD R8 CC7KCa rAaf.. PIPNG(TYP) BOTTOMCF I..T C !NG 51..OPF:/�r 12"MfIJ PC3Qf_ELF.V:c'.s' FUJICLEAN USA CE-7 51NGLE LINE WIRING DIAGRAM r F.L.. t0..� WATEP �., Nor TO n 5cAl... FOUND )ECTION PD «usa,we NF 4.1 NNh,RVO-�k 5 Y+aary �1 .-y � n nuF 4 „" A 1 d n4.v UMC! 'yP 9 �_C� ,�+�,,��I�� .w ,mdl�tt Ipwtt LF Pica 0¢d lrr-+w-.. hrurMaw.C wlvw.r R. '.T Nuuprv!h,�, 9� �•� ••••••��" w,.a„x.a`m 41 uliuwwx L"Ywu ntlFcl �ro5 G kJ+r+lae txrry Pw1gNfIH'fMM tl4� r M 9 —w" "'hww ..�. � � wwa.exa r.�crr ra.rera lv�u Sawn '1 w xinr d@T dau�iux7tl 4kn4rnva,w PrWttl4 T'TIC TAW, "...� "HON PROM Y4'DIA in'151 rift, ;E OE DU I LDI NG 5 5 5" )CALF - r N �a 4° 70 k. SEC MQNI A-A VIEW SECTION B-B VIEW FUJICLEAN CE-7 I.A. SEPTIC SYSTEM F Nc NYSDEC � p �,`'r APPROVED AS PER TERMS mr, AND CONDITIONS OF , PERMIT N ~ - 0 �''`.�f"j,/o0001 DATE ,st gr 'a px I i NEWYORK Department of STATE OF OPPORTUNITY Environmentat Conservation N- OTICE The Department of Environmental Conservation (DEC) has issued permit(s) pursuant to the Environmental Conservation Lawfor work being conducted at this site. For further information regarding the nature and extent of work approved and any Departmental conditions on it, contact the Regional Permit Administrator listed below. Please refer to the permit number shown when contacting the DEC. Regional Permit Advisor SLUNACMRMAN Permit Number 1-4738-04893/00001 Expiration Date 8/15/2027 NOTE This notice is NOT a permit ISSUES I REVISIONS z B H-pV S TEST HOLE DATA 00 McDONALD GEOSCIENCE N 12/4/2020 EL. G, MIXED SAND AND LOAM 3' GRAY ORGANIC 4' CLAY OL BROWN CLAY EL. O. 5.8' (WATER IN 6' BROWN CLAY cm WATER IN PALE BROWN FINE SAND SP 3' NOTE: WATER ENCOUNTERED 5.8' BELOW SURFACE ELEVATIONS AND CONTOUR LINES BOARD MEMBERS � """ Southold Town Hall Leslie Kanes Weisman,Chairperson �� 53095 Main Road•P.O. Box 1179 Southold,NY 11971-0959 Patricia Acampora Qffice iA)Cali n: Eric Dantes Town Annex/First Floor, Robert Lehnert,Jr. 54375 Main Road(at Youngs Avenue) Nicholas Planamento +, `. Southold,NY 11971 http://southoldtownny.gov ZONING BOARD OF APPEALS TOWN OF SOUTHOLD October 25, 2022 Tel.(631) 765-1809 Robert Herrmann En-Consuiltants 1319 North Sea Road Southampton, NY 11968 Re: ZBA#7683, Diviney 400 Bay Road, Greenport SCTM No, 1000-43-5-8 Dear Mr. Herrmann; Transmitted for your records is a copy of the Board's October 20, 2022 Findings, Deliberations and Determination,the original of which was filed with the Town Clerk regarding the above variance application. Before commencing any construction activities, a building permit is necessary. Be sure to submit an application along with a copy of the attached determination to the Building Department. Pursuant to Chapter 280-146(B)of the Code of the Town of Southold any variance granted by the Board of Appeals shall become null and void where a Certificate of Occupancy has not been procured, and/or a subdivision map has not been filed with the Suffolk County Clerk,within three(3) years from the date such variance was granted. The Board of Appeals may, upon written request prior to the date of expiration, grant an extension not to exceed three (3)consecutive one (1) year terms. IT IS THE PROPERTY OWNER'S RESPONSIBILITY TO ENSURE COMPLIANCE WITH THE CODE REQUIRED TIME FRAME DESCRIBED HEREIN. Failure to comply in a timely manner may result in the denial by the Building Department of a Certificate of Occupancy,nullify the approved variance relief, and require a new variance application with public hearing before the Board of Appeals If you have any questions, please don't hesitate to contact our office. Sincerely, Kim E, Fuentes Board Assistant Encl. cc: Building Department BOARD MEMBERS d sr `` Southold Town Hall a� Leslie Kanes Weisman,Chairperson rrwMr r 53095 Main Road • P.O. Box 1 179 �� �w� ,M � ,tip ,�"�, , Southold,NY 11971-0959 Patricia Acampora n , J 'a Office,. l.oc[tion: Eric Dantes k ,? i Town Annex/First Floor, Robert Lehner[,Jr. �, a mr �;`' �" 54375 Main Road (at Youngs Avenue) Nicholas Planamento W n Southold, NY l 1971 I�a9� ito RECEIVED http://southoldtownny.gov ZONING BOARD OF APPEALS TOWN OF SOUTHOLD Tel. (631) 765-1809 Southold TOWN Cleark FINDINGS, DELIBERATIONS AND DETERMINATION MEETING OF OCTOBER 20,2022 ZBA FILE: #7683 NAME OF APPLICANT: Daniel and Suzanne Diviney PROPER"fY LOCATION: 400 Bay Road, (Adj. to Gull Pond Inlet), Greenport, SCTM#1.000-43-5-8 Sl rIA LSI l f llwilNA 1 11. ,: The Zoning Board of Appeals has visited the property under consideration in [Iris. application and detcrntines that this review falls under the Type if category of the State's List of Actions, without further steps under SEQRA. L�!���, I� ��1.]N,I�Y A1�., rll ll `1"1 A,1 I1r'I C ),1�: This applic�aation was referred as rccltaired under' the Sarl"'faalk County Administrative Code Sections A 14-14 thru A 14-25, and the Suflol �.ousaty l ehatttrraent of Plttrtrtrrtg issued its reply dated ,lune 14, 2022 stating that this application is considered a matter for local determination as there atppe.aj•s to be no sigriidacunt county-wide or inter-cornnlLrnity impact. I,,Wlrl' ISI I kal Ml lr lm This application was referred for review under Chapter 268, Waterfront Consistency review of the Town of Southold Town Code and the Local Waterfront Revitalization Program (LWRP) Policy Standards.The LWR..P Coordinator issued a recomruendation dated September 15,2022. Based upon the information provided on the LWRP Consistency Assessment Form submitted to this department, as well as the records available, it is recommended that the proposed action is E ;EM.Pl' from Coastal Consistency Review. ' l? The subject property is as nonconforming 18„500 square foot parcel located irla the Residential R-40 Zoning District. The northerly property line rneasures 125.00 feet and is adjacent to Bay Road. 1-he easterly property line mcaasm,es 16200 feet, the southerly property line measures 128.10 feet and is aafljacent and divided by Gull Pond with a wood catwalk connecting bridge to the tidal wetland property which is unbuildable. The westerly property line mcastares 134.00 feet. "The parcel is improved witi:t as one-story framed dwelling with attached two-car garage. There is a small shed located on the cast rear yard and as wood deck attached to the rear of the dwelling as shown on the survey prepared by John T. Metzger, LS and last dated October 29, 2021. I aASC ,QF-ADI”lt IC� \I°IC 1N; Request ror°Variance frtan,rr Article XXIII, Section 280-124 and the Building Inspector's May 9,2022,,Notice of Disapproval based on an aappiication for a permit to demolish existing dwelling and coatstruct as new single-fancily dwelling: 1) located less than the code required minimum front yard setback of 35 feet, located at° 400 dray Road, (Adj. to Gull Pond Inlet), Gi-eenptrrt, NY. SCTM91000-43-5-8. I ,l l ll 1 R1X211 ST IQ: The applicant requests a variance to demolish an existing dwelling and construct a new single-family dwelling. The proposed construction, on this nonconforming 18,500 square foot parcel in the Page 2, October 20,2022 1#7683, Diviney SCTM No. 1000-43-5-8 Residential R-40 Zoning District, is not permitted pursuant to Article XXIII, Section 280-t24 which states: lots measuring less than 20,000 square 't`eet in total size require a minimum front yard setback of 35 feet. The Site Plan shows the new house with a front yard setback of 16.5 feet. .p "flat;existing dwelling was originally constructed prior to 1957, and the 16.5-foot front yard setback was establislQ by a gaaraagc addition on the north side of the dwelling that was permitted by the Building Department in 1967 (Certificate cif Oecupaancy No, Z-3029). Front yard setback relief was granted in 1999 for` r,econstructiou of the dweHing located at 100 Bay Road south of the applicants (Case #4695). The Site Plan drawing submitted by Robert I, Brown,Architect, P,C, and dated June 2,2022 shows the plans for the new residence. Two letters of support frorn neighbors were received by the Board. Although the Site Plan drawing shows what appears to be a third floor, the applicant's architect testified that the space is for attic storage only "jNDlNQj QI,` FACV,rcry a 1 "t)1 f A The Zoning Board of Appeals held a public hearing on this application on October 6, 2022 at which time written and oral evidence were presented. Based upon all testimony, documentation, personal inspection of the property and surrounding neighborhood, and other evidence, the Zoning Board linds,'t�he fa�aldowing facts to be true and relevant and makes the following findings: 1, Town Law 2 7-k) 3 fr, 1 . Cravat of the variance will not produce an undesirable change in the chaaractcr oftltc neighborhood or a detriment to nearby properties. Other nearby properties have lesser front yard setbacks than what tine applicant is proposing at 16.5 beet and 13.2 feet respectively, Many ofthe older'l�aonwes in this neighborhood have. also been jrnpr"oved over the years to this f"loud-prorrc. "'I'lie Subject front yard setback that was established 54 years agowill a-emain the same relative to Bay Road and will avoid creating any undesiraal,-fle change to the ehcaracter°of the surrounding neighborhood. Since the ticlal wetlands and tidal waters (:)l' uil Pond have begtin to encroach lar'ther to the west,closer to the road, the dwellings are situated increasingly closer to the road. 2„ ,f.°crww ra f,aw "2 a7-fa b 2 . "rhe beneM sought by the applicant cannot be achieved by some method, feasible for the appheant to pursue, other than an area variance. "l'lae lot has a shallow depth between the road and the tidal wetlands in the rear yard. Creating a niorc conforming front yard setback for it reasonably sized horne conapaarable in size to others in the neighborhood would encroach further ilato the wetlands resulting in signilicaant adverse environmental impacts. 3. °�"o'waa saww 267 b � The variance granted herein is naathernatically substantial, representing 52.8611"ir relief from tlae code. However, the proposed new honwe is tile saaa:ae depth as the existing,dwelling to be demolished, the existing non-conforming front yard setback will not be decreased, and the current wetlands setback will be increased by tour feet. Additionally, other homes in the neighborhood have similar anon-conforming front yard setbacks. 4. Town L,aw '167-11) 31(b)(4)., No evidence has been submitted to suggest that a variance in this residential conamta:nity will have ata adverse impact on the physical or environmental conditions in the neighborhood The proposed new dwelling will be elevated to VEMA compliant standards and will be setback in additional (bUr tet. from the wetlands. Also proposed is the installation of aa, new Innovative Advanced (I/A CSW 1"S) sanitary system, all of which are environmental improvements. The applicant must comply with Chapter 236 0l"the Town's Storm Water Management Code,, 5. 17own Law `2'67-1)(3)(b),(5). The dila"iculty has been self-created. The applicant purchased the parcel after the Zoning Code was in effect and it is presurned that the applicant had aactaral oj' constructive knowledge of the limitations on tine use of the paarcel under the Zoning(:.:'ode its effect prior to or at the time of purchase. Page 3, October 20,2022 #7683, Diviney SCTM No. 1000-43-5-8 6. Town Law I267-b.. Grant of the requested relief'is the minimum action necessary and adequate to enable the applicant to enjoy the benefit of a new and more energy efficient and FEMA compliant dwelling while preserving and protecting the character of the neighborhood and the health, safety and wclfare of the community. 1EI 011U. I"10N Ol rItll IJC� ISI : In considering all of the above factors and applying the balancing test under New York Town Law 267-B, motion was offered by Member Acampora, seconded by Chairperson Weisman, and duly carried, to GRANT the variance as applied for, and shown on the Site Plan Drawings and Architectural Plans (Sheet A3-A9) prepared by Robert I. Brown, Architect, P.C. and dated June 2, 2022. SpBI"1'd;CT TO TH:P izo L i,ow iNG conk 1)ITIONS: 1. Installation of an Innovative Advanced sanitary system (1/A OWTS) approved by the Suffolk County Department of I-lealth Services. 