Loading...
HomeMy WebLinkAbout49524-Z TOWN OF SOUTHOLD BUILDING DEPARTMENT TOWN CLERK'S OFFICE ,`` SOUTHOLD, NY `d BUILDING PERMIT (THIS PERMIT MUST BE KEPT ON THE PREMISES WITH ONE SET OF APPROVED PLANS AND SPECIFICATIONS UNTIL FULL COMPLETION OF THE WORK AUTHORIZED) Permit#: 49524 Date: 7/27/2023 Permission is hereby granted to: Moffat Farm North LLC Tina J Koslosky manager 48125 CR 48 Southold NY 11971 To: construct agricultural barn for equipment storage as applied for per Land Preservation approval. At premises located at: 47775 CR 48 SCTM # 473889 Sec/Block/Lot# 55.-2-10.4 Pursuant to application dated 9/29/2022 and approved by the Building Inspector. To expire on 7/26/2024. Fees: FARM BUILDING-NEW $150.00 CERTIFICATE OF OCCUPANCY $50.00 Total: $200.00 Bu ding Inspector � sira� TOWN OF SOUTHOLD—BUILDING DEPARTMENT a Town Hall Annex 54375 Main Road P. O. Box 1179 Southold NY 11971-0959 a 'r Telephone(631) 765-1802 Fax(631) 765-9502 litU)s://www.soutlioldtoNvilily.gov Date Received APPLICATION FOR BUILDING PERMIT For Office Use Only f I PERMIT NO. Building inspector; Applications and forms must be filled out in their entirety.Incomplete applications will not be accepted. Where the Applicant is not the owner,an Owners Authorization form(Page 2)shall be completed. Date:September 26, 2022 OWNER(S)OF PROPERTY: Name:Flowers & Flores Farm, LLCscTM#1000-55.-2-10.3 & 10.4 Project Address:48455 Middle Road, Southold, NY, 11971 Phone#:631.323.6690 Email:kevin@northforkflowerfarm.com Mailing Address:440 Haywater Road, Cutchouque, NY 11935 CONTACT PERSON: - Name:Kevin Perry Mailing Address 880 Village Lane Box 95, Orient NY, 11957 Phone#:631.323.6690 Email:kevin@northforkflowerfarm.com DESIGN PROFESSIONAL INFORMATION: Name: TBD Mailing Address: Phone#: Email: CONTRACTOR INFORMATION: Name:TBD Mailing Address: Phone#: Email: DESCRIPTION OF PROPOSED CONSTRUCTION @New Structure ❑Addition ❑Alteration ❑Repair ❑Demolition Estimated Cost of Project: ❑Other $30,000 Will the lot be re-graded? ❑Yes iRNo Will excess fill be removed from premises? ❑Yes @No 1 . ....�._.�.._.�. ��,PROPERTY INFORMATION.. .._�.-...._.T,�....__"_ Existing use of ro ertY Agrlcultural intendedded use of ro ert : Agrlcultural Zone or use district in which premises is situated: Are there any covenants and restrictions with respect to AC this property? WYes ❑No IF YES, PROVIDE A COPY. IN Check Box After Reading: The owner/contractor/design professional is responsible for all drainage and stone water issues as provided by Chapter 236 of the Town Code.APPLICATION IS HEREBY MADE to the Building Department for the Issuance of a Building Permit pursuant to the Building Zone ordinance of the Town of Southold,Suffolk,County,New York and other applicable Laws,Ordinances or Regulations,for the construction of buildings, additions,alterations or for removal or demolition as herein described.The applicant agrees to comply with all applicable laws,ordinances,building code, housing code and regulations and to admit authorized inspectors on premises and In building(s)for necessary inspections.False statements made herein are punishable as a Class A misdemeanor pursuant to Section 210.45 of the New York State Penal Law. Application Submitted By(pri/na evi n Perry ❑Authorized Agent ROWner Signature of Applicant: Date: 2� 12 U"LZ CAROLINE M MACARTHUR STATE OF NEW YORK) NOTARY PUBLIC-STATE OF NEW YORK SS: No.01 MA6384635 COUNTY OF �V�T[JL/ ) oualified in Suffolk County Kevin Perry My Commission Expires 12-17-2022 being duly sworn deposes and says that(s he is s theaPplicant (Name of individual signing contract)above named, Nhe is theGeneral Member of the LLC (Contractor,Agent,Corporate Officer,etc.) of said owner or owners, and is duly authorized to perform or have performed the said work and to make and file this application;that all statements contained in this application are true to the best of his/her knowledge and belief;and that the work will be performed in the manner set forth in the application file