HomeMy WebLinkAbout21365-zFORM NO. 4
TOWN OF SOUTHOLD
BUILDING DEPARTMENT
Office of the Building Inspector
Town Hall
Southold, N.Y.
CERTIFICATE OF OCCUPANCY
No Z-22462 Date JULY 22~ 1993
ACCESSORY
THIS CERTIFIES that the building
Location of Property 4855 STILLWATER AVENUE CUTCHOGUE~ N.Y.
House No. Street Hamlet
County Tax Map No. 1000 Section 137 Block 3 Lot 8
Subdivision Filed Map No. Lot No.
conforms substantially to the Application for Building Permit heretofore
filed in this office dated APRIL 23, 1993 pursuant to which
Building Permit No. 21365-Z dated APRIL 26~ 1993
was issued, and conforms to all of the requirements of the applicable
provisions of the law. The occupancy for which this certificate is
issued is ACCESSORY THREE CAR GARAGE AS APPLIED FOR
The certificate is issued to
(owners)
of the aforesaid building.
SUFFOLK COUNTY DEPARTMENT OF HEALTH APPROVAL N/A
UNDERWRITERS CERTIFICATE NO. N/A
PLUMBERS CERTIFICATION DATED N/A
JOHN & CHRISTINE CARACCIA
Rev. 1/El
I~OBM NO. ,u
TOWN OF SOUTHOLD
BUILDING DEPARTMENT
TOWN HALL
SOUTHOLD, N. Y.
BUILDING PERMIT
(THIS PERMIT MUST BE KEPT ON THE PP. EMISES UNTIL FULL
COMPLETION OF THE WORK AUTHORIZED)
N~N? 2136~ Z
Permission is hereby granted to:
.~.~..'t..... ' ..... ~.~
~~/.~.,~, ....~..:.,-/..,.LL...'7.~..~ .....
,o ..~~....,~.....~.L~....~....~...,~.~,,.....c~.. ......
at premises located at .......................................... ~ ........
County Tax Map No. 1000 Sectiof~Jy.~.,7~ ........ 8lock ....... I~.~2~ ...... Lot No....I~...~. ............
,u~.,o,t ~o o,,~l~a~ion do*~ ...~.....~.~ .................. , !~.9...~, a,d oppro~ by ,h,
Building Inspector.
Building Inspector
Rev. 6/30/80
Form No. 6'
TOWN OF SOUTHOLD
BUILDING DEPARTMENT
TOWN HALL
~65-1802
APPLICATION FOR CERTIFICATE OF OCCUPANCY
This application must be filled in by typewriter OR ink and submitted to the building
inspector with the following: for new building or new use:
1. Final survey of property with accurate location of all buildings, property lines,
streets, and unusual natural or topographic features.
2. Final Approval from Health Dept. of water supply and sewerage-disposal(S-9 form).
3. Approval of electrical installation from Board of Fire Underwriters.
4. Sworn statement from plumber certifying that the solder used in system contains
less than 2/10 of 1% lead.
5. Commercial building, industrial building, multiple residences and similar buildings
and installations, a certificate of Code Compliance from architect or engineer
responsible for the building.
6. Submit Planning Board Approval of completed site plan requirements.
,B. For existing buildings (prior to April 9, 1957) non-conforming uses, or buildings and
'.'pre-existing" land uses:
1. Accurate survey of property showing all property lines, streets, building and
unusual natural or topographic features.
2; A properly completed application and a consent to inspect signed by the applicant.
If a Certificate of Occupancy is denied, the Building Inspector shall state the
reasons therefor in writing to the applicant.
C. Fees
~ 1. Certificate of Occupancy - New dwelling $25.00, Additions to dwelling $25.00,
Alterations to dwelling $25.00, Swin~ming pool $25.00, Accessor~ building $25.00,
Additions to accessory building $25.00. Businesses $50.00.
2. Certificate of Occupancy on Pre-existing Building - $100.00
3.' Copy of Certificate of Occupancy - $5.00 over 5 years - $10.00
~4. Updated Certificate of Occupancy - $50.00 ,
5. Temporary Certificate of Occupancy - Residential $15.00, Commercial $15.00
~ Date
......... ................. .
New Construction ...... · .... Old Or P~e-exis'ting Buildin~ ....
House No. Street ZHamlet
Onwer or Owners of Property ..... ~q..~ .f.~. . ..~.~. ...........................
County Tax Map No 1000, Section. /.~.7. .Block. ..~.
Subdivision .................................... Filed Map ............ Lot .................... . .