2. The Third Floor Attic shall be used for STORAGE only, 3. Southold Town Board of Trustees approval is required. Tltis approval s/ctill not be deemed effective until the required conditions have been met. At the discretion of the Board of'Appeals,failure to comply with the above conditions may render this decision null and void That the above conditions be written into the Building Inspector's Certificate of Occupancy, when issued. The Board reserves the right to substitute a similar design that is de minimis in nature for an alteration that does not increase the degree of nonconformity. Any deviation from the survey, site plan anctlor architectural drawings cited'in this decision will result in delays andlor a passible denial by the Building Departtnern of a building permit, and may regidre a new applica(ican and public hearing before the Zoning Board of Appeals. An)°deviatican f oryi the variance(s) granted herein as shown on the architecuoral drawings, site plc'in andlor survey cited above, such cis alterations, extensions, or r,,lernolitions•, erre not outhorizect this crpplic ation when involving nonconformities under the zoning code. This action does not authorize or condone ansa cair),°ent orfititure use, setback or other feature of the subject property that may violate the Zoning Code, other than such uses, setbacks and other features as are expressly addressed in this action. IMPORT'AN'T TIME' LIMITS ON THIS APPROVAL Pursuant to Chapter 280-146(B) of the Code of the Town of Southold any variance granted by the Board of Appeals shall become null and void where a Certificate of Occupancy has not been procured, and/or a subdivision map has not been filed with the Suffolk County Clerk, within three (3) years from the date such variance was granted. The Board of Appeals may, upon written request prior to the date of expiration, grant an extension not to exceed three (3) consecutive one (1) year terms. IT IS THE PROPERTY OWNER'S RESPONSIBILITY TO ENSURE CC MPLIAN'CE WITII T1IE CODE' REQUIRED TIME FRAME DESC,R.IBE ) ERJ� ,SIN. Failure to comply in a timely manner may result in the denial by the Building Department of a Certificate Page 4, October 20,2022 #7683, Diviney SCTM No. 1000-43-5-8 of Occupancy, nullify the approved variance relief, and require a new variance application with public hearing before the Board of Appeals Vote of the Board: Ayes: Members Acampora, Dantes, Lehnert, Planamento, Lehnert, Chairperson Weisman. This Resolution was duly adopted (5-0). Leslie Kanes Weisman, Chairperson Approved for filing /2022 0-1zz 0. HH51 is m 5 z . :s,�, �<Q k Z B N t o Al a� R.HU N��a = foo w Ya u '3zN o: �^ a m i s > H0 o=oi B F_ errx«yrrm WVwrwuwn.aVkW'm. •-• M X II ovoo r, n Zo z = - O 2� ? cam° 5 aewywd 44.«'. Oo= 3 5 -c zzC 6 �Q' 'z 3:m Q i-e 10�' Om '�3 'SCIS"' _ u w:n �c3LIL _ 99 R8 t5'g p NS "`u @0400 s� s � k�� S�� g7 S ug � kR z 33€ W a� ""'F k �ye 0• S<'eb 9igcFK 9ia�`u����3� �Z iSoae� �z d`uM �$�3�.°�� C� C � 1Sni 319V30AMW "' tm NVNHON 3NVf 1Sn 319VOOA3W18 3 VM Ol'eu NVNH0 8 O ONVHOIN 3/O/N ON=a .S ni � S l3 . "raa a asna,,a: m , q,- ...... s C' W g o o Nog,d t a t i t at. �'� 0z c e� �. � � �by4p F'" � Q✓L W'� �4 U W Oz C ......, �-'• '%M.pN.N6 "3'w F.S`9 l3 O�[� C ar 9 M 2 "I.r mCH ,..,..,,....e, ._ .._..._ w^a .. ...��,,,, f���.00 Z91 tl31VM OIl9Od �. 5 m 1 Ztrpyry NO ON1113MO gpg w $Wry a !O "TAIAp3¢ �I �R% 6 IVS 3113HOOtl . z• eg ONItl30NV15NO0 I Nw �99p{y"V' • � 1113NVSV}1 tltivlHD V A NLLNtlW 3/0/N I f z cOZ � oau ai �a . w -5 ' Z " K y vfir:re s� O o Liz W W Q KPP AL IH Es z Z n iu Z ® . M �� SI 0 ..., ..�.r..m.�_ ...... .,,., ..... .__..., .... V V dam+ N x a o� ❑ Y ..... ....................... _ .— .:'::"...__.� __ A o n AEwE`VEC - !liN 1 +" fi COVERED DECK _ ' z_ ....... SCREENED3 FINAL Pyr r 5k j PORCH [REVIEWED BY ZBA ._.' I =R 'SEE DECISION q'1L4,"> z-e..�,• f�� �.>' _. � =�- �� DATEDJ_0 l�IaoLv { IJ - GREAT s ffe.9.& ROOM _¢ REPTRL .�--_ � �N � �� � Robert I.Brown Architect,P.C. , g E B. A-narchitcctmm `f[= GARAGE LL CLOSET s3 4n sus= a IL � E PAVING PAVING UNDER � UNDER ROOF ROOF l DAN&SUE FIRST FLOOR PLAN DMNEY NEW RESIDENCE FIRST FLOOR PLAN Sf_T_ivFC 7 uut i a a� l 1�9 BALCONY DECK BELOW 3� LOW HEADROOMUj 111 Robert z.Brown Architect,P.C. =l==R ?— ..— „—— LOW HEADROOM STORAGE ? ,®®ag Ave.Gn n,port nm Uh`CshD47 A`app L€5UNCONDITIONED bn�mpnbrmm rch edet.cam 631-9TSS75- [ LOW i HEADROOM F 02 ] �0 t� DAN&SUE DMNEY ATTIC PLAN 'vEw—RESIDENCE ATTIC PIAN lREvItEWED By ZB DEVS" .21— Robert I.Brown Architect,P.C. 63-477-975- DAN&SUE DIVINEY ROOF PLAN NEW RESIDENCE ROOF PLAN � 1VN80Zpg j j _ t 3 ttt € AL I7!-; rmv ISION 5 NORTH (SIDE) ELEVATIONaD , Robert I.Brown - Architect,P.C. -.i6nero i m i 1 63�-9TI9P5= LW 4k f l 3 �I �; D NES E I i 'Mill i ;�) ELI f g[( NEW RESIDENCE I i i E ,•� - < aaxaonn.cxmvwzr.wx I = } _ ll - ¢ F __� 'ir.:- �. 1 �_ - �, ' 3�F [:� 9 (�j I — ELEVATIONS l EAST (REAR) ELEVATION TEST HOLE DATA SURVEY OF PROPERTY M`°°aLD GE°�°zo��� 121 AT GREENPORT # EL BY T— i TOWN OF SOUTHOLD- MOEO SAND AND LOAM SUFFOLK COUNTY, N.Y. MANHANSET AVENUE 1000-43-05-08 & 23 + GRAY oRCANIc cur aSCALE. 1=30 - `s3 BROWN CLAY ON FEBRUARY 17,2021 RECEIVE® U-O5' S6 WA IFR IN BROWN SEPTEMBER 14 2021 #o JUN I 0 2472 6. CLAY°v OCTOBER 29,2021(Wetland Flags,Lot Covin ge) t Zoning eoarE of Appea{s WATER IN PALE SANDY BEACH ROAD p BROWN qNE SAND SP 13' fj NOTE. WATER ENCOUNTERED 58'BELOW SURFACE j ^ry ELEVATIONS AND CONTOUR UNES REFERENCED TD NAVI Be 1 N i.tY N k CHIARA RASANELI j,NANTBAUESIRINO �} ROC"LLE KTRK PI1 YI ON J W VALUING ON TIDAL WETLAND BOUNDARY,AS DELINEATED BY EN-CONSULTANTS.ON AUGUST 5,2021 Q � 1 182.00 x _ N853B'40'E S8705.00-E p EL 6" � 3 r �0 - - WLF r I If pWEELNG ON an l C mak. ' PE4€ Fla-. . r=A. PUBLIC WATER t T 1000 43 OS-23 r g f PES opt 1a T� 1 Cxs:G r �yJ( 7 SB538'40�11 pWF11RIO ON J - y Y�4 sL, END Fz;x134 00' TIE LINES ALONG M.H W M WATER 3'40"5'T �T OLS PUBLIC _L 5.5' �FE ,rzBa.a'S ?9rr-== yyANO BOUNDARY,AS DELINEATED BY EN-CONSULTANTS ON AUGUST 5,2021 NIDfT §A: C.RDNMAW DWELLING ON �A'kEDTRUST 7 PUBLIC WAILER 3},yg vmmm TRUST DWELLING ON 1 1000-43-05-08 PUBLIC WATER �• SOUTHOLD TOWN LOT COVERAGE KEY BUILDABLE LAND AREA-14,483 eq.H.(AREA LANDWARD OF RDAL WETLANDS BOUNDARY=16483 SOFT.) Q =REBAR HOUSE 1354 SOFT. DECK LBO SOFT. ® _ � - SHED 126 SO.FE =STAKE 1660114483=11 511,660 SOFT. B = LEST HOLE i =PIPE o 1000-43-05-08 111 NYSDEC LOT COVERAGE O =MONUMENT BUILDABLE LAND AREA-F4,483 q.R.(AREA LANDWARD ' =WETLAND FLAG — OF RDAL WETLANDS BOUNDARY 14,483 SOFT) '11a-URUTY POLE HOUSE 1354 SO.FT. i L#T T`-{tv WUOD DECK,STEPS 208 SOFT. t 'P. SHED 126 SOFT. T DRIVEWAY&PARD 752 SO.FT. ANY ALTERATION OR ADD/DOY TO 710S SURVEY IS A WO.A77ON OF 2.441 SOFT. NY.S UG NO 4'z6#8 SECTION 720 9 or THE NEW YORK STATE E°UCADO4 LAW.EXCEPT 0 2441/14(BJ=1S2A' t >'. .Y L NO #d37-Of As PER SECRLW 7209-SUAND SIONCOP z.ALL CERTHEREOF ONLY F S IDHEREONMAP c AREA OF 1000-43-05-23= 25,403 S0. FT. TO TIE LINES -- ARE VALID FOR RTH MAP AND COPIES OF 7HEF DAY IF SAID MAP 63zJ # OR LYl°!ES BEAR THE IMPRESSED SEAL OF R/E STFRVEYOR WHOSE AREA OF 1000-43-OS-OB- 18,500 S0. FT. TO TIE LINES SIGNATURE APPEARS HEREON - ----- 1 �� 1977 ,20—OBI r4VGenerated by REScheck-Web Software Compliance Certificate. Project Diviney NEW CONSTRUCTION Energy Code: 2018 IECC Location: Greenport, New York Construction Type: Single-family Project Type: New Construction Conditioned Floor Area: 3,009 ft2 Glazing Area 22% Climate Zone: 4 (5572 HDD) Permit Date: Permit Number: Construction Site: Owner/Agent: Designer/Contractor: 400 Bay Road Dan&Suzanne Diviney Robert I. Brown Architect P.C. Greenport, NY 11944 205 Bay Avenue Greenport, NY 11944 631-477-9752 info@ribrownarchitect.com EMEME—n- o= Compliance: 7.6%Better Than Code Maximum UA: 591 Your UA: 546 Maximum SHGC: 0.40 Your SHGC: 0.40 The%Better or Worse Than Code Index reflects how close to compliance the house is based on code trade-off rules. It DOES NOT provide an estimate of energy use or cost relative to a minimum-code home. Slab-on-grade tradeoffs are no longer considered in the UA or performance compliance path in REScheck. Each slab-on-grade assembly in the specified climate zone must meet the minimum energy code insulation R-value and depth requirements. Envelope-AssernblieS Prop.Gross Area Cavity Cont. Ceiling: Flat Ceiling or Scissor Truss 1,220 49.0 0.0 0.026 0.026 32 32 Ceiling Cathedral: Cathedral Ceiling 274 49.0 0.0 0.022 0.026 6 7 Wall - 1st Floor: Wood Frame, 16" o.c. 1,714 28.0 0.0 0.050 0.060 64 77 Door-front: Solid Door(under 50%glazing) 27 0.500 0.320 13 9 Door-Garage: Solid Door(under 50%glazing) 24 0.500 0.320 12 8 Door-bedrooml: Glass Door(over 50%glazing) 48 0.300 0.320 14 15 SHGC: 0.40 Door-greatroom: Glass Door(over 50%glazing) 48 0.300 0.320 14 15 SHGC: 0.40 Door-greatroom/sunroom: Glass Door(over 50% glazing) 24 0.300 0.320 7 8 SHGC: 0.40 Window- Powder room: Wood Frame 14 0.300 0.320 4 4 SHGC: 0.40 Window-greatroom front 1: Wood Frame 17 0.300 0.320 5 5 SHGC: 0.40 Window-greatroom front 2: Wood Frame 17 0.300 0.320 5 5 SHGC: 0.40 Project Title: Diviney NEW CONSTRUCTION Report date: 06/27/23 Data filename: Page 1 ofll Window-bedrooml 1: Wood Frame 10 0.300 0.320 3 3 SHGC: 0.40 Window-bedrooml 2: Wood Frame 17 0.300 0.320 5 5 SHGC: 0.40 Window-bedrooml 3:Wood Frame 17 0.300 0.320 5 5 SHGC: 0.40 Window-bedrooml 4: Wood Frame 10 0.300 0.320 3 3 SHGC: 0.40 Window-bedrooml closet 1: Wood Frame 17 0.300 0.320 5 5 SHGC: 0.40 Window-bathroom 1: Wood Frame 5 0.300 0.320 2 2 SHGC: 0.40 Window-bathroom 2: Wood Frame 14 0.300 0.320 4 4 SHGC: 0.40 Window-bedrooml 5: Wood Frame 16 0.300 0.320 5 5 SHGC: 0.40 Window-bedrooml 6: Wood Frame 16 0.300 0.320 5 5 SHGC: 0.40 Window-greatroom rear 1: Wood Frame 21 0.300 0.320 6 7 SHGC: 0.40 Window-greatroom rear 2: Wood Frame 21 0.300 0.320 6 7 SHGC: 0.40 Window-greatroom rear 3: Wood Frame 21 0.300 0.320 6 7 SHGC: 0.40 Window-greatroom rear 4: Wood Frame 21 0.300 0.320 6 7 SHGC: 0.40 Wall - 2nd Floor: Wood Frame, 16" o.c. 1,653 28.0 0.0 0.050 0.060 60 72 Door-familyroom front: Glass Door(over 50% glazing) 48 0.300 0.320 14 15 SHGC: 0.40 Door- bedroom 2: Glass Door(over 50%glazing) 48 0.300 0.320 14 15 SHGC: 0.40 Door-familyroom rear: Glass Door(over 50% glazing) 48 0.300 0.320 14 15 SHGC: 0.40 Door- bedroom 3: Glass Door(over 50%glazing) 48 0.300 0.320 14 15 SHGC: 0.40 Door-bedroom 4: Glass Door(over 50%glazing) 48 0,300 0.320 14 15 SHGC: 0.40 Window-guest bath: Wood Frame 14 0.300 0.320 4 4 SHGC: 0.40 Window-familyroom front 1: Wood Frame 17 0.300 0.320 5 5 SHGC: 0.40 Window-familyroom front 2: Wood Frame 17 0.300 0.320 5 5 SHGC: 0,40 Window-bedroom2 1: Wood Frame 10 0.300 0.320 3 3 SHGC: 0.40 Window-bedroom2 2: Wood Frame 17 0.300 0.320 5 5 SHGC: 0.40 Window-bedroom2 3: Wood Frame 17 0.300 0.320 5 5 SHGC: 0.40 Window-bedroom2 4: Wood Frame 10 0.300 0.320 3 3 SHGC: 0.40 Window-bedroom2 closet 1: Wood Frame 17 0.300 0.320 5 5 SHGC: 0.40 Window-bathroom 1: Wood Frame 5 0.300 0.320 2 2 SHGC: 0.40 Project Title: Diviney NEW CONSTRUCTION Report date: 06/27/23 Data filename: Page 2 ofll Gross Area Cavity Cont. Prop. Req. Prop. Perimeter Window-bathroom 2: Wood Frame 14 0.300 0.320 4 4 SHGC: 0.40 Window-bedroom2 5: Wood Frame 14 0.300 0.320 4 4 SHGC: 0.40 Window-bedroom2 6: Wood Frame 14 0.300 0.320 4 4 SHGC; 0.40 Window-familyroom rear 1: Wood Frame 21 0.300 0.320 6 7 SHGC: 0.40 Window-familyroom rear 2: Wood Frame 21 0.300 0.320 6 7 SHGC; 0.40 Attic: Wood Frame, 16" o.c. 671 28.0 0.0 0.050 0.060 30 36 Window-front 1: Wood Frame 10 0.300 0.320 3 3 SHGC: 0.40 Window-front 2: Wood Frame 10 0.300 0.320 3 3 SHGC: 0.40 Window-front 3: Wood Frame 10 0.300 0.320 3 3 SHGC: 0.40 Window-front 4: Wood Frame 10 0.300 0,320 3 3 SHGC: 0.40 Window-rear 1: Wood Frame 10 0.300 0.320 3 3 SHGC: 0.40 Window- rear 2: Wood Frame 10 0.300 0.320 3 3 SHGC: 0.40 Window-rear 3: Wood Frame 10 0.300 0.320 3 3 SHGC: 0.40 Window-rear 4: Wood Frame 10 0.300 0.320 3 3 SHGC: 0.40 Floor: All-Wood Joist/Truss 1,516 22.0 0.0 0.042 0.047 64 71 Compliance Statement: The proposed building design described here is consistent with the building plans, specifications, and other calculations submitted with the permit application.The proposed building has been designed to meet the 2018 IECC requirements in Version RES check-Web and to comply with the mandato requirements listed in the REScheck Inspection Checklist. RESc eck Vers � ���� � Pia e.Title §ignkurellIOte ,U Project Title: Diviney NEW CONSTRUCTION Report date: 06/27/23 Data filename: Page 3 ofll REScheck Software Version : REScheck-Web Inspection Checklist Energy Code: 2018 IECC Requirements: 100.0% were addressed directly in the REScheck software Text in the "Comments/Assumptions" column is provided by the user in the REScheck Requirements screen. For each requirement, the user certifies that a code requirement will be met and how that is documented, or that an exception is being claimed. Where compliance is itemized in a separate table, a reference to that table is provided. Se#tion ._ ..._ �.�_ .. �eserafleda Fielda, k�erlled rInspe�tlonC�� rRel ies? . ntt..s�./ com A.s..�sum_...p..._t_i.o._n..s .............. alaeValue p Comme Re �ITITITIT - --------------- 103.1, Construction drawings _. .. and ❑Complies Requirement will be met. 103.2 documentation demonstrate ❑Does Not [PR1]1 energy code compliance for the ❑Not Observable building envelope.Thermal envelope represented on 1' ;� ❑Not Applicable �'/�, �%o .. construction documents. �„ 103 1, Construction drawings and �";%,'%%�"%�'�" %�ii�'/ ',ii��� i,�/ ®Com lies Requirement will be met, i/Yi; �i/ia ii i� P q 103.2, documentation demonstrate �i, i,� %, ��';%�� c ,❑Does Not 403.7 energy code compliance for [PR3]1 lighting and mechanical systems %/%% ❑Not Observable �'�� ❑Not Applicable Systems serving multiple dwelling units must demonstrate compliance with the IECC . Commercial Provisions. . 302.1, Heating andcooling equipment is Heating: Heating: ❑Complies :Requirement_ -—will be met. 403.7 sized per Manual S based Btu/hr Btu/hr ❑Does Not [PR2]2 on loads calculated per ACCA Cooling: Cooling: ;❑Not Observable ianuad y or other methods Btu/hr Btu/hr approved by the code official. Applicable Additional Comments/Assumptions: .. _ Tier 1) 2 Medium Im a .._. p ct(Tier 2) 3 Low dmpact(Tier 3) 1. Hi h impact(. ..... �.....r. . Project Title: Diviney NEW CONSTRUCTION Report date: 06/27/23 Data filename: Page 4 of11 'Se tion . .Com orn .