Loading...
HomeMy WebLinkAbout1000-55.-2-20 TOWN OF SOUTHOLD BUILDING DEPARTMENT SOUTHOLD,N.Y. NOTICE OF DISAPPROVAL DATE: October 11, 2023 subs TO: Village of Southold LLC RECEIVED 2000 Hobart Rd Southold,NY 11971 C G 12 2023 Planning Board Please take notice that your application dated August 23, 2023: For permit to: t; tl5trttt,t eigh 11 tesla(l char it g,statiotas at: Location of property: 46455 County Road 48 Sout c�I mm.M ` County Tax Map No. 1000— Section 55 Block 2 Lot 20 Is returned herewith and disapproved on the following grounds: Pursuant to Article ; 1 Sectionw280-48 A . the proposed useremres sitepl�an approval oval from the Southold IXcaNyn Pla nina Board. You may now apply to this agency directly. At10iced. Signatttt 0 Note to Applicant: Any change or deviation to the above referenced application, may require further review by the Southold Town Building Department. CC: file, Planning Board H I G I F ( E I D I C I B I A TESLA SUPERCHARGER SOUTHOLD , NY 46455 ROUTE 48 TSSLF:i 3500 DEER CREEK RD. 8 PALO ALTO, CA 94304 SUPERCHARGERS (650)681-5000 6 APN ■ ORIGINAL SIZE 24"X36" ■ 1000 - 055 - 00 � 02 - 20 - 000 SHEET SIZE ARCH"D" „ TRT : 400876 o Y2" 0 NE� Y SITE LAYOUT AERIAL MAP IV - a cl Uj Uj , r+ • ,m..:.. e „ t . . x 4 ro• t EXP 1/ 31124 t 0051 V 1 - r k .r a .. -. ," ..,:,.rte ,,,.T4 a. ,a 4.- -i:. " : ' `.'F` 5 � � � , � � ,;a .� � � — �,' Esso r tip, P r • , . �/ '•f Willia m Digitally signed • by William K Lou ' Date:2023.07.10 K Lou 16:54:24-07'00' ✓ jam • • : _, i. • z 4 • RECEIVE / O • SEP 2 1 2023 ON• � ..= � L--- "' Southold Town AREA OF WORK Planning Board n • • � s _ O c!) .00010N 00-00 U) Uj (D • < n . = L.IJ 00 (D d.. LU LiJ Q N w .� ► 3 W— D—E ' U 0 r V) Q O S , LU = Q �— ABBREVIATIONS PROJECT TEAM DESIGN CRITERIA PROJECT SCOPE SYSTEM SUMMARY SHEET INDEX D 411L IJ U) (.00 AC ALTERNATING CURRENT INSTANTANEOUS GROUND STRUCTURAL ENGINEER OF RECORD: ELECTRICAL ENGINEER OF RECORD: 1. WIND DESIGN INSTALLATION OF SUPERCHARGERS SUPERCHARGER SYSTEM �-- 00 Iq U) ADA AMERICANS WITH DISABILITIES LV LOW-VOLTAGE PZSE STRUCTURAL ENGINEERS BILL LOU, PE, PH. D - DESIGN WIND SPEED = 127 MPH AND NEW PSU 3.0 PRE-ASSEMBLED SUMMARY SHEET # SHEET TITLE ACT LVDC LOW VOLTAGE DIRECT 1478 STONE POINT DR. SUITE 190, PAULICON CORPORATION (ULTIMATE) SUPERCHARGER UNIT, ASSOCIATED AC G-001 COVER PAGE w BLDG BUILDING CURRENT EQUIPMENT QTY ~ ROSEVILLE, CA 95661 3463 ASHTON COURT - RISK CATEGORY = II AND DC EQUIPMENT. Q CLR CLEAR MAX MAXIMUM o COMM COMMUNICATION MIN MINIMUM P:(916)961-3960 PALO ALTO, CA 94306 - WIND EXPOSURE = C G-002 NOTES (650) 269-6888 2. SEISMIC DESIGN INSTALLATION OF CONCRETE PRE-ASSEMBLED UNIT 2 G-101 DEMO PLAN CONC CONCRETE MV MEDIUM-VOLTAGE PAULICONEE@GMAIL.COM - RISK CATEGORY = II EQUIPMENT PADS AND WALKWAYS. DC DIRECT CURRENT (N) NEW SUPERCHARGER POSTS 8 E-101 SITE PLAN SEISMIC IMPORTANCE FACTOR = 1.0 DIA DIAMETER NEC NATIONAL ELECTRIC CODE - SITE CLASS = D INSTALLATION OF NEW PARKING UTILITY TRANSFORMER 1 E-201 SINGLE LINE DIAGRAM DIST DISTANCE NIC NOT IN CONTRACT PROJECT DESIGNER: - Ss = 0.179/ S1 = 0.05 STRIPING, SIGNAGE AND ADA ACCESS SWITCHBOARD 1 E-501 ELECTRICAL DETAILS (E) EXISTING NRTL NATIONALLY-RECOGNIZED CONNOR LYONS - Sds = 0.191 / Sd1 = 0.08 FEATURES. 2 EA. EACH TESTING LABORATORY TESLA, INC. - SEISMIC DESIGN CATEGORY = B E-502 ELECTRICAL DETAIILS EGC EQUIPMENT GROUNDING NTS NOT TO SCALE 15 GRUMMAN ROAD WEST - BASIC SEISMIC-FORCE-RESISTING ASPHALT OVERLAY FOR PROPOSED EV S-301 ENLARGED SITE PLAN CONDUCTOR OC ON CENTER BETHPAGE, NY 11714 SYSTEM = NON-STRUCTURAL ADA STALLS. S-501 STRUCTURAL DETAILS EMT ELECTRICAL METALLIC TUBING PCC POINT OF COMMON COUPLING (650) 681-5000 COMPONENT EQ EQUAL PL PROPERTY LINES COLYONS@TESLA.COM - R = 2.5 / a_p = 1.0 S-502 STRUCTURAL DETAILS ERMS ENERGY REDUCTION PLC POWER LINE COMMUNICATION 3. GROUND SNOW LOAD — 25 PSF - z MAINTENANCE SETTINGS PP POWERPACK _O ESS ENERGY STORAGE SYSTEM PSU PRE-ASSEMBLED co EV ELECTRIC VEHICLE SUPERCHARGER UNIT w GAB GRADED AGGREGATE BASE PV PHOTOVOLTAIC GALV GALVANIZED PVC POLYVINYL CHLORIDE O GEC GROUNDING ELECTRODE RSD RAPID SHUTDOWN z CONDUCTOR SCCR SHORT CIRCUIT CURRENT GFP GROUND FAULT PROTECTOR RATING GND GROUND SCH SCHEDULE HVAC HEATING, VENTILATION, & AIR SQ. IN. SQUARE INCHES APPLICABLE CODES CONDITIONING SS STAINLESS STEEL 2017 NATIONAL ELECTRICAL CODE COVER PAGE 1 1 CURRENT SSBJ SUPPLY SIDE BONDING 2020 NY STATE BUILDING CODE IMP CURRENT AT MAX POWER JUMPER INV INVERTER SSD SEE STRUCTURAL DRAWINGS REFERENCED DOCUMENTS G-001 ISC SHORT CIRCUIT CURRENT STC STANDARD TESTING KVA KILOVOLT AMPERE CONDITIONS PRE-ASSEMBLED SUPERCHARGER UNIT KW KILOWATT TYP TYPICAL INSTALLATION MANUAL JB-1192956-00 KWH KILOWATT-HOUR UON UNLESS OTHERWISE NOTED TOPOGRAPHIC SURVEY LOS LINE OF SIGHT VIF VERIFY IN FIELD LSIG LONG TIME SHORT TIME W WATT UTILITY DESIGN REV; O IFP IJ( 7 PROPRIETARY AND CONFIDENTIAL iL.t1 AI L 1'r c°vr LiJ<.v �"•' u{ ice` y�L_v,.i!'" 1'.._.� H I G I F I E ( D I C I B I A GENERAL NOTES SUPERCHARGER NOTES SCOPE OF WORK SITE LEGEND _ ALL WORK SHALL COMPLY WITH ALL STATE AND LOCAL CODES AND ANY OTHER 1NEUTRAL MUST BE INCLUDED FOR PROPER OPERATION OF TESLA (EXISTING OBJECTS) TESLIn . REGULATING AUTHORITIES WHICH HAVE AUTHORITY OVER ANY PORTION OF THE SUPERCHARGERS. UTILITY PSE&G - LONG ISLAND UTILITY WORK. CATEGORY ITEMS TESLA UTILITY 2. ALL CONDUIT FURNISHED AND INSTALLED BY CONTRACTOR. ALL WIRING �/'i ELECTRIC MANHHOLE 3500 DEER CREEK RD. PRIOR TO COMMENCEMENT OF ANY WORK, THE CONTRACTOR SHALL VERIFY FURNISHED BY TESLA AND INSTALLED BY CONTRACTOR. PRIMARY TRENCHING X PALO ALTO, CA 94304 EXISTING CONDITIONS AND NOTIFY THE DESIGN PROFESSIONAL IN RESPONSIBLE (650)681-5000 6 CHARGE FROM TESLA OF ANY DISCREPANCIES. ANY WORK PERFORMED IN 3. ALL BUSHINGS AND WIRING INTERNAL OF PROPOSED SERVICE EQUIPMENT INSTALL PRIMARY CONDUIT X I, STORM WATER MANHOLE CONFLICT WITH THE CONTRACT DOCUMENTS SHALL BE CORRECTED AT THE PROVIDED BY MANUFACTURER. ANY MODIFICATIONS SHALL REQUIRE INSTALL PULL ROPE X ORIGINAL SIZE 24°xis° SUBCONTRACTORS SOLE EXPENSE. ENGINEERING APPROVAL PRIOR TO ANY CHANGES BEING MADE. PRIMARY INSTALL PRIMARY FEEDERS X TREE SHEET SIZE ARCH"D^ ,h 7 SUBCONTRACTOR INITIATED CHANGES SHALL BE SUBMITTED IN WRITING TO TESLA DURING INSTALLATION. ALL OTHER CONDUCTORS ARE COPPER UNLESS 4. ALL ALUMINUM(AI) CONDUCTORS TO RECEIVE ANTI-OXIDATION COATING PROVIDE PRIMARY FEEDERS X �� o yz ,. FOR APPROVAL BEFORE MAKING ANY CHANGES. DEVIATION FROM PLANS BEFORE OTHERWISE NOTED. PAVEMENT REPLACEMENT X WRITTEN APPROVAL FROM TESLA PLACES LIABILITY ON THE SUBCONTRACTOR. INSTALL TRANSFORMER PAD X (�� MANHOLE 5. THE FOLLOWING CHARGING CABINETS AND THE CHARGING POSTS USED ON �. ALL EQUIPMENT SHALL BE MOUNTED AS SHOWN. WHERE DETAILS ARE NOT THIS PROJECT COMPLY WITH THE FOLLOWING STANDARDS: PROVIDE TRANSFORMER X OF NE y PROVIDED, CONTRACTOR SHALL USE STANDARD CONSTRUCTION PRACTICES. IEC 61851-23: 2014 / EN 61851-23: 2014 TRANSFORMER INSTALL TRANSFORMER X r� WATER VALVE ��Q'`Q� KEGgNQ O,A ALL SURFACES SHALL BE PATCHED AND PAINTED AROUND NEW DEVICES AND . UL 2202: 2009(R2012) INSTALL CONNECTIONS - PRIMARY X '�J�/ * ,� �O ( ) EQUIPMENT TO MATCH EXISTING FINISHES. INSTALL CONNECTIONS - SECD X UE UNDERGROUNDUJI r o� 41 CAN CSA C22.2 NO. 107.1-01(R2011) ELECTRIC LINE mui PROVIDE METERX 2 Li ANY METAL SHAVING.. FROM SITE WORK SHALL BE CLEANED FROM ALL SURFACES 6. THE AFOREMENTIONED STANDARDS IDENTIFY THE REQUIREMENTS MET BY sD UNDERGROUND N EXP 1131124 WHERE OXIDIZED OR CONDUCTIVE METAL SHAVINGS MAY CAUSE RUST, SWITCHBOARD INSTALL METER X STORM DRAIN LINE SOA 095002-1\ THE EQUIPMENT INCLUDING BUT NOT LIMITED TO: ELECTRICAL SHORT CIRCUITS, OR OTHER DAMAGE. LAND SECONDARY FEEDERS X ROF NP 5 • PROTECTION AGAINST ELECTRIC SHOCK -UG- UNDERGROUND GAS ESS10 APPROVALS FROM BUILDING INSPECTORS SHALL NOT CONSTITUTE AUTHORITY TO . OVERLOAD AND SHORT CIRCUIT PROTECTION SECONDARY TRENCHING X LINE DEVIATE FROM THE DRAWINGS. INSTALL SECONDARY CONDUIT X • FAULT PROTECTION INSTALL PULL ROPE X of--- OVERHEAD ELECTRIC NEW PAVEMENT INSTALLED AS PART OF THIS PROJECT SHALL MATCH EXISTING SECONDARY LINE PAVEMENT SECTION. ASPHALT AND GAB DEPTHS SHALL BE MAINTAINED. DEGREES OF PROTECTION AGAINST ACCESS TO HAZARDOUS LIVE INSTALL SECONDARY FEEDERS X ss UNDERGROUND PARTS PROVIDE SECONDARY FEEDERS X [ELECTRICAL - • THE INTERNAL COMPONENTS OF THE SYSTEM ARE PROPRIETARY. PAVEMENT REPLACEMENT X SANITARY SEWER LINE >- [= L E CT R I CA L NOTES ANY QUESTIONS CONCERNING ACTUAL INTERNAL PROTECTIVE z DEVICES MUST BE COORDINATED DIRECTLY WITH TESLA. RE__C_E_ _I_VED GENERALNOTES 7. TESLA SUPERCHARGER SIGNAL WIRING RATED 1000V AND USED FOR SEP 2 1 2023 POWER LIMITED CLASS 1 CIRCUITS SHALL BE PERMITTED TO RUN IN _- _____ 1. ALL ELECTRICAL WORK SHALL COMPLY WITH THE NATIONAL ELECTRIC CODE Southold Town AS AMENDED BY APPLICABLE STATE AND LOCAL CODES. CONDUITS, CABLE TRAYS, WIRE WAYS, OR RACEWAYS ALONG WITH 0 Planning Board ASSOCIATED DC CONDUCTORS AS ALLOWED PER NEC 725.48(B)(1) AND 2. ALL WIRING SHIALL BE MANAGED IN A PROFESSIONAL, WORKMAN-LIKE 620.36. MANNER AND MUST BE SUPPORTED, SECURED, AND PROTECTED TO 4 PREVENT DAMAGE. 