therewith. Sworn before me this 2 day of -er7MPc 20 Notary Public PROPERTY OWNER AUTHORIZATION (Where the applicant is not the owner) I, residing at do hereby authorize to apply on my behalf to the Town of Southold Building Department for approval as described herein. Owners Signature Date Print Owner's Name 2 z LILLIAN F.MCCULLOUGH OFFICE LOCATION: LAND PRESERVATION Town Hall Annex EXECUTIVE ASSISTANT ��� 54375 State Route 25 lillianm@southoldtownny.gov (comer of Main Rd&Youngs Ave) Southold,New York Telephone(631)765-5711 Facsimile(631)765-6640 MAILING ADDRESS: P.O.Box 1179 www.southoldtownny.gov Southold,NY 11971-0959 DEPARTMENT OF LAND PRESERVATION TOWN OF SOUTHOLD TO: Amanda Nunemaker, Building Permits Examiner FROM: Lilly McCullough,Land Preservation Executive Assistant RE: SCTM# 1000-55.-2-10.4 48455 Middle Road, Southold Request for Review: Application for Building Permit for Flowers & Flores Farm, LLC on Land Subject to Town Development Rights DATE: July 26, 2023 At its regular meeting held on July 25, 2023,the Land Preservation Committee reviewed the July 24, 2023 referral from the Building Department. The Committee presented and passed the following motion: The Land Preservation Committee has reviewed and discussed Flowers & Flores Farms, LLC's revised design for an 810 sq. ft. equipment barn on lands subject to a recorded Town Development Rights Easement. The Land Preservation Committee finds that the proposed improvements are not in conflict with the purposes and other terms and conditions of the recorded Easement. Encl. 2023 Revised Equip Barn Design cc: Flowers &Flores Farm, LLC M u E yI c Ln vto x x N co N d CO a0 Cr N a x a `o X x U. EXT-2 30' 9' 10 1/2° 10' 91101/211 3- 25/8"3' 2"T5 7/8 1'° C. a. �d — �� MB—PWMw(nsro iA' sR�MMs'7M °? i M a M of � � N N s3 M V - i O �--� l euro� wroemws " 'L p CL a IL a! i V� ..Z/T OT ,6 .OT ..Z/T OT .6 E f to ,0£ a i".LX3 LL s 0 w- t cm t'N 'm O0 ', ZEN LLc1��O LL O C �, � r �r� �y��%%� %�y ������al�/�%�rf�(nr��4 JY����"�i�r��✓�'8�!%%l��rv��4ii�rFi�jt'ydl �&ri���� �VIll1°'+,dY�r"' ua v� � �r/��r/ rrr ver wr rtri ixr,/✓�i/rrl��yi;�/�; m�r�0 /r+i� //✓/��' �� ;� �. h / ,r ie/ill%l l�l%Y Ont��y��U � e4+/J�iJ �✓�� i/ll w� �� v, t ',r ,��r �� ✓" r r�l��I%81���'��yy�✓�� �� � � f/ . r i i a �rr ✓�r � r � r8 ��� �"" ✓ /li r��j r rl f 1'nl r88j� /� � � 1 �� �� r �'�� r � N ro v ��' in,✓��p�r�)�r��r/rel ii�'�"� r � �� r t!'� rir,�6 ✓� �✓ '�w ���✓ /rr dal �i Y 8 %Ir ?` r9 E Y ,�, "�"' '"'� � ✓/'%par✓�%�w��'i1�'il�r✓�r i � l 1�y�r U �� „. r * X cY) +' " uj till 0) 0 CEJ' , C�! fa� {�✓��i/�� xYr✓iiJ lr �' 0 0 1 r � �tA����✓�iPr���r�Yrj r;r<���IJ � ' � a ' r r r � i i r//i�///�)nl ire /r1y �� �'� ✓I rtf/ Y i/ /r�����r/� KM it r ✓�u l �� i D ✓�. r ii��✓ll arwi y r � ^i���Il 1 Y Yi� ✓ � � r ✓ 1 '✓yrs li l�ydj� r rr °(�����„ Hri, e;8^�f� p°J r r y r�rro rrr Yr i r 88%lu /// r�/r� V� r i n r.... r� r r r o,r y tr t r �z q R r /���Op�r� ✓ �QYrjy � .� Y 'm �r , n r� r LL` 1�d 1 0 7 P• Fobrn ��er o N a Z N •-q-1 `�Jli• O Y� � r4wJ a )'oyrl r rY 1 l�D (rl4-1 y E 0 D H ?, r d Iw`rwy ��^ I r ver rrr ar nr wry yr wgavw�.v r7�ry;nwi�7y3""'6i+ r wy-*,y;ra�>N Aid"�jdrM"a�"�vryf�;F r r u r rrr �rry rah/ y r 7�� iiw wr ��ra wv` a%i/ / », 'o�il�'�1a�/r✓rN/i(r I ���r J rtilllr/l �f yar ,r,/�n�y � I �w �" /� 1�'��rN�N��' `li�/%v �%`�� "1,rJ;✓, JJ��ram��r�, �%'r,f�/j N'i ''',.. o/I i' , a ri6" r>u���-;:. �- J/,���� /Jy/J/J yuf�,��/fi/�l//r �1�f�i�lr�i�/��/J�I��1fl�(ti���f�'/��;1� �!!'✓�7o In'r! �° w ���� �, ; (�., N /ia��'��� %������y�r kri" ��� !� 'illl`�(��� ���� i 1' 6 �i�. ✓ �o� r�1 I �. rCa r aril�r e /� J fr r o I r�iyi J' r �wf u Uo 42 •7 i IYi" 'G '` %'i`j✓�� �j 1%�^'"'� �1� )t'� '(� �I�v�` a✓ Yr+lw F' ' Y°,V�° / +,w a ril w✓1�llr r;✓ r v i(; n w r I @ rr r r 0 0Fz �i of/�/i'����rryr r���h ei r ������J� �� / r�, vi r ,� ✓ a ��✓ //11��", i�dr�, �I y r� w�� � �gl y � r a w' e} r t r rfr�y/r w`�r� Ilw/r��lyy riY� fwa JA i i I t �� r rTp��'�y✓l�r�r�l/9 f � � 1 r t ir�ry 5 �� i. 'w' r 1 w , r rr� ri wl//rF� r/f�" r✓� r lril w UO ��/v rr'r'�rvrr/l'� �� r ✓ 7J lrr.