� nts/Assumpt ons.. ,. :. eq.. —.a.P�ou�r�dt6�n Inspection rnplie � rn 103,2w A protective covering is installed to ❑Complies 'Exception: Requirement is not applicable. [.f' 11) protect exposed exterior insulation ❑Does Not and extends a minimum of 6 in. below grade. ,❑Not Observable ❑Not Applicable 4.3 g......e Snow-and ice-melting system controls ❑Complies Exception: Requirement is � . _._._._ 0 not applicable. (FO1212 installed. LJDoes Not ❑N'ot Observable ❑Not Applicable Additional Comments/Assumptions: 1..,1 High Impact( °der 1 ..... . .Medium lmnpact&'Ther 2) Low Impact pact lTAer 3 ... . ,...� Project Title: Diviney NEW CONSTRUCTION Report date: 06/27/23 Data filename: Page 5 ofll section Tns Verified Field Verified Rough In InspectioValue Value Complies? Comments/Assumptions & Re .ID Framing / ....._,..e �_...-... W....-..._..... - 402.1.1, Door U-factor, U- U. ❑Complies See the Envelope Assemblies 402.3.4 ❑Does Not table for values. [FR1]1 ❑Not Observable ❑Not Applicable 402.3.1, averageU-factor(area-weighted U- �..w..U_._,____ ❑Domplies See Not table the EnvelopeAssemblies G L es 402.3.3, 402.5 ❑Not Observable [FR2]1 ❑Not Applicable ion products: Complies will 3. .3 are determined enestaccordance 3 I be met. 1 ,. ❑Does Not with the NFRC test procedure or < , taken from the default table, ' ]Not Observable ❑Not Applicable 402.3. Fenestration in thermally isolated -❑U Isolated Isolated ❑CompliesRequirement will 402.3.5 F i 'll be met. unrooms in Climate Zones 2-8 ❑Does Not �J have maximum U-0.45. ❑ Not Isolated ❑ Not Isolated ❑Not Observable ❑Not Applicable 402.3.5 Skylights in thermally isolated U p Exception: ion: Requirement is [FR9]1 sunrooms in Climate Zones 2-8 ❑ Isolated ❑ Isolated ❑Does Not not applicable. g have a maximum skylight U- ❑ Not Isolated ❑ Not Isolated ❑Not Observable factor of 0.70.All other sunroom skylights must meet code ❑Not Applicable 402.4.1.1 Air baeand therm... ..... ... .. _____ .. FR23 1 installed per manufactureral barner '°� " % '�/r'i 1'/ requirements. ' / ,,, °❑Complies °.Requirement will be met. [ ] p 's Not instructions. r y / ❑Not Observable ^❑Not Applicable 402.4.3 Fenestration that is not site built iFIComplies Requirement will� ,�m.._......__. be met. [FR20]1 is listed and labeled as meeting r EDoes AAMA/WDMA/CSA 101/I.S.2/A440 ❑Not Observable or has infiltration rates per NFRC 400 that do not exceed code ❑Not Applicable limits._ 402.4,5 IC rated races ❑ ornpIies ��- .Requirement ..........be met. . sed lighting fixtures /i '° ' ' will be met. [FR16]2 sealed at housing/interior finish % /�' ' �'� ❑Does Not and leakage atdto 75 Padicate <_2.0 cfm �, iii,%i, ,' 'G�%%%/f%iji '❑Not Observable g //mo' ❑Not Applicable 403.3.1 Supply return ducts in attics !/, i %%J''r°'% j%% ,i ❑C¢ mplies Requirement will t. y � II be met. FR1211 insulated >= R-8 where duct is ; , ia/�,� ❑Does Not >= 3 inches in diameter and > y1 i; / ri, Not Observable ; R-6 where < 3 inches. Supply and /�/ /; return ducts in other portions of /� '/'r'a''%/%i'% j�° �'/� '�// Not Applicable the building insulated >= R-6 for diameter inches and R-4.2 or< 3in hes in diameter. ,. rn „/r i%//%iri//iai ji// %/% /%//%j/// i 403.3.2 Ducts, air handlers and filter ��,,���,//��j/ // , / ; �;,❑Corrlplies ;Requirement will be met. [FR13]1 boxes are sealed with % ,fj%/ /%'/'%;l/�f!� !/ 'ii❑Does Not joints/seams compliant with -]Not Observable International Mechanical Code or International Residential Code, as �%- °❑Not Applicable applicable. [ R15]3 ducts or plenums. ❑DoespNot Requirement a, _ Building cavities are not used as ❑C ment will be met, , / ❑Not Observable 7❑Not Applicable 1 High Impact (Tier 1) 2 p ­fl� �.._ g p .....mm pact(Tier 3) .m... _ Medium Impact (Tier 2) _ 3 Low Im mm� ....^^^^^^ ^^^^^n Project Title: Diviney NEW CONSTRUCTION Report date: 06/27/23 Data filename: Page 6 of 11 Se on IF /Rough-In Inspection Pla Valuefled FieIVdV�Qfied. _ mmComplies, FC40mments/Assumptlons &Req ID 403.4 HVAC piping conveying fluids R.- R- ;❑Complies !Requirement will be met. [FR17]2 above 105 °F or chilled fluids j❑Does Not j below 55 °F are insulated to >_R- ❑Not Observable ; ❑Not Applicable 40��� p� 1 potegction of insulation on HVAC 01❑DompNot � � _.mm �..._ i Requirement will be met. n . ❑Not Observable ❑Not Applicable _ 403.5.3 � --R-3.ater pipes are insulated to RR � R-��. ,❑❑CDomplies Requirement will be met. 2 oes Not ❑Not Observable ❑Not Applicable w. g y.. .. ❑Doi phot - ---- 403.6 2 atom trod r gra itdampers are:-",, ❑Com lies Requirement will be m,............. ww_4 qp et. [FR19] installed on all outdoor air ,❑Not Observable ❑Not Applicable Additional Comments/Assumptions: 1 Hi h Im act(Tier 1) 2 Medium„ 1 g p "I'l"I'---^ --.- Impact(Tier 2) �..3 Low Impact(Tier 3) ____......1 Project Title: Diviney NEW CONSTRUCTION Report date: 06/27/23 Data filename: Page 7 of 11 #ir _ . flans 1�erlfled Elelclerlfl Inspection Val a vaNu w Complies? C nrnrnentslA$ su�x�ptioros Insu &11eq�.MD .._��.... 30��1 � ;All instal eNd�nsulation�s labe�� � ,_,_-u._.._��._ .... ,.._ -...�... ..�...._�.� __..... ..-.__-, led „ ! ;❑Complies ;Requirement will be met. [IN13P ;or the installed R-values []Does Not provided. ❑Not Observable of Applicable❑N 402.2.6,..... Floori-ns ulation.R'-'value. ......... R�- R- lC _ ompl❑�.__W .n.___. - � plies See the Envelope Assemblies Wood Wood oes Not table for values. [IN1]1 ❑ Steel ❑ Steel ;❑Not Observable ❑Not Applicable 303.2, Floor..... // Requirement wil I be met.linstalled per pt❑DoesNo0 .2.8manufacturerr'sinstrucoosand [ 2] in substantial contact with the ❑Not Observable underside of the subfloor, or floor .framing cavity insulation is in ;❑Not Applicable :contact with the top side of sheathing, or continuous Insulation is Installed on the iii;// ////i%% /i%%i%% li l j underside of floor framing and / / �/ � / extends from the bottom to the .top of all perimeter floor framing 402.1.1, Wahl insulation R-value. If this is a R- . ; R--� ;❑Complies :See the Envelope Assemblies ies 402.2.5, mass wall with at least V. of the ❑ Wood ;❑ Wood ![]Does Not ;table for values. 402.2.6 wall 'insulation on the wall ❑ Mass, ;❑ Mass ❑Not Observable [IN3]' exterior,the exterior Insulation 10 requirement applies(FRIO). EJ Steel ❑ Steel ;❑Not Applicable 303.2 Wall insulation is installed per / ° j 'J „/ , ❑DoesPNot Requirement w .. lies ill be met. [IN4]1 manufacturer's instructions. t?❑Not Observable ❑Not Applicable licable _ S 303.2 Sunroom w-a�ll insulation installed lled / ❑Complies Exception: Requirement is [IN9]i per manufacturer's Instructions / ❑Does Nototapplicable. ❑Not Observable : []Not Applicable _ ___ . 303.2Sunroom ceiling insulation is ❑Com plies :Exception:tion: Re uirem ent is [IN11]1 ;installed per manufacturer's �❑Does Not not applicable. instructions. /� �i � ' �'�/�%�/ /!°�" ;/� / iO ❑Not Observable ❑Not Applicable Additional Comments/Assumptions: ( Impact(1f ie. 2) 3 Low Impact(Tier 3) �_1 �Hwgh Impact..Tier 1) �.�..Mediu.m...M,.. ........�. �� ...�........ .... .. ...... Project Title: Diviney NEW CONSTRUCTION Report date: 06/27/23 Data filename: Page 8 ofll ie Section Plans Verified Field Verified &Ite ID s Value Value Complies Comments/Assumptions # Final Inspection Provision .._-..., ,-._.w. ..,...._-. ._._.-, ._._._.e.- _..._.______..... ..... ,.,,....vin..,-,,- .. ._ 402.1.1, Ceiling Insulation R-value, R- R- ❑Complies See the Envelope Assemblies 402.2.1, ❑ Wood ❑ Wood ❑Does Not table for values. 402.2.2, ❑ Steel ❑ Steel ❑Not Observable 402.2.6 [FI1]1 ❑Not Applicable _,. g cn ❑Cles Requirement will be met ompi � 303.1.1.1, Ceiling insulation installed per es 303.2 manufacturer's instru [F12] Blown insulation marked every 300 ft2. y ❑Not Observable z permeable '' ❑Co Pp1elscable-- Exception: : Requirement [F122] insulation include ballapplicable, nt is 402.2.3 Vented attics with air le adjacent ❑Does Not PP a to soffit and eave vents that extends over insulation. ❑Not Observable ❑Not Applicable 402.2.4 Attic access hatch and door R- R- ❑Complies Requirement will be met. [FI3]1 insulation >R-value of the ❑Does Not adjacent assembly. ❑Not Observable ❑Not Applicable ....,402.4 – ._� ACH 50 ... .._,.❑Complies ..__—,..Requirement will be me-� ....__.... 1.2 Blower door test @ 50 Pa. <=5 ACH 50 – t• [F117]1 ach in Climate Zones 1-2, and ❑Does Not <=3 ach in Climate Zones 3-8. ❑Not Observable ❑Not Applicable 402.4.2 Wood-burning _ ..............r ,. ,,.. ...........- t. fireplaces have ❑Complies Requirement will be met. :[F18] tight fittingflue dampers and '' ❑Does Not .. outdoor air for combustion. Not Observable ❑ f Not Applicable 40127]13 determine air leakage tested to z cfm/100 2 cfm/100 ❑❑Complies Require t ..ment will be met. e with ft ft Does Not either: Rough-in test:Total leakage measured with a ❑Not Observable pressure differential of 0.1 inch ❑Not Applicable w.g. across the system including the manufacturer's air handler enclosure if installed at time of test. Postconstruction test:Total leakage measured with a pressure differential of 0.1 inch w.g. across the entire system including the manufacturer's air handler enclosure. ....._.403.3.4 Duct tightness test result of<=4 cfm/100 cfm/100 ❑Complies Requirement will be met. [FI4]1 cfm/100 ft2 across the system or ft2 ft2 ❑Does Not <=3 cfm/100 ft2 without air handler @ 25 Pa. For rough-in ❑Not Observable tests, verification may need to ❑Not Applicable occur during Framing Inspection. . 403.3.2.1 Air handler leakage designated MComplies Requirement iremen_t Jwill be met, /��'%//i��%/// it [F124]1 by manufacturer at<=2%of r '�y/�, ������, �� �j� ��, �❑Does Not design air flow. ❑Not Observable ❑Not Applicable , r i 4031,1 Programmable thermostats Requirement will be met, FI9.2 installed for control of primary ❑ oes NC8't. heating and cooling systems and ❑ Not Observable initially set by manufacturer to pP able codespecifications. _ _ 403.1.2 Heat ain thermostat install ' '� ��� � ��, ❑Com lielsc Requirement will be me p P ed ; r'r �� �� �i p q t. [FI 1012 on heat pumps. ���/moi'% '%i�;'�'' �'i i� 'G �'�/ ❑Does Not //o / 2 E]Not Observable JE] Not Applicable �1Hi h Im ac,t(Tier 1) 2Medium 9m act(Tier 2) Low Impact(Tier 3) g p p Project Title: Diviney NEW CONSTRUCTION Report date: 06/27/23 Data filename: Page 9 of 11 .a Pians Verified � Field Verified ieiVerified Final Inspection Provisions Value Value � n Complies? _Comments/Assumptions.m.m.eWnts/As_sam._�P_ t.io.._.n_s 403,31 Circulating service hot water ❑Complies :Exception: Requirement is (Fill)" systems have automatic or ;`❑Does Not not applicable. accessible manual controls. ❑Not Observable /, ❑Not Applicable BVI mechanical... ._.. .. ._. Flt a 1� ical ventilation system �/ i ��/i�� ' '% „ i� �� Complies Requirement will be met. 403 a ❑ ( 17 fans not part of tested and listed –]Does Not HVAC equipment meet efficacy ;❑Not Observable ;and air flow limits per Table ❑Not Applicable j 0 �o�3.6.1. R403 Hot 9 _"b -ly–i ".... _ 3w2 ter boilers supplying heat ❑Complies ;Requirement will be met. F1261 through or two-pipe heating „� �❑Does Not / air systems have outdoor setback / control to lower boiler water ' ❑Not Observable 'temperature based on outdoor ” `" /',[]Not Applicable _ temperature. � . �.. 4035.11 Heated water circulation systems ❑ComPlies Requirement will be met .... - IF12512 :have a circulation pump.The Does Not ;system return pipe is a dedicated %,,,,, / // ii„% i // /,/❑Not Observable return pipe or a cold water supply pipe. Gravity and thermos �� ,� '� � ❑Not Applicable syphon circulation systems are not present. Controls for ;circulating hot water system 06Z pumps start the pump with signal ,for hot water demand within the occupancy. Controls , automatically turn off the pump when water is in circulation loop is at set-point temperature and waterno exists./ a....._. P 4012 5J� 2 comply heat races EE 5.1 or UL '�/ /� �� ❑Does N._.. : l b Electric heat trace systems � � p' s :Requirement will be met. Not 515. Controls automatically -P-1- ; %//�%��� /�„` i�,, „,/ Ix, E]Not Observable adjust the energy input to the / heat tracing to maintain thei ❑Not Applicable desired water temperature in the A/ ❑Complies Requirement will be me_. --- t. 1130]2 Demand have controls that e” piping. � � ;",,,,,,,❑Does Not manage operation of the pump and limit the temperature of the –]Not�r –]Not Observable water entering the cold water ❑Not Applicable k piping to < 104°F, (•. 4 tested water er eat recon ❑ r. Complies � Requirement w �� �. recovery units / i ���j ,, � � � /r/ , III be met. FN311' accordance with CSA ❑Does Not B55.1. Potable water-side pressure loss of drain water heat j/ %i//%�i'/j'! %/�� %�'i1 i mo ❑Not Observable , � ; % recovery units < 3 psi for ��%���'�i�/ij�/% �i � /� �� ; ! !❑Not Applicable individual units connected to one or two showers. Potable water. side pressure loss of drain water heat recovery units < 2 psi for individual units connected to ;three or more showers. 