8. SUPERCHARGER CABINET AC CONDUCTORS SIZED UNDER ENGINEERING SUPERVISION USING THERMAL MODELING SOFTWARE. SPECIFICATIONS 0 3. AC CIRCUIT CONDUCTORS SHALL BE IDENTIFIED BY PHASE AND SYSTEM PER ABOUT THE TRENCHING REQUIREMENTS ARE SHOWN IN E-501 ART 210.5 OR 215.12. UNLESS OTHERWISE REQUIRED BY ART 210.5(1) OR AHJ, I COLOR-CODING OF POWER CONDUCTORS SHALL BE AS FOLLOWS: 9. FOR DC RUNS IN EXCESS OF 330 FEET, CONTACT TESLA. CONDUCTOR 277/480V 120/208V 10. UNDERGROUND CONDUITS SHALL BE SCHEDULE 40 PVC OR UL LISTED PHASE A BROWN BLACK HDPE. THE ABOVEGROUND PORTION OF AN UNDERGROUND/ABOVEGROUND W PHASE B ORANGE RED TRANSITION SHALL BE SCHEDULE 80 PVC OR UL LISTED HDPE. PHASE C YELLOW BLUE 11. ABOVEGROUND CONDUITS EXPOSED TO VEHICULAR OR EQUIVALENT NEUTRAL. GRAY WHITE PHYSICAL DAMAGE SHALL BE RMC. ABOVEGROUND CONDUITS NOT Q EXPOSED TO VEHICULAR OR EQUIVALENT DAMAGE SHALL BE PERMITTED = L J 4. DC CIRCUIT CONDUCTORS SHALL BE IDENTIFIED PER ART 210.5 OR 215.12: TO BE EMT. r 1 (D >_ CONDUCTOR STD COLOR ALT COLOR v CORED RED-STRIPED 12. IF APPROVED BY TESLA CONSTRUCTION MANAGER, ALTERNATIVE CONDUIT fy � W z MATERIALS SUCH AS FLEXIBLE OR FIBERGLASS ARE PERMISSIBLE IF W Q �-- DC- BLACK BLACK-STRIPED INSTALLED PER MANUFACTURER INSTALLATION GUIDELINES AND LOCAL _ 0 5. TERMINATIONS OF AC, DC, AND COMMUNICATIONS CONDUCTORS SHALL BE CODES. U O J 3 PROFESSIONALLY AND LEGIBLY LABELED WITH CIRCUIT SCHEDULE 13. WIRE SPLICES ARE NOT PERMITTED TO EXTEND WIRE RUN LENGTH. U) 0 IDENTIFIER, CONDUCTOR SIZE (AS APPLICABLE) AND TERMINATION TORQUE. CONTRACTOR IS RESPONSIBLE FOR RERUNNING FULL LENGTH OF WIRE IF W 6. ALL EQUIPMENT SHALL BE LISTED BY A NRTL IN COMPLIANCE WITH ART 110.3. RUN LENGTH IS MISCALCULATED. Q LO WHERE EXISTING NRTL LISTING CANNOT BE MAINTAINED, ENGINEERING J m I- 14. SPECIAL INSPECTION IS REQUIRED FOR ALL POST-INSTALLED CONCRETE APPROVAL SHALL BE OBTAINED PRIOR TO EQUIPMENT MODIFICATION, AND ANCHORS. U THE EQUIPMENT SHALL BE RELISTED BY A SUITABLE NRTL. W 0 15. PLANT GUARANTEE: CONTRACTOR SHALL GUARANTEE ALL PLANTS FOR A �--. U) 7. UNDERGROUND CONDUCTORS & CABLES TO BE INSTALLED IN CONDUIT LION. 15. OF ONE (1) YEAR FROM DATE OF PROJECT ACCEPTANCE BY THE 8. ALL WIRES SHALL BE PROVIDED WITH STRAIN RELIEF AT ALL ENTRY INTO OWNER. CONTRACTOR IS RESPONSIBLE FOR PLANT MAINTENANCE FOR w BOXES AS REQUIRED BY NRTL LISTING. THE FIRST GROWING SEASON. 0 9. REFER TO MANUFACTURER'S CURRENT PLANNING AND INSTALLATION 16. IF EXISTING GRASS IS DAMAGED/REMOVED DURING CONSTRUCTION, MANUAL FOR TORQUE SPECS FOR ALL BOLTS AND TERMINAL CONNECTIONS. CONTRACTOR SHALL APPLY SEED PER HYDROSEED METHOD. RATING OF SEED SHALL BE PER DISTRIBUTOR BASED ON SPECIES TYPE. 10. ALL CONDUCTOR TERMINATIONS ON BUSSING OR TRANSFORMER SPADES SHALL BE MADE WITH HIGH-PRESS CRIMP LUGS UON. 17. CONTRACTOR SHALL MATCH EXISTING LANDSCAPE; USE GRASS, RIVER ROCK, MULCH ETC. TO MATCH EXISTING LANDSCAPE AROUND EQUIPMENT, 2 11. ALL TERMINATIONS OF ALUMINUM CONDUCTORS SHALL BE PROPERLY UNLESS OTHERWISE NOTED. INSTALLED WITH BEST PRACTICES INCLUDING BUT NOT LIMITED TO: • USE OF TERMINATION EQUIPMENT RATED FOR ALUMINUM AT THE 18. CONTRACTOR TO INSTALL WEED BARRIER IN FRONT OF SUPERCHARGER CONDUCTOR TEMPERATURE, CURRENT, AND VOLTAGE CABINETS AND SWITCHBOARD. BARRIER TO EXTEND FULL WIDTH AND • ALLOWANCE FOR MOVEMENT DUE TO THERMAL DEPTH OF NEC REQUIRED WORKING CLEARANCES. EXPANSION/CONTRACTION • PROPER COATING OF EXPOSED ALUMINUM WITH ANTI-OXIDIZATION z0 COMPOUND U) • USE OF CALIBRATED DEVICES TO TORQUE AND MARK TERMINALS TO w REQUIRED SETTINGS Of 12. DUCT SEAL COMPOUND SHALL BE APPLIED WHEREVER CONDUITS O TRANSITION INDOOR/OUTDOOR OR UNDERGROUND/ABOVEGROUND. REFER z TO EQUIPMENT- NOTES FOR ADDITIONAL DUCT SEAL REQUIREMENTS. 13. BELL ENDS SHALL BE INSTALLED WHEREVER CONDUIT ENTERS EQUIPMENT FROM UNDERGROUND AND WHEREVER POTENTIAL FOR DAMAGE TO NOTES CONDUCTORS IS PRESENT AT ANY POINT. BELL ENDS SHALL NOT PREVENT THE USE OF GROUNDING FITTINGS OR COUPLERS WHEN REQUIRED. 14. ALL STUB-UPS WITHIN FLOOR-MOUNTED EQUIPMENT SHALL BE 3-5" ABOVE FINISHED GRADE. -002 15. ALL CONDUITS EXPOSED TO VEHICULAR OR EQUIVALENT PHYSICAL DAMAGE SHALL BE RIGID GALVANIZED STEEL. JB-1192956-00 16. GROUND LUGS SHALL BE RATED FOR THEIR ENVIRONMENT AND CONDITION OF USE. REV: 0 IFP PLOT DATE: 7(1012023 11:13 AM IPEREZCARREON PROPRIETARY AND CONFIDENTIAL H I I F I E I I c I B I a NOTES TESL (E) PROPERTY THE. ' ' THE CONTRACTOR SHALL REFER TO THE LINE C TRENCHING DETAILS ON THE ELECTRICAL 3500 DEER CREEK RD. - DETAILS SHEET. PALO ALTO, CA 94304 _ 1 \ (650)681-5000 THE LIMITS OF HARDSCAPE REMOVAL ARE SHOWN AS FOR INFORMATION ONLY AND ORIGINAL SIZE 24"X36" �. IT SHALL BE UP TO THE CONTRACTOR TO SHEET SIZE ARCH"D" DETERMINE THE EXACT LIMITS. (E) CONCRETE BARRIER F NE O w L - I (E) WOOD s QKEG,qRAMP (E) ABOVE GROUND y0 SITE LEGEND PROPANE TANKS so v � � � f�D f�D o U) r `� fY • — _ _ _ _ _ ANY (E) ELEMENT TO BE n ' i, ► w �L9 Lu AC I/ REMOVED 2 L z l tS� EXP 1/31/24 To l' "o PD ,- - 0 _ HARDSCAPED AREA �� 95002' (E) WOOD / / i - - / A (E) 6' STOCKADE - W r ; 55 POST TYP. ' TO BE MODIFIED '40 NP 5 FENCE /` ' '` �- (E) WOOD POST, TYP. FESS10 + I -- L-__J P ` I i • I I � z RECEIVED I �I 4'-8" SEP 2 120 1 Southold Town O Planning Board �• j I (E) PART OF CONCRETE CURB TO BE I REMOVED FOR INSTALLATION OF � �- CHARGE POST AT SHADED AREA. I (E) BUILDING 0 / / / / i�/ /_1 1 1_ i ;,L �' W F V C— i P-/) I RD PD ry (10 SD SD ' iuJ (E) GAS LINE U U }- ,. (E) CONCRETE I--_ UE / WALKWAY � W W < •• D U 0 -� 3 (E) PULLBOX ASPHALT -` PAVEMENT I (E) FLAG POLE (E) MAIL BOX, TYP. Q W _ r I �1 Lo c 4r Lo W u, (JO 0 25' I- d" V1 00 (E) CONCRETE '` DRIVE AISLE n I � CURB WIDTH w W J m o Q O • OF _UE \ IJE _ -- 11zo 2 GRASS \�__ �� • • I C _ I � � •\sem� • _, _.. _�•�- — _�_��-- �-- \rte`�z—" � • • • • � • • � •i� • • � • -.— _--- ---------_ - _, a - -- j0 — o (E) DOUBLE YELLOW STRIPE, TYP. ---- _ --`- _ -- 4 = . . 0 w L' --------- _ O - DEMO PLAN i ti G-101 DEMOLITION PLAN 01' ' JB-1192956- 1" = 10'-0" 10 �0 S 00 REV: 0 IFP PLOT DATE: 7/10/2023 11:13 AM 1PEREZCARREON PROPRIETARY AND CONFIDENTIAL H I G I F I E I D I C I B I A ..� ' • �,�"" ,"` j,��✓"F` SITE LEGEND (E) PROPERTY (N) CONDUIT ROUTE, T = SLi=i I SHOWN FOR LINE • • • DIAGRAMMATIC PURPOSES 3500 DEER CREEK RD. • ' • • . . . . . . . . . . ONLY. PALOALTO, 304 681 5000 6 O _ P i — - 6 �; ------ e (N) REBOUNDING BOLLARD (N) REBOUNDING BOLLARD \ SIGN ORIGINAL SIZE 24"X36" SHEET SIZE ARCH"D" (N) -_ (N) CRADLE POINT N 4" WHITE PARKING `---; -_�_ �;, rs ' •' STRIPING, TYP. , � REPEATER REF. o Yz , .wp (E) CONCRETE -__ SINGLE LINE DIAGRAM (N) REBOUNDING BOLLARD, �, BARRIER ---- PRE-ASSEMBLED WITH PSU, � `' `o � �� 1" '� '' (N) POLE-MOUNTED LIGHT (TYP. 8), REF. S-501 (E) WOOD --J FIXTURE OF NE1�1/y PSU-2 'n, ' 2p �� RAMP (E) ABOVE GROUND so E G O (N) SHRUB P Q� K A/li�, PROPANE TANKS , s� co, SPR-2 0 / (N) UTILITY BOLLARD * �� • _ tJ _- PL11A � -, L� X �� �� /\ SPOT ELEVATION n �I I w 20'-10" %. / / / % / / ;" /T i / / / i i / C ❑ ❑ c �� lb iI m W2C nn DRIVE AISLELJ - ( �` �� (E) XX.XX EXISTING ELEVATION Zcs� EXP 1/31/24 `-V - --- �J� PARKING STALL SCHEDULE CoA °9soo2-'` WIDTH a > -- T r . _ / / i / i / 5 (E) 6' STOCKADE : = I -, _ (E) WOOD FENCE �,i,; ' f r----_ S` �� POST, TYP. • (E) WOOD POST, TYP. EXISTING STANDARD STALLS 8 ROFESSIONP • I 2g INSTALL PSU PLATFORM EDGE FLUSH WITH UTILIZED AS A RESULT OF THIS CURB TO MAINTAIN NEC WORKING CLEARANCE PROJECT REQUIREMENTS IN FRONT OF CABINENT, TYP. PROPOSED TESLA STALLS 8 2A S PROPOSED STANDARD STALLS 0�' / NET STALL COUNT 0 >- RECEIVED � (N) 4 WIDE WHITE STRIPING z f - LGT-1 � � � WITH 4" WIDE WHITE CROSS Z — STRIPING AT 36" O.C. CHARGING STALLS SCHEDULE w SEP 2 12023 _-. SUPERCHARGER POST Q Southold Town (N) ACCESSIBLE AND TESLA EV Z 5' `� (' SIGN TYPE 1 Planning Board PARKING SIGN MOUNTED ON �• 6 1 D a (N) VAN ACCESSIBLE . CABINET TAG _I REBOUNDING BOLLARD I STALL, REF. S-502 ' 1 A REF. S-502 / 0 ' i ; ° ° X (E) 39.69 12' I 1 B - I �TYP. 1 I 19, 1C - 4 ' u 1D ACCESSIBLE ( ) E 39.72 _ (E) BUILDING PSU-1 � ' (E) 39.43 ���/ 2A - 0 SPRA 1 C 9' G. W TYP. 2 2B - I I Lu 2D i ill � n _ � I MINIMUM SERVICE � SB-1 ! 