�D f � s v �!o %w�/%1�/ � rl 9Y/M/ei�r'�Jv W�i iyr r ✓�J l! N -i r /y �� r r r0U n l � Jl r l v ��I19 ✓�/'r 7 �1 ! 0 A 1 w,, rr ffwlua r r � rla✓U' �� r '�a pr/la v i � � f VIt, r`o �lr�r otr�/ijf� LL G�lyl6v/ir l,r,/y�r 1 ' �� try rpl r ! x. 3 //�r/✓%/iy i1 j✓�%A��f rr° f�fy,.;'s i�a � 1 sr p ". I r r;; r rrO/ry,✓ �jrr�G' �ll���l �J � �'� o� ✓ri/�/1!J�rr/r'����9� r ���� ! � � �' I. r CA Z�'i 6i N ca ;BrM LL Q! U- . m E -,cf- Project Name: Flowers&Flores Farm-North Fork Flower Farm ` CSP: Certified Commercial Project Address: 48455 Middle Road Quote#: KevinPerry-061323 POLE GBAMNS Southold,NY 11971 Job Type: DIY DIY Pole Barns Email: kevin@northforkflowerfarm.com 9232 Hogpath Rd.Arcanum,OH 45304 Phone#: 631-323-6690 Business:937-547-9100 Building Details: Color Selection: Openings: Cupola: Color Gauge Qty Type Quantity: Building Width: 30' Roof: 29 Ga. Windows: 2 Opening Only Size: Building Length: 27' Walls: 29 Ga. Type: Building Height: 12' Trim: Roof- Eave Overhang: 12"OH Vented Wainscoting: Man Doors: 1 6 Panel LH Sides: Gable Overhang: 12"OH Vented Skylight: Base: Roof Pitch: 4/12 Corners: Truss Spacing: 4' Ridge Closure: OHD Openings: Weathervane: Truss Load: 32-15*-0-5 Type: Metal-Vented Truss Type: Standard Snow Bars: Framing Nails: *Top cord dead load was increased by Dutch Door: Panel: Quantity: Sheathing Nails: 10psf to accommodate furture solar panels. Trim: Bale Door: Panel: Interior Liner: Building Specifications: Trim: Ceiling: Sliding Doors: 1 Size: 13.5 x 11 Wall: Snow Load: 32 Type:Split(Offset) Design Wind Speed: 126 Panel: Ivory Additional Sheathing: Building Code: NYBC 2020 Roof: Use Group: U Condensation Barrier/Insulation: Wall: Design Soil Bearing:*1500 PSF Roof: Double Bubble Soil bearing pressure is assumed. A site specific Roof: Decay Protection: soil test may be required for approval. Roof: Post Protector: YES Wall: Double Bubble GradeGuard: Type Size Wall: Skirtboard Protector: YES Footing: Pour Depth=8" Wall: Skirtboard Protector: Diameter= 24" Hole Depth= 3'8" Posts: Size Spacing Eave Post: 2x6 3ply 9'ox Gable Post: 2x6 3ply 10'ox 13'6"Opening Post: 2x6 4ply Wall Girts: 2 x 6 �0SE G� Roof Purlins: 2 x 4 I JUL 2 4 2023 Diagonal Bracing: 2 x 6 X Truss Carriers: Fasteners/qty: BUILDING DEPT. m " EXT-1: 2x12 Quad 5/16"Power Lag/16 T®�aN EXT-3: 2x12 Quad 5/16"Power Lag/16 j I I 1015135 13'6"Opening: LVL 117/8"Double 1/2"Balt/4 5$1 07/19/2023 .......... ...... Job:F&F-North Fork Flower Farm Date:7/7/2023 Time:10:21 AM Post Layout 'e.()F Ne 271 EXT-1 X 8' 101/2" 91 8' 10 1/2 Pi Pi PI U L 07119/2023 LO CI4 1--A r C) C) ~ Pi Pi C10 tK � W S C) C) MK E ti PI E: Pi W M LLJ Un P2C-0 00 W C) C) r-i 3P9 W Custom Split Slider Ln F1 CO Pi Pi Pi 1 3 Ply 2x6 Nail Lam 4' 61/4" 131211 9' 0 3/4 PI 2'x4'8"Hole Depth 3PLY2x6 Post Protec for 261911 Treated 46 P2 2'x4'8"Hole Depth 27' EXT-3 4x6 Post Protector WALL BRACING DETAIL Eave 25'MAX 25'MAX <— Braced Corner ❑ ❑ ❑ ❑ m Indicates 2 x 4 or 2 x 6 Diagonal Bracing Between Posts Attach Brace to Girts&Posts w/ d o- (2)3"Framing Nails @ Each Location,Typ. a 0 C m m Gable Posts Post Orientation of X64" Ey �0 r E Structural ❑ Post +t1 m a / \ Yk Corner Posts Eave Wall Posts Ll 7(p raj$ 07/19/2023 Eave Wall Girts 'm M n 0 0 M ❑ ❑ n ❑ n =j Braced Corner �� 25'MAX Braced Wall — e 25'MAX Braced Corner Eave "...Job: Jo FU-North Fork Hower Farm Date:6/29/2023 Time:3:11 PM Isol OF NC- Epil OM X 400 07/1912023, --- V a. IQ Q i l'i P,P i t:�it. i, F f fill fill 3�,,k'Q H I —Vs .......... j Ji N .