No...~../.~..~.~-- ~ ~ . .~.. ~. ?..~. ~ ?..~ Applicant..~..O.~..~...~.~. ~ .~.~. ~./.~(~...
Permit ..... oate Of Permit .... ..
Health Dept. Approval...~/~ ............ ..... Underwriters Approval....~?./~ ................
Planning Board Approval ..... ~//~ ..............
Request for: Temporary Certificate ........... Final Certicate.,..~. ......
~ ' APPLICANT '
INSPECTORS
Victor Lessard
Principal Building Inspector
Curtis Horton
Senior Building Inspector
Thomas Fisher
Building Inspector
Gary Fish
Building Inspector
Vincent R. Wieczorek
Ordinance Inspector
Robert Fisher
Assistant Fire Inspector
Telephone (516) 765-1802
OFFICE OF BUILDING INSPECTOR
TOWN OF SOUTHOLD
SCOTT L. HARRIS, Supervisor
Southold Town Hall
P.O. Box 1179, 53095 Main Road
Southold, New York 11971
Fax (516) 765-1823
Telephone (516) 765-1800
gIJ'LY 12, 1993
JOHN & CHRISTINE CARACCIA
5855 STILL}/AI~R AVENUE
CIJ~CHO~UE, BY 11935
To Whom This May Concern:
We are unable to complete your Certificate of Occupancy
because of the following reasons:
xxx An application for Certificate of Occupancy is
not on file. (Enclosed)
No Underwriters Certificate on file.
The check is ~u~l~a~X/not on file.)$25.00
No Health Department Approval on file.
No final inspectio~ has been made.
No Plumber Solder Certificate on file.
(All permits involving plumbing being
issued after April 1, 1984).
BUILDING PERMIT ~ 21365-Z
Please contact our office on this matter.
cooperation.
Thank you for
SOUTHOLD TOWN BUILDING DEPT.
?~IELD '~L,S, ~C, ~ON IfDATE
FOUNDATION (1st)
FOUNDATION
2.
(2nd)
ROUGH FRAME &
.FLUMBING
INSULATION PER N.
STATE ENERGY
CODE
FINAL
ADDITIONAL COMMENTS:
765-1802
BUILDING DEPT.
INSPECTION
FOUNDATION 1ST [ ] ROUGH PLBG.
FOUNDATION ZND [ ] INSULATION
[~F~MING [ ] FINAL
765-1802
BUILDING DEPT.
ON 1ST [ ] ROUGH PLBG.
FOUNDATION ZND [ ] INSULATION
FRAMING [ ] FINAL
REMARKS: ~/~-~'~'~~
DATE
INSPECTOR
76S-1802
BUILDING DEPT.
INSPECTION
~FOUNDATION 1ST [ ] ROUGH PLBG.
FOUNDATION 2ND [ ] INSULATION
FRAMING [ ] FINAL
RE~:~4RKS: /
DATE
INSPECTOR
New York State Department of Environmental Conservation
Building 40--SUNY, Stony Brook, New York 11790-2356
(516) 751--1389
FAX (516) 751-3839
John Caracoia
18 Linden Lane
Farmingville, NY 11738
April 5, 1993
Thomas C. Jorling
Commissioner
RE: 1-4738-00771/00001-0
Dear Mr. Caraccia:
In conformance with the requirements of the State Uniform
Procedures Act (Article 70, ECL) and its implementing regulations
(6NYCRR, Part 621) we are enclosing your permit. Please read all
conditions carefully. If you are unable to comply with any
conditions, please contact us at the above address.
Also enclosed is a permit sign which is to be conspicuously
posted at the project site and protected from the weather.
Very truly yours,
Darleen Gerbino
Program Aide
DG/nw
enclosure
/-~DOT71
PERMIT
Under the £n¥1ronmentM Conservation Law
i Article 15, Tttle 3; 6NYCRR 327,
. 328, 329. Aquatic Pesticides
) Article 15, Title 5:
_ Protection ol Water
~------~ Article tS, Title 15:
Water Supply
~ Article 15, Title 15:
Water Transport
-- Article 15, Title 15'
__ Long Island Wells
~'---i Article 15, T(t~e 27:
Wild, Sc~nic and Recreational
Rivers
6NYORR 608:
Water Quality Certification
~ ArtiCe 17, Titles 7, 8:
SPDES
~--~ Article 19'.