1A ` SD --- ='.,. — ----- ------- CLEARANCES ^ rM. � . . _ WIFI �.. . ' SERVICE SIDE LIJ 0 TSC � f 1 ``��� I � Z 9 II d" MTR-1 • .� a (E) CONCRETE (E) GAS LINE 1'-6" U ' w z :E WALKWAY I CHARGE POST /N . i / CHARGE HANDLE w1 ) SHRUB, TYPt u I CABLE TERMINUS �- 3 (E) PULLBOX U ASPHALT D U 0 PAVEMENT (E) FLAG POLE (E) MAIL BOX, TYP. SWITCHBOARD U) 0� ry 0 LIJ I 41 —� W - SUPERCHARGER (,f) I (N) UTILITY BOLLARD, PER I; ,, m4 CABINET LLI (n (.0 0 GN T UILITY DESIGN ' 1 4 I ---__ � 25 � � co •I � I = , (N) PRIMARY ROUTE, (E) CONCRETE `. - — DRIVE AISLE 51 \ I PER UTILITY DESIGN CURB '?� WIDTH \ TRANSFORMER p ' FROM PAD TON EDGE ' • - ALL SIDES AND 1 • I •\ -- - - �✓ FROM FRONT (VERIFY •� �- ti E ___LIF -- _ _ , _- ___� 1 /� WITH UTILITY -- ) L) STANDARDS) 2 GRASS ��-- _ -- � ' ' G •�-- . . .___ . . . . - - -- -- NOTES : .- . . _ . . _ .-.- - _ _ I 1. UTILITY EQUIPMENT/FOUNDATION — — DIMENSIONS AND LOCATIONS PER - ---— UTILITY. CONTRACTOR TO VERIFY _ _ AGAINST EXECUTED UTILITY DESIGN. (E) DOUBLE YELLOW _ STRIPE, TYP. 2. UTILITY BOLLARDS PER UTILITY 0 ---------_.__�_______—--- - — _ _ — ------ i REQUIREMENTS. CONTRACTOR TO U) COUNTY ROUTE 48 -----�-- ---- —— — —7- ``' VERIFY AND COORDINATE WITH UTILITY wIY ON LOCATION, QUANTITY, AND SPECS. 3. CONTRACTOR TO REFER TO EXECUTED z UTILITY DESIGN FOR PRIMARY AND , POINT OF CONNECTION DETAILS. 4. FOR N ACCESSIBLE EV CHARGING AREA(S), CONTRACTOR TO FIELD VERIFY SITE PLAN OPES ACCESS BLE STALL COMPLIANT ALLDETAL (REF. ER TRANSFORMER TSC TESLA SYSTEM CONTROLLER PARKING SIGN, REF A-501 ARCHITECTURAL OR STRUCTURAL XR-# (PROVIDED BY UTILITY UTILITY METER SHEETS). REGRADE AND ADD ASPHALT EQUIPMENT TAGS PER UTILITY DESIGN) MTR (PROVIDED BY UTILITY OVERLAY, NEW FULL DEPTH ASPHALT, E-1 01 ELECTRICAL SITE PLAN 0 10' 0' SB-# SWITCHBOARD PER UTILITY DESIGN) AND/OR ASPHALT MILLING IF REQUIRED. SUPERCHARGER VAN EXISTING SPOT ELEVATIONS ARE JB-1192956-00 1" = 10'-0" �` PRE-ASSEMBLED SPR- PSU #X SUPERCHARGER POST ACCESSIBLE APPROXIMATE PER SURVEY DATA AND - S SUPERCHARGER CRADLEPOINT WIFI ARE TO BE FIELD VERIFIED BY UNIT WIFI LG LIGHT POLE ACCESSIBLE CONTRACTOR. REV: 0 IFP BROja ST UNITPLOT DATE: 7/10/2023 11:14 AM IPEREZCARREON PROPRIETARY AND CONFIDENTIAL H G F ) E D C B A SWITCHBOARD "SB-1" LOAD SCHEDULE EQUIPMENT CKT TRIP VOLT-AMPS VOLT-AMPS TRIP CKT TO UTILITY T ""EL i=i NO AMPS DESCRIPTION A B C A B C DESCRIPTION AMPS NO 1 NOTES 1 600 SUPERCHARGER#1 129,000 _ _ 129,000 - - SUPERCHARGER#2 600 2 (N) UTILITY (N) UTILITY TRANSFORMER " - " �� Q .. �� ER 3500 DEER CREEK RD. 3 if129,000 129,000 4 � � XR-1 vv XR-1 PALO ALTO, CA 94304 5 _ _ 129,000 - - 129,000 It6 NOTE: SUPERCHARGER CABINETS ' ' BY UTILITY • SIZE & PRIMARY VOLTAGE PER (650)681-5000 6 - I I 1 CONCENTRIC NEUTRAL 5 kV, 7 15 MONITORING 100 - - 8 AND POST ARE PART OFA 9 15 LIGHTING - 75 10 CERTIFIED SYSTEM, INCLUDING THE ' ' 20,919 AFC SHIELDED, CROSS-LINKED ORIGINAL SIZE 24"x36° - 11 12 DC-POST CONDUCTORS. AN NRTL I I NOTE: AFC CALCULATED POLYETHYLENE INSULATED SHEET SIZE ARCH"D" HAS INSPECTED AND APPROVED OF ' ' ASSUMING 1000kVA CABLES PHASE A B C ALL PROTECTION MECHANISMS L TRANSFORMER , 5.75% IZ AND • SECONDARY 480Y/277V ° rz TOTALS APPARENT POWER 258 kVA 258 kVA 258 kVA WITHIN THE SYSTEM. INFINITE AFC AT PRIMARY. (N) UTILITY METER CURRENT 931 A 931 A 931 A 2 • METER#TBD (N) TESLA PROVIDED AND INSTALLED, (N) MAIN SWITCHBOARD "SB-1" ,C�o l E EIS y (4) SETS OF 500 AL, PROPOSED 3 • 480/277 VAC, 1200A ,� K G O • 1200A MAIN BREAKER �PvP q - - - - - - - - - - - - - - - - - - - - - - - - - - - - - (N) MAIN 3 �p � CONTROLS COMPARTMENT (SWITCHBOARD INTEGRATED) SWITCHBOARD 80%-RATED, LSIG AND ERMS SB-1" • 65 kAIC i$ CRADLEPOINT 4 I • NEMA 3R m �� w TESLA SYSTEMWIFI BROADCAST I - 2 (N) CENTRAL WIFI BROADCAST 2cn EXP 1/31/24 CONTROLLER C UNIT " UNIT WIFI" 09�O A 1200A/3P I (N) UTILITY .0 5002 tG I 5 _ M ' METER • TESLA-PROVIDED UNIT X90 N BY UTILITY PS' 4 • FIELD-INSTALLED FESS10 . POE INJECTOR SWITCH 600A/3P 600A/3P I 80% gp% TO CONTROLS 15A/1 P 15A/1 P I • REQUIRES 80' CLEAR L.O.S TO RATED RATED COMPARTMENT 80% SPARE GFP SUPERCHARGER STALLS AND I 65 kAIC 65 kAIC A vRATED 80% ( GEN3 WALL CONNECTORS 65 kAIC RATED _65 kAIC - - - - - - -� 5 CONTROLLER STEM RECEIVED �� • INTERNALLY FUSED F_ � (N) PSU 3.0 PRE-ASSEMBLED z SEP 21 2023 c — — — c — — c — — — c — — — c _ _ SUPERCHARGER UNIT "PSU" I Southold—Tow_ n C • (1) SUPERCHARGER CABINET QPlanning Board "SPR" PER UNIT J 1 CONDUIT, • (4) SUPERCHARGER POSTS AC-PSU I TYP. 6 "DC" PER UNIT TYP. AC-LGT • FACTORY PRE-WIRED DC-POST U c CIRCUIT 6 I 6 4 (N) PRE-ASSEMBLEDF-- - - - - - - - ---- - - - - - - - - - -� - (N) PRE-ASSEMBLED • FACTORY PRE-WIRED AC-SPR SUPERCHARGER' - - - - - ' - - - - - - SUPERCHARGER 10 CIRCUIT O UNIT "PSU-2"I I I UNIT "PSU-1" - - • (2) PSU's TOTAL U) ' 7 n ( ' 7 ' I (N) LIGHT (N) EV JUNCTION BOX I I I I I ® PS FIXTURE • TESLA PROVIDED, COORDINATE I , EV JUNCTION , I , EV JUNCTION , I �_ _� "LGT- 1" 7 PART NUMBER WITH TESLA ry I BOX I I BOX I DEMAND PLANNING W I I • NEMA 3R (D r— _ L_ _ _ _ _ _J ' (N) SUPERCHARGER CABINET AC-SPR I "SPR" Q AC-SPR 'I — — ' • (2) SUPERCHARGER CABINETS = W QD c — — — c — � FACTORY-WIRED, c — — c — I • d- FACTORY-WIRED, , TYP 8 ' 8 ' 8 • 480VAC, 3PH, 4W 465A MAX AC INPUT U TYP. I _ I I I • DC OUTPUT TO 4 CHARGE Lu z (N) SUPERCHARGER ' F— ____j (N) SUPERCHARGER ' POSTS MAX EACH W Q F— I , CABINET "SPR-2" ( I ' CABINET "SPR-1" SUPERCHARGER CABINET 1: 0 n'_ I • 85 kA SCCR U O 3 i I I I (N) SUPERCHARGER POST "DC" • 250KW O 9 • (8) SUPERCHARGER POSTS W i I Q n �n M(N) DC-POST • 0 VDC - 500 VDC .i �(N) LIGHT FIXTURE "LGT" FACTORY-WIRED, TYP. • LINMOREDC-BUS LL-SLI-SM-75-40K-T3-UNV-SA-SN W O TYP. co9 • 75W, 120-277VAC • INTEGRATED PHOTO AND PERCHARGER SU MOTION SENSOR �_ - _ _ - - POST "DC" Q - -� • POLE MOUNTED o SYSTEM PLACARDS C-POST 1 D 10 L(l) IGHTI G COLOR EITH 4000K MPERA URE CAST PER FIXTURE • CAST ALUMINUM BODY, IP65 AC CIRCUIT SCHEDULE RATED # PHASE PHASE NEUTRAL MAX MIN • -40°C MIN REQUIRED AMBIENT CONDUCTOR # OF CIRCUIT WIRE CONDUIT TEMPERATURE 2 TESLA SUPERCHARGER CIRCUIT # METAL UON CONDUITS PER CONDUIT CONDUCTOR CONDUCTOR EGC SSBJ LENGTH TYPE TYPES CONDUIT (INI� (1) TOTAL FIXTURE 46455 ROUTE 48 AC-PSU AL 2 3 500 KCMIL 500 KCMIL AWGOR 210 (AL) - 300' XHHW-2 PVC, RMC, 4 EMT AWG 1 (CU) SOUTHOLD, NY z AC-SPR AL 2 3 500 KCMIL 500 KCMIL 1 AWG (CU) - 600' XHHW-2 PVC, RMC, 4 LEGEND p (FACTORY WIRED) EMT BUSSING WYE TRANSFORMER PVC, RMC, WINDING ATTACH AT FRONT OF SWITCHBOARD AC-LGT CU 1 1 12 AWG 12 AWG 12 AWG - 150' THWN-2 EMT I CONDUCTORS GROUNDED WYE SHIELDED CAT6 TRANSFORMER z TESLA EV SYSTEM DC CIRCUIT SCHEDULE CABLE _ WINDING CIRCUIT BREAKER EQPT. DISCONNECT CONDUCTOR # OF # PHASE PHASE MAX WIRE CONDUIT MIN /._ SWITCH - ENCLOSURES SINGLE LINE CIRCUIT # METAL UON CONDUITS CONDUCTORS CONDUCTOR EGC LVDC SIGNAL WIRE DC MID CIRCUIT TYPE TYPES CONDUIT WIREWAY ATTACH ON SWITCHBOARD MAIN PER CONDUIT SIZE LENGTH SIZE (IN) ® FUSE O METER 1 DISCONNECT DC-POST TESLA XHHW-2 PVC, RMC, _ CURRENT fV AC-DC OR DC-AC DIAGRAM (FACTORY WIRED) AL 1 4 600 KCMIL AWG 2/0 (CU) (2) AWG 6 (CU) PROVIDED - 330 4(1000V) EMT TRANSFORMER CONVERTER PLACARD NOTES: DC-BUS AL 1 4 600 KCMIL 1/0 AWG (CU) - - 3/0 AWG 900' X HW-2 PVC, RMC, 3.5 TESLA 8.25IM POWER I - PS LIGHT WITH MOTION E-201 ( ) © TRANSFORMER PLACARDS TO BE MADE: OF RED PHENOLIC PLASTIC W/ 1" WHITE AND PHOTO SENSOR DC-POST (1 D) AL 1 4 600 KCMIL AWG 2/0 (CU) (2) AWG 6 (CU) TESLA _ 330' XHHW-2 PVC, RMC, 4 _ DELTA JB-1 192956-00 LETTERING. ATTACH PLACARDS WITH RIVETS OR SELF-TAPPING SCREWS PROVIDED (1000V) EMT 0 TRANSFORMER % WIFI CONNECTION ADDITIONAL PLACARDS REQUIRED FOR ARC FLASH LABELS WINDING REV: 0 IFP PLOT DATE: 7/10'2023 11:14 Am, IPEREZCARREOr, PROPRIETARY AND CONFIDENTIAL H I G I F I E I D I C I B I A TRENCHING NOTES s T = S L rl • THE TRENCH DESIGNS FOR ALL VEHICLE CHARGING CIRCUITS REQUIRING RHO VALUES ARE THE RESULT OF A THERMAL ANALYSIS OF THE BREAKER SETTINGS BREAKER SETTINGS - ROTARY SWITCHES CONDUCTORS UNDER LOAD. FOR PROPER PROTECTION THEY MUST BE 3500 DEER CREEK RD. FOLLOWED. PALO ALTO, CA 94304 BREAKER SETTINGS MAIN SWITCHBOARD SBA, MCB 1200A 80% RATED LINCOLN SUPERCHARGER CABINET (650)681-5000 i NOTE: CONTRACTOR TO VERIFY BREAKER MODEL IN FIELD AND USE THE CORRESPONDING SWITCHBOARD MAIN BREAKER BREAKER SETTINGS TABLE. IF THE BREAKER MODEL DOES NOT MATCH EITHER TABLE, PHASE GROUND BREAKERS APPROVED BACKFILL REQUIRES DOCUMENTATION THAT SPECIFIES VERIFY SETTINGS WITH ELECTRICAL ENGINEER OF RECORD. FRAME AMPS 1,200 1,200 EATON PXR 20 LSIG DIAL TRIP UNIT PD-3 THERMAL-MAG TRIP UNIT TESTED RHO VALUE. USE THE SPECIFIED BACKFILL LISTED BELOW OR ORIGINAL SIZE 24"X36" DESIGNATION (1200A TRIP) (600A TRIP) TEST NATIVE SOIL CONDITIONS TO CONFIRM MAX DEFINED RHO VALUES. SHEET SIZE ARCH"D" EATON EATON SQUARED ABB MFR PSU INTEGRAL BREAKER AIC R EATON s5 ON EATON LONG TIME PICKUP 1200 (A) MINIMUM 2" OF APPROVED BACKFILL COVERAGE AROUND CONDUITS PD-3 THERMAL-MAG TRIP UNIT LGH3 THERMAL-MAG TRIP UNIT UL W/U31 TRIP UNIT TMAX XT5 TRIP UNIT FRAME PDF5 M PDF5_M LONG TIME DELAY(t,): 24 (sec @ 6x I,) REQUIRED. 