<, tlE jJI .... . x 'W V�j rw A `4 �; " , - I,----,"," 1 -42", Wj� Y". �JV q A� X��,h V • '^/•;f 3x -�r VK-", 0z, • v"/ A its R� 5 Jo F_No r Fork Flower r Date-612912023 Time.3..11 Pm IM Ch AY SEPq 00 07/19/2023 t. tt POW—_J TWOS Ins"M A Q­­',!" SKY, lump"i ti , , TAN"Ay WINN 0-05fi too Ml Ill 511 low Sam :-Wkt, to a Q !1 JIM, s�ggkk 1 MOW BMI octal-, WH­ Who 144 01"m MY- "Puff Q u's QW,Wj*A, =U"Mwy % 04eu IV Ky NOY, �4 a T away st 1 Am KM Aw" 'M on Azov yz" -My ol, WoeiiYs MOW pool? 0 A„, its, 15SAMM Aff :W,f JAY- --ma Novick- son Job:F&F-North Fork Flower Farm Date:6/29/2023 Time:3:11 PM Left Elevation . f N6:tV BSEP 0 C, 10 16135 07/19/2023 Job:F&F-North Fork Flower Farm Date:6/29/2023 oF Time:3:11 PM Right Elevation 'C � a- EPh o� / 07/19/2023 Custom split slider 13.2"w x 11'61/2"h Job:F&F-North Fork Flower Farm Date:6/29/2023 Time:3:11 PM Back Elevation Lu 015 51 07/19/2023 4/12 4/12 Yl iA :ustem Wi,dm3',x 6'8114" Job:F&F-North Fork Flower Farm Date:7/19/2023 GIRTS& PURLINS Time:9:43 AM Assembly Drawing- ROOF-1 X, Stock lengths.Measure Spans on-site for accurate cut lengths. OF NEpyY c7O SEP)) Materials 81 8'&10'lengths are non-stock.Obtain from 16'or 20'long stock boards. Usaae [Material Purlin Spruce 2x4 "S S Scrap.Obtain from extra cut-offs. 07/19/2023 777— 77 iV 14' 16', fV 14' '16' .......... '77 tV rV AW, 14" 16' 14' 16! Ib 14 1.4, 29' 29' Job:F&F-North Fork Flower Farm Date:7/19/�023 Time:9:43 AM Assembly Drawing- EXT-1 GIRTS& PURLINS oF NCtj,;,. X1 Stock lengths.Measure Spans on-site for accurate cut lengths. Materiats Diagonal Wall Bracing is Required. 81 8'&10'lengths are non-stock.Obtain from Usage Material See Detail 16'or 20'long stock boards. TrussBearer 1.5 x 11.875 LVL SkirtBoard Treated 2x8 S Scrap.Obtain from extra cut-offs. Girt Spruce 2x6 07/19/2023 2' 2' 2' 2' 2' 2' .......... e"i IV. �-/Am", .10, .. ..................... lo,. 7, Is" 10' al"0,/j----;,,v- % qv 18 18, 27' 27' Job:F&F-North Fork Flower Farm Date:7/19/2023 Time:9:43 AM Assembly Drawing- EXT-2 E p Materials Usage Material SkirtBoard Treated 2x8 Girt Spruce 2x6 I SVI SSI 07/19/2023 fV IT 20' zo � 10' 20" tV 7 20' 3'2"WX7'h fV 20' '10, ON, 20 0 NJ Li 30' 30' Job:F&F-North Fork Flower Farm Date:7/19/2023 Time:9:43 AM Assembly Drawing- SLD-1 OF Ne81 i Yo r, 07/19/2023 8.. , ro o0 8. a a LL 6-7- 6'7" jo'���&�-�.r't'h'F'o"r-k*'F'Io"'we,-r,F'a rm*'*' Date:7/19/2023 Time:9:43 AM Assembly Drawing- SLD-2 OF NEW s p 8' 07/19/2023 8!' 6.7. 6-7- SKYLIGHT PANEL w/Overhang NO/Overhang 7, ------ Wall Panel d Wall Panel -Bar Panel -----------— Wall Panel Z Wall P Z-Bar ....... . 111 J Y Z-Bar Z-Bar 11/2" cn Z-Bar Z-Bar Wall Panel Wall Panel 11 2" M, Z-Bar Z-Bar Wall Panel Wall Panel F N IOSE C, .0 07/19/2023 TYPICAL M Tmm I , I , I , I , NO OVERHANG 1 W/OVERHANG Roof Panel Roof Panel Roof Purlin Roof Purlin � 1 Roof Edge Trim Roof Edge Trim \ Fascia Trim 1 � I Truss Carrier ,... �� 5fi „ 7: #}ijs"r F&J Trim . ` Truss Carrier . DF NE X Wall Girt Wall Girt Structural Post '•; Structural Post Wall Panel Wall Panel A ,Qi JRa �L -- - j ---- W/WAINSCOT --- - ---- 07/19/2023 2x6 Wall Girt @ Transition Wall Panel Wall Girt Structural Post SkirtBoard Base Angle Top of SkirtBoard \ •`.z,':,::E, Base Angle Panel Start y I Panel Start v t"r;.:t• y;'n: ;,�:sr`Ids SkirtBoard r. m ,ri;s i.�i.:,'�'L�r.�-.i„ti`� {: 'e ''r`?i;s:�T.�%l:,f'•;ir;'s r:A; �,:�: -''-- - - - ---------- . ---•---- I" . t.l';-.iI;;'��+{��'pi:ti�'^k•�rr'�^«,�'j{ r5.r,:.^t:'•`a,i.:;.,ta(�:t-fir,. .£.s�^�; • y8, zrY.7i ........... ---------TRUSS -- N6 WRIER CONFIGURATIONSOF SEP A (2)Fasteners Each 07/19/2023 Carrier Per Post DOUBLE TRUSS CARRIERS ---------------- ---- -- -- ----- ---- ----- ---- ------- ------------j 13'6-Opening (4)Fasteners Each F Carrier Per Post i 7 F,7 A ------ ---- l ----- ---- TYPICAL GABLE TRIM NO OVERHANG 1'OVERHANG 2'OVERHANG /Roof Panel Outside Corner Trim Roof Panel Outside Corner Trim Roof Panel Outside Corner Trim Wall Panel Roof Purli 2x Fascia 2x Fascia Gable End Truss Roof Purlin Fascia Trim Roof Purlin Fascia Trim Soffit Panel Soffit Panel 2x Blocking @ 4'O.C. F&J Trim 2x Blocking @ 4'0.C. F&J Trim Gable End Truss Gable End Truss Wall Panel Wall Panel PORCH W/NO OVERHANG PORCH W/1'OVERHANG PORCH W/2'OVERHANG Roof Panel Outside Corner Trim Roof Purlin Roof Panel Outside Corner Trim Roof Purlin Roof Panel Outside Corner Trim / Wall Panel Roof Purlin rfl 2x Nailer 2x Fascia 2x Nailer 2x Fascia ' " - Fascia Trim r-. Rafter Soffit Panel \Soffit Panel Fascia Trim Roof Raker F&J Trim Rafter F8J Trim 2x Blocking @ 4'O.C. -_-- 2x Blocking @ 4'O.C. /_" _ 2x Framing @ 2'O.C. 2x Framing @ 2'0.C. 2x Framing @ 2'O.C. Wall Panel Wall Panel 2x End Wall 2x End Wall 2x End Wall Support Rafter Porch Trim Support Rafter Porch Trim Support Rafter Porch Trim 1 TYPICAL PORCH TRIM EA VEW/NO OVERHANG EA VEW/OVERHANG OF NFtV� Roof Panel Roof PanelSEPI Roof Edge Roof Edge Trim Trim ."la Wall Panel ��� i Fascia Trim Porch Trim 1 tiw5$ t� Soffit Panel .7ti � F&J Trim Wall Panel 07/19/2023 Porch Trim ............. .........