Air potlution Control*
Artmle 23, Title 27:
Mined Land Reclamation
~'--] Article 24:
Freshwater Wetlands
N--New, R--Renewal, M--Modification,
O--Oonstruct (*only). O--Operate (*only)
EFFECTIVE DATI:
Tidal Wetlands
Article 27, Title 7; 6NYCRR 360:
Solid Waste Management*
Article 27, Title 9; 6NYORR 373:
Hazardous Waste Management
Article 34: ·
Coastal Erosion Management
Article 36:
Floodplain Management
Artices 1, 3 17, 19, 27, 37;
6NYCRR 380: P~diation Centre
r N^t _ , -/'c eve '
Con str~c¢~ on/expa~ on/mod~ f~ ca¢~ on of ~ struc~uP~TaC~ ·
.__~ e~i~jnq sj~¢zz~ALt~Z_dwell~nq and more thg~
bound~rz o~r~s~reconstructJon o~ ~n
/~ ~bls e m~t the perm~ttee ~
~ ) ~'~ ~ /Y Y ~ ' rees that the perm t s contingent upon strsct comp~-
Office of General Services or local government wh,ch may be required
solvents, lubricants, epoxy coatings, paints, concrete, leachate or any ~. ~'~'i/~/'/--~
Tidal Wetlands
Anv mater~al dredged m the prosecution ot the work hereto permitted
to,ts former condition Nocla~rn shall be made against the State
If granted under Article 36, this permtt does not s~gmfv tn any wa,,
that r.b,e pro~ect wdl be free from floodm~
If ~ranted under 6 NYCRR Part 60~, the NYS Department ot Environ-
mental Conservation hereby cert~Hes that the subject ~rolect will not
Sections 301, 302, 303, 306 a~d 307 of the C~ean Water Act ot 1977
(PL 9S-2~7) prowded that all of the conditions hsted hereto are met
Ali act)v~t~es authottzed by th~s permit must be
wmth the approved plans submitted by the appimcant or hms agent as part
ot the permit apphcatmon~/~
Such app,oved plans were prepared b~~-
SPECIAL CONDITIONS
1. A copy of this permit with supplementary conditions and approved plans
must be available at the project site whenever authorized work is in
progress.
2. The permit sign enclosed with the permit or a copy of letter of approval
must be protected from the weather and posted in a conspicuous location
at the work site until completion of authorized work.
3. At least 48 hours prior to commencement of the project, the permittee
must complete and return the top portion of the enclosed receipt form
certifying that he is fully aware of and understands all provisions and
conditions of this permit. Within one week of completion of the
permitted work, the bottom portion of that form must also be completed
and returned.
4. If the permittee intends to undertake any project design modifications
after permit issuance, the permittee must submit the appropriate plan
changes for approval by the Regional Permit Administrator prior to
undertaking any such modifications. The permittee is advised that
substantial modification may require submission of a new application for
permit.
5. Discharge of wet or fresh concrete, leachate or wash water from mix
trucks, mixers or other devices to tidal wetlands is prohibited.
6. Contamination of tidal wetlands and the waters of New York State by
suspended solids, sediments, fuels, lubricants, epoxy coatings, paints,
concrete, leachate or any other environmentally deleterious materials
associated with the conduct of the permitted activity is prohibited.
Page ~ 2 of ~
SPECIAL CONDITIONS
For Article 25 ( Tidal Wetlands .)
7. Contamination of tidal wetlands and the waters of New York State by
suspended solids, sediments, fuels, lubricants, epoxy coatings, paints,
concrete, leachate or any other environmentally deleterious materials
associated with the conduct of the permitted activity is prohibited.
8. Any debris or excess material from construction of this project must be
immediately and completely removed from the adjacent area and disposed of
at an approved upland site. Disposal of debris in tidal wetlands is
prohibited.
9. Construction equipment and materials must be stored in upland areas more
than 75 ft. landward of the most landward edge of the tidal wetland
boundary.
10. All areas of soil disturbance resulting from this project must be seeded
with an appropriate perennial grass seed and mulched with hay or straw
within one week of final grading. Mulch must be maintained until a
suitable vegetative cover is established.
11. If seeding is impracticable due to the time of year, a temporary mulch
must be applied and final seeding performed at the earliest opportunity
when weather conditions favor germination and growth, but not more than
six months after project completion.
12. All disturbed areas where soil is temporarily exposed or stockpiled for
longer than one month must be stabilized with a temporary hay or s=raw
mulch. Mulch must be maintained until a suitable vegetative cover is
established.
13. Bales of hay or other means to control erosion are to be placed on the
downslope edge of any disturbed area. This sediment barrier is to be put
in place before any disturbance of the ground occurs and is to be
maintained in good condition until all disturbed land is heavily
vegetated.