0 y 1• (600A TRIP) (600A TRIP) (600A TRIP) (600A TRIP) TYPE MODEL SENSOR AMPS 1,200 1,200 SHORT TIME PICKUP 0.,d): 6 (6000A) . RHO 90 BACKFILL - LOW STRENGTH FLUIDIZED THERMAL (SLURRY) PLUG AMPS 1,200 1,200 SHORT TIME DELAY(�)_ 0.067 (sec Izt) BACKFILL WITH MIN 28 DAY COMPRESSIVE STRENGTH OF 150 PSI MUST BE F NE INSTANTANEOUS(k):5(3000A) INSTANTANEOUS(k):5(3000A) LOW(II):5(3000A) INSTANTANEOUS(I,):(3000A) TRIP UNIT DESCRIPTION LSI , 1200A GF, 1200A INSTANTANEOUS (l;): 5(3000A) USED TO ACHIEVE MAX RHO 90. O KEG � �y0 TYPE/MODEL PD-5, PXR 20 PD-5,PXR 20 INSTANTANEOUS PICKUP(I;): 8(9600A) Q`vP� • FOR TRENCHES WITH MIXED CIRCUIT TYPES, APPLY THE CONDUIT LONG TIME PICKUP 10(1200A) GROUND FAULT PICKUP (I;): 0.8 (960A) „SPACING FOR THE CIRCUIT TYPE WITH THE LARGER SPACING * ALON TIME DELAY 24 OG SHORT TIME PICKUP 6(6000A) GROUND FAULT DELAY(tg): 0.5(sec) REQUIREMENT. n I I W W TRIP UNIT SHORT TIME DELAY 0.067(I^S T ON) . CONDUIT TO BE INSTALLED TO A MAX COVER OF 24". ADDITIONAL N EXP L1131124 SETTINGS INSTANTANEOUSg(g600A) REDUCED COVERS MAY BE FOUND IN NEC TABLE 300.5. �� 095002'1 �Ci= (1200A TRIP) PICKUP A90FESSIONP� GROUND FAULT 0.8(960A) • CONDUIT ARE PERMITTED TO HAVE GREATER THAN 24" COVER FOR PICKUP SHORT DISTANCES WHERE REQUIRED TO CROSS UNDER (E) UTILITY LINES, GROUND FAULT 0.5 TO ALLOW FOR NEC REQUIRED MIN RADIUS FOR CONDUIT TURN-UPS INTO DELAY PAD-MOUNTED EQUIPMENT, TO AVOID (E) OBSTRUCTIONS, ETC. RECEIVED Z f ----- SEP 2 1 2023 Q Southold Town J Planning Board NOTES O • REFER TO ONE:-LINE DIAGRAM FOR GEC OR COMBINED SPECIFIC CIRCUIT IDENTIFIERS GEC/EGC FROM GROUND BETWEEN EQUIPMENT. BAR IN EQUIPMENT • REFER TO AC & DC CIRCUIT SCHEDULES FOR NEUTRAL/GROUND ATTACH GEC OR COMBINED 0 SIZING PER CIRCUIT. GEC/EGC TO 20' OF CONTINUOUS OR SPLICED MAX RHO 90 BACKFILL W REBAR USING LISTED REBAR I LEGEND GROUNDING CONNECTOR RED WARNING LiJ 24" MAX _I I !-1 I(; !!i TAPE 8" BELOW NEUTRAL BUSBAR CONCRETE —{ I �1-11 THE SURFACE. EQUIPMENT PADry �Q �!! I II= © GROUND BUSBAR TO UTILITY r— TRANSFORMER _ = LIJ PRIMARY OR SECONDARY GROUNDED CONDUCTOR REBAR CAGE CONNECTED F, n CONDUIT, RUN IN 1 d' [2 COMMON TERMINAL, AS (NEUTRAL) AND CONNECTIONS MAIN BONDING JUMPER BY REBAR TIES 4 IN A SINGLE �! W z ROW, CANNOT APPLICABLE PER UTILITY REQUIREMENTS BE STACKED. Lu Q 0 TERMINAL ON NEUTRAL G77 OR GROUND BUSBAR - - - L - � a (N) MAIN SERVICE v � � U OJ IRREVERSIBLE SPLICE OR I N C G I EQUIPMENT (n ry_ 0� 0 CRIMP PER NEC 250.64(C) - _ H Q LIJ Lo _r- DC-BUS NEC 25CI.52(A)-COMPLIANT I (N) 3/0 CU GEC, J a LoGROUNDING ELECTRODE I I �`_ SEE DETAIL C. CONCRETE-ENCASED ELECTRODE FOR 1 �LSI�-t—�!� CE PADS ONLY "DC-BUS" CIRCUITS TRENCH - MAX RHO 90W00C NTS CB) E5Ut.1221 DC-BUS GRCUITS TRENCH-MAX RHO 9U RA NTS II W (N) NEUTRAL, TYP. "AC-PSU" NOTE: BOND "DC-BUS" CIRCUIT EGC TO WIREWAY TESLA WIREWAY DIMS SHOWN. ADJUST CONCRETE BLOCK DIMS IF Q FACTORY WIRED OFF-THE-SHELF WIREWAY IS USED. (PEDESTRIAN RATED) 8.1 --- ---�� I (N) EGC, TYP. "AC-PSU" WIREWAY MOUNTED TO BLOCK USING 1/4n DIA TAPCON ANCHOR FACTORY WIRED MIN. 1-3/4" EMBEDMENT FACTORY PROVIDED (OR APPROVED (N) PSU 3.0, E.C. TO BOND WIREWAY USING 1/0 AWG EQUAL). (2) ANCHORS PLACED AT EACH END OF WIREWAY. 7.77" 6.74" TO OTHER PSU(S) I It O N ItIfIII&IGI SUPERCHARGER CU EGC. PROVIDE JUMPERS AND ►_ IIIICABINET, TYP. GROUNDING WIRE WHERE SUFFICIENT (E) GRADE BONDING IS NOT POSSIBLE PER NEC PRE-ASSMBLED � ' I , n 20 (N) EGC, TYP. j I I I 250.102. WIREWAY IS UL LISTED AS EGC I MIN. 4 "DC-BUS" �-� / SUPERCHARGER UNIT (PSU) { — TO ADDITIONALCONCRETE FOUNDATION SIDE VIEW ��!✓ o fl TO OTHER SUPERCHARGER POSTS FILL FLUSH GAP WITH Z CABINETS I (N) EGC TYP. DUCT SEAL TO PREVENT _ WIREWAY MOUNTED O_ CABINET( ) n (N) SUPERCHARGER "DC-POST" WATER INTRUSION _j {- I TO CONCRETE BLOCK I GQ� I POST, TYP. FACTORY WIRED —I—'—{�' w 1- „ 4"XO"X8n ---'. 4"X8"X8u - CONCRETE 7.77 DRAINAGE HOLES CONCRETE p —�— ! i BLOCK, TYP. 2 3-1 BLOCK AT Z - I I= — •• 1 I i PER WIR _�- EWAY - BOTH ENDS Ii OF WIREWAY • n ,. 3-9 ELECTRICAL MOUNT HOLE THROUGH TRAY AND FEET 1/2" HOLE TO ACCEPT DETAILS ! 24" WIDTH OF 4" MIN. DEEP 3/8" HARDWARE FEET WELDED COMPACTED 3/4" CRUSHED / (E) GRADE TO BOTTOM OF TRAY ROCK UNDERNEATH WIREWAY BOTTOM VIEW E-501 JB-1192956-00 GROUNDINGi DIAGRAM DC-BUS-t�a3.0 SLIM WIREWAY MOUNTED ON SOIL DETAIL DE5U7.1258GROUNDINGDUIGRAM-PSU WITFISWRCHBOARDRA NTS A NGDETAU_RA NTS REV: 0 IFP PLOT DATE: 7/10/2023 11:14 AM IPEREZCARREON PROPRIETARY AND CONFIDENTIAL H G F E D C B A T IS S L Fi (E) BUILDING 3500 DEER CREEK RD. PALO ALTO, CA 94304 6 (E) POURED IN PLACE (650)681-5000 CONCRETE FOUNDATION 100 18" MIN. ORIGINAL SIZE 24"X36" SHEET SIZE ARCH"D" (E) GRADE to (N) COMPACTED BACKFILL RED WARNING TAPE (L w OF- NEFw U) w > I ---- -; I1= APPROVED BACKFILL o = 0 1 I I�I L: KEG,gN O N °r° U I COMPACTED 95% C PVC CONDUIT (REFER TO r G cr_ PLANS AND WIRE m �I i w NO NCMBDULE FOR ACTUAL (P A/0Ez 131124 Cr eF� FSC NUER AND LOCATION �<p 095002-N S OF CONDUITS). UAg4FESS10Av NP�' 1 � � 2 TRENCH THROUGH SOIL NON-TRAFFIC RECEIVED CE511.120 TRENCH-SOIL NON-TRAFFIC DETAIL RB NTS z SEP 2 1 2023 Southold Town QPlanning Board 0 IE 4 0 MAX. RHO 100 BACKFILL (n if l ; W f -- —i i._ 24" MAX I_-I1 I I !i- RED WARNING U TAPE W/TRACE < 0) �- WIRE. 8" BELOWW THE SURFACE. Z cd r 1 (D CONDUITS MAY NOT W ww\1z BE STACKED MORE W Q THAN 2 HIGH. 4" CONDUIT, (1) CONDUIT PER a 3 CHARGE POST. =) U 0 MAX. (16) CONDUITS PER U) of ol� 0 CONDUIT GROUP; MIN. 24" w SEPARATION BETWEEN DC-POST GROUPS J Lo �— DC-POST-ALT � � �- "DC-POST" OR "DC-POST-ALT" CIRCUIT TRENCH - MAX. RHO 100 W0 NTS ILL! Q 0 2 MAX RHO 90 BACKFILL III—I I Ili—i I!= 24" MAX !-! ill O 4 MIN =j i !_ RED WARNING U) 1=i TAPE 8" BELOW THE > i I I SURFACE, TYP. i I I i= o z CONDUITS MAY NOT 4" CONDUIT, MAX (8) BE STACKED MORE CONDUITS PER THAN 2 HIGH. GROUP. ELECTRICAL SPARE 4" CONDUITS 1 MAY BE USED AS DETAILS SPACERS. AC-PSU E-502 "AC-PSU" CIRCUIT TRENCH - MAX RHO 90 JB-1192956-00 AE501.1223 SPR-#CIRCUIT TRENCH-MAX RHO 90 RA NTS REV: 0 IFP PLOT DATE: 7/10/2023 11:14 AM IPEREZCARREO^, PROPRIETARY AND CONFIDENTIAL H G F E C B A ' � r SITE LEGEND - T = L c <:DP (N) SUPERCHARGER POST I 3500 DEER CREEK RD. PALO ALTO,CA 94304 N REBOUNDING BOLL ( ) ARD (650)681-5000 6 i SIGN (N) REBOUNDING BOLLARD ORIGINAL SIZE 24"X36" (N) POLE-MOUNTED LIGHT SHEET SIZE ARCH"D" ° FIXTURE U y, I .I ! (N) SHRUB, TYP. (N) SHRUB (N) UTILITY METER, PER I ! (N) UTILITY BOLLARD DIGITALLY SEALED UTILITY DESIGN ;I oF NEtti Y C K. Zq O,p (N) SUPERCHARGER ����;%/ �o�l r ``�'���iij `'aj &� \ SWITCHBOARD FOUNDATION REF. S-501 (N) TESLA WIREWAY FOR DCUj --- --- ;r = BUS, REF. E-501 =%,;,. =-.T 1 T (E) PROPERTY LINE ;a �� j ', \ %%��II \ XP 0. .,,m� 2 091365 5 (N) PRE-ASSEMBLED SUPERCHARGER UNIT (N) LIGHT-POLE i (N) PRE-ASSEMBLED SUPERCHARGER UNIT ROFESSIONP� (1) V3 CABINET, (3) POSTS, TYP., REF. S-501 FOUNDATION, I (1) V3 CABINET, (4) POSTS, TYP., REF. S-501 07/14/2023 70-611 REF. S-501 i "IgNa1YY3"E 1,Pabtls Paul Zacher - — ° o--° -c-- _- —. _°-— -- —c —1-0- -- i—c• �—c • •° ^• • ° •^ • � • - ., ,- _� • � • • � .•--1 • • � • • — • • � • • or.:ma m., ,e:nn.arm 3'-2" fes' ✓a —_. ------ ----- - -------- _ 6'-6" 41211 � .� � _ ,,� ��E --- ,E4-8 — UE --- - UE UE - 'E , - _ -- UF - UE A- 0 UE -- z 2 2023 5'-7" _ UE o - FE o E �;_j o _, SEP —� �— __ o _� O a 314" Socithoid Town 4U ® ® — - -- — 2-6 ® - Q Planning Board 32'-11" J 0 (N) TRANSFORMER PAD, I , ,'0STRUCTURAL i' PER UTILITY DESIGN 7'-4" I 2_g I `� DESIGN CRITERIA: I- (N) CAST-IN-PLACE SUPERCHARGER 4 �/ POST FOUNDATION, REF. S-501 / 25�_g�� i DESIGN CODE: 0 2020 NY STATE BUILDING CODE r � I DESIGN CRITERIA: .! 