— DOOR&WINDOW FRAMING DEALS ENTRY DOOR OSTRUCTURAL POST ENTRYDOOR DUTCH DOOR OVERHEAD DOOR IAMB 4x6 Treated Post 46 Treated Post 46 Post Post 2x4 Back Jamb Structural Post Wall Girt Wall Girt Trim Jamb Flush w/ �tl<—R.0. r MI--R.O. Back Jamb 'Verify Rough Opening Per 4x6 Post to Manufacturer's Specifications4 Wall Girt Above R.O. Wgill Mrr(I ------- -- - ------------- (,�2x Header Structural Post 2x Header 2x Header Structural Post 2x10 Jamb Wall Girt R.O. 2x Backing R.0 2x Backing R.O. Zx Backing Skirt boa rd Skirtboar d Of P 11, .F�, 05 0 5k!rtboard C, -AL WINDOW 0 STRUCTURAL POST WINDOW DOOR TRIM CWINDOW SM X Structural Post Wall GirtStructu ra I Post Wall Girt Iw R.0. R.O.--�4 F'Ws F—Q PL O._JZ4 ,, 0 r YJ r7i r.771 07/19/2023 rf S�Mjpost 2x Header Trt;mmerTrimmer "J MIP C-P R.0. (Extend to S.B.) R.0. (Extend to S.B.) PI x Sill 2x Sill 7 Skirtboard(S.B.) /Skir tboard(S.B. 7 4=� Hold Trimmer Above HoldTrlmmerA b e Conc Conc -AVA-- Sliding Door Accessories 77 ;j fAn, 4J "T"'T" Available 1,Et,10,IT,19',16,18'&20' 6, Protests the topRound Tk rac of the door from rain,snow,and ke. Door"andh, 'I wfi,, Track End 1--ft 1-4 bell:lu, -d wfth M.2ting Bolt This door pul,I I* R-1.11"unt—L hpr End!bb :d.6,516"o-0-.eh n wtlt h—. srnu te—lian W.1— I 314*6---p cf--N -4- WOOQ/STM BLOCKING all— 91,—d N�xl. Ring end hook simply s—e a chain to desfod length tog Designed for with dad wood4rame for holding bl-p mung sidin door leaves elt— doors,rods mount on opposite sides afJoirling door—ticaIs,angling upward from horizontal door Spacers toward the inside of vatkals where, the d—meet.The chaw win Then drop W < lowest position for a snug fit Nan Oude Tmliev Guide Railed rDmbl—bolt-thnogh I.Pricif f Ir,us with Guide Red.Wted We In each leg allows "A' Sha 7'IF.b r.r-Wn,-—1 amounts - economy WO pWjswIng actme, Fah lateral and vertIcal adjustments.Boils and note kabed ft—16 accost . o. 1/2'x 9'offset bolt adjust "c Included. with cr.1de rail tuadaks. ft bottom door to Id the door in place wind go. Generous—tical adjustment plate Is accommodates a—fiely of door materials. SLIDER BOTTOM RAIL GUIDES DETAIL �.OF N9 EP" X �� 1. ��f � f- X; 07/19/2023 SPLIT SLIDING DOOR TRIM DETAIL BELOW TRUSS MARRIER/TRUSS (I.S' 5.5'A-9%mm) (15- 5.7 AM�Wm) TRACK MAIL BELOW TRuss TRACK DETAR.BELow TRuss Cm .10 T,.,k�pp. m Tmk M T'lld�d GABLE END Supgo DOOR EAYE$ME Sm Do 2a I,.& C-IN Jamb Tdm J..b Tdm (T, Dslng) (T. �mg) OF NE�V sE SPLIT SLIDING DOOR TRIm DETAIL AT TRUss/TRUSS CARRIER 07/19/2023 (1.5-x.5'Algle W, G-8D EAVE SME TwOmaTM TwK Dam M T-k and o..v M Tr.,*Md (1.5-x 5.5-ADgle tHm) N4 X)—d J..b Tlh hmb Tlim (T. (To ........... .......... PANEL DUMLS Panel Rib Conflict Adjustment(Eave Wall&Roof Panels) Gable Wall Panel Typ Cutoff Lengths Panel Run(including overhang for Roof Panels) PanelRun Length(ft) Action Length(ft) Action 3/12 24 None 62 Shift First Panel 1-1/2"Away From Corner ----------------------- 26 Shift First Panel 1-1/2"Away From Corner 64 Cut 1-1/2"Off First Panel Make sure you IC--- 38" 28 Cut 1-1/2"Off First Panel 66 None fasten the panels 30 None 68 Shift First Panel 1-1/2"Away From Corner plumb up and 9 1/2"T—------I---------------i 32 Shift First Panel 1-1/2"Away From Corner 70 Cut 1-1/2"Off First Panel down so your Q) 34 Cut 1-1/2"Off First Panel 72 None computer 36 None 74 Shift First Panel 1-1/2"Away From Corner generated 38 Shift First Panel 1-1/2"Away From Corner 76 Cut 1-1/2"Off First Panel measurements remain accurate. 