Loading...
HomeMy WebLinkAbout05/22/2023 Elizabeth Thompson,R.A. Chairperson %5f F04/( Town Hall Annex Anne Surchin,R.A. , 54375 Route 25 Reynolds duPont,Jr. PO Box 1179 Ronald McGreevy Southold,NY 11971 Umberto Fasolino ' Fax(631)765-6641 Meryl Kramer,AIA,LEED AP N1 c " 0 Telephone: (631)765-1892 Jim Fredriksson www.southoldtownny.gov Frank Buonaiuto TOWN OF SOUTHOLD ARCHITECTURAL REVIEW COMMITTEE MINUTES THURSDAY,MAY 22,2023 at 4:OOPM TOWN HALL ANNEX CONFERENCE ROOM AND VIA ZOOM BASED WEBINAR Members Present: Elizabeth Thompson,Chairperson;Ron McGreevy;Meryl Kramer;Mara Cerezo,Town Planner; and Elizabeth Cantrell,Secretary were present. The minutes for the meeting of March 9,2023 were approved. Introduction• All applicants will give a presentation consisting of drawings, exterior materials samples and other information required by the Planning Department to the Committee. The Committee will ask questions and make suggestions as part of a general discussion with each applicant. Final recommendations from the ARC will be presented to the Planning Board in the ARC Meeting Minutes,and be made part of the Planning file for that application. The Planning Board will consider these recommendations,together with all comments from other agencies, and provide the applicant with a comprehensive written list of its requested revisions. New Site Plan Application: PECONIC WATER SPORTS SCTM#:1000-55-5-9.1 This Site Plan application is for the proposed creation of a two-story,9,652sq.ft. marine sales, service,and storage facility with parking stalls on a 37,123sq.ft. parcel in the General Business "B" Zoning District located at 46770 Route 48,Southold. The Committee first met with the applicants on March 9,2023 with an initial proposal. At that time the Committee recommended modifications to the proposed project and requested that the applicant return to allow the Committee to review the revised plans. Robert Stromski of Stromski Architects P.C. and Martin Finnegan,Esq. presented the revised proposed site plan and design drawings for Committee review. Following their presentation, Committee members discussed the proposed with the applicants which led to the following comments: - In addition to the ARC comments made at the March 9, 2023 meeting, please see the additional comments below. Page 1 of 2 Overall footprint&bulk have been reduced,and are more acceptable. - Building front setback is increased by 4.7ft. - Peak roof height is lowered by 6ft. - Eave height is lowered by 6'-10" - Total GSF is reduced by 681 sf. (from 10,333 sf. to 9,652 sf.) - Horizontal lap siding is preferable to metal siding,and is recommended for the front and both east and west sides of the structure as drawn, (accompanying note should be revised). A general simplifying of architectural detailing is recommended including: - Replacing all stone veneer with stucco - Deletion of decorative shutters - Removal of west garage door decals - Simplified square column capital and plinth on stucco pedestal Landscaping is improved, except ARC recommends deletion of infrequently used concrete over-runs,to increase permeable surface. Lighting and signage are acceptable. The Architectural Review Committee approves the revised project plans. Motion made and seconded. All Ayes. 4 �r EIi )e!thM_ntrell,, A.R.C.Secretary Page 2 of 2