1. WIND DESIGN W O - DESIGN WIND SPEED = 127 MPH / NO (ULTIMATE) EV CH RGING Q J ' - RISK CATEGORY= it ,- 0 LY PARKING � ry UE WIND EXPOSURE = C W 0()�- -- UE � � 1/4" - 1/2" GAP BETWEEN PSU & (N) REBOUNDING BOLLARD (TYP. 8) U m - UE CURB REQUIRED WITH CAULK REF. S-501 2. SEISMIC DESIGN 7 Ur cy � W z • -__-_- 1 JOINT FILLER, TYP. OF 2 PSUs _ W Q �— / _ RISK CATEGORY = II 0 - (N) ACCESSIBLE AND TESLA EV - SEISMIC IMPORTANCE FACTOR = 1.0 �- 3 ( 6' �� PARKING SIGN MOUNTED ON - SITE CLASS = D � U 0 .� I ' � � N REBOUNDING BOLLARD, REF. S-502 _____ ( ) UTILITY BOLLARD, ------------------- - Ss = 0.179 /S1 = 0.05 PER UTILITY DESIGNLO 1 (N) VAN ACCESSIBLE EV Sds = 0.191 /Sd1 = 0.08 0- CHARGE STALL, REF. S-502 G _ T �J SEISMIC DESIGN CATEGORY= B / L-------- BASIC SEISMIC-FORCE-RESISTING W O SYSTEM = NON-STRUCTURAL 00 COMPONENT 6 i W I I I 3. GEOTECHNICAL INFORMATION ALLOWABLE BEARING PRESSURE _ 1,500 PSF USED FOR EQUIPMENT FOUNDATION 4. SNOW LOAD GROUND SNOW LOAD = 25 P F UE _ �- l I Y cy- GE ! of p -- NOTES: I of I Z c� � I O o� - -- o i I � • �'_� — �` of— PAD EXTENTS AND FOOTING TO BE j I , CONFIRMED BY CONTRACTOR PRIOR TO w ! I CONSTRUCTION. O 2. SWITCHBOARD DIMENSIONS AND Z ANCHOR LOCATIONS ARE LIABLE TO I CHANGE. CONTRACTOR TO VERIFY I ` AGAINST VENDOR FINAL SHOP • ��` DRAWINGS. ENLARGED 1 3. UTILITY EQUIPMENT/FOUNDATION SITE PLAN DIMENSIONS AND LOCATIONS PER UTILITY. CONTRACTOR TO VERIFY AGAINST EXECUTED UTILITY DESIGN. S-301 ENLARGED STRUCTURAL SITE PLAN ' 4' 8' 12' 47 3/16" = 1'-0" � �' JB-1192956-00 REV: 0 IFP PLOT DATE: 7/10/2023 1:55 PM IPEREZCARREON PROPRIETARY AND CONFIDENTIAL H G F E D I C I B I A ANCHOR BOLT BY 4' SWITCHBOARD CABINET DESIGN TO BE CONCRETE DESIGN OTHERS PER POLE 61' TSSLFi MAX. VERIFIED AGAINST VENDOR DRAWINGS MANUFACTURER MAX SPECIFICATIONS LBS MAX PERN�— 1800 CABINET, (N) ANCHOR LOCATION, TYP. 1. ALL CONCRETE SHALL CONFORM TO THE LATEST EDITION OF THE ACI. � PER 100 LBS MAX. LIGHT FIXTURE, TYP. ONLY THE CORNER ANCHORS 3500 DEER CREEK RD. 2. CONCRETE SHALL BE NORMAL WEIGHT AND SHALL HAVE 4,500 PSI PALO ALTO, CA 94304 FIELD INSTALLED, DESIGNED OF EACH CABINET ARE (650)681-5000 3" MIN BY OTHERS 1011 REQUIRED, (4) ANCHORS PER STRENGTH AT 28 DAYS. 6 DIAM. CABINET, TYP. 3. REINFORCED CONCRETE IN THE FOUNDATION SHALL BE OF NATURAL (4) #4 TIES @ 3" SPACING O.C. MAX AGGREGATE CONFORMING TO ASTM C-33. ORIGINAL SIZE 24°x36° AT TOP OF PIER SHEET SIZE ARCH"D" 21111 1 11 4. TYPE 1/II CEMENT TO MEET ASTM C150. 2' 311 #4 REBAR TIES AT 6" 0 y2 MAX MIN SPACING O.C. 20' 78" 28 3" 5. REINFORCING STEEL -ASTM A615 WITH THE FOLLOWING STRENGTHS: (E) GRADE ��� MAX 4 TYP SIZE STRENGTH: i 177d ! i! t #4 AND SMALLER GRADE 60 (fy = 60000 PSI) F NE (8) #6 VERTICAL REBAR - - -- IDE TIES ! #5 AND LARGER GRADE 60 (fy = 60000 PSI) OK• Zq�YO !=r EQUALLY SPACED INS i -- — 7 - — -- CONDUIT t � —� + _- I WINDOW, MIN- _ _ =� (= 6. FABRICATE AND PLACE REINFORCEMENT IN ACCORDANCE WITH ACI w (N) LIGHT POLE, FIELD _ TYP. PUBLICATION SP-66, ACI DETAILING MANUAL - LATEST EDITION. - ° FINISHED INSTALLED DESIGNED � X91 5- 365• � BY OTHERS (VERIFY ° I GRADE 7. PLACE CONCRETE IN COMPLIANCE WITH ACI 304. ALL CONCRETE SHALL AROFESSIDNP� 2' MIN DIMENSIONS IN FIELD) ���- ;= G. BE MECHANICALLY VIBRATED. 500 LBS MAX. ! FOUNDATION AND 07/14/2023 5 I =i I f- I i- ANCHORAGE PER 8. CONFORM TO ASTM C-94 FOR CONCRETE MIXING OPERATIONS. POLE BASE PLATE (E) GRADE EQUIPMENT PAD 9. BY OTHERS DETAIL A. CONCRETE COVER FOR REINFORCEMENT FOR NON-PRESTRESSED, CAST IN PLACE CONCRETE SHALL BE AS FOLLOWS: RECEIVED CONDITION COVER r - ----- LIGHT POLE FOUNDATION WITH BOLLARD EV2IINC���N�SWITCHBOARD DETAIL CAST AGAINST EARTH 3" SEP 1 2023 WITCHBOANTS EXPOSED TO WEATHERz 5o.-,tr�ola -town #5 AND SMALLER 1-1/2" Planning Board w V4 TESLA OFFSET BOLLARD W/ #6 AND LARGER 2" SUPERCHARGER POST 2'-2311 (N) V4 TESLA OPTIONAL SIGNPOST Q WEIGHT: 150 LBS 4 SUPERCHARGER POST 1� 41-811 SLAB-ON-GRADE 2" J 8 2,_31„ 1,_81„ O T (4) 1/2" DIA SS THREADED ROD 4 4 Von" YE 9 L 9 WITH HILT[ HIT-HY 200 V3 BOLLARD W/ 10.EMBEDS -ALL ITEMS TO BE CAST INTO CONCRETE SUCH AS REINFORCING VEMCM CHMGING ADHESIVE ANCHOR SYSTEM SIGNPOST ° DOWELS, BOLTS, ANCHORS, PIPES, SLEEVES, ETC., SHALL BE SECURELY (- TESLA �y WITH 4" EMBEDMENT PER M�„ 0 2'-611 AND ACCURATELY POSITIONED INTO THE FORMS PRIOR TO PLACING THE 4ESR-4868, OR APPROVED CONCRETE. O SUPERCHARGER EQUAL. 512„ 1'-3" HANDLE 11.ALL CONCRETE EXPOSED TO THE WEATHER TO BE AIR ENTRAINED AND U) BOLLARD W/ 111 2 #5 CONTINUOUSLFONT SHALL CONFORM TO ASTM C-260. SIGNPOST 6-42 REBAR AT T&B 12.PROVIDE CONTINUOUS REINFORCING BARS UNLESS WHERE SPLICES ARE r #4 @ 12" O.C. VIEW SPECIFICALLY SHOWN ON THE DRAWINGS. w (N) CIP PAD FLUSH (E) GRADE @ ACCESSIBLE WITH (E) PAVEMENT 13.CALCIUM CHLORIDE ADMIXTURES OR ADMIXTURES CONTAINING r/ (f) I� EV CHARGE POSTS CHLORIDE SALTS SHALL NOT BE ADDED TO THE CONCRETE. � ' = w 00 �— : :; a .d a -, e . e: 4a I !I e: e a i NATIVE L-- --- E IL 1'-6" _1 -6 i I i 4,_8„ -i I- NATIV SO , - - eb i (3) 3/8" DIA SS HILTIo 30° LLJ z e - E LANDSCAPE t16" O6" KWIK-BOLT TZ2 WITHFlo w Q 2.5" MIN EMBEDMENT 4.5" Q 0- 1=1 I 1=1 I - AND MIN 4.5" FROM MI 3�� U O J 21-6" EDGE OF PAD 54 Cn ry 6" MIN. COMPACTED FRONT VIEW CLASS 2 AGGREGATE SIDE VIEW BOLLARD Q w Lo W/ BASE OPTIONAL J 0- U) � SIGN ANCHORS (n � d w � O V4 �ARGER POST CAST-IN-PLACE FOUNDATION E-- 00 d- V)C 5501-1369 CIP SINGLE POST FOUNDATION RA NTS . W SEE CUTSHEETS FOR ADDITIONAL INFORMATION. ALT SUPERCHARGER POST REBOUNDING BOLLARD W/ NOTE: MAX. CONTINUOUS SLAB o APPROXIMATE COMPONENT WEIGHTS: SIGNPOST LENGTH SHOULD NOT EXCEED 1/2" DIA SS THREADED ROD WITH HILTI CABINET = 2,448 LBS 50 FT W/O EXPANSION JOINT HIT-HY 200 V3 ADHESIVE ANCHOR SYSTEM POST = 150 LBS (EACH) SUPERCHARGER HANDLE WITH 4" EMBEDMENT PER ESR-4868, OR TOTAL UNIT WEIGHT: 18,099 LBS APPROVED EQUAL. DRILL AND SET OF - SUPERCHARGER CABINET IS ANCHORED DOWN TO THE PRECASTZ.� T EPDXY ANCHORS SHALL NOT OCCUR LESS„ rrrL.e � rrr,.■ ni,r rrr..r rrr,.w SLAB USING (4) 1/2" DIA HILTI HUS-EZ-CRC W/ 5.5" MIN EMBED PER - - 8 MIN THAN 7 DAYS FROM POURING CONCRETE. ESR-3027 AND EACH CHARGING POST ANCHORED DOWN USING (4) 7,_719n EDGE DISTANCE 2 1/2" DIA SS HILTI KWIK-BOLT TZ2 W/ 3.75" MIN EMBED PER ESR-4266. 32 IN ORDER TO MAINTAIN POSITIVE DRAINAGE, 4'-3" 100 00, TOP OF SLAB SHALL SLOPE IN THE DOWNHILL FINISHED GRADE 4" ..... .. .. ..a.. .: . ,.. :: .; : :..-:.: 9 SLAB SHALL SLOPE BETWEEN SWITCHBOARD AND .: >. .; . ... ..: :.:. .. . .... . ..:. ..::. : . . 2 1 ° AND 2/o DIRECTION 0 5% FOR SWI CIRCUIT BREAKER W/TESLA SYSTEM - r . . _ t. _ of r.„ ,{- _ ;f,: r =- te=a�-a� FOR SUPERCHARGERS. Z n !h'Y.,i;-C r- ..fi ., �.. .r'�. ,- i•'r i i-?j-I t-nrd�.�"L. --�'--� -=-t! ' _ .., 1`-'.'� 'Lt 1 2n CONTROLLER8 T a — 4" TYPE IV EXTRUDED POLYSTYRENE MIN. 3" MIN. FINISHED acn FRONT V3 SUPERCHARGER 6" MAX. a INSULATION GRADE_T � `-' 1 off w 12" MIN 95% RELATIVE COMPACTED NATIVE SOIL CABINET FINISHED GRADE CLASS 2 AGGREGATE BASE. PRECAST CONCRETE FOUNDATION THE PRECAST SHALL MAINTAIN A —� a ° o O 13'- 8$" 5,_2 4,1 14'-0$„ — Z rt 1811 _ CROSS SLOPE OF 1-2% All ! U � - �CJ�jv< i MIN. I �ar � 12„ -- -- - _� SIDE LONGITUDINAL SLOPE OF 0-5% ' �-: � � MIN. STRUCTURAL 54 — iii---- i'i I Ii T� -- I I lIII—� I (3) 1/2 DIA HILTI DC BUS, ETHERNET & 0S � 5 10 z ; ! _I_ I--_I , (—_t I I_— I = 10" SLAB WITH #5 @ 16" O.C. EACH DETAILS LIGHTING CONDUITS, 3'-4" 0 #5 REBAR- - = HUS-EZ-CRC WITH 5.5 0 0 2'-6" CONTINUOUS WAY AT CENTER OF SLAB MIN EMBEDMENT AND 4.5 TYP. - J, - MIN 4.5 FROM EDGE MI 53„ \ _ 12" MIN., 95% RELATIVE COMPACTED S 5 01 OF PAD PER ESR-3017 4 CLASS 2 AGGREGATE BASE ot 40 9' 9' 9' BOLLARD ANCHORS 32'-11 2' JB-1192956-00 ALTERNATIVE POST PSU 3.0 SLAB DETAIL EQUIPMENT PAD & ANCHOR SECTION M B 5561.1397 ALT POST PRE-ASSEMBLED SUPERCHAF2GER UNIT 3.0 DETAIL RA NTS TOP 3 W i T H D 00 R OPEN A 5511.107 FLAT EQUIPMENT PAD 6 ANCHOR SECTION RA NTs REV: 0 IFP PROPRIETARY AND CONFIDENTIAL PLOT DATE: 7/10/2023 1:55 PM IPEREZCARREON H G F E D C B A MOUNTING OPTIONS: 1. SIGN CAN BE INSTALLED ON WALL USING ANCHOR TESL SYSTEM MATCHING WALL TYPE. 2. SIGN CAN BE POLE MOUNTED PER SPECIFICATIONS IN POLE MOUNTED SIGN DETAILS. 