40 Cut 1-1/2"Off First Panel 78 None 42 None 80 Shift First Panel 1-1/2"Away From Corner 44 Shift First Panel 1-1/2"Away From Corner 82 Cut 1-1/2"Off First Panel ME ED�(M C3 0� 46 Cut 1-1/2"Off First Panel 84 None 4/12 48 None 86 Shift First Panel 1-1/2"Away From Corner 38" 50 Shift First Panel 1-1/2"Away From Corner 88 Cut 1-1/2"Off First Panel 52 Cut 1-1/2"Off First Panel 90 None 54 None 92 Shift First Panel 1-1/2"Away From Corner 12-11 56 Shift First Panel 1-1/2"Away From Corner 94 Cut 1-1/2"Off First Panel 58 Cut 1-1/2"Off First Panel 96 None 60 None 98 Shift First Panel 1-1/2"Away From Corner .9P 100 Cut 1-1/2"Off First Panel Panel Rib Conflict Adjustment(Gable Wall) Length(ft) Action Length(ft) Action 24 None 42 None 5/12 26 Cut 25"Off Corner Panels 44 Cut 25"Off Corner Panels I<--- 38" 28 Cut 13"Off Corner Panels 46 Cut 13"Off Corner Panels 30 None 48 None 15-13/ 32 Cut 25"Off Corner Panels 50 Cut 25"Off Corner Panels 16" 34 Cut 13"Off Corner Panels 52 Cut 13"Off Corner Panels i7q 36 None 54 None 38 Cut 25"Off Corner Panels 56 Cut 25"Off Corner Panels V NEW, 0 tf 40 Cut 13"Off Corner Panels 58 Cut 13"Off Corner Panels 0 60 None FOR:Intemiediate Supper Anti!Syphon Groove 6/12 ­145,"ScrewS 38" 07/19/2023 19.. V 0 X Notes- 1-1/2"Screws for Siding,Roofing,&Trim 2"Screws for Ridge Cup FOR:Eave,Ridge,and End;aps 1-vp Screws Anti-Syphon Groove Starting Panel Next Panel Overlays the Starting Panel Cross Section View L Steel Trim A ccessorles For Reference Only - Not To Scale Wafl Trim Accessories Roof Trim Accessories 14" 9 Ratgaurd F&JTrIm Rid e Cap 3.5" .75" 2.675" 2.675 ---------------- S-1/2"Corner/Gable Trim .75, Snow Guard ........ . .....- 875" 01% 1.25" Angle Trim/Fascia . .......... Skirt Board Pr.o.tector L1,25" 1..8 25" ---------- 4.125" varies In Lengths -.81 1.25' --- .81251, From: 1 Rqo.f Eclg� I 7.5" i 4.51- ................ 2" 1.625" Interior Wall Trim Accessories Z-BAR/WAINSCOTING ................. S-1/2"Inside Corner Trim of NEN, Finished Side 4-----�-------------- .8125" 4 125" EP 7 .8125" 4.125" ................. .8125" 10168 07/19/2023 ........... ........ ......... ....... Steel Trim Accessories For Reference Only - Not To Scale Porch Trim A ccessorles Door Trim Accessories .......... PostCapsFront ------ h J7C-..annel Porch Flashing -O*ve*r*h*ead DoorTrim- 2.5" 2.125" 2.75" .25 r i��7 5 J., J...2-75" I Varies In Size 75" 8.375" Drip Cap Side W*all ............... 2 125" Varies In Size 4" .......... 5" 8.375" Post Caps Back .75" 1. Sliding Door Trim Accessories 5 ........... our Track Cover Varies In Size Jamb Trim .................... Porch Trim 1 5.S 7" oV Nek,,, OVEP;i I .8r, ........................ 5............... ............ 3.5 �73T' v 07/19/2023 SEAN:681122 COMN Ply: 1 Job Number: 2302479 Cust:R2193 JRef:1XRJ21930004 T5 FROM:WS Qty: 6 F&F-NORTH FORK 30 DIY POLE DrwNo: 201.23.1536.41477 Truss Label: T1 �Jy I BM 07120/2023 L 87"15 510"" 23'11 31'9" 87"15 7 2"9 77"9 87"15 1 =6X10 C 12 4 p 3X4 ,3X4 v B D i� in 4X1A2(D1) 4X12(D1) a•s E H G F I 4X6 =H0510 =4X6 8 30' 10''1 11'013 6'11"3 2'8"3 11'0"13 r 11'0"13 + 18 20,8"3T 31,9" 't Loading Criteria(psf) Wind Criteria Snow Criteria (Pg,Pf in PSF) Defl/CSI Criteria ♦Maximum Reactions(Ibs) TCLL: 32.00 Wind Std: ASCE 7-16 Pg:32.0 Ct 1.1 CAT:II PP Deflection in loc Udefl U# Gravity Non-Gravity TCDL: 15.00 Speed: 126 mph Pf:24.6 Ce:1.0 VERT(LL): 0.283 F 999 240 Loc R+ /R- /Rh /Rw /U /RL BCLL: 0.00 Enclosure:Part.Enc. Lu: - Cs:1.00 VERT(CL): 0.467 F 770 240 A 3352 /- /- /1585 /141 /108 BCDL: 5.00 Risk Category:II Snow Duration:1.15 HORZ(LL): 0.096 E - - 1 3352 /- /- /1585 /141 /- EXP:B Kzt:NA Des Ld: 52.00 HORZ(TL): 0.158E Wind reactions based on MWFRS Mean Height:15.07 ft A Br Wid=8.5 Min Re 4.0 Truss NCBCLL: 10.00 TCDL:9.0 psf Building Code: Creep Factor:2.0 9 q= (Truss) Soffit: 2.00IRC 2018 Max TC CSI: 0.617 1 Brg Wid=8.5 Min Req=4.0(Truss) BCDL:3.0 psf Bearings A&I are a rigid surface. Load Duration:1.15 MWFRS Parallel Dist:0 to h/2 TPI Std: 2014 Max BC CSI: 0.987 Re Fac:No Max Web CSI: 0.421 Members not