404.1 ,/ / ` // / j❑❑Complies :Requirement will be me ° or more of permanent /, �/ // /�/ q t• res have high efficacy lamps / / Does Not a❑Not Observable r a ❑Not Applicable ❑®CDoomes Nlieost Exception: blRequirement is 404, 1 Fuel gas lightinpsystems have ]3 no clot Ig ,A///11//!­/1//11 i%%"''° "// �� //� ' %[ Not Observable pP 2gh Impact(Tier 1) Medium Impact(Tmi2j 3 Low Impact(Tier 3) Project Title: Diviney NEW CONSTRUCTION Report date: 06/27/23 Data filename: Page 10 of 11 p.... _.. n Plans erif Field Valu af ied �... ... .. — _�------- '0C .. ue , ... . &R 1p Final Inspection Provisions complies? Comments/Assum tions 401.3 Compliance certificate posted. / °j� ��,' / omplies :Requirement will be met. [FI7]2 ❑Does Not ✓ ,r/i�/ //� ii/ // fi �G/ %�,��/�j%/%�/�/ ;%i❑NOt Observable Not Applicable 3.. /�i �i�/� �/�/�i�/�%///���o�/„i/,� - ��i��i, ,❑ 3.3 ,Manufacturer manuals for omplies Requirement will be met. [F[18]3 mechanical and water heating ❑Does Not systems have been provided. i ]Not Observable ❑Not Applicable Additional Comments/Assumptions: 1 Ht @ p —­' J` ­ ` --m—p "----- - ., p .�. g Im act(Tier 1) 2 Medium Im act(Tier 2) "-3-'L Impact[Ter 3) Project Title: Diviney NEW CONSTRUCTION Report date: 06/27/23 Data filename: Page 11 ofll C2018 IECC Energ�y Efficiency Certificate �(j Above-Grade Wall 28.00 Below-Grade Wall 0.00 Floor 22.00 Ceiling / Roof 49.00 Ductwork (unconditioned spaces): I be@ . . 6 M= Window 0.30 0.40 Door 0.30 0.40 Heating System: Cooling System: Water Heater: Name: Date: Comments Robert I. Brown Architect P.C. 205 Bay Avenue,Greenport, NY 11944 ' info@ rib rownarchitect.com ' 631-477-9752 a SEP `� 1 2023 �. September 11 2023 p BUILDING 11EV'I���, I ��0171��t.w 11, Amanda Nunemaker Town of Southold Building Department Southold, NY 11971 Re: Diviney Residence 400 Bay Road Greenport, NY Dear Ms. Nunemaker, This letter is to certify that there is no natural gas service to the above referenced property. The contractor (Michael Chuisano, Build Like Mike, Inc.) has requested that the electrical service not be disconnected, as he intends to use the existing electrical service during demolition and construction. If you have any questions, or require additional information, please feel free to contact me. Thank you for your attention to this matter Sincerely, , Robert Brown, A.I.A. J` 1ti34� QF No� Q M«01' 91p -�—gS # EXISTING NATURAL VEGETATION A J.TO WETLAND O O BOUNDARY TO REMAIN AS NON-01S TURBANCE BUFFER O O Z 4'WIDE CLEARED PATH f f� TO BE MAINTAINED ry W Z Li JY PROJECT LIMITING Q FENCE/LIMIT OF Sl E M >- DISTURBANCE 1 4 \ W Y Z EX.EDGE OF LAW U LL1 I U - Z J w m G Q w 3. LLj _ a- PROP. -F T WIDE,APPIR Z U 600 SF 01Y URF BUFFER g 0 Q' NOTE: e W O THERE WILL BE NO GRADE CHANGES NE 1 DRY 45 NO IMPORTED FILLr i F dM Z W p6'DtAx , n< �� EXISTING SHED TO BE E E C}F LAWN Q U EX.EDGE OF LAWN � 1 REMOVED Z 24' 123 S.1:,SCRk't�NED _ U PORCHAND ' J _ 112 SF.PAVERS 4 BI CUNYADOVE U —j J IN SAND PATIO j m 430 S.F.WOOV II1�CK AE6 Z AND BALCONY ABOVC 17 SF.4'x 4 B W 5 17 SF.4'x 4'3" r, 12111' WOOD STEPS 1 L� WOOD STEPS W W +a PROPOSED(4'x 4') SHOWER ENCLOSURE _ 1 PROPOSED 1,516 S.I'. 4 BEDROOM 2 STORY FIOUSE OVER GRAVEL BED PIPED _ O TO ZONE 1 DRYWELLS �_ / F,F'.EL.r9.& � � � A'1'I'ACIiED � � ,/ Z r ONE STORY = W GARAGE' I.A.CONTROL PANEL 00 Z U ./ I,I SI' z S}'.ROOF ELECT( r P R LIN )' FUTUR�r��-Ur s Z 34 9 5 S.F.SI1:PS 1016. r, - LO I FUTU 6-V dia,X 2'D.TALL Q F,F.EL,rB.o' OVERHANG BEYOND R001�- �. ftp� I` `� 00 39 S.F.CONC. OVERHANG � R' N FUJ C BLOWER � -t (n LEACHING RINGS EXISTING O/H ELECTRIC AND APRON 277' � ON CONCRETE CABLE LINES TO BE EURIED 4 / —j"OAIR LINE t n 'FUTURE' I ALL LEACHING "DRAIN LIN' %_,j ELEMENTS TO BE m RELO ATEO U G €` F. t r � r,E SERVICE E ,� .4 ���� s �' '� PRECAST CONCRETE i ��., -- � s ��v �� �s >� �€�) PER SCDHS STANDARDS MAIN GJ LL 1OvE C .0 3 9, ; M ell -- I R CONCRETE DSu- F PLACE 1WATa -TEtSTRiIOh BOX , Z In PS.F,VIOUb. RAVEL { - _ E� s , ZONE 2 DR WELLS t t£ N e21 20"W ;2,6't LA D ; J TI L. POLE :S.F.UNCO EKED U T P LE .ND -I' DECK EDGE PAVEMENT PROPOSEDI/A Ln SANITARY SYSTEM Water lines must be inspected by the Suffolk County Dept.of Health Services. J Call(6311852-5754,48 hours in SUI FOLK €v DLt1.t{T N'. �f{-'I ALft-E-.. VrCCcs LL.I advance,to schedule inspection(s). t-�L-. -1)rt APPROVAL�f CONSTRUCTION F �. -- --- SINGE F:FAMILY RFSIDFNCF ONLY _ BAYROAD DATE r06r1&20 t�.s.R ° R-22-0662 PPROVE PUBLIC WATER IN STREET \11 FOR MAXIMUM OF 4 BEDROOMS - E 'EES THREE YEARS FROM DATE OFAPPR 7 F' DWELLING ON DWELLING ON ' DWELLING ON 100' / 5 PUBLIC WATER PUBLIC WATER PUBLIC WATER P R O P O S E D BASED ON SURVEY BY PECONIC SURVEYORS (JOHN METZGER) I S T E PLAN LAST DATED OCTOBER 29, 2021 it I SCTM No. 1000-43-05-o8 1 ZO 18,500 sf to TIE LINES SEE ATTACHED SPECIAL CONDITION, GRADING PLAN AND/OR PLOT PLAN D ig PWC ti [ Req a.. EXCAVATION INSPECTION REQUIRED ( 5ubrT,,t1F or RAC tt For Thmnauat­ d C t mo r me s wage D SNosauvsi Ufe Furin W WMU73 G 0 Ir EW FOR SANITARY SYSTEM Agan lonment of the existing sanitary system must be in BY HEALTH DEPARTMENTi cc f(rfrrince with the Department's requirements. ' ] Submit completed form WWM-080 as proof W LU 015 1� PLEAS= NOTE , 00 �O9`E� ' Sanitary system not to be installed StONP\ under driveway. i DIVINEY RESIDENCE Robert 1. BrOWn 205 Bay Ave, G1'eenport NY Architect P.C. infcl ribi-ownarc itect.com SANITARY SYSTEM DESIGN ' 631-477-9752 400 BAY ROAD, GREENDORT, NY DRAWING May 19, 2022 1/A OWTS Nick Mazzaferro, P.E. SCTM No.1000-43-05-08 REV MAY 25, 2023 S_Z �SeSsdl� HOLDDOWN ISSUES/ REVISIONS AS NEEDED RESIDENTIAL GENERAL NOTES ELECTRICAL RIDGE R I I/2' SPACING N E I . FURNISH ALL LABOR, MATERIALS, EQUIPMENT, PLANT, TOOLS, AND SERVICES ALLOWS HOLDDOWN MISC. GENERAL NOTES NECESSARY AND REQUIRED FOR PROPER AND COMPLETE INSTALLATION OF ALL NEW RIDGE TENSI STRA' INSTALIION 1. THIS PROJECT IS CONSTRUCTION OF A NEW TWO STORY SINGLE FAMILY RESIDENCE AND DETACHED ELECTRICAL SYSTEMS AND RELATED WORK INCLUDING, BUT NOT LIMITED TO: CORNER STUD GARAGE. CONNECTIONS TO PREVIOUSLY INSTALLED ELECTRICAL SYSTEMS, WIRING, LIGHTING, AL CONNECTED TO �8O'C� _ TRANSFER SHEAR 2. THE PROPOSED HEIGHT OF THE BUILDING IS 34'-G". APP IANCES E GROUNDINGRIBNDION AND ALL INCLUDING ALLOCONNEICTIONS AND DEVICESNS __;k TO 3 (2)1 Gd COMMON y�M. M"�2,10•ZS 3. THE TYPE OF CONSTRUCTION I5 TYPE V (B). RI J NAILS@G"O.C. H W 4. ALL WORK SHALL CONFORM TO THE REQUIREMENTS OF THE 2020 RESIDENTIAL CODE OF NEW YORK WITHIN THE SCOPE OF THE WORK AS SHOWN ON THE APPLICABLE DRAWINGS AND ° FN STATE AND THE AF*PA WOOD FRAME CONSTRUCTION MANUAL 2018 HIGH WIND EDITION. AND SPCIPICATIONS AND AS NORMALLY SPECIFIED IN THIS TYPE OF PROJECT AND OPE EAT O��<< INCLUDING CONNECTIONS TO PREVIOUSLY INSTALLED TRANSFORMERS AND J015T HANGER. rrnn((������ 5. DE51GN LOAD CALCULATION ARE BASED ON: ELECTRICAL DISTRIBUTION SYSTEMS. W�? BEAM PROVIDING 5C A . 5D TABLE 2.4 6 i1+ R LIVE LOAD: AS PER TABLES R301.5 It 8301.G OF RCNY5 2020. 2. ALL WORK SHALL CONFORM TO THE REQUIREMENTS OF THE 2020 ELECTRICAL IN EACH END DF 1-1/4" 20 GAGE STRAPS DEAD LOAD: CALCULATED AS PER R301.3 OF RCNY5 2015. CODE OF NEW YORK STATE, THE NATIONAL ELECTRICAL CODE, NFPA NO, 70-2017 CROSS SECTION FOR 120 MPHND VIEW WIND SPEED. SNOW LOAD: 20 PSI GROUND SNOW LOAD AS PER FIG. 8301 .2(G) OF RCNY5 2020. (NEC), LOCAL UTILITY STANDARDS, OCCUPATIONAL SAFETY AND HEALTH CAT(OSHA), WIND EXPOSURE CATEGORY"C", FOR 130 MPH 3 SECOND GUST, AS PER 8301 .2.1.4 t FIGURE THE NATIONAL ELECTRICAL MANUFACTURERS'ASSOCIATION (NEMA) AND ANY OTHER 8301.2(5)A OF RCNY5 2020. APPLICABLE CODES. IN THE EVENT Of CONFLICT, THE MORE STRINGENT REQUIREMENTS WILL APPLY. 3. ALL PRODUCTS USED FOR ELECTRICAL WORK SHALL BEAR THE UNDERWRITERS ►� LOCATION LIVE DEAD DEFLECT LIMIT LABORATORIES, INC. LABEL AND BE SUITABLE FOR THE ENVIRONMENT IN WHICH THEYN 15T.FL. 40 PSF 12 PSP U3GO WILL BE INSTALLED. LOw "a 2ND.FL. (SLEEP AREA) 30 PSF 12 PSF U3GO 4. ALL WORK ON THE ELECTRICAL SYSTEM SHALL BE PERFORMED BY OR UNDER THE "°m"""°'• `: N ATTIC (SERVED BY STAIRS) 30 PSF 10 PSF U3GO SUPERVISION OF A PROPERLY LICENSED MASTER ELECTRICIAN. 5. THE CONTRACTOR SHALL OBTAIN, SUBMIT, AND PAY FOR ALL PERMITS, LICENSES ^'G ' ROOF 20 PSF 15 PSF U3G0 AND INSPECTIONS AS REQUIRED BY THE LOCAL, STATE, AND FEDERAL AUTHORITIES, P^,.,G;°°°" Al, 17 .z ^ AND ANY OTHER APPLICABLE JURISDICTION. "°'" rn G. THE ARCHITECT ASSUMES NO RESPONSIBILITY FOR THE CONSTRUCTION MEANS, METHODS, G. CARBON MONOXIDE DETECTORS IN CONFORMANCE WITH APPLICABLE CODES ""':9: E: �.*! .t35A.4a MMON N LS IN EAC END OF I-I/4"x 00 TECHNIQUES, SEQUENCES, OR PROCEDURES, OR FOR SAFETY PRECAUTIONS AND PROGRAMS IN SHALL BE CONNECTED TO THE LIGHTING CIRCUITS WITH NO INTERVENING WALL r :.�' :. tnai'A..4F R LATE L/SHEAR ONNECTION CONNECTION WITH THE WORK. SWITCH. LINE CORD-CONNECTED, DIRECT PLUG-IN, AND BATTERY POWERED ALARMS ;;(AtL-C-0NNECTI C N (TABLE 3.38) WFCM-1995 THERE ARE NO WARRANTIES, NOR ANY MERCHANTABILITY OF FITNESS FOR A SPECIFIC USE EXPRESSED ARE NOT ACCEPTABLE. ALARMS SHALL BE INSTALLED ON EACH LEVEL ON WHICH 3 FOR 120 MFH FASTEST WIN SPEED. OR IMPLIED IN THE USE OF THESE PLANS. SLEEPING QUARTERS ARE LOCATED. 7. CONTRACTOR TO VERIFY ALL DIMENSIONS BEFORE STARTING CONSTRUCTION. DO NOT SCALE 7. SMOKE DETECTORS IN CONFORMANCE WITH THE ELECTRICAL CODE OF NEW YORK DRAWINGS. FOLLOW DIMENSIONS ONLY. STATE AND THE RESIDENTIAL CODE OF NEW YORK STATE, THE NFPA NATIONAL FIRE zf ALARM CODE NO. 72-1993 SHALL BE PROVIDED OUTSIDE EACH SEPARATE SLEEPING 8. CONTRACTORS) SHALL FURNISH AND INSTALL ALL MATERIAL AND EQUIPMENT SHOWN, LISTED, OR AREA, IN EACH SLEEPING AREA, AND ON EACH FLOOR LEVEL. Ad 0 DESCRIBED ON THESE DRAWINGS SUBJECT TO QUALIFICATIONS, CONDITIONS, OR EXCEPTIONS AS B.CONTRACTOR SHALL COORDINATE WITH OWNERS ALARM COMPANY FOR SMOKE f LOCIR NOTED. CONTRACTOR SHALL FURNISH ALL LABOR, SCAFFOLDING, AND TOOLS NECESSARY TO AND BURGLAR ALARMS AS NECESSARY. JOTS COMPLETE THE WORK. 7-1 �� Q6 •� _' °°,o-2 EI �.1) 9. ALL MATERIAL SHALL BE INSTALLED IN STRICT CONFORMANCE WITH MANUFACTURES REQUIREMENTS NAILING SCHEDULEQ,E P, AND SPECIFICATIONS. (PER AF It- PA AMERICAN WOOD COUNCIL WFCM FOR P OV E 8x 3d COM ON N LS IN EA H END OF I-I/4"x 10. CONTRACTOR SHALL OBTAIN ALL REQUIRED INSPECTIONS, APPROVALS AND CERTIFICATE OF TEST HOLE DATA ONE AND TWO FAMILY DWELLINGS 201 5 SBC HIGH WIND EDITION) AGE STRgP (0o7� ROOF TO WALL WALL TO WALL AND SEP � � 2023 OCCUPANCY. ALL TO FOUWDATION CONNECTIONS (TABLE 3.315) McDONALD GEOSCIENCE DEMOLITION JOINT DESCRIPTION NUMBER OF COMMON NAIL5 NAIL SPACING 3 K 1 20 MPH PASTES WI SPE 12/4/2020 1 . CONTRACTOR SHALL CLEAR AND EXCAVATE THE PROPERTY AS REQUIRED TO CONSTRUCT THI5 ROOF FRAMING PROJECT. 3 PER RAFTER FlUTT,T)n7f;T)TITIT. RAFTER TO TOP PLATE(TOE-NAILED) n�Ilxen SAND ANO LOAM - a - 2. CONTRACTOR SHALL REMOVE TREES AS DESIGNATED BY THE ARCHITECT AND OWNERS. CEILING J015T TO TOP PLATE (TOE-NAILED) 3 PER JOIST !d O `,'• ..�.,�.11.�°t CEILING JOIST TO PARALLEL RAFTER(FACE-NAILED) 3 EACH LAP FLO R O FCEILING JOIST LAPS OVER PARTITION ((FACE-NAILED) 3 EACH LAP OUNDATIONS JOIS O 3 GPA YORGAN/CCLAY OL I . ASSUMED SOIL BEARING CAPACITY, 1,500 Ib./Sq.Ft. RIDGE STRAP (EACH END) 2 PER TIE p 2. CONCRETE TO BE PLAIN, REINFORCED, 3,000 p5. -28 DAY TEST. BLOCKING TO RAFTER(TOE-NAILED) 2-8d EACH END n 4' 3. ALL NEW FOOTINGS TO REST ON UNDISTURBED SOIL. 00 BROWN CLAY CH RIM BOARD TO RAFTER(END-NAILED) 2-IGd EACH END "+ � GENERAL CONSTRUCTION WALL FRAMING WATER IN BROWN CLAY EL. 0.5' 1 . PROVIDE ALL LABOR, MATERIALS, TRANSPORTATION, EQUIPMENT AND SERVICES NECESSARY TO TOP PLATE TO TOP PLATE(FACE-NAILED) 2-1 Gd PER FOOT G' crI COMPLETE ALL WOOD AND PLASTIC WORK REQUIRED BY THE DRAWINGS AS SPECIFIED HEREIN, OR TOP PLATES AT INTERSECTIONS (FACE-NAILED) 4-1 Gd J015T EA.51DE 6' UPLIFT CONNECTIONS N/O/F DANIEL AND SUZANNE DIMNEY REASONABLY IMPLIED AS NECESSARY TO COMPLETE THE WORK. STUD TO STUD (FACE-NAILED) 2-1 Gd 24"O.C. 2. FASCIAS, SOFFITS AND EXTERIOR TRIM SHALL MATCH EXISTING. HEADER TO HEADER(FACE-NAILED) IGd I G"O.C.ALONG EDGES O WATER IN PALE BROWN 3. INTERIOR TRIM SHALL MATCH EXISTING. TOP OR BOTTOM PLATE TO STUD (END-NAILED) 2-1 Gd,3-1 Gd,4-1 Gd PER 2x4, 2xG, 2x8 RESPECTIVELY C O N N E C 71 O N S D E T A I L 1000-43-05-23 FINE SAND sP 00 4. FRAMING ELEMENTS: BOTTOM PLATE TO FLOOR JOIST, BAND JOIST, A. ALL FRAMING LUMBER SHALL BE GRADE STAMPED DOUGLAS FIR-LARCH STRUCTURAL GRADE NO.2 END JOIST OR BLOCKING (FACE-NAILED) 2-IGd PER FOOT OR BETTER. Cp NOTE: WATER ENCOUNTERED B. ALL ENGINEERED LUMBER SHALL BE AS INDICATED ON DRAWINGS, AND SHALL BE INSTALLED, CUT FLOOR FRAMING V) 13' 5.6' BELOW SURFACE AND DRILLED IN ACCORDANCE WITH MANUPACTUREP.S REQUIREMENTS AND SPECIFICATIONS. J015T TO SILL, TOP PLATE TO GIRDER(TOE-NAILED) 4-8d PER JOIST ELEVATIONS AND CONTOUR LINES REFERENCED TO C. ALL SHEATHING TO BE APA RATED, EXPOSURE 1, THICKNESS AS INDICATED. BRIDGING TO J015T (TOE-NAILED) 2-8d EACH END NAVD 85 JUNE z,2022 D. ALL SUB FLOORING TO BE APA RATED 5TURD-I-FLOOR, EXPOSURE 1 , 3/4" MIN. THICKNESS. BLOCKING TO J015T(TOE-NAILED) 2-8d EACH END KEY _ E. ALL HEADERS 0-0" AND OVER SHALL BE SUPPORTED WITH DOUBLE UPRIGHTS, 9'-0" AND OVER BLOCKING TO SILL OR TOP PLATE(FACE-NAILED) 3-1 Gd EACH BLOCKO WITH TRIPLE UPRIGHTS. ALL HEADERS SHALL BE A MIN. OF (2)2"x8" OR AS SHOWN ON DRAWING. LEDGE STRIP TO BEAM (FACE-NAILED) 3-1 Gd EACH JOIST r 9�S' OO = REE3 F. SOLID BLOCKING SHALL BE PROVIDED FOR ALL JOISTS AND FLOOR BEAMS AS PER N.Y.S. CODE z ® = WELLL THESE PLANS ARE AN INSTRUMENT OF = OR AS NOTED @ 8'-0" O.C. MIN.. PROVIDE 2"SPACE FOR AIR CIRCULATION IN ROOF. JOIST ON LEDGE TO BEAM (TOE-NAILED) 3-8d PER JOIST ¢ A 5TAK.E� SERVICE AND ARE THE PROPERTY OF THE -BAND JOIST TO JOIST(END-NAILED) 3-IGd PER JOIST 6 :E & - TE5T HOLE G. PROVIDE DOUBLE FRAMING AROUND ALL OPENINGS (STAIRS, ETC.) OR AS NOTED ON DRAWINGS. O = ARCHITECT. INFRINGEMENTS WILL H. PROVIDE DOUBLE UP FRAMING UNDER ALL'O5T5 AND PARALLEL PARTITIONS OR A5 NOTED ON BAND JOIST TO SILL OR TOP PLATE (TOE-NAILED) 2-IGd PER FOOT •6� �o • - PIPE BE PROSECUTED O F- ■ _= MONUMENT DRAWING' ROOF SHEATHING �'ti 0 � � ' = WETLAND FLAG 2022 ALL RIGHTS RESERVED I. ALL FLUSH WOOD CONNECTIONS SHALL BE FASTENED WITH RATED GALVANIZED METALSTRUCURALPANELS 8d TABLE 3.8) o UTILITY POLE CONNECTORS BY"SIMPSON" OR APPROVED EQUAL. Z l9 a W z DIAGONAL BOARD SHEATHING W 3� U m z m ZONED:R-40 J. NAILING SCHEDULE SHALL BE AS PER N.Y.S. BUILDING CODE AS A MINIMUM. ALL 2"xG"STUDS C9 SHALL RECEIVE 5 1 Od NAILS AT SILL AND PLATE. ALL EXTERIOR NAILS SHALL BE GALVANIZED. SEE I"xG"OR 1'x8" 2-Sd PER SUPPORT `�S,Q�Z� v zo < AREA OF1000-43-05-08:18,500SF(o.424 AC) TO TIE LINES ATTACHED NAILING SCHEDULE. I"x 10" OR WIDER 3-8d PER SUPPORT GULL P O N Co INLET /y O Of O AREA OF,000-43-05-08:14,483 SF(o.ggz AC) TO TIDAL WETLANDS BOUNDARY LL > > (NYSDEC ADJACENT AREA/TOWN OF SOUTHOLD BUILDABLE LAND) K. PLYWOOD SHEATHING TO BE NAILED 8d NA'L5 @ 4" O.C. EXTERIOR EDGES AND Gd NAILS @ 12" CEILING SHEATHING DAL WETLAND BOUNDARY,AS DELINEATED BV � ui z W O.C. INTERMEDIATE. SEE ATTACHED NAILING SCHEDULE. EN-coNsuLTANTs 0NAu6usT6,2o2, J < hpr} r GYPSUM WALLBOARD 5d coolers 7"EDGE/ 10" FIELD Z SOUTHOLD TOWN EXISTING LOT COVERAGE: Robert 1. l 1 I Brown L ALL INTERIOR AND EXTERIOR FINISHES TO B= SELECTED BY OWNER. 