3500 DEER CREEK RD. SIGN MATERIAL: ALUMINUM PALO ALTO, CA 94304 (650)681-5000 6 ORIGINAL SIZE 24"X36" 1/2" RADIUS SIGN 12 SHEET SIZE ARCH"D" CORNER WHITE SYMBOL V WHITE TEXT SIGN TO HAVE 1811 REFLECTIVE FINISHOF NEw AN/ �K. Zgc0 SOLID FEDERAL BLUE /CCES�SI L #15090 IN FED j c l w STANDARD 595C �, W BACKGROUND PAINT DESIGNED FOR 'n xP o DISABILITY ACCESS- 6" �,o X91365 USE LAST �OFESSIONP 5 WHITE TEXT 07/14/2023 60" MIN A.F.F. TESLA EV STALL PARKING SIGN - VAN ACCESSIBLE T B &501.1119 TESLA EV STALL PARKING SIGN-VAN ACCESSIBLE RA NTS R E(/�_E_I V E D z SEP 21 2023 Q Southold Town J Planning Board 0 1 4 2" X 2" SQUARE POWDER 0 COATED GRAY HSS TUBE SIGN POST, ONLY REQUIRED WHEN SIGNS I I ARE REQUIRED BOLTED OR WELDED CAP W w ACCESSIBLE SIGN & DESIGNED FOR DISABLED ACCESS - USE LAST SIGN I Q PER PLAN & PER B/- = W 00 r— j i EV PARKING SIGN, IF ` J U REQUIRED PER PLAN ( W z W Q EPDXY BEAD BETWEEN POST & SIGN ( U 0 J 3 � � cn D'o 0 QW Lr) _ 3/8" DIA. ALUMINUMj 18" J Lo SECURITY PIN BOLT V) RIVET W/ 3/4" DIA. DOME j W (.0 0 HEAD FLANGE & .330" 00 d' U) GRIP LENGTH cn i = IF ACCESSIBLE ROUTE PASSES BEHIND THE HEAD OF THE ACCESSIBLE STALL, NOTE: SIGNAGE MUST BE ENSURE MINIMUM 4' CLEAR SPACE AT BACK OF CHARGE POST,AND 1:48 MAX PLACED WITHIN THE 12" SLOPE ALL DIRECTIONS FOR ACCESSIBLE ROUTE AT HEAD OF STALL PROJECTED HEAD END OF THE HANDLE PARKING SPACE p Z = I 2 Z ~ a' HINGE H Z O Ow0 z .......................... ........ ... ro w — 2 :.:.:.:.:.:.:.:.:.:.:. 30"X 48" CLEAR REBOUNDING BOLLARD O w FLOOR SPACE PRE-ASSEMBLED WITH . Z F' 3' PRE-CAST SUPERCHARGER FOUNDATION, PER - y. USE BOLLARD SIGN FOR 4"WHITE BORDER STRUCTURAL Q Z O PROTECTION WHEN WHEEL STOPSz AND CROSS _O ARE NOT USED. BOLLARD SIGN TO STRIPING,TYP. BE 4" IN FRONT OF POST FACE 3' 18' 5'WIDE ACCESS - W AISLEIrf O 12" HIGH WHITE Z \\blll TEXT N ARKING STRUCTURAL 12' 5' DETAILS 14, 17' S-502 1:48 MAX SLOPE ALL DIRECTIONS AT ACCESSIBLE EV VEHICLE STALL AND ACCESS AISLE JB-1 192956-00 VAN EV CHARGE STALL - TESLA STANDARD REBOUNDING BOLLARD MOUNTED EV SIGN C &591.1123 ACCESSIBLE PARKING STALL-TESLA STANDARD RA NTS A &501.1105 BOLLARD MOUNTED ACCESSIBLE EV SIGN DETAIL RB NTS REV: 0 I F P PROPRIETARY AND CONFIDENTIAL PLOT DATE: 7/10/2023 1:55 PN1 IPEREZCARRFON I (N)4"WH STRIPIN( (N)REBOUNDING BOLLARD, FIRE-ASSEMBLEWITH PSU, M ; REF.S-501 IPSU-2 2D SPR-2 • 20'-10" 2C DRIVE AISLE �Q WIDTH (E)6'STOCKADE FENCE INSTALL PS • (� 26 CURB TO M REQUIREMI I 2A (N)4"WIDI • WITH 4"W LGT-1 II Z _ STRIPING �( 5 (N)VAN A, (N)ACCESSIBLE AND TESLA EV 1 D STALL,RE PARKING SIGN MOUNTED ON REBOUNDING BOLLARD I REF.S-502 3 i 9 12' I TYP. !4 rl1 4 PSU-1 W 1C 9' SPR-1 Typ. i I ry1 1 B SB-1 r/1 IA WIFI W 9. TSC MTR-1 (N)SHRUB,TYP. (E)PULL 3 (N)UTILI XR-1 UTILITY • (N)PRIN PER UTI GRASS 2 (E)DOUBLE YELLOW STRIPE,TYP. FOR INTERNAL USE ONLY .:.._. IVE .. SITE PLAN USE DETERMINATION ` 2 b 202" OtjtiioGd.I"ai r Initial Determination Manning Board Date: Date Sent: / b / ....._ . Project Name: Project Address; .I Suffolk County Tax Map No.; 1800- - - Zoning District: Request: :I (Note:Copy of Building permit Application and supporting documentation as to proposed use or uses should be submitted.) 1f Initial Determination as to whether use is permitted: ! Initial Determination as to whether site plan is rewired: 'Q '"i C `\I Signature f wilding Inspecto -------------------------------------------------------------- planning Department (P.D.) Referral: P.D. Date Received: / Date of Comment: f�, Signature of planning ept. Staff Reviewer Final Determination Date: Decision: Signature of Building Inspector FOR INTERNAL USE ONLY RECEIVED SITE PLAN USE DETERMINATION SEP 2 1 Z023 Southold Town Initial Determination Planning Board Date: Z� �� Date Sent: 2-b / Z3 Project Name: V Project Address: T 7 J C u C� �l �i 1 inn I C, Suffolk County Tax Map No.: 1000- JC5 -�_- 20 Zoning District: Request: --L (Note: Copy of Building Permit Application and supporting documentation as to proposed use or uses should be submitted.) v Initial Determination as to whether use is permitted: Initial Determination as to whether site plan is required: S , 'C LA i rK d -T\i I , U Ct d -C Signature fuilding Inspecto ------------------------------------------------------------- Planning Department (P.D.) Referral: P.D. Date Received:_�� Date of Comment: Comments: Signature of Planning Dept. Staff Reviewer Final Determination Date: Decision: Signature of Building Inspector SvfFo`K TOWN OF SOUTHOLD —BUILDING DEPARTMENT "off 00 Gy= Town Hall Annex 54375 Main Road P. O. Box 1179 Southold,NY 11971-0959 -oo�. Telephone (631) 765-1802 Fax (631) 765-9502 hiips://www.southoldtownny.jzov Date Received APPLICATION FOR BUILDING PERMIT For Office Use Only 1 0 W PERMIT NO. Building Inspector: U AUG 2 3 2023 Applications and forms must be filled out in their entirety. Incomplete applications will not be accepted. Where the Applicant is not the owner,an Building Department Owner's Authorization form(Page 2)shall be completed. Town of Southold Date: OWNER(S)OF PROPERTY: Name:Village of Southold, LLC - SC-TM# 1000-055.00-02.00-020.000 Project Address:46455 County Road 48, Southold, NY 11971 Phone#:631-678-6546 Email:joebattaglia6l @gmail.com Mailing Address:2000 Hobart Rd. Southold, NY 11971 CONTACT PERSON: Name: Franz Gerdes Mailing Address:2719 Columbus Ave. Bellmore, NY, 11710 Phone#:516-945-7132 Email:fgerdes@tesla.com DESIGN PROFESSIONAL INFORMATION: Name:Bill Lou, PE, PH. D Mailing Address:3463 Ashton Court, Palo Alto, CA, 94306 Phone#:650-269-6888 Email:Pauliconee@gmail.com CONTRACTOR INFORMATION: Name:CNB Contracting Corp. Mailing Address: 1140 Grinnell Place, Bronx, NY 10474 Phone#:718-618-7630 Email:liz@cnbcorp.net _ DESCRIPTION OF PROPOSED CONSTRUCTION ❑New Structure ❑Addition ❑Alteration ❑Repair ❑Demolition Estimated Cost of Project: OOther Tesla electric vehicle(EV)charging stations and associated ground equipment $88,000.00 Will the lot be re-graded? ❑Yes RNo Will excess fill be removed from premises? ❑Yes ®No 1 PROPERTY INFORMATION Existing use of property:commercial/retail Intended use of property:Same Zone or use district in which premises is situated: Are there any covenants and restrictions with respect to B (General Business District) this property? ❑Yes ANo IF YES, PROVIDE A COPY. ❑ Check Box After Reading The owner/contractor/design professional is responsible for all drainage and storm water issues as provided by Chapter 236 of the Town Code. APPLICATION IS HEREBY MADE to the Building Department for the issuance of a Building Permit pursuant to the Building Zone Ordinance of the Town of Southold,Suffolk,County,New York and other applicable laws,Ordinances or Regulations,for the construction of buildings, additions,alterations or for removal or demolition as herein described.The applicant agrees to comply with all applicable laws,ordinances,building code, housing code and regulations and to admit authorized Inspectors on premises and In building(s)for necessary Inspections.False statements made herein are punishable as a Class A misdemeanor pursuant to Sedton 210.45 of the New York State Penal Law. Application : F��z '�Cz3 �T � WfAuthorized Agent ❑Owner PP Submitted B Y(print name) Signature of Applicant: _ �_. Date: /q/�'3 STATE OF NEW YQRK) 1 SS: COUNTY OF ✓ s ) rnZ being duly sworn, deposes and says that (s)he is the applicant (Name of individual signing contract) above named, (S)he is the (Contractor, Agent, Corporate Officer, etc.) of said owner or owners,and is duly authorized to perform or have performed the said work and to make and file this application;that all statements contained in this application are true to the best of his/her knowledge and belief;and that the work will be performed in the manner set forth in the application 7Notary BARTHOLE Stat6 of Now York Sworn before methis BA6381621 Nassau County Lday of 20y� Expires pct 2026 /Nota ry Pyolic PROPERTY OWNER AUTHORIZATION (Where the applicant is not the owner) residing at �5 43 S10 Jul A do hereby authorize C, to apply on 'alf to the Town of S Id Building Department for approval as described herein. ,,/bwner's Ignnature Date Print Owner's fume 2 BUILDING DEPARTMENT- Electrical Inspector TOWN OF SOUTHOLD H = Town Hall Annex - 54375 Main Road - PO Box 1179 Southold, New York 11971-0959 oy�jO� Telephone (631) 765-1802 - FAX (631) 765-9502 • -mss rogerrsouth oldtownny.gov – seandCcDsoutholdtownny qov APPLICATION FOR ELECTRICAL INSPECTION ELECTRICIAN INFORMATION (All Information Required) Date: Company Name: Hi-Tech Wiring, Inc. Electrician's Name: Steven Palmo License No.: ME-49771 Elec. email: steve@hitechwiringinc.com Elec. Phone No: 516-417-5034 E I request an email copy of Certificate of Compliance Elec. Address.: 1140 Grinnell Place, Bronx, NY 10474 JOB SITE INFORMATION (All Information Required) Name: Tesla electric vehicle (EV) charging stations - Southold, NY Address: 46455 County Road 48, Southold, NY 11971 Cross Street: Youngs Avenue/County Road 48 Phone No.: Bldg.Permit#: email: steve@hitechwiringinc.com Tax Map District: 1000 Section: 055.00 Block: 02.00 Lot: 020.000 BRIEF DESCRIPTION OF WORK, INCLUDE SQUARE FOOTAGE (Please Print Clearly).