listed have forces less than 375# Spacing:48.0" C&C Dist a:3.17 ft P Loc.from endwall:Any FT/RT:20(0)/10(0) Maximum Top Chord Forces Per Ply(lbs) Chords Tens.Comp. Chords Tens. Comp. GCpi:0.55 Plate Type(s): Wind Duration:1.33 WAVE,HS VIEW Ver:22.02.01.1115.14 A-B '1103-7313 C-D 1051 -6344 Lumber B-C 1053-6344 D-E 1104 -7314 Top chord:2x6 SP 2400f-2.0E; Bot chord:2x6 SP#1; Maximum Bot Chord Forces Per Ply(Ibs) Webs:2x4 SP#2; Chords Tens.Comp. Chords Tens. Comp. Purlins A-H 6740 -944 G-F 4693 -568 H-G 4693 -568 F-E 6741 -906 In lieu of structural panels or rigid ceiling use purlins to laterally brace chords as follows: b WForces Per PI Maximum e Chord Spacing(in oc) Start(ft) End(ft) Maxy(lbs ) TC 24 0.88 15.88 Webs Tens.Comp. Webs Tens. Comp. TC 24 15.88 30.88 BC 120 0.00 31.75 B-H 373-1455 C-F 1717 220 Apply purlins to any chords above or below fillers H-C 1717 -220 F-D 373 -1455 at 24"OC unless shown otherwise above. Loading Bottom chord checked for 10.00 psf non-concurrent live load. Truss designed for unbalanced snow loads. Wind13F NEWyo Wind loads based on MWFRS with additional C&C C� �Q Q Hro ;,, member design. Left and right cantilevers are exposed to wind Wind loading based on both gable and hip roof types. a jj �ux2ztlu `r 105603 07/21/2023 **WARNING** READ AND FOLLOW ALL NOTES ON THIS DRAWING! '*IMPORTANT`* FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS Trusses require extreme care in fabricating,handling shipping,installing and bracing. Refer to and follow the latest edition of BCSI(Building Component Safety Information,b TPI and SBCA) r safety practices rior to performing these functions. Installers shall provide tempora bracing per BCSI.Unless noted o�herwise,top chord shall have properly attached structural sheathing and bottom chord shall have a properly attached rigid ceiling Locations shown for ermanent lateral restraint of webs shall have continuous lateral restraint((CLR),installed with diagonal bracing installed on the CLR per SCSI sections B3,B7,or B10,as applicable. A ply plates to each face oAruss and position as shown above and or)the Joint Details, unless noted otherwise. Refer to drawings 160A-L for standard plate positions.Refer to job's General ALPINE Notes page for additional information. Alpine,a division of ITW Buildin$g�Components Group Inc.shall not be responsible for any deviation from this drawing,any,failure to build the a,,,,,,,mw,U,,, truss in conformance with ANSI/TPI 1, or for handling, shipping,.installation and bracing of trusses. A seal on this drawin or cover pa a 155 Hadem Ave listing this drawin indicates acceptance of professional en sneering responsibility solely-for the design shown.The suitability and use of this drawing for any stgr'ucture is the responsibility of the BuildinggDesigner per ANSI/TPI 1 Sec.2. North Building,4th Floor For more information see these web sites:Alpine:al ineitw.com;TPI:t inst.or ;SBCA:sbcacom onents.com•ICC:iccsafe.or •AWC:awc.org Glenview,IL 60025 SEAN:681134 GABL Ply: 1 Job Number: 2302479 Cust:R 2193 JRef:1XRJ21930004 T6 FROM:WS Qty: 2 F&F-NORTH FORK 30 DIY POLE DrwNo: 201.23.1536.44450 Truss Label: T2 �Jy / BM 07/20/2023 8'7"15� 12'4"4 + 15'10"8 + 19'4"12 + 23'1"1 1 25'4"1$ 31'9" 4 2'3"11 3'8"5 3'6"4 3'64 3'8"5 2311 6'4"4 =6X10 =3X10 E=3X10 4 p D F =3X10 Q S =3X10 � C G B H n M pN U =4X1A2(D1) =4X12(1) 4.8 =4X6 =3X10 K=3X10 J Y _ =H0510 =4X6 g P 30 10" 11'0"13 6'11"3 2'8"3 11'0"13 11'0"13 + 18' + 208"3 31'9" Loading Criteria(psf) Wind Criteria Snow Criteria (Pg,Pf in PSF) Defl/CSI Criteria - ♦Maximum Reactions(Ibs) TCLL: 32.00 Wind Std: ASCE 7-16 Pg:32.0 Ct 1.1 CAT:II PP Deflection in loc L/defl L/# Gravity Non-Gravity TCDL: 15.00 Speed: 126 mph Pf:24.6 Ce:1.0 VERT(LL): 0.276 E 999 240 Loc R+ /R- /Rh /Rw /U /RL BCLL: 0.00 Enclosure:Part.Enc. Lu: - Cs:1.00 VERT(CL): 0.430 F 837 240 A 3352 A A /1585 /141 /108 BCDL: 5.00 Risk Category:II Snow Duration:1.15 HORZ(LL): 0.101 1 - - Y 3352 A A /1585 /141 A EXP:B Kzt:NA Mean Height:15.07 ft HORZTL Des Ld: 52.00 ( ) 0.167 