14. Disturbance to the natural vegetation or topography greater than 25 feet
seaward of the approved structure is prohibited.
15. Driveway and parking areas must be constructed of pervious material.
16. Roof runoff must be directed to drywells a minimum of 75 linear feet
landward of the tidal wetland boundary.
17. Backwash from pool filter must be discharged to a drywell located a mini-
mum of 100 linear feet landward of the tidal wetland boundary.
18. Draining of swimming pool water directly or indirectly into tidal wetlands
is prohibited.
19. Road, driveway and/or parking areas must be graded to direct runoff away
from tidal wetlands.
20. Construction of any decks, accessory structures or additions that are not
specifically authorized by the approved plans that are part of the permit
is prohibited..
FACILITY ID NUMBER
Regional Permit Administrator
N¥S Dept. of Environmental Conservation
Building 40, SUNY - Room 291
Stony Brook, NY 11794
(516) 751-7900
P R O C ~ ^ M N U M B,~..,./~:)~ Page 3 of__
SUPPLEMENTARY SPECIAL CONDITIONS
The following conditions apply to all permits:
A copy of this permit, including all conditions and
approved plans, shall be available at the project site
whenever authorized work is in progress. The permit
sign enclosed with the permit shall be protected from
the weather and posted in a conspicuous location at the
work site until all authorized work has been completed.
The permittee shall require that any contractor,
project engineer, or other person responsible for the
overall supervision of this project reads, understands,
and complies with this permit and all its general,
special, and supplementary special conditions. Any
failure to comply precisely with all of the terms and
conditions of this permit, unless authorized in
writing, shall be treated as a violation of the
Environmental Conservation Law. If any of the permit
conditions are unclear, the permittee shall contact the
Division of Regulatory Affairs at the address on page
one or telephone (516) 751-1389.
Ct
If project design modifications become necessary after
permit issuance, the permittee shall submit the
appropriate plan changes for approval by the Regional
Permit Administrator prior to undertaking any such
modifications. The permittee is advised that
substantial modification may require submission of a
new application for permit.
At least 48 hours prior to commencement of the project,
the permittee and contractor shall sign and return the
top portion of the enclosed notification form
certifying that they are fully aware of and understand
all terms and conditions of this permit. Within 30
days of completion of the permitted work, the bottom
portion of that form shall also be signed and returned,
along with photographs of th~ completed work and, if
required, a survey.
For projects involving activities to be undertaken in
phases over a period of more than one year, the
permittee shall notify the Regional Permit
Administrator in writing at least 48 hours prior to
recommencing work in subsequent years.
The granting of this permit does not relieve the
permittee of the responsibility of obtaining a grant,
easement, or other necessary approval from the Division
of Land Utilization, office of General Services, Tower
Building, Empire State Plaza, Albany, NY 12242
(5~6) 474-2195, which may be required for any encroachment
upon State-owned lands underwater.
DEC PERMIT NUMBER 1-4738-00771/00001-0 PAGE 4 OF 4
............. o al .............. Demolition ..... : .......... Other Work ...............
4. Estimated Cost ~?-~2 · .6~...i..' *~' ' (Description)
(to be paid on filing this application)
5. If dwelling, number of dwellinj?=~pits ....... ~ ....... Number of dwelling units on each floor ................
· Ifgarage, number of cars . [ .t-3. r~ C (,3.). '
6. If business, commercial or roi.xed occupancy, specify nature and extent of,each type of use ......
7. Dimensions of existing structures, if any: Front ........ . ..... .. Rear .... '..' ........ D~;t't~ .
Height ............... Number of Stories ........................................................
Dimensions of shine structure with alterations or additions; Front ................. Rear ..................
~D.epth .. .......... ............. Height ....... i. ~.' ......... ... Number of Stories ........... 2 . .
8. ulmenstons of entire new construction: Front... D..q, ...... Rear '~ ~ / l~o,,,h ~ ~ / .......
9. Size of lot' Front hg~o~ · Re~ ...... (_~) ; ..... :" .... ~, ...... "'Z' ;.'c' '~. ~ .... ~ ....
10. uateotrurcnase ...... .t.rfp. ..... ~ ............. NameofFormerO,wner ..T.~.5.h.((c.~.m..' ' ........