- Tesla learly):Tesla proposes to construct (8) electric vehicle (EV) charging stations, associated ground equipment and all associated underground conduit routing & site work. Square Footage: N/A Circle All That Apply: Is job ready for inspection?: 1:1 YES ❑✓ NO F—]Rough In F-1 Final Do you need a Temp Certificate?: 1-1 YES FV—] NO Issued On Temp Information: (All information required) Service SizeF_11 Ph[—ve]3 Ph Size: 1200 A # Meters 1 Old Meter# ✓❑New Service❑Fire Reconnect❑Flood Reconnect❑Service Reconnect OUnderground❑Overhead # Underground Laterals ✓ 1 2 H Frame Pole Work done on Service? Y ✓ N Additional Information:Tesla EV charging station. PAYMENT DUE WITH APPLICATION V3 PSU 3.0 DATASHEET T :-" S L n R1.0 OCT 2022 CHARGING INFRASTRUCTURE DEPLOYMENT V3 PRE-ASSEMBLED SUPERCHARGER UNIT 2.0 AC Input Voltage 480 VAc(-5%,+10%),4-wire 3AC+N Peak AC Input Power 387 kVA AC INPUT AC Input Current 465 AAc Max. Eaton: PDG33M0600TFAN Circuit Breaker 600A/3P,480/277V,65kAIC,80%Rated Fixed thermal,adjustable magnetic UL 489, IEC 60947-2.CSA C22.2 No.5, CCC Marked Conductor Sizes L1, L2, L3, N: 150—240mm2,250MCM—500MCM INPUT PE:#14 AWG-2/0 AC Conductor Material Type L1, L2,L3, N: Cu,Al PE:Cu Mfr.Termination Temp Rating 90°C Factory Wiring(Circuit Breaker to Cabinet) 2 x(1/phase 500 MCM Al)+ 1/0 AWG Cu PE SHARED Max Rated DC Bus Power 580 Kw Max Rated DC Bus Current 640 A DC Bus Voltage Range 880-970 VDc Embedded Conduit Size 1 x 4 inch PVC Schedule 40 V+,V-(2x/pole): 150—240mm2,250MCM—600MCM Conductor Sizes Mid:2.5—35mM2, 14 AWG—1 AWG SHA_ • DC BUS PE:#14 AWG-2/0 Conductor Material Type V+,V-, Mid: Cu,AI PE:Cu Conductor Voltage Rating 1000V Mfr.Termination Temp Rating 90"C Max.Rated Post Power 250 kW DC POST Post Rated Voltage Range 0-500 VDc • Post Rated Current @Te=35"C 350 ADc Number of Charge Posts 4 Max Voltage Drop 10 VDc Embedded Conduit Size 1 x 3 inch PVC Schedule 40 -• Factory Wiring(Each Post) 2 x(1/pole 350 MCM Al)+ 1AWG Cu EGC+ 1000V Class A DC comms cable in 3"conduit Conductor Voltage Rating 1000V Mfr.Termination Temp Rating 90"C Electrical 1 V3 Supercharger Cabinet;4 Supercharger Post; COMPONENTS Disconnect/control enclosure Protection 3 Rebounding Bollard;3 Rebounding Bollard with Signpost WEIGHT Weight 18,059 lbs DIMENSIONS Length,Width,Height 10,034, 1793.2,2524.8 mm;32'-11",5210.6"',8'-3.4" @ 2020 Tesla, Inc. V3 PRE-ASSEMBLED SUPERCHARGER UNIT DATASHEET T 5 L n R1.1 SEPT 2021 CHARGING INFRASTRUCTURE DEPLOYMENT FRONT VIEW nrBDUNQING DOLLAno WITH SIGN V3 SUPERCHARGER CABINET V3 SUPERCHARGER POST 241 . 3 2524.8 0'3 . 4' TOP VIEW 4169 . 66 1594 4271 . 26 13'8. 16" 5'2. 76 14' 16" LEFT VIEW 793 .24 1016 a � o tE CIRCUIT C BREAKER 2743 . 21 2743 . 21 2743 . 21 y 9' 9 ' 9' 10034 .93 32'11 . 08' © 2020 Tesla, Inc. V3 PRE-ASSEMBLED SUPERCHARGER UNIT DATASHEET T = 5 L n R1.1 SEPT 2021 CHARGING INFRASTRUCTURE DEPLOYMENT SUPERCHARGER CABINET [VAC] 480 440 415 400 380 Peak AC Input Power Power[kVA] 387 354 334 322 306 AC Input Voltage 380 VAc-480 VAc(-5%,+10%),4-wire 3AC+N • AC Input Current 465 AAc Max. Frequency 50 Hz/60 Hz Power Factor 2:0.99 Current THD 2.376% Voltage THD 1.135% Conductor Sizes L1, L2,L3, N: 150—400mm2,250MCM—750MCM AC INPUT PE:#14 AWG-2/0 Conductor Material Type L1, L2,L3, N:Cu,Al PE:Cu Mfr.Termination Temp Rating 90° C Input[VAc] 480 440 415 400 380 SHARED DC BUS Max Rated DC Bus Power Power[kW] 580 580 580 580 580 Max Rated DC Bus Current Current[ADc] 640 640 640 640 640 DC Bus Voltage Range 880-970 VDc V+,V-(2x/pole): 150—300mm2,250MCM—600MCM Conductor Sizes Mid:2.5—35mm2, 14 AWG—1 AWG SHARED PE:#14 AWG-2/0 Conductor Material Type V+,V-, Mid:Cu,Al PE:Cu Conductor Voltage Rating 1000V Mfr.Termination Temp Rating 90° C Max.Rated Post Power 250 kW DC POST Post Rated Voltage Range 0-500 VDc • Post Rated Current @Ta=35°C Tesla Handle:350 ADc,CCS2&GB Handle:450 ADc Number of Charge Posts 1 -4 Max Voltage Drop 10 VDc Conductor Size V+,V-(2x/pole): 350MCM or 185mm2 AL(certified equipment wiring) PE:#14 AWG-2/0 D POST Conductor Material Type V+,V-:Al,Cu PE:Cu Conductor Voltage Rating 1000V Mfr.Termination Temp Rating 90°C Efficiency 96% AC Input side:Class 1 DC Output side: Isolated DC Output Over Voltage/Current/Temperature,Surge Protection, Isolation Monitoring Short-Circuit Protection External Electronic Trip Circuit Breaker Short Circuit Current Rating 85 kA RMS symmetrical Operating Temperature -30°C to 50°C,-22°F to 122°F ENVIRONMENTALIngress Protection IP66(Cabinet), IP2X(Cooling) Ventilation Requirements Ventilation Not Required • Typical noise at 1m 35 dB(A) STANDARDS UL 2202,CSA C22.2#107.1, FCC, ICES-003-13, IEC 61851-1,EN 61000-6-2 EN 55011,GB/T 18487.1,GB/T 27930,NB/T 33008.1,NB/T-33001 • • Max.Distance to Charge Post 100 m,340 ft. Supercharger Cabinet Weight 4 Post Cabinet: 1110 kg(2448 lbs) 3 Post Cabinet:1 039kg(2291 lbs) • 111111111111 Depth,Width, Height 1000, 1250,2200 mm;39 12J32,49 iia,86 20/32 in. • Per-anchor min.Shear Strength 4 kN Per-anchor min.Tension Strength 11 kN @ 2020 Tesla, Inc V3 PRE-ASSEMBLED SUPERCHARGER UNIT DATASHEET T E 5 L n R1.1 SEPT 2021 CHARGING INFRASTRUCTURE DEPLOYMENT Dimensions for cabinets with part number PN 1450758-0*-F or later BOLT PATTERN 4x 0 19.05 1 0.75" 1 1340 1 52.76" 1 859.98 859.98 33.86" 33.86" t •1524 60" SERVICE AREA 1254.2 t 49.38" 1 �- TOP VIEW (TYP 1 0 25.4 t 1"1 MOUNTING PATTERN 910 35.83' AM452.5 17.81" 7 2273.3 El 2243 3 1778.5 89.5" 1 1 239.5 86.32" 69.94" 9.43' I . I 1+ 1250 t 49.21'MH REAR Illl'� 9601 37.8'1 1390 1 54.72' 1066.4 FRONT 41.98" RIGHT 1340 1 52.76' 1 275.2 10.63' REAP CABINET 170.2 1 s.7 ' INSIDE CABINET ENLARGED FOR 859.96 • '��� ;�;j ,� 659.96 DETAILED VIEW 33.86' 619.79 16.54 235.2 235 538 25 33.66' 24.4' 0.65' 9.26' 9 75' 21.19' FRONT CABINET 115.7 4.56" 355.7 ® CABINET OPENING 14' 395.9 15.59' © 2020 Tesla, Inc. V3 PRE-ASSEMBLED SUPERCHARGER UNIT DATASHEET T E 5 L n R1.1 SEPT 2021 CHARGING INFRASTRUCTURE DEPLOYMENT V3 SUPERCHARGER CHARGE POST POST Max.Rated Post Power 250 kW INPUT/OUTPUTPost Rated Voltage Range 0-500 VDc Post Rated Current @Te=35°C Tesla Handle:350 ADc,CCS2&GB Handle:450 ADc Power Conductors V+,V-(2x/pole): 350MCM or 185mm2 AL(certified equipment wiring) DC INPUT PE Conductor PE:25-50mm2,3AWG—1/0 Conductor Material Type V+,V-:Al,Cu PE:Cu Conductor Voltage Rating 1000V Mir.Termination Temp Rating 90° C • • Over CurrentlTemperature,Uneven Current Split ENVIRONMENTAL Operating Temperature -40°C to 50°C,-40°F to 122°F Ingress Protection IP44 STANDARDS UL 2202,CSA 22.2#107.1-16,FCC, ICES-003,EN 61000-6-2,EN 61000-6-4, IEC 61851-1, IEC 61851-23,GBlT 18487.1,GB/T 27930,GB/T 20234.1,GBlT 20234.3,GB/T 34658 • Max.Distance to Cabinet 100 m,340 ft. Charge Post Weight 64 kg, 140 lbs. IIIIIETZ • Depth,Width,Height 250,810, 1687 mm;9 27/32,31 7/8,66 13/32 in. • Per-anchor min.Shear Strength 1 kN Per-anchor min.Tension Strength 11 kN @ 2020 Tesla, Inc. V3 PRE-ASSEMBLED SUPERCHARGER UNIT DATASHEET T S 5 L n R1.1 SEPT 2021 CHARGING INFRASTRUCTURE DEPLOYMENT i I , 1 809.6131 7/8M I I I I UNITS: MM [IN] TeEHILF1 I I I ' i' ml I J �m,t �I J 1 I FRONT I BACK I I 102,82 L U16L�I J_ I I 2b0�9 2j___ I I 660 125 31/32L— _ G -- _T I I I I C 510 (20 3!321— NI of c4I Col -1 F430 (16 29!321 �I 1 79.87 3L31321 1 809.6 (31 7/1 I e�g SERVICE AREA I BACK I - -4 I _■__ I 16_12j J_ ^I 1 1 154.87 16 31321 ��——��— Q1 r FRONT co - - - ENLARGED FOR DETAILED VIEW © 2020 Tesla, Inc. V3 PRE-ASSEMBLED SUPERCHARGER UNIT DATASHEET T E 5 L n R1.1 SEPT 2021 CHARGING INFRASTRUCTURE DEPLOYMENT DISCONNECT ENCLOSURE Service Entrance Suitable for use as service equipment when bonding jumper - . installed Ingress Protection NEMA 4X, IP 66 Krl ■ • -■ UL 50 Depth,Width, Height 366,770, 1482 mm; 14.4",30.3",58.3" Weight 90 kg(200 lbs) SUPERCHARGER Ratings 3 Pole,600A,480/277V,65kAIC,80%Rated ELECTRICAL Trip Type Thermal-Magnetic(Fixed-Adjustable) Manufacturer Eaton Part Number PDG33MO60OTFAN • ■ • -■ UL 489,IEC 60947-2.CSA C22.2 No.5,CCC Marked AUXILLIARY CIRCUIT BREAKER Electrical Ratings Single Pole, 15A,480W 277V,65kAIC,90%Rated ELECTRICAL Trip Type Thermal-Magnetic(Fixed-Adjustable) Manufacturer Eaton Part Number PDG21 M0015TFFJ Fill 211■ • -■ IIIIIIIII UL 489, IEC 60947-2,CSA,CCC Marked CONTROLLER ■-• IN KIT - Input Voltage 120,240,277,or 480 VAc ELECTRICAL Input Power 100 W Max. Frequency 50 Hz/60 Hz Overvoltage Protection Category III ENVIRONMENTAL Operating Temperature -30"C to 50"C,-22"F to 122"F Relative Humidity 100%condensing,wet location rated Protocols Modbus TCP,DNP3, Rest API COMMUNICATION Backhaul Ethernet,4G LTE © 2020 Tesla, Inc V3 PRE-ASSEMBLED SUPERCHARGER UNIT DATASHEET T S 5 L n R1.1 SEPT 2021 CHARGING INFRASTRUCTURE DEPLOYMENT 366 571 . 