1 Wind reactions based on MWFRS A Br Wid=8.5 Min Re 4.0 Truss NCBCLL: 10.00 Building Code: Creep Factor:2.0 9 q= (Truss) TCDL:9.0 psf Y Br Wid=8.5 Min Re 4.0 Truss Soffit: 2.00 BCDL:3.0 psf IRC 2018 Max TC CSI: 0.580 g q= (Truss) Load Duration:1.15 TPI Std: 2014 Max BC CSI: 0.997 Bearings A&li are a rigid surface. MWFRS Parallel Dist:0 to h12 Members not listed have forces less than 375# Spacing:48.0" C&C Dist a:3.17 It Rep Fac:No Max Web CSI: 0.597 Maximum Top Chord Forces Per Ply(Ibs) Loc.from endwall:Any FT/RT:20(0)/10(0) Chords Tens.Comp. Chords Tens. Comp. GCpi:0.55 Plate Type(s): Wind Duration:1.33 WAVE,HS VIEW Ver.22.02.01.1115.14 A-B 1088-7384 E-F 602 -4233 Lumber Additional Notes B-C 961 -6397 F-G 924 -5975 C-D 926-5975 G-H 959 -6398 Top chord:2x6 SP 2400f-2.OE; Truss has been designed for vertical in-plane loads D-E 599-4232 H-1 1089 -7385 Bot chord:2x6 SP#1; only.Any IateraVhorizontal wind loads shall be Webs:2x4 SP#2; transferred into the roof and ceiling diaphragms. Connection and design of these systems is the Maximum Bot Chord Forces Per Ply(Ibs) ) Plating Notes responsibility of the Building Designer in accordance Chords Tens.Comp. Chords Tens. Comp. All plates are 3X4 except as noted. with ANSI/TPI 1. A-L 6817 -956 K-J 5489 -761 Handling stresses not considered for plates.Handling L-K 5489 -761 J-1 6817 -919 of this truss requires special care by truss manufacturer and installation contractor to prevent Maximum Web Forces Per Ply(Ibs) plate damage. Webs Tens.Comp. Webs Tens. Comp. Purlins C-L 235-1042 E-J 1454 -124 In lieu of structural panels or rigid ceiling use purlins L-E 1453 -124 J-G 235 -1041 to laterally brace chords as follows: Chord Spacing(in oc) Start(ft) End(ft) TC 24 0.88 15.88 Maximum Gable Forces Per Ply(lbs) Gables Tens.Comp. Gables Tens. Com TC 24 15.88 30.88 p• p• BC 120 0.00 31.75 B-M 230 -764 Q-S 439 -1819 Apply purlins to any chords above or below fillers P��'of NEW rO M-0 204 -684 S-F 420 -1662 at 24"OC unless shown otherwise above. D-Q 419-1662 U-W 204 -684 Loading Gj�\��Q f DE�q�� O-U 198 -646 W-H 230 -764 Bottom chord checked for 10.00 psf non-concurrent * C�• yy live load. Truss designed for unbalanced snow loads. Wind �, Z Wind loads based on MWFRS with additional C&C 105603 member design. p P Left and right cantilevers are exposed to wind RoFj - Wind loading based on both gable and hip roof types. 07/21/2023 **WARNING** READ AND FOLLOW ALL NOTES ON THIS DRAWING! **IMPORTANT** FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERS Trusses require extreme care in fabricating,handling shipping,installing and bracing. Refer to and follow the latest edition of BCSI(Building Component Safety Information,by TPI and SBCA) r safety practices prior to performing these functions. Installers shall provide tempora bracing per BCSI.Unless noted otherwise,top chord shall have properly attached structural sheathingand bottom chord shall have a properly attached rigid ceiling Locations shown forpermanent lateral restraint of webs shall have continuous lteral restraint(CLR),installed with diagonal bracing installed on the CLR per BCSI sections B3,B7,or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer to drawings 160A-Z for standard plate positions.Refer to job's General ALPINE Notes page for additional information. Alpine,a division of ITW Buildin$Components Group Inc.shall not be responsible for any deviation from this drawing,any failure to build the * ,,cow* truss in conformance with ANSI/TPI 1, or for handling, shipping,,installation and bracingof trusses. A seal on this drawing or cover paTe 155 Harlem Ave listing this drawing indicates acceptance of professional en rneering responsibility solelyor the design shown.The suitability and use of this North Building,drawing for any structure is the responsibility of the BuildinggDesigner perANSI/TPI 1 Sec.2. g,4th Floor For more information see these web sites:Alpine:al ineitw.com;TPI:t inst.or •SBCA:sbcacom onents.com;ICC:iccsafe.or AWC:awc.org Glenview,IL 60025