11. Zone or use district in which premises are situated ~¢ % I c~ .e'Aq' ,~ ..¢~.. 'J- ...... : .......
12. Does proposed construction violate any zoning law, ordinance or regulation"' ~-' ~ ........... i ...... i .......
13. Will lot be regraded N) O Will e .... ' ' ' '; ]' .....................
............................. xcess ru~ oe removeu ~rom premises: Yes
14. NameofOwnerofpremjses .~n.~.~LO~.C.c~t.~ Address 8L. Iqd. eet~.o.q¢ PhoneNo (glg)Tg2--(,,qll ·
Name of Arcintect ... P,~f>.q.~, ........... Adgr, e~s .~..-m~r~qo I/e,~k/ PhoneNo '
Name of Contractor '~¢, [ ~. Address ....... .t .....'~ D)~ k,,- ~ ' ........... : ....
t5. Is this property within 300 feet of a tidal wetland? *Yes..L~..... No...
· If yes, S~uthold Town Trustees Permit may be required. ' .....
PLOT DIAGRAM
Locate clearly and distinctly all buildings, whether existing or proposed, and. indicate all set-back dimensions, from
lines. Give street and block number or description according to deed, and show street names and indicate whether
r corner lot.
STATE OF NEW YOR~, r-,,~ ~ S S '
COUhFFY OF ....... ~ ~.[.~.. ·
' .(]~ff./3 .~.~..Q~. ~¢..~...~..~.~.[..O'r ................ being duly sworn, deposes and says that he is the applicant
(Name of individual signing contract)
above named.
Heis the ... ...................... .~..~q ~.. ......................
(Contractor, agent, corporate officer, etc.)
of said owner or owners, and is duly authorized to perform or have performed the said work and to make ahd file this
application; that all statements contained in this application are true to the best of his knowledge and belief; and that the
work will be performed in the manner set forth in the application flied therewith.
Sworn to before me this
: APJ Z,; l UlL;b J JG DEPARTMENT
?t',~ i ~ ~, ~OWN HALL
Examined ., 19~[~
Approved ., 19~ Permit No.
sapprove a c ............... ~ ...................
(Budding Inspector)
APPLICATION FOR BUILDING PERMIT
B~ARD OF
3 SETS OF PLANS
SURVEY
CIIECK
sEpT c';; ................
Date ......... , ...
INSTRUCTIONS
a. Tins application must be com:pletely filled in by typewriter or in ink and submitted to the Building Inspector, with 3
sets of plans, accurate plot plan to scale. Fee according to schedule.
b. Plot plan showing location o( lot and of buildings on premises, relationship to adjoining premises or public streets
~r arqas, and giving a detailed description of Iayout of property mu~t be drawn on the diagram which is part of this appli-
cation.
c.' The work covered by tins app!ication may not be commenced before issuance of Building Permit.
d., Upon approval of this applicaition, the Building Inspector will issued a Building Permit to the applicant. Such permit
shall be kept on the premises availabl~ for inspection throughout the work.
e. No building shall be oceupiefl or used in whole or in part for any purpose whatever until a Certificate of Occupancy
shall have been granted bY the Building Inspector.
APPLICATION IS HEREBY MA~)E to the Building Department for the issuance of a Building Permit pursuant to the
Building Zone Ordinance of the Town of Southbld, Suffolk County, New York, and other applicable Laws, Ordinances or
Regulations, for the construction ofi buildings, additions or alterations, or for removal or demolition, as herein described.
The applicant agrees to comply witl~ all applicable laws, ordinances, building code, housing code, and regulations, and to
admit authorized inspectors on premises and in building for necessary inspect~on~ ,d ~ '
. ...... ...............
-- . (~g~flture of applicant, or name, if a corporation)
(Mailing address o~ applicant) //
State whe,~her applicant is owner, l~ssee, 'agent, architect, engineer generai 'contractor, electrician, plumber or builder.
Name of owne: of premises.. ~ ,~...~..,~. ,~n. t.h.e~, t.~~ e.d.), . , ' ........... ' .........
If applicant is a corporation, signatur~ of duly authoriied officer.'
(Name and t~tle of corporote officer)
Builder's License No. ' .....
Plumber's License No ........ i ....... . ..........
Electrician's License No.
Other Trade's License No
1. Location~of land on which prop?ed work will .be done ................... ¥ ............. ~ .. .............. ..
House Number [ Street / Hamlet
Cotmty Tax Map No. 1000 SectiOn . :. ].~.'~ .......... Block ...-.~. ......... i... Lot ............
Subdivision ........ . ........ (iq' ~d) ........... ......'. Filed Map No ............... Lot ...............
a
2: State existing use and occupancy iof premises and intended use and occupancy of proposed construction:
a. Existing use and occupancy . .i.
b. Intended use'and occupancy ..
oz
wo
~z~
~O<.m