5 14 . 41 " �--- 22 . 5" EE 403 . 4 1371 . 6 1481 . 4 15 . 25" 54" 58 . 32" 336 . 2 13 . 24" 914 . 4 36" SERVICE AREA FOR DISCONNECT ENCLOSURE 762 301, © 2020 Tesla, Inc. V3 PRE-ASSEMBLED SUPERCHARGER UNIT DATASHEET T = 5 L n R1.1 SEPT 2021 CHARGING INFRASTRUCTURE DEPLOYMENT DISCONNECT ENCLOSURE (111AIN DOOR OPEN) . o CONTROLS PANEL DEADFRONT TESLA SITE CONTROLLER • C=3 MAIN POWER DEADFRONT C=3 BREAKER 600A BREAKER SUPERCHARGER SWITCH 15A BREAKER LIGHTING SWITCH Ij Lfu J- © 2020 Tesla, Inc V3 PRE—ASSEMBLED SUPERCHARGER UNIT DATASHEET T - 5 L n R1.1 SEPT 2021 CHARGING INFRASTRUCTURE DEPLOYMENT DISCONNECT ENCLOSURE (DEADFPONTS REMOVED) FO-1 0 00.0 - TESLA SITE CONTROLLER • DROP—IN KIT „ D D BLUE ❑D 9 s o D s 0 0 0 o e ° • ° --- NEUTRAL BAR • c . o x -.p-_____---- n u p CAN BE GROUNDED WHEN USED AS SERVICE ENTRANCE 000 O n ° 0 0 noo aao 0 TGF: LOAD SIDE ® noe 600A/3P BREAKER SUPERCHARGER SWITCH ° O0A�O ° BOTTOhf: LINE SIDE nan ° auu 15A/1P BREAKER • LIGHTING SWITCH nUA e a a a A O ® ano GROUND BAR a0n Q p ol III Lnj 2 © 2020 Tesla, Inc Tesla V4 Supercharger Post Tesla's next generation V4 Supercharger Post is designed to deliver best-in-class performance, user experience, and aesthetics.The V4 Supercharger Post brings Tesla's global leadership in EV charging infrastructure deployment to more use cases by enabling support for global charging standards,including NACS,CCS1,CCS2,and GB/T.The V4 Supercharger Post with universal cable reach delivers a vehicle-agnostic experience allowing all users to charge with confidence. KEY FEATURES • Supports global charging standards Integrated revenue-grade DC energy meter • Supports open communication standards • Universal cable reach Optional payment/display module • • • Unparalleled ergonomics and performance Illuminated logo for greater visibility • 1 m flood tolerance • No high voltage at post when not in use • Small footprint saves space in parking areas T B S L n Tesla V4 Supercharger Post The specifications within this datasheet are subject to change by Tesla t V4 Supercharger Post Technical Specifications Product Model Number 1732843 Certified Maximum Power with V3 Cabinet 25OkW Certified Voltage Range with V3 Cabinet 0-50OVDC Certified Continuous Current with V3 Cabinet 615A Protection Over Current, Over Temperature Compliance (pending) UL 2202, CSA 22.2#107.1, IEC 61851-1, IEC 61851-2 Payment Payment Types Contactless Payments with Debit Card, Credit Module Card and Digital Wallets(Apple Pay, Google Pay (Optional) etc.), RFID card Display Size 3.5 inch touchscreen Compliance EMVCo L1, EMVCo L2 contactless, EMVCo 1-3, PCI PTS V6 unattended Environmental Operating Temperature -30'C to 50°C Ingress Protection IP54 Flood Tolerance 1015 mm Maximum Noise Level @ 1m 60 dBA below 40°C, 65 dBA above 40°C Mechanical Total Weight 90 kg Dimensions 334 x 891 x 1946 mm Charging Cable Length 3 m Site Layout and Input Lug: V+,V- (2/pole) Cu/Al,150 mm2-380 mm2 (300MCM - 750MCM) Installation PE Lug (2) Cu/Al,16 mm2- 95 mm2 (6AWG -250MCM) 24V Power Input: V+, V- (1/pole) Cu, 10 mm2 (8 AWG) Termination Temperature 90°C Max Distance From Cabinet 100 m Tesla V4 Supercharger Post The specifications within this datasheet are subject to change by Tesla V4 S-upercharger Post Technical Specifications Dimensions \CABLE EXIT LE HANDLE OPTIONAL PAYMENT MODULE '\ (BEHIND HANDLE) Ci 1945.93 76 e" 1691.36 68 B" 1 125.61 4416' 185.24 5 T16 lu Li 1 SERVICE ACCESS SIDE -- 308.38 134.91 12 5 6. CABLE DESIGNED TO HIWG ON EITHER SIDE OF POST ,tG 660 26 4" 35 116 .. Tesla V4 Supercharger Post The specifications within this datasheet are subject to change by Tesla 3 Tesla V3 . 5 Supercharger Cabinet The Tesla V3.5 Supercharger Cabinet provides AC/DC power conversion as part of the Supercharger system when deployed with the V4 Supercharger Post. The advanced system architecture includes highly optimized state of the art power electronics, efficient conversion, and enables site-wide power sharing for maximum throughput. Key Features • Supports NACS, CCS1, CCS2, GB Global voltage input range • High power density/compact footprint Rugged enclosure for all environments • Compliant with global EVSE standards Surface mount wiring options • High efficiency low noise cooling system High power factor and low harmonics ','• :::;:ti ecwi 7'�r• :'��'r l 1 e Tesla V3.5 Supercharger Cabinet 2023-05-05 V3.5 Supercharger Cabinet Technical Specifications AC Input Input (VAC) 480 440 415 400 380 (Electrical) Rated AC Input Power Power(kVA) 387 354 334 322 306 AC Input Voltage 380 VAC-480 VAC (-5%, +10%),4-wire 3AC+N Ac Input Current 465 AAC Max. Frequency 50 Hz/60 Hz Power Factor >_ 0.99 Current THD < 3% Voltage THD < 2% AC Input Conductor Sizes L1, L2, L3, N:150 - 400 mm2,250-750 MCM (Mechanical) PE: 10 - 70 MM2,#8 AWG-2/0 Conductor Material Type L1, L2, L3, N: Cu, AI PE: Cu/AI Mfr.Termination Temp. Rating 90°C Shared DC Bus Max Rated DC Bus Power Power(kW) 575 (Electrical) Max Rated DC Bus Current Current (ADC) 640 DC Bus Voltage Range 880 -1000 VDC Shared DC Bus Conductor Sizes V+, V- (2x/pole):150-300 mm2,250- 600 MCM (Mechanical) Mid:16 -150 mm2, 6AWG -250 MCM PE:10 - 70 MM2,#8 AWG -2/0 Conductor Material Type V+, V-, Mid: Cu,Al PE: Cu/AI Conductor Voltage Rating 1000 V Mfr.Termination Temp. Rating 90°C DC Post Output Max. Rated Post Power 250 kW (Electrical) Post Rated Voltage Range 0-500 V DC Post Rated Current @Ta=35°C NACS: 350 A DC, CCS2&GB Handle:450A DC Number of Charge Posts 1-4 Max Voltage Drop 10 V DC DC Post Output Conductor Size V+, V- (2x/pole): 600 MCM or 300 mm2 (Mechanical) AL(certified equipment wiring) PE: 10 - 70 mm2,#8 AWG-2/0 Conductor Material Type V+,V-: AI, Cu PE: Cu/AI Conductor Voltage Rating 1000 V Mfr.Termination Temp Rating 90°C Tesla V3.5 Supercharger Cabinet 2023-05-05 V3.5 Supercharger Cabinet Technical Specifications System Efficiency 96% Protection AC Input side: Class 1 Isolated DC Output Over Voltage/Current/Temperature, Surge Protection, Isolation Monitoring Short-Circuit Protection External Electronic Trip Circuit Breaker Short-Circuit Current Rating 85 kA RMS symmetrical Environmental Operating Temperature -30°C to 50°C,-22°F to 122°F Ingress Protection IP66 (Cabinet), IP2X(Cooling) Ventilation Requirements Ventilation Not Required Noise Typical noise at 1m 35 dB(A) Standards UL 2202, CSA C22.2#107.1, FCC, ICES-003-13, IEC 61851-1, EN 61000-6-2 EN 55011, GB/T 18487.1, GB/T 27930, NB/T 33008.1, NB/T 33001 Layout Max. Distance to Charge Post 100 m, 340 ft. Weight Supercharger Cabinet Weight 4 Post Cabinet:1110 kg (2448 lbs) 3 Post Cabinet:1039 kg (2291 lbs) Dimensions Depth,Width, Height 1000,1250, 2200 mm;39,2/,2.49 7/8 8620/32 in. Mounting Per-anchor min. Shear Strength 4 kN Per-anchor min. Tension Strength 11 kN DC Post Output 24V Post Power Supply Conductors V+,V- (1x/pole):10 MM2, #8 AWG CU (24V) Integrated in signal cable bundle esia V3.5 Supercharger Cabinet 2023-05-05 V3.5 Supercharger Cabinet Dimensions BOLT PATTERN 4K m 19.05[0.75" � ` 1340 1 52.76"[ 859.98 859.98 33.86• 33.86" 1524 60" SERVICE AREA 1254.2[49.36" TOP VIEW (TVP) 0 25-4 1 1-1 MOUNTING PATTERN 910 35.93' 452.5 17.61' 7 2243 3 2273.3 1 7• 0 7 .aB.32- 1776 89-5' 239.5 9-43' 69.94" ED 1250[49.21" 960 1 37.8"1 REAR >►� — 1066.4 1390[54.72' ] 41.98" FRONT RIGHT 1340 1 52.76- 1 275.2 10.83- REAR CABINET 179.2 1 6 7 1 INSIDE CABINET ENLARGED FOR 859.98 �% •� 859.98 DETAILED VIEW 33.86' 619.79 16 54 235.2 235 538.25 33.86' 24.4• p,65• •.26• 9.25' 21.19- FRONT CABINET 116.7 4.66- 355.7 ® CABINET OPENING 14- 395 9 15.59• Tesla V3.5 Supercharger Cabinet 2023-05-05 4