8Zl � ROOF of EXISTING Hovss: 1.354 SF M. ALL ROOF RAFTERS SHALL BE ATTACHED TO THE PLATE AND STUD WITH GALVANIZED HURRICANE WALL SHEATHING TYPE CONNECTORS BY'SIMPSON" OR APPROVED EQUAL. POR TIMBER PILE FOUNDATIONS, PROVIDE 5TRUCURAL PANEL gd (TABLE 3.9) Q DECK: 186 SHED: 126 Architect P.C. HURRICANE CLIPS AT ALL PERIMETER JOISTS TO GIRDER CONNECTIONS. FIBERBOARD PANELS 8d 3"EDGE/G" FIELD �l ` U M„ TOTAL: 1,66o SF 5. ALL NEW WINDOWS TO BE THERMAL INSULATED LOW E GLASS, WITH ARGON GAS, IMPACT RESISTANT AS � p �<<9L.8S 3 ,66o/1q,g83(BUILDABLE LAND)=,1.5% REQUIRED. FLOOR SHEATHING W 020 Bax Ave. Greenport NY G. LOAD PATHS ARE INDICATED Bi� o@ribrownarchitect.com SECTION DRAWINGS. o SOUTHOLD TOWN PROPOSED LOT COVERAGE: in @ribrownarchitect.com 7. CONNECTIONS SHALL BE BUILT IN ACCORDANCE WITH ANSI/AF/�- PA WCPM-1995.(SEE NAILING 5TRUCURAL PANELS ¢ o PROPOSED HOUSE : 1,5,6 SF SCHEDULE) 8d G"EDGE/ 12" FIELD a to I> t >17! GARAGE: 341 631-477-9752 GREATER THAN I" � �"'�_ f o SCREENED Poaclt: ,Z3 8. FLASHING AT ALL WINDOW AND DOOR OPENINGS SHALL BE EPDM OR APPROVED RUBBERIZED .J Od G"EDGE/G FIELD LL1 EXISTING NATURALVEGETATIONA rowETLANo p FRONT ROOF OVERHANG: 92 DIAGONAL BOARD SHEATHING ¢ BOUNDARY TO REMAIN AS NON-DI URRANCE BUFFER MEMBRANE. r' O M EAST DECK/BALCONY 410 I' OR LE55 2-8d PER SUPPORT ¢ z 4'WIDECLEAREDPATH ! / WEST2ND FLOOR BALCONY: 112 9. FLASHING AT ROOF CONNECTIONS, VALLEYS, CHIMNEYS AND CRICKETS SHALL BE ALUMINUM. = TO BE MAINTAINED ROOF FRAMING 3-8d PER SUPPORT z 0 Ir ! TOTAL: x,594 SF 10. STEP FLASHING SHALL BE USED AT ALL INTERSECTIONS OF SLOPED AND VERTICAL SURFACES, EXCEPT W W )_ 79 ITlsnVIOLATION OFTHE LAW FOR ANY PERSON, C' / / - x,594/14.483(BUILDABLE LAND -1 STEP FLASHING AND COUNTER- AND CAP- FLASHING SHALL BE USED AT INTERSECTION OF ROOF AND RAFTER TO TOP PLATE (TOE-NAILED) 3 PER RAFTER > 1 Y o F- FENCE C/LMITIOFSIE ! UNLESSACT[NGUNDERTHEDIRECTIONOPA CHIMNEY, AND ROOF AND WALLS. CEILING JOIST TO TOP PLATE (TOE-NAILED)', 3 PER JOIST F m ¢ DISTURBANCE LICENSED ARCHITECT,TO ALTER ANY ITEM ON 1 1. INSULATION SHALL BE BATT INSULATION OF THICKNESS INDICATED ON THE DRAWINGS AND SHALL BE Q � W Y z 3 EX EDGE OF LA NYSDEC EXISTING LOT COVERAGE: THIS DRAWING IN ANYWAY. ANYAUTHORIZED 2-112 Ib. DENSITY FIBER-GLASS BATTS CONFORMING TO THE SPECIFICATIONS FOR PRE-FORMED CEILING JOIST TO PARALLEL RAFTER(FACE-NAILED) 3 EACH LAP ¢ 0 W J _j J cf EXISTING HOUSE: 1.354 SF ALTERATION MUST BE NOTED,SEALED,AND 7 z DECK AND STEPS: 201 FIBROUS GLA55 INSULATION. NAAMM STANDARD SI, 1 b-70. CLOSED-CELL SPRAY-IN FOAM INSULATION CEILING JOIST LAPS OVER PARTITION ((FACE-NAILED) 3 EACH LAP I"' ¢ -j `' m w 9 DESCRIBED IN ACCORDANCE WITH THE LAW. W :) U- (A SHED: 126 (R-G.5 PER INCH) BY ICYNENE OR APPROVED EQUAL SHALL BE PROVIDED AS INDICATED ON DRAWINGS. RIDGE STRAP(EACH END) 2 PER TIE W W cn = o a -� PROP. -F TWIDE,APPRo p- DRIVEWAY AND PATO: 752 '^ z (� BDO SF ON URF BUFFER 12. NEW INTERIOR DOORS SHALL BE "'""". BLOCKING TO RAFTER(TOE-NAILED) 2-8d EACH END co O O O NOTE w o TOTAL 2,441 SF 13. NEW HARDWARE SHALL MATCH EXISTING. RIM BOARD TO RAFTER(END-NAILED) 2-I Gd EACH END z z GRATHERE CWILL BE HANGE O {r A' z.441/,q,g83(ADJACENT AREA)=15.x% z GRADE CHANGES/ Of 14. GYPSUM BOARD SHALL BE EASED EDGE TYPE, CONFORMING TO ASTM C3G, AND SHALL BE NE,DRY S NO IMPORTED FILL f z �ED1�,q 6'DIA G��''""•`•�''� ' WALL FRAM I NG Q E GE OF LAW 11 ¢ NYSDEC PROPOSED LOT COVERAGE: �, 1xt+ "SHEETROCK SW" BY U.S. GYPSUM CO. OR APPROVED EQUAL. GYPSUM WALLBOARD THICKNESS SHALL BE EXISTING SHED TO BE EX EDGE OF LAWN 3 PROPOSED HOUSE : 1, 16 SF TOP PLATE TO TOP PLATE (FACE NAILED) 2-IGd PER FOOT = REMOVED z 5 Z 112" F- 3,. PORCH c ENED U GARAGE: 341 Q p' TOP PLATES AT INTERSECTIONS (FACE-NAILED) 4-IGd JOIST EA.SIDE Z FALCH D '' SCREENED PORCH AND STEPS: 1 �. 15. ALL NEW AND REPAIRED GYP. BOARD SHALL BE TAPED AND SPACKLED THREE (3) COATS. ALL EXTERIOR „2sF.PAVERS RALco ABOVE C) -� m 4° CORNERS SHALL HAVE METAL CORNER BEADS. STUD TO STUD (FACE-NAILED) 2-IGd 24"O.C. C NSANDPATIO 1 1 „°SI'w009UFICX AE6 O FRONT ROOF OVERHANG: 92 IC AN I) 17 BE WOOD ST (L p 0- EASTDECK/BALCONY AND STEPS: 27 HEADER TO HEADER(FACE-NAILED) IGd I G"O.C.ALONG EDGES 175E 4'x4'3" a.".. WOOD ST s 4 WOOD STEPS w WEST 2ND FLOOR BALCONY/DECK: 112 FIN ISH ES TOP OR BOTTOM PLATE TO STUD (END-NAILED) 2-1 Gd,3-1 Gd,4-1 Gd PER 2x4, 2xG, 2x8 RESPECTIVELY n j I' CY WEST'STEPS BEYOND ROOF OVERHANG: 5 V I . NEW FLOORS SHALL BE AS DESIGNATED ON THE FINISH SCHEDULE. BOTTOM PLATE TO FLOOR JOIST, BAND JOIST, ZS` W CONCRETE PADS(@ GARAGE&A/C UNITS): 9 PROPOSED(4'x 4') t 3 471 SHOWER ENCLOSURE I PROPOSEDI„p6SF. 4 BEDROOM i STORY HOUSE t PAVERS IN SAND' 112 / r 2. EXISTING WOOD FLOORS SHALL BE SANDED AND REFINISHED. END J015T OR BLOCKING (FACE-NAILED) 2-IGd PER FOOT OVER GRAVEL BED PIPED E- I o O fticw TO ZONE,DRYWE LLS ATTACHED E FF El.no.o' d- 3. CERAMIC TILE FLOOR SHALL BE SELECTED BY OU/HERS AND INSTALLED WITH THIN to X I �-E FLOOR FRAM I NG W ap TOTAL: 2,792 Sp ,/ OHI'STORY I A CONTROL PANEL � SLI ADHESIVE. CONCRETE PADS FOR HEAT DO d I. ^GARAGE ELECTRIC POWER LIN FuruRj x,792/14,483(ADJACENT AREA)=19.3% JOIST TO SILL, TOP PLATE TO GIRDER O gg4„S1. qa SF ROOF 4. EXTERIOR PAINT SHALL BE LATEX ACRYLIC BY BENJAMIN MOORE OR APPROVED (TOE-NAILED) 4-8d PER JOIST PUMPS I FFFL.86' OVERHANG 1- M " ,.,, V3 � � �6-B'Cia X2'D TALL 39 SF CONC LL UT,,\'_ON CONCRLTL PA`O (�1 LEACHING RINGS EQUAL, APPLIED IN ACCORDANCE WITH MANUFACTURER'S SPECIFICATIONS AND BRIDGING TO JOIST(TOE-NAILED) 2-8d EACH END Z EXISTING OIH ELECTRIC AND AP ON D4 TBAIRLINE , ° CABLE LINES TO BE BURIED "/ • ' "DR INLINE • ALL LEACHING CLIENT/OWNER RECOMMENDATIONS. COLOR TO BE SELECTED. BLOCKING TO JOIST(TOE-NAILED) 2-8d EACH END O ' UTURE) EI EMENTS TO BE EXISIINGUIG / • O a PRECAST CONCRETE 5. EXISTING INTERIOR WALLS AND CEILINGS IN ROOMS AFFECTED BY THE WORK SHALL BLOCKING TO SILL OR TOP PLATE(FACE-NAILED) 3-1 Gd EACH BLOCK WATER SERVICE (/�) PER SCDHS STANDARDS BE CLEANED AND REPAINTED. NEW WALLS AND CEILINGS SHALL BE SEALED AND I-EDGE STRIP TO BEAM (PACE-NAILED) 3-i Gd EACH JOIST "' EMOVEC D CAIN AOW S ^" O rn PAINTED. PAINTING SHALL BE TWO (2) COATS BENJAMIN MOORE AQUA PEARL LATEX J015T ON LEDGE TO BEAM (TOE-NAILED) 3-8d PER JOIST 3g' ��� vEav�ous Rnv^ dwATERMETER �•z DANIEL & SUZANNE PAINTED, COLOR TO BE SELECTED BAND J015T?O JOIST(END NAILED) 3-IGd PER JOIST ZON1211IL11 125 G. INTERIOR TRIM SHALL BE SANDED SMOOTH, PRIMED, AND FINISHED WITH TWO (2) fZ N4.21 O W 2 ) 6'. ' A . 3'6"D 125. 0 D IVINEY COATS BENJAMIN MOORE LATEX ACRYLIC SEMI-GLOSS FAINT . BAND JOIST TO SILL OR TOP PLATE (TOE-NAILED) 2-IGd PER FOOT NOTE: ENTIRE PROPERTY IS WITHIN _E E'I w UTIL P LE ROOF SHEATHING FEMA FLOOD ZONE AE6. FLOOD UTIL. POLE 6SFSTERS qprn�°aSFUNCO LRED DRAINAGE CALCULATIONS OVERHANG DECK PROPOSEDI/A TQRI STKUCURgL PANELS 8d (TABLE 3.8} EDGE PAVEMENT SANITARY SYSTEM HVAC ZONE LINE IS NOT APPLICABLE � LO ZONE 1(GARAGE,FRONT COLONADEAND SOUTH MAIN ROOF): 1 . PROVIDE ALL LABOR, MATERIALS, TRANSPORTATION, EQUIPMENT AND SERVICES DIAGONAL BOARD SHEATHING co L6 1,249.9SFx0.17=212.5 CF NECESSARY TO PROVIDE A HVAC SYSTEM TO HEAT AND COOL THE LIVING SPACES I"XG" OR 1"x8" 2-6d PER SUPPORTLw w PROVIDE(3)6'DIA x36"D DRYWELLS(234.6 CF) AS INDICATED ON THE PLANS AND A5 REQUIRED BY THE RESIDENTIAL CODE OF NEW I"x 10" OR WIDER 3-8d PER SUPPORT ZONE 2(NORTFI MAIN ROOF): PROJECT TITLE YORK STATE 2020, OR REASONABLY IMPLIED AS NECESSARY TO COMPLETE TO CEILING SHEATHING Q BAY ROAD 796.o SF X 0.17= 135.3 CF WORK. PROVIDE(2)6'DIAx3'6"DDRYWELLS(156.4CF) NEW RESIDENCE 2. PROVIDE AIR-HANDLERS, DUCTWORK, AND CONTROLS A5 NECESSARY TO GYPSUM WALLBOARD 5d coolers 7"EDGE/ 10" FIELD PUBLIC WATER IN STREET COMPLETE THE WORK FOR AIR CONDITIONING IN ALL ZONES. WALL SHEATHING = ' PLUMBING 5TRUCURAL PANEL 8d (TABLE 3.9) V 100' 75' PUBM W T PUBLIC W ON 57' PUBLIC W W 50' S0 oo BAY ROAD, GREENPORT, NY OWEWNC ON PUBUC WATER PUBUC WATER PUBUC WATER 4 PUBUC WATER SCTM No 1000-43-05-o8 I. PROVIDE ALL LABOR, MATERIALS, TRANSPORTATION, EQUIPMENT, AND SERVICES FIBERBOARD PANELS Q 7/1 G" 8d 3"EDGE/G" FIELD NECESSARY TO COMPLETE ALL NEW PLUMBING WORK REQUIRED BY THE DRAWINGS m (JOHN METZGER AND SPECIFICATIONS AND THE RESIDENTIAL CODE OF NEW YORK STATE 2020, OR 25/32" 8d 3"EDGE/G" FIELD ) GYPSUM WALLBOARD 5d coolers 7"EDGE/ 10" FIELD S I T E PLAN LAST DATED OCTOBER 29,2021 DRAWING TITLE REASONABLY IMPLIED AS NECESSARY TO COMPLETE THE WORK. SCTM No.1o00-43-05-o8 2. CONFORM TO THE NEW YORK STATE ENVIRONMENTAL CONSERVATION LAW WITH HARDBOARD Sd (TABLE 3.9) Z I1 I REGARDS TO WATER SAVING AND CONSERVATION. ALL FIXTURES SHALL BE ON THE PAKTICALBOARD PANELS 8d (TABLE 3.9) Q 1 = 20 18,500 sf to TIE LINES SITE PLAN APPROVED "LIST OF CERTIFIED WATER SAVING PLUMBING FIXTURES" AS PUBLISHED BY DIAGONAL BOARD SHEATHING THE NEW YORK STATE DEPARTMENT OF ENVIRONMENTAL CONSERVATION. I"xG" OR I"x8" 2-8d PER SUPPORT GENERAL NOTES 3. ALL WORK ON THE PLUMBING SYSTEM SHALL BE PERFORMED BY OR UNDER THE I"x 10"OR WIDER 3-8d PER SUPPORT SUPERVISION OF A PROPERLY LICENSED MASTER PLUMBER. UPON COMPLETION, THE PLUMBER SHALL PROVIDE A SOLDER CERTIFICATE AS REQUIRED BY THE TOWN OF FLOOR SHEATHING SOUTHOLD. 5TRUCURAL PANELS SCALE 4. THE CONTRACTOR SHALL OBTAIN, SUBMIT, AND PAY FOR ALL PERMITS, I" OR LE55 861 GTDGE/ 12" FIELD REV.SEPT. ,2o23 NOTED CERTIFICATIONS, LICENSES AND INSPECTIONS ASS REQUIRED BY LOCAL, STATE, AND GREATER THAN I" I Od G"EDGE/G" FIELD DRAWING NO. FEDERAL AUTHORITIES, AND ANY OTHER APPLICABLE JURISDICTION. DIAGONAL BOARD SHEATHING FROM TABLE N 1 102. 1 .2 (R402. 1 .2) INSULATION AND FENESTRATION REQUIREMENTS BY COMPONENT I"XG" OR I"x8" 2-8d PER SUPPORT I"x 10"OR WIDER 3-8d PER SUPPORT GLAZED eA5I7MFNT SLAB CRAWL CLIMATE FENESTRATION SKYLIGHT FFNESTRATIN CEILING WOOD FRAME MA55 WALL FLOOR WALL PI-VAI UE 6 SPACE WALL ZONE U-FACTOR U-FACTOR SHGC R-VALUE WALL R-VALUE R-VALUE R-VALUE R-VALUE DEPTH R-VALUE 4 0.35 0.55" 0.40 49 200P 13+5 8/ 13 19 10/ 13 10,2FT 10/ 13 ISSUES/ REVISIONS HARDWARE SCHEDULE NO. LOCATION DESCRIPTION MAKUNIODEL FINISH NOTES D00R SCHEDULE No. LOCATION SIZE MODEL MAKE SWING HARDWARE NOTES I CRAWLSPACE DOOR HASP AND PADLOCK STAINLESS STEEL HINGES STAINLESS STEEL TO BE SELECTED BY OWNERS: EXTERIOR 2 MAIN ENTRY DOOR PLUMBING SCHEDULE CRAWLSPACE No. ROOM ITEM QUANTITY NOTES Ci CRAWLSPACE ACCESS 4-0" W x 2'-0" H CUSTOM CUSTOM PAIR I PAINTED WOOD HINGED GLASS WEATHER SHIELD ASHLAND BRUSHED NICKEL OUTSWING 3 DOORS HINGED DOOR HANDLE SQUARE BACK PLATE PVD FIRST FLOOR I KITCHEN SINK I 4 INTERIOR CLOSET DUMMY KNOBS WITH MAGNETIC TOP EMTEK PROVIDENCE SATIN NICKEL REGULAR ROSETTE, I ENTRY 3'-4" x 8'-0" 2 PAIR ATCHES PRIVACY OPERATION 2 KITCHEN DISHWASHER I PAIR EMTEK 3.5" x 3.5"5QUARE 2 BEDROOM I 2-6080 SIGNATURE WEATHERSHIELD OUTSWING HINGES CORNER PLAIN BEARING SATIN NICKEL 3 KITCHEN DISHWASHER I MORTISE HINGES 3 SUNROOM 1-3180 SIGNATURE WEATHERSHIELD LHR 3 INSWING 4 KITCHEN REFRIG/ICEMAKER I 4 SUNROOM 1-3 180 SIGNATURE WEATHERSHIELD LH - OUTSWING 5 INTERIOR DOOR KNOB EMTEK PROVIDENCE SATIN NICKEL REGULAR ROSETTE, PASSAGE PRIVACY OPERATION 5 POWDER ROOM TOILET I 5 SUNROOM/GREATROOM 1-3180 SIGNATURE WEATHERSHIELD RHR 3 INSWING EMTEK 3.5" x 3.5"SQUARE HINGES CORNER PLAIN BEARING SATIN NICKEL 6 POWDER ROOM LAVATORY I G GREAT ROOM 2-GO80 SIGNATURE WEATHERSHIELD PAIR MORTISE HINGES OUTSWING 7 BATHROOM I LAVATORY I 7 GARAGE 310" x 810" THERMA-TRU REED LH 7 SSF 1100 (20 MIN. FIRE RATED) 8 BATHROOM I LAVATORY I G INTERIOR DOOR KNOB EMTEK PROVIDENCE SATIN NICKEL REGULAR ROSETTE, PRIVACY PRIVACY OPERATION SECOND FLOOR EMTEK 3.5" x 3.5"SQUARE 9 BATHROOM I TOILET I HINGES CORNER PLAIN BEARING SATIN NICKEL 8 FAMILY ROOM 2-GO80 SIGNATURE WEATHERSHIELD PAIR MORTISE HINGES 10 BATHROOM I SHOWER I INSWING 9 BEDROOM 2 2-6080 SIGNATURE WEATHERSHIELD PAIR 11 BATHROOM I TUB I OUTSWING 7 KEYED LOCKSET/ KNOB 10 FAMILY ROOM 2-6080 SIGNATURE WEATHERSHIELD PAIR THUMB TURN 12 EXTERIOR SOUTH HOSE BIBB I OUTSWING 11 BEDROOM 3 2-GO80 SIGNATURE WEATHERSHIELD PAIR 13 EXTERIOR EAST OUTDOOR SHOWER/ HOSE 1 OUTSWING BIBS 8 POCKET DOOR CONTINUOUS TRACK GRANT#1200 ALUMINUM WITH 2 EA STOPS #1213 12 BEDROOM 4 2-GO80 SIGNATURE WEATHERSHIELD PAIR WITH 2 EA CARRIERS 14 EXTERIOR WEST HOSE BIBB I OUTSWING I SET PER DOOR FLOOR TRACK GRANT#1 10 FLOOR GUIDE AT 15 LAUNDRY WASHER I INTERIOR INTERIOR OF POCKET MARCH 31,2023 PULLS, CONCEALED EDGE PULUFLUSH HANDLE ACCURATE EALED SCREWS B FLUSH US 1 5 2 PER DOOR IG LAUNDRY FLOOR DRAIN I ACCURATE 2000 SPRING THESE PLANS ARE AN INSTRUMENT OF FIRST FLOOR SERVICE AND ARE THE PROPERTY LOADED ELDGf- PULL PUSH US 1 5 I PER DOOR 17 GUEST BATH SHOWER I ARCHITECT. INFRINGEMENTS L THE BUTTON BE PROSECUTED 13 CLOSET 4'0" REVERSE x 8'0" PAIR 4 (2) 2'0" x 8'0" 18 GUEST BATH TOILET 2022 ALL RIGHTS RESERVED I 14 CLOSET 2'G" x 810" RHR 5 19 GUEST BATH LAVATORY I 15 BEDROOM 1 218" x 8'0" RH G 9 BI-FOLD DOOR DUMMY KNOB EMTEK PROVIDENCE SATIN NICKEL HEAVY DUTY W/TOP TRACK ONLY 20 BATHROOM 2 LAVATORY I IG CLOSET 210" x 810" POCKET 8 Robert I. Brown 21 BATHROOM 2 LAVATORY I Architect P.C. 17 BATHROOM 1 210" x 8'0" RH G 20 Bax Ave. Greenport NY 18 MUDROOM 2'G" 8 x 10" 10 GARAGE DOOR MOTORIZED OPENER WITH LIGHT REMOTE CONTROL 22 BATHROOM 2 TOILET I info@rlbrownarchitect.com 19 POWDER ROOM 216" x 81 0" 631-477-9752 LHR G 23 BATHROOM 2 SHOWER I FIN1511 SCHEDULE SECOND FLOOR 24 BATHROOM 2 TUB I IT IS A VIOLATION or THE LAW FOR ANY PERSON, No. ROOM FLOOR WALL5 CEILING 13ASEMOLD CEILING MOLD NOTES UNLESSACTING UNDERTHE DIRECTION OFA LICENSED ARCHITECT,TO ALTER ANY ITEM ON 20 BEDROOM 2 218" x 810" RH G CRAWLSFACE 25 EXTERIOR NORTHEAST HOSE BIBB I THIS DRAWING IN ANYWAY. ANY AUTHORIZED ALTERATION MUST BE NOTED,SEALED,AND 001 CRAWL5PACE WA N/A N/A N/A N/A N/A DESCRIBED IN ACCORDANCE WITH THE LAW. 21 CLOSET 210" x 810" POCKET 8 22 BATHROOM 2 216" x 810" RH FIRST FLOOR �REDA,4 ROVIDED BY OWNERS.TO BE 5ANDED AND STAINED.3 COATS POLY FINISH ` C'�' 101 GREAT ROOM RECLAIMED WOOD GYP.BD. GYP.BD. RBS WM753 OLOR TO BE SELECTED. 10"W BOARDS TO BE GLUED AND FACE NAILED(2 23 BEDROOM 3 2'G" x 8'0" R G 6,T EACH END OF EACH BOARD) USE SQUARE HEAD SCREWSa QO aNl kAk r�y 102 KITCHEN RECLAIMED WOOD GYP.BD. BFADBOAPD PANELS WINDOW SCHEDULE 24 CLOSET 210" x 70" RHR 4 (2) 11811 x G'8" V, ;r'r GYP.BD.WITH AZEK BEAD SIZE MODEL MANUFACTURER LITES QUANTITY NOTES * " • 103 MUDROOM CERAMIC TILE BOARD WAINSCOTING TO 42" GYP.BD. rl r� 25 LINEN CLOSET 2'8" x 8'O" RHR 4 AFF WITH CHAIR RAIL TOP A 2'G"X 2'G" CUSTOM I I INSERT BY OWNERS �U GYP.BE.WITH AZEK BEAD O yE 104 POWDER ROOM CERAMIC TILE BOARD WAINSCOTING TO 42" GYP.BD. 2G BEDROOM 2 210" x 710" LH G APF WITH CHAIR RAIL TOP B 1'-9'9" x G'-4 Z" WDH 18G2 ANDERSEN 400 SERIES DOUBLE HUNG/TEMPERED ROVIDED BY OWNERS.TO BE SANDED AND STAINED,3 COATS POLY FINISH. WOODWRIGHT GLASS 105 BEDROOMI RECLAIMED WOOD GYP.BD. GYP. BD. RBS WM753 OLOR TO BE SELECTED. 10"W BOARDS TO BE GLUED AND FACE NAILED(2 T EACH END OF EACH BOARD) USE SQUARE HEAD SCREWS ANDERSEN 400 SERIES 27 CLOSET 2 G x 80 BI-FOLD 9 GYF.BD.WITH AZEK BEAD "X 4°FLAT AZEK ROVIDED BY OWNER5.TO BE SANDED AND STAINED.3 COATS POLY FIN15H C 7'-G" x 4'-5 WOODWRIGHT 1 I MULTI-GLIDE PASS-THRU CLIENT/OWNER I OG CLOSET RECLAIMED WOOD BOARD WAINSCOTING TO 42" GYP.BD. RBS WM753 TRIM BOARD OLOR TO BE SELECTED. 10"W BOARDS TO BE GLUED AND FACE NAILED(2 8 28 LAUNDRY 210" x 'O" LH 5j GYP.DD.WITH AZfK BEAD AFF WITH CHAIR.RAIL TOP T EACH END OF EACH BOARD) U5E SQUARE HEAD SCREWS D 2'-7 ANDERSEN 400 SERIES DOUBLE HUNG/TEMPERED DAN & SUE 107 BATHROOM I CERAMIC TILE BOARD WAINSCOTING TO 42" GYP.BO. g' X G'-4�" WDH 2662 I 7 WOODWRIGHT / I GLASS AFF WITH CHAIR RAIL TOP ANDERSEN 400 SERIES DOUBLE HUNG/TEMPERED DIVINEY 29 GUEST BATH 2'G" x 8'O" LH G 108 UNCONDITIONED DECKING AZEK TRIM BOARDS AZEK BEAD BOARD E 2'-7 g" x G'-4 8" WDH 2662 910 4 GLASS sUNROOM WOODWRIGHT 109 GARAGE 2"SLAB h"GYP.BD.(FIRE RATED) j"GYP.BD. F 2'-5 J" x G'-4 illWDH2462 ANDERSEN 400 SERIES 9/ 9 2 DOUBLE HUNG/TEMPERED ATTIC WOODWRIGHT GLASS G 1'-9 8" x 3'-4 8" WDH 1832 ANDERSEN 400 SERIES 1 / I 2 DOUBLE HUNG/TEMPERED 30 TOP OF STAIRS 3'0" x G'8" SECOND FLOOR WOODWRIGHT GLASS LHR 5 ANDERSEN 400 SERIES DOUBLE HUNG /TEMPERED PROJECT TITLE 'ROVIDED BY OWNERS.TO BE 5ANDED AND STAINED.3 COATS POLY FINISH i ��i 201 FAMILY ROOM/HALL RECLAIMED WOOD GYP,BD. GYP.BD. OLOR TO BE SELECTED. 10"W BOARDS TO BE GLUED AND FACE NAILED(2 H 2—I a x G�-4 (5 WDH 2062 WOODWRIGHT 1 / I 4 GLASS AT EACH END of EACH BOARD) USE SQUARE HEAD scREws ANDERSEN 400 SERIES I I 0 DOUBLE HUNG /TEMPERED NEW RESIDENCE GARAGE BD.WITH AZEK BEAD I 2'-5 8" x G'-4 8" WDH 2462 / I 202 GYP.GUEST BATH CERAMIC TILE BOARD WAINSCOTING TO 42" GYP.BD. WOODWRIGHT GLASS EGRESS YP WITH AZ RAIL TOP GmANDERSEN 400 SERIES DOUBLE HUNG/TEMPERED 400 BAY ROAD,GREENPORT, NY G .BD.WITH 1rH AzeK BEAD J 2'-5 8�" x4'-0 Z" WDH 243 I 0 I / I 8 31 GARAGE REAR 5'0" x 8'0" CUSTOM CARRIAGECUSTOM CARRIAGE PAIR I CUSTOM CARRIAGE DOORS 203 LAUNDRY CERAMIC TILE BOARD WAINSCOTING TO 42" GYP.BD. 8 WOODWRIGHT GLASS DOORS DOORS OUTSWING AFP WITH CHAIR RAIL TOP ROVIDFD BY OWNERS.TO BE SANDED AND STAINED.3 COATS POLY FINISH 32 GARAGE DOOR 810" x 9'0" CANYON RIDGE CLOPAY OVERHEAD 10 DESIGN 33 TOP 13 204 BEDROOM 2 RECLAIMED WOOD GYP.BD, GYP.BD. O OCHOP DE SELECTED.EACH BO RD) BOSSARDS TO BE GLUED AND SQUARE HEAD SCREWS ACE NAILED(2 DRAWING TITLE ROVIDED BY OWNERS.TO BE SANDED AND STAINED.3 COATS POLY FINISH SCHEDULES 205 BEDROOM 3 RECLAIMED WOOD GYP.BD. GYP.BD. OLOR TO BE SELECTED. 10"W BOARDS TO BE GLUED AND FACE NAILED(2 T EACH END OF EACH BOARD) USE SQUARE HEAD 5CREW5 'ROVIDED BY OWNERS.TO BE SANDED AND STAINED.3 COATS POLY FINISH NOTES 20G BEDROOM 4 RECLAIMED WOOD GYP.BD. GYP.BD. OLOR TO BF SELECTED. 10"W BOARDS TO BE GLUED AND FACE NAILED(2 T EACH END OF EACH BOARD) USE SQUARE HEAD SCREWS ROVIDED BY OWNERS.TO BE SANDED AND 5TAINED.3 COATS POLY FINISH 207 CLOSET RECLAIMED WOOD GYP.BD. GYF. BD. OLOR TO BE SELECTED. 10"W BOARDS TO BE GLUED AND FACE NAILED(2 T EACH END OF EACH BOARD) USE SQUARE HEAD SCREWS SCALE GYP.BD.WITH AZD';BEAD REV Sept.6,2023 1"=20' 208 BATHROOM 2 CERAMIC TILE BOARD WAINSCOTING TO 42" GYP.BD. Aff WITH CHAIR RAIL TOP DRAWING NO. ATTIC 301 ATTIC/STORAGE °ADVANTECH GYP.BD. GYP.BD. SUBFLOOR .2�/F, 302 ATTIC/STORAGE ADVANTECH GYP.BD. GYP.BD. 5UBFLOOR ISSUES/REVISIONS B C D A10 All All 2L'-6" _ I I 2'-6" � 21 I F- (3) 2"X 10" P.T. r (3) 2"X 10" P.T. r J L J L (3) 2"X 10" P.T. N i� 2'I I � � 2._G.. 'n (3) 2"X 10" P T. � 2'-G" N G'-10" G'-10" 12'-5" N L J v (3) 2"X 10" P.T. r `n 11-2 3,_5 L — _ I N L J 1 3'-1 1 3/4" 1 1 37-5 114" 15-5" I I -4" I 2 --3'-b" — — — — — — — — — — — — — — — — — — — — — — — — — AIR VENT TYPICAL. I 3 �t I !•?� I PROVIDE TOTAL 10 EA. CRAWLSPACE AREA 1373 _ ELEV. = 6.5' i 0 ,'t I SF. EACH VENT COVERS — I •;. I 10" 150 SF, Cn •! I--- - - - - - - — — N UNFINISHED CRAWL 5PACE —� ',`"+:: +`,.'..• '•'• • • •e A - •• ' - 001 •� - - - - - - - - - -.� • L- - .* - - 5 - - Fr;: :;�.: ':; �••r' ";;;,,� � 4"TH POURED CONCRETE SLAB IN = I m UNFINISHED CRAWL SPACE I •':' 1. ;' FLUSH WITH SURROUNDING G DE. I THESE PLANS ARE AN INSTRUMENT OF Q SERVICE AND ARE THE PROPERTY OF THE ,. PROVIDE CONTROL JOINTS AS I m b ARCHITECT. INFRINGEMENTS WILL SHOWN. p BE PROSECUTED 2' 2G'-I" p zona ALL RIGHTS RESERVED ..� 3 0 I +,• i o _ . I N �T _ Robert I. Brown • 1 I G"x I G" FILLED CONCRETE m Architect P.C. �. BLOCK PIERS > :� I I • I 10'-7 IO'- "� 10' '-7GARAGE - I I A I 0 20Ba AVe. Greenport NY c I in?o@ribrownarchitect.com 631-477-9752 m I I CONCRETE SLAB ON GRADE Ln I •,; x. w i / •. G IT IS A VIOLATION OF THE[AW FOR ANY PERSON, UNLESS ACTING UNDER THE DIRECTION OFA r•.• ?•• ` J :•' 3-8 LICENSED ARCHITECT,TO ALTER ANY ITEM ON •�f �';r:�=�•�- THIS DRAWING IN ANYWAY.ANY AUTHORIZED r 3' b' ALTERATION MUST BE NOTED,SEALED,AND ElDESCRIBED IN ACCORDANCE WITH THE LAW. In .. .: ,A.,. -;;' .•:' ,a... .. .. ,ti. •,.*;..�. � Q O til, V" � �a .f� •�n i- a �.1i;.a:;Y..'i,�, 10'-G 2'-I I 10 7-5" r, 9 O 10" 1 I J `.. i< - LT r - f rl rs `gyp�oz� O T T -J Lp� 2'-3" T 10'-I" 2'-3" T 13'-G 112" 13'-G 112" 9'-9 112" 14-7" 20-5" CLIENT/OWNER 7b'-5" DAN & S U E DIVINEY FOUNDATION PLAN 0' 5' 10' 15' PROJECT TITLE 73 NEW RESIDENCE 400 BAY ROAD, GREENPORT,NY DRAWING TITLE FOUNDATION PLAN SCALE REV.SEPT.5,2o2371/4"=1'-0" DRAWING NO. ISSUES/ REVISIONS B C D A10 All All G'-I P, 24'-0" G'-I I" 12'-3" 2'-g" 3G" H. GUARD RAIL WITH 2" SQ. PAINTED WOOD BALUSTERS AND N GAS FIRED GRILL m N PROVIDE-4z"x 4"TREX DECKING. COLOR TO BE SELECTED COVERED DECK N Ln O OO O O O Y 37-8" O D F 0 QO 0-2" 10'-10" D 3'-2 112" nE) 4'-I -10" D -2 I/2" D4' I/2 UNCONDITIONED 1 I'-2 112" PATIO RAD LEVEL > I I SUNROOM O i O 108 011 JI m O O O cn 1 KITCHEN DESIGN FN ABRICATION m 3 N ELEV. = G.5' AND INSTALLATION BY OTHERS m O5 N `p DO w f� Lu POSED RECLAIMED WOOD 2'-5" 2'-7" i- Nz O S R z o o EAM ABOVE PROVIDED BY U G H H H Q O N z � OTHERS, INSTALLED BY 2 2'-I 3 v i CONTRACTOR N UN THESE PLANS ARE AN INSTRUMENT OF T f�1 VII AND ONE E THE PROERRLOF THE ARCHITECT. INFRINGEMENTS 3'-10 1/2" ' 3" 3 I 4'-G 1/2" Q I BE PROSECUTED5- BLUEST ON L-JI o CONCRETE DEAFENING 0 I I p o 2022 ALL RIGHTS RESERVED JN1 �t GREAT ROOM r-—--1:; ffe.=io.o' UNDERCOU TER II BATHROOM I �.o ER I GARB GE C N I 8" 7 iq 1 KITCHEN -ll p I DROOM I 107 I Q3 i BEADBOARD PANEL CEILING Robert I. Brown 3-1/2" HEAVY DUTY 0-/I> L_JI N N STEEL COLUMN TO Lu CD 102 w - 105 1 -5 N Architect, P.C. CONCRETE FOOTING IQ - 17 BELOW u- N = a� 3G" HIGH HANDRAIL �' - E 2( 0 35 Bax Ave. Greenport NY TO CODE Im 12'-0" J z A lnffo@rlbrownarchitect.com GARAGE I= Q 3-1/2" HEAVY DUTY STEEL A I 0 631-477-9752 COLUMN TO ONCRETE For-] Lui��I`OOTING BEL WWALK-IN CLOSETS G I OJ O o DE OUTFITTED -------------------- IT IS A N or THE LAW FOR ANY d 18 15 BYQTHERS UNLESS AOC'TINGOUNDERTHEDIRECCTIONOFASON, ffe. 7.5' = N (V LICENSED ARCHITECT,TO ALTP"R ANY ITEM ON � O MUDROOM � I THIS DRAWING W ANY WAY. ANYAUTHORIZ,ED ALTERATION MUST BE NOTED,SEALED,AND 103 N NDESCRIBED IN ACCORDANCE WITH THE LAW. z FOYER 3'-9" 7-5 112" PROVIDE " FIRECODE GYP. CCB B r BD WALLS AND UNDER ROOFN19 3'I /2" 3'-2 I/2' 3'-G" �D A, C ALL 31-011 USE FIRE-RATED CAULKING AT =N I13 ALL GAPS. O Do POWDER ROOM � U I !nING OI EGRESS EGRESS " 104 UNDER I/2" ROOF = 4'-1 1" 1 2'-3" 4'- '-7 1/2" 10'-G" 2' I I" 9'-2" 3'-5 112" 1 1'-2 112" B PAVING UNDER ROOF UA r N N 2'-2 1 2' 10'-3" 2-2' ❑ ❑ CLIENT/OWNER 27-2" fl 14'-7 112" DAN & S U E DIVINEY PROJECT TITLE FIRST FLOOR PLAN NEW RESIDENCE 01 51 10, 151 40o BAY ROAD, GREENPORT, NY r7l r77771 DRAWING TITLE FIRST FLOOR PLAN SCALE REV SEPT.6,2023 1/4" DRAWING NO. ISSUES/ REVISIONS B C D A10 All All T 36" H. GUARD RAIL WITH 2"SQ. PAINTED WOOD BALUSTERS AND 2-1/4" MAHOGANY OVAL TOP FREE-STANDING GAS FIRE PIT PR VIDE APPROPRIATE GAS LINE AND ELECTRIC PROVIDE 4"x 4"TREX Q DECKING. COLOR TO BE N BALCONY DECK SELECTED 12'-1 1" 36" H. GUARD RAIL WITH 2" SQ. 1 O 10 O PAINTED WOOD BALUSTERS AND 2-114" MAHOGANY OVAL TOP H12 BALCONY DECK r 25 O O U_j O B 2'-I" 2'-5" 2'-7" THESE PLANS ARE AN INSTRUMENT OF SERVICE AND ARE THE PROPERTY OF THE 13'-I I I/4" O CH H ARCHITECT. INFRINGEMENTS WILL BE PROSECUTED 1 0'-10" BLUESTONE HEARTH ON zozz ALL RIGHTS RESERVED BEDROOM 3 CONCRETE DEAFENING n BEDROOM 2 BEDROOM 4 205 I I 206 0 204 m Robert I BATHROOM 2 . Brown 2 8 FAMILY ROOM 208 Architect, P.C. N 24 20I ®. ' 20 Ba Ave. Greenport NY 14± 1/2" w �� �� �� :; 22 P 22 2 1 In?o@ribrownarchitect.com 5'-4 1/2 3'-2' 2- 1112" '-9" 2'-9" 3'-2 I/2" 631-477-9752 3" H x 5" CURB AROUND ( 4 1/2" cz WASHER/DRYER AS 2L z SHOWN 23 I z WALK-IN CLOSETS 26 EXPOSED RECL�4IMED WOOD TO BE OUTFITTED A 1 0 IT IS A VIOLATION OF THE LAW FOR ANY PERSON, � O COLLAR TIES OVE CLOSET LAUNDRY ROOM CABINETRY AUNDRY O O BY OTHERS DESIGN FABRICATION AND °� 3 25 2 I 207 LICEUNLESS ACTING UNDER THE DIRECTION OFA 203 2 20 II II II THISNSED ARCHITECT,TO ALTER ANY ITEM ON DRAWINGINANYWAY. ANYAUTHORIZ D INSTALLATION BY OTHERS ALTERATION MUST BE NOTED,SEALED,AND I DESCRIBED IN ACCORDANCE WITH THE LAW. 8'-6 3/4" ED'�'�G \ � O F, C\j LO lo GUEST BATHg U ' O 202 v BALCONY DECK O I O CLIENT/OWNER DAN & SUE DIVINEY SECOND FLOOR PLAN PROJECT TITLE lip NEW RESIDENCE 40o BAY ROAD, GREENPORT,NY DRAWING TITLE SECOND FLOOR PLAN SCALE rev. SEPT.6,2023 1/4" =1'-0" DRAWING NO. ISSUES /REVISIONS B C D A10All All BALCONY DECr, BELOW 0 0 0 0 17-0 112" 5'-3 3/4" 5'-3 3/4" 5'-3 3/4" 4'-8 112" o� in LOW HEADROOM 15'-G 112" 1 1'-2 112" I 22'-8" - THESE PLANS ARE AN INSTRUMENT OF SERVICE AND ARE THE PROPERTY OF THE ARCHITECT. INFRINGEMENTS WILL BE PROSECUTED 2022 ALL RIGHTS RESERVED 13'-10" N N Robert I. Brown ® — N ATTIC/STORGE CATHDRAL CEILING IN Architect, P.C. \ utieatdl51t oNc-a- BEDROOM BELOW :_r 205 Bad Ave. Greenport NY info@ribrownarchitect.com 301 N 4'-4 112" 31-477-9752 10'-3" m A O A10 — IT IS A VIOLATION OF THE LAW FOR ANY PERSON, UNLESS ACTING UNDER THE DIRECTION OFA LOW HEADROOM LICENSED ARCHITECT,TO ALTER ANY ITEM ON ch THIS DRAWING IN ANY WAY. ANY AUTHORIZED ALTERATION MUST RE NOTED,SEALED,AND 30 DESCRIBED IN ACCORDANCE WITH THE IAW. N i 2'-0 _ D 15'-G 112" I P-2 112" sir r i• � LOW HEADROOM Lnvl,d" 8'-1 112" 5'-3 3/4" 5-3 3/4" 5-3 3/4" O Uj 0 0 CLIENT/OWNER DAN &. SUE DIVINEY PROJECT TITLE NEW RESIDENCE A T T I C PLAN 40o BAY ROAD, GREENPORT, NY 01 51 10, 15' DRAWING TITLE IL ATTIC PLAN SCALE REV SEPT. 6, 2023 1/4"=1'-0" DRAWING NO. ISSUES/REVISIONS B C D A10 All All BALCONY DECK N N � N m THESE PLANS ARE AN INSTRUMENT OF 0 O SERVICE AND ARE THE PROPERTY OF THE ARCHITECT. INFRINGEMENTS WILL O o n BE PROSECUTED O cJn O 2022 ALL RIGHTS RESERVED (f7 (n N N L N N O LnO 0 p W W Robert I. Brown N Architect, P.C. 0 20 Bad Ave. Greenport NY o N N info@ribrownarchitect.com u, N N 631-477-9752 o O A 0 O A10 Q IT IS A VIOLATION OF THE LAW FOR ANY PERSON, uj UNLESS ACTING UNDER THE DIRECTION OF A N � _ O LICENSED ARCHITECT,TO ALTER ANY[TEM ON (n (n THIS DRAWING IN ANY WAY. ANY AUTHORIZED 2 ALTERATION MUST BE NOTED,SEALED,AND N N n DESCRIBED IN ACCORDANCE WITH THE LAW. m n a_ cq N O Lu 0 0 ��, ��y�F.3,q Q O �y�. &� k` e. S•, w (n N `n CLIENT/OWNER 0 BALCONY DECK w DAN & SUE DIVINEY ROOF PLAN PROJECT TITLE NEW RESIDENCE 40o BAY ROAD, GREENPORT, NY DRAWING TITLE ROOF PLAN SCALE MARCH 31,2023 1/4'=1'-0" DRAWING NO. / �— SPARK ARRESTOR AND CHIMNEY CAP ISSUES REVISIONS FIELD STONE VENEER ON CHIMNEY PER ARCHITECT'S SAMPLE OP Of RIDGE EL + 40' - G ' MIN. 40 YEAR MIN. 40 YEAR IF FIBERGLASS/ASPHALT ARCHITECTURAL ROOFING SHINGLES ARCHITECTURAL MIN. 40 YEAR ROOFING SHINGLES FIBERGLASS/ASPHALT HORIZON ARCHITECTURAL RDI PLAN ROOFING SHINGLES IPLAP SID (TYPICAL) 1 TOP OF WINDOW EL. +28" - 4" 1 BATHROOM CEILING EL. +28" - 4" O MIN. 40 YEAR �O FIBERGLASS/ASPHALT ARCHITECTURAL ROOFING SHINGLES f SECOND FLOOR EL. + 20' -4" I FINISH CEILING EL. +1 9' -0" tGPAE)E A I G" WH ITE 'R R' SHINGLES" EXPOSURE O a-) PROVIDE 2'SQ x 2-1/2" 15LUE5TC N E CAP O !� WITH ROUGH I-IffWN EDGES b u (TYPICAL) ALIGN OM OF CAP WITH P i EXPOSED FOU ION WALL GRADE A I G"WHITE I CEDAR'R t R SHINGLE FIRST FLOOR EL. + 10' - 0" WITH 5" EXPOSURE ut� OL i P P P P GRADE EL. +G' - 0" MARCH 31,2023 WEST FRONT ELEVATION 5i I °i 15i THESE PLANS ARE AN INSTRUMENT _ SERVICE AND ARE THE PROPERTY OFF THE ARCHITECT. INFRINGEMENTS WILL BE PROSECUTED 2022 ALL RIGHTS RESERVED TOP Of RIDGE EL. + 40' - G ' Robert I. Brown 3 r— 12 Architect, P.C. 2o Bax Ave. Greenport NY into@ribrownarchitect.com 631-477-9752 GRADE A I G"WHITE Ak TOP OF WINDOW EL. +35' - G CEDAR'R�- R'SHINGLES WITH 5" EXPOSURE 12 IT IS A VIOLATION OF THE LAW FOR ANY PERSON, 5 UNLESS ACTING UNDER THE DIRECTION OF A LICENSED ARCHITECT,TO ALTER ANY ITEM ON THIS DRAWING IN ANY WAY. ANY AUTHORIZED ALTERATION MUST BE NOTED,SEALED,AND 12 AIC F DESCRIBED IN ACCORDANCE WITH THE LAW. + � _ 12 10.25 4 F FINISH CEILING EL. +291 - 4" TOP OF WINDOW EL. +28" -4" __ r CLIENT/OWNER SECOND FLOOR EL. +20' - 4" DAN & SUE FINISH CEILING EL. + 19' - 0" D IVINEY TOP OF WINDOW EL. +18' - 0" l 1 PROJECT TITLE I NEW RESIDENCE ! 40o BAY ROAD, GREENPORT, NY f t t 1 FIRST FLOOR EL. +10' - 0" I 2666 2666 DRAWING TITLE t 0 ELEVATIONS WEST AND SOUTH GRADE AND FEMA ELF€GEL.G4 G' - SCALE REV SEPT. 6, 2023 1/4"=1'-0" SOUTH SIDE ELEVATION 51 10, ► 5i - DRAWING NO. ISSUES/ REVISIONS TOP OF RIDGE EL. + 40' - G ' 12 3r-- GRADE A I G" CEDAR'Rt R'SHINGLES GRADE A I G"WHITE WITH 5" EKPOSURE T P F WINDOW EL. +35' - G 3' CEDAR'R t R' S WITH 5" EXP 12 8.5 ATTIC FLOOR EL. +30' - 71" FINISH CEILING EL. +29' -4" _ TOP OF WINDOW EL. +28" -4"_- GRADE A I G"WHI-E =_ CEDAR'R f R' SHIgGL WITH 5" EXPOSUR= O 12 5 r— SECOND FLOOR EL. +20' -4" N � FINISH CEILING EL. +1 9' -0" O o� TOP Of WINDOW EL. + 18' -0" m N In c� O � O 63 @iii LES FIRST FLOOR EL. + 10' - 0" GRADE ANDFEMA B.F.E. EL. +G' - 0" 01 51 10, 5' MARCH 31,2023 NORTH S I D E ELEVATION THESE PLANS ARE AN INSTRUMENT OF SERVICE AND ARE THE PROPERTY OF THE ARCHITECT. INFRINGEMENTS WILL BE PROSECUTED 2022 ALL RIGHTS RESERVED 24" LEAD COATED Robert I. Brown COPPER FLASHING Architect, P.C. T P FRIDGE El_. + 40 G MIN. 40 YEAR 20 Bax Ave. Greenport NY FIBERGLASS/ASPHALT 24" LEAD COATED lnf.o@rlbrownarchitect.com ARCHITECTURAL 24" LEAD COATED ROOFING SHINGLES COPPER FLASHING 631-477-9752 COPPER FLASHING 24" LEAD COATED MIN 40 YEAR COPPER FLASHING FIBERGLASS/ASPHALT A� TOP OF WINDOW EL. +35' - G�" IT IS A VIOLATION OF THT LAW FOR ANY PERSON, MIN. 40 YEAR ARCHITECTURAL ` T UNLESS ACTING UNDER THE DIRECTION OFA ROOFING SHINGLES LICENSED ARCHITECT,TO ALTER ANY ITEM ON FIBERGLASS/ASPHALT THIS DRAWING IN ANY WAY. ANY AUTHORIZED ARCHITECTURAL ALTERATION MUST BF.NOTED,SEALED,AND ROOFING SHINGLES DESCRIBED IN ACCORDANCE WITH THE LAW. MIN. 40 YEAR FIBERGLASS/ASPHALT x_ 7 C �D P. ♦��i~C r.8� � ARCHITECTURAL ATTIC FLOORL. +30' 1" ROOFING SHINGLES FINISH CEILING EL +29' -4" v �cvrr� TOP OF WINDOW EL. +28"-4" ❑ € 24" LEAD COATED ' `� COPPER FLASHING �I`v CLIENT/OWNER J l MIN. 40 YEAR 1 FIBERGLASS/ASPHALT DAN & SUE ARCHITECTURAL I V ROOFING SHINGLES SECOND FLOOR EL. +20' - 4° D IVINEY FINISH CEILING EL. +19' - 0" i TOP OF WINDOW EL. + 16 -0" ■ IPE SHOWER GRADE A I G"WHITE PROJECT TITLE ENCLOSURE CEDAR'R 4 R'SHINGLES 1 WITH 5" EXPOSURE NEW RESIDENCE 40o BAY ROAD, GREENPORT,NY DRAWING TITLE FIRST FLOOR EL. +10' - 011 ELEVATIONS 4 EAST AND NORTH k g ,. nARn FAc',('IA SCALE GRADE AND FEMA BFE EL. +G' -0" REV Aug.i8, 2023 1/4"-l'-0" 2866 " HARDI BOARD DRAWING NO. ATTACHED TO SUPPORT PIERS ITH 01 51 10, 151 EAST ( REAR ) ELEVATION CONSTRUCTION ADH 7 J"SPRAY-IN CLOSED CELL FOAM ALUMINUM STEP FLASHING. ISSUES/REVISIONS INSULATION (R-50) �, CD-X PLYWOOD RATE[SHEATHING I ,,x I.. i z" SPRAY-IN MIN. 40 YEAR T P F RIDGE EL. + 40' - G ' ' I h LOSED CELL FOAM FI ERGLASS/ASPHALT NSULATION (R-50) ARCHITECTURAL ROOFING SHINGLES ALUMINUM STEP FLASH NG. ALUMI UM STEP FLASHING. t ALUMINUM STEP FLASHING. F Ln CATHEDRAL CEILING 7 z"SPRAY-IN 2xG STUD FRAMING, TYP. CLOSED CELL FOAM 2" SPRAY-IPJ CLOSED CELL FOAM INSULATION (R-1 3) INSULATION (R-50) +30'- 1 PLUS EXPOSED 3"X 8" DRESSED COLLAR TIES 3 " F.G. BATT INSULATION (R-1 5) FINISH CEILING EL. +291 - 4" FOR WHOLE A55Y MIN. R-29 O WALL/CEILING BREAK : , ;_ TOP OF WINDOW EL +28" -4" 14 TJI 5GO @ I G" O.C. ALUMINUM STEP FLASHING. R-22 BATT INSUUATION 0 RECLAIMED WOOD FLOORING FURNISHED AND INSTALLED BY OTHERS 3/4"ADVANTECH SUBFLOORING SECOND FLOOR EL. +20' -4" i { • *•' )$ FINISH CEILING EL. +1 9' - 0" 14"TJI 5GO @ I G" O.C. TOP OF WINDOW EL. + 18' - 0" R-22 BATT IN5LUATION PROVIDE GLASS DOOR O 8"TH POURED CONCRETE ENCLOSURE AND FRESH FOUNDATION WALL W/(2) #5 AIR INTAKE AS PER COD REBAR CONTINUOUS TOP RECLAIMED WOOD FLOORING FURNISHED AND AND BOTTOM (TYPICAL). INSTALLED BY OTHERS 3/4" ADVANTECH 5UBFLOORING 1-3/4"x 9-1/4" MICROLLAM @ I G" O.C. FIR5T FLOOR EL. +I C'- 0" 4"TH. POURED CONCRETE SLAB WITH GXG/I OX 10 WWM REINFORCING i. E.- LATEHIMS AS NECE55ARY(TYP) 2" POUREDI G" SQ CONCRETER-22 BATT INSUUATION CONCREETE SLAB BLOCK PIER _E Oiv1PACTED FILLEAS1REQUIRED EL +G 0" ... _ k GRADE { F i.(3) ' , F l ':• 1 , 1 i ._, �. ., .,. ,_: € ���__ �$...__. I� ;_� t:.r r;�.,. ••i j"` 1 -s —_I.• t 'd. •e`:'• .._ �_._ i .A .. � ( tr :RI_uHR.., N t iPvu I r I > ,�r 2 I�P.COE ; . .. .: t , t 7-�--•. ; . .,� .. ..:....'•.__ 1_ 4�'- ..»,. k__�.�... "__.. •'4: �-e:�'r�-sI. - I �. �. aJS fi v I .. � ,3, C Jti..R,E E t i I •_ _, i :�- � •' - t � ��.,. t _.. i k {( r i e "-"_� '"-i 4 F t . Tll�l ,,��A�'; 'S�f� I r 1 � - ... - , 1 7- , •'� i._ '<.• 1 -,.. r:c�OTrN�'S . � �� A� I I I._— _ — ,-____• ;-._ _; , !____6 1 ; .._.I 3---� 1 __I � i---` :.�;:�,: _ 1� -». ` �.;�..�_ TCA_ E e 1 { F .__...,...__ F ` ......... _.,..._.._ ._,..... _.... ......... E .« e a• I r t , t '�—• .. , E_A DI TIOPv MI � `Y 1 i ; � s ( I ._.___ i. — ',,_ .,.I .. "y �r. ','E•a' _.E -1 3 !. ----'3 y 1 :•�. ,•+:'•• 'wY,e•:e t , � , I , �, F• BA -'IY i �-�- '_ ».�._ w.� _..._,_ { ; -1 ,— -.. — �:�... .._.. , r _ E- F .i I i _.j THESE PLANS ARE AN INSTRUMENT OF _._..._.,t��. ....t..._.._ :__.,'.._ '^.�..... .».._,_. .__«'_�. 0' 5' 10' 15' 1._._...._ ......._ ................_€ _ _._.."="...I - a , " 1 - ; �_ t.......-...._.F ...............I f ,. - i i _ I SERVICE AND ARE THE PROPERTY OF THE I_.._..._-! _ _ I ._ _ E ----t , I -- 1P. --_-. _ -- i_..i 1 ARCHITECT. INFRINGEMENTS WILL __S E C T 10 N A , I , 1 l , t BE PROSECUTED 2022 ALL RIGHTS RESERVED — TOP OF RIDGE EL. + 40' - G 2' Robert I. Brown TOP OF WINDOW EL. +35' - 6�" Architect, P.C. 20 Bax Ave. Greenport NY info@ribrownarchitect.com 631-477-9752 4" 5UBFLOORING ONLY ATTICFLOOR EL +30' - I IT IS A VIOLATION OF THE LAW FOR ANY PERSON, 2xG STUD FRAMING, TYP. UNLESS ACTINGUNDF.RTHEDIRECTI ON0FA FINISH CEILING EL. +291 - 4" 2"SPRAY-IN CLOSED CELL FOAM INSULATION (R-13) LICENSED ARCHITECT,TO ALTER ANY ITEM ON PLUS THIS DRAWING IN ANY WAY. ANY AUTHORIZED ALTERATION MUST BE NOTED,SEALED,AND TOP OF WINDOW EL. +28" - 4"91- 3 J" F.G. BATT INSULATION (R-15) DESCRIBED INACCORDANCE WITH THE LAW. FOR WHOLE A55'Y MIN. R-29 t Q'' (2) 2x8 HEADER, TYP. vC� SECOND FLOOR EL. +20' - 4" �t k FINISH CEILING EL. +I e' -0" TOP OF WINDOW EL. +18' -0" CLIENT/OWNER DAN & SUE I? ' DIVINEY � o G"x G" P.T. POST I BUILT OUT AND CLAD E r WITH J"AZEK BOARDS TO 10"SO. PROJECT TITLE FIRST FLOOR EL. + 10' - O" j NEW RESIDENCE G"x G" P.T. POST CLAD ON EXPOSED SIC 40o BAY ROAD, GREENPORT, NY I"x 10" HARDI BOARD SITTING OVER HORZIONTAL BOARDS AS SHOWN ON � " •� PROVIDE METAL PROVIDE META ELEVATIONS JOIST HANGERS HOLDER TO HOLD GIRDER TO POST GALVANIZED METAL POST HOLER DRAWING TITLE GRADE AMD FEMA B.F.E. EL. +G' - 0" " IMBEDDED IN CONCRETE -.. ._ ."..,: .: € t.�_.{ ....._. _ _._— ,,.." _ 3 ,_......:...... _ � € I I— 1 --_-------- DBE — — t _u=.7."f — i i _ I,.. , _...."......„.,. .• _._--.,.[ r ......-._.._...; -...., t 1 _......._.... .._..... __....., -.,.___ _.... 1 .............I .,..., t _ I € —i..._. -il—_ _ ! I...._..._-.� I. _ _ 14--_SONQI DBE t ; I —. :...._,._._,..d F i...............F .k r .: :__. r.'..._........• �.. ..... _.` I,.. I..•,_._.._ I 1....,. i r4r t.� .....7,� .._t kN t i i SECTIONS s ; E s { itt , E F � k s, , ` I _.1 , 1,_.__..w; :__.._.....; SCALE 51 10 15 MARCH 31,2023 1/4'=1'-0" S E C T I O N B - DRAWING NO. i"� ISSUES/REVISIONS TOP Of RIDGE FL, + 40' - Gz' MIN. 40 YE FI BERGLA RAL KO ING SHINGLES 2" CD-X PLYWOOD RATED SHEATHING 7�" SPRAY-IN CLOSED CELL FO ' INSULATION I '• TOP OF WINDOW EL. +28" - 4" - f i 1 _ t (� E `n SECOND FLOOR EL. +20' -4" FINISH CEILING EL. + 1 9' -0" TOP OF WINDOW EL. +18' - 0" 2xG STUD FRAMING, TYP. "5PRA -IN CLO ED CEL FOAM INSULATION (R-13) PLUS 3 1" F. . BATT INSULATION (R-1 5) I'd R WHOLE A55Y MIN. R-29 O 1 FIRST FLOOR EL. +10' - 0" O i GRADE AMD FEMA B.F.E.EL. +G' - , -•-' i t_._.._.._., ;,....._.__._: ,____._..; E # '.(' (_ _.3`E `k. e it 1. _ ! , f , , } 4 E _1 pp E I` THESE PLANS ARE AN INSTRUMENT OF lilt SERVICE AND ARE THE PROPERTY OF THE Ii .__.— # # I............... I �-J I .._.,.ti,_ _,— ....- ....._. E __ ....__.. (,—.._.. ..__.._.... E .__ .E•T E L.._. _'. _.__,' €� ____.i....s,.,.4 ,�.�....i._.i,�; I f�"-I„.',...€. �.I.� f i r i-----1--4 ! '--E—s I I,._�I � , 1 ' {..„i'�� ! _0#__.'..,� • -j.I i i ii � p 1 # i ARCHITECT. ECT. INFR INGEMENTS WILL 1 � BE PROSECUTED 5' w10' 15' 2022 ALL RIGHTS RESERVED S C 1 0N C A9KP - TO OF RIDGE EL. + 40' 6 12 3 F-— Robert I. Brown YEAR Architect P.C. GLASS/ASPHALT ALUMINUM STEP 7 ARCHITECTURAL FLASHING R OFING SHINGLES12 x Ave. Greenport NY --18.5 in?o@ribrownarchitect.com ?"CD-X PLYWOO 631-477-9752 TED SHEAT 7 -IN �\ 12 h C1.05E OAM 12 10.25 IN N (R-50) 4 r IT IS A VIOLATION OF THE LAW FOR ANY PERSON, UNLESS ACTING UNDER THE DIRECTION OF A LICENSED ARCHITECT,TO ALTER ANY ITEM ON ( THIS DRAWING IN ANY WAY. ANY AUTHORIZED TOP OF WINDOW EL. +28"- 4° ALTERATION MUST BE NOTED,SEALED,AND 112" DESCRIBED IN ACCORDANCE.WITH THE LAW. i—Dh.'1 t-A � i ,is I SECOND FLOOR EL. +20 -4" oo 1 io r Iv cam,// = FINISH CEILING EL. +1 9' -0" TOP OF WIND01h' EL. + 1 8'-0" CLIENT/OWNER 0 DAN & SUE 0 DIVINEY I PROJECT TITLE FIRST FLOOR EL. +10'-0" NEW RESIDENCE 400 BAY ROAD, GREENPORT, NY GRADE AND EEM%B.F.E.EL. +G' - G' 1 1-7-71L' _ I"-" I.1.�`�..3•• _. ..E # __ I — S — 72-11 '! E LT— . w 3 --' -! DRAWING TITLE _ -, ( —._.__! € F'--'""""—", t..._.�.. I _..__....{ ._._.,_• __,_._.._ i .. ......,I _.._�.._ ._,»,...._.._ I - E •K• .t .( �...,.._... ...,g .. ,...... t r I ... SECTIONS C & D 4 , ; w , , r t ( I 01 51 101 151 S E C T 10 N D SCALE MARCH 31, 2023 1/4"=1'4' DRAWING NO. ISSUES/REVISIONS (3) 2"X 10" P.T. r 7 r I — J L — J L — Idle 0 L J N I __ L 4"x 10" LEDGER BOARD BOLTED TO FOUNDATION WALL W/(2)4" CARRAIGE BOLTS @ 12"O.C. f- - - - - i II0 6 o U f IN1511ED ClKAWL 5FACIE —� THESE PLANS ARE AN INSTRUMENT OF 00 I SERVICE AND ARE THE PROPERTY OF THE ARCHITECT. INFRINGEMENTS WILL O O m — I BE PROSECUTED r v v = I 2022 ALL RIGHTS RESERVED II II I 0 x X � m m I I g 2 - I r r Robert I. Brown I L, 7 J I O I (2) 13/4" I I-14" MI ROL AM 2) I /4"x I I-1 4" MI ROL AM v ( 1-3/4"x I -1/4" MIC LLA — -� - I -� I Architect, P.C. — —J L_ — - L —t-1 20Ba Ave. Greenport NY o o g Q in?o@ribrownarchitect.com r lu 631-477-9752 GARAGE U x I I I ° I Q I I Io x - IT IS A VIOLATION OF THE LAW FOR ANY PERSON, I CONCRETE SLAB ON GRADE I o O m U UNLESS ACTING UNDER THE DIRECTION OF A LICENSED ARCHITECT,TO ALTER ANY ITEM ON 2 m THIS DRAWING W ANYWAY. ANY AUTHORIZED _ ALTERATION MUST BE NOTED,SEALED,AND DESCRIBED IN ACCORDANCE WITH THE LAW. x �- - -I =4 ZI r - - - - - - - - - - - - - - - - - - - - - - - - - - -j rJ �l17I- 71 F - /El LE�l LEIJ LE�lOWNER CLIENT DAN & SUE DIVINEY PROJECT TITLE FIRST FLOOR FRAMING PLAN NEW RESIDENCE 01 51 10, 15' 40o BAY ROAD,GREENPORT, NY DRAWING TITLE FIRST FLOOR FRAMING PLAN SCALE MARCH 31,2023 1/4"="-0" DRAWING NO. ISSUES/ REVISIONS Q D W o� o P D a oQ o P DOIL S R O ®' v Fr- 13 lovU r 0 O _ THESE PLANS ARE AN INSTRUMENT OF o aU SERVICE AND ARE THE PROPERTY OF THE 0 ARCHITECT. INFRINGEMENTS WILL o u BE PROSECUTED 2022 ALL RIGHTS RESERVED Ln �t �t v f LL 511 B 7TTER BEAD R(3 1-3/ "x 14 LVL /(2) " 5TEf L PLA FE5 -- �- -� Robert I. Brown Architect, P.C. 2055 Bay,Ave. Greenport NY info@ribrownarchitect.com 631-477-9752 IT IS A VIOLATION OF THE LAW FOR ANY PERSON, UNLESS ACTING UNDER THE DIRECTION OFA LICENSED ARCHITECT,TO ALTER ANY ITEM ON LJ I I 'll THIS DRAWING IN ANY WAY. ANY AUTHORIZED ALTERATION MUST RE NOTED,SEALED,AND DESCRIBED IN ACCORDANCE.WITH THE LAW. 0 `1 �v CLIENT/OWNER DAN & SUE SECOND FLOOR FRAMING PLAN DIVINEY 0' 5' 10' 15' PROJECT TITLE NEW RESIDENCE 400 BAY ROAD,GREENPORT, NY DRAWING TITLE SECOND FLOOR FRAMING PLAN SCALE MARCH 31, 2023 1/4" =1'_0" DRAWING NO. ISSUES REVISIONS I W 0 THESE PLANS ARE AN INSTRUMENT OF SERVICE AND ARE THE PROPERTY OF THE ARCHITECT. INFRINGEMENTS WILL 0 BE PROSECUTED 2022 ALL RIGHTS RESERVED o II II II Ln II II Lon II II II II Robert I. Brown FL SHB=TTER IIEAD=-K(3 1-3P x 14 LVL V/(2) 5TE L FLA IFE5 Architect, P.C. 205 Bay Ave. Greenport NY info@ribrownarchitect.com u 631-477-9752 Lj IT Is A VIOLATION OF THE IAW FOR ANY PERSON, UNLESS ACTING UNDFR THE DIRECTION OF A LICENSED ARCHITECT,TO ALTER ANY ITEM ON THIS DRAWING IN ANY WAY. ANY AUTHORIZED I? ALTERATION MUST BE NOTED,SEALED,AND DESCRIBED IN ACCORDANCE WITH THE LAW.. U i*D ATTIC FLOOR FRAMING PLAN CLIENT OWNER 01 51 10, 15' DAN & SUE I L-1-:1 r7l 7.7 7 1 DIVINEY PROJECT TITLE NEW RESIDENCE 40o BAY ROAD, GREENPORT, NY DRAWING TITLE ATTIC FLOOR FRAMING PLAN SCALE MARCH 31,2023 DRAWING NO. 41 ISSUES/ REVISIONS B C D A10 All All BALCONY DECK N � N � O D I] D IL D W tu W W W O J In Cn `n N N THESE PLANS ARE AN INSTRUMENT OF SERVICE AND ARE THE PROPERTY OF THE N N ARCHITECT. INFRINGEMENTS WILL p p BE PROSECUTED 2022 ALL RIGHTS RESERVED D 0 Lu n N 0 0 LO N Ln LuN O N Robert I. Brown co J NN Architect, P.C. O A ?: A,0 20Bay.Ave. Greenport NY D D info@ribrownarchitect.com N631-477-9752 W W o � o N 1 N IT IS A VIOLATION OF THE LAW FOR ANY PERSON, (y) N UNLESS ACTING UNDER THE DIRECTION OFA OO O _ 9 LICENSED ARCHITECT,TO ALTER ANY ITEM ON (\I C) p THIS DRAWING IN ANY WAY. ANY AUTHORIZED W W p ALTERATION MUST BE NOTED,SEALED,AND 0 L D DESCRIBED IN ACCORDANCE WITH THE LAW. Ln � N N O47 O 0 Lu J C:/ C>> ,I L �\ oBALCONY DECK 0 v�V1 W O J (n CLIENT/OWNER R O O F PLAN DAN &. SUE DIVINEY PROJECT TITLE NEW RESIDENCE 40o BAY ROAD, GREENPORT,NY DRAWING TITLE ROOF FRAMING PLAN SCALE MARCH 31,2023 T1/4"=1'-0" DRAWING NO. ISSUES REVISIONS F I F I ❑ I I F-I I I F-1 I L -J L 1 ❑ I I F] I J I I r- — --I I F-1 I I F-I I L -J L -1 42: F— ELECTRICAL LEGEND L UNFINISHED CRAWL SPACE LIGHT 5WITCH Foo 11 • 3 = THREE WAY D = DIMMER �;, f = FAN � LIGHT CONTROL TIMER SWITCH FOR OUTDOOR HEATERS 4" F 0- OUTLET GFI= GROUND FAULT INTERUPT S = 220 VOLT -s 4220= QUAD OUTLET FIXTURE -�s 5= SURFACE MOUNT PROVIDED 13Y OWNER If NO MARKING THEN ASSUME RECESSED; F Lj CONTRACTOR TO PROVIDE F— L=-_JF Iwil CEILING FAN LIGHT Ip —J 10, 10, F0 WALL SCONCE PROVIDED BY OWNER THESE PLANS ARE AN INSTRUMENT OF L INFRARED HEATER: FLUSH MOUNT RE CE55ED SERVICE AND ARE THE PROPERTY OF THE IN CEILING - CD-40 13Y INFRATECH ARCHITECT. INFRINGEMENTS WILL S BE PROSECUTED GARAGE 77 CABLE &— NETWORK CABLE s J, _T9-5V ITCH AT 2021 ALL RIGHTS RESERVED 1 ;'� (� I ❑ 1 FRONT DOOR L.E.D. LIGHT STRIP ALARM KEYPAD CONCRETE SLAB ON GRADE :,'..... THERMOSTAT VENT Robert I. Brown Architect, P.C. CARBON MONOXIDE DETECTOR SD 20 Bay,Ave. Greenport NY SMOKE DETECTOR info@rlbrownarchitect.com 631-477-9752 L IT IS A VIOLATION OF THE LAW FOR ANY PERSON, UNLESS ACTING UNDER THE DIRECTION OF A LICENSED ARCHITECT,TO ALTER ANY ITEM ON L THIS DRAWING IN ANYWAY. ANY AUTHORIZED MUST BE , Fr , Fr , rr -1 DESCRIBEALTERATIOND IN A CCOR DANCENOTEDSEALED,AND WITH THE LAW. NOTE: ALL ELECTRIC SERVICE MUST BES:,A LOCATED ABOVE EL. 8.0' ABOVE M.H.T. CRAWLSPACE PLAN CLIENT OWNER 01 51 10, 15' r7-3 DAN & SUE DIVINEY PROJECT TITLE NEW RESIDENCE 40o BAY ROAD,GREENPORT, NY DRAWING TITLE CRAWLSPACE ELECTRICAL PLAN � o SCALE 23 REV. SEPT.6 2 1/4" =1'-0" DRAWING NO. E ISSUES/REVISIONS GAS FIRED GRILL FA /LIGHT \\ // FAN/LIGHT \\ I \ O D W ---- Oil I \ Wr gyp -- _ L---------- WP — HEATERS ON i WP -- / TIMER SWITCH \ / \ W \ / �N/LIGHT AFF AFF HEATERS I , '— R R, R� TIME ;,-SWITCH 1 �\ ELECTRICAL LEGEND P I FpF �n/ \\ \\ �WP $ LIGHT SWITCH *61ertop \ J \ \ ",' 3 = THREE WAY \\ `' IF = DIMMER N * LIGHT CONTROL \ s \ R I S \\ R / i R P, ® TIMER SWITCH FOR OUTDOOR HEATERS 1 h 6q. \ // \\ OUTLET I r• I /I, I \ / I / \ GFI= GROUND FAULT INTERUPT 220 = 220 VOLT 4 = QUAD OUTLET t I \ I I II \ \ \ \ \ 1 I RFIXTURE : S NOT? PROVIDEITWO — S= SU RFACE MOUNT PROVIDED BY OWNER�d (2) EACH QUAD(FLUSH IF NO MARKING THEN ASSUME RECESSED; THESE PLANS ARE AN INSTRUMENT OF 1 I CONTRACTOR TO PROVIDE SERVICE AND ARE THE PROPERTY OF THE \ ref \ I /34 \ \ FLOOR OUTLET IN I 1 I \ @ —jI 1 I \ GREAT ROOM. 1 \ I \ 6� CEILING FAN/LIGHT ARCHITECT. INFRINGEMENTS WILL 1 / L—J, I I \\ \\ LOCATIONS TO�E \ \ I / 105 \ i —� \\�✓✓/ BE PROSECUTED I I rpr p ` \ R / \ R DETERMINED IN FIELD. \ R / \ 102 �r�ce tacl�e.ifi // FO WALL SCONCE PROVIDED BY OWNER zoal ALL RIGHTS RESERVED I i 1 ———-nun ereor — / \ J \ — INFRARED HEATER: FLUSH MOUNT RECESSED R 'R, /�// // \I \\ i /// IN CEILING - CD-40 BY INFRATECH TV CABLE 5E NETWORK CABLE W 08 I06 / L.E.D. LIGHT STRIP I / \ 3 \\\\ / 4 ALARM KEYPAD Robert I. Brown /� \ CO I J / \ / loll T THERMOSTAT Architect, P.C. ' S-Y WP ® VENT 205 Bay,Ave. Greenport NY / /m, T info@ribrownarchitect.com 103 COCARBON MONOXIDE DETECTOR 631-477-9752 SPOWER FOR HEAT PUMPS 8WP/AS REQUIRED / SD SMOKE DETECTOR W ' T FI TU .E BO E DOOR OPENER WITH LIGHT O S - / - - I WP UNLESS ACTING UNDER IT IS A VIOLATION DER THF.DIRECTION OFA THE LAW FOR ANY PERSON, / \ -i/ 1 04 i \ 3 LICENSED ARCHITECT,TO ALTER ANY ITEM ON _ __ / \ THIS DRAWING IN ANY WAY. ANY AUTHORIZED ALTERATION MUST BE NOTED,SEALED,AND / \ / / DESCRIBED IN ACCORDANCE WITH THE LAW. I \ \ R -// — --//' L N ' . KEYFAI in CLIENT/OWNER FIRST FLOOR PLAN DAN & SUE 01 51 10, 15' DIVINEY PROJECT TITLE NEW RESIDENCE 40o BAY ROAD, GREENPORT, NY DRAWING TITLE FIRST FLOOR ELECTRICAL PLAN SCALE MARCH 31,2023 DRAWING NO. =t:. ISSUES/REVISIONS FREE-STANDING GAS FIRE PIT PROVIDE GAS LINE AND ELECTRIC SERVICE WP � ---(lWP i Y WP `_moi -1 r 1\\ '[7 R P, / \\ WP WP ELECTRICAL LEGEND ' 1 / i $ LIGHT SWITCH DIMMABLE LED LIG 3 = THREE WAY \ \ STRIPS ON TOP Of D = DIMMER AN LIGHT CONTROL \ \ / 3"X 8" COLLAR _ 205 \ \ BEAMS R ® TIMER SWITCH FOR OUTDOOR HEATERS /k y _ ® �`\ I I 20G \\ OUTLET 204 GPI= GROUND FAULT INTERUPT 220 = 220 VOLT THESE PLANS ARE AN INSTRUMENT OF 4 = QUAD OUTLET SERVICE AND ARE THE PROPERTY OF THE FIXTURE : ARCHITECT. INFRINGEMENTS WILL I I y 1 BE PROSECUTED II II II R R R \\� pg S= SURFACE MOUNT PROVIDED BY OWNER _——— If NO MARKING THEN ASSUME RECESSED; CONTRACTOR TO PROVIDE 2021 ALL RIGHTS RESERVED / \ 201 I / CEILING FAN/LIGHT _ P, JI FO WALL SCONCE PROVIDED BY OWNER INFRARED HEATER: FLUSH MOUNT RECESSED // � I I I I I I I IN CEILING - CD-40 BY INFKATECH rj-L� I, H I- N]ELEC. / / I ' I I I I I I TV CABLE 5E NETWORK CABLE Robert I Brown RYER 3 / / I _/ II / II II 5 - Architect P.C. 203 // Sp R / / `\ -64-\ I I // I I I i 207 i L.E.D. LIGHT STRIP —— —— I / p\\ // ——— ALARM KEYPAD 20 Bay Ave. Greenport NY -- co T \ \Q_ _— info@ribrownarchitect.com T THERMOSTAT 1 I / Q 631-477-9752 ASHER 1 � / \� T \� / 3 __5 ® VENT YADN � ( /— \ _— _ �\ I CO CARBON MONOXIDE DETECTOR IT IS A VIOLATION OF THE LAW FOR ANY PERSON, 202 i \ R \ I WP UNLESS ACTING UNDER THE DIRECTION OF A \ I \ I SD SMOKE DETECTOR LICENSED ARCHITECT,TO ALTER ANY ITEM ON \ F XT RE B VE \ I THIS DRAWING IN ANY WAY. ANY AUTHORIZED 0 \ \ I ALTERATION MUST BE NOTED,SEALED,AND \\ \ U \ \\ 1 DESCRIBED IN ACCORDANCE WITH THE LAW. J T S IT:H EL W 3 3 G E eT, Q ui r F Lr cS✓: J F-7 SECOND FLOOR PLAN CLIENT/OWNER DAN & SUE DIVINEY PROJECT TITLE NEW RESIDENCE 400 BAY ROAD, GREENPORT, NY DRAWING TITLE SECOND FLOOR ELECTRICAL PLAN SCALE MARCH 31,2023 1/4' -1'_0" DRAWING NO. ISSUES/REVISIONS BALCONY DECK BELOW LOW HEADROOM ELECTRICAL LEGEND / LIGHT SWITCH 3 = THREE WAY / D = DIMMER F = FAN * LIGHT CONTROL _ ATTIC/STORGE ® ® TIMER SWITCH FOR OUTDOOR HEATERS AIR HANDLER UNCONDITIONED ® OUTLET : GFI= GROUND FAULT INTERUPT THESE PLANS ARE AN INSTRUMENT OF 1 220 = 220 VOLT SERVICE AND ARE THE PROPERTY OF THE 4 = QUAD OUTLET ARCHITECT. INFRINGEMENTS WILL \ FIXTURE : BE PROSECUTED ® 5= SURFACE MOUNT PROVIDED BY OWNER 2021 ALL RIGHTS RESERVED HOT WATER HEATER IF NO MARKING THEN A55UME RECESSED; S S \ S ® CONTRACTOR TO PROVIDE S /�— CEILING FAN/LIGHT i IN\ �,��_–_�� ��`�_–_��� FO WALL SCONCE PROVIDED BY OWNER INFUNT RE IIN CEI ING TCD-40 BY NfRATECHCESSED Robert I. Brown 3 5E \\ TV CABLE NETWORK CABLE Architect, P.C. L.E.D. LIGHT STRIP LOW HEADROOM 205 Bay Ave. Greenport NY 4 ALARM KEYPAD inPo@ribrownarchitect.com 4 THERMOSTAT 631-477-9752 /3 ® VENT IT IS A VIOLATION OP THE LAW FOR ANY PERSON, DI _ 1 CO CARBON MONOXIDE DETECTOR UNLESS ACTING UNDER THE DIRECTION OF A LICENSED ARCHITECT,TO ALTER ANY ITEM ON 5 5 SD SMOKE DETECTOR THIS DRAWING IN ANY WAY. ANY AUTHORIZED ALTERATION MUST BE NOTED,SEALED,AND LOW HEADROOM DESCRIBED IN ACCORDANCE WITH THE LAW. J V+ CLIENT/OWNER DAN & SUE DIVINEY ATTIC PLAN 01 51 10, 15' PROJECT TITLE NEW RESIDENCE 400 BAY ROAD, GREENPORT,NY DRAWING TITLE ATTIC FLOOR ELECTRICAL PLAN SCALE MARCH 31,2023 7 1/4'="-0" DRAWING NO. ISSUES/ REVISIONS 00, GAS FIRED GRILL COVERED DECK D W oho Q r z SCREENED PORCH NOR VENT NOR VENT 0 0 OO NOR VENT �q YA REPRI 1 OR VENT OR VENT I I All n n (::Dx I II II II I J,. _ 101 II II F TC E KICK VENT NOR VE I Q i I I I I I I 07 H 1 1 THESE PLANS ARE AN INSTRUMENT OF _ `L SERVICE AND ARE THE PROPERTY OF THE LL__ JI I I 1 5 I I VN Rd v ARCHITECT.INFRINGEMENTS WILL 102 i I I I I BE PROSECUTED LE 2021 ALL RIGHTS RESERVED I I I I I Al R RET RN IAIR RETURN I VENT ABN9 E II II II 106 108 z II II II ALY DOWN TO u uII Robert I. Brown AIR Tu lJ ffe.=8.0' HANDL DUCTS IN CRAWLSPACE OR VENT Architect, P.C. 103 — Ell, "l< NOR VENT n?o@rlbrownarch tect com � ort NY OR VE IFT 631-477-9752 104 [�q I I I U ( H 14 IT IS A VIOLATION OF THE LAW FOR ANY PERSON, UNLESS ACTING UNDER THP.DIRECTION OF A OR VENT LICENSED ARCHITECT,TO ALTER ANY ITEM ON THIS DRAWING IN ANYWAY. ANY AUTHORIZED ALTERATION MUST BF,NOTED,SEALED,AND DESCRIBED IN ACCORDANCE WITH THE LAW. 1� CLIENT/OWNER FIRST FLOOR PLAN DAN & SUE 01 51 ► o, 15' DIVINEY PROJECT TITLE NEW RESIDENCE 400 BAY ROAD,GREENPORT,NY DRAWING TITLE FIRST FLOOR MECHANICAL PLAN _T SCALE MARCH 31,2023 1/4" 1'_0" DRAWING NO. b I.21"mm"R ISSUES/REVISIONS FREE-STANDING GAS FIRE PIT PROVIDE GAS LINE AND ELECTRIC SERVICE A z 2 H NILING VENT NILING VENT NILING VENT v •,+ C.N. 205 206 THESE PLANS ARE AN INSTRUMENT OF ® D 21 SERVICE AND ARE THE PROPERTY OF THE 204 ARCHITECT. INFRINGEMENTS WILL ,. BE PROSECUTED 2021 ALL RIGHTS RESERVED NILING VENT 20,5 201 18 19 — Robert I. Brown AIR RET RN Architect, P.C. AIR RET RN NILING VENT 2o5 Bax Ave. Greenport NY 20� in?`o@ribrownarchitect.com 203 (LING VENT 631-477-9752 I� ILI G VENT ®I LI N G NT IT IS A VIOLATION OF THE LAW FOR ANY PERSON, UNLESS ACTING UNDER THE DIRECTION OF A LICENSED ARCHITECT,TO ALTER ANY ITEM ON THIS DRAWING IN ANY WAY. ANY AUTHORIZED 202 ALTERATION MUST BE NOTED,SEALED,AND NI I DESCRIBED IN ACCORDANCE WITH THE LAW. a '::,K SECOND FLOOR PLAN CLIENT/OWNER DAN & SUE DIVINEY PROJECT TITLE NEW RESIDENCE 40o BAY ROAD, GREENPORT,NY DRAWING TITLE SECOND FLOOR MECHANICAL PLAN SCALE MARCH 31, 2023 1/4"=i-o" DRAWING NO. I t� ISSUES/ REVISIONS —\BALCONY DECK BELOW LOW HEADROOM AIR HANDLER RUN CROSS DUCT THESE PLANS ARE AN INSTRUMENT OF ALONG CEILING SERVICE AND ARE THE PROPERTY OF THE ARCHITECT. INFRINGEMENTS WILL BE PROSECUTED OT WATER HEATER ® 2021 ALL RIGHTS RESERVED ATTIC/STORGE UNCONDITIONED Robert I. Brown Architect, P.C. LOW HEADROOM 2,oBay,Ave. Greenport NY in?o@ribrownarchitect.com 631-477-9752 D I IT IS A VIOLATION OF THE LAW FOR ANY PERSON, UNLESS ACTING UNDER THE DIRECTION OP A LICENSED ARCHITECT,TO ALTER ANY ITEM ON THIS DRAWING IN ANYWAY. ANY AUTHORIZED ALTERATION MUST BE NOTED,SEALED,AND LOW HEADROOM DESCRIBED IN ACCORDANCE WITH THE LAW. t JET i.`9 � , y CLIENT/OWNER DAN & SUE DIVINEY ATTIC PLAN 0' 5' 10' 15' PROJECT TITLE NEW RESIDENCE 40o BAY ROAD,GREENPORT, NY DRAWING TITLE ATTIC MECHANICAL PLAN SCALE MARCH 31,2023 